1 Massachusetts Bay Transportation Authority HEAVY RAIL AND LIGHT RAIL OPERATIONS FLEET MANAGEMENT PLAN FY November 3, 2010
2 Massachusetts Bay Transportation Authority HEAVY RAIL AND LIGHT RAIL OPERATIONS FLEET MANAGEMENT PLAN Table of Contents Section Page Red Line Orange Line Executive Summary 3 Fleet Activity 4 Overview 5 Fleet Plan Summary 7 Current Fleet Profile 7 Fleet Management Objective 8 Capital Investment Plan 9 Passenger Loading 9 Operational Policies 9 Red Line Ridership Forecast 10 Red Line Peak Period Vehicle Requirements 10 Spare Ratio and Justification 11 Maintenance and Capital Reinvestment Programs 11 Fleet Overview Table 12 Fleet Capacity Table 13 Fleet Size Table 15 Fleet Plan Summary 16 Current Fleet Profile 16 Fleet Management Objective 17 Capital Investment Plan 17 Passenger Loading 17 Operational Policies 18 Orange Line Ridership Forecast 18 Orange Line Peak Period Vehicle Requirements 18 Spare Ratio and Justification 18 Maintenance and Capital Reinvestment Programs 19 Fleet Overview Table 19 Fleet Capacity Table 20 Fleet Size Table 21 Subway Operations Fleet Plan 1
3 Blue Line Green Line Fleet Plan Summary 21 Current Fleet Profile 22 Fleet Management Objective 23 Capital Investment Plan 23 Passenger Loading 23 Operational Policies 23 Blue Line Ridership Forecast 23 Blue Line Peak Period Vehicle Requirements 24 Spare Ratio and Justification 24 New Car Procurement 24 Retirement of No. 4 Cars 24 Fleet Overview Table 25 Fleet Capacity Table 26 Fleet Size Table 27 Fleet Plan Summary 28 Current Fleet Profile 28 Fleet Management Objective 30 Capital Investment Plan 30 Passenger Loading 30 Operational Policies 30 Green Line Ridership Forecast 31 Green Line Peak Period Vehicle Requirements 31 Spare Ratio and Justification 32 Green Line Extension Spare Ratio Issues 32 Maintenance and Capital Reinvestment Programs 32 Fleet Overview Table 33 Fleet Capacity Table 34 Fleet Size Table 35 Subway Operations Fleet Plan 2
4 MBTA HEAVY RAIL AND LIGHT RAIL OPERATIONS FLEET MANAGEMENT PLAN Executive Summary This Fleet Management Plan is the result of analysis of the condition of rolling - stock and projections for ridership demand placed on Heavy Rail and Light Rail Operations through This plan is an update of the Fleet Management Plan March The assumptions underlying this plan include: 25-year useful life for all heavy rail vehicles and 20-year useful life for all light rail vehicles, provided the Authority implements necessary overhaul programs through the use of periodic capital investments. Car capacity is based on 60% of the manufacturers AW3 car capacity for Red, Orange and Blue Lines. Capacity for Green Line is based on actual observation. Heavy Rail and Light Rail Operations subscribes to a philosophy of preventive maintenance, utilizing mileage and time-based inspections, annual services and component overhauls. This approach keeps the vehicles safe and reliable at a reasonable cost. As long as the maintenance operating budget remains approximately at or below its current level, we anticipate the need for capital reinvestment in most Heavy Rail and Light Rail vehicles to achieve or exceed each fleet s life cycle. Capital funds must be programmed to overhaul, or replace major components, or to perform vehicle overhauls. These items are once-or-twice-in-a-vehicle-life investments that the operating budget cannot support. We refer to such investments as Capital Investment Programs. The MBTA s Capital Investment Program (FY11-FY15) identifies funding for all of the procurements and activities presented in this document over the next five years. Heavy Rail and Light Rail Operations will request funding for future activities through the MBTA s capital program planning process. Subway Operations Fleet Plan 3
5 MBTA HEAVY RAIL AND LIGHT RAIL OPERATIONS FLEET MANAGEMENT PLAN LINE FY 2011 FLEET ACTIVITY FY 2017 FLEET SIZE FY 2011 FY 2017 FLEET SIZE Red Line 218 cars 218 cars No. 1 Car (74) Reinvestment No. 3 Car (86) Upgrade Procure 74 Red Line No. 4 Cars* No. 2 Car Overhaul (58) Delivery of 74 Red Line No. 4 Cars Retire 74 No.1 Red Line Cars Orange Line 120 cars 146/152 cars No.12 Car Capital Investment Phase II Capital Investment Procure 146/152 Orange Line Cars ** Delivery of 146/152 Orange Line Cars Retire 120 No.12 Cars Blue Line 94 cars 94 cars Delivery of No.5 Blue Line Cars (94) Retire 52 No.4 Cars 2012 Retire 14 No. 4 Cars Green Line 209 cars 233 cars No. 7 Car Mid-Life Overhaul Fall/Winter 2015 Delivery of 24 Low Floor Light Rail Cars*** * A tandem procurement is planned for the new Red No. 4 and Orange Line No.14 cars. ** The Orange Line Infrastructure Alternatives and Impact Analysis for the Procurement of New Transit Vehicles Study recommends the procurement of an additional 6-car train to maintain the 4-minute headways planned for this line if Assembly Station is built. *** The Lechmere Extension will require 24 additional vehicles. Subway Operations Fleet Plan 4
6 MBTA Heavy Rail and Light Rail Operations Fleet Management Plan Overview This Fleet Management Plan provides a justification for current fleet levels and operational policies along with a five-year projection of issues relating to the level of maintenance, condition and quantities of rolling - stock. The plan has been derived by examining the day-to-day operations of Heavy Rail and Light Rail lines, the demands on equipment and projected preventive maintenance requirements, new service requirements and potential retirement of rolling stock. The plan presents fleet requirements by Heavy Rail and Light Rail Line (Blue, Green, Orange, and Red) with detail provided regarding: Current Fleet Profile and Plan Description of Fleet, Fleet Management Strategies, and Fleet Plans through Operational Policies level of service requirements (peak, offpeak), load factors, schedules, headways, failure-in-service criteria and failure resolutions. Spare Ratio and Justification preventive and corrective maintenance, holds, long-term repair cars, spare train sets, procurement, and scrapping policies. Maintenance and Capital Reinvestment Programs Operating Environment weather, right of way, track configuration, and signal systems. The Fleet Management Plan is a working document, which is reviewed annually and updated to reflect the most recent conditions and operating plans for Heavy Rail and Light Rail Operations. Subway Operations Fleet Plan 5
7 Heavy Rail and Light Rail Fleet Profile Currently, the MBTA operates 432 Heavy Rail and 209 Light Rail Vehicles. The proceeding pages detail that the plans, profiles, requirements and programs are distinctly different for these vehicles according to the line that operates them. However, there are some similarities in the conditions these vehicles operate under and the way failures in service are managed and reported. Vehicle performance is tracked by measuring mean distance between failures and vehicle availability. Maintenance personnel perform trend analysis to identify failures and develop appropriate courses of action. Specific goals are established for vehicle performance. These goals are determined by Operations. Goals take into consideration the age of the fleet, operating conditions, and maintenance capabilities. Operating Conditions MBTA Rapid Transit Vehicles (Blue, Orange, and Red Lines) operate on right of way that is at grade, above grade on bridges, elevated structures and embankments and below grade in the subway. Blue Line vehicles operate under a dual environment, part of the line is electrified by third rail and part by an overhead catenary line. Orange and Red Lines operate strictly by third rail. These varying conditions offer unique challenges. Rapid transit vehicles have been designed and built to fit on the current infrastructure and operate in weather conditions that are typical to the climate in coastal New England. MBTA Light Rail Vehicles (Green Line) operate under three different conditions. The restricted right of way is at grade level. There are no automotive crossings and it is a fenced-in right of way (such as the Highland Branch). The unrestricted right of way runs in the street and crosses intersections that are governed by automobile traffic lights. The semi-restricted right of way is a dedicated median strip partly fenced in. All the surface lines merge in a subway environment through the core of the city. Light Rail vehicles are severely restricted in their width, length and height, for they must fit in the country s oldest subway. Heavy and Light Rail Vehicles operate in several noise sensitive areas. A number of efforts have been expended to mitigate noise including construction of noise walls, rail grinding programs, rail lubrication, wheel truing, truck maintenance and track configuration. Subway Operations Fleet Plan 6
8 RED LINE FLEET MANAGEMENT PLAN Fleet Plan Summary The present Red Line fleet consists of 218 active vehicles. Future plans include: No. 1 Car (74) Reinvestment No. 3 Car (86) Upgrade Procure 74 Red Line No. 4 Cars* No. 2 Selective Systems Overhaul (58) Delivery of 74 Red Line No. 4 Cars Retire 74 No.1 Red Line Cars Current Fleet Profile The active fleet of 218 Red Line cars is comprised of three series of cars. All of the cars are configured as married pairs. Each two-car set has operating cabs on the outer ends. A fourcar train consists of two compatible married pairs; a six-car train consists of three compatible married pairs. Six car trains operate during peak periods and four car trains operate during off peak periods. Two car trains are not used in revenue service. The current fleet profile is: No. 1 Red Line Car Manufacturer: Pullman-Standard Year Built: 1969 Description: The No. 1 Car Fleet (numbered , and ) is the oldest active heavy rail fleet on MBTA property. Seventy-four (74) cars are in active service. The No. 1 Car has a Westinghouse DC Propulsion System and aluminum car body. Subway Operations Fleet Plan 7
9 The No. 1 Car Fleet was rebuilt in the years Two (2) cars, and are stored at Codman Yard. Cars 1604 and 1605 were damaged beyond repair in a 1975 collision. No. 2 Red Line Car Manufacturer: UTDC Year Built: 1988 Description: The No. 2 Car Fleet includes vehicles numbered All 58 cars are active. No. 3 Red Line Car The No. 2 Car has a Westinghouse DC Propulsion System and an aluminum car body. The No. 2 Car Fleet is compatible with the No. 1 car fleet and has just begun its overhaul program. Manufacturer: Bombardier Year Built: 1994 Description: The No. 3 Car Fleet includes vehicles numbered All 86 cars are in the active fleet. The No. 3 Car Fleet represents state of the art technology. Systems control is microprocessor based rather than electro-mechanical. The cars have an AC Propulsion System manufactured by General Electric. The car bodies are stainless steel. The No. 3 Cars are not compatible with No. 1 or No. 2 series cars except for towing purposes. No. 5 Red Line Car Fleet is retired. All but four cars have been scrapped and removed from MBTA property. The four remaining cars are used as a work train. Fleet Management Objective The Fleet Plan for the Red Line has a tandem procurement planned for the replacement of the Red Line No.1 Car. The new Red Line No. 4 Cars will be procured along with the new Orange Line No.14 Cars. Currently, a Capital Reinvestment Program is being performed on all three Red Line Cars. The scope of work being performed to the No.1 Car includes many of the sub-systems that Subway Operations Fleet Plan 8
10 will improve the reliability and sustain safe performance until retirement. The Red Line has recently replaced the primary and secondary suspension, drawbar and coupler assemblies, vehicle batteries, door engines with sensitive edges, sash windows and operator seats. The Red Line will replace the propulsion control system within the next two years. The scope of the Capital Reinvestment Program being performed on the No.3 Car is comprehensive, identifying most of the major systems to be overhauled or replaced, to improve reliability and sustain these vehicle systems for an additional 15 years. Several of the systems that are being replaced or overhauled are the vehicles batteries, drawbar and couplers, speed sensors, primary and secondary suspension, Monitoring Train Units (MTU s), traction motors and journal bearings. The No.2 Car Selective Systems Overhaul has recently begun. The overhaul is the first that the MBTA will accomplish using strictly in-house resources. This overhaul will consist of 29 married pairs and is scheduled to be completed in Capital Investment Plan Red Line Revenue Vehicle ($ in Millions) Spending through FY10 FY11 FY12 FY13 FY14 FY15 Total FY11-15 Project RL-No. 1 Car Reinvestment* $7.98 $3.69 $3.77 $7.46 RL.- No.2 Car Selective Systems Overhaul $23.50 $13.08 $10.00 $23.08 RL. No.3 Car Upgrade* $2.30 $0.04 $0.04 Total $33.78 $16.81 $13.77 $58.02 *Programmed but not currently funded Passenger Loading Passenger loading, or passenger crowding, is measured by looking at the average passenger loading per car during the peak hour of service and comparing this to the MBTA s policy for the maximum loading per car (60% of AW3 Load). For the Red Line, the peak load point is measured exiting Broadway Station Northbound during the time-period of 8:15 AM to 8:45 AM on weekdays. These numbers are shown on the tables that follow this section. Operational Policies Red Line operational policies are developed and implemented with the goal of providing safe, reliable, cost effective transportation with the highest level of customer service to over 242,000 patrons per day. Current and future levels of service are carefully determined by Subway Operations Fleet Plan 9
11 analyzing ridership trends and developing schedules which meet demand. The Red Line is currently operating at the capacity of the signal system. Therefore, peak-service capacity is unlikely to be expanded within the foreseeable future, regardless of demand. Off-peak service, however, may be expanded as demand increases and resources allow. Red Line Ridership Forecast Red Line ridership is expected to increase consistent with the average Heavy Rail ridership growth of 1.9% yearly from If most ridership growth on the Red Line is outside of the peak periods, the current Red Line Fleet will provide sufficient capacity. Red Line Peak Period Vehicle Requirements Current peak period service levels are provided 100% by six-car operation. Twenty-eight six car consists (168 cars) operate during this peak period. The scheduled headway is four to five minutes on the trunk line (JFK/U-Mass to Alewife stations) and eight to nine minutes on the Braintree and Ashmont branches. On the Braintree branch, supplemental Run as Directed (RAD's) trains are also utilized to meet peak period demand. Schedule (Peak Period) Round Trip Time Number of Trains Headway Round Trip Mileage Braintree-Alewife 127 minutes 15 six car consists 8-9 minutes miles Ashmont-Alewife 93 minutes 11 six car consists 8-9 minutes 23.4 miles JFK-Alewife 4-5 minutes Car Count (Peak Period) Trains Cars Braintree-Alewife Ashmont-Alewife Run As Directed 2 12 Total Service Requirement Subway Operations Fleet Plan 10
12 Spare Ratio and Justification The Red Line spare ratio is 23 percent. This spare ratio allows the Red Line to provide one extra train for each rush hour to be RAD. This RAD mitigates the effects of any service interruptions due to defective equipment. This operating philosophy requires six additional cars. The daily breakdown of vehicles out-of service is generally: 12 Run as Directed 12 Mileage Inspections 6 HVAC inspections 24 Corrective maintenance holds 8 Long-term program cars The established procurement policy is based on a useful life of up to 25 years for each fleet. New Red Line cars will be compatible with the No. 3 Cars. Every reasonable measure will be taken to improve system reliability through calculated integration of new technologies. Procurement and scrapping policies are subject to change depending on the availability of financial resources. Maintenance and Capital Reinvestment Programs Preventive maintenance inspections are mileage based and occur on an 8,500 mile interval for the No. 1 and No. 2 Cars and 15,000 miles for the No. 3 Cars. The HVAC system is inspected on a 12,500 mile interval. Other campaigns and minor modification programs are initiated on an, as needed basis, on the projected life cycles as specified by the Operations Quality Assurance Division. The Fleet Plan calls for occasional Capital Reinvestment Programs to each fleet. The scope of work for such programs is determined by analyzing the performance of the car and setting priorities for areas that need overhaul. System overhauls, like the primary and secondary suspension, are required for the safe operation of the vehicles. Other overhauls, such as replacing the No.2 Cars antiquated cam operated propulsion group, with an electronic cam simulating propulsion group, would replace an unreliable system that consumes significant labor and materials, with a modern solid state device. Subway Operations Fleet Plan 11
13 Fleet Overview Table Current Fleet Fleet Name Manufacturer No. 1 No. 2 No. 3 Pullman Standard UTDC Bombardier Car Numbers & Fleet Size Fleet Age AW3 Capacity** Seating/Standing Average Car Mileage / million miles / million miles / million miles Red Line * 269* 308 million miles *Weighted Average ** As defined by manufacturer Subway Operations Fleet Plan 12
14 Fleet Capacity Table The following table provides detailed information of peak load volume relative to line capacity. Peak load volumes are based on the 2007 Automated Fare Collection (AFC) station entry counts along with factors from the Central Transportation Planning Staff s 2004 Rapid Transit Counts. The Red Line currently provides a throughput of 7.5 trains through the peak location on the trunk section and four trains through the peak location on the Braintree branch during the peak time period. Current volume estimates indicate current levels of service will be adequate through year 2017, although the Braintree branch is approaching capacity. Line: Direction: Peak Time Period: Peak Location: Red Line Trunk Northbound 8:15 AM to 8:45 AM Broadway to South Station Year Peak 30- minute Load * Peak Per. Trains Cars Per Train Capacity Per Car Capacity Per Train Total Capacity , , , , , , , , , , , , , , , ,762 * Assumes a 1.9% growth factor, based on average heavy rail ridership growth Subway Operations Fleet Plan 13
15 Line: Direction: Peak Time Period: Peak Location: Red Line Braintree Branch Northbound 8:15 AM to 8:45 AM North Quincy to JFK/UMass Year Peak 30- minute Load * Peak Per. Trains Cars Per Train Capacity Per Car Capacity Per Train Total Capacity , , , , , , , , , , , , , , , ,864 * Assumes a 1.9% growth factor, based on average heavy rail ridership growth Subway Operations Fleet Plan 14
16 Fleet Size Table The following table provides a detailed analysis of the required and planned fleet size for each year of the Fleet Plan. Year Peak Per. Headway Required Required Spares Req. Spare Planned Trains Trains Cars Required Fleet Size Ratio Fleet Size % % % % % % % % 218 Subway Operations Fleet Plan 15
17 ORANGE LINE FLEET MANAGEMENT PLAN Fleet Plan Summary The present Orange Line Fleet consists of 120 active vehicles. Future plans include: Fleet Reinvestment Car Rebuild Phase II Procure New Vehicles (146/152) Delivery of New Vehicles (146/152) Retire 120 No. 12 Cars Current Fleet Profile The Orange Line fleet is comprised of 120 No. 12 Series Cars. All of these cars are configured as married pairs. Each two-car set has operating cabs on the outer ends. The line operates primarily with six car trains. A six-car train consists of three compatible married pairs. Two car trains are not used in revenue service. The current fleet profile is described below: No. 12 Orange Line Car Manufacturer: Hawker-Siddeley Year Built: 1981 Description: The No. 12 Car Fleet ( ) has all 120 cars available for revenue service. This Car has a G.E. DC Propulsion System and LAHT steel car body. Subway Operations Fleet Plan 16
18 Fleet Management Objective The primary objective for the Orange Line is to complete a major Capital Reinvestment Program on the No. 12 Car. Phase I of the program encompassed the overhaul of the suspension system and the replacement of the propulsion cam controllers for the entire Orange Line Fleet. These actions are now completed. The Phase II project involves overhaul and replacement of major sub-systems, which will ensure continued vehicle reliability. These actions should ensure that projected Orange Line demand could be met safely and reliably through the year 2017 when the entire fleet will be replaced. Significant resources have been expended to address an escalation in carbody corrosion. As the No. 12 Car enters its twenty-ninth year in revenue service, corrosion in the main side sill support beam area is causing perforation of the exterior shell. To address this, Phase II resources have been partially reallocated. An assessment of need will be done to quantify the scope of work required to maintain car body integrity until the fleet is retired in Starting in 2008, miscellaneous investments have been allocated to address subsystem reliability. HVAC compressor motors have undergone a fleet-wide remanufacture, complete with a like-new two year warranty. In addition, a HVAC test stand will be developed. In order to accommodate projected increases in demand, it will be necessary to increase the frequency of peak service on the Orange Line. This increase in peak service requirement necessitates the expansion and replacement of the current fleet. The completion of the Haymarket North Signal System allows for this increase. Capital Investment Plan Orange Line Revenue Vehicle ($ in Millions) Project Spending through FY10 FY11 FY12 FY13 FY14 FY15 Total FY11-15 Orange Line Car Reinvest.* $10.00 $1.30 $0.50 $1.80 Orange Line Car Rebuild II* $6.44 $1.82 $1.82 Orange Line Fleet Procurement* $3.20 $15.80 $96.00 $59.00 $ Total $19.64 $18.92 $96.50 $59.00 $ *Programmed but not currently funded Passenger Loading Passenger loading or passenger crowding is measured by looking at the average passenger loading per car during the peak hour of service and comparing this to the MBTA s Subway Operations Fleet Plan 17
19 policy for the maximum loading per car (60% of AW3 Load). For the Orange Line, the peak load point is measured exiting North Station southbound during the time-period of 8:15 AM to 8:45 AM on weekdays. These numbers are shown on the tables that follow this section. Operational Policies Orange Line operational policies are developed and implemented with the goal of providing safe, reliable, cost effective transportation with the highest level of customer service to over 185,000 patrons per day. The Orange Line is currently at, or near, capacity during peak periods. Future expansion of the Orange Line Fleet will be based upon capacity constraints during the peak periods and current ridership forecasts. Orange Line Ridership Forecast Orange Line ridership is expected to increase consistent with the average Heavy Rail ridership growth of 1.9% yearly from The current plan to increase fleet size has been deemed sufficient to meet future peak period requirements. Orange Line Peak Period Vehicle Requirements Current service levels provide 100% six-car operation on the entire line during weekday rush hours. Schedule (Peak Period) Round Trip Time Number of Trains Headway Round Trip Mileage Forest Hills-Oak Grove 77 minutes 17 six car consists 4-5 minutes miles Car Count (Peak Period) Trains Cars Forest Hills-Oak Grove Spare Ratio and Justification The Orange Line spares ratio is 15 percent. This translates to 18 vehicles from the fleet of 120 total vehicles. The daily breakdown of vehicles out-of-service is generally: 2 Preventive maintenance inspections 2 HVAC inspections 6 Corrective maintenance holds 4 Capital Investment Plan (CIP) Program Maintenance 4 Other preventive maintenance Subway Operations Fleet Plan 18
20 In 2017, upon replacement of the No. 12 Orange Line vehicles, the spare ratio will increase to 18 percent. Maintenance and Capital Reinvestment Programs Preventive maintenance inspections are time and mileage based and occur on a 90- day/12,000 mile interval. The HVAC system is inspected four times per year. An extensive Preventive Maintenance Program is conducted annually. In addition to the periodic inspections, maintenance campaigns such as annual lubrication programs, component overhauls and modification campaigns including equipment upgrades are scheduled to minimize the impact of equipment life cycles on vehicle reliability and maintenance costs. Fleet Overview Table Current Fleet Fleet Name Manufacturer No. 12 Hawker- Siddeley Car Numbers Fleet Size Fleet Age AW3 Capacity* Seating/Standing Average Car Mileage / million miles Orange Line million miles * As defined by manufacturer Subway Operations Fleet Plan 19
21 Fleet Capacity Table The following table provides detailed information of peak load volume relative to line capacity. Peak load volumes are base on the Central Transportation Planning Staff s 2004 Rapid Transit Counts. The Orange Line currently provides a throughput of six trains through the peak location during the peak time period. Line: Direction: Peak Time Period: Peak Location: Orange Southbound 8:15 AM to 8:45 AM North Station to Haymarket Year Peak 30- minute Load * Peak Per. Trains Cars Per Train Capacity Per Car Capacity Per Train Total Capacity , , , , , , , , , , , , , , , ,432 *Assumes a 1.9% growth factor, based on average heavy rail ridership growth from Subway Operations Fleet Plan 20
22 Fleet Size Table The following table provides a detailed analysis of the required and planned fleet size for each year of the Fleet Plan. In , the entire Orange Line Fleet will be retired and replaced with 146 or 152* new Orange Line cars. At this time the spare ratio will increase to 18% or 21%. Year Peak Per. Headway Required Required Spares Req. Spare Planned Trains Trains Cars Required Fleet Size Ratio Fleet Size % % % % % % * / /32 146/152 18%/21% 146/ / /32 146/152 18%/21% 146/152 * The Orange Line Infrastructure Alternatives and Impact Analysis for the Procurement of New Transit Cars identifies two fleet sizes depending on four-minute headways and the possible expansion for three-minute headways. An extra six-car train will be required for the anticipated Assembly Station. Subway Operations Fleet Plan 21
23 BLUE LINE FLEET MANAGEMENT PLAN Fleet Plan Summary The present Blue Line Fleet consists of 112 active vehicles. The Blue Line has 94 of their new Seimens No. 5 series Cars and currently has 18 No. 4 Cars on property. Future plans include: Current Fleet Profile 2012 Anticipate Retirement of 14 No. 4 Cars The Blue Line Fleet is configured as married pairs. Each two-car set has operating cabs on the outer ends. The Line operates with a complement of six car trains. A six car train consists of three compatible married pairs. The current fleet profile is described below: No. 4 Blue Line Car Manufacturer: Hawker-Siddeley Year Built: 1979 Description: The No. 4 Car Fleet ( ) has 44 cars in active service. This car has a G.E. DC Propulsion System and LAHT Steel car body. No. 5 Blue Line Car Manufacturer: Seimens Year Built: 2008 Description: The No. 5 Car Fleet ( ) has 18 cars in active service. This car has an AC Inverter Drive Propulsion System and stainless steel car body. Subway Operations Fleet Plan 22
24 Fleet Management Objective The Blue Line has completed the procurement process of the new Blue Line No. 5 vehicles. There are currently 18 Blue Line No. 4 Cars that must be kept in service until 2012 to conform to financing arrangements. Fifty-two of the Blue Line No. 4 Cars have been retired to date. The Blue Line will retain four of the No. 4 Cars beyond 2012 to use as a work train. Project Capital Investment Plan Blue Line Revenue Vehicle ($ in Millions) Spending through FY10 FY11 FY12 FY13 FY14 FY15 Total FY11-15 Blue Line Fleet Procurement $ $9.48 $8.59 $18.07 Total $ $9.48 $8.59 $18.07 Passenger Loading Passenger loading or passenger crowding is measured by looking at the average passenger loading per car during the peak half hour of service and comparing this to the MBTA s policy for concerning the targeted maximum loading per car (60% of AW3 Load). For the Blue Line, the peak load point is measured exiting Maverick Station westbound during the time-period of 8:30 AM to 9:00 AM on weekdays. These numbers are shown on the tables that follow at the end of this section. Operational Policies Blue Line operational policies are developed and implemented with the goal of providing safe, reliable, and cost effective transportation with the highest level of customer service to over 58,200 patrons per day. The Blue Line is currently at, or near, capacity during peak periods. Future expansion of the Blue Line peak period requirement will be based upon signal capacity during these times and ridership forecasts. Blue Line Ridership Forecast Blue Line ridership is expected to increase consistent with the average Heavy Rail ridership growth of 1.9% yearly from The current plan to increase fleet size and signal system capacity has been deemed sufficient to meet future peak period requirements. Subway Operations Fleet Plan 23
25 Blue Line Peak Period Vehicle Requirements Current service levels provide 100% four-car operation on the entire line during weekday rush hours. Schedule (Peak Period) Round Trip Time Number of Trains Headway Round Trip Mileage Wonderland-Gov't Ctr 52 minutes 12 six car consists 3.75 minutes miles Car Count (Peak Period) Trains Cars Wonderland-Gov't Ctr Spare Ratio and Justification The Blue Line spare ratio is currently 36 percent. This allows for up to 40 vehicles outof-service at any given time. The daily breakdown of vehicles out-of-service is generally: 16 Preventive maintenance inspections 2 Maintenance campaign cars 22 Corrective maintenance holds The spare ratio will decrease to 27 percent in 2012 when 14 No. 4 Car leases expire and these cars are retired. New Car Procurement The new car procurement for the Blue Line was awarded to Siemens Transportation Systems in November of The Blue Line has received 94 brand new state-of-the-art cars. These cars began to run in six car consists in June of Retirement of Blue Line No. 4 Cars The Blue and Orange Line cars were built by the same manufacturer (Hawker-Siddeley). However, it has been determined that the No. 4 Cars are not compatible with the Orange Line infrastructure and will not be able to supplement the Orange Line Fleet in revenue service. Therefore, components will be redistributed from the retiring Blue Line No. 4 Cars to the Orange Line No. 12 Car. Subway Operations Fleet Plan 24
26 Fleet Overview Table Current Fleet Fleet Name No. 4 Manufacturer Hawker- Siddeley Car Numbers Fleet Size Fleet Age AW3 Capacity* Seating/Standing Average Car Mileage /166 1,181,857 No. 5 Siemens /90 80,963 Blue Line million miles * As defined by manufacturer Subway Operations Fleet Plan 25
27 Fleet Capacity Table The following table provides detail information related to peak load volume relative to line capacity. Peak load volumes are based on the Central Transportation Planning Staff s 2004 Rapid Transit Counts. The Blue Line currently provides a throughput of nine four-car trains through the peak location during the peak time period. Current volume estimates indicate that maintaining this level of service to be adequate through year Line: Direction: Peak Time Period: Peak Location: Blue Westbound 8:30AM to 9:00 AM Maverick to Aquarium Year Peak 30- minute Load * Peak Per. Trains Cars Per Train Capacity Per Car Capacity Per Train Total Capacity , , , , , , , , , , , , , , ,130 *Assumes a 1.9% growth factor, based on average heavy rail ridership growth from Subway Operations Fleet Plan 26
28 Fleet Size Table The following table provides a detailed analysis of the required and planned fleet size for Blue Line operations for each year of the Fleet Plan. Year Peak Per. Headway Required Required Spares Req. Spare Planned Trains Trains Cars Required Fleet Size Ratio Fleet Size % % % % % % % % 98 Subway Operations Fleet Plan 27
29 GREEN LINE FLEET MANAGEMENT PLAN Fleet Plan Summary The present Green Line fleet consists of 209 active vehicles and ten PCC Cars No. 7 Car Mid-Life Overhaul Fall/Winter 2015 Delivery of 24 Low Floor Cars The projected FY2017 Green Line fleet will consist of 233 vehicles and ten PCC cars. Current Fleet Profile The Green Line is a light rail system serving the Central Subway (core) and four Branch Lines (Beacon St, Boston College, Riverside and Lechmere-Huntington Ave.). The Mattapan High Speed Line, a feeder service to the Red Line, is also part of the Green Line. The fleet of 209 Green Line Light Rail Vehicles (LRVs) consists of two vehicle types; Kinki-Sharyo No. 7 Cars and the new No. 8 Low-floor Cars. All types are six-axle, doubleended, articulated vehicles. These vehicles can be configured as singles (running alone), deuces (2-car trains), or as 3-car trains. The modification of the No. 7 Fleet allows compatibility between the No. 7 and No. 8 Cars for revenue service. The Mattapan High Speed Line uses an active fleet of ten PCCs. Subway Operations Fleet Plan 28
30 No. 7 Car Manufacturer: Kinki-Sharyo Year Built: ; 1997 Description: The No. 7 Car ( ) has a fleet size of 114 cars. 105 cars are in active service. Nine cars are in storage due to heavy damage and may be scrapped. The No. 7 Car has a Westinghouse DC Thyristor micro processor-controlled propulsion system and LAHT steel car body. The cars received modifications in order to operate as a multivehicle consist with the No.8 Low Floor car during , all modifications are complete, enabling the No.7 & No.8 Fleets to be fully operational in two or three car configurations. No. 8 Car Manufacturer: Breda Year Built: Description: The No. 8 Low Floor Car has a fleet size of 95 cars. Ninety-four cars are in active service. One car has heavy damage. These state-of-the-art vehicles have an AC Propulsion, an automated audible and visual PA announcement system, and a low-floor design. PCC Cars Manufacturer: Pullman Standard Year Built: Description: The PCC Car Fleet currently is the oldest light rail fleet on Authority property. Nine cars are in active service, the tenth car is undergoing maintenance activities to increase the revenue fleet to 10 cars. The PCC Car has a Westinghouse DC Propulsion System and a steel car body. A PCC rebuild project was completed in A new heating ventilation and air-conditioning system, and Low Voltage Auxiliary Power Supply was introduced to the PCC Car in Subway Operations Fleet Plan 29
31 Fleet Management Objective The fleet plan for the Green Line is focused on improving the reliability of the No.7, No.8 and PCC car fleet. The No. 7 Cars will be overhauled in 2012 and this will extend their life for 15 years. We are also preparing to procure 24 vehicles required for the proposed Green Line extension. Capital Investment Plan Green Line Revenue Vehicle ($ in Millions) Spending through FY10 FY11 FY12 FY13 FY14 FY15 Total FY11-15 Project Green Line No. 8 Car Purchase and Retrofit $231.4 $2.25 $2.00 $1.1 $5.41 Green Line No. 7 Car Overhaul* $22.09 $3.91 $17.4 $14.00 $19.79 $15.97 $71.08 Total $ $6.16 $19.4 $15.1 $19.79 $15.97 $76.49 * $6 Million is currently Federally Funded. Passenger Loading Passenger loading or passenger crowding is measured by looking at the average passenger loading per car during the peak half hour of service and comparing this to the MBTA s policy for the maximum loading per car. For the Green Line, the peak load point is measured entering Copley Station eastbound from 8:30 AM to 9:00 AM on weekdays. These numbers are shown on the tables that follow this section. Operational Policies Green Line operational policies are developed and delivered with the goal of providing safe, reliable, cost effective transportation with the highest level of customer service to over 236,000 patrons per day. Heavy Rail and Light Rail Operations will analyze future peak period ridership and ridership forecast data to as well as planned extensions of the Green Line beyond Lechmere. Subway Operations Fleet Plan 30
32 Green Line Ridership Forecast Green Line ridership is projected to show steady growth based on the average yearly growth of 0.9% from The current plan to increase fleet size has been deemed sufficient to meet peak period requirements. Green Line Peak Period Vehicle Requirements Current service levels provide two-car operation on the entire line at all times. Schedule (Peak Period) Round Trip Time Number of Trains Headway Round Trip Mileage Riverside Line 105 minutes minutes Beacon St. Line 91 minutes minutes Boston College Line 100 minutes minutes 13.2 Heath St Line 85 minutes 17 5 minutes Mattapan Line 30 minutes 6 (singles) 5 minutes 5.12 Car Count (Peak Period) Cars Riverside Line 40 Beacon St. Line 28 Boston College Line 42 Heath St Line 34 Mattapan Line 6 Run As Directed (RAD) 6 Total Service Requirement* 150 * Does not include Mattapan Line Subway Operations Fleet Plan 31
33 Spare Ratio and Justification The current Green Line spare ratio for LRV operations is 28 percent. This translates into 59 vehicles from the active composite fleet of 209 vehicles (see fleet size table). It must be noted that 10 of the 59 are in storage and have severe accident damage. The daily breakdown of vehicles out-of-service is generally 8 Preventive maintenance inspections 41 Corrective maintenance holds 10 In storage due to heavy damage The spare ratio for the Mattapan High Speed Line PCC service is 40 percent. Of the fleet of ten PCCs, six are required for daily service. All maintenance is performed outside. Materials for these 50-year-old cars are difficult to purchase and are often fabricated at the Everett Shops. Green Line Extension Spare Ratio Issues The MBTA is obligated to maintain a spare ratio of no more than 27 percent that is currently projected for the fleet that is augmented for the extension. The FTA requires that the MBTA maintain that spare ratio if the fleet is procured and the extension is not built. The Authority is committed to maintaining the overall spare ratio and the spare ratio pertinent to the Type 9 fleet through retirement of sufficient Type 7 vehicles to maintain the ratio. This number will vary from time to time, depending upon the attrition rate of the balance of the fleet on account of catastrophic damage. Maintenance and Capital Reinvestment Programs Preventive maintenance inspections are mileage based for the No. 7 Cars, they are inspected at 6,500 mile intervals, or at 90 days if they haven t accumulated 6,500 miles. Type 8 Vehicles are inspected on a 90-day interval. The PCC Cars are inspected on a 30-day basis. The HVAC system is inspected annually. Air compressor inspections are also performed on an annual basis. There is an on-going coupler modification program in place. Other campaigns and modifications are initiated on an as-needed basis. Subway Operations Fleet Plan 32
34 Fleet Overview Table Current Fleet Fleet Name Manufacturer Car Numbers Fleet Size Fleet Age AW3 Capacity** Seating/Standing Type 7 (original) Kinki-Sharyo /223 Type 7 (reorder) Kinki-Sharyo /223 Type 8 Breda /206 Green Line * 264* *Weighted Average ** As defined by manufacturer Subway Operations Fleet Plan 33
35 Fleet Capacity Table The following table provides detail information related to peak load volume relative to line capacity. Peak load volumes are base on the Central Transportation Planning Staff s 1997 Rapid Transit Counts. Forty-six cars travel through the peak location during the peak time period. Line: Direction: Peak Time Period: Peak Location: Green Eastbound 8:30 AM to 9:00 AM Copley Jct. to Copley Year Volume at Peak Per. Capacity Total Peak Load* Cars Per Car Capacity , , , , , , , , *Assumes a 0.9% growth factor based on average light rail ridership growth from Subway Operations Fleet Plan 34
36 Fleet Size Table The following table is a detailed analysis of the required and planned Green Line Fleet size for each year of the Fleet Plan. Year Peak Per. Headway Required Required Spares Req. Spare Planned Fleet Fleet Cars Trains Cars Required Size Ratio Size % % % % % % % % 233 Subway Operations Fleet Plan 35
ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001)
ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001) INTRODUCTION To supplement and expand its understanding of available fixed guideway transit system vehicle
More informationNY State Rail Summit Alstom Transportation Inc.
NY State Rail Summit Alstom Transportation Inc. Chuck Wochele 06/14/2010 Two main activities 19.7 Billion Euro s in Sales (2009 FY) 81,500 Employees 70 countries Power Sector 13 Billion Euro Transport
More informationFrequently Asked Questions (FAQs) about DART
Frequently Asked Questions (FAQs) about DART What is DART? Where can I take the bus? Where can I take the train? How much does it cost to park at a station? Can I take a train to American Airlines Center?
More informationTable 10-1 Travel Times Between Stations 1 10. OPERATING & MAINTENANCE PLAN
10. OPERATING & MAINTENANCE PLAN This section describes an operating plan that responds directly to anticipated commuter ridership patterns. Train schedules, type and capacity of rolling stock, and likely
More informationMETRORAIL. Fleet Management Plan
METRORAIL Fleet Management Plan Washington Metropolitan Transit Authority Metrorail Fleet Management Plan Revision 4G REVISION HISTORY Version Date Authorization Change Description Draft 1 Feb 26, 2010
More informationState of Good Repair Roundtable Chicago, Illinois. Asset Management Systems MBTA Approach and Lessons Learned
State of Good Repair Roundtable Chicago, Illinois Asset Management Systems MBTA Approach and Lessons Learned Eric R. Waaramaa Deputy Director of Financial Planning July 23, 2010 MBTA Profile 5 th largest
More information2014 SFMTA Transit Fleet Management Plan March 2014
2014 SFMTA Transit Fleet Management Plan March 2014 Financial Services 1. Introduction 1-1 Introduction to the SFMTA The San Francisco Municipal Transportation Agency (SFMTA) is the principal multi-modal
More informationPATH Industrial Engineering Study Overview
PATH Industrial Engineering Study Overview Tom Rowbottom PATH, Car Equipment Division Superintendent Harrison, NJ Gene Sansone CH2M HILL, Senior Consultant New York, NY Janice Li, P.E. CH2M HILL, Principal
More informationSYSTEMWIDE REQUIREMENTS
SYSTEMWIDE REQUIREMENTS for the Peninsula Rail Program San Francisco to San Jose on the Caltrain Corridor Description of the Systemwide Context for the High Speed Train Project This document provides a
More informationTransit in the United States 3. Operating Costs and Performance Measures 13. Quality of Transit Service 19. ADA Compliance Bus 28
1999 National Transit Summaries and Trends Introduction 1 Introduces the transit modes discussed throughout the NTST. Transit in the United States 3 National statistics and trends in ridership, miles of
More informationAASHTO RR101 Webinar Equipment
Presentation to AASHTO RR101 Webinar Equipment M. Bergeron Chief Mechanical Officer April 9, 2013 Agenda Amtrak Mechanical Department Maintenance Plan & Production Capabilities Amtrak Train 5 Bull Gulch,
More informationGreen Line Extension Project Analysis of the Boston Engine Terminal for The Purposes of Siting a Light Rail Vehicle Support Facility
Analysis of the Boston Engine Terminal for The Purposes of Siting a Light Rail Vehicle Support Facility During the alternatives analysis process for the Green Line Extension project, MassDOT and the MBTA
More informationRevenue Vehicles Funding consumption of resources to maintain their reliability. Other Capital Investments $1,754.7m 65.1%
CHAPTER 1 REVENUE VEHICLES PROGRAM OVERVIEW The revenue vehicle fleet is one of the most visible and important components of the MBTA service network. These are the trains, buses, and other vehicles that
More information2010 SFMTA TRANSIT FLEET MANAGEMENT PLAN
2010 SFMTA TRANSIT FLEET MANAGEMENT PLAN Prepared by: San Francisco Municipal Transportation Agency Revised April 2011 This document is the property of the SFMTA. This document and the information contained
More informationState of Good Repair Assessment Dallas Area Rapid Transit
State of Good Repair Assessment Dallas Area Rapid Transit Mike Hubbell Vice President, Maintenance Dallas Area Rapid Transit FTA Roundtable Chicago IL July 23, 2010 1,714 vehicles 232 track miles ROW 63.5M
More informationIntegrated Services Workshop Services
Integrated Services Workshop Services Erlangen, 2009 Industry Sector, Mobility Division Page 1 We have the power of high-skilled personnel providing solutions worldwide Our worldwide expertise Project
More informationCapital Investment Program
Investing in the MBTA s Future Capital Investment Program FY 2008 FY 2012 Capital Investment Program FY2008 FY2012 [This page intentionally left blank] Massachusetts Bay Transportation Authority Deval
More informationDRAFT METRORAIL REVENUE VEHICLE FLEET MANAGEMENT PLAN WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY 600 FIFTH STREET, N. W. WASHINGTON, D.C.
WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY 600 FIFTH STREET, N. W. WASHINGTON, D.C. 20001 DRAFT June 1, 2007 METRORAIL REVENUE VEHICLE FLEET MANAGEMENT PLAN NOVEMBER 2006 Revised May 2007 This Metrorail
More informationImpact of Hurricane Ike
Island Transit History, Design and Impact of Hurricane Ike By Gary A. Gordon, P.E. Assistant Federal Security Director-Surface Surface, South Central Region and Michael Worthy Director of Transportation,
More informationCost and Financial Analysis
Chapter 19: Cost and Financial Analysis A. INTRODUCTION The purpose of this chapter is to present examples of financial resources available to the Metropolitan Transportation Authority (MTA), which may
More informationNotice of Public Hearing Washington Metropolitan Area Transit Authority Docket B13-01
Notice of Public Hearing Docket B13-01 PROGRAM OF PROJECTS FOR FEDERAL FISCAL YEAR 2013 FUNDS AUTHORIZED UNDER THE MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY ACT (MAP-21) AND THE PASSENGER RAIL INVESTMENT
More information2008 TTC OPERATING BUDGET
Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: NOVEMBER 14, 2007 SUBJECT: 2008 TTC OPERATING BUDGET RECOMMENDATION It is recommended that the Commission: 1) Approve the
More informationNOTICE OF BOARD OF DIRECTORS SPECIAL TELEPHONE MEETINGS
NOTICE OF BOARD OF DIRECTORS SPECIAL TELEPHONE MEETINGS CALL TO ORDER NEW JERSEY TRANSIT CORPORATION NJ TRANSIT BUS OPERATIONS, INC. NJ TRANSIT RAIL OPERATIONS, INC. NJ TRANSIT MERCER, INC. NJ TRANSIT
More informationMunicipal Transportation Quality Review
Municipal Transportation Quality Review SFMTA Response June 2015 San Francisco, California Overview The Agency s response to recommended modifications in the Transportation Quality Review An update on
More informationMBTA Green Line Positive Train Control Project
PRESENTATION MBTA Green Line Positive Train Control Project Presented to: MBTA Board of Directors December 2012 Agenda Project Goal Why Green Line PTC/Evaluation Criteria? Key Findings Maintaining Green
More informationOwner s Procurement Forum
Washington Metropolitan Area Transit Authority Construction Management Association of America National Capitol Chapter Owner s Committee Owner s Procurement Forum February 24, 2015 OVERVIEW of WMATA INFRASTRUCTURE:
More informationS-11: Tacoma Link Extension to Tacoma Community College
Project Number S-11 Subarea Pierce Primary Mode Light Rail Facility Type Corridor Length 3.65 miles Version ST Board Workshop Date Last Modified 11-25-2015 PROJECT AREA AND REPRESENTATIVE ALIGNMENT SHORT
More informationProposed Capital Improvement Program (CIP) for FY 2015-2019
RELATED TO AGENDA ITEM 17 Proposed Capital Improvement Program (CIP) for FY 2015-2019 February 20, 2014 Presentation Overview Planning Agency roles District s capital needs Bridge funding plan Capital
More informationSAMPLE VEHICLE FLEET SAFETY & USAGE POLICY
SAMPLE VEHICLE FLEET SAFETY & USAGE POLICY Policy The purpose of this policy is to ensure the safety of those individuals who drive company vehicles and to provide guidance on the proper use of company
More informationFLEET MANAGEMENT. Fleet Management s motto is If you make the time for us, We will make the time for you.
FLEET MANAGEMENT Department Mission/Purpose Statement We are dedicated to be a well managed, responsive and preferred provider of fleet services and to meet all fuel, mechanical repairs, towing and vehicle
More informationHeavy Metro Systems Light Rail Systems Automated Metros APMs Airport Link/City Shopping New & Retrofit Installations. w w w. platformscreendoors.
R a i l V e h i c l e S y s t e m s P l a t f o r m S y s t e m s A p p l i c a t i o n s Heavy Metro Systems Light Rail Systems Automated Metros APMs Airport Link/City Shopping New & Retrofit Installations
More informationTORONTO TRANSIT COMMISSION REPORT NO.
Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: March 26, 2014 SUBJECT: PROCUREMENT AUTHORIZATION AMENDMENT TO PURCHASE 10 ADDITIONAL TORONTO ROCKET TRAIN SETS PURCHASE ORDER NO.
More informationImpact of Reliability Centered Maintenance Program
Impact of Reliability Centered Maintenance Program Long Island Rail Road & Metro-North Railroad Maintenance of Equipment 1 Objective Describe the success of the MNR/LIRR Reliability Centered Maintenance
More informationDraft Capital Investment Program FY2016
Draft Capital Investment Program FY2016 5/26/2015 Draft Capital Investment Program FY2016 [This page intentionally left blank] TABLE OF CONTENTS TABLE OF CONTENTS I LETTER FROM THE GENERAL MANAGER 1 INTRODUCTION
More informationADOPTED CAPITAL ASSET MANAGEMENT AND INVESTMENT PROGRAM 2015 2019. Tri-County Metropolitan Transportation District of Oregon
ADOPTED CAPITAL ASSET MANAGEMENT AND INVESTMENT PROGRAM 2015 2019 Tri-County Metropolitan Transportation District of Oregon This page left intentionally blank. ADOPTED CAPITAL ASSET MANAGEMENT & INVESTMENT
More informationLight-Duty Vehicle Purchase Approval Form
Light-Duty Vehicle Purchase Approval Form Attachment II Requestor Name: Date: (As of date of application for vehicle to be replaced) Replacement (R) / New (N): (Enter R or N) Mileage (km): Department:
More informationGUIDANCE FOR TRANSIT FINANCIAL PLANS
U.S. Department of Transportation Federal Transit Administration GUIDANCE FOR TRANSIT FINANCIAL PLANS JUNE 2000 Prepared By: Federal Transit Administration Office of Planning Office of Program Management
More informationClosed on All City of Buckeye Designated Holidays
CITY OF BUCKEYE Fleet Management PUBLIC WORKS DEPARTMENT DEFINITION OF FLEET MANAGEMENT SERVICES Scope of Services Available Public Works Department Fleet Management Division is an Automotive Service Excellence
More informationFiscal Year 2015 Quarter 4 April - June 2015 Stephanie Pollack Secretary & CEO
Performance and Accountability Report Fiscal Year 2015 Quarter 4 April - June 2015 Stephanie Pollack Secretary & CEO Prepared by: Office of Performance Management & Innovation August 2015 Inside This Issue
More informationAppendix H. Projects Required for. Achieving a State of Good Repair. by 2030
Appendix H Projects Required for Achieving a State of Good Repair by 2030 The following projects, which are currently unfunded, must be completed to achieve and maintain a state of good repair by 2030.
More information9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015
9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,
More informationLegislative Council Panel on Transport Subcommittee on matters relating to railways
LC Paper No. CB(1)1023/04-05(01) Legislative Council Panel on Transport Subcommittee on matters relating to railways MTR Performance and Asset Management - Follow up measures to Lloyd's Report by MTRCL
More informationSOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY
SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY AGENDA REGULAR MEETING To Be Held at 3:00 PM APRIL 24, 2014 1234 Market Street, Mezzanine Level Philadelphia, PA 1. Approval of Minutes of the Regular
More informationAIR CONDITIONING LIFE EXTENDER ACX10 FIELD INSTALLATION AND PERFORMANCE EVALUATION
AIR CONDITIONING LIFE EXTENDER ACX10 FIELD INSTALLATION AND PERFORMANCE EVALUATION Tony Thorne Manager of Electrical Engineering Index Sensors and Controls, Stanwood, WA 98292 USA ABSTRACT Air conditioning
More informationState Of Texas Vehicle Fleet Management
Finance & Operations Policy FO-45 Vehicle Fleet Management 1. Introduction Texas Government Code Sections 2171.104 and 2171.105, mandate that the State Office of Vehicle Fleet Management (OVFM), as directed
More informationOperations and Maintenance Quantities and Costs LRT
LYNX Blue Line Extension (Northeast Corridor) Light Rail Project Contract #: 08-477 WBS #: 5.05 Operations and Maintenance Quantities and Costs LRT Prepared by: 1000 W. Morehead Street, Suite 200 Charlotte,
More informationRail Mileage-Based Asset Management
Customer Service and Operations Committee Board Information Item III-B November 4, 2010 Rail Mileage-Based Asset Management Page 23 of 52 Washington Metropolitan Area Transit Authority Board Action/Information
More informationCHAPTER 8: INTELLIGENT TRANSPORTATION STSTEMS (ITS)
CHAPTER 8: INTELLIGENT TRANSPORTATION STSTEMS (ITS) Intelligent Transportation Systems (ITS) enables people and goods to move more safely and efficiently through a state-of-the-art multi-modal transportation
More informationLayover Facility Alternatives Analysis
Layover Facility Alternatives Analysis March 2013 Version 0 Back of cover page March 2013 South Station Expansion Massachusetts Department of Transportation Table of Contents 1. Introduction...1 1.1. Layover
More informationVehicle Service Contract. Extend your coverage. Eliminate your worries.
Vehicle Service Contract Extend your coverage. Eliminate your worries. Covered components Not only does Hyundai Protection Plan VSC extend the coverage for the service of major components, our Platinum
More informationLos Angeles Metro Rapid
Los Angeles Metro Rapid Why BRT In Los Angeles Public dissatisfied with slow bus service Average bus speeds had declined by 10% since late- 1980s LADOT found that 50% of the time a bus is in service it
More information5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES
5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.1 FINANCIAL ANALYSIS The cost of a transportation investment falls into two categories: capital costs, and operating and maintenance (O&M) costs.
More informationMaintenance and Management of JR East Civil Engineering Structures
Maintenance and Management of JR East Civil Engineering Structures Tadayoshi Niitsu Introduction Japan s problem of aging population and declining birth-rate has been known for years and the labour force,
More informationHow To Ride The Inspirationiro Metro From Siemens
siemens.com Inspiro The new metro platform from Siemens Inspiro Inspiration for city life To address the diverse demands posed by public transportation in the cities of tomorrow, we have developed a metro
More informationSUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS WWW.SGS.COM/RAIL
SUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS WWW.SGS.COM/RAIL OUR UNIQUE SOLUTION TO YOUR UNIQUE SITUATION SGS is recognised as the global benchmark for quality and integrity. We
More informationNEW BLUE LINE CONNECTIONS
Washington Metropolitan Area Transit Authority NEW BLUE LINE CONNECTIONS 3/31/2014 A Major Capital Project of Momentum s Metro 2025 Program In support of its new strategic plan, Metro has considered the
More informationGeneral Insurance Version1.3. Certification Criteria
Eco Mark Product Category No. 147 General Insurance Version1.3 Certification Criteria - Applicable Scope- A. Automobile insurance Established November 29, 2010 Last Revised June 1, 2015 Japan Environment
More informationWARRANTY MANAGEMENT REDESIGN
TECHNICAL SERVICE DEPARTMENT Jan/2014 SUMMARY The Technical Service Department has established a set of business principles to support a variety of Departments within the District that includes Maintenance,
More informationFY2016 Second Quarter Financial Update
Finance & Administration Committee Action Item IV-B February 11, 2016 FY2016 Second Quarter Financial Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information
More information11 Software License and Hardware Maintenance and Support Agreement Extensions
Clause 7 in Report No. 11of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on June 25, 2015. 11 Software License and Hardware
More informationInfrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey
Infrastructure and Growth Leadership Advisory Group Ideas and Approaches Survey In its second meeting, the Infrastructure and Growth Leadership Advisory Group expanded and refined the list of approaches/ideas
More informationCapital Investment Program FY2016
Capital Investment Program FY2016 Capital Investment Program FY2016 [This page intentionally left blank] TABLE OF CONTENTS TABLE OF CONTENTS I LETTER FROM THE GENERAL MANAGER 1 INTRODUCTION 3 SOURCES
More informationVehicle Maintenance Policies and Procedures
Vehicle Maintenance Policies and Procedures Adopted: 09/20/2011 1 Table of Contents Introduction:... 4 Goals and objectives:... 5 Goals:... 5 Objectives:... 5 Preventative Maintenance:... 6 Daily... 6
More informationBAFFLES AS A MEANS OF STATION PROTECTION FROM HIGH AIR VELOCITIES - COMPARISON OF ANALYTICAL AND FIELD MEASUREMENTS RESULTS
- 289 - BAFFLES AS A MEANS OF STATION PROTECTION FROM HIGH AIR VELOCITIES - COMPARISON OF ANALYTICAL AND FIELD MEASUREMENTS RESULTS Maevski Igor, PhD, PE Jacobs Engineering, USA ABSTRACT Draught relief
More informationGOVERNANCE: Improved Policies, Practices, and Training Can Enhance Capital Project Management DRAFT. Audit Report OIG-A-2014-009 July 15, 2014
GOVERNANCE: Improved Policies, Practices, and Training Can Enhance Capital Project Management July 15, 2014 DRAFT This page intentionally left blank. NATIONAL RAILROAD PASSENGER CORPORATION REPORT HIGHLIGHTS
More informationScheduled Maintenance
Scheduled Maintenance Scheduled Maintenance Scheduled maintenance is planned component repair or replacement, often triggered by preventive maintenance inspections, pre- trip and post- trip inspections,
More informationRefurbishment and accident repair
How do you make your vehicles fit for the future? Refurbishment and accident repair Enhancing the attractiveness of your vehicles. Answers for mobility. 1 2 Today and tomorrow: Guaranteed availability
More informationFleet Services CORPORATE SERVICES. Branch Manager: Steve Rapanos 57 FLEET SERVICES 2016 2018 BUSINESS PLAN
Fleet Services CORPORATE SERVICES Branch Manager: Steve Rapanos 57 FLEET SERVICES 2016 2018 BUSINESS PLAN Table of Contents INTRODUCTION Our Branch 60 CONTRIBUTION TO THE CITY S VISION The Way Ahead 62
More informationPower Point Presentation
Good Morning Chairman Evans and members of the Committee on Finance and Revenue. I am Jack Requa, Interim General Manager and CEO of the Washington Metropolitan Area Transit Authority (WMATA), commonly
More informationEmergency Telephone Systems
Standard Issued Date: 22 May 2014 Important Warning This document is one of a set of standards developed solely and specifically for use on the rail network owned or managed by the NSW Government and its
More informationRoadway Congestion 139,600 135,300 134,700 NA 4,300 4,900. Table 7-2 Transportation Criteria - Roadway Congestion (2035)
7 Transportation Criteria 7.1 Introduction A goal of this project is to improve mobility in the corridor. To that end, all the major Project alternatives identified at this point in the study include significant
More informationCOUNTY OF GREENVILLE EQUIPMENT MANAGEMENT SYSTEM
COUNTY OF GREENVILLE EQUIPMENT MANAGEMENT SYSTEM I POLICY The equipment management system provides detail and management information about replacement and operation costs for the County s rolling equipment.
More information2010 METROBUS FLEET MANAGEMENT PLAN
2010 METROBUS FLEET MANAGEMENT PLAN Office of Long Range Planning Department of Planning and Joint Development Office of Bus Planning Department of Bus Services Washington Metropolitan Area Transit Authority
More informationProcurement & Contracting Division. Request for Information (RFI) Concerning Procurement of Electrified Rolling Stock ("Rolling Stock")
Request for Information (RFI) Concerning Procurement of Electrified Rolling Stock ("Rolling Stock") November 2013 1 Request for Information ( RFI ) Concerning the Procurement of Electrified Rolling Stock
More informationOverview of Program Management Services and Proposed CIP FY2012-17
Finance & Administration Committee Item III-A January 13, 2010 Overview of Program Management Services and Proposed CIP FY2012-17 Page 3 of 64 Washington Metropolitan Area Transit Authority Board Action/Information
More informationMETRO. Fiscal Year 2013 Monthly Board Report. June 2013 (Third Quarter Fiscal Year-to-Date)
METRO Fiscal Year 2013 Monthly Board Report Revenue Expense Ridership Performance (Third Quarter Fiscal Year-to-Date) 7/16/2013 Table of Contents Section A Section B Section C Section D Section E Section
More informationTABLE OF CONTENTS. Background Performance Review Guidelines 2. Fleet and Facility Performance Review Guidelines 2 Fleet 3 Facility 4 Guidelines 4
TABLE OF CONTENTS Background Performance Review Guidelines 2 Fleet and Facility Performance Review Guidelines 2 Fleet 3 Facility 4 Guidelines 4 Performance Review - Fleet and Facility Chart 6 Section A
More informationBudget Used Balance Obligation Based Budget: Infrastructure Renewal Program $290.1 $251.2 $38.9
FY 05 Metro Matters Summary End of Fiscal Year Status Dollars in Million Budget Used Balance Obligation Based Budget: Infrastructure Renewal Program $290.1 $251.2 $38.9 Expenditure Based Budget: Rail Car
More informationVRE SYSTEM PLAN SUMMARY
VRE System Plan Summary January 2014 VRE SYSTEM PLAN SUMMARY VRE A Cost-Effective Contributor to Regional Mobility During the last decade, VRE has demonstrated its ability to accommodate a rapid and substantial
More informationAMTRAK UNVEILS ADVANCED TECHNOLOGY LOCOMOTIVES FOR NORTHEAST SERVICE Siemens-built equipment to improve reliability, efficiency and mobility
FOR IMMEDIATE RELEASE: May 13, 2013, 5 AM ET ATK-13-039 Media Contact: Amtrak: 202 906.3860 Siemens: 917 622.2413 AMTRAK UNVEILS ADVANCED TECHNOLOGY LOCOMOTIVES FOR NORTHEAST SERVICE Siemens-built equipment
More informationMid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)
Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total
More informationGoals & Objectives. Chapter 9. Transportation
Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system
More informationPassenger Risk Mitigation Strategy Guidelines Province of Alberta (Version 0.5- September 7, 2011)
Passenger Risk Mitigation Strategy Guidelines Province of Alberta (Version 0.5- September 7, 2011) Passenger Risk Mitigation Strategy Guidelines Province of Alberta 1) Background Transit systems are growing
More informationIndex of issues discussed
Strategy for regulation of health and safety risks - chapter 7: Rolling Stock Asset Management ORR strategy for Rolling Stock Asset Management How ORR will address this topic: The industry, regulator and
More informationVehicle Management Plan 2008 07 22 revision
Vehicle Management Plan March 18, 2008 University of Florida Physical Plant Division Preamble... 3 Purpose... 5 Vehicle Management... 7 Composition... 7 Cost Savings from Vehicle Reduction... 7 Grant Funded
More informationDUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD
DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD JOB DESCRIPTION POSITION TITLE: Air Conditioning Mechanic DEPARTMENT: Plant TITLE OF IMMEDIATE SUPERVISOR: Supervisor, Maintenance Services Position Summary
More informationMetro Rail Gating Study
Executive Management & Audit Committee Item # 27 Operations Committee Item # 43 FINAL DRAFT Metro Rail Gating Study Los Angeles, California November 15, 2007 Filename/RPS Number 1 Briefing Contents Executive
More informationOperating Concept and System Design of a Transrapid Maglev Line and a High-Speed Railway in the pan-european Corridor IV
Operating Concept and System Design of a Transrapid Maglev Line and a High-Speed Railway in the pan-european Corridor IV A. Stephan & E. Fritz IFB Institut für Bahntechnik GmbH, Niederlassung, Germany
More informationMaximizing Fleet Efficiencies with Predictive Analytics
PHH Arval - Trucks Maximizing Fleet Efficiencies with Predictive Analytics Neil Gaynor Manager of Business Development 29 December 2012 1 Maximizing Fleet Efficiencies with the use of Predictive Analytics
More informationATTACHMENT K 5310 ELIGIBLE COST
ATTACHMENT K 5310 ELIGIBLE COST Attachment K - Traditional 5310 Eligible Cost a. Rolling stock and related activities for Section 5310-funded vehicles (1) Acquisition of expansion or replacement buses
More informationEngineered Material Handling. Overhead Bridge Cranes and Gantry Cranes
TM Engineered Material Handling Overhead Bridge Overhead and Gantry Bridge Cranes and Gantry Cranes Custom Engineered Crane Systems Gantry Cranes EMH builds a complete range of gantry cranes including
More informationIndustrial Rail Car Issues and Concerns
December 29, 2006 AUD 07-076 An Internal Audit Report by the Office of Auditor General On Review of Issues and Concerns on Alstom Rail Car Contracts The objectives of our audit are to ascertain the contract
More informationMarch 2015 Prepared by the Department of Finance & Performance Management. 2013 Regional Peer Review PERFORMANCE MEASURES
March 2015 Prepared by the Department of Finance & Performance Management 2013 Regional Peer Review PERFORMANCE MEASURES CONTENTS CONTENTS... 1 EXECUTIVE SUMMARY... 2 SNAPSHOT... 4 PEER SELECTION... 5
More informationChapter 1: Background
Chapter 1: Background 1.1 Trends in Bicycle Ridership and Collisions in Toronto Toronto has relatively high levels of bicycle traffic on its downtown streets. On a typical weekday, bicycles make up roughly
More informationTransportation Alternatives
1 Transportation Alternatives Transportation alternatives involve a variety of components: Location Alternatives - when and where service is provided - general location as well as level of service on the
More informationFleet Management. Fleet Management is responsible for supporting the transportation and equipment needs of Pinellas County.
Fleet Management Fleet Management is responsible for supporting the transportation and equipment needs of Pinellas County. The preventive maintenance and repair of the County s automobile, light truck,
More informationLegislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873
Legislative Fiscal Bureau One East Main, Suite 301 Madison, WI 53703 (608) 266-3847 Fax: (608) 267-6873 February 16, 2010 TO: FROM: Members Joint Committee on Finance Bob Lang, Director SUBJECT: Governor's
More informationDirections To the ERME Department
Department of Educational Research, Measurement and Evaluation (ERME) Lynch School of Education, Chestnut Hill Campus, Campion Hall Boston College 140 Commonwealth Ave Chestnut Hill, MA 02467 Boston College
More informationPROGRAM CRITERIA FOR ELECTRICAL ENGINEERING TECHNOLOGY
PROGRAM CRITERIA FOR ELECTRICAL ENGINEERING TECHNOLOGY Scope These program criteria apply to programs having titles involving Electrical Engineering Technology including: electrical engineering, electrical
More informationMONORAIL. Scomi Rail THE REVOLUTION OF URBAN TRANSIT. A smooth ride quality. Higher passenger capacity. Energy efficiency. Lower operating costs.
Scomi Rail MONORAIL THE REVOLUTION OF URBAN TRANSIT Scomi s Monorail system is designed to address current mass urban transportation needs. The system complies with international standards of safety, quality
More information