1 PROJECT COMMUNICATIONS MANAGEMENT STRATEGIES FOR IMPROVING UNDERSTANDING AND RELATIONSHIPS Herbert Remidez University of Dallas 1845 East Northgate Drive Anselm Hall Room 216 Irving, TX ABSTRACT The competencies required for a project manager to be successful have changed due to the globalization of business and changing role of the project manager. Increasingly project managers are required to work in distributed teams composed of stakeholders with whom they have not had a relationship. Traditional communications management techniques that focus on relaying information are inadequate for managing relationships in these new settings. This article provides the rationale for a more relationship-oriented approach to managing project communications and proposes a set of decision rules to support project managers in the development of communication strategies that promote understanding and relationship development. INTRODUCTION Effective communications has been cited repeatedly as critical to the successful completion of projects (Henderson, 2008; R. Nelson, 2007; Skulmoski & Hartman, 2010). Conveying information and managing stakeholder relationships are the core requirements for effective communication. Ample guidance in the form of templates and best practice documentation is available for project managers seeking assistance with how to best convey information in meetings, status reports and similar settings. The second component of effective communication, managing stakeholder relationships, allows project managers to manage expectations effectively and to identify issues and concerns before they become problems. Although managing relationships is equally as important as if not more important than conveying information, there is little guidance available for project managers seeking help with developing communication strategies to manage relationships. The following sections review the literature related to the importance of project managers being effective communicators, benefits of positive relationships with project stakeholders, and communication practices associated with promoting understanding and developing or maintaining relationships. That review serves as the basis for a set of decision rules to guide project managers in developing communication strategies appropriate for conveying information and managing relationships

2 COMMUNICATION MANAGEMENT COMPETENCY Multiple studies suggest that for the past 30 years managers have spent approximately 75% of their time communicating (Mintzberg, 1973; Rice & Shook, 1990). The importance of project managers utilizing their time spent communicating effectively has been acknowledged for some time (Haywood, 1998). For example, Muller studied projects that spanned organizational boundaries and involved buyer-seller relationships and found that good communication between project managers and sponsors was necessary for effective communication across project team boundaries (Müller, 2003). He found that successful project managers communicated in ways that promoted good relationships and conveyed project status information while adapting the communication style to the project s characteristics and organizational context. Task-oriented communications that lacked relationship building aspects were insufficient. Like Muller, Pinto and Pinto (1991) found that effective project communication on cross-functional projects was associated with superior outcomes on project objectives related to budget, schedule, and likelihood of use by clients. The recognition of the positive relationship between project communication practices and project success has led to communication skills becoming one of the most desired project management competencies (Ingason & Jónasson, 2009; Crawford, 2002). Strong communication skills have been shown to compliment other aspects of team performance such as supporting team-building efforts by maintaining relationships throughout the project (Haywood, 1998) and promoting team member satisfaction and project team productivity (Henderson, 2008). While these studies document the connection between communication practices and project outcomes, there has been little discussion of the processes by which communication practices impact project outcomes. The next section discusses one outcome of communication practices, trust, and how is connected to project success. TRUST In addition to impacting the level of understanding among the communicating parties, a communication exchange often results in an assessment of the parties trustworthiness. The choice of words, format, frequency, etc. can influence the perception of trustworthiness. Project managers need to cultivate an image of trustworthiness because it enables them to achieve two outcomes critical to the success of a project: influencing and managing stakeholder expectations (Pinto, Slevin, & English, 2009; Smyth, Gustafsson, & Ganskau, 2010; Smyth & Edkins, 2007). The ability to influence others is especially important in a matrix organizational structure, which is where most projects are executed. The matrix structure results in the project manager having little or no direct authority over project team members. In this setting the project manager s ability to influence team members to take actions in a timely manner that will benefit the project is critical to the project s success. Project managers who are trusted will have more success influencing team members and other stakeholders. In addition to influencing the project team, the dynamic nature of projects requires that project managers be skilled in managing stakeholder expectations. One of the key interpersonal skills

3 necessary for this is the ability to build and maintain trust (Project Management Institute, 2008). Strong positive relationships in the form of trust have been cited as facilitating cooperation (Mayer, 1995), a more productive free flow of information (Hart & Saunders, 1997; Nelson & Cooprider, 1996), leadership (Atwater, 1988), and collective learning, knowledge sharing, and creative problem solving (Argyris, 1999; Reina & Reina, 1999). Good relationships can reduce the coordination and communication costs associated with managing a project. In an example from a project setting, Nelson and Cooprider (1996) examined the relationship between mutual trust, shared knowledge, influence, and IS department performance. They asked members of an IS department and their customers (line managers) to rate one another on trust. They found that mutual trust and influence between IS groups and their line customers led to increased levels of shared knowledge, which led to increased IS group performance. Not only are positive relationships beneficial, but a lack of trust has been attributed to restricting knowledge sharing, problem solving, and collective learning (Argyris, 1999; Nelson & Cooprider, 1996; Reina & Reina, 1999). People need to know whether those initiating change are trustworthy, especially if they are in positions of authority (Senge, Kleiner, Roberts, Ross, & Smith, 1999). After trust has developed it must be maintained, because the loss of trust can lead to openness being seen as a façade inconsistent with what actually happens in the organization (Senge, Kleiner, Roberts, Ross, & Smith, 1994). COMMUNICATION PRACTICES FOR BUILDING RELATIONSHIPS Although the ability to develop and execute effective communication management strategies that builds strong relationships is recognized as important to the success of a project, there are few resources a project manager can reference when confronted with the need to design and implement communication strategies to build relationships. This section reviews research related to how the choice of communication medium, frequency, format, distribution, and message content impacts the strength of relationships. The result is a set of guidelines that are incorporated into a framework that can help project managers select appropriate communication strategies. CAMOC-DIT The Cognitive Affective Model of Organizational Communication for Designing IT (CAMOC- DIT) (Te'eni, 2001) (Figure 1) describes how communication goals (instructing action, managing interdependent action, managing relationships, and influencing) drive strategy selection (contextualization, affectivity, control through testing and adjusting, control through planning, perspective taking, and attention focusing) and how certain medium attributes (interactivity, channel capacity, and adaptiveness) and message attributes (size, distribution, degree of organization, and formality) are better suited for certain strategies

4 Communication Communication process Communication Inputs Impact Task Distance Norms Goal Strategies Medium Message Mutual Understanding Relationship Communication complexity Figure 1 The overall communication model (Te'eni, 2001) The four classes of communication goals (instructing action, managing interdependent action, managing relationships, and influencing) have inherent sources of communication complexity. Communication complexity is viewed as a function of cognitive complexity, dynamic complexity, and affective complexity. Cognitive complexity is presented as a function of the intensity of the information exchange, the multiplicity of views held by the communicators, and the incompatibility between representation and use of information. Te'eni (2001) argues that the higher the level of cognitive complexity, the greater the likelihood of misunderstanding and relationship deterioration. Dynamic complexity is dependent on the time-constraints of the communication process, the quality of the feedback exchanged, and the number of changes made to the solution requirements during the problem-solving process. Dynamic complexity can increase the likelihood that the actions required to complete the task will be misunderstood (Diehl & Sterman, 1995). Affective complexity is how sensitive the communication is to attitudes or changes in disposition toward the communication partner or subject matter (Te'eni, 2001). A decrease in affective complexity is associated with an increase in relationship strength (Salazar, 1995), and an increase in relationship strength is associated with higher performing project teams (Müller, 2003). Of the communication strategies discussed in the model, affectivity and perspective taking are the two most associated with improving relationship strength. Affectivity is the act of providing emotional and mood-related components in messages. Perspective taking is considering the viewpoints of the receiver and adapting the message to make it more personal. An underlying assumption of the CAMOC-DIT model is that a reduction in communication complexity will result in higher levels of mutual understanding and relationship strength. Six strategies are identified in the model as means to overcome the three sources of communication complexity inherent in each of the four communication goals. Contextualization is a strategy of including background information to build an interpretation for the receiver that supports the request for action and goes beyond stating the desired action. It can include explaining events leading up to the current state and why other possible actions were not taken. Another strategy, affectivity, involves including emotional and mood-related components in the message

5 The message components do not need to be positive for the strategy to be effective. A closely related strategy that is often employed along with affectivity is perspective taking. Perspective taking emphasizes the sender showing consideration of the cognitive and affective aspects of the receiver s perspective in the message components. Control by planning and control by testing are two closely related strategies. Control by planning is the strategy that dominates the Project Management Institute s recommendations for managing project communications. It involves identifying the stakeholders, the information each stakeholder needs, the best format to deliver the communication, the appropriate frequency and the party responsible for gathering and sending the information. Control by testing is a strategy that involves closely monitoring the impact of the communications and adjusting during the process. It requires the sender to play an active part in obtaining timely feedback from the receiver. The last of the six strategies is attention focusing, which involves the sender using cues to draw the receiver s attention to important message components. Highlighting, changing tone, changing font size or style are all examples of attempts to focus the receiver s attention. CAMOC-DIT Propositions After describing the elements of the model, Te eni (2001) stated a series of propositions about how the interactions among the inputs to the communication process, goals, strategies, media attributes, message attributes, and task attributes impact understanding and relationship strength. A complete review of the model and the more than 30 propositions associated with it is beyond the scope of this paper. This section reviews the communication process described in the model and presents a set of decision rules developed by combining propositions relevant to managing project communications. The rules are presented in a format that project managers can use when developing communication strategies. COMMUNICATION PROCESS OVERVIEW Step 1: Assess Inputs Task characteristics (analyzability, variety, and temporal demands) Cognitive and affective distance between sender and receiver Values and cultural norms Step 2: Determine Goal(s) Getting the receiver to act according to directions Coordinating interdependent actions Fostering relationship Influencing behavior or attitude Step 3: Select Strategy(ies) Provide explicit context in message Include affective components in message Planning to test and adjust according to feedback during process Planning the pattern of messages and contingencies ahead of time Adapting message considering the receiver s view and attitude Planning to direct and mange receiver s information focus

6 Step 4: Select Media Characteristics and Message Attributes to Fit Selected Strategy(ies) Medium s potential for immediate feedback, high variety of cues, and adaptability to receiver Message attributes include the number of semantic units, distribution, organization, and formality DECISION RULES The propositions Te eni (2001) presented are worded such that they include only two of the elements of the model. For example, Proposition 2A (pg. 269) reads: Contextualization is selected for communication goals characterized by high cognitive complexity. Te eni does not attempt to connect multiple related propositions. Although Proposition 3B (pg. 274) states: For contextualization, high rather than low, channel capacity is more effective, it is left to the reader to combine proposition 2A and 3B along with other propositions related to contextualization or selecting a medium with a high channel capacity. The decision rules presented below were created by combining related propositions into compound statements. The decision rules are intentionally worded in the general sense to facilitate their application in a variety of contexts. Following each rule is an example that illustrates its application in a project setting. Then, Table 1 presents the guidance encapsulated in the rules in quick reference format. Rule 1: If the communication goal has high cognitive complexity (i.e., intense information exchange, multiplicity of views, incompatibility between representation and use of information, etc.), choose contextualization, a medium with high channel capacity, high message organization, and low formality. Example: Early in a project s lifecycle, a project manager is charged with organizing the team, informing members of the project s objective and their roles and responsibilities. This goal has high cognitive complexity because the team members are new to the problem context (i.e., the project) and there is a high likelihood that they could misunderstand their role in the project or the expectations. Following Rule 1, a project manager would organize an in-person meeting (highest channel capacity), that was highly organized, but provided an opportunity for informal discussions to answer questions. The inverse of this approach, and one likely to fail, would be to kick off the project using a series of informal s. Rule 2: If the communication goal has high cognitive complexity (i.e., intense information exchange, multiplicity of views, incompatibility between representation and use of information, etc.) and high dynamic complexity (i.e., time constrained, changes during process, deficient feedback), choose control by testing and adjusting, a highly interactive medium, high message organization, and high formality. Example: Implementing a new information system often impacts a large group of people who hold diverse views and who need the system to begin working immediately. A project manager could choose to support communicating with this group via user documentation, training, and regular s. However, Rule 2 suggests that a more effective communication strategy would be to implement a control by testing strategy that involved online surveys to repeatedly ask the users about their understanding and experiences, developing contingency plans to adjust the

7 communication process (e.g. adding video conferences if necessary) and implementing live online support. Rule 3: If the communication goal has high cognitive complexity (i.e., intense information exchange, multiplicity of views, incompatibility between representation and use of information, etc.) and low dynamic complexity (i.e., not time constrained and few changes during the process with adequate channels for feedback), choose control by planning, a medium with low channel capacity, high message organization, and high formality. Example: When developing a project communications plan, the project manager must plan to communicate roles, procedures, policies, team rules, etc. Some project managers choose to convey this information during an on-site kick off meeting. Rule 3 suggests this approach is not the most effective and could result in misunderstanding and damaged relationships, because the participants could believe their time was wasted. Because the information is likely to be intense and detailed and it is not likely to change quickly, implementing a control by planning strategy would be more effective. The project manager could use to send each participant a copy of the team rules, policies, procedures, and roles that were created using company document template and answer questions via . Rule 4: If the communication goal has high cognitive complexity (i.e., intense information exchange, multiplicity of views, incompatibility between representation and use of information, etc.) and high affective complexity (i.e., sensitivity to attitudes and changes is dispositions, build relationships, asking for a favor, etc.), choose perspective taking and a medium that supports adapting a message to a particular receiver (adaptiveness). Example: When faced with the task of needing to request an extension of a project deadline from the customer, some project managers would choose to or text the request. However, because complex events are usually associated with a project falling behind schedule and a request for a delay requires a bit of trust that the delay is an anomaly and not an indication the entire project is troubled, a different approach would be more effective. Instead of (low channel capacity), a project manager should plan a meeting that provides enough time and with the necessary people to explain the reasons for the delay and to articulate that the project team is taking the perspective of the customer and working with the customer s best interest in mind. Rule 5: If the communication goal has high affective complexity (i.e., sensitivity to attitudes and changes is dispositions, build relationships, asking for a favor, etc.), select affectivity, perspective taking, a medium with high channel capacity (i.e., video or in-person meeting), a small distribution, and low formality. In addition, even if channel capacity is low, higher interactivity can boost affectivity. Example: A project manager working in a distributed team environment might choose to send an to the entire team asking for a volunteer. Rule 5 suggests that a more effective approach would be to send a message to one person with components that are affective in nature (i.e., things they care about) along with the request. Combining affective and task-related components is characteristic of communication in high trusting teams (Müller, 2003; Jarvenpaa & Leidner,

8 1999). Keeping the distribution small will increase its impact on relationship strength and increase the likelihood of a positive response. When possible it would be best to make the request in person or over the telephone because these media have the highest channel capacity and interactivity. Decision Rule Summary Table (Table 1) Goal Strategy Medium Organization Formality Distribution Complexity High Cognitive Contextualization High Capacity High Low Small or Large High Cognitive and High Dynamic Control By Testing and Adjustment High Interactivity High High Small High Cognitive and Low Dynamic High Cognitive and High Affective Control By Planning Perspective Taking Low Interactivity High Adaptiveness High High Small or Large N/A Low Small High Affective Affectivity High Capacity Low Low Small Note: Bolded rule components are those not stated in propositions but extrapolated from the model. CONCLUSION This paper describes how the competencies required to be a successful project manager have shifted to include a greater emphasis on the ability to manage relationships. This change has been brought about by the globalization of business and the increased need to execute projects across organizational boundaries. Research has shown that managing relationships, including trust, is important to the success of projects in this new environment. The tools and techniques available to assist project managers in developing communication strategies that improve understanding and relationship strength are inadequate. This paper contributes a set of decision rules designed to address this shortage. By adapting guidance provided by a modern organizational communication theory, this paper presents a process and rules for selecting communication goals, strategies, medium, and message attributes that balance the need to impact understanding with the need to impact relationship strength. This is followed by a set of rules to guide the selection of appropriate combinations. The result is a methodology for developing communication strategies that project managers can use to improve their communication practices. Although there has not been any research in this area, it is reasonable to assert that new project managers, and those from more technical and engineering backgrounds, who have not had ample opportunities to practice building relationships with stakeholders might benefit the most from this work. REFERENCES References are available upon request from Herbert Remidez

The CPA Way 6 - Communicate

The CPA Way 6 - Communicate The CPA Way 6 - Communicate This document focuses on Communicate, the last part of The CPA Way, as shown in the following diagram. For an overview of Communicate, see the video that accompanies this document.

More information

How To Be A Team Member

How To Be A Team Member The following rating descriptions are examples of the behaviors employees would be demonstrating at each of the four levels of performance. These examples should assist the supervisor and employee during

More information

Public Health Competency Based Employee Performance Management Self Assessment Tool - Manager/Supervisor

Public Health Competency Based Employee Performance Management Self Assessment Tool - Manager/Supervisor Public Health Competency Based Employee Performance Management Self Assessment Tool - Manager/Supervisor Public Health Competency Based Employee Performance Management Toolkit OPHA & Partners, Version

More information

Illinois Professional Teaching Standards

Illinois Professional Teaching Standards Illinois Professional Teaching Standards Preamble: We believe that all students have the potential to learn rigorous content and achieve high standards. A well-educated citizenry is essential for maintaining

More information

KIPP King Leadership Class: Individual Learning Plan

KIPP King Leadership Class: Individual Learning Plan School Focus : HIGH EXPECTATIONS. Expresses high expectations for all teammates and expresses belief in their potential to grow. : STUDENT BEST INTERESTS. Seeks to understand the needs and motivations

More information

College of Psychology and Humanistic Studies (PHS) Curriculum Learning Goals and PsyD Program Learning Goals, Objectives and Competencies (GOCs)

College of Psychology and Humanistic Studies (PHS) Curriculum Learning Goals and PsyD Program Learning Goals, Objectives and Competencies (GOCs) College of Psychology and Humanistic Studies (PHS) Curriculum Learning Goals and PsyD Program Learning Goals, Objectives and Competencies (GOCs) College of PHS Learning Goals PsyD Program Learning Goals

More information

PERFORMANCE MANAGEMENT THE NEXT PLATEAU GEORGIA PERIMETER COLLEGE

PERFORMANCE MANAGEMENT THE NEXT PLATEAU GEORGIA PERIMETER COLLEGE PERFORMANCE MANAGEMENT THE NEXT PLATEAU GEORGIA PERIMETER COLLEGE Please, place cellular phone & pagers on silent mode. Thank You! Module 1 Aligning Job Performance with the Strategic Plan Agenda 1. Performance

More information

Council for the Advancement of Standards Learning and Development Outcomes Contextual Statement

Council for the Advancement of Standards Learning and Development Outcomes Contextual Statement Council for the Advancement of Standards Learning and Development Outcomes Contextual Statement The Council for the Advancement of Standards in Higher Education (CAS) promotes standards to enhance opportunities

More information

Public Health Competency Based Employee Performance Management Self Assessment Tool - Master Templates (For HR Administration purposes only)

Public Health Competency Based Employee Performance Management Self Assessment Tool - Master Templates (For HR Administration purposes only) Public Health Competency Based Employee Performance Management Self Assessment Tool - Master Templates (For HR Administration purposes only) Public Health Competency Based Employee Performance Management

More information

ISHN 01-11 1 Using Performance Objectives and Corrective Feedback. To Increase Competence

ISHN 01-11 1 Using Performance Objectives and Corrective Feedback. To Increase Competence ISHN 01-11 1 Using Performance Objectives and Corrective Feedback To Increase Competence Last month my ISHN article addressed the challenge of using performance appraisals to build people s competence.

More information

UNLV Department of Curriculum and Instruction Masters in Education Degree with an emphasis in Science Education Culminating Experience

UNLV Department of Curriculum and Instruction Masters in Education Degree with an emphasis in Science Education Culminating Experience UNLV Department of Curriculum and Instruction Masters in Education Degree with an emphasis in Science Education Culminating Experience The culminating experience for the Masters of Education degree with

More information

~Empowering and Motivating for Today and Tomorrow~

~Empowering and Motivating for Today and Tomorrow~ Lindsay Unified School District Mission Statement ~Empowering and Motivating for Today and Tomorrow~ - Adopted by Lindsay Unified School Board: May 21, 2007 Mission: Empowering and Motivating for Today

More information

Public Health Competency Based Employee Performance Management Self Assessment Tool - Consultant/Specialist

Public Health Competency Based Employee Performance Management Self Assessment Tool - Consultant/Specialist Public Health Competency Based Employee Performance Management Self Assessment Tool - Consultant/Specialist Public Health Competency Based Employee Performance Management Toolkit OPHA & Partners, Version

More information

Position Statement SCHOOL FAMILY PARTNERING TO ENHANCE LEARNING: ESSENTIAL ELEMENTS AND RESPONSIBILITIES

Position Statement SCHOOL FAMILY PARTNERING TO ENHANCE LEARNING: ESSENTIAL ELEMENTS AND RESPONSIBILITIES Position Statement SCHOOL FAMILY PARTNERING TO ENHANCE LEARNING: ESSENTIAL ELEMENTS AND RESPONSIBILITIES The National Association of School Psychologists (NASP) is committed to enhancing the academic,

More information

Guide to Effective Staff Performance Evaluations

Guide to Effective Staff Performance Evaluations Guide to Effective Staff Performance Evaluations Compiled by Human Resources Siemens Hall, Room 211 The research is clear. The outcome is consistent. We know with certainty that the most powerful leadership

More information

Mapping a Social Foundation of HRD: A Framework for Theoretical Development. Russell Korte. University of Illinois at Urbana-Champaign

Mapping a Social Foundation of HRD: A Framework for Theoretical Development. Russell Korte. University of Illinois at Urbana-Champaign 1 Running head: SOCIAL FOUNDATION OF HRD Mapping a Social Foundation of HRD: A Framework for Theoretical Development Russell Korte University of Illinois at Urbana-Champaign Copyright 2010 Russell Korte

More information

Nine Probation Officer Competencies. Alberta Justice & Solicitor General

Nine Probation Officer Competencies. Alberta Justice & Solicitor General Nine Probation Officer Competencies 2014 Officer 1. Managing Information & People The ability to interact with others to access, retrieve, input analyze, apply, interpret and process information for investigative

More information

Coaching the team at Work

Coaching the team at Work Coaching the team at Work Introduction While a great deal has been written about coaching individuals, there has been relatively little investigation of coaching teams at work. Yet in discussions with

More information

Risk Management Plan <Project Title> Risk Management Plan

Risk Management Plan <Project Title> Risk Management Plan Risk Management Plan Risk Management Plan This document has been derived from a template prepared by the Department of Premier and Cabinet, Tasmania. The structure is based on a number

More information

System Behavior and Causal Loop Diagrams

System Behavior and Causal Loop Diagrams C H A P T E R 1 System Behavior and Causal Loop Diagrams Human beings are quick problem solvers. From an evolutionary standpoint, this makes sense if a sabertooth tiger is bounding toward you, you need

More information

ITRM Guideline CPM 110-01 Date: January 23, 2006 SECTION 5 PROJECT CLOSEOUT PHASE

ITRM Guideline CPM 110-01 Date: January 23, 2006 SECTION 5 PROJECT CLOSEOUT PHASE PROJECT MANAGEMENT GUIDELINE SECTION 5 PROJECT CLOSEOUT PHASE Table of Contents Introduction... 3 Project Closeout Phase... 3 Activities and Documents in the Closeout Phase... 4 Project Closeout Task...

More information

Project Management. [Student s Name] [Name of Institution]

Project Management. [Student s Name] [Name of Institution] 1 Paper: Assignment Style: Harvard Pages: 10 Sources: 7 Level: Master Project Management [Student s Name] [Name of Institution] 2 Project Management Introduction The project management also known as management

More information

How To Be A Successful Employee

How To Be A Successful Employee Attention to Detail Achieves thoroughness and accuracy when accomplishing a task through concern for all the areas involved. Provides accurate, consistent numbers on all paperwork Provides information

More information

School of Advanced Studies Doctor Of Education In Educational Leadership With A Specialization In Educational Technology. EDD/ET 003 Requirements

School of Advanced Studies Doctor Of Education In Educational Leadership With A Specialization In Educational Technology. EDD/ET 003 Requirements School of Advanced Studies Doctor Of Education In Educational Leadership With A Specialization In Educational Technology The mission of the Doctor of Education in Educational Leadership degree program

More information

How To Be A Successful Leader

How To Be A Successful Leader Leadership Development Program (Level I and Level II) PR O GR A M OV ER V IE W Our Leadership Development Programs (LDP Level I and Level II) are designed to address the development needs of managers and

More information

Business Intelligence Engineer Position Description

Business Intelligence Engineer Position Description Business Intelligence Position Description February 9, 2015 Position Description February 9, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level

More information

COMMUNICATIONS MANAGEMENT PLAN <PROJECT NAME>

COMMUNICATIONS MANAGEMENT PLAN <PROJECT NAME> COMMUNICATIONS MANAGEMENT PLAN TEMPLATE This Project Communications Management Template is free for you to copy and use on your project and within your organization. We hope that you find this template

More information

GUIDE TO EFFECTIVE STAFF PERFORMANCE EVALUATIONS

GUIDE TO EFFECTIVE STAFF PERFORMANCE EVALUATIONS GUIDE TO EFFECTIVE STAFF PERFORMANCE EVALUATIONS The research is clear. The outcome is consistent. We know with certainty that the most powerful leadership tool for improving productivity and increasing

More information

Functional Title Classification FLSA Status Reports To Team Purpose

Functional Title Classification FLSA Status Reports To Team Purpose Functional Title Classification FLSA Status Reports To Team Purpose Vice President of Marketing and Engagement Director, Marketing & Communications UWW 400 N Exempt President & CEO Marketing & Engagement

More information

Competencies for Early Childhood Professionals Area II: Understanding Child Growth and Development

Competencies for Early Childhood Professionals Area II: Understanding Child Growth and Development Competencies for Early Childhood Professionals Area II: Understanding Child Growth and Development Rationale: Child development is the foundation upon which early childhood practice is based. Because the

More information

Albemarle County Schools Teacher Performance Appraisal (TPA) Rubrics

Albemarle County Schools Teacher Performance Appraisal (TPA) Rubrics Albemarle County Schools Teacher Performance Appraisal (TPA) Rubrics The Teacher Performance Appraisal includes performance rubrics designed to guide self-assessment and reflection based on professional

More information

DoDEA Personnel Center HR Competency Definitions

DoDEA Personnel Center HR Competency Definitions DoDEA Personnel Center HR Competency Definitions ATTACHMENT 10 Business Management Competencies Business Process Reengineering Applies business process reengineering principles and techniques to reengineer

More information

Learning Strategies for Creating a Continuous Learning Environment

Learning Strategies for Creating a Continuous Learning Environment Continuous Learning Environment INTRODUCTION A key component of the Leadership and Knowledge Management system is a continuous learning system that uses a wide variety of methods, including classroom training;

More information

PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:

PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Project Name Project Management Plan Document Information Document Title Version Author Owner Project Management Plan Amendment History

More information

TOOL KIT for RESIDENT EDUCATOR and MENT OR MOVES

TOOL KIT for RESIDENT EDUCATOR and MENT OR MOVES Get to Know My RE Observe Collect Evidence Mentor Moments Reflect Review Respond Tailor Support Provide Provide specific feedback specific Feedback What does my RE need? Practice Habits Of Mind Share Data

More information

WHO GLOBAL COMPETENCY MODEL

WHO GLOBAL COMPETENCY MODEL 1. Core Competencies WHO GLOBAL COMPETENCY MODEL 1) COMMUNICATING IN A CREDIBLE AND EFFECTIVE WAY Definition: Expresses oneself clearly in conversations and interactions with others; listens actively.

More information

How To Be A Successful Writer

How To Be A Successful Writer S WORKING DRAFT FOR PILOT ACROSS GRADUATE PROGRAMS Approved by GASCC; Revised by the Assessment Council, Spring 2013 April 2 nd, 2013 Notre Dame de Namur University Note: Most rubrics adapted from AAC&U

More information

PERFORMANCE EXPECTATION 1: Vision, Mission, and Goals

PERFORMANCE EXPECTATION 1: Vision, Mission, and Goals PERFORMANCE EXPECTATION 1: Vision, Mission, and Goals PERFORMANCE EXPECTATION 1: Vision, Mission, and Goals Education leaders ensure the achievement of all students by guiding the development and implementation

More information

BUSINESS WRITING: LETTERS, E-MAILS, REPORTS, CASES, AND PRESENTATIONS

BUSINESS WRITING: LETTERS, E-MAILS, REPORTS, CASES, AND PRESENTATIONS BUSINESS WRITING: LETTERS, E-MAILS, REPORTS, CASES, AND PRESENTATIONS WHY IS EXCELLENT PROFESSIONAL WRITING SO IMPORTANT TO YOU? Hiring a new employee is expensive, and companies often evaluate their recruiters

More information

Performance Through Relationships. Towards a Cohesive Virtual Intercultural Team

Performance Through Relationships. Towards a Cohesive Virtual Intercultural Team Journal of Intercultural Management Vol. 2, No. 1, March 2010, pp. 49 56 Monika Chutnik Uniwersytet Ekonomiczny we Wrocławiu Katarzyna Grzesik Uniwersytet Ekonomiczny we Wrocławiu Performance Through Relationships.

More information

Onboarding and Engaging New Employees

Onboarding and Engaging New Employees Onboarding and Engaging New Employees Onboarding is the process of helping new employees become full contributors to the institution. During onboarding, new employees evolve from institutional outsiders

More information

Crosswalk of the New Colorado Principal Standards (proposed by State Council on Educator Effectiveness) with the

Crosswalk of the New Colorado Principal Standards (proposed by State Council on Educator Effectiveness) with the Crosswalk of the New Colorado Principal Standards (proposed by State Council on Educator Effectiveness) with the Equivalent in the Performance Based Principal Licensure Standards (current principal standards)

More information

EXECUTIVE BEHAVIORAL INTERVIEW GUIDE

EXECUTIVE BEHAVIORAL INTERVIEW GUIDE EXECUTIVE BEHAVIORAL INTERVIEW GUIDE INTERVIEW GUIDE INSTRUCTIONS: This Interview Guide is intended to help hiring executives conduct behavioral interviews for executive classifications covered by the

More information

The Role of Human Resource Management in Risk Management

The Role of Human Resource Management in Risk Management The Role of Human Resource Management in Risk Management Bernard L. Erven Department of Agricultural, Environmental and Development Economics Ohio State University Human resources have two roles in risk

More information

SPEECH LANGUAGE PATHOLOGIST PERFORMANCE AND EVALUATION SYSTEM

SPEECH LANGUAGE PATHOLOGIST PERFORMANCE AND EVALUATION SYSTEM SPEECH LANGUAGE PATHOLOGIST PERFORMANCE AND EVALUATION SYSTEM (Revised 11/2014) 1 Fern Ridge Schools Speech Language Pathologist Performance Review and Evaluation System TABLE OF CONTENTS Timeline of Teacher

More information

School of Advanced Studies Doctor Of Management In Organizational Leadership. DM 004 Requirements

School of Advanced Studies Doctor Of Management In Organizational Leadership. DM 004 Requirements School of Advanced Studies Doctor Of Management In Organizational Leadership The mission of the Doctor of Management in Organizational Leadership degree program is to develop the critical and creative

More information

OPM LEADERSHIP DEVELOPMENT MATRIX:

OPM LEADERSHIP DEVELOPMENT MATRIX: 1 OPM LEADERSHIP DEVELOPMENT MATRIX: The following Leadership Development Matrix is part of OPM s Effective Learning Interventions for Developing ECQs report. The Matrix lists a range of leadership development

More information

Shared Solutions: An Overview Special Education Policy and Programs Branch Ministry of Education

Shared Solutions: An Overview Special Education Policy and Programs Branch Ministry of Education Shared Solutions: An Overview Special Education Policy and Programs Branch Ministry of Education Table of Contents 1. Shared Solutions: Overview 2. Understanding Conflict 3. Preventing Conflicts 4. Video:

More information

Develop Project Charter. Develop Project Management Plan

Develop Project Charter. Develop Project Management Plan Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs

More information

CHAPTER 1: The Preceptor Role in Health Systems Management

CHAPTER 1: The Preceptor Role in Health Systems Management CHAPTER 1: The Preceptor Role in Health Systems Management Throughout the nursing literature, the preceptor is described as a nurse who teaches, supports, counsels, coaches, evaluates, serves as role model

More information

Standards for Certification in Early Childhood Education [26.110-26.270]

Standards for Certification in Early Childhood Education [26.110-26.270] I.B. SPECIFIC TEACHING FIELDS Standards for Certification in Early Childhood Education [26.110-26.270] STANDARD 1 Curriculum The competent early childhood teacher understands and demonstrates the central

More information

Team Building. HR can provide you with support for building effective team work.

Team Building. HR can provide you with support for building effective team work. Team Building HR can provide you with support for building effective team work. Developing Effective Teams Model Typically we work with the leader or a smaller working group to determine what they would

More information

Federal Bureau of Investigation s Integrity and Compliance Program

Federal Bureau of Investigation s Integrity and Compliance Program Evaluation and Inspection Division Federal Bureau of Investigation s Integrity and Compliance Program November 2011 I-2012-001 EXECUTIVE DIGEST In June 2007, the Federal Bureau of Investigation (FBI) established

More information

COMMUNICATION. Slide. Say:

COMMUNICATION. Slide. Say: In this module, we will be discussing communication in schools. More specifically, we will be identifying what creates effective communication and how these behaviors can be used in your school. Communication

More information

D 1. Working with people Develop productive working relationships with colleagues. Unit Summary. effective performance.

D 1. Working with people Develop productive working relationships with colleagues. Unit Summary. effective performance. 1 Develop productive working relationships with colleagues Unit Summary What is the unit about? This unit is about developing working relationships with colleagues, within your own organisation and within

More information

Project Manager Job Descriptions

Project Manager Job Descriptions Promotion Criteria Position Overview Statement Principal Duties and Responsibilities PROJECT MANAGER Admin Level 4 Typically >8 years in increasing responsible IT leadership role; typically managed one

More information

Project Management Topics

Project Management Topics S E C T I O N II T W O Project Management Topics SECTION II: PROJECT MANAGEMENT TOPICS TABLE OF CONTENTS Introduction 3 1. PROJECT TRIAGE 5 1.1 Gather the Data 7 1.2 Review and Analyze the Data 10 1.3

More information

Practicum and Internship Manual COUN 505 and COUN 588 Master of Science Program in Rehabilitation Counseling. Updated 3/21/2011

Practicum and Internship Manual COUN 505 and COUN 588 Master of Science Program in Rehabilitation Counseling. Updated 3/21/2011 Practicum and Internship Manual COUN 505 and COUN 588 Master of Science Program in Rehabilitation Counseling The mission of the Rehabilitation Counselor Education Program is to recruit and train individuals

More information

Masters Comprehensive Exam and Rubric (Rev. July 17, 2014)

Masters Comprehensive Exam and Rubric (Rev. July 17, 2014) 1 Educational Leadership & Policy Studies Masters Comprehensive Exam and Rubric (Rev. July 17, 2014) The comprehensive exam is intended as a final assessment of a student s ability to integrate important

More information

Develop «D» Execution & Change Management

Develop «D» Execution & Change Management Develop «D» Execution & Change Management Dr. Abdurrahman Baş Fall 2013 www.abdurrahmanbas.com Contents Three Core Processes of Execution Forces for Change Principles of Change Five Activities Contributing

More information

Master s Certificate in Public Sector Management

Master s Certificate in Public Sector Management 1. Leadership in the Public Sector Program Outline (2015 2016) (16 day program) Is the public sector leadership even possible in an environment that is constrained by labour unions, unresponsive incentives

More information

Employee Performance Review

Employee Performance Review Employee Performance Review Source: Learn to Read, Inc. Review Date: Date of Last Review: Employment Date: Name: Title: Reports to: Expectation Basis Leadership Readily assumes responsibility for projects

More information

Knowledge Management in Agile Projects

Knowledge Management in Agile Projects Cognizant 20-20 Insights Management in Agile Projects Executive Summary Software development is knowledge-intensive work and the main challenge is how to manage this knowledge. The Agile manifesto advocates

More information

Leadership Framework and Competency Model

Leadership Framework and Competency Model Leadership Framework and Competency Model Introduction The KIPP Leadership Framework and Competency Model describes the competencies and behaviors considered most important to the performance of KIPP Executive

More information

How To Be A Productive Online Discussion Instructor

How To Be A Productive Online Discussion Instructor Effective Online Communication Even for seasoned users of the Internet, communicating online can be a minefield of misunderstandings. It is therefore imperative that instructors enter the online classroom

More information

5 Myths about Leading Virtual Teams

5 Myths about Leading Virtual Teams 5 Myths about Leading Virtual Teams By Gihan Perera www.gihanperera.com The workplace of the 21 st century has changed, with more telecommuting, outsourcing, and globally dispersed teams. As a result,

More information

Undergraduate Psychology Major Learning Goals and Outcomes i

Undergraduate Psychology Major Learning Goals and Outcomes i Undergraduate Psychology Major Learning Goals and Outcomes i Goal 1: Knowledge Base of Psychology Demonstrate familiarity with the major concepts, theoretical perspectives, empirical findings, and historical

More information

IT Services Management

IT Services Management IT Services Management Developing an Effective ITSM Communications Plan White Paper Prepared by: Rick Leopoldi May 25, 2002 Copyright 2002. All rights reserved. Duplication of this document or extraction

More information

BRICE ROBERTS BUSINESS CONSULTING SERVICES

BRICE ROBERTS BUSINESS CONSULTING SERVICES BRICE ROBERTS BUSINESS CONSULTING SERVICES BROCHURE: TRAINING AND DEVELOPMENT PROGRAMMES RE-AWAKENING SPIRIT - TRANSFORMING RESULTS For Further Information: Contact: Brice Roberts Business Consulting Services

More information

Leadership Development Catalogue

Leadership Development Catalogue The TrainingFolks Approach The importance of superior management, leadership and interpersonal skills are critical to both individual and organizational success. It is also critical to apply these skills

More information

MANAGING VIRTUAL PROJECT TEAMS

MANAGING VIRTUAL PROJECT TEAMS MANAGING VIRTUAL PROJECT TEAMS A research project submitted to the faculty of San Francisco State University In partial fulfillment of the requirements for the degree Master of Business Administration

More information

Forensic Psychology Major Learning Objectives (adapted from APA)

Forensic Psychology Major Learning Objectives (adapted from APA) Forensic Psychology (BA) Mission Statement & Learning Objectives The mission of the Forensic Psychology major is to enhance understanding of behavior, in terms of its biological, cognitive, social, emotional

More information

Leadership. D e v e l o p m e n t Your Guide to Starting a Program

Leadership. D e v e l o p m e n t Your Guide to Starting a Program Leadership D e v e l o p m e n t Your Guide to Starting a Program This publication is produced by the Leadership Education and Training Division of Rotary International. If you have questions or comments,

More information

CHANGE MANAGEMENT PLAN WORKBOOK AND TEMPLATE

CHANGE MANAGEMENT PLAN WORKBOOK AND TEMPLATE CHANGE MANAGEMENT PLAN WORKBOOK AND TEMPLATE TABLE OF CONTENTS STEP 1 IDENTIFY THE CHANGE... 5 1.1 TYPE OF CHANGE... 5 1.2 REASON FOR THE CHANGE... 5 1.3 SCOPE THE CHANGE... 6 1.4 WHERE ARE YOU NOW?...

More information

IT Governance and Managed Services Creating a win-win relationship

IT Governance and Managed Services Creating a win-win relationship WHITE PAPER IT Governance and Managed Services Creating a win-win relationship 1 cgi.com 2015 CGI GROUP INC. IT Governance and Managed Services The question of whether to outsource IT has become part of

More information

Managing Conflict. and Negotiation. Conflict. Conflict One party perceives its interests are being opposed or set back by another party.

Managing Conflict. and Negotiation. Conflict. Conflict One party perceives its interests are being opposed or set back by another party. 11 Managing Conflict Chapter and Negotiation Conflict: A Modern Perspective Types of Conflict Managing Conflict Negotiation Conflict Management and Negotiation: A Contingency Approach Conflict 14-2 Conflict

More information

Guide to Effective Staff Performance Evaluations

Guide to Effective Staff Performance Evaluations Guide to Effective Staff Performance Evaluations HRS Human Resource Services-Operations The research is clear. The outcome is consistent. We know with certainty that the most powerful leadership tool for

More information

LECTURE 7 THE HUMAN RESOURCE MANAGEMENT

LECTURE 7 THE HUMAN RESOURCE MANAGEMENT CSC 443- IT Project Management Dr. Safwan Qasem 1 LECTURE 7 THE HUMAN RESOURCE MANAGEMENT Spring 2011-2012 Instructor: Dr. Safwan Qasem Course: CSC 443: IT Project Management Human Resource Management

More information

EMPLOYEE OPINION SURVEY

EMPLOYEE OPINION SURVEY EMPLOYEE OPINION SURVEY In this edition we present a sequel to part one of Metis Report on EOS that unearthed Employee Opinion Survey (EOS) as a construct and an essential measurement tool for understanding

More information

Information Technology Project Management, Sixth Edition. Note: See the text itself for full citations.

Information Technology Project Management, Sixth Edition. Note: See the text itself for full citations. Management, Sixth Edition Note: See the text itself for full citations. Understand the importance of good communications in projects Discuss the process of identifying stakeholders and how to create a

More information

LEARNING OUTCOMES FOR THE PSYCHOLOGY MAJOR

LEARNING OUTCOMES FOR THE PSYCHOLOGY MAJOR LEARNING OUTCOMES FOR THE PSYCHOLOGY MAJOR Goal 1. Knowledge Base of Psychology Demonstrate familiarity with the major concepts, theoretical perspectives, empirical findings, and historical trends in psychology.

More information

CHAPTER 1: WEB MANAGEMENT BEST PRACTICES IN THE FEDERAL GOVERNMENT

CHAPTER 1: WEB MANAGEMENT BEST PRACTICES IN THE FEDERAL GOVERNMENT CHAPTER 1: WEB MANAGEMENT BEST PRACTICES IN THE FEDERAL GOVERNMENT Best-in-Web organizations come in all shapes and sizes. This study sought awardwinning large, distributed, and diverse organizations.

More information

Field Guide to Consulting and Organizational Development. Table of Contents

Field Guide to Consulting and Organizational Development. Table of Contents Field Guide to Consulting and Organizational Development Collaborative and Systems Approach to Performance, Change and Learning Introduction Focus of Guidebook Audiences Content of Guidebook How to Use

More information

Conflict... An Opportunity for Development

Conflict... An Opportunity for Development Conflict... An Opportunity for Development ~ Agenda ~ Introductions and Workshop Objectives Understanding Conflict: What is Conflict? The Conflict Cycle Resolving Conflict: Using I Messages College Conflict

More information

Business Intelligence Analyst Position Description

Business Intelligence Analyst Position Description Business Intelligence Position Description February 9, 2015 Position Description February 9, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level

More information

TenStep Project Management Process Summary

TenStep Project Management Process Summary TenStep Project Management Process Summary Project management refers to the definition and planning, and then the subsequent management, control, and conclusion of a project. It is important to recognize

More information

I Opt (Input Output Processing Template)

I Opt (Input Output Processing Template) I Opt (Input Output Processing Template) INDIVIDUAL SALES REPORT This report has been prepared for: Sample Person 0/00/0000 2003, Professional Communications Inc. All rights reserved. Trademarks: Professional

More information

Best Practices for Managing and Working with Virtual Teams. Discussion Question

Best Practices for Managing and Working with Virtual Teams. Discussion Question Best Practices for Managing and Working with Virtual Teams Gina Abudi, MBA Discussion Question What are your challenges managing and working on virtual (remote) teams? 2 Copyright 2014 Abudi Consulting

More information

CALIFORNIA S TEACHING PERFORMANCE EXPECTATIONS (TPE)

CALIFORNIA S TEACHING PERFORMANCE EXPECTATIONS (TPE) CALIFORNIA S TEACHING PERFORMANCE EXPECTATIONS (TPE) The Teaching Performance Expectations describe the set of knowledge, skills, and abilities that California expects of each candidate for a Multiple

More information

Organizational Leadership and Communication Certificate Program

Organizational Leadership and Communication Certificate Program Business and Management Organizational Leadership and Communication Certificate Program Accelerate Your Career extension.uci.edu/olc In today s competitive business environment, leaders are appointed based

More information

Central Project Office: Charter

Central Project Office: Charter Central Project Office: Charter ITCS: Central Project Office EAST CAROLINA UNIVERSITY 209 COTANCHE STREET, GREENVILLE, NC 27858 1 Table of Contents INTRODUCTION... 3 PURPOSE... 3 EXPECTED BENEFITS... 3

More information

QUALITY MANAGEMENT SYSTEM MANUAL

QUALITY MANAGEMENT SYSTEM MANUAL The online version of this document is controlled. Therefore, all printed versions of this document are unofficial copies. QUALITY MANAGEMENT SYSTEM MANUAL 6901 Charles Street Towson, Maryland 21204 Manual

More information

THE LEADERSHIP ASSESSMENT THAT ILLUMINATES LEADER EFFECTIVENESS

THE LEADERSHIP ASSESSMENT THAT ILLUMINATES LEADER EFFECTIVENESS THE LEADERSHIP ASSESSMENT THAT ILLUMINATES LEADER EFFECTIVENESS CONNECTING PATTERNS OF ACTION WITH HABITS OF THOUGHT The Leadership Circle Profile (LCP) is a true breakthrough among 360 degree profiles.

More information

National Commission for Academic Accreditation & Assessment. Handbook for Quality Assurance and Accreditation in Saudi Arabia PART 1

National Commission for Academic Accreditation & Assessment. Handbook for Quality Assurance and Accreditation in Saudi Arabia PART 1 National Commission for Academic Accreditation & Assessment Handbook for Quality Assurance and Accreditation in Saudi Arabia PART 1 THE SYSTEM FOR QUALITY ASSURANCE AND ACCREDITATION Ver. 2.0 THE SYSTEM

More information

Managing Organizational Performance: Linking the Balanced Scorecard to a Process Improvement Technique Abstract: Introduction:

Managing Organizational Performance: Linking the Balanced Scorecard to a Process Improvement Technique Abstract: Introduction: Managing Organizational Performance: Linking the Balanced Scorecard to a Process Improvement Technique William K. Hoehn, Ph.D. Raytheon Systems Company Tucson, Arizona Abstract: Numerous researchers have

More information

Project Management Process

Project Management Process Project Management Process Description... 1 STAGE/STEP/TASK SUMMARY LIST... 2 Project Initiation 2 Project Control 4 Project Closure 5 Project Initiation... 7 Step 01: Project Kick Off 10 Step 02: Project

More information

Leadership-related Competencies

Leadership-related Competencies -related Competencies Excerpts from the Competency Index for the Library Field http://www.webjunction.org/competencies/articles/content/67024491 Compiled by WebJunction June 2009 Copyright 2009, OCLC Online

More information

PMP Examination Tasks Puzzle game

PMP Examination Tasks Puzzle game PMP Examination Tasks Puzzle game Here is a great game to play to test your knowledge of the tasks you will be tested on in the actual examination. What we have done is take each of the domain tasks in

More information

NASP Position Statement on Home-School Collaboration: Establishing Partnerships to Enhance Educational Outcomes

NASP Position Statement on Home-School Collaboration: Establishing Partnerships to Enhance Educational Outcomes NASP Position Statement on Home-School Collaboration: Establishing Partnerships to Enhance Educational Outcomes The National Association of School Psychologists is committed to increasing the academic,

More information

SWOT ANALYSIS-MANAGEMENT TECHNIQUES TO STREAMLINE PUBLIC BUSINESS MANAGEMENT

SWOT ANALYSIS-MANAGEMENT TECHNIQUES TO STREAMLINE PUBLIC BUSINESS MANAGEMENT SWOT ANALYSIS-MANAGEMENT TECHNIQUES TO STREAMLINE PUBLIC BUSINESS MANAGEMENT PhD Candidate Rodica IVORSCHI Academy of Economic Studies Bucharest Abstract SWOT analysis is the most important management

More information