RAPID SOFTWARE PROCESS ASSESSMENT TO PROMOTE INNOVATION IN SMES. Giovanni A. Cignoni 1

Size: px
Start display at page:

Download "RAPID SOFTWARE PROCESS ASSESSMENT TO PROMOTE INNOVATION IN SMES. Giovanni A. Cignoni 1"

Transcription

1 RAPID SOFTWARE PROCESS ASSESSMENT TO PROMOTE INNOVATION IN SMES Giovanni A. Cignoni 1 Abstract Products and processes innovation is a key-topic for the competitiveness of small and medium enterprises operating in the Information Technology field. The ESPINODE network links 18 European projects with the common goals of diffusing Software Process Improvement concepts and supporting the enterprises already involved in improvement experiments. This paper describes the methodology developed by the TOPS project, the ESPINODE for Central Italy, to use rapid software process assessment as a way to promote innovation. Rapid assessments are offered as a free service to small and medium enterprises that join TOPS as target enterprises. The offer of an assessment is a powerful way to both diffuse software best practices and propose actual improvement paths to the enterprises. Assessment data are collected by TOPS for a survey about software process maturity in Italy: the paper reports the first results of this survey. 1. Introduction Information Technology will be one of the key factors driving progress in the 21st century it will transform the way we live, learn, work, and play. Advances in computing and communications technology will create a new infrastructure for business, scientific research, and social interaction. As indicated in the findings of the President s Information Technology Advisory Committee (PI- TAC) [7], research in the Information Technology (IT) field is considered of fundamental importance for the progress of an industrial economy. At the end of its work, the committee suggested the US President to strongly increase the funding for research in the IT field for the next five years and the increase is measured in billion of dollars. 1 CESVIT SpA TOPS, ESPRIT Project no ; cignoni@cesvit.it

2 But to actually foster such progress, research should be coupled with industrial innovation. Excellent research results, to become widely spread technologies and provide all the benefits cited in the PITAC report, have to be transferred to competitive enterprises. In this paper we present how, within the context of an initiative funded by the European Commission, we use a rapid software process assessment methodology to promote innovation in IT Small and Medium Enterprises (SMEs). Rapid assessment meetings are offered as a free service to enterprises. The offer of a free assessment is a way to both diffuse process quality concepts and propose actual improvement paths to the enterprises. Moreover, assessment data are collected and used for a survey about software process maturity in Italy: here we report the first results of this survey. This work is part of the ESPINODE initiative [4] funded by the European Commission within the ESPRIT-ESSI programme. The ESPINODE network links a set of 18 projects (17 in Europe plus one in Israel). All projects aim to diffuse Software Best Practices (SBP) and Software Process Improvement (SPI) concepts and methodologies, and to support enterprises already involved in Process Improvement Experiments (PIEs) funded by the ESPRIT-ESSI programme. The ESPINODE for Central Italy is TOPS (TOPS stands for Toward Organised Processes in SMEs) [11]. Section 2 describes specific goals and characteristics of TOPS. Section 3 presents the methodology that TOPS developed for rapid software process assessment. Section 4 collects the results of the first assessments we made; they depict the status of software process maturity in Central Italy. Section 5 draws some conclusions about this experience, both regarding the assessed average maturity level and the results in terms of effective promotion of innovation initiatives on the part of the enterprises. 2. TOPS, the ESPINODE for Central Italy The TOPS ESPINODE derives from a proposal made by CESVIT in response to a call of the European Commission. CESVIT SpA is the Agency for High Technology in Tuscany: its mission is to promote technological innovation in order to improve the competitiveness of the Region. Within CESVIT, the Centre for Software Quality has specific competencies in the fields of software engineering and quality control applied to IT industries. CESVIT provides services concerning technical advising, technology transfer, training and assistance in preparing proposals for European and national calls for project funding.

3 TOPS is the ESPINODE for Central Italy, providing services to the enterprises located in Tuscany, Liguria, Latium, Umbria and Marche. CESVIT is the main contractor of the project and Innova SRL is the partner for the zone of Rome. The target audience to which TOPS offers its services includes the following entities [14]: attached PIEs, enterprises that have on-going SPI projects funded within the ESPRIT-ESSI initiative; such enterprises have in TOPS the reference ESPINODE; other PIEs, enterprises that have performed or completed SPI experiments and are willing to verify and disseminate the results of the experiments or to give continuity to their SPI activities; regional industry, enterprises that are interested in improving their software process and that are looking for financial support from the European Commission or from national or local programmes or funds; ESPINODE network, the European network made by all the ESPINODEs, which acts as a mean to share information so as to identify and propose European initiatives that provide support to IT industry. TOPS activities targeted to PIEs generally comprehend technical advising and training, support to the dissemination, and assistance in the relationship with the European Commission. As for all the ESPINODEs, the generic goal of TOPS towards regional industry not already involved in PIEs is to promote awareness regarding the benefits of SPI. More specifically, TOPS activities regarding regional industry comprehends: public events, TOPS organises awareness events about SPI and SBP benefits, training events aiming to presents methodologies for process assessment and improvement as well as techniques and tools for software development, and information events to present European initiatives to support innovation; direct contacts, TOPS asks the regional industries to join the project as target enterprises to receive a visit for a rapid assessment of their software process; the assessment serves both as an awareness action and as a practical way to identify and plan specific actions to improve software processes. Other activities comprehend demonstrations of software tools, voice and telematic help desk, web services and traditional publications. However, with respect to regional industry, the specific char-

4 acteristic and the main goal of TOPS is contacting the enterprises, first inviting them at public events and then assessing their software processes. Assessment visits are an interesting chance for the enterprises that can try what is a software process assessment. Moreover the assessments will result in a collection of data about the maturity of software processes in Central Italy. From these data and from direct suggestions, which are possible to obtain only in close contacts with the companies, it is possible to identify, with some reasonable confidence, the actual needs of regional industry and use them to direct the future initiatives of the European Commission. Public events and assessment visits are free for the enterprises, i.e. funded by the project. Other services, as specific training courses or advising requests, are out of the TOPS scope and they will follow the market prices. CESVIT guarantees the maximum commitment to meet the enterprise demand. Maximum commitment is also guaranteed in the finding of financing opportunities (at local, national or European level) to support the enterprise in the costs of the requested services. In this perspective, we naturally regard to TOPS as a marketing initiative for CESVIT services. But we also think that services provided out of TOPS scope demonstrate a success of TOPS itself: an enterprise that decides to invest in a SPI activity is the most meaningful result of the project promotion action. 3. Rapid Assessment Methodology The policy of TOPS towards regional industry is contacting the enterprises. To implement such policy, we decided to use awareness and training events as a way to establish the first contact with the enterprises. During the events, we present the TOPS initiative and the opportunity of a rapid software process assessment is offered to the enterprises. The subsequent assessment programme has the following specific results: to stimulate interest in software process assessment and improvement; to contribute to the definition of specific improvement plans; to collect data and statistics about software process maturity in regional industry; to create a database of companies really interested in SPI and SBP.

5 Moreover, in the search for a methodology to use for the rapid assessments, we had to cope with two other requirements: to be compliant with the Regional Industry Survey (RIS); this survey, which is based on a common questionnaire, is an initiative regarding SPI awareness promoted by the ESPINODE network; to stay within project budget; we wanted to perform a considerable number of assessment, both to obtain a wide awareness action and to have a good statistical sample, therefore single assessments had not to be too expensive. In search for a good compromise between accurate results and low costs, we decided to develop our own methodology. Pre-existent tools, such as, for instance, Bootcheck [3], or Process Advisor [8], need a full day or more to perform an assessment, while we want to stay in half a day and have time for explaining and discussing SBP and SPI concepts with the enterprise people. Our methodology is based on a two parts questionnaire to be used for the assessment. Questionnaire is compiled by TOPS experts that interview one or more enterprise representatives, but Part 1 (QP1) is made by phone while Part 2 (QP2) is compiled within a direct audit meeting. The Questionnaire is public and it is available on the TOPS Web site [13] Assessment questionnaires and tools QP1 is to be made by phone: we contact the enterprise asking to answer some preliminary questions. QP1 is organised in 5 sections. Sections 1 and 2 collect general data about the enterprise and the person responsible for the questionnaire. Section 3 defines the enterprise characteristics such as company type, dimensions, turnover, and so on. Section 4 and 5 are specific of the RIS. Section 3 assesses enterprise goals for the near future and awareness about SPI methodologies and benefits. Section 5 evaluates the knowledge of European initiatives to support enterprises in their SPI experiments. For QP1, answers are predefined and the enterprise has to pick the most applicable one. QP2 is the base for the assessment and is compiled during the meeting with the enterprise. It is organised in three sections. Section 1 is aimed to collect some general data about the software development unit such as dimensions, type of life-cycle, type of software products, and so on. Section 2 of QP2 assesses the organisational and technological characteristics of the software development unit. While in some cases questions regard issues that are considered SPB (as, for instance, project planning or risk evaluation), in fact the goal of this section is to evaluate how much

6 the enterprise is well organised and technologically mature. In the analysis of the assessment results, we do not use these data to define the software process maturity; instead we use them to give an evaluation of the improvement capability of the enterprise. A well defined organisation is a strong advantage in the enactment of a software process improvement action. From another point of view, technology is often a factor of change: for instance when the introduction of a development methodology pushes forward the formalisation of the development process. Section 3 of QP2 finally is the true software process assessment. Assessment is made with respect to three specific processes: requirement analysis, verification and test, and joint review. With respect to the ISO TR standard [6] they correspond to the processes ENG.2 (develop software requirements), ENG.5 (integrate and test software), and CUS.4 (perform joint audits and reviews). We restricted the assessment to these processes mainly for time constraints: we want to have time for discussion rather than to submit the enterprise to a long and rapid succession of questions. We also want to avoid the risk of difficult topics, as for instance configuration management, that may need explanation diverting the focus of the meeting. Moreover, the chosen processes, because they directly impact product quality and customer satisfaction, are often naturally seen as the ones in which improvement is more important and then they are the most suitable for small improvement projects. In this sense, we privileged the use of the assessment meeting as a mean to pick out improvement opportunities and suggest a consequent experiment. For each specific process there are five questions, each one corresponds to a maturity level and summarises the best practices of that level i.e. the generic practices of the ISO standard. Answers to questions of Sections 2 and 3 of QP2 are of yes/no kind, where to answer yes there must exists documentation that proves that processes actually follow the best practice presupposed by the question. Moreover, to the yes/no answer it is added a percentage value. In the yes case, the percentage represents how much the activity is performed as stated; in the no case, percentage represents how much the practice is not stated but de facto applied, for instance by customer request or personal initiative. While yes 100% is the best situation and no 0% the worst, yes 0% (a practice stated but completely disregarded) and no 100% (a praxis established but not formalised) are still possible answers. We use the percentage value to have a measure of the distance between the actual situation and the ideal one. The measure can be interpreted in terms of needs of internal diffusion (yes with low percentages) or needs of procedure formalisation (no with high percentages). Final results of the assessment are expressed in terms of actual maturity level, potential maturity level, and improvement capability. Actual maturity level is defined as in the ISO TR standard

7 and requires full application of stated practices. Potential maturity instead captures the situations in which maturity level is not reached because of lack in procedure application or because it exists as a praxis that demonstrates the awareness of the best practice. Finally, improvement capability, also expressed as a score in the range 0-5, depends by percentages (how much close to the full application) and by the organisational and technological levels of the enterprise interpreted as ease factors for improvement. Organisational and technological level are also calculated as assessment results and expressed as a score in the range 0-5, but they are functional to improvement capability and they are not related to the software process maturity level. To support the analysis and the presentation of the survey results, we set-up a database in which data from questionnaires are collected. The database is used to perform queries and to support the data presentation via the TOPS Web site. To aid the assessment enactment we developed a tool based on an MS Excel spreadsheet. The spreadsheet is used to collect data and to calculate results directly during the assessment meeting. The tool is free and it is available for download from the TOPS Web site Contact and meet the enterprise We think that process assessment based on a self-compiled questionnaire may lead to wrong results. When the questionnaire regards process quality, i.e. the quality of the way in which people are used to work, the self-compilation often results in a lack of realism reflecting a good or bad vision closely related to the feeling of the compiler. Using self-compilation at the end of a workshop about SPI and SBP, while it is a way to perform many assessments in one time, it is not a solution to improve accuracy. The event, instead of being a guide to questionnaire compilation, in many cases works as an amplifier of feelings, resulting in very bad or very good visions. Last, using selfcompilation we lose the opportunity to establish a true contact with the enterprise. Then, we decided that TOPS skilled professionals should compile the questionnaire by interviewing the enterprises, explaining the questions and discussing the answers. In spite of its higher cost, this technique is more accurate. Moreover it is less tedious and more useful for the enterprise, which has the opportunity to meet expert people without any direct cost. We use awareness and training events organised within TOPS as a mean to contact regional industries potentially interested in the target enterprise role. Even if event participation is for free, an enterprise invest some of their person/time to participate. This is an indicator that the enterprise is potentially interested in a future SPI experiment.

8 Then we contact by phone the enterprise for QP1 compilation. QP1 is an occasion to talk about SPI and SBP and serves also to enterprise selection. TOPS funds are limited and then we want to accurately aim our effort towards enterprises. We do not want to bother enterprises with initiatives they are not interested in: the assessment has to be an effective opportunity for their business. The acceptance of the target enterprise role must be formally signed. Formally joining the project, the enterprise accepts that assessment results will be published in aggregate form. While this is in the interest of the enterprise because it is a way to make some benchmarking, it is a privacy issue that needs a clear agreement. To prepare the meeting with the enterprise we have to select the TOPS professional that is more skilled to perform that assessment. In this perspective data previously collected by QP1 are a useful guide to address specific needs of the enterprise and match them with the right skilled professional. More generally the TOPS professionals that meet the enterprises should comply with the following requirements: expertise in software engineering and software process; non trivial experience in software process assessment; good knowledge of ISO 9000 & C (an inevitable hot topic). On the part of the enterprise, we require that the software development manager or quality system manager participates to the assessment. We also suggest the attendance of people involved in software development as well as people involved in customer/supplier relationships, as, for instance, project managers and salesmen. 4. First Results By the end of the project in May 2000, TOPS plans to collect at least 100 QP1 to be used for RIS and 50 rapid assessment based on QP2. Here we present some general considerations about the results of the first half of our task: 50 QP1 and 25 QP2. Full aggregate data and analysis are available as project technical reports and regularly updated on the TOPS Web site [10, 12].

9 4.1. QP1: Regional Industry Survey The large majority of enterprises are very small both in terms of employed people and turnover. This reflects the typical situation of central Italy enterprises and, in fact, TOPS has SMEs as a specific target audience. The geographical distribution of the collected questionnaires reflects the localisation of CESVIT (in Florence) and Innova (in Rome), with the majority of the interviewed enterprises located in Tuscany, Latium and Liguria. For the end of the survey we plan to obtain a more uniform distribution over the area assigned to TOPS. It is remarkable that the large majority of the interviewed enterprises has expansion (60%) or innovation (20%) as their goals for the near future. On the other part, very few of them want to make their processes more efficient (10%) or consolidate their market position (10%). This depicts a situation in which SPI can rely on very few resources: all enterprise efforts are directed to new targets and not towards consolidation and improvement of the already reached ones. As a natural consequence major barriers to SPI are costs and resources (78%); noticeably very few enterprises do not invest in SPI because of distrust in its benefits (7%). When and where some SPI initiative is performed (46%), the most pursued goal is efficiency (61%). consolidation 10% efficiency 10% innovation 20% expansion 60% competences 15% resources 37% distrust 7% costs 41% Enterprise goals for the near future Barriers to investments in SPI activities Figure 1 In conclusion, it seems that enterprises, probably as a consequence of Euro and Y2K, have lot of business opportunities and logically want to exploit them as much as possible. Quality is put in background and SPI is principally viewed as a way to be more profitable. Figure 1 shows data about enterprise goals for the near future and general barriers to investments in SPI activities.

10 A negative remark regards the poor awareness of the ESPINODE initiative. Enterprises are interested in ESPINODE services but do not know the existence of the network nor of the ESSI initiative (76%). In other words, ESPINODEs have to introduce themselves and the whole programme QP2: Rapid Assessment As for QP1, the large majority of assessed enterprises are very small both in terms of employed people (88% has less than 100 employees) and turnover (58% does not reach a turnover of 1 million Euro). This partially explains the poor score achieved as average actual maturity level (0.44): small enterprises with few people do not feel the need of internal organisation and process control. Moreover, many of them rely on internal or local customers (40%), a situation that presuppose an elevate grade of confidence often based on personal relations. Enterprises are not pushed to invest in solutions to improve customer confidence by enterprise organisation and quality control: 50% of assessed enterprises does not have at all a quality system and another 20% had only approached its definition. Generally enterprises obtain better evaluations in organisational than in technological aspects (average organisational level is 2.62 where average technological level is 1.82). Going to the details, poor technology evaluations mainly depend by the scarce adoption of tools for project management, version and configuration control, test automation and software measurement. In many cases, regarding pure product technology, enterprises are strongly committed in innovation, for instance about RAD and CASE tools (76%). So we have to read the result not as poor technology at all, but as poor technology in support of process and quality control. As previously anticipated, results about actual maturity are very poor. The very large majority (80%) of enterprises scores a 0 level: they have no documentation evidence that activities are performed. Average value is 0.44 and the maximum scored level is 3. Potential maturity scores, while not exciting, are better, with an average value of 1.67 and a maximum score of This reflects a usual situation: there is a general knowledge of SBP but, instead as being received as enterprise standards, they are applied by demand, for instance in the most critical projects. To tune our assessment tool, 5 of the 25 enterprises we assessed were selected between enterprises that had a certified quality system and already had some rigorous SPI experience, for instance in an ESSI-PIE or in a SPIRE experiment [9]. Some of them already received a formal assessment using

11 CMM or Bootstrap. In these cases our assessment showed an average error of ± 0.18 in terms of potential maturity level. 5 4 All enterprises Average actual maturity levels Selected enterprises ENG.2 ENG.5 CUS.4 Overall Figure 2 Because the maturity scores of the selected enterprises are far better that the average, we use these results to stimulate the regional industry: while the average is low there are some excellent performers that demonstrate that SPI is a valuable investment. Figure 2 and 3 show respectively the assessed actual and potential average maturity levels. 5 4 Average potential maturity levels All enterprises Selected enterprises ENG.2 ENG.5 CUS.4 Overall Figure 3

12 5. Conclusions The action that TOPS is performing with regional industry is very interesting because it allow us to really meet the enterprises. The choice of three levels of contact with enterprises (events, regional industry survey and rapid assessment) is very promising both for the aim of providing useful services to enterprises and for the target of surveying SPI application in regional industry. In the development of questionnaire we followed the ISO standard: results are expressed in maturity levels, the audit is performed with respect to selected base practices and assessment is based on the application of generic practices. As a rapid assessment, our methodology is necessarily approximate. Due to time constraints we have to limit the scope and the accuracy of the assessment. We want to perform the assessment meeting in half a day and we need time for discussion. More in detail, declared limitations of our assessment are: scope of the assessment is limited to three processes belonging to two of the five ISO process categories; accuracy of the assessment is limited to the answers given by the enterprises; in other words, we do not look for sources of evidence or probe for process management indicators. Moreover, it is possible to map QP2 answers in the ones of the SBP Questionnaire [2] realised within the ESPRIT-ESSI programme. In this perspective results of our assessments can be directly used in the survey promoted by the European Commission. From the survey data and from experience gathered in the many meetings with the enterprises, we can identify the following issues that summarise the situation about SPI in the TOPS interest area: very small enterprises with local customers do not feel a strong need for process quality, however many enterprises declare expansion as their next future goal; expansion can become a motivation for more organised processes; maturity level is very low, however it is possible to argue that SBP are in general known, even if not applied; in this perspective, awareness and training events may be targeted to the benefit of adoption of SBP as enterprise standards; technologies to support process control are not applied; this can be viewed as another target for training events.

13 The rapid assessment initiative is a clear success: we already have booked assessments nearly to the end of the project. For the CESVIT mission (promote innovation by providing services), TOPS is also a valuable marketing tool. About 35% of the target enterprises asked specific advising services to enact improvement activities identified during the assessment meeting. More than half of them accepted our services, in some cases partially funded by local initiatives to promote innovation. We regard to this as one of the most important achievements of TOPS. After the last project review, encouraged by the European Commission, we are detailing an agreement with the other Italian ESPINODEs, namely AINODE [1] and INSIEME [5], to use our approach for an Italy wide survey. The approach was also suggested to WG4, the working group about marketing solutions inside the ESPINODE network. 6. Acknowledgements First of all, it is mandatory to thank our target enterprises: they made the survey possible. Many people contributed to the development of the rapid assessment methodology, in particular we want to thank Francesco Capanni that also performed many of the assessments as did also Giulio Ravizza, while Maurizio Campanai and Paolo Martinez contributed to the paper with useful suggestions. We must also thank the projects and organisations that co-operated in the realisation of awareness and training events and therefore helped TOPS in the establishment of first contacts with enterprises: we cite here the ISA-EUNET project and its partner ENEA, the LSD project and its main contractor Sogea SCpA, the SPIRE project and its partner Etnoteam SpA, the Mcube project, the MA.IN. project, Sitech SCRL, and Tecnomarche SRL. 7. References [1] AINODE, ESPINODE for Northern Italy, Project Web site at [2] EUROPEAN SOFTWARE INSTITUTE, 1997 Software Best Practice Questionnaire Analysis of Results, ESI Technical Report, available on the Internet at December [3] EUROPEAN SOFTWARE INSTITUTE, BootCheck Overview, Internet document available at es/bootcheck/, October [4] EUROPEAN SYSTEMS AND SOFTWARE INITIATIVE, ESPINODE: A new scheme to implement take-up measures, Internet document available at September [5] INSIEME, ESPINODE for Southern Italy, Project Web site at [6] INTERNATIONAL ORGANISATION FOR STANDARDISATION, ISO/IEC TR 15504:1998 Information technology Software process assessment Parts 1-9, 1998.

14 [7] PRESIDENT S INFORMATION TECHNOLOGY ADVISORY COMMITTEE, Information Technology Research: Investing in Our Future, Report to the President, available on the Internet at February [8] PRESSMAN, R.S., Process Advisor, RSP&A Inc., [9] THE SPIRE PROJECT TEAM, The SPIRE Handbook: Better, Faster, Cheaper Software Development in Small Organisations, The European Commission, December [10] TOPS PROJECT, Analysis of Requests from Local Industry, TOPS Technical Report TR12, available on the Internet at May [11] TOPS PROJECT, ESPINODE for Central Italy, Project Web site at [12] TOPS PROJECT, Report on the Results of Preliminary Assessment of Needs of Local Industry, TOPS Technical Report TR5, available on the Internet at May [13] TOPS PROJECT, SME&SPI Questionnaire, Annex of TOPS Technical Report TR5, available on the Internet at February [14] TOPS PROJECT, TOPS Terms of Reference, TOPS Technical Report TOR, available on the Internet at June 1998.

Introduction to Quality Assessment

Introduction to Quality Assessment Introduction to Quality Assessment EU Twinning Project JO/13/ENP/ST/23 23-27 November 2014 Component 3: Quality and metadata Activity 3.9: Quality Audit I Mrs Giovanna Brancato, Senior Researcher, Head

More information

Measurement Program Implementation Approaches

Measurement Program Implementation Approaches CHAPTER SIX Measurement Program Implementation Approaches Lori Holmes Introduction Measurement processes have become a necessary and important part of today s software organization. To compete in an ever-changing,

More information

Post-accreditation monitoring report: The Chartered Institute of Personnel and Development. June 2007 QCA/07/3407

Post-accreditation monitoring report: The Chartered Institute of Personnel and Development. June 2007 QCA/07/3407 Post-accreditation monitoring report: The Chartered Institute of Personnel and Development June 2007 QCA/07/3407 Contents Executive summary... 4 Accreditation conditions... 4 Observations... 5 Introduction...

More information

Workplace Productivity Snapshot

Workplace Productivity Snapshot Workplace Productivity Snapshot 2 WORKPLACE PRODUCTIVITY SNAPSHOT How To Use This Tool This self-assessment productivity tool is designed for the owners and managers of small-to-medium businesses. It is

More information

Survey report on Nordic initiative for social responsibility using ISO 26000

Survey report on Nordic initiative for social responsibility using ISO 26000 Survey report on Nordic initiative for social responsibility using ISO 26000 2013 Contents SUMMARY... 3 1. INTRODUCTION... 4 1.1 Objective of the survey... 4 1.2 Basic information about the respondents...

More information

Benchmark of controls over IT activities. 2011 Report. ABC Ltd

Benchmark of controls over IT activities. 2011 Report. ABC Ltd www.pwc.com/cy Benchmark of controls over IT activities 2011 Report ABC Ltd... 2012 Scope and approach We wish to provide you with our IT Benchmarking report over IT activities at ABC Ltd (the Company)

More information

FORUM ON TAX ADMINISTRATION

FORUM ON TAX ADMINISTRATION ORGANISATION FOR ECONOMIC CO-OPERATION AND DEVELOPMENT FORUM ON TAX ADMINISTRATION Guidance Note: Guidance for the Standard Audit File Payroll Version 1.0 April 2010 CENTRE FOR TAX POLICY AND ADMINISTRATION

More information

Monitoring and Reporting Drafting Team Monitoring Indicators Justification Document

Monitoring and Reporting Drafting Team Monitoring Indicators Justification Document INSPIRE Infrastructure for Spatial Information in Europe Monitoring and Reporting Drafting Team Monitoring Indicators Justification Document Title Creator Justification document Creation date 2008-12-15

More information

FORUM ON TAX ADMINISTRATION

FORUM ON TAX ADMINISTRATION ORGANISATION FOR ECONOMIC CO-OPERATION AND DEVELOPMENT FORUM ON TAX ADMINISTRATION Guidance Note: Guidance for the Standard Audit File Tax Version 2.0 April 2010 CENTRE FOR TAX POLICY AND ADMINISTRATION

More information

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited PB ASSOCIATES COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN Prepared for PB Associates Quality System: Document Identifier : 153162 Top Energy Final Report Revision : 2 Report Status : Final Date

More information

SPiCE for SPACE: A Process Assessment and Improvement Method for Space Software Development

SPiCE for SPACE: A Process Assessment and Improvement Method for Space Software Development r bulletin 107 august 2001 SPiCE for SPACE: A Process Assessment and Improvement Method for Space Software Development A. Cass, C. Völcker SYNSPACE AG, Binningen, Switzerland L. Winzer, J.M. Carranza Product

More information

17-11-05 ANNEX IV. Scientific programmes and initiatives

17-11-05 ANNEX IV. Scientific programmes and initiatives 17-11-05 ANNEX IV Scientific programmes and initiatives DG TAXUD Pre-feasibility study for an observation system of the External Border of the European Union In this study, the external border will be

More information

Using Administrative Data in the Production of Business Statistics - Member States experiences

Using Administrative Data in the Production of Business Statistics - Member States experiences Using Administrative Data in the Production of Business Statistics - Member States experiences Rome, 18 th and 19 th March 2010 The use of national and international administrative data for the compilation

More information

Exhibition Audit Reporting Standard Of the Circulations Audit Board

Exhibition Audit Reporting Standard Of the Circulations Audit Board Exhibition Audit Reporting Standard Of the Circulations Audit Board Effective from November 30, 2011 November 2011 Release Version 1 Overview The Circulations Audit Board s (CAB) Exhibition Audit verifies

More information

Recruitment and Selection

Recruitment and Selection Recruitment and Selection The recruitment and selection belongs to value added HR Processes. The recruitment is about: the ability of the organization to source new employees, to keep the organization

More information

Software Process in Geant4 an overview

Software Process in Geant4 an overview Software Process in Geant4 an overview Gabriele Cosmo CERN IT/API-SI Gabriele.Cosmo@cern.ch Outline Overview on Software Processes The area of application Life-cycle processes in Geant4 Assessment model

More information

Business Operations. Module Db. Capita s Combined Offer for Business & Enforcement Operations delivers many overarching benefits for TfL:

Business Operations. Module Db. Capita s Combined Offer for Business & Enforcement Operations delivers many overarching benefits for TfL: Module Db Technical Solution Capita s Combined Offer for Business & Enforcement Operations delivers many overarching benefits for TfL: Cost is reduced through greater economies of scale, removal of duplication

More information

ISO/IEC 20000 IT Service Management - Benefits and Requirements for Service Providers and Customers

ISO/IEC 20000 IT Service Management - Benefits and Requirements for Service Providers and Customers ISO/IEC 20000 IT Service Management - Benefits and Requirements for Service Providers and Customers Authors Ralf Buchsein, Manager, KESS DV-Beratung GmbH Klaus Dettmer, Product Manager, iet Solutions GmbH

More information

Evaluation and Integration of Risk Management in CMMI and ISO/IEC 15504

Evaluation and Integration of Risk Management in CMMI and ISO/IEC 15504 Evaluation and Integration of Risk Management in CMMI and ISO/IEC 15504 Dipak Surie, Email : ens03dse@cs.umu.se Computing Science Department Umea University, Umea, Sweden Abstract. During software development,

More information

Procurement Policy Note Use of Cyber Essentials Scheme certification

Procurement Policy Note Use of Cyber Essentials Scheme certification Procurement Policy Note Use of Cyber Essentials Scheme certification Action Note 09/14 25 September 2014 Issue 1. Government is taking steps to further reduce the levels of cyber security risk in its supply

More information

Evaluating Pedagogical Quality: An Integral Part of Course Development Strategy

Evaluating Pedagogical Quality: An Integral Part of Course Development Strategy 1 20th Annual Conference on Distance Teaching and Learning click here -> Evaluating Pedagogical Quality: An Integral Part of Course Development Strategy L Bagley, PhD Head of Learning Research and Development

More information

Aggregation. Is bigger always better?

Aggregation. Is bigger always better? Aggregation Is bigger always better? Contents Purpose of this guidance 1 What is aggregation? 2 When should aggregation be considered? 4 Why use aggregation? 6 Some practical considerations 8 Further reading

More information

Information Management Advice 39 Developing an Information Asset Register

Information Management Advice 39 Developing an Information Asset Register Information Management Advice 39 Developing an Information Asset Register Introduction The amount of information agencies create is continually increasing, and whether your agency is large or small, if

More information

-Blue Print- The Quality Approach towards IT Service Management

-Blue Print- The Quality Approach towards IT Service Management -Blue Print- The Quality Approach towards IT Service Management The Qualification and Certification Program in IT Service Management according to ISO/IEC 20000 TÜV SÜD Akademie GmbH Certification Body

More information

Royal Borough of Kensington and Chelsea. Data Quality Framework. ACE: A Framework for better quality data and performance information

Royal Borough of Kensington and Chelsea. Data Quality Framework. ACE: A Framework for better quality data and performance information Royal Borough of Kensington and Chelsea Data Quality Framework ACE: A Framework for better quality data and performance information March 2010 CONTENTS FOREWORD 2 A CORPORATE FRAMEWORK FOR DATA QUALITY

More information

Area planning and economic development

Area planning and economic development LIFE AMBIENTE ENTE PER LE NUOVE TECNOLOGIE L ENERGIA E L AMBIENTE Area planning and economic development PROVINCIA DI ROVIGO INIZIATIVE IMMOBILIARI INDUSTRIALI UNIVERSITA DEGLI STUDI DI PADOVA COMUNE DI

More information

Stakeholder management and. communication PROJECT ADVISORY. Leadership Series 3

Stakeholder management and. communication PROJECT ADVISORY. Leadership Series 3 /01 PROJECT ADVISORY Stakeholder management and communication Leadership Series 3 kpmg.com/nz About the Leadership Series KPMG s Leadership Series is targeted towards owners of major capital programmes,

More information

ISO 9000 FOR SOFIYifrARE QUALITY SYSTEMS

ISO 9000 FOR SOFIYifrARE QUALITY SYSTEMS ISO 9000 FOR SOFIYifrARE QUALITY SYSTEMS Folkert Rienstra, KEMA, the Netherlands SUMMARY This paper outlines some key elements of quality system standards ISO 9000 and their application to Information

More information

Services Provided. PO Box 5057 Amman 11953, Jordan Telefax: + 962 6 585 12 19 info@shareek-hr.com www.shareek-hr.com

Services Provided. PO Box 5057 Amman 11953, Jordan Telefax: + 962 6 585 12 19 info@shareek-hr.com www.shareek-hr.com At a time when service-oriented businesses are fast outnumbering all other types of businesses, more and more organisations are citing human resources as their number one asset. Having said that, it only

More information

HR Capacity Check. Overview of the Capacity Assessment Tool

HR Capacity Check. Overview of the Capacity Assessment Tool HR Capacity Check Overview of the Capacity Assessment Tool Objectives The e-government of the Human Capacity Resources Check Capacity Check A diagnostic tool to assess the current and future (desired)

More information

Is securing personal information a priority? Reassure clients and achieve data protection compliance with BS 10012

Is securing personal information a priority? Reassure clients and achieve data protection compliance with BS 10012 Is securing personal information a priority? Reassure clients and achieve data protection compliance with BS 10012 Make protection of personal information your priority and safeguard your reputation. Comply

More information

Environmental Certification Services: Certification Manual for Green Squared SM Tile and Installation Material Sustainability

Environmental Certification Services: Certification Manual for Green Squared SM Tile and Installation Material Sustainability SCS Green Squared SM Certification Manual 2011. Scientific Certification Systems Environmental Certification Services: Certification Manual for Green Squared SM Tile and Installation Material Sustainability

More information

Need to protect your information? Take action with BSI s ISO/IEC 27001.

Need to protect your information? Take action with BSI s ISO/IEC 27001. Need to protect your information? Take action with BSI s ISO/IEC 27001. Put sensitive customer and company information in the safe hands of ISO/IEC 27001. You simply can t be too careful when it comes

More information

Western Australian Auditor General s Report. Information Systems Audit Report

Western Australian Auditor General s Report. Information Systems Audit Report Western Australian Auditor General s Report Information Systems Audit Report Report 10 June 2012 Auditor General s Overview The Information Systems Audit Report is tabled each year by my Office. It summarises

More information

Quality Assurance in Higher Education

Quality Assurance in Higher Education III.4.7 Decision-making structures Good practices in decision-making suggest: Strong feeling of identity, commitment and responsibility Recognition based on performance criteria Awareness to improve quality

More information

ECLAC Economic Commission for Latin America and the Caribbean

ECLAC Economic Commission for Latin America and the Caribbean 1 FOR PARTICIPANTS ONLY REFERENCE DOCUMENT DDR/2 22 June 2012 ENGLISH ORIGINAL: SPANISH ECLAC Economic Commission for Latin America and the Caribbean Eleventh meeting of the Executive Committee of the

More information

Strengthening the capabilities of the Department of Statistics in Jordan MISSION REPORT

Strengthening the capabilities of the Department of Statistics in Jordan MISSION REPORT TWINNING CONTRACT JO/13/ENP/ST/23 Strengthening the capabilities of the Department of Statistics in Jordan MISSION REPORT on Activity 3.9: Quality Audit - I Mission carried out by Ms Orietta Luzi, Chief

More information

Guidelines for Addressing Distance and Correspondence Education

Guidelines for Addressing Distance and Correspondence Education Southern Association of Colleges and Schools Commission on Colleges 1866 Southern Lane Decatur, Georgia 30033-4097 Guidelines for Addressing Distance and Correspondence Education A Guide for Evaluators

More information

ICT Indicators. The scope of the ICT function covers all aspects of infrastructure, systems, processes and disciplines required to support:

ICT Indicators. The scope of the ICT function covers all aspects of infrastructure, systems, processes and disciplines required to support: ICT Indicators ICT value for money indicators guidance 1) Introduction This document sets out the indicators for the ICT Function. The guidance below starts by defining the scope of the function and goes

More information

Sustainability & Transferability Plan

Sustainability & Transferability Plan QUALOBSTER SUSTAINABILITY & TRANSFERABILITY PLAN Qualobster Quality Assurance in Learning Organisation in the Banking and Financial Sector in Europe LU/07/LLP-LdV/TOI/156005 Sustainability & Transferability

More information

Benefits of conducting a Project Management Maturity Assessment with PM Academy:

Benefits of conducting a Project Management Maturity Assessment with PM Academy: PROJECT MANAGEMENT MATURITY ASSESSMENT At PM Academy we believe that assessing the maturity of your project is the first step in improving the infrastructure surrounding project management in your organisation.

More information

How to gather and evaluate information

How to gather and evaluate information 09 May 2016 How to gather and evaluate information Chartered Institute of Internal Auditors Information is central to the role of an internal auditor. Gathering and evaluating information is the basic

More information

Guidelines for reporting. for Accompanying Measures. implemented as. Specific Support Action

Guidelines for reporting. for Accompanying Measures. implemented as. Specific Support Action SIXTH FRAMEWORK PROGRAMME Research Infrastructures Action Guidelines for reporting for Accompanying Measures implemented as Specific Support Action This document can be found on the INTERNET at the following

More information

Hertsmere Borough Council. Data Quality Strategy. December 2009 1

Hertsmere Borough Council. Data Quality Strategy. December 2009 1 Hertsmere Borough Council Data Quality Strategy December 2009 1 INTRODUCTION Public services need reliable, accurate and timely information with which to manage services, inform users and account for performance.

More information

BT Contact Centre Efficiency Quick Start Service

BT Contact Centre Efficiency Quick Start Service BT Contact Centre Efficiency Quick Start Service The BT Contact Centre Efficiency (CCE) Quick Start service enables organisations to understand how efficiently their contact centres are performing. It

More information

TRAINING NEEDS ANALYSIS

TRAINING NEEDS ANALYSIS TRAINING NEEDS ANALYSIS WHAT IS A NEEDS ANALYSIS? It is a systematic means of determining what training programs are needed. Specifically, when you conduct a needs analysis, you Gather facts about training

More information

OMCL Network of the Council of Europe QUALITY ASSURANCE DOCUMENT

OMCL Network of the Council of Europe QUALITY ASSURANCE DOCUMENT OMCL Network of the Council of Europe QUALITY ASSURANCE DOCUMENT PA/PH/OMCL (08) 69 3R Full document title and reference Document type VALIDATION OF COMPUTERISED SYSTEMS Legislative basis - CORE DOCUMENT

More information

Preliminary Planning and Integrated Data Collection Handbook U.S. Fish and Wildlife Service

Preliminary Planning and Integrated Data Collection Handbook U.S. Fish and Wildlife Service Preliminary Planning and Integrated Data Collection Handbook Diiviisiion off Polliicy and Diirecttiives Managementt Preliminary Planning and Integrated Data Collection Handbook U.S. Fish and Wildlife

More information

Northwestern Michigan College Supervisor: Employee: Department: Office of Research, Planning and Effectiveness

Northwestern Michigan College Supervisor: Employee: Department: Office of Research, Planning and Effectiveness General Information Company: Northwestern Michigan College Supervisor: Employee: Department: Office of Research, Planning and Effectiveness Employee No: Detail Job Title: Coordinator of Data Reporting

More information

ENQA Review 2011: Empfehlungen und deren Umsetzung durch das OAQ / 1. Implementation of the ENQA recommendations on ESG Part 2

ENQA Review 2011: Empfehlungen und deren Umsetzung durch das OAQ / 1. Implementation of the ENQA recommendations on ESG Part 2 ENQA Review 2011: Empfehlungen und deren Umsetzung durch das OAQ / 1 Implementation of the ENQA recommendations on ESG Part 2 ESG 2.1 Use of internal quality assurance procedures (ENQA Criterion 1) External

More information

Partnership Satisfaction & Impact Survey

Partnership Satisfaction & Impact Survey Partnership Satisfaction & Impact Survey Page 1 of TABLE OF CONTENTS Contents I INTRODUCTION... 3 II SATISFACTION SURVEY... 4 II.1 What?... 4 II.1.1 Definition... 4 II.1.2 Satisfaction survey in Practice...

More information

Performance Monitoring

Performance Monitoring 7 Chapter 17 Performance Monitoring Performance Monitoring Contents: 17.1 Introduction 17.2 A Wider Perspective 17.3 Requirements for a Good Performance Indicator 17.4 Types of Performance Monitoring 17.5

More information

BS 25999 BUSINESS CONTINUITY MANAGEMENT

BS 25999 BUSINESS CONTINUITY MANAGEMENT BS 25999 BUSINESS CONTINUITY MANAGEMENT AUDIT, CERTIFICATION & training services HOW CAN YOU ENSURE BUSINESS CONTINUITY? BS 25999 AUDITS & CERTIFICATION FROM SGS Most organisations will, at some point,

More information

The Capability Road Map a framework for managing quality and improving process capability

The Capability Road Map a framework for managing quality and improving process capability 1 The Capability Road Map a framework for managing quality and improving process capability Dr Kevin Daily, Improve QPI Ltd and Luis Joaquim, Critical Software SA Abstract Software developers and IT providers

More information

Essex County Council Policy for Information Management and Security

Essex County Council Policy for Information Management and Security Essex County Council Policy for Information Management and Security Title Author/Owner Status Essex County Council Policy for Information Management and Security Information Management IS Final Version

More information

RATIONALISING DATA COLLECTION: AUTOMATED DATA COLLECTION FROM ENTERPRISES

RATIONALISING DATA COLLECTION: AUTOMATED DATA COLLECTION FROM ENTERPRISES Distr. GENERAL 8 October 2012 WP. 13 ENGLISH ONLY UNITED NATIONS ECONOMIC COMMISSION FOR EUROPE CONFERENCE OF EUROPEAN STATISTICIANS Seminar on New Frontiers for Statistical Data Collection (Geneva, Switzerland,

More information

Solvency II. PwC. *connected thinking. Solvency II GAP-analysis: practical experience (life and non-life business)

Solvency II. PwC. *connected thinking. Solvency II GAP-analysis: practical experience (life and non-life business) Solvency II Solvency II GAP-analysis: practical experience (life and non-life business) *connected thinking PwC Decide ambition level for Solvency II Business use Standard model, Total eller partiel Optimizing

More information

Unit 41: Succession Planning

Unit 41: Succession Planning Unit 41: Succession Planning Extract from Managing Governance in Nonprofit Organisations in Australia (Jean Roberts, 2004) Text book and CD ROM Note: The term Board includes Board of Directors and Committee

More information

Reduce risk. Reduce cost. Raise performance.

Reduce risk. Reduce cost. Raise performance. Reduce risk. Reduce cost. Raise performance. Services for professional procurement. Be better informed, make better decisions. Enterprise Supplier Management System (ESMS) Tiered pre-qualification for

More information

Queensland Government Human Services Quality Framework. Quality Pathway Kit for Service Providers

Queensland Government Human Services Quality Framework. Quality Pathway Kit for Service Providers Queensland Government Human Services Quality Framework Quality Pathway Kit for Service Providers July 2015 Introduction The Human Services Quality Framework (HSQF) The Human Services Quality Framework

More information

UMJINDI MUNICIPALITY CUSTOMER CARE POLICY

UMJINDI MUNICIPALITY CUSTOMER CARE POLICY UMJINDI MUNICIPALITY CUSTOMER CARE POLICY UMJINDI MUNICIPALITY CUSTOMER CARE POLICY Core Business Area Corporate Services Directorate Operational Area All Directorates Version: Draft 0.01 Date: 1 July

More information

City and County of Swansea. Human Resources & Workforce Strategy 2013-2017. Ambition is Critical 1

City and County of Swansea. Human Resources & Workforce Strategy 2013-2017. Ambition is Critical 1 City and County of Swansea Human Resources & Workforce Strategy 2013-2017 Ambition is Critical 1 Delivering quality services for a safer, greener, smarter, fairer, healthier, richer Swansea Executive Summary

More information

What makes a good process?

What makes a good process? Rob Davis Everyone wants a good process. Our businesses would be more profitable if we had them. But do we know what a good process is? Would we recognized one if we saw it? And how do we ensure we can

More information

Commercial Buildings Special Working Group Change Management Report 2010

Commercial Buildings Special Working Group Change Management Report 2010 1 Contents 1. Introduction... 3 2. Findings from member interviews... 4 Review of Current Change Management Practices... 6 3. Methodology... 7 Structured Approach... 7 Improving your context... 8 Getting

More information

ISO/IEC 20000 Part 1 the next edition. Lynda Cooper project editor for ISO20000 part 1

ISO/IEC 20000 Part 1 the next edition. Lynda Cooper project editor for ISO20000 part 1 ISO/IEC 20000 Part 1 the next edition Lynda Cooper project editor for ISO20000 part 1 Agenda The ISO20000 series Why has it changed Changes ITIL3 impact New requirements Changed requirements How to prepare

More information

PROCESSING & MANAGEMENT OF INBOUND TRANSACTIONAL CONTENT

PROCESSING & MANAGEMENT OF INBOUND TRANSACTIONAL CONTENT PROCESSING & MANAGEMENT OF INBOUND TRANSACTIONAL CONTENT IN THE GLOBAL ENTERPRISE A BancTec White Paper SUMMARY Reducing the cost of processing transactions, while meeting clients expectations, protecting

More information

January 2016. Brand and Campaigns Executive: Information for Candidates

January 2016. Brand and Campaigns Executive: Information for Candidates January 2016 Brand and Campaigns Executive: Information for Candidates Thank you for expressing interest in the role of Brand and Campaigns Executive. We have compiled this information pack to tell you

More information

A Compelling Case for AP Automation in the Cloud

A Compelling Case for AP Automation in the Cloud WHITE PAPER A Compelling Case for AP Automation in the Cloud ROCC Computers Ltd Stanford Gate South Road Brighton BN1 6SB Tel: 01273 274716 Email: info@rocc.co.uk Author: Andrew Westhead Date : February

More information

QUALITY ASSURANCE STRATEGY EUROPEAN HERITAGE DIGITAL MEDIA AND THE INFORMATION SOCIETY EUROPEAN MASTER PROGRAMME IN

QUALITY ASSURANCE STRATEGY EUROPEAN HERITAGE DIGITAL MEDIA AND THE INFORMATION SOCIETY EUROPEAN MASTER PROGRAMME IN Quality Assurance Strategy EuroMACHS 1 EUROPEAN MASTER PROGRAMME IN EUROPEAN HERITAGE DIGITAL MEDIA AND THE INFORMATION SOCIETY QUALITY ASSURANCE STRATEGY VERSION 1 Quality Assurance Strategy EuroMACHS

More information

Finding your balance Top tips for successful HR delivery in multiple countries across Europe

Finding your balance Top tips for successful HR delivery in multiple countries across Europe Perspectives Finding your balance Top tips for successful HR delivery in multiple countries across Europe ...organisations are striving for a more standardised approach across all their business locations

More information

Integrated data and information management in social protection

Integrated data and information management in social protection BRIEFING Integrated data and information management in social protection Key messages > Integrating data and information management of social protection programs through a Single Registry and associated

More information

Identifying & Implementing Quick Wins

Identifying & Implementing Quick Wins Identifying & Implementing Quick Wins 1 Executive Summary........3 2 Introduction....... 5 3 Key Steps to Quick Wins....... 7 4 Sample Quick Wins...8 4.1 People Quick Wins... 8 4.2 Process Quick Wins......9

More information

Your appraisal 360. product guide. Competency Frameworks

Your appraisal 360. product guide. Competency Frameworks Your appraisal 360 product guide Competency Frameworks ver 1.0 2 of 11 Third Eye Resolutions Ltd Contents What Appraisal360 feedback does for you... 4 Ways of buying Appraisal360... 5 System only packages...

More information

Periodic risk assessment by internal audit

Periodic risk assessment by internal audit Periodic risk assessment by internal audit I Introduction The Good Practice Internal Audit Manual Template, developed by the Internal Audit CoP of Pempal, defines the importance and the impact that an

More information

JOB DESCRIPTION. Contract Management and Business Intelligence

JOB DESCRIPTION. Contract Management and Business Intelligence JOB DESCRIPTION DIRECTORATE: DEPARTMENT: JOB TITLE: Contract Management and Business Intelligence Business Intelligence Business Insight Manager BAND: 7 BASE: REPORTS TO: Various Business Intelligence

More information

ENISA s contribution to the development of Network and Information Security within the Community

ENISA s contribution to the development of Network and Information Security within the Community ENISA s contribution to the development of Network and Information Security within the Community By Andrea PIROTTI Executive Director ENISA WSIS Implementation Mechanism: Action Line C5. 15 May 2006 1

More information

EMPIR Reporting Guidelines Part 0 Guide to the parts

EMPIR Reporting Guidelines Part 0 Guide to the parts Part 0 Guide to the parts EMPIR Reporting Guidelines Part 0 Guide to the parts EURAMET MSU, Hampton Road, Teddington, Middlesex, TW11 0LW, UK Phone: +44 20 8943 6666 Email: msu@npl.co.uk msu.euramet.org

More information

Information Security Policies and Procedures Development Framework for Government Agencies. First Edition - 1432 AH

Information Security Policies and Procedures Development Framework for Government Agencies. First Edition - 1432 AH Information Security Policies and Procedures Development Framework for Government Agencies First Edition - 1432 AH 6 Contents Chapter 1 Information Security Policies and Procedures Development Framework

More information

ITAG RESEARCH INSTITUTE

ITAG RESEARCH INSTITUTE ITAG RESEARCH INSTITUTE Control and Governance Maturity Survey Establishing a reference benchmark and a self-assessment tool Erik Guldentops Wim Van Grembergen Steven De Haes Control and Governance Maturity

More information

Implementing a Metrics Program MOUSE will help you

Implementing a Metrics Program MOUSE will help you Implementing a Metrics Program MOUSE will help you Ton Dekkers, Galorath tdekkers@galorath.com Just like an information system, a method, a technique, a tool or an approach is supporting the achievement

More information

Monitoring, Evaluation and Learning Plan

Monitoring, Evaluation and Learning Plan Monitoring, Evaluation and Learning Plan Cap-Net International Network for Capacity Building in Sustainable Water Management November 2009 The purpose of this document is to improve learning from the Cap-Net

More information

Higher Education Review Unit

Higher Education Review Unit Higher Education Review Unit Programme Review Report Master of Business Administration AMA International University-Bahrain Kingdom of Bahrain Date Reviewed: 26-27 October 2011 Table of Contents 1. The

More information

Experience with external active fixed income managers - NBIM

Experience with external active fixed income managers - NBIM Page 1 of 5 Experience with external active fixed income managers This article summarises nearly five years experience with external fixed income managers. During this period, net excess return in relation

More information

M2 Survey of Software Best Practice Experience for Small Companies

M2 Survey of Software Best Practice Experience for Small Companies M2 Survey of Software Best Practice Experience for Small Companies Project : ESPICE ESPINODE in Iceland Originator : Anita Bjork Lund, Ebba Thora Hvannberg Date : 17.05.1999 No. of pages : 12 Systems Engineering

More information

Proposed Public Records Legislation Consultation

Proposed Public Records Legislation Consultation Proposed Public Records Legislation Consultation Question 1 Do you agree that a public record is one that is created or received by a publicly funded authority, or do you think that the public status of

More information

A Review of the NHSLA Incident Reporting and Management and Learning from Experience Standards. Assessment Outcomes. April 2003 - March 2004

A Review of the NHSLA Incident Reporting and Management and Learning from Experience Standards. Assessment Outcomes. April 2003 - March 2004 A Review of the NHSLA Incident Reporting and Management and Learning from Experience Standards Assessment Outcomes April 2003 - March 2004 September 2004 1 Background The NHS Litigation Authority (NHSLA)

More information

Quality Management Subcontractor QM Guide-Section Two

Quality Management Subcontractor QM Guide-Section Two SECTION TWO QUALITY MANAGEMENT SYSTEMS Version No 1. PREFACE This document has been developed to assist subcontractors to meet Monaco Hickeys (MHPL) Quality Management (QM) requirements whilst working

More information

Guide for Applicants. Call for Proposal:

Guide for Applicants. Call for Proposal: Guide for Applicants Call for Proposal: COSME Work Programme 2014 TABLE OF CONTENTS I. Introduction... 3 II. Preparation of the proposal... 3 II.1. Relevant documents... 3 II.2. Participants... 4 II.2.1.

More information

Programme Specification: MSc Electronic Commerce

Programme Specification: MSc Electronic Commerce Programme Specification: MSc Electronic Commerce 1. Awarding institution Middlesex University 2. Teaching institution Middlesex University 3. Programme accredited by 4. Final qualification MSc 5. Programme

More information

U.S. Department of the Treasury. Treasury IT Performance Measures Guide

U.S. Department of the Treasury. Treasury IT Performance Measures Guide U.S. Department of the Treasury Treasury IT Performance Measures Guide Office of the Chief Information Officer (OCIO) Enterprise Architecture Program June 2007 Revision History June 13, 2007 (Version 1.1)

More information

Measuring Contractors Performance Using KPIs GUIDANCE NOTES FOR FACILITIES MANAGERS

Measuring Contractors Performance Using KPIs GUIDANCE NOTES FOR FACILITIES MANAGERS Measuring Contractors Performance Using KPIs GUIDANCE NOTES FOR FACILITIES MANAGERS Published by the British Institute of Facilities Management BIFM November 2014 1 Why measure performance? Jonah Lomu

More information

Health Informatics Service Accreditation Manual. Assessment Process. May 2013, Version 1

Health Informatics Service Accreditation Manual. Assessment Process. May 2013, Version 1 Health Informatics Service Accreditation Manual Assessment Process May 2013, Version 1 Contents 1. Contacts... 2 2. Introduction... 3 3. Assessment principles... 6 4. Assessment outcome... 7 5. Planning

More information

General Rules for the certification of Management Systems

General Rules for the certification of Management Systems General Rules for the certification of Management Systems Effective from 19/11/2015 RINA Via Corsica 12 16128 Genova - Italy tel. +39 010 53851 fax +39 010 5351000 website : www.rina.org Technical rules

More information

Internal Audit Quality Assessment Framework

Internal Audit Quality Assessment Framework Internal Audit Quality Assessment Framework May 2013 Internal Audit Quality Assessment Framework May 2013 Crown copyright 2013 You may re-use this information (excluding logos) free of charge in any format

More information

ITIL V3 Sample Questions Page 1 of 15 Sample ITIL version 3 Foundation Examination. Instructions

ITIL V3 Sample Questions Page 1 of 15 Sample ITIL version 3 Foundation Examination. Instructions Page 1 of 15 Sample ITIL version 3 Foundation Examination Instructions 40 questions should be attempted. There are no trick questions. You have 60 minutes to complete this paper. Candidates sitting the

More information

EUCERD RECOMMENDATIONS QUALITY CRITERIA FOR CENTRES OF EXPERTISE FOR RARE DISEASES IN MEMBER STATES

EUCERD RECOMMENDATIONS QUALITY CRITERIA FOR CENTRES OF EXPERTISE FOR RARE DISEASES IN MEMBER STATES EUCERD RECOMMENDATIONS QUALITY CRITERIA FOR CENTRES OF EXPERTISE FOR RARE DISEASES IN MEMBER STATES 24 OCTOBER 2011 INTRODUCTION 1. THE EUROPEAN CONTEXT Centres of expertise (CE) and European Reference

More information

Overview of the involvement of local Research. Organisations, Enterprises, Universities in. national and international projects on Earth

Overview of the involvement of local Research. Organisations, Enterprises, Universities in. national and international projects on Earth Overview of the involvement of local Research Organisations, Enterprises, Universities in national and international projects on Earth Observation applications and services. ( Earth Observation, Satellite

More information

CommBank Accounting Market Pulse. Conducted by Beaton Research + Consulting November 2014

CommBank Accounting Market Pulse. Conducted by Beaton Research + Consulting November 2014 CommBank Accounting Market Pulse. Conducted by Beaton Research + Consulting November 2014 Contents Increasing confidence underpinned by strong economic outlook 2 Australian economic outlook 3 November

More information

Citation for published version (APA): Berthing, H. H. (2014). Vision for IT Audit 2020. Abstract from Nordic ISACA Conference 2014, Oslo, Norway.

Citation for published version (APA): Berthing, H. H. (2014). Vision for IT Audit 2020. Abstract from Nordic ISACA Conference 2014, Oslo, Norway. Aalborg Universitet Vision for IT Audit 2020 Berthing, Hans Henrik Aabenhus Publication date: 2014 Document Version Early version, also known as pre-print Link to publication from Aalborg University Citation

More information

How To Use A Td Database

How To Use A Td Database Construction Projects and Products Database Review and Recommendations Introduction R.W. Beck identified, researched and evaluated eight separate databases for potential future use by the California Integrated

More information