1 Preventive Action Plan Belgium After regulation No 994/2010 of the European Parliament and of the Council of 20 October 2010 concerning measures to safeguard security of gas supply FPS Economy, S.M.E.s, Self-Employed and Energy North Gate III, Koning Albert II-laan Brussel

2 1 Table of contents EXECUTIVE SUMMARY INTRODUCTION CONTEXT REGULATION 994/ SUMMARY OF THE MAIN RESULTS OF THE RISK ASSESSMENT RISK & SCENARIO ANALYSIS RISK EVALUATION RISK TREATMENT DIVERSIFICATION ANALYSIS INFRASTRUCTURE & SUPPLY STANDARD INFRASTRUCTURE STANDARD (N-1) SUPPLY STANDARD INTERRUPTIBLE & PROTECTED CUSTOMERS End-users on the distribution network End-users on the transport network STRESS TEST N-x analyses Scenario analysis Commodities analysis OBLIGATIONS IMPOSED ON NATURAL GAS UNDERTAKINGS AND OTHER RELEVANT BODIES, INCLUDING FOR THE SAFE OPERATION OF THE GAS SYSTEM PUBLIC SERVICE OBLIGATIONS (PSO S) National legislation Regional legislation (distribution network) QUALITY & LEVEL OF MAINTENANCE OF THE NETWORK OVERVIEW PREVENTIVE MEASURES SUPPLY SIDE & MARKET BASED MEASURES Increased import flexibility (through long term and short term contracts) Facilitating the integration of gas from renewable energy sources into the gas network infrastructure Commercial gas storage withdrawal capacity and volume of gas in storage LNG terminal capacity and maximal send-out capacity Diversification of gas supplies and gas routes Reverse flows and investments in infrastructure Coordinated dispatching by transmission system operators DEMAND SIDE & MARKET BASED MEASURES Use of interruptible contracts Fuel switch possibilities including use of alternative back-up fuels in industrial and power generation plants Voluntary firm load shedding SUPPLY SIDE & NON MARKET BASED MEASURES... 35

3 Use of strategic storage Enforced use of electricity generated from sources other than gas Enforced storage withdrawal DEMAND-SIDE & NON MARKET BASED MEASURES Enforced fuel switching Enforced utilisation of interruptible contracts Enforced firm load shedding MECHANISMS FOR COOPERATION WITH OTHER MEMBER STATES TRANSPARENCY COHERENCE COOPERATION COMMUNICATION COMMON CRISIS EXERCISES LEARNING FROM BEST PRACTICES INFORMATION ON EXISTING AND FUTURE INFRASTRUCTURE IN BELGIUM EXISTING AND NEW INFRASTRUCTURE REVERSE FLOW ANALYSIS ANNEX 1: OVERVIEW TABLE OF THE MARKET BASED SUPPLY SIDE MEASURES ANNEX 2: OVERVIEW OF THE MARKET BASED DEMAND SIDE MEASURES ANNEX 3: CALCULATION DETAILS AND RESULTING ESTIMATIONS OF GAS DEMAND BELGIAN PROTECTED COSTUMERS... 49

4 3 Executive Summary The preventive action plan identifies all the measures the Belgian government and the stakeholders in the gas industry can take in order to reduce risks that can occur in the gas supply chain. A series of risks were already identified in the risk assessment drafted by the Energy administration in 2011 and was updated in From the risk analyses, we could conclude that the Belgian gas system never had any serious incidents threatening the gas supply to protected customers. However, if there is an accumulation of circumstances (for example a pipeline blow during very severe winter conditions), the gas supplies to protected customers 1 could be endangered. The preventive action plan picks up on the main points of the risk analyses, notably what we consider as main threats for the Belgian security of supply (mainly incidents upstream that cause a complete shut off of one source of gas), the results of the N-1 analyses and an analyses of the reverse flows and the degree of diversification. One important element in the preventive action plan is the supply standard. In Belgium, a main part of the responsibility to keep the gas system in balance lays with the shippers and suppliers. Therefore the suppliers will have to meet certain obligations if they are supplying the distribution network. At last, we will give an indication of which market and non-market based measures could be implemented in Belgium. 1 Protected customers are defined in Belgium as the consumers connected to the distribution grid (residential and non-residential), as described in the Ministerial Decree on 18 December 2013 establishing the federal emergency plan for the supply of natural gas.

5 4 1. Introduction The purpose of the preventive action plan is to identify the possible measures the Belgian government and the stakeholders in the gas industry can take in order to reduce risks that could occur in the gas supply chain. It gives an overview of the actions that already exist and makes an analysis of new actions that could be introduced. We already mention that a distinction will be made between risks that could have an impact on a local level, or incidents that could endanger the entire gas systems and therefore have possible effects on neighbouring countries as well. Our primary focus will be on the risk for the entire gas system. Risks that only have a local impact are part of the emergency planning of the transmission system operator and/or the distribution system operator. In the risk assessment a series of risks were identified. The risk assessment gives a first indication of the main risk for our gas security of supply. The actions to take to prevent and mitigate the risks are now taken up in the preventive action plan and in the emergency plan. Article 4 of the Regulation stipulates that the plans should be notified to the European Commission by December 3, In the first part of the preventive action plan, we will sum up the main elements from the risk analyses, notably what we consider as main threats for the Belgian security of supply (mainly incidents upstream that cause a complete shut off of one source of gas), the results of the N-1 calculation, an analyses of the reverse flows and the degree of diversification. Secondly, we will take a closer look at the supply standard and what will be done to enforce it. Thirdly, we will list up the generally accepted risks in the gas supply chain and what actions already exist in Belgium to mitigate them, and finally we will make an analysis of the market based and the non-market based measures that could be implemented in case of an emergency. On this last point, we can already point out that in Belgium most of the focus during a supply disruption lies on actions at the supply side. Momentarily, there aren t any possible actions that can be conducted on the demand side to reduce the impact of a supply disruption. However a study is being conducted to investigate possible actions that can be taken in the future. The preventive action plan will make an evaluation of the actions to take. The next step will be to effectively implement those measures with an accurate legal framework and a regularly follow up of those measures.

6 5 2. Context regulation 994/2010 The intention of the Regulation 994/2010 of the European Parliament and of the Council Concerning Measures to Safeguard Security of Gas Supply is to prevent the kind of gas crisis situations EU-27 experienced in January One of the means considered in the Regulation to achieve this target is performing a full risk assessment, a preventive action and emergency plan. As for the preventive action plan, article 5 of the Regulation stipulates the following on the content of the Preventive Action Plan: The national and joint Preventive Action Plans shall contain: (a) the results of the risk assessment as laid down in Article 9 ( CHAPTER 3); (b) the measures, volumes, capacities and the timing needed to fulfil the infrastructure and supply standards, as laid down in Articles 6 and 8 (CHAPTER 4); (c) obligations imposed on natural gas undertakings and other relevant bodies, including for the safe operation of the gas system (CHAPTER 5); (d) the other preventive measures, such as those relating to the need to enhance interconnections between neighbouring Member States and the possibility to diversify gas routes and sources of supply, if appropriate, to address the risks identified in order to maintain gas supply to all customers as far as possible (CHAPTER 6); (e) the mechanisms to be used for cooperation with other Member States for preparing and implementing joint Preventive Action Plans and joint Emergency Plans, as referred to in Article 4(3), where applicable (CHAPTER 7); (f) information on existing and future interconnections, including those providing access to the gas network of the Union, cross-border flows, cross-border access to storage facilities and the physical capacity to transport gas in both directions (bidirectional capacity), in particular in the event of an emergency (CHAPTER 8); (g) information on all public service obligations that relate to security of gas supply. (CHAPTER 5) This report is fully structured in function of above bullets and will attempt to address the respective elements.

7 6 3. Summary of the main results of the risk assessment As mentioned, in 2011 the Belgian Energy Administration as competent authority performed a risk assessment, which was based on the International Standard on risk management ISO that suggested by the Joint Research Centre (JRC) of the European Commission. This risk assessment was updated in Figure 1: Methodology risk assessment The methodology is structured in five steps: Step 1: Establishing the context of the Belgian gas sector Step 2: Risk identification Step 3: Risk analysis Step 4: Risk evaluation Step 5: Risk treatment This chapter will go deeper into some general results of the Belgian risk assessment, and more specifically results from the scenario analysis and risk evaluation (step 3 & 4). Risk treatment (step 5) is proposed for identified risks. Other, more specific results of the risk assessment (such as infrastructure & supply standards, diversification analysis, reverse flow analysis, ) will be discussed in separate chapters Risk & scenario analysis Five risk scenarios were identified in the risk assessment of which three incidents upstream and two scenarios with incidents internally in the Belgian network. The three upstream scenarios concerned an LNG disruption from Qatar (ex. through the closure of the Strait of Hormuz), a technical incident

8 7 on Zeepipe (supplies from Norway) and an incident on one of the L-gas pipelines coming from the Netherlands. The two scenarios we envisaged inside the Belgian gas network are an incident with the storage facility and an increased gas demand due to the nuclear phase out. Outside of those scenarios identified, technical incidents (pipeline burst, leakage, ICT breakdown, accidents, loss of power supply, explosion...) can occur anywhere else in the network. Table 1: Overview considered scenarios Category Scenarios Impact Likelihood Timeframe risk Threat/ hazard Provenance Duration Timing Severity 1. Political unrest in Middle East: LNG disruption scenario on 15/01 (Qatar) Political risk Severe Low Short term Hazard External 30 days Winter 295 GWh/d 2. Hurricane in North Sea: major outage of supplies from Norway on 15/01 Environmental risk Severe Very low Short term Hazard External 1 month Winter 411 GWh/day 3. Technical failure major pipeline: outage of supplies from the Netherlands on 5/02 Technical risk Severe Low Short term Hazard External 7 days Winter 77 GWh/day 4. Nuclear phase out Belgium and impact of increased gas supplies from Russia Political risk Noticeable High Long term Threat Internal & external / / n/a 5. Failure of Loenhout storage facility - all storage capacity out (15/7) Geo-political risk Noticeable Low Short term Threat Internal 2 months Summer 625 kcm/day As for any of the simulated scenarios, the impact on the gas flows in and to Belgium will be manageable for a certain period of time and the supplies to protected customers will not be impacted, we assume that this will be the case for either incident in the network. Of course, the impact of a technical incident in the Belgian network will depend on several conditions (timing of the incident e.g. during winter peak demand or summer, disproportion in the demand zones or supply entries in the Belgian network,...). For example, an incident on Zeepipe in the middle of winter will lead to the emergency phase in a couple of hours if the market is not able

9 8 to renominate the gas via other entry points within three hours. The impact of the closure of the Strait of Hormuz will be much harder to assess. First of all, in the risk analyses, we could see that the impact on the Belgian gas network would be manageable if supplies could be increased from other sources. However, as all of the Qatari gas would fall away due to a blockage in the strait of Hormuz, all European buyers of Qatar gas would draw on their additional supplies, which could come from the same sources as the Belgian supplies Risk evaluation In the risk evaluation, all risks (with its likelihoods and impacts) identified and analysed during the risk identification & risk analysis, are evaluated. Risk is acceptable => OK Risk is not acceptable => risk treatment/risk avoidance/risk transfer is needed. As for the risk evaluation, it is not feasible to guarantee a total protection of the entire Belgian gas supply. A reasonable risk threshold, that determines a realistic protection level, has to be defined. The level of the threshold will depend on several matters, most of all on: - the quantities of gas lost - the probability of the risks considered - the duration to cover The guarantee of a secure gas supply in Belgium comes at a cost. The higher the risk that needs to be covered, the higher the price tag. We can try to classify the risks according to the probability levels and the impact. The classification only gives a broad indication of the risks, as the impact of the same risk may vary according to the timing and the location of the incident. We have tried to take into account the most likely outcome of the incidents based on historical experiences. Table 2: Severity levels of consequences criteria Impact Description Minor Low Noticeable Severe Very severe Short-term disturbance of sector activity. No direct consequences to other sectors. Temporary disturbance of national gas supply. Consequences are eliminated by efforts of Fluxys Belgium alone. Impact of consequences of disturbance of gas supply on other sectors (heat supply) are negligible. Gas supply disruption to the area and necessity of back-up systems or alternative measures. The impact of the disruption of gas supply to other sectors is severe. (Load shedding) Long-term efforts required for restoration of gas supply. Impact on other sectors and protected customers.

10 9 Table 3: Assessment of the probability accidents Probability level Probability Average frequency of occurrence 1 Very low Less than once in 20 years 2 Low Once in 10 years 3 Medium Once in 3 years 4 High Once a year 5 Very high More often than once a year The risk matrix below (table 4) gives an overview of the main scenarios (see table 1) as identified in the risk assessment: Table 4: Risk matrix Probability Impact Very low Low Medium High Very High Minor Low Noticeable Failure Loenhout Nuclear phase out Severe Closure strait Loss supply Norway Hormuz; L gas scenario Very Severe Conclusion: From this risk assessment & analysis, we could conclude that the Belgian gas system has never had any serious incidents threatening the gas supply to protected customers. However, if there is an accumulation of circumstances (for example a pipeline blow during very severe winter conditions), the gas supplies to protected customer could be endangered Risk treatment Risk treatment (step 5) is not part of the risk assessment as such and is addressed in the preventive action plans and emergency plans. The main threats that we identified in the risk assessment are mostly of a technical nature. Indeed, most of the incidents in the gas network that occurred in Belgium were either pipeline blows (ex. Ghislenghien), or other short lived technical incidents on interconnection points, this on either side of the border. Fortunately, those incidents have always been handled without the system integrity being endangered and with no impact on the gas consumption of the protected customers.

11 10 In table 5, for the considered risks, we give an overview of possible risk treatment. Possible market based and non-market based measures will be described in chapter 6. Table 5: overview of the risks and risk treatment Risk Possible impact Acceptability Risk treatment Pipeline burst in Belgian network One part of a pipeline is hit. The impacted pipeline will be isolated and gas will be renominated via other routes. Possibility to reduce the risk Information on pipeline location through KLIM, maintenance of the infrastructure, cathodic protection, foresee bypasses, redundancy in the network Pipeline burst upstream No gas flows from a certain entry point to the Belgian network Risk acceptance Foresee enough other interconnection points to import gas via other routes Technical failure of utilities necessary to operate pipelines (compressor stations, SCADA s, control rooms ) Impact on the gas flows, depending on the duration, the location and gas demand Risk reduction Maintenance, back-up facilities, foresee sufficient incident means Failure of infrastructure due to impact Impact on the gas flows, depending on the duration, the location and gas demand Risk acceptance Preventive measures on infrastructure sites, concept design, protection of critical infrastructure Failure of infrastructure due to extreme weather Pipeline leakages may occur after extended periods of frost Risk reduction Preventive measures on infrastructure sites, concept design, protection of critical infrastructure Failure of infrastructure due to technical neglect or outdated technology Impact on the gas flows, depending on the duration, the location and gas demand Risk reduction Pipeline maintenance and design Loss of power supply/electricity black-out/brown out Loss of compression Risk reduction Back-up power generation or compressor stations operated on other power source

12 11 Intentional sabotage Impact on the gas flows, depending on the incident, the duration, the location and gas demand Risk reduction Protection of critical infrastructure Virus/cyber attack Destabilisation of SCADA Supervisory Control and Data Acquisition Risk reduction Computer Emergency Response Team (CERT) Sudden gas peak demand (e.g. Due to cold wave) Interruptions to end consumers Risk reduction Introduction of supply standard Commercial disputes/supplier default Shortfall in gas supplies, interruptions to end consumers Risk reduction Financial check through obtaining supply license Strikes in gas sector Blockage of gas infrastructure, no staff for control room, Risk reduction Conclude minimum service agreements Floods/landslides/earthquakes Damage to infrastructure Risk reduction Preventive measures on infrastructure sites, concept design, protection of critical infrastructure With respect to the risk of a loss of power supply/electricity black-out, a serie of preventive actions are taken by the Transmission System operator of Natural Gas, Fluxys Belgium, in collaboration with the Transmission System Operator of the Electricity Grid Elia, National Regulatory Authority CREG and the Belgian Energy Administration, in order to assess and minimise the impact of a loss of power supply/electricity: A black-start study has been conducted to assess the possibility and the conditions under which Fluxys Belgium can assist Elia in rebuilding the balance of the Electricity Transmission Grid by supplying a natural gas to black-start power plants. On the other hand, Fluxys Belgium provided a list of Installations to Elia together with priorities indicating their necessity for safeguarding the security of gas supply when load shedding is applied in the Electricity Transmission Grid Finally, Fluxys Belgium established an emergency plan specifically aimed at actions to be undertaken in case of an emergency situation in the Electricity Transmission Grid and invested in Back-up power generation.

13 12 Belgium has also participated during summer 2014 to the European study on the impact of a scarcity of natural gas coming from Russia and/or via the transit route through Ukraine during the winter (the stress test scenario). The result of the stress test for Belgium indicates that the Fluxys Belgium TSO network is quite interconnected and supply sources quite are diversified Diversification analysis In above table, we mainly took into account the risks for gas supply on the Belgian national territory because we assume that upstream risks are out of our power to treat. The main remedy is to have well diversified supply routes. Belgium has a well-diversified gas portfolio and supply network for H-gas that allows looking for alternative supplies in case of a supply disruption. We had already mentioned in the risk assessment that the suppliers no longer manage their portfolios according to the demand of the consumers in a specific country, but they keep rather EU-wide portfolios. On the one hand, this makes it very difficult to determine the supply portfolio destined for the Belgian market. On the other hand, it increases the flexibility of the suppliers to deal with an emergency somewhere in the European market. Mostly they have storage available in other countries and access to flexible contracts and more diversified supply routes. This means that renominations should also be easier to handle in case of an emergency. Figure 2: Physical flows of natural gas into Belgium in 2013 Source: FPS Economy It is however necessary to keep in mind supplies can only be re-routed if the suppliers have access to upstream capacity to enter the gas in Belgium through another entry point or to make use of the secondary capacity market. The supplies of L-gas originate mainly from the Netherlands. The availability of L-gas on the market can normally be guaranteed because the Dutch system no longer makes a difference in the gas quality, the Dutch network transmission operator can convert H-gas into L-gas by ballasting it.

14 13 Natural gas can enter the country through a series of entry points on the natural gas transmission network. LNG supplies come mainly from Qatar by long-term contracts, via the Zeebrugge terminal and accounted for a share of 4% of the physical flows into Belgium in Natural gas customers who use L-gas are supplied directly from the Netherlands. Figure 3: Distribution of the entry volumes in 2013 Source: CREG; *The entry points of Blaregnies are opposite to the physical flows (reverse flows) by making use of the dominant transits on these points In order to increase the flexibility of the system and to increase the security of supply, the TSO works with an Entry-Exit model. The main advantage for the security of supply (mainly for the H-gas network) of the Entry-Exit model is the increased flexibility that is introduced through: only one balancing point for H-gas (imbalances over the currently three H-gas balancing zones will automatically be re-distributed to create virtually one balancing zone) and one for L-gas on which intraday balancing will be applied; introduction of a virtual trading point for H-gas; free exchange of quantities of natural gas from any interconnection point within the Belgian system to any interconnection point or domestic exit point. 4. Infrastructure & supply standard 4.1. Infrastructure standard (N-1) The N 1 formula describes the ability of the technical capacity of the gas infrastructure to satisfy total gas demand in the calculated area in the event of disruption of the single largest gas infrastructure during a day of exceptionally high gas demand occurring with a statistical probability

15 14 of once in 20 years. Gas infrastructure includes the gas transmission network including interconnectors as well as production, LNG and storage facilities connected to the calculated area. The technical capacity of all remaining available gas infrastructure in the event of disruption of the single largest gas infrastructure should be at least equal to the sum of the total daily gas demand of the calculated area during a day of exceptionally high gas demand occurring with a statistical probability of once in 20 years. In the risk assessment, we noted that transit flows to neighbouring countries are not taken into account for the calculation of the N-1 standard. Therefore, the N-1 calculation assumes that all the gas flows are destined for the Belgian domestic market. In practice, this is not the case. To take into account the gas flows for the neighbouring countries, it could be useful in the future to calculate the N-1 standard at regional level. For Belgium, the N-1 calculation for the H-gas infrastructure gave a result of 172,34% in 2011 and 162,48% for This means that the full demand could be covered during a day of exceptionally high gas demand in the event of the disruption of the single largest gas infrastructure. The single largest gas infrastructure for Belgium is IZT, the interconnector between UK and BE. We refer to the risk assessment for the detailed calculation of the N-1 formula. No demand side measures were taken into account for the calculation of the N-1. The table below gives an overview of the N-1 calculations up to 2020 bases on the capacity expansions in the investment plan of Fluxys Belgium (see also chapter 8). We took the most restrictive approach for this calculation, based on the minimum of the available capacity between the Fluxys Belgium network and the TSO network. We can state that even with the most restrictive approach, Belgium has sufficient capacity available to meet the N-1 criteria. Table 6: Based on Fluxys capacity and loss of Interconnector pipeline N-1 Calculation (mcm/day) Date D max H 88,01 89,3 D eff H 0 0 EP m H 229,92 263,72 P m H -9,6-9,6 S m H LNG m H 45,6 45,6 I m Interconnector 64,8 74,4 N-1[%] 246,7% 270,0%

16 15 Table 7: Based on min(fluxys, adjacent TSO) capacity and loss of Interconnector pipeline N-1 Calculation (mcm/day) Date Dmax H 88,01 89,3 Deff H 0 0 Epm H 229,92 263,52 Pm H -8,64-8,64 Sm H LNGm H 45,6 45,6 Im Interconnector N-1[%] 248,7% 282,7% As from 2016, the new interconnection point at Alveringem will be added to our network (new pipeline from the LNG terminal in Dunkirk in France to Belgium) Supply standard According to article 8 of the regulation, the gas undertakings have to be able to supply the protected customers of the Member State in the following cases: - Extreme temperatures during a 7-day peak period occurring with a statistical probability of once in 20 years - Any period of at least 30 days of exceptionally high gas demand, occurring with a statistical probability of once in 20 years - For a period of at least 30 days in case of the disruption of the single largest gas infrastructure under average winter conditions The gas undertakings that will need to live up to those standards are all gas undertakings that deliver gas to the distribution network. In our risk analysis, we already tried to convert the above standards in more concrete criteria that can be applied and checked on a transparent basis. First of all we had to check what temperature profile corresponds to the 7 day peak period occurring with a statistical probability of once in 20 years. For this period we had identified the number of degree days and the equivalent temperature, based on historical data of the last 100 years. This way we can establish a profile that can be used to simulate gas demand. For the 7 day peak period, we obtained the following result:

17 16 Table 8: Degree days and equivalent temperature for the 7 day peak period occurring once in 20 years begin end Degree Day/Equivalent temperatures Sum/mean 28/12/1996 3/01/ ,1 23,3 20,1 23,1 26,9 27,4 25,3 169,2-6,6-6,8-3,6-6,6-10,4-10,9-8,8-7,7 1/01/1979 7/01/ ,6 24,6 23,7 22,9 24,6 25,7 22,9 170,0-9,1-8,1-7,2-6,4-8,1-9,2-6,4-7,8 17/01/ /01/ ,6 26,9 26,2 22,8 22,9 23,9 22,3 168,6-7,1-10,4-9,7-6,3-6,4-7,4-5,8-7,6 17/12/ /12/ ,4 23, ,8 25,6 23,6 23,4 169,3-6,9-7 -7,5-9,3-9,1-7,1-6,9-7,7 19/01/ /01/ ,5 25,6 23,5 26,5 24,6 23,6 22,2 170,5-8 -9, ,1-7,1-5,7-7,9 Average 24,0 24,8 23,5 24,2 24,9 24,8 23,2 169,5-7,5-8,3-7,0-7,7-8,4-8,3-6,7-7,7 Source: FPS Economy For the 30 day period of peak demand, we obtained the following results for the degree days based on the historic data of the last 100 years: Table 9: Average Degree Days (DD) per peak period and amount of DD with 5% risk 5 6 Consumption Slope 1 month month month 1 year due to 1 day 7 days 30 days 150 days 180 days 365 days Central Heating (CH) Average Linear Varying 100 years 21,2 133, in function of DD Peak 5% 100 years 26,8 169, Others than CH Constant 3,3 22, Total Average 100 years 24,5 155, Peak 5% 100 years 30,1 192, Source: FPS Economy The volumes (energy in kwh) and the transport capacities (in m³(n)/h) corresponding to the supply standards are given in the following tables 10 and 11. The fact that in Belgium, two types of gas are distributed, leads to two values, one for the protected customers in the low calorific gas zone and one for the protected customers in the high calorific gas zone. These values were based on the gas year and can be re-actualized with the last data available (transfer of costumers from the low calorific gas market to the high calorific gas market, growth on the distribution network, ). Due to the cold spell in gas year these values however are quite representative for a winter colder than average. For H and L gas we will apply respectively the conversion factor energy/volume of 11,3 KWh/m³ and 9,77 kwh/m³. The following tables will included under chapter 4.2 (page 16) of the preventive action plan. Table 10: volumes (in TWh) corresponding to the supply standard

18 17 H (TWh) L (TWh) 7 days (5% climatic Risk) 2,95 2,83 30 days (5% climatic Risk) 10,87 10,30 30 days (50/50 climatic Risk) 9,14 8,56 Table 11: capacities (in m³(n)/h corresponding to the supply standard. H (m³(n)/h) L (m³(n)/h) 7 days (5% climatic Risk) days (5% climatic Risk) days (50/50 climatic Risk) To enforce the supply standard, the suppliers to the Belgian market will need to contract enough gas to meet those criteria for the 7 day peak demand, the 30 day peak demand and sufficient supplies through alternatives routes in case of a disruption of the largest gas infrastructure. As such a standard does no longer exist in Belgian national legislation, Belgium will introduce a new legal framework that obliges suppliers to foresee enough gas to supply the 7 day peak period. In the past, the following criteria were applicable in the Belgian market: 1. A transport capacity covering the hourly peak demand of -11 Ceq (statistical risk of 1 in 20 years) 2. The gas volumes need to be able to cover the gas demand linked to the winter peak of 1962/1963, the coldest year in the century (statistical risk of 1 in 95 years) 3. A gas volume covering gas demand for a 5 day peak period between -10 Ceq and -11 Ceq (average temperature during the day measured at Uccle with a statistical risk of 1 in 95 years) According to our calculations above, the peak winter peak value occurring once in 20 years is still -11 Ceq, we will opt to reintroduce these standards by law. The above criteria fall into two parts. The first part is the infrastructure obligations and the second part is the molecule obligation. For the infrastructure calculations, the TSO still bases its calculations in the investment plan on the -11 Ceq hourly peak criterion. By introducing the same criteria for the shippers, both the molecule standards will be in line with our infrastructure standard. An improvement is already made through the introduction of the new entry-exit model. The TSO will calculate the needed capacity per aggregated receiving station (ARS) to cover the full demand distribution network behind that specific ARS at -11 Ceq. The shippers and suppliers will then be forced to book the capacity calculated by the TSO in order to cover the winter peak demand and to avoid free riding. This way, at least the capacity is already in place to cover the peak demand. To solve the issue of the molecule obligation, the question remains how the government will monitor if the suppliers live up to the molecule standard. A possible option is to launch an annual winter information request on demand and supply portfolio of the suppliers. This information is

19 18 intended to assess the security of supply situation for the approaching winter. Requested information could amongst others include: the supplier s/ shipper s anticipated supply portfolio, including the source of contracted supply (e.g. National Balancing Point, Liquefied Natural Gas (LNG) imports and storage) demand information, including the volume of interruptible contracts and volume of demand that is not yet met by existing supply contracts. Information on the supply-demand portfolio could be requested for various scenarios such as the 7 day peak demand, the 30 day exceptionally high demand and in case of the disruption of the single largest infrastructure. This way, suppliers could be asked to provide demand and supply information for the entire winter as a whole or for different periods in winter (e.g. September to November and December to February). We would like to note that it is sometimes difficult to obtain data that can be aggregated consistently. Suppliers hold information in different formats and it has been difficult for some suppliers to provide the requested information in the required format. Given that contractual positions can change rapidly, there is also a question about the usefulness of such information. Furthermore, we will need to look at the consequences that can be imposed on shippers that cannot fulfil the supply standard, for example some sort of financial penalty. A second option is to adjust the licence conditions. The licence condition could require suppliers to prove that they can meet demand under specified security of supply standards. If companies fail to prove compliance with these standards, then this would constitute a licence breach. This would be assessed ex-ante before an emergency occurs and would not affect company s behaviour in or immediately prior to an emergency. In general, a licence condition benefits from not favouring a particular source of demand or supply flexibility above others. However, supply solutions do implicitly deliver different types of flexibility in terms of response time and certainty of delivery. This might need to be taken into account when designing an ex-ante license condition. In this case, such an obligation may increase the number of long-term supply contracts, as a means of demonstrating compliance with the obligation, which could potentially dampen market innovation. There is a risk that relying on an ex-ante assessment could be somewhat ineffective since suppliers could rapidly change their contractual positions following compliance with the license condition. An ex-post license condition could significantly reduce monitoring costs. In addition, given the potentially significant consequences associated with a license breach, we think that this requirement could be effective in ensuring suppliers take adequate measures to protect their firm customers. However, there are legal risks associated with this option as parties might disagree for example, on whether a supplier has used best endeavours to avoid a gas deficit. In order to implement the above mentioned measures, a new legal framework to enforce the supply standard for identified consumers (based on the regulation 994/2010) has been drafted. The supply standard enforces suppliers to have enough natural gas in their portfolio to first of all cover the peak demand that will be set at an equivalent temperature of -11 Ceq of their identified customers connected to the distribution grid and this for a period of at least 7 days. Secondly, to cover a winter period of exceptional high natural gas demand and thirdly, to cover the natural gas demand of their

20 19 customers connected to the distribution network for a period of at least 30 days in case of a disruption of the single largest gas infrastructure. The Administration will define a clear standard (e.g. the winter period could be defined by royal decree) for those thresholds and communicate them to the suppliers, but without being responsible if any natural gas disruption might still occur even if the suppliers all meet the standard. Another option is to make the natural gas suppliers responsible if any shortage of natural gas (for identified consumers) occurs during a winter peak demand or if there is a disruption in single largest and only have an ex-post checks on the companies. This could however lead to serious discussions about which supplier is responsible afterwards. A measure that is already in place to make sure suppliers deliver gas to Belgian end-users, is the daily market balancing regime. The Belgian TSO monitors the balance between entry and exit on a cumulative basis for all hours of a given day and intervenes in order to keep the system balanced at all times. Two kinds of interventions are possible: Within day interventions End of day interventions Within day interventions: In case the market balancing position goes beyond the upper (or lower) market threshold, the Belgian TSO intervenes through a sale (or purchase) transaction on the commodity market. The considered volume is then settled in cash with the grid users (s) contributing to such imbalance in proportion of their individual contribution. Grid users are penalized by 10% of the Belgian TSO price for the settled volumes. End of day interventions: At the end of the gas day, each grid user is returned to zero by a settlement in cash: Grid users helping the system pay or paid the Belgian TSO price

21 20 Imbalance causing grid users pay or paid the Belgian TSO price and pay an additional penalty of 10% price on their contribution to the market settlement exceeding the end of day market tolerance of +/- 2,5 GWh/d. Conclusion To conclude, there is no supply danger if a supplier doesn t fulfill its contractual engagements related to its clients. In case of an imbalance of the market, the Belgian TSO will identify the supplier(s) that caused the imbalance and a penalty needs to be paid (depending on kind of intervention needed to balance system) Interruptible & protected customers Energy end-users include residential and commercial customers as well as industrial firms and electric utilities. These customer groups have different energy requirements and thus quite different service needs. In the natural gas market, consumers can contract for either firm or interruptible service. Residential and small commercial customers such as households, schools, and hospitals use natural gas primarily for space and water heating and need reliable supply. Such customers require on demand service with no predetermined quantity restrictions, known as firm service. In contrast, larger commercial, industrial, and electric utility customers could have fuel switching or dual-fuel capabilities (which is rarely the case in Belgium) and could receive natural gas through a lower priority service known as interruptible service. In theory, energy supply reliability could be effectively handled at the customer level ability to switch quickly to an alternative fuel. Therefore, some countries distinguish between protected customers for whom most of the capacity offered is firm capacity. In Belgium, interruptible capacity is only offered if all the firm capacity is booked by the shippers End-users on the distribution network The definition of protected customers in the regulation states that protected customers include all household customers connected to a gas distribution network and can also include small and medium sized enterprises and essential social services connected to the gas distribution network provided that these additional customers do not represent more than 20% of the final gas use. The regulation defines the protected customers as all household customers connected to a gas distribution network and may also include: - small and medium-sized enterprises connected to the distribution network and essential social services connected to the gas distribution or transmission network if they do not represent more than 20% of the final gas use - district heating installations to the extent that they deliver heating to household customers and to customers mentioned above provided that these installations are not able to switch to other fuels and that they are connected to the distribution or transmission network.

22 21 For Belgium the protected customers are defined as all customers connected to the distribution network. One of the reasons is that a selective shut off is not possible on the distribution network. Protected customers represent about 50% of the total gas demand. Most of this demand stems from household consumers. It might be useful to study (in consultation with the distribution network operators) if it could be possible for the tele-measured clients to reduce their consumption in case of an emergency. Table 12 gives a detailed overview of the consumption profiles on the distribution network during the winter peak. Table 12: Consumption profiles and their representation on the distribution network S30 S31 S32 S41 S31+S32+S41 H 10,13% 12,63% 19,90% 57,34% 89,87% L 13,34% 12,14% 19,62% 54,91% 86,67% There are 4 consumption profiles on the distribution network: S30, S31, S32 and S41. The household customers are represented under category S41. Their consumption is heavily reliable on the outside temperature. The other three profiles dispose of a VAT number and correspond to the tertiary, commercial and industrial sector. The profiles S31 and S32 are the non-telemeasured clients. S31 are the commercial clients that consume less than KWh/year, S32 clients consume more than KWh/year. The gas consumption of those clients is dependent on the outside temperature so they are close to household consumers. It is however not possible to get a more clearer explanation of the type of consumers under categories S31 and S32, under category S31 there are for example combined profiles with residential and business use, S32 consist mainly of a significant part of professional components that are influenced by a residential behavior for example hospitals, nursing homes, The profile S30 represents the telemeasured clients. Those are the larger clients with an hourly counting of the gas consumption (hospitals, administrative buildings, large supermarkets, ) connected to the distribution grid. We can see that the gas consumption of these consumers (except for the hospitals) is less dependent on the outside temperature. The consumption of those clients represents less than 20% of the total gas demand. In category S30 and to a lesser extend in category S32 there are non-eligible consumers i.e. consumers which are not eligible in the definition contained in art. 2(1) of the Regulation. First of all the impact is very limited due to the following reasons: Numbers of non-eligible customers is limited as far as technically possible

23 22 The Belgian transport network is a well-connected network and well-present in all the regions on the most strategic places. Because of this connectivity it is often possible to connect large industrial clients and power plants (about 250) directly to the transport network (transport pipeline is nearby the industrial plants). The costs to connect them to the transport network are not significantly greater than the total costs to connect them to the distribution grid. On other hands, it is economically more advantageous for an industrial customer to be connected to the transport network than the distributor network, as the costs for the first are far less important than those of the second, what still constitutes an incentive not to be connected to the distribution network. Only a very small part of the industrial clients is still connected to the distribution network. Added volume due to non-eligible customers on distribution network is also limited When looking at the total gas consumption in Belgium, which is 183,2 TWh in 2013, protected customers (i.e. eligible in term of the definition contained in art. 2(1) of the Regulation 994/2010) on the distribution network will consume at least 79,23 TWh and the non-eligible customers less than 15,85 TWh. The total percentage of end-users on the distribution network that don t comply with Article 2 of the Regulation is less than 8,65%. Indeed, this 15,85 TWh has to be considered as an overestimated volume. This volume of energy contains the volume consumed by larger essential social services like hospitals and a small part of SMEs, which meets the definition of protected costumers. But due to the fact that there are referenced under category S30, there are considered as non-protected costumers in our calculation. We must also add that a small amount of industrial clients within the S32 and S30 categories have a contract that allows them to be interrupted in case of for example extreme cold weather 2. This indicates that this percentage is definitely overestimated. The impossibility to fully dissociate on distribution network protected customer (cfr. art 8(1)) from non-eligible user (cfr. art 8(1)) due to technical reasons S30 and the estimation of the remaining 1/4 of S32 (estimated number 2000 clients), connected to the distribution network, these clients should, based on our estimation, be considered as not compliant with the definition of protected costumers. The only relevant information available about the distribution today is related to the annual consumption of the customers on this network. In function of this information (annual consumption of the different categories), we have been able to estimate the volume and the number (but not identify) belonging in the different categories foreseen In the regulation (i.e. household customer, SME and others (Industries and large industries)). Due to the fact that those clients are not referenced in the database of the suppliers or the distribution network companies as SME s or little, middle or large industrial clients, there can t be individually identified as such (no bottom-up information (local or regional) but only through topdown information (federal)). Furthermore, usually, those non-eligible customers do not have their consumption monitored on an hourly basis. It can t therefore be expected to control if they consume gas or not in case of curtailment situation. So for more than 80% of these customers, it isn t possible 2 CREG study: de prijzen op de Belgische aardgasmarkt in 2013, december 2014

24 23 today to monitor the respect of the curtailment on the distribution network. Due to the above limitations, it is today not foreseen to curtail these categories of customers. Only 1000 of the remaining clients have today their consumption monitored hourly. As far as the monitoring is concerned, the situation could evolve in the future if the number of clients with tele-measured gas meter increases. No impact on compliant with art 8(2) First of all, there is enough capacity available in Belgium on the transport network to permit the free flow of commodities. The transport capacity allows the gas undertakings to have an easy access to all neighboring trading places, to the LNG facilities in Zeebrugge and also direct access to producing counties (as NL and Norway). Even under extreme winter conditions 3, the capacity needed to transport the gas will not be affected due to these increased volumes to some non-protected customers (cfr. art8(1)) on distribution network. The flow chart shows clearly that the transit from or to other EU countries through Belgium can be about 2-3 times higher than the correlated consumption of Belgian internal market. Secondly, the probability that this extra volume allocated to non-protected users (cfr. art 8(1)) could have any impact one day is very very low. Thirdly, even if this unlikely event would occur, a regional authority competent in Belgium for the distribution networks has foreseen a legal possibility to curtail (reduce) the consumption of some customers on the distribution network in case of absolute necessity or technical problems, and this, even if the technical instruments to control or monitor the respect of this kind of curtailment obligations are not always in place. Conclusion Even if Belgium is not able to totally dissociate non eligible consumers relating to article 8(1) of the regulation on the distribution network, nevertheless, we are convinced that this increased supply of non-eligible customers does not have any relevant impact on the compliance with the regulation 994/ End-users on the transport network Contrary to the protected customers, the gas supply to industrial consumers connected to the Fluxys transport network could be interrupted. Historically, the infrastructure for transporting and delivering natural gas is designed and operated primarily to meet the need for firm service. Because the peak demand for natural gas tends to be seasonal, interruptible service contracts allow pipeline and distribution system operators to increase on of their fixed assets and better manage costs of service on average. These arrangements allow operators to maximize economic efficiency by meeting the needs of their committed firm service customers while providing delivery during off 3 Risk assessment Belgium, 1st update, Annex III, Annex IV, Annex V

25 24 peak periods to interruptible and seasonal customers. In the past, these arrangements provided opportunities for large-volume energy consumers such as industrial firms and electric generators to attain lower-cost energy supplies. There are two kinds of interruptible contracts: 1. Supplier interruption: Suppliers have the right to interrupt the customer, normally in return for a discount on price and with some notice in advance. The notice period will be specified in the energy contract. Most interruptible contracts specify that there will only be a few hours notice, unless it is specified otherwise in the contract. Customers with an interruptible contract have agreed to receive gas but are willing to have supply interrupted at some point, according to the reasons in the contract (mostly meteorological circumstances) and for a maximum amount of hours or days. Interruptible contracts are more and more disappearing from the stage. This is due to the fact that the attributed discounts are no longer a sufficient incentive on the longer term. In the industrial sector, interruptible contracts account for less than 5% of the total contracted volumes between end users and suppliers. Interruptions are also limited to force majeure events. For the power plants, we also see a tendency towards more firm contracts (depends a lot on the supplier). 2. Transporter or border-to-border interruption: The TSO has the right to interrupt supply (this is to interruptible contracted customers) in the network for operational reasons under normal circumstances. Again this will be covered in the transmission contract signed by the network user. Interruptible capacity is hardly booked by the shippers because Fluxys Belgium only offers interruptible capacity to the market if there is no firm capacity left. Even if Fluxys Belgium would offer interruptible capacity, the price difference between interruptible and firm capacity has become too small to be an incentive. Therefore we can say that interruptible capacity for the shippers is negligible in Belgium. We have to be clear however that the above mentioned interruptions are separate to other interruption rights, which exist for use only in potential or actual emergency situations. In emergency situations, some companies can reduce demand considerably when prices are high or maintain production by switching to back-up fuels. However, they still need to maintain a certain level of gas to keep systems going and to let their plant safely shut down. At any point an accident could damage a major part of the gas infrastructure and cut off supply. Some gas users have back-up systems and fuels to switch to in the event of an emergency or if commercial incentives make using an alternative fuel source preferable. Not every gas user has back up fuels (most of the end consumers in Belgium do not have back up fuels), so the gas system and the procedures that exist within it are designed to minimise the risk of gas being switched off from those who don t expect it to be (those not on interruptible contracts). Appliances for commercial premises generally incorporate flame out safety devices. These allow for supplies to be quickly and safely reinstated following a cessation in gas supplies.

26 25 In the unlikely event of an emergency, the safe provision of gas to domestic users and other low volume users (all connected to the distribution network) is the top priority. Before firm customers are interrupted, emergency plans provide for the suspension of the normal market for gas. After the suspension, it will depend on how quickly gas supply and demand is balanced, before firm customers start to be interrupted. Before firm customers are interrupted, firm border-to-border transmission will be interrupted. Public appeals may take place asking the public to restrain gas usage but this would depend on the type of emergency Stress test As ask by the European Commission a stresstest was conducted to see if the Belgian gas network could cope with the 4 given scenarios: Disruption Ukrainian route for 1 month Disruption Ukrainian route for 6 months Disruption of all Russian gas to Europe for 1 month Disruption of all Russian gas to Europe during 5 months N-x analyses Different possible cases were calculated which could be possible on the Belgian network, also linked interruption scenarios were taken into account. Complete disruption of the Interconnector Complete disruption of the Eynatten 1 and 2 entry points Complete disruption of the s Gravenvoeren entry point Complete disruption of the Eynatten 1 and 2 entry points and the underground storage facility of Loenhout Complete disruption of the Eynatten 1 and 2 entry points and s Gravenvoeren entry point Complete disruption of the Eynatten 1 and 2 entry points and the Interconnector Complete disruption of the Eynatten 1 and 2 entry points, the Interconnector, the underground storage facility of Loenhout Based on the N-x analyses it can be concluded that the entry capacity for the Belgian market is high enough to cover a complete disruption of Russian gas coming to Belgium Scenario analysis In the scenario analysis which was made did not show an insurmountable problem on the Belgian gas supply during an average winter period. Based on the made assumptions there is always a solution to cover the Belgian gas supply. However the scenario left out the months of March and April which are (based on the climatic data of the last years), two cold months at the end of the winter period with a possible higher use of gas than the months of September and October Commodities analysis The commodities analysis shows that 90% of the Belgian market is supplied by 6 players. The possibility exist that about 12% of the Belgian market is supplied by gas coming from Russia,

27 26 however because the supply contracts are not for one end-user market but also contract gas for other Member States, it is not possible to know what the real amount of Russian gas will be used to cover the needs of the Belgium customers. When the suppliers make use of a specific gas contract and for which market(s) is completely dependent on their decision on possible opportunities and needs. In comparison of the last 3 years the underground storage facility of Loenhout was more filled and so more prepared for the winter period. The use of this storage facility is however completely market-based.

28 27 5. Obligations imposed on natural gas undertakings and other relevant bodies, including for the safe operation of the gas system Next to the future supply standard, the PSO s are the main imposed obligations in Belgium 4. A second part of this chapter will focus on the safety policy of the TSO with regard to the quality and maintenance of the network Public Service Obligations (PSO s) There is specific legislation related to public service obligations (PSOs). As required by the security of gas supply regulation, the legislation related to PSOs was communicated in February 2011 to the European Commission. Hereafter those PSOs are described National legislation Article 15/1 of the Gas Act (12/04/1965), modified by article 20 from the law of 01/06/2005: general obligation related to the responsibility of the exploitation and development of the gas installations Article 15/11, 1 of the Gas Act (12/04/1965), modified by article 109 (law of 22/12/2008) and article 5 (law of 27/02/2003) = PSO on the necessary investments (al.1 ) and on both the regularity and quality of supplies (al. 2 ) Royal Decree of 16/12/1999 giving a list of priority consumers in case of supply disruption Ministerial Decree of 23/10/2002 related to PSOs in the gas market = implementing decree for already mentioned article 15/11, 1, al.1 (Gas Act of 12/04/1965) and indicating specific cases where supply disruption is authorized Article 1 of the Gas Act (12/04/1965), modified by article 2 from the law of 11/6/2011: Law to amend the Act of 12 April 1965 on the transport of gaseous and other products by pipeline Article 1,2,15/13 of the Gas Act (12/04/1965), respectively modified by article 55, 56, 86 from the law of 08/01/2012: Law to amend the Act of 29 April 1999 on the organization of the electricity market and the Act of 12 April 1965 on the transport of gaseous and other products by pipeline Ministerial Decree of 18/12/2013 establishing the federal emergency plan for natural gas supply 4 For Belgium, the bullets (c) and (g) in article 5 of the Regulation are practically the same.

29 Regional legislation (distribution network) The Flemish «Energy Decree» on energy policy (08/05/2009) concerning i.e. the DSO s responsibilities (art ) and Public Service Obligations imposed to DSO s & suppliers (art , , , , 6.1.1, , 7.5.1) The Flemish «Act» on energy policy (19/11/2010) concerning the organisation of the gas market including Public Service Obligations (several articles under Title III) The Flemish «Technical Regulation Gas Distribution» by Ministerial Decree (21/01/2010) concerning Planning Code (Chapter II) The Walloon «Decree» on gas market (19/12/2002) concerning i.e. the DSO s responsibilities (art. 12) and the Public Service Obligations imposed to DSO s & suppliers (art ) The Walloon «Decree» on gas market (19/12/2002) concerning i.e. the DSO s Investments Plan called Adaptation Plan (art.16) aiming to ensure the continuity of supply, the safety, the development and the extension of the network The Brussels «Ordonnance» on gas market (01/04/2004, modified by Ord and by Ord ) concerning i.e. the DSO s responsibilities and tasks (art. 5) and the Public Service Obligations imposed to DSO s & suppliers (art. 18) The Brussels «Ordonnance» on gas market (01/04/2004, modified by Ord. 14/12/2006 and by Ord ) concerning i.e. the DSO s Investments Plan (art. 10) aiming to the continuity and the security of supply 5.2. Quality & level of maintenance of the network Fluxys Belgium, the TSO, is responsible for the quality and the maintenance of the network. One of the main concerns is the quality and reliability of its network. A lot of the attention goes to the choice of materials. The high-pressure pipelines are made of the highest quality steel and meet all applicable European and international standards. The pipes undergo stringent quality-control procedures at the factory and these procedures are overseen by a recognised independent inspection body. The pipes also have a synthetic coating system and are fitted with a cathodic protection system to prevent external corrosion. Also, a tracking system that monitors the quality and reliability of operation of its transportation network and transportation services has been developed. The report of this tracking system takes into account the situations in which subscribed transportation services were interrupted or reduced. During 2013 neither reductions nor interruptions of firm services were observed. The maintenance periods are planned in consultation with adjacent TSO s and customers connected to the transmission network. The work and intervention overview published on the Fluxys Belgium website lists the works and interventions planned for the current year that could affect the execution of the transmission contracts. The overview is updated each month for the current calendar year.

30 29 Internal Line Inspections ( ILI also called I-pigging) have been performed for several years. The targeted frequency is an inspection of each line every 7 to 10 years. Pigging results, when validated, can lead to requests to further physically inspect the condition of the pipeline. These examination works are performed with a priority depending on the type of issue discovered during the I-pigging run. All lines are not accessible Internal Line Inspections for various reasons (geometry of the line, gas flow, presence of pig traps, ): At the moment 75 % of the Belgian high pressure network is piggable. The Belgian TSO is conducting a program to improve this ratio, at the same time that research en development is running to develop other methodologies of inspection in order to cover 100% of the network. The maintenance of the network is supported by a centralized management system (SAP Plant Maintenance) and is based on Plants Orders generated by this system. Different tasks are performed to ensure the maintenance and the monitoring (preventive maintenance) of the network. Pipelines are scraped (pigging) systematically in a defined interval (cleaning of the pipe, scraping and rinsing, any repairs). Area lines are perpetually maintained (pruning, weeding) and the special points (air passages, pipelines in rivers) are subject to appropriate supervision (bridges, diving). Patrols by helicopter flights are performed on the main sections on a regular basis (daily for mains pipelines to 2x a week or fortnight for the entire network). Moreover, this air surveillance is supplemented by patrols by car (1x per month for pipelines) and foot patrols throughout the network (1x per year). Point measurements of predetermined gases are also conducted as part of these patrols: during the helicopter flights with the CHARM-system (unique system equipped by only one helicopter in Germany and leased by Fluxys Belgium) and during the pedestrian supervision. Finally, monitoring of third-party works (work sites nearby high pressure pipelines) is performed during these different interventions and tends to be even sharper, thanks to new technologies in place or planned (detecting work by optical fiber and shock on a pipeline detection via the ThreatScan system). One of the challenges is the replacement of the aging gas infrastructure where necessary. Fluxys Belgium is currently looking into some replacement investments between Poppel and Blaregnies where part of the pipelines will be replaced on the section after Weelde in Overview preventive measures In this chapter, we will make an evaluation of the possible measures (supply side & demand side) and attempt to assess the most efficient means that can be used to reduce the impact of an incident. We will discuss each measure separately. For each of the measures we will check if they are already applied in Belgium, what the potential impact is of the measure, what the potential costs are to apply it, if the measure could be carried out and supported by the gas sector and what actions would be necessary to execute the measure in Belgium. In Annex 1, we will provide a table with an overview of the most important comments per supply side market based measure. In Annex 2, the same is done for the demand side market based measures.

31 Supply side & market based measures Increased import flexibility (through long term and short term contracts) Increased import flexibility is already applicable in Belgium. Most companies have access to flexible contracts. This either included in their long term contracts (mostly a provision is foreseen of 85%- 115% or 90%-110% of the contracted gas that can be taken up), or they dispose of forward contracts on the European Hubs. Companies can either buy all their gas to cover the winter demand at -11 C with forward contracts, or they can foresee gas to cover the average winter demand, and if necessary buy additional gas on a short term basis. There is no obligation in Belgium to dispose of flexibility in the supply contracts. This is solely done on a company basis. A total picture of the costs of the flexible contracts is very hard to obtain as the costs for flexibility differ according to the contracts. Every single company can have multiple contracts and prices which may vary substantially, so it is impossible to give an estimate for Belgium as a whole. The import flexibility is monitored by an obligation on the gas companies to report on their gas contracts. This monitoring is done by the CREG, the Belgian Energy regulator and the Energy Administration. The Energy Administration has asked the CREG to provide a detailed study on the flexibility of the gas contracts. This study will serve as a starting point for future evaluations. The regulation 994/2010 gives the competent authority a sufficient basis to monitor the gas contracts on a yearly basis. The purpose of this monitoring is to verify if the companies take into account enough flexibility to cover the winter peak demand as provided for by the supply standard. However, the competent authority only has the authority through the regulation to monitor the situation because the regulation does not carry a penalty. If the competent authority wants to impose sanctions on companies that do not live up to the supply standard, this will need to be fixed by law Facilitating the integration of gas from renewable energy sources into the gas network infrastructure Integrating gas from renewable (e.g. Biogas) is only economically viable if injected in the distribution network in Belgium. This also falls under the competence of the regional governments, so a federal policy option here is not possible. As the production of biogas remains limited, the potential for biogas to serve as a preventive measure for incidents is negligible. Depending on the prospective for the production of biogas in the future, we can reassess the situation to see whether this could serve as a preventive measure and if government action needs to be taken at that point.

32 Commercial gas storage withdrawal capacity and volume of gas in storage The aquifer in Loenhout is the only underground storage installation (for H-gas) in Belgium and is used for commercial storage. The useful storage capacity at Loenhout is 700 mcm, with a send out capacity of cubic metres per hour and injection capacity of cubic metres per hour. Under normal winter circumstances and if the storage is filled up to its full capacity, the stored gas can be used during about 60 days. All companies can subscribe (a part of) storage capacity at Loenhout on a yearly basis, on medium term (service period between two and three storage years) or on a long term (service period between four and ten storage years) basis according to the law of 11 June During a storage year in function of optimisation of the Storage Installation, the storage operator could offer additional services for injection, storage volume, and for withdrawal, on a short term basis (e.g. daily, weekly, monthly, or yearly or another term). The Mid Term and Long Term Storage Services on the Primary Market can be subscribed and allocated through a Subscription Window organised by Storage Operator. Participation to such allocation process is open to all Storage Users having registered as Participants according to the Terms and Conditions of a particular Subscription Window. The priority is given to Participants who commit to subscribe the longest service duration for their Storage Services. As gas storage possibilities remain limited in Belgium, Fluxys Belgium looked in 2010 for other potential sites for underground gas storage in the Limburg province in collaboration with the Flemish Institute for Technological Research (VITO) and the Limburg Investment Company (LRM). This was without much success. However, as Belgium is surrounded by countries that have sufficient gas storage possibilities (e.g. Germany, France, UK, and The Netherlands) and most gas undertakings active in Belgium are also active in the neighbouring countries, gas operators can make use of the storage flexibility in several countries over the different gas markets. Furthermore, as LNG capacity (and the possibility for fast storage) is increasing in the neighbouring countries, this will also provide a source of short-term storage on site at the terminal. There is no storage for L-gas. Currently Belgium uses, for the L-gas grid in particular, the ability of the Dutch L-gas fields as swing supplier and flexibility provided in the supply contracts. With shrinking Dutch gas production, maintaining the flexibility of this gas supply could be more difficult or more costly (depending on contractual arrangements) in the future. As most companies operate on a European basis, most of them have contracted storage capacity outside of Belgium. In case of an emergency, gas companies can exercise a swap of gas from storage abroad and gas transmission in Belgium.

33 LNG terminal capacity and maximal send-out capacity The Zeebrugge LNG re-gasification terminal (in operation since 1987) has a yearly throughput capacity of 9 bcm per year. Currently the terminal has a send-out capacity of up to m³ LNG per hour (or 1,7 mcm/h in gas) and can unload 110 LNG cargos per year. The four storage tanks can hold cubic metres of LNG, the equivalent of about three shiploads of LNG. Because of the high number of slots that are allocated, the LNG storage have to send out almost immediately after the LNG cargos have been unloaded. Therefore, the LNG storage tanks do not operate as storage as such but more as a very temporary buffer (3-4 days) before sending out in the pipelines. It is therefore useful to increase the send out capacity of the LNG terminal and to increase the storage capacity. With the disappearance of the peak shaving plant in Dudzele, new mechanisms should be sought to cover the peak demand. Fluxys has launched an open season for a second capacity enhancement of the Zeebrugge LNG terminal. The project has been approved and will include the construction of a second berthing jetty allowing ships from app m³ LNG up to a capacity of m³ LNG, expected in the course of The capacities of the LNG terminal are allocated through an open season procedure and are subscribed through long term contracts (15-20 years) on the primary market. Any remaining unused capacity is allocated, until a new open season procedure is launched, according to the rule first come, first served. Currently, four shippers have slots reserved in the LNG terminal. Besides these long-term contracts, tankers from Egypt, Nigeria, Trinidad, Malaysia and Qatar deliver spot LNG Diversification of gas supplies and gas routes As already mentioned above, gas supplies are fairly well diversified. There is no legal obligation yet in Belgium for portfolio diversification or for entry point diversification. We do however note that most gas undertakings have a very well diversified portfolio and use at least two entry points to bring the gas into Belgium. The suppliers have multiple contracts with different suppliers and bring the gas in via a variety of supply routes. The higher the diversification, the lower the impact of an incident on one supply source or route. Of course for L-gas, there is only one, nevertheless a very reliable, supply source, notably the Netherlands. For H-gas, we have two main suppliers, Norway and Qatar. The costs of diversification depend more on the contract type and conditions and cannot really been seen as costs as such, but as a proper procedure for proper care in the gas business. Certainly the larger companies with many long term contracts dispose of a very well diversified portfolio. We have noted that smaller companies depend more on contracts on the gas hubs than contracts directly with producing countries. It could be argued that, in order to increase the security of supply, an obligation could be introduced on the shippers to contract their gas at minimum two or three different sources and use at least two or three different entry points. The question is how we have to treat shippers that contract their gas mainly on gas Hub as it is not now where the gas originates from or through which entry point it will be delivered.

34 Reverse flows and investments in infrastructure Reverse flows exists already on all borders with the neighbouring countries. Open seasons were conducted on most borders in the period (see chapter 8). Reverse flows and investments in infrastructure are analysed yearly by the TSO in the investment plan for the coming 10 years. This investment plan is revised by the NRA and the competent Authority to analyse if the infrastructure expansions are in line with the predicted gas demand. Capacity on the Belgian side of the interconnection points is consistently higher than on the adjacent networks. There is enough flexibility left in the network to deal with a cold wave, as the Belgian network is designed on an -11 C standard. This was also proven during the February 2012 cold wave. The gas consumption on the distribution network had reached peak level on 3 February 2012 (1.165 GWh) and 7 February 2012 (1.181 GWh). The gas flows on the transmission network to assure the total domestic consumption and the border-to-border transmission reached their peak level of a little bit over 2 TWh on 8 February About 60% of the 2 TWh was destined for the Belgian gas consumption and about 40% was destined for export, mainly to France and a minor part to the Netherlands and Luxemburg. There was enough flexibility remaining in the network. In the H-gas network, about 80% of the available demand capacity was used and about 85% of the demand capacity on the L-gas network Coordinated dispatching by transmission system operators Fluxys has several Operating Balancing Agreements (OBA s) with the TSO s in neighbouring countries, namely GRTGas, GTS, OGE, Gassco, IUK, Zebra en Gascade. This agreement between countries is a possible measure to reduce the impact of an incident Demand side & market based measures Use of interruptible contracts Suppliers have the right to interrupt the customer, normally in return for a discount on price and with some notice. The notice period will be specified in the energy contract. Most interruptible contracts specify that there will only be a few hours notice, unless it is specified otherwise in the contract. Customers with an interruptible contract have agreed to receive gas but are willing to have supply interrupted at some point, according to the reasons in the contract (mostly meteorological circumstances) and for a maximum amount of hours or days per year. Interruptible contracts are hardly offered anymore to end consumers in Belgium. This is due to the fact that the attributed discounts are no longer a sufficient incentive on the longer term. In the industrial sector, interruptible contracts account for less than 5% of the total contracted volumes

35 34 between end users and suppliers. Interruptions are also limited to force majeure events. For the electricity plants, we also see a tendency towards more firm contracts. The TSO has to interrupt supply (this is to interruptible contracted customers) in the event of technical difficulties with the transportation system or in the event of congestion. Again this will be covered in the customer s contract. Interruptible capacity is hardly booked by the shippers because Fluxys Belgium only offers interruptible capacity to the market if there is no firm capacity left. Even if Fluxys Belgium would offer interruptible capacity, the price difference between interruptible and firm capacity has become too small to be an incentive. Therefore we can say that interruptible capacity for the shippers is negligible in Belgium. We have to be clear however that the above mentioned interruptions are separate to other interruption rights, which exist for use only in potential or actual emergency situations. In emergency situations, some companies can reduce demand considerably when prices are high or maintain production by switching to back up fuels. However, they still need to maintain a certain level of gas to keep systems going and to let their plant safely shut down. At any point an accident could damage a major part of the gas infrastructure and cut off supply. Some gas users have back-up systems and fuels to switch to in the event of an emergency or if commercial incentives make using an alternative fuel source preferable. Not every gas user has back up fuels (most of the end consumers in Belgium do not have back up fuels), so the gas system and the procedures that exist within it are designed to minimise the risk of gas being switched off from those who don t expect it to be (those not on interruptible contracts). Appliances for commercial premises generally incorporate flame out safety devices. These allow for supplies to be quickly and safely reinstated following a cessation in gas supplies. In the event of an emergency, the safe provision of gas to domestic users and other low volume users (all connected to the distribution network) is the top priority. Before firm customers are interrupted, emergency plans provide for the suspension of the normal market for gas. After the suspension, it will depend on how quickly gas supply and demand is balanced, before firm customers start to be interrupted. Before firm customers are interrupted, firm border-to-border transmission will be interrupted. Public appeals may take place asking the public to restrain gas usage but this would depend on the type of emergency Fuel switch possibilities including use of alternative back-up fuels in industrial and power generation plants Fuel switching from gas to fuel oil or diesel is no longer applied in Belgium. The remaining capacity is only used for black-start and not for fuel switching purposes. Also the environmental limitations do not allow fuel switching from gas to fuel oil or diesel. Therefore, we do not take into account any fuel switching capacity in the natural gas sector.

36 Voluntary firm load shedding The impact of voluntary firm load shedding is very limited in Belgium and is an option the government cannot control as it is highly dependent on price signals. It will mainly be used by companies that contract their own gas, like for example power plants. Only companies with real time measuring will be able to adjust their gas consumption. Of course, also the type of contract the companies have with their gas supplier is determining whether it will be possible to see how the price fluctuates on a real time basis, and how the consumption can be adjusted to it. A study is being conducted on possible measures that can be taken to reduce demand reduction, within this study voluntary firm load shedding is one of the topics which will be investigated Supply side & non market based measures Use of strategic storage There is no strategic storage of gas in Belgium Enforced use of electricity generated from sources other than gas Not applicable in Belgium Enforced storage withdrawal Although it is not a real enforcement, two possible situations can be mentioned in this regard: In the early warning and alert phase, the TSO may encourage (without binding obligations) the gas companies that make use of the underground storage to withdraw the gas from storage. In the emergency phase, the TSO may actually withdraw commercial gas from storage if the gas companies haven t done this themselves. The TSO will allocate the liberated gas to the protected customers. The gas taken will be replaced by the TSO or a compensation will be given to the company.

37 Demand-side & non market based measures Enforced fuel switching As already mentioned, fuel switching from gas to fuel oil or diesel is no longer applied in Belgium. The remaining capacity is only used for black-start and not for fuel switching purposes. Also the environmental limitations do not allow fuel switching from gas to fuel oil or diesel. Therefore, we do not take into account any fuel switching capacity in the natural gas sector Enforced utilisation of interruptible contracts The TSO can only enforce the interruption of capacity contracts. As for the contracts between suppliers & final consumers, it is up to the supplier to interrupt the contract Enforced firm load shedding In the Belgian shut-off plan, it is the TSO that makes the decision to enter the plan into force. This can only take place in the emergency phase. Several categories are created for all consumers, in function of predefined criteria. The distribution network cannot be shut off. Also the electricity security of supply is taken into account. 7. Mechanisms for cooperation with other member states This chapter will provide an overview of some other elements that can be important when dealing with a regional crisis, i.e. a situation in which several countries are impacted by a supply disruption. The successful management of a regional supply disruption will for example require effective communication and cooperation between the industry, government departments and other organisations from various member states. A regional risk assessment and/or plans could be helpful. Obviously, on the regional level, the role of the Gas Platform (Belgium, Netherlands, Luxemburg, Germany, France) cannot be underestimated. This is a very important consultation platform for Belgium and enables effective communication/coordination between Belgium and its neighbouring countries. Six pillars have been identified, namely transparency, coherence, cooperation, communication, common crisis exercises and learning from best practices. Each of them can be of importance both before the crisis as during an emergency situation.

38 Transparency Most of the national markets are very well interconnected with other markets. In the event of a serious supply disruption, it is likely that several countries will be impacted in a way. Therefore it is important, not only for governments, but also for other stakeholders, to have a good & detailed understanding of the market functioning of the region (and other countries ) and study thoroughly the impact of certain scenario s in these countries. Proactive data collection is important in this respect. Precise and relevant data are vital and should be exchanged pro-actively as much as possible between countries, as for example past, current and forecasted data for demand and supply, data on industrial gas users and consumption patterns, data on interruptible contracts and switching capacities, storage levels and availability,. During a crisis, a well-organized transfer of data and information is crucial to enable an efficient decision-making process for the federal authority for security of supply for natural gas. Based on the information obtained from the EC, other Member States, The federal authority can undertake the needed actions. Moreover, a complete transparency with regard to the preventive action plans and emergency plans of all countries could be valuable. The sharing of incident reports (taking into account strict confidentiality rules) of past emergency responses could be helpful as well Coherence In the event of a gas crisis, a set of crisis measures can be taken, as for example the increased withdrawal from storage, the increase of imports, the reduction of exports,. It is of importance that the crisis measures taken are coherent and solidary with other MS. Moreover, with regard to the crisis levels & triggers, a certain standardized quantification (by using some common crisis indicators) could be positive. This might enable an improved and more effective communication and cooperation.

39 Cooperation The role and responsibilities of all organisations (NESO, TSO, DSO, regulators, ) concerned are discussed in the Belgian emergency plan. However, a good cooperation is also necessary with their counterparts in neighbouring countries. Regular contact between the competent government departments, regulators, TSO s, suppliers, shippers, should be organized to discuss issues with regard to emergency planning, both before, during and after an emergency. Obviously, there is also an important role for the gas coordination group, which gathers all member states and stakeholders. The emergency response structure for a national gas supply emergency is described in the Emergency Plan. For a regional or European gas supply emergency, it could be good to have experts/representatives from other MS involved in the crisis management structure for emergency planning Communication The successful management of a major regional supply emergency requires effective communication and cooperation with the respective national and regional governments, industry,. The communication should be organized via designated persons & procedures. A crisis manual should also contain up-to-date contact details of these foreign departments & organisations. In Belgium, there should be one interface or SPOC, who deals with the communication with other MS. This is one of the tasks of the coordinator (see the Belgian Emergency Plan). All communication (between Minister, EC, neighbouring countries, industry,...) will take place via the federal authority for security of supply for natural gas (see the Belgian Emergency Plan) Common crisis exercises Well organized crisis exercises are an important element of proper emergency planning. It could be positive apart from the necessary national crisis exercises to have a regional crisis exercise with several countries participating. These regional crisis exercises could deal with cross border risks. Moreover cross border communication and emergency management skills could be improved.

40 Learning from best practices The identification of best practices in European and international emergency planning & the study of the possibilities for implementation of these best practices in Belgium, could be valuable. A lot can be learnt from incidents and emergency responses that took place in the past. In function of these best practices & gained expertise, Belgium could improve its emergency planning. 8. Information on existing and future infrastructure in Belgium 8.1. Existing and new infrastructure Fluxys Belgium, Belgium s transmission system operator, has a network of more than 4100 kilometres of pipelines with 18 interconnection points and four compressor sites. Different cross border pipeline systems connect the Belgian natural gas market directly to Norway, UK, Germany, the Netherlands, France and Luxembourg. The Belgian network disposes of five compressor sites. The most recent compression facilities at Zelzate, Winksele and Berneau are electrically driven (like elsewhere in the EU: more and more compressor stations are electrically instead of natural gas driven), which again confirms the growing convergence between electricity and natural gas security of supply which deserves particular attention. The four compressor sites are located in: Weelde: The compression station in Weelde was renewed in 2010 to maintain the capacity of low-calorific natural gas in the pipeline from Poppel on the Dutch border to the French border at Blaregnies. Winksele: The compressor site at Winksele lies at the crossroads of major North/South and East/West transmission axes. The existing compression facility for L-gas serves to maintain pressure levels in the North/South pipeline. Due to increasing demand for capacity for both the domestic market and border-to-border, it was decided to build new compressor facilities in Winksele for the East/West H-gas transmission axis as well. In this way, capacity can be enhanced on both the East/West and North/South transmission axes. This new facility is operational since end Berneau: Since 2010, work has been done to build additional compressor facilities at the compressor station in Berneau. These upgrade works has extend the options for combining natural gas flows on the East/West and North/South axes and also fit in with, inter alia, the transition to an entry/exit system and the introduction of a virtual trading point. Zelzate: The Zelzate compressor station came on line at the end of 2008 to create additional capacity for the overall rise in demand of the Belgian domestic market and enables larger volumes to be transported to and from the underground storage facility in Loenhout. Since 2010 it is also used to recompress the cross border natural gas delivery at Zelzate from the Dutch GTS grid.

41 40 The Fluxys Belgium transmission grid is also connected to other facilities operated by Fluxys Belgium or its subsidiaries: the Loenhout underground storage facility and the LNG terminal located in Zeebrugge. The Loenhout underground storage facility is aquifer storage for high calorific natural gas that combines mainly seasonal storage with high flexibility of usage. The Zeebrugge LNG terminal is used to load and unload ships carrying liquefied natural gas (LNG). LNG is temporarily kept in storage tanks at the facility as a buffer before re-gasifying the LNG and injecting it into the grid for transmission or loading the LNG back onto LNG ships or LNG trucks. Figure 4: The Belgian transmission network (2014) Source: Fluxys Belgium The need for new infrastructure is evaluated every year by Fluxys Belgium in the ten-year indicative investment program. These updates take into account the changes in requirements in terms of natural gas supply, request for new connections and the changing needs of grid users identified through subscription periods and international market consultations among other things. Several simulations based on the winter peak (January at -11 Ceq) are being set up to calculate the effects on the network. In the latest investment plan, the calculations are based on the Entry-Exit model. Main infrastructure investments identified in the Fluxys Belgium TYNDP are underway or will start in the coming years(s) under investment decision: Enhancement of the Zeebrugge LNG terminal: The project of a second capacity enhancement of the Zeebrugge LNG terminal includes the construction of a second berthing jetty allowing ships from 2,000 m³ LNG up to a capacity of 217,000 m³ LNG and the construction of a 5 th tank. This second capacity enhancement gives rise to additional berthing rights offered to the market for the purpose of loading ships. The investment

42 41 decision of the project was already taken in 2011 for the construction of the second jetty. The Zeebrugge Port Authority has finished the underwater structure of the second jetty in 2013 and Fluxys LNG has started building the superstructure mid The commissioning of this second jetty is expected by end For the 5th tank, the investment decision has been taken and the works have started in May 2015, with a provisional end date of December Firm entry France: In the context of the construction of the LNG-terminal in Dunkirk (FR), Fluxys Belgium and GRTgaz, the French Transmission System Operator of the natural gas grid, have decided to construct a new pipeline (DN900) from Dunkirk via Pitgam to the Belgian border at Alveringem and from Alveringem to Maldegem, connecting the new pipeline to the VTN pipeline. The Alveringem interconnection will connect non-odorized gas coming from France with the Belgian grid, allowing an expected 8 bcm of imports as from late Fluxys will make available about m 3 (n)/h from the Dunkirk facility to the Belgian network, either to the Zeebrugge hub or the ZTP (virtual trading point). The joint offer by Belgian and French transmission system operators Fluxys Belgium and GRTgaz has led to binding commitments totalling more than 219 GWh/day ( cubic metres/hour) by shippers for a 20-year period. Capacities are expected to become available as from November Shippers have committed to a total of 266 GWh/day ( cubic metres/hour) during the first two years following commissioning. For the next 18 years, 219 GWh/day ( cubic metres/hour) is booked, with 51 GWh/day ( cubic metres/hour) of not yet contracted capacity still available to the market. Regional branching on the Belgian part of this pipeline at Ypers will cope with the growth of and further increase the security of supply to the western region of Belgium. The project is expected to be commissioned in October The pipeline project will be constructed in such a way that some physical reverse flow will be technically feasible in case of emergency (to supply France). However, in order to have full reverse flow capacity, a new compressor station would be required in Belgium. Reinforcement of the Limburg area for H-gas: To achieve the conversion of L-gas distribution networks in the region to H-gas, a study is started to realise a connection between the VTN-VTN2 pipelines and the Tessenderlo-Diest pipeline. This means that the pipeline Tessenderlo-Diest will first be used to transport L-gas towards Diest. Afterwards it will be used for the transport of H-gas towards the Limburg area. While the L-gas is supplied from the north, the H-gas will be coming from the West-East H-gas axis (VTN) located in the south of Diest. If the Limburg projects for combined cycle gas turbine power plants (CCGT) in the future will be realized, it will provide the necessary capacity and operating pressure needed. The project is not expected before and not decided yet. Reinforcement Hageland: The distribution networks in the region between Leuven and Diest (Iverlek) and between Tessenderlo and Halen (Interenerga) reach saturation. In order to create an injection point in these networks, it is necessary to strengthen the Fluxys Belgium grid which results in a pipeline project (DN 250 over 3.4 km and DN 600 over 14.5 km)

43 42 between Tessenderlo and Diest (L-gas pipe) and the construction of a new injection point for both concerned DSO s at Diest. The works are planned to start in beginning 2016 and to be achieved in August The commutation to the H-gas system of large industrial customers will free the necessary upstream capacity for this project. Pressure increase Oupeye-Lanaken: A project is started to adapt the pipeline between Lixhe and Lanaken in order to flow at a higher working pressure and obtain an increase in transport capacity for the Limburg H transport system. Through this eastern route, Fluxys Belgium will be able to provide soon the necessary capacity to switch from L-gas to H-gas the industry in the canal area between Olen and Tessenderlo-Beringen (see also reinforcement Hageland). The project is scheduled for April Enhancement of the Brussels area: Sibelga, Brussels DSO, has asked Fluxys Belgium to provide a new injection point in the southern area of Brussels. This needs Fluxys Belgium to build a new 7.7 km long pipeline between Overijse and Jesus-Eik and a new pressure reduction station (city gate). The project will be implemented in 2017 to be available for commissioning in October Connections for new power plants: Several projects connecting new CCGT power plants are still being studied. These gas power plants require capacity at an operating pressure that cannot be provided by the DSO s, which is why they must be directly connected to the TSO network. Connection requests have been asked to Fluxys Belgium for different sites but have not yet resulted in a firm demand from customers because the market is currently in an uncertainty related to the costs of the electricity production. Summary of the above-mentioned projects and re-evaluation of the estimated commissioning date: Project Estimated commissioning date Second jetty Zeebrugge LNG Terminal December th tank Zeebrugge LNG Terminal (decided) December 2018 Alveringem (New entry France) November 2015 Reinforcement Yper October 2016 Reinforcement Hageland August 2016 Pressure increase Oupeye-Lanaken April 2017 Enhancement Brussels aera October Reverse flow analysis Between Belgium and the adjacent entry-exit systems surrounding Belgium, bi-directional flows towards or from these entry-exit systems are already possible, and thus also in case of emergency. In most cases (for H-gas), bi-directional capacity is offered to the market and market consultations, open seasons or capacity subscriptions indicated no (additional) bi-directional is requested by the

44 43 market, nor have requests been received for enhancements for security of supply reasons. The open seasons on almost all interconnection points were conducted in the period The interconnections for L-gas are connections to production facilities in the Netherlands and therefor fall under the exceptions. The interconnection point with Norway (ZPT) is also connection to a production facility and falls under the exceptions. The interconnection point with the UK (IZT) has full reverse flow capacity. With the Netherlands, one of the interconnection points is bi-directional, namely Zelzate 1. The only purpose of the interconnection points of Zandvliet and Zelzate 2 is to serve local areas in Belgium and the Netherlands, and therefor reverse flows are not necessary on those points. In emergency, physical reverse flow can be possible on s Gravenvoeren as a bypass is available that can be used only in the case of emergency. Bi-directional gas flows with Germany are already possible, so no further enhancement is needed at this point. The open season also indicated that no further enhancement was needed. Bi-directional capacity with France is possible. However, there is still a problem with the odorization of the gas coming from France. Odorized gas cannot be accepted in the Fluxys network. The new interconnection point of Alveringem that will come online in 2016 will be transmitting non-odorised gas from France to Belgium. Provisions will be taken on this entry point to make physical reverse flow, at least in case of emergency, possible. On the interconnections with Luxembourg, only backhaul is possible. However, as Luxembourg is a supply only network, we do not deem it necessary to have firm bidirectional capacity on that point. However, physical reverse flow is possible in case of emergency. The table below captures an overview of the bi-directional capacity with our neighbouring countries. Table 13: Firm entry and exit capacity offered on the interconnection points for H-gas (in mcm/d) Connection point Type Firm capacity offered 2014 (mcm/d) Firm capacity offered 2017 (mcm/d) Entry Exit Entry Exit IZT EP 64,800 78,000 74,400 78,000 LNG terminal 1 22,800 0,000 22,800 0,000 LNG terminal 2 LNG 22,800 0,000 22,800 0,000 ZPT EP 45,600 0,000 45,600 0,000 H Alveringem EP 0,000 0,000 24,000 0,000 Zandvliet H EP 4,320 0,000 4,320 0,000 Zelzate 1 EP 34,800 16,800 34,800 16,800 Zelzate 2 EP 0,000 10,800 0,000 10,800 Eynatten 1 EP 18,000 16,800 18,000 16,800 Eynatten 2 EP 31,200 18,000 31,200 18,000 S Gravenvoeren + Obbicht EP 31,200 0,000 31,200 0,000 Blaregnies H EP 0,000 60,000 0,000 60,000 Loenhout Storage S 15,000 7,800 15,000 7,800

45 44 Pétange & Bras (GD Lux) EP 0,000 4,320 0,000 4,320 L-inject EP 0,000 0,000 0,000 0,000 Source: Data compiled based on information of Fluxys

46 45 ANNEX 1: Overview table of the market based supply side measures Applicable in Belgium Potential impact Costs Sector support and responsibility Possibilities for execution Actions to take Increased import flexibility yes Contracts are mostly 85% to 115% of normal offtake, additional gas can be bought on short term basis on the gas Hubs to cover winter demand Depends on the contracts, cost aggregation is very hard to make Yes, this is done solely by the gas companies Monitoring through questionnaire Establish questionnaire Foresee adequate legal framework Facilitating the integration of gas from renewable energy sources into the gas network infrastructure Only in distribution network limited depends on level of support/ subsidies given Fluxys supports the injection of biomethane into the transmission grid provide support/ subsidies None, competence of the regional governments Commercial gas storage withdrawal capacity and volume of gas in storage Yes, commercial capacity available Storage at Loenhout Service fee paid by storage users All companies can book storage capacity (TPA), allocation of the capacity All the terms and conditions for access to storage are described in the access code for storage None LNG terminal capacity and maximal send-out capacity

47 46 One LNG terminal with total send out capacity of 1,7 mcm/h extension of the terminal with a second jetty in 2015 Few LNG storage capacity available because as send out has to occur in 3-4 days Cost of increasing the capacity of the LNG terminal Tbd Increase send out capacity and LNG storage capacity, more incident means for Fluxys Belgium If necessary, increase incident means Diversification of gas supplies and gas routes Shippers keep fairly well diversified portfolio Reduces risk of incidents on one supply source or route Costs are reflected in the contracts of the suppliers Most suppliers (especially the larger suppliers) already have a well-diversified portfolio Monitoring of supply portfolio through questionnaires Introduce legal obligation on portfolio and entry point diversification Reverse flows Yes, on all borders Enables the gas flows to be redirected where the gas is needed Cost of building compressors, new pipelines, measuring stations, costs will need to be taken up in the tariffs The TSO organises regular open seasons to interrogate the market on their needs for new capacity Relaunch a procedure of open seasons every x years Monitoring of the open season procedures Coordinated dispatching by transmission system operators Fluxys Belgium has several OBA s with the TSO s in neighbouring countries Ability to ask for assistance (use of gas, reducing capacity, ) of other TSO s during an incident Cost of discussing the operational procedures for managing the OBA Mutual agreement between TSO s Facilitate the coordination between TSO s Establish clear communication procedures and agreements for emergency situations

48 47 Investments in infrastructure, including bi-directional capacity Yes, investment plan of the TSO Keep infrastructure expansion in line with demand growth Analyses of necessary investments and their respective costs are taken up in the tariffs if approved by the regulator yes Tbd Yearly revision of the investment plan and the prospective study every 4 years

49 48 ANNEX 2: Overview of the market based demand side measures Applicable in Belgium Potential impact Costs Sector support and responsibility Possibilities for execution Actions to take Use of interruptible contracts Hardly any interruptible capacity on infrastructure, interruptible contracts for end consumers are also slowly disappearing Very limited Cost for the interruptible clients during interruptions, but that is accounted for in the price of their gas contract Not much willingness to accept interruptible contracts from the end consumers Incentivise interruptible contracts Tbd Fuel switch possibilities including use of alternative back-up fuels in industrial and power generation plants Hardly applicable in Belgium Very limited Cost to foresee backup installations is very high + trouble to get permits Not practised anymore because no incentives from the government Create legal obligations for certain industries or power plants to have back-up installations Tbd Voluntary firm load shedding No Very limited, mainly price driven Depends on the price of gas Possibility of solidarity principle between endusers Create a certain goodwill of the companies and examine the possibilities for load shedding Create a communication strategy in case of an gas incident

50 49 ANNEX 3: Calculation details and resulting estimations of gas demand Belgian protected costumers Distribution network/ Protected Customers: The consumption profiles and their representation on the distribution network are S30 S31 S32 S41 S31+S32+S41 H 10,13% 12,63% 19,90% 57,34% 89,87% L 13,34% 12,14% 19,62% 54,91% 86,67% The households are represented under category S41 and are therefore according Regulation 994/2010, under the protected customers : S41 H 57,34% L 54,91% S31 are the commercial clients that consume less than KWh/year, there are for example combined profiles with residential and business use. Their consumption is about 7 times higher than the consumption of an average household. These commercial clients are enterprises that are smaller than 50 persons, following the commission s recommendation of 6 th May 2003 they can be classified as an SME (small enterprise) S31 H 12,63% L 12,14% S32 are commercial clients that consume more than KWh/year, for example professional components that are influenced by a residential behavior such as for example hospitals, nursing homes,. Most of these clients are SMEs with less than 250 employers. However, about 5% of the clients in these categories are larger clients that are not telemeasured and have the same profile as S S32 S32 without not tele-measured larger clients H 19,90% 14,90% L 19,62% 14,62% S30 are tele-measured larger clients for whom of the gas consumption is being counted by the hour. In this category there are for example: hospitals, administrative buildings, large supermarkets,. Also there is a possibility that in this category a small part of SMEs are present.

51 S30 H 10,13% L 13,34% Following the definition of Regulation 994/2010 the protected costumers are households and small and medium size enterprises connected to the distribution grid: S41 S31 S32 without not tele-measured larger clients Protected Costumers at distribution grid Non-protected customers: S30 + 5% H 57,34% 12,63% 14,90% 84,87% 15,13% L 54,91% 12,14% 14,62% 81,67% 18,34% The normalized gas consumption in Belgium for the distribution network (in 2013) is 38% for the H- gas network and 86% for the L-gas network. Percentage Gas Consumption on distribution grid Protected Costumers at distribution grid Non-protected customers: S30 + 5% H 32,25% 5,75% L 70,23% 15,77% The total gas demand in Belgium is divided between H-gas and L-gas: 71% H-gas and 29% L-gas Percentage of Total gas demand Protected Costumers at distribution grid Non-protected customers: S30 + 5% H 22,89% 4,08% L 20,36% 4,57% Total 43,25% 8,65%

EMERGENCY PLAN FOR SECURITY OF SUPPLY OF NATURAL GAS THE NETHERLANDS

EMERGENCY PLAN FOR SECURITY OF SUPPLY OF NATURAL GAS THE NETHERLANDS EMERGENCY PLAN FOR SECURITY OF SUPPLY OF NATURAL GAS THE NETHERLANDS Based on Regulation (EU) No 994/2010 of the European Parliament and of the Council of 20 October 2010 concerning measures to safeguard

More information

ACCESS CODE FOR TRANSMISSION. Attachment C.1: Operating Procedures

ACCESS CODE FOR TRANSMISSION. Attachment C.1: Operating Procedures ACCESS CODE FOR TRANSMISSION Attachment C.1: Operating Procedures Based on version approved by CREG on 1 of 32 Deleted: 4 Deleted: 94 Deleted: 4 Deleted: 94 Deleted: 4 Deleted: 94 Deleted: 4 Table of Contents

More information

International comparison of electricity and gas prices for commerce and industry

International comparison of electricity and gas prices for commerce and industry International comparison of electricity and gas prices for commerce and industry FINAL REPORT ON A STUDY PREPARED FOR CREG October 2011 Frontier Economics Ltd, London. October 2011 Frontier Economics

More information

Methodology for Merit Order Dispatch. Version 1.0

Methodology for Merit Order Dispatch. Version 1.0 Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...

More information

COMMISSION STAFF WORKING DOCUMENT

COMMISSION STAFF WORKING DOCUMENT EUROPEAN COMMISSION Brussels, 16.10.2014 SWD(2014) 325 final COMMISSION STAFF WORKING DOCUMENT Report on the implementation of Regulation (EU) 994/2010 and its contribution to solidarity and preparedness

More information

EURELECTRIC presentation. EURELECTRIC contribution to a reference model for European capacity markets. DG COMP workshop 30 June 2015

EURELECTRIC presentation. EURELECTRIC contribution to a reference model for European capacity markets. DG COMP workshop 30 June 2015 EURELECTRIC presentation EURELECTRIC contribution to a reference model for European capacity markets DG COMP workshop 30 June 2015 EURELECTRIC believes that energy, flexibility and capacity are all needed

More information

Gas transport tariffs calculation

Gas transport tariffs calculation Ad Hoc Expert Facility under the INOGATE project Support to Energy Market Integration and Sustainable Energy in the NIS (SEMISE) Gas transport tariffs calculation 1 TABLE OF CONTENTS 1. INTRODUCTION...

More information

INDICATIVE TERMINALLING PROGRAMME OF THE ZEEBRUGGE LNG TERMINAL

INDICATIVE TERMINALLING PROGRAMME OF THE ZEEBRUGGE LNG TERMINAL INDICATIVE TERMINALLING PROGRAMME OF THE ZEEBRUGGE LNG TERMINAL FOR THE PERIOD: 2005-2006 (PROPOSED ON THE BASIS OF ARTICLE 9 OF THE ROYAL DECREE OF 4 APRIL 2003 ON THE CODE OF CONDUCT FOR ACCESS TO THE

More information

Wind Power and District Heating

Wind Power and District Heating 1 Wind Power and District Heating New business opportunity for CHP systems: sale of balancing services Executive summary - Both wind power and Combined Heat and Power (CHP) can reduce the consumption of

More information

APPENDIX XII: EMERGENCY SUPPORT FUNCTION 12 - ENERGY

APPENDIX XII: EMERGENCY SUPPORT FUNCTION 12 - ENERGY APPENDIX XII: EMERGENCY SUPPORT FUNCTION 12 - ENERGY PRIMARY AGENCIES: Public Service Commission and the Florida Energy and Climate Commission SUPPORT AGENCIES: Nuclear Regulatory Commission, Florida Rural

More information

Q1: Which further key design criteria should be reflected in cross-quality market areas?

Q1: Which further key design criteria should be reflected in cross-quality market areas? Attachment to ExxonMobil letter dated Sept. 21, 2010 Please find below our responses to the FNA public consultation with regard to a cross-quality creation of market areas. Our responses are indicated

More information

Session I Energy Security in the EU. - Report on short, medium and long term measures on energy security -

Session I Energy Security in the EU. - Report on short, medium and long term measures on energy security - Informal Meeting of the Energy Ministers Milan, October 6 th 2014 Session I Energy Security in the EU - Report on short, medium and long term measures on energy security - As part of the preparations for

More information

ACER scoping document for Rules for Trading

ACER scoping document for Rules for Trading ENTSOG response to ACER questionnaire on scoping for Rules for 12 May 2014 Final ACER scoping document for Rules for ENTSOG response to the ACER questionnaire Since some of the questions are addressed

More information

Piedmont Natural Gas Company, Inc. Tennessee Index of Tariff & Service Regulations

Piedmont Natural Gas Company, Inc. Tennessee Index of Tariff & Service Regulations Tennessee Index of Tariff & Service Regulations Rate Schedule 301 Rate Schedule 302 Rate Schedule 303 Rate Schedule 304 Rate Schedule 306 Rate Schedule 307 Rate Schedule 309 Rate Schedule 310 Rate Schedule

More information

Subject: Consultation TYNDP 2011-2020

Subject: Consultation TYNDP 2011-2020 ENTSOG Avenue de Cortenbergh 100 / second floor 1000 Brussels BELGIUM T +32 2 894 51 00 F +32 2 894 51 01 [email protected] Your reference: Consultation TYNDP 2011-2020 TAP s reference: Direct line: +41 41

More information

Investing in the Infrastructure for Energy Markets

Investing in the Infrastructure for Energy Markets Investing in the Infrastructure for Energy Markets Executive Summary: The European Commission, energy ministers and energy regulatory authorities have recognised that, if the European electricity and gas

More information

Monitoring report on the security of supply on the Belgian natural gas market. Year 2014. (based on article 5 of the directive 2009/73/EC)

Monitoring report on the security of supply on the Belgian natural gas market. Year 2014. (based on article 5 of the directive 2009/73/EC) Monitoring report on the security of supply on the Belgian natural gas market Year 2014 (based on article 5 of the directive 2009/73/EC) Member States are asked under article 5 of the Directive 2009/73/EC

More information

ENTSO-E Network Code on Emergency and Restoration

ENTSO-E Network Code on Emergency and Restoration ENTSO-E Network Code on Emergency and Restoration Notice 25 March 2015 This Network Code represents ENTSO-E s final proposals in line with the ACER Framework Guidelines on Electricity System Operation

More information

EU Directive on Network and Information Security SWD(2013) 31 & SWD(2013) 32. A call for views and evidence

EU Directive on Network and Information Security SWD(2013) 31 & SWD(2013) 32. A call for views and evidence EU Directive on Network and Information Security SWD(2013) 31 & SWD(2013) 32 A call for views and evidence 22 nd May 2013 Contents Contents... 2 Overview: The EU Directive on Network and Information Security...

More information

Slovakia. Key issues. 1. General overview

Slovakia. Key issues. 1. General overview Slovakia Key issues Slovakia should enhance the independence of national regulatory authority and ensure its accountability. Slovakia should promote a regulatory framework conducive to investment in and

More information

Specific amendments to the Capacity Allocation and Congestion Management Network Code

Specific amendments to the Capacity Allocation and Congestion Management Network Code Annex: Specific amendments to the Capacity Allocation and Congestion Management Network Code I. Amendments with respect to entry into force and application The Network Code defines deadlines for several

More information

CAPACITY MECHANISMS IN EU POWER MARKETS

CAPACITY MECHANISMS IN EU POWER MARKETS CAPACITY MECHANISMS IN EU POWER MARKETS Can we progress to bilateral energy options? Simon Bradbury Ultimately, European renewable targets mean that prices and dispatch patterns will be dictated by wind

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Coordination between Natural Gas and Electricity Markets Docket No. AD12-12-000 Prepared Statement of Brad Bouillon on behalf of

More information

Main variations of business models for Flexible Industrial Demand combined with Variable Renewable Energy

Main variations of business models for Flexible Industrial Demand combined with Variable Renewable Energy Innovative Business Models for Market Uptake of Renewable Electricity unlocking the potential for flexibility in the Industrial Electricity Use Main variations of business models for Flexible Industrial

More information

Ref: C15-GWG-118-03 7-April-2015

Ref: C15-GWG-118-03 7-April-2015 CEER response to European Commission Consultation paper of the Revision of Regulation (EU) No 994/2010 concerning measures to safeguard security of gas supply and repealing Council Directive 2004/67/EC

More information

FINNGULF LNG LNG IMPORT TO FINLAND

FINNGULF LNG LNG IMPORT TO FINLAND FINNGULF LNG LNG IMPORT TO FINLAND CLEANLY WITH NATURAL ENERGY GASES Gasum is a Finnish expert in natural energy gases. We import natural gas to Finland, and transmit and supply it for energy production,

More information

ENTSO-E Working Draft Network Code on Emergency and Restoration

ENTSO-E Working Draft Network Code on Emergency and Restoration ENTSO-E Working Draft Network Code on Emergency and Restoration DRAFT FOR THE FOURTH PUBLIC WORKSHOP Notice 22 January 2015 This document reflects the status of the work of Transmission System Operator

More information

Poland must fully transpose the Third Energy Package Directives without further delay to liberalise the electricity and gas markets.

Poland must fully transpose the Third Energy Package Directives without further delay to liberalise the electricity and gas markets. Poland Key Issues + With regard to electricity, coal is still the main source of fuel for power generation. Poland's generating capacity is ageing, and the country needs better incentives for investment

More information

LAW OF UKRAINE On the natural gas market This Law defines legal fundamentals of the functioning of the natural gas market in Ukraine founded on

LAW OF UKRAINE On the natural gas market This Law defines legal fundamentals of the functioning of the natural gas market in Ukraine founded on LAW OF UKRAINE On the natural gas market This Law defines legal fundamentals of the functioning of the natural gas market in Ukraine founded on principles of free competition, due protection of consumers

More information

In electronic form on the EUR-Lex website under document number 32011M6389

In electronic form on the EUR-Lex website under document number 32011M6389 EN Case No COMP/M.6389 - ENI / NUON BELGIUM / NUON WIND BELGIUM / NUON POWER GENERATION Only the English text is available and authentic. REGULATION (EC) No 139/2004 MERGER PROCEDURE Article 6(1)(b) NON-OPPOSITION

More information

The UK Electricity Market Reform and the Capacity Market

The UK Electricity Market Reform and the Capacity Market The UK Electricity Market Reform and the Capacity Market Neil Bush, Head Energy Economist University Paris-Dauphine Tuesday 16 th April, 2013 Overview 1 Rationale for Electricity Market Reform 2 Why have

More information

Harmonisation of electricity generation transmission tariffs. A EURELECTRIC contribution to ACER s scoping exercise

Harmonisation of electricity generation transmission tariffs. A EURELECTRIC contribution to ACER s scoping exercise Harmonisation of electricity generation transmission tariffs A EURELECTRIC contribution to ACER s scoping exercise December 2015 EURELECTRIC is the voice of the electricity industry in Europe. We speak

More information

A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM)

A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM) A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM) Non-technical summary High level design Draft Decision Paper SEM -14-047 June 2014 1 INTRODUCTION

More information

National Report 2014 to the Agency for the Cooperation of Energy Regulators and to the European Commission

National Report 2014 to the Agency for the Cooperation of Energy Regulators and to the European Commission Ref: 1602/601/2014 10.7.2014 National Report 2014 to the Agency for the Cooperation of Energy Regulators and to the European Commission Finland National Report 2014 - Energy Authority, Finland 1 CONTENT

More information

Smart Energy Consumption and the Smart Grid

Smart Energy Consumption and the Smart Grid Smart Energy Consumption and the Smart Grid Executive Summary The nation s outdated electrical infrastructure is being transformed. Fundamental changes that add intelligence, integrated communications

More information

PROPOSAL FOR THE OVERSUBSCRIPTION AND BUY-BACK SCHEME. -EDP comments-

PROPOSAL FOR THE OVERSUBSCRIPTION AND BUY-BACK SCHEME. -EDP comments- PROPOSAL FOR THE OVERSUBSCRIPTION AND BUY-BACK SCHEME -EDP comments- General comments We consider that the coordination between TSOs of the South Gas Region in the development of this Draft is very important

More information

The Natural Gas-Electric Interface: Summary of Four Natural Gas-Electric Interdependency Assessments WIEB Staff November 30, 2012

The Natural Gas-Electric Interface: Summary of Four Natural Gas-Electric Interdependency Assessments WIEB Staff November 30, 2012 Introduction. The Natural Gas-Electric Interface: Summary of Four Natural Gas-Electric Interdependency Assessments WIEB Staff November 30, 2012 The increased reliance on natural gas as the primary fuel

More information

June 2015. Position Paper Contribution to the debate on electricity market design and capacity markets

June 2015. Position Paper Contribution to the debate on electricity market design and capacity markets June 2015 Position Paper Contribution to the debate on electricity market design and capacity markets Eurogas is the association representing the European gas wholesale, retail and distribution sectors.

More information

Gas Network Security Provisions. Peter Boreham UKT Gas Operations Manager and National Emergency Coordinator

Gas Network Security Provisions. Peter Boreham UKT Gas Operations Manager and National Emergency Coordinator Gas Network Security Provisions Peter Boreham UKT Gas Operations Manager and National Emergency Coordinator Network Gas Supply Emergency Definitions A Network Gas Supply Emergency (NGSE) can be caused

More information

August 2000. A Review of the Development of Competition in the Industrial and Commercial Gas Supply Market

August 2000. A Review of the Development of Competition in the Industrial and Commercial Gas Supply Market August 2000 A Review of the Development of Competition in the Industrial and Commercial Gas Supply Market Executive summary This document explains the conclusions of Ofgem s 1999 review of the development

More information

TERMS OF ELECTRICITY SALES 2010. as recommended by Finnish Energy Industries

TERMS OF ELECTRICITY SALES 2010. as recommended by Finnish Energy Industries TERMS OF ELECTRICITY SALES 2010 as recommended by Finnish Energy Industries Content: A. General, concluding an electricity sale contract, the prerequisites for electricity sales, commencement of electricity

More information

Estimating Future Energy Prices: Geopolitics, Economics & Vulnerability

Estimating Future Energy Prices: Geopolitics, Economics & Vulnerability Estimating Future Energy Prices: Geopolitics, Economics & Vulnerability By David Bangert, Polaris Consulting & Neil Davies and John Walls, Defence Economics Tel: 023 9225 9930 [email protected]

More information

Making CfDs work for renewable generators

Making CfDs work for renewable generators Making CfDs work for renewable generators This is in two parts. 1 st a brief introduction to the Green Power Auction Market. 2 nd gives more detail on the structure and follows on. We consider this a critical

More information

Gas Transmission Charging Methodology Statement. Gas Year 2015/16

Gas Transmission Charging Methodology Statement. Gas Year 2015/16 Gas Transmission Charging Methodology Statement Gas Year 2015/16 Contents 1. Introduction... 3 Part A - POSTALISED CHARGES... 5 2. Process for setting Forecast Postalised Charges... 5 3. Calculation of

More information

SIMONE Capacity Tools and Gas Transport Commercial Management System Integration

SIMONE Capacity Tools and Gas Transport Commercial Management System Integration SIMONE Capacity Tools and Gas Transport Commercial Management System Integration Zdravko Oklopčić, Končar KET Martin Stýblo, SIMONE Research Group Summary: Calculation of Available Capacity is very important

More information

NERA Analysis of Energy Supplier Margins

NERA Analysis of Energy Supplier Margins 7 December 2009 NERA Analysis of Energy Supplier Margins By Graham Shuttleworth Even though wholesale energy prices have fallen recently, gas and electricity suppliers are earning very little margin on

More information

Disclaimer: All costs contained within this report are indicative and based on latest market information. 16 th March 2015

Disclaimer: All costs contained within this report are indicative and based on latest market information. 16 th March 2015 Disclaimer: All costs contained within this report are indicative and based on latest market information 16 th March 2015 FD SUMMARY The make up of the electricity bill is changing, with non-commodity

More information

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations G1 DEFINITIONS In the ISO rules: acceptable operational reason means with respect to a source asset, any one or more of the following: i) a circumstance related to the operation of the generating asset

More information

Greece s Role as the Emerging Energy Hub of South- Eastern Europe: DESFA s Role and Perspectives

Greece s Role as the Emerging Energy Hub of South- Eastern Europe: DESFA s Role and Perspectives Greece s Role as the Emerging Energy Hub of South- Eastern Europe: DESFA s Role and Perspectives By: Konstantinos E. Maroulis General Manager Director of Gas Transmission, Administration & Finance Hellenic

More information

REDUCING ENERGY CONSUMPTION AND PEAK POWER IN BELGIUM

REDUCING ENERGY CONSUMPTION AND PEAK POWER IN BELGIUM REDUCING ENERGY CONSUMPTION AND PEAK POWER IN BELGIUM With the support of: [email protected] www.3e.eu PRESENTATION CONTENT Outline Objective Background Energy efficiency: examples in 3 sectors Residential: electric

More information

BUSINESS RULES FOR CHAPTER VII DAILY IMBALANCE CHARGES

BUSINESS RULES FOR CHAPTER VII DAILY IMBALANCE CHARGES BUSINESS RULES FOR CHAPTER VII DAILY IMBALANCE CHARGES 1. General 1.1. The TSO shall publish its imbalance charge methodology and update it accordingly as any changes are made. This methodology must contain:

More information

ENTSO-E Network Code on Emergency and Restoration

ENTSO-E Network Code on Emergency and Restoration ENTSO-E Network Code on Emergency and Restoration 25 March 2015 Notice This Network Code represents ENTSO-E s final proposals in line with the ACER Framework Guidelines on Electricity System Operation

More information

ESRI Research Note. The Irish Electricity Market: New Regulation to Preserve Competition Valeria di Cosmo and Muireann Á. Lynch

ESRI Research Note. The Irish Electricity Market: New Regulation to Preserve Competition Valeria di Cosmo and Muireann Á. Lynch ESRI Research Note The Irish Electricity Market: New Regulation to Preserve Competition Valeria di Cosmo and Muireann Á. Lynch Research Notes are short papers on focused research issues. They are subject

More information

Developing Estonian energy policy hand in hand with EU energy packages

Developing Estonian energy policy hand in hand with EU energy packages Developing Estonian energy policy hand in hand with EU energy packages Einari Kisel Secretary General of Energy of the Estonian Ministry of Economic Affairs and Communications 2008 will go down in history

More information

National Report 2015 to the Agency for the Cooperation of Energy Regulators and to the European Commission

National Report 2015 to the Agency for the Cooperation of Energy Regulators and to the European Commission Ref: 1842/601/2015 10.7.2015 National Report 2015 to the Agency for the Cooperation of Energy Regulators and to the European Commission Finland National Report 2015 - Energy Authority, Finland 1 CONTENT

More information

Reliability and security of electricity supply: the Italian blackout

Reliability and security of electricity supply: the Italian blackout Reliability and security of electricity supply: the Italian blackout Alessandro Ortis President AEEG The Regulatory Authority for Electricity and Gas of Italy 5th NARUC/CEER Energy Regulators Roundtable

More information

Access to gas transportation

Access to gas transportation Access to gas transportation Sergio Ascari Gas Advisor, Florence School of Regulation WAGPA Natural Gas Workshop Cotonou, February 14-16, 2012 Contents The gas market model Transportation Tariffs Network

More information

Title 2 Rules Governing the Eastern Market Area Part 1 Access to the Network and Capacity Management Chapter 1 Access to the Transmission Network

Title 2 Rules Governing the Eastern Market Area Part 1 Access to the Network and Capacity Management Chapter 1 Access to the Transmission Network Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model as amended in 2016 (2016 Gas Market Model Amendment Ordinance 2012) In exercise of section 41 Gaswirtschaftsgesetz

More information

CENTRAL BANK OF KENYA (CBK) PRUDENTIAL GUIDELINE ON BUSINESS CONTINUITY MANAGEMENT (BCM) FOR INSTITUTIONS LICENSED UNDER THE BANKING ACT

CENTRAL BANK OF KENYA (CBK) PRUDENTIAL GUIDELINE ON BUSINESS CONTINUITY MANAGEMENT (BCM) FOR INSTITUTIONS LICENSED UNDER THE BANKING ACT CENTRAL BANK OF KENYA (CBK) PRUDENTIAL GUIDELINE ON BUSINESS CONTINUITY MANAGEMENT (BCM) FOR INSTITUTIONS LICENSED UNDER THE BANKING ACT JANUARY 2008 GUIDELINE ON BUSINESS CONTINUITY GUIDELINE CBK/PG/14

More information

Pilot Framework Guidelines on Electricity Grid Connection Ref: E10-ENM-18-04 7 December 2010

Pilot Framework Guidelines on Electricity Grid Connection Ref: E10-ENM-18-04 7 December 2010 Pilot Framework Guidelines on Electricity Grid Connection Ref: E10-ENM-18-04 7 December 2010 European Regulators Group for Electricity and Gas Contact: Council of European Energy Regulators ASBL 28 rue

More information

Code of Conduct on Data Centre Energy Efficiency. Endorser Guidelines and Registration Form. Version 3.0.0

Code of Conduct on Data Centre Energy Efficiency. Endorser Guidelines and Registration Form. Version 3.0.0 1 EUROPEAN COMMISSION DIRECTORATE-GENERAL JRC JOINT RESEARCH CENTRE Institute for Energy Renewable Energies Unit Ispra, 1 st January 2015 Code of Conduct on Data Centre Energy Efficiency Endorser Guidelines

More information

Germany. Key issues. 1. General overview

Germany. Key issues. 1. General overview Germany Key issues High volumes of renewables have changed the way the electricity market in Germany operates. In 2012 direct marketing increased, in particular in onshore wind, due to a change of the

More information

Gas terminology for business. Gas Terminology. Simplifying energy management. www.businesscostconsultants.co.uk

Gas terminology for business. Gas Terminology. Simplifying energy management. www.businesscostconsultants.co.uk Gas Terminology Simplifying energy management AMR Automated Meter Reading - automatic collection of data from meters which is transferred to a central database for billing and/or analysis. AQ Annual quantity.

More information

NATURAL GAS PRICES TO REMAIN AT HIGHER LEVELS

NATURAL GAS PRICES TO REMAIN AT HIGHER LEVELS I. Summary NATURAL GAS PRICES TO REMAIN AT HIGHER LEVELS This brief white paper on natural gas prices is intended to discuss the continued and sustained level of natural gas prices at overall higher levels.

More information

Energy storage in the UK and Korea: Innovation, Investment and Co-operation Appendix 4.1: Stakeholder interviews from Korea

Energy storage in the UK and Korea: Innovation, Investment and Co-operation Appendix 4.1: Stakeholder interviews from Korea Energy storage in the UK and Korea: Innovation, Investment and Co-operation Appendix.1: Stakeholder interviews from Korea Peter Taylor & Lloyd Davies, University of Leeds Appendix.1: Stakeholder interviews

More information

LONG-TERM ENERGY SECURITY RISKS FOR EUROPE: A SECTOR-SPECIFIC APPROACH

LONG-TERM ENERGY SECURITY RISKS FOR EUROPE: A SECTOR-SPECIFIC APPROACH New approaches to secure Europe s energy supplies First SECURE stakeholders meeting LONG-TERM ENERGY SECURITY RISKS FOR EUROPE: A SECTOR-SPECIFIC APPROACH Arianna Checchi Brussels, 29 January 2009 1 OUTLINE

More information

GLOSSARY. Glossary of Terms for Capacity Based Demand Response PUBLIC. Issue 3.0 GOT-1

GLOSSARY. Glossary of Terms for Capacity Based Demand Response PUBLIC. Issue 3.0 GOT-1 PUBLIC GOT-1 GLOSSARY Glossary of Terms for Capacity Based Demand Response Issue 3.0 This document provides a glossary of terms with definitions used in the Capacity Based Demand Response program. Public

More information

Norwegian position on the proposed EU framework for climate and energy policies towards 2030

Norwegian position on the proposed EU framework for climate and energy policies towards 2030 Norwegian position on the proposed EU framework for climate and energy policies towards 2030 The EU plays an important role as a global leader in climate policy and has a fundamental interest in strengthening

More information

Company Management System. Business Continuity in SIA

Company Management System. Business Continuity in SIA Company Management System Business Continuity in SIA Document code: Classification: Company Project/Service Year Document No. Version Public INDEX 1. INTRODUCTION... 3 2. SIA S BUSINESS CONTINUITY MANAGEMENT

More information

REPORT On the work of the Croatian Energy Regulatory Agency For the year 2005

REPORT On the work of the Croatian Energy Regulatory Agency For the year 2005 Republic of Croatia Croatian Energy Regulatory Agency REPORT On the work of the Croatian Energy Regulatory Agency For the year 2005 Zagreb, July 2006 Croatian Energy Regulatory Agency CONTENT A. REPORT

More information

Analysis of the electricity prices in the Slovak Republic and their impact on the individuals energy security

Analysis of the electricity prices in the Slovak Republic and their impact on the individuals energy security Analysis of the electricity prices in the Slovak Republic and their impact on the individuals energy security Abstract Martina Mokrišová Department of Finance and Accounting Faculty of Management University

More information

1. EXECUTIVE SUMMARY AND KEY RECOMMENDATIONS

1. EXECUTIVE SUMMARY AND KEY RECOMMENDATIONS 1. EXECUTIVE SUMMARY AND KEY RECOMMENDATIONS EXECUTIVE SUMMARY Energy policy in Greece has the potential to make a significant contribution to the country s economic recovery. Increasing competition and

More information

Alice Miller Energy Consultant September 28, 2011

Alice Miller Energy Consultant September 28, 2011 Rate Design and Billing Systems Alice Miller Energy Consultant September 28, 2011 What is Rate Design? Principal goals of rate design Meet revenue requirement Equity among service classes Customer impacts

More information

An Introduction to Natural Gas

An Introduction to Natural Gas An Introduction to Natural Gas NYMEX settlement prices since 1995 $12.00 $10.00 $ / MMBTU $8.00 $6.00 $4.00 $2.00 $0.00 95'Jan Jul 96'Jan Jul 97'Jan Jul 98'Jan Jul 99'Jan Jul 00'Jan Jul 01'Jan Jul 02'Jan

More information

CLOUD SERVICES SERVICE LEVEL AGREEMENT. Cloud Services

CLOUD SERVICES SERVICE LEVEL AGREEMENT. Cloud Services Article 1: Definitions CLOUD SERVICES SERVICE LEVEL AGREEMENT Support for all Customers on all Problems with the exception of 1 st line Help desk those which initial investigation shows are directly related

More information

sustainable gains in energy policy. While the report addresses energy policies comprehensively, the following sections highlight these three topics.

sustainable gains in energy policy. While the report addresses energy policies comprehensively, the following sections highlight these three topics. EXECUTIVE SUMMARY 01 A small, somewhat isolated country, Finland takes a balanced view of its energy policy, taking advantage of its situation wherever possible. Where it can leverage its location and

More information

GDF SUEZ. Introduction. Jean-François Cirelli

GDF SUEZ. Introduction. Jean-François Cirelli GDF SUEZ Introduction Jean-François Cirelli Content 1. Focus on gas market dynamics 2. Focus on electricity market dynamics 3. Focus on P&L resilience and sensitivities 4. Focus on synergies and performance

More information

LONG-TERM OUTLOOK FOR GAS TO 2 35

LONG-TERM OUTLOOK FOR GAS TO 2 35 LONG-TERM OUTLOOK FOR GAS TO 2 35 Eurogas is the association representing the European gas wholesale, retail and distribution sectors. Founded in 1990, its members are some 50 companies and associations

More information

LONG-TERM ASSESSMENT OF NATURAL GAS INFRASTRUCTURE TO SERVE ELECTRIC GENERATION NEEDS WITHIN ERCOT

LONG-TERM ASSESSMENT OF NATURAL GAS INFRASTRUCTURE TO SERVE ELECTRIC GENERATION NEEDS WITHIN ERCOT LONG-TERM ASSESSMENT OF NATURAL GAS INFRASTRUCTURE TO SERVE ELECTRIC GENERATION NEEDS WITHIN ERCOT Prepared for The Electric Reliability Council of Texas JUNE 2013 Black & Veatch Holding Company 2011.