Preventive Action Plan Belgium

Size: px
Start display at page:

Download "Preventive Action Plan Belgium"

Transcription

1 Preventive Action Plan Belgium After regulation No 994/2010 of the European Parliament and of the Council of 20 October 2010 concerning measures to safeguard security of gas supply FPS Economy, S.M.E.s, Self-Employed and Energy North Gate III, Koning Albert II-laan Brussel

2 1 Table of contents EXECUTIVE SUMMARY INTRODUCTION CONTEXT REGULATION 994/ SUMMARY OF THE MAIN RESULTS OF THE RISK ASSESSMENT RISK & SCENARIO ANALYSIS RISK EVALUATION RISK TREATMENT DIVERSIFICATION ANALYSIS INFRASTRUCTURE & SUPPLY STANDARD INFRASTRUCTURE STANDARD (N-1) SUPPLY STANDARD INTERRUPTIBLE & PROTECTED CUSTOMERS End-users on the distribution network End-users on the transport network STRESS TEST N-x analyses Scenario analysis Commodities analysis OBLIGATIONS IMPOSED ON NATURAL GAS UNDERTAKINGS AND OTHER RELEVANT BODIES, INCLUDING FOR THE SAFE OPERATION OF THE GAS SYSTEM PUBLIC SERVICE OBLIGATIONS (PSO S) National legislation Regional legislation (distribution network) QUALITY & LEVEL OF MAINTENANCE OF THE NETWORK OVERVIEW PREVENTIVE MEASURES SUPPLY SIDE & MARKET BASED MEASURES Increased import flexibility (through long term and short term contracts) Facilitating the integration of gas from renewable energy sources into the gas network infrastructure Commercial gas storage withdrawal capacity and volume of gas in storage LNG terminal capacity and maximal send-out capacity Diversification of gas supplies and gas routes Reverse flows and investments in infrastructure Coordinated dispatching by transmission system operators DEMAND SIDE & MARKET BASED MEASURES Use of interruptible contracts Fuel switch possibilities including use of alternative back-up fuels in industrial and power generation plants Voluntary firm load shedding SUPPLY SIDE & NON MARKET BASED MEASURES... 35

3 Use of strategic storage Enforced use of electricity generated from sources other than gas Enforced storage withdrawal DEMAND-SIDE & NON MARKET BASED MEASURES Enforced fuel switching Enforced utilisation of interruptible contracts Enforced firm load shedding MECHANISMS FOR COOPERATION WITH OTHER MEMBER STATES TRANSPARENCY COHERENCE COOPERATION COMMUNICATION COMMON CRISIS EXERCISES LEARNING FROM BEST PRACTICES INFORMATION ON EXISTING AND FUTURE INFRASTRUCTURE IN BELGIUM EXISTING AND NEW INFRASTRUCTURE REVERSE FLOW ANALYSIS ANNEX 1: OVERVIEW TABLE OF THE MARKET BASED SUPPLY SIDE MEASURES ANNEX 2: OVERVIEW OF THE MARKET BASED DEMAND SIDE MEASURES ANNEX 3: CALCULATION DETAILS AND RESULTING ESTIMATIONS OF GAS DEMAND BELGIAN PROTECTED COSTUMERS... 49

4 3 Executive Summary The preventive action plan identifies all the measures the Belgian government and the stakeholders in the gas industry can take in order to reduce risks that can occur in the gas supply chain. A series of risks were already identified in the risk assessment drafted by the Energy administration in 2011 and was updated in From the risk analyses, we could conclude that the Belgian gas system never had any serious incidents threatening the gas supply to protected customers. However, if there is an accumulation of circumstances (for example a pipeline blow during very severe winter conditions), the gas supplies to protected customers 1 could be endangered. The preventive action plan picks up on the main points of the risk analyses, notably what we consider as main threats for the Belgian security of supply (mainly incidents upstream that cause a complete shut off of one source of gas), the results of the N-1 analyses and an analyses of the reverse flows and the degree of diversification. One important element in the preventive action plan is the supply standard. In Belgium, a main part of the responsibility to keep the gas system in balance lays with the shippers and suppliers. Therefore the suppliers will have to meet certain obligations if they are supplying the distribution network. At last, we will give an indication of which market and non-market based measures could be implemented in Belgium. 1 Protected customers are defined in Belgium as the consumers connected to the distribution grid (residential and non-residential), as described in the Ministerial Decree on 18 December 2013 establishing the federal emergency plan for the supply of natural gas.

5 4 1. Introduction The purpose of the preventive action plan is to identify the possible measures the Belgian government and the stakeholders in the gas industry can take in order to reduce risks that could occur in the gas supply chain. It gives an overview of the actions that already exist and makes an analysis of new actions that could be introduced. We already mention that a distinction will be made between risks that could have an impact on a local level, or incidents that could endanger the entire gas systems and therefore have possible effects on neighbouring countries as well. Our primary focus will be on the risk for the entire gas system. Risks that only have a local impact are part of the emergency planning of the transmission system operator and/or the distribution system operator. In the risk assessment a series of risks were identified. The risk assessment gives a first indication of the main risk for our gas security of supply. The actions to take to prevent and mitigate the risks are now taken up in the preventive action plan and in the emergency plan. Article 4 of the Regulation stipulates that the plans should be notified to the European Commission by December 3, In the first part of the preventive action plan, we will sum up the main elements from the risk analyses, notably what we consider as main threats for the Belgian security of supply (mainly incidents upstream that cause a complete shut off of one source of gas), the results of the N-1 calculation, an analyses of the reverse flows and the degree of diversification. Secondly, we will take a closer look at the supply standard and what will be done to enforce it. Thirdly, we will list up the generally accepted risks in the gas supply chain and what actions already exist in Belgium to mitigate them, and finally we will make an analysis of the market based and the non-market based measures that could be implemented in case of an emergency. On this last point, we can already point out that in Belgium most of the focus during a supply disruption lies on actions at the supply side. Momentarily, there aren t any possible actions that can be conducted on the demand side to reduce the impact of a supply disruption. However a study is being conducted to investigate possible actions that can be taken in the future. The preventive action plan will make an evaluation of the actions to take. The next step will be to effectively implement those measures with an accurate legal framework and a regularly follow up of those measures.

6 5 2. Context regulation 994/2010 The intention of the Regulation 994/2010 of the European Parliament and of the Council Concerning Measures to Safeguard Security of Gas Supply is to prevent the kind of gas crisis situations EU-27 experienced in January One of the means considered in the Regulation to achieve this target is performing a full risk assessment, a preventive action and emergency plan. As for the preventive action plan, article 5 of the Regulation stipulates the following on the content of the Preventive Action Plan: The national and joint Preventive Action Plans shall contain: (a) the results of the risk assessment as laid down in Article 9 ( CHAPTER 3); (b) the measures, volumes, capacities and the timing needed to fulfil the infrastructure and supply standards, as laid down in Articles 6 and 8 (CHAPTER 4); (c) obligations imposed on natural gas undertakings and other relevant bodies, including for the safe operation of the gas system (CHAPTER 5); (d) the other preventive measures, such as those relating to the need to enhance interconnections between neighbouring Member States and the possibility to diversify gas routes and sources of supply, if appropriate, to address the risks identified in order to maintain gas supply to all customers as far as possible (CHAPTER 6); (e) the mechanisms to be used for cooperation with other Member States for preparing and implementing joint Preventive Action Plans and joint Emergency Plans, as referred to in Article 4(3), where applicable (CHAPTER 7); (f) information on existing and future interconnections, including those providing access to the gas network of the Union, cross-border flows, cross-border access to storage facilities and the physical capacity to transport gas in both directions (bidirectional capacity), in particular in the event of an emergency (CHAPTER 8); (g) information on all public service obligations that relate to security of gas supply. (CHAPTER 5) This report is fully structured in function of above bullets and will attempt to address the respective elements.

7 6 3. Summary of the main results of the risk assessment As mentioned, in 2011 the Belgian Energy Administration as competent authority performed a risk assessment, which was based on the International Standard on risk management ISO that suggested by the Joint Research Centre (JRC) of the European Commission. This risk assessment was updated in Figure 1: Methodology risk assessment The methodology is structured in five steps: Step 1: Establishing the context of the Belgian gas sector Step 2: Risk identification Step 3: Risk analysis Step 4: Risk evaluation Step 5: Risk treatment This chapter will go deeper into some general results of the Belgian risk assessment, and more specifically results from the scenario analysis and risk evaluation (step 3 & 4). Risk treatment (step 5) is proposed for identified risks. Other, more specific results of the risk assessment (such as infrastructure & supply standards, diversification analysis, reverse flow analysis, ) will be discussed in separate chapters Risk & scenario analysis Five risk scenarios were identified in the risk assessment of which three incidents upstream and two scenarios with incidents internally in the Belgian network. The three upstream scenarios concerned an LNG disruption from Qatar (ex. through the closure of the Strait of Hormuz), a technical incident

8 7 on Zeepipe (supplies from Norway) and an incident on one of the L-gas pipelines coming from the Netherlands. The two scenarios we envisaged inside the Belgian gas network are an incident with the storage facility and an increased gas demand due to the nuclear phase out. Outside of those scenarios identified, technical incidents (pipeline burst, leakage, ICT breakdown, accidents, loss of power supply, explosion...) can occur anywhere else in the network. Table 1: Overview considered scenarios Category Scenarios Impact Likelihood Timeframe risk Threat/ hazard Provenance Duration Timing Severity 1. Political unrest in Middle East: LNG disruption scenario on 15/01 (Qatar) Political risk Severe Low Short term Hazard External 30 days Winter 295 GWh/d 2. Hurricane in North Sea: major outage of supplies from Norway on 15/01 Environmental risk Severe Very low Short term Hazard External 1 month Winter 411 GWh/day 3. Technical failure major pipeline: outage of supplies from the Netherlands on 5/02 Technical risk Severe Low Short term Hazard External 7 days Winter 77 GWh/day 4. Nuclear phase out Belgium and impact of increased gas supplies from Russia Political risk Noticeable High Long term Threat Internal & external / / n/a 5. Failure of Loenhout storage facility - all storage capacity out (15/7) Geo-political risk Noticeable Low Short term Threat Internal 2 months Summer 625 kcm/day As for any of the simulated scenarios, the impact on the gas flows in and to Belgium will be manageable for a certain period of time and the supplies to protected customers will not be impacted, we assume that this will be the case for either incident in the network. Of course, the impact of a technical incident in the Belgian network will depend on several conditions (timing of the incident e.g. during winter peak demand or summer, disproportion in the demand zones or supply entries in the Belgian network,...). For example, an incident on Zeepipe in the middle of winter will lead to the emergency phase in a couple of hours if the market is not able

9 8 to renominate the gas via other entry points within three hours. The impact of the closure of the Strait of Hormuz will be much harder to assess. First of all, in the risk analyses, we could see that the impact on the Belgian gas network would be manageable if supplies could be increased from other sources. However, as all of the Qatari gas would fall away due to a blockage in the strait of Hormuz, all European buyers of Qatar gas would draw on their additional supplies, which could come from the same sources as the Belgian supplies Risk evaluation In the risk evaluation, all risks (with its likelihoods and impacts) identified and analysed during the risk identification & risk analysis, are evaluated. Risk is acceptable => OK Risk is not acceptable => risk treatment/risk avoidance/risk transfer is needed. As for the risk evaluation, it is not feasible to guarantee a total protection of the entire Belgian gas supply. A reasonable risk threshold, that determines a realistic protection level, has to be defined. The level of the threshold will depend on several matters, most of all on: - the quantities of gas lost - the probability of the risks considered - the duration to cover The guarantee of a secure gas supply in Belgium comes at a cost. The higher the risk that needs to be covered, the higher the price tag. We can try to classify the risks according to the probability levels and the impact. The classification only gives a broad indication of the risks, as the impact of the same risk may vary according to the timing and the location of the incident. We have tried to take into account the most likely outcome of the incidents based on historical experiences. Table 2: Severity levels of consequences criteria Impact Description Minor Low Noticeable Severe Very severe Short-term disturbance of sector activity. No direct consequences to other sectors. Temporary disturbance of national gas supply. Consequences are eliminated by efforts of Fluxys Belgium alone. Impact of consequences of disturbance of gas supply on other sectors (heat supply) are negligible. Gas supply disruption to the area and necessity of back-up systems or alternative measures. The impact of the disruption of gas supply to other sectors is severe. (Load shedding) Long-term efforts required for restoration of gas supply. Impact on other sectors and protected customers.

10 9 Table 3: Assessment of the probability accidents Probability level Probability Average frequency of occurrence 1 Very low Less than once in 20 years 2 Low Once in 10 years 3 Medium Once in 3 years 4 High Once a year 5 Very high More often than once a year The risk matrix below (table 4) gives an overview of the main scenarios (see table 1) as identified in the risk assessment: Table 4: Risk matrix Probability Impact Very low Low Medium High Very High Minor Low Noticeable Failure Loenhout Nuclear phase out Severe Closure strait Loss supply Norway Hormuz; L gas scenario Very Severe Conclusion: From this risk assessment & analysis, we could conclude that the Belgian gas system has never had any serious incidents threatening the gas supply to protected customers. However, if there is an accumulation of circumstances (for example a pipeline blow during very severe winter conditions), the gas supplies to protected customer could be endangered Risk treatment Risk treatment (step 5) is not part of the risk assessment as such and is addressed in the preventive action plans and emergency plans. The main threats that we identified in the risk assessment are mostly of a technical nature. Indeed, most of the incidents in the gas network that occurred in Belgium were either pipeline blows (ex. Ghislenghien), or other short lived technical incidents on interconnection points, this on either side of the border. Fortunately, those incidents have always been handled without the system integrity being endangered and with no impact on the gas consumption of the protected customers.

11 10 In table 5, for the considered risks, we give an overview of possible risk treatment. Possible market based and non-market based measures will be described in chapter 6. Table 5: overview of the risks and risk treatment Risk Possible impact Acceptability Risk treatment Pipeline burst in Belgian network One part of a pipeline is hit. The impacted pipeline will be isolated and gas will be renominated via other routes. Possibility to reduce the risk Information on pipeline location through KLIM, maintenance of the infrastructure, cathodic protection, foresee bypasses, redundancy in the network Pipeline burst upstream No gas flows from a certain entry point to the Belgian network Risk acceptance Foresee enough other interconnection points to import gas via other routes Technical failure of utilities necessary to operate pipelines (compressor stations, SCADA s, control rooms ) Impact on the gas flows, depending on the duration, the location and gas demand Risk reduction Maintenance, back-up facilities, foresee sufficient incident means Failure of infrastructure due to impact Impact on the gas flows, depending on the duration, the location and gas demand Risk acceptance Preventive measures on infrastructure sites, concept design, protection of critical infrastructure Failure of infrastructure due to extreme weather Pipeline leakages may occur after extended periods of frost Risk reduction Preventive measures on infrastructure sites, concept design, protection of critical infrastructure Failure of infrastructure due to technical neglect or outdated technology Impact on the gas flows, depending on the duration, the location and gas demand Risk reduction Pipeline maintenance and design Loss of power supply/electricity black-out/brown out Loss of compression Risk reduction Back-up power generation or compressor stations operated on other power source

12 11 Intentional sabotage Impact on the gas flows, depending on the incident, the duration, the location and gas demand Risk reduction Protection of critical infrastructure Virus/cyber attack Destabilisation of SCADA Supervisory Control and Data Acquisition Risk reduction Computer Emergency Response Team (CERT) Sudden gas peak demand (e.g. Due to cold wave) Interruptions to end consumers Risk reduction Introduction of supply standard Commercial disputes/supplier default Shortfall in gas supplies, interruptions to end consumers Risk reduction Financial check through obtaining supply license Strikes in gas sector Blockage of gas infrastructure, no staff for control room, Risk reduction Conclude minimum service agreements Floods/landslides/earthquakes Damage to infrastructure Risk reduction Preventive measures on infrastructure sites, concept design, protection of critical infrastructure With respect to the risk of a loss of power supply/electricity black-out, a serie of preventive actions are taken by the Transmission System operator of Natural Gas, Fluxys Belgium, in collaboration with the Transmission System Operator of the Electricity Grid Elia, National Regulatory Authority CREG and the Belgian Energy Administration, in order to assess and minimise the impact of a loss of power supply/electricity: A black-start study has been conducted to assess the possibility and the conditions under which Fluxys Belgium can assist Elia in rebuilding the balance of the Electricity Transmission Grid by supplying a natural gas to black-start power plants. On the other hand, Fluxys Belgium provided a list of Installations to Elia together with priorities indicating their necessity for safeguarding the security of gas supply when load shedding is applied in the Electricity Transmission Grid Finally, Fluxys Belgium established an emergency plan specifically aimed at actions to be undertaken in case of an emergency situation in the Electricity Transmission Grid and invested in Back-up power generation.

13 12 Belgium has also participated during summer 2014 to the European study on the impact of a scarcity of natural gas coming from Russia and/or via the transit route through Ukraine during the winter (the stress test scenario). The result of the stress test for Belgium indicates that the Fluxys Belgium TSO network is quite interconnected and supply sources quite are diversified Diversification analysis In above table, we mainly took into account the risks for gas supply on the Belgian national territory because we assume that upstream risks are out of our power to treat. The main remedy is to have well diversified supply routes. Belgium has a well-diversified gas portfolio and supply network for H-gas that allows looking for alternative supplies in case of a supply disruption. We had already mentioned in the risk assessment that the suppliers no longer manage their portfolios according to the demand of the consumers in a specific country, but they keep rather EU-wide portfolios. On the one hand, this makes it very difficult to determine the supply portfolio destined for the Belgian market. On the other hand, it increases the flexibility of the suppliers to deal with an emergency somewhere in the European market. Mostly they have storage available in other countries and access to flexible contracts and more diversified supply routes. This means that renominations should also be easier to handle in case of an emergency. Figure 2: Physical flows of natural gas into Belgium in 2013 Source: FPS Economy It is however necessary to keep in mind supplies can only be re-routed if the suppliers have access to upstream capacity to enter the gas in Belgium through another entry point or to make use of the secondary capacity market. The supplies of L-gas originate mainly from the Netherlands. The availability of L-gas on the market can normally be guaranteed because the Dutch system no longer makes a difference in the gas quality, the Dutch network transmission operator can convert H-gas into L-gas by ballasting it.

14 13 Natural gas can enter the country through a series of entry points on the natural gas transmission network. LNG supplies come mainly from Qatar by long-term contracts, via the Zeebrugge terminal and accounted for a share of 4% of the physical flows into Belgium in Natural gas customers who use L-gas are supplied directly from the Netherlands. Figure 3: Distribution of the entry volumes in 2013 Source: CREG; *The entry points of Blaregnies are opposite to the physical flows (reverse flows) by making use of the dominant transits on these points In order to increase the flexibility of the system and to increase the security of supply, the TSO works with an Entry-Exit model. The main advantage for the security of supply (mainly for the H-gas network) of the Entry-Exit model is the increased flexibility that is introduced through: only one balancing point for H-gas (imbalances over the currently three H-gas balancing zones will automatically be re-distributed to create virtually one balancing zone) and one for L-gas on which intraday balancing will be applied; introduction of a virtual trading point for H-gas; free exchange of quantities of natural gas from any interconnection point within the Belgian system to any interconnection point or domestic exit point. 4. Infrastructure & supply standard 4.1. Infrastructure standard (N-1) The N 1 formula describes the ability of the technical capacity of the gas infrastructure to satisfy total gas demand in the calculated area in the event of disruption of the single largest gas infrastructure during a day of exceptionally high gas demand occurring with a statistical probability

15 14 of once in 20 years. Gas infrastructure includes the gas transmission network including interconnectors as well as production, LNG and storage facilities connected to the calculated area. The technical capacity of all remaining available gas infrastructure in the event of disruption of the single largest gas infrastructure should be at least equal to the sum of the total daily gas demand of the calculated area during a day of exceptionally high gas demand occurring with a statistical probability of once in 20 years. In the risk assessment, we noted that transit flows to neighbouring countries are not taken into account for the calculation of the N-1 standard. Therefore, the N-1 calculation assumes that all the gas flows are destined for the Belgian domestic market. In practice, this is not the case. To take into account the gas flows for the neighbouring countries, it could be useful in the future to calculate the N-1 standard at regional level. For Belgium, the N-1 calculation for the H-gas infrastructure gave a result of 172,34% in 2011 and 162,48% for This means that the full demand could be covered during a day of exceptionally high gas demand in the event of the disruption of the single largest gas infrastructure. The single largest gas infrastructure for Belgium is IZT, the interconnector between UK and BE. We refer to the risk assessment for the detailed calculation of the N-1 formula. No demand side measures were taken into account for the calculation of the N-1. The table below gives an overview of the N-1 calculations up to 2020 bases on the capacity expansions in the investment plan of Fluxys Belgium (see also chapter 8). We took the most restrictive approach for this calculation, based on the minimum of the available capacity between the Fluxys Belgium network and the TSO network. We can state that even with the most restrictive approach, Belgium has sufficient capacity available to meet the N-1 criteria. Table 6: Based on Fluxys capacity and loss of Interconnector pipeline N-1 Calculation (mcm/day) Date D max H 88,01 89,3 D eff H 0 0 EP m H 229,92 263,72 P m H -9,6-9,6 S m H LNG m H 45,6 45,6 I m Interconnector 64,8 74,4 N-1[%] 246,7% 270,0%

16 15 Table 7: Based on min(fluxys, adjacent TSO) capacity and loss of Interconnector pipeline N-1 Calculation (mcm/day) Date Dmax H 88,01 89,3 Deff H 0 0 Epm H 229,92 263,52 Pm H -8,64-8,64 Sm H LNGm H 45,6 45,6 Im Interconnector N-1[%] 248,7% 282,7% As from 2016, the new interconnection point at Alveringem will be added to our network (new pipeline from the LNG terminal in Dunkirk in France to Belgium) Supply standard According to article 8 of the regulation, the gas undertakings have to be able to supply the protected customers of the Member State in the following cases: - Extreme temperatures during a 7-day peak period occurring with a statistical probability of once in 20 years - Any period of at least 30 days of exceptionally high gas demand, occurring with a statistical probability of once in 20 years - For a period of at least 30 days in case of the disruption of the single largest gas infrastructure under average winter conditions The gas undertakings that will need to live up to those standards are all gas undertakings that deliver gas to the distribution network. In our risk analysis, we already tried to convert the above standards in more concrete criteria that can be applied and checked on a transparent basis. First of all we had to check what temperature profile corresponds to the 7 day peak period occurring with a statistical probability of once in 20 years. For this period we had identified the number of degree days and the equivalent temperature, based on historical data of the last 100 years. This way we can establish a profile that can be used to simulate gas demand. For the 7 day peak period, we obtained the following result:

17 16 Table 8: Degree days and equivalent temperature for the 7 day peak period occurring once in 20 years begin end Degree Day/Equivalent temperatures Sum/mean 28/12/1996 3/01/ ,1 23,3 20,1 23,1 26,9 27,4 25,3 169,2-6,6-6,8-3,6-6,6-10,4-10,9-8,8-7,7 1/01/1979 7/01/ ,6 24,6 23,7 22,9 24,6 25,7 22,9 170,0-9,1-8,1-7,2-6,4-8,1-9,2-6,4-7,8 17/01/ /01/ ,6 26,9 26,2 22,8 22,9 23,9 22,3 168,6-7,1-10,4-9,7-6,3-6,4-7,4-5,8-7,6 17/12/ /12/ ,4 23, ,8 25,6 23,6 23,4 169,3-6,9-7 -7,5-9,3-9,1-7,1-6,9-7,7 19/01/ /01/ ,5 25,6 23,5 26,5 24,6 23,6 22,2 170,5-8 -9, ,1-7,1-5,7-7,9 Average 24,0 24,8 23,5 24,2 24,9 24,8 23,2 169,5-7,5-8,3-7,0-7,7-8,4-8,3-6,7-7,7 Source: FPS Economy For the 30 day period of peak demand, we obtained the following results for the degree days based on the historic data of the last 100 years: Table 9: Average Degree Days (DD) per peak period and amount of DD with 5% risk 5 6 Consumption Slope 1 month month month 1 year due to 1 day 7 days 30 days 150 days 180 days 365 days Central Heating (CH) Average Linear Varying 100 years 21,2 133, in function of DD Peak 5% 100 years 26,8 169, Others than CH Constant 3,3 22, Total Average 100 years 24,5 155, Peak 5% 100 years 30,1 192, Source: FPS Economy The volumes (energy in kwh) and the transport capacities (in m³(n)/h) corresponding to the supply standards are given in the following tables 10 and 11. The fact that in Belgium, two types of gas are distributed, leads to two values, one for the protected customers in the low calorific gas zone and one for the protected customers in the high calorific gas zone. These values were based on the gas year and can be re-actualized with the last data available (transfer of costumers from the low calorific gas market to the high calorific gas market, growth on the distribution network, ). Due to the cold spell in gas year these values however are quite representative for a winter colder than average. For H and L gas we will apply respectively the conversion factor energy/volume of 11,3 KWh/m³ and 9,77 kwh/m³. The following tables will included under chapter 4.2 (page 16) of the preventive action plan. Table 10: volumes (in TWh) corresponding to the supply standard

18 17 H (TWh) L (TWh) 7 days (5% climatic Risk) 2,95 2,83 30 days (5% climatic Risk) 10,87 10,30 30 days (50/50 climatic Risk) 9,14 8,56 Table 11: capacities (in m³(n)/h corresponding to the supply standard. H (m³(n)/h) L (m³(n)/h) 7 days (5% climatic Risk) days (5% climatic Risk) days (50/50 climatic Risk) To enforce the supply standard, the suppliers to the Belgian market will need to contract enough gas to meet those criteria for the 7 day peak demand, the 30 day peak demand and sufficient supplies through alternatives routes in case of a disruption of the largest gas infrastructure. As such a standard does no longer exist in Belgian national legislation, Belgium will introduce a new legal framework that obliges suppliers to foresee enough gas to supply the 7 day peak period. In the past, the following criteria were applicable in the Belgian market: 1. A transport capacity covering the hourly peak demand of -11 Ceq (statistical risk of 1 in 20 years) 2. The gas volumes need to be able to cover the gas demand linked to the winter peak of 1962/1963, the coldest year in the century (statistical risk of 1 in 95 years) 3. A gas volume covering gas demand for a 5 day peak period between -10 Ceq and -11 Ceq (average temperature during the day measured at Uccle with a statistical risk of 1 in 95 years) According to our calculations above, the peak winter peak value occurring once in 20 years is still -11 Ceq, we will opt to reintroduce these standards by law. The above criteria fall into two parts. The first part is the infrastructure obligations and the second part is the molecule obligation. For the infrastructure calculations, the TSO still bases its calculations in the investment plan on the -11 Ceq hourly peak criterion. By introducing the same criteria for the shippers, both the molecule standards will be in line with our infrastructure standard. An improvement is already made through the introduction of the new entry-exit model. The TSO will calculate the needed capacity per aggregated receiving station (ARS) to cover the full demand distribution network behind that specific ARS at -11 Ceq. The shippers and suppliers will then be forced to book the capacity calculated by the TSO in order to cover the winter peak demand and to avoid free riding. This way, at least the capacity is already in place to cover the peak demand. To solve the issue of the molecule obligation, the question remains how the government will monitor if the suppliers live up to the molecule standard. A possible option is to launch an annual winter information request on demand and supply portfolio of the suppliers. This information is

19 18 intended to assess the security of supply situation for the approaching winter. Requested information could amongst others include: the supplier s/ shipper s anticipated supply portfolio, including the source of contracted supply (e.g. National Balancing Point, Liquefied Natural Gas (LNG) imports and storage) demand information, including the volume of interruptible contracts and volume of demand that is not yet met by existing supply contracts. Information on the supply-demand portfolio could be requested for various scenarios such as the 7 day peak demand, the 30 day exceptionally high demand and in case of the disruption of the single largest infrastructure. This way, suppliers could be asked to provide demand and supply information for the entire winter as a whole or for different periods in winter (e.g. September to November and December to February). We would like to note that it is sometimes difficult to obtain data that can be aggregated consistently. Suppliers hold information in different formats and it has been difficult for some suppliers to provide the requested information in the required format. Given that contractual positions can change rapidly, there is also a question about the usefulness of such information. Furthermore, we will need to look at the consequences that can be imposed on shippers that cannot fulfil the supply standard, for example some sort of financial penalty. A second option is to adjust the licence conditions. The licence condition could require suppliers to prove that they can meet demand under specified security of supply standards. If companies fail to prove compliance with these standards, then this would constitute a licence breach. This would be assessed ex-ante before an emergency occurs and would not affect company s behaviour in or immediately prior to an emergency. In general, a licence condition benefits from not favouring a particular source of demand or supply flexibility above others. However, supply solutions do implicitly deliver different types of flexibility in terms of response time and certainty of delivery. This might need to be taken into account when designing an ex-ante license condition. In this case, such an obligation may increase the number of long-term supply contracts, as a means of demonstrating compliance with the obligation, which could potentially dampen market innovation. There is a risk that relying on an ex-ante assessment could be somewhat ineffective since suppliers could rapidly change their contractual positions following compliance with the license condition. An ex-post license condition could significantly reduce monitoring costs. In addition, given the potentially significant consequences associated with a license breach, we think that this requirement could be effective in ensuring suppliers take adequate measures to protect their firm customers. However, there are legal risks associated with this option as parties might disagree for example, on whether a supplier has used best endeavours to avoid a gas deficit. In order to implement the above mentioned measures, a new legal framework to enforce the supply standard for identified consumers (based on the regulation 994/2010) has been drafted. The supply standard enforces suppliers to have enough natural gas in their portfolio to first of all cover the peak demand that will be set at an equivalent temperature of -11 Ceq of their identified customers connected to the distribution grid and this for a period of at least 7 days. Secondly, to cover a winter period of exceptional high natural gas demand and thirdly, to cover the natural gas demand of their

20 19 customers connected to the distribution network for a period of at least 30 days in case of a disruption of the single largest gas infrastructure. The Administration will define a clear standard (e.g. the winter period could be defined by royal decree) for those thresholds and communicate them to the suppliers, but without being responsible if any natural gas disruption might still occur even if the suppliers all meet the standard. Another option is to make the natural gas suppliers responsible if any shortage of natural gas (for identified consumers) occurs during a winter peak demand or if there is a disruption in single largest and only have an ex-post checks on the companies. This could however lead to serious discussions about which supplier is responsible afterwards. A measure that is already in place to make sure suppliers deliver gas to Belgian end-users, is the daily market balancing regime. The Belgian TSO monitors the balance between entry and exit on a cumulative basis for all hours of a given day and intervenes in order to keep the system balanced at all times. Two kinds of interventions are possible: Within day interventions End of day interventions Within day interventions: In case the market balancing position goes beyond the upper (or lower) market threshold, the Belgian TSO intervenes through a sale (or purchase) transaction on the commodity market. The considered volume is then settled in cash with the grid users (s) contributing to such imbalance in proportion of their individual contribution. Grid users are penalized by 10% of the Belgian TSO price for the settled volumes. End of day interventions: At the end of the gas day, each grid user is returned to zero by a settlement in cash: Grid users helping the system pay or paid the Belgian TSO price

21 20 Imbalance causing grid users pay or paid the Belgian TSO price and pay an additional penalty of 10% price on their contribution to the market settlement exceeding the end of day market tolerance of +/- 2,5 GWh/d. Conclusion To conclude, there is no supply danger if a supplier doesn t fulfill its contractual engagements related to its clients. In case of an imbalance of the market, the Belgian TSO will identify the supplier(s) that caused the imbalance and a penalty needs to be paid (depending on kind of intervention needed to balance system) Interruptible & protected customers Energy end-users include residential and commercial customers as well as industrial firms and electric utilities. These customer groups have different energy requirements and thus quite different service needs. In the natural gas market, consumers can contract for either firm or interruptible service. Residential and small commercial customers such as households, schools, and hospitals use natural gas primarily for space and water heating and need reliable supply. Such customers require on demand service with no predetermined quantity restrictions, known as firm service. In contrast, larger commercial, industrial, and electric utility customers could have fuel switching or dual-fuel capabilities (which is rarely the case in Belgium) and could receive natural gas through a lower priority service known as interruptible service. In theory, energy supply reliability could be effectively handled at the customer level ability to switch quickly to an alternative fuel. Therefore, some countries distinguish between protected customers for whom most of the capacity offered is firm capacity. In Belgium, interruptible capacity is only offered if all the firm capacity is booked by the shippers End-users on the distribution network The definition of protected customers in the regulation states that protected customers include all household customers connected to a gas distribution network and can also include small and medium sized enterprises and essential social services connected to the gas distribution network provided that these additional customers do not represent more than 20% of the final gas use. The regulation defines the protected customers as all household customers connected to a gas distribution network and may also include: - small and medium-sized enterprises connected to the distribution network and essential social services connected to the gas distribution or transmission network if they do not represent more than 20% of the final gas use - district heating installations to the extent that they deliver heating to household customers and to customers mentioned above provided that these installations are not able to switch to other fuels and that they are connected to the distribution or transmission network.

22 21 For Belgium the protected customers are defined as all customers connected to the distribution network. One of the reasons is that a selective shut off is not possible on the distribution network. Protected customers represent about 50% of the total gas demand. Most of this demand stems from household consumers. It might be useful to study (in consultation with the distribution network operators) if it could be possible for the tele-measured clients to reduce their consumption in case of an emergency. Table 12 gives a detailed overview of the consumption profiles on the distribution network during the winter peak. Table 12: Consumption profiles and their representation on the distribution network S30 S31 S32 S41 S31+S32+S41 H 10,13% 12,63% 19,90% 57,34% 89,87% L 13,34% 12,14% 19,62% 54,91% 86,67% There are 4 consumption profiles on the distribution network: S30, S31, S32 and S41. The household customers are represented under category S41. Their consumption is heavily reliable on the outside temperature. The other three profiles dispose of a VAT number and correspond to the tertiary, commercial and industrial sector. The profiles S31 and S32 are the non-telemeasured clients. S31 are the commercial clients that consume less than KWh/year, S32 clients consume more than KWh/year. The gas consumption of those clients is dependent on the outside temperature so they are close to household consumers. It is however not possible to get a more clearer explanation of the type of consumers under categories S31 and S32, under category S31 there are for example combined profiles with residential and business use, S32 consist mainly of a significant part of professional components that are influenced by a residential behavior for example hospitals, nursing homes, The profile S30 represents the telemeasured clients. Those are the larger clients with an hourly counting of the gas consumption (hospitals, administrative buildings, large supermarkets, ) connected to the distribution grid. We can see that the gas consumption of these consumers (except for the hospitals) is less dependent on the outside temperature. The consumption of those clients represents less than 20% of the total gas demand. In category S30 and to a lesser extend in category S32 there are non-eligible consumers i.e. consumers which are not eligible in the definition contained in art. 2(1) of the Regulation. First of all the impact is very limited due to the following reasons: Numbers of non-eligible customers is limited as far as technically possible

23 22 The Belgian transport network is a well-connected network and well-present in all the regions on the most strategic places. Because of this connectivity it is often possible to connect large industrial clients and power plants (about 250) directly to the transport network (transport pipeline is nearby the industrial plants). The costs to connect them to the transport network are not significantly greater than the total costs to connect them to the distribution grid. On other hands, it is economically more advantageous for an industrial customer to be connected to the transport network than the distributor network, as the costs for the first are far less important than those of the second, what still constitutes an incentive not to be connected to the distribution network. Only a very small part of the industrial clients is still connected to the distribution network. Added volume due to non-eligible customers on distribution network is also limited When looking at the total gas consumption in Belgium, which is 183,2 TWh in 2013, protected customers (i.e. eligible in term of the definition contained in art. 2(1) of the Regulation 994/2010) on the distribution network will consume at least 79,23 TWh and the non-eligible customers less than 15,85 TWh. The total percentage of end-users on the distribution network that don t comply with Article 2 of the Regulation is less than 8,65%. Indeed, this 15,85 TWh has to be considered as an overestimated volume. This volume of energy contains the volume consumed by larger essential social services like hospitals and a small part of SMEs, which meets the definition of protected costumers. But due to the fact that there are referenced under category S30, there are considered as non-protected costumers in our calculation. We must also add that a small amount of industrial clients within the S32 and S30 categories have a contract that allows them to be interrupted in case of for example extreme cold weather 2. This indicates that this percentage is definitely overestimated. The impossibility to fully dissociate on distribution network protected customer (cfr. art 8(1)) from non-eligible user (cfr. art 8(1)) due to technical reasons S30 and the estimation of the remaining 1/4 of S32 (estimated number 2000 clients), connected to the distribution network, these clients should, based on our estimation, be considered as not compliant with the definition of protected costumers. The only relevant information available about the distribution today is related to the annual consumption of the customers on this network. In function of this information (annual consumption of the different categories), we have been able to estimate the volume and the number (but not identify) belonging in the different categories foreseen In the regulation (i.e. household customer, SME and others (Industries and large industries)). Due to the fact that those clients are not referenced in the database of the suppliers or the distribution network companies as SME s or little, middle or large industrial clients, there can t be individually identified as such (no bottom-up information (local or regional) but only through topdown information (federal)). Furthermore, usually, those non-eligible customers do not have their consumption monitored on an hourly basis. It can t therefore be expected to control if they consume gas or not in case of curtailment situation. So for more than 80% of these customers, it isn t possible 2 CREG study: de prijzen op de Belgische aardgasmarkt in 2013, december 2014

24 23 today to monitor the respect of the curtailment on the distribution network. Due to the above limitations, it is today not foreseen to curtail these categories of customers. Only 1000 of the remaining clients have today their consumption monitored hourly. As far as the monitoring is concerned, the situation could evolve in the future if the number of clients with tele-measured gas meter increases. No impact on compliant with art 8(2) First of all, there is enough capacity available in Belgium on the transport network to permit the free flow of commodities. The transport capacity allows the gas undertakings to have an easy access to all neighboring trading places, to the LNG facilities in Zeebrugge and also direct access to producing counties (as NL and Norway). Even under extreme winter conditions 3, the capacity needed to transport the gas will not be affected due to these increased volumes to some non-protected customers (cfr. art8(1)) on distribution network. The flow chart shows clearly that the transit from or to other EU countries through Belgium can be about 2-3 times higher than the correlated consumption of Belgian internal market. Secondly, the probability that this extra volume allocated to non-protected users (cfr. art 8(1)) could have any impact one day is very very low. Thirdly, even if this unlikely event would occur, a regional authority competent in Belgium for the distribution networks has foreseen a legal possibility to curtail (reduce) the consumption of some customers on the distribution network in case of absolute necessity or technical problems, and this, even if the technical instruments to control or monitor the respect of this kind of curtailment obligations are not always in place. Conclusion Even if Belgium is not able to totally dissociate non eligible consumers relating to article 8(1) of the regulation on the distribution network, nevertheless, we are convinced that this increased supply of non-eligible customers does not have any relevant impact on the compliance with the regulation 994/ End-users on the transport network Contrary to the protected customers, the gas supply to industrial consumers connected to the Fluxys transport network could be interrupted. Historically, the infrastructure for transporting and delivering natural gas is designed and operated primarily to meet the need for firm service. Because the peak demand for natural gas tends to be seasonal, interruptible service contracts allow pipeline and distribution system operators to increase on of their fixed assets and better manage costs of service on average. These arrangements allow operators to maximize economic efficiency by meeting the needs of their committed firm service customers while providing delivery during off 3 Risk assessment Belgium, 1st update, Annex III, Annex IV, Annex V

Monitoring report on the security of supply on the Belgian natural gas market. Year 2012. (based on article 5 of the directive 2009/73/EC)

Monitoring report on the security of supply on the Belgian natural gas market. Year 2012. (based on article 5 of the directive 2009/73/EC) Monitoring report on the security of supply on the Belgian natural gas market Year 2012 (based on article 5 of the directive 2009/73/EC) Member States are asked under article 5 of the Directive 2009/73/EC

More information

EMERGENCY PLAN FOR SECURITY OF SUPPLY OF NATURAL GAS THE NETHERLANDS

EMERGENCY PLAN FOR SECURITY OF SUPPLY OF NATURAL GAS THE NETHERLANDS EMERGENCY PLAN FOR SECURITY OF SUPPLY OF NATURAL GAS THE NETHERLANDS Based on Regulation (EU) No 994/2010 of the European Parliament and of the Council of 20 October 2010 concerning measures to safeguard

More information

ACCESS CODE FOR TRANSMISSION. Attachment C.1: Operating Procedures

ACCESS CODE FOR TRANSMISSION. Attachment C.1: Operating Procedures ACCESS CODE FOR TRANSMISSION Attachment C.1: Operating Procedures Based on version approved by CREG on 1 of 32 Deleted: 4 Deleted: 94 Deleted: 4 Deleted: 94 Deleted: 4 Deleted: 94 Deleted: 4 Table of Contents

More information

International comparison of electricity and gas prices for commerce and industry

International comparison of electricity and gas prices for commerce and industry International comparison of electricity and gas prices for commerce and industry FINAL REPORT ON A STUDY PREPARED FOR CREG October 2011 Frontier Economics Ltd, London. October 2011 Frontier Economics

More information

Methodology for Merit Order Dispatch. Version 1.0

Methodology for Merit Order Dispatch. Version 1.0 Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...

More information

COMMISSION STAFF WORKING DOCUMENT

COMMISSION STAFF WORKING DOCUMENT EUROPEAN COMMISSION Brussels, 16.10.2014 SWD(2014) 325 final COMMISSION STAFF WORKING DOCUMENT Report on the implementation of Regulation (EU) 994/2010 and its contribution to solidarity and preparedness

More information

EURELECTRIC presentation. EURELECTRIC contribution to a reference model for European capacity markets. DG COMP workshop 30 June 2015

EURELECTRIC presentation. EURELECTRIC contribution to a reference model for European capacity markets. DG COMP workshop 30 June 2015 EURELECTRIC presentation EURELECTRIC contribution to a reference model for European capacity markets DG COMP workshop 30 June 2015 EURELECTRIC believes that energy, flexibility and capacity are all needed

More information

Gas transport tariffs calculation

Gas transport tariffs calculation Ad Hoc Expert Facility under the INOGATE project Support to Energy Market Integration and Sustainable Energy in the NIS (SEMISE) Gas transport tariffs calculation 1 TABLE OF CONTENTS 1. INTRODUCTION...

More information

INDICATIVE TERMINALLING PROGRAMME OF THE ZEEBRUGGE LNG TERMINAL

INDICATIVE TERMINALLING PROGRAMME OF THE ZEEBRUGGE LNG TERMINAL INDICATIVE TERMINALLING PROGRAMME OF THE ZEEBRUGGE LNG TERMINAL FOR THE PERIOD: 2005-2006 (PROPOSED ON THE BASIS OF ARTICLE 9 OF THE ROYAL DECREE OF 4 APRIL 2003 ON THE CODE OF CONDUCT FOR ACCESS TO THE

More information

Wind Power and District Heating

Wind Power and District Heating 1 Wind Power and District Heating New business opportunity for CHP systems: sale of balancing services Executive summary - Both wind power and Combined Heat and Power (CHP) can reduce the consumption of

More information

APPENDIX XII: EMERGENCY SUPPORT FUNCTION 12 - ENERGY

APPENDIX XII: EMERGENCY SUPPORT FUNCTION 12 - ENERGY APPENDIX XII: EMERGENCY SUPPORT FUNCTION 12 - ENERGY PRIMARY AGENCIES: Public Service Commission and the Florida Energy and Climate Commission SUPPORT AGENCIES: Nuclear Regulatory Commission, Florida Rural

More information

Q1: Which further key design criteria should be reflected in cross-quality market areas?

Q1: Which further key design criteria should be reflected in cross-quality market areas? Attachment to ExxonMobil letter dated Sept. 21, 2010 Please find below our responses to the FNA public consultation with regard to a cross-quality creation of market areas. Our responses are indicated

More information

January 2015. Eurogas Views on the Energy Union and Enhancing Supply Security

January 2015. Eurogas Views on the Energy Union and Enhancing Supply Security January 2015 Eurogas Views on the Energy Union and Enhancing Supply Security Eurogas is the association representing the European gas wholesale, retail and distribution sectors. Founded in 1990, its members

More information

Session I Energy Security in the EU. - Report on short, medium and long term measures on energy security -

Session I Energy Security in the EU. - Report on short, medium and long term measures on energy security - Informal Meeting of the Energy Ministers Milan, October 6 th 2014 Session I Energy Security in the EU - Report on short, medium and long term measures on energy security - As part of the preparations for

More information

ACER scoping document for Rules for Trading

ACER scoping document for Rules for Trading ENTSOG response to ACER questionnaire on scoping for Rules for 12 May 2014 Final ACER scoping document for Rules for ENTSOG response to the ACER questionnaire Since some of the questions are addressed

More information

Piedmont Natural Gas Company, Inc. Tennessee Index of Tariff & Service Regulations

Piedmont Natural Gas Company, Inc. Tennessee Index of Tariff & Service Regulations Tennessee Index of Tariff & Service Regulations Rate Schedule 301 Rate Schedule 302 Rate Schedule 303 Rate Schedule 304 Rate Schedule 306 Rate Schedule 307 Rate Schedule 309 Rate Schedule 310 Rate Schedule

More information

Subject: Consultation TYNDP 2011-2020

Subject: Consultation TYNDP 2011-2020 ENTSOG Avenue de Cortenbergh 100 / second floor 1000 Brussels BELGIUM T +32 2 894 51 00 F +32 2 894 51 01 info@entsog.eu Your reference: Consultation TYNDP 2011-2020 TAP s reference: Direct line: +41 41

More information

Investing in the Infrastructure for Energy Markets

Investing in the Infrastructure for Energy Markets Investing in the Infrastructure for Energy Markets Executive Summary: The European Commission, energy ministers and energy regulatory authorities have recognised that, if the European electricity and gas

More information

Monitoring report on the security of supply on the Belgian natural gas market. Year 2014. (based on article 5 of the directive 2009/73/EC)

Monitoring report on the security of supply on the Belgian natural gas market. Year 2014. (based on article 5 of the directive 2009/73/EC) Monitoring report on the security of supply on the Belgian natural gas market Year 2014 (based on article 5 of the directive 2009/73/EC) Member States are asked under article 5 of the Directive 2009/73/EC

More information

Short and long-term indicators and early warning tool for energy security. L. Vanhoorn *, H. Faas

Short and long-term indicators and early warning tool for energy security. L. Vanhoorn *, H. Faas Short and long-term indicators and early warning tool for energy security L. Vanhoorn *, H. Faas European Commission; JRC - Institute for Energy; Energy Security Unit P.O. Box 2, 1755 ZG Petten, the Netherlands

More information

ENTSO-E Network Code on Emergency and Restoration

ENTSO-E Network Code on Emergency and Restoration ENTSO-E Network Code on Emergency and Restoration Notice 25 March 2015 This Network Code represents ENTSO-E s final proposals in line with the ACER Framework Guidelines on Electricity System Operation

More information

Risk Assessment 2014. Risk Assessment 2014. By N.M. van der Sar. Department Prognosis and Market Modelling. Report. Due by 10 June 2014

Risk Assessment 2014. Risk Assessment 2014. By N.M. van der Sar. Department Prognosis and Market Modelling. Report. Due by 10 June 2014 Risk Assessment 2014 By N.M. van der Sar Department Prognosis and Market Modelling Report Risk Assessment 2014 Due by 10 June 2014 Date, version 10 June 2014 Our reference Status Final Draft 2014 Gasunie

More information

Long-term Security of Gas Supply in a Liberalized Market

Long-term Security of Gas Supply in a Liberalized Market Long-term Security of Gas Supply in a Liberalized Market Jean-Paul PINON Director Gas Market, CREG Co-chairman of the Gas Working Group, CEER UNEC Round Table Genève 20/01/2004 Security of supply (SoS)

More information

EU Directive on Network and Information Security SWD(2013) 31 & SWD(2013) 32. A call for views and evidence

EU Directive on Network and Information Security SWD(2013) 31 & SWD(2013) 32. A call for views and evidence EU Directive on Network and Information Security SWD(2013) 31 & SWD(2013) 32 A call for views and evidence 22 nd May 2013 Contents Contents... 2 Overview: The EU Directive on Network and Information Security...

More information

Slovakia. Key issues. 1. General overview

Slovakia. Key issues. 1. General overview Slovakia Key issues Slovakia should enhance the independence of national regulatory authority and ensure its accountability. Slovakia should promote a regulatory framework conducive to investment in and

More information

UNDERSTANDING WINTER GAS SUPPLY. Answers to frequently asked questions from business

UNDERSTANDING WINTER GAS SUPPLY. Answers to frequently asked questions from business UNDERSTANDING WINTER GAS SUPPLY Answers to frequently asked questions from business In response to questions regarding winter gas supply, the Department of Trade & Industry has prepared the following information.

More information

Specific amendments to the Capacity Allocation and Congestion Management Network Code

Specific amendments to the Capacity Allocation and Congestion Management Network Code Annex: Specific amendments to the Capacity Allocation and Congestion Management Network Code I. Amendments with respect to entry into force and application The Network Code defines deadlines for several

More information

CAPACITY MECHANISMS IN EU POWER MARKETS

CAPACITY MECHANISMS IN EU POWER MARKETS CAPACITY MECHANISMS IN EU POWER MARKETS Can we progress to bilateral energy options? Simon Bradbury Ultimately, European renewable targets mean that prices and dispatch patterns will be dictated by wind

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Coordination between Natural Gas and Electricity Markets Docket No. AD12-12-000 Prepared Statement of Brad Bouillon on behalf of

More information

Main variations of business models for Flexible Industrial Demand combined with Variable Renewable Energy

Main variations of business models for Flexible Industrial Demand combined with Variable Renewable Energy Innovative Business Models for Market Uptake of Renewable Electricity unlocking the potential for flexibility in the Industrial Electricity Use Main variations of business models for Flexible Industrial

More information

I. GENERAL FUNCTIONING OF THE RETAIL MARKET AND CONSUMER PARTICIPATION

I. GENERAL FUNCTIONING OF THE RETAIL MARKET AND CONSUMER PARTICIPATION Response to European Commission s Public Consultation on Retail Markets 16 April 2014 INFORMATION ABOUT THE RESPONDENTS Are you responding to this questionnaire on behalf of/as: Public Authority On behalf

More information

C. System Operations, Reliability Standards and Capacity Management

C. System Operations, Reliability Standards and Capacity Management C. System Operations, Reliability Standards and Capacity Management 1. Demonstrate that the restructuring plan will maintain the standards and procedures for safety and reliability presently in effect

More information

Ref: C15-GWG-118-03 7-April-2015

Ref: C15-GWG-118-03 7-April-2015 CEER response to European Commission Consultation paper of the Revision of Regulation (EU) No 994/2010 concerning measures to safeguard security of gas supply and repealing Council Directive 2004/67/EC

More information

FINNGULF LNG LNG IMPORT TO FINLAND

FINNGULF LNG LNG IMPORT TO FINLAND FINNGULF LNG LNG IMPORT TO FINLAND CLEANLY WITH NATURAL ENERGY GASES Gasum is a Finnish expert in natural energy gases. We import natural gas to Finland, and transmit and supply it for energy production,

More information

ENTSO-E Working Draft Network Code on Emergency and Restoration

ENTSO-E Working Draft Network Code on Emergency and Restoration ENTSO-E Working Draft Network Code on Emergency and Restoration DRAFT FOR THE FOURTH PUBLIC WORKSHOP Notice 22 January 2015 This document reflects the status of the work of Transmission System Operator

More information

Poland must fully transpose the Third Energy Package Directives without further delay to liberalise the electricity and gas markets.

Poland must fully transpose the Third Energy Package Directives without further delay to liberalise the electricity and gas markets. Poland Key Issues + With regard to electricity, coal is still the main source of fuel for power generation. Poland's generating capacity is ageing, and the country needs better incentives for investment

More information

Safety Monitor Requirements. October 2015

Safety Monitor Requirements. October 2015 Introduction This document sets out Safety Monitors for the 2015/16 winter, pursuant to National Grid s obligations under the Uniform Network Code (UNC), Section Q. Safety Monitors were introduced in 2004

More information

LAW OF UKRAINE On the natural gas market This Law defines legal fundamentals of the functioning of the natural gas market in Ukraine founded on

LAW OF UKRAINE On the natural gas market This Law defines legal fundamentals of the functioning of the natural gas market in Ukraine founded on LAW OF UKRAINE On the natural gas market This Law defines legal fundamentals of the functioning of the natural gas market in Ukraine founded on principles of free competition, due protection of consumers

More information

In electronic form on the EUR-Lex website under document number 32011M6389

In electronic form on the EUR-Lex website under document number 32011M6389 EN Case No COMP/M.6389 - ENI / NUON BELGIUM / NUON WIND BELGIUM / NUON POWER GENERATION Only the English text is available and authentic. REGULATION (EC) No 139/2004 MERGER PROCEDURE Article 6(1)(b) NON-OPPOSITION

More information

Lithuania. Key issues. 1. General overview

Lithuania. Key issues. 1. General overview Lithuania Key issues Lithuania remains highly dependent on electricity imports, particularly from the Russian Federation. Interconnectors with Sweden and Poland have to be completed so as to decrease the

More information

The UK Electricity Market Reform and the Capacity Market

The UK Electricity Market Reform and the Capacity Market The UK Electricity Market Reform and the Capacity Market Neil Bush, Head Energy Economist University Paris-Dauphine Tuesday 16 th April, 2013 Overview 1 Rationale for Electricity Market Reform 2 Why have

More information

Call for comments to ACER on the Network Code Emergency and Restoration. EURELECTRIC and VGB PowerTech comments

Call for comments to ACER on the Network Code Emergency and Restoration. EURELECTRIC and VGB PowerTech comments Call for comments to ACER on the Network Code Emergency and Restoration EURELECTRIC and VGB PowerTech comments April 2015 EURELECTRIC and VGB PowerTech (thereafter referred as VGB) welcome this opportunity

More information

Harmonisation of electricity generation transmission tariffs. A EURELECTRIC contribution to ACER s scoping exercise

Harmonisation of electricity generation transmission tariffs. A EURELECTRIC contribution to ACER s scoping exercise Harmonisation of electricity generation transmission tariffs A EURELECTRIC contribution to ACER s scoping exercise December 2015 EURELECTRIC is the voice of the electricity industry in Europe. We speak

More information

A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM)

A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM) A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM) Non-technical summary High level design Draft Decision Paper SEM -14-047 June 2014 1 INTRODUCTION

More information

National Report 2014 to the Agency for the Cooperation of Energy Regulators and to the European Commission

National Report 2014 to the Agency for the Cooperation of Energy Regulators and to the European Commission Ref: 1602/601/2014 10.7.2014 National Report 2014 to the Agency for the Cooperation of Energy Regulators and to the European Commission Finland National Report 2014 - Energy Authority, Finland 1 CONTENT

More information

Smart Energy Consumption and the Smart Grid

Smart Energy Consumption and the Smart Grid Smart Energy Consumption and the Smart Grid Executive Summary The nation s outdated electrical infrastructure is being transformed. Fundamental changes that add intelligence, integrated communications

More information

PROPOSAL FOR THE OVERSUBSCRIPTION AND BUY-BACK SCHEME. -EDP comments-

PROPOSAL FOR THE OVERSUBSCRIPTION AND BUY-BACK SCHEME. -EDP comments- PROPOSAL FOR THE OVERSUBSCRIPTION AND BUY-BACK SCHEME -EDP comments- General comments We consider that the coordination between TSOs of the South Gas Region in the development of this Draft is very important

More information

EDISON S POSITION ON THE CESR/ERGEG CONSULTATION ON MARKET ABUSE INTO ELECTRICITY AND GAS SECTOR

EDISON S POSITION ON THE CESR/ERGEG CONSULTATION ON MARKET ABUSE INTO ELECTRICITY AND GAS SECTOR EDISON S POSITION ON THE CESR/ERGEG CONSULTATION ON MARKET ABUSE INTO ELECTRICITY AND GAS SECTOR Edison is today the second largest electricity company in Italy and the third player for natural gas in

More information

ORIGINAL COMMISSIE VOOR DE REGULERING VAN DE ELEKTRICITEIT STRUCTURE AND FUNCTIONING OF THE NATURAL GAS. March 2008. Final Report

ORIGINAL COMMISSIE VOOR DE REGULERING VAN DE ELEKTRICITEIT STRUCTURE AND FUNCTIONING OF THE NATURAL GAS. March 2008. Final Report COMMISSIE VOOR DE REGULERING VAN DE ELEKTRICITEIT EN HET GAS / COMMISSION DE RÉGULATION DE L'ELECTRICITÉ ET DU GAZ: STRUCTURE AND FUNCTIONING OF THE NATURAL GAS MARKET IN BELGIUM IN A EUROPEAN CONTEXT

More information

The Natural Gas-Electric Interface: Summary of Four Natural Gas-Electric Interdependency Assessments WIEB Staff November 30, 2012

The Natural Gas-Electric Interface: Summary of Four Natural Gas-Electric Interdependency Assessments WIEB Staff November 30, 2012 Introduction. The Natural Gas-Electric Interface: Summary of Four Natural Gas-Electric Interdependency Assessments WIEB Staff November 30, 2012 The increased reliance on natural gas as the primary fuel

More information

June 2015. Position Paper Contribution to the debate on electricity market design and capacity markets

June 2015. Position Paper Contribution to the debate on electricity market design and capacity markets June 2015 Position Paper Contribution to the debate on electricity market design and capacity markets Eurogas is the association representing the European gas wholesale, retail and distribution sectors.

More information

Gas Network Security Provisions. Peter Boreham UKT Gas Operations Manager and National Emergency Coordinator

Gas Network Security Provisions. Peter Boreham UKT Gas Operations Manager and National Emergency Coordinator Gas Network Security Provisions Peter Boreham UKT Gas Operations Manager and National Emergency Coordinator Network Gas Supply Emergency Definitions A Network Gas Supply Emergency (NGSE) can be caused

More information

August 2000. A Review of the Development of Competition in the Industrial and Commercial Gas Supply Market

August 2000. A Review of the Development of Competition in the Industrial and Commercial Gas Supply Market August 2000 A Review of the Development of Competition in the Industrial and Commercial Gas Supply Market Executive summary This document explains the conclusions of Ofgem s 1999 review of the development

More information

TERMS OF ELECTRICITY SALES 2010. as recommended by Finnish Energy Industries

TERMS OF ELECTRICITY SALES 2010. as recommended by Finnish Energy Industries TERMS OF ELECTRICITY SALES 2010 as recommended by Finnish Energy Industries Content: A. General, concluding an electricity sale contract, the prerequisites for electricity sales, commencement of electricity

More information

High Prices Show Stresses in New England Natural Gas Delivery System

High Prices Show Stresses in New England Natural Gas Delivery System February 7, 2014 High Prices Show Stresses in New England Natural Gas Delivery System Abstract. Since 2012, limited supply from the Canaport and Everett liquefied natural gas (LNG) terminals coupled with

More information

Estimating Future Energy Prices: Geopolitics, Economics & Vulnerability

Estimating Future Energy Prices: Geopolitics, Economics & Vulnerability Estimating Future Energy Prices: Geopolitics, Economics & Vulnerability By David Bangert, Polaris Consulting & Neil Davies and John Walls, Defence Economics Tel: 023 9225 9930 info@polarisconsulting.co.uk

More information

Making CfDs work for renewable generators

Making CfDs work for renewable generators Making CfDs work for renewable generators This is in two parts. 1 st a brief introduction to the Green Power Auction Market. 2 nd gives more detail on the structure and follows on. We consider this a critical

More information

Gas Transmission Charging Methodology Statement. Gas Year 2015/16

Gas Transmission Charging Methodology Statement. Gas Year 2015/16 Gas Transmission Charging Methodology Statement Gas Year 2015/16 Contents 1. Introduction... 3 Part A - POSTALISED CHARGES... 5 2. Process for setting Forecast Postalised Charges... 5 3. Calculation of

More information

SIMONE Capacity Tools and Gas Transport Commercial Management System Integration

SIMONE Capacity Tools and Gas Transport Commercial Management System Integration SIMONE Capacity Tools and Gas Transport Commercial Management System Integration Zdravko Oklopčić, Končar KET Martin Stýblo, SIMONE Research Group Summary: Calculation of Available Capacity is very important

More information

NERA Analysis of Energy Supplier Margins

NERA Analysis of Energy Supplier Margins 7 December 2009 NERA Analysis of Energy Supplier Margins By Graham Shuttleworth Even though wholesale energy prices have fallen recently, gas and electricity suppliers are earning very little margin on

More information

Disclaimer: All costs contained within this report are indicative and based on latest market information. 16 th March 2015

Disclaimer: All costs contained within this report are indicative and based on latest market information. 16 th March 2015 Disclaimer: All costs contained within this report are indicative and based on latest market information 16 th March 2015 FD SUMMARY The make up of the electricity bill is changing, with non-commodity

More information

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations G1 DEFINITIONS In the ISO rules: acceptable operational reason means with respect to a source asset, any one or more of the following: i) a circumstance related to the operation of the generating asset

More information

Greece s Role as the Emerging Energy Hub of South- Eastern Europe: DESFA s Role and Perspectives

Greece s Role as the Emerging Energy Hub of South- Eastern Europe: DESFA s Role and Perspectives Greece s Role as the Emerging Energy Hub of South- Eastern Europe: DESFA s Role and Perspectives By: Konstantinos E. Maroulis General Manager Director of Gas Transmission, Administration & Finance Hellenic

More information

SUMMARY. A study commissioned by the Federal Ministry for Economic Affairs and Energy Bundesministerium für Wirtschaft und Energie (BMWi)

SUMMARY. A study commissioned by the Federal Ministry for Economic Affairs and Energy Bundesministerium für Wirtschaft und Energie (BMWi) SUMMARY Possibilities to improve gas security and crisis prevention via regulation of storage (strategic reserve, storage obligations), including the costs and the economic effect on the market - A study

More information

REDUCING ENERGY CONSUMPTION AND PEAK POWER IN BELGIUM

REDUCING ENERGY CONSUMPTION AND PEAK POWER IN BELGIUM REDUCING ENERGY CONSUMPTION AND PEAK POWER IN BELGIUM With the support of: info@3e.eu www.3e.eu PRESENTATION CONTENT Outline Objective Background Energy efficiency: examples in 3 sectors Residential: electric

More information

BUSINESS RULES FOR CHAPTER VII DAILY IMBALANCE CHARGES

BUSINESS RULES FOR CHAPTER VII DAILY IMBALANCE CHARGES BUSINESS RULES FOR CHAPTER VII DAILY IMBALANCE CHARGES 1. General 1.1. The TSO shall publish its imbalance charge methodology and update it accordingly as any changes are made. This methodology must contain:

More information

ENTSO-E Network Code on Emergency and Restoration

ENTSO-E Network Code on Emergency and Restoration ENTSO-E Network Code on Emergency and Restoration 25 March 2015 Notice This Network Code represents ENTSO-E s final proposals in line with the ACER Framework Guidelines on Electricity System Operation

More information

ESRI Research Note. The Irish Electricity Market: New Regulation to Preserve Competition Valeria di Cosmo and Muireann Á. Lynch

ESRI Research Note. The Irish Electricity Market: New Regulation to Preserve Competition Valeria di Cosmo and Muireann Á. Lynch ESRI Research Note The Irish Electricity Market: New Regulation to Preserve Competition Valeria di Cosmo and Muireann Á. Lynch Research Notes are short papers on focused research issues. They are subject

More information

External Review of Ofgem s Gas Security of Supply Further Interventions

External Review of Ofgem s Gas Security of Supply Further Interventions External Review of Ofgem s Gas Security of Supply Further Interventions A REPORT PREPARED FOR CENTRICA October 2012 Frontier Economics Ltd, London. October 2012 Frontier Economics i External Review of

More information

Developing Estonian energy policy hand in hand with EU energy packages

Developing Estonian energy policy hand in hand with EU energy packages Developing Estonian energy policy hand in hand with EU energy packages Einari Kisel Secretary General of Energy of the Estonian Ministry of Economic Affairs and Communications 2008 will go down in history

More information

National Report 2015 to the Agency for the Cooperation of Energy Regulators and to the European Commission

National Report 2015 to the Agency for the Cooperation of Energy Regulators and to the European Commission Ref: 1842/601/2015 10.7.2015 National Report 2015 to the Agency for the Cooperation of Energy Regulators and to the European Commission Finland National Report 2015 - Energy Authority, Finland 1 CONTENT

More information

Reliability and security of electricity supply: the Italian blackout

Reliability and security of electricity supply: the Italian blackout Reliability and security of electricity supply: the Italian blackout Alessandro Ortis President AEEG The Regulatory Authority for Electricity and Gas of Italy 5th NARUC/CEER Energy Regulators Roundtable

More information

Access to gas transportation

Access to gas transportation Access to gas transportation Sergio Ascari Gas Advisor, Florence School of Regulation WAGPA Natural Gas Workshop Cotonou, February 14-16, 2012 Contents The gas market model Transportation Tariffs Network

More information

Title 2 Rules Governing the Eastern Market Area Part 1 Access to the Network and Capacity Management Chapter 1 Access to the Transmission Network

Title 2 Rules Governing the Eastern Market Area Part 1 Access to the Network and Capacity Management Chapter 1 Access to the Transmission Network Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model as amended in 2016 (2016 Gas Market Model Amendment Ordinance 2012) In exercise of section 41 Gaswirtschaftsgesetz

More information

CENTRAL BANK OF KENYA (CBK) PRUDENTIAL GUIDELINE ON BUSINESS CONTINUITY MANAGEMENT (BCM) FOR INSTITUTIONS LICENSED UNDER THE BANKING ACT

CENTRAL BANK OF KENYA (CBK) PRUDENTIAL GUIDELINE ON BUSINESS CONTINUITY MANAGEMENT (BCM) FOR INSTITUTIONS LICENSED UNDER THE BANKING ACT CENTRAL BANK OF KENYA (CBK) PRUDENTIAL GUIDELINE ON BUSINESS CONTINUITY MANAGEMENT (BCM) FOR INSTITUTIONS LICENSED UNDER THE BANKING ACT JANUARY 2008 GUIDELINE ON BUSINESS CONTINUITY GUIDELINE CBK/PG/14

More information

Pilot Framework Guidelines on Electricity Grid Connection Ref: E10-ENM-18-04 7 December 2010

Pilot Framework Guidelines on Electricity Grid Connection Ref: E10-ENM-18-04 7 December 2010 Pilot Framework Guidelines on Electricity Grid Connection Ref: E10-ENM-18-04 7 December 2010 European Regulators Group for Electricity and Gas Contact: Council of European Energy Regulators ASBL 28 rue

More information

Thrive in Regulated Gas Markets with Enhancements for SAP Software

Thrive in Regulated Gas Markets with Enhancements for SAP Software SAP Brief SAP Extensions SAP Energy Data Management, Add-On for Gas Regulatory Compliance by PROLOGA Objectives Thrive in Regulated Gas Markets with Enhancements for SAP Software 2014 SAP SE or an SAP

More information

Code of Conduct on Data Centre Energy Efficiency. Endorser Guidelines and Registration Form. Version 3.0.0

Code of Conduct on Data Centre Energy Efficiency. Endorser Guidelines and Registration Form. Version 3.0.0 1 EUROPEAN COMMISSION DIRECTORATE-GENERAL JRC JOINT RESEARCH CENTRE Institute for Energy Renewable Energies Unit Ispra, 1 st January 2015 Code of Conduct on Data Centre Energy Efficiency Endorser Guidelines

More information

Germany. Key issues. 1. General overview

Germany. Key issues. 1. General overview Germany Key issues High volumes of renewables have changed the way the electricity market in Germany operates. In 2012 direct marketing increased, in particular in onshore wind, due to a change of the

More information

Gas terminology for business. Gas Terminology. Simplifying energy management. www.businesscostconsultants.co.uk

Gas terminology for business. Gas Terminology. Simplifying energy management. www.businesscostconsultants.co.uk Gas Terminology Simplifying energy management AMR Automated Meter Reading - automatic collection of data from meters which is transferred to a central database for billing and/or analysis. AQ Annual quantity.

More information

NATURAL GAS PRICES TO REMAIN AT HIGHER LEVELS

NATURAL GAS PRICES TO REMAIN AT HIGHER LEVELS I. Summary NATURAL GAS PRICES TO REMAIN AT HIGHER LEVELS This brief white paper on natural gas prices is intended to discuss the continued and sustained level of natural gas prices at overall higher levels.

More information

POLICYbrief. A Gas Target Model for the European Union: Contrasting MECOS and EURAM Proposal. Highlights

POLICYbrief. A Gas Target Model for the European Union: Contrasting MECOS and EURAM Proposal. Highlights ISSN 1977-3919 POLICYbrief On the web: http://fsr.eui.eu ISSUE 2011/08 October 2011 A Gas Target Model for the European Union: Contrasting MECOS and EURAM Proposal Authors: Sergio Ascari and Jean-Michel

More information

Energy storage in the UK and Korea: Innovation, Investment and Co-operation Appendix 4.1: Stakeholder interviews from Korea

Energy storage in the UK and Korea: Innovation, Investment and Co-operation Appendix 4.1: Stakeholder interviews from Korea Energy storage in the UK and Korea: Innovation, Investment and Co-operation Appendix.1: Stakeholder interviews from Korea Peter Taylor & Lloyd Davies, University of Leeds Appendix.1: Stakeholder interviews

More information

LONG-TERM ENERGY SECURITY RISKS FOR EUROPE: A SECTOR-SPECIFIC APPROACH

LONG-TERM ENERGY SECURITY RISKS FOR EUROPE: A SECTOR-SPECIFIC APPROACH New approaches to secure Europe s energy supplies First SECURE stakeholders meeting LONG-TERM ENERGY SECURITY RISKS FOR EUROPE: A SECTOR-SPECIFIC APPROACH Arianna Checchi Brussels, 29 January 2009 1 OUTLINE

More information

GLOSSARY. Glossary of Terms for Capacity Based Demand Response PUBLIC. Issue 3.0 GOT-1

GLOSSARY. Glossary of Terms for Capacity Based Demand Response PUBLIC. Issue 3.0 GOT-1 PUBLIC GOT-1 GLOSSARY Glossary of Terms for Capacity Based Demand Response Issue 3.0 This document provides a glossary of terms with definitions used in the Capacity Based Demand Response program. Public

More information

Norwegian position on the proposed EU framework for climate and energy policies towards 2030

Norwegian position on the proposed EU framework for climate and energy policies towards 2030 Norwegian position on the proposed EU framework for climate and energy policies towards 2030 The EU plays an important role as a global leader in climate policy and has a fundamental interest in strengthening

More information

Company Management System. Business Continuity in SIA

Company Management System. Business Continuity in SIA Company Management System Business Continuity in SIA Document code: Classification: Company Project/Service Year Document No. Version Public INDEX 1. INTRODUCTION... 3 2. SIA S BUSINESS CONTINUITY MANAGEMENT

More information

of2o July of Transmission System Operators for Electricity

of2o July of Transmission System Operators for Electricity Energy Regulators OPINION OF THE AGENCY FOR THE COOPERATION OF ENERGY REGULATORS No 06/2015 2O July 2015 ON THE ENT$O-E IMPLEMENTATION PLAN 2016-2018 OF THE RESEARCH AND DEVELOPMENT ROADMAP 2013-2022 THE

More information

REPORT On the work of the Croatian Energy Regulatory Agency For the year 2005

REPORT On the work of the Croatian Energy Regulatory Agency For the year 2005 Republic of Croatia Croatian Energy Regulatory Agency REPORT On the work of the Croatian Energy Regulatory Agency For the year 2005 Zagreb, July 2006 Croatian Energy Regulatory Agency CONTENT A. REPORT

More information

European Strategies on Gas Supply Security

European Strategies on Gas Supply Security European Strategies on Gas Supply Security Koji Fujishima * Summary European countries employ different strategies on gas supply security depending on the time scale: while their short-term strategies

More information

Analysis of the electricity prices in the Slovak Republic and their impact on the individuals energy security

Analysis of the electricity prices in the Slovak Republic and their impact on the individuals energy security Analysis of the electricity prices in the Slovak Republic and their impact on the individuals energy security Abstract Martina Mokrišová Department of Finance and Accounting Faculty of Management University

More information

1. EXECUTIVE SUMMARY AND KEY RECOMMENDATIONS

1. EXECUTIVE SUMMARY AND KEY RECOMMENDATIONS 1. EXECUTIVE SUMMARY AND KEY RECOMMENDATIONS EXECUTIVE SUMMARY Energy policy in Greece has the potential to make a significant contribution to the country s economic recovery. Increasing competition and

More information

Electric Gas Reliability Workshop April 2012

Electric Gas Reliability Workshop April 2012 Electric Gas Reliability Workshop April 2012 New Mexico experience New Mexico Gas Company lost approximately 30,000 customers in February 2011 Customers were without natural gas for several days before

More information

Alice Miller Energy Consultant September 28, 2011

Alice Miller Energy Consultant September 28, 2011 Rate Design and Billing Systems Alice Miller Energy Consultant September 28, 2011 What is Rate Design? Principal goals of rate design Meet revenue requirement Equity among service classes Customer impacts

More information

An Introduction to Natural Gas

An Introduction to Natural Gas An Introduction to Natural Gas NYMEX settlement prices since 1995 $12.00 $10.00 $ / MMBTU $8.00 $6.00 $4.00 $2.00 $0.00 95'Jan Jul 96'Jan Jul 97'Jan Jul 98'Jan Jul 99'Jan Jul 00'Jan Jul 01'Jan Jul 02'Jan

More information

CLOUD SERVICES SERVICE LEVEL AGREEMENT. Cloud Services

CLOUD SERVICES SERVICE LEVEL AGREEMENT. Cloud Services Article 1: Definitions CLOUD SERVICES SERVICE LEVEL AGREEMENT Support for all Customers on all Problems with the exception of 1 st line Help desk those which initial investigation shows are directly related

More information

sustainable gains in energy policy. While the report addresses energy policies comprehensively, the following sections highlight these three topics.

sustainable gains in energy policy. While the report addresses energy policies comprehensively, the following sections highlight these three topics. EXECUTIVE SUMMARY 01 A small, somewhat isolated country, Finland takes a balanced view of its energy policy, taking advantage of its situation wherever possible. Where it can leverage its location and

More information

GDF SUEZ. Introduction. Jean-François Cirelli

GDF SUEZ. Introduction. Jean-François Cirelli GDF SUEZ Introduction Jean-François Cirelli Content 1. Focus on gas market dynamics 2. Focus on electricity market dynamics 3. Focus on P&L resilience and sensitivities 4. Focus on synergies and performance

More information

LONG-TERM OUTLOOK FOR GAS TO 2 35

LONG-TERM OUTLOOK FOR GAS TO 2 35 LONG-TERM OUTLOOK FOR GAS TO 2 35 Eurogas is the association representing the European gas wholesale, retail and distribution sectors. Founded in 1990, its members are some 50 companies and associations

More information

LONG-TERM ASSESSMENT OF NATURAL GAS INFRASTRUCTURE TO SERVE ELECTRIC GENERATION NEEDS WITHIN ERCOT

LONG-TERM ASSESSMENT OF NATURAL GAS INFRASTRUCTURE TO SERVE ELECTRIC GENERATION NEEDS WITHIN ERCOT LONG-TERM ASSESSMENT OF NATURAL GAS INFRASTRUCTURE TO SERVE ELECTRIC GENERATION NEEDS WITHIN ERCOT Prepared for The Electric Reliability Council of Texas JUNE 2013 Black & Veatch Holding Company 2011.

More information