1 Bureau Veritas Certification has established certain minimum expectations for companies who wish to register their Aerospace Quality Management Systems (AQMS) to AS9100. These expectations are based upon our understanding of the requirements of the standard and the requirements for third party registration/certification to the standard gained through our collective experience in auditing quality management systems of many varied applications. Additionally, The ISO Technical Committee (TC) has developed several guidance documents for various requirements of ISO9001:2000 that are applicable to the requirements of AS9100. These documents are available to the public via Internet website These documents are referred to throughout this document. Auditor Notes: This document is not intended to add to, minimize, or in any way modify the requirements of the standard and the requirements for accredited certification to the standard. It is meant to be a guidance tool for Bureau Veritas Certification auditors providing common understanding on the intent of the standard and certification requirements in addition to providing clarification of the text. For organizations seeking registration/certification, this document provides insight as to the expectations of Bureau Veritas Certification auditors. In order to claim conformity with AS9100, the organization has to be able to provide objective evidence of the effectiveness of its processes and its quality management system. Clause of ISO 9000:2000 defines Objective evidence as Data supporting the existence or verity of something and notes that Objective evidence may be obtained through observation, measurement, test or other means. Objective evidence does not necessarily depend on the existence of documented procedures, records or other documents, except where specifically mentioned in AS9100. In some cases, (for example, in clause 7.1{d} Planning of product realization, and clause 8.4 Monitoring and measurement of product), it is up to the organization to determine what records are necessary in order to provide objective evidence. 1 OF 61

2 AS9100 Interpretations Element 4: Quality Management System 4.1: General Section 4.1 includes the general requirements that must be met in order to establish, implement and continually improve the effectiveness of a quality management system meeting the requirements of the standard. These requirements are referenced to and/or further defined in subsequent clauses of the standard. Table A, shown below, contains the cross-linked references. Continual improvement of the effectiveness of the quality management system may be reflected in a number of different areas. These may include: Quality objectives; Corrective and preventive actions; Internal audits; External audits; Review of customer satisfaction surveys and associated action items; Operation meetings producing improvement actions; Actions initiated by suggestion programs; Process Changes; Infrastructure and environment changes; Management Reviews If continual improvement has become a way of life for a company, it is unlikely that a demonstration of company wide continual improvement will come from only a few sources. System deterioration would not necessarily lead to non-conformity if all actions were positive and the improvement path is still evident and logical. The system would be questionable if the company did not recognize it or had not reacted to the issues appropriately. Note: It is the responsibility of the company to demonstrate improvement rather than the auditor to look for it. Accordingly, it is useful audit practice to ask management to identify any improvement initiatives taken since the previous visit, and any planned for the future. 4.1 a) Process identification Bureau Veritas Certification auditors will expect to see a process model that explains the key processes of the business and how each relates and links to the others. The depth of process explanation may be as detailed as the company chooses, but should 2 OF 61

3 be based on its customer and applicable regulations or statutory requirements, the nature of its activities and its overall corporate strategy. In determining which processes should be documented the organization may wish to consider factors such as: Effect on quality Risk of customer dissatisfaction Statutory and/or regulatory requirements Economic risk Effectiveness and efficiency Competence of personnel Complexity of processes Bureau Veritas Certification promotes the identification of Customer Oriented Processes (COPS), Support Oriented Processes (SOPS) and Management Oriented Processes (MOPS) while defining processes however, this is not a requirement. The auditor must see evidence that the organization has identified and defined their processes. The ISO TC document - ISO/TC 176/SC 2/N 544R - ISO 9000 Introduction and Support Package: Guidance on the Concept and Use of the Process Approach for Management Systems, provides basic information for understanding application of the process approach. The bulletin defines a process as: A Process can be defined as a Set of interrelated or interacting activities, which transforms inputs into outputs. These activities require allocation of resources such as people and materials ( 4.1 b) Sequence and interaction of these processes The interactions of the processes must somehow be described in the quality manual (4.2.2 c). The organization is not required to produce system maps, flow charts, lists of processes etc. as evidence to demonstrate that the processes and their sequence and interactions were identified. Such documents may be used by organizations should they deem them useful, but are not mandatory. Graphical representation such as flow-charting is perhaps the most easily understandable method for describing interactions between processes. Other possible methods may include: documentation prepared for implementation of the product management system (SAP, SYMIX, MRP, etc ); deployment flowcharts; and pictorial diagrams. The Completion of the Bureau Veritas Certification process matrix provides the relationship between the organizations processes and the requirements of ISO9001:2000 however does not show the interaction between the identified processes. If the organization chooses to use the process matrix to show interaction, it must be supplemented with another method to show process interaction. The Bureau Veritas Certification process matrix must be completed in order to assist in the scheduling of the organizations audits. 3 OF 61

4 4.1 c) Criteria and methods needed to ensure that both the operation and control of these processes are effective. This could be demonstrated with stated objectives, instructions and or procedures as required for consistent output of the processes. 4.1 d) Ensure the availability of resources and information necessary to support the operation and monitoring of these processes. This may be through Management Review or other methods for defining and determining resources. 4.1 e) Monitor, measure and analyze these processes - All identified processes are subject to requirements for monitoring, measurement, and analysis for needed improvement. The methods employed and the timing of such analysis should be based upon priorities established by the organization. Auditor expects to see measurable objectives established for each process. These objectives should support the organization s overall objectives. 4.1 f) Implement actions necessary to achieve planned results and continual improvement of these processes Same as described above. Auditor expects to see corrective action taken when measurable objectives fall below target or defined action level. Outsourced Processes: Outsourced processes must be controlled by the organization and these controls must be defined/described within their system. Organizations are required to identify the controls they apply for any outsourced processes. The facility quality manual must identify if outsource processes are applicable. In addition, the client shall have written documentation on the methods used to control the outsourced process(es). Examples of some outsourced processes are: Process completed wholly or partially by a sister facility outside the scope of registration. Such as corporate performing design, purchasing or customer related processes. This may include the entire element or a subsection i.e. corporate completes supplier evaluation and re-evaluation of suppliers and the registered site initiates purchase orders. Processes completed by an outside vendor or subcontractor such as heat treating, plating, calibration, painting, powder coating, etc. Documented objective evidence must be ascertained to ensure that these processes are being controlled beyond the basic purchasing requirements, which are focused on controlling products not processes. The organization is responsible to ensure that the outsourced process is meeting applicable requirements to ISO9001:2000. Outsourced processes may be controlled through such methods as (not limited to): Internal Audits Internal Agreements between two sites where only the audited site is under the scope of registration (Interface Agreements Bureau Veritas Certification terminology) 4 OF 61

5 Process performance data Purchasing Process ISO/TC 176/SC 2/N 630R2 ISO 9000 Introduction and Support Package: Guidance on 'Outsourced Processes: An outsourced process can be performed by a supplier that is totally independent from the organization, or which is part of the same parent organization (i.e. a separate department or division that is not subject to the same quality management system). It may be provided within the physical premises or work environment of the organization, at an independent site, or in some other manner The organization has to demonstrate that it exercises sufficient control to ensure that this process is performed according to the relevant requirements of ISO 9001:2000, and any other requirements of the organization s quality management system. The nature of this control will depend, among other things, on the importance of the outsourced process, the risk involved, and the competence of the supplier to meet the process requirements ( TABLE A: Cross-linked references 4.1 General requirements Relevant further clauses a) Identify the processes, including outsourcing, needed for the quality management system and their application throughout the organization (see 1.2), b) Determine the sequence and interaction of these processes, c) Determine criteria and methods needed to ensure that both the operation and control of these processes are effective, d) Ensure the availability of resources and information necessary to support the operation and monitoring of these processes, QMS planning 7.1 Planning of product realization 8.1 General QMS planning 7.1 Planning of product realization (c) 7.1 (c) (c) (Criteria for selection) Whole of 6 e) Monitor, measure, and analyze these processes, and, f) Implement actions necessary to achieve planned results and continual improvement of these processes. Whole of 8.2 Whole of 5, 6, 7 and 8 These processes shall be managed by the 5 OF 61

6 organization in accordance with the requirements of this International Standard. Where an organization chooses to outsource any process that affects product conformity with requirements, the organization shall ensure control over such processes. Control of such outsourced processes shall be identified within the quality management system. 4.2: Documentation Requirements 4.2.1: General The Quality Management System (QMS) documentation shall include: a) Statements showing the organization s quality policy (see 5.3) and quality objectives (see 5.4.1) b) A quality manual (see 4.2.2) c) Procedures that this standard requires (see 4.2.3, 4.2.4, 8.2.2, 8.3, 8.5.2, 8.5.3) d) Documents that the organization will need to ensure that the planning, operation, and control of their processes is effective e) Records that this standard requires (see 5.6.1, 6.2.2, 7.1, 7.2.2, 7.3.2, 7.3.4, 7.3.5, 7.3.6, 7.3.7, 7.4.1, 7.5.2, 7.5.3, 7.5.4, 7.6, 8.2.2, 8.2.4, 8.3, 8.5.2, and 8.5.3) f) quality system requirements imposed by the applicable regulatory authorities. BV Certification: This requirements effectively invokes all pertinent requirements of the industryapplicable regulatory agencies (e.g. FAA, CAA, JAA, etc.) such as those included in FAR Part 21, 145, etc. While the BV Certification auditor may not look for conformance to those specific regulatory requirements a nonconformance against a closely related requirement in Standard AS9100 may be cited. The organization shall ensure that personnel have access to quality management system documentation and are aware of relevant procedures. Customer and/or regulatory authorities representatives shall have access to quality management system documentation. 6 OF 61

7 BV Certification: It is expected that all personnel have access to relevant documentation, in any appropriate format. Documentation can include procedures, work instructions, forms, travelers, drawings and work standards. For complex operations, job packages should be at the workstation. In other situations, it is sufficient for the co-worker to demonstrate knowledge of where the relevant documentation is located. The right of access by customer and/or regulatory authorities appears in several clauses throughout the standard. A broad statement permitting right of access to quality documentation at the organization s facilities, coupled with flow down to suppliers and sub-tier suppliers (see section 7.4) is sufficient to satisfy this requirement. See also the Interpretation comments under section 4.2.4, below : Quality Manual Exclusions from the quality management system must be described and justified within the quality manual (see a). The documented procedures established for the quality management system must be included or cross-referenced in the quality manual (see b). A description of the interaction between the organization s processes needs to be identified in the quality manual (see c). The applicable processes might include those relating to four general categories: 1) Management Activities, 2) Resource Management, 3) Product Realization, and 4) Measurement and Monitoring. Most companies will prefer to focus on their own COPS, MOPS, and SOPS. Manual content and design - There are many ways of documenting the quality management system and organizations should adopt the approach that is most useful for effective operation of their system. Examples include: Flowcharts; Written text; Diagrams; System maps; Process maps; Process Turtles. 7 OF 61

8 The quality manual may have many forms. Although many organizations structure their documentation in a typical pyramid, it is not the only, and not always the most suitable, way. A quality manual doesn't have to exist as a separate document. The quality manual may: Be a direct collection of QMS documents including procedures; Be a grouping or a section of QMS documentation; Be more than one document or level; Be in one or more volumes; Be a stand alone document or otherwise; Be a collection of separate documents. The ISO 9001:2000 standard offers companies a possibility to establish effective, user-friendly systems. This edition offers the current users a unique opportunity to streamline their quality management system documentation. A separate document "addressing" all the clauses of the standard is not required by the standard - neither does the standard require the quality manual to "address" or "cover" the requirements of the standard. The manual may be documented specifically to the organizations processes a) Scope The organization may exclude portions of the standard that do not apply to their quality management system due to the nature of the product or service that they supply. ISO 9001:2000 clearly limits and identifies which activities may be excluded. The justification for exclusion and those considered not applicable must be clearly documented in the quality manual. If, for example, design does not apply to the quality management system, the standard stipulates (in section 1.2 Application) how a reduction in scope of the standard may be justified and documented within the quality manual. Bureau Veritas Certification has defined exclusion applicability to be within the clause Design and Development (7.3) only. All other potential exclusions within section 7 must be identified as not applicable or not applicable at this time. ISO TC Guidance - Document: ISO/TC 176/SC 2/N 524R3 ISO 9000 Introduction and Support Package: Guidance on ISO 9001:2000 clause 1.2 'Application: ISO 9001:2000 clause 1, Scope, defines the scope of the standard itself. This should not be confused with the scope of the QMS, which is a term commonly used within the context of QMS certification/registration to describe the organization and products to which the QMS applies ( Auditor should discuss the difference between the scope of certification and the scope of the QMS (i.e. what is on or will be on the organization s certificate). The scope of the QMS should be based on the nature of the organization's products and their realization processes, the result of risk assessment, commercial considerations, and contractual, statutory and regulatory requirements. 8 OF 61

9 If an organization chooses to implement a quality management system with a limited scope, this should be clearly defined in the organization's Quality Manual and any other publicly available documents to avoid confusing or misleading customers and end users (this includes, for example, certification/registration documents and marketing material). Note: For multi-site/corporate certifications the auditor will expect to see that one quality manual is applicable for all sites and that any changes are centrally controlled (see 4.2.3) b) Documented Procedures The manual must include reference to, at a minimum the six required documented procedures (see 4.2.3, 4.2.4, 8.2.2, 8.3, 8.5.2, 8.5.3). The manual may reference other documentation but must list those required documents in some format. This may be in the form of a link or other such reference. The notes after sub clause in ISO9001: 2000 make it clear that where the standard specifically requires a documented procedure, the procedure has to be established, documented, implemented and maintained. It also emphasizes that the extent of the QMS documentation may differ from one organization to another due to: The size of the organization and the type of activities; The complexity of processes and their interactions and The competence of personnel - when referencing the documented procedures, the relationship between the requirements of this International Standard [AS9100] and the documented procedures shall be clearly shown. BV Certification: Points of reference may be throughout the manual when discussing pertinent subjects (imbedded in the text). All of the referenced procedures may be listed together in an appendix / attachment to the manual. Or, the pertinent procedure(s) may be called out at the beginning or end of each major section of the manual. A cross reference matrix is especially effective - linking specific clauses in the Standard to corresponding paragraphs in the quality manual down to specific paragraphs in the detailed procedure (or W/I as appropriate). Regardless of the approach, the intent of the Standard is that there be a clear, unbroken, definitive trail from a particular requirement in the Standard, into and through the quality manual, down to the procedural (and or work instruction) level such that users of the documentation can clearly and readily arrive at a description of how that requirement in the Standard is satisfied / fulfilled in the organizations system documentation c) Interaction between processes This requirement ties closely to section 4.1 b), which is discussed in the previous paragraphs. The interactions between the quality management system processes do not have to be separately described, or illustrated, by charts, tables or maps. If an organization chooses to use a process map to show interaction, just using arrows is not sufficient 9 OF 61

10 a description or other depiction is required for interactions. An example might be an interaction matrix listing COP S across the top and SOP & MOP down the side. Although many organizations may choose such a form, it is not a mandatory method. Interaction between processes may be described, for instance, by way of references and/or crossreferences within the procedures, where the procedures form part of the Quality Manual. If the procedures are not part of the Quality Manual, then the manual can not be consider acceptable to the standard requirements, they can be in an appendix, addendum or hyper linked to the manual if the system is electronic : Control of Documents A documented procedure is required for control of documents. Guidance is given for documents and records in ISO/TC 176/SC 2/N 525R ISO 9000 Introduction and Support Package: Guidance on the Documentation Requirements of ISO 9001:2000 ( a) Approve documents procedure must identify the approval process b) Review and update All management system documentation must be covered by some review strategy. The procedure must identify a period of time in which all documents are reviewed on an ongoing basis. Different types / levels of documents may be reviewed at different intervals / criteria and / or by different methods (i.e. at each use, through internal audits, via formal recalls and reviews, etc.), review should be conducted by personnel competent to do so. Bureau Veritas auditors should assess whether review methodology demonstrates effective document controls. Note statutory / regulatory and customer / industry requirements may also impact review methodology. A method must be in place to show review was completed where there were no changes. Those documents that are updated must be put back through the organizations required approval process (4.2.3 a) c) Changes and current revision status The procedure must identify how changes and revisions to documents are identified. These must be identifiable for each document. How does the user know what the changes are? d) Availability of documents procedure must identify how documents are made available to employees. Auditor will expect to see that documents are readily available to employees through out the facility at their points of use e) Documents are legible and readily identifiable auditor will expect to see that documents are maintained and remain legible and easily identifiable. 10 OF 61

11 4.2.3 f) Documents of external origin Documents of external origin are those that are produced from outside the organization that are used by the organization in support of the quality management system processes. The procedure must address if documents of external origin are applicable and if so how these documents are controlled by the facility. The auditor expects to see that controls are in place to ensure current versions are used and documents are controlled within the facility g) Obsolete documents Procedure must address how obsolete documents are controlled to prevent unintended use and if retained how these documents are identified. The organization shall coordinate document changes with customers and/or regulatory authorities in accordance with contract or regulatory requirements. BV Certification: The degree and type of documentation change coordination (if required at all) will be defined by the customer and/or regulator agency. Additionally, the organization may add to (but not contradict) details. Coordination may be as little as mere notification, to distributing approved copies, up to and including formal approval by the customer / agency) prior to implementation. Documents typically subject to this requirement include pre-approved contracts, statements of work, inspection/test plans, frozen or fixed process plans and routings. The BV Certification auditor will seek documented, objective evidence that such coordination has taken place (as appropriate) and as prescribed in the organizations documented procedure. Note: For multi-site/corporate certifications the auditor will expect to see that System documentation and changes are centrally managed (usually performed at the headquarters location) : Control of Records Records required by the organization may be in any format deemed suitable for the organizations method of operation. A documented procedure must be in place and define the controls needed for: Identification the procedure must identify the system/process is in place to identify records. Have all required records been identified. Refer to Annex B of the ISO/TC 176/SC 2/N 525R - ISO 9000 Introduction and Support Package: Guidance on the Documentation Requirements of ISO 9001:2000. Storage where records are stored specific location i.e. Quality filing cabinet in the QC Laboratory. Protection how individual records are protected i.e. tape back up every 24 hours (for electronic records), fireproof safe, filing cabinet etc. 11 OF 61

12 Retrieval any special requirements for retrieval. Generally dependant on location and protection. May be a request process. Retention time identification of how long each record will be maintained. Disposition of records method for disposing of records i.e. shredding, burned, trash A spreadsheet or other document may be used to identify the above requirements. The documented procedure shall define the method for controlling records that are created by and/or retained by suppliers. BV Certification: The organization is ultimately responsible for all pertinent quality records that apply to a given contract or order. Most such quality records are produced by the organization themselves but many are also created at the lower levels in the supply chain at the organization s supplier(s) and at the supplier s sub-tier sources. It is not uncommon for pertinent quality records to exist at three or four levels down in the supply base. Typically, only the most significant records make their way back to the organization. Those records that typically bubble up are certifications and inspection / test reports, nonconforming product concessions / waivers, etc. The majority of records relating to the order / contract continue to reside at a level lower in the supply chain. Those records retained by lower-level sources must still be subject to the organizations control. This control is often managed and asserted by / through purchase order flowdown requirements from the organization to the lowest level supplier / subcontractor involved. Such flowdown requirements may specify record retention periods, protection, disposition, disposal and may describe the conditions under which the record holder must forward the records to the organization. Records shall be available for review by the customer and regulatory authorities in accordance with contract or regulatory requirements. BV Certification: This requirement most obviously applies to records maintained by the organization. It equally applies to pertinent quality records retained by the organization s suppliers and by the supplier s sub-tier sources. Pertinent records (at any level in the supply chain) may be kept on-site, or at an off-site repository or by a remote records management service. In any event, retrieval of such records should be relatively convenient and timely so as not to impede availability to customers and regulatory authorities. Compliance to this requirement is often managed and assured by / through purchase order flowdown requirements from the organization to the lowest level supplier / subcontractor involved. Such flowdown typically invokes the right of access to all pertinent quality records that may exist at any/all levels in the supply chain. 4.3 Configuration Management: The organization shall establish, document and maintain a configuration management process appropriate to the product. NOTE: Guidance on configuration management is given in ISO OF 61

13 BV Certification: Requirements for a Configuration Management (CM) process apply to virtually all companies and products / services and especially to those organizations performing Design and Development activity and to those responsible for the design of the product / deliverable. The formality and complexity of the CM process will vary depending on the product. CM can be applied to products, processes and processed materials (including individual components as well as assemblies). A configuration is most often described in terms of its integral configuration items. Fundamental building blocks of a CM process typically include: design change control, document change control, process change control, product identification and traceability. Changes in any of those disciplines might translate into configuration change. Documentation that helps define a specific configuration might include drawings, specifications, bills of materials, routings/travellers, change requests, First Article Inspection Reports, nonconforming product documents (including deviations and waivers), where used listings, etc. Configuration baselines must be established, and any subsequent changes must be identified and controlled. After a significant number of changes, a new baseline (model, part number, etc.) may be established. Element 5: Management Responsibility Note that this section has nine references to top management. This is defined in ISO 9000:2000, as person or group of people who directs or controls an organization at the highest level. It is therefore essential to examine top management s commitment to, and support for, the QMS (and to record objective evidence to support any conclusions reached). 5.1: Management Commitment It is necessary for auditors to obtain (and record) objective evidence of management commitment. This would include: 5.1 a) Evidence that top management has communicated to the organization the importance of meeting customer requirements as well as statutory and regulatory requirements. This can be achieved through meetings, newsletters, bulletin boards, training records etc. NOTE - statutory and regulatory requirements are broad based and include all applicable requirements for processes, products and activities. 5.1 b) Top Management s establishment of and input into, and commitment to, the quality policy (its definition, delivery and maintenance) through management review or other meetings. 5.1 c) Documented quality objectives (for all processes). 13 OF 61

14 5.1 d) Top Management s active participation in management review meetings. 5.1 e) Evidence of a process for defining resource requirements and ensuring that adequate resources are available. In short, how well they address requirements 5.2 through : Customer Focus Customer requirements and customer satisfaction are directly linked with the process approach concept in the standard. Auditors will seek objective evidence to demonstrate that the customer requirements are indeed being met, whether the satisfaction is revealed in customer survey results, repeat sales or any other type of mechanism that would reveal trends and lead to improved customer satisfaction. Management review minutes might be a record where Customer Focus is addressed. You might also look at Quality plans and or product plans that include customer related requirements. 5.3: Quality Policy It is expected that there is evidence that Top Management fully back the quality policy. The standard identifies five specific points which requires that top management ensures that the policy; 5.3 a) Is appropriate to the purpose of the organization 5.3 b) Includes a commitment to meeting requirements and to continual improvement of the quality system 5.3 c) Provides framework for establishing and reviewing quality objectives 5.3 d) Is communicated and understood at appropriate levels in the organization 5.3 e) Is reviewed for continuing suitability. Auditors must determine if the Quality Policy meets the intent and is understood, by interviewing personnel at all levels. Although the exact policy does not need to be recited by interviewees, the awareness of the quality policy and how their job affects the company objectives should be determined. If personnel interviewed do not know what their measurable objectives are and/or do not know what the organizational objectives are that they have a direct 14 OF 61

15 effect on, the auditor would be further directed to evaluate managements communication of the policy and objectives. The Quality Policy must be documented (typically in the quality manual because it must be controlled). The Quality Policy does not have to include objectives but should create a framework for establishing them. The Quality Policy should be stated in such a way that it aims toward continual improvement. It should be reviewed and possibly revised to meet higher aspirations. Bureau Veritas Certification does not require that the policy include the words continual improvement in the written policy, however it must be ascertained that it is implied and known through out the organization. To meet the intent of this clause, the auditor would be looking for a clearly defined Quality Policy that is sufficiently detailed to provide a framework for quality objectives that can be monitored for continual improvement. An auditor would not want to see a vague policy, such as Our Policy is to Maintain Status Quo. When interviewing top management, their input into, and commitment to, the quality policy needs to be determined. Is it theirs, or have they clearly just signed something written for them by the management representative? Note: For multi-site/corporate certifications the quality policy must be applicable for all sites. 5.4: Planning Quality Objectives Auditor must determine that the organization has developed measurable quality objectives for relevant functions and levels of the organization. Bureau Veritas Certification expects overall objectives to be established at the facility/corporate level and objectives established for each identified process. Process objectives shall support the organization s overall objectives. The organization must establish what the relevant functions of the organization are, however at a minimum this will include all defined processes (reference 4.1 a, c, e). Sub-processes, projects, or individual objectives would be at the discretion of organization. The auditor may want to ask what criteria were used to determine if functions are relevant or not. It would be left up to the company to determine if a cost or added value benefit would result from including or not including functions of the operation when establishing quality objectives. 15 OF 61

16 If some functions or levels have been excluded, it may be necessary to explore, evaluate (and record) the reasons for such omissions (which might be quite acceptable at that particular stage in the continual improvement process). The organization must identify quality objectives that can be measurable, such as vendor ontime rating, on-time delivery, all employees will have completed an ISO 9001 awareness class and all machines will have clearly defined procedures on their usage. If the objectives were not measurable (including a time-based element where appropriate), they would not meet the intent of the standard. The objectives do not have to be defined in a specific document although the objectives are required to be documented (see a). Objectives can either be defined in associated procedures or instructions, or could be recorded in meeting minutes such as management review records. The organization must have a process that ensures that all the objectives are clear and communicated to all employees who can influence the defined objective(s). The organization should be able to demonstrate that the objectives are being measured and reviewed (see and 8.5.1) : Quality Planning Auditors have to use their judgment in evaluating the entire collected audit evidence in order to assess effectiveness of planning activities. The auditor may also satisfy him/herself that planning was done, by interviewing the personnel involved in establishing or achieving specific quality objectives. Auditors are recommended to attribute such QMS deficiencies to relevant clause, requirements of which were contravened, rather than to clause Determining effective and efficient planning may be found by evidence of: All those planning activities undertaken to establish the QMS in accordance with clause 4.1. The existence of an effective, documented, and implemented QMS that provides collective evidence demonstrating that these planning activities have been performed effectively. Deficiencies in the quality system that may indicate that these planning activities were not quite effective. The evidence and use of Strategic Plans, Business Plans, Management Review results, Contingency Plans, Quality Objectives, any programs or plans, documented or not, such as Minutes of meetings, Memos, Internal communications. 16 OF 61

17 Where there is lack of documented evidence, an auditor may satisfy him/herself through interviewing the personnel at those levels and functions involved in achieving particular objectives to determine the level of planning. Another methodology allowing audit of effective planning involves review of the progress in implementation of such plans aimed at adhering to individual objectives. 5.5: Responsibility, Authority and Communication 5.5.1: Responsibility and authority In order for the auditor to be satisfied that the intent of this element has been met, he/she may review organization charts, job descriptions or a responsibility matrix. Identification of responsibility and authority could be written into procedures and/or work instructions, as well. The auditor may also use interviews of individuals to determine if responsibility and authority has been communicated effectively : Management Representative Responsibilities to include: a) Ensuring that the processes needed for the quality management system are established, implemented and maintained b) Reporting on the performance of the system to top management c) ensuring the promotion of awareness of customer requirements, and d) the organizational freedom to resolve matters pertaining to quality. BV Certification: The Management Representative (MR) need not be a member of the Quality organization, though this is most often the case. Any management-level individual from any organization / discipline is acceptable. Of utmost importance is that the MR has freedom within the company s organizational, political, cultural and communication arenas. This freedom necessitates that the MR have access mobility, both vertically and horizontally, and especially across departmental boundaries. It is expected that the MR have at least a dotted-line relationship with executive management that may be exercised on an exception basis if/when internal influences impede the MR s normal freedom. It is sometimes difficult to observe / demonstrate the MR s organizational freedom. More apparent are situations where this freedom is limited, restricted or even nonexistent. This problem may be evident in cases of unresolved Quality problems, recurring problems, 17 OF 61

18 ineffective/untimely corrective action responses, low customer satisfaction and perception, ineffective internal audits, lack of system/process improvement, etc. Promotion of customer awareness might include news releases, meetings, training, photographs, models; examples of products demonstrating required visual attributes. We look for one individual to be the management representative in terms of defined responsibility. However, implementation of those responsibilities may be in the form of a defined and delegated team. Note: The management representative is responsible for ensuring it happens not making it happen, which is the job of line management. Note: For multi-site/corporate certifications the auditor will expect to see that there is a management representative with overall responsibility across all sites for ensuring that requirements are established, implemented, maintained, and for reporting on performance : Internal Communication Although there is no mandate for documenting methods for communication, the auditor will expect to find evidence of communication through interviews with employees. Evidence could possibly include the employees understanding of process linkage and effectiveness, customer satisfaction levels, preventive and corrective action information, on time delivery, quality costs, returned material, non-conformances. This could be communicated by access to the computer network, an information board, newsletters, or even process routers, checklists, and multifunctional meetings (see d). The type and extent of the documentation will depend on the nature of the organization s products and processes, the degree of formality of communication systems and the level of communication skills within the organization and the organization culture. 5.6: Management Review 5.6.1: Management Review - General IMPORTANT INITIAL CERTIFICATION REQUIREMENT: For a new/first time registration/certification, a full round of Management Review meeting(s), including documented evidence of all required inputs and outputs, must be completed prior to the registration/certification audit (note a full internal audit cycle must be completed prior to this review see Internal Audit). For multi-site/corporate certifications the review must include inputs (as appropriate) from each site (see the standard a g). Normally, the review process is conducted at the headquarters location. Top management shall review the quality management system at planned intervals not only for continuing suitability and effectiveness, but also adequacy. Additionally, this review shall 18 OF 61

19 include assessing opportunities for improvement, the need for changes to the system, the quality policy, and quality objectives. These words are more prescriptive which cause a more proactive expectation and approach to keeping the system current and useful and maintaining improvement activities. The auditor cannot prescribe the intervals for reviews to occur, but can look for evidence that the frequency is sufficient to accomplish the requirements of the standard. Although the dictionary would suggest that suitable and adequate are the same, the standard seeks to distinguish both the system from a global perspective of adequacy as well as the detailed suitability of the many processes that comprise the system : Management review input The auditor will expect to see documented evidence that the (7) required inputs are discussed during the review. Although a documented procedure for management review is not required, records of such reviews are required (see the standard General). The minimum (7) inputs are required in those records (see the standard a g). Evidence of cross functional input is also expected, which means one person alone could do the review, but there would need to be evidence of multifunctional input in the evaluation of the system and its status and actions concluded : Management review output Output should focus on decisions and actions related to system improvement (5.6.3 a), product improvement for customer requirements (5.6.3 b), and resource needs (5.6.3 c). Auditors expect to see that some documented conclusions have been developed. The output record must include evidence of action and progress for system improvement, customer requirements, resource needs as it all relates to system health. It is important to note that a documented procedure may or may not exist. It should also be noted that formal meetings for review may or may not happen and still be complaint - such as in the case of being accomplished in stages; on going process review; or by circulated documentation covering the system incrementally. Element 6: Resource Management 6.1: Provision of Resources The intent of this section is to ensure that adequate resources are provided to continually improve the effectiveness of the quality management system (6.1 a) and to enhance customer satisfaction by meeting customer requirements (6.1 b). Auditor would expect to see a process for evaluating 19 OF 61

20 and determining resource needs. This may be through management review, production planning, budget review, long range planning etc. The auditor should determine that process activities are not prevented by a lack of resources. Auditors may review instances where customer requirements were not met and determine if a lack, or insufficiency, of any resources was causation factors of these instances. This requirement also ties to paragraphs 5.1 and 5.6.3, which address management s responsibility to determine and provide necessary resources. Additionally, any clear evidence of resource problems links directly to this section. 6.2: Human Resources 6.2.1: General The standard requires that personnel be competent. This could be demonstrated by a person being qualified. Competence may be based on appropriate education, training, skills, experience, and/or demonstrated performance : Competence, awareness and training The intent of this section is to ensure that suitably competent people are performing the activities as defined in the quality system. Evidence of the effectiveness of the training or other means of providing competent employees must be available. Employees must be aware of the impact that they have on the overall quality system. The auditor would expect employees to be able to verbalize how their job activities contribute to the achievement of the quality objectives a) Determine the necessary competence - The requirement is in emphasis toward validating training and other activities aimed at ensuring employee competence. Identification of competency is essentially a precursor to identification of training needs. The organization should determine knowledge and/or skills an employee would need to be considered competent, in their opinion, to perform a particular job. The company could then determine if the employee performing the job possesses that knowledge or skill and, if not, consider it a training need. Changes in the business and its environment may necessitate new competencies, which may not be available. Therefore the identification of competencies may need to be revisited. There is no requirement for any particular frequency of such re-review. Competency may be defined in a job description, position profile, or by any other method or associated documents such as specific instructions or procedures. Usually competency is determined during performance reviews, if the organization does not perform reviews of this nature, other methods for determining personnel competence would need to be defined and records verified. 20 OF 61

21 6.2.2 b) Provide training or take other actions - The requirement allows for options other than training to obtain competent personnel. Training includes all those activities where a learning opportunity needs to be satisfied. It may take a number of forms: Classroom style, tutor led training; Hands on experience training; Shadowing Individual or group coaching; Mentoring; Briefings; Distance learning; Technology based training (CD ROMS, web based etc); Workshops. Organizations will choose whichever form best suits their needs at any particular moment. Other actions to bridge competence gaps might include: Recruitment; Outsourcing; Acquisitions; Use of experts and/or consultants. Documented procedures or work instructions All such means are acceptable as long as an organization has ensured the availability of the competencies needed c) Evaluate the effectiveness of the actions taken - The requirement is aimed at ensuring that the training or other activity has produced the desired result. This requirement could be met in a variety of ways, including, but are not limited to: Observation of personnel performing their duties; Written or oral exams; Assessment of employee in achieving learning objectives during the course of training program; Audit of performance at work focusing, for example, on: Productivity; Reduction of rejects; Efficiency; Interviews with the persons; Annual appraisal. Performance reviews; the 21 OF 61

22 Discussions; Evaluation of performance, quality or other indicators; Cost reviews; Customer satisfaction assessment (see 8.2.1) d) Ensure that its personnel are aware of the relevance and importance of their activities (perhaps by internal communication see 5.5.3) and how they contribute to the achievement of the quality objectives - The requirement could be met in a variety of ways. Options include: Training; Memos, and/or meetings regarding the impact of various individual or departmental goals on quality objectives; Plant tours or briefings where an individual s work and goals are shown as an integral part of the larger processes; Cross functional teams working towards quality objectives and reporting their progress to their departments. Any activity that allows individuals to understand how their efforts affect quality objectives may satisfy this requirement. All personnel need to know the specific measurable objective(s) for the process that they work in; they should also know what organizational objective their process effects. They should be able to demonstrate that they know what the actual measurable is, their progress towards that goal, what the plan is to achieve the goal. If they do not know the actual numbers, they should be able to communicate the topics of the measurable and know where the actual measurements are maintained or posted e) Maintain appropriate records - The requirement expands record keeping requirements to include education, skills and experience, in addition to training, where appropriate. There are a great variety of ways to record and provide evidence of training, education, skills and experience. Records may include: Diplomas; Certificates; Training log; Annotations in shift logs; Toolbox meeting notes; Attendance lists; Resumes; Employment history; Test results. Such records may be filed in any location as long as the requirements of are observed. 22 OF 61

Quality Management System Manual

Quality Management System Manual Quality Management System Manual This manual has been reviewed and approved for use by: Jack Zazulak President, Aurora Machine Limited March 07, 2011 Date - Copyright Notice - This document is the exclusive

More information

QUALITY MANUAL ISO 9001. Quality Management System

QUALITY MANUAL ISO 9001. Quality Management System Page 1 of 20 QUALITY MANUAL ISO 9001 Quality Management System Printed copies are not controlled unless marked "CONTROLLED". Upon receipt of this document, discard all previous copies. Page 2 of 20 Approval

More information

ISO 9001:2008 Audit Checklist

ISO 9001:2008 Audit Checklist g GE Power & Water ISO 9001:2008 Audit Checklist Organization Auditor Date Page 1 Std. 4.1 General s a. Are processes identified b. Sequence & interaction of processes determined? c. Criteria for operation

More information

QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752

QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752 QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752 Section 1. REVISION STATUS Revision 01 Initial Issue 02/13/95 Revision 02 ECO No.Q-0032 05/07/96 Revision 03 ECO No.97171

More information

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR Page 1 of 20 ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR SUPPLIER/ SUBCONTRACTOR NAME: ADDRESS: CITY AND STATE: ZIP CODE: SUPPLIER/MANUFACTURER NO PHONE: DIVISION:

More information

QUALITY OPERATING PROCEDURE QOP-00-02 QUALITY ASSURANCE SYSTEM MANUAL

QUALITY OPERATING PROCEDURE QOP-00-02 QUALITY ASSURANCE SYSTEM MANUAL PAGE 1 OF 40 QUALITY Note: The revision level of this document and any referenced documents must be verified for latest issue before use QOP-00-02 TITLE QUALITY ASSURANCE SYSTEM MANUAL APPROVALS DATE REVISIONS

More information

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents Chapter j 38 Self Assessment 729 QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements 1. Establishing and implementing a documented quality management system 2. Implementing a documented quality

More information

Quality Management System Manual

Quality Management System Manual Quality Management System Manual Assurance ISO / AS Manual Quality Management System EXCEEDING ALL EXPECTATIONS Since our inception in 1965, Swiss-Tech has supplied the medical, aerospace, hydraulic, electronic

More information

ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL

ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL 8200 Brownleigh Drive Raleigh, NC 27617-7423 Phone: (919) 510-9696 Fax: (919) 510-9668 ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL ALLIANCE OF PROFESSIONALS & CONSULTANTS, INC. - 1 - Table of Contents

More information

ISO 9001:2000 AUDIT CHECKLIST

ISO 9001:2000 AUDIT CHECKLIST ISO 9001:2000 AUDIT CHECKLIST No. Question Proc. Ref. Comments 4 Quality Management System 4.1 General Requirements 1 Has the organization established, documented, implemented and maintained a quality

More information

ISO 9001:2000 Gap Analysis Checklist

ISO 9001:2000 Gap Analysis Checklist ISO 9001:2000 Gap Analysis Checklist Type: Assessor: ISO 9001 REQUIREMENTS STATUS ACTION/COMMENTS 4 Quality Management System 4.1 General Requirements Processes needed for the quality management system

More information

Micro Plastics, Inc. Quality Manual

Micro Plastics, Inc. Quality Manual ISO 9001:2008 11 Industry Lane Flippin, Arkansas 72634 QM-001-2008-F Page 2 of 39 Introduction Micro Plastics, Inc. developed and implemented a Quality Management System in order to document the company

More information

FINE LOGISTICS. Quality Manual. Document No.: 20008. Revision: A

FINE LOGISTICS. Quality Manual. Document No.: 20008. Revision: A FINE LOGISTICS Quality Manual Document No.: 20008 Revision: A 20008 Rev. A FINE LOGISTICS, Quality Manual Page 1 of 24 Quality Manual: Table of contents Number Section Page 1. GENERAL 3 1.1 Index and revision

More information

ONTIC UK SUPPLIER QUALITY SURVEY

ONTIC UK SUPPLIER QUALITY SURVEY MAIL-IN / ONSITE This report is intended to furnish data relative to the Suppliers capability to control the quality of supplies and services furnished to Ontic UK. Please complete this Survey and return

More information

QUALITY MANAGEMENT SYSTEM MANUAL

QUALITY MANAGEMENT SYSTEM MANUAL The online version of this document is controlled. Therefore, all printed versions of this document are unofficial copies. QUALITY MANAGEMENT SYSTEM MANUAL 6901 Charles Street Towson, Maryland 21204 Manual

More information

ISO 9001 Quality Systems Manual

ISO 9001 Quality Systems Manual ISO 9001 Quality Systems Manual Revision: D Issue Date: March 10, 2004 Introduction Micro Memory Bank, Inc. developed and implemented a Quality Management System in order to document the company s best

More information

Cartel Electronics. AS 9100 Quality Systems Manual

Cartel Electronics. AS 9100 Quality Systems Manual Cartel Electronics AS 9100 Quality Systems Manual 1900 C Petra Lane Placentia, California 92870 Introduction Cartel Electronics, as a global supplier to the aviation, space, and space industries, has developed

More information

CENTRIS CONSULTING. Quality Control Manual

CENTRIS CONSULTING. Quality Control Manual CENTRIS CONSULTING Quality Control Manual ISO 9001:2008 Introduction Centris Consulting developed and implemented a Quality Management System in order to document the company s best business practices,

More information

ISO 9000 Introduction and Support Package: Guidance on the Documentation Requirements of ISO 9001:2008

ISO 9000 Introduction and Support Package: Guidance on the Documentation Requirements of ISO 9001:2008 Document: ISO/TC 176/SC 2/N 525R2 ISO 9000 Introduction and Support Package: 1 Introduction Two of the most important objectives in the revision of the ISO 9000 series of standards have been a) to develop

More information

Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368

Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368 Quality Manual CBT Technology, Inc. 358 North Street Randolph, MA 02368 Issue 4 Revision 4 Note: updates are in italics Page 1 of 18 1.0 Scope and Exclusions Scope This Quality Manual contains policies

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

Eagle Machining, Inc. Quality Management System

Eagle Machining, Inc. Quality Management System Eagle Machining, Inc. Quality Management System 1 of 10310 Antoine Drive Bldg D, Houston, Texas 77086 BUSINESS OPERATING MANUAL (QUALITY MANUAL) Revision Date: 08/01/2014 Approved By: Joseph Vu Date: 08/01/2014

More information

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of

More information

Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8

Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 5. MANAGEMENT RESPONSIBILITY...8-9 6. RESOURCE MANAGEMENT... 10 7. PRODUCT

More information

ISO 9001:2008 Quality Management System Requirements (Third Revision)

ISO 9001:2008 Quality Management System Requirements (Third Revision) ISO 9001:2008 Quality Management System Requirements (Third Revision) Contents Page 1 Scope 1 1.1 General. 1 1.2 Application.. 1 2 Normative references.. 1 3 Terms and definitions. 1 4 Quality management

More information

ALL PRODUCTS MFG & SUPPLY

ALL PRODUCTS MFG & SUPPLY ALL PRODUCTS MFG & SUPPLY 618 ANDERSON DRIVE ROMEOVILLE, IL 60446 PHONE: 877-255-8700 FAX: 877-255-8701 WWW. APGASKET.COM QUALITY MANAGEMENT SYSTEM MANUAL DATE: 11/20/12 REVISION 9.1 UNCONTROLLED COPY

More information

QUALITY MANUAL REVISION RECORD

QUALITY MANUAL REVISION RECORD Page 2 of 31 REVISION RECORD Date Rev Description Jun 18, 2007 N/C Original Issue Sep 16, 2009 A Update to ISO 9001:2008 Standard. Feb 04, 2010 B Revised exclusions, removed (Except 7.3.7 from the exclusion

More information

Camar Aircraft Products Co. QUALITY MANUAL Revision D

Camar Aircraft Products Co. QUALITY MANUAL Revision D QUALITY MANUAL Revision D Gujll'y Manual Introduction The purpose of this manual is to describe the Quality Assurance Program implemented by Camar Aircraft Products Co. (hereafter referred to as C.A.P.C.)

More information

QUALITY MANAGEMENT SYSTEM Corporate

QUALITY MANAGEMENT SYSTEM Corporate Page 1 of 12 4 Quality Management System 4.1 General Requirements The Peerless Pump Quality Management System shall include: Documented statements of a quality policy and of quality objectives; A quality

More information

AVNET Logistics & EM Americas. Quality Manual

AVNET Logistics & EM Americas. Quality Manual AVNET Logistics & EM Americas Quality Manual Avnet is committed to ensuring customer satisfaction while meeting all customer and applicable legal, statutory and regulatory requirements. This is accomplished

More information

This Business Management System Manual is based on ISO 9001:2008 requirements

This Business Management System Manual is based on ISO 9001:2008 requirements Page 1 of 19 (Formerly: Quality Management System Manual) When the ISO 9001:2008 standard is identifying the Quality Manual or Quality Management System, Turbonetics is representing this requirement with

More information

DNV GL Assessment Checklist ISO 9001:2015

DNV GL Assessment Checklist ISO 9001:2015 DNV GL Assessment Checklist ISO 9001:2015 Rev 0 - December 2015 4 Context of the Organization No. Question Proc. Ref. Comments 4.1 Understanding the Organization and its context 1 Has the organization

More information

QUALITY MANUAL ISO 9001:2015

QUALITY MANUAL ISO 9001:2015 Page 1 of 22 QUALITY MANUAL ISO 9001:2015 Quality Management System Page 1 of 22 Page 2 of 22 Sean Duclos Owner Revision History Date Change Notice Change Description 11/02/2015 1001 Original Release to

More information

Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011

Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011 Quality Manual 1 QM-001 Quality Manual Issue 1 January 1, 2011 This document is uncontrolled when printed. Please verify with Quality Management Representative 16 Dukes Close, West Way, Walworth Industrial

More information

Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22

Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22 ISO 9001:2008 Page: 1 of 22 Central Technologies has developed a Quality Management System, and the associated procedures and work instructions, to be compliant to ISO 9001:2008. Utilizing this Quality

More information

14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988. WEB: www.texasinternational.com QUALITY MANUAL

14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988. WEB: www.texasinternational.com QUALITY MANUAL 14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic

More information

Quality Management System Manual Revision L

Quality Management System Manual Revision L This Page 1 of 35 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies

More information

Row Manufacturing Inc. Quality Manual ISO 9001:2008

Row Manufacturing Inc. Quality Manual ISO 9001:2008 Row Manufacturing Inc. Quality Manual ISO 9001:2008 Row Manufacturing 210 Durham Drive Athens, Alabama 35611 Phone:256.232.4151 Fax:256.232.4133 Page 2 of 33 This Page intentionally left Blank Page 3 of

More information

ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008

ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008 ISO 9001: 2008 Boosting quality to differentiate yourself from the competition xxxx November 2008 ISO 9001 - Periodic Review ISO 9001:2008 Periodic Review ISO 9001, like all standards is subject to periodic

More information

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization 4.1 Understanding the organization and its context

More information

Quality Manual Printed copy valid for 24 hours from time of printing unless stamped CONTROLLED COPY in red. Page

Quality Manual Printed copy valid for 24 hours from time of printing unless stamped CONTROLLED COPY in red. Page Quality Manual Page 1 of 20 Change Log Document Revision Date Description of Change 15/04/09 Initial Release Page 2 of 20 1.0 Scope and Exclusions Scope This Quality Manual contains policies that have

More information

0. 0 TABLE OF CONTENTS

0. 0 TABLE OF CONTENTS QUALITY MANUAL Conforming to ISO 9001:2000 0. 0 TABLE OF CONTENTS Section Description ISO 9001 Clause Page 0 TABLE OF CONTENTS n/a 2 1 PIMA VALVE, INC. DESCRIPTION n/a 3 2 QUALITY MANUAL DESCRIPTION 4.2.2

More information

The President of Inductors Inc. is the senior executive responsible for operations.

The President of Inductors Inc. is the senior executive responsible for operations. Title: Quality Management System Manual Page: 1 of 20 INTRODUCTION Inductors Inc., founded in 1991, specializes in the distribution of inductive components, including but not limited to standard and custom

More information

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production

More information

The Prophotonix (UK) Ltd Quality manual

The Prophotonix (UK) Ltd Quality manual The Prophotonix (UK) Ltd Quality manual Date: March 2014 Revision: D Sparrow lane, Hatfield Broad Oak, Herts, UK, CM22 7BA Tel: +44 (0)1279 717170 Fax: +44 (0)1279 717171 e-mail: info@prophotonix.com Page

More information

AS 9100 Rev C Quality Management System Manual. B&A Engineering Systems, Inc. 3554 Business Park Drive, Suite A-1 Costa Mesa, CA 92626

AS 9100 Rev C Quality Management System Manual. B&A Engineering Systems, Inc. 3554 Business Park Drive, Suite A-1 Costa Mesa, CA 92626 AS 9100 Rev C Quality Management System Manual B&A Engineering Systems, Inc. 3554 Business Park Drive, Suite A-1 Costa Mesa, CA 92626 Doc. No. AS9100C Rev E Effective Date: 01 JAN 2013 Page 2 of 45 CONTROLLED

More information

ISO 9001:2008 QUALITY MANUAL. Revision B

ISO 9001:2008 QUALITY MANUAL. Revision B ISO 9001:2008 QUALITY MANUAL Revision B Because we want you to achieve the highest levels of performance, we connect care Because with leading we want science you to achieve continuously the highest improve,

More information

ED FAGAN INC. QUALITY SYSTEM MANUAL

ED FAGAN INC. QUALITY SYSTEM MANUAL ED FAGAN INC. QUALITY SYSTEM MANUAL APPROVED BY: Ed Fagan President ED FAGAN INC. January 13, 2010 TABLE OF CONTENTS 1. PURPOSE AND SCOPE 2 2. PRODUCTS, SERVICES AND CAPABILITIES 2 3. REVISION HISTORY

More information

Quality Manual. DuraTech Industries, Inc. 3216 Commerce Street La Crosse, WI 54603 MANUAL SERIAL NUMBER 1

Quality Manual. DuraTech Industries, Inc. 3216 Commerce Street La Crosse, WI 54603 MANUAL SERIAL NUMBER 1 Quality Manual Approval Page Document: QA1000 Issue Date: 5/29/1997 Page 1 of 17 Revision Date: 5/20/2013 DuraTech Industries, Inc. 3216 Commerce Street La Crosse, WI 54603 MANUAL SERIAL NUMBER 1 This

More information

QUALITY MANAGEMENT SYSTEM (QMS) MANUAL

QUALITY MANAGEMENT SYSTEM (QMS) MANUAL QUALITY MANAGEMENT SYSTEM (QMS) MANUAL This document and the data contained herein are the property of ISOLINK, and shall not, without prior written permission, be reproduced or used for any unintended

More information

AEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE

AEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE AEROSPACE STANDARD AS9100C Issued 1999-11 Revised 2009-01 Superseding AS9100B Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE This standard has been revised

More information

Quality Manual ALABAMA RESEARCH & DEVELOPMENT. This Quality Manual complies with the Requirements of ISO 9001:2008.

Quality Manual ALABAMA RESEARCH & DEVELOPMENT. This Quality Manual complies with the Requirements of ISO 9001:2008. ALABAMA RESEARCH & DEVELOPMENT This complies with the Requirements of ISO 9001:2008. Prepared By: Phyllis Olsen Release Date: 03/19/09 Quality Policy & Objectives s quality policy is to achieve sustained,

More information

Revision Date Author Description of change. 10 07Jun13 Mark Benton Removed Admin. Manager from approval

Revision Date Author Description of change. 10 07Jun13 Mark Benton Removed Admin. Manager from approval Page 2 of 15 Document Revision History Revision Date Author Description of change 10 07Jun13 Mark Benton Removed Admin. Manager from approval 12Feb13 Mark Benton 08 01Oct12 Mark Benton 07 8/30/2012 Refer

More information

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 TABLE OF CONTENTS DESCRIPTION SECTION PAGE INTRODUCTION 1.0 1 APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 CORPORATE POLICY 3.0 3 QUALITY MANAGEMENT SYSTEM 4.0 4 GENERAL

More information

Quality Management System General

Quality Management System General Audit Date: Quality Management System General Requirement: 4.1 and 4.2.2-QMS General Verify Scope Comments/Evidence/Findings: Verify the Exclusions is applicable and justified How are the processes in

More information

Quality Management System Manual

Quality Management System Manual Effective Date: 03/08/2011 Page: 1 of 17 Quality Management System Manual Thomas C. West Eric Weagle Stephen Oliver President ISO Management General Manager Representative Effective Date: 03/08/2011 Page:

More information

Quality Systems Manual

Quality Systems Manual Quality Systems Manual This manual was developed to support ISO 9001 elements Revision Description of Change Author Effective Date 5-28-02 Initial Release Support ISO 9001: 2000 L. Hook 5-28-02 7-01-02

More information

Turbo Resources International Quality Procedure

Turbo Resources International Quality Procedure TURBO RESOURCES INTERNATIONAL QUALITY MANAGEMENT SYSTEM MANUAL APPROVALS: Revision : 46 Page : 1 of 53 TABLE OF CONTENTS INTRODUCTION 3 1. SCOPE 4 1.1 GENERAL 4 1.2 APPLICATION 5 2. NORMATIVE REFERENCE

More information

Disclosure to Promote the Right To Information

Disclosure to Promote the Right To Information इ टरन ट म नक Disclosure to Promote the Right To Information Whereas the Parliament of India has set out to provide a practical regime of right to information for citizens to secure access to information

More information

Quality Assurance System Manual

Quality Assurance System Manual The online version of this procedure is official. Therefore, all printed versions of this document are unofficial copies. St. Louis Public Schools Quality Assurance System Manual 801 North 11 th Street

More information

Quality Management System and Procedures

Quality Management System and Procedures Commercial HVAC/R Coils & Protective Coatings Quality Management System and Procedures Rahn Industries, Inc. Quality Assurance Manual Version 3.0 www.rahnindustries.com 1-800-421-7070 Commitment to Quality

More information

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Quality Management System MANUAL SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Doc. No. G5500 Rev. 9.2 Status : APPROVED Effective: 9/25/2015 Page 2 of 23 Quality Manual Table of Contents

More information

Quality, Environmental, Health and Safety Manual Toshiba International Corporation

Quality, Environmental, Health and Safety Manual Toshiba International Corporation Quality, Environmental, Health and Safety Manual Toshiba International Corporation Doc. No. QEHS 001 Rev. 19 (12/12) Title: Prepared By: Revision No.: Table of Contents and Cross Reference Ken Mori/Homer

More information

Surgi Manufacturing Quality Manual

Surgi Manufacturing Quality Manual Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6

More information

ISO-9001:2000 Quality Management Systems

ISO-9001:2000 Quality Management Systems ISO-9001:2000 Quality Management Systems REQUIREMENTS 10/10/2003 ISO-9001:2000 Requirements 1 Process Based Approach C U S MANAGEMENT RESPONSIBILITY RESOURCE MANAGEMENT C U S T O M Requirements PRODUCT

More information

Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL

Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL Revision D October 27, 2015 Statement of Commitment and Authority Commitment This Quality Management System Manual (QMSM) delineates the processes,

More information

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual Specialties Manufacturing Talladega Castings & Machine Co., Inc. ISO 9001:2008 This document is the property of TMS and may not be reproduced, wholly, or in part, without the express consent of TMS. Rev.

More information

ISO 9001:2015 Overview of the Revised International Standard

ISO 9001:2015 Overview of the Revised International Standard ISO 9001:2015 Overview of the Revised International Standard Introduction This document provides: a summary of the new ISO 9001:2015 structure. an overview of the new and revised ISO 9001:2015 requirements

More information

Quality Management System Manual

Quality Management System Manual Quality Management System Manual 10V Gill Street Woburn, MA USA 01801 INTRODUCTION RL CONTROLS, LLC RL Controls, LLC is a privately held company headquartered in Woburn, MA, USA. RLC has more than 80 years

More information

NABL NATIONAL ACCREDITATION

NABL NATIONAL ACCREDITATION NABL 160 NABL NATIONAL ACCREDITATION BOARD FOR TESTING AND CALIBRATION LABORATORIES GUIDE for PREPARING A QUALITY MANUAL ISSUE NO. : 05 AMENDMENT NO : 00 ISSUE DATE: 27.06.2012 AMENDMENT DATE: -- Amendment

More information

ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION

ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION INTRODUCTION What auditors should look for: the items listed in these headings that the ISO requirement is met that the requirement is met in the manner described in the organization's documentation Page

More information

Quality System Manual

Quality System Manual Quality System Manual Joe Coatter 9/23/15 President - Joe Coatter Date Bill Gareis ISO/TS Management Representative - Bill Gareis 9/23/15 Date Revision Status: Revision # 7 (9-23-15) QUA-0003 4.2.2 SECTION

More information

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards INTEGRATED MANAGEMENT SYSTEM MANUAL IMS Based on ISO 9001:2008 and ISO 14001:2004 Standards Approved by Robert Melani Issue Date 30 December 2009 Issued To Management Representative Controlled Y N Copy

More information

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Quality Management System MANUAL SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Doc. No. G5500 Rev. 9.1 Status : APPROVED Effective: 12/11/2014 Page 2 of 23 Quality Manual Table of Contents

More information

QUALITY MANAGEMENT SYSTEM (QMS) ASSESSMENT CHECKLIST

QUALITY MANAGEMENT SYSTEM (QMS) ASSESSMENT CHECKLIST 1. QUALITY MANAGEMENT SYSTEM QUALITY MANAGEMENT SYSTEM (QMS) ASSESSMENT CHECKLIST 1.1 Quality Management System General 1.1.1 Is objective evidence available to demonstrate that the MDSAP site has defined,

More information

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems Certification Services Division Newton Building, St George s Avenue Northampton, NN2 6JB United Kingdom Tel: +44(0)1604-893-811. Fax: +44(0)1604-893-868. E-mail: pcn@bindt.org CP14 ISSUE 5 DATED 1 st OCTOBER

More information

Quality Manual. This Quality Manual complies with the Requirements of ISO 9001:2008 and ISO/IEC 80079-34, Explosive Atmospheres - Edition 1.

Quality Manual. This Quality Manual complies with the Requirements of ISO 9001:2008 and ISO/IEC 80079-34, Explosive Atmospheres - Edition 1. This complies with the Requirements of ISO 9001:2008 and ISO/IEC 80079-34, Explosive Atmospheres - Edition 1.0 2011-04 Prepared By: Phyllis Olsen Release Date: 10/28/15 Certificate No: CERT-08776-2006-AQ-HOU-RvA

More information

G & R Labs. Quality Assurance Manual. G&R Labs. 2996 Scott Boulevard Santa Clara CA 95054. Light Meters and Calibration

G & R Labs. Quality Assurance Manual. G&R Labs. 2996 Scott Boulevard Santa Clara CA 95054. Light Meters and Calibration G & R Labs Light Meters and Calibration Quality Assurance Manual G&R Labs 2996 Scott Boulevard Santa Clara CA 95054 QM01 QUALITY MANUAL ISO9001:2008 Manual Contents QM 01 Manual Contents 2 QM 02 Copy Holder

More information

ISO 9001:2008 Quality Manual Clause 3.7.4

ISO 9001:2008 Quality Manual Clause 3.7.4 ISO 9001:2008 Quality Manual Clause 3.7.4 Strode Park Foundation for People with Disabilities Approvals The signatures below certify that this Quality Manual has been reviewed and accepted, and demonstrates

More information

TRANSPORT CANADA MARINE SAFETY PLEASURE CRAFT OPERATOR COMPETENCY PROGRAM QUALITY MANAGEMENT SYSTEM FOR ACCREDITATION

TRANSPORT CANADA MARINE SAFETY PLEASURE CRAFT OPERATOR COMPETENCY PROGRAM QUALITY MANAGEMENT SYSTEM FOR ACCREDITATION TRANSPORT CANADA MARINE SAFETY PLEASURE CRAFT OPERATOR COMPETENCY PROGRAM FOR ACCREDITATION OF COURSE PROVIDERS PROJECT TRANSITION AND IMPLEMENTATION PLEASURE CRAFT OPERATOR COMPETENCY PROGRAM QUALITY

More information

International Workshop Agreement 2 Quality Management Systems Guidelines for the application of ISO 9001:2000 on education.

International Workshop Agreement 2 Quality Management Systems Guidelines for the application of ISO 9001:2000 on education. ISO 2002 All rights reserved ISO / IWA 2 / WD1 N5 Date: 2002-10-25 Secretariat: SEP-MÉXICO International Workshop Agreement 2 Quality Management Systems Guidelines for the application of ISO 9001:2000

More information

MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS

MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS CONTENTS 1. CONTROL PLANS 2. PROCESS APPROACH 3. PERFORMANCE 4. INTERNAL AUDITING 5. CONTROL OF NON-CONFORMING PRODUCT 6.

More information

Uncontrolled Document

Uncontrolled Document SOUTHWEST RESEARCH INSTITUTE QUALITY SYSTEM MANUAL July 2015 Revision 5 Quality System Manual Page iii TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 SCOPE... 1 3.0 TERMS AND DEFINITIONS... 2 4.0 QUALITY MANAGEMENT

More information

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002)

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002) Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002) Supplier: Plant/Location: Date: Audit Team: Scope of Audit: Number of C.A.R. s: Corrective Action Due: Potential suppliers

More information

THE KOCOUR COMPANY 4800 S. St. Louis Avenue, Chicago, IL 60632

THE KOCOUR COMPANY 4800 S. St. Louis Avenue, Chicago, IL 60632 THE KOCOUR COMPANY 4800 S. St. Louis Avenue, Chicago, IL 60632 Metal Finishing Instrumentation, Equipment and Supplies ISO 9001: 2008 QUALITY MANAGEMENT MANUAL ISSUED: 03/01/02(REV. 0) REVISION NO: 4 DATE:

More information

ISO 9001:2015 Internal Audit Checklist

ISO 9001:2015 Internal Audit Checklist Page 1 of 14 Client: Date: Client ID: Auditor Audit Report Key - SAT: Satisfactory; OBS: Observation; NC: Nonconformance; N/A: Not Applicable at this time Clause Requirement Comply Auditor Notes / Evidence

More information

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev

More information

Quality Manual ISO9001:2008

Quality Manual ISO9001:2008 Quality Manual ISO9001:2008 Connor Winfield Corp. Date: 4/26/10 Revision: 3 Quality Manual Quality Manual Connor Winfield GENERAL Section 0.1 Section Rev.: 2 Rev. Date: 4/26/10 Section Page 1 Index and

More information

THE QUALITY MANAGEMENT PRINCIPLES AND PRODUCT DESIGN REALIZATION REQUIREMENTS

THE QUALITY MANAGEMENT PRINCIPLES AND PRODUCT DESIGN REALIZATION REQUIREMENTS 3. Naučno stručni skup sa međunarodnim učešćem KVALITET 2003, Zenica, B&H, 13. i 14 Novembar 2003. THE QUALITY MANAGEMENT PRINCIPLES AND PRODUCT DESIGN REALIZATION REQUIREMENTS Prof.dr. Nedžad Repčić,

More information

FMC Technologies Measurement Solutions Inc.

FMC Technologies Measurement Solutions Inc. Table of Contents 1 Revision History... 4 2 Company... 5 2.1 Introduction... 5 2.2 Quality Policy... 6 2.3 Quality Organization... 6 2.4 Company Processes... 7 3 Scope and Exclusions... 8 3.1 Scope...

More information

DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation

DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation Digital Internal Use Only DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation DOCUMENT IDENTIFIER: A-DS-EL00017-02-0000 Rev A, ABSTRACT: This standard

More information

Appendix 3 (normative) High level structure, identical core text, common terms and core definitions

Appendix 3 (normative) High level structure, identical core text, common terms and core definitions Appendix 3 (normative) High level structure, identical core text, common terms and core definitions NOTE In the Identical text proposals, XXX = an MSS discipline specific qualifier (e.g. energy, road traffic

More information

Quality Management System Manual QM-QUA-001

Quality Management System Manual QM-QUA-001 Quality Management System Manual QM-QUA-001 Nelson-Miller Inc. 2800 Casitas Avenue Los Angeles, Ca 90039 P a g e 2 Revision Date Description of the Change N/C 10/10/79 Initial release of documented inspection

More information

Rockwell Automation Quality Management System

Rockwell Automation Quality Management System Rockwell Automation Quality Management System Our Quality Policy Rockwell Automation is committed to a global quality system focused on customer solutions. We achieve this through superior products and

More information

Vigilant Security Services UK Ltd Quality Manual

Vigilant Security Services UK Ltd Quality Manual Quality Manual Date: 11 th March, 2014 Issue: 5 Review Date: 10 th March 2015 VSS-COM-PRO-001 SCOPE This Quality Manual specifies the requirements for the Quality Management System of Vigilant Security

More information

Implementing ISO 9000 Quality Management System

Implementing ISO 9000 Quality Management System Implementing ISO 9000 Quality Management System Implementation of ISO 9000 affects the entire organization right from the start. If pursued with total dedication, it results in 'cultural transition' to

More information

www.transition-support.com

www.transition-support.com Can we include all products and services in the QMS but limit the scope of registration? According to ISO/TC 176/SC 2/N 524, organizations are not obliged to include all the products that it provides within

More information

AS9100C Revised Standard Improves Aerospace Quality

AS9100C Revised Standard Improves Aerospace Quality AS9100C Revised Standard Improves Aerospace Quality Customer satisfaction is one of the newest changes to the international quality management standard for aerospace. By Christian Lupo, Business Unit Manager

More information