A-Ow INDIA NA MICHIGAN POW!ER. September 18, 2015 AEP-NRC CFR Docket No.:

Size: px
Start display at page:

Download "A-Ow INDIA NA MICHIGAN POW!ER. September 18, 2015 AEP-NRC-201 5-86 10 CFR 50.90. Docket No.: 50-315"

Transcription

1 INDIA NA MICHIGAN POW!ER A unit of American Electric Power indiana Michigan Power Cook Nuclear Plant One Cook Place Indiana MichiganPower.com September 18, 2015 AEP-NRC CFR Docket No.: U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC, Donald C. Cook Nuclear Plant Unit 1 Supplemental Response to "Request for Additional Information on the Application for Amendment to Restore Normal Reactor Coolant System Pressure and Temperature Consistent with. Previously Licensed Conditions (TAC No. MF2916)" References: 1. Letter from J. P. Gebbie, Indiana Michigan Power Company (I&M), to U. S. Nuclear Regulatory Commission (NRC) Document Control Desk, "Donald C. Co'ok Nuclear Plant Unit 1 Docket No , License Amendment Request Regarding Restoration of Normal Reactor Coolant System Operating Pressure and Temperature Consistent with Previously Licensed Conditions," dated October 8, 2013, Agencywide Documents Access and Management System (ADAMS) Accession Number ML13283A Letter from T. J. Wengert, NRC, to L. J. Weber, I&M, "Donald C. Cook Nuclear Plant, Unit 1, Request for Additional Information on the Application for Amendment to Restore Normal Reactor Coolant System Pressure And Temperature Consistent with Previously Licensed Conditions (TAC No. MF2916)," dated March 31, 2014, ADAMS Accession Number ML14066A Letter from J. P. Gebbie, I&M, to NRC Document Control Desk, ".Donald C. Cook Nuclear Plant Unit 1, Response to 'Request for Additional Information on the Application for Amendment to Restore Normal Reactor Coolant System Pressure and Temperature Consistent with Previously Licensed Conditions (TAC No. MF2916)'," dated April 29, 2014, ADAMS Accession Number ML A Letter from T. J. Wengert, NRC, to L. J. Weber, I&M, "Donald C. Cook Nuclear Plant, Unit I - Request for Additional Information on the Application for Amendment to Restore Normal Reactor Coolant System Pressure and Temperature Consistent with Previously Licensed Conditions (TAC No. MF2916)," dated May 6, 2014, ADAMS Accession Number ML14099A450. A-Ow

2 U. S. Nuclear Regulatory Commission AEP-NRC Page 2 5. Letter from J. P. Gebbie, I&M, to NRC Document Control Desk, "Donald C. Cook Nuclear Plant Unit 1, Response to 'Request for Additional Information on the Application for Amendment to Restore Normal Reactor Coolant System Pressure and Temperature Consistent with Previously Licensed Conditions (TAC No. MF2916)'," dated June 5, 2014, ADAMS Accession Numbers ML14181A537 and ML14181A Letter from J. P. Gebbie, I&M, to NRC Document Control Desk, "Donald C. Cook Nuclear Plant Unit 1, Response to 'Request for Additional Information on the Application for Amendment to Restore Normal Reactor Coolant System Pressure and Temperature Consistent with Previously Licensed Conditions (TAC No. MF2916)'," dated July 3, 2014, ADAMS Accession Number ML14189A from M. L. Chawla, NRC, to H. L. Etheridge, I&M, "Request for Additional Information - Round 2 by Containment and Ventilation Branch Donald C. Cook Unit I Technical Specification Changes in Reactor Coolant System Normal Operating Pressure and Temperature Docket No ," dated August 8, Letter from J. P. Gebbie, I&M, to NRC Document Control Desk, "Donald C. Cook Nuclear Plant Unit 1, "Response to 'Request for Additional Information on the Application for Amendment to Restore Normal Reactor Coolant System Pressure and Temperature Consistent with Previously Licensed Conditions (TAC No. MF2916)'," dated September 30, 2014, ADAMS Accession Number ML14275A Letter from M. L. Chawla, NRC, to L. J. Weber, I&M, "Donald C. Cook Nuclear Plant, Unit 1 - Nuclear Regulatory Commission Staff Review of Licensee Response to Request for Additional Information Related to a License Amendment Request to Restore Normal Operating Pressure and Temperature (TAC No. MF2916)," dated October 22, 2014, ADAMS Accession Number ML14283A271. By letter dated October 8, 2013 (Reference 1), Indiana Michigan Power Company (I&M) submitted an. application.for a license amendment to restore the normal reactor coolant system operating pressure and temperature consistent with previously licensed conditions for the Donald C. Cook Nuclear Plant, Unit 1. The U. S. Nuclear Regulatory Commission (NRC) staff provided a Request for Additional Information (RAI) (Reference 2) to complete the review of Reference 1. I&M responded to Reference 2 by Reference 3. By letter dated May 6, 2014, the NRC provided an additional RAI (Reference 4). to complete the review of Reference 1. l&m responded to Reference 4 by References 5 and 6. The NRC provided an additional RAI (Reference 7) to complete the review of Reference 1. I&M responded to Reference 7 by Reference 8. In Reference 8, I&M stated that a supplemental response to Reference 7 would be provided to the NRC at a future date. An NRC acknowledgement to Reference 8 was sent to I&M by Reference 9. This letter provides I&M's supplemental response to the RAI in Reference 7. Enclosure 1 to this letter provides an affirmation statement. Enclosure 2 to this letter provides I&M's supplemental response to RAI SCVB-RAI-10 in Reference 7. Enclosure 3 to this letter provides the regulatory commitment made in this supplemental response.

3 U. S. Nuclear Regulatory Commission AEP-NRC Page 3 Should you have any questions, please contact Mr. Michael K. Scarpello, Regulatory Affairs Manager, at (269) Sincerely Q./Shne Lies Engineering Vice President, Indiana Michigan Power JMT/ams Enclosures: 1. Affirmation 2. Supplemental Response to SCVB-RAI Regulatory Commitments c: A. W. Dietrich, NRC Washington DC J. T. King, MPSC MDEQ - RMD/RPS NRC Resident Inspector C. D. Pederson, NRC Region Ill A. J. Williamson, AEP Ft. Wayne, w/o enclosures

4 ENCLOSURE 1 TO AEP-NRC AFFIRMATION I, Q. Shane Lies, being duly sworn, state that I am Engineering Vice President of Indiana Michigan Power Company (I&M), that I am authorized to sign and file this request with the U. S. Nuclear Regulatory Commission on behalf, of I&M, and that the statements made and the matters set forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief. Indiana Michigan Power Company haelies Engineering Vice President, Indiana Michigan Power SWORN TO AND SUBSCRIBED BEFORE ME THIS DAY OF ~-...x<r'-\,,2015 MysCo~mmission Expires c \ -t - o Notary DANIELLE Public, State BURGOYNE of Michigan County of Berrien My Commission Expires " Acting In the County of ',.-,

5 ENCLOSURE 2 TO AEP-NRC Introduction Supplemental Response to SCVB-RAI-10 By letter dated October 8, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML13283A121), Indiana Michigan Power Company (l&m), the licensee for Donald C. Cook Nuclear Plant (CNP) Unit 1, submitted a License Amendment Request (LAR). I&M proposed to increase the Reactor Coolant System Normal Operating Pressure and Temperature (NOP/NOT) consistent with previously licensed operating pressure of 2250 pounds per square inch absolute and full power average temperature of 571 degrees Fahrenheit ( 0 F), to mitigate the ongoing Steam Generator (SG) tube wear. I&M's letter dated October 8, 2013, was supplemented by letters dated April 29, 2014 (ADAMS Accession Number ML14121A422), June 5, 2014 (ADAMS Accession Numbers ML14181A537 and ML14181A538), July 3, 2014 (ADAMS Accession Number ML14189A112), and September 30, 2014 (ADAMS Accession Number ML14275A453), which provided responses to the U. S. Nuclear Regulatory Commission's (NRC) previous Requests for Additional Information (RAls). In the letter dated September 30, 2014, l&m stated that a supplemental response would be provided to the NRC RAI SCVB-RAI-10 following completion of additional analysis. This Enclosure provides I&M's supplemental response to SCVB-RAI-10. By dated August 8, 2014, the NRC provided an additional RAI to I&M. The NRC RAI contained Westinghouse proprietary information which was 'identified by the NRC with underlining the information and enclosed in double square brackets. [[This sentence is an exampele] In order to withhold this information from public disclosure, the wording from the RAI has been redacted and enclosed in brackets, similar to the RAI. This is an example: The RAl text is restated below. For completeness, the RAI is followed by I&M's first response from letter dated September 30, I&M's first response to the RAI is followed by I&M's supplemental response to the RAI. SCVB-RAI-1 0 I] applies to all containment types such as CNP Unit 1 which has an ice condenser having design pressure 12 psig smaller compared to a typical large dry PWR containment having a design pressure 55 psig. It would be unreasonable to assume that [L J] would apply to all containment types because it would imply that WCAP P-A along with WCAP-8354-P-A LOTIC methodology would over predict about 100% for CNP, and about 12% for a typical large dry containment. Therefore the NRC staff considers the applicability of [[ J] in the peak containment pressure unacceptable without validation by performing a CNP Unit 1 specific containment pressure response analysis.

6 Enclosure 2 to AEP-NRC Pg Page 2 Response to SCVB-RAI-3(c) reports that the LOCA peak containment pressure is psig which exceeds the design pressure of 12 psig. The response recommends the following two independent actions to mitigate the specific psig impact associated with assuming higher initial containment temperatures. o OR o Decreasing the maximum assumed Residual Heat Removal (RHR) containment spray actuation time from 4500 seconds to 4200 seconds, which provides a benefit of approximately one psi Crediting additional ice in the ice condenser above the TS minimum value; crediting an additional ice mass of 25, 000 pounds-mass provides a benefit of approximately 0. 7 psi A CNP Unit 1 plant specific LOCA containment pressure response analysis is necessary. Without the analysis, the estimated peak containment pressure is approximately psig which is unacceptable because it is higher than the containment design pressure of 12 psig. The following table summarizes the breakdown of the 15.5 psig - estimated value of the containment peak pressure: Source Document Peak Containment Pressure Correction to LAR value of psig, as reported in response to 1.77p SCVB-RAI=-3(c) Penalty due to non-conservative initial temperature, response to 07 s SCVB-RAI-3(c) NSAL-11-5 (Table 1) penalty 2. 8 psi NSAL (under heading "Technical Evaluation') penalty 0. 2 psi minimum NSA L-06-6 (under heading "Safety Significance') penalty Total (excluding the NSA L-06-6 penalty) 5.8t ps1ppoimtl psig Note 1: For ice condenser containment, NSAL-06-6 states the "Instead of applying the impact in a pressure increase, the penalty was converted into an energy value." The real value of penalty is therefore unknown. Please revise the CNP Unit 1 LOCA AOR incorporating the above recommendations. In performing the revised licensing basis LOCA analysis, use the corrected WCAP-1O325-P-A methodology which has the removed the errors reported in NSA L-06-6, NSAL-1 1-5, and NSA L-14-2 and any other known errors. Confirm that based on the new licensing basis analysis, the peak containment pressure is less than the containment design pressure of 12 psig. Provide the containment pressure profile and the peak pressure value for the limiting design basis LOCA. I&M's First Response to SCVB-RAI-10 SCVB-RAI-10 requests that I&M reanalyze the loss of coolant accident (LOCA) mass and energy (M/E) release and containment analysis utilizing the currently licensed WCAP (Reference 1) methodology with the errors from NSAL-06-6 (Reference 2), NSAL (Reference 3), and NSAL-14-2 (Reference 4) corrected. The WCAP methodology is a

7 Enclosure 2 to AEP-NRC Pg Page 3 non-mechanistic calculation of the LOCA M/E releases that also contains overly-conservative assumptions inherent to the methodology and over-predicts the CNP peak calculated containment pressure. With the errors in the WCAP methodology corrected, the results of the analysis are expected to exceed the 12 pounds per square inch gauge (psig) design limit for CNP and; therefore, reanalysis utilizing the current methodology is not considered an acceptable approach. Due to the limitations of the WCAP methodology, l&m intends to reanalyze the LOCA M/E release and containment response analysis utilizing the Westinghouse WCAP P (Reference 5) methodology which is currently under review by the NRC. The WCAP P methodology provides a mechanistic calculation of the M/E releases and is expected to result in calculated pressure below CNP's design pressure, based on initial results provided by Westinghouse to I&M. l&m plans to adopt the WCAP P methodology after NRC review and approval of the generic topical report, which is anticipated to be in March of I&M plans to provide, as a supplemental response to this RAI, the results of the revised analysis and appropriate supporting information within three months of NRC approval of the generic topical report. l&m's previous responses to the RAIs indicated that CNP was relying on the generic margin, identified in Reference 3 for WCAP-10325, for continued operability. As discussed in SCVB-RAI-10, the generic analysis margin was not stated to apply for all designs. Based on the undefined applicability of the generic margin, I&M has revised the justification for continued operability with a plant specific calculation using the unapproved WCAP P methodology. This plant specific operability analysis was implemented consistent with the guidance in the NRC Inspection Manual Chapter 0326, Section C.04, and is documented in the CNP corrective action program. The WCAP P CNP analysis provides the basis for continued operability and therefore, the generic margin is not required. The supplemental WCAP operability analysis crediting additional ice, identified in I&M's previous response to the NRC's SCVB-RAI-5b, is still applicable under this new approach. References: 1. WCAP P-A (Proprietary), 'Westinghouse LOCA Mass and Energy Release Model for Containment Design - March 1979 Version," May NSAL-06-6, "LOCA Mass and Energy Release Analysis," June 6, NSAL-1 1-5, "Westinghouse LOCA Mass and Energy Release Calculation Issues," July 25, NSAL-14-2, "Westinghouse Loss-of-Coolant Accident Mass and Energy Release Calculation Issue for Steam Generator Tube Material Properties," March 31, WCAP P, "Westinghouse Containment Analysis Methodology - PWR LOCA Mass and Energy Release Calculation Methodology." I&M's Supplemental Response to SCVB-RAI-10 Consistent with the I&M commitment in the first response to SCVB-RAI-10 in Reference 1 and the subsequently issued NRC acknowledgement Letter (Reference 2), CNP has performed a

8 Enclosure 2 to AEP-NRC Pg Page 4 new Unit 1 LOCA M/E release calculation using WCAP P methodology (Reference 3) and an associated containment response using WCAP-8354 (Reference 4) under conditions that bound Unit 1 NOP/NOT. The LOCA M/E release calculation and containment response analysis will be implemented into the CNP licensing basis utilizing the 10 CFR process. The CNP Unit 1 analysis will be implemented into the CNP license basis by November 20, The purposes of this Supplemental Response are to describe the new CNP Unit 1 containment integrity analysis, address the applicability of previous errors reported in NSAL-06-6 (Reference 6), NSAL (Reference 7), and NSAL-14-2 (Reference 8) and any other known errors to the methodologies used in the new analysis, and present results [containment pressure profile and the peak pressure value for the limiting design basis LOCA] demonstrating that the peak containment pressure is less than the containment design pressure of 12 psig. Description of New LOCA M/E Release Calculation and Containment Response Analysis The new analysis bounds the operation of Unit 1 as described in the LAR submitted in Reference 11 for the proposed return of the unit to NOP/NOT conditions. Full double-ended ruptures were analyzed in the cold leg and the pump suction leg, each with one and two trains of safety injection assumed, to cover the spectrum of possible limiting break locations for CNP Unit 1 in the context of the new methodology. The CNP Unit 1 LOCA M/E release calculation using the WCAP (Reference 3) methodology was performed without exception to the NRC approved methodology documented in Reference 5. The LOTICI code (Reference 4) was used to determine the containment response for each case, which is not a change from the current CNP license basis methodology. The analysis uses an ice condenser ice mass of 2.2 x 106 pounds mass, which is consistent with current Technical Specifications (TS). It also uses a maximum residual heat removal (RHR) spray time of 4200 seconds that is consistent with the previous response to SCVB-RAI-10 in Reference 12 and reflects the formal change in the maximum RHR spray actuation time implemented at CNP for Unit 1 using the 10 CFR process in Consistent with the NRC Safety Evaluation (Reference 5), a conservative initial accumulator pressure was modeled which bounds plant operating conditions and accounts for measurement uncertainty. Finally, a sensitivity evaluation of initial ambient containment temperature conditions was performed to determine if the maximum or minimum temperatures are conservative with respect to containment integrity. Based on information obtained from the sensitivity, a bounding set of initial conditions was used in the analysis. Applicability of Known Errors in New LOCA M/E Release Calculation and Containment Response Analysis NSAL-06-6 The generic issues described in NSAL-06-6 (Reference 6) are unique to the LOCA M/E analysis methodologies in WCAP-8264-P-A Rev. 1 (Reference 9) and WCAP (Reference 10) series of codes. It should be noted that Westinghouse informed CNP that the errors identified in NSAL-06-6 were not applicable to the CNP-specific WCAP analysis. Additionally, the errors reported in Reference 6 have no effect on LOCA M/E release calculation performed in accordance with the WCAP P

9 Enclosure 2 to AEP-NRC Pg Page 5 (Reference 3) methodology. The LOCA M/E release calculation using References 9 and 10, and the LOCA M/E release calculation using Reference 3 both are used in the same containment response analysis methodology (Reference 4) which is not impacted by Reference 6. NSAL NSAL-11-5 (Reference 7) is applicable to LOCA M/E release calculations performed for Westinghouse-designed pressurized water reactors utilizing the methodologies documented in WCAP P-A (Reference 10) and WCAP-8264-P-A, Revision I (Reference 9) as specified in Reference 7. NSAL identified four errors that applied to CNP. The most significant being an error in the EPITOME code, which caused an underestimation of the calculated LOCA M/E releases. The code issues identified in NSAL do not affect the new Unit 1 LOCA M/E release calculation and containment response analysis that use the methodologies described in WCAP P (Reference 3) and in WCAP-8354 (Reference 4) because the code containing the errors is not used. N SAL-I14-2 NSAL-14-2 (Reference 8) identified errors in the LOCA M/E release calculations related to the modeling of the specific heat capacity of the SG thick metal mass in WCAP-8264-P-A, Rev.1 and WCAP P-A (References 9 and 10, respectively). The WCAP (Reference 10) methodology used in the CNP analysis of record (AOR) utilized a non-conservative value for density and specific heat capacity of the SG thick metal mass. The WCAP P (Reference 3) methodology utilizes the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code values for specific heat capacities as stipulated in the NRC Safety Evaluation (Reference 5). As a result, the new CNP Unit I LOCA M/E release calculation and containment response analysis are not impacted by NSAL Initial Containment Temperature I&M previously notified the NRC in Reference 12 of an error in the initial containment temperatures assumed in the containment analysis performed for Unit 1 NOP/NOT. To address this issue in the new Unit 1 LOCA M/E release calculation and containment response analysis, a sensitivity evaluation was performed utilizing the WCAP P (Reference 3) M/E releases along with the existing Reference 4 LOTIC1 containment methodology. The timing of ice bed melt-out relative to the initiation of RHR spray dictates when minimum or maximum temperatures are conservative. The evaluation ensured that the most limiting set of initial conditions for the ambient temperatures in upper and lower containment was used. Initial Ice Bed Temperature Westinghouse previously notified I&M of an issue related to the initial ice bed temperature modeled in the LOTIC computer code used in the WCAP-8354 containment analysis methodology. TS Surveillance Requirement for ice condenser containment designs limits the maximum allowable temperature in the ice bed to < 27 F. For current AOR which uses the WCAP M/E releases, the initial temperature of the ice bed was modeled at 15 F rather than the TS maximum value. Increasing the initial ice bed temperature reduces the effectiveness of the ice condenser and results in

10 Enclosure 2 to AEP-NRC Pg Page 6 a peak pressure penalty. The WCAP-8354 containment analysis methodology is still used with the new analysis which uses the WCAP M/E releases; however, the initial ice bed temperature was corrected to the TS maximum value and therefore a limiting initial ice bed temperature is used in the new Unit 1 analysis and reflected in Figure 1. InfoGram 14-1 Westinghouse issued InfoGram 14-1 (Reference 13) due to issues with the volumetric heat capacity of stainless steel utilized in the WCAP methodology. The WCAP methodology uses a lower volumetric heat capacity than currently listed in the ASME Boiler and Pressure Vessel Code and would under calculate the metal energy released during the transient. A similar concern was raised by the NRC during the NRC's review of the WCAP Topical Report and is documented as a limitation in the NRC Safety Evaluation (Reference 5). Similar to the response provided for NSAL-14-2, the CNP LOCA M/E releases calculated using the WCAP methodology utilize the ASME Boiler and Pressure Vessel Code values for volumetric heat capacities to ensure conservative modeling of metal energy is released during the transient. No other known errors exist in the LOCA M/E release calculation or containment~ response analysis or their corresponding methodologies that could affect the results of the new CNP Unit 1 analysis described in this supplemental response to SCVB-RAI-10. Analysis Results The calculated peak pressure from the limiting set of conditions for the CNP Unit I LOCA M/E release calculation and containment response analysis is psig, which includes the 0.27 pounds per square inch (psi) containment pressure Updated Final Safety Analysis Report rack-up identified previously in Reference 12. Figure 1 below contains the direct output from the analysis and does not include the 0.27 psi rack-up. The results of the new containment integrity analysis are acceptable because they are less than the design pressure limit of 12.0 psig. With the implementation of the Reference 3 LOCA M/E analysis, all known outstanding issues with the AOR for Unit 1 will be resolved. Figure 1 below provides the Unit 1 peak pressure transient plot for the limiting WCAP P (Reference 3) M/E releases utilizing the current license basis, containment analysis methodology (Reference 4).

11 Enclosure 2 to AEP-NRC Pg Page 7 PSYS Gouge Pressure 10.5"1_ Time (s) Figure 1: Unit 1 Peak Containment Pressure References 1. Letter AEP-NRC from J. P. Gebbie, Indiana Michigan Power Company (I&M), to U. S. Nuclear Regulatory Commission (NRC) Document Control Desk, "Donald C. Cook Nuclear Plant Unit 1 Response to 'Request for Additional Information on the Application for Amendment to Restore Normal Reactor Coolant System Pressure and Temperature Consistent with Previously Licensed Conditions (TAC No. MF2916)'," dated September 30, 2014, Agencywide Documents Access and Management System (ADAMS) Accession Number ML14275A Letter from Mahesh Chawla, NRC, "Donald C..Cook Nuclear Plant, Unit 1 - Nuclear Regulatory Commission Staff Review of Licensee Response to Request for Additional Information Related to a License Amendment Request to Restore Normal Operating Pressure and Temperature (TACF NO. MF2916)," of October 22, 2014, ADAMS Accession No. ML14283A WCAP P, Westinghouse Containment Analysis Methodology - PWR LOCA Mass and Energy Release Calculation Methodology," April 2013.

12 Enclosure 2 to AEP-NRC Pg Page 8 4. WCAP-8354-P-A, "Long Term Ice Condenser Containment Code - LOTIC Code," April "Final Safety Evaluation for Westinghouse Electric Company (Westinghouse) Topical Report (TR) WCAP P," Revision 0, and WCAP NP, Revision 0, "Westinghouse Containment Analysis Methodology - PWR [Pressurized Water Reactor] LOCA [Loss-of-Coolant Accident] Mass and Energy Release Calculation Methodology," August 24, 2015 ADAMS Accession No. ML15221A NSAL-06-6, "LOCA Mass and Energy Release Analysis," June 6, NSAL-1 1-5, "Westinghouse LOCA Mass and Energy Release Calculation Issues," July 25, NSAL-14-2, "Westinghouse Loss-of-Coolant Accident Mass and Energy Release Calculation Issue for Steam Generator Tube Material Properties," March 31, WCAP-8264-P-A, Revision 1, "Topical Report - Westinghouse Mass and Energy Release Data for Containment Design," August 31, WCAP P-A, "Westinghouse LOCA Mass and Energy Release Model for Containment Design March 1979 Version," May 1, Letter from J. P. Gebbie, I&M, to NRC Document Control Desk, "Donald C. Cook Nuclear Plant Unit 1 Docket No , License Amendment Request Regarding Restoration of Normal Reactor Coolant System Operating Pressure and Temperature Consistent with Previously Licensed Conditions," dated October 8, 2013, ADAMS Accession Number ML13283A Letter AEP-NRC from Q. S. Lies, I&M, to NRC Document Control Desk, "Donald C. Cook Nuclear Plant Unit 1 Response to 'Request for Additional Information on the Application for Amendment to Restore Normal Reactor Coolant System Pressure and Temperature Consistent with Previously Licensed Conditions (TAC No. MF2916),' dated May 6, 2014," July 3, 2014, ADAMS Accession Number ML14189A InfoGram 14-1, "Material Properties for Loss-of-Coolant Accident Mass and Energy Release Analyses," November 5, 2014.

13 Enclosure 3 to AEP-NRC REGULATORY COMMITMENTS The following table identifies an action committed to by Indiana Michigan Power Company (I&M) in this document. Any other actions discussed in this submittal represent intended or planned actions by I&M. They are described to the U. S. Nuclear Regulatory Commission (NRC) for the NRC's information and are not regulatory commitments. All commitments discussed in this table are one-time commitments. Commitment Scheduled Completion Date (if applicable) The CNP Unit I analysis for containment pressure, which is based on WCAP P and the associated NRC Safety Evaluation dated August 24, 2015, will be implemented into the Donald C. Cook Nuclear Plant license basis. Noebr2,01

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001. March 3, 2011

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001. March 3, 2011 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 3, 2011 Mr. Timothy S. Rausch Senior Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard Berwick,

More information

In Reference 3, the RAI includes two questions for which responses are provided in Attachment 1.

In Reference 3, the RAI includes two questions for which responses are provided in Attachment 1. Jon A. Franke Site Vice President Susquehanna Nuclear, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 jon.franke@talenenergy.com TALEN ~ ENERGY SEP 2 1 2015 U.S. Nuclear Regulatory

More information

Should you have any questions in regard to this submittal, please contact Ms. Margaret Earle at 804-273-2768.

Should you have any questions in regard to this submittal, please contact Ms. Margaret Earle at 804-273-2768. Dominion Nuclear Connecticut, Inc. ')(l(lt Dominion Boulevard, Glen Allen, Virginia 2.,060 \VeI. Address: www.dom.com January 18, 2008 U. S. Nuclear Regulatory Commission Attention: Document Control Desk

More information

Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 37

Response to NRC Request for Additional Information for the Review of the Fermi 2 License Renewal Application - Set 37 Vito A. Kaminskas Site Vice President DTE Energy Company 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.6515 Fax: 734.586.4172 Email: kaminskasv@dteenergy.com DTE Ensergy- 10 CFR 54 September 24,

More information

ARE VA AREVA INC. August 31, 2015 NRC:15:035. U.S. Nuclear Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, MD 20852

ARE VA AREVA INC. August 31, 2015 NRC:15:035. U.S. Nuclear Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, MD 20852 A ARE VA August 31, 2015 NRC:15:035 U.S. Nuclear Regulatory Commission Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Request for Review and Approval of ANP-10337P, "PWR Fuel Assembly Structural

More information

July 31, 2015. Dear Dr. Biegalski:

July 31, 2015. Dear Dr. Biegalski: July 31, 2015 Dr. Steven Biegalski, Director Nuclear Engineering Teaching Laboratory The University of Texas at Austin 10100 Burnet Rd, Bldg 159 Austin, Texas 78758 SUBJECT: UNIVERSITY OF TEXAS AT AUSTIN

More information

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, D.C. 20555-0001. June 1, 2005

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, D.C. 20555-0001. June 1, 2005 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, D.C. 20555-0001 June 1, 2005 NRC INFORMATION NOTICE 2005-14: FIRE PROTECTION FINDINGS ON LOSS OF SEAL COOLING

More information

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C. 20555-0001. July 7, 2015

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C. 20555-0001. July 7, 2015 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, 0.C. 20555-0001 July 7, 2015 Mr. Randall K. Edington Executive Vice President Nuclear and Chief Nuclear Officer Arizona Public Service Company P.O.

More information

Apr; 1 5, 2013 10 CFR 50.90. U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Apr; 1 5, 2013 10 CFR 50.90. U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 SOUTHERN CALIFORNIA iiiiiiiiiii ED ISO N Peter T. Dietrich Senior Vice President & Chief Nuclear Officer An EDISON INTERNATIONAL Company Apr; 1 5, 2013 10 CFR 50.90 U. S. Nuclear Regulatory Commission

More information

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001. November 13, 2012

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001. November 13, 2012 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 November 13, 2012 Vice President, Operations Entergy Nuclear Operations, Inc. Vermont Yankee Nuclear Power Station P.O. Box 250 Governor

More information

NUCLEAR REGULATORY COMMISSION. [Docket No. 52-039; NRC-2008-0603] PPL Bell Bend, LLC; Combined License Application for Bell Bend Nuclear Power Plant

NUCLEAR REGULATORY COMMISSION. [Docket No. 52-039; NRC-2008-0603] PPL Bell Bend, LLC; Combined License Application for Bell Bend Nuclear Power Plant [7590-01-P] NUCLEAR REGULATORY COMMISSION [Docket No. 52-039; NRC-2008-0603] PPL Bell Bend, LLC; Combined License Application for Bell Bend Nuclear Power Plant AGENCY: Nuclear Regulatory Commission. ACTION:

More information

POLICY ISSUE (INFORMATION)

POLICY ISSUE (INFORMATION) POLICY ISSUE (INFORMATION) October 26, 2011 SECY-11-0149 FOR: FROM: SUBJECT: The Commissioners Eric J. Leeds, Director Office of Nuclear Reactor Regulation SUMMARY FINDINGS RESULTING FROM THE STAFF REVIEW

More information

NUCLEAR REGULATORY COMMISSION. [Docket Nos. 50-382; NRC- 2015-0205] Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3

NUCLEAR REGULATORY COMMISSION. [Docket Nos. 50-382; NRC- 2015-0205] Entergy Operations, Inc.; Waterford Steam Electric Station, Unit 3 This document is scheduled to be published in the Federal Register on 09/08/2015 and available online at http://federalregister.gov/a/2015-22553, and on FDsys.gov [7590-01-P] NUCLEAR REGULATORY COMMISSION

More information

NUCLEAR REGULATORY COMMISSION. [Docket No. 50-128; NRC-2015-0210] Texas Engineering Experiment Station/Texas A&M University System

NUCLEAR REGULATORY COMMISSION. [Docket No. 50-128; NRC-2015-0210] Texas Engineering Experiment Station/Texas A&M University System [7590-01-P] NUCLEAR REGULATORY COMMISSION [Docket No. 50-128; NRC-2015-0210] Texas Engineering Experiment Station/Texas A&M University System Nuclear Science Center Reactor AGENCY: Nuclear Regulatory Commission.

More information

October 22, 2015 EA-14-230

October 22, 2015 EA-14-230 October 22, 2015 EA-14-230 Dr. Sean McDeavitt, Director Texas A&M University Texas A&M Engineering Experiment Station Nuclear Science Center 1095 Nuclear Science Road, M/S 3575 College Station, TX 77843-3575

More information

S)Westinghouse. bc)(0o3. U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C. 20555

S)Westinghouse. bc)(0o3. U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C. 20555 S)Westinghouse Westinghouse Electric Company Nuclear Power Plants P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355 USA U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C.

More information

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION. December 10, 2008

OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION. December 10, 2008 Mr. Larry Meyer Site Vice President FPL Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241 December 10, 2008 NRC SECURITY BASELINE INSPECTION REPORT 05000266/2008404(DRS); 5000301/2008404(DRS)

More information

Westinghouse. Westinghouse Electric Company

Westinghouse. Westinghouse Electric Company Westinghouse Nuclear Power Plants Westinghouse Electric Company P.O. Box 355 Pittsburgh, Pennsylvania 15230-0355 USA U.S. Nuclear Regulatory Commission Directtel: 412-374-6202 ATTENTION: Document Control

More information

AoDI. December 9, 2015 NOC-AE-1 5003318 10 CFR 50.90. U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

AoDI. December 9, 2015 NOC-AE-1 5003318 10 CFR 50.90. U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Nuclear Operating Company South Texas Project Electric Generating Station PO. Box 289 W/adsworth, Texas 77483 v/v - December 9, 2015 NOC-AE-1 5003318 10 CFR 50.90 U.S. Nuclear Regulatory Commission Attention:

More information

Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos.

Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. Exelon Generation 200 Exelo11 Way Kennett Square. PA 19348 www.pxeloncoroi.c cm 10 CFR 50.55a August 13, 2015 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Peach

More information

POST-IMPLEMENTATION REVIEW OF INADEQUATE CORE COOLING INSTRUMENTATION. J. L. Anderson. R. L. Anderson

POST-IMPLEMENTATION REVIEW OF INADEQUATE CORE COOLING INSTRUMENTATION. J. L. Anderson. R. L. Anderson POST-IMPLEMENTATION REVIEW OF INADEQUATE CORE COOLING INSTRUMENTATION J. L. Anderson. R. L. Anderson E. W. Hagen CONF-881103 14 T. C. Morelock Oak Ridge National Laboratory* DE89 002347 Oak Ridge, Tennessee

More information

REGULATORY GUIDE 5.29 (Draft was issued as DG 5028, dated May 2012) SPECIAL NUCLEAR MATERIAL CONTROL AND ACCOUNTING SYSTEMS FOR NUCLEAR POWER PLANTS

REGULATORY GUIDE 5.29 (Draft was issued as DG 5028, dated May 2012) SPECIAL NUCLEAR MATERIAL CONTROL AND ACCOUNTING SYSTEMS FOR NUCLEAR POWER PLANTS U.S. NUCLEAR REGULATORY COMMISSION June 2013 Revision 2 REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 5.29 (Draft was issued as DG 5028, dated May 2012) SPECIAL NUCLEAR MATERIAL

More information

August 21, 2012. Dear Mr. Marcinowski:

August 21, 2012. Dear Mr. Marcinowski: August 21, 2012 Mr. Frank Marcinowski Deputy Assistant Secretary for Technical and Regulatory Support Office of Environmental Management U.S. Department of Energy 1000 Independence Avenue, S.W. Washington,

More information

Published in the Official State Gazette (BOE) number 166 of July 10th 2009 [1]

Published in the Official State Gazette (BOE) number 166 of July 10th 2009 [1] Nuclear Safety Council Instruction number IS-22, of July 1st 2009, on safety requirements for the management of ageing and long-term operation of nuclear power plants Published in the Official State Gazette

More information

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001. July 22, 2015

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001. July 22, 2015 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 22, 2015 LICENSEE: Nuclear Operations, Inc. FACILITY: Indian Point Nuclear Generating Unit Nos. 2 and 3 SUBJECT: SUMMARY OF

More information

7.1 General 5 7.2 Events resulting in pressure increase 5

7.1 General 5 7.2 Events resulting in pressure increase 5 GUIDE YVL 2.4 / 24 Ma r ch 2006 Primary and secondary circuit pressure control at a nuclear power plant 1 Ge n e r a l 3 2 General design requirements 3 3 Pressure regulation 4 4 Overpressure protection

More information

B.Arc ie. Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555. Dear Sir / Madam:

B.Arc ie. Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555. Dear Sir / Madam: Jeffrey B. Archie Vice President, Nuclear Operations 803.345.4214 A SCANA COMPANY May 12, 2008 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Dear Sir / Madam: Subject:

More information

Attachment 10. Peach Bottom Atomic Power Station Units 2 and 3. NRC Docket Nos. 50-277 and 50-278

Attachment 10. Peach Bottom Atomic Power Station Units 2 and 3. NRC Docket Nos. 50-277 and 50-278 Attachment 10 Peach Bottom Atomic Power Station Units 2 and 3 NRC Docket Nos. 50-277 and 50-278 WCAP-17654, Rev 3. Peach Bottom Unit 2 Power Ascension Program Description for Extended Power UDrate Westinghouse

More information

This occurrence is considered to be of no significance with respect to the health and safety of the public.

This occurrence is considered to be of no significance with respect to the health and safety of the public. Serial No. MNS-15-072 September 10, 2015,. DUKESteven Vice D. President Capps, ENERGYMcGuire Nuclear Station Duke Energy MGOIVP 1 12700 Hagers Ferry Road Huntersville, NC 28078 0: 980.875.4805 f: 980.875.4809

More information

March 31, 2005. Dear Mr. Marion:

March 31, 2005. Dear Mr. Marion: March 31, 2005 Mr. Alex Marion Senior Director, Engineering Nuclear Generation Division Nuclear Energy Institute 1776 I Street, Suite 400 Washington, DC 20006-3708 SUBJECT: INSTRUMENTATION, SYSTEMS, AND

More information

Quality Management System-A Revision 7 (NRC-approved Version)

Quality Management System-A Revision 7 (NRC-approved Version) Westinghouse Non-Proprietary Class 3 2013 Westinghouse Electric Company LLC. All Rights Reserved. Quality Management System-A (NRC-approved Version) Westinghouse Electric Company Quality Management System

More information

March 6, 2013 BABCOCK AND WILCOX, LICENSEE PERFORMANCE REVIEW OF LICENSED ACTIVITIES (NUCLEAR REGULATORY COMMISSION INSPECTION REPORT 70-27/2013-001)

March 6, 2013 BABCOCK AND WILCOX, LICENSEE PERFORMANCE REVIEW OF LICENSED ACTIVITIES (NUCLEAR REGULATORY COMMISSION INSPECTION REPORT 70-27/2013-001) Mr. B. J. Burch General Manager UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 6, 2013 SUBJECT: BABCOCK AND WILCOX, LICENSEE

More information

Reconsideration of Application of GDC-4 Exclusion of Local Dynamic Effects to Local Debris Generation

Reconsideration of Application of GDC-4 Exclusion of Local Dynamic Effects to Local Debris Generation Reconsideration of Application of GDC-4 Exclusion of Local Dynamic Effects to Local Debris Generation April 2010 In October 1987, General Design Criterion (GDC) 4 in Appendix A to 10 C.F.R. Part 50 was

More information

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001. June 26, 2014

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001. June 26, 2014 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 26, 2014 Mr. Michael J. Pacilio Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)

More information

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001. June 26, 2013. Palo Verde Nuclear Generating Station, Units 1, 2, and 3

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001. June 26, 2013. Palo Verde Nuclear Generating Station, Units 1, 2, and 3 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 26, 2013 LICENSEE: FACILITY: SUBJECT: Arizona Public Service Company Palo Verde Nuclear Generating Station, Units 1, 2, and

More information

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH. REGULATORY GUIDE 1.174 (Draft was issued as DG-1226, dated August 2009)

REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH. REGULATORY GUIDE 1.174 (Draft was issued as DG-1226, dated August 2009) U.S. NUCLEAR REGULATORY COMMISSION May 2011 Revision 2 REGULATORY GUIDE OFFICE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 1.174 (Draft was issued as DG-1226, dated August 2009) AN APPROACH FOR USING

More information

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN OFFICE OF NUCLEAR REACTOR REGULATION

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN OFFICE OF NUCLEAR REACTOR REGULATION U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN OFFICE OF NUCLEAR REACTOR REGULATION NUREG-0800 (Formerly NUREG-75/087) 9.2.2 REACTOR AUXILIARY COOLING WATER SYSTEMS REVIEW RESPONSIBILITIES Primary

More information

June 8, 2007. SUBJECT: NOTICE OF VIOLATION (NRC Inspection Report No. 2006-001)

June 8, 2007. SUBJECT: NOTICE OF VIOLATION (NRC Inspection Report No. 2006-001) June 8, 2007 EA-07-102, EA-07-126 Maureen P. Barnes Vice President, Risk Management The Cooper Health System Robert Wood Johnson Medical School at Camden One Cooper Plaza Camden, NJ 08103 SUBJECT: NOTICE

More information

DRAFT REGULATORY GUIDE DG-1154 (Proposed Revision 2 of Regulatory Guide 1.128, dated October 1978)

DRAFT REGULATORY GUIDE DG-1154 (Proposed Revision 2 of Regulatory Guide 1.128, dated October 1978) U.S. NUCLEAR REGULATORY COMMISSION October 2006 OFFICE OF NUCLEAR REGULATORY RESEARCH Division 1 DRAFT REGULATORY GUIDE Contact: W.S. Raughley (301) 415-7577 DRAFT REGULATORY GUIDE DG-1154 (Proposed Revision

More information

NORTH CAROLINA EASTERN MUNICIPAL POWER AGENCY SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1. Renewed License No. NPF-63

NORTH CAROLINA EASTERN MUNICIPAL POWER AGENCY SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1. Renewed License No. NPF-63 CAROLINA POWER & LIGHT COMPANY NORTH CAROLINA EASTERN MUNICIPAL POWER AGENCY DOCKET NO. 50-400 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 RENEWED FACILITY OPERATING LICENSE 1. The Nuclear Regulatory Commission

More information

December 5, 2013 VENDOR INSPECTION PROGRAM ANNUAL SELF-ASSESSMENT REPORT FOR FISCAL YEAR 2013

December 5, 2013 VENDOR INSPECTION PROGRAM ANNUAL SELF-ASSESSMENT REPORT FOR FISCAL YEAR 2013 December 5, 2013 MEMORANDUM TO: FROM: Michael C. Cheok, Acting Director Division of Construction Inspection and Operational Programs Office of New Reactors Edward H. Roach, Chief /RA/ Mechanical Vendor

More information

June 27, 2014. Scott C. Flanders, Director Division of Site Safety and Environmental Analysis Office of New Reactors

June 27, 2014. Scott C. Flanders, Director Division of Site Safety and Environmental Analysis Office of New Reactors June 27, 2014 MEMORANDUM TO: Timothy J. McGinty, Director Division of Safety Systems Office of Nuclear Reactor Regulation Scott C. Flanders, Director Division of Site Safety and Environmental Analysis

More information

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, DC 20555-0001. June 16, 2011

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, DC 20555-0001. June 16, 2011 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, DC 20555-0001 June 16, 2011 NRC INFORMATION NOTICE 2011-12: REACTOR TRIPS RESULTING FROM WATER INTRUSION INTO

More information

Boiling Water Reactor Systems

Boiling Water Reactor Systems Boiling Water (BWR) s This chapter will discuss the purposes of some of the major systems and components associated with a boiling water reactor (BWR) in the generation of electrical power. USNRC Technical

More information

April 15, 2011. Dear Dr. Williams:

April 15, 2011. Dear Dr. Williams: April 15, 2011 Dr. John G. Williams, Director Nuclear Reactor Laboratory Engineering Building (20), Room 104 P.O. Box 210020 1127 East James E. Rogers Way Tucson, AZ 85721-0020 SUBJECT: UNIVERSITY OF ARIZONA

More information

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NEW REACTORS WASHINGTON, DC 20555-0001.

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NEW REACTORS WASHINGTON, DC 20555-0001. OMB Control No.: 3150-0012 ML12074A115 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NEW REACTORS WASHINGTON, DC 20555-0001 July 27, 2012 NRC BULLETIN 2012-01:

More information

C. starting positive displacement pumps with the discharge valve closed.

C. starting positive displacement pumps with the discharge valve closed. KNOWLEDGE: K1.04 [3.4/3.6] P78 The possibility of water hammer in a liquid system is minimized by... A. maintaining temperature above the saturation temperature. B. starting centrifugal pumps with the

More information

PUBLIC MEETING. details&code APPLICATIONS FOR NUCLEAR POWER PLANTS Regulatory Guide 1.206 [Revision]

PUBLIC MEETING. details&code APPLICATIONS FOR NUCLEAR POWER PLANTS Regulatory Guide 1.206 [Revision] PUBLIC MEETING http://meetings.nrc.gov/pmns/mtg?do=details&code=20150270 details&code APPLICATIONS FOR NUCLEAR POWER PLANTS Regulatory Guide 1.206 [Revision] Division of Advanced Reactors and Rulemaking

More information

NRC REGULATORY ISSUE SUMMARY 2006-11, REQUESTING QUALITY ASSURANCE PROGRAM APPROVAL RENEWALS ONLINE BY ELECTRONIC INFORMATION EXCHANGE

NRC REGULATORY ISSUE SUMMARY 2006-11, REQUESTING QUALITY ASSURANCE PROGRAM APPROVAL RENEWALS ONLINE BY ELECTRONIC INFORMATION EXCHANGE UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS WASHINGTON, DC 20555 July 20, 2006 NRC REGULATORY ISSUE SUMMARY 2006-11, REQUESTING QUALITY ASSURANCE PROGRAM

More information

May 7, 2008. SUBJECT: NRC INSPECTION REPORT FOR AREVA-NP GmbH 99901371/2008-201, NOTICE OF VIOLATION, AND NOTICE OF NONCONFORMANCE

May 7, 2008. SUBJECT: NRC INSPECTION REPORT FOR AREVA-NP GmbH 99901371/2008-201, NOTICE OF VIOLATION, AND NOTICE OF NONCONFORMANCE May 7, 2008 Mr. Hans-Joachim Nisslein QEM Liaison Officer AREVA-NP GmbH Paul-Gossen-Strasse 100 91001 Erlangen, Germany SUBJECT: NRC INSPECTION REPORT FOR AREVA-NP GmbH 99901371/2008-201, NOTICE OF VIOLATION,

More information

Results and Insights of Internal Fire and Internal Flood Analyses of the Surry Unit 1 Nuclear Power Plant during Mid-Loop Operations*

Results and Insights of Internal Fire and Internal Flood Analyses of the Surry Unit 1 Nuclear Power Plant during Mid-Loop Operations* BNL-NUREG-61792 Results and Insights of Internal Fire and Internal Flood Analyses of the Surry Unit 1 Nuclear Power Plant during Mid-Loop Operations* Tsong-Lun Chu, Zoran Musicki, and Peter Kohut Brookhaven

More information

Diablo Canyon NPP Probabilistic Risk Assessment Program. Workshop Information IAEA Workshop

Diablo Canyon NPP Probabilistic Risk Assessment Program. Workshop Information IAEA Workshop IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Lecturer Lesson Lesson IV IV 3_11.2 3_11.2 Workshop Information IAEA

More information

This document is the property of and contains Proprietary Information owned by Westinghouse Electric Company LLC and/or its subcontractors and

This document is the property of and contains Proprietary Information owned by Westinghouse Electric Company LLC and/or its subcontractors and This document is the property of and contains Proprietary Information owned by Westinghouse Electric Company LLC and/or its subcontractors and suppliers. It is transmitted to you in confidence and trust,

More information

'ii. October 11, 2002. MEMORANDUM TO: James Clifford, Chief Project Directorate Section 1-1 Division of Licensing Project Management

'ii. October 11, 2002. MEMORANDUM TO: James Clifford, Chief Project Directorate Section 1-1 Division of Licensing Project Management October 11, 2002 MEMORANDUM TO: James Clifford, Chief Project Directorate Section 1-1 Division of Licensing Project Management FROM: SUBJECT: A. Louise Lund, Chief IRA Cheryl Khan for! Component Integrity

More information

OWestinghouse. U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C. 20555. February 1, 2010

OWestinghouse. U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C. 20555. February 1, 2010 OWestinghouse Westinghouse Electric Company Nuclear Power Plants P.O. Box 355 Pittsburgh, Pennsylvania 1 5230-0355 USA U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, D.C.

More information

March 5, 2015 NUCLEAR FUEL SERVICES, INC., LICENSEE PERFORMANCE REVIEW (NUCLEAR REGULATORY COMMISSION INSPECTION REPORT 70-143/2015-001)

March 5, 2015 NUCLEAR FUEL SERVICES, INC., LICENSEE PERFORMANCE REVIEW (NUCLEAR REGULATORY COMMISSION INSPECTION REPORT 70-143/2015-001) UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 5, 2015 Mr. Joel Duling, President Nuclear Fuel Services, Inc. P. O. Box

More information

Proposal to Consolidate Post-Fukushima Rulemaking Activities

Proposal to Consolidate Post-Fukushima Rulemaking Activities Proposal to Consolidate Post-Fukushima Rulemaking Activities On January 28, 2014, the U.S. Nuclear Regulatory Commission s (NRC s) Fukushima Steering Committee endorsed an NRC staff proposal for integrating

More information

May 30, 2013. Commissioner Svinicki Commissioner Apostolakis Commissioner Magwood Commissioner Ostendorff

May 30, 2013. Commissioner Svinicki Commissioner Apostolakis Commissioner Magwood Commissioner Ostendorff May 30, 2013 MEMORANDUM TO: Chairman Macfarlane Commissioner Svinicki Commissioner Apostolakis Commissioner Magwood Commissioner Ostendorff FROM: Glenn M. Tracy, Director /RA/ Office of New Reactors SUBJECT:

More information

NUCLEAR REGULATORY COMMISSION. [Docket No. 72-27; NRC-2011-0115] Pacific Gas and Electric Company;

NUCLEAR REGULATORY COMMISSION. [Docket No. 72-27; NRC-2011-0115] Pacific Gas and Electric Company; This document is scheduled to be published in the Federal Register on 09/16/2013 and available online at http://federalregister.gov/a/2013-22468, and on FDsys.gov [7590-01-P] NUCLEAR REGULATORY COMMISSION

More information

August 31, 2007 REQUEST FOR COMMENTS CONCERNING THE VOGTLE ELECTRIC GENERATING PLANT UNITS, 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW

August 31, 2007 REQUEST FOR COMMENTS CONCERNING THE VOGTLE ELECTRIC GENERATING PLANT UNITS, 1 AND 2, LICENSE RENEWAL APPLICATION REVIEW August 31, 2007 Mr. James Webb, Chief The Waccamaw Indian People P.O. Box 628 Conway, SC 29528 SUBJECT: REQUEST FOR COMMENTS CONCERNING THE VOGTLE ELECTRIC GENERATING PLANT UNITS, 1 AND 2, LICENSE RENEWAL

More information

2. ASTM Standard E 185-82, "Standard Practice for Conducting Surveillance Tests for Light-Water Cooled Nuclear Power Reactor Vessels".

2. ASTM Standard E 185-82, Standard Practice for Conducting Surveillance Tests for Light-Water Cooled Nuclear Power Reactor Vessels. ENT000670 Submitted: August 10, 2015 Entergy Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Tel 914 254 6700 John A. Ventosa Site Vice President Administration

More information

August 24, 2009 NRC INSPECTION REPORT 99901364/2009-201 AND NOTICE OF VIOLATION TO JAPAN STEEL WORKS

August 24, 2009 NRC INSPECTION REPORT 99901364/2009-201 AND NOTICE OF VIOLATION TO JAPAN STEEL WORKS August 24, 2009 Mr. Masanobu Maruoka, Deputy Manager Quality Assurance Group JSW, LTD. 4, Chatsumachi, Muroran Hokkaido, Japan 051-08505 SUBJECT: NRC INSPECTION REPORT 99901364/2009-201 AND NOTICE OF VIOLATION

More information

OFFICIAL USE ONLY SECURITY-RELATED INFORMATION January 25, 2008 ENERCON SERVICES, INC. - NRC EVENT FOLLOWUP INSPECTION REPORT 05000443/2007405

OFFICIAL USE ONLY SECURITY-RELATED INFORMATION January 25, 2008 ENERCON SERVICES, INC. - NRC EVENT FOLLOWUP INSPECTION REPORT 05000443/2007405 OFFICIAL USE ONLY SECURITY-RELATED INFORMATION January 25, 2008 Mr. J. A. Stall, Senior Vice President Nuclear and Chief Nuclear Officer P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. Gene St. Pierre, Site

More information

NUCLEAR REGULATORY COMMISSION [EA-14-193; NRC-2015-0289] In the Matter of Northern States Power Company, Minnesota

NUCLEAR REGULATORY COMMISSION [EA-14-193; NRC-2015-0289] In the Matter of Northern States Power Company, Minnesota This document is scheduled to be published in the Federal Register on 01/11/2016 and available online at http://federalregister.gov/a/2016-00322, and on FDsys.gov [7590-01-P] NUCLEAR REGULATORY COMMISSION

More information

CFD Topics at the US Nuclear Regulatory Commission. Christopher Boyd, Ghani Zigh Office of Nuclear Regulatory Research June 2008

CFD Topics at the US Nuclear Regulatory Commission. Christopher Boyd, Ghani Zigh Office of Nuclear Regulatory Research June 2008 CFD Topics at the US Nuclear Regulatory Commission Christopher Boyd, Ghani Zigh Office of Nuclear Regulatory Research June 2008 Overview Computational Fluid Dynamics (CFD) is playing an ever increasing

More information

Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants

Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants Nuclear Safety Council Instruction number IS- 23 on in-service inspection at nuclear power plants Published in the Official State Gazette (BOE) No 283 of November 24 th 2009 Nuclear Safety Council Instruction

More information

ELECTRODE BOILERS VAPOR POWER INTERNATIONAL

ELECTRODE BOILERS VAPOR POWER INTERNATIONAL ELECTRODE BOILERS WITH JET-FLO Technology VAPOR POWER INTERNATIONAL ELECTRODE boilers The Electrode Steam Boiler with Jet-Flo technology consists of an insulated pressure vessel and is fully enclosed in

More information

TALEN ~ SEP 1 8 2015 ENERGY. U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.

TALEN ~ SEP 1 8 2015 ENERGY. U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50. Jon A. Franke Site Vice President Susquehanna Nuclear, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 Jon.Franke@talenenergy.com TALEN ~ ENERGY SEP 1 8 2015 U. S. Nuclear

More information

WEST VIRGINIA DIVISION OF FINANCIAL INSTITUTIONS Notification Required to Become a Supervised Financial Institution

WEST VIRGINIA DIVISION OF FINANCIAL INSTITUTIONS Notification Required to Become a Supervised Financial Institution WEST VIRGINIA DIVISION OF FINANCIAL INSTITUTIONS Notification Required to Become a Supervised Financial Institution Please provide the following information and documentation subject to the West Virginia

More information

Three Myths of the Three Mile Island Accident

Three Myths of the Three Mile Island Accident Three Myths of the Three Mile Island Accident Presented by: Arnie Gundersen The Three Myths 1. Should an evacuation have been ordered? 2. Did the Contaminant Leak? 3. How much radiation was really released?

More information

Westinghouse UK AP1000 GENERIC DESIGN ASSESSMENT. Resolution Plan for GI-AP1000-FD-02. Tolerability of Depressurisation Forces in LBLOCA

Westinghouse UK AP1000 GENERIC DESIGN ASSESSMENT. Resolution Plan for GI-AP1000-FD-02. Tolerability of Depressurisation Forces in LBLOCA MAIN ASSESSMENT AREA GDA ISSUE: Westinghouse UK AP1000 GENERIC DESIGN ASSESSMENT Tolerability of Depressurisation Forces in LBLOCA RELATED ASSESSMENT AREA(S) RESOLUTION PLAN REVISION GDA ISSUE REVISION

More information

Crystal River Unit 3 License Transfer Notification of Transfer Date

Crystal River Unit 3 License Transfer Notification of Transfer Date Crystal River Nuclear Plant 15760 W. Power Line Street Crystal River, FL 34428 Docket 50-302 Operating License No. DPR-72 10 CFR 50.90 October 05, 2015 3F1015-01 U.S. Nuclear Regulatory Commission Attn:

More information

1J,4Zc6 * CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD - EAST HAMPTON, CT 06424-3099

1J,4Zc6 * CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD - EAST HAMPTON, CT 06424-3099 * CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD - EAST HAMPTON, CT 06424-3099 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

More information

Wilfred C. LaRochelle Principal Nuclear Consultant HSB Global Standards, USA

Wilfred C. LaRochelle Principal Nuclear Consultant HSB Global Standards, USA Wilfred C. LaRochelle Principal Nuclear Consultant HSB Global Standards, USA ASME Vice President, Conformity Assessment and Vice Chairman of Committee on Nuclear Certification 2nd NRC Workshop on Vendor

More information

August 15, 2007. Docket No. 03036490 License No. 45-30875-01 Control No. 140749

August 15, 2007. Docket No. 03036490 License No. 45-30875-01 Control No. 140749 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 15, 2007 Docket No. 03036490 License No. 45-30875-01 Control No. 140749 Frans A.

More information

August 27, 2007. Docket No. 03031048 License No. 29-28361-01 Control No. 140877

August 27, 2007. Docket No. 03031048 License No. 29-28361-01 Control No. 140877 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 August 27, 2007 Docket No. 03031048 License No. 29-28361-01 Control No. 140877 Vibhay Bhatnagar,

More information

M0okc. OPower. -Nuclear. February 6, 2006 704 382 6401

M0okc. OPower. -Nuclear. February 6, 2006 704 382 6401 JAMES R MORRIS OPower. -Nuclear Vice President, Nuclear Support Generation Duke Power 526 South Church St. Charlotte, NC 28202 Mailing Address: ECO7H / PO Box 1006 Charlotte, NC 28201-1006 February 6,

More information

u gust 23, 1983 Sincerely, Original signed by: Kenneth T. Eccleston, Project Manager Operating Reactors Branch #2 Division of Licensing

u gust 23, 1983 Sincerely, Original signed by: Kenneth T. Eccleston, Project Manager Operating Reactors Branch #2 Division of Licensing I u gust 23, 1983 Docket No. 50-293 Mr. William D. Harrington Senior Vice President, Nuclear 800 Boylston Street Boston, Massachusetts 02199 Dear Mr. Harrington: The Commission has requested the Office

More information

May 23, 2011 Tokyo Electric Power Company

May 23, 2011 Tokyo Electric Power Company Analysis and evaluation of the operation record and accident record of Fukushima Daiichi Nuclear Power Station at the time of Tohoku-Chihou-Taiheiyou-Oki-Earthquake (summary) May 23, 2011 Tokyo Electric

More information

Ifred M. P~aglia Manager, Nuclear Licensing. March 14, 2013 NND-13-0157

Ifred M. P~aglia Manager, Nuclear Licensing. March 14, 2013 NND-13-0157 Alfred M. Paglia, Jr. Manager Nuclear Licensing A SCANA COMPANY New Nuclear Deployment U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Subject: Virgil C. Summer

More information

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NEW REACTORS WASHINGTON, DC 20555-0001.

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NEW REACTORS WASHINGTON, DC 20555-0001. UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION OFFICE OF NEW REACTORS WASHINGTON, DC 20555-0001 December 2, 2010 NRC INFORMATION NOTICE 2010-26: SUBMERGED ELECTRICAL CABLES

More information

Security Requirements for Spent Fuel Storage Systems 9264

Security Requirements for Spent Fuel Storage Systems 9264 Security Requirements for Spent Fuel Storage Systems 9264 P. G. Brochman, S. R. Helton, E. A. Thompson US Nuclear Regulatory Commission 11555 Rockville Pike, M/S: T4-F25M, Rockville, MD 20852-2738 ABSTRACT

More information

AP1000 European 18. Human Factors Engineering Design Control Document

AP1000 European 18. Human Factors Engineering Design Control Document 18.2 Human Factors Engineering Program Management The purpose of this section is to describe the goals of the AP1000 human factors engineering program, the technical program to accomplish these goals,

More information

SOLVING REACTOR WATER CLEAN-UP SYSTEM ANOMALIES USING RELAP5 MOD3.3

SOLVING REACTOR WATER CLEAN-UP SYSTEM ANOMALIES USING RELAP5 MOD3.3 11 th International Conference on Nuclear Engineering Tokyo, JAPAN, April 20-23, 2003 ICONE11-36149 SOLVING REACTOR WATER CLEAN-UP SYSTEM ANOMALIES USING RELAP5 MOD3.3 Joseph S. Miller EDA, Inc 6397 True

More information

INTRODUCTION. Three Mile Island Unit 2

INTRODUCTION. Three Mile Island Unit 2 INTRODUCTION here was an accident at Three Mile Island Unit 2 on March 28,1979. It caused extensive damage to the plant's nuclear fuel core. Most of the plant's major systems were relatively undamaged.

More information

January 3, 2007. Docket No. 03029501 License No. 45-24867-01 Control No. 139551

January 3, 2007. Docket No. 03029501 License No. 45-24867-01 Control No. 139551 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 January 3, 2007 Docket No. 03029501 License No. 45-24867-01 Control No. 139551 Neil C. Smarte,

More information

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES These guidelines are to be used for ALL commercial cooking hoods, ventilation systems and related fire suppression

More information

FIRE RISK ASSESSMENT IN GERMANY - PROCEDURE, DATA, RESULTS -

FIRE RISK ASSESSMENT IN GERMANY - PROCEDURE, DATA, RESULTS - International Conference Nuclear Energy in Central Europe 2000 Golf Hotel, Bled, Slovenia, September 11-14, 2000 FIRE RISK ASSESSMENT IN GERMANY - PROCEDURE, DATA, RESULTS - H.P. Berg Bundesamt für Strahlenschutz

More information

How To Clean Up A Reactor Water Cleanup

How To Clean Up A Reactor Water Cleanup General Electric Systems Technology Manual Chapter 2.8 Reactor Water Cleanup System TABLE OF CONTENTS 2.8 REACTOR CLEANUP SYSTEM... 1 2.8.1 Introduction... 2 2.8.2 System Description... 2 2.8.3 Component

More information

UNITED STATES NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEE ON REACTOR SAFEGUARDS WASHINGTON, DC 20555-0001. July 17, 2012

UNITED STATES NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEE ON REACTOR SAFEGUARDS WASHINGTON, DC 20555-0001. July 17, 2012 UNITED STATES NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEE ON REACTOR SAFEGUARDS WASHINGTON, DC 20555-0001 July 17, 2012 Mr. R. W. Borchardt Executive Director for Operations U.S. Nuclear Regulatory

More information

OVERVIEW OF THE OPERATING REACTORS BUSINESS LINE. July 7, 2016 Michael Johnson Deputy Executive Director for Reactor and Preparedness Programs

OVERVIEW OF THE OPERATING REACTORS BUSINESS LINE. July 7, 2016 Michael Johnson Deputy Executive Director for Reactor and Preparedness Programs OVERVIEW OF THE OPERATING REACTORS BUSINESS LINE July 7, 2016 Michael Johnson Deputy Executive Director for Reactor and Preparedness Programs Program Overview Bill Dean Director Office of Nuclear Reactor

More information

QUESTIONS THERMODYNAMICS PRACTICE PROBLEMS FOR NON-TECHNICAL MAJORS. Thermodynamic Properties

QUESTIONS THERMODYNAMICS PRACTICE PROBLEMS FOR NON-TECHNICAL MAJORS. Thermodynamic Properties QUESTIONS THERMODYNAMICS PRACTICE PROBLEMS FOR NON-TECHNICAL MAJORS Thermodynamic Properties 1. If an object has a weight of 10 lbf on the moon, what would the same object weigh on Jupiter? ft ft -ft g

More information

VAAS CONNECTICUT YANKEE ATOMIC POWER COMPANY ~HADDAM. March 2, 2016 CY- 16-003 10 CFR 140.15(e)

VAAS CONNECTICUT YANKEE ATOMIC POWER COMPANY ~HADDAM. March 2, 2016 CY- 16-003 10 CFR 140.15(e) CONNECTICUT YANKEE ATOMIC POWER COMPANY ~HADDAM 362 INJUN HOLLOW ROAD * EAST HAMPTON, CT 06424-3099 NECK PLANT March 2, 2016 CY- 16-003 10 CFR 140.15(e) ATTN: Document Control Desk U.S. Nuclear Regulatory

More information

September 15, 2003. Docket No. 99990001 General License (10 CFR 31.5)

September 15, 2003. Docket No. 99990001 General License (10 CFR 31.5) UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 September 15, 2003 Docket No. 99990001 General License (10 CFR 31.5) Annette D. Knox Superintendent

More information

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD NRCR000161 Submitted: August 10, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) ) ENTERGY NUCLEAR OPERATIONS, INC. ) Docket

More information

/All APPLICANTS SHOULD NOTE THAT THE TOUR LENGTH OF A RESIDENT INSPECTOR AT A SINGLE SITE IS LIMITED TO SEVEN (7) YEARS BY COMMISSION POLICY.

/All APPLICANTS SHOULD NOTE THAT THE TOUR LENGTH OF A RESIDENT INSPECTOR AT A SINGLE SITE IS LIMITED TO SEVEN (7) YEARS BY COMMISSION POLICY. Senior Resident Inspector QUALIFICATIONS REQUIRED: Candidates must have at least one year of experience at the next lower grade level or equivalent by the closing date or no later than 30 calendar days

More information

BEFORE THE ATOMIC SAFETY AND LICENSING BOARD PRE-FILED WRITTEN SUPPLEMENTAL REPLY TESTIMONY OF REGARDING CONTENTION NYS-38 / RK-TC-5

BEFORE THE ATOMIC SAFETY AND LICENSING BOARD PRE-FILED WRITTEN SUPPLEMENTAL REPLY TESTIMONY OF REGARDING CONTENTION NYS-38 / RK-TC-5 United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units and ) ASLBP #: 0-88-0-LR-BD01 Docket #: 0000

More information

December 26, 2007. Docket No. 03035305 License No. 37-28803-02 Control No. 141398

December 26, 2007. Docket No. 03035305 License No. 37-28803-02 Control No. 141398 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 December 26, 2007 Docket No. 03035305 License No. 37-28803-02 Control No. 141398 Felix M.

More information

NUCLEAR REGULATORY COMMISSION. [Docket No. 040-09067; NRC-2015-0126] Uranerz Energy Corporation; Nichols Ranch ISR Project

NUCLEAR REGULATORY COMMISSION. [Docket No. 040-09067; NRC-2015-0126] Uranerz Energy Corporation; Nichols Ranch ISR Project [7590-01-P] NUCLEAR REGULATORY COMMISSION [Docket No. 040-09067; NRC-2015-0126] Uranerz Energy Corporation; Nichols Ranch ISR Project AGENCY: Nuclear Regulatory Commission. ACTION: Indirect transfer of

More information

3.9.2 Dynamic Testing and Analysis of Systems, Components, and Equipment

3.9.2 Dynamic Testing and Analysis of Systems, Components, and Equipment 3.9.2 Dynamic Testing and Analysis of Systems, Components, and Equipment The U.S. EPR systems, components, and equipment retain their structural and functional integrity when subjected to dynamic loads

More information