Erik Backström, High Voltage breakers, After Sales & Service High voltage SF 6 live tank circuit breakers After Sales & Service Training course

Size: px
Start display at page:

Download "Erik Backström, High Voltage breakers, After Sales & Service High voltage SF 6 live tank circuit breakers After Sales & Service Training course"

Transcription

1 Erik Backström, High Voltage breakers, After Sales & Service High voltage SF 6 live tank circuit breakers After Sales & Service Training course description HPL B2/B4 with BLG1002A DCB Level A & B

2 Training course description HPL B2/B4 with BLG1002A (DCB), Level A & B Duration 3 days Maximum participants 6 Price This training shall enable the trainee to Included subjects Tools/equipment used Documentation used and distributed Pre-requisitions Conditions for confirmation of participation: :-/ attendee - Know the HPL B2/B4 DCB circuit breaker range. -For the above stated breaker type: - Understand the design, operation and function and adhering components. - Perform installation & pre-commissioning. - Understand the lifespan of a circuit breaker - Know about and how to perform the required periodic, preventive maintenance and condition assessments. - Safety - Design, function and mode of operation. - Description of circuit breaker lifespan. - Training in installation & pre-commissioning - Training in periodic and preventive maintenance - Practical exercises Focus of the training is hands-on exercises - Standard toolbox - Gas filling equipment, Gas reclaiming system, Gas analyzing equipment, Gas leakage detector - Breaker analyzer system SA10 - Laptop computer - Product documentation - Leaflets - Confirmation of participation - Knowledge in English, reading and writing - Electromechanical education - Basic computer use. - Written examination - Assessment of factory supervisor February 6, 2013 Slide 2

3 HPL B2/B4 with BLG1002A (DCB) Scope of training program, competence level A Steps Installation & pre-commissioning Competence level A Pole beam and support Assembly Fitting the circuit breaker pole and protective tubes. Installation of operating mechanism Final assembly of the circuit breaker pole. Fitting of rod system Assembly of gas monitoring system Electrical connections Pressurizing of circuit-breaker poles Inspection of bolt joints Assembling the indicator sign and cover Inspection prior to commissioning Pre-commissioning check list Circuit breaker Periodic maintenance Competence level A External cleanliness Heating element function Gas pressure Valves and draining holes Lubrication Note!!! Safety and preparations are always included February 6, 2013 Slide 3

4 HPL B2/B4 with BLG1002A (DCB) Scope of training program, competence level B Preventive maintenance and condition assessment Preventive maintenence and condition assessment Circuit breaker Operating mechanism Rating plates Operation counter SF 6 gas Porcelain insulators Composite insulators External cleanliness Gas pressure Valves and draining holes Bolts and nuts Heating element function Oil leakages from damper Note serial number s Note the number of operations Gas level (filling ifnecessary) Dew point, for normal gas pressure in the circuit breaker. Cleanliness Bolts and nuts Damages Function times Availability Motor current Latch device Coils Limit switch Opening time Closing time Close-Open time Deviations between phases Auxiliary switch Travel curve Contact damping Rod system Control safety Anti-pumping relay Motor current Visual inspection of settings Function control Coil resistance and current Main circuit Mechanism -Resistance measurement Resistance bridge, using a test current of ADC Reference hole in outer lever and mechanism housing. Heating element Central control cabinet (if applicable) Note!!! Safety and preparations are always included Resistance measurement Resistance measurement February 6, 2013 Slide 4

5 HPL B2/B4 with BLG1002A (DCB) Scope of training program, competence level B Preventive maintenance and condition assessment Preventive maintenance and condition assessment Thermostat (if applicable) Terminal blocks Adjusted value Bolts and clamps SM 800 Corrosion Cabling Heating element Ventilation Electrical functions Protective motor switch Seals/SF6 gas Blocking relays Corrosion Signal for voltage drop Density monitoring Relays Operating mechanism contacts pullrod system Corrosion Lubrication Cleanliness Contact operation Wear Corrosion Settings End positions Lubrication Tightening torque Operation Latches Worm gear All bolt joints Operation Operating time measurement Locking contact position resistance Locking function Check the contact position by making a load test. Check the earthing switch resistance. Note!!! Safety and preparations are always included February 6, 2013 Slide 5

6

Erik Backström, High Voltage breakers, After Sales & Service High voltage SF 6 live tank circuit breakers After Sales & Service Training course

Erik Backström, High Voltage breakers, After Sales & Service High voltage SF 6 live tank circuit breakers After Sales & Service Training course Erik Backström, High Voltage breakers, After Sales & Service High voltage SF 6 live tank circuit breakers After Sales & Service Training course description HPL 72,5-300 B1 with BLG1002A Level A & B Training

More information

Maintenance Report MEDIUM VOLTAGE POWER STATION 500SC / 630SC / 800SC / 900SC / 1000 1SC / 1000 2SC / 1250SC / 1600SC / 1800SC / 2000SC

Maintenance Report MEDIUM VOLTAGE POWER STATION 500SC / 630SC / 800SC / 900SC / 1000 1SC / 1000 2SC / 1250SC / 1600SC / 1800SC / 2000SC Maintenance Report MEDIUM VOLTAGE POWER STATION 500SC / 630SC / 800SC / 900SC / 1000 1SC / 1000 2SC / 1250SC / 1600SC / 1800SC / 2000SC Project name: Customer: Address, location of the system: Serial number

More information

Circuit Breaker LTB D with Motor Drive. Motor Drive. ABB PP/H/HV - Page 1. Ed 2006-04

Circuit Breaker LTB D with Motor Drive. Motor Drive. ABB PP/H/HV - Page 1. Ed 2006-04 Circuit Breaker LTB D with Motor Drive Motor Drive ABB PP/H/HV - Page 1 Ed 2006-04 Technology Traditional technology Traditional spring operating mechanism: Closing mechanism ABB PP/H/HV - Page 2 Tripping

More information

Water Pump Replacement

Water Pump Replacement 1 of 8 2/5/2008 6:36 AM Document ID# 713637 2001 Cadillac Seville Print Water Pump Replacement Tools Required 1. J 38816-A Water Pump Remover & Installer 2. J 38185 Hose Clamp Pliers

More information

Consortiwm Awdurdodau Lleol Cymru Consortium Local Authorities Wales

Consortiwm Awdurdodau Lleol Cymru Consortium Local Authorities Wales Consortiwm Awdurdodau Lleol Cymru Consortium Local Authorities Wales SPECIFICATION FOR LAUNDRY EQUIPMENT MAINTENANCE Maintenance Module 32 March 2011 issue This document has been compiled by the Engineering

More information

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS

PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS PRE COMMISSIONING TESTS ON EQUIPMENT AT 33/11 KV SUB STATIONS TESTS ON TRANSFORMERS 1. IR Values a) For 33/11 KV Power Transformer 2500 V megger is to be need. b) Power Transformer neutral Earthing is

More information

Medium Voltage Distribution FLUVAC. Vacuum Circuit Breaker Up to 24 kv 630 A 21 ka. Operation Maintenance Instructions. www.schneider-electric.

Medium Voltage Distribution FLUVAC. Vacuum Circuit Breaker Up to 24 kv 630 A 21 ka. Operation Maintenance Instructions. www.schneider-electric. Medium Voltage Distribution FLUVAC Vacuum Circuit Breaker Up to 24 kv 630 A 21 ka Operation Maintenance Instructions www.schneider-electric.com Contents Introduction... 3 Our Service Unit: our specialists,

More information

High-Voltage Circuit-Breakers 3AP1/2 72.5 kv up to 550 kv. Power Transmission and Distribution

High-Voltage Circuit-Breakers 3AP1/2 72.5 kv up to 550 kv. Power Transmission and Distribution High-Voltage Circuit-Breakers AP/ 7.5 kv up to 550 kv Power Transmission and Distribution The AP/ High-Voltage Circuit-Breakers Now Applicable for 550 kv Decades of our experience in high-voltage switching

More information

WE-350 Series ¼ Turn Electric Actuator

WE-350 Series ¼ Turn Electric Actuator WE-350 Series ¼ Turn Electric Actuator Operation and Installation Manual Pg 1 (Rev. 020113) Table of Contents 1.0 General 1.1 Pre-Installation Inspection 1.2 Storage 1.3 Features & General Information

More information

DIAMOND Gear Company, LTD. an ERIKS Company. Installation, Maintenance, & Operation Manual Declutchable Worm Gear

DIAMOND Gear Company, LTD. an ERIKS Company. Installation, Maintenance, & Operation Manual Declutchable Worm Gear DIAMOND Gear Company, LTD. an ERIKS Company Installation, Maintenance, & Operation Manual Declutchable Worm Gear 2016 DECLUTCHABLE WORM GEAR INSTRUCTIONS This is an instructional manual which provides

More information

Type K current limiting fuse canister Technical information and installation guide

Type K current limiting fuse canister Technical information and installation guide Transformer components Type K current limiting fuse canister Technical information and installation guide The Type K current limiting fuse canister provides an air-insulated receptacle for general-purpose

More information

1/29/2008 DR70. Baja Motorsports Inc. P.O. Box 61150 Phoenix, AZ 85082 Toll Free: 888-863-2252 PART NUMBERS PRICES ARE SUBJECT TO CHANGE 1 of 43

1/29/2008 DR70. Baja Motorsports Inc. P.O. Box 61150 Phoenix, AZ 85082 Toll Free: 888-863-2252 PART NUMBERS PRICES ARE SUBJECT TO CHANGE 1 of 43 DR70 Toll Free: 888-863-2252 PART NUMBERS PRICES ARE SUBJECT TO CHANGE 1 of 43 CYLINDER & CYLINDER HEAD 1 DR70-001 883099044472 CYLINDER 1 1 2 DR70-002 883099044489 GASKET, CYLINDER 1 1 3 DR70-003 883099044496

More information

Evaluate, Clean, and Tune Guidance

Evaluate, Clean, and Tune Guidance Evaluate, Clean, and Tune Guidance The Evaluate, Clean and Tune (ECT) process serves three essential purposes in the Weatherization Assistance Program (WAP). The first is to evaluate the existing system

More information

11. COOLING SYSTEM 11-0 COOLING SYSTEM BET & WIN 50

11. COOLING SYSTEM 11-0 COOLING SYSTEM BET & WIN 50 11 COOLING SYSTEM SERVICE INFORMATION------------------------------------------------ 11-1 TROUBLESHOOTING----------------------------------------------------- 11-1 RADIATOR ------------------------------------------------------------------

More information

SECTION 15750 PACKAGED ROOFTOP AIR CONDITIONING UNITS

SECTION 15750 PACKAGED ROOFTOP AIR CONDITIONING UNITS SECTION 15750 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for roof mounted, self-contained units, with electric cooling, and electric or reverse refrigeration cycle (heat pump) heating

More information

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR)

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR) Heating, Ventilation, Air Conditioning and Refrigeration (HVACR) I. Demonstrate safety skills in typical HVACR work situations to NATE Core Installer Knowledge Areas for Technician Excellence for Safety

More information

13. REAR WHEEL/BRAKE/SUSPENSION

13. REAR WHEEL/BRAKE/SUSPENSION 13. REAR WHEEL/BRAKE/SUSPENSION 13 3.5~4.5kg-m 8.0~10.0kg-m 0.8~1.2kg-m 3.0~4.0kg-m 2.4~3.0kg-m 3.5~4.5kg-m 6.0~8.0kg-m 13-0 13. REAR WHEEL/BRAKE/SUSPENSION 13 REAR WHEEL/BRAKE/SUSPENSION SERVICE INFORMATION...

More information

RESIDENTIAL HEATING OIL SERVICE CONTRACT ANNUAL COST $276.00

RESIDENTIAL HEATING OIL SERVICE CONTRACT ANNUAL COST $276.00 RESIDENTIAL HEATING OIL SERVICE CONTRACT This service contract covers all routine service and maintenance of your residential oil fired furnace or boiler. In addition this contract covers all service calls

More information

Pallet Jack. OWNER S MANUAL Model MH1230. Important Safety Instructions Assembly Instructions Parts and Hardware Identification

Pallet Jack. OWNER S MANUAL Model MH1230. Important Safety Instructions Assembly Instructions Parts and Hardware Identification OWNER S MANUAL Model MH1230 Important Safety Instructions Assembly Instructions Parts and Hardware Identification Pallet Jack CAUTION: Read, understand and follow ALL instructions before using this product

More information

Turbocharger system components, servicing

Turbocharger system components, servicing 21-1 Turbocharger system components, servicing Engine codes: AAZ, 1Z, AHU Observe rules of cleanliness Page 21-10 Turbocharger hoses and lines, connecting Page 21-11 WARNING! Do not re-use any fasteners

More information

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING

MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING Training Title MV, HV AND EHV SWITCHGEAR TESTING & COMMISSIONING Training Duration 5 days Training Date MV, HV and EHV Switchgear Testing & Commissioning 5 20 24 Apr $3,750 Dubai, UAE In any of the 5 star

More information

OPERATING AND MAINTENANCE MANUAL FOR COMMERCIAL ELECTRIC WATER HEATER ELECTRIC HEATER COMPANY BASE MODEL SE

OPERATING AND MAINTENANCE MANUAL FOR COMMERCIAL ELECTRIC WATER HEATER ELECTRIC HEATER COMPANY BASE MODEL SE OPERATING AND MAINTENANCE MANUAL FOR COMMERCIAL ELECTRIC WATER HEATER ELECTRIC HEATER COMPANY BASE MODEL SE HUBBELL ELECTRIC HEATER COMPANY P.O. BOX 288 STRATFORD, CT 06615 PHONE: (203) 378-2659 FAX: (203)

More information

Oil and Coolant Circulating Heating System. Model - OCSM

Oil and Coolant Circulating Heating System. Model - OCSM Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine

More information

AC Electric Motors best practice

AC Electric Motors best practice If you want to learn more about best practice machinery maintenance, or world class mechanical equipment maintenance and installation practices, follow the link to our Online Store and see the Training

More information

CEILING CASSETTE FAN COIL UNIT

CEILING CASSETTE FAN COIL UNIT CEILING CASSETTE FAN COIL UNIT Operation and Installation Manual MHCFC4W-04, 08, 12, 16 Four way ceiling cassette fan coil unit Please read this manual before using the fan coil unit. Installation and

More information

Transformer oil cooler ALFA A02

Transformer oil cooler ALFA A02 A02 Transformer oil cooler ALFA Transformer oil cooler ALFA The transformer oil cooler ALFA is used to cool power transformers by means of forced air and oil flow. The oil in the cooler is circulated using

More information

Unit 24: Applications of Pneumatics and Hydraulics

Unit 24: Applications of Pneumatics and Hydraulics Unit 24: Applications of Pneumatics and Hydraulics Unit code: J/601/1496 QCF level: 4 Credit value: 15 OUTCOME 2 TUTORIAL 4 DIRECTIONAL CONTROL VALVES The material needed for outcome 2 is very extensive

More information

DR125 and DR150 Hensim Dirt Runner 125cc and 150cc Dirt Bike (VIN PREFIX LLCH or LUAH)

DR125 and DR150 Hensim Dirt Runner 125cc and 150cc Dirt Bike (VIN PREFIX LLCH or LUAH) Parts Lists - DR125 and DR150 Hensim Dirt Runner 125cc and 150cc Dirt Bike (VIN PR... Page 1 of 25 Product Information Baja Web > Product Information > Parts Lists > DIRTBIKE > DR125 and DR150 Hensim Dirt

More information

UNIVERSAL 1550 PRE-MIX DISPENSER

UNIVERSAL 1550 PRE-MIX DISPENSER MODEL NO. 284974xxx 1 of 8 Control Code A ªIMI Cornelius Co., 1987-95 22 5 6 2 3 7 4 1 26 32 19 28 33 29 27 11 15 18 16 17 14 9 31 30 34 24 20 23 8 10 21 13 FIGURE 1. ASSEMBLY ªIMI Cornelius Co., 1987-95

More information

Table of Contents. Overview 1. Pump Disassembly 2. Control Disassembly / Reassembly 7. Pump Reassembly 13. Adjustment Procedures DR Control 19

Table of Contents. Overview 1. Pump Disassembly 2. Control Disassembly / Reassembly 7. Pump Reassembly 13. Adjustment Procedures DR Control 19 Table of Contents Overview 1 Pump Disassembly 2 Control Disassembly / Reassembly 7 Pump Reassembly 13 Adjustment Procedures DR Control 19 Adjustment Procedures DRG Control 20 Adjustment Procedures DFR

More information

OUTDOOR DISCONNECTORS A division of ACTOM (Pty) Ltd

OUTDOOR DISCONNECTORS A division of ACTOM (Pty) Ltd OUTDOOR DISCONNECTORS A division of ACTOM (Pty) Ltd ACTOM OUTDOOR DISCONNECTORS Single Side Break (SSB) Disconnector 22-132 kv, 800-1 A, 25 ka - 3s Typical bearing assembly. Voltage range 11 kv to 132

More information

SIRIUX. SINGLE AND DOUBLE HIGH EFFICIENCY CIRCULATORS Heating Air-conditioning OPERATING LIMITS APPLICATIONS. 28 m 3 /h* Heads up to: Flows up to:

SIRIUX. SINGLE AND DOUBLE HIGH EFFICIENCY CIRCULATORS Heating Air-conditioning OPERATING LIMITS APPLICATIONS. 28 m 3 /h* Heads up to: Flows up to: OPERATING LIMITS Flows up to: m /h* Heads up to: m C Max operating pressure: bars Temperature range: - à + C Max ambient temperature: + C ND of orifices: à * m /h: parallel operation SIRIUX SINGLE AND

More information

2003 ACCORD - Automatic Transmission Removal

2003 ACCORD - Automatic Transmission Removal 2003 ACCORD - Automatic Transmission Removal Special Tools Required Engine support hanger, A and Reds AAR-T-12566 Engine hanger balancer bar VSB02C000019 Front subframe adapter VSB02C000016 These special

More information

26 3213.13 Diesel Engine Driven Generators Page 1 of 6

26 3213.13 Diesel Engine Driven Generators Page 1 of 6 Last Update: December 8, 2014 A. Description of System Consultant s Handbook Page 1 of 6 1. Provide a diesel engine driven electric generating unit, factory assembled, tested and certified to operate at

More information

Directions for use : Dosing chutes type DSX.

Directions for use : Dosing chutes type DSX. Pag. 1-10 Directions for use : Dosing chutes type DSX. Introduction The linear vibrations of STILETTO consist of a drive part and a movable part which are connected to leave springs. The purpose of the

More information

Easy Tool Retracting System CMC-SR2159ER36

Easy Tool Retracting System CMC-SR2159ER36 Easy Tool Retracting System CMC-SR2159ER36 Pepperl+Fuchs, Inc. 1600 Enterprise Parkway Twinsburg, Ohio 44087 Phone: +1 330 486 0002 e-mail: pa-info@us.pepperl-fuchs.com Mounting the Easy Tool Refer to

More information

2740 Whitten Rd Bldg 103 Memphis, TN 38133 Telephone 901-380-9290 Email Bwilliams@Dieselcare.net

2740 Whitten Rd Bldg 103 Memphis, TN 38133 Telephone 901-380-9290 Email Bwilliams@Dieselcare.net Fuel Injection Pump Replacement REMOVAL Diesel Care & Performance Inc 1. Disconnect negative battery terminal. 2. Remove throttle linkage. Fuel Injection Pump Bracket 3. Remove injection pump bracket.

More information

1/29/2008 DR125 / DR150. Baja Motorsports Inc. P.O. Box 61150 Phoenix, AZ 85082 Toll Free: 888-863-2252 PARTS AND PRICES ARE SUBJECT TO CHANGE 1 of 55

1/29/2008 DR125 / DR150. Baja Motorsports Inc. P.O. Box 61150 Phoenix, AZ 85082 Toll Free: 888-863-2252 PARTS AND PRICES ARE SUBJECT TO CHANGE 1 of 55 DR125 / DR150 Toll Free: 888-863-2252 PARTS AND PRICES ARE SUBJECT TO CHANGE 1 of 55 CYLINDER HEAD ASSY. 1 125-001 883099006937 CYLINDER HEAD COVER 1 1 2 125-002 883099006944 BOLT M6X28 2 3 3 125-003 883099006951

More information

Cooling system components, removing and installing

Cooling system components, removing and installing Volkswagen Touareg 3.2 - Cooling system components, removing and installing Page 1 / 24 19-1 Cooling system components, removing and installing Warning! Hot steam may escape when opening expansion tank.

More information

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1 Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1 Nuclear Power in Pakistan Nuclear Power Plants Capacity (MWe) Year of Commissioning In

More information

Training Syllabus to Instruct/Prepare for the ASE Transit Bus HVAC Test

Training Syllabus to Instruct/Prepare for the ASE Transit Bus HVAC Test APTA STANDARDS DEVELOPMENT PROGRAM RECOMMENDED PRACTICE American Public Transportation Association 1666 K Street, NW, Washington, DC, 20006-1215 APTA BTS-BMT-RP-001-10 Approved October, 2010 APTA Bus Maintenance

More information

Class 5 to 7 Truck and Bus Hydraulic Brake System

Class 5 to 7 Truck and Bus Hydraulic Brake System Class 5 to 7 Truck and Bus Hydraulic Brake System Diagnostic Guide 1st Edition * 5+0 Important Service tes The information in this publication was current at the time of printing. The information presented

More information

Chapter 5. Components, Symbols, and Circuitry of Air-Conditioning Wiring Diagrams

Chapter 5. Components, Symbols, and Circuitry of Air-Conditioning Wiring Diagrams Chapter 5 Components, Symbols, and Circuitry of Air-Conditioning Wiring Diagrams Objectives Upon completion of this course, you will be able to: Explain what electrical loads are and their general purpose

More information

Table V. Troubleshooting Checklist for Refrigeration Systems. Air or non-condensable gas in system. Inlet water warm.

Table V. Troubleshooting Checklist for Refrigeration Systems. Air or non-condensable gas in system. Inlet water warm. Table V Troubleshooting Checklist for Refrigeration Systems TROUBLE POSSIBLE CAUSE CORRECTIVE MEASURE High condensing pressure. Low condensing pressure. Air or non-condensable gas in system. Inlet water

More information

USER S, MAINTENANCE and SERVICE INFORMATION MANUAL

USER S, MAINTENANCE and SERVICE INFORMATION MANUAL CONTENTS SAFETY INFORMATION................ 2 FOR YOUR SAFETY....................... 2 SYSTEM OPERATION.................. 2 THERMOSTATS........................... 2 INTERMITTENT IGNITION DEVICE...........

More information

SERVICE GUIDE For WARN PULLZALL 120v AC &100v AC P/N 685000 & 685001

SERVICE GUIDE For WARN PULLZALL 120v AC &100v AC P/N 685000 & 685001 SERVICE GUIDE For WARN PULLZALL 120v AC &100v AC P/N 685000 & 685001 REPAIR / REPLACEMENT INSTRUCTIONS TROUBLE SHOOTING GUIDE 986765A2.doc Page 1 of 50 WARNING This guide identifies potential hazards and

More information

LK Electric Boiler - 4,5

LK Electric Boiler - 4,5 LK Electric Boiler -, Design LK Electric Boiler, kw is a wall-mounted electric boiler, intended primarily for low-temperature heating systems, e.g. under floor heating. LK Electric Boiler, kw is delivered

More information

specializing in AIR CONDITIONING, PARTS AND SYSTEMS for your classic vehicle PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST 1967-72 CHEVROLET PICKUP

specializing in AIR CONDITIONING, PARTS AND SYSTEMS for your classic vehicle PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST 1967-72 CHEVROLET PICKUP specializing in AIR CONDITIONING, PARTS AND SYSTEMS for your classic vehicle PERFECT FIT IN-DASH HEAT/ COOL/ DEFROST 1967-72 CHEVROLET PICKUP CONTROL & OPERATING INSTRUCTIONS The controls on your new Perfect

More information

INSTRUCTIONS AND PARTS LIST FOR MODEL 70H & 75H HAND-OPERATED HYDRAULIC PRESS

INSTRUCTIONS AND PARTS LIST FOR MODEL 70H & 75H HAND-OPERATED HYDRAULIC PRESS INSTRUCTIONS AND PARTS LIST FOR MODEL 70H & 75H HAND-OPERATED HYDRAULIC PRESS SETTING UP THE PRESS FOR OPERATION For shipping convenience, the gauge, pump handle, hoist crank, screw nose and base angles

More information

Dead Tank Circuit Breaker 72PM40-C Proven reliability through common platforms

Dead Tank Circuit Breaker 72PM40-C Proven reliability through common platforms Dead Tank Circuit Breaker 72PM40-C Proven reliability through common platforms ABB innovations for changing demands ABB (www.abb.com) is a leader in power and automation technologies that enables utility

More information

1 DESCRIPTION OF THE APPLIANCE

1 DESCRIPTION OF THE APPLIANCE 1 DESCRIPTION OF THE APPLIANCE 1.1 INTRODUCTION The cast iron SF boilers are a valid solution for the present energetic problems, since they can run with solid fuels: wood and coal. These series of boilers

More information

Models: WA182, WA242. Contents. Cabinet Components. Functional Components " Exploded View... 3 " Usage List... 4. Control Panel.

Models: WA182, WA242. Contents. Cabinet Components. Functional Components  Exploded View... 3  Usage List... 4. Control Panel. REPLACEMENT PARTS MANUAL WALL MOUNTED PACKAGE AIR CONDITIONER Models: WA182, WA242 General Notes! Revised and/or additional pages may be issued from time to time.! A complete and current manual consists

More information

PERFECT FIT SERIES IN-DASH HEAT/ COOL/ DEFROST 1967 CHEVROLET IMPALA

PERFECT FIT SERIES IN-DASH HEAT/ COOL/ DEFROST 1967 CHEVROLET IMPALA specializing in AIR CONDITIONING, PARTS AND SYSTEMS for your classic vehicle PERFECT FIT SERIES IN-DASH HEAT/ COOL/ DEFROST 1967 CHEVROLET IMPALA CONTROL & OPERATING INSTRUCTIONS The controls on your new

More information

Product Guide. Low voltage grounding system. Answers for industry.

Product Guide. Low voltage grounding system. Answers for industry. Product Guide Low voltage grounding system Answers for industry. Advanced switchgear solutions for process industries In today s high-tech manufacturing world, profitability can be greatly impacted by

More information

AWWA Butterfly Valve Operation and Maintenance Manual Series 511A & 510A 20 and Smaller

AWWA Butterfly Valve Operation and Maintenance Manual Series 511A & 510A 20 and Smaller January 2013 AWWA Butterfly Valve Operation and Maintenance Manual Series 511A & 510A 20 and Smaller Milliken Valve Company 190 Brodhead Avenue, Suite 100 Bethlehem, PA 18017 Phone: (610) 861-8803 Fax:

More information

Type: DILM115(RAC240) Article No.: 239548 Sales text Contactor,55kW/400V,AC operated. Ordering information

Type: DILM115(RAC240) Article No.: 239548 Sales text Contactor,55kW/400V,AC operated. Ordering information Type: DILM115(RAC240) Article No.: 239548 Sales text Contactor,55kW/400V,AC operated Ordering information Connection technique Description Description Rated operational current Screw terminals 3 pole AC

More information

INSTALLATION INSTRUCTIONS COMMERCIAL ROOM VENTILATORS WITH EXHAUST

INSTALLATION INSTRUCTIONS COMMERCIAL ROOM VENTILATORS WITH EXHAUST INSTALLATION INSTRUCTIONS COMMERCIAL ROOM VENTILATORS WITH EXHAUST MODEL CHCRV-5 For Use with Bard CH Series 3, 4 & 5 Ton 2-Stage Wall Mount Heat Pumps AND W38H, W43H, W49H and W61H Single Stage Wall Mount

More information

SUBJECT: How to wire a motor starter Number: AN-MC-004 Date Issued: 2/08/2005 Revision: Original

SUBJECT: How to wire a motor starter Number: AN-MC-004 Date Issued: 2/08/2005 Revision: Original SUBJECT: How to wire a motor starter Number: AN-MC-004 Date Issued: 2/08/2005 Revision: Original A motor starter is a combination of devices to allow an induction motor to start, run and stop according

More information

Siemens Integrated Substation Condition Monitoring System. Circuit Breaker Monitoring

Siemens Integrated Substation Condition Monitoring System. Circuit Breaker Monitoring Siemens Integrated Substation Condition Monitoring System Circuit Breaker Monitoring System Description Introduction The Circuit Breaker Monitor [CBM] is only one example of the way that the Substation

More information

INSTALLATION INSTRUCTIONS. 6108 Air Spring Kit 2011+ Ford F250 Single Wheel 4WD 2011+ Ford F350 Dually 4WD (2011 F350 Single Wheel 4WD use p/n 6113)

INSTALLATION INSTRUCTIONS. 6108 Air Spring Kit 2011+ Ford F250 Single Wheel 4WD 2011+ Ford F350 Dually 4WD (2011 F350 Single Wheel 4WD use p/n 6113) INSTALLATION INSTRUCTIONS 6108 Air Spring Kit 2011+ Ford F250 Single Wheel 4WD 2011+ Ford F350 Dually 4WD (2011 F350 Single Wheel 4WD use p/n 6113) Thank you for purchasing a quality Hellwig Product. PLEASE

More information

POSEIDON 2-29, 2-25 & 2-22 POSEIDON 2-29, 2-25 & 2-22 XT

POSEIDON 2-29, 2-25 & 2-22 POSEIDON 2-29, 2-25 & 2-22 XT POSEION 2-29, 2-25 & 2-22 POSEION 2-29, 2-25 & 2-22 XT Repair Manual Index A. Safety precautions 3 B. Technical data 4 C. Structure 5-6. Service / Repair 7-23 E. Tools 24 F. Function 25-26 G. Electric

More information

Volume. HOMEWOOD PRODUCTS CORPORATION Westinghouse Technology. CA Breaker Instruction Manual

Volume. HOMEWOOD PRODUCTS CORPORATION Westinghouse Technology. CA Breaker Instruction Manual Volume 1 HOMEWOOD PRODUCTS CORPORATION Westinghouse Technology CA Breaker Instruction Manual HOMEWOOD PRODUCTS CORPORATION Compressed Air Circuit Breaker Homewood Products Corporation 820 Washington Blvd.

More information

CONTINUOUSLY VARIABLE TRANSMISSION (CVT)

CONTINUOUSLY VARIABLE TRANSMISSION (CVT) GROUP 23 CONTINUOUSLY VARIABLE TRANSMISSION (CVT) CONTENTS CVT........................... 23-2 GENERAL INFORMATION............. 23-2 ELECTRONIC CONTROL SYSTEM...... 23-3 EEPROM...........................

More information

HOLLISTER-WHITNEY ROPE GRIPPER

HOLLISTER-WHITNEY ROPE GRIPPER HOLLISTER-WHITNEY ROPE GRIPPER Instructions for Model #620GA1, 620GA2 (Patented worldwide, other patents pending) WARNING: KEEP HANDS CLEAR OF ROPE GRIPPER. FORCES CREATED CAN CRUSH FINGERS. Figure 1 ROPE

More information

Char-Lynn Hydraulic Motor. Repair Information. 10 000 Series. October, 1997

Char-Lynn Hydraulic Motor. Repair Information. 10 000 Series. October, 1997 Char-Lynn Hydraulic Motor October, 1997 Repair Information Geroler Motor Two Speed 001 27 Retainer inside bore of valve plate bearingless motors only 4 15 16 3 6 35 Parts Drawing 25 2 2 1 19 17 36 40 47

More information

Owner s Manual Read and keep this manual. Patents World Wide

Owner s Manual Read and keep this manual. Patents World Wide Owner s Manual Read and keep this manual. Patents World Wide S & S Industries, Inc., Sarasota, FL, USA www.trail-gator.com Copyright 2008 All Rights Reserved The following manual is provided to assist

More information

T-Series Precision Linear Actuators Installation and Service Manual DW110353GB-1018 - EDITION 5. www.thomsonlinear.com

T-Series Precision Linear Actuators Installation and Service Manual DW110353GB-1018 - EDITION 5. www.thomsonlinear.com T-Series Precision Linear Actuators Installation and Service Manual DW110353GB-1018 - EDITION 5 www.thomsonlinear.com Version History Edition Number Edition Date Reason for Revision 1 2004 First edition

More information

REMOVAL AND INSTALLATION

REMOVAL AND INSTALLATION 303-01C-1 REMOVAL AND INSTALLATION Engine Body On Special Tool(s) Adapter For 303-D043 303-D043-02 or equivalent Special Tool(s) 303-01C-1 Turbocharger Lifting Bracket 303-1266 Wrench, Fan Clutch Nut 303-214

More information

Munchkin Heat Exchanger Maintenance

Munchkin Heat Exchanger Maintenance Munchkin Heat Exchanger Maintenance By: Mike Granahan *Refer to the appropriate boiler manual for your specific model number. Adjustment procedures will vary. Boiler shown below is an HTP Munchkin 80M

More information

High-Voltage Compact Switchgear 3AP1 DTC for 145 kv and 245 kv

High-Voltage Compact Switchgear 3AP1 DTC for 145 kv and 245 kv High-Voltage Compact Switchgear AP1 DTC for 1 kv and kv Answers for energy. The AP1 DTC Complying with our Customers demands Experience you can rely on - at anytime, anywhere Decades of experience in high-voltage

More information

E2 Series Electric Furnaces

E2 Series Electric Furnaces E2 Series Electric Furnaces Service Manual Table of Contents Electrical Requirements... 10 Codes, Specifications Requirements... 10 Connection Supply Service Wires... 10 Furnace Sequence of Operation...

More information

www.siemens.com/energy High Voltage Circuit Breakers 3AP Type 72.5 kv to 800 kv Answers for energy.

www.siemens.com/energy High Voltage Circuit Breakers 3AP Type 72.5 kv to 800 kv Answers for energy. s www.siemens.com/energy High Voltage Circuit Breakers AP Type 7.5 kv to 800 kv Answers for energy. The AP High Voltage Circuit Breakers Available up to 800 kv Decades of our experience in high voltage

More information

Electronic Power Control

Electronic Power Control Service. Self-Study Programme 210 Electronic Power Control Design and Function With the Electronic Power Control system, the throttle valve is actuated only by an electric motor. This eliminates the need

More information

NO-FROST CUSTOMER SUPPORT INFORMATION INFORMATION ON THE NO-FROST TECHNOLOGY WHITE GOODS

NO-FROST CUSTOMER SUPPORT INFORMATION INFORMATION ON THE NO-FROST TECHNOLOGY WHITE GOODS INFORMATION INFORMATION ON THE TECHNOLOGY The -Frost refrigerators are different from the other static refrigerators in terms of their operational system. In normal refrigerators, in the freezing section,the

More information

2005 MINI Cooper. 2002-05 MANUAL TRANSMISSIONS On-Vehicle Servicing. Cooper S Getrag 285

2005 MINI Cooper. 2002-05 MANUAL TRANSMISSIONS On-Vehicle Servicing. Cooper S Getrag 285 2002-05 MANUAL TRANSMISSIONS On-Vehicle Servicing APPLICATION MANUAL TRANSMISSION APPLICATIONS Application Transmission Model Cooper R65 Cooper S Getrag 285 LUBRICATION SERVICE INTERVALS Inspect fluid

More information

SECTION 4 ELECTRIC MOTORS UNIT 17: TYPES OF ELECTRIC MOTORS

SECTION 4 ELECTRIC MOTORS UNIT 17: TYPES OF ELECTRIC MOTORS SECTION 4 ELECTRIC MOTORS UNIT 17: TYPES OF ELECTRIC MOTORS UNIT OBJECTIVES After studying this unit, the reader should be able to Describe the different types of open single-phase motors used to drive

More information

RAY-MAX Integrated Solar Power Strip

RAY-MAX Integrated Solar Power Strip RAY-MAX Integrated Solar Power Strip 600008, 600009, 600010, 600208, 600209, 600210 Owner s Manual NEXTRONEX, INC. Revision Date: 10/27/14 Contents 1. Safety Instructions... 3 2. General Equipment Warnings...

More information

1/29/2008 DR50. Baja Motorsports Inc. P.O. Box 61150 Phoenix, AZ 85082 Toll Free: 888-863-2252 PART NUMBERS PRICES ARE SUBJECT TO CHANGE 1 of 45

1/29/2008 DR50. Baja Motorsports Inc. P.O. Box 61150 Phoenix, AZ 85082 Toll Free: 888-863-2252 PART NUMBERS PRICES ARE SUBJECT TO CHANGE 1 of 45 DR50 Toll Free: 888-863-2252 PART NUMBERS PRICES ARE SUBJECT TO CHANGE 1 of 45 CYLINDER & CYLINDER HEAD Part UPC Number Description Baja Description 1 DR50-001 842645074424 CYLINDER 1 1 2 DR50-002 842645074431

More information

A.Y. McDonald Mfg. Co. Troubleshooting Submersible and Jet Pumps

A.Y. McDonald Mfg. Co. Troubleshooting Submersible and Jet Pumps A.Y. McDonald Mfg. Co. Troubleshooting Submersible and Jet Pumps Troubleshooting Submersible Pumps Fuse overload or circuit breaker trips when motor is started 1. Incorrect line voltage. Check the line

More information

CABINET. A Clean Burn Heat Exchanger provides approximately 200% more surface area for capturing combustion heat. You get more heat from less oil.

CABINET. A Clean Burn Heat Exchanger provides approximately 200% more surface area for capturing combustion heat. You get more heat from less oil. Lanair Clean Burn CABINET Lanair's lightweight heat exchanger provides very little travel for the heat to be picked-up and ultimately be transferred to your shop. It uses a 2-pass design made up of 12

More information

Installation, operation and maintenance manual

Installation, operation and maintenance manual Installation, operation and maintenance manual TWO POST LIFT HCT2.1AL30 HCT2.1AL40 HCT2.5AL30 HCT2.5AL40 READ THIS ENTIRE MANUAL BEFORE INSTALLATION TO ENSURE A CORRECT OPERATION AND LONG SERVICE LIFE

More information

Fire Alarm System Standpipes Sprinkler Systems Fire Drills Commercial Cooking Hood and more

Fire Alarm System Standpipes Sprinkler Systems Fire Drills Commercial Cooking Hood and more FIRE PROTECTION SYSTEMS Fire protection systems, measures and equipment are all related to the safety of the occupants and the protection of the property. As part of a building design and its intended

More information

Models: Contents. Cabinet Components. Functional Components " Exploded View... 3 " Usage List... 4. Control Panel. Blower Housing

Models: Contents. Cabinet Components. Functional Components  Exploded View... 3  Usage List... 4. Control Panel. Blower Housing REPLACEMENT PARTS MANUAL WALL MOUNTED PACKAGE HEAT PUMPS Models: WH301 WH361 General Notes! Revised and/or additional pages may be issued from time to time.! A complete and current manual consists of pages

More information

WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU!

WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU! WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU! Atlanta (Monroe) GA 770-267-3787 gpm@gpmhydraulic.com www.gpmhydraulic.com What You Don t Know About Hydraulic Accumulators Can Kill You TABLE OF CONTENTS

More information

ELECTRICIAN TRADE REGULATION

ELECTRICIAN TRADE REGULATION Province of Alberta APPRENTICESHIP AND INDUSTRY TRAINING ACT ELECTRICIAN TRADE REGULATION Alberta Regulation 274/2000 With amendments up to and including Alberta Regulation 122/2014 Office Consolidation

More information

AXLE SHAFTS - FRONT. 1993 Toyota Celica DESCRIPTION REMOVAL, DISASSEMBLY, REASSEMBLY & INSTALLATION. 1993 DRIVE AXLES Toyota FWD Axle Shafts

AXLE SHAFTS - FRONT. 1993 Toyota Celica DESCRIPTION REMOVAL, DISASSEMBLY, REASSEMBLY & INSTALLATION. 1993 DRIVE AXLES Toyota FWD Axle Shafts AXLE SHAFTS - FRONT 1993 Toyota Celica 1993 DRIVE AXLES Toyota FWD Axle Shafts Toyota; Celica DESCRIPTION Axle shafts transfer power from transaxle to driving wheels. All axle shafts consist of a shaft

More information

Type MG-6 Multi-Contact Auxiliary Relay

Type MG-6 Multi-Contact Auxiliary Relay Type MG-6 Multi-Contact Auxiliary Relay Instruction Leaflet: 41-753.1 N Effective: August 2008 Supersedes 41-753.1 M, Dated December 1999 ( ) Denotes Change Since Previous Issue Device Number: 94X, Y,

More information

OPL BASIC. Dosing System for Professional Laundry machines. Contents

OPL BASIC. Dosing System for Professional Laundry machines. Contents OPL BASIC Dosing System for Professional Laundry machines Contents 1 Getting Started. Page 2 2 Installation. Page 4 3 Set Up & Operation. Page 8 4 Maintenance & Accessories. Page 10 5 Troubleshooting Page

More information

Operation Manual. 5-Ton Electric Log Splitter MODEL # 100481

Operation Manual. 5-Ton Electric Log Splitter MODEL # 100481 5-Ton Electric Log Splitter MODEL # 100481 Operation Manual This safety alert symbol identifies important safety messages in this manual. Failure to follow this important safety information may result

More information

Gas Oven Repair Guide

Gas Oven Repair Guide - /6 - Gas Oven Repair Guide [ FX70*, FX50*] Ver. Aug-0 Ignition Failure Cooktop ignition Oven ignition Heating defect Oven Cooktop Abnormal Flame Button, Motors Lamp Others Smell, Smoke, Noise No Display,

More information

TOP AND CABINET PARTS

TOP AND CABINET PARTS TOP AND CABINET PARTS AUTOMATIC WASHER 9 06 Printed in U.S.A. (drd) 1 Part No. Rev. A TOP AND CABINET PARTS 1 Literature Parts 8182271 Use & Care Guide 8182277 Tech Sheet 8182614 Energy Guide 8182196 Quick

More information

DR90. Baja Motorsports Inc. P.O. Box 61150 Phoenix, AZ 85082 Toll Free: 888-863-2252 PART NUMBERS AND PRICES ARE SUBJECT TO CHANGE 1 of 51

DR90. Baja Motorsports Inc. P.O. Box 61150 Phoenix, AZ 85082 Toll Free: 888-863-2252 PART NUMBERS AND PRICES ARE SUBJECT TO CHANGE 1 of 51 DR90 Toll Free: 888-863-2252 PART NUMBERS AND PRICES ARE SUBJECT TO CHANGE 1 of 51 CYLINDER & CYLINDER HEAD 1 DR90-001 842645048166 CYLINDER 1 1 2 DR90-002 842645048173 GASKET, CYLINDER 1 1 3 DR90-003

More information

Rotary actuator for 2 and 3-way (control) ball valves Torque 5 Nm Nominal voltage AC 100... 240 V Control: Open/close or 3-point Auxiliary switch

Rotary actuator for 2 and 3-way (control) ball valves Torque 5 Nm Nominal voltage AC 100... 240 V Control: Open/close or 3-point Auxiliary switch echnical data sheet Rotary actuator LR-S Rotary actuator for and -way (control) ball valves orque 5 Nm Nominal voltage C... 4 V Control: Open/close or -point uxiliary switch echnical data Electrical data

More information

ZAPPY 3 OWNER S MANUAL. Read this manual completely before riding your Electric ZAPPY 3.

ZAPPY 3 OWNER S MANUAL. Read this manual completely before riding your Electric ZAPPY 3. ZAPPY 3 OWNER S MANUAL Read this manual completely before riding your Electric ZAPPY 3. TECHNICAL INFORMATION Model No. : ZAPPY 3 Product size Type of motor Motor power Battery type Battery Charger Charging

More information

Kobelco Extended Warranty Program. www.kobelco-europe.com

Kobelco Extended Warranty Program. www.kobelco-europe.com Kobelco Extended Warranty Program www.kobelco-europe.com Kobelco Extended Warranty is a convenient, value added way to give your Kobelco customers added security and peace of mind. Benefits of the Kobelco

More information

CDS TROUBLESHOOTING SECTION I. VACUUM. 1.0. Weak vacuum at wand. Gauge reads normal (10hg to 14hg)

CDS TROUBLESHOOTING SECTION I. VACUUM. 1.0. Weak vacuum at wand. Gauge reads normal (10hg to 14hg) CDS TROUBLESHOOTING SECTION I. VACUUM 1.0. Weak vacuum at wand. Gauge reads normal (10hg to 14hg) 1.1. Clogged hoses or wand tube. Disconnect hoses and carefully check for an obstruction. 1.2. Excessive

More information

Fire Hydrant Troubleshooting

Fire Hydrant Troubleshooting Fire Hydrant Troubleshooting Pulsation or chatter during opening and flow of water from hydrant. Loose condition in stem at lower valve plate nut. Tighten lower valve plate nut and secure with SS lock

More information

Air Conditioner Water Heater - A Product of HotSpot Energy LLC

Air Conditioner Water Heater - A Product of HotSpot Energy LLC Air Conditioner Water Heater - A Product of HotSpot Energy LLC PLEASE READ THIS BEFORE YOU INSTALL THE UNIT 1. This air conditioner must be installed and/or repaired by a qualified technician. If you perform

More information

GIANT POPCORN MACHINE SERVICE MANUAL

GIANT POPCORN MACHINE SERVICE MANUAL 3243 North California Avenue, Chicago, IL 60618 GIANT POPCORN MACHINE SERVICE MANUAL Included in this manual: *One Pop Option *Salt/Sugar Option 120/208 Volt, Single and Three Phase, 60 Hz 120/240 Volt,

More information

Inspections Standard Operating Procedure 5 Aboveground Storage Tanks

Inspections Standard Operating Procedure 5 Aboveground Storage Tanks Aboveground Storage Tanks Aboveground Storage Tank Inspection This Standard Operating Procedure describes the steps that campus units that manage aboveground oil storage tanks (ASTs) or containers must

More information