1 Contingency Planning and Disaster Recovery Plan Introduction In response to Homeland Security concerns and following sound business practices, agencies were asked to develop a Continuity of Operations Plans (COOP) for review. In response to that directive, John Tyler Community College has developed a COOP as a comprehensive document to deal effectively with personnel safety issues and recovering critical business operations at an off site location. Companion documents to the COOP are the John Tyler Community College Campus Emergency Operations Plan (EOP), John Tyler Community College Information Technology Security Plan, Crisis Communication Plan (CCP), and the College Closing Policy The John Tyler Community College Information Technology Security Plan includes, but is not limited to, the College s Business Analysis and Risk Assessment, Risk Assessment for Information Technology Infrastructure, and the Contingency Management Plan (Contingency Planning and Disaster Recovery Plan). Disaster recovery planning involves identifying, preventing and preparing for events that may interrupt the College s business functions due to the effects of disasters or other failure. Please note that these business functions include essential business functions as well as dependent business functions. Risks may come from many sources and could damage the College s image or reputation, cause harm to College assets, subject the College to legal ramifications, or weaken the College s business controls. The business impact analysis process was completed to identify those business functions which must be maintained to provide College services to the greatest extent possible in the event of a disaster. The recovery time objective identified is the maximum acceptable down time for the IT systems associated with these critical tasks. The risk assessment process has been completed to identify risks which may expose the College to these damages and apply proactive, corrective measures to mitigate those risks. The Business Impact Analysis results are located at: G:\itsc\JTCC Security Planning - BIA_RA College management has ensured the necessary allocation of resources for the development and maintenance of a contingency plan for critical information technology systems for the support of essential functions. John Tyler Community College s Information Technology Security Plan has been written to reflect the College s current network infrastructure and environment. This plan applies to all functions, operations and resources at the all campus locations. Page 1
2 Small non-networked systems, such as those located in office environments, are the responsibility of the individual departments to develop a more abbreviated and less formal plan. All plans will be operationally tested at a frequency commensurate with the risk and magnitude of loss or harm that could result from disruption of information processing support. Definitions A disaster can be defined as a total or partial loss of any or all of the following: physical space, servers, workstations, network infrastructure equipment, personnel, software eradication, or hostile intrusion of the College s network resources resulting in an interruption of services. An incident need not be a disaster to warrant attention. There may be various levels of incidents and each should be handled according to the level of damage the incident may cause to the College s business functions. Types of disasters may include natural disasters (earthquakes, floods, tornados, hurricanes, thunderstorms, and fire for example), system malfunctions (any unavailability due to actual equipment failure or loss of electricity, gas, or water for example), or human causes (deliberate or non-deliberate). Purpose The purpose of the John Tyler Community College Information Technology Security Plan is to ensure compliance with the Information Technology Security Standard as stated in ISO/IEC 27002:2005(E). This document provides the required disaster recovery procedures as well as plans for the continuity of operations which support the College s business functions. Assumptions This contingency plan is based on the following assumptions: On-site College Disaster: 1. Emergency resources and staff can be made available. 2. Users will return to manual operations while ITSC is out of service and will retain source data for ITSC updates when operations are resumed. Page 2
3 3. All ITSC staff will have access to the plan(s), have been properly trained and can manage the recovery if required. 4. In the event of loss of all ITSC personnel, College administration will contact the Vice Chancellor for Information Technology Services, Virginia Community College System, to request assistance to JTCC management to procure trained operations and technical staff from state wide VCCS resources or elsewhere to carry out ITSC duties. 5. Any surviving ITSC staff members will be able to manage the execution of the disaster recovery plan. 6. Technical personnel can use ITSC's off-site system back-up media and documentation to restore the College's ITSC department. 7. System back-up media are secure at the primary off-site location at the JTCC Midlothian Campus. 8. The college utilizes five Barracuda backup servers to back up the college s data. Three servers are located at Chester and two servers are located at Midlothian. Chester data is backed up locally to one of the Chester BBS appliances and Midlothian data is backed up locally to one of the Midlothian BBS appliances. Twenty-four hours after a backup cycle completes, the data is then replicated. a. Documentation and software located at JTCC Chester or Midlothian Campuses will be available. b. College departments are responsible for inter-departmental hard copy manually processed data and documentation if disaster is wide spread. All electronic data and programs residing on network servers will be retrievable from back-up media. c. Use of the current server environment existing at the Midlothian Campus and acquisition of additional servers acquired at the time of a disaster would provide sufficient server resources to support the College if the Chester site is lost. Reallocation of server definitions and data and program restoration (if required) would bring all services back on line as soon as possible. Current server environment existing at the Chester Campus would provide sufficient server resources if the Midlothian site was lost. d. Reconstruction of the ITSC department may be in a leased mobile office space (double-wide trailer). Location on campus will be determined by the Management Team. Page 3
4 e. All members of the four disaster recovery teams have been issued a copy of the Contingency Management/Disaster Recovery Plan. Off-Site Non-College Disaster: This would include locations that contain critical applications and data essential to College automated operations via remote based systems (i.e., Oracle, PeopleSoft or PMIS and CARS via VITA). College Environment John Tyler Community College has two campuses, one in Chester and the other in Midlothian. We also have faculty and staff at two off-site locations for the Community College Workforce Alliance and the College s Nursing Program. Chester Campus Street and Mailing Address John Tyler Community College Jefferson Davis Highway Chester, Virginia Directions Map of Campus Midlothian Campus Street and Mailing Address John Tyler Community College 800 Charter Colony Parkway Midlothian, Virginia Directions Map of Campus Community College Workforce Alliance at Featherstone Professional Center Street Address 1807 Huguenot Road Suite 108 Midlothian, VA (please do not send mail to this address) Mailing Address John Tyler Community College Page 4
5 13101 Jefferson Davis Highway Chester, VA Map & Directions Nursing Program at CJW Johnston-Willis Campus Street Address 1401 Johnston-Willis Drive Richmond, Virginia (please do not send mail to this address) Mailing Address John Tyler Community College Jefferson Davis Highway Chester, VA Directions Infrastructure Environment All network drawings are housed at: G:\itsc\JTCC Security Planning - Configuration Management\Network\Diagrams Backup procedures are housed at: G:\itsc\JTCC Security Planning - Configuration Management\Barracuda\BBS Backup and Recovery\How to Recover Using Barracuda Backup Services - for Systems Engineers.docx Page 5
6 When an IT Disaster is recognized In the event of a disaster, the disaster planning coordinator, Michael Smith, Interim Director of (ITSC), will initiate disaster recovery procedures. If the disaster planning coordinator is unavailable or incapacitated, the order of responsibility for coordinating the recovery will be as follows: Disaster Planning Coordinator Smith, Michael Interim Director of ITSC ITSC Staff in order of succession Blackwell, Scott W. Greene, Jeffrey Scott MacPherson, Dennis Programmer Analyst Williams, Patricia Abu-Saleh, Emad Ramirez, Jose L. Sr II Tookes, La Toria H. Coordinator, PeopleSoft Chaoul, Michel. Chester-B133b; Midlothian-B216 (804) (804) msmith01@jtcc.edu Chester-B133 (804) (804) sblackwell@jtcc.edu Midlothian-B212 (804) (804) FAX jgreene@jtcc.edu Chester-B130 (804) (804) FAX dmacpherson@jtcc.edu Chester-B133 (804) pwilliams@jtcc.edu Chester - B133 (804) (804) FAX eabu-saleh@jtcc.edu Midlothian-B216 (804) (804) (804) FAX jramirez@jtcc.edu Chester-B135 (804) (804) FAX ltookes@jtcc.edu Chester-B135 Page 6
7 Programmer/Analyst Mitchell, Lincoln Audio Visual/Multi-Media Specialist (804) Chester-B131 (804) The first task of the coordinator is to secure a current copy of the JTCC Contingency Management/Disaster Recovery Plan. A current copy resides at Chester, B133B, and Midlothian Campus, B216. Additional copies can also be retrieved from: the Vice President of Financial and Administrative Services located at the Chester Campus. First Activity to be performed The disaster planning coordinator, or individual acting as the same, will: Perform a quick analysis of the situation and determine if the disaster recovery plan needs to be implemented. Notify: 1. The College Vice President of Financial and Administrative Services 2. The College President 3. The ITSC staff 4. The VCCS Client Services Center, Chancellor and Vice Chancellor of Information Technology Services 5. Notify computer customers (staff, faculty, administrators, students, etc.) Call and place into service the Emergency Management Team. At this point in time, the disaster recovery teams will begin performing their appointed duties. IT Disaster Recovery Teams Disaster recovery teams will be utilized to restore automated computer/technology services. Four recovery teams lead by a disaster planning coordinator will participate in recovery activities based on the level of severity of the loss, recovery deemed necessary, and restoration order as deemed in the Business Impact Analysis and Risk Assessment processes. Team members may serve in multiple roles and be assigned to multiple teams. The coordinator and four teams are: Page 7
8 Disaster Planning Coordinator: Smith, Michael Interim Director of ITSC Chester-B133b; Midlothian-B216 (804) (804) Responsibilities of the Disaster Planning Coordinator are: Manage and coordinate all disaster plan activities. Contact all disaster recovery team members involved in the recovery effort. Ensure all recovery team members have a copy of the plan. Appoint replacement staff if necessary. Contact the College President, College Vice-President of Financial and Administrative Services. Initiate tasks as delegated by disaster recovery team responsibilities. Provide disaster recovery status via communication with College administrators. If necessary, assist planning for returning to normal conditions (renovations, new construction, etc.). Page 8
9 Emergency Management Team The team consists of the following personnel: Smith, Michael Interim Director of ITSC MacPherson, Dennis Programmer Analyst Blackwell, Scott W. Greene, Jeffrey Scott Williams, Patricia Abu-Saleh, Emad Ramirez, Jose L. Sr II Tookes, La Toria H. Coordinator, PeopleSoft Chaoul, Michel. Programmer/Analyst Mitchell, Lincoln Audio Visual/Multi-Media Specialist Chester-B133b; Midlothian-B216 (804) (804) Chester-B130 (804) (804) FAX Chester-B133 (804) (804) Midlothian-B212 (804) (804) FAX Chester-B133 (804) Chester - B133 (804) (804) FAX eabu-saleh@jtcc.edu Midlothian-B216 (804) (804) (804) FAX jramirez@jtcc.edu Chester-B135 (804) (804) FAX ltookes@jtcc.edu Chester-B135 (804) mchaoul@jtcc.edu Chester-B131 (804) lmitchell@jtcc.edu Page 9
10 Responsibilities of the Emergency Management Team are: Conduct on-site assessment of the damaged areas. Provide a detailed status of the disaster to the disaster planning coordinator as soon as possible. Contact necessary vendors to meet at the ITSC site to assess the damage and determine resources necessary to restore services to the damaged areas. Determine the priorities and the minimum time frame the college will function with degraded operations before the backup plan is implemented. Ensure other support staff is contacted to provide assistance as needed. Determine a time frame for when all services will be restored. Provide the College president and administration a briefing within 12 hours of the damage inflicted on the information technology environment, particularly in ITSC. This briefing may include: o What is affected o Can ITSC be restored at current location o What is salvageable in ITSC o What is probable length of time frame involved for restoration of services o Anticipated vendor support o If a security officer is required in the IT area o Can ITSC s operation be transferred and headquartered at Midlothian Campus (If Midlothian Campus is impacted, can Midlothian operations be transferred to Chester Campus) o Recommend priorities Notify the following individuals/vendors: VCCS Chancellor s Office Verizon Cisco Systems Current Cisco Certified Contract Vendor Cable Contractor Electrical Contractor Dell Computers Mobile office (trailer) vendor Miscellaneous vendors as needed Page 10
11 Technical Support Team The team consists of the following personnel: Smith, Michael Interim Director of ITSC MacPherson, Dennis Programmer Analyst Blackwell, Scott W. Greene, Jeffrey Scott Williams, Patricia Abu-Saleh, Emad Ramirez, Jose L. Sr II Tookes, La Toria H. Coordinator, PeopleSoft Chaoul, Michel. Programmer/Analyst Mitchell, Lincoln Audio Visual/Multi-Media Specialist Chester-B133b; Midlothian-B216 (804) (804) Chester-B130 (804) (804) FAX Chester-B133 (804) (804) Midlothian-B212 (804) (804) FAX Chester-B133 (804) Chester - B133 (804) (804) FAX eabu-saleh@jtcc.edu Midlothian-B216 (804) (804) (804) FAX jramirez@jtcc.edu Chester-B135 (804) (804) FAX ltookes@jtcc.edu Chester-B135 (804) mchaoul@jtcc.edu Chester-B131 (804) lmitchell@jtcc.edu Page 11
12 The responsibilities of the Technical Support Team are: Work with Emergency Management Team to conduct on-site assessment of the damaged areas to determine condition of network infrastructure equipment/servers, etc., and determine what computer hardware and software has been damaged. Responsible for making decisions based on information received from the Emergency Management Team. Inform Campus Security Force of their role in the disaster plan. Inform Application Owners of their role in the disaster plan and recovery process. Notify staff and vendors using "Emergency Notification Telephone List" o See the Emergency Contact List Determine via JTCC Information Technology Security Plan, Business Impact Analysis and Risk Assessment Executive Summary, which applications are mission critical and need to be on-line immediately and who is responsible for each application. o See BIA System Results. Schedule, coordinate, and communicate as needed with: o All College managers o Emergency Management Team o Special Projects Team o Customer Support Team o Vendors o Users o VCCS Review pre-disaster environment Network Infrastructure Schematics, VCCS and VITA Resources via Connectivity. Prepare the temporary mobile office trailer at the JTCC Chester or Midlothian Campus if required. Reconstruct pre-disaster environment or new environment in accordance with Emergency Management Team's proposal. This will include scheduling repair, replacement, and movement of equipment: 1. Salvage usable equipment 2. Document arrival of equipment 3. Prepare charts with expected installation dates, personnel responsible for duties, etc. Page 12
13 4. Document events as they occur 5. Configuration and moving of equipment Reconstruct pre-disaster environment or new environment in accordance with Emergency Management Team's proposal. This will include installation of software: Salvage usable software: 1. Document re-installation of software 2. Prepare charts with expected installation dates, personnel responsible for duties, etc. Document events as they occur: Work with VCCS Customer Support Center to reestablish terminal dependent IMS access privileges. Work with VCCS Security Officer to reestablish terminal dependent VITA access privileges. Prepare a list of the essential items for use in the temporary mobile office (trailer). Special Projects Team The team consists of the following personnel: ITSC Staff College Lab Assistants Institutional Effectiveness College Web Master Associate Vice President of F&A Procurement Staff Accounting Staff Fixed Assets Staff Facilities Staff Executive Secretary, Financial and Administrative Services Responsibilities of the Special Projects Team are: Help with transportation needs, order state cars, trucks, etc. Page 13
14 Assist managers in making phone calls as requested. Order supplies as requested. Borrow or purchase boxes for moving. Coordinate the preparation of any needed paper work. Acquiring emergency purchasing means (charge card, delegated purchasing, contract information, etc.). Provide assistance to any support teams as needed. Customer Support Team The team consists of the following personnel: Smith, Michael Interim Director of ITSC MacPherson, Dennis Programmer Analyst Blackwell, Scott W. Greene, Jeffrey Scott Williams, Patricia Abu-Saleh, Emad Ramirez, Jose L. Sr II Tookes, La Toria H. Coordinator, PeopleSoft Chester-B133b; Midlothian-B216 (804) (804) Chester-B130 (804) (804) FAX Chester-B133 (804) (804) Midlothian-B212 (804) (804) FAX Chester-B133 (804) Chester - B133 (804) (804) FAX eabu-saleh@jtcc.edu Midlothian-B216 (804) (804) (804) FAX jramirez@jtcc.edu Chester-B135 (804) Page 14
15 Chaoul, Michel. Programmer/Analyst Mitchell, Lincoln Audio Visual/Multi-Media Specialist (804) FAX Chester-B135 (804) Chester-B131 (804) Responsibilities of the Customer Support Team: Assist users in recovery of non-network supported automated systems. Assist users in implementing manual procedures to accomplish mission critical application processing if immediate automated solutions will not be forthcoming. Assist users with hardware and software restoration, or relocation to new office site. Keep users knowledgeable of the restoration schedule, particularly as to the impact of there particular areas and services need for them to be productive. Page 15
16 Emergency Response Procedures John Tyler Community College (JTCC) Information Technology services are split between the two primary campus locations: Chester and Midlothian Campus. The foundation of the College s disaster recovery plan is to take advantage of JTCC s multicampus environment. If one site were to suffer a major disruption, the other location would become the College s disaster recovery site. The ITSC network administrator and staff would perform steps to establish the Midlothian Campus Hot Site as the College s primary WAN/LAN infrastructure domain. If the Midlothian Campus ITSC environment was to suffer a disaster the technology services would be established at the Chester Campus to support Midlothian technical activities. If equipment replacement is required due to the College suffering a debilitating disaster at both campuses, the normal emergency order procedures should produce the needed equipment within a reasonable time to support recovery activities. Page 16
17 Emergency Telephone List For security purposes, personal telephone information is not housed in this main document. Appropriate employees will have access to the document noted below. o See the EOP Emergency Contact List Smith, Michael Interim Director of ITSC MacPherson, Dennis Programmer Analyst Blackwell, Scott W. Greene, Jeffrey Scott Williams, Patricia Abu-Saleh, Emad Ramirez, Jose L. Sr II College Contacts Chester-B133b; Midlothian-B216 (804) (804) msmith01@jtcc.edu Chester-B130 (804) (804) FAX dmacpherson@jtcc.edu Chester-B133 (804) (804) sblackwell@jtcc.edu Midlothian-B212 (804) (804) FAX jgreene@jtcc.edu Chester-B133 (804) pwilliams@jtcc.edu Chester - B133 (804) (804) FAX eabu-saleh@jtcc.edu Midlothian-B216 (804) Page 17
18 (804) (804) FAX Tookes, La Toria H. Coordinator, PeopleSoft Chaoul, Michel. Programmer/Analyst Raspiller, Dr. Ted President President's Office Taylor, William F. "Fred" Vice President, Finance & Administration Finance and Administration Fiege, Dr. Bill Vice President, Learning & Student Success Dunaway, Gregory Director, Facilities Operations Facilities Operations Horning, Jered Webmaster College Relations Grinnan, Susan Human Resource Manager Chester-B135 (804) (804) FAX Chester-B135 (804) Midlothian-B206c; Chester- A105b (804) (804) (804) FAX Chester-A102c;Midlothian-B206e (804) (804) (804) FAX Chester-N113; Midlothian B206f (804) (804) Midlothian-P101 (804) (804) (804) FAX Midlothian-B212 (804) (804) FAX Chester,-A101a; Midlothian-B206h (804) Page 18
19 Human Resources (804) (804) FAX Jimison, Nancy Procurement Manager Business Office Frank Medaglia Security Manager Security Services Patteson, Beki Fixed Asset Control Specialist Finance and Administration Mitchell, Lincoln Audio Visual/Multi-Media Specialist Chester-A102a (804) (804) FAX Chester-N111b (804) (804) (804) FAX Chester-G118 (804) (804) (804) FAX Chester-B131 (804) Page 19
20 Maintaining and Testing the Plan The Disaster Planning Coordinator is responsible for maintaining the VCCS Information Technology Disaster Prevention and Recovery Program. The College Coordinator has developed a plan to minimize disruptions of critical functions and the capability to recover operations expediently and successfully. The Coordinator performs the following activities to maintain the plan: Develop a time table to test the College plan as required. ITSC staff will support the Coordinator to ensure the plan is continuously updated with the most recent information so as not to render the plan outdated and useless. Update the position description of the employee assigned to be the Disaster Planning Coordinator and include the responsibilities in the employee annual Performance Evaluation. Coordinator conducts annual planning meetings with each team prior to annual testing. The purpose of testing the plan is to ensure the plan will work when needed. Goals are to identify the weaknesses and incorporate the information obtained to improve the plan. The testing will assess the following: Verify that the plan is complete and accurate. Evaluate that all participants know their roles and responsibilities. Measure the overall performance of the plan. ITSC will participate in all college-wide testing. Information or documentation obtained from all testing will be used for detailed analysis and improvement of the plan. Training will be held at various ITSC staff meetings and informally periodically to ensure IT staff is aware of their individual roles and responsibilities, notification and warning procedures, location and use of emergency equipment, and emergency shutdown procedures. Input from staff at these meetings may be used to update the plan accordingly. Updates will be made periodically as recovery strategies or technology environments change. Page 20
21 Technology Team information from the current COOP. The College Management Team guides and directs all phases of the COOP process and evaluates the transition between the Responses, Recover, Resume, and Restore phases. The College Management Team will also monitor and evaluate the Continuity Teams and determine when specific teams can either be disbanded or restructured. The Director of Information Technology is part of the College Management Team and will: Contact the IT staff and provide a status report of the current situation. Call the Business Recovery Center contacts and provide a status report of the current situation. Assign Incident Command Post contacts the tasks of preparing the Recovery sites for use. Recommend establishing a Call Center with appropriate personnel. Announce fax numbers and contact numbers on the agency web site and TV/radio. Technology Team The Technology Team provides the essential technical and telecommunications support functions during the recovery and resume processes. The Technology Team is activated by a call from the College Management Team. The Technology Team reestablishes technology services. The Technology Team consists of individuals who are knowledgeable about information systems and infrastructure, telecommunications and database technologies. This group is responsible for the recovery and resumption of automated systems, networks, and telephony for John Tyler Community College. In accordance with the active Security Plan, the following will be recovered: Telephones: Determine what systems are intact and what needs to be recovered, if possible. Data Communications: Determine which networks are functioning and which are not. Take necessary steps to reestablish communications in coordination with the Special Projects Team. Information Services: Restore critical applications at Business Recovery Center site, as needed in the order of priority established by JTCC. Page 21
22 Step Activity 1 Respond to the Special Projects Team call in response to an event. Get as much information as you can on the nature and the circumstances of the emergency. 2 Phone the other Technology Team members, as required. Convey to them what you know about the event. 3 Identify Client Services personnel who will work with Public Information Office on all communications associated with the disaster event. 4 Call the contact at the Business Recovery Center and schedule the restoration. 5 Contact Critical Vendors to provide assistance at the Business Recovery Center. 6 Determine the extent of the Technology and Data procedures that must be followed as identified in the current John Tyler Community College Information Technology Security Plan. 7 Re-establish critical data center services through hardware reconfiguration, ordering of hardware, or use of other state facility computing resources as specified in the in the John Tyler Community College Information Technology Security Plan. 8 Report recovery progress to Special Projects Team for the Business Recovery Center. John Tyler Community College is not required to establish any Memorandums of Agreement for Business Recovery locations. All Business Recovery Center sites are John Tyler Community College locations. These consist of the following locations to be used in the event any one or two of the other John Tyler Community College locations experience an emergency. Recovery Team Info (Note: ITSC employees may serve on more than one team) Page 22
23 College Management Team Disaster Site Business Recovery Center(s) Technology Recovery Site Coordination & Recovery Team Special Projects Team Technology Team Administrative Support Team Technology Team Division Teams Page 23
SAMPLE IT CONTINGENCY PLAN FORMAT
SAMPLE IT CONTINGENCY PLAN FORMAT This sample format provides a template for preparing an information technology (IT) contingency plan. The template is intended to be used as a guide, and the Contingency
More informationUnit Guide to Business Continuity/Resumption Planning
Unit Guide to Business Continuity/Resumption Planning (February 2009) Revised June 2011 Executive Summary... 3 Purpose and Scope for a Unit Business Continuity Plan(BCP)... 3 Resumption Planning... 4 Assumptions
More informationMARQUIS DISASTER RECOVERY PLAN (DRP)
MARQUIS DISASTER RECOVERY PLAN (DRP) Disaster Recovery is an ongoing process to plan, develop, test and implement changes, processes and procedures supporting the recovery of the critical functions in
More informationComprehensive Emergency Management Plan (CEMP) Annex V CONTINUITY OF OPERATIONS PLAN (COOP)
Annex V CONTINUITY OF OPERATIONS PLAN (COOP) Milwaukee County Office of the Sheriff (MCSO) Division of Emergency Management Milwaukee County, ANNEX V CONTINUITY OF OPERATIONS PLAN (COOP) TABLE OF CONTENTS
More informationEMERGENCY PREPAREDNESS PLAN Business Continuity Plan
EMERGENCY PREPAREDNESS PLAN Business Continuity Plan GIS Bankers Insurance Group Powered by DISASTER PREPAREDNESS Implementation Small Business Guide to Business Continuity Planning Surviving a Catastrophic
More informationOhio Supercomputer Center
Ohio Supercomputer Center IT Business Continuity Planning No: Effective: OSC-13 06/02/2009 Issued By: Kevin Wohlever Director of Supercomputer Operations Published By: Ohio Supercomputer Center Original
More informationSecurity Architecture. Title Disaster Planning Procedures for Information Technology
Category Applicability Title Disaster Planning Procedures for Information Technology All Public Entities (See the Applicability section below.) Standard - A degree or level of requirement that all jurisdictions
More informationBusiness Unit CONTINGENCY PLAN
Contingency Plan Template Business Unit CONTINGENCY PLAN Version 1.0 (Date submitted) Submitted By: Business Unit Date Version 1.0 Page 1 1 Plan Review and Updates... 3 2 Introduction... 3 2.1 Purpose...
More informationContinuity of Operations Planning. A step by step guide for business
What is a COOP? Continuity of Operations Planning A step by step guide for business A Continuity Of Operations Plan (COOP) is a MANAGEMENT APPROVED set of agreed-to preparations and sufficient procedures
More informationDomain 3 Business Continuity and Disaster Recovery Planning
Domain 3 Business Continuity and Disaster Recovery Planning Steps (ISC) 2 steps [Har10] Project initiation Business Impact Analysis (BIA) Recovery strategy Plan design and development Implementation Testing
More informationContract # 04-06. Accepted on: March 29, 2005. Starling Systems. 711 S. Capitol Way, Suite 301 Olympia, WA 98501
Disaster Recovery Plan Starling Systems Deliverable #15 - Draft I Contract # 04-06 Accepted on: March 29, 2005 Starling Systems 711 S. Capitol Way, Suite 301 Olympia, WA 98501 DISASTER RECOVERY PLAN TABLE
More informationThe University of Iowa. Enterprise Information Technology Disaster Plan. Version 3.1
Version 3.1 November 22, 2004 TABLE OF CONTENTS PART 1: DISASTER RECOVERY EXPECTATIONS... 3 OVERVIEW...3 EXPECTATIONS PRIOR TO AN INCIDENT OCCURRENCE...3 EXPECTATIONS PRIOR TO A DISASTER OCCURRENCE...4
More informationBuilding and Maintaining a Business Continuity Program
Building and Maintaining a Business Continuity Program Successful strategies for financial institutions for effective preparation and recovery Table of Contents Introduction...3 This white paper was written
More informationSuccess or Failure? Your Keys to Business Continuity Planning. An Ingenuity Whitepaper
Success or Failure? Your Keys to Business Continuity Planning An Ingenuity Whitepaper May 2006 Overview With the level of uncertainty in our world regarding events that can disrupt the operation of an
More informationBusiness Continuity Planning and Disaster Recovery Planning
4 Business Continuity Planning and Disaster Recovery Planning Basic Concepts 1. Business Continuity Management: Business Continuity means maintaining the uninterrupted availability of all key business
More informationEmergency Operations California State University Los Angeles
Business Continuity Plan Emergency Operations California State University Los Angeles 1. Objective & Scope 2. Definition of Disaster 3. Risk and Business Impact Analysis Summary 4. Business Continuity
More informationOffice of Information Technology
Office of Information Technology Core Services Resilience Plan Version 6.5.6 March 2010 Page 1 of 13 Table of Contents Overview... 3 Background... 4 OIT Organizational Resilience Program... 4 Data Centers...
More information85-01-55 Overview of Business Continuity Planning Sally Meglathery Payoff
85-01-55 Overview of Business Continuity Planning Sally Meglathery Payoff Because a business continuity plan affects all functional units within the organization, each functional unit must participate
More informationVirginia Commonwealth University School of Medicine Information Security Standard
Virginia Commonwealth University School of Medicine Information Security Standard Title: Scope: Business Continuity Management Standard for IT Systems This standard is applicable to all VCU School of Medicine
More informationICT & Communications Services Disaster & Recovery Plan
ICT & Communications Services Disaster & Recovery Plan Advanced IT Services with George Spencer Academy www.aitn.co.uk Advanced IT Services - Arthur Mee Road, Stapleford, Nottingham. NG9 7EW Email: info@advanceditservices.co.uk
More informationBusiness Continuity Planning for Schools, Departments & Support Units
Business Continuity Planning for Schools, Departments & Support Units 1 What is Business Continuity Planning? Examples Planning for an adverse, major or catastrophic event that would cause a disruption
More informationDisaster Recovery Planning Procedures and Guidelines
Disaster Recovery Planning Procedures and Guidelines A Mandatory Reference for ADS Chapter 545 New Reference: 06/01/2006 Responsible Office: M/DCIO File Name: 545mal_060106_cd44 Information System Security
More informationDISASTER RECOVERY AND BUSINESS CONTINUITY
DISASTER RECOVERY AND BUSINESS CONTINUITY ISO 9001/27001 PARTNER ONLY NODE4 LIMITED 03/01/2014 DISASTER RECOVERY PLAN This plan will be held at Node4 s premises located at Pride Park in Derby and also
More informationProcessing Sites for Commonwealth Agencies
Information Technology Supporting Documentation Commonwealth of Pennsylvania Governor's Office of Administration/Office for Information Technology Document Number: OPD-SYM004A Document Title: Guidelines
More informationFORMULATING YOUR BUSINESS CONTINUITY PLAN
WHITE PAPER Page 0 Planning for the Worst Case Scenario: FORMULATING YOUR BUSINESS CONTINUITY PLAN 9 Wing Drive Cedar Knolls, NJ 07927 www.nac.net Page 1 Table of Contents Overview... 2 What is Disaster
More informationRiverhead Central School District
Riverhead Central School District Data Disaster Recovery Plan The following pages outline the data recovery process for the Riverhead Central School District **This document should be kept in paper form**
More informationAll-Hazard Continuity of Operations Plan. [Department/College Name] [Date]
d All-Hazard Continuity of Operations Plan [Department/College Name] [Date] TABLE OF CONTENTS SECTION I: INTRODUCTION... 3 Executive Summary... 3 Introduction... 3 Goal... 4 Purpose... 4 Objectives...
More informationHow To Manage A Business Continuity Strategy
Business continuity strategy 2009 2012 Table of contents 1 Why this strategy is needed 3 2 Aim of the strategy 4 3 Our approach to business continuity 4 PROCESS 4 STRUCTURE 5 DOCUMENTATION 6 DISRUPTION
More informationDISASTER RECOVERY PLAN
DISASTER RECOVERY PLAN Section 1. Goals of a Disaster Recovery Plan The major goals of a disaster recovery plan are: To minimize interruptions to normal operations. To limit the extent of disruption and
More informationBusiness Continuity Plan
Business Continuity Plan October 2007 Agenda Business continuity plan definition Evolution of the business continuity plan Business continuity plan life cycle FFIEC & Business continuity plan Questions
More informationTechnology Recovery Plan Instructions
State of California California Information Security Office Technology Recovery Plan Instructions SIMM 5325-A (Formerly SIMM 65A) September 2013 REVISION HISTORY REVISION DATE OF RELEASE OWNER SUMMARY OF
More informationBusiness Continuity Glossary
Developed In Conjuction with Business Continuity Glossary ACTIVATION: The implementation of business continuity capabilities, procedures, activities, and plans in response to an emergency or disaster declaration;
More informationData Center Assistance Group, Inc. DCAG Contact: Tom Bronack Phone: (718) 591-5553 Email: bronackt@dcag.com Fax: (718) 380-7322
Business Continuity and Disaster Recovery Job Descriptions Table of Contents Business Continuity Services Organization Chart... 2 Director Business Continuity Services Group... 3 Manager of Business Recovery
More informationJacksonville University Information Technology Department Disaster Recovery Plan. (Rev: July 2013)
Jacksonville University Information Technology Department Disaster Recovery Plan (Rev: July 2013) Table of Contents Introduction 3 Objectives/Constraints 4 Assumptions 4 Critical Systems 5 Incidents Requiring
More informationIT Contingency Planning: IT Disaster Recovery Planning
IT Contingency : IT Disaster Recovery Introduction CONTINGENCY PLANNING GUIDELINES FOR TABLE-TOP EXERCISE A tabletop exercise is a focused practice activity that places the participants in a simulated
More informationCITY OF RICHMOND CONTINUITY OF OPERATIONS (COOP) DEPARTMENT PLAN TEMPLATE
CITY OF RICHMOND CONTINUITY OF OPERATIONS (COOP) DEPARTMENT PLAN TEMPLATE Version 2 February 2010 This template is derived from the Virginia Department of Emergency Management (VDEM) Local Government COOP
More informationClinic Business Continuity Plan Guidelines
Clinic Business Continuity Plan Guidelines Published: January 2015 Table of Contents Emergency Notification Contacts Primary... 2 Emergency Notification Contacts Backups (in case primary is unavailable)...
More informationDISASTER RECOVERY PLAN For UNIVERSITY COMPUTING. Fayetteville State University
DISASTER RECOVERY PLAN For UNIVERSITY COMPUTING Fayetteville State University PREFACE This document titled Disaster recovery plan is simply a plan that addresses immediate and temporary restoration of
More informationBUSINESS CONTINUITY PLANNING GUIDELINES
BUSINESS CONTINUITY PLANNING GUIDELINES Washington University in St. Louis The purpose of this guide is to serve as a tool to all departments, divisions, and labs across the University in building a Business
More informationDisaster Recovery Plan
Disaster Recovery Plan Date: February 2, 2009 Revision: 9.0 EXTERNAL BUSINESS CONTINUITY PLAN PAGE 1 of 13 Federal regulation states, and internal corporate policies require, that Penson Financial Services,
More informationClinic Business Continuity Plan Guidelines
Clinic Business Continuity Plan Guidelines Emergency notification contacts: Primary Role Name Address Home phone Mobile/Cell phone Business Continuity Plan Coordinator QSP Business Continuity Plan Coordinator
More informationBusiness Continuity & Recovery Plan Summary
Introduction An organization s ability to survive a significant business interruption is determined by the company s ability to develop, implement, and maintain viable recovery and business continuity
More informationBusiness Continuity Planning for Risk Reduction
Business Continuity Planning for Risk Reduction Ion PLUMB ionplumb@yahoo.com Andreea ZAMFIR zamfir_andreea_ileana@yahoo.com Delia TUDOR tudordelia@yahoo.com Faculty of Management Academy of Economic Studies
More informationB U S I N E S S C O N T I N U I T Y P L A N
B U S I N E S S C O N T I N U I T Y P L A N 1 Last Review / Update: December 9, 2015 Table of Contents Purpose...3 Background...3 Books and Records Back-up and Recovery...4 Mission Critical Systems...
More informationDisaster Recovery Plan Documentation for Agencies Instructions
California Office of Information Security Disaster Recovery Plan Documentation for Agencies Instructions () November 2009 SCOPE AND PURPOSE The requirements included in this document are applicable to
More informationRISK CONTROL. Strategy guide for business continuity planning. Risk Management Guide
Risk Management Guide RISK CONTROL REDUCE RISK. PREVENT LOSS. SAVE LIVES. A FOUR STEP PROCESS: About this planning guide This guide discusses the fundamental process and plan components of Travelers Strategy
More informationReady for Anything BUSINESS CONTINUITY GUIDE FOR BUSINESS OWNERS. Plan to Stay in Business
BUSINESS CONTINUITY GUIDE FOR BUSINESS OWNERS Administration, Louisiana Economic Development and participating universities. All opinions, conclusions or recommendations expressed are those of the author(s)
More informationBusiness Continuity and Disaster Recovery Planning
Business Continuity and Disaster Recovery Planning Jennifer Brandt, CISA A p r i l 16, 2015 HISTORY OF STINNETT & ASSOCIATES Stinnett & Associates (Stinnett) is a professional advisory firm offering services
More informationWhich Backup Option is Best?
Which Backup Option is Best? Which Backup Option is Best? Why Protect Your Data? Data loss disasters happen more frequently than you would think, for many different reasons: Human error and accidental
More informationSCOPE; ENFORCEMENT; AUTHORITY; EXCEPTIONS
Title: DRAFT USG Continuity of Operation Plan Policy Policy Number: 2009-Julian Date Topical Security Area: Document Type: Standard Pages: Words: Lines: 5 1,387 182 Issue Date: May-09 Effective Date: Immediately
More informationBusiness Continuity & Recovery Plan Summary
Introduction An organization s ability to survive a significant business interruption is determined by the company s ability to develop, implement, and maintain viable recovery and business continuity
More informationLAMAR STATE COLLEGE - ORANGE INFORMATION RESOURCES SECURITY MANUAL. for INFORMATION RESOURCES
LAMAR STATE COLLEGE - ORANGE INFORMATION RESOURCES SECURITY MANUAL for INFORMATION RESOURCES Updated: June 2007 Information Resources Security Manual 1. Purpose of Security Manual 2. Audience 3. Acceptable
More informationProtecting your Enterprise
Understanding Disaster Recovery in California Protecting your Enterprise Session Overview Why do we Prepare What is? How do I analyze (measure) it? What to do with it? How do I communicate it? What does
More informationWiley College Information Technology (IT) Disaster Recovery Plan
Wiley College Information Technology (IT) Disaster Recovery Plan Dr. Haywood L. Strickland President and CEO Submitted by: Nathaniel E. Hewitt, III Vice President for Information Systems and Technology
More information15 Organisation/ICT/02/01/15 Back- up
15 Organisation/ICT/02/01/15 Back- up 15.1 Description Backup is a copy of a program or file that is stored separately from the original. These duplicated copies of data on different storage media or additional
More informationUNITED CHURCH OF CHRIST LOCAL CHURCH DISASTER PREPAREDNESS AND RESPONSE PLANNING GUIDELINES
UNITED CHURCH OF CHRIST LOCAL CHURCH DISASTER PREPAREDNESS AND RESPONSE PLANNING GUIDELINES The United Church of Christ local churches may use this plan as a guide when preparing their own disaster plans
More informationDepartment of Defense INSTRUCTION. Reference: (a) DoD Directive 3020.26, Defense Continuity Programs (DCP), September 8, 2004January 9, 2009
Department of Defense INSTRUCTION SUBJECT: Defense Continuity Plan Development NUMBER 3020.42 February 17, 2006 Certified current as of April 27, 2011 Reference: (a) DoD Directive 3020.26, Defense Continuity
More informationInformation Security Management: Business Continuity Planning. Presentation by Stanislav Nurilov March 9th, 2005 CS 996: Info. Sec. Mgmt.
Information Security Management: Business Continuity Planning Presentation by Stanislav Nurilov March 9th, 2005 CS 996: Info. Sec. Mgmt. Overview BCP: Definition BCP: Need for (Why?) BCP: When BCP: Who
More informationPPSADOPTED: OCT. 2012 BACKGROUND POLICY STATEMENT PHYSICAL FACILITIES. PROFESSIONAL PRACTICE STATEMENT Developing a Business Continuity Plan
PROFESSIONAL PRACTICE STATEMENT Developing a Business Continuity Plan OCT. 2012 PPSADOPTED: What is a professional practice statement? Professional Practice developed by the Association Forum of Chicagoland
More informationPAPER-6 PART-1 OF 5 CA A.RAFEQ, FCA
1 Chapter-4: Business Continuity Planning and Disaster Recovery Planning PAPER-6 PART-1 OF 5 CA A.RAFEQ, FCA Learning Objectives 2 To understand the concept of Business Continuity Management To understand
More informationDisaster Recovery Plan
Disaster Recovery Plan Date: Revision: 8.0 EXTERNAL BCP PLAN PAGE 1 OF 12 Federal regulation states, and internal corporate policies require, that Penson Financial Services, Inc. (Penson) develop Business
More informationContinuity Planning and Disaster Recovery
Responsible Officer: AVP - Information Technology Services & UC Chief Information Officer Responsible Office: IT - Information Technology Services Issuance Date: 7/27/2007 Effective Date: 7/27/2007 Scope:
More informationTUFTS HEALTH PLAN CORPORATE CONTINUITY STRATEGY FREQUENTLY ASKED QUESTIONS OVERVIEW CORPORATE CONTINUITY PROGRAM.
TUFTS HEALTH PLAN CORPORATE CONTINUITY STRATEGY FREQUENTLY ASKED QUESTIONS July 2015 OVERVIEW The intent of this document is to provide external customers and auditors with a high-level overview of the
More informationBlackboard Managed Hosting SM Disaster Recovery Planning Document
BLACKBOARD MANAGED HOSTING Blackboard Managed Hosting SM Disaster Recovery Planning Document Prepared By: MH Services Modified Date: March 2009 Revision: 1.8 1. OBJECTIVES... 3 2. SCOPE... 3 3. ASSUMPTIONS...
More informationRockwell Financial Group Business Continuity Plan. Emergency Contact Persons Rockwell Financial Group has two emergency contact persons:
Rockwell Financial Group Business Continuity Plan Emergency Contact Persons Rockwell Financial Group has two emergency contact persons: Michael Halkitis, President/ Finop Primary Contact Information: Phone
More informationCITY UNIVERSITY OF HONG KONG Business Continuity Management Standard
PUBLIC Version: 1.0 CITY UNIVERSITY OF HONG KONG Business Continuity Management Standard (Approved by the Information Strategy and Governance Committee in December 2013; revision 1.1 approved by Chief
More informationBusiness Continuity Planning Toolkit. (For Deployment of BCP to Campus Departments in Phase 2)
Business Continuity Planning Toolkit (For Deployment of BCP to Campus Departments in Phase 2) August 2010 CONTENTS: Background Assumptions Business Impact Analysis Risk (Vulnerabilities) Assessment Backup
More informationDisaster Preparedness Plan. "[Click Here and type your Company Name]" Prepared By: Date:
isaster Preparedness Plan "[Click Here and type your Company Name]" Prepared By: ate: isaster Preparedness Plan Table of Contents '" isaster Supply Checklist '" Emergency Contact List '" Employee Contact
More informationUniversity of Prince Edward Island. Emergency Management Plan
Emergency Management Plan March 2012 ON CAMPUS Emergency Dial Security Assistance Dial 566-0384 OFF CAMPUS SUPPORT AGENCIES Fire & Ambulance... 9-1-1 Charlottetown Fire Department... 566-5548 Fire Marshal...
More informationDepartment of Information Technology Data Center Disaster Recovery Audit Report Final Report. September 2006
Department of Information Technology Data Center Disaster Recovery Audit Report Final Report September 2006 promoting efficient & effective local government Executive Summary Our audit found that a comprehensive
More informationUNIVERSITY INFORMATION TECHNOLOGY SERVICES (UITS) & INFORMATION WAREHOUSE FUNCTIONAL ANNEX 13
UNIVERSITY INFORMATION TECHNOLOGY SERVICES (UITS) & INFORMATION WAREHOUSE FUNCTIONAL ANNEX 13 Revision: December 19, 2012 Supersedes: June 9, 2009 Effective Date: January 30, 2012 OBJECTIVES The primary
More informationTufts Health Plan Corporate Continuity Strategy
Tufts Health Plan Corporate Continuity Strategy July 2015 OVERVIEW The intent of this document is to provide external customers and auditors with a highlevel overview of the Tufts Health Plan Corporate
More informationTable of Contents ESF-12-1 034-00-13
Table of Contents Primary Coordinating Agency... 2 Local Supporting Agencies... 2 State, Regional, and Federal Agencies and Organizations... 2 Purpose... 3 Situations and Assumptions... 4 Direction and
More informationHanh Do, Director, Information System Audit Division, GAA. SUBJECT: Review of HUD s Information Technology Contingency Planning and Preparedness
Issue Date: August 31, 2006 Audit Report Number 2006-DP-0005 TO: Lisa Schlosser, Chief Information Officer, A FROM: Hanh Do, Director, Information System Audit Division, GAA SUBJECT: Review of HUD s Information
More informationBusiness Continuity Planning Guide April 2013
Introduction Business Continuity Planning Guide April 2013 Departments can do much to prepare for the impact of the many hazards faced in today s world including natural hazards like floods, tornadoes,
More informationIdentify and Protect Your Vital Records
Identify and Protect Your Vital Records INTRODUCTION The Federal Emergency Management Agency s Federal Preparedness Circular 65 states The protection and ready availability of electronic and hardcopy documents,
More informationWhy Should Companies Take a Closer Look at Business Continuity Planning?
whitepaper Why Should Companies Take a Closer Look at Business Continuity Planning? How Datalink s business continuity and disaster recovery solutions can help organizations lessen the impact of disasters
More informationTHORNBURG INVESTMENT MANAGEMENT THORNBURG INVESTMENT TRUST. Business Continuity Plan
THORNBURG INVESTMENT MANAGEMENT THORNBURG INVESTMENT TRUST Business Continuity Plan June 2012 Purpose The purpose of this Business Continuity Plan ( BCP ) is to define the strategies and the plans which
More informationDISASTER RECOVERY PLANNING GUIDE
DISASTER RECOVERY PLANNING GUIDE AN INTRODUCTION TO BUSINESS CONTINUITY PLANNING FOR JD EDWARDS SOFTWARE CUSTOMERS www.wts.com WTS Disaster Recovery Planning Guide Page 1 Introduction This guide will provide
More informationbusiness continuity plan for:
business continuity plan for: Insert your company name here Our statement of Business Continuity is: > To ensure all employees are competent to do their tasks, and to provide adequate training > To review
More informationI.T. Disaster Recovery Plan
I.T. Disaster Recovery Plan Ref 000xxxxQ January, 2015 5, 443 Albany Hwy Victoria Park, WA, 6100 p. 1300 664 136 Info@focusnetworks.com.au www.focusnetworks.com.au I.T. Disaster Recovery Plan - January
More informationINSIDE. Preventing Data Loss. > Disaster Recovery Types and Categories. > Disaster Recovery Site Types. > Disaster Recovery Procedure Lists
Preventing Data Loss INSIDE > Disaster Recovery Types and Categories > Disaster Recovery Site Types > Disaster Recovery Procedure Lists > Business Continuity Plan 1 Preventing Data Loss White Paper Overview
More informationBusiness Continuity Overview
Business Continuity Overview Beverley A. Retjos Senior Manager WW SWG Security & Controls 03/12/07 Business Continuity Management (BCM) Process of ensuring that a business is prepared to survive any disruption
More informationReview of Information Technology s Data System Backup and Disaster Recovery Process Page 2 of 10 September 30, 2013
Page 2 of 10 Scope and Objectives We reviewed the backup and disaster recovery processes utilized by DOH for information applications/systems managed by IT over the last three years. This review included
More informationInformation Resources Security Guidelines
Information Resources Security Guidelines 1. General These guidelines, under the authority of South Texas College Policy #4712- Information Resources Security, set forth the framework for a comprehensive
More informationWith the large number of. How to Avoid Disaster: RIM s Crucial Role in Business Continuity Planning. Virginia A. Jones, CRM, FAI RIM FUNDAMENTALS
How to Avoid Disaster: RIM s Crucial Role in Business Continuity Planning The world has experienced a great deal of natural and man-made upheaval and destruction in the past few years, including tornadoes,
More informationWhite Paper AN INTRODUCTION TO BUSINESS CONTINUITY PLANNING AND SOLUTIONS FOR IT AND TELECOM DECISION MAKERS. Executive Summary
AN INTRODUCTION TO BUSINESS CONTINUITY PLANNING AND SOLUTIONS FOR IT AND TELECOM DECISION MAKERS Executive Summary Today s businesses rely heavily on voice communication systems and data networks to such
More informationEducation and Workforce Development Cabinet POLICY/PROCEDURE. Policy Number: EDU-06 Effective Date: April 15, 2006 Revision Date: December 20, 2012
Education and Workforce Development Cabinet POLICY/PROCEDURE Policy Number: EDU-06 Effective Date: April 15, 2006 Revision Date: December 20, 2012 Subject: Backup Procedures Tower and Server Farms Policy:
More informationDISASTER RECOVERY AND CONTINGENCY PLANNING CHECKLIST FOR ICT SYSTEMS
Appendix L DISASTER RECOVERY AND CONTINGENCY PLANNING CHECKLIST FOR ICT SYSTEMS I. GETTING READY A. Obtain written commitment from top management of support for contingency planning objectives. B. Assemble
More informationDisaster Recovery and Business Continuity Plan
Disaster Recovery and Business Continuity Plan Table of Contents 1. Introduction... 3 2. Objectives... 3 3. Risks... 3 4. Steps of Disaster Recovery Plan formulation... 3 5. Audit Procedure.... 5 Appendix
More informationHow to Prepare for an Emergency: A Disaster and Business Recovery Plan
How to Prepare for an Emergency: A Disaster and Business Recovery Plan Chapter 1: Overview of the Disaster and Business Recovery Plan Purpose: To develop and establish a comprehensive Disaster and Business
More informationClient Security Risk Assessment Questionnaire
Select the appropriate answer from the drop down in the column, and provide a brief description in the section. 1 Do you have a member of your organization with dedicated information security duties? 2
More informationIT Disaster Recovery Plan Template
HOPONE INTERNET CORP IT Disaster Recovery Plan Template Compliments of: Tim Sexton 1/1/2015 An information technology (IT) disaster recovery (DR) plan provides a structured approach for responding to unplanned
More informationMassachusetts Institute of Technology Public version Business Continuity Plan
Massachusetts Institute of Technology Public version Business Continuity Plan For information contact: Jerry Isaacson MIT Information Security Office (617) 253-1440 gii@mit.edu Business Continuity Plan
More informationDisaster Recovery Plan
Disaster Recovery Plan This guide sets forth items to consider in the review of the firm s disaster recovery plan. You should form a committee to assess the plan and should assign activities under the
More informationDISASTER RECOVERY PLAN CENTRAL PARK CAMPUS. Updated:
DISASTER RECOVERY PLAN CENTRAL PARK CAMPUS Updated: January 2014 TABLE OF CONTENTS QUICK REFERENCE GUIDE... 3 INTRODUCTION... 4 LEADERSHIP TEAM... 4 LEADERSHIP RESPONSIBILITIES... 5 CAMPUS RECOVERY TEAM
More informationHow To Ensure That Non-Peoplesoft Applications Can Withstand Adverse Events
FINAL AUDIT REPORT Audit of the arrangements for business continuity and disaster recovery for non- PeopleSoft applications in UNHCR BACKGROUND The field offices of the United Nations High Commissioner
More informationMANAGEMENT AUDIT REPORT DISASTER RECOVERY PLAN DEPARTMENT OF FINANCE AND ADMINISTRATIVE SERVICES INFORMATION TECHNOLOGY SERVICES DIVISION
MANAGEMENT AUDIT REPORT OF DISASTER RECOVERY PLAN DEPARTMENT OF FINANCE AND ADMINISTRATIVE SERVICES INFORMATION TECHNOLOGY SERVICES DIVISION REPORT NO. 13-101 City of Albuquerque Office of Internal Audit
More informationPAPER-6 PART-5 OF 5 CA A.RAFEQ, FCA
Chapter-4: Business Continuity Planning and Disaster Recovery Planning PAPER-6 PART-5 OF 5 CA A.RAFEQ, FCA Learning Objectives 2 To understand the concept of Business Continuity Management To understand
More information