BARBADOS (BA-L1020) LOAN PROPOSAL
|
|
|
- Pierce Wright
- 10 years ago
- Views:
Transcription
1 DOCUMENT OF THE INTER-AMERICAN DEVELOPMENT BANK BARBADOS SUSTAINABLE ENERGY INVESTMENT PROGRAM (SMART FUND) (BA-L1020) LOAN PROPOSAL This document was prepared by the project team consisting of: Christiaan Gischler (INE/ENE) and Juan Roberto Paredes (INE/ENE) Co-team Leaders; Gastón Astesiano and Jorge Ordóñez (INE/ENE); Jose Jorge Saavedra (ICF/CMF); Lumas Kendrick (ENE/CHA); Magda Theodate (PDP/CTT); Paula Louis-Grant (PDP/CBA); Rochelle Franklin (CCB/CBA); and Hyun Jung Lee (LEG/SGO); under the supervision of Leandro Alves (INE/ENE), Chief of the Energy Division and Anneke Jessen, Representative (CCB/CBA).
2 i CONTENT PROJECT SUMMARY I. DESCRIPTION AND RESULTS MONITORING... 2 A. Background, Problem Addressed, Justification... 2 B. Objective, Components and Cost... 7 C. Key Results Indicators... 9 II. FINANCING STRUCTURE AND MAIN RISKS A. Financial Instruments and Contractual Conditions B. Environmental and Social Safeguard Risks C. Risks and Special Considerations D. Other Key Issues III. IMPLEMENTATION AND MANAGEMENT PLAN A. Summary Implementation Arrangements B. Project Cycle within the Smart Fund C. Summary of Arrangements for Monitoring Results... 15
3 - ii - Annexes ANNEX I: Development Effectiveness Matrix (DEM) - Summary ANNEX II: Results Framework ANNEX III: Summary procurement table Electronic Links REQUIRED 1. Plan of activities for first disbursement and the first 18 months of implementation 2. Monitoring and evaluation arrangements 3. Fiduciary Financial Management and Procurement Arrangements and Requirements Other Electronic Links 1. Sustainable Energy Framework for Barbados (volume 1) 2. Sustainable Energy Framework for Barbados (volume 2) 3. Inputs for the Operating Guide of the Smart Fund
4 - iii - Abbreviations AC BAU bbl/d BE BL&P CO 2 CBB CCB/CBA CFLs CHENACT EA EC EE EGFL ETD FCA FTC GCI GDP GEF GHG GOBA HVAC IDB INE/ENE IPP kwh MW MWh MFIE ODS OGSF PBP PCR PEU PI PV OC Air Conditioning Business As Usual Barrels of oil per day Bioenergy Barbados Light and Power Carbon Dioxide Central Bank of Barbados IDB Country Office in Barbados Compact Fluorescents Lamps Caribbean Hotel Energy Efficiency Action Program Executing Agency Energy Conservation Energy Efficiency Enterprise Growth Fund Limited The Energy and Telecommunications Division Fuel Clause Adjustment Fair Trading Commission General Capital Increase Gross Domestic Product Global Environment Facility Green House Gas Government of Barbados Heat and Ventilation and Air-conditioning systems Inter-American Development Bank Energy Division of the Infrastructure and Environment Department Independent Power Producers Kilowatt hour Megawatts Megawatt hour Ministry of Finance, Investment and Energy Ozone Depleting Substances Operating Guide of the Smart Fund Programmatic Policy Based Loan Project Completion Report Project Execution Unit Project Idea Photovoltaic Ordinary Capital
5 iv RE SEFB SFTC SME SPP SWH SFTC tco2e Renewable Energy Sustainable Energy Framework for Barbados Smart Fund Technical Committee Small and Medium Enterprise Small Power Producers Solar Water Heaters Smart Fund Technical Committee Tons of Carbon Dioxide equivalent
6 PROJECT SUMMARY BARBADOS SUSTAINABLE ENERGY INVESTMENT PROGRAM (BA-L1020) Financial Terms and Conditions Borrower: Government of Barbados (GOBA) Amortization Period: 25 Years Executing Agency: The Prime Minister s Office, acting through the Energy and Telecommunications Division (ETD), with Enterprise Growth Fund Limited (EGFL) as a sub executing agency. Grace Period: 5 Years Source (US$) Amount Disbursement Period: 5 Years IDB (OC) 10,000,000Supervision and Inspection Fee: * Interest Rate: LIBOR-based Local -- Credit Fee: * Total Project Objective/Description: 10,000,000Currency: Project at a Glance US Dollar of Single Currency Facility The objective of this project is to promote the increased use of renewable energy (RE) and the implementation of energy efficiency (EE) measures through the design and implementation of the Sustainable Energy Investment Program, also known as the Smart Fund, a Government initiative comprising a package of financial instruments and technical assistance to support investments in RE and EE. Ultimately, the project will help reduce Barbados fossil fuel dependency and promote sustainable energy supply as well as carbon emission reductions. Special contractual clauses as a condition prior to first disbursement: 1. Approval by the Office of the Prime Minister, through ETD, and by EGFL of the Operating Guide of the Smart Fund (OGSF), with prior non-objection by the Bank, and its entry into force ( 1.24) 2. Signature and entry into force of an agreement between the Office of the Prime Minister, through ETD, and EGFL for the establishment and management of the Smart Fund under Component 1, including its operating terms and conditions, on terms previously agreed with the Bank ( 3.1). 3. The selection and appointment of the Program Manager for the Smart Fund by the Office of the Prime Minister, through ETD ( 2.12). Exceptions to Bank policies: None Project consistent with Country Strategy: Yes [ X ] No [ ] Project qualifies for: SEQ[ ] PTI [ ] Sector [ ] Geographic[ ]Headcount [ ] (*) The credit fee and inspection and supervision fee will be established periodically by the Board of Executive Directors as part of its review of the Bank s lending charges, in accordance with the applicable provision of the Bank s policy on lending rate methodology for ordinary capital loans. In no case will the credit fee exceed 0.75% or the inspection and supervision fee exceed, in a given six-month period, the amount that would result from applying 1% to the loan amount divided by the number of six-month periods included in the original disbursement period.
7 - 2 - I. DESCRIPTION AND RESULTS MONITORING A. Background, Problem Addressed, Justification 1.1 In his February 2008 inaugural speech, the Prime Minister of Barbados stated that the single biggest challenge of our generation is the drain on foreign exchange created by the high cost of oil, and that the Government of Barbados (GOBA) was prepared to be bold and move aggressively in the area of energy conservation, reducing the oil import bill and preserving our delicate environment for the future. 1.2 The Prime Minister highlighted three main objectives related to energy, namely, to: (i) reduce energy costs; (ii) achieve greater energy security; and (iii) improve environmental sustainability. These objectives reflect the need to address the predominance of imported fossil fuels in Barbados energy sector. In 2009, all of the electricity generated in the country was produced with fossil fuels. 1.3 Barbados Energy Sector. In addition to the effects of the economic crisis of 2009, Barbados high dependence on fossil fuels risks jeopardizing the sustainability of its economic and social development, as well as the country s competitiveness. According to a 2008 report of the Barbados Light & Power Company (BL&P), the national electricity utility, the entirety of the country s electricity generation is fossil-fuel based: 82% with heavy fuel oil (of which 19 % is used in steam plants, and 63% in low-speed diesel plants), and the remaining 18% with diesel fuel. 1.4 Power generation represents the main use of fuel in the country (50%), followed by transport (33%). Barbados produces some oil, but domestic demand (about 10,000 barrels per day) greatly exceeds local supply (about 1,000 barrels per day). This results in imports of more than 9,000 bbl/d, representing a significant expenditure and drain on Barbados foreign reserves. 1.5 Energy costs are a concern for the GOBA both at the macroeconomic level and at the level of individual consumers. In 2007, Barbados spent US$208 million in oil imports, which represents about 7% of the Gross Domestic Product (GDP), a percentage comparable to Government expenditure on education. This generated significant effects in the economy, and therefore affecting the country s competitiveness. 1.6 BL&P can directly pass through fuel costs to consumers by using a Fuel Clause Adjustment (FCA). The FCA reached an all-time high in August 2008 of US$0.25 per kilowatt hour (kwh). This would have meant a monthly electricity bill of about US$158 for a residential customer consuming 400kWh per month. This figure is striking when compared to other countries in Latin America and the Caribbean. However, residential customers were cushioned from the full impact of the increase through a government subsidy on fuel oil used for electricity generation. This subsidy on the FCA 1 cost the GOBA approximately US$18 million in If the price of oil increases, this will represent an additional burden on the national budget through a possible subsidy on the FCA. 1 The FCA is currently in use and it applies to all tariff categories and it is calculated before every billing month by BL&P.
8 Given the aforementioned economic challenges, the GOBA is committed to promoting sustainable energy practices both on the supply side, mainly using renewable energy (RE) sources, and on the demand side, by encouraging energy efficiency (EE) and energy conservation (EC) as means to reduce the country s dependency on fossil fuels, enhance security and stability in energy supply, improve the economy s competitiveness, and achieve greater environmental sustainability. 1.8 The GOBA decided to take a twofold approach with the Inter-American Development Bank (IDB): (i) develop a Programmatic Policy Based Loan for the Energy Sector (Energy PBP) 2 (2410/OC-BA) as an instrument to catalyze the regulatory, policy and legislative measures required to promote sustainable energy, and (ii) implement a Sustainable Energy Investment Program also called Smart Fund (this project). The recently approved Energy PBP was prepared in parallel with this project in order to harness all the synergies of both operations. While the Energy PBP focuses on regulatory and policy actions required to promote EE and RE, the Smart Fund will develop a package of financial instruments to address the main market failures that prevent the country from adopting RE and EE. 1.9 To date, the most successful story of RE in Barbados has been that of solar water heating. It is estimated that approximately one in every three residences on the island has installed a solar water heater (SWH). Experience of the SWH industry shows that government incentives can and do make a difference in the promotion of RE. The GOBA used a number of incentives to support the industry: (i) removal of import duties on raw materials for manufacturers of SWH; (ii) imposition of a 30% tax on electric water heaters; and (iii) income tax deduction of the full cost of the SWH system To advance the implementation of RE and EE projects, the GOBA requested IDB technical assistance to develop several initiatives, currently under execution: (a) The Sustainable Energy Framework for Barbados (SEFB) (ATN/OC BA) is assessing the energy matrix and analyzing the potential of RE, EE and bioenergy (BE) for the island. The results of the SEFB will support the fulfillment of the policy matrix conditions for both phases of the Energy PBP, which will help catalyze the regulatory, policy and legislative measures required to promote sustainable energy; the SEFB has also provided recommendations for the preparation of the Smart Fund. (b) The Caribbean Hotel Energy Efficiency Action Plan (CHENACT) (ATN/OC RG) will encourage the implementation of EE practices and micro generation with RE technologies in the Caribbean tourism sector, hence improving the competitiveness of small, medium and large hotels. Half of the CHENACT funds will finance a case study in Barbados to show the potential benefits of implementing EE measures in the hotel industry, providing information that will feed into the SEFB. The outputs of the CHENACT project 2 Approved by the IDB on September 15 th, 2010
9 - 4 - will be essential for the implementation of the Smart Fund, as small and medium hotels would be eligible for financing under the Smart Fund. (c) The IDB, through the Global Environment Facility (GEF), is funding the Sustainable Energy Implementation Program (GRT/FM BA), or SEF Pilot Program. This program, executed in cooperation with BL&P and the GOBA, will install 3,000 power meters, 15,000 compact fluorescent lamps (CFLs), 28 photovoltaic (PV) systems and 1 micro wind system in selected households These initiatives are not enough to jump start a sustainable energy market in the country. For this reason, the GOBA decided to replicate the SEF Pilot Program with a national RE and EE promotional program through the Smart Fund, mainly targeting the residential sector, government buildings and business enterprises, including the tourism sector RE Implementation Potential. As shown in figure 1, the implementation of utility scale wind farms (10 Megawatt (MW) or more), biomass cogeneration (20MW), waste to energy (13.5 MW) and SWH are economically and commercially viable (when compared to the avoided cost of diesel, line marked in red in figure 1); therefore, these technologies are all recommended and may operate below the avoided cost of fossil fuel. Even today some of the PV technology would be commercially viable in Barbados and it is expected for the rest of the PV applications costs to drop in the future. The overall RE potential that could be deployed is estimated at 28.9% of the total installed capacity of electricity generation (in terms of MW). Figure 1: Analysis of technically and economically feasible renewable energy technologies available in Barbados (Report prepared by Castalia Consulting Firm, 2010) EE Implementation Potential. In figure 2 below are listed the commercially and economically energy efficient appliances and technologies. The most cost effective appliances for Barbados market are CFLs, power monitors, premium
10 - 5 - efficiency motors, efficient Air Conditioning (AC) systems, variable frequency drives and efficient chillers (when these are compared to the avoided cost of diesel, the red line in figure 2). If the population of Barbados used these technologies, the potential for EE would be 19.4% (in terms of Megawatt hour (MWh) saved compared to the total electricity consumption). Figure 2: Analysis of technically and economically feasible energy efficiency technologies available in Barbados (Report prepared by Castalia Consulting Firm, 2010) The RE and EE potential was calculated considering a baseline of zero RE and EE projects implemented as of May 2010 and extrapolated over a period of 20 years, comparing a business as usual (BAU) scenario with reduced 3 number of RE and EE projects in the energy matrix versus a sustainable energy scenario where technically and commercially viable RE and EE projects are incorporated in the energy mix The RE and EE market barriers. Although many RE and EE technologies are commercially viable, their uptake in Barbados is low, mainly due to the following barriers: (i) limited access to capital, as many consumers would have need to borrow to install RE or EE technologies and cannot find financing at reasonable rates; (ii) limited and uncompetitive RE and EE equipment supply; (iii) lack of information; and (iv) agency problems. The latter takes place when the person that should invest in the equipment is not the same person that uses it. This happens in the public sector, in the development of new construction, and in leased buildings or rented homes. In these cases, very often, there is no interest to reduce energy consumption. This barrier will be addressed through public awareness and education (see paragraph 1.29b). A complete analysis of the 3 The BAU scenario would consider a minor portion of RE projects (10 MW of wind).
11 - 6 - barriers for RE and EE can be seen in the link to the Sustainable Energy Framework for Barbados (volumes 1 and 2) Bank s Country Strategy. The strategy that the country is pursuing for the energy sector seeks to ensure energy security and reduction of imported oil by introducing RE in the energy matrix, maximizing EE measures, diversifying the energy matrix, allowing Independent Power Producers (IPPs) and Small Power Producers (SPPs) to sell power to the grid, achieving environmental benefits such as carbon emission reduction and ensuring timely and effective implementation of the previous objectives. The project is fully coherent with the new IDB country strategy for Barbados ( ) (GN-2539) in the energy sector Contribution to the Integrated Strategy for Climate Change Adaptation and Mitigation, and Sustainable and Renewable Energy as part of the IDB s 9th General Capital Increase (GCI). The activities of the Program will contribute to the IDB s strategy towards the promotion of RE and EE contained in the Integrated Strategy for Climate Change Adaptation and Mitigation, and Sustainable and Renewable Energy, as part of the GCI. The project will be an important step towards energy conservation in Barbados and will encourage the reduction of imported fossil fuels, which will generate greenhouse gas (GHG) emission reductions The Financial Intermediary. In January 1998, the Enterprise Growth Fund Limited (EGFL) commenced operations as a limited liability company 4 to provide venture capital to the Small and Medium Enterprise (SME) sector. The total capitalization of funds currently managed by EGFL is US$108,914,055 (see the link to the Fiduciary Arrangements and Requirements) The loan financing and venture capital (equity financing) provided by EGFL from its own capital account ranges from US$100,000 to US$1.5 million, and the target group consists of dynamic, small and medium sized Barbadian companies in the productive sectors. In addition, EGFL provides business advisory services and technical assistance to its client companies Given EGFL s track record 5, and its role and experience in development of the country and its mandate to promote business for SMEs, in addition to lower transaction costs, the GOBA has chosen EGFL to sub execute the project The Energy and Telecommunications Division (ETD) of the Office of the Prime Minister. This Division, previously in the Ministry of Finance, Investment and Energy (MFIE) (see paragraph 2.5) is responsible for the management of the energy sector of Barbados, through the monitoring of activities of the Barbados National Oil Company and the National Petroleum Company; pricing of petroleum products; and setting goals and objectives of policy direction for the 4 EFGL shareholder participation is comprised of type A shares: National Insurance Board (5.76%), RBTT Bank Barbados (2.88%), SAGICOR Life Inc. (5.76%) and the Central Bank of Barbados (5.76%); and type B shares: GOBA (65.19%) and CRL Limited (14.67%). Including type A and B shares the GOBA has the majority of shares. 5 Since 1998 EGFL has approved 248 loans for an amount of US$141.5 million. The cumulative disbursements in this period amount to US$116.5 million.
12 - 7 - sector. The Division is also responsible for the development of the current tax incentives for the support of RE and EE. The Division has produced a draft National Energy Policy which was presented and approved by Parliament in The current SEFB activities support the further development of a comprehensive National Energy Policy. The Public Sector Energy Conservation Program is the responsibility of the Division. The SEFB has been an initiative of the Division to ensure an economically, socially and environmentally sustainable energy sector for the island The Project: The Smart Fund seeks to develop a package of financial instruments and provide technical assistance designed to remove the main barriers and respond to the demand 6 for the implementation of commercially and economically viable RE and EE technologies (see figures 1 and 2), which will contribute to reduced electricity costs, improved energy security, a more diversified energy matrix and enhanced environmental benefits, such as carbon emission reductions The Smart Fund has been structured using the following criteria: (i) simplicity in the structure and functioning and in the management and allocation of funds; (ii) ease of access for end users; and (iii) financial and technical sustainability of the mechanism. The adherence to these criteria should help provide end users with a product that is easy to use and that facilitates the adoption and increased use of EE and RE technologies Selection Criteria for projects to be funded by the Smart Fund. As to the technologies, type of projects and end users that would benefit from the Smart Fund, the loans and technical assistance provided by EGFL to the end customers will be based on the following criteria: (i) energy savings and contribution to avoided oil imports; (ii) payback period; (iii) size of the investment; (iv) carbon emission reductions; and (v) target population or sectors as prioritized by GOBA. The observance of these criteria will help maximize the cost effectiveness of the projects funded by the Smart Fund. Further details of the operation of the Smart Fund will be found in the Operating Guide of the Smart Fund 7 (OGSF). Approval by the Office of the Prime Minister, through the ETD, and by EGFL of the OGSF, with the prior non-objection of the Bank, and its entry into force is a condition prior to the first disbursement. B. Objective, Components and Cost 1.25 The objective of this project is to promote the increased use of RE and the implementation of EE measures through the design and implementation of the Sustainable Energy Investment Program, also known as the Smart Fund, a Government initiative consisting of a package of financial instruments to support investments in RE and EE. Ultimately, the project will help reduce Barbados fossil fuel dependency, promote sustainable energy and reduce carbon emissions. 6 The technical studies to support this project show that at least US$18.3 million in RE distributed generation investments and US$234.1 million in EE at all levels will be required to achieve a sustainable energy matrix by 2029, along with US$300 million in large scale RE investments such as wind farms, waste to energy plants, etc. 7 See electronic link to the inputs for the preparation of the OGSF. The OGSF will cover both components 1 and 2 of the project.
13 The program has two components, component 1 executed by EGFL, as sub executing agency, and component 2 executed directly by the ETD: 1.27 Component 1: Encouraging EE and RE projects (US$ 9.0 Million): This component will promote the adoption of RE and EE appliances in the residential sector and business enterprises, including the hotel sector 8.The overall financial terms and conditions to access the financial instruments under each subcomponent will be defined in the OGSF. This component will have the following subcomponents: a. A grant provision facility (US$ 0.5 Million) for pre-investment studies (feasibility studies, EE audits, environmental assessments, etc.) and detailed design of RE and EE projects. The aim of this subcomponent is to support the development, funding and execution of projects. This facility will work in a scheme, in which the developer will be required to provide counterpart funding in a range from 25% up to 75% of the total grant awarded, depending on the size and risk of the project, and the track record of the developers/sponsors. b. Loans to support RE and EE projects (US$ 6 million). The projects developed in subcomponent (a) and other selected 9 projects can be financed using this subcomponent. RE equipment, such as solar PV panels, hybrid solar PV/solar water systems, and other small size applications, would be eligible to be financed. In the case of EE applications, equipment such as power monitors, CFLs, efficient refrigerators, efficient public lighting, efficient Heat and Ventilation and Air-conditioning systems (HVAC), efficient electric motors, among other equipment designed to reduce power consumption, will be eligible for financing. Financing will be limited to a maximum of US$ 750,000 per applicant. c. Financial mechanism for individual customers to access RE and EE systems (US$ 0.5 million). Retailers with experience in the hire-purchase sector, that are actually selling, or planning to sell, RE and EE equipment will be eligible for financing under this subcomponent. In turn, the retailers or energy sector firms should provide better financing conditions to their customers. Under this subcomponent, the end users will have the opportunity to purchase RE and EE equipment from retailers at reduced interest rates. d. Distribution of CFLs and other EE lighting systems (US$ 0.5 million). This subcomponent will promote and encourage the use of CFLs and other costeffect EE lighting systems, by providing a subsidy, as a continuation of the GEF funded SEF Pilot Program (see paragraph 1.10 (c)). The proposed execution mechanism of this subcomponent will be detailed in the OGSF. 8 Priority will be given to SMEs, in accordance with the criteria established in the OGSF. 9 The selection of RE and EE projects to be funded through the Smart Fund will use the criteria developed in the OGSF and EGFL s terms and conditions for financing.
14 - 9 - e. AC rebate mechanism (US$ 1.5 Million). The rebate mechanism will be set up to replace 10 inefficient AC systems, particularly those using Ozone Depleting Substances (ODS), with more efficient and ODS free AC units. The ETD will issue vouchers to replace the ACs using ODS and inefficient ACs with new EE certified and ODS free units. Eligible customers 11 will use the AC vouchers as a 50% discount of the cash price offered by retailers. The retailers will then be able to cash in the vouchers at EGFL on a regular basis The amounts of all subcomponents in this component 1, except for subcomponent (a), are indicative, as funds may be reallocated among the subcomponents depending on the success and demand of each one of these mechanisms of the Smart Fund, providing additional flexibility to the project Component 2: Institutional Support for the execution of the Smart Fund (US$ 1 million): The GOBA has requested resources for the following activities to support the Smart Fund: a. Facilitate the execution of the Smart Fund, including the issuing of the vouchers for subcomponent (e) of component 1. This subcomponent can expand the GEF program (see paragraph 1.10 c) to purchase RE and/or EE equipment for retrofitting government buildings, public lighting among other EE applications. Additionally, this component will finance the Project Execution Unit (PEU) in ETD, including a Program Manager; b. Allow the GOBA to implement an awareness and education program to promote RE and EE throughout the country, including schools, universities, labor unions, and broader civil society; and c. Data collection and monitoring of the program, including support for project management. C. Key Results Indicators 1.30 Expected Results. Through the financing of RE and EE equipment, the project will promote the generation of at least 1 MW of RE distributed generation and energy savings of at least 500 MWh, as well as financial savings from the reduction in electricity bills. The baseline, results and target for the Smart Fund can be found in the Project Results Framework (see annex II). The financing of RE projects will increase self generation and distributed generation with the possibility of selling excess electricity to the grid, thereby lowering the energy bill of end users and contributing to reduced fossil fuel electricity generation that would have been necessary without this project. The SEF Pilot Program, sponsored by GOBA, BL&P and IDB, will benefit from the Fair Trading Commission s (FTC) recent approval of a rider allowing private individuals or companies to feed excess power from RE technologies into the grid for a pilot 10 Or by acquiring a new energy efficient and ODS free AC systems; however, priority will be given to replacing AC containing ODS. 11 The Operative Guide of the Smart Fund (OGSF) will define the criteria for eligibility of customers and the methodology for the distribution of the AC vouchers.
15 period of two years. FTC s RE rider 12 introduces tariffs and terms for a feed-in tariff for PV and micro wind applications. It is expected that after the two year trial, FTC could approve the same policy for a longer period of time Overall, the Smart Fund, as part of the Sustainable Energy Framework for Barbados, will contribute to reduced GHG emissions and mitigate climate change. The project team estimates that, with all the GOBA initiatives combined, 13 Barbados would generate US$283.5 million in electricity costs savings over the next 20 years and would avoid the production of more than 4.5 million tco 2 e, 14 which are concrete environmental benefits, over the same period. II. FINANCING STRUCTURE AND MAIN RISKS A. Financial Instruments and Contractual Conditions 2.1 The proposed operation is structured as an investment loan. Ninety percent (90%) of the loan will be managed by EGFL, under component 1, to provide loans to purchase RE and EE equipment. Ten percent (10%) will be managed by the ETD directly under component 2 as institutional support for the execution of the Smart Fund (see table 1 below). Table 1. Program Costs Component Total (US$million) 1. Encouraging EE and RE projects Grant provision facility Loans to support RE and EE projects Financial mechanism for individual customers to access RE and EE systems Distribution of CFLs and other EE lightings systems AC rebate mechanism Institutional support for the execution of the Smart Fund Execution support Public awareness and education program Data collection and monitoring of the program 0.20 Other Costs Financial Auditory 0.05 Contingencies 0.05 Total B. Environmental and Social Safeguard Risks 2.2 The project will have net positive environmental effects due to the potential impacts in GHG emission reductions, substitution of fossil fuel based electricity generation and climate change mitigation brought by the implementation of EE 12 The Rider approved by FTC will allow at least 200 RE connections, of which 29 connections will be financed by SEF Pilot Program, mainly PV systems, with a value of 1.8 times the Fuel Clause Adjustment (FCA) (equivalent to US$0.16 per kwh) for a period of 2 years. This policy commitment was included the first phase of the Energy PBP. 13 The Energy PBP (phase 1 and 2), the Smart Fund, the SEF Pilot Program, the CHENACT project and the RE and EE studies provided by SEFB, and studies to recommend efficient use of fossil fuels. 14 The country will achieve carbon emission reductions, which eventually could be sold in the world carbon markets.
16 and RE measures. The policies triggered under this operation are OP-703, as well as the non investment lending and flexible lending instruments under policies OP-704 and OP-102. According to the IDB s Environmental and Safeguard Compliance Policy (OP-703), this operation has triggered directive B.13 and consequently does not need classification. 2.3 The type of operations currently envisioned for support by the Smart Fund (EE appliances and measures, distributed power generation using RE technologies, such as solar PV systems and small wind turbines connected to the distribution grid, mainly targeting households, government buildings and SMEs) are likely to have minimal to moderate adverse environmental impact. 2.4 The eligibility criteria of the Smart Fund will be identified in the OGSF, explaining the use of resources as well as any other management system needed to ensure proper use of resources from the Smart Fund. C. Risks and Special Considerations 2.5 Fiduciary Risk. An Institutional Capabilities Assessment (SECI, acronym in Spanish) determined that the capacity of the Energy Division of the MFIE, the name of the Executing Agency until October 2010, now called the ETD of the Office of the Prime Minister, will need to be strengthened in the area of RE and EE to ensure successful execution of the Smart Fund and SEFB in general. To ensure successful execution, both RE and EE have to be given a higher priority in the activities of the ETD. Given the importance of RE and EE in the energy policy for Barbados, the ETD and EGFL will be strengthened with the required expertise 15 to meet the demand for Smart Fund resources. The head of the ETD, its staff, infrastructure and technological support have remained unchanged. Therefore, the SECI evaluation made for the Energy Division of the MFIE is still valid for the ETD. 2.6 The fiduciary financial management assessment indicates that EGFL possesses adequate institutional capacity to manage the execution of the Smart Fund under component 1. The analysis shows that EGFL has acquired significant experience over the years in Barbados as fund manager; therefore, the fiduciary risk related to EGFL as Fund Manager for the Smart Fund is low. The evaluation of the financial management system, the internal control and external control systems concluded a satisfactory development level and low risk for both financial management and external control systems. The assessment showed a medium development level and medium risk for the internal control systems. 2.7 Based on the SECI evaluation and the IDB project team s assessment, EGFL has the capacity to execute the Smart Fund given its knowledge of the banking sector and the business community, its experience with managing similar financial instruments and the strength of its financial management, external and internal control systems used for the monitoring of resources. Considering the nature of 15 The expertise will be in the form of new qualified staff and/or the services of a consulting firm under a retainer contract. The institutional strengthening required and the corresponding terms of reference will be specified in the OGSF.
17 this program, EGFL will require strong technical support from the ETD, particularly in the areas of RE and EE, as well as an energy auditor/consultant who should be hired on a retainer basis, within the first year of operation of the project, to ensure successful execution of the program. This intervention is to be funded by the project budget under component 2 and included in the project execution plan. 2.8 Procurement Risk. Under component 1, no procurement will be performed as EGFL will only provide funding to business enterprises, including hotel sector, and retailers, in order to access end users. In the case of component 2 (see paragraph 1.29), all the procurement of goods and services will be carried out in accordance with IDB procurement policies and procedures. No major risks are foreseen. 2.9 Procurements for this project will be carried out in accordance with the Policies for the Procurement of Works and Goods Financed by the Inter-American Development Bank (GN ), of July 2006; the Policies for the Selection and Contracting of Consultants Financed by the Inter-American Development Bank (GN ), of July 2006; and the provisions established in the loan contract and the procurement plan Procurement Plan. The procurement plan for Component 2 covering the first 18 months of the program (from January 2011 to August 2012) is summarized in Annex III. It indicates the procedure to be used for the procurement of goods, the contracting of works or services, and the method of selecting consultants, for each contract or group of contracts. It also indicates cases requiring prequalification; the estimated cost of each contract or group of contracts; the requirement for ex ante or ex post review by the Bank; and estimated dates for the publication of specific procurement notices and completion of the contracts included in this project. The procurement plan will be updated annually or whenever necessary or as required by the Bank The possible procurements to be made under component 2 for the proposed project are: (i) goods: (a) solar PV panels, CFLs, RE and EE equipment for retrofitting government buildings, public lighting equipment, and (b) public relations materials such as brochures; and (ii) consulting Services to: (a) prepare public education materials, (b) support the execution of the Smart Fund through technical expertise and consultants to support the work of the ETD and EGFL, and (c) develop public awareness campaigns, implement and execute public education and awareness activities and media relations Execution Risk. The Smart Fund presents some risks for the execution of this loan, given the limited institutional capacity of both the ETD and EGFL in the management and execution of an RE and EE financial facility, due to its innovative nature. This risk will be mitigated with the implementation of a PEU, The OGSF will provide detailed terms of reference for the PEU, including staffing needs in order to ensure adequate execution capacity within the ETD from a managerial, technical, and administrative (finance/procurement and monitoring/evaluation) point of view.
18 including a project manager, funded through component 2 of this loan. The selection and appointment of the Program Manager for the Smart Fund by the Office of the Prime Minister, through ETD, will be a condition prior to first disbursement. The IDB, through INE/ENE and CCB/CBA, will also provide technical assistance to assist in the execution upon request of the GOBA The lack of interest from end users to use the Smart Fund could also be a possible risk. In order to mitigate this risk, public awareness and education campaigns to promote RE and EE among SMEs, the residential sector and government officials will be financed and implemented through component 2 of this loan. The promotional campaign is expected to generate an increased response from endusers. The lessons learned from the implementation of the GEF project (see paragraph 1.10 c) that include public awareness will be taken into account in the design of activities under component 2. D. Other Issues 2.14 The GOBA has expressed its interest in the preparation of a second phase of the Smart Fund (Smart Fund II) for The preparation and implementation of the Smart Fund II will depend on the success achieved (use of funds) and lessons learned in the first phase of the Smart Fund, as well as the IDB s programming exercise with the GOBA This operation is being prepared with a view to executing it in parallel with the first phase of the Energy PBP (2410/OC-BA), in order to obtain as much synergy as possible from the two loans, so that the regulation and policy impacts from the Energy PBP will contribute to new investments in sustainable energy projects, facilitated with the financial assistance of the Smart Fund. III. IMPLEMENTATION AND MANAGEMENT PLAN A. Summary Implementation Arrangements 3.1 Borrower and Executing Agency. The GOBA will be the borrower and the Office of the Prime Minister, acting through the ETD, will be the executing agency. EGFL with the technical support and supervision of the ETD, will be the sub executing agency for component 1; ETD will execute component 2 directly. ETD will be responsible for the entire execution of the Smart Fund. Signature and entry into force of an agreement between the Office of the Prime Minister, through the ETD, and EGFL for the establishment and management of the Smart Fund under component 1, including its operating terms and conditions, on terms agreed previously by the Bank, will be a condition prior to first disbursement. 3.2 EGFL will sub execute 90% of the resources of the Smart Fund (US$ 9 million) under component 1, as shown in paragraph The ETD and EGFL will agree on the terms and conditions under which EGFL will be compensated and the fee
19 recovery scheme 17. In any case, EGFL will not charge any fees to ETD or against the project resources. The terms and conditions for loans and grants, collateral requirements, disbursements and repayment mechanism to EGFL from the end users will be defined in the OGSF. The expected disbursement schedule for this operation is shown in table 2 below (disbursements may vary from year to year depending on demand; if demand is high, disbursements could be frontloaded). The IDB will disburse the funds to ETD which will then provide EGFL with funding for component 1. The specific disbursement arrangements between the Bank and the ETD, and between ETD and the EGFL, will be specified in the OGSF. Table 2. Disbursement Schedule US$ Millions Year 1 Year 2 Year 3 Year 4 Year 5 Total Disbursement Percentage Execution period. The execution period will start as of the entry into force of the loan contract, for a period of 5 years. The Smart Fund should be totally disbursed in that period. Nevertheless, the Smart Fund, as an instrument of the GOBA to promote RE and EE, will continue as the loans from EGFL to SMEs and their repayment may take longer than 5 years. These loans will follow the terms and conditions of EGFL (see link to the inputs of OGSF). The repayment of loans under component 1b by customers to EGFL will be used to prepare other loans under the Smart Fund for a period of at least 5 years. B. Project Cycle within the Smart Fund 3.4 As shown in figure 3, the project cycle begins with a project idea (PI) submitted to EGFL. The PI is forwarded to the Smart Fund Technical Committee (SFTC), 18 based in the ETD, who will decide from a technical point of view if the project is sound for financing, if it needs technical assistance to improve it or if it should be rejected. If the project needs technical assistance, the PI can be eligible for a grant provision facility (see paragraph 1.27 a). Once the PI obtains technical approval by the SFTC, the PI will be eligible for financing by EGFL (see paragraph 1.27 b and c). The PI will then have to comply with the financial requirements of EGFL, in order to get final approval. EGFL will apply the terms and conditions established in the OGSF and the agreement between EGFL and ETD to oversee credit and risk decision for each operation funded under component As part of the mid-term review (2 years of execution from the date of signature of the loan contract or when 50% has been disbursed, whichever occurs first), the IDB and ETD (through an independent auditor) will review the performance of the Fund and agree to adopt appropriate measures, mutually acceptable to the parties to remedy any observed underperformances in accordance with the OGSF. 18 The SFTC is expected to be composed by the Permanent Secretary of Energy or designated representative (at least a Senior Technical Officer or related grade from ETD) who will chair the committee, the Program Manager of the Smart Fund (or designated representative from the PEU), a Representative of the Government Electrical Engineering Department, a Representative of the Barbados Light and Power Co. and a Representative of the Barbados National Oil Company. The terms of reference of the SFTC will be detailed in the OGSF.
20 Figure 3: Project Cycle within the Smart Fund (component 1) C. Summary of Arrangements for Monitoring Results 3.5 From the IDB, the IDB project team both located in Washington and in the Barbados Country Office will be in charge of the follow-up of the program. The borrower and the IDB have agreed to carry out follow-up meetings, initially on a quarterly basis. ETD, through the PEU, will prepare a semi-annual progress report for the Bank s non-objection, with inputs from EGFL pertaining to component 1 (showing the evolution of disbursements and repayments as well as technical assistance provided under the Smart Fund). These reports will include technical information in terms of cumulative MW of RE introduced and/or MWh saved with EE measures or equipment. The PEU will also monitor and evaluate the progress of the project in relation to the results framework (see annex II), and include such information in the semi-annual reports. ETD will also submit to the Bank annual audited reports for component 1 (sub executed by EGFL), unaudited semi-annual reports for component 2 (executed by ETD), and a final audited financial statement of the Program. 3.6 The ETD, through the PEU, will collaborate with BL&P to monitor installed RE equipment, and to estimate excess energy sold to the grid from SPPs and energy savings. With the information gathered through the monitoring process, ETD will prepare a mid-term (end of year 2 of operation) and final evaluation of the Smart Fund (see link Monitoring and Evaluation arrangements). 3.7 A Project Completion Report (PCR) will be prepared within six months after the last disbursement of the project. The PCR will evaluate the impact and results obtained by the program. The borrower, through the PEU, is responsible for the gathering of information and data required for monitoring and evaluation. The ETD will fund the costs incurred for collection and processing of the information, using the funds of component 2.
21 Annex I (BA-L1020) Indicator Score I. Strategic Relevance High Maximum Score 1. IDB Strategic Development Objectives Country Diversification Corporate Initiatives Harmonization and Alignment Beneficiary Target Population Country Strategy Development Objectives Country Strategy Sector Diagnosis Country Strategy sector objective & indicator II. Development Outcomes - Evaluability Highly Satisfactory 3. Evidence-based Assessment & Solution Evaluation & Monitoring Plan Cost-Benefit or Cost-Effectiveness Risks & Mitigation Monitoring Matrix III. IDB s Role - Additionality Development Effectiveness Matrix Summary 7. Additionality Technical Assistance provided prior the project Improvements in management of financial, procurement, monitoring or statistics internal controls Improvements in environmental, health and labor performance I. Strategic Relevance: This is an investment project that will take place in Barbados, classified as a C country. The project falls under the corporate initiative related to SECCI. The project is strongly aligned with the Country Strategy. II. Evaluability: The problems being addressed through the project are clearly defined and its diagnosis is empirically based. The main factors that contribute to these problems are clearly specified, as are the interrelationship among factors and the magnitudes of their deficiencies. The project s outcomes and outputs are clearly stated and show vertical logic. All indicators have baselines, targets and sources of information and are SMART. The documentation presents a thorough monitoring plan with substantial resources allocated. It also presents an evaluation plan with a budget for this activity. Some of the components of the project were analyzed using a costeffectiveness analysis. The risks of the operation are identified and classified and present mitigation measures, however, no indicators, baselines or targets are included to monitor these measures. III. Additionality: A technical cooperation has been provided to increase the likehood of success of the project. In addition, externalities are expected to be generated in the environmental area.
22 Project Objective Annex II Page 1 of 2 BA-L1020 BARBADOS SUSTAINABLE ENERGY INVESTMENT PROGRAM SMART FUND (BA-L1020) RESULTS FRAMEWORK & INDICATOR MATRIX The objective of this project is to facilitate the increasing use of Renewable Energy (RE) and the implementation of Energy Efficiency (EE) measures through the Sustainable Energy Investment Program also known as the Smart Fund, a Government s program consisting of a package of financial instruments through which resources will be made available, facilitating and providing the mechanisms, for funding for investments in RE and EE. Ultimately, the project will help reduce Barbados fossil fuel dependency, promote sustainable energy as well as carbon emission reductions. Outcome Indicators Number of MW of installed distributed RE generation capacity and/or number of MWh of saved energy Baseline 0 MW of installed distributed RE generation capacity 0 MWh of saved energy Target level MW of installed distributed RE generation capacity financed or leveraged by the Smart Fund, as part of the Sustainable Energy Framework for Barbados (SEFB) and/or 500 MWh of saved energy financed or leveraged by the Smart Fund as part of the SEFB Smart Fund 100% undisbursed Smart Fund 100% disbursed Components/ Outputs Component 1: Encouraging EE and RE projects A grant provision facility, disbursed (US$ 0.5 Million) Baseline US$ 0 in technical assistance to develop RE or EE projects facilitated US$ 0.2 million in technical assistance to develop RE or EE projects facilitated US$ 0.4 million in technical assistance to develop RE or EE projects facilitated Target level (2014) US$ 0.5 million in technical assistance to develop RE or EE projects facilitated Loans to support RE and EE projects (US$ 6 million). US$ 0 in EE or RE loans to SMEs US$ 1million in EE or RE loans to SMEs US$ 3million in EE or RE loans to SMEs US$ 6million in EE or RE loans to SMEs Financial mechanism for individual customers to access RE and EE systems US$ 0 in t RE or EE projects for individual US$ 0.1 million in RE or EE projects for US$ 0.3million in RE or EE projects for US$ 0.5 million in RE or EE projects for
23 Annex II Page 2 of 2 BA-L1020 Components/ Outputs Baseline available (US$ 0.5 million). costumers individual costumers Distribution of CFLs and other EE lighting systems (US$ 0.5 million). US$ 0 in CFLs distributed US$ 0.1 million in CFLs distributed individual costumers US$ 0.3 million in CFLs distributed Target level (2014) individual costumers US$ 0.5 million in CFLs distributed AC rebate mechanism available (US$ 1.5 Million). Component 2: Institutional Support for the execution of the Smart Fund (US$ 1 million): Human resources to facilitate the execution of the Smart Fund incremented 1 US$ 0 in transactions for AC rebate mechanism 0 new positions filled US$ 0.3 million in transactions for AC rebate mechanism 1 new position filled US$ 1million in transactions for AC rebate mechanism 2 new positions filled US$ 1.5 million in transactions for AC rebate mechanism 4 new positions filled Awareness and education program to promote RE and EE implemented 0 Workshop developed 1 Workshop developed and delivered 2 Workshops developed and delivered 3 workshops developed and delivered Data collection and monitoring of the program implemented No data collected Data collection is system operative and data is available Data collection is system operative and data is available Data collection is system operative and data is available 1 These positions are consistent with the recommendations made under the Energy Policy Based Loan (BA-L1022).
24 Annex III Page 1 of 1 BA-L1020 SUSTAINABLE ENERGY INVESTMENT PROGRAM Procurement Action Plan (PAA) Component 2: Institutional Support for the execution of the Smart Fund (US$ 1 million) for the period of 18 Months Description of the contract Component 2: Institutional Support for the execution of the Smart Fund (US$ 1 million) Amount (US$000) Procurement method 1 Review (prior or post) Source of financing and percentage IDB % Local/ other % Prequalification (Yes/No) Estimated dates Publication of specific procurement notice Completion of contract Status (pending, in process, awarded, cancelled) Comments 1. Consulting Services 1.1 Project Management 200 NICQ Post No Jan 2011 Dec 2014 Pending 1.2 Awareness Campaign 150 NCB Post No Feb 2011 Nov Pending 1.3 Supervision and Monitoring 150 ICB Prior No Jun 2011 Nov Pending A project management team will be hired to support project execution. Size and personnel will be defined during execution A consulting firm will be hired to design and implement an awareness campaign. The activities of the campaign will be defined during the project's execution. A consulting firm will supervice project execution and achievement of results 2. Non Consulting Services 3. Other services 1 ICB: International competitive bid ding; LIB: limited international bidding; NCB: national competitive bidding; PC: price comparison; DC: direct contracting; FA: force account; PSA: Procurement through specialized agencies; PAs: Procurement agents; IA: Inspection agents; PLFI: Procurement in loans to financial intermediaries; BOO/BOT/BOOT: Build, own, operate/build, operate, transfer/build, own, operate, transfer; PBP: Performance-based procurement; PLGB: Procurement under loans guaranteed by the Bank; PCP: Community participation procurement; QCBS: Quality- and cost-based selection QBS: Quality-based selection FBS: Selection under a fixed budget; LCS: Least-cost selection; CQS: Selection based on the consultants qualifications; SSS: Single-source selection.
25 DOCUMENT OF THE INTER-AMERICAN DEVELOPMENT BANK PROPOSED RESOLUTION DE- /10 Barbados. Loan /OC-BA to the Government of Barbados Sustainable Energy Investment Program (Smart Fund) RESOLVES: The Board of Executive Directors That the President of the Bank, or such representative as he shall designate, is authorized, in the name and on behalf of the Bank, to enter into such contract or contracts as may be necessary with the Government of Barbados, as Borrower, for the purpose of granting it a financing to cooperate in the execution of a Sustainable Energy Investment Program (Smart Fund). Such financing will be for an amount of up to US$10,000,000 from the Single Currency Facility of the Ordinary Capital resources of the Bank, and will be subject to the Financial Terms and Conditions and the Special Contractual Conditions of the Project Summary of the Loan Proposal. (Adopted on 2010) LEG/SGO/BA BA-L1020
PROJECT PROFILE (PP) JAMAICA. The Ministry of Energy and Mining of Jamaica Financing Plan: IDB US$ 20,000,000 Total US$ 20,000,000
PROJECT PROFILE (PP) JAMAICA Project Name: Project Number: Project Team: I. BASIC DATA Energy Efficiency and Conservation Program JA-L1025 Natacha Marzolf (INE/ENE) and Sylvia Larrea (INE/ENE), Co-Team
CARIBBEAN HOTEL ENERGY EFFICIENCY ACTION PROGRAM (CHENACT)
CARIBBEAN HOTEL ENERGY EFFICIENCY ACTION PROGRAM (CHENACT) (RG-T1431) Terms of Reference Project Manager of the Technical Cooperation I. Background 1.1 Due to a lack of naturally available oil, one of
Financing Energy Efficiency and Renewable Energy through the India Renewable Energy Development Agency
RENEWABLE ENERGY INDUSTRIAL ENERGY EFFICIENCY BUILDING ENERGY EFFICIENCY Financing Energy Efficiency and Renewable Energy through the India Renewable Energy Development Agency A RANGE OF FINANCIAL SUPPORT
National Energy Efficiency and Renewable Energy Action (NEEREA) August 2014
National Energy Efficiency and Renewable Energy Action (NEEREA) August 2014 Prepared by: Melda Jabbour, Energy Engineer, Lebanese Center for Energy Conservation (LCEC) Rana El-Guindy, Junior analyst -
INDONESIA S COUNTRY REPORT ENCOURAGING CLEAN ENERGY INITIATIVE
DEWAN PERWAKILAN RAKYAT REPUBLIK INDONESIA INDONESIA S COUNTRY REPORT ENCOURAGING CLEAN ENERGY INITIATIVE As part of the international community, Indonesia shares its concern on the environment and development
Revolving and Esco Funds for Renewable Energy and Energy Efficiency Finance
Renewable Energy Industrial Energy Efficiency Building Energy Efficiency Revolving and Esco Funds for Renewable Energy and Energy Efficiency Finance Funding the future The growing might of financing boosts
Financing Renewables and Energy Efficiency Projects in Developing Countries
Mobilising Private Capital to reduce Climate Change Instruments and Policies to mobilise International Green Energy Investment Berlin June 29-30, 2010 Financing Renewables and Energy Efficiency Projects
Greenhouse gas abatement potential in Israel
Greenhouse gas abatement potential in Israel Israel s GHG abatement cost curve Translated executive summary, November 2009 1 Executive Summary Background At the December 2009 UNFCCC Conference in Copenhagen,
Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility
Sustainable and Renewable Energy Development Authority (SREDA) of Bangladesh Role and Responsibility Welcome to SREDA Siddique Zobair Member (EE & C) Sustainable & Renewable Energy Development Authority
Hong Kong, China. 40 th APEC Energy Working Group Meeting Statement on Notable Energy Developments. (1) Building Energy Codes
40 th APEC Energy Working Group Meeting Statement on Notable Energy Developments Hong Kong, China (1) Building Energy Codes The Electrical and Mechanical Services Department of the Hong Kong Government
COMMISSION STAFF WORKING PAPER EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT. Accompanying the document
EUROPEAN COMMISSION Brussels, 22.6.2011 SEC(2011) 780 final COMMISSION STAFF WORKING PAPER EXECUTIVE SUMMARY OF THE IMPACT ASSESSMENT Accompanying the document DIRECTIVE OF THE EUROPEAN PARLIAMENT AND
Report on 2012 Energy Efficiency Utility Program Revenues and Expenditures Pursuant to 30 V.S.A. 209
Report on 2012 Energy Efficiency Utility Program Revenues and Expenditures Pursuant to 30 V.S.A. 209 by the Vermont Public Service Board April 14, 2014 In accordance with 30 V.S.A. 209, the Public Service
Summary of the Impact assessment for a 2030 climate and energy policy framework
Summary of the Impact assessment for a 2030 climate and energy policy framework Contents Overview a. Drivers of electricity prices b. Jobs and growth c. Trade d. Energy dependence A. Impact assessment
Incentivizing Generation of More Renewable Energy in Residential and Commercial Sector in Hawaii
Incentivizing Generation of More Renewable Energy in Residential and Commercial Sector in Hawaii Farzand Ali Policy Paper prepared under the supervision of Dr. Susan Chandler, Director Public Policy Center,
DIVISION ON TECHNOLOGY INDUSTRY AND ECONOMICS Energy Branch Renewable Energy and Finance Unit THE BALKAN RENEWABLE ENERGY PROGRAMME (BALREP)
DIVISION ON TECHNOLOGY INDUSTRY AND ECONOMICS Energy Branch Renewable Energy and Finance Unit THE BALKAN RENEWABLE ENERGY PROGRAMME (BALREP) Call for Proposals Evaluation of Concepts for the Implementation
Western Australian Feed-In Tariff Discussion Paper
Western Australian Feed-In Tariff Discussion Paper OVERVIEW In September 2008, the incoming State Government announced its intention to introduce a feed-in tariff as part of the Liberal Plan for Environmental
2014/15-2016/17 ELECTRICITY EFFICIENCY PLAN
2014/15-2016/17 ELECTRICITY EFFICIENCY PLAN PLAN OVERVIEW Prepared for the New Brunswick Department of Energy and Mines with the assistance of Dunsky Energy Consulting July 2014 This page intentionally
SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems, and Opportunities
Country Operations Business Plan: Philippines, 2013 2015 SECTOR ASSESSMENT (SUMMARY): ENERGY 1. Sector Performance, Problems, and Opportunities 1. Challenges. Economic growth has been impeded in the Philippines
Clean Energy Jobs Plan
Clean Energy Jobs Plan Introduction When I was governor, California was the world leader in renewable energy and it led the nation in efficiency standards. Our programs saved California consumers billions
Examples of State Tax Credits and Incentive Programs for Renewable Energy Projects and Energy Efficiency Improvements
TN TVA - Generation Partners Program i Performance-based incentive Tennessee Valley Authority (TVA) and participating power distributors of TVA power offer a production-based incentive program to Valley
C5 :106. The Alleviation of Prices Impact on Electricity Tariff caused by Renewable Energy Adders in Thailand
2012 Paris Session http : //www.cigre.org C5 :106 The Alleviation of Prices Impact on Electricity Tariff caused by Renewable Energy Adders in Thailand SIRIWAN WORADEJ Metropolitan Electricity Authority
Massachusetts Saving Electricity:
Commonwealth of Massachusetts Massachusetts Saving Electricity: A Summary of the Performance of Electric Efficiency Programs Funded by Ratepayers Between 2003 and 2005 Executive Office of Energy and Environmental
BGE Smart Energy Savers Program Energy Efficiency and Demand Response Programs December 4, 2012 USEA Global Workshop On Clean Energy Development
BGE Smart Energy Savers Program Energy Efficiency and Demand Response Programs December 4, 2012 USEA Global Workshop On Clean Energy Development Ruth C. Kiselewich, Director Demand Side Management Programs
Green Power Accounting Workshop: Concept Note For discussion during Green Power Accounting Workshop in Mexico City, May 13th 2011
Introduction As more companies and government organizations prepare greenhouse gas (GHG) inventories that reflect the emissions directly and indirectly associated with their operations, they increasingly
How to Earn the LEED Green Power Credit
3D EG REES WH ITE PAPER How to Earn the LEED Green Power Credit Using on-site and off-site renewable energy to mitigate the impact of greenhouse gas emissions associated with a LEED project s energy use
Department of Energy South Africa
Department of Energy South Africa Policy to support the Energy Efficiency and Demand Side Management Program for the Electricity Sector through the Standard Offer Incentive Scheme 20 May 2010 1 TABLE OF
are country driven and in conformity with, and supportive of, national development priorities;
OPERATIONAL PROGRAM NUMBER 6 PROMOTING THE ADOPTION OF RENEWABLE ENERGY BY REMOVING BARRIERS AND REDUCING IMPLEMENTATION COSTS 6.1 The United Nations Framework Convention on Climate Change (UNFCCC) seeks
Solar Water Heating in Oregon s Residential Sector: The Current Landscape
December 2012 Policy Brief No. 001 Oregon State University School of Public Policy Solar Water Heating in Oregon s Residential Sector: The Current Landscape Getchell, M., Meuse, P., O Casey, E., & Sigmon,
Using Less Energy: Nova Scotia s Electricity Efficiency and Conservation Plan
Using Less Energy: Nova Scotia s Electricity Efficiency and Conservation Plan April 2014 Contents Summary...1 Introduction...2 Objectives of the Plan...3 Plan of Action...5 The Benefits of Energy Efficiency...
NEW COMMERCIAL Rates. Understanding the. Commercial Customers
Understanding the NEW COMMERCIAL Rates The Austin City Council increased Austin Energy s base rates, which pay for operations and maintenance, for the first time in 18 years. The new rates, which amount
International Solar Energy Arena January 23rd, 2009, Istanbul STEAM (Strategic Technical Economic Research Center)
International Solar Energy Arena January 23rd, 2009, Istanbul STEAM (Strategic Technical Economic Research Center) Good morning. Sayin Bakanım. Members of Parliament. Ladies and Gentlemen. Slide 1: Opening
Introduction to the London Energy Efficiency Fund (LEEF)
Executive Summary Introduction to the London Energy Efficiency Fund (LEEF) 1. The London Green Fund (LGF) is a 100m Fund comprising of 50m from the London 2007-13 European Regional Development Fund (ERDF)
SPANISH EXPERIENCE IN RENEWABLE ENERGY AND ENERGY EFFICIENCY. Anton Garcia Diaz Economic Bureau of the Prime Minister
SPANISH EXPERIENCE IN RENEWABLE ENERGY AND ENERGY EFFICIENCY Anton Garcia Diaz Economic Bureau of the Prime Minister «Symposium on Strengthening Sino-Spain cooperation in multiple Fields» New Energy Cooperation
FINANCING RESOURCES FOR SOLAR PV IN WASHINGTON STATE
FINANCING RESOURCES FOR SOLAR PV IN WASHINGTON STATE Evergreen State Solar Partnership February 2013 Authors & Contributors: Northwest SEED, WA State Department of Commerce, City of Seattle, City of Bellevue,
Solar City Master Plan - Executive Summary
Solar City Master Plan - Executive Summary Meeting the growing energy demand is one of the biggest challenges that the world is facing today. Rising population and depleting fossil fuel resources are compelling
Fiscal Year 2011 Resource Plan
Salt River Project Fiscal Year 2011 Resource Plan Page 1 Last summer SRP hosted three resource planning workshops for a diverse group of stakeholders and customers to explain the planning process, discuss
Clean State Energy Actions 2011 Update. colorado
Energy Efficiency Building Energy Codes Utility Demand-Side-Management Energy Savings Targets/Energy Efficiency Resource Standards Residential: 2003 IECC, required in jurisdictions with a building code
CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007
CANADIAN RENEWABLE ENERGY POLICIES Matthew H. Brown InterEnergy Solutions 2007 The following offers an overview of Canadian federal and provincial policies that promote renewable energy. It is excerpted
ESCO Financing. State of Israel Ministry of National Infrastructure. Pierre Baillargeon. March 2007 ECONOLER INTERNATIONAL
ESCO Financing State of Israel Ministry of National Infrastructure Pierre Baillargeon March 2007 Agenda Evaluation of the EE market Introduction to the ESCO concept Introduction to performance contracts
Project Idea Note: Solar Water Heating Fee-For-Service Program in the Caribbean
PROJECT IDEA NOTE (Based on the World Bank s PIN Template, with Some Adaptations) A. Project description, type, location and schedule Name of Project: Solar Water Heating Fee-for-Service Program in the
The Renewable Energy Sector in Cyprus
Energie The Renewable Energy Sector in Cyprus Dr. Isabelle Riesenkampff, German Energy Agency (dena) Cologne, 29 November 2010 Conference Solar Industry in the Republic of Cyprus Outline: The Renewable
Success story: Feed-In Tariffs Support renewable energy in Germany
Success story: Feed-In Tariffs Support renewable energy in Germany This document will show how this success story has been brought about and is made up of the following sections: 1. What is a Feed-In Tariff?
GHG Accounting Guidance Note Manufacture of Renewable Energy Climate Related Products
GHG Accounting Guidance Note Manufacture of Renewable Energy Climate Related Products IFC CLIMATE BUSINESS GROUP SEPTEMBER 2011 Introduction The following is an overview guidance for IFC investment staff
PG&E and Renewable Energy. Chuck Hornbrook Senior Manager Solar and Customer Generation
PG&E and Renewable Energy Chuck Hornbrook Senior Manager Solar and Customer Generation PG&E and our Business What we do: Deliver safe, reliable, and environmentally responsible gas and electricity to approximately
Clean State Energy Actions 2011 Update. north carolina. Energy efficiency included in North Carolina s REPS
Energy Efficiency Building Energy Codes Utility Demand-Side-Management Utility Rate Realignment Energy Savings Targets/Energy Efficiency Resource Standards 2009 North Carolina Energy Conservation Code
BWH & CEEH 2 - A Model of Strategic Energy Management
BWH & CEEH 1 Sustainable Energy Plan Bluewater Health BWH & CEEH 2 Table of Contents About Bluewater Pg. 3 Strategic Approach Pg. 4 Preface to Energy Management Plan Pg. 5 Bluewater Health s Energy Management
Roadmap for moving to a competitive low carbon economy in 2050
Roadmap for moving to a competitive low carbon economy in 2050 COUNTRY CAPITAL XXX, 9 March 2011 NAME XXX DG Climate Action European Commission 1 Limiting climate change a global challenge Keeping average
Siemens and The Carbon Trust The Free Money Deal. Free Money. Money doesn t grow on trees. But it does now grow on roofs and in boiler houses.
Siemens and The Carbon Trust The Free Money Deal Free Money Money doesn t grow on trees. But it does now grow on roofs and in boiler houses. Under this delicious funding scheme sponsored by Siemens and
PG&E and Renewables. Finding the ROI in Green Programs. Andrew Yip Manager Solar and Customer Generation Integrated Demand-Side Management
1 PG&E and Renewables Finding the ROI in Green Programs Andrew Yip Manager Solar and Customer Generation Integrated Demand-Side Management Pacific Gas and Electric Company Energy services to 15 MM people:
Formulating an energy management action plan
Formulating an energy management action plan Eskom Energy Management Information Pack: Brochure 1 Index Formulating an energy management action plan 1 Structuring an energy management action plan Sample:
SEC. 1301. STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID.
TITLE XIII--SMART GRID SEC. 1301. STATEMENT OF POLICY ON MODERNIZATION OF ELECTRICITY GRID. It is the policy of the United States to support the modernization of the Nation's electricity transmission and
Response to the Energy White Paper Issues Paper PREPARED BY EMC ENGINEERING FOR THE AUSTRALIAN GOVERNMENT DEPARTMENT OF INDUSTRY
Response to the Energy White Paper Issues Paper PREPARED BY EMC ENGINEERING FOR THE AUSTRALIAN GOVERNMENT DEPARTMENT OF INDUSTRY i P a g e www.energym adeclean.com CONTENTS
Extension of Rural & Renewable Energy Fund (No.37)
Extension of Rural & Renewable Energy Fund (No.37) EXECUTIVE ORDER N 37 CONTINUATION OF THE LIBERIA RURAL AND RENEWABLE ENERGY AGENCY AND THE RURAL ENERGY FUND Whereas, under Executive Order #23 dated
ACCELERATING GREEN ENERGY TOWARDS 2020. The Danish Energy Agreement of March 2012
ACCELERATING GREEN ENERGY TOWARDS The Danish Energy Agreement of March 2012 The most ambitious energy plan of the world In March 2012 a historic new Energy Agreement was reached in Denmark. The Agreement
Cogeneration Based District Heating Restoration Project in Avan District of Yerevan, Armenia
Ministry of Nature Protection of the Republic of Armenia Cogeneration Based District Heating Restoration Project in Avan District of Yerevan, Armenia Diana Harutyunyan, Climate Change Program Coordinator
Measure: Residential PV (G2e)
Measure: Residential PV (G2e) Increase uptake of residential PV by 400 homes per year resulting in adding 200kW of residential rooftop solar annually. COT ARRA RFP Summary: Emission reduction potential
The Economic Impacts of Reducing. Natural Gas and Electricity Use in Ontario
The Economic Impacts of Reducing Natural Gas and Electricity Use in Ontario Prepared for Blue Green Canada July 2013 Table of Contents Executive Summary... i Key Findings... i Introduction...1 Secondary
Overview. PG&E and Energy Efficiency. CA Energy Efficiency Regulatory & Policy Roadmap. Financing Options for Efficiency & Demand Response
Overcoming Financial Barriers to Energy Efficiency April 6, 2010 Overview PG&E and Energy Efficiency CA Energy Efficiency Regulatory & Policy Roadmap Financing Options for Efficiency & Demand Response
CHP & ENVIRONMENTAL COMMODITIES: MARKET & POLICY UPDATE FOR MONETIZING RENEWABLE ENERGY CREDITS FROM CHP PROJECTS. Thomas Jacobsen October 2012
CHP & ENVIRONMENTAL COMMODITIES: MARKET & POLICY UPDATE FOR MONETIZING RENEWABLE ENERGY CREDITS FROM CHP PROJECTS Thomas Jacobsen October 2012 ELEMENT MARKETS US Emissions House of the Year Launched in
FEED-IN TARIFF (FiT) IN MALAYSIA www.seda.gov.my
IN MALAYSIA www.seda.gov.my 1 Introduction to Feed-in Tariff Mechanism Feed-in Tariff mechanism oblige energy utilities to buy renewable energy from producers, at a mandated price. By guaranteeing access
Committee on the Northern Territory s Energy Future. Electricity Pricing Options. Submission from Power and Water Corporation
Committee on the Northern Territory s Energy Future Electricity Pricing Options Submission from Power and Water Corporation October 2014 Power and Water Corporation 1. INTRODUCTION On 21 August 2014, the
THE BAHAMAS NATIONAL ENERGY POLICY 2013-2033
THE BAHAMAS NATIONAL ENERGY POLICY 2013-2033 Advanced by: Ministry of the Environment and Housing Ministry of Works & Urban Development Supported by: Table of Contents List of Acronyms i Message from the
Banking on Renewables
RURAL INFRASTRUCTURE BRIEFINGS Banking on Renewables These Briefings showcase different facets of the rural infrastructure industries: power, energy, and utilities; water utilities; and communications.
Personal Power Stations: The Australian Market for Micro-Combined Heat and Power to 2021
Personal Power Stations: The Australian Market for Micro-Combined Heat and Power to 2021 A Private Report for Strategic Research Clients 1.0 Overview Personal power plant technology could cost effectively
FIRST ANNOUNCEMENT AND CALL FOR ABSTRACTS. 7th International Conference on Energy Efficiency in Domestic Appliances and Lighting (EEDAL 13)
FIRST ANNOUNCEMENT AND CALL FOR ABSTRACTS 7th International Conference on Energy Efficiency in Domestic Appliances and Lighting (EEDAL 13) 11-13 September 2013 Coimbra, Portugal Introduction Citizens and
Renewable Electricity and Liberalised Markets REALM. JOULE-III Project JOR3-CT98-0290 GREECE ACTION PLAN. By ICCS / NTUA K. Delkis
Renewable Electricity and Liberalised Markets REALM JOULE-III Project JOR3-CT98-0290 GREECE ACTION PLAN By ICCS / NTUA K. Delkis October 1999 INTRODUCTION AND BACKGROUND Background to Renewable Energy
IDEAS Energy Innovation Contest 2012 Winners
IDEAS Energy Innovation Contest 2012 Winners Echos Consulting, Jamaica The Family Garden, Jamaica Caribbean ESCO Ltd., Jamaica N.V. VSH Foods, Suriname N.V. Guguplex Technologies, SAC, Suriname B2D, Haiti
Guidance for U.S. Positions on MDBs Engaging with Developing Countries on Coal-Fired Power Generation 1
October 29, 2013 Guidance for U.S. Positions on MDBs Engaging with Developing Countries on Coal-Fired Power Generation 1 The following guidance is intended to be adapted by individual MDBs and incorporated
CRS Report Summaries WORKING DRAFT
CRS Report Summaries R40147 Green Buildings This is a definition and analysis of the cost and benefits of green buildings. It also cites agencies and laws that encourage the building of environmentally
Financing Energy Efficiency and Renewable Energy: Thailand s ENCON Fund
International Energy Efficiency Forum, ASTANA, KAZAKHSTAN, 27-30 September 2010 Financing Energy Efficiency and Renewable Energy: Thailand s ENCON Fund Prasert Sinsukprasert Director of Planning Division
Official Journal of the European Union
L 132/32 COMMISSION IMPLEMTING REGULATION (EU) No 447/2014 of 2 May 2014 on the specific rules for implementing Regulation (EU) No 231/2014 of the European Parliament and of the Council establishing an
Rules of Thumb Energy Efficiency in Buildings
Energy Efficiency in Buildings Energy Savings Cost Savings Increased Productivity Economic Development Other Standard lighting retrofits: $0.90-$1.20 per square foot. High-efficiency packaged and split
European Master in Sustainable Energy Systems Management
SPECIALISATION SYLLABUS : Sustainable Energy Management European Master in Sustainable Energy Systems Management Contents: TOTAL HOURS 1. Socio-economic aspects of the energy 50 2. Renewable energy markets
Goals Status Current Policies & Programmes GENERAL OVERVIEW
Mauritius Air Quality Overview This document is based on research that UNEP conducted in 2015, in response to Resolution 7 of the UNEA 1. It describes countrylevel policies that impact air quality. Triple
California Energy Commission 2015 Accomplishments
California Energy Commission 2015 Accomplishments Responding to California s Drought Responded to the state's historic drought and Governor Edmund G. Brown Jr. s Executive Order B-29-15 by approving new
SECTOR ASSESSMENT (SUMMARY): ENERGY 1
Country Partnership Strategy: Kazakhstan 2012 2016 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Overview. Oil accounts for about a quarter
Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems
Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems This Agreement is made and entered into this day of, 20, ( Effective Date ) by and between the Orlando Utilities Commission
Energy efficiency is a priority for the Russian Federation in its energy policy
Energy efficiency is a priority for the Russian Federation in its energy policy Mikhail Soloviev Geneva, 7-9 October 2009 Purpose and Principles of Government Energy Policy Purpose: most efficient use
Residential & Commercial Sectors Overview CLIMATE
CLIMATE TECHBOOK Residential and Commercial Emissions in the United States Greenhouse gas (GHG) emissions data can be reported either by economic sector, which includes electric power generation as a separate
Green Energy Efficiency Fund Overview Financed Cases. Jose-Luis Bobes, October 2012
Green Energy Efficiency Fund Overview Financed Cases Jose-Luis Bobes, October 2012 Objectives of the Conference User Forum Share experiences Learn from each other Provide feedback Target Audience: ESCOs
Roadmap to Energy Efficiency. for. Water and Wastewater Utilities
Roadmap to Energy Efficiency for Water and Wastewater Utilities Prepared by: Howard Steiman, P.E. ([email protected]) and Paul Doran, P.E. ([email protected]) R. W. Beck, Inc. 550 Cochituate Road Meditech
The Energy Saving Trust s community solar programme How your community can benefit from discounted solar panels and Feed-in Tariffs
The Energy Saving Trust s community solar programme How your community can benefit from discounted solar panels and Feed-in Tariffs 1 Introduction Feed-in Tariffs have arrived, which means there has never
Finding a green engine for economic growth China s renewable energy policies
Low Carbon Green Growth Roadmap for Asia and the Pacific CASE STUDY Finding a green engine for economic growth China s renewable energy policies Key points China s renewable energy industry has been elevated
Solar Panel Property Tax Abatement Property Tax Abatement for PV Equipment Expenditures Amount: Amount: Maximum
Solar Panel Property Tax Abatement Allows NYC building owners to deduct solar electric generating systems from property tax. Amount: Systems placed between August 8, 2008 and December 31, 2010 are eligible
JASPERS Networking Platform. Training on general State Aid issues in infrastructure projects CASE STUDY
JASPERS Networking Platform Training on general State Aid issues in infrastructure projects CASE STUDY The national authorities of an EU Member State are designing four investment programmes which will
Report. Analysis of. Queensland Government. Electricity Sector Cash Flows
Analysis of Queensland Government Electricity Sector Cash Flows February 2014 Analysis of Queensland Government Electricity Sector Cash Flows February 2014 David Spearritt Director ORION Consulting Network
Solar Irrigation in Bangladesh
Solar Irrigation in Bangladesh Country Context Bangladesh is the one of the most densely populated countries in the world Land Area (~144,000 sq km) slightly smaller than the State of Iowa Population (156
Market Mechanisms for Energy Efficiency: White Certificates in Italy
TAIEX Workshop on Demand Side Management in Energy Efficiency Market Mechanisms for Energy Efficiency: White Certificates in Italy Ankara, 22-23 Technical Director Power System Economics Dpt. CESI RICERCA
Energy Efficiency Finance in Pennsylvania
Energy Efficiency Finance in Pennsylvania Summary: Propel increases in non-utility delivered demand-side energy efficiency by providing education, access and funding for innovative energy efficiency finance
Policy Brief International Renewable Energy Investment Credits Under a Federal Renewable Energy Standard
Policy Brief International Renewable Energy Investment Credits Under a Federal Renewable Energy Standard Andrew Stevenson and Nigel Purvis* July 13, 2010 Key Findings Allowing regulated entities to comply