Sediment & Erosion Control and Vegetation for Stream Restoration Projects
|
|
- Catherine Shelton
- 7 years ago
- Views:
Transcription
1 Sediment & Erosion Control and Vegetation for Stream Restoration Projects
2 Presentation Outline 1. Supplemental erosion control lessons learned 2. Vegetation the key to erosion control
3 Keys to Erosion Control 1. Control on- and off-site water flow 2. Pumping sequence 3. Establishment of temporary ground cover 4. Establishment of trees and permanent ground cover
4
5
6 Overland Flow
7
8 INFILTRATION BAY
9 SLOPE DRAIN
10
11
12 BASIN
13 Stream Diversion Open Channel Pipe Pump Around Greater than 5 sq miles?
14
15
16
17
18
19
20 Pump Zone Active Work Zone 250 max
21
22
23
24
25
26
27
28
29 Bank Protection Temporary Rye Grain (winter) Browntop Millet (summer) Erosion Control Matting
30
31
32
33
34
35
36 Root Wads
37
38
39 Bank Protection Permanent Permanent Seed Mixture Live Stakes Tree and Shrub Plantings Transplants
40 Transplants
41 LIVE STAKES
42 BRUSH MATTRESS
43
44
45
46
47
48
49 Summary 1. There are tools available to improve the sediment and erosion control 2. Increase in the amount of surface drainage throughout the site 3. Increase in the number of basins 4. Collect surface runoff water, treat the water and settle it 5. Utilize baffles, skimmers, and alternative check dams to reduce sediment loss and turbidity control 6. Emphasis on quick establishment of ground covers 7. Utilize matting that protects the bank while not risking birds and reptiles 8. Incorporate bank stabilization methods that quickly establishes rootmass throughout the channel bank.
50 Summary 2. Increase in the amount of surface drainage throughout the site 3. Increase in the number of basins 4. Collect surface runoff water, treat the water and settle it
51 Summary 5. Utilize baffles, skimmers, and alternative check dams to reduce sediment loss and turbidity control
52 Summary 6. Emphasis on quick establishment of ground covers 7. Utilize matting that protects the bank while not risking birds and reptiles
53 Summary 8. Incorporate bank stabilization methods to quickly establish rootmass throughout the channel bank.
54 Questions
55 Restoring Riparian Vegetation
56 Gold Standard
57 Gold Standard
58 Gold Standard
59 Initial assessment Plant inventory, including exotics Soil characterization Wetland delineation Threatened & endangered species Animal disturbance Other project constraints? Transplants and protected plants
60 Planning How much restoration disturbance?
61 Planning Invasive removal
62 Invasive removal Physical removal Cut and paint Pre-emergent Foliar sprays
63 Transplants Marking and excavation Storage during construction Skilled installation
64 Topsoil Stockpile Removal Storage during construction Re-application
65 Species selection Native and local By physiographic province Eight or more species Availability may limit
66 Power lines Identify easement Confirm species with power company Parks
67 Live Stakes Holds erosion mat in place Dormant season (Oct-March) Steep banks Slim profile
68 Live Stakes Native local stock Temporary inundation only 2-3 foot centers Willow, dogwood, elderberry, ninebark Soak in water
69 Trees and Shrubs 320 planted stems per acre after five years
70 Bare Root Seedlings Dormant season Transport and storage care Proper planting
71 Plugs Herbaceous, Shrubs, and Trees Easier to Handle Much more successful Order ahead of time
72 Plant year round Container Trees Often larger Availability
73 Tree Planting Tree shelters Tree mats Herbicides
74 Tree Shelters Critters Herbicide spray Visibility Increased height
75 Tree Shelters Cost Installation Removal Heat trap Bird hazard Floodplain forces
76 Sample Specifications and Plans
77 Planning Guide ad/rfb_design&maintenance.pdf
78 Maintenance and Monitoring Invasive removal Reseeding Stem counts Replacement of dead material Maintenance plan for landowner Pruning Fertilizing Mowing
79 Summary Pre-construction assessment and planning Soil preparation and amendments Temporary and permanent seeding Live stakes Trees and shrubs Ongoing monitoring and maintenance
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering
More informationLand Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
More informationFinal Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum
Final Report Dixie Creek Restoration Project Funded by Plumas Watershed Forum Plumas Corporation January 2009 1 Background FR-CRM staff presented this project to the Dixie Valley Landowners Association
More informationPost-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Purpose The purpose of this document is to provide guidance and recommendations for minimizing potential impacts to
More informationChapter 11 Site Rehabilitation and Stabilization
Chapter 11 Site Rehabilitation and Stabilization Chapter 11 Layout: Part 1 - Page 131 Planning Site Rehab Part 2 - Page 132 Controlling Runoff and Capturing Sediment Part 3 - Page 133 Rehab for Crossings
More informationAngora Fire Restoration Activities June 24, 2007. Presented by: Judy Clot Forest Health Enhancement Program
Angora Fire Restoration Activities June 24, 2007 Presented by: Judy Clot Forest Health Enhancement Program California Tahoe Conservancy Independent California State Agency within the Resources Agency Governed
More informationGREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH
GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH JULY 2015 BIOSWALE/HYBRID DITCH SCALABLE TOOL AND DESIGN TEMPLATE This tool and associated design files are one section of a larger toolkit: Green Infrastructure
More informationSTORMWATER MANAGEMENT CHECKLIST
STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative
More informationCity of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
More informationAppendix C. Municipal Planning and Site Restoration Considerations
Appendix C Municipal Planning and Site Restoration Considerations 67 68 Appendix C - Municipal Planning and Site Restoration Considerations This appendix contains best practice standards for site planning
More informationSTORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local
More informationIndex. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
More informationConstruction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources
More information1.7.0 Floodplain Modification Criteria
1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:
More informationHow To Plan A Buffer Zone
Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific
More informationChapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS
Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter
More information2012 Program Report. Agricultural Group Drainage Program
2012 Program Report Agricultural Group Drainage Program Accomplishments: It was a successful year for the drainage program. We were able to complete two new projects and seven maintenance projects throughout
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)
More informationOutlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
More informationWaterway Technote Planning
Waterway Technote Planning Contents Benefits to planning your waterway management 1 Prioritising waterway management where to start? 1 What are your priorities? 1 Start with the best areas or those at
More informationCarlton Fields Memorandum
Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed
More informationCLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
More informationSUSTAINABLE URBAN DRAINAGE SYSTEMS
overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being
More informationCONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.
More informationAdopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:
CHATTAHOOCHEE CORRIDOR PLAN Adopted 9/23/98 PART 1: GOALS. POLICY. COVERAGE. A. Goals The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are: 1. Preservation and protection
More informationSTANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY
STANDARD INSPECTION FORM GENERAL PERMIT FOR STORMWATER ASSOCIATED WITH CONSTRUCTION ACTIVITY Project Name Permittee NOI # Start Time Inspector s Name(s) Green Card Certification # Inspector s Contact Information
More informationPRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS
BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS Check here for Address or phone number change the fiscal year (July 1 June 30), and date(s) maintenance was performed. Under Inspection,
More informationMONITORING TOOLS AND METHODS. Michelle Buzalsky Rangeland Management Technician Shoshone National Forest
MONITORING TOOLS AND METHODS Michelle Buzalsky Rangeland Management Technician Shoshone National Forest MONITORING TOOLS Tools for Monitoring Transect Stakes (PVC pipe, Rebar) 100 Tape Two Carpenter Rules
More informationVarious options are discussed below.these low cost, low impact interventions can also be applied as general erosion control methods.
Week 10 River Hydraulics Rehabilitating Urban Waterways (From http://hubpages.com/hub/river-bank-erosion-control-methods) See also the resources placed on Moodle. Water channels should be viewed as a resource
More informationStormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
More informationDESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
More informationCOMMONWEALTH OF KENTUCKY CITY OF LONDON ORDINANCE NO. 2006-19 AN ORDINANCE ESTABLISHING EROSION AND STORM WATER CONTROL
COMMONWEALTH OF KENTUCKY CITY OF LONDON ORDINANCE NO. 2006-19 AN ORDINANCE ESTABLISHING EROSION AND STORM WATER CONTROL For health, safety and welfare reasons, particularly due to problems experienced
More informationGeneral Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]
General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit
More informationMine Plan of Operations Reclamation Bond Checklist
Mine Plan of Operations Reclamation Bond Checklist NOTE: This checklist is provided to assist the operator in calculating the engineering and environmental costs required to properly stabilize, reclaim,
More informationThe Teton Creek Restoration Project Summary:
The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project area extends for approximately one mile upstream from the Cemetery Road Bridge and includes the Aspen Pointe, The Aspens
More informationA. In this chapter, the following terms have the meanings indicated.
08.07.02.01 Title 08 DEPARTMENT OF NATURAL RESOURCES Subtitle 07 FORESTS AND PARKS Chapter 02 Roadside Tree Care Authority: Natural Resources Article, 5-209 and 5-406, Annotated Code of Maryland.01 Purpose.
More informationIAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION
IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION 199 9.1(479,479B) General information. 9.1(1) Authority. The standards contained herein
More informationSTATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S
STATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S. DEPARTMENT OF THE INTERIOR BEFORE THE HOUSE APPROPRIATIONS SUBCOMMITTEE ON INTERIOR, ENVIRONMENT AND RELATED AGENCIES
More informationTABLE OF CONTENTS. Page 2 of 37 Ohio EPA Permit No.: OHC000004
Page 2 of 37 TABLE OF CONTENTS PART I. COVERAGE UNDER THIS PERMIT A. Permit Area B. Eligibility C. Requiring an individual permit or an alternative general permit D. Permit requirements when portions of
More informationIntegrated Pest Management, Erosion and Sedimentation Control, and Landscape Management Plan
Integrated Pest Management, Erosion and Sedimentation Control, and Landscape Management Plan Introduction Conventional site and landscape management can have adverse impacts on the surrounding environment
More informationFloodplain Connectivity in Restoration Design
Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,
More informationEFB 496.10/696.03 Online Wetland Restoration Techniques Class Syllabus
EFB 496.10/696.03 Wetland Restoration Techniques Online Class Syllabus SUNY-ESF College of Environmental Science and Forestry Summer Session II 2015 Wetland Restoration Techniques is a graduate and undergraduate
More informationWETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE
WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE May 24, 2005 Table of Contents Introduction...3 Definitions...3 Types of Wetland Restorations...4 Re-Contouring...4 Engineered...4 Water
More informationPrepared By: Tom Parker Geum Environmental Consulting, Inc.
Prepared By: Tom Parker Geum Environmental Consulting, Inc. Topics covered: Definition of riparian and floodplain restoration Floodplain attributes as a basis for developing criteria for restoration designs
More informationHow To Amend A Stormwater Ordinance
Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental
More informationLower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY
EXECUTIVE SUMMARY Project Background Located in southwestern Pennsylvania, Crooked Creek is a major tributary of the Allegheny River, entering near Ford City in Armstrong County. It is rich in natural
More informationStorm Drain Inlet Protection - IP
Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior
More informationMuddy River Restoration Project Project Description
Muddy River Restoration Project Project Description Since the fall of 1996, the Muddy River has flooded three times, causing damage to residents, businesses institutions and the public transit system in
More informationREFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:
EG-30NY ENVIRONMENTAL GUIDANCE PAGE 1 of 9 DATE 10/1/10 EP 3 Natural Resource Protection 1.0 SCOPE AND RESPONSIBILITIES National Grid s New York service territory encompasses thousands of wetlands, lakes,
More informationOSU Extension FACT SHEET
OHIO STATE UNIVERSITY EXTENSION! OSU Extension FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Shale Oil and Gas Development Fact Sheet Series A Landowner s Guide to Understanding
More informationREPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE
Making a difference... together Agenda Item #9 REPORT #RWSC 2013-17 REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 SUBJECT LEECH WATER SUPPLY AREA RESTORATION UPDATE
More informationCITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
More informationPrattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
More informationRestoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed Summary Report 2002 DOE/BP-00005268-5 November 2002 This Document should be cited as follows: "Restoring Anadromous Fish Habitat in Big Canyon
More informationScheduling Maintenance for Infiltration Basins and Trenches
Visual Inspection for Infiltration Practices Visual inspection is a rapid assessment procedure for qualitatively evaluating the functionality of a stormwater best management practice (BMP). Visual inspections
More informationRhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.
American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4
More informationMiquon Creek STREAM RESTORATION PROJECT WHO WE ARE
Miquon Creek STREAM RESTORATION PROJECT WHO WE ARE Introductions Brett Long, PE Project Permitting & Construction Oversight Chris Streb, PE Project Designer & Construction Oversight Assistance WHO WE ARE
More informationA Developer s Guide: Watershed-Wise Development
A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another
More informationAppendix C. Re-vegetation and Rehabilitation Sub-Plan
Appendix C Re-vegetation and Rehabilitation Sub-Plan DRENNAN SOLAR ENERGY FACILITY REVEGETATION & REHABILITATION PLAN PRODUCED FOR ERM ON BEHALF OF SOLAIREDIRECT BY Simon.Todd@3foxes.co.za JUNE 2013 BACKGROUND
More informationMULTI-AGENCY COMPENSATORY MITIGATION PLAN CHECKLIST 1
MULTI-AGENCY COMPENSATORY MITIGATION PLAN CHECKLIST 1 Mitigation Goals and Objectives o Describe functions lost at impact site o Describe functions to be gained at mitigation site o Describe overall watershed
More information3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
More informationChallenging Sustainable Goals for Landscape Architects
Challenging Sustainable Goals for Landscape Architects By Barrett L. Kays 11, FASLA Sustainable goals need to challenge landscape architects, our clients, and the public to incrementally solve major environmental
More informationPreparing for Success: Waterfowl Habitat Management Annual Planning by Houston Havens
Preparing for Success: Waterfowl Habitat Management Annual Planning by Houston Havens While working with private landowners and wetland managers over the past several years, I ve noticed a common theme
More informationCity of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting
More informationHabitat Management Techniques Flatwoods Salamander. USFWS Recommendations
Habitat Management Techniques Flatwoods Salamander USFWS Recommendations Habitat Management Techniques to Benefit the Flatwoods Salamander. These techniques are the most current recommendations that the
More informationMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report
Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. A. Introduction A Stormwater Report must be submitted with the Notice of Intent
More informationLEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN
1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially
More informationHow To Preserve Trees
San Diego County Water Authority Vic Bianes, PE - Engineering Manager Tad Brierton, SR/WA - Right of Way Supervisor APWA National Congress 2013 Chicago, IL 2 1 Background - San Diego County Water Authority
More informationNORTH COUNTY TRANSFER CENTER METRO Contract Numbers 01756/01862 100% - DESIGN DEVELOPMENT SECTION 32 90 13 NEW PLANTING MAINTENANCE
SECTION 32 90 13 NEW PLANTING PART 1 - GENERAL 1.01 INTENT A. The intent of the landscape maintenance program is to maintain the landscape areas (lawn and shrub plantings) in a vigorous, healthy and attractive
More informationFlood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey
Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Rutgers Cooperative Extension Water Resources Program Christopher C. Obropta, Ph.D., P.E. Email: obropta@envsci.rutgers.edu
More informationRainScapes. Runoff/Erosion: RainScapes for Schools Environmental Report Card. Excess runoff will affect these indicators of Bay health:
RainScapes Environmentally Friendly Landscapes for Healthy Watersheds RainScapes for Schools Environmental Report Card How is your schoolyard doing? Is it helping the Chesapeake Bay, or is it contributing
More informationMinimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
More informationFebruary 4, 2011. hoffman.stephen@epa.gov. Report Recommendations and NIPSCO Responses. 4.3 Maintaining and Controlling Vegetation Growth
February 4, 2011 VIA E-MAIL AND CERTIFIED MAIL #7010 0290 0002 0577 6226 Mr. Stephen Hoffman US Environmental Protection Agency (5304P) 1200 Pennsylvania Avenue, NW Washington, DC 20460 hoffman.stephen@epa.gov
More informationSAMPLE COPY. Stormwater Pollution Prevention Plan. A site map must be developed and must contain, at a minimum, the following information:
Stormwater Pollution Prevention Plan "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure
More informationCOLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
More informationKing Fire Restoration Project, Eldorado National Forest, Placer and El Dorado Counties, Notice of intent to prepare an environmental impact statement.
This document is scheduled to be published in the Federal Register on 12/24/2014 and available online at http://federalregister.gov/a/2014-30158, and on FDsys.gov [3410-11- P] DEPARTMENT OF AGRICULTURE
More informationLisgar District Basement Water Infiltration Investigation Answers to Residents Written Questions Received by Councillors Ward 10 Office
Lisgar District Basement Water Infiltration Investigation Part A Answers to Technical Questions 1. There has been a tremendous amount of work done everywhere along the creek. If there was nothing wrong
More informationWaterway Technote Drains
Waterway Technote Drains Contents Benefits of good drain practice 1 Are your drains healthy? 2 The Sustainable Dairying Water Accord 3 Planning drain maintenance 3 Fencing and clearing 3 Bank shaping (battering)
More informationLOW INTEREST LOANS FOR AGRICULTURAL CONSERVATION
LOW INTEREST LOANS FOR AGRICULTURAL CONSERVATION LILAC MANUAL LOW INTEREST LOANS FOR AGRICULTURAL CONSERVATION TABLE OF CONTENTS Introduction... 3 General Eligibility... 4 Specific Eligibility Criteria
More informationSECTION 5. Sediment Control Measures
SECTION 5 Sediment Control Measures 60. STORM DRAIN INLET PROTECTION When Runoff from earth change activities will discharge to a catch basin or storm drain inlet. A newly constructed catch basin or storm
More informationHow To Assess An Area For Erosion
SKY BASIN (UPPER CA 1 WATERSHED) EROSION ASSESSMENT Prepared by Kevin Drake, CPESC Integrated Environmental Restoration Services, Inc. August 2014 COMMON GROUND UNCOMMON SOLUTIONS P.O. BOX 7559 2780 LAKE
More informationSample Punch List. Garth Ruffner Landscape Architect (916) 797-2576. Page 1 of 5
Sample Punch List This document is provided primarily for landscape contractors who have not previously worked with Garth and would like to know what issues are frequently addressed by site observation
More informationSANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA
SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA A. LAND USE ELEMENT INTERPRETIVE GUIDELINES B. COMMUNITY BENEFITS C. COUNTY ACTION ITEMS Adopted by the Board of Supervisors November 9, 1999 A. Santa
More informationSCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY
SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the
More informationBeseck Switching Station Inspection
Page 1 of 5 Docket No. 272 Development and Management Plan Inspection The Connecticut Light and Power Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV
More informationMountainous forest watershed management Governance in Greece
Mountainous forest watershed management Governance in Greece Katerina Koutla Forester Ministry of Environment, Energy and Climate Change Alcala de Henares, 28 29 January 2014 Central Forest Service Ministry
More informationSTATE LEVEL AGREEMENT BETWEEN THE NATURAL RESOURCES CONSERVATION SERVICE (NRCS) AND THE NEW JERSEY OFFICE OF HISTORIC PRESERVATION
STATE LEVEL AGREEMENT BETWEEN THE NATRAL RESORCES CONSERVATION SERVICE (NRCS) AND THE NEW JERSEY OFFICE OF HISTORIC PRESERVATION PRPOSE The NRCS, and New Jersey State Historic Preservation Officer (SHPO)
More informationDEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Watershed Management
DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Watershed Management DOCUMENT NUMBER: 394-5600-001 TITLE: Riparian Forest Buffer Guidance EFFECTIVE DATE: November 27, 2010 AUTHORITY: POLICY: PURPOSE:
More informationStorm Drain Inlet Protection
Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description Applications Installation and Implementation Requirements Devices installed at storm drain inlets to detain and/or
More informationStormwater Wetland Design and Construction Mitigation Duke Bitsko. Construction Activities, Schedule and Sequence Tom Ritchie
September 7, 2011 Welcome Catherine Daly Woodbury DCR Coordination Dan Driscoll Project Background Catherine Daly Woodbury Stormwater Wetland Design and Construction Mitigation Duke Bitsko Construction
More informationPART I DEPARTMENT OF HUMAN RESOURCES DEVELOPMENT 9.097 STATE OF HAWAII 9.099... 9.101 9.103 Class Specifications 9.105 for the
PART I DEPARTMENT OF HUMAN RESOURCES DEVELOPMENT 9.097 STATE OF HAWAII 9.099............................. 9.101 9.103 Class Specifications 9.105 for the FORESTRY AND WILDLIFE WORKER SERIES This series
More information18 voting members 44 stakeholders 114 email list. Senators: Wyden & Merkley Representative DeFazio
18 voting members 44 stakeholders 114 email list Senators: Wyden & Merkley Representative DeFazio State Representative Krieger State Senators: Roblan, Johnson, and Kruse Governor Brown s office County
More informationSECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1
SECTION ELEVEN: ACTIVITIES REQUIRING A CERTIFIED EROSION AND SEDIMENT CONTROL PLAN 1 An application for approval of a soil erosion and sediment control plan in accordance with these regulations shall be
More informationMosquito Control Guidelines
Appendix G Mosquito Control Guidelines This appendix presents the guidance for designing and maintaining stormwater treatment measures to control mosquitoes from ACCWP s Vector Control Plan. Project sponsors
More informationRIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.
RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover
More informationWoodlands Management Plan. (Draft June 2011) A. Definition of Woodlands Areas vs. Landscaped Areas of Parkfairfax
Woodlands Management Plan (Draft June 2011) I. Background A. Definition of Woodlands Areas vs. Landscaped Areas of Parkfairfax The woodlands are defined as those wooded areas of Parkfairfax which are left
More informationExperienced Planning and Design
www.pizzo.info Consistently Better Natural Restoration Everyone should have a passion in life, and for me it s been to protect and restore our lands to their original native beauty. That s why in 1988
More informationFairlington Community Center
Williamsburg Boulevard Green Street Project June 13, 2012 Williamsburg Middle School Relevant Outreach November 12, 2008: Introduction to Little Pimmit Run Watershed Retrofits Workshop, Yorktown High School
More informationAPPENDIX I DEVELOPMENT PROCESS CHECKLIST
APPENDIX I DEVELOPMENT PROCESS CHECKLIST Bureau of Indian Affairs, Western Regional Office 400 N. 5 th St., Two AZ Center/Phoenix, AZ 85004/Telephone/website PRE-DEVELOPMENT PROCESS CHECKLIST This checklist
More information