CALL FOR EXPRESSION OF INTEREST

Size: px
Start display at page:

Download "CALL FOR EXPRESSION OF INTEREST"

Transcription

1 CALL FOR EXPRESSION OF INTEREST FOR FIRST PHASE OF NOOR MIDELT COMPLEX DEVELOPMENT PROJECT(S), IN THE FRAMEWORK OF THE MOROCCAN SOLAR PLAN, NOOR December 31, 2015

2 CONTENTS 1. INTRODUCTION BACKGROUND ON NOOR MIDELT PHASE I Hybrid CSP - PV technology: an optimal solution for NOOR Midelt Phase I Erreur! Signet non défini Overview of the NOOR M Projects... Erreur! Signet non défini. a- Localization and information on the site... 4 b- Scope and preliminary structure of the projects... 5 c- Process and indicative timeline CALL FOR EXPRESSION OF INTEREST ANNEX - QUESTIONNAIRE... 9 Confidential NOOR MIDELT PHASE I 2

3 1. INTRODUCTION Promoting a sustainable development to preserve the environment while facing an increasing power demand, Morocco adopted an ambitious and voluntarist energy strategy aiming to reach 42% of renewable energy in its energy mix by 2020 and to further increase to 52% by An attractive legal and institutional framework was set-up to achieve these objectives and integrated national plans have been rolled-out for both solar and wind power. It has recently been further adjusted to enable the implementation of a global and integrated approach in terms of renewable energy, relying on an enhanced cooperation between the national utility company ONEE (Office National de l Electricité et de l Eau Potable) and Masen, and an extended scope for Masen to cover all renewable energy, in particular solar, wind and hydro power. As a reminder, the Moroccan solar plan NOOR (the NOOR plan ) with its target of a minimum of MW by 2020 is expected to generate investments worth more than $ 9 bn and to allow for annual savings of green-house gas (GHG) emissions equivalent to 3.7 million tons of carbon dioxide. Masen,a dedicated public entity, was created by law in 2010 to implement the NOOR plan and value the solar resources in every aspect initially, catalysing the development of a local solar ecosystem. Beyond power production through integrated and well-structured projects, Masen aims at i) endowing the country with competitive industrial capabilities to generate added-value, ii) developing R&D mainly to serve industrial companies, iii) promoting specialized training and iv) contributing to local development of the implementation areas of the projects. To reach these goals, Masen is acting as to increase the visibility on the framework and the overall environment of the development of these projects to the various stakeholders. This approach is operationalized through clear, effective and timely international competitive bidding processes with an underlying optimized risk allocation, including provision of available data on the sites and provision of needed infrastructures. It may extend to the supply of the financing of the project(s) (as for the four projects already being developed within the NOOR Ouarzazate complex). Relying on complementary solar technologies to implement the NOOR Plan, Masen is combining CSP and PV technologies to provide, on a case by case basis, the best answer to identified needs while optimizing the overall cost of the kilowatthour and maximizing synergies. This approach includes using CSP technology with storage to offer a significant flexibility through very largescale dispatchable plants to better meet peak hours demand (after sunset) and PV technology to offer tailored solutions for specific needs through mid and large-sized plants. NOOR Ouarzazate, the first solar complex developed by Masen with a capacity of ~580 MW, comprises a mix of CSP and PV projects. The CSP phases were launched first, namely due to the Confidential NOOR MIDELT PHASE I 3

4 construction duration and consist of 3 CSP projects under an independent power production (IPP) scheme covering the design, financing, construction, operation and maintenance of the plants. The first project, NOOR O I, is a CSP trough of 160 MW with 3 hours of storage, to be commissioned shortly. The two other projects, NOOR O II (CSP trough of 200 MW with 8 hours of storage) and NOOR O III (CSP tower of 150 MW with 8 hours of storage) are financially closed (commissioning is expected by 2017). First phase of PV projects was launched in 2015 and consists of the design, financing, construction, operation and maintenance of plants under an IPP scheme with an aggregate capacity of ~170 MW. This program, for which prequalification results have been released in December 2015 together with the issuance of the request for proposal documents, includes three projects: NOOR Ouarzazate IV, NOOR Laayoune and NOOR Boujdour. In parallel to the development of this PV phase, an additional solar complex near the city of Midelt in Morocco would be implemented in multiple phases. This call for expression of interest (the Call for EoI ) relates to its first phase (the NOOR Midelt Phase I ) covering one or more projects expected to be developed under an IPP scheme with hybrid CSP-PV technology and an installed capacity of around 400 MW per plant, as detailed hereafter. This Call for EoI is intended to provide interested parties with a brief background on NOOR Midelt Phase I and give them the opportunity to share their experiences and views in accordance with the attached questionnaire. 2. OVERVIEW OF NOOR MIDELT PHASE I 2.1. Hybrid CSP-PV technology foreseen One or more solar power plants with an installed capacity around 400 MW each and hybrid technology, CSP with storage and PV, are contemplated for the NOOR Midelt Phase I projects (the NOOR M Projects ) to optimize the operating mode of the plants. A full time connected capacity (adding CSP and PV simultaneously connected) of around 400 MW is expected in aggregate for NOOR M Projects, regardless of the installed capacity per project. Such configuration is foreseen in order to increase the electricity availability after sunset while providing a low-cost solution for daytime generation. In addition to the above, Masen intends, through the deployment of the NOOR Midelt complex, to further develop a competitive and sustainable solar socio-economic sector in Morocco by increasing local solar expertise and industrial capabilities and to catalyze the improvement of the living conditions within the ex-centered implementation area. This key objective is supported by a framework set-up by Morocco providing all needed visibility for ambitious action by the private sector in the best conditions. Confidential NOOR MIDELT PHASE I 4

5 In this context, the establishment of manufacturing units for some key components are currently under analysis (PV modules, CSP mirrors ) in order to supply the NOOR M Projects. All stakeholders are invited to fully explore the opportunities to successfully achieve the highest level of local integration and to propose relevant measures in this respect Localization and information on the site Various studies of the site were performed and will be made available to the pre-qualified bidders for a better knowledge of site characteristics. These studies cover, inter alia, solar measurements, topography, seismicity, geotechnical, water resources and environmental aspects and are briefly described in the above picture. Furthermore, a framework environmental and social impact assessment (FESIA) of the overall Midelt complex has been performed and will be made publicly available through Masen s website shortly Scope and preliminary structure of the projects NOOR M Projects will be developed through an IPP scheme covering the following scope: design, financing, construction, operation and maintenance of one or more solar power plants. The minimum functional specifications and other details will be provided at the request for proposal stage. Each plant is expected to be built, owned, operated and transferred by the selected bidder pursuant to a long-term PPA to be entered into between Masen and the project company (SPC) to be incorporated by the selected bidder. Masen will buy this electricity at the price offered by Confidential NOOR MIDELT PHASE I 5

6 the selected bidder and on-sell it to ONEE through a second PPA to be entered into between Masen and ONEE. Required land for the project will be made available to the SPC entitling the latter to a real right over this land. In addition to its roles as offtaker and land provider mentioned above, Masen will be providing the common infrastructures of the complex (roads, water, electricity, telecom, etc.) and associated services for optimal and coordinated site management. Management of such common infrastructures will be carried-out by Masen Services, a fullyowned subsidiary of Masen, in charge of the site s management and the operation and maintenance (O&M) of the associated infrastructures, ensuring the coordination with and between the developers. Masen may also hold a minority stake in the SPC and, as the case may be, in the dedicated O&M vehicle (through its fully owned subsidiary Masen Capital). Should Masen act as a minority shareholder of the SPC and/or the O&M vehicle, it would expect to benefit, inter alia, from a put option (to ensure that the construction risk is kept at the level of the selected bidder), veto rights on key decisions (to protect its minority shareholder position), a first-ranking pre-emption right and a call option (covering change of control and default cases, amongst others) or a tag-along right. As financing is part of the abovementioned IPP scope, the bidders shall be ready to mobilize commercial debt. However, one of the options explored by Masen at this stage is to act as sole lender on all or part of the NOOR M Projects, on-lending concessional financing from International Financing Institutions. Should Masen act as sole lender, it would expect the selected bidder to provide, inter alia, in addition to standard security package and a solid financial model, liquid guarantees until completion (final commercial operation date) from an entity with appropriate credit rating to cover among others (i) base equity investment, (ii) cost overruns undertaking, (iii) a minimum level of debt service coverage ratio restored at completion, and (iv) a strong completion support in particular under an EPC lump sum turnkey contract for each project and relevant support from sponsors (including top-up LCs from sponsors/banks with appropriate rating) Process and indicative timeline The selection process of the developer(s) of the NOOR M Projects is contemplated to be pursued through an international bidding competition with a request for pre-qualification (RfQ) phase, once the Call for EoI is completed, followed by a two stages request for proposal (RfP) phase. The expected indicative timeline is the following: Confidential NOOR MIDELT PHASE I 6

7 Launch of the CEoI Issuance of the RfQ document Issuance of the RfP1 document Issuance of the RfP2 document Award Financial close Q Q1/Q Q Q Q3/Q Q / Q CALL FOR EXPRESSION OF INTEREST Masen is inviting companies, with strong financial capabilities and significant CSP and PV experiences, interested in participating to all or part of the aforementioned NOOR Midelt Projects to express their interest by submitting the attached questionnaire duly filled-in together with supporting documents referred to therein (as well as any information deemed appropriate) on Masen s electronic platform ( and in accordance with Masen s e-tendering rules 1 by February 1, 2016 at 10:00 AM Moroccan Time at the latest. The questionnaire and attached documents submitted by the companies will be treated on a confidential basis. A non-disclosure agreement can be signed should the interested party deem it necessary for more comfort in this respect. 1 This e-tendering process offers guarantees as to traceability, confidentiality and security for the access, processing and storage of documents and information provided for by the applicants. Prior to submission, the applicants shall connect to the dedicated page of Masen s website ( to register and create a user account. Once this account is created, its access is restricted exclusively to the sole persons habilitated by the applicant. The electronic platform will make available to the applicant the following functions: - access and download of the Call for EoI and related documents; - submission by the applicant of requested documents; - secured deposit of the documents and electronic files; - possibility to send s, through a secured electronic mail, with acknowledgment of receipt; - possibility to receive a dated acknowledgment of receipt of the documents transmitted. The applicants may modify the documents uploaded until the deadline for submission. However, once the deadline for submission is expired, the documents cannot be modified anymore. A guide of utilization is available (in French) on Masen s e-tendering platform and a hotline is available on 24 hours 7 days a week at the following number: for any further assistance. Confidential NOOR MIDELT PHASE I 7

8 DISCLAIMER This document is intended to provide interested parties with a brief background on the first phase of the NOOR Midelt complex to be launched by Masen in the frame of the NOOR Plan. The information provided herein is presented for information purposes only and does not constitute an offer. No representation or warranty, expressed or implied is made, or responsibility of any kind is or will be accepted by Masen with respect to the accuracy and completeness of this document. The information contained in this document may be amended or replaced by Masen at any time, without giving any prior notice, or providing any reason. Any liability in connection with the use by any recipient of the information contained in this document is hereby disclaimed. For the sake of clarity, Masen does not undertake and will not be obliged to take into consideration any information collected for the purposes of the pre-qualification/tender process to be launched in connection with its projects. This document is strictly confidential and may not be communicated or reproduced, in whole or in part, to any third party without the prior written consent of Masen. Confidential NOOR MIDELT PHASE I 8

9 4. ANNEX - QUESTIONNAIRE Please refer to the attached document and related excel file. Confidential NOOR MIDELT PHASE I 9

NOORo: the largest concentrated solar power complex in Africa increases the share of renewable energy in electricity generation in Morocco

NOORo: the largest concentrated solar power complex in Africa increases the share of renewable energy in electricity generation in Morocco NOORo: the largest concentrated solar power complex in Africa increases the share of renewable energy in electricity generation in Morocco 1 Summary Page 3 NOORO, A LARGE-CAPACITY CONCENTRATED THERMAL-SOLAR

More information

Moroccan plan for solar energy

Moroccan plan for solar energy Moroccan plan for solar energy FINANCIAL INSTITUTIONS ENERGY INFRASTRUCTURE AND COMMODITIES TRANSPORT TECHNOLOGY Briefing October 2010 MASEN 500MW Phase One Solar Power Complex at Ouarzazate The Kingdom

More information

The Reorganization of General Growth Properties

The Reorganization of General Growth Properties General Growth Properties, Inc. The Reorganization of General Growth Properties July 2010 Situation Overview Challenging economic conditions, unprecedented capital markets fundamentals, high leverage and

More information

-Translation- 2. Related Parties Vintage Engineering Public Company Limited ( Company or VTE ) Green Earth Power (Thailand) Company Limited ( GEP )

-Translation- 2. Related Parties Vintage Engineering Public Company Limited ( Company or VTE ) Green Earth Power (Thailand) Company Limited ( GEP ) Information Memorandum of Vintage Engineering Public Limited Company Regarding Related Transaction on the Rendering of Construction Service for The 220MW Solar Power Plant Project located in Minbu, Myanmar

More information

Minnesota Power PRE QUALIFICATION QUESTIONNAIRE. Engineering, Procurement and Construction of a 10 MW Solar PV Power Plant

Minnesota Power PRE QUALIFICATION QUESTIONNAIRE. Engineering, Procurement and Construction of a 10 MW Solar PV Power Plant Minnesota Power PRE QUALIFICATION QUESTIONNAIRE Engineering, Procurement and Construction of a 10 MW Solar PV Power Plant December 1, 2014 CONTRACTOR s NAME: Project Description: Minnesota Power is developing,

More information

Financial Mechanisms and Policies Oriented towards the development of Renewable Energy Markets. Mexico City, 28 November 2007

Financial Mechanisms and Policies Oriented towards the development of Renewable Energy Markets. Mexico City, 28 November 2007 Financial Mechanisms and Policies Oriented towards the development of Renewable Energy Markets Mexico City, 28 November 2007 Index I. Santander I Financing Drivers I Market Drivers IV. Example: Refit V.

More information

EXPRESSION OF INTEREST. for. Reconciliation System

EXPRESSION OF INTEREST. for. Reconciliation System EXPRESSION OF INTEREST for Reconciliation System May 2015 (K-REP Bank reserves the right to cancel this request for EOI and / or invite afresh with or without amendments to this request for EOI, without

More information

Request for Expressions of Interest 3805EOI Consulting Services - Microsoft Productivity Specialist

Request for Expressions of Interest 3805EOI Consulting Services - Microsoft Productivity Specialist Request for Expressions of Interest 3805EOI Consulting Services - Microsoft Productivity Specialist 1. Introduction 1.1. The City of Richmond invites Expressions of Interest ( EOI ) from interested parties

More information

REQUEST FOR EXPRESSIONS OF INTEREST 4887 EOI NETWORK BACKUP/EMAIL ARCHIVING

REQUEST FOR EXPRESSIONS OF INTEREST 4887 EOI NETWORK BACKUP/EMAIL ARCHIVING 4887 EOI REQUEST FOR EXPRESSIONS OF INTEREST 4887 EOI NETWORK BACKUP/EMAIL ARCHIVING Expressions of Interest will be received at the Information Counter, Main Floor, Richmond City Hall, addressed to the

More information

Financing of Wind Projects: IFC s Perspective. Walid Labadi 2nd IEL-ANADE May, 2012

Financing of Wind Projects: IFC s Perspective. Walid Labadi 2nd IEL-ANADE May, 2012 Financing of Wind Projects: IFC s Perspective Walid Labadi 2nd IEL-ANADE May, 2012 IFC was established in 1956 to promote private sector development and is a member of the World Bank Group IFC Power Sector

More information

CMM PRE-FINANCE INFORMATION. Krasnogorskaya Mine Methane Utilisation Synopsis. Entire report available from Uglemetan (tailakov@uglemetan.

CMM PRE-FINANCE INFORMATION. Krasnogorskaya Mine Methane Utilisation Synopsis. Entire report available from Uglemetan (tailakov@uglemetan. CMM PRE-FINANCE INFORMATION Krasnogorskaya Mine Methane Utilisation Synopsis Entire report available from Uglemetan (tailakov@uglemetan.ru) 1 JUNE 2008 2 IMPORTANT NOTICE This Pre-Finance Information (

More information

Guidelines for Setting Up of Private Power Projects Under Short Term Capacity Addition Initiative AUGUST 2010 Private Power and Infrastructure Board Ministry of Water & Power Government of Pakistan PART

More information

Moroccan Solar Plan 1

Moroccan Solar Plan 1 Moroccan Solar Plan 1 The Moroccan Solar Plan 5 sites defined MIN Capacity 2 000 MW Deadline 2020 5 sites defined Sites Capacity in MW Ouarzazate 500 Ain Beni Mathar 400 Sebkha Tah 500 Foum El Oued 500

More information

MCC TERMS AND CONITIONS

MCC TERMS AND CONITIONS MCC TERMS AND CONITIONS Welcome to MNCred.org, which is owned by Minnesota Credentialing Collaborative, LLC ( we, us or MCC ) a joint effort of the Minnesota Council of Health Plans (MCHP), Minnesota Hospital

More information

Energy Finance in the Middle East: Uncertainties and Opportunities Maamari Auditorium, OSB AUB, 22 January 2016

Energy Finance in the Middle East: Uncertainties and Opportunities Maamari Auditorium, OSB AUB, 22 January 2016 American University of Beirut (AUB) The Munib and Angela Masri Institute of Energy and Natural Resources Energy Finance in the Middle East: Uncertainties and Opportunities Maamari Auditorium, OSB AUB,

More information

ARCH CAPITAL ADVISORS

ARCH CAPITAL ADVISORS ARCH CAPITAL ADVISORS TERM SHEET Mezzanine Debt This term sheet does not constitute an offer and is solely for discussion purposes. This term sheet shall not be construed as creating any obligations on

More information

CTF/TFC.7/5 June 8, 2011. Meeting of the CTF Trust Fund Committee Cape Town, South Africa June 22, 2011. Agenda Item 7

CTF/TFC.7/5 June 8, 2011. Meeting of the CTF Trust Fund Committee Cape Town, South Africa June 22, 2011. Agenda Item 7 CTF/TFC.7/5 June 8, 2011 Meeting of the CTF Trust Fund Committee Cape Town, South Africa June 22, 2011 Agenda Item 7 MOROCCO: OUARZAZATE I CONCENTRATED SOLAR POWER PROJECT Proposed Decision by CTF Trust

More information

SOFTWARE LICENSE AGREEMENT

SOFTWARE LICENSE AGREEMENT SOFTWARE LICENSE AGREEMENT This Software License Agreement (the "Agreement") is a legal agreement between you (either an individual or a legal entity) (the "Licensee") and IMC B.V. located at Zwolleweg

More information

FINANCING PERSPECTIVE

FINANCING PERSPECTIVE C1 FINANCING PERSPECTIVE European Forum for Science and Industry Olivier Musset Energy Finance Société Générale DISCLAIMER This Presentation has been prepared by Société Générale Corporate and Investment

More information

H1 2014 LEVELISED COST OF ELECTRICITY - PV

H1 2014 LEVELISED COST OF ELECTRICITY - PV H1 2014 LEVELISED COST OF ELECTRICITY - PV JENNY CHASE 4 FEBRUARY 2014 LCOE OF PV, FEBRUARY 2014 1 PV EXPERIENCE CURVE, 1976-2013 (2013 $/W) 100 Cost per W (2013 $) 1976 10 1985 2003 2006 1 2012 2013 Q3

More information

REQUEST FOR EXPRESSIONS OF INTEREST 4643 EOI

REQUEST FOR EXPRESSIONS OF INTEREST 4643 EOI 4643 EOI REQUEST FOR EXPRESSIONS OF INTEREST 4643 EOI 4643 EOI - FUNCTIONAL CONSULTANT TO LEAD THE IMPLEMENTATION OF THE PURCHASE REQUISITION MODULE IN THE PEOPLESOFT 9.0 FINANCIALS AND SUPPLY CHAIN PRODUCT.

More information

Consultation on changes to Feed-in Tariff accreditation

Consultation on changes to Feed-in Tariff accreditation Consultation on changes to Feed-in Tariff accreditation Removing preliminary accreditation from the Feedin Tariff 21 July 2015 Department of Energy and Climate Change 3 Whitehall Place London SW1A 2AW

More information

Amendment and Consent No. 2 (Morris County Renewable Energy Program, Series 2011)

Amendment and Consent No. 2 (Morris County Renewable Energy Program, Series 2011) Execution Version Amendment and Consent No. 2 (Morris County Renewable Energy Program, Series 2011) by and among MORRIS COUNTY IMPROVEMENT AUTHORITY, COUNTY OF MORRIS, NEW JERSEY, U.S. BANK NATIONAL ASSOCIATION

More information

Prospects and Incentives for Use of Alternative Energy Technologies in the Arab Electric Power Generation Sector

Prospects and Incentives for Use of Alternative Energy Technologies in the Arab Electric Power Generation Sector Prospects and Incentives for Use of Alternative Energy Technologies in the Arab Electric Power Generation Sector Samir AlKotob Arab Fund for Economic and Social Development Objectives To overview the Arab

More information

Poiana 1 PHOTOVOLTAIC ENERGY PROJECT

Poiana 1 PHOTOVOLTAIC ENERGY PROJECT Poiana 1 PHOTOVOLTAIC ENERGY PROJECT Investment Opportunity Corporate Status Location Projects Specifications The developers (or the Shareholders ) of the photovoltaic energy project (the Project ) have

More information

Climb Investco, LLC, a Delaware limited liability company. Climb Credit, Inc., a Delaware Corporation

Climb Investco, LLC, a Delaware limited liability company. Climb Credit, Inc., a Delaware Corporation Amended and Restated Final Agreement of the Parties PARTIES Lender Manager Master Servicer School ELIGIBILITY Eligible Assets Eligible Schools TRANSACTION Transaction Term Survival Program Size Funding

More information

Request for Proposal

Request for Proposal Request for Proposal Design, Build, Lease Rooftop Solar PV System RFP# 14-2015 Calabogie Community Rink, 574 Mill Street, Calabogie, Ontario Proposal Closing Date: September 25, 2015; 2:00 PM Local Time

More information

Summary of Request for Applications to participate in a tender process for twenty year licenses together with the acquisition of the businesses of

Summary of Request for Applications to participate in a tender process for twenty year licenses together with the acquisition of the businesses of Summary of Request for Applications to participate in a tender process for twenty year licenses together with the acquisition of the businesses of two existing mobile network operators Issued by the Telecommunications

More information

Transport for London. INVITATION TO TENDER FOR BRIDGE DESIGN CONSULTANCY SERVICES ITT REF: TfL/90711 PUBLICATION DATE: 13 FEBRUARY 2013

Transport for London. INVITATION TO TENDER FOR BRIDGE DESIGN CONSULTANCY SERVICES ITT REF: TfL/90711 PUBLICATION DATE: 13 FEBRUARY 2013 Transport for London INVITATION TO TENDER FOR BRIDGE DESIGN CONSULTANCY SERVICES ITT REF: TfL/90711 PUBLICATION DATE: 13 FEBRUARY 2013 Invitation to Tender TfL/90711 Bridge Design Consultancy Services

More information

MEETING IN TERMS OF SECTION 151 OF THE COMPANIES ACT: EVRAZ HIGHVELD STEEL AND VANADIUM LIMITED

MEETING IN TERMS OF SECTION 151 OF THE COMPANIES ACT: EVRAZ HIGHVELD STEEL AND VANADIUM LIMITED MEETING IN TERMS OF SECTION 151 OF THE COMPANIES ACT: EVRAZ HIGHVELD STEEL AND VANADIUM LIMITED Date: 28 September 2015 AGENDA Background to Business Rescue Proceedings Timing of Business Rescue Proceedings

More information

Request for Information on Finance Program Administrator Scope of Services for Hawaii s On-Bill Financing Program

Request for Information on Finance Program Administrator Scope of Services for Hawaii s On-Bill Financing Program Request for Information on Finance Program Administrator Scope of Services for Hawaii s On-Bill Financing Program I. Introduction and Purpose The State of Hawaii Public Utilities Commission ( PUC or the

More information

REQUEST FOR INFORMATION NUMBER: 2014-02-14. Specialized Equipment and Commercial/Industrial Real Property. Appraisal Services

REQUEST FOR INFORMATION NUMBER: 2014-02-14. Specialized Equipment and Commercial/Industrial Real Property. Appraisal Services Farm Credit Canada Manager, Corporate Procurement 1800 Hamilton Street, P.O. Box 4320 Regina, SK S4P 4L3 mike.humble@fcc-fac.ca REQUEST FOR INFORMATION NUMBER: 2014-02-14 Specialized Equipment and Commercial/Industrial

More information

[SIGNATURE PAGE FOLLOWS]

[SIGNATURE PAGE FOLLOWS] [ ] TERM SHEET FOR SUBORDINATED VARIABLE PAYMENT DEBT (DEMAND DIVIDEND) THIS TERM SHEET outlines the principal terms of a proposed financing for [ ] (hereafter, the Company ), a [ ] corporation by [ ]

More information

QUOTE OPENING MEETING: Sealed Quotes will be opened at 9:00 a.m (eastern standard time) on Wednesday, May 1, 2013 at the County of Muskegon.

QUOTE OPENING MEETING: Sealed Quotes will be opened at 9:00 a.m (eastern standard time) on Wednesday, May 1, 2013 at the County of Muskegon. COUNTY OF MUSKEGON REQUEST FOR QUOTES (RFQ) FOR PROFESSIONAL REAL ESTATE SERVICES The County of Muskegon, through its County Administration Department, Office of Grant Services, is seeking contractors

More information

CONSULTING SERVICES AGREEMENT

CONSULTING SERVICES AGREEMENT CONSULTING SERVICES AGREEMENT This CONSULTING SERVICES AGREEMENT (this Agreement ) is dated as of the latest date set forth on the signature page hereto (the Effective Date ) and is entered into by and

More information

Detroit Land Bank Authority Request for Qualifications:

Detroit Land Bank Authority Request for Qualifications: Detroit Land Bank Authority Request for Qualifications: Organizations to serve as Homeownership Educators and Third Party Advisors during the Purchase and Rehab of Homes from the Detroit Land Bank Authority

More information

Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems

Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems This Agreement is made and entered into this day of, 20, ( Effective Date ) by and between the Orlando Utilities Commission

More information

How To Sell Golden Pages To A Private Company

How To Sell Golden Pages To A Private Company Babcock & Brown Capital General Meeting 27 April 2009 CONTENTS 1. Welcome 2. Management Internalisation Proposal 3. Strategic Update 4. TaemasBridge Proposal 5. EGM Formal Business 6. Close 1 INTRODUCTION

More information

Corporate Governance Regulations

Corporate Governance Regulations Corporate Governance Regulations Contents Part 1: Preliminary Provisions Article 1: Preamble... Article 2: Definitions... Part 2: Rights of Shareholders and the General Assembly Article 3: General Rights

More information

The Return on Disability Company

The Return on Disability Company The Return on Disability Company RoD Canada Index Methodology July 2012 Table of contents Introduction Introduction 3 Eligibility Criteria Additions RoD Canada 50 4 Deletions RoD Canada 50 5 Timing of

More information

Green Industries, Department of Trade and Industry

Green Industries, Department of Trade and Industry Solar and Wind Sector Development Strategy Solar Energy Technology Roadmap 18 June 2012 Green Industries, Department of Trade and Industry Challenges Solar and wind strategy Content Local Content Requirements

More information

Rocket Internet Co-Investment Fund

Rocket Internet Co-Investment Fund Presentation1 Agenda Page [ P R E S E N T A T I O N T I T L E ] April 2015 Rocket Internet Co-Investment Fund [ C L I E N T N A M E ] 19 th January 2016 1 Disclaimer This document is being presented solely

More information

REQUEST FOR PROPOSALS (RFP) FOR FINANCIAL AUDIT SERVICES

REQUEST FOR PROPOSALS (RFP) FOR FINANCIAL AUDIT SERVICES REQUEST FOR PROPOSALS (RFP) FOR FINANCIAL AUDIT SERVICES Issued by: City of Clewiston 115 W. Ventura Avenue Clewiston, Florida 33440 September 30, 2015 1 REQUEST FOR PROPOSALS FOR FINANCIAL AUDIT SERVICES

More information

Law No. 67 for the year 2010

Law No. 67 for the year 2010 Disclaimer This English translation of the Law No. 67 for the year 2010 has been reviewed by Zulficar & Partners Law Firm and Trowers & Hamlins in association with Nour Law Office. Neither The Ministry

More information

Request for Proposals to Design, Build, Finance, Operate and Maintain North Commuter Parkway and Traffic Bridge Project City of Saskatoon

Request for Proposals to Design, Build, Finance, Operate and Maintain North Commuter Parkway and Traffic Bridge Project City of Saskatoon Request for Proposals to Design, Build, Finance, Operate and Maintain North Commuter Parkway and Traffic Bridge Project City of Saskatoon () Request for Proposals TABLE OF CONTENTS SECTION 1 INTRODUCTION...

More information

City of Bellevue Request for Proposal RFP #15091 Locate Ticket Management Software

City of Bellevue Request for Proposal RFP #15091 Locate Ticket Management Software City of Bellevue Request for Proposal RFP #15091 Locate Ticket Management Software RFP GENERAL INFORMATION RFP Notification: Notice is hereby given that proposals will be received by the City of Bellevue,

More information

PROCUREMENT STANDARD OPERATING PROCEDURES (SOP)

PROCUREMENT STANDARD OPERATING PROCEDURES (SOP) PROCUREMENT STANDARD OPERATING PROCEDURES (SOP) TABLE OF CONTENTS 1. RESPONSIBILITY 1.1 Responsibility for Acquisition 1.2 Responsibility for Procurement Planning 2. REQUISITION 2.1 Requisitions for Supplies,

More information

ANNOUNCEMENT CONNECTED TRANSACTION

ANNOUNCEMENT CONNECTED TRANSACTION Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness

More information

F. van Lanschot Bankiers N.V. (incorporated in the Netherlands with its statutory seat in 's-hertogenbosch)

F. van Lanschot Bankiers N.V. (incorporated in the Netherlands with its statutory seat in 's-hertogenbosch) 20 December 2012 FIFTH SUPPLEMENT TO THE BASE PROSPECTUS IN RESPECT OF THE EURO 5,000,000,000 DEBT ISSUANCE PROGRAMME F. van Lanschot Bankiers N.V. (incorporated in the Netherlands with its statutory seat

More information

STATE OF NORTH CAROLINA 11/2015 WAKE COUNTY FABRICATION SERVICES AGREEMENT

STATE OF NORTH CAROLINA 11/2015 WAKE COUNTY FABRICATION SERVICES AGREEMENT STATE OF NORTH CAROLINA WAKE COUNTY 11/2015 FABRICATION SERVICES AGREEMENT This Fabrication Services Agreement ( AGREEMENT ) entered into by and between the North Carolina State University, c/o 2701 Sullivan

More information

2015 Half-Year Results

2015 Half-Year Results 2015 Half-Year Results 26 August 2015 Copyright Copyright 2015 2015 APR Energy. APR Energy. All Rights All Rights Reserved. Reserved. APR Energy, APR Energy, its logo, its logo, and Powering and Powering

More information

BANKA SOCIETE GENERALE ALBANIA

BANKA SOCIETE GENERALE ALBANIA BANKA SOCIETE GENERALE ALBANIA Request for Proposals (RFP) for: Maintenance works for Bank's premises Issued on December 29 th, 2015 Deadline for Response: January 14 th, 2016 12:00 CET 1 Objective of

More information

Overview of current market trends for Solar Thermal Electricity plants Dr. Luis Crespo President of ESTELA Secretary General of Protermosolar

Overview of current market trends for Solar Thermal Electricity plants Dr. Luis Crespo President of ESTELA Secretary General of Protermosolar IEA TECHNOLOGY ROADMAPS WORKSHOP Overview of current market trends for Solar Thermal Electricity plants Dr. Luis Crespo President of ESTELA Secretary General of Protermosolar Paris, 3 February 2014 Current

More information

INVESTMENT ADVISORY AGREEMENT

INVESTMENT ADVISORY AGREEMENT The undersigned client ( I ) agrees to engage WealthStrategies Financial Advisors, LLC ( you ) as advisor for the Account(s) custodied with FOLIOfn Investments, Inc. ( Account(s) ) upon the following terms

More information

Developing Power Projects in Southern Africa. Annual General Meeting Presentation 20 th November 2015

Developing Power Projects in Southern Africa. Annual General Meeting Presentation 20 th November 2015 Developing Power Projects in Southern Africa Annual General Meeting Presentation 20 th November 2015 2015 Company Highlights AFR now participating in the development of three large-scale power projects

More information

Implementing Regulations under the Benelux Convention on Intellectual Property (Trademarks and Designs) *

Implementing Regulations under the Benelux Convention on Intellectual Property (Trademarks and Designs) * Implementing Regulations under the Benelux Convention on Intellectual Property (Trademarks and Designs) * The Executive Board of the Benelux Trademark Office and the Executive Board of the Benelux Designs

More information

MORTGAGE BROKER AGREEMENT

MORTGAGE BROKER AGREEMENT MORTGAGE BROKER AGREEMENT This Mortgage Broker Agreement (the "Agreement") is entered into by and between: ST. CLOUD MORTGAGE, a California Corporation (the "Lender"), and (the "Mortgage Broker") as of

More information

CSP-gas hybrid plants: Cost effective and fully dispatchable integration of CSP into the electricity mix

CSP-gas hybrid plants: Cost effective and fully dispatchable integration of CSP into the electricity mix CSP-gas hybrid plants: Cost effective and fully dispatchable integration of CSP into the electricity mix Erik Zindel Director Marketing CSP (Power Block) Siemens AG PowerGen Europe 2012 Köln Messe, 12-14

More information

REQUEST FOR QUALIFICATIONS PROPERTY APPRAISAL SERVICES. Prepared by. City of Richmond Finance Department. February 18, 2016 RESPONSES DUE:

REQUEST FOR QUALIFICATIONS PROPERTY APPRAISAL SERVICES. Prepared by. City of Richmond Finance Department. February 18, 2016 RESPONSES DUE: REQUEST FOR QUALIFICATIONS PROPERTY APPRAISAL SERVICES Prepared by City of Richmond Finance Department February 18, 2016 RESPONSES DUE: 2:30 P.M., Monday, March 7, 2016 REQUEST FOR STATEMENTS OF QUALIFICATIONS

More information

Systematic Investment Plan

Systematic Investment Plan Systematic Investment Plan a simple way to invest in equity and create wealth For Private & Internal Circulation Only 1 1 Disclosure Mutual Fund Investments are subject to market risks. Read all scheme

More information

NEWBURGH ENLARGED CITY SCHOOL DISTRIST NEWBURGH, NEW YORK REQUEST FOR PROPOSAL ARCHITECTURE SERVICES 2015 2016

NEWBURGH ENLARGED CITY SCHOOL DISTRIST NEWBURGH, NEW YORK REQUEST FOR PROPOSAL ARCHITECTURE SERVICES 2015 2016 NEWBURGH ENLARGED CITY SCHOOL DISTRIST NEWBURGH, NEW YORK REQUEST FOR PROPOSAL ARCHITECTURE SERVICES 2015 2016 Notice is hereby given that the Board of Education of the Newburgh Enlarged City School District,

More information

Quarterly Income Statement

Quarterly Income Statement 1 ST QUARTER 2016 Disclaimer This Presentation has been produced by Komplett Bank ASA (the Company or Komplett Bank ), solely for use at the presentation to investors and is strictly confidential and may

More information

Current and expected contribution of RES-E in NA countries

Current and expected contribution of RES-E in NA countries Arab Republic of Egypt Ministry of Electricity & Energy New & Renewable Energy Authority (NREA) Current and expected contribution of RES-E in NA countries Ehab Ismail Ameen General Manager of Planning

More information

AMENDED AND RESTATED GUARANTEED INVESTMENT CONTRACT. by and among RBC COVERED BOND GUARANTOR LIMITED PARTNERSHIP. as Guarantor LP.

AMENDED AND RESTATED GUARANTEED INVESTMENT CONTRACT. by and among RBC COVERED BOND GUARANTOR LIMITED PARTNERSHIP. as Guarantor LP. Execution Version AMENDED AND RESTATED GUARANTEED INVESTMENT CONTRACT by and among RBC COVERED BOND GUARANTOR LIMITED PARTNERSHIP as Guarantor LP and ROYAL BANK OF CANADA as Cash Manager and GIC Provider

More information

"New style" Basel III-compliant bank subordinated debt and Additional Tier 1 securities/hybrids are higher risk

New style Basel III-compliant bank subordinated debt and Additional Tier 1 securities/hybrids are higher risk "New style" Basel III-compliant bank subordinated debt and Additional Tier 1 securities/hybrids are higher risk Key points 1. All subordinated debt and Additional Tier 1 capital securities/hybrids (AT1)

More information

Dematerialization of Turkish Government Debt Instruments

Dematerialization of Turkish Government Debt Instruments Dematerialization of Turkish Government Debt Instruments Asli Gunel Central Registry Agency Gunsel Topbas Citibank A.S. Turkey 19 January 2012 1 Government Debt Instruments Quick Facts Central Bank of

More information

SOFTWARE LICENSE AGREEMENT (Web Version October 18, 2002)

SOFTWARE LICENSE AGREEMENT (Web Version October 18, 2002) SOFTWARE LICENSE AGREEMENT (Web Version October 18, 2002) Whenever LICENSEE licenses software products ( Program(s) as further defined herein), a License Form shall be executed which shall refer to this

More information

Update following the publication of the Bank of England Stress Test. 16 December 2014

Update following the publication of the Bank of England Stress Test. 16 December 2014 Update following the publication of the Bank of England Stress Test 16 December 2014 Background Top 8 Banks Resilience Stress Tested by PRA following FPC recommendation in March 2013 Guidance for stress

More information

Banking on Renewables

Banking on Renewables RURAL INFRASTRUCTURE BRIEFINGS Banking on Renewables These Briefings showcase different facets of the rural infrastructure industries: power, energy, and utilities; water utilities; and communications.

More information

Deduction of income tax from interest: peer-topeer

Deduction of income tax from interest: peer-topeer Deduction of income tax from interest: peer-topeer lending Consultation document Publication date: 15 July 2015 Closing date for comments: 18 September 2015 Subject of this consultation: Scope of this

More information

SMARSH WEBSITE & HOSTING REPRESENTATIVE TERMS & CONDITIONS

SMARSH WEBSITE & HOSTING REPRESENTATIVE TERMS & CONDITIONS SMARSH WEBSITE & HOSTING REPRESENTATIVE TERMS & CONDITIONS This Webhosting & Services Terms and Conditions ( Terms ) are effective as of the date of execution of the Order Form, as defined in Section 1,

More information

Video Production Services for the Ontario College of Trades (the College)

Video Production Services for the Ontario College of Trades (the College) Video Production Services for the Ontario College of Trades (the College) Request for Proposal (RFP) No. OCOT/CM/2014-03 Date Issued: 14 April 2014 1 TABLE OF CONTENTS A. INTRODUCTION...4 1. Objective...

More information

The Republic of South Africa. Department of Energy REQUEST FOR INFORMATION IN RESPECT OF THE DESIGN OF A GAS TO POWER PROGRAMME

The Republic of South Africa. Department of Energy REQUEST FOR INFORMATION IN RESPECT OF THE DESIGN OF A GAS TO POWER PROGRAMME The Republic of South Africa Department of Energy REQUEST FOR INFORMATION IN RESPECT OF THE DESIGN OF A GAS TO POWER PROGRAMME 2 TABLE OF CONTENTS 1. Disclaimer... 3 2. Definitions and Interpretation 5

More information

Business Opportunity. Title: Denmark-Ballerup: Lubricating preparations. Document Type: Contract Notice

Business Opportunity. Title: Denmark-Ballerup: Lubricating preparations. Document Type: Contract Notice Business Opportunity Title: Denmark-Ballerup: Lubricating preparations Document Type: Contract Notice Published By: Forsvarsministeriets Materiel- Og Indkøbsstyrelse (Danish Defence Acquisition An Date

More information

1. Technical Offer Submission Sheet

1. Technical Offer Submission Sheet 8. Sample Forms SUMMARY Sample Form No. 1: 1. TECHNICAL OFFER SUBMISSION SHEET... 3 Sample Form No. 2: 2. PRICE OFFER SUBMISSION SHEET... 5 Sample Form No. 3: 3. BID SECURITY... 6 Sample Form No. 4: 4.

More information

SUPPLIER PREQUALIFICATION QUESTIONNAIRE FORM

SUPPLIER PREQUALIFICATION QUESTIONNAIRE FORM SUPPLIER PREQUALIFICATION QUESTIONNAIRE FORM BRIEF This Supplier Pre Qualification Questionnaire is provided for the following project types of ALARGAN PROJECTS: 1) Supply of Construction Materials 2)

More information

Egypt Renewable energy Projects. Eng. Lamya Youssef Head Of FIT Unit Central Unit Egyptian Electricity Transmission Company EETC

Egypt Renewable energy Projects. Eng. Lamya Youssef Head Of FIT Unit Central Unit Egyptian Electricity Transmission Company EETC Egypt Renewable energy Projects Eng. Lamya Youssef Head Of FIT Unit Central Unit Egyptian Electricity Transmission Company EETC Strategy Private Sector is our partner towards achieving our goal increasing

More information

Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016

Developing Power Projects in Southern Africa. Cape Town Presentation 8 th February 2016 Developing Power Projects in Southern Africa Cape Town Presentation 8 th February 2016 Company Highlights AFR now participating in the development of three large-scale power projects in Botswana Completion

More information

SOLAR PROJECT FINANCING: Case Studies & Emerging Market Trends Rory Lonergan, Director Corporate and Project Finance. CEFC Mission

SOLAR PROJECT FINANCING: Case Studies & Emerging Market Trends Rory Lonergan, Director Corporate and Project Finance. CEFC Mission SOLAR PROJECT FINANCING: Case Studies & Emerging Market Trends Rory Lonergan, Director Corporate and Project Finance Clean Energy Finance Corporation CEFC Mission Accelerate Australia's transformation

More information

Lenders Axis LLC Working Capital Sales Agent Agreement Lenders Axis Sales Agent Agreement V 2.0

Lenders Axis LLC Working Capital Sales Agent Agreement Lenders Axis Sales Agent Agreement V 2.0 Lenders Axis LLC Working Capital Sales Agent Agreement Lenders Axis Sales Agent Agreement V 2.0 This Sales Agent Agreement (the Agreement ) is made and effective as of this the day of 13 by and between

More information

Doing Business. with Hydro-Québec

Doing Business. with Hydro-Québec Doing Business with Hydro-Québec Contents A Word from the Director Procurement... 1 Introduction... 2 Hydro-Québec s Rules of Ethics... 3 Quality at Hydro-Québec... 3 Acquisition of Goods and Services...

More information

MODEL CONTRACTS FOR SMALL FIRMS LEGAL GUIDANCE FOR DOING INTERNATIONAL BUSINESS

MODEL CONTRACTS FOR SMALL FIRMS LEGAL GUIDANCE FOR DOING INTERNATIONAL BUSINESS MODEL CONTRACTS FOR SMALL FIRMS LEGAL GUIDANCE FOR DOING INTERNATIONAL BUSINESS International Trade Centre, August 2010 Contents Foreword Acknowledgements Chapter 1 International Contractual Alliance ITC

More information

Presentation Title ( Arial, Font size 28 )

Presentation Title ( Arial, Font size 28 ) Presentation Title ( Arial, Font size 28 ) Acquisition of 1,140 MW Welspun Renewable Portfolio Date, Venue, etc..( Arial, Font size 18 ) June, 2016 Message Box ( Arial, Font size 18 Bold) Disclaimer Certain

More information

AcroTime Workforce Management Time & Labor Human Resources Payroll Service Terms and Conditions

AcroTime Workforce Management Time & Labor Human Resources Payroll Service Terms and Conditions Terms of Agreement Acroprint Time Recorder Company (referred as Acroprint ) grants you access to use its web hosted time and attendance solution AcroTime (referred as Service ), subject to your agreement

More information

Carmel Unified School District. Prequalification Application For Bleacher and Pressbox Replacement Project at Carmel High School

Carmel Unified School District. Prequalification Application For Bleacher and Pressbox Replacement Project at Carmel High School Carmel Unified School District Prequalification Application For Bleacher and Pressbox Replacement Project at Carmel High School January 4, 2016 1 NOTICE REGARDING PREQUALIFICATION FOR BLEACHER AND PRESSBOX

More information

PerfectForms End-User License Agreement

PerfectForms End-User License Agreement PerfectForms End-User License Agreement 2011 PerfectForms Page 1 of 12 Contents 1. DEFINITIONS... 4 2. GRANT OF RIGHTS... 4 3. FEES... 5 4. CONFIGURATION... 5 5. INTELLECTUAL PROPERTY... 5 6. TERM AND

More information

Costa Rica Negotiated M&A Guide

Costa Rica Negotiated M&A Guide Costa Rica Negotiated M&A Guide Corporate and M&A Law Committee Contact Juan Manuel Godoy Consortium Laclé & Gutiérrez San José, Costa Rica jmgodoy@consortiumlegal.com Coordinator Rafael Alvarado-Riedel

More information

Request for Proposal (RFP) for Services

Request for Proposal (RFP) for Services Ref: RFP 2015/106 Request for Proposal (RFP) for Services Catering Services for the 10 th Meeting of the GCF Board, Songdo, Korea RFP No. 2015/106 1 1. Background Catering Services for the 10 th Meeting

More information

Instruction. N Title. 1.3 In this Instruction: LCH.Clearnet SA IV.5-4. Article 1 - Scope and interpretation

Instruction. N Title. 1.3 In this Instruction: LCH.Clearnet SA IV.5-4. Article 1 - Scope and interpretation N Title LCH.Clearnet SA Instruction IV.5-4 THE FIXED INCOME DEFAULT MANAGEMENT PROCESS FOR TRANSACTIONS EXECUTED ON TRADING & MATCHING PLATFORMS AND THE MTS ITALY REGULATED MARKET Pursuant to Section 4.5.2.

More information

CN - 1 $50,000 (YOUR COMPANY NAME HERE) CONVERTIBLE SUBORDINATED PROMISSORY NOTE

CN - 1 $50,000 (YOUR COMPANY NAME HERE) CONVERTIBLE SUBORDINATED PROMISSORY NOTE THIS NOTE HAS NOT BEEN REGISTERED UNDER THE SECURITIES ACT OF 1933, AS AMENDED, NOR UNDER ANY STATE SECURITIES LAW AND MAY NOT BE PLEDGED, SOLD, ASSIGNED OR TRANSFERRED UNLESS (I) A REGISTRATION STATEMENT

More information

TERMS AND CONDITIONS FOR THE USE OF SINGAPORE POWER SUPPLIER RELATIONSHIP MANAGEMENT SYSTEM (SPSRM)

TERMS AND CONDITIONS FOR THE USE OF SINGAPORE POWER SUPPLIER RELATIONSHIP MANAGEMENT SYSTEM (SPSRM) SINGAPORE POWER SUPPLIER RELATIONSHIP MANAGEMENT SYSTEM (SPSRM) Contents 1 Definitions... 3 2 Singapore Power Supplier Relationship Management System (SPSRM)... 5 3 Security, Access and Use of SPSRM...

More information

OKLAHOMA GAS AND ELECTRIC COMPANY REQUEST FOR INFORMATION. Solar Energy Purchase Power Agreement Information

OKLAHOMA GAS AND ELECTRIC COMPANY REQUEST FOR INFORMATION. Solar Energy Purchase Power Agreement Information OKLAHOMA GAS AND ELECTRIC COMPANY REQUEST FOR INFORMATION Solar Energy Purchase Power Agreement Information RFI Issue Date May 18, 2015 Responses Due June 15, 2015 1. RFI Purpose and Scope 1.1 Purpose

More information

Discretionary Investment Management Agreement Vulcan Investments LLC 2100SouthBridge Pkwy Suite 650, Birmingham AL, 35209 1. Scope of Engagement a)

Discretionary Investment Management Agreement Vulcan Investments LLC 2100SouthBridge Pkwy Suite 650, Birmingham AL, 35209 1. Scope of Engagement a) Discretionary Investment Management Agreement This investment management agreement (the Agreement ) is, made this day of, 20 Between the undersigned party, Client(s) whose mailing address is. (Hereinafter

More information

(i) ASX TradeMatch primary central limit

(i) ASX TradeMatch primary central limit MOELIS AUSTRALIA SECURITIES PTY LTD ACN 122 781 560 AFSL 308241 BEST EXECUTION POLICY and PROCEDURES 1. BEST EXECUTION OBLIGATION 1.1 Overview (a) This policy is issued pursuant and in compliance with

More information

FOREXer Advisory ADVISORY AGREEMENT. Last update of this DisclosureDocument is Aug 1 st, 2013.

FOREXer Advisory ADVISORY AGREEMENT. Last update of this DisclosureDocument is Aug 1 st, 2013. FOREXer Advisory ADVISORY AGREEMENT Last update of this DisclosureDocument is Aug 1 st, 2013. TRADING ADVISORY AGREEMENT This Trading Advisory Agreement (the Agreement ) is entered into as of the Date:-------------------by

More information

Mortgage Brokerages, Lenders and Administrators Act, 2006. Additional Draft Regulations for Consultation

Mortgage Brokerages, Lenders and Administrators Act, 2006. Additional Draft Regulations for Consultation Mortgage Brokerages, Lenders and Administrators Act, 2006 Additional Draft Regulations for Consultation Proposed by the Ministry of Finance January, 2008 Mortgage Brokerages, Lenders and Administrators

More information

(Incorporated in the Cayman Islands with limited liability) (Stock Code: 01250)

(Incorporated in the Cayman Islands with limited liability) (Stock Code: 01250) Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness

More information

Effective Date: January, 2007 Last Reviewed Date: September, 2014 Last Revised Date: September, 2014 Next Review Date: September, 2015

Effective Date: January, 2007 Last Reviewed Date: September, 2014 Last Revised Date: September, 2014 Next Review Date: September, 2015 Policy and Procedure Section: Finance and Administration Subject: Goods and Services Procurement (including consulting services) Number: 12.20.PP.v6 Associated Document Form Number: 12.20.F Effective Date:

More information

RoD Canada 50 Tracking Index Methodology July 2014

RoD Canada 50 Tracking Index Methodology July 2014 RoD Canada 50 Tracking Index Methodology July 2014 Table of contents Introduction Introduction 3 Eligibility Criteria Additions RoD Canada 50 4 Deletions RoD Canada 50 5 Timing of Changes 6 Index Construction

More information

BRIARWOOD CAPITAL MANAGEMENT INC. MANAGED ACCOUNT AGREEMENT

BRIARWOOD CAPITAL MANAGEMENT INC. MANAGED ACCOUNT AGREEMENT BRIARWOOD CAPITAL MANAGEMENT INC. MANAGED ACCOUNT AGREEMENT THIS MANAGED ACCOUNT AGREEMENT (the "Agreement") is made by and between BRIARWOOD CAPITAL MANAGEMENT INC., a New York corporation (the "Advisor")

More information