1 Summary of Orders Issued for Electric and Gas Industry EU 01/05/2015 Consummating Order PSC CO-EU makes Order Joint petition for approval of amendment to PSC PAA-EU effective and final; closes territorial agreement between the City of Tallahassee and Talquin Electric Cooperative, Inc GU 01/05/2015 Consummating Order PSC CO-GU makes Order Petition for approval of Cast Iron/Bare Steel Pipe PSC TRF-GU effective and final; closes Replacement Rider (Rider CI/BSR), by Peoples Gas System EI 01/05/2015 Consummating Order PSC CO-EI makes Order Petition to modify transmission structure PSC PAA-EI effective and final; closes inspection cycle, by Tampa Electric Company EI 01/05/2015 Consummating Order PSC CO-EI makes Order Petition for approval of revised facilities rental PSC TRF-EI effective and final; closes agreement by Tampa Electric Company EI 01/05/2015 Consummating Order PSC CO-EI makes Order Petition for approval of base rate adjustment for PSC PAA-EI effective and final; docket to extended power uprate project by Florida Power & Light Company EU 01/05/2015 PAA Order PSC PAA-EU approving amendment Joint petition for approval of amendment to to territorial agreement between FPL and LCEC.; if territorial agreement in Charlotte, Lee, and no protest, order to become effective and final Collier Counties, by Florida Power & Light Company upon issuance of consummating order; if order and Lee County Electric Cooperative. becomes final, docket to be closed; protest due 1/26/15. 1

2 Summary of Orders Issued for Electric and Gas Industry (Continued) EI 01/06/2015 Order PSC CFO-EI granting FPL's motion for Fuel and purchased power cost recovery clause with temporary protective order (DN ) [For DN generating performance incentive factor ] EQ 01/07/2015 PAA Order PSC PAA-EQ approving FPUC's Petition for approval of amendment to extend term request to extend term of negotiated purchase of negotiated renewable energy power purchase power agreement with Rayonier; if no protest, contract with Rayonier Performance Fibers, LLC, by docket to be closed on issuance of consummating Florida Public Utilities Company. order; protest due 1/28/ EI 01/07/2015 Final Order PSC FOF-EI approving FPL's Petition for approval of optional non-standard proposed non-standard meter rider tariff, meter rider, by Florida Power & Light Company. effective 1/2/15; docket to be closed administratively after any motions for reconsideration are disposed of and the time for filing an appeal has run; FPL has made refunds to its existing non-standard meter rider customers who have paid current charges;, and FPL received staff's approval of a revised NSMR tariff reflecting Commission's vote EI 01/07/2015 PAA Order PSC PAA-EI approving Duke Petition for approval to construct an independent Energy's petition to construct an independent spent fuel storage installation and an accounting spent fuel storage installation and to defer order to defer amortization pending recovery from amortization pending recovery from the Department the Department of Energy, by Duke Energy Florida, of Energy; if no protest, order to become final Inc. and effective upon issuance of consummating order; if order becomes final, docket to be closed; protest due 1/28/15. 2

3 Summary of Orders Issued for Electric and Gas Industry (Continued) 3

4 Summary of Orders Issued for Telecommunications Industry TX 01/09/2015 Consummating Order PSC CO-TX makes Order Application for certificate to provide local PSC PAA-TX effective and final; closes telecommunications service, by Integrated Path Communications, LLC TX 01/09/2015 PAA Order PSC PAA-TX granting Certificate Application for certificate to provide local of Authority No to ITS Fiber; if no protest, telecommunications service by ITS Fiber, LLC d/b/a order to become final and effective on issuance ITS Fiber. of CO; docket to be closed if order becomes final; protest due 1/30/ TX 01/09/2015 PAA Order PSC PAA-TX granting Certificate Application for certificate to provide local of Authority No to Atlantis; if no protest, telecommunications service by Atlantis order to become final and effective on issuance of Communications LLC. CO; docket to be closed if order becomes final; protest due 1/30/15. 4

5 Summary of Orders Issued for Water and Wastewater Industry WU 01/05/2015 Consummating Order PSC CO-WU makes Order Request for approval of water rate tariff for a PSC TRF-WU effective and final; closes revision in customer billing from quarterly billing to monthly billing by W.B.B. Utilities, Inc. in Lake County SU 01/05/2015 Consummating Order PSC CO-SU makes Order Application for limited proceeding rate increase PSC PAA-SU effective and final; docket to in Polk County by West Lakeland Wastewater, Inc SU 01/08/2015 Order PSC CFO-SU granting Utilities, Application for increase in wastewater rates in Inc.'s request for confidential classification Lee County by Utilities, Inc. of Eagle Ridge. (for DN )[x-ref. DN ] for up to 18 months from issuance date of this order. [Audit Control No ] WS 01/08/2015 PAA Order PSC PAA-WS setting rates and Application for staff-assisted rate case in Lee final order granting temporary rates in the event County by Useppa Island Utilities Co., Inc. of protest and addressing rate case expense; if no protest, a consummating order will be issued; docket to remain open for staff's verification that the revised tariff sheets and customer notice have been filed by the Utility and approved by staff; docket to be closed administratively when tariff and notice actions are complete; protest due 1/29/15. 5

6 Summary of Orders Issued for Water and Wastewater Industry (Continued) SU 01/09/2015 Consummating Order PSC CO-SU makes Order Application to transfer wastewater facilities and PSC PAA-SU effective and final; docket to Certificate No. 137-S in Brevard County from Colony Park Utilities, Inc. to Colony Park Development Utilities, LLC WU 01/09/2015 Consummating Order PSC CO-WU makes Order Application for approval of transfer of PSC PAA-WU effective and final; docket to Certificate No. 339-W from Brendenwood Utilities, LLC. to Brendenwood Waterworks, Inc. in Lake County WU 01/09/2015 Consummating Order PSC CO-WU makes Order Application for approval of transfer of PSC PAA-WU effective and final; docket to Certificate No. 539-W from Raintree Harbor Utilities, LLC to Raintree Waterworks, Inc. in Lake County WU 01/09/2015 Consummating Order PSC CO-WU makes Order Request to remove the fines imposed for the delay PSC PAA-WU effective and final; closes of filing annual reports for Cedar Acres, Inc. 6

7 Summary of Orders Issued for Generic Dockets OT 01/06/2015 Order PSC FOF-OT authorizing appearance as Applications for qualified representative status. qualified representative to Diana A. Csank for Sierra Club OT 01/06/2015 Order PSC FOF-OT authorizing appearance as Applications for qualified representative status. qualified representative to R. Wade Litchfield for FPL OT 01/09/2015 Order PSC FOF-OT authorizing appearance as Applications for qualified representative status. qualified representative to Dulaney L. O'Roark III for Verizon. 7

FLORIDA PUBLIC SERVICE COMMISSION Summary of Orders Issued for Electric and Gas Industry July 27, 2015 through July 31, 2015

FLORIDA PUBLIC SERVICE COMMISSION Summary of Orders Issued for Electric and Gas Industry July 27, 2015 through July 31, 2015 Summary of Orders Issued for Electric and Gas Industry 150101-EQ 07/28/2015 PAA Order PSC-15-0303-PAA-EQ approving GPC's Petition for approval of standard offer for purchase of firm capacity and energy

More information

JOINT COMMITTEE ON PUBLIC COUNSEL OVERSIGHT Senator Joyner, Alternating Chair Representative Artiles, Alternating Chair

JOINT COMMITTEE ON PUBLIC COUNSEL OVERSIGHT Senator Joyner, Alternating Chair Representative Artiles, Alternating Chair 2013 Regular Session The Florida Senate COMMITTEE MEETING EXPANDED AGENDA JOINT COMMITTEE ON PUBLIC COUNSEL OVERSIGHT Senator Joyner, Alternating Chair Representative Artiles, Alternating Chair MEETING

More information

Division of Competitive Markets & Enforce Office of the General Counsel (Teitzman)

Division of Competitive Markets & Enforce Office of the General Counsel (Teitzman) 7- ~ -, State of Florida CAPITAL CIRCLE OFFICE CENTER 0 2540 SHUMARD OAK BOULEVARD TALLAHASSEE, FLORIDA 32399-0850 0 3 3 -A rn f-7 -M-E-M-0-R-A-N-D-U-M-

More information

File & Suspend Rate Cases. Water & Wastewater Reference Manual 1

File & Suspend Rate Cases. Water & Wastewater Reference Manual 1 File & Suspend Rate Cases 1 Basics of a File & Suspend Rate Case A file and suspend rate case is a process required to be used by Class A and Class B water and wastewater utilities. Under this process,

More information

I= PL. March 21, 2014

I= PL. March 21, 2014 These innovative technologies are delivering value for FPL customers. Smart meters and associated technologies are enabling important customer benefits and achieving operational savings, while laying the

More information

LOUISIANA PUBLIC SERVICE COMMISSION MINUTES FROM JANUARY 21, 2015 OPEN SESSION

LOUISIANA PUBLIC SERVICE COMMISSION MINUTES FROM JANUARY 21, 2015 OPEN SESSION LOUISIANA PUBLIC SERVICE COMMISSION MINUTES FROM JANUARY 21, 2015 OPEN SESSION MINUTES OF JANUARY 21, 2015 OPEN SESSION OF THE LOUISIANA PUBLIC SERVICE COMMISSION HELD IN BATON ROUGE, LOUISIANA. PRESENT

More information

The attached is submitted for filing on behalf of Verizon Florida LLC by

The attached is submitted for filing on behalf of Verizon Florida LLC by Page 1 of 1 Eric Fryson From: Sent: To: Cc: Subject: Scobie, Teresa A (TERRY) [terry.scobie@verizon.com] Tuesday, February 05,201311:31 AM Filings@psc.state.fl.us O'Roark, Dulaney L; Carolyn Ridley; David

More information

STATE OF NEW JERSEY Board of Public Utilities 44 South Clinton Avenue, 9th Floor Post Office Box 350 Trenton, New Jersey 08625-0350 www.nj.

STATE OF NEW JERSEY Board of Public Utilities 44 South Clinton Avenue, 9th Floor Post Office Box 350 Trenton, New Jersey 08625-0350 www.nj. *REVISED March 17, 2015 STATE OF NEW JERSEY Board of Public Utilities 44 South Clinton Avenue, 9th Floor Post Office Box 350 Trenton, New Jersey 08625-0350 www.nj.gov/bpu/ CONSENT AGENDA FOR BOARD MEETING

More information

142 FERC 62,199 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER AUTHORIZING DISPOSITION OF JURISDICTIONAL FACILITIES

142 FERC 62,199 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER AUTHORIZING DISPOSITION OF JURISDICTIONAL FACILITIES 142 FERC 62,199 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Pasco Cogen, Ltd. Lake Investment, LP NCP Lake Power, LLC Teton New Lake, LLC Auburndale LP, LLC Auburndale GP, LLC Dade Investment,

More information

ATTORNEYS AND COUNSELORS AT LAW P. O. BOX 391 (ZIP 32302) TALLAHASSEE, FLORIDA 32301. (8501222-7560 n HAND DELIVERED

ATTORNEYS AND COUNSELORS AT LAW P. O. BOX 391 (ZIP 32302) TALLAHASSEE, FLORIDA 32301. (8501222-7560 n HAND DELIVERED AUSLEY & McMuLLEN ATTORNEYS AND COUNSELORS AT LAW 227 SOUTH CALHOUN STREET P. O. BOX 391 (ZIP 3232) TALLAHASSEE, FLORIDA 3231 (85 1 224-9115 FAX n= (851222-756 n r -:~ November 12,29 rrl - :: ' ) ;,;;

More information

VoIP And FCC Regime - Changes In Consumer Protection

VoIP And FCC Regime - Changes In Consumer Protection ve~ December 7, 0 State Government Relations 5055 orth Point Parkway Alpharetta, GA 00 Transmittal Letter o. -0 VIAE-FILIG Ms. Beth Salak, Director Division of Competitive Markets and Enforcement Florida

More information

FPUC'S RESPONSES TO STAFF'S FIRST SET OF INTERROGATORIES (NOS, 1-5) AND FIRST REQUEST FOR PRODUCTION OF DOCUMENTS DOCKET NO.

FPUC'S RESPONSES TO STAFF'S FIRST SET OF INTERROGATORIES (NOS, 1-5) AND FIRST REQUEST FOR PRODUCTION OF DOCUMENTS DOCKET NO. FPUC'S RESPONSES TO STAFF'S FIRST SET OF INTERROGATORIES (NOS, 1-5) PAGE 6 industrial facility. The purchase of such locally generated power would benefit FPUC's electric rate payers through lower overall

More information

RESIDENTIAL ENERGY BILL CHARGES. The following charges may appear on your Electric bill:

RESIDENTIAL ENERGY BILL CHARGES. The following charges may appear on your Electric bill: Distribution/Delivery Service The following charges may appear on your Electric bill: Delivery/Distribution charges are applicable to company full-service and retail open access (electric customer choice)

More information

How To Defend Yourself Against A Power Plant Claim In A Court Of Law

How To Defend Yourself Against A Power Plant Claim In A Court Of Law STEEL. ORIGINAL Steel Hector & Davis LLP 215 South Monroe, Suite 601 HECTOR Tallahassee, Florida 32301-1804 IDA V IS'" 850.222.2300 850.222.8410 Fax www.steelhector.com Elizabeth C. Daley August 29, 2002

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Rock Island Clean Line LLC ) Docket No. ER12-365-000

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Rock Island Clean Line LLC ) Docket No. ER12-365-000 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Rock Island Clean Line LLC ) Docket No. ER12-365-000 ROCK ISLAND CLEAN LINE LLC S ANSWER TO COMMENTS OF INTERSTATE POWER AND LIGHT

More information

Comparative Rate Statistics

Comparative Rate Statistics F L O R I D A P U B L I C S E R V I C E C O M M I S S I O N Comparative Rate Statistics Regulated Industries: Electric Gas Water & Wastewater A S O F D E C E M B E R 3 1, 2 0 1 3 This report was prepared

More information

RESIDENTIAL ENERGY BILL CHARGES. The following charges may appear on your Electric bill:

RESIDENTIAL ENERGY BILL CHARGES. The following charges may appear on your Electric bill: Distribution/Delivery Service The following charges may appear on your Electric bill: Delivery/Distribution charges are applicable to full-service and retail open access (electric choice) customers. Delivery

More information

Legislative Council, State of Michigan Courtesy of www.legislature.mi.gov

Legislative Council, State of Michigan Courtesy of www.legislature.mi.gov THE INSURANCE CODE OF 1956 (EXCERPT) Act 218 of 1956 CHAPTER 33 AUTOMOBILE INSURANCE PLACEMENT FACILITY 500.3301 Michigan automobile insurance placement facility; purpose; participation. Sec. 3301. (1)

More information

BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION

BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION n A BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION Telephone Certificate No. 3359 issued to Richard 0. and Ann C. Hance for violation of Rule 25-4.0161, F.A.C., Regulatory Assessment Fees; Telecommunications

More information

Florida Senate - 2016 SB 534

Florida Senate - 2016 SB 534 By Senator Hays 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 A bill to be entitled An act relating to water and wastewater; creating s. 159.8105, F.S.; requiring the Division

More information

TARIFF. APPLICABLE TO UTILITY GAS SERVICE OF THE GAS COMPANY, LLC dba HAWAI IGAS

TARIFF. APPLICABLE TO UTILITY GAS SERVICE OF THE GAS COMPANY, LLC dba HAWAI IGAS TARIFF APPLICABLE TO UTILITY GAS SERVICE OF THE GAS COMPANY, LLC dba HAWAI IGAS EFFECTIVE: December 1, 2012 Sheet No. 1 SCHEDULE NO. 10 GENERAL SERVICE RATE AVAILABILITY: This rate is available to any

More information

(1{\k~ ~~DL -:::VJ 'l>

(1{\k~ ~~DL -:::VJ 'l> State of Florida Juhlk~mrtt~ Clrnmmissimt CAPITAL CIRCLE OFFICE CENTER 2540 SHUMARD OAK BOULEVARD TALLAHASSEE, FLORIDA 32399-0850 DATE: TO: FROM: RE: June 4, 2015 Office of Commission Clerk (Stauffer)

More information

Yes. See, e.g., California-American Water Company, Decision 06-11-050 (Nov. 30, 2006). The Commission may be adjusting this policy.

Yes. See, e.g., California-American Water Company, Decision 06-11-050 (Nov. 30, 2006). The Commission may be adjusting this policy. Alabama Alaska STATE RATE CONSOLIDATION No general policy, but could be permitted for a water company with systems that are close enough to interconnect, and share the same employees and a central office.

More information

TECO Energy Edison Electric Institute Financial Conference

TECO Energy Edison Electric Institute Financial Conference TECO Energy Edison Electric Institute Financial Conference Dallas, TX Nov. 13, 2014 Forward Looking Statements The Private Securities Litigation Reform Act of 1995 provides a safe harbor for forward-looking

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO * * * *

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO * * * * BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF COLORADO * * * * IN THE MATTER OF ALTERNATIVE NOTICE ) FOR ADVICE LETTER NO. 1704 ELECTRIC ) OF PUBLIC SERVICE COMPANY OF ) COLORADO TO REVISE ITS

More information

GDS Associates, Inc. Senior Project Manager Page 2 of 7

GDS Associates, Inc. Senior Project Manager Page 2 of 7 Ellen Blumenihal GDS Associates, Inc. Senior Project Manager Page 2 of 7 taxes, Affiliate transactions, Oil and gas exploration and development. Reviewed the books and business records of public utilities

More information

BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION

BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION In re: Complaint and Petition of the City of Cape Coral, Florida, for an investigation into the rate structure of Lee County Electric Cooperative, Inc. Docket

More information

121 FERC 61,143 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

121 FERC 61,143 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 121 FERC 61,143 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Joseph T. Kelliher, Chairman; Suedeen G. Kelly, Marc Spitzer, Philip D. Moeller, and Jon Wellinghoff.

More information

Florida Public Service Commission SPECIAL REPORT J U N E 2 0 0 3 N O. 1 0

Florida Public Service Commission SPECIAL REPORT J U N E 2 0 0 3 N O. 1 0 Florida Public Service Commission SPECIAL REPORT J U N E 2 0 0 3 N O. 1 0 Application for a Staff-Assisted Rate Case in Brevard County by Service Management Systems, Inc. On February 12, 2003, Service

More information

CSX RAILROAD U. S. F O R E S T S E R V I C E O S C E O L A N A T I O N A L F O R E S T FLORIDA POWER & LIGHT OVERHEAD ELECTRIC LINE

CSX RAILROAD U. S. F O R E S T S E R V I C E O S C E O L A N A T I O N A L F O R E S T FLORIDA POWER & LIGHT OVERHEAD ELECTRIC LINE FLORIDA POWER & LIGHT OVERHEAD ELECTRIC LINE EXISTING OVERHEAD ELECTRIC C:\Projects\Columbia County\End Users\Project Mongoose\, ELEC, smoore, May 09, 2014-12:28:43pm FLORIDA POWER & LIGHT OVERHEAD TRANSMISSION

More information

Southern California Edison IEC (Corp ID 6096) Status of Advice Letter 157 As of September 29, 2015. Disposition: Effective Date: Accepted 09-13-2015

Southern California Edison IEC (Corp ID 6096) Status of Advice Letter 157 As of September 29, 2015. Disposition: Effective Date: Accepted 09-13-2015 STATE OF CALIFORNIA EDMUND G. BROWN JR., Governor PUBLIC UTILITIES COMMISSION 505 Van Ness Avenue San Francisco CA 94102-3298 Southern California Edison IEC (Corp ID 6096) Status of Advice Letter 157 As

More information

IN THE UNITED STATES BANKRUPTCY COURT FOR THE DISTRICT OF MARYLAND (Greenbelt Division)

IN THE UNITED STATES BANKRUPTCY COURT FOR THE DISTRICT OF MARYLAND (Greenbelt Division) IN THE UNITED STATES BANKRUPTCY COURT FOR THE DISTRICT OF MARYLAND (Greenbelt Division) ) In re: ) ) USGen New England, Inc., ) Case No. 03-30465 (PM) ) Debtor. ) Chapter 11 ) DEBTOR'S MOTION PURSUANT

More information

January 22, 2016. Joint Petition of the Orlando Utilities Commission and Duke Energy Florida, LLC, to Approve Territorial Agreement; Docket No.

January 22, 2016. Joint Petition of the Orlando Utilities Commission and Duke Energy Florida, LLC, to Approve Territorial Agreement; Docket No. Matthew R. Bernier Senior Counsel January 22, 2016 VIA ELECTRONIC FILING Ms. Carlotta Stauffer, Commission Clerk Florida Public Service Commission 2540 Shumard Oak Boulevard Tallahassee, Florida 32399-0850

More information

The Nebraska Public Service Commission and General Admasion

The Nebraska Public Service Commission and General Admasion Page 8761 Chair Anne Boyle called the regularly scheduled meeting to order at 10:01 a.m. with Commissioners Anne Boyle, Rod Johnson, Frank Landis, and Tim Schram present, and Commissioner Gerald Vap excused.

More information

130 FERC 61,013 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER AUTHORIZING DISPOSITION OF TRANSMISSION FACILITIES

130 FERC 61,013 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER AUTHORIZING DISPOSITION OF TRANSMISSION FACILITIES 130 FERC 61,013 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer and Philip D. Moeller. American Electric Power Service Corporation

More information

30.8% Florida Information Technology Industry Labor Market Industry Profile

30.8% Florida Information Technology Industry Labor Market Industry Profile 30.8% Florida Information Technology Industry Labor Market Industry Profile Labor Market Information Source: Florida Agency for Workforce Innovation, Labor Market Statistics Center Prepared May 2007 Florida

More information

Department of Legislative Services Maryland General Assembly 2009 Session

Department of Legislative Services Maryland General Assembly 2009 Session Department of Legislative Services Maryland General Assembly 2009 Session SB 1026 FISCAL AND POLICY NOTE Senate Bill 1026 Finance (Senator Middleton) Telecommunications - Basic and Competitive Services

More information

152 FERC 61,028 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

152 FERC 61,028 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 152 FERC 61,028 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Philip D. Moeller, Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable.

More information

Pamela Jo Bondi, Attorney General, and J. Clifton Cox, Special Counsel, Tallahassee, for Appellee.

Pamela Jo Bondi, Attorney General, and J. Clifton Cox, Special Counsel, Tallahassee, for Appellee. IN THE DISTRICT COURT OF APPEAL FIRST DISTRICT, STATE OF FLORIDA VERIZON BUSINESS PURCHASING, LLC, v. Appellant, NOT FINAL UNTIL TIME EXPIRES TO FILE MOTION FOR REHEARING AND DISPOSITION THEREOF IF FILED

More information

JAN 2 2 2016 AUTHORIZING THE ISSUANCE OF SPECIAL PURPOSE REVENUE BONDS FOR HAWAII RENEWABLE RESOURCES, LLC.

JAN 2 2 2016 AUTHORIZING THE ISSUANCE OF SPECIAL PURPOSE REVENUE BONDS FOR HAWAII RENEWABLE RESOURCES, LLC. THE SENATE TWENTY-EIGHTH LEGISLATURE, 0 STATE OF HAWAII JAN 0 A BILL FOR AN ACT S.B. NO. %7 AUTHORIZING THE ISSUANCE OF SPECIAL PURPOSE REVENUE BONDS FOR HAWAII RENEWABLE RESOURCES, LLC. BE IT ENACTED

More information

APSC FILED Time: 9/26/2014 11:13:03 AM: Recvd 9/26/2014 11:01:49 AM: Docket 14-099-U-Doc. 1

APSC FILED Time: 9/26/2014 11:13:03 AM: Recvd 9/26/2014 11:01:49 AM: Docket 14-099-U-Doc. 1 Arkansas Public Service Commission Docket Summary Cover Sheet (For all dockets other than Rate Cases, "TD", "C" and "TF" Dockets Must be filed with each new docket filed at the Commission STYLE OF DOCKET:

More information

135 FERC 61,068 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER GRANTING PETITION FOR TEMPORARY WAIVER. (Issued April 22, 2011)

135 FERC 61,068 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER GRANTING PETITION FOR TEMPORARY WAIVER. (Issued April 22, 2011) 135 FERC 61,068 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. Hydrogen

More information

UNIFORM SYSTEM OF ACCOUNTS FOR WATER AND WASTEWATER UTILITIES

UNIFORM SYSTEM OF ACCOUNTS FOR WATER AND WASTEWATER UTILITIES 23-1 CHAPTER 23 UNIFORM SYSTEM OF ACCOUNTS FOR WATER AND WASTEWATER UTILITIES CLASSIFICATION OF WATER AND WASTEWATER UTILITIES Water and Wastewater Utility Classes (based on annual revenues): Class A:

More information

RECE ED OCUHENT OR1G1NAL. FPSC-eREA RECORDS "284 SEP 10 Q FPSC-COMNISSION CLERK

RECE ED OCUHENT OR1G1NAL. FPSC-eREA RECORDS 284 SEP 10 Q FPSC-COMNISSION CLERK .. -- -- ". BEFORE THE FLORIA PUBLIC SERVICE COMMISSION OR1G1NAL In re: Review of Florida Power Corporation's earngs, including effects of proposed acquisition of Florida Power Corporation by Carolina

More information

Attention was called to the following proceedings:

Attention was called to the following proceedings: Page 6906 Chairman Rod Johnson called the regularly scheduled meeting to order at 10:08 a.m. with Commissioners Johnson, Landis and Schram present, Commissioner Vap excused and Commissioner Boyle excused

More information

ORDER ACCEPTING FOR FILING AND SUSPENDING PROPOSED RATES, AND ESTABLISHING HEARING PROCEDURES. (Issued March 12, 2003)

ORDER ACCEPTING FOR FILING AND SUSPENDING PROPOSED RATES, AND ESTABLISHING HEARING PROCEDURES. (Issued March 12, 2003) UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 102 FERC 61,270 Before Commissioners: Pat Wood, III, Chairman; William L. Massey, and Nora Mead Brownell. Pacific Gas and Electric Company

More information

R8-67 RENEWABLE ENERGY AND ENERGY EFFICIENCY PORTFOLIO STANDARD (REPS) (a) Definitions. (1) The following terms shall be defined as provided in G.S.

R8-67 RENEWABLE ENERGY AND ENERGY EFFICIENCY PORTFOLIO STANDARD (REPS) (a) Definitions. (1) The following terms shall be defined as provided in G.S. R8-67 RENEWABLE ENERGY AND ENERGY EFFICIENCY PORTFOLIO STANDARD (REPS) (a) Definitions. (1) The following terms shall be defined as provided in G.S. 62-133.8: "Combined heat and power system"; "demand-side

More information

Ameren Illinois Company Ill. C. C. No. 1 d/b/a Ameren Illinois Original Sheet No. 26 Electric Service Schedule Ill. C. C. No. 1

Ameren Illinois Company Ill. C. C. No. 1 d/b/a Ameren Illinois Original Sheet No. 26 Electric Service Schedule Ill. C. C. No. 1 d/b/a Ameren Illinois Original Sheet No. 26 Electric Service Schedule Ill. C. C. No. 1 PURPOSE The purpose of this Rider PSP - Power Smart Pricing (PSP) is to comply with 220 ILCS 5/16-107(b-5) and encourage

More information

Florida. Information Technology Industry. Source: Florida Agency for Workforce Innovation, Bureau of Labor Market Statistics Center

Florida. Information Technology Industry. Source: Florida Agency for Workforce Innovation, Bureau of Labor Market Statistics Center L a b o r M a r k e t I n d u s t r y P r o f i l e Florida Information Technology Industry Source: Florida Agency for Workforce Innovation, Bureau of Labor Market Statistics Center Florida Information

More information

Version Part Section Description 0.0.0 II 13.27 Summary of Negotiated Rate Agreement

Version Part Section Description 0.0.0 II 13.27 Summary of Negotiated Rate Agreement Transcontinental Gas Pipe Line Company, LLC 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 (713) 215-2000 Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

FEECA Annual Report on Activities Pursuant to the Florida Energy Efficiency & Conservation Act

FEECA Annual Report on Activities Pursuant to the Florida Energy Efficiency & Conservation Act F L O R I D A P U B L I C S E R V I C E C O M M I S S I O N FEECA Annual Report on Activities Pursuant to the Florida Energy Efficiency & Conservation Act As Required by Sections 366.82(10), and 377.703(2)(f),

More information

1. Name of business. 15. Renewal month of your policy:

1. Name of business. 15. Renewal month of your policy: Florida Commercial Property Insurance Survey The Office of Insurance Regulation has received reports that some insurers are sending notices of cancellation or non-renewal of commercial insurance coverage.

More information

RATES, RULES AND REGULATIONS. for GAS SERVICE

RATES, RULES AND REGULATIONS. for GAS SERVICE Original Sheet i Cancels WN U-5 RATES, RULES AND REGULATIONS for GAS SERVICE at BATTLE GROUND, BINGEN, CAMAS, La CENTER, NORTH BONNEVILLE, RIDGEFIELD, VANCOUVER, WASHOUGAL, AND WHITE SALMON, WASHINGTON,

More information

October 29,2008. Utah Public Service Commission Heber M. Wells Building P. 0. Box 45585 Salt Lake City, UT 84145-0585. Dear Commissioners:

October 29,2008. Utah Public Service Commission Heber M. Wells Building P. 0. Box 45585 Salt Lake City, UT 84145-0585. Dear Commissioners: Questar Gas Company 180 East 100 South PO. Box 45360 Salt Lake City, UT 84145-0360 Tel801 324 5555 October 29,2008 Utah Public Service Commission Heber M. Wells Building P. 0. Box 45585 Salt Lake City,

More information

NWN OPUC Advice No. 15-11 / UG (UM 1635 / UG 221)

NWN OPUC Advice No. 15-11 / UG (UM 1635 / UG 221) ONITA R. KING Rates & Regulatory Affairs Tel: 503.721.2452 Fax: 503.721.2516 Email: ork@nwnatural.com July 31, 2015 NWN OPUC Advice No. 15-11 / UG (UM 1635 / UG 221) VIA ELECTRONIC FILING Public Utility

More information

ORDER RE: UPDATED BUSINESS CASE I. INTRODUCTION

ORDER RE: UPDATED BUSINESS CASE I. INTRODUCTION 7612 Order Re: Update Business Case STATE OF VERMONT PUBLIC SERVICE BOARD Docket No. 7612 Petition of Central Vermont Public Service Corporation for approval of its "Smart Power Plan", to implement Advanced

More information

, ISSUED: June 9,2008

, ISSUED: June 9,2008 BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION In re: Complaint of Sallijo A. Freeman against DOCKET NO. 080039-El Florida Power & Light Company for violation ORDER NO. PSC-08-0380-PCO-El ofrule 25-6.105,

More information

FORTISALBERTA INC. MANAGEMENT S DISCUSSION AND ANALYSIS

FORTISALBERTA INC. MANAGEMENT S DISCUSSION AND ANALYSIS FORTISALBERTA INC. MANAGEMENT S DISCUSSION AND ANALYSIS May 1, 2015 The following ( MD&A ) of FortisAlberta Inc. (the Corporation ) should be read in conjunction with the following: (i) the unaudited interim

More information

Florida. Information Technology Industry. 2015 Edition. Source: Florida Department of Economic Opportunity, Bureau of Labor Market Statistics

Florida. Information Technology Industry. 2015 Edition. Source: Florida Department of Economic Opportunity, Bureau of Labor Market Statistics L a b o r M a r k e t I n d u s t r y P r o f i l e Florida Information Technology Industry 2015 Edition Source: Florida Department of Economic Opportunity, Bureau of Labor Market Statistics Florida Information

More information

137 FERC 61,183 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

137 FERC 61,183 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 137 FERC 61,183 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. City of South Daytona,

More information

PRESS!RELEASE! For!Immediate!Release! February!17,!2015!! Contact:!Floridians!for!Solar!Choice,!954E580E6370,!jennifer@flsolarchoice.org!

PRESS!RELEASE! For!Immediate!Release! February!17,!2015!! Contact:!Floridians!for!Solar!Choice,!954E580E6370,!jennifer@flsolarchoice.org! PRESSRELEASE ForImmediateRelease February17,2015 Contact:FloridiansforSolarChoice,954E580E6370,jennifer@flsolarchoice.org SolarBallotInitiativeSecures100,000PetitionSignaturesinFirstMonth Strong*Support*from*Residents*Across*the*State*Confirms**

More information

Dulaney L. O Roark III Vice President & General Counsel, Southeast Region Legal Department 5055 North Point Parkway Alpharetta, Georgia 30022

Dulaney L. O Roark III Vice President & General Counsel, Southeast Region Legal Department 5055 North Point Parkway Alpharetta, Georgia 30022 Dulaney L. O Roark III Vice President & General Counsel, Southeast Region Legal Department 5055 North Point Parkway Alpharetta, Georgia 30022 Phone 678-259-1449 Fax 678-259-1589 de.oroark@verizon.com July

More information

c. The name of the party on whose behalf the document is filed: Aqua Utilities Florida, Inc. ("AUF")

c. The name of the party on whose behalf the document is filed: Aqua Utilities Florida, Inc. (AUF) Page 1 of2 From: jennifer.gillis@hklaw.com Sent: Wednesday, April 13,2011 3:Ol PM To: Filings@psc.state.fl.us cc: Caroline Klancke; Ralph Jaeger; CHRISTENSEN.PATTY@leg.state.fl.us; kenneth.curtin@arlawxom;

More information

NC General Statutes - Chapter 160A Article 16A 1

NC General Statutes - Chapter 160A Article 16A 1 Article 16A. Provision of Communications Service by Cities. 160A-340. Definitions. The following definitions apply in this Article: (1) City-owned communications service provider. A city that provides

More information

Oklahoma Corporation Commission - Public Utility Division March 2, 2015 through March 13, 2015

Oklahoma Corporation Commission - Public Utility Division March 2, 2015 through March 13, 2015 FINAL ORDERS - ENERGY Date 201500011 01/09/15 Application Filed Empire District Electric Company, a Kansas 03/03/15 Final Order, number 637184 dismissing cause. Corporation ALJ Jackson Amendment to the

More information

Chapter 52. Operation of Public Utilities. Article 7. Water and Wastewater Utilities.

Chapter 52. Operation of Public Utilities. Article 7. Water and Wastewater Utilities. Chapter 52. Operation of Public Utilities. Article 7. Water and Wastewater Utilities. 700. Exempt water or wastewater utilities 710. Certificate of public convenience and necessity 715. Public convenience

More information

LAKEWOOD RANCH STEWARDSHIP DISTRICT AUDITED FINANCIAL STATEMENTS. FOR THE FISCAL YEAR ENDED September 30, 2013

LAKEWOOD RANCH STEWARDSHIP DISTRICT AUDITED FINANCIAL STATEMENTS. FOR THE FISCAL YEAR ENDED September 30, 2013 AUDITED FINANCIAL STATEMENTS FOR THE FISCAL YEAR ENDED September 30, 2013 FOR THE FISCAL YEAR ENDED September 30, 2013 TABLE OF CONTENTS PAGE INDEPENDENT AUDITOR S REPORT 1 2 MANAGEMENT S DISCUSSION AND

More information

OFFICIAL RECORDS OF OUR CONDOMINIUM ASSOCIATION

OFFICIAL RECORDS OF OUR CONDOMINIUM ASSOCIATION OFFICIAL RECORDS OF OUR CONDOMINIUM ASSOCIATION DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION Division of Florida Condominiums, Timeshares, and Mobile Homes 1940 North Monroe Street Tallahassee, Florida

More information

PLEASE NOTE. For more information concerning the history of this Act, please see the Table of Public Acts.

PLEASE NOTE. For more information concerning the history of this Act, please see the Table of Public Acts. PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this Act, current to November 1, 2003. It is intended for information and reference purposes only. This

More information

Ameren Illinois Company Ill. C. C. No. 1 d/b/a Ameren Illinois Original Sheet No. 47 Electric Service Schedule Ill. C. C. No. 1

Ameren Illinois Company Ill. C. C. No. 1 d/b/a Ameren Illinois Original Sheet No. 47 Electric Service Schedule Ill. C. C. No. 1 d/b/a Ameren Illinois Original Sheet No. 47 PURPOSE OF RIDER The Hazardous Materials Adjustment Clause (HMAC) shall operate to recover allowable HMAC Costs (as defined herein) of the Company. APPLICABLE

More information

111 FERC 61,205 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

111 FERC 61,205 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 111 FERC 61,205 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Pat Wood, III, Chairman; Nora Mead Brownell, Joseph T. Kelliher, and Suedeen G. Kelly. PacifiCorp and

More information

IN THE UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT

IN THE UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT USCA Case #15-1173 Document #1563792 Filed: 07/22/2015 Page 1 of 5 IN THE UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT BEYOND NUCLEAR, INC. Petitioner, v. Case No. 15-1173 UNITED

More information

Southern California Edison IEC (Corp ID 6096) Status of Advice Letter 69 As of July 9, 2009 Disposition: Accepted Effective Date: 03-06-2009

Southern California Edison IEC (Corp ID 6096) Status of Advice Letter 69 As of July 9, 2009 Disposition: Accepted Effective Date: 03-06-2009 Southern California Edison IEC (Corp ID 6096) Status of Advice Letter 69 As of July 9, 2009 Subject: CONTRACTS Division Assigned: Telecommunications Date Filed: 02-04-2009 Date to Calendar: 02-09-2009

More information

S T A T E O F M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * *

S T A T E O F M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * * S T A T E O F M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION * * * * * In the matter of the application of ) VOIP TELECOM, LLC, for a temporary and ) permanent license to provide basic local

More information

COST RECOVERY MECHANISMS FOR PUBLIC UTILITIES IN NEW YORK STATE

COST RECOVERY MECHANISMS FOR PUBLIC UTILITIES IN NEW YORK STATE COST RECOVERY MECHANISMS FOR PUBLIC UTILITIES IN NEW YORK STATE Staff Subcommittee on Gas, NARUC Annual Convention, Chicago, Illinois Sunday, November 15, 2009 Thomas G. Dvorsky New York State Public Service

More information

Arizona 1. Dependent Public School Systems (14) Arizona ranks 39th among the states in number of local governments, with 639 as of June 2002.

Arizona 1. Dependent Public School Systems (14) Arizona ranks 39th among the states in number of local governments, with 639 as of June 2002. Arizona Arizona ranks 39th among the states in number of local governments, with 639 as of June 2002. COUNTY GOVERNMENTS (15) There are no areas in Arizona lacking county government. The county governing

More information

Construction Best Practices II II Ron Bilodeau Nevada Power Company Company

Construction Best Practices II II Ron Bilodeau Nevada Power Company Company Construction Best Practices II Ron Bilodeau Nevada Power Company Nevada Power Sierra Pacific Wireless Operations Overview Utilisite Council Dallas Texas March 7, 2008 Las Vegas Metropolitan Area 807,282

More information

Income/Franchise: New Jersey: General Guidelines Issued for Determining Whether Select Activities Create Corporation Business Tax Nexus

Income/Franchise: New Jersey: General Guidelines Issued for Determining Whether Select Activities Create Corporation Business Tax Nexus Multistate Tax State Tax Matters August 7, 2015 In this issue: Income/Franchise: New Jersey: General Guidelines Issued for Determining Whether Select Activities Create Corporation Business Tax Nexus...

More information

SECTION TWO: MAJOR REVENUE SOURCES

SECTION TWO: MAJOR REVENUE SOURCES SECTION TWO: MAJOR REVENUE SOURCES 57 Major Revenue Sources This section on major revenue sources was developed as a reference for the primary revenues collected. Tracking, forecasting, and reporting revenue

More information

Electricity Procurement. Budget, Finance and Audit Committee June 15, 2015

Electricity Procurement. Budget, Finance and Audit Committee June 15, 2015 Electricity Procurement Budget, Finance and Audit Committee June 15, 2015 Provide a brief overview of City electricity program Discuss current energy market Discuss an opportunity to take advantage of

More information

151 FERC 62,145 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

151 FERC 62,145 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 151 FERC 62,145 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Cross-Sound Cable Company, LLC AIA Energy North America, LLC Docket No. EC15-122-000 ORDER AUTHORIZING ACQUISITION AND DISPOSITION

More information

DATA CENTER INCENTIVES

DATA CENTER INCENTIVES DATA CENTER APPLICATION June 1, 2011 through May 31, 2012 DATA CENTER INCENTIVES HOW TO PARTICIPATE IN SMART IDEAS FOR YOUR BUSINESS 1. CHECK PROJECT AND EQUIPMENT ELIGIBILITY Project must be a new improvement

More information

XOOM Energy Texas, LLC PUCT Certificate #10203 YOUR RIGHTS AS A CUSTOMER

XOOM Energy Texas, LLC PUCT Certificate #10203 YOUR RIGHTS AS A CUSTOMER XOOM Energy Texas, LLC PUCT Certificate #10203 YOUR RIGHTS AS A CUSTOMER Por favor refiérase a la parte interior de este documento para leer esta información en español. This document summarizes Your Rights

More information

MINISTRY OF SMALL BUSINESS AND REVENUE

MINISTRY OF SMALL BUSINESS AND REVENUE The ministry's mission is to promote small business growth by working in partnership with British Columbians; to streamline and simplify the regulatory system to stimulate business growth and investment,

More information

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C. 20554 REPLY TO OPPOSITIONS TO PETITION FOR RECONSIDERATION

Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C. 20554 REPLY TO OPPOSITIONS TO PETITION FOR RECONSIDERATION Before the FEDERAL COMMUNICATIONS COMMISSION Washington, D.C. 20554 In the Matter of Implementation of Section 621(a)(1) of the Cable Communications Policy Act of 1984 as amended by the Cable Television

More information

CASE NO. 1D10-1766. An appeal from an order of the Business and Professional Regulation.

CASE NO. 1D10-1766. An appeal from an order of the Business and Professional Regulation. IN THE DISTRICT COURT OF APPEAL FIRST DISTRICT, STATE OF FLORIDA FT. MYERS REAL ESTATE HOLDINGS, LLC, v. Appellant, NOT FINAL UNTIL TIME EXPIRES TO FILE MOTION FOR REHEARING AND DISPOSITION THEREOF IF

More information

Starting an Energy Efficiency Program for Your Utility and Community

Starting an Energy Efficiency Program for Your Utility and Community SM Starting an Energy Efficiency Program for Your Utility and Community Why Energy Efficiency Is Important Utilities continue to seek ways to meet growing electricity demand and manage increasing energy

More information

MISSISSIPPI LIFE AND HEALTH INSURANCE GUARANTY ASSOCIATION PLAN OF OPERATION

MISSISSIPPI LIFE AND HEALTH INSURANCE GUARANTY ASSOCIATION PLAN OF OPERATION MISSISSIPPI LIFE AND HEALTH INSURANCE GUARANTY ASSOCIATION PLAN OF OPERATION (As revised and adopted by the Board of Directors of the Association on May 18, 2006; Effective upon the written approval of

More information

October 15, 2014 George Hammer 209 Harrogate pi Longwood,FJ32779

October 15, 2014 George Hammer 209 Harrogate pi Longwood,FJ32779 October 15, 214 George Hammer 29 Harrogate pi Longwood,FJ32779 RE: Docket 146-WS SanlandoUtilities Corp (""') n3: -~ (""') -f 13: _, rn- ;::;:;(.{) ::t:~ C> :z: :J> :X 'P. &" "\.: rn!ll < rn ll u (J) (

More information

Florida Gas Transmission Company, LLC Docket No. RP14- -000

Florida Gas Transmission Company, LLC Docket No. RP14- -000 April 30, 2014 Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 RE: Florida Gas Transmission Company, LLC Docket No. RP14- -000 Dear Ms.

More information

Tres Palacios Natural Gas Storage Acquisition Overview. September 7, 2010

Tres Palacios Natural Gas Storage Acquisition Overview. September 7, 2010 Tres Palacios Natural Gas Storage Acquisition Overview September 7, 2010 Forward Looking Statements NYSE: NRGY, NRGP Cautionary Statement Regarding Forward-Looking Statements This communication contains

More information

Prescriptive, Custom, New Construction and Data Center

Prescriptive, Custom, New Construction and Data Center Construction and Data Center Application Terms & Conditions and Final Payment Agreement Version: November 2014 TERMS AND CONDITIONS Program Effective Dates AEP Ohio Business Incentives Program offers incentives

More information

HURRICANE FRANCES BRIEFING SHEET As of 4:00 p.m., September 2, 2004

HURRICANE FRANCES BRIEFING SHEET As of 4:00 p.m., September 2, 2004 Jeb Bush Governor THE STATE OF FLORIDA State Emergency Response Team www.floridadisaster.org Craig Fugate State Coordinating Officer FOR IMMEDIATE RELEASE-REVISED CONTACT: Public Information-ESF14 September

More information

CHARLOTTE COUNTY GOVERNMENT APPLICATION FOR NON PROFIT UTILITY CERTIFICATE

CHARLOTTE COUNTY GOVERNMENT APPLICATION FOR NON PROFIT UTILITY CERTIFICATE CHARLOTTE COUNTY GOVERNMENT APPLICATION FOR NON PROFIT UTILITY CERTIFICATE To: Charlotte County Board of County Commissioner Budget Department 18500 Murdock Circle Port Charlotte, FL 33948-1068 Phone 941.743.1542

More information

WEATHERIZATION WORKS PREPARED BY IN PARTNERSHIP WITH

WEATHERIZATION WORKS PREPARED BY IN PARTNERSHIP WITH WEATHERIZATION WORKS Energy efficiency investment in low-income housing will cut energy costs, reduce the need for payment assistance, and create jobs by Amanda K. Woodrum PREPARED BY IN PARTNERSHIP WITH

More information

BUSINESS USE PERMIT APPLICATION

BUSINESS USE PERMIT APPLICATION BUSINESS USE PERMIT APPLICATION Instructions and Information for Business Use Permits and Temporary Certificates of Occupancy are included at the end of this application. Planning and Development Services

More information

BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION. Cost Recovery Clause Filed: September 4, 2015 /

BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION. Cost Recovery Clause Filed: September 4, 2015 / BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION In Re: Nuclear Power Plant Docket 150009-EI Cost Recovery Clause Filed: September 4, 2015 / THE FLORIDA INDUSTRIAL POWER USERS GROUP S POST-HEARING STATEMENT

More information

R14-2-314. Intermittent gas ignition ARTICLE 4. WATER UTILITIES Section. Section

R14-2-314. Intermittent gas ignition ARTICLE 4. WATER UTILITIES Section. Section Arizona Administrative Code Title 14, Ch. 2 TITLE 14. PUBLIC SERVICE CORPORATIONS; CORPORATIONS AND ASSOCIATIONS; SECURITIES REGULATION CHAPTER 2. CORPORATION COMMISSION FIXED UTILITIES Authority: Article

More information

APPLICABILITY/ACCOUNTABILITY

APPLICABILITY/ACCOUNTABILITY SUBJECT: Effective Date: Policy Number: Utility Rate Methodology and Billing 1/17/2016 FSP 2015 UES0001 Supersedes: Page Of 1 5 Responsible Authority: Associate Vice President, Facilities & Safety APPLICABILITY/ACCOUNTABILITY

More information

Bylaws of the Supervisory Board of K+S Aktiengesellschaft. Version of 21 November 2012 The German Version is binding.

Bylaws of the Supervisory Board of K+S Aktiengesellschaft. Version of 21 November 2012 The German Version is binding. Bylaws of the Supervisory Board of K+S Aktiengesellschaft Version of 21 November 2012 The German Version is binding. Page 2 1 Position and Responsibility The Supervisory Board performs its functions in

More information