1 INTRODUCTION: PORT EVERGLADES WETLANDS CONSTRUCTION & PLANTING BERGERON LAND DEVELOPMENT, INC. and BROWARD COUNTY would be pleased to have your company be a part of our CONSTRUCTION TEAM. We are inviting interested CONTRACTORS, SUBCONTRACTORS, and VENDORS to submit a Prequalification Package for the services described herein. In order to be considered, all SUBCONTRACTORS will be required to provide proof of bond ability from a known, reputable Surety Company with a minimum rating provided for on page 4 of 8 of this announcement. We have scheduled the following meetings in effort to familiarize all interested parties with the project elements all interested proposers are encouraged to attend. CBE PREQUALIFICATION MEETING: A CBE contractor prequalification meeting will be held Tuesday, September 3, 2013 at 10:00 am at the Port Everglades Administration Building Auditorium at 1850 Eller Drive, Ft. Lauderdale, FL Please note a valid government-issued photo ID will be required for entrance into the Port - please allow adequate time for entrance. PREQUALIFICATION MEETING: A contractor prequalification meeting will be held Tuesday, September 3, 2013 at 10:00 am at the Port Everglades Administration Building Auditorium at 1850 Eller Drive, Ft. Lauderdale, FL Please note a valid government-issued photo ID will be required for entrance into the Port - please allow adequate time for entrance. PROJECT DESCRIPTION: The Port Everglades Wetlands Construction & Planting Project includes the construction of approximately 16.5 acres of wetlands and the construction of wetland enhancement mitigation areas. The project also includes the construction of a drainage system, roadways, and utilities. The work includes traffic markings, signage, safeguards, as well as fencing and lighting. Bids will be received from QUALIFIED CONTRACTORS, SUBCONTRACTORS, and VENDORS in order to establish a Guaranteed Maximum Price (GMP) contract to include, but not limited to, the following work items as described in the contract plans and specifications: Demolition Construction will include, but is not limited to: the removal and disposal of existing asphalt and concrete pavements, removal and disposal of existing storm drainage facilities, potable and non-potable water utilities, sanitary sewer services, and removal of electrical power services. Clearing and grubbing construction activity will include, but is not limited to: the removal of on-site vegetation, both selective clearing and non-selective clearing including the removal and disposal of nuisance plants. Excavation/Embankment will include, but is not limited to: excavation and grading compaction, placement of mangrove planting substrate within the wetland creation area, removal of unsuitable materials, removal and disposal of C&D debris, removal and disposal of contaminated materials. This activity will also include the excavation and grading of on-site drainage swales and a drainage storage pond. Protection of Existing Vegetation will include, but is not limited to: installation of silt protection and floating turbidity barrier as required for environmental compliance of the permitting agency having Page 1 of 8

2 jurisdiction over the site. Storm Water Drainage Installation will include, but is not limited to: the installation of a storm drainage collection and conveyance system that will have 18-inch through 72-inch RCP and storm drainage structures, to include backfill and compaction. Utilities Relocation will include the location, removal, and relocation of various existing water and sewer utilities. Electrical/Lighting will include, but is not limited to: the installation of new light poles, conduit, and electrical service riser. Concrete Curb and Flatwork will include, but is not limited to: the construction of curb pads, sidewalk stabilized subgrade, and the forming and pouring concrete curb and gutter and concrete sidewalk. Asphalt Milling/Paving will include, but is not limited to: the milling of existing pavements of various depths and placement of new asphalt road base and finish courses. Fencing includes the installation of various fences as shown on the plans. Subgrade will include, but is not limited to: the grading of various roadbeds to the footprint of the plans, and stabilizing the road subgrade to the grades of the plans. SPECIALTY CONTRACTING Survey will include, but is not limited to: establishing control points, verifying Subcontractors survey staking, and providing certified as-built survey documentation. QC/QA will include, but is not limited to: providing quality control inspection and testing and documentation of all construction to assure compliance with the contract specifications. Construction of Precast Concrete Manatee Crossing Culvert (8-foot by 8-foot) will include, but is not limited to the installation of pre-cast concrete box culvert including associated wing wall and foundations. Dewatering will include providing dewatering of the site during construction of various underground utilities. Riprap Installation Seawall Installation Floating Dock Retaining Wall Installation Sheet Piling Installation Page 2 of 8

3 PROJECT LOCATION: The Project Site is located at 3500 SE 18 th Avenue in Port Everglades, Florida. PROJECT START DATE: The Project is tentatively scheduled to start January 27, 2014 and is scheduled to end mid-october of DUE DATE: On or before 09/05/13 at 5:00pm. Please use this Word document for responding electronically (preferred) to attention of Dennis Brown Senior Project Manager in care of c/o Questionnaires can be submitted to Bergeron in the form of a hard copy enclosed in a sealed envelope prior to the due date and time. Hard copies shall be delivered to Bergeron's main office at SW 69th Place, Fort Lauderdale, FL ATTN: Dennis Brown Senior Project Manager. General questions should be directed Mr. Brett Gallrein person designated as initial contact person. Any questions regarding contract bid issues or technical issues must be submitted in writing brett.gallrein@bergeroninc.com, Phone: You may also contact Mrs. Rebecca Bolen at rebecca.bolen@bergeroninc.com, Phone: The package will also be available on Bergeron s website: alification CBE INFORMATION: The Broward County Business Opportunity Act of 2004 and the County Business Enterprise (CBE) Act of 2009 establish Broward County s policies for participation by small business enterprises, county business enterprises, and federal disadvantaged business enterprises in all County contracts and in other selected activities. County Business Enterprise (CBE) participation is a part of the selection criteria for this project, as applicable. The total CBE goal is 22%. Submit a Declaration Statement as to whether or not you are capable of providing CBE participation for this project. If you are a CBE, please attach a copy of your CBE certification to your Qualification and Bid submission. PREQUALIFICATION CRITERIA: Contractor and Specialty Contractors wishing to Prequalify shall demonstrate ability and experience necessary for the Project, interested companies shall submit, the following to be consider for short listing: 1. Company Name. 2. Owner's Name. 3. Company contact information. 4. Applicable licenses and/or certifications. 5. Years in Business. 6. Years of Experience related to Heavy Civil Construction and Environmental Wetland Construction. 7. References from Three (3) similar projects completed within the last five (5) years. Three (3) references from current projects. Please be advised that all Prequalification Questionnaire responses will be evaluated by the BERGERON TEAM to determine responsiveness and responsibility. Your firm may be required to provide additional information or your firm may be required to meet with BERGERON representatives. Subcontractors and Vendors need to acknowledge any partial or total ownership by BERGERON, a BERGERON company, or a BERGERON affiliate. Page 3 of 8

4 Selection Committee (SC) within BERGERON will evaluate all submissions and create a short list of the most qualified firms. The SC will determine the number of firms per trade to be short-listed. The short list for each trade will include a minimum of three (3) firms and/or minimum of three (3) firms wishing to submit as prime contractor performing all trades. If your firm is on the short list, an Invitation to Bid (ITB) will be sent to you. The ITB will contain additional Selection Criteria, including, but not necessarily limited to: proposed project personnel, resource availability, scope exclusions, CBE Participation level, references on key personnel, any qualifications to the Subcontract terms and conditions, changes in your financial profile, and past and current OSHA performance. The ITB will also contain information on the pre-bid conference, plans and specifications, and bid due date. BONDING REQUIREMENT: Each bond must be executed by a surety company of recognized standing, authorized to do business in the State of Florida as surety, having a resident agent in the State of Florida and having been in business with a record of successful continuous operation for at least five years. The surety company shall hold a current certificate of authority as acceptable surety on federal bonds in accordance with United States Department of Treasury Circular 570, Current Revisions. If the amount of the Bond exceeds the underwriting limitation set forth in the circular, in order to qualify, the net retention of the surety company shall not exceed the underwriting limitation in the circular, and the excess risks must be protected by coinsurance, reinsurance, or other methods in accordance with Treasury Circular 297, revised September 1, 1978 (31 DFR Section , Section ). Further, the surety company shall provide BERGERON with evidence satisfactory to BERGERON, that such excess risk has been protected in an acceptable manner. BERGERON will accept a surety bond from a company with a rating of B+ or better for bonds up to $_ million, provided, however, that if any surety company appears on the watch list that is published quarterly by Intercom of the Office of the Florida Insurance Commissioner, BERGERON shall review and either accept or reject the surety company based on the financial information available to BERGERON. A surety company that is rejected by BERGERON may be substituted by the bidder or proposer with a surety company acceptable to the BERGERON, only if the bid amount does not increase. The ratings of Surety shall correspond to the amount of bonds as follows: Amount of Bond Policy Holder s Ratings Category 500,001 to 1,000,000 B+ Class I 1,000,001 to 2,000,000 B+ Class II 2,000,001 to 5,000,000 A Class III 5,000,001 to 10,000,000 A Class IV Page 4 of 8

5 Port Everglades Wetlands Construction & Creation Prequalification Instructions 1. Prequalification Evaluation Criteria For your firm to be considered for the Port Everglades Wetlands Construction & Planting project, please fill out items 1 through 22 below and provide the requested similar project information. The Prequalification Questionnaire must be completed in its entirety and submitted to Bergeron as indicated below. Qualification Questionnaire Items 1 through 22: Evaluation Criteria Provide answers below. When an entire response cannot be entered, instead enter a summary response with an attachment number reference for where a complete response can be found 1. Company Name 2. Company Address 3. Company Phone Number 4. Company Owner s Name 5. Company Contact Information 6. Letter from your firm's Bonding Company stating that your firm is capable of providing a bond. Their letter must also indicate your firm's single project limit and annual aggregate limit 7. Identify any terms and conditions to Bergeron's Standard Subcontract Agreement (Attachment 1) with which your firm cannot agree. If no exceptions are taken to this Agreement, your firm must indicate as such in the box to the right. A copy of Bergeron's Standard Subcontract Agreement can be found in Attachment Current Certificate of Insurance meeting the requirements stipulated in Bergeron's Standard Subcontract Agreement (Attachment 2). Please scan the letter and make it a separate attachment to your response Please scan your certificate and make it a separate attachment to be submitted with your response Page 5 of 8

6 9. Bergeron's SUBCONTRACTOR INFORMATION FORM (Attachment 3) This form is found in Attachment 5 and you are required to fill it out and return it along with this file 10. Applicable Licenses and Certifications Please scan any and all relevant licenses/certifications and make them a separate attachment to be submitted with your response 11. What experience, if any, does your company have working in environments with security restrictions? 12. What experience, if any, does your company have working on projects adjacent to wetlands while maintaining compliance with National Pollutant Discharge Elimination System (NPDES)? 13. What experience, if any, does your company have working in Port Everglades? Respond to the following questions: 14. Has your company ever failed to complete any work awarded to you? If so, when, where, and why? 15. Has your company ever been terminated from a contract? If so, when, where, and why? 16. List all business related claims (including dollar value) and litigation history for the past five (5) years, a description of the subject matter of the dispute and the final outcome of the claim. 17. What is your company's current backlog of work? 18. What experience, if any, does your company have with the construction of wetlands enhancements projects? 19. What experience, if any, does your company have with the construction of heavy civil underground construction whereby the water table varies with tidal conditions and the underground construction must be installed in the dry? 20. What experience, if any, does your company have with the excavation and removal of C&D debris in compliance with local and state regulations? 21. What experience, if any, does your company have with Construction Management at Risk (Guaranteed Page 6 of 8

7 Maximum Price) contracts and or Design Build Contracts? 22. What experience if any does you company have in regards to National Pollutant Discharge Elimination System (NPDES) permits, do you have staff certified under NPDES requirements, has your company been fined for failure to comply to NPDES permit requirements? Please answer all three parts of this question. Similar project experience: Please provide a list of three (3) projects completed in the last five (5) years of similar scope and complexity to this project below Project 1 Project Name Project Location Owner s Name, Address, and Business Phone Number Scope of Work and Contract Amount Project Consultant or Project Designer Project 2 Project Name Project Location Owner s Name, Address, and Business Phone Number address Scope of Work and Contract Amount Page 7 of 8

8 Project Consultant or Project Designer Project 3 Project Name Project Location Owner s Name, Address, and Business Phone Number Scope of Work and Contract Amount Project Consultant or Project Designer County Business Enterprise Information 23. County Business Enterprise (CBE) participation is a part of the selection criteria for this project. The total CBE goal is 22%. Submit a Declaration Statement as to whether or not you are capable of providing CBE participation for this project. If you are a CBE, please attach a copy of your CBE certification to your Prequalification submission. End of Responses - for this Form The above Prequalification Questionnaire (items 1 through 22) is Due: On or before 09/05/13 at 5:00pm. Please use this Word document for responding electronically (preferred) to attention of Dennis Brown Senior Project Manager in care of c/o brett.gallrein@bergeroninc.com. Questionnaires can be submitted to Bergeron in the form of a hard copy enclosed in a sealed envelope prior to the due date and time. Hard copies shall be delivered to Bergeron's main office at SW 69th Place, Fort Lauderdale, FL ATTN: Dennis Brown Senior Project Manager. General questions should be directed Mr. Brett Gallrein person designated as initial contact person. Any questions regarding contract bid issues or technical issues must be submitted in writing brett.gallrein@bergeroninc.com, Phone: You may also contact Mrs. Rebecca Bolen at rebecca.bolen@bergeroninc.com, Phone: The package will also be available on Bergeron s website: Page 8 of 8

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing.

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing. COLORADO DEPARTMENT OF TRANSPORTATION CONTRACTOR PREQUALIFICATION STATEMENT (EXPERIENCE, EQUIPMENT AND FINANCIAL) Return to: Contracts & Market Analysis Prequalification Unit 4201 E. Arkansas,4th Floor

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT. BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309

EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT. BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309 EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309 FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT FOUR 1.0 SCOPE OF

More information

SECTION 5 DRAFTING STANDARDS

SECTION 5 DRAFTING STANDARDS SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.

More information

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.

More information

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...

More information

COPPER BEECH TOWNHOME DEVELOPMENT

COPPER BEECH TOWNHOME DEVELOPMENT COPPER BEECH TOWNHOME DEVELOPMENT This 28 acre, 30 Townhome development is slated to open doors in time for the 2007 2008 college school year. To accommodate this project s tight time line, Dennis Corporation

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

ANY INVALID WILL NOT

ANY INVALID WILL NOT NOTICE!! THIS IS AN OFFICIAL DOCUMENT THAT IS USED TO DETERMINE THE QUALIFICATIONS OF CONTRACTORS TO BID WITH THE AGENCY OF TRANSPORTATION FOR THE STATE OF VERMONT. ANY ALTERATIONS OF THIS DOCUMENT WILL

More information

CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS FOR

CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS FOR PH 231.946.5874 FAX 231.946.3703 WWW.gourdiefraser.com CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS FOR Little Traverse Bay Bands of Odawa Indians Nine Mile Point Boat Launch Hayes Township, Charlevoix

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

Table 4.9 Storm Drain Inlet Protetion Applicable for

Table 4.9 Storm Drain Inlet Protetion Applicable for BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

SUBCONTRACTOR Pre-Qualification Form

SUBCONTRACTOR Pre-Qualification Form Please complete the form below and email (form and all attachments) to prequal@cswcontractors.com or fax to 602-266-7070. If all information is not provided and all attachments are not submitted this will

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)

More information

Unit Price Averages Reports

Unit Price Averages Reports Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation

More information

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions. SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings

More information

DIVISION 1 - GENERAL REQUIREMENTS SECTION 01000 - SPECIAL PROVISIONS

DIVISION 1 - GENERAL REQUIREMENTS SECTION 01000 - SPECIAL PROVISIONS TEMPO PARK IMPROVEMENTS PROJECT # 2012-3-4202-86 1.01 SCOPE OF WORK DIVISION 1 - GENERAL REQUIREMENTS SECTION 01000 - SPECIAL PROVISIONS The Contractor shall perform, furnish and complete the following

More information

CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING. 7.05 Subdivision Improvement Performance Bond Requirements

CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING. 7.05 Subdivision Improvement Performance Bond Requirements CHAPTER 7: SUBDIVISION CONSTRUCTION, INSPECTION AND BONDING 7.00 Construction 7.01 Inspection and Testing of Improvements 7.02 Approval of Improvements 7.03 City Engineer s Acceptance of All Improvements

More information

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or

More information

Guidelines for Fiber Optic Cable Permits

Guidelines for Fiber Optic Cable Permits Guidelines for Fiber Optic Cable Permits NOVA District (Fairfax/Arlington) Permits www.virginiadot.org/business/fairfax-permits-main.asp Email: NOVAFairfaxPermits@VDOT.Virginia.gov 14685 Avion Parkway

More information

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of

More information

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons)

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons) DATE: March 8, 2006 TO: FROM: SUBJECT: Plan Commission Larry D. Nelson, P.E., City Engineer 5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons) The City Engineering

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

CONSTRUCTION CONTRACT NO. T-333.59F001-3-02

CONSTRUCTION CONTRACT NO. T-333.59F001-3-02 SPECIAL PREQUALIFICATION PROCESS FOR PLYMOUTH MEETING MAINTENANCE FACILITY RELOCATION AND CONSTRUCTION MILEPOST 332.5 EASTBOUND PLYMOUTH TOWNSHIP, MONTGOMERY COUNTY PENNSYLVANIA TURNPIKE COMMISSION CONSTRUCTION

More information

2014 Inlet Rehab Project II Various Locations

2014 Inlet Rehab Project II Various Locations 2014 Inlet Rehab Project II Various Locations in the City of Sioux Falls, South Dakota Bid Request No. 14-1078 Prepared by: Engineering Division 224 West 9 th Street Sioux Falls, SD 57104 TABLE OF CONTENTS

More information

TOWNSHIP OF BRIGHTON REQUEST FOR PROPOSALS SANITARY SEWER REPAIRS AND/OR GRINDER PUMP INSTALLATION

TOWNSHIP OF BRIGHTON REQUEST FOR PROPOSALS SANITARY SEWER REPAIRS AND/OR GRINDER PUMP INSTALLATION TOWNSHIP OF BRIGHTON REQUEST FOR PROPOSALS SANITARY SEWER REPAIRS AND/OR GRINDER PUMP INSTALLATION April 25, 2014 DUE DATE/LOCATION: Friday, May 9, 2014 Bid forms and references are due by 9:30 A.M. at:

More information

Carlton Fields Memorandum

Carlton Fields Memorandum Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed

More information

W. REYNOLDS ST. (SR 574) SEWER LINE REPLACEMENT BID NO. 10-91345-003 Addendum 3a

W. REYNOLDS ST. (SR 574) SEWER LINE REPLACEMENT BID NO. 10-91345-003 Addendum 3a PROPOSAL AND BID FORM W. REYNOLDS ST. (SR 574) SEWER LINE REPLACEMENT Pursuant to and in compliance with your Invitation to Bid dated February 9, 2010, the Instructions to Bidders, Special Conditions and

More information

2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA

2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA 2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA Issued on January 7, 2015 1 ADVERTISEMENT FOR BIDS 2014/2015 ROADWAY PATCHING PROJECT JASPER COUNTY, GEORGIA Separate,

More information

North American Development Bank. Model Prequalification Document: Prequalification of Contractors

North American Development Bank. Model Prequalification Document: Prequalification of Contractors North American Development Bank Model Prequalification Document: Prequalification of Contractors 2 Preface Procurement under projects financed by the North American Development Bank (the Bank), is carried

More information

MOBILE HOME SERVICE REQUIREMENTS GAS

MOBILE HOME SERVICE REQUIREMENTS GAS ELECTRIC AND GAS 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 GENERAL 4.0 REFERENCE MATERIAL 5.0 TYPICAL UNDERGROUND UTILITY LAYOUT 6.0 METER PAD DETAILS 7.0 GENERAL INSTALLATION PROCEDURES 8.0 PEDESTAL SPECIFICATIONS

More information

Work Type Definition and Submittal Requirements

Work Type Definition and Submittal Requirements Work Type: Geotechnical Studies Soils Analysis & Recommendations The first section, Work Type Definition, provides a detailed explanation of the work type. The second section, Work Type Submittal Requirements,

More information

SUBCONTRACTOR S QUALIFICATION STATEMENT. Give complete answers to the following questions (attach additional pages if necessary).

SUBCONTRACTOR S QUALIFICATION STATEMENT. Give complete answers to the following questions (attach additional pages if necessary). 1 SUBCONTRACTOR S QUALIFICATION STATEMENT Submitted to: B.C. Construction Co., Inc. 385 Main Street Wakefield, MA 01880 For consideration with regard to: (Name of Project) Date: Give complete answers to

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial

More information

DESERT WILDLIFE UNLIMITED POB 1388 Brawley, CA 92227 760 275 3953 NOTICE TO BIDDERS ALAMO RIVER TREATMENT WETLANDS AT SHANK ROAD

DESERT WILDLIFE UNLIMITED POB 1388 Brawley, CA 92227 760 275 3953 NOTICE TO BIDDERS ALAMO RIVER TREATMENT WETLANDS AT SHANK ROAD DESERT WILDLIFE UNLIMITED POB 1388 Brawley, CA 92227 760 275 3953 NOTICE TO BIDDERS ALAMO RIVER TREATMENT WETLANDS AT SHANK ROAD The contactor shall possess a California contractor s license, Class A,

More information

SAMPLE COPY. Stormwater Pollution Prevention Plan. A site map must be developed and must contain, at a minimum, the following information:

SAMPLE COPY. Stormwater Pollution Prevention Plan. A site map must be developed and must contain, at a minimum, the following information: Stormwater Pollution Prevention Plan "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

For Construction of the Sandy Suburban Improvement District 2013 Pipeline Rehabilitation Project

For Construction of the Sandy Suburban Improvement District 2013 Pipeline Rehabilitation Project DOCUMENTS For Construction of the Sandy Suburban Improvement District 2013 Pipeline Rehabilitation Project February 11, 2013 OWNER Sandy Suburban Improvement District 8855 South 700 West Sandy, UT 84070

More information

PITTSBURG UNIFIED SCHOOL DISTRICT

PITTSBURG UNIFIED SCHOOL DISTRICT PITTSBURG UNIFIED SCHOOL DISTRICT New Construction and Modernization Projects PRE-QUALIFICATION PROGRAM QUESTIONNAIRE FOR PROJECTS $20 MILLION AND OVER TABLE OF CONTENTS PAGE NO. GENERAL INFORMATION.......i

More information

Section 600 Incidental Construction

Section 600 Incidental Construction Table of Contents 1. Pipe Culverts... 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes... 600-5 2. Grade Adjustment of Existing Miscellaneous Structures... 600-8 3. Rebuilt Miscellaneous Structures...

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

REQUEST FOR QUALIFICATIONS. 2013 Concrete Rehabilitation Program. Various Locations within the City of Centennial PROJECT NO.

REQUEST FOR QUALIFICATIONS. 2013 Concrete Rehabilitation Program. Various Locations within the City of Centennial PROJECT NO. REQUEST FOR QUALIFICATIONS 2013 Concrete Rehabilitation Program Various Locations within the City of Centennial PROJECT NO. 2013-RFQ-13-01-01 Request for Qualifications due: Date: Friday, January 11, 2013

More information

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

ANNUAL PREQUALIFACTION APPLICATION. Interested Subcontractor:

ANNUAL PREQUALIFACTION APPLICATION. Interested Subcontractor: ANNUAL PREQUALIFACTION APPLICATION Interested Subcontractor: Each Frank L. Blum Construction subcontractor that has the potential of having a contract greater than $50,000 must submit a completed Subcontractor

More information

SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES

SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES BOARD OF COUNTY COMMISSIONERS ST. MARY S COUNTY LEONARDTOWN, MARYLAND SUBDIVISION ROAD CONSTRUCTION AND INSPECTION PROCEDURES APRIL, 1991 AMENDED: JUNE, 2002 DEPARTMENT OF PUBLIC WORKS & TRANSPORTATION

More information

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. 19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

COMMERCIAL CONDUIT RULES AND REGULATION

COMMERCIAL CONDUIT RULES AND REGULATION Electric Engineering Division COMMERCIAL CONDUIT RULES AND REGULATION S:\COO_ACM_US_Electric_Telecommunications\COO_ET_Engineering\Conduit Policies\Residential 1805 NE 30th Ave., Bldg. 400 Ocala, FL 34470-4875

More information

Stormwater/Wetland Pond Construction Inspection Checklist

Stormwater/Wetland Pond Construction Inspection Checklist : Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials

More information

HOMER TOWNSHIP HIGHWAY DEPARTMENT ADDENDUM #1. June 13, 2014 VARIOUS (2014 ROAD PROGRAM) SECTION NO.: 14-00000-01-GM

HOMER TOWNSHIP HIGHWAY DEPARTMENT ADDENDUM #1. June 13, 2014 VARIOUS (2014 ROAD PROGRAM) SECTION NO.: 14-00000-01-GM HOMER TOWNSHIP HIGHWAY DEPARTMENT ADDENDUM #1 June 13, 2014 VARIOUS (2014 ROAD PROGRAM) SECTION NO.: 14-00000-01-GM This addendum consists of the following clarification: 1. Addendum #1 is attached and

More information

CONSTRUCTION PERMIT REQUIREMENTS

CONSTRUCTION PERMIT REQUIREMENTS CONSTRUCTION PERMIT REQUIREMENTS Any work to be done in the City right-of-way (ROW), in a utility easement, and certain work on private property, requires an Engineering Inspection Permit from the Department

More information

IRVINE UNIFIED SCHOOL DISTRICT. 100 Nightmist Irvine, California 92618 (949) 936-5317 CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20

IRVINE UNIFIED SCHOOL DISTRICT. 100 Nightmist Irvine, California 92618 (949) 936-5317 CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 100 Nightmist Irvine, California 92618 (949) 936-5317 CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 The Irvine Unified School District ( District ) has determined that bidders on an annual basis must

More information

Minnesota Power PRE QUALIFICATION QUESTIONNAIRE. Engineering, Procurement and Construction of a 10 MW Solar PV Power Plant

Minnesota Power PRE QUALIFICATION QUESTIONNAIRE. Engineering, Procurement and Construction of a 10 MW Solar PV Power Plant Minnesota Power PRE QUALIFICATION QUESTIONNAIRE Engineering, Procurement and Construction of a 10 MW Solar PV Power Plant December 1, 2014 CONTRACTOR s NAME: Project Description: Minnesota Power is developing,

More information

SECTION 02221 SELECTIVE DEMOLITION

SECTION 02221 SELECTIVE DEMOLITION SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY 1. Applicant's Name Address (Street or Rural Route) (City & State) (Zip) Person to contact Title Phone Fax

More information

ORDINANCE NO. 2013 -

ORDINANCE NO. 2013 - ORDINANCE NO. 2013 - AN ORDINANCE OF BREVARD COUNTY, FLORIDA AMENDING CHAPTER 62, LAND DEVELOPMENT REGULATIONS SECTION 62-2891, LOT DRAINAGE, AND CHAPTER 22 BUILDINGS AND BUILDING REGULATIONS, SECTION

More information

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 2 1109 S. Marion Avenue, Mail Station 2015 Lake City, Florida 32025-5874

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 2 1109 S. Marion Avenue, Mail Station 2015 Lake City, Florida 32025-5874 ADVERTISEMENT FOR LETTERS OF INTEREST FOR A DESIGN BUILD PROJECT (PROCUREMENT METHOD SHORTLISTING OF PROPOSERS WITH TECHNICAL AND PRICE EVALUATION BY ADJUSTED SCORE) PROCUREMENT NUMBER: E2N44 Financial

More information

MDWASD 8/1999 SECTION 02315 TRENCHING AND BACKFILLING FOR PIPING SYSTEMS

MDWASD 8/1999 SECTION 02315 TRENCHING AND BACKFILLING FOR PIPING SYSTEMS PART 1 - GENERAL 1.01 WORK INCLUDED SECTION 02315 TRENCHING AND BACKFILLING FOR PIPING SYSTEMS A. The work included under this Section consists of excavating, backfilling and compaction as required for

More information

SECTION 4Aggegate Subbase

SECTION 4Aggegate Subbase The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages

More information

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas 78121 Phone: (830)779-4541 Fax: (830) 253-1198 cityoflavernia@lavernia-tx.

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas 78121 Phone: (830)779-4541 Fax: (830) 253-1198 cityoflavernia@lavernia-tx. cityoflavernia@lavernia-tx.gov Commercial New/Remodel Building Requirements This document is not meant to modify any Federal or State laws or City Ordinances. It is intended to be informative and to be

More information

Ocoee, FL July 01, 2016 Advertisement No. 1

Ocoee, FL July 01, 2016 Advertisement No. 1 BID SOLICITATION NOTICE Turnpike FLORIDA DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MAINTENANCE PROGRAMS Ocoee, FL July 01, 2016 Advertisement No. 1 All bids must be completed using Expedite Bid software

More information

FDOT Specifications List

FDOT Specifications List FDOT Specifications List TABLE OF CONTENTS DIVISION II CONSTRUCTION DETAILS CLEARING CONSTRUCTION SITE 110 Clearing and Grubbing... 152 EARTHWORK AND RELATED OPERATIONS 120 Excavation and Embankment...

More information

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project

More information

State of North Carolina Prequalification for First Tier Subcontractors under CM at Risk

State of North Carolina Prequalification for First Tier Subcontractors under CM at Risk NC General Statute 143.128.1.c states, The construction manager at risk shall contract directly with the public entity for all construction; shall publicly advertise as prescribed in G.S. 143 129; and

More information

INSTRUCTION FOR COMPLETING COMPETITIVE SOLICITATION ACKNOWLEDGEMENT FORMS

INSTRUCTION FOR COMPLETING COMPETITIVE SOLICITATION ACKNOWLEDGEMENT FORMS INSTRUCTION FOR COMPLETING COMPETITIVE SOLICITATION ACKNOWLEDGEMENT FORMS The Competitive Solicitation Acknowledgement Form must be completely filled in. This may be done on line then printed or you may

More information

SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1

SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1 SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1 An application for approval of a soil erosion and sediment control plan in accordance with these regulations shall be

More information

Work Type Definition and Submittal Requirements Work Type: Construction Contract Administration & Management

Work Type Definition and Submittal Requirements Work Type: Construction Contract Administration & Management The first section, Work Type Definition, provides a detailed explanation of the work type. The second section, Work Type Submittal Requirements, identifies the requirements a firm must meet to become pre-qualified

More information

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11 Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;

More information

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

How To Bid On A Building Project In San Jose

How To Bid On A Building Project In San Jose NOTICE TO CONTRACTORS INVITATION FOR BIDS The REDEVELOPMENT AGENCY OF THE CITY OF SAN JOSE invites sealed written proposals for the CIVIC AUDITORIUM BOILER SYSTEM REPLACEMENT PROJECT ( Project ), located

More information

Bidding and Contract Requirements:

Bidding and Contract Requirements: CITY OF LAREDO, TEXAS WATER UTILITIES DEPARTMENT 24-INCH TRANSMISSION MAIN ADDENDUM 7 June 10, 2016 To Bidder of Record: The following changes, additions, and/or deletions are hereby made a part of the

More information

BUSINESS USE PERMIT APPLICATION

BUSINESS USE PERMIT APPLICATION BUSINESS USE PERMIT APPLICATION Instructions and Information for Business Use Permits and Temporary Certificates of Occupancy are included at the end of this application. Planning and Development Services

More information

ADVERTISEMENT FOR BIDDERS

ADVERTISEMENT FOR BIDDERS ADVERTISEMENT FOR BIDDERS Sealed Bids will be received by the City of Lookout Mountain, Georgia, 1214 Lulu Lake Road, Lookout Mountain, Georgia 30103, Attention: Brad Haven, City Manager until: for the

More information

INVITATION TO BID. Dear Prospective Bidder:

INVITATION TO BID. Dear Prospective Bidder: INVITATION TO BID Dear Prospective Bidder: Your firm is invited to submit a bid on School District Asset Inventories and Appraisals. This bid will include (school district), buildings, and total square

More information

RFP SW - 032916 SWP. ADVERTISEMENT for SURVEYING and CIVIL ENGINEERING SERVICES for STORM WATER IMPROVEMENT PROJECTS

RFP SW - 032916 SWP. ADVERTISEMENT for SURVEYING and CIVIL ENGINEERING SERVICES for STORM WATER IMPROVEMENT PROJECTS RFP SW - 032916 SWP ADVERTISEMENT for SURVEYING and CIVIL ENGINEERING SERVICES for STORM WATER IMPROVEMENT PROJECTS The City of College Park is accepting Sealed Proposals from qualified civil engineering

More information

Residential Building Permits Information

Residential Building Permits Information City of Bonham Building Department 514 Chestnut St. Bonham, Texas 75418 OFFICE: (903) 583-7555 FAX: (903)583-5761 Residential Building Permits Information Application for Permits: To apply for a permit,

More information

Standard Site Drainage and Erosion Control Details (August 15, 2006)

Standard Site Drainage and Erosion Control Details (August 15, 2006) City of St. Petersburg Construction Services and Permitting Standard Site Drainage and Erosion Control Details (August 15, 2006) Attached are the City Engineer s approved City standards dated September

More information

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

Definition of Tower from the Bradley County Zoning Resolution

Definition of Tower from the Bradley County Zoning Resolution Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio

More information

Getting Connected with the Colorado Department of Transportation (CDOT)

Getting Connected with the Colorado Department of Transportation (CDOT) Getting Connected with the Colorado Department of Transportation (CDOT) INTRODUCTION Who is CDOT? CDOT is responsible for 9,146 miles of highway including 3,447 bridges State government agency with funding

More information

STORM DRAINS CHAPTER 7

STORM DRAINS CHAPTER 7 CHAPTER 7 Chapter 7 - Storm Drains A storm drain is a drainage system that conveys water or stormwater, consisting of two or more pipes in a series connected by one or more structures. Storm drains collect

More information

May 2013. This document is not a public record. Amador Water Agency

May 2013. This document is not a public record. Amador Water Agency Gravity Supply Line Project PRE-QUALIFICATION QUESTIONNAIRE May 2013 Amador Water Agency 12800 Ridge Road Sutter Creek, California 95686 Phone:(209) 257-5222 Fax:(209) 257-5295 INVITATION TO PRE-QUALIFY

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and

More information

SUBMISSION REQUIREMENTS

SUBMISSION REQUIREMENTS GREATER ORLANDO AVIATION AUTHORITY REQUEST FOR CONTRACTOR STATEMENT OF QUALIFICATIONS (RFQ) FOR BP-459 SECURED AREA ACCESS POINT CCTV IMPROVEMENTS ORLANDO INTERNATIONAL AIRPORT SUBMISSION REQUIREMENTS

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

Exhibit A Scope of Work

Exhibit A Scope of Work Exhibit A Scope of Work The agreement for S.P. 3116-142 (T.H. 169-Cross Range Expressway) includes final design plans for a 1.55 mile length of a 2 lane to 4 lane expansion project located 0.66 miles SW

More information

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit

More information

Underground Commercial Electric Service

Underground Commercial Electric Service Underground Commercial Electric Service SCANA Corporation 2013 Revised: June 2013 Table of Contents SECTION PAGE I. Specification and Requirements 2 A. General B. Definition of Terms C. Company and Developer

More information