Hardy Frame Shearwall System Installation Guide

Size: px
Start display at page:

Download "Hardy Frame Shearwall System Installation Guide"

Transcription

1 Hardy Frame Shearwall System Installation Guide Easy as 1, 2, 3 1. Embed Anchors Select Template Kit based on product width and anchor grade STD=ASTM F1554 GR 3 HS=ASTM A193 GR B7 2. Bottom Connection S E R I E S Place Panel or Brace Frame on anchors Secure with Hardened Round Washers and Grade 8 Hex Nuts 3. Top Connection Connect to top plates with 1/4" diameter screws HARDY FRAME PANEL AT TOP PLATES See inside for other installations including fillers, garage portals and beams 789 S. Victoria Ave., Suite 200 Ventura, California IG 1/11

2 PRODUCTS 1 Panel Balloon Panel Hardy Frame Product Listing HFX-Series Depth Width Height Weight (lbs) HFX/S-Series Height Weight (lbs) HFX-9x /2" 81 NA 9" HFX-9X8 93-3/4" 95 HFX/S-9x8 9 5/8" 98 HFX-12x78 78" 91 NA HFX-12x8 92-1/4" 10 HFX/S-12x8 9-5/8" " HFX-12x /4" 11 HFX/S-12x /8" 121 HFX-12x /4" 128 HFX/S-12x /8" 133 HFX-18x78 78" 113 NA HFX-18x8 92-1/4" 131 HFX/S-18x8 9-5/8" 137 HFX-18x /4" 144 HFX/S-18x /8" 150 HFX-18x10 18" 11-1/4" 158 HFX/S-18x /8" /2" HFX-18x /4" 177 HFX/S-18x /8" 183 HFX-18x /4" 190 HFX/S-18x /8" 19 HFX-18x /4" 203 HFX/S-18x /8" 209 HFX-24x78 78" 148 NA HFX-24x8 92-1/4" 172 HFX/S-24x8 9-5/8" 180 HFX-24x /4" 190 HFX/S-24x /8" 198 HFX-24x10 24" 11-1/4" 209 HFX/S-24x /8" 217 HFX-24x /4" 233 HFX/S-24x /8" 241 HFX-24x /4" 251 HFX/S-24x /8" 259 HFX-24x /4" 29 HFX/S-24x /8" 277 HFX-32x8 92-1/4" 138 HFX/S-32x8 9-5/8" 145 HFX-32x /4" 13 HFX/S-32x /8" 170 HFX-32x /4" 188 HFX/S-32x /8" " HFX-32x /4" 213 HFX/S-32x /8" 220 HFX-32x /4" 238 HFX/S-32x /8" 245 HFX-32x /4" 23 HFX/S-32x /8" /2" HFX-44x8 92-1/4" 15 HFX/S-44x8 9-5/8" 13 HFX-44x /4" 181 HFX/S-44x /8" 189 HFX-44x /4" 20 HFX/S-44x /8" " HFX-44x /4" 231 HFX/S-44x /8" 239 HFX-44x /4" 25 HFX/S-44x /8" 24 HFX-44x /4" 281 HFX/S-44x /8" 289 HFX-18x14 Hardy Frame Balloon Wall Application 14-1/4" 221 HFX-18x /4" 237 HFX-18x /4" 250 HFX-18x17 18" 200-1/4" 24 HFX-18x /4" 283 HFX-18x /4" 29 HFX-18x /4" /2" HFX-24x /4" 290 HFX-24x /4" 311 HFX-24x /4" 329 HFX-24x17 24" 200-1/4" 348 HFX-24x /4" 372 HFX-24x /4" 390 HFX-24x /4" 408

3 PRODUCTS Post Hardy Frame Product Listing HFP-Series Depth Width Height Weight (lbs) HFX/S-Series Height Weight (lbs) HFP8-7/8 92-1/4" 42 HFP/S8-7/8 9-5/8" 44 HFP8-1 1/8 92-1/4" 42 HFP/S8-1 1/8 9-5/8" 44 HFP9-7/ /4" 47 HFP/S9-7/ /8" 49 HFP9-1 1/ /4" 47 HFP/S9-1 1/ /8" 49 HFP10-7/8 11-1/4" 52 HFP/S10-7/ /8" 54 HFP10-1 1/8 3-1/2" 3-1/2" 11-1/4" 52 HFP/S10-1 1/ /8" 54 HFP11-7/ /4" 57 HFP/S11-7/ /8" 59 HFP11-1 1/ /4" 57 HFP/S11-1 1/ /8" 59 HFP12-7/ /4" 2 HFP/S12-7/ /8" 4 HFP12-1 1/ /4" 2 HFP/S12-1 1/ /8" 4 HFP13-7/ /4" 7 HFP/S13-7/8 15-5/8" 9 HFP13-1 1/ /4" 7 HFP/S13-1 1/8 15-5/8" 9 Hardy Frame Accessories Single Use Templates Weight (lbs) Face to Face Templates Weight (lbs) CMU Templates Weight (lbs) HFXT9 0.8 HFXDT9 2.0 HFXT-CMU9 0.8 HFXT HFXDT HFXT-CMU HFXT HFXDT HFXT-CMU HFXT HFXDT HFXT-CMU HFXT HFXDT HFXT-CMU32 2. HFXT HFXDT44.4 HFXT-CMU STD Template Kits Weight (lbs) HS Template Kits Weight (lbs) Bolt Brace Weight (lbs) HFXTK HFXTK-HS HFXBB9 0.3 HFXTK HFXTK-HS HFXBB HFXTK HFXTK-HS HFXBB18 0. HFXTK HFXTK-HS HFXBB HFXTK HFXTK-HS HFXTK STD Tension Connector Kits Weight (lbs) HS Tension Connector Kits Weight (lbs) Bearing Plates Weight (lbs) HFTC-7/8 STD 14.5 HFTC-7/8 HS 15.5 HFXBP12 (Length = 18") 13 HFTC-12 STD 17.5 HFTC-12 HS 18.5 HFXBP18 (Length = 24") 17 HFTC-18/24 STD 20.0 HFTC-18/24 HS 21.0 HFXBP24 (Length = 30") 21 Base Extension Weight (lbs) Reducer Weight (lbs) Bolt Lever Weight (lbs) HFBX 2 HFR 0.2 HFBL 21 Saddles Weight (lbs) Deep Socket Weight (lbs) Stacking Washers Weight (lbs) HFS24 3 HFDS 7/8 2 HFSW12 1 HFS3 4 HFDS-1 1/8 3 HFSW18/24 2 Notes 1) For Panels, adding STK after the model number indicates HFX-Series Stacking Panels with built-in Plate Washers at the top channel. 2) Custom heights are available for Panels s and Posts not to exceed the maximum height listed for that product. 3) Model number HFX-9x79.5, HFX-12x78, HFX-18x78 and HFX-24x78 Panels come with two straps welded to the solid face. 4) All Panels, s and Posts are a 3-1/2 depth. Refer to Attachment page for a description of installation in 2x and greater wall depths. 2

4 TM ANCHORAGE NOTE: HFX HOLD DOWN CENTER LINES ARE NOT THE SAME AS ORIGINAL SERIES PRODUCTS 10 INCH MAXIMUM OR PER PLANS 3 MIN. 10 INCH MAXIMUM OR PER PLANS VARIES WITH PANEL/BRACE FRAME WIDTH CURB ELEVATION BOLT BRACE SEE TABLE NOTE 7 P0P-OUT PER PLAN 10-INCH MAXIMUM OR PER PLAN 3" MIN C a2 C a2 CURB SECTION OTHER SECTION VIEWS SIMILAR 3 L t 4 MIN # 3 REBAR, GRADE 0 (MIN) TIE FIELD TIE TABLE FOR OVERLAP HOLD DOWN ANCHOR SHEAR TIE REINFORCEMENT H.D. # 3 REBAR TIE SEE TABLE FOR REQUIRED QUANTITY 3 MIN. 5 1/2" HFX-9 8 1/2" HFX-12 EXTERIOR SLAB ELEVATION 12 3/4" HFX /4" HFX-24 3 MIN. 20 1/2" HFX-32 SHEAR CURB INTERIOR SLAB ELEVATION 31" HFX-44 GROUT FILLED CMU OR CONCRETE (PER PLAN) PER PLAN ANCHORAGE NOMENCLATURE 1 1/8-STD C a 1 C a 2 l e ROD GRADE ROD DIAMETER = Length of Embed into Footing C a2 = Edge, End Distance ANCHORAGE NOMENCLATURE 1-1/8-HS C a 1 C a 2 l e ROD GRADE ROD DIAMETER = Length of Embed into Footing C a2 = Edge, End Distance 3 MIN. FOOTING DEPTH AND WIDTH MAY DECREASE BEYOND DIMENSION STEM WALL ELEVATION NOTE: COUPLING NUTS MAY BE USED TO EXTEND ALL THREAD ROD LENGTH THROUGH GROUT FILLED CMU OR CONCRETE Product Width (in) Max Height (ft) Anchorage 1 (See Nomenclature for Description) 4, 5, Shear Tie Quantity Tie Length (in) STD ROD 2 HS ROD 3 STD ROD HS ROD /8-STD NA NA 7 1/ /8-HS /2 1 1/8-STD /8-HS NA 1 1/8-HS NA /8-STD /8-HS NA 1 1/8-HS NA /2 7/8-STD /8-HS ) Applies to 2500 psi compressive strength concrete, both seismic and wind loading 2) STD indicates rods complying with ASTM F1554 Grade 3 with a Hardy Frame Bolt Brace (HFXBB) double nutted on the embed end. 3) HS indicates rods complying with ASTM A 193 Grade B7 (or equal) with a1/2x3x3 plate washer double nutted on the embed end. HFXBB is recommended. 4) Concrete edge distance must comply with ACI D8.2. 5) Installations on curbs or stemwalls must be inch width minimum, and may require supplemental shear reinforcement per ACI , fc = 2500 psi ) Shear Ties are not required for installations away from the Foundation Edge, for installations on wood framing or for Braced Wall Panel applications. 7) Bolt Brace is used for bolt alignment. When used with STD grade rods plate washers are not required. When used with HS grade rods plate washers are still required. 8) Foundation Design is by others 9) The Building Design Professional is permitted to modify these details to accommodate a specific condition.

5 TM TEMPLATE KITS Hardy Frame HFX-Series Template (HFXT) Grade 8 Hex Nut Hardened Round Washers ALT: two SAE Washers ALT: two Flat-Round Washers Hold Down Anchor STD = ASTM F1554 Grade 3 HS = ASTM A193 Grade B7 Hardy Frame Bolt Brace (HFXBB) 1/2 x 3 x 3 Plate Washer - not required for STD specification Standard Grade Hex Nut minimum HFXBB - Bolt Brace Hardy Frame HFX-Series Template Kit (HFXTK) Panel Kit at Slab Panel Kit at Curb Kit at Interior Footing Hardy Frame Bolt Brace Hardy Frame HFX-Series Template Kit Components Panels s Kit Model Number Template (1 ea) Bolt Brace (1 ea) Hold Down Anchor Assembly 1-1/8 STD 1-1/8 HS 7/8 STD 7/8 HS HFXTK9 HFXT9 HFXBB9 2 HFXTK12 HFXT12 HFXBB12 2 HFXTK-HS12 HFXT12 HFXBB12 2 HFXTK18 HFXT18 HFXBB18 2 HFXTK-HS18 HFXT18 HFXBB18 2 HFXTK24 HFXT24 HFXBB24 2 HFXTK-HS24 HFXT24 HFXBB24 2 HFXTK32 HFXT32 NA 2 HFXTK-HS32 HFXT32 NA 2 HFXTK44 HFXT44 NA 2 HFXTK-HS44 HFXT44 NA 2 Hold Down Anchor Assemblies: 1-1/8 STD = 1-1/8 x 32" ASTM F1554 Grade-3 all thread with(1)-hardened Round Washer & (3) Grade 8 Hex Nuts. 1-1/8 HS = 1-1/8 x 38" ASTM A193 Grade-B7 all thread with (1) Hardened Round Washer, (1) 1/2x3x3 ASTM A3 Plate Washer & (3) Grade-8 Hex Nuts 7/8 STD = 7/8 x 30" ASTM F1554 Grade-3 all thread with(1)-hardened Round Washer & (3) Grade 8 Hex Nuts. 7/8 HS = 7/8 x 31" ASTM A193 Grade-B7 all thread with (1) Hardened Round Washer, (1) 1/2x3x3 ASTM A3 Plate Washer & (3) Grade-8 Hex Nuts 1) All Thread length = length of embed (le) + 12 (formboard) + (Kit assembly + height above concrete) For Raised Floor installations adjust the all thread length or extend length with a Grade 8 Coupling nut 2) The Hardened Round Washers for connecting the Panel base may be substituted with two SAE or two Round-Flat Washers 3) STD assemblies require a Hardy Frame Bolt Brace (Minimum) double nutted at the embed end 4) HS assemblies require 1/2x3x3 ASTM A3 Plate Washer (Minimum) and the Hardy Frame Bolt Brace is recommended 5) HS all thread rods provided by Hardy Frames, Inc. are stamped on both ends HF B7 4

6 PANEL INSTALLATIONS TM 2-3/4 Hardy FramePANEL PanelBOTTOM HARDY FRAME on concrete ON CONCRETE Base Extension HFBX attachment for adjacent framing Bearing Plate HFXBP Install below Panel directly on Rim. Requires 3" end distance (Panels only) 4-1/4 Hardy Frame Panel at raised floor head out Hardy FramePANEL PanelBOTTOM Hardy Frame Panel HARDY FRAME HARDY FRAME PANEL BOTTOM on and washers (RequiresON MUD SILL on wood sill ONnuts DOUBLE NUT 5,000 psi non-shrink grout) HARDY FRAME PANEL BOTTOM ON RAISED FLOOR ON CONCRETE Hardy Frame Panel on raised floor 1/4 x 4 1/2" screws Hardy Frame Panel Hardy Frame Panel Hardy Frame Panel straight stack installation. stagger-stack installation. to two Hardy Frame Note: Stacking Washers Note: Stacking Washers Posts below HARDY FRAME PANEL BOTTOM HARDY FRAME PANEL HARDY FRAME in PANEL BOTTOM are required the top are required in thebottom top HARDY FRAME PANEL BOTTOM 2 POSTS STAGGER STACK ONchannel MULTI STORY of lower Panel. channel of lower Panel. ON RAISED FLOOR Hardy Frame Panel Hardy Frame Panel Hardy Frame Panel at top plates with 2x filler at Portal 1/4 x 3"screws (straps may be 1/4 xpanel 3" screws HARDY FRAME AT TOP PLATES 1/4 x 4PANEL 1/2" screws HARDY FRAME WITH 2X FILLER required by design professional) HARDY FRAME include PANEL welded AT PORTAL Note: 78" heights straps Floor to Floor connectors Hardy Frame Tension Connector Kit Componentsnts Panels HFTC Tension Kit Model Number STK Stacking Washer Connector Rod Assembly 1-1/8 STD 1-1/8 HS 5 HFTC12- STD 2-HFSW12 HFTC12- HS 2-HFSW12 HFTC18/24 STD 2-HFSW18/24 HFTC18/24 HS 2-HFSW18/ Hardy Frame Panel with 4x filler 1/4 x 3" screws (custom heights available) HARDY FRAME PANEL WITH 4X FILLER Connector Rod Assemblies: HFTC-1 1/8 STD = 1-1/8 x 2" ASTM F1554 Grade-3 all thread with (2) Hardened Round Washers & (2) Grade 8 Hex Nuts. HFTC-1 1/8 HS = 1-1/8 x 2" ASTM A193 Grade-B7 all thread with (2) Hardened Round Washers & (2) Grade 8 Hex Nuts. 1) Hardy Frame STK washers are required in the top channel of Panels when connnecting to a hold down rod from above. 2) All Thread length fits up to a 14 joist depth + 3/4" subfloor + (4) 2x wood plates 3) Each Hardened Round Washer may be substituted with two SAE or two Round-Flat Washers 4) HS all thread rods provided by Hardy Frames, Inc. are stamped on both ends HF B7 Refer to the Hardy Frame Catalog and Installation Details for more specific information

7 TM PANEL & CONNECTOR INFORMATION Model Number Net Height (in Hardy Frame HFX-Series Panel - Dimensions & Connectors Width (in) Depth (in Anchorage Call-Out - STD Rods 1 Dia-Grade-le-Ca 1,2 Anchorage Call-Out - HS Rods 1 Dia-Grade-le-Ca 1,2 Top Screw Qty 2,3 (ea) Bottom Screw Qty 2,4 (ea) Edge Screw QTY Available 5 (ea) HFX-9x /2 HFX-9x8 93 3/ /2 1 1/8-STD NA 5 NA 4 HFX-12x HFX-12x8 92 1/ /2 1 1/8-STD /8-HS HFX-12x /4 HFX-12x /4 5 HFX-18x78 78 HFX-18x8 92 1/4 4 HFX-18x /4 HFX-18x /4 1 1/8-STD /8-HS HFX-18x /4 5 HFX-18x /4 HFX-18x / /2 10 HFX-18x /4 HFX-18x /4 HFX-18x /4 HFX-18x /4 NA 1 1/8-HS NA HFX-18x /4 7 HFX-18x /4 HFX-18x /4 8 HFX-24x HFX-24x8 92 1/ HFX-24x /4 HFX-24x /4 1 1/8-STD /8-HS HFX-24x / HFX-24x /4 HFX-24x / /2 HFX-24x /4 14 HFX-24x /4 HFX-24x /4 HFX-24x /4 NA 1 1/8-HS NA HFX-24x /4 7 HFX-24x /4 HFX-24x /4 8 Panel Balloon Panel (14'- 20 Heights) Notes 1) STD Hold Down rods must comply with ASTM F 1554 Grade 3. HS Hold Down rods must comply with a high strength steel specification, High Strength rods include but are not limited to ASTM F 1554 Grade 105, ASTM A 193 Grade B7 and ASTM A 354 Grade BD. ANCHORAGE NOMENCLATURE PANEL NOMENCLATURE 2) Screws are 1/4-inch diameter USP-WS Series (ESR-271) or equal with a 1 1/8-STD HFX-18 x 9 minimum allowable design value of 311 lbs. (excluding any duration of load C a 1, 2 stress increase) based on connecting metal (No. 12 gage) to wood (specific l e gravity of 0.50 or greater). ROD GRADE ROD DIAMETER 3) Top screw length is 3-inches when attaching directly to the collector. When installing a 2-by wood filler (specific gravity of 0.5 or greater) at the top connection, the minimum screw length is 4-1/2 inches. STACKING PANEL NOMENCLATURE HFX-18 x 9 - STK 4) Bottom screw length is 4-1/2 inches at Panel and connections, STACKING 3-inches at Hardy Frame Bearing Plate. NOMINAL HEIGHT 5) 1/4 diameter screws are required at Balloon Panels, when installing fillers ACTUAL WIDTH above greater than 1-1/2" or when specified by the Building Design Professional. PRODUCT SERIES 9 inch wide Panels are intended for installation directly on concrete. Heights are 1-1/2" greater than all other HFX-Series Panels. NOMINAL HEIGHT ACTUAL WIDTH PRODUCT SERIES NOTE: Model number followed by STK indicates Stacking Panel with built-in plate washers at top.

8 TM BRACE FRAME INSTALLATIONS Hardy Frame on concrete Hardy Frame at raised floor head out Hardy Frame on nuts and washers (Requires 5,000 psi non-shrink grout) BOTTOM ON DOUBLE NUT Hardy Frame on wood sill BOTTOM ON MUD SILL Hardy Frame Hardy Frame on raised floor 1/4 x 4 1/2" screws straight HARDY FRAME stack BRACE installation FRAME BOTTOM ON MULTI STORY (check cumulative forces) BOTTOM ON RAISED FLOOR Hardy Frame stagger-stack installation BOTTOM STAGGER Hardy Frame to two Hardy Frame BOTTOM 2 POSTS Posts below Hardy Frame TOP WITH TOP PLATE at top plates 1 1/4 x 3" screws Hardy Frame TOP WITH FILLER with 2x filler 1/4 x 4 1/2" screws Hardy Frame 4X FILLER with 4x filler 1/4 x 3" screws (custom heights available) Hardy Frame at Portal 1/4 x 3" screws. Straps may be required. 7 Floor to Floor connectors HFTC Hardy Frame Tension Connector Kit Componentsnts Tension Kit Model Number STK Stacking Washer HFTC-7/8 STD NA 2 s Connector Rod Assembly 7/8 STD 7/8 HS HFTC-7/8 HS NA 2 Connector Rod Assemblies: Refer to the Hardy Frame Catalog and Installation Details for more specific information HFTC-7/8 STD = 7/8 x 2" ASTM F1554 Grade-3 all thread with (2) Hardened Round Washers & (2) Grade 8 Hex Nuts. HFTC-7/8 HS = 7/8 x 2" ASTM A193 Grade-B7 all thread with (2) Hardened Round Washers & (2) Grade 8 Hex Nuts 1) Plate washers are built into all four corners of Brace Frames. STK washers are not required. 2) All Thread length fits up to a 14" joist depth + 3/4" subfloor + (4) 2x wood plates 3) Each Hardened Round Washer may be substituted with two SAE or two Round-Flat Washers 4) HS all thread rods provided by Hardy Frames, Inc. are stamped on both ends HF B7

9 TM BRACE FRAME CONNECTOR INFORMATION Hardy Frame HFX-Series Dimensions and Connectors Model Number Net Height (in) Width (in) Depth (in) Anchorage STD Anchorage HS Top Screw Qty (ea) Bottom Screw Qty (ea) HFX-32x8 92-1/4" HFX-32x /4" HFX-32x /4" HFX-32x /4" /2" 7/8-STD /8-HS HFX-32x /4" HFX-32x /4" HFX-44x8 92-1/4" 17 HFX-44x /4" 15 HFX-44x /4" /2" 7/8-STD /8-HS HFX-44x /4" 14 HFX-44x /4" HFX-44x /4" 1) For top and bottom shear connections use 1/4 inch diameter USP WS-Series, SDS-Series or equivalent screws. BRACE FRAME NOMENCLATURE HFX-32 x 9 NOMINAL HEIGHT ACTUAL WIDTH PRODUCT SERIES ANCHORAGE NOMENCLATURE 7/8 - STD C a 1, 2 l e ROD GRADE ROD DIAMETER HFX Series 32" Bolt Pattern TOP & BOTTOM 5 3/4" 20 1/2" 5 3/4" 32" 32" Hardy Frame HFX-Series TOP & BOTTOM HFX Series 44" Bolt Pattern 1/2" 31" 1/2" 44" 44" Hardy Frame HFX-Series Model Number Hardy Frame HFP-Series Post Net Height (in) Width (in) Depth (in) Hold Down Diameter (in) 7/8 HFP8-7/8 92 1/4 HFP8-1 1/8 92 1/4 1 1/8 HFP9-7/ /4 7/8 HFP9-1 1/ /4 1 1/8 HFP10-7/8 11 1/4 7/8 HFP10-1 1/8 11 1/4 1 1/8 3-1/2 3-1/2 HFP11-7/ /4 7/8 HFP11-1 1/ /4 1 1/8 HFP12-7/ /4 7/8 HFP12-1 1/ /4 1 1/8 HFP13-7/ /4 7/8 HFP13-1 1/ /4 1 1/8 POST NOMENCLATURE HFP9-7/8 HD DIA NOMINAL HEIGHT SERIES Hardy Frame Post Hardy Frame Post HARDY on concrete FRAME POST HARDY on nut BOTTOM FRAME and washer POST BOTTOM ON (requires DOUBLE 5,000 NUT psi ON DOUBLE NUT non-shrink grout) 8

10 PRE-ASSEMBLED MOMENT FRAME INSTALLATIONS 5 1/4 " AT D9, D12 7 1/2 " AT D18 2x TOP PLATE BY OTHERS 2x Top Plate Connects to 3x nailer with USP MP4 F (or LTP 4) connectors on each face. Quantity by Building Design Professional. SIDEPLATES STEEL COLUMN 4" AT D9, D12 " AT D18 2x COLUMN NAILER BASE PLATE 1/2" SIDEPLATE COLUMN SIDEPLATE BEAM VARIES W in (steel to steel) W out (outside of 2x to outside of 2x) h 1 (Top of concrete to lowest point of header/sideplate assembly Actual Double Plate Height (Top of concrete to top of field installed 2x) FILL GAP WITH 5000 PSI (MIN) NO-SHRINK GROUT EDGE VIEW TOP OF CONCRETE 5" AT D9, D12 7" AT D18 ANCHOR BOLT ASSEMBLY Section of Header With Nailers and Plates Section at Roof Framing Elevation of header tie plate connectors required on both faces for shear transfer Pre-installed wood nailers 2x4 at all column flanges 3x at top and bottom of D9, D12 header 3x8 at top and bottom of D18 header Section of Header With Nailers and Plates Section at Roof Framing On Nuts On & Washers Nuts & Washers (Requires (Requires 5,000 psi 5,000 Non-Shrink psi Non-Shrink Grout Grout On Nuts & Washers (Requires 5,000 psi Non-Shrink Grout On Nuts & Washers (Requires 5,000 psi Non-Shrink Grout On Nuts & Washer pinned base (requires 5,000 psi non-shrink grout) On Concrete On Concrete Section of Header With Nailers and Plates Elevation of header tie plate On Concrete Section of Header Section at Joist On Concrete connectors - Section of Header With Nailers and Plates required on both faces with Nailers and Plate Hanging Condition for shear transfer Section at Roof Framing Section of Header With Nailers and Plates Section at Joist - Bottom Cord Bearing Section at Joist - Hanging Condition Section at Roof Framing Elevation of header tie plate connectors required on both faces Elevation of for header shear tie transfer plate connectors required on both faces for shear transfer On Concrete pinned base Section at Roof Framing Section at Elevation of header tie plat connectors required on bo for shear transfer 9 On Nuts & Washers Fixed Base On Nuts On & Washers Nuts & Washers Fixed Base Fixed Base On Nuts & Washers Fixed Base On Concrete Fixed Base On Concrete On On Concrete Fixed Fixed Base Fixed Base Base On Concrete Fixed Base Section at Joist - Bottom Cord Bearing Section at Joist - Bottom Cord Bearing Elevation at header USP MP4-F (or LTP4) connectors on each face for shear transfer. Minimum quantity by Building Design Professional. Section at Joist - Hanging Condition Section at Joist - Bottom Cord Bearing Section at Joist - Hanging Condition

11 MOMENT FRAME CONNECTOR INFORMATION Nominal 8 foot Wall Height ( 8 0-3/4 ) Nominal 9 foot Wall Height ( 9 0-3/4 ) Model W in W out h1 Weight Model W in W out h1 Weight Number ft-in ft-in ft-in lbs Number ft-in ft-in ft-in lbs HF-D9 x /4 987 HF-D9 x /4 1,04 HF-D9 8x /4 1,051 HF-D9 8x /4 1,128 HF-D9 8x8 H /4 1,102 HF-D9 8x9 H /4 1,179 HF-D12 8x / /4 890 HF-D12 8x / /4 938 HF-D18 8x /2 11-3/4 1,412 HF-D18 8x / /4 1,490 HF-D9 10x /4 1,173 HF-D9 10x /4 1,250 HF-D12 10x / /4 954 HF-D12 10x / /4 1,002 HF-D18 10x /2 9-1/4 1,50 HF-D18 10x / /4 1,728 HF-D9 12x /4 1,244 HF-D9 12x /4 1,321 HF-D12 12x / /4 1,018 HF-D12 12x / /4 1,07 HF-D18 12x /2 9-1/4 1,74 HF-D18 12x / /4 1,824 HF-D9 14x /4 1,315 HF-D9 14x /4 1,392 HF-D12 14x / /4 1,083 HF-D12 14x / /4 1,131 HF-D18 14x /2 9-1/4 1,842 HF-D18 14x / /4 1,919 HF-D18 14x8 H /4 2,372 HF-D18 14x9 H /4 2,471 HF-D9 1x /4 1,42 HF-D9 1x /4 1,539 HF-D18 1x /2 9-1/4 1,938 HF-D18 1x / /4 2,015 HF-D18 1x8 H /4 2,502 HF-D18 1x9 H /4 2,01 HF-D18 18x8 H /4 2,33 HF-D18 18x9 H /4 2,732 HF-D18 20x8 H /4 2,73 HF-D18 20x9 H /4 2,82 Nominal 10 foot Wall Height ( /4 ) Model W in W out h1 Weight Number ft-in ft-in ft-in lbs HF-D9 x /4 1,141 HF-D9 8x /4 1,205 HF-D9 8x10 H /4 1,25 HF-D12 8x / /4 987 HF-D18 8x / /4 1,57 HF-D9 10x /4 1,327 HF-D12 10x / /4 1,051 HF-D18 10x /2 8 91/4 1,805 HF-D9 12x /4 1,398 HF-D12 12x / /4 1,115 HF-D18 12x / /4 1,901 HF-D9 14x /4 1,49 HF-D12 14x / /4 1,180 HF-D18 14x / /4 1,997 HF-D18 14x10 H /4 2,570 HF-D9 1x /4 1,1 HF-D18 1x / /4 2,093 HF-D18 1x10 H /4 2,701 HF-D18 18x10 H /4 2,831 HF-D18 20x10 H /4 2,92 MOMENT FRAME NOMENCLATURE HF-D9 8 X 9 H H SERIES (HEAVY DUTY) AS OCCURS NOMINAL 1ST STORY DOUBLE PLATE HEIGHT (FT) NOMINAL CLEAR SPAN (FT) NOMINAL WIDTH OF COLUMN (IN) HARDY FRAME For a complete list of standard sizes see the Hardy Frame Moment Frame Catalog Two Story Frames available All model numbers shown ship pre-assembled; over-sized frames ship as knock-down units that require field welding and special inspection by others D9 =BUILT UP 8x3 4" 9" 10" D12 COLUMN W12 x 22 " 12 1/4 13 1/4 3" 4" 5" Template Kits Model Rod Dia Rod Lgth QTY HFT HFBB HFTK-D9 3/4 in HFTK-D12 3/4 in HFTK-D18 1 1/8 in Rod material is ASTM F-1554 grade 3 Plate washers, flat washers and nuts included. Double nut at HFT Top of bolt to top of concrete is 4 ¼" Measured Distance from notch to notch is Moment Frame W IN dimension 2x4s Placed Flat Double nut at plate washer and bolt brace 3" 4" 5" D9 =BUILT UP 8x3 4" 9" 10" BASE PLATE = COLUMN = 4 x COLUMN WOO ANCHORS = ¾ ALL THREAD D12 COLUMN W12 x 22 ASTM A53 Grade A BASE PLATE = coupling nut may be COLUMN = 4 x used to extend 3" 4" rod 5" length when necessarycolumn WOO ANCHORS = ¾ " 12 1/4 ALL THREAD Bolt Brace and plate washers 13 1/4 D18 = W18 x 35 " 17 3/4 18 3/4 D18H = W18x4 Form boards " 18" 18 3/4" 3" 4" 5" 4" " 7" 4" " 7" BASE PLATE COLUMNS W WOOD TO COLUMN W WOOD TO W ANCHORS = ALL THREA BASE PLATE COLUMNS W WOOD 10 TO COLUMN W WOOD TO W ANCHORS = ALL THREA

12 TM ATTACHMENTS Hole chart and Attachments 3 DIAMETER HOLE PROVIDED IN FACE OF 18 AND 24 WIDE PANELS 9 1 UPPER HALF (PANEL HEIGHT 2) Hole Chart An additional 1 diameter hole may be drilled in the upper half of the Panel when it is located in the hatched area. To drill more than one hole, a larger diameter hole or a hole in a location outside of the hatched area, contact Hardy Frames, Inc. There is not an inside or outside face for the Panel. To avoid the need for additional holes, orient the open face toward the fixture to be installed. 4 4 Wood For attaching wood, siding, drywall and other surface finishes to the Panel or face #10 Flat or Wafer Head, self-tapping screws with a Winged self drilling (SD) SELF DRILLING SD POINT WING TIP SD point SELF are TAPPING recommended. When SELF connecting TAPPING to the edge of Panels, use a #12 diameter screw. BUGLE HEAD WAFER HEAD SELF DRILLING SD POINT WING TIP SD SELF DRILLING SD POINT FLAT BUGLE TRUSS HEAD SELF MODIFIED WAFER TAPPING TRUSS HEAD WING TIP SD SELF DRILLING SD POINT WING TIP SD BUGLE HEAD Steel HEX HEAD WAFER HEAD When attaching steel connectors FLAT TRUSS (12-gage maximum) MODIFIED TRUSS fixtures, electrical boxes, wire BUGLE mesh, HEAD etc. to SELF the WAFER DRILLING Panel HEAD or Brace SD POINT Frame face WING #10 Hex, TIP SD Flat Truss or Modified Truss Head with a Self Drilling (SD) point FLAT are TRUSS recommended. MODIFIED When TRUSS connecting to the edge of Panels, use a HEX #12 HEAD diameter. BUGLE HEAD WAFER HEAD FLAT TRUSS MODIFIED TRUSS HEX HEAD HEX HEAD FLAT TRUSS SELF DRILLING SD POINT MODIFIED SELF TRUSS TAPPING WING TIP SD HEX HEAD BUGLE HEAD WAFER HEAD FLAT TRUSS 789 S. Victoria Ave., Suite 200, Ventura, California HEX HEAD MODIFIED TRUSS

POST AND FRAME STRUCTURES (Pole Barns)

POST AND FRAME STRUCTURES (Pole Barns) POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:

More information

Residential Deck Safety, Construction, and Repair

Residential Deck Safety, Construction, and Repair Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the

More information

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES 101 Retrofits Required. Pursuant to Section 553.844 553.884, Florida Statutes, strengthening of existing site-built,

More information

Narrow Wall Bracing. Prescriptive Method 1-07. Hardy Frame

Narrow Wall Bracing. Prescriptive Method 1-07. Hardy Frame Narrow Wall racing Prescriptive Method 1-07 ompany and Product Profile Hardy Frames, Inc. manufactures and markets the revolutionary shear wall system. The is a state of the art pre-fabricated shear panel

More information

STANDARD OPEN PATIO COVER

STANDARD OPEN PATIO COVER STANDARD OPEN PATIO COVER BUILDING & SAFETY DIVISION 201 E. LA HABRA BLVD. LA HABRA, CA 90631 62-90-9710 Call Before You Dig 1-800-227-2600 PLEASE NOTE: This information Bulletin is made available to assist

More information

Superform Products Ltd.

Superform Products Ltd. TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000

More information

TYPICAL PATIO COVERS 111

TYPICAL PATIO COVERS 111 City of Laguna Niguel Building Division 30111 Crown Valley Pkwy Laguna Niguel, CA 92677 (949) 362-4360 FAX 362-4369 www.cityoflagunaniguel.org TYPICAL PATIO COVERS 111 PLEASE NOTE: This information Bulletin

More information

ICC-ES Evaluation Report

ICC-ES Evaluation Report ICC-ES Evaluation Report ESR-2369 Reissued May 1, 2010 This report is subject to re-examination in one year. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council

More information

Guidelines for Earthquake Bracing of Residential Water Heaters

Guidelines for Earthquake Bracing of Residential Water Heaters Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)

More information

Page & Turnbull imagining change in historic environments through design, research, and technology

Page & Turnbull imagining change in historic environments through design, research, and technology DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED

More information

How to secure your property after a disaster

How to secure your property after a disaster How to secure your property after a disaster The Red Guide to Recovery HOuse secured properly Board-Up of Windows, Doors and Roof Hole. Lot secured with Perimeter Fencing. Fires, floods, tornadoes, hurricanes,

More information

Connection Solutions

Connection Solutions Connection Solutions DESIGN BUILD SYSTEM Connection Solutions for Cold formed Steel Construction Complies with; AS/NZS 4600:2005 AISI S100:2007 AS/NZ 1397 ASTM A653 DESIGN & BUILD SYSTEM FRAMECAD Construction

More information

SECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS SECTION 26 05 49 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes seismic restraints and other earthquake-damage-reduction measures for electrical

More information

COMMONLY USED RESIDENTIAL BUILDING CODES

COMMONLY USED RESIDENTIAL BUILDING CODES COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 FOUNDATION 1. DESIGN OF FORMWORK. Section 1906.1 IBC 2009, Section R404.1.2.3.6 IRC 2009, ACI 318 Section

More information

Custom 30 x 20-8 Garage Plan Plan #g233 By SDS-CAD Specialized Design Systems

Custom 30 x 20-8 Garage Plan Plan #g233 By SDS-CAD Specialized Design Systems P O Box 34 Mendon, Utah Custom 30 x 20-8 Garage Plan Plan #g233 By Page 1 Title Page Page 2 Main Floor Plan Page 3 Foundation Plan Page 4 Elevation Views Page 5 Framing and Details Page 6 Typical Section

More information

609 West Rock Road, Radford,VA 24141 540-633-5000 / (fax) 540-731-3712 RECOMMENDED ATTACHMENTS & CONNECTION DETAILS

609 West Rock Road, Radford,VA 24141 540-633-5000 / (fax) 540-731-3712 RECOMMENDED ATTACHMENTS & CONNECTION DETAILS 609 West Rock Road, Radford,VA 24141 540-633-5000 / (fax) 540-731-3712 RECOMMENDED ATTACHMENTS & CONNECTION DETAILS INDEX OF DRAWINGS SECTION A: A-1 = METAL TRACK TO PANEL ATTACHMENT A-2 = WOOD PLATE TO

More information

Best Barns USA Assembly Book

Best Barns USA Assembly Book Best Barns USA Assembly Book Revised November 27, 2013 the Easton - R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

Diameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug.

Diameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug. P-5 The P-5 is hot forged from carbon steel. The formed head provis spherical seating that the Lifting Eye engages, while a disc-shaped foot is embedd in the concrete. Due to its being a forged part, the

More information

Chapter 36 - STRAW BALE CONSTRUCTION SECTION 3601 - PURPOSE. SECTION 3602 - SCOPE. SECTION 3603 - DEFINITIONS.

Chapter 36 - STRAW BALE CONSTRUCTION SECTION 3601 - PURPOSE. SECTION 3602 - SCOPE. SECTION 3603 - DEFINITIONS. Austin City Code - Volume II TITLE 25 LAND DEVELOPMENT\CHAPTER 25-12 TECHNICAL CODES\ARTICLE 1: UNIFORM BUILDING CODE\25-12-3 LOCAL AMENDMENTS TO THE BUILDING CODE Chapter 36 - STRAW BALE CONSTRUCTION

More information

Ceiling Mounted Folding Attic Ladders Installation Instructions

Ceiling Mounted Folding Attic Ladders Installation Instructions Ceiling Mounted Folding Attic Ladders Installation Instructions WARNING Before you start installing your new Louisville Ceiling Mounted Folding Attic Ladder, you must read and understand the following:

More information

Featuring TJ Rim Board and TimberStrand LSL

Featuring TJ Rim Board and TimberStrand LSL #TJ-8000 SPECIFIER S GUIDE TRUS JOIST RIM BOARD Featuring TJ Rim Board and TimberStrand LSL Multiple thicknesses, grades, and products to cover all your rim board needs 1¼" Thickness matches lateral load

More information

Guidelines for Earthquake Bracing Residential Water Heaters

Guidelines for Earthquake Bracing Residential Water Heaters Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the

More information

FRAME PROFILE MASONRY METAL DOOR FRAME FLUSH MASONRY KD MITER CORNER JOINT. #8 Screw (MS002485) Required on all fire rated KD frames. Bend Tabs.

FRAME PROFILE MASONRY METAL DOOR FRAME FLUSH MASONRY KD MITER CORNER JOINT. #8 Screw (MS002485) Required on all fire rated KD frames. Bend Tabs. FRAME PROFILE MASONRY FLUSH MASONRY KD MITER CORNER JOINT Bend Tabs Head #8 Screw (MS002485) Required on all fire rated KD frames Corner Assembly 2" (50.8) Head Jamb Head Break Away Corner Clip Spot Welds

More information

Technical Assignment 2 TABLE OF CONTENTS

Technical Assignment 2 TABLE OF CONTENTS 2 TABLE OF CONTENTS Executive Summary...3 Introduction..5 Gravity Loads......6 Design Codes......7 Materials..8 Existing Structural System.. 10 Existing Floor System 15 Alternate Floor Framing Systems...17

More information

6 RETROFITTING POST & PIER HOUSES

6 RETROFITTING POST & PIER HOUSES Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This

More information

Hilti KWIK HUS-EZ I (KH-EZ I) Internally Threaded Carbon Steel Screw Anchor

Hilti KWIK HUS-EZ I (KH-EZ I) Internally Threaded Carbon Steel Screw Anchor Hilti KWIK HUS-EZ I (KH-EZ I) Internally Threaded Carbon Steel Screw Anchor Supplement to Hilti North American Product Technical Guide Volume 2: Anchor Fastening Technical Guide 2011 Edition 3.3. KWIK

More information

Chapter 6 ROOF-CEILING SYSTEMS

Chapter 6 ROOF-CEILING SYSTEMS Chapter 6 ROOF-CEILING SYSTEMS Woodframe roof-ceiling systems are the focus of this chapter. Cold-formed steel framing for a roof-ceiling system also is permitted by the IRC but will not be discussed;

More information

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally

More information

Sports and High Mast Lighting Poles Phone: (866) 474-7200 Fax: (817) 924-7049

Sports and High Mast Lighting Poles Phone: (866) 474-7200 Fax: (817) 924-7049 Sports and High Mast Lighting Poles 4 High Mast Lighting Poles General American LitePole offers a raising and lowering system that allows for ease of maintaining the lighting system at ground level. Ideal

More information

Seismic Technical Guide

Seismic Technical Guide Technical Document Seismic Technical Guide Hanger Wire Attachment Code Requirements 1 The International Building Code (IBC) defines the requirement for hanger wire and their supports and attachment methods.

More information

PART 1 GENERAL 1.1 SECTION INCLUDES

PART 1 GENERAL 1.1 SECTION INCLUDES J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including

More information

PANELIZED HOME INSTALLATION GUIDELINE

PANELIZED HOME INSTALLATION GUIDELINE PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.

More information

Residential Decks. Planning and Development Services Department

Residential Decks. Planning and Development Services Department Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Planning and Development Services Department Residential Decks

More information

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION SIPS SCREWS WITH MINIMUM 1" PENETRATION IN WOOD MEMBER IN SIP WALL PANEL CONNECTED TO @ 24" O.C. MAXIMUM OUTSIDE SKIN EACH SIDE OF FRAMING TYP. AS RECOMMENDED BY FOAM CORE AS EACH SIDE OF FRAMING TYP.

More information

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE BUILDINGS CONTRACTOR SERIES 2 X 4 FRAMES

UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE BUILDINGS CONTRACTOR SERIES 2 X 4 FRAMES UNIVERSAL ASSEMBLY INSTRUCTIONS FOR VERSATUBE BUILDINGS CONTRACTOR SERIES 2 X 4 FRAMES Our unique assembly process quickly transforms the individual pieces into a finished structure that will give you

More information

Introduction...COMB-2 Design Considerations and Examples...COMB-3

Introduction...COMB-2 Design Considerations and Examples...COMB-3 SECTION DIRECTORY General Information Introduction...COMB-2 Design Considerations and Examples...COMB-3 Combination Assembly Recommendations and Limitations Composite Configurations...COMB-4 Typical Sealant

More information

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures SECTION 7201 - PURPOSE The purpose of this appendix chapter is to establish minimum prescriptive standards

More information

Hunter College school of Social Work Thesis Proposal

Hunter College school of Social Work Thesis Proposal Fall 2009 Hunter College school of Social Work Thesis Proposal To analyze how energy efficiency can be implemented using facade and green roof redesign. It ties structural engineering concepts with existing

More information

Formwork for Concrete

Formwork for Concrete UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Formwork for Concrete Horizontal Formwork Design and Formwork Design

More information

Chapter 10 - Scaffolding Systems

Chapter 10 - Scaffolding Systems Chapter 10 - Scaffolding Systems Contents Chapter 10 - Scaffolding Systems... 10-1 Check and Oil the Pump Jacks... 10-4 Set Pump Jack Brackets... Error! Bookmark not defined. Set Pump Jack Poles... 10-5

More information

TZ WEDGE ANCHOR FOR CRACKED AND UNCRACKED CONCRETE

TZ WEDGE ANCHOR FOR CRACKED AND UNCRACKED CONCRETE SECTION 2.2 PAGE 1 / 9 l DESCRIPTION UCAN TZ torque controlled mechanical expansion wedge anchors have a Category 1 classification. They are used to resist static, wind and seismic tension and shear loads

More information

Hilti, Inc. 5400 South 122 nd East Avenue Tulsa, OK 74146. 1-800-879-8000 www.hilti.com

Hilti, Inc. 5400 South 122 nd East Avenue Tulsa, OK 74146. 1-800-879-8000 www.hilti.com Attached are page(s) from the 2014 Hilti North American Product Tech Guide. For complete details on this product, including data development, product specifications, general suitability, installation,

More information

EAST LYME HIGH SCHOOL

EAST LYME HIGH SCHOOL Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed

More information

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona for Earthen Material and Straw Bale Structures SECTION 70 - GENERAL "APPENDIX CHAPTER 7 - EARTHEN MATERIAL STRUCTURES 70. Purpose. The purpose of this chapter is to establish minimum standards of safety

More information

USP SIP Connection Manual www.uspconnectors.com

USP SIP Connection Manual www.uspconnectors.com SIP Connection Manual www.connectors.com Structural Insulated Panels (SIP) supplies quality products to build Stronger Safer Structures Los Angeles San Francisco Minneapolis Houston Tampa Charlotte Philadelphia

More information

Chapter. Restoration of Damaged Structures

Chapter. Restoration of Damaged Structures 5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.

More information

CPA Steel Stud Framing Page 1 of 11

CPA Steel Stud Framing Page 1 of 11 CPA Steel Stud Framing Page 1 of 11 STEEL STUD FRAMING General Requirements City of Palo Alto (CPA) Building Inspection Division 285 Hamilton Ave. Inspection Request: 650 329-2496 Building Division IVR#

More information

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code LEGACY REPORT Reissued November 1, 2003 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900

More information

March 14, 2007. Installation of Bay, Bow and Garden Windows

March 14, 2007. Installation of Bay, Bow and Garden Windows March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed

More information

Uncovered Decks & Porches

Uncovered Decks & Porches Uncovered Decks & Porches Building Guides for Homeowners Why Do I need a Permit? D I D Y O U K N O W? As owner-builder you are the responsible party of record on such a permit. If your work is being performed

More information

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances. Residential Decks Community Development Department Building Inspections Division 5200 85 th Avenue North / Brooklyn Park, MN 55443 Phone: (763) 488-6379 / Fax: (763) 493-8171 6/15 www.brooklynpark.org

More information

Policy on Water Heater Installations Policy No. UPC 510-1-94 Effective: September 1, 1995 Revised: February 10, 1996

Policy on Water Heater Installations Policy No. UPC 510-1-94 Effective: September 1, 1995 Revised: February 10, 1996 CITY OF SAN JOSE BUILDING DIVISION POLICY Policy on Water Heater Installations Policy No. UPC 510-1-94 Effective: September 1, 1995 Revised: February 10, 1996 All new and replacement water heaters installed

More information

3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form

3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form 3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form THIS FULLY COMPLETED DOCUMENT MUST BE INCLUDED WITH EACH RETURN SHIPMENT IN ORDER FOR CREDIT TO BE ISSUED. ALL CREDITS WILL BE ISSUED TO

More information

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................

More information

4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.

4. ANCHOR BOLTS AND STRAPS a. ½ anchor bolts shall be embedded 7 into concrete a maximum of 6' on center and 12 from corners and ends of plates. GENERAL CODE REQUIREMENTS (BASEMENTS) 1. FOOTINGS a. Footings shall be below frost line depth (42"). b. For an 8" foundation wall, footings shall be no less than 8" deep and 16" wide. c. Steel reinforcement

More information

DE Frame with C Series Sidelight

DE Frame with C Series Sidelight TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Screw gun with clutch adjusted #2 phillips tip #3 phillips tip Screwdriver (used to adjust frame on will using oval slots) Pry Bar Powder

More information

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11 K. D. FRAME ASSEMBLY FOR MASONRY WALLS...........................Ins 2 FRAME INSTALLATION DETAILS FOR MASONRY WALLS......................Ins 3 INSTALLING EXISTING MASONRY WALL ANCHORS IN FRAME..................Ins

More information

IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality

IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION Generated: Sergiy Papyshev Engineering Approved: Don Prysi Manufacturing Approved: Merzuk Ramic Quality Approved: Steven Barnett Administrative DATE DATE DATE

More information

The following excerpt are pages from the North American Product Technical Guide, Volume 2: Anchor Fastening, Edition 16.

The following excerpt are pages from the North American Product Technical Guide, Volume 2: Anchor Fastening, Edition 16. The following excerpt are pages from the North American Product Technical Guide, Volume 2: Anchor Fastening, Edition 16. Please refer to the publication in its entirety for complete details on this product

More information

Hilti, Inc. 5400 South 122 nd East Avenue Tulsa, OK 74146. 1-800-879-8000 www.hilti.com

Hilti, Inc. 5400 South 122 nd East Avenue Tulsa, OK 74146. 1-800-879-8000 www.hilti.com Attached are page(s) from the 2014 Hilti North American Product Tech Guide. For complete details on this product, including data development, product specifications, general suitability, installation,

More information

Detailing of Reinforcment in Concrete Structures

Detailing of Reinforcment in Concrete Structures Chapter 8 Detailing of Reinforcment in Concrete Structures 8.1 Scope Provisions of Sec. 8.1 and 8.2 of Chapter 8 shall apply for detailing of reinforcement in reinforced concrete members, in general. For

More information

Wisconsin Building Products Evaluation

Wisconsin Building Products Evaluation Safety & Buildings Division 201 West Washington Avenue P.O. Box 2658 Madison, WI 53701-2658 Evaluation # 200813-O Wisconsin Building Products Evaluation Material Best Management Standards for Foundation

More information

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors Installation Manual Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors SW602206 Rev B Table of Contents Chapter 1: Safety Warning... 3 Chapter 2: Kit Contents... 4 Included in Kit...

More information

Seismic Installation for Attic Storage System

Seismic Installation for Attic Storage System Your Performance Partner Seismic Installation for Storage System CONTENTS SSafety Precautions................................. 2 Required Tools..................................... 2 Parts and Fastener

More information

Section A Roof Truss

Section A Roof Truss Section A Roof Truss Truss Types Wisconsin Truss, Inc. can build a variety of truss types, pictured below are some common examples. Common Bobtail Scissor Mono Studio Dual Slope Cathedral Tray Vault Parallel

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

Development Services Department Building Permit & Inspection Services Shed and Garage Construction Guide for Detached and Semi-Detached Dwellings

Development Services Department Building Permit & Inspection Services Shed and Garage Construction Guide for Detached and Semi-Detached Dwellings Development Services Department Building Permit & Inspection Services Shed and Garage Construction Guide for Detached and Semi-Detached Dwellings H:/forms/handouts/bldg071.docx Shed and Garage Construction

More information

Protecting Your Home From Hurricane Wind Damage

Protecting Your Home From Hurricane Wind Damage T H E W I N D Protecting Your Home From Hurricane Wind Damage During a hurricane, homes may be damaged or destroyed by high winds and high waves. Debris can break windows and doors, allowing high winds

More information

USP SIP Connection Manual

USP SIP Connection Manual USP SIP Connection Manual Structural Insulated Panels (SIP) Lumberton Largo Montgomery Humble Livermore Thornhill, Ontario Copyright 2013 United Steel Products Company 2 Company Information Company History

More information

[TECHNICAL REPORT I:]

[TECHNICAL REPORT I:] [Helios Plaza] Houston, Texas Structural Option Adviser: Dr. Linda Hanagan [TECHNICAL REPORT I:] Structural Concepts & Existing Conditions Table of Contents Executive Summary... 2 Introduction... 3 Structural

More information

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built

More information

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS Johnson County Building Officials Association January 2008 Residential Foundation Guideline Foundation designs for one-and two-family dwellings may use

More information

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS Office and Production 126 New Pace Rd., PO Box 279 Newcomerstown, OH 43832 1-800-446-2188, Fax: 740-498-4184 www.buildwithsips.com CONSTRUCTION DETAILS & LOAD DESIGN CHARTS Table of Contents Description

More information

CALCULATION & DRAFTING STANDARDS MANUAL PROCEDURE: C&D 515 Bill of Materials Standard REV 0.0 5/6/04

CALCULATION & DRAFTING STANDARDS MANUAL PROCEDURE: C&D 515 Bill of Materials Standard REV 0.0 5/6/04 BROWN MINNEAPOLIS TANK PAGE 1 OF 7 PURPOSE: Create and Drawing Uniformity Create, explain, and establish a standard bill of materials to be placed on every drawing (except the overall tank elevation and

More information

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:

More information

Owner's Manual & Assembly Instructions

Owner's Manual & Assembly Instructions Owner's Manual & Assembly Instructions PM01 BASE KIT Model No. FDN1014 717090311 CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP. FOR SAFETY

More information

What is Seismic Retrofitting?

What is Seismic Retrofitting? What is Seismic Retrofitting? SEISMIC RETROFITTING A Seismic Retrofit provides existing structures with more resistance to seismic activity due to earthquakes. In buildings, this process typically includes

More information

CHAPTER 6 CONSTRUCTION TYPES

CHAPTER 6 CONSTRUCTION TYPES CHAPTER 6 CONSTRUCTION TYPES SECTION 601 GENERAL 601.1 Scope. Provisions of this chapter shall govern the classification of construction type by materials and fire resistance of its elements and the use

More information

Discipline: Structural Issued 04-26-06

Discipline: Structural Issued 04-26-06 California Department of General Services. Division of the State Architect. Product Acceptance Report STRUCTURAL SHEAR PANEL SURE-BOARD SERIES 200 PANELS PA-132 Discipline: Structural Issued 04-26-06 This

More information

INSTALLATION OF A BAY WINDOW

INSTALLATION OF A BAY WINDOW INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening

More information

Residential Foundations and Basements

Residential Foundations and Basements Residential Foundations and Basements Disclaimer All of the following information is based on the 2006 International Residential Code with Kentucky Amendments. As some information is paraphrased, article

More information

HORIZONTAL INSTALLATION

HORIZONTAL INSTALLATION THERMO/SOLAR Žiar s.r.o. MANUAL FOR INSTALLATION PV SUPPORTING FRAMES HORIZONTAL INSTALLATION Technical alternation reserved A1410 1 12/2014 CONTENT ORD.NO. PAGE Mounting information 3 Mounting, flat roof

More information

TABLE OF CONTENTS. Roof Decks 172 B, BA, BV Deck N, NA Deck. Form Decks 174.6 FD,.6 FDV Deck 1.0 FD, 1.0 FDV Deck 1.5 FD Deck 2.0 FD Deck 3.

TABLE OF CONTENTS. Roof Decks 172 B, BA, BV Deck N, NA Deck. Form Decks 174.6 FD,.6 FDV Deck 1.0 FD, 1.0 FDV Deck 1.5 FD Deck 2.0 FD Deck 3. Pages identified with the NMBS Logo as shown above, have been produced by NMBS to assist specifiers and consumers in the application of New Millennium Building Systems Deck products. Pages identified with

More information

Assembly Instructions

Assembly Instructions Assembly Instructions Overhead Storage Rack 4 x 8 3 x 8 2 x 8 4 x 6 3 x 6 2 x 6 4 x 4 Two 4x8 Racks Pictured Eagle Industrial Group, Inc. 25471 Arctic Ocean Drive Lake Forest, CA 92630 877.655.3443 888.313.9228

More information

This digital document created and presented by Richard Fleetwood. He is the. Civil Defense Now! (http://www.survivalring.org/cd-main.htm) websites.

This digital document created and presented by Richard Fleetwood. He is the. Civil Defense Now! (http://www.survivalring.org/cd-main.htm) websites. This digital document created and presented by Richard Fleetwood. He is the founder, author, producer, and webmaster of the SurvivalRing (http://www.survivalring.org) and Civil Defense Now! (http://www.survivalring.org/cd-main.htm)

More information

Submittal Information

Submittal Information Wedge SPECIFIED FOR ANCHORAGE INTO CONCRETE Wedge anchs feature a stainless steel expansion clip, threaded stud body, nut and washer. Anch bodies are made of plated carbon steel, hot-dipped galvanized

More information

Typical Deck Details

Typical Deck Details Fairfax County, Virginia Typical Deck Details Based on the 2012 Virginia Residential Code The design details in this document apply to residential, single-level decks only. Construction cannot deviate

More information

Installation Instructions: (Part # SB76880) XRC Armor Front Fender Kit

Installation Instructions: (Part # SB76880) XRC Armor Front Fender Kit WARNING: Check with Local and State laws before installing this accessory! NOTE: Carefully read entire instructions thoroughly before attempting to install this part. Parts Included: Qty Parts Included:

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

Dock Hardware & Accessory Products Catalog

Dock Hardware & Accessory Products Catalog Dock Hardware & Accessory Products Catalog Product Page # Product Page # Angle Brackets/Clips 8 Back Up Plate 5 Backing Plate/Hurricane Stop 10 Carriage Bolt Sets 4 Chain Retainer 10 Connector Pin Set

More information

Standard from CSI Part Section Format. 06212 For Wood Framing 05160 For Metal Framing 09226 For Gypsum Sheathing

Standard from CSI Part Section Format. 06212 For Wood Framing 05160 For Metal Framing 09226 For Gypsum Sheathing Standard from CSI Part Section Format. 06212 For Wood Framing 05160 For Metal Framing 09226 For Gypsum Sheathing Specifications for SURE-BOARD Series 200 and 200W Panel for shear PART 1.0 GENERAL 1.01

More information

TJi 110 TJi 210 TJi 230 TJi 360 TJi. 560 JoiSTS. NEW! now featuring 18" and 20" TJi joists

TJi 110 TJi 210 TJi 230 TJi 360 TJi. 560 JoiSTS. NEW! now featuring 18 and 20 TJi joists #TJ-4500 SPECIFIER S GUIDE TJi 110 TJi 210 TJi 230 TJi 360 TJi 560 JoiSTS WESTERN CANADA Featuring Trus Joist TJi Joists for Floor and Roof applications uniform and predictable lightweight for Fast installation

More information

Repair of Earthquake-Damaged Masonry Fireplace Chimneys SOUTH NAPA EARTHQUAKE RECOVERY ADVISORY

Repair of Earthquake-Damaged Masonry Fireplace Chimneys SOUTH NAPA EARTHQUAKE RECOVERY ADVISORY Repair of Earthquake-Damaged Masonry Fireplace Chimneys SOUTH NAPA EARTHQUAKE RECOVERY ADVISORY Purpose and Intended Audience The August 24, 2014 South Napa Earthquake has again served as a reminder that

More information

Canvas Office Landscape Wall Strip Installation and Disassembly for Recycling Instructions

Canvas Office Landscape Wall Strip Installation and Disassembly for Recycling Instructions Y Parts Included: Canvas Office Landscape Wall Strip Installation and Disassembly for Recycling Instructions Tools Required: Power Driver Drill Bit (Determined by fastener) Driver Bit (Determined by fastener)

More information

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

WHI 90-Minute Rated Veneered Door Frame Installation Instructions No. 940-03-10 INSTALLATION INSTRUCTIONS 90 MINUTE RATED VENEERED DOOR FRAME DOOR REQUIREMENTS: Consult the door manufacturer to make sure that the doors are qualified for the hardware to be installed,

More information

8/18/14. Introduction to. Framing. Terminology and Concepts

8/18/14. Introduction to. Framing. Terminology and Concepts 8/18/14 Introduction to Framing Terminology and Concepts Terminology: Framing Level Two points on exactly the same horizontal plane. Square Intersecting lines or faces that form an exact 90 angle. Plumb

More information

Structural Bolting. Notice the Grade 5 has a much smaller head configuration and a shorter shank then the A325 structural bolt. Rev.

Structural Bolting. Notice the Grade 5 has a much smaller head configuration and a shorter shank then the A325 structural bolt. Rev. Structural Bolting ASTM A325 and ASTM A490 are the two U.S. standard structural bolts. When looking at the mechanical requirements of bolts it appears that an ASTM A325 and SAE J429 Grade 5 are identical

More information

Chapter 3 FOUNDATIONS AND FOUNDATION WALLS

Chapter 3 FOUNDATIONS AND FOUNDATION WALLS Chapter 3 FOUNDATIONS AND FOUNDATION WALLS This chapter discusses foundations and foundation walls constructed using the two most common foundation materials concrete and masonry. Although the IRC permits

More information