Planning the use of Lean Six Sigma as a framework for blood bank management improvements
|
|
|
- Katrina Gordon
- 10 years ago
- Views:
Transcription
1 International Journal of Industrial Engineering and Management (), Vol. 4 No 4, 2013, pp Available online at ISSN UDK: 614.2:005.7 Planning the use of Lean Six Sigma as a framework for blood bank management improvements Radmila Jovanović Assistant professor, University of Novi Sad, Medical Faculty, Hajduk Veljkova 3, Serbia, [email protected] Milan Delić Assistant professor, University of Novi Sad, Faculty of Technical Sciences, Trg Dositeja Obradovića 6, Serbia, [email protected] Bato Kamberović Full professor, University of Novi Sad, Faculty of Technical Sciences, Trg Dositeja Obradovića 6, Serbia, [email protected] Srđan Vulanović Assistant professor, University of Novi Sad, Faculty of Technical Sciences, Trg Dositeja Obradovića 6, Serbia, [email protected] Vladan Radlovački Associate professor, University of Novi Sad, Faculty of Technical Sciences, Trg Dositeja Obradovića 6, Serbia, [email protected] Received ( ); Revised ( ); Accepted ( ) Abstract As a multidisciplinary process, blood bank management (often called BSM - Blood Stock Management) is designed to gain optimal use of blood products. Careful and responsible management of blood supplies, optimal use of blood products and minimizing the wastage of outdated blood are its main goals. Race for blood donors is being promoted in Serbia for past several decades by setting the following strategic parameter: 4 blood units have to be collected per 100 inhabitants (unofficially it is called a "4% donations"). Meanwhile, various important factors related to the efficiency and efficacy of the use of blood products are not treated by national strategies at all. Recent changes were done by the review of such policy initiating Serbian blood banks to improve the BSM based on adequate experience of EU and other countries. A new goal set by the national Law of transfusion practice was set: "donation should be planned in accordance with the needs of clinics and patients". Being aware of the lack of information as well as of a possibility that there are different needs in various regions, legislator set general aims, indicating the need for each blood bank to find its particular indicators of patients' and clinics' needs. This paper provides descriptions of processes of planning, blood collecting, blood and products processing, storage and issuing for the use in clinics. These are the main BSM processes. With the use of DMAIC (PDCA) approach and appropriate Lean Six Sigma improvement methods, a framework for process improvements set by new strategic goals is described in this paper. Key words: Transfusion, Blood bank, lean six sigma framework, process improvement 1. INTRODUCTION Using Lean Six Sigma approaches in health care processes is rather a new area for research. However, researchers and practitioners have already found it very useful for improving health care processes, as explained later on. Based on significant practical work experience of authors (in building about ten various, mainly integrated management systems in the area of health care), it is obvious that quality of process is still a widely misunderstood term in Serbia. It does not denote organizing processes that only generate usable information or ones that only use very small amount of resources nor it does denote processes that only result in products or services of outstanding technical quality. It denotes processes that generate sufficient information with the lowest costs; processes that use valid information for rational managing and processes that have sufficient quality of product/service. That's not all - of course these processes have to be on a road of continual improvement. Authentic quality requires from managers not only to understand this declaratively, but to live this story every day, doing their routine jobs always having in their minds the strategy. Applying Lean Six Sigma approach might be a way to gain this state [1]. This paper is a contribution to setting a framework for Lean Six Sigma improvement project in the transfusion practice in Serbia today. It is based on experiences from one of the largest blood banks in Serbia, Transfusion Institute of Vojvodina, Novi Sad, Serbia. Being aware of particularities among blood banks, authors have made efforts to distinguish only general facts and guidelines.
2 238 Jovanovic et al. 2. BACKGROUND In study [2] authors report successful usage of five stage "Lean Sigma" process (DMAIC - Define, Measure, Analyse, Improve and Control) to reduce RBC (Red Blood Cells) wastage from 4.4% to only 2%. Study is made during 4 year period and a total amount of around $800,000 was saved. Authors used a variety of methods (affinity diagrams, Pareto diagrams, cause-and-effect analysis, various diagrams, quality charts, etc.) as a framework for process improvements. Attention paid to the application of Lean Six Sigma approach in health care is obviously a result of recent findings in [2] and other studies. It is than not uncommon that researchers generally emphasise these efforts and support them (see [3]). Example of applying DMAIC approach in transfusion is found in study [4]. DMAIC is again a source for substantial process improvements. They report decrease of inappropriate transfusions of packed red blood cells from 16 to less than 5%. A number of other improvements are reported as well. Study [5] provides some general historical and theoretical backgrounds for Lean Six Sigma approach and its use in health care. Polk emphasise that origins of Lean Six sigma approach are in Deming's PDCA cycles and that co-existence of Lean Six sigma and innovation can reduce cost and increase quality and value. Authors of study [6] found that Lean Six sigma projects are appropriate link between approaches of improving production (and service) quality and systematic improving of health care processes. The TQM philosophy created in previous century may not be framework practical enough to be used as road to production and service improvements. Lean Six Sigma may bring in this dimension. According to [7] the use of Six Sigma framework in hospitals began in 2002, while in 2006 Lean approach was introduced. Today, they are usually mixed together in a form of Lean Six Sigma approach. It is obvious that Lean Six Sigma is the approach that can be successfully applied in health sector. First step in the research is getting the picture of the Blood Transfusion Institute of Vojvodina (further referred to as Institute) processes global picture. After defining processes, it became obvious that Lean Six Sigma concepts could be practically applied in order to improve Institute's processes. Planned improvements and initial analyses indicate that the effective use of a number of Lean Six Sigma related methods is possible. 3. RESULTS TO BE EXPECTED AND DISCUS- SION 3.1 Basic processes of the Institute This section provides a framework for the application of Lean Six Sigma approach in the Institute. Since blood banks worldwide have similar processes, this paper can be considered as general for the area to a great extent. The result of previously described analysis, a process diagram of the basic processes and their relations in the Institute was made (Fig. 1). Figure 1. Basic processes in Blood Transfusion Institute of Vojvodina Five basic processes were found: 1 Planning of donations, 2 Blood collection, 3 Lab processing and testing, 4 Storage and 5 Product distribution. Figure 1 shows processes and the most important external interested parties. Communication with donors, clinics and other transfusion institutions is noted in particular, while all other communications between the Institute and interested parties are noted by dotted line at the right [1].
3 Jovanovic et al. 239 The Institute processes are at the moment being modernized by implementing new Blood Bank management software called Progesa ( /software-solutions/blood-banks-ep/). Software producers took into account a variety of informational needs of a blood bank (basic information needs incorporating support for routine processes, needs related to data processing covering stock, collecting and ordering management and various reports related to business intelligence needs). The following text in this section contains descriptions of Institute processes, expected changes thereof implied by the application of mentioned integral software solution for BSM, other implications related to the application of Lean Six sigma and expected overall results. The story begins with Donation planning process. For the process of Donation planning (process 1, fig. 2), data is collected from clinics, population (or various institutions handling the population data) and from the Institute (such as stock levels). Adequate planning implies the use of various data from Institute's information system. Coordination with the Red Cross, National Biomedicine Agency at the Health Ministry and other institutions, the media and a number of other organizations is performed in this process for planning broader joint actions. Donation plan is based primarily on the needs for blood products. Accordingly, donors are invited in cases where specific blood collection is performed. This process prepares materials for informing the public. Donation planning is at the moment mostly based on expected values of relevant indicators and their trends, instead of objective assessment values obtained by the use of appropriate predictive statistical methods. With the Institute's staff great experience, errors of this kind of predicting are usually not significant. However, statistical predicting especially when done upon a variety of data, using large samples and for a longer time period should provide better results, save more blood and money and make work process even more efficient and effective. Plans exist to form central national databases of blood donors, needs on clinics and blood inputs. This would enable even better predictive planning of blood products needs, while blood lacks and overages could be immediately reported to the central database and their undesired impact therefore reduced by implementing adequate reaction. At the moment blood banks send their input, output and stock data to the national Biomedicine Agency once a week. The lack of computers in blood banks in Serbia today is a reason why some of this data could be hold as inaccurate and rather unreliable. On the other hand, implementing the consistent national system could not only improve the Institute efficiency, but the efficiency (and, therefore, the effectiveness) of the overall national transfusion system. Progesa is a web oriented solution and it could ease the reporting to national services and other blood banks and incorporating into national system. Advantages of implementing computers and standardized software in Data acquisition include prompt systematization of input data, instant availability of collected blood quantities (by blood groups, Rh factor). On the other hand, coordination with Red Cross and other health institutions related to donations planning should be immeasurably more effective and more efficient. Calling of phenotyped blood donors any time when needed could also be many times efficient, even if blood is needed in different region. Figure 2. Donations planning process A blood collecting plan is sent from the process of donations planning (process 1) to Blood collection process (process 2, fig. 3). This is the only process having direct contacts with donors. Donor is first being registered and medically examined. This is followed by blood donation. Employees monitor donors for a certain time after the donation and undertake appropriate actions if needed. After the donation, units of whole blood obtained from donors are labelled with the donation sticker and unique barcode. Test samples are taken from donors to test the quality of the donation and these are also labelled. The process of blood collection sends appropriate information (labels and data entered to the computer database during registration) to process of lab processing and testing (process 3), along with donated blood units and samples. With the unique or compatible software solutions used in whole health system and all relevant data entered to the database, assuming that web solution is in use, any donor would have a unique bar code recognizable within the national health system. This would enable the full traceability of all blood units in the system and their use.
4 240 Jovanovic et al. Figure 4. Lab processing and testing Storage (process 4, fig. 5) or Stock management is carried out under strictly defined temperature. Some blood units and products are stored in quarantine for they cannot be used at the moment. Figure 3. Blood collection process Lab processing and testing (process 3, fig. 4) has three interlinked sub-processes. These are separation of the blood, testing and (product) labelling. Links between these processes and processes 2 and 4 are also complex. Separation results are erythrocytes, platelets and plasma units as three basic blood products. Testing involves performing a series of standard tests in accordance with the law and medical procedures, but, under specific conditions, some additional analyses are performed. Every result is recorded. Unlike the primary labelling where the whole blood units are marked, products obtained by separation, filtration, and radiation are here labelled while labels containing information about the donor, blood group / Rh factor. These labels are directly or indirectly traceable to the donor, testing, date of collection, processing, blood, date of production and other data. The use of standard BSM software enables the traceability of a blood product all the way to the donor, date of donation, date of lab processing, time, place and storage details, and all of that just by a touch of a barcode reader. Laboratory generates data about positive marker tests. If a donor is once detected as critical marker positive, his or her blood must never be used again. The only way of reliable instant positive marker donor identification is possible if appropriate information system is in place and in function. If a system is in function on whole the country, marker positive donors could never be in a situation to donate blood. This is also a process providing inputs for database of phenotyped blood donors, treated as a part of process 1. Figure 5. Stock management process Reasons for this may include incomplete testing, indications of non-conformances, non-conformance of storage / packaging, expired lifetime, positive marker tests etc. When certain conditions are met, some whole blood units / products have to be rejected. Blood and blood products can arrive from previous process to be stored, and, when conditions are met, they may return for labelling and back to the storage. Modification includes filtration of leukocytes, and, in special cases, radiation is performed to eliminate lymphocytes. These modifications are made to the products after separation, when the product is sent for labelling and returned to storage. Using computer program in this process may ease whole standard stock management process (First-
5 Jovanovic et al. 241 In-First-Out discipline, early warning expiry system, shipping order, etc), as well as quarantine handling. Progesa has a stock management module which enables opening stock data from various blood banks. When an integrated solution is in use, all possible users of blood product (no matter where they are) could have an access all the data about a blood group, expiry date, donor and other relevant data. Figure 6. Distribution process The last process on the list is Distribution of blood products (process 5, fig. 6). Blood products may be issued to clinics and to other transfusion institutions. Product is issued upon the request which is submitted on the appropriate form followed by patient data and patient's blood sample. Sample is used to conduct analysis before product is handed to the user. This process includes transport of products as needed. Issuing of blood products itself can indeed be improved by using BSM software by the following: all of the process is recorded automatically; stock management module chooses the unit to be issued; all printed records (if needed) are being generated automatically, human errors are practically removed, etc. After some period and after database is filled with data generated by described processes, application of statistic methods for planning of blood donations and blood/blood product quantities could enable creation of desired performance monitoring system and gaining planned reducing of waste and costs. 3.2 Planned improvements Process 1 - Planning of donations - can be improved in several ways. The most important aspect of improving the process involves broader action for it has to include users of blood products. Specifically, planning of donations could be more effective and efficient if the Institute had a significant response to demands for careful planning at the place of product use - at a clinic. Timely sending of user requirements to the Institute (and planning information where available), with use of statistics to reduce seasonal and other random and stochastic impacts, should result in significant increase of blood products' use efficiency. Methods applicable to gain these improvements include cause and effect diagrams, different graphic data representations (histograms, box plots, pies, scatter diagrams, etc.), matrix diagrams, and methods of advanced statistics (regression, cluster and factor analysis, ANOVA structural equation modelling, etc). This all is very important for meeting the legal requirements - optimal operations of blood banks in accordance with the requirements (which, in addition to the optimal quantity of the product also include optimal use of all other resources). For planning, it is very important to determine signal and lower stock limits for different types of blood products, as well as activities to carry out when these limits are reached. Important improvements may be brought by user trainings about the importance of establishing a significant communication between the Institute and its users. It is also necessary to define the structure and frequency of these communications. For the improvement of the process, it is necessary to raise the effectiveness and efficiency of the information system in all its elements, from data acquisition to information storage/transfer and creating reports. Now, the Institute is adjusting for applying new software to support the information system. This software is an excellent ground for the application of listed methods and achieving the planned improvements. Improving process 2 - Blood collection - is largely related to acquiring data from donors, but also using data from the Institute information system. Preliminary findings [8] indicate the presence of a high level of donor's satisfaction, but also the fact that staff training (along with some other improvements) could bring this vital parameter of the Institute performance at a higher level. Moreover, using different methods of statistics (primarily cluster analysis) various donor groups could be extracted, which would enable determining donor target groups, their motivators for donating and design of appropriate way to better inform this groups about donating ([9] is the example of studies in this area). Improvements should also include various analyses of information flows and operation related times. Improving donor surveys, the review of present questionnaires and developing research to find most efficient improvements should be carried out. In order to educate donors there is a need to undertake a number of seminars related to the conditions that are contraindicated for blood donation (medications usage, various acute and chronic diseases, inadequate body weight, etc.). It is assumed that such educations should reduce number of donors trying to donate in unfavourable circumstances. This, further, could reduce the waiting time for donation (it is recently found that waiting is a significant source of donor dissatisfaction if it interacts with other factors, see [8]) and lower the costs. For those who are interested, pre-donation questionnaires should be published on Institute Internet pages to adequately inform potential donors. The data acquired in this process can be joined with data from other Institute processes. For example, linking nonconformances of purchased materials identified in the process with information about the manufac-
6 242 Jovanovic et al. turers / suppliers would allow more effective monitoring of suppliers efficiency (it is the requirement of ISO 9001, anyway). Efficiency of the Institute information system has a major impact on the planned improvements. This is just another confirmation of the findings reported in studies on the relationship between management system and information system [10], [11], [12]. Process 3 Lab processing and testing generates a series of data groups valuable for both the processes of the Institute, and for the community. Access to large amounts of data on a number of blood parameters (group, Rh, coagulation, sedimentation, number of cells, etc.), and data related to epidemiology (transfusion transmitted or contraindicated disease markers), enables the Institute to warn the public if these parameters start to indicate systematic disorders in the population (the significance of this is both national and wider). The process of making synthetic reports from data on blood analyses may be accelerated many times by introducing an integrated information system. Besides accuracy, it could increase the reliability of the results obtained (introduction of a blood bank standard software for data acquiring and processing in the Institute is currently underway; software is assumed to be a catalyst for a series of improvements that are subject of this paper). Process 1 generally does not employ medical doctors, while in processes 2 and 3 medical staff makes up the majority of employees. So, improvements of process 1 should be designed and carried out with intensive consultations with medical staff from processes 2 and 3. Some improvements could refer to the application of control charts (numeric and attribute) to monitor the stability of various parameter values. Various means of visualization can be used for clear process status display (for example different color stickers for various blood groups or writing boards). Some of the processes significant for quality can be represented by flowcharts and set to be accessible to employees and other interested parties. Risks for donors, patients, employees and the process itself can be analyzed using the FMEA technique and appropriately documented. In accordance with the results of these analyses, if necessary, follow-up actions should be carried out. Creating and maintaining an accurate database of Institute equipment and its use for effective maintenance should also be considered. Most of the activities in the process 4 Storage is carried out by staff from processes 3 and 5. Specifically, these activities include: monitoring and keeping valid storage conditions, modification of blood products and preparing for distribution. Preparation for discard, discard itself and monitoring of storage conditions (temperature) is also performed by employees who participate in other processes. It is, therefore, clear that any activity of this process should be properly documented. Human errors in making records or storage of misplaced units can have serious consequences. Improvements could include application of various colours of labels/stickers for various categories of stored units. In addition, storage could be supported by various visual devices, and by automatic monitoring system for storage conditions. Detailed monitoring of reasons for rejecting units of blood or blood products could result in discovering ways to improve process and lower the probability of discarding the unit. For determining improvement actions with such goals there are different frames. One of them is 5 Whys - set 5 questions "why" until there is a problem found as a root of non-conformance occurrence. Creating various diagrams relating to the process, and reports with performance parameter values could be put into practice. Storage process improvements may include the application of the FMEA method for the purposes of risk analysis (or an integrated approach could be set to determine the risk analysis in the Institute process as a whole). Early alarms of reaching signal or low/high stock limits could be set for the purpose of timely reaction (Software for support of Information system could be here of a great help since it can simultaneously manage user orders and actions plans). In the end, the distribution process (process 5) can be improved primarily treating relations with the user. Organizing training for user's medical staff about the importance of timely sending appropriate feedback information to the Institute is considered necessary. In this process, more attention has to be paid to the acquiring and processing of user complaints. Some complaints may not be caused by the operations of the Institute, but rather by the lack of will on the user part to send the timely information on the use of blood product. All of the disagreements between Institute and its users need to be resolved by cooperation since it adds value to both sides. All of these improvements are made possible now with the use of Progesa software because it enables acquiring all the data needed for implementation of these improvements. However, using the software itself is not the only condition to be satisfied prior to reaching described improvements. One systematic step-by-step improvement project created and implemented by a multidisciplinary team of various experts in a number of fields (at least transfusion, information technology, management systems and mathematics) and appropriate financial, political and marketing support would enable such improvements to be implemented. Experience tells that implementation itself is not enough. Appropriate trainings should take place in various levels of the health system to support implementation of such system, as well as its maintenance (which can be also a very difficult and complicated task). The Institute management should coordinate implementing described improvements (along with those to be determined) in order to enable proper trainings, needed resources, accomplishing of improvement phases, verifying results and deciding whether improvements are ready to replace existing practice or not. This activity sequence is an instance of DMAIC approach: Defining elements of process improvement, accomplishing Measurements to find out basis for analyses, accomplishing Analyses to determine improvements and implementation of those Improvements. Coordination by management is even more important after implementing improvements to enable continuous effects. That is Control section of DMAIC approach, which should become a routine all the way since new improvements are determined. DMAIC is maybe the shortest successful recipe for any improve-
7 Jovanovic et al. 243 ment (using this approach is never the only, but is always considered a necessary requirement for reaching a successful improvement). Similarity between DMAIC concept and Deming PDCA cycle [13] is not accidental. Both approaches are very similar. They represent maybe the simplest way to "make life easier". All of us passed this cycle many times. Every time when we were satisfied with the result of any innovation and aware of at least a little improvement it brought, we most likely used the DMAIC / PDCA cycle (no matter if we were aware of that or not). 3.3 Results This paper provides framework for process improvements in Blood Transfusion Institute of Vojvodina and in national health system, as a whole. After analysis of Institute processes, proposals for improvements were given for each process. Besides proposals, paper provides information about which methods should be used for each of the improvements. One of the proposed improvements is described in the following text as a guideline how improvements could be implemented. Implementing of new information system called Progesa in the Institute is found an effective support for described improvements. What is more, this software is found to be a very good base for significant improvements of some aspects of blood use in whole the health system. Figure 7 is a graphical representation of key elements of improvement of a donation planning process, explained earlier in this paper. Today, information base for blood donation and production planning is not sufficient and this situation should be improved. Major Institute primary users exchange information with Institute, but it is rarely related to longer periods (month or year). Some unusual situations implying higher needs for blood products are reported, but reports are rather informal and oral instead of formal and recorded. Information are also received in informal manner and written down by hand. Having in mind that work processes are carried out in shifts, the possibility of communication errors and emerging of other non-conformances is significant. Clinics' side of the process has three key elements. Employees obliged for planning in a clinic must be aware of the importance of their job for the community as a whole. It is best if they are formally obliged for summarizing the needs for blood products within their system. Figure 7. Key elements of a donation planning process improvement On the other side, Institute may formally put in use some statistical methods for simulating the future use of blood products (based on history records from database), while sending alerts to clinics may be a good idea of reminding if a report was not received as scheduled. If situation is adequate, communication channels with other blood banks in the region may be intensified to resolve surplus or deficit of some blood products. 4. CONCLUSIONS This paper sets a framework for Lean Six Sigma concept application to plan improvements in Blood Transfusion Institute of Vojvodina and national health system as a whole. The ultimate goal of applying these improvements is reaching continual optimal function of a blood bank and minimum of blood / blood products wastage. It is assumed that improvements described in the previous sections will have the desired effect if they are based on Lean Six Sigma concept. Among the leading approaches to be implemented is the DMAIC approach. Implementing of appropriate software as a support of information system is recognized as an efficient improvement. Implementing such sophisticated software as described in this paper brings some risks that must not be overlooked, for the sake of information security, including legal requirements. for more details see [14], [15] and other available sources. This paper is a contribution to efforts of any employee who consciously improves his/her work process. The authors' wish is that more such employees are to be employed in the health system than is the case today. Available to everyone there is a variety of process improvement methods considered an effective force for progress [16].
8 244 Jovanovic et al. 6. REFERENCES [1] Jovanović R., Delić M., Kamberović B., Vulanović S. and Radlovački V. (2012), "Improvements of blood stock management in blood banks using lean six sigma", 1. International Scientific Conference on Lean Technologies - LeanTech proceedings, Novi Sad: Faculty of technical sciences Novi Sad, pp [2] Heitmiller E.S., Hill R.B., Marshall C.E., Parsons B.J., Berkow L.C., Barrasso C.A., Zink E.K. and Ness P.M. (2010), "Blood wastage reduction using Lean Sigma methodology", Transfusion, Vol. 50, No. 9, pp [3] Mandell, S.H. (2010), "Lean Six Sigma to reduce blood wastage", editorial, Transfusion, Vol 50, No. 9, pp [4] Neri R.A., Mason C.E. and Demko L.A. (2008), "Application of Six Sigma/CAP Methodology: Controlling Blood - Product Utilization and Costs", Journal of Healthcare Management, Vol. 53, No. 3, pp [5] Polk J.D. (2011), "Lean Six Sigma, innovation, and the change acceleration process can work together", Physician Executive, Vol. 37, No. 1, pp [6] Murphree P., Vath R. R. and Daigle L. (2011), "Sustaining Lean Six Sigma projects in health care", Physician Executive, Vol. 37, No. 1, pp [7] Buell J.M. (2010), "Lean Six Sigma and patient safety: a recipe for success", Healthcare Executive, Vol. 25, No. 2, pp [8] Jovanović R., Radlovački V., Pečujlija M., Kamberović B., Delić M. and Grujić J. (2012), "Assessment of blood donors satisfaction and measures to be taken to improve quality in transfusion service establishments", Medicinski glasnik, Vol. 9, No. 2, pp [9] Gillespie T.W. and Hillyer C.D. (2002), "Blood donors and factors impacting the blood donation decision", Transfusion medicine reviews, Vol. 16, No. 2, pp [10] Radlovački V., Delić M., Beker I., Kamberović B. and Jovanović R. (2010), "Primena sredstava informacione tehnologije u sertifikovanim sistemima menadžmenta u srbiji" (Application of IT in certified firms in Serbia), Menadžment totalnim kvalitetom & izvrsnost * Total quality management & excellence, Vol. 38, No. 1, pp [11] Radlovački V., Beker I., Majstorović V., Pečujlija M., Stanivuković D. and Kamberović B. (2011), "Quality managers' estimates of quality management principles application in certified organisations in transitional conditions - is Serbia close to TQM", Strojniški vestnik - Journal of Mechanical Engineering, Vol. 57, No. 11, [12] Radlovački V., Beker I., Kamberović B., Pečujlija M. and Delić M. (2011), "Organization performance measurement and quality information system in Serbia - quality managers' estimates", International Journal of Industrial Engineering and Management, Vol. 2, No. 1, pp [13] Vulanović, V., Stanivuković, D., Kamberović, B., Maksimović, R., Radaković, N., Radovački, V. and Šilobad, M. (2012), "Sistem menadžmenta kvalitetom" (Quality management System), Fakultet tehničkih nauka - Departman IIM i IIS-Istraživački i tehnološki centar, Novi Sad, Serbia [14] Beker I. and Radlovački V. (2008), "ISO/IEC requirement: information security incident management", proceedings of international scientific conference INDUSTRIAL SYSTEMS IS '08, pp , Faculty of Technical Sciences, Novi Sad, Serbia [15] Beker I and Radaković N. (2006), "Iskustva na implementaciji ISO standarda" (Experiences in implementing the ISO standard), Total Quality Management & Excellence, Vol. 34, No. 3-4, pp [16] Vulanović, V., Stanivuković, D., Kamberović, B., Maksimović, R., Radaković, N., Radovački, V. and Šilobad, M. (2003), "Metode i tehnike unapređenja procesa rada - statističke * inženjerske * menadžerske" (Work process improvement methods and techniques - statistical * engineering * management), Fakultet tehničkih nauka - Departman IIM i IIS-Istraživački i tehnološki centar, Novi Sad, Serbia Planiranje upotrebe Lean Six Sigma kao okvira za poboljšanje upravljanja bankama krvi Radmila Jovanović, Milan Delić, Bato Kamberović, Srđan Vulanović, Vladan Radlovački Primljen ( ); Recenziran ( ); Prihvaćen ( ) Rezime Kao multidisciplinarni proces, upravljanje bankama krvi (poznato kao BSM Blood Stock Management) nastalo je kako bi obezbedilo optimalnu upotrebu krvnih proizvoda. Njeni osnovni ciljevi su pažljivo i odgovorno upravljanje zalihama krvi, optimalna upotreba krvnih proizvoda i minimalizacija neupotrebne - zastarele krvi. Trka za donatore krvi se promoviše u Srbiji tokom nekoliko poslednjih decenija tako što je određen sledeći strateški parametar: 4 jedinice krvi treba da budu prikupljene na 100 stanovnika (neslužbeno to se naziva 4% donacija ). Za to vreme, različiti važni faktori u vezi sa efikasnošću i uspehom upotrebe krvnih proizvoda nisu uopšte tretirani nacionalnim strategijama. Nedavne promene su učinjene nakon provere ovakve politike, što je iniciralo srpske banke krvi da poboljšaju BSM na osnovu adekvatnog iskustva EU i drugih zemalja. Novi cilj koji je postavio nacionalni zakon za transfuziju glasi: donacije treba da budu planirane u skladu s potrebama klinika i pacijenata. Svestan nedostatka informacija kao i mogućnosti da postoje različite potrebe u različitim regionima, predlagač zakona je postavio opšte ciljeve, nagovestivši potrebu da svaka banka krvi nađe svoje posebne indikatore potreba pacijenata i klinika. Ovaj rad pruža opis procesa planiranja, sakupljanja krvi, procesuiranja krvi i proizvoda, skladištenje i izdavanje za upotrebu u klinikama. To su osnovni BSM procesi. Sa upotrebom DMAIC (PDCA) pristupom i odgovarajućim Lean Six Sigma metodima poboljšanja, u ovom radu je opisan okvir za poboljšanje procesa određenih novim strateškim ciljevima. Ključne reči: Transfuzija, banka krvi, lean six sigma okvir, poboljšanje procesa
Tools & Techniques for Process Improvement
Tools & Techniques for Process Improvement Understanding processes so that they can be improved by means of a systematic approach requires the knowledge of a simple kit of ols or techniques. The effective
Blood System Inventory Management Best Practices Guide
Blood System Inventory Management Best Practices Guide Blood is a precious resource that must be carefully managed to ensure that each donor s gift provides the greatest benefit to patients. Blood system
CHAPTER 6. Discussion and Conclusion. patient health information, such as diagnosis, medicine orders, managing patient
CHAPTER 6 Discussion and Conclusion 6.1 Introduction Health care information system is a computer application to represent patient information in a friendly user interface and allowing users to review
THE PROCESS APPROACH IN ISO 9001:2015
International Organization for Standardization BIBC II, Chemin de Blandonnet 8, CP 401, 1214 Vernier, Geneva, Switzerland Tel: +41 22 749 01 11, Web: www.iso.org THE PROCESS APPROACH IN ISO 9001:2015 Purpose
Role of the Medical Director
Role of the Medical Director Beth Shaz, MD Assistant Professor, Emory University School of Medicine Director, Transfusion Services, Grady Memorial Hospital Atlanta, GA 1.1.1 Medical Director Responsibilities
Body of Knowledge for Six Sigma Green Belt
Body of Knowledge for Six Sigma Green Belt What to Prepare For: The following is the Six Sigma Green Belt Certification Body of Knowledge that the exam will cover. We strongly encourage you to study and
Study of Productivity Improvement Using Lean Six Sigma Methodology
International Review of Applied Engineering Research. ISSN 2248-9967 Volume 4, Number 1 (2014), pp. 33-38 Research India Publications http://www.ripublication.com/iraer.htm Study of Productivity Improvement
The Remote Control of Power Supplies Experience of Exploitation*
SERBIAN JOURNAL OF ELECTRICAL ENGINEERING Vol. 9, No. 1, February 2012, 95-105 UDK: 621.311.68-52 DOI: 10.2298/SJEE1201095P The Remote Control of Power Supplies Experience of Exploitation* Dragana Petrović
The benefits of ISO certification and Total Quality Management in a radiology department
H. P. A. Geraedts 1, R. Montenarie 1 and M. J. Hendriks 2 The benefits of ISO certification and Total Quality Management in a radiology department The Departments of Radiology, Radiotherapy and Nuclear
PROJECT QUALITY MANAGEMENT
8 PROJECT QUALITY MANAGEMENT Project Quality Management includes the processes required to ensure that the project will satisfy the needs for which it was undertaken. It includes all activities of the
How To Inspect A Blood Bank
Site visit inspection report on compliance with HTA minimum standards Belfast Cord Blood Bank HTA licensing number 11077 Licensed for the procurement, processing, testing, storage, distribution and import/export
Content Sheet 3-1: Equipment Management Overview
Content Sheet 3-1: Equipment Management Overview Role in quality management system Equipment management is one of the essential elements of a quality management system. Proper management of the equipment
INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards
INTEGRATED MANAGEMENT SYSTEM MANUAL IMS Based on ISO 9001:2008 and ISO 14001:2004 Standards Approved by Robert Melani Issue Date 30 December 2009 Issued To Management Representative Controlled Y N Copy
Comment on the Critique of the paper ERP and Management Accounting Changes of Industrial Enterprises in Serbia *
Comment on the Critique of the paper ERP and Management Accounting Changes of Industrial Enterprises in Serbia * UDK 001.83 Slobodan Malinić, University of Kragujevac,Faculty of Economics, Kragujevac Mirjana
Lean Silver Certification Blueprint
The Lean Certification Blueprint provides additional useful information beyond the Body of Knowledge. The Body of Knowledge specifies the competencies, topics, and subtopics required by different types
CORPORATE QUALITY MANUAL
Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance
Red blood cell transfusions in the Netherlands Towards (very) low use
Red blood cell transfusions in the Netherlands Towards (very) low use Marian G.J. van Kraaij, MD PhD hematologist/ transfusion medicine specialist Director Dept Transfusion Medicine Sanquin Blood Supply,
MUTUAL DEPENDANCE OF MANAGEMENT AND QUALITY UDC 005.6. Ljubiša V. Cvetković
FACTA UNIVERSITATIS Series: Economics and Organization Vol. 1, N o 9, 2001, pp. 59-63 MUTUAL DEPENDANCE OF MANAGEMENT AND QUALITY UDC 005.6 Ljubiša V. Cvetković Faculty of Technology, University of Niš,
Six Sigma. Breakthrough Strategy or Your Worse Nightmare? Jeffrey T. Gotro, Ph.D. Director of Research & Development Ablestik Laboratories
Six Sigma Breakthrough Strategy or Your Worse Nightmare? Jeffrey T. Gotro, Ph.D. Director of Research & Development Ablestik Laboratories Agenda What is Six Sigma? What are the challenges? What are the
Influence of Project Management Software Tools Usage on Project Success
Influence of Project Management Software Tools Usage on Project Success Kristina Brodar University of Zagreb Faculty of Organization and Informatics, Varaždin [email protected] Igor Pihir University of Zagreb
The Importance of Project Quality Management. What Is Project Quality? The International Organization for Standardization (ISO)
Chapter 8 Project Quality Management November 17, 2008 2 The Importance of Project Quality Management Many people joke about the poor quality of IT products People seem to accept systems being down occasionally
www.transition-support.com
Can we include all products and services in the QMS but limit the scope of registration? According to ISO/TC 176/SC 2/N 524, organizations are not obliged to include all the products that it provides within
Supplier Training 8D Problem Solving Approach. 2013 Brooks Automation, Inc.
Supplier Training 8D Problem Solving Approach What is the 8D method? 8D stands for the 8 disciplines or the 8 critical steps for solving problems. It is a highly disciplined and effective scientific approach
KNOWLEDGE BASE SDN BHD innovation through knowledge engineering
KBASE LIFE the complete solution for blood bank management KNOWLEDGE BASE SDN BHD innovation through knowledge engineering Knowledge is information that changes something or somebody - either by becoming
CHAPTER 6 PROCUREMENT AND SUPPLY OF PHARMACEUTICAL PRODUCTS IN THE PUBLIC AND PRIVATE MEDICAL SECTORS
CHAPTER 6 PROCUREMENT AND SUPPLY OF PHARMACEUTICAL PRODUCTS IN THE PUBLIC AND PRIVATE MEDICAL SECTORS Overview 6.1 This chapter sets out the Review Committee s findings and recommendations on procurement
Quality Process in Engineering ISO 9000 and Beyond. Presented by: Roxanne L. Pillar, P.E. October 2014
Quality Process in Engineering ISO 9000 and Beyond Presented by: Roxanne L. Pillar, P.E. October 2014 Good morning Introductions: Quality Management Systems (QMS) What are they? Where do they come from?
Figure 1. An embedded chart on a worksheet.
8. Excel Charts and Analysis ToolPak Charts, also known as graphs, have been an integral part of spreadsheets since the early days of Lotus 1-2-3. Charting features have improved significantly over the
PHARMACEUTICAL QUALITY SYSTEM Q10
INTERNATIONAL CONFERENCE ON HARMONISATION OF TECHNICAL REQUIREMENTS FOR REGISTRATION OF PHARMACEUTICALS FOR HUMAN USE ICH HARMONISED TRIPARTITE GUIDELINE PHARMACEUTICAL QUALITY SYSTEM Q10 Current Step
QUALITY/BUSINESS OPERATING SYSTEM - DESIGN AND CONTROL FOR PRODUCTION
QUALITY/BUSINESS OPERATING SYSTEM - DESIGN AND CONTROL FOR PRODUCTION Ing. Lenka Hejnková, Ing. Zdeňka Videcká, Ph.D. Annotation: Quality Operating System/Business Operating System is an advanced approach
Hoshin Kanri Workshop
Hoshin Kanri Workshop By Pete Babich Inc., 2004-2006. All rights reserved. Revision: 003, 6/15/2006 No part of this document may be reproduced, stored in a retrieval system, or transmitted in any form
GENERAL TERMS AND CONDITIONS OF USING ELECTRONIC BANKING SERVICES
GENERAL TERMS AND CONDITIONS OF USING ELECTRONIC BANKING SERVICES VobEbank service for Legal Entities segmented as Small Business Banking and Entrepreneurs I DEFINITIONS: The terms used in these General
Basic Quality Tools in Continuous Improvement Process
Strojniški vestnik - Journal of Mechanical Engineering 55(2009)5, StartPage-EndPage Paper received: 03.03.2008 UDC 658.5 Paper accepted: 00.00.200x Basic Quality Tools in Continuous Improvement Process
ISO 50001 Energy Management System
ISO 50001 Energy Management System DETAILED GUIDE ISO 50001 Background It has been estimated that the ISO 50001 Energy Management Standard could have a positive impact on some 60% of the world s energy
QAT - TECHNICAL ASSESSMENT QUESTIONNAIRE: Domestic Suppliers 1. TECHNICAL ASSESSMENT
COMPANY: ADDRESS: TEL- FAX- E-MAIL: PERSON RESPONSIBLE: QAT - TECHNICAL ASSESSMENT QUESTIONNAIRE: Domestic Suppliers Cemig Suppliers Award OBJECTIVE: The purpose of this questionnaire is to obtain information
Total Quality Management and Cost of Quality
Total Quality Management and Cost of Quality Evsevios Hadjicostas The International Quality movement Operator Quality Control Foreman (Supervisor) Quality Control Full-time Inspectors Statistical Quality
Cellular Therapy Liaison Meeting 10 September 2009 BECS. M. Allene Carr-Greer, MT(ASCP)SBB Director, Regulatory Affairs AABB
Cellular Therapy Liaison Meeting 10 September 2009 BECS M. Allene Carr-Greer, MT(ASCP)SBB Director, Regulatory Affairs AABB Definition from October 2007 draft guidance BECS Validation In the User s Facility
Evaluation of an Electronic Charting System in the BCIT Nursing Simulation Lab
Evaluation of an Electronic Charting System in the BCIT Nursing Simulation Lab Prepared by: Johanne Mattie Research Associate, Technology and Product Evaluation Group As part of the Stage 3 ehealth Go
QUIZ MODULE 1: BASIC CONCEPTS IN QUALITY AND TQM
QUIZ MODULE 1: BASIC CONCEPTS IN QUALITY AND TQM These questions cover Sessions 1, 2, 5, 6, 7. The correct answer is shown in bold A fundamental attribute of TQM is Drawing control charts Having team meetings
Appendix O MANUFACTURING YOUTH APPRENTICESHIP PRODUCTION OPERATIONS MANAGEMENT PATHWAY PRODUCTION OPERATIONS MANAGEMENT (UNIT 8)
Appendix O MANUFACTURING YOUTH APPRENTICESHIP PRODUCTION OPERATIONS MANAGEMENT PATHWAY PRODUCTION OPERATIONS MANAGEMENT (UNIT 8) Pathway: (Unit 8) PAGE 1 OF 17 Unit 8: Pathway 1. Assist to purchase materials
An Introduction to. Metrics. used during. Software Development
An Introduction to Metrics used during Software Development Life Cycle www.softwaretestinggenius.com Page 1 of 10 Define the Metric Objectives You can t control what you can t measure. This is a quote
Using Business Intelligence to Mitigate Graduation Delay Issues
Using Business Intelligence to Mitigate Graduation Delay Issues Khaled Almgren PhD Candidate Department of Computer science and Engineering University of Bridgeport Abstract Graduate master students usually
Process approach to quality management in education
AARMS Vol. 3, No. 4 (2004) 625 631 EDUCATION Process approach to quality management in education SLAVKO POKORNI Military Academy, Belgrade, State Union of Serbia and Montenegro In the past, ISO 9001:1994,
Unit 1: Introduction to Quality Management
Unit 1: Introduction to Quality Management Definition & Dimensions of Quality Quality Control vs Quality Assurance Small-Q vs Big-Q & Evolution of Quality Movement Total Quality Management (TQM) & its
APPENDIX H VISTA BLOOD BANK USER MANUAL SOFTWARE REQUIREMENTS SPECIFICATIONS
APPENDIX H VISTA BLOOD BANK USER MANUAL SOFTWARE REQUIREMENTS SPECIFICATIONS August 1998 Laboratory V. 5.2 Appendix H-1 Appendix H-2 Laboratory V. 5.2 August 1998 Table of Contents VISTA Blood Bank Software
MULTIMEDIA COLLEGE JALAN GURNEY KIRI 54100 KUALA LUMPUR
STUDENT IDENTIFICATION NO MULTIMEDIA COLLEGE JALAN GURNEY KIRI 54100 KUALA LUMPUR FIFTH SEMESTER FINAL EXAMINATION, 2014/2015 SESSION MGT2063 TOTAL QUALITY MANAGEMENT DMGA-E-F-3/12, DMGW-E-F-3/12, DMGQ-E-F-3/12
The Importance of Integrative Components in the Field of e-business and Information Systems
Jelica Trninić Jovica Đurković The Importance of Integrative Components in the Field of e-business and Information Systems Article Info:, Vol. 3 (2008), No. 1, pp. 023-028 Received 12 Januar 2008 Accepted
Training As a Root Cause
Corrective Action Preventative Action Defining Alternatives to Training As a Root Cause Presentation Sponsors Corporate Quality Director at MME Group Inc ISO 9001:2008 & ISO 13485-:2003 Certified Customer
Keywords: inspection; nuclear material control and accountancy (NMC&A); quality management system
French Domestic Safeguards inspections with regard to quality management system of the operators, in the field of nuclear material control and accountancy Julie LASNEL-PAYAN, Flavien LEMOINE, Bruno AUTRUSSON,
JOINT COMMISSION INTERNATIONAL ACCREDITATION STANDARDS FOR. 2nd Edition
JOINT COMMISSION INTERNATIONAL ACCREDITATION STANDARDS FOR CliniCAl laboratories 2nd Edition Effective 1 April 2010 International Patient Safety Goals (IPSG) Goals The following is a list of all goals.
Learning Objectives Lean Six Sigma Black Belt Course
Learning Objectives Lean Six Sigma Black Belt Course The overarching learning objective of this course is to develop a comprehensive set of skills that will allow you to function effectively as a Six Sigma
TAGUCHI APPROACH TO DESIGN OPTIMIZATION FOR QUALITY AND COST: AN OVERVIEW. Resit Unal. Edwin B. Dean
TAGUCHI APPROACH TO DESIGN OPTIMIZATION FOR QUALITY AND COST: AN OVERVIEW Resit Unal Edwin B. Dean INTRODUCTION Calibrations to existing cost of doing business in space indicate that to establish human
FMEA and FTA Analysis
FMEA and FTA Analysis Why it is Coming to Your Hospital and Your Laboratory Tina A. Krenc Director, R&D Phase Systems Abbott Laboratories 1 Agenda Background on requirements for risk management Tools to
Directed, Autologous and Therapeutic Donations
Directed, Autologous and Therapeutic Donations Directed Donations: What is a directed donation? A directed donation is when a specific donor makes a blood donation at the request of a patient and the patient
A Six Sigma Approach for Software Process Improvements and its Implementation
A Six Sigma Approach for Software Process Improvements and its Implementation Punitha Jayaraman, Kamalanathan Kannabiran, and S.A.Vasantha Kumar. Abstract Six Sigma is a data-driven leadership approach
Service Blueprinting HANDBOOK Maik Seyring Dr. Utz Dornberger MBA Alfredo Suvelza MBA Trevor Byrnes
International SEPT Program Service Blueprinting HANDBOOK Maik Seyring Dr. Utz Dornberger MBA Alfredo Suvelza MBA Trevor Byrnes SEPT Program May 09 Contents Prototypical process of Service Engineering...
Edwin Lindsay Principal Consultant. Compliance Solutions (Life Sciences) Ltd, Tel: + 44 (0) 7917134922 E-Mail: [email protected].
Edwin Lindsay Principal Consultant, Tel: + 44 (0) 7917134922 E-Mail: [email protected] Corrective and Preventative Action (CAPA) is a system of quality procedures required to eliminate the causes
g We bring good things to life What Is Six Sigma? The Roadmap to Customer Impact
g We bring good things to life What Is Six Sigma? The Roadmap to Customer Impact Making Customers Feel Six Sigma Quality Globalization and instant access to information, products and services have changed
Methodological Approaches to Evaluation of Information System Functionality Performances and Importance of Successfulness Factors Analysis
Gordana Platiša Neđo Balaban Methodological Approaches to Evaluation of Information System Functionality Performances and Importance of Successfulness Factors Analysis Article Info:, Vol. 4 (2009), No.
On Development of Fuzzy Relational Database Applications
On Development of Fuzzy Relational Database Applications Srdjan Skrbic Faculty of Science Trg Dositeja Obradovica 3 21000 Novi Sad Serbia [email protected] Aleksandar Takači Faculty of Technology Bulevar
ICH guideline Q10 on pharmaceutical quality system
September 2015 EMA/CHMP/ICH/214732/2007 Committee for Human Medicinal Products Step 5 Transmission to CHMP May 2007 Transmission to interested parties May 2007 Deadline for comments November 2007 Final
ISO 9001 Quality Management System
ISO 9001 Quality Management System DETAILED GUIDE ISO 9001 Background ISO 9001:2008 is the world s foremost quality management standard, used by hundreds of thousands of organizations in over 170 countries
SCPC's Quality Improvement is the Science of Process Management
SCPC's Quality Improvement is the Science of Process Management Identifying and implementing Processes of Care within your hospital will help transform your organization, improve healthcare processes,
The Role of Information Technology Studies in Software Product Quality Improvement
The Role of Information Technology Studies in Software Product Quality Improvement RUDITE CEVERE, Dr.sc.comp., Professor Faculty of Information Technologies SANDRA SPROGE, Dr.sc.ing., Head of Department
2009 LAP Audioconference Series. How to Prepare and Comply with Your Quality Management Plan
2009 LAP Audioconference Series How to Prepare and Comply with Your Quality Management Objectives: As a result of participating in this session, you will be able to: Explain the reasons why the QM is important
LAP Audioconference How to Prepare and Comply with Your Quality Management Plan* February 18, 2009
LAP Audioconference How to Prepare and Comply with Your Quality Management Plan* February 18, 2009 Paul Bachner, MD, FCAP Professor & Chair Department of Pathology & Laboratory Medicine University of Kentucky
Regional Inventory Management Rural Ontario
Regional Inventory Management Rural Ontario Infused with Six Sigma & Lean Methodologies InterHospital Laboratory Partnership Huron Perth Healthcare Alliance Stratford General Hospital Robert Scheuermann,
Consultation Response Medical profiling and online medicine: the ethics of 'personalised' healthcare in a consumer age Nuffield Council on Bioethics
Consultation Response Medical profiling and online medicine: the ethics of 'personalised' healthcare in a consumer age Nuffield Council on Bioethics Response by the Genetic Interest Group Question 1: Health
IN AMERICA, HEALTH CARE COSTS
Impacts & Innovations Cynthia Plonien Six Sigma for Revenue Retrieval EXECUTIVE SUMMARY Deficiencies in revenue retrieval due to failures in obtaining charges have contributed to a negative bottom line
Implementation of a Quality Management System for Aeronautical Information Services -1-
Implementation of a Quality Management System for Aeronautical Information Services -1- Implementation of a Quality Management System for Aeronautical Information Services Chapter IV, Quality Management
Lean Six Sigma Black Belt-EngineRoom
Lean Six Sigma Black Belt-EngineRoom Course Content and Outline Total Estimated Hours: 140.65 *Course includes choice of software: EngineRoom (included for free), Minitab (must purchase separately) or
Effective Root Cause Analysis For Corrective and Preventive Action
Effective Root Cause Analysis For Corrective and Preventive Action Manuel Marco Understanding Key Principles Requirement need or expectation that is stated, generally implied, or obligatory Generally implied
A Conceptual Approach to Data Visualization for User Interface Design of Smart Grid Operation Tools
A Conceptual Approach to Data Visualization for User Interface Design of Smart Grid Operation Tools Dong-Joo Kang and Sunju Park Yonsei University [email protected], [email protected] Abstract
Lean Six Sigma Training The DMAIC Story. Unit 6: Glossary Page 6-1
Unit 6: Glossary Page 6-1 Glossary of Terms Unit 6: Glossary Page 6-2 Action Plan A technique that documents everything that must be done to ensure effective implementation of a countermeasure or improvement
The Blood Budget: how can we reduce costs and influence best practice? Sue Redfearn Blood Transfusion Manager Poole Hospital NHS Foundation Trust
The Blood Budget: how can we reduce costs and influence best practice? Sue Redfearn Blood Transfusion Manager Poole Hospital NHS Foundation Trust Poole Hospital vital statistics 680 beds 2011 (reduced
Quality Procedures and Work Instructions Manual
Quality Procedures and Work Instructions Manual Revision Number: (1) ISSUED TO: MANUAL NO: REVISION NO: ISSUE DATE: President Date 1 ii. Table of Contents 1 of 4 0 Section Number Name Revision Date i.
Course Overview Lean Six Sigma Green Belt
Course Overview Lean Six Sigma Green Belt Summary and Objectives This Six Sigma Green Belt course is comprised of 11 separate sessions. Each session is a collection of related lessons and includes an interactive
TOTAL QUALITY MANAGEMENT
VALLIAMAMI ENGINEERING COLLEGE DEPARTMENT OF MANAGEMENT STUDIES BA7104 TOTAL QUALITY MANAGEMENT UNIT I PART-A 1. Define Total Quality Management. Define manufacturing based view of quality. 2. What are
MATERIAL PURCHASING MANAGEMENT IN DISTRIBUTION NETWORK BUSINESS
MATERIAL PURCHASING MANAGEMENT IN DISTRIBUTION NETWORK BUSINESS Turkka Kalliorinne Finland [email protected] ABSTRACT This paper is based on the Master of Science Thesis made in first half of
White Paper Combining Attitudinal Data and Behavioral Data for Meaningful Analysis
MAASSMEDIA, LLC WEB ANALYTICS SERVICES White Paper Combining Attitudinal Data and Behavioral Data for Meaningful Analysis By Abigail Lefkowitz, MaassMedia Executive Summary: In the fast-growing digital
Camar Aircraft Products Co. QUALITY MANUAL Revision D
QUALITY MANUAL Revision D Gujll'y Manual Introduction The purpose of this manual is to describe the Quality Assurance Program implemented by Camar Aircraft Products Co. (hereafter referred to as C.A.P.C.)
IMPROVING THE DESIGN-CONSTRUCTION INTERFACE
Improving the Design-Construction Interface IMPROVING THE DESIGN-CONSTRUCTION INTERFACE Luis F. Alarcón 1 and Daniel A. Mardones 2 ABSTRACT In building projects customer requirements, constructive aspects
Jonathan Wilson. Sector Manager (Health & Safety)
Jonathan Wilson Sector Manager (Health & Safety) OHSAS 18001:2007 Making Life Easier For Health & Safety Managers Workshop Agenda 1. Introduction 2. Why Manage Health & Safety 3. OHSAS 18001 and OHSMS
EFFECTIVE ROOT CAUSE ANALYSIS AND CORRECTIVE ACTION PROCESS
JOURNAL OF ENGINEERING MANAGEMENT AND COMPETITIVENESS (JEMC) Vol. 1, No. 1/2, 2011, 16-20 EFFECTIVE ROOT CAUSE ANALYSIS AND CORRECTIVE ACTION PROCESS Branislav TOMIĆ 1, Vesna SPASOJEVIĆ BRKIĆ 2 1 Bombardier
Part III: Program Director s Annual Evaluation Report
Part III: Program Director s The American Osteopathic Association requires DME s and Program Directors to implement training, and Program Evaluators to assess, the AOA Core in all AOA residency training
Common Tools for Displaying and Communicating Data for Process Improvement
Common Tools for Displaying and Communicating Data for Process Improvement Packet includes: Tool Use Page # Box and Whisker Plot Check Sheet Control Chart Histogram Pareto Diagram Run Chart Scatter Plot
Office Efficiency Improving Office Processes and Task Analysis
Office Efficiency Improving Office Processes and Task Analysis Contents Office Efficiency... 3 Office Efficiency Aim... 3 Sample Office Efficiency Aims... 3 Key Efficiency Measures... 4 Balance Supply
Research paper 1. INTRODUCTION 2. PRODUCTION PLANNING SYSTEMS
International Journal of Industrial Engineering and Management (), Vol. 4 No. 2, June 2013, pp. 95 101 Available online at www.iim.ftn.uns.ac.rs/ijiem_journal.php ISSN 2217-2661 Research paper An Application
THE BASICS OF STATISTICAL PROCESS CONTROL & PROCESS BEHAVIOUR CHARTING
THE BASICS OF STATISTICAL PROCESS CONTROL & PROCESS BEHAVIOUR CHARTING A User s Guide to SPC By David Howard Management-NewStyle "...Shewhart perceived that control limits must serve industry in action.
Six Sigma Methodology. December 5-6 & 11-13, 2015
Weekend Green Belt (5 days) Training Programme On Six Sigma Methodology during December 5-6 & 11-13, 2015 Conducted by SQC & OR Unit Indian Statistical Institute Room No 320, 3rd Floor Old C G O Building
Learning Six Sigma Theory
Independent Learning Pursuit FX Competency The following essay was written by a student in the School for New Learning, in support of an Independent Learning Pursuit (ILP). The student has agreed to share
FINAL DOCUMENT. Guidelines for Regulatory Auditing of Quality Management Systems of Medical Device Manufacturers Part 1: General Requirements
GHTF/SG4/N28R4:2008 FINAL DOCUMENT Title: Guidelines for Regulatory Auditing of Quality Management Systems of Medical Device Manufacturers Authoring Group: GHTF Study Group 4 Endorsed by: The Global Harmonization
SELECTION OF THE MANNER OF MEASURING SIGNIFICANT CHARACTERISTICS OF THE INSURANCE COMPANIES SERVICE QUALITY
UDK: 005.6:368.03 005.336.3:005.346 COBISS.SR-ID 220568332 Review Article SELECTION OF THE MANNER OF MEASURING SIGNIFICANT CHARACTERISTICS OF THE INSURANCE COMPANIES SERVICE QUALITY Saša Cudić 1, Miloš