OFFSHORE SUPPORT VESSELS 2013

Size: px
Start display at page:

Download "OFFSHORE SUPPORT VESSELS 2013"

Transcription

1 RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS 2013 NOTICE NO. 2 JULY 2013 The following Rule Changes were approved by the ABS Rules Committee on 31 May 2013 and become EFFECTIVE AS OF 1 JULY (See for the consolidated version of the Rules for Building and Classing Offshore Support Vessels 2013, with all Notices and Corrigenda incorporated.) Notes - The date in the parentheses means the date that the Rule becomes effective for new construction based on the contract date for construction, unless otherwise noted. (See 1-1-4/3.3.) PART 3 CHAPTER 3 APPENDIX 2 VESSEL SYSTEMS AND MACHINERY SUBDIVISION AND STABILITY DAMAGE STABILITY REQUIREMENTS FOR OFFSHORE SUPPLY VESSELS (Revise Subsection 3-3-A2/3, as follows:) 3 Damage Assumptions (1 July 2013) The following damage assumptions are to be applied: i) Damage is to be assumed to occur anywhere in the vessel s length between transverse watertight bulkheads. The longitudinal extent of damage is: a) For a vessel the keel of which is laid or which is at a similar stage of construction* before 22 November 2012: **) not greater than 43 m (141 ft): 10% of L f ; and ) greater than 43 m (141 ft): 3 m (10 ft) plus 3% of L f ; b) For a vessel the keel of which is laid or which is at a similar stage of construction on or after 22 November 2012: ) not greater than 43 m (141 ft): 10% of L f ; ) greater than 43 m (141 ft) and less than 80 m (262.5 ft): 3 m (10 ft) plus 3% of L f ; and ) from 80 m (262.5 ft) to 100 m (328 ft): 1/3L f 2/3 ; * A similar stage of construction means the stage at which: 1 construction identifiable with a specific ship begins; and 2 assembly of that ship has commenced comprising at least 50 tonnes (49 Long tons) or one per cent of the estimated mass of all structural material, whichever is less. ** L f is the freeboard length, as defined in 3-1-1/3.3. ABS RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS

2 ii) iii) The vertical extent of damage is to be assumed from the underside of the cargo deck, or the continuation thereof, for the full depth of the vessel. The transverse extent of damage is: a) For a vessel the keel of which is laid or which is at a similar stage of construction before 22 November 2012: 760 mm (30 in.) measured inboard from the side of the vessel perpendicularly to the centerline at the level of the summer load waterline; b) For a vessel the keel of which is laid or which is at a similar stage of construction on or after 22 November 2012: ) less than 80 m (262.5 ft): 760 mm (30 in.); and ) from 80 m to 100 m (262.5 ft to 328 ft): B/20, but not less than 760 mm (30 in.); Notes: 1 (1 July 2013) For a vessel the keel of which is laid or which is at a similar stage of construction: 1.1 Before 22 November 2012: A transverse watertight bulkhead extending from the vessel s side to a distance inboard of 760 mm (30 in.) or more at the level of the summer load line joining longitudinal watertight bulkheads is to be considered as a transverse watertight bulkhead for the purpose of the damage calculations. 1.2 On or after 22 November 2012: For a vessel ) less than 80 m (262.5 ft), a transverse watertight bulkhead extending from the vessel s side to a distance inboard of 760 mm (30 in.) or more at the level of the summer load line joining longitudinal watertight bulkheads is to be considered as a transverse watertight bulkhead for the purpose of the damage calculations. For a vessel ) from 80 m to 100 m (262.5 ft to 328 ft), a transverse watertight bulkhead extending from the vessel s side to a distance inboard of B/20 or more but not less than 760 mm (30 in.) at the level of the summer load line joining longitudinal watertight bulkheads is to be considered as a transverse watertight bulkhead for the purpose of the damage calculations. 2 If pipes, ducts or tunnels are situated within the assumed extent of damage, arrangements are to be made to ensure that progressive flooding cannot thereby extend to compartments other than those assumed to be floodable for each case of damage. 3 If damage of a lesser extent than that specified in 3-3-A2/3i), 3-3-A2/3ii), and 3-3-A2/3iii) results in a more severe condition, such lesser extent is to be assumed. 4 Where a transverse watertight bulkhead is located within the transverse extent of assumed damage and is stepped in way of a double bottom or side tank by more than 3.05 m (10 ft), the double bottom or side tanks adjacent to the stepped portion of the transverse watertight bulkhead is to be considered as flooded simultaneously. 5 If the distance between adjacent transverse watertight bulkheads or the distance between the transverse planes passing through the nearest stepped portions of the bulkheads is less than the longitudinal extent of damage given in i), only one of these bulkheads should be regarded as effective. 6 The forecastle space need not be assumed damaged if the continuation of the cargo deck forward is capable of being secured watertight. 7 For a vessel operating in well stimulation service, the assumed damage occurs anywhere in the vessel s length at any transverse watertight bulkhead. 2 ABS RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS. 2013

3 PART 3 CHAPTER 7 SECTION 1 HULL CONSTRUCTION AND EQUIPMENT TESTING, TRIALS AND SURVEYS DURING CONSTRUCTION HULL TANK, BULKHEAD AND RUDDER TIGHTNESS TESTING 1 General (1 July 2013) (Revise Subsection 3-7-1/1, as follows:) Test procedures are to confirm the watertightness of tanks and watertight boundaries, the structural adequacy of tanks and the weathertightness of structures/shipboard outfitting. The tightness of tanks and tight boundaries is to be confirmed by test procedures for: New ships, prior to delivery, and Structures involved in or affected by major conversions or repairs affecting structural integrity 1.1 Application All gravity tanks which are subjected to vapor pressure not greater than 0.7 bars (0.7 kgf/cm 2, 10 psi) and other boundaries required to be watertight or weathertight are to be tested in accordance with this Subsection and proven tight or structurally adequate as follows: Gravity Tanks for their structural adequacy and tightness, Watertight Boundaries Other Than Tank Boundaries for their watertightness, and Weathertight Boundaries for their weathertightness. Testing of structures not listed in 3-7-1/Table 1 and 3-7-1/Table 2 is to be specially considered. 1.3 Types and Definitions of Test Structural Testing is a test to verify the structural adequacy of the construction of the tank. This may be hydropneumatic testing or hydrostatic testing as specified in 3-7-1/5.1 and 3-7-1/ Leak Testing is a test to verify the tightness of the boundary. Unless specific testing is indicated, this may be hydrostatic/hydropneumatic testing or air testing as specified in 3-7-1/5.1, 3-7-1/5.3 and 3-7-1/5.5. Leak testing in items 14 to 17 as specified in 3-7-1/Table 1 includes hose test as an acceptable medium of the test. 3 Test Procedures 3.3 Structural Testing (1 July 2013) (Revise Paragraph 3-7-1/3.3, as follows:) Test Type and Time Where structural testing is specified by 3-7-1/Table 1 or 3-7-1/Table 2, hydrostatic testing in accordance Where structural testing is specified by 3-7-1/Table 1 or 3-7-1/Table 2, hydrostatic testing in accordance with 3-7-1/5.1 will be acceptable, except where practical limitations (strength of building berth, density of liquid, etc.) prevent it or where air testing is permitted by Note 1 to /Table 1. Hydropneumatic testing, in accordance with 3-7-1/5.3, may be approved in lieu of hydrostatic testing. Structural testing may be carried out after the vessel is launched. ABS RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS

4 Tank boundaries are to be tested at least from one side. Tanks to be tested for structural adequacy (see Note 1 to 3-7-1/Table 1) are to be selected so that all representative structural members are tested for the expected tension and compression Number of Structural Testing i) Structural testing is to be carried out for at least one tank of the same construction (i.e. tanks of the same structural design and configuration and same general workmanship as determined by the attending Surveyor) on each vessel provided all subsequent tanks are tested for leaks by an air test. The relaxation to accept leak testing using an air test instead of a structural test does not apply to cargo space boundaries in tankers and combination carriers and tanks for segregated cargoes or pollutants. ii) iii) iv) However, where structural adequacy of a tank was verified by structural testing required in 3-7-1/Table 1, the subsequent vessels in the series (i.e. sister ships built in the same shipyard) may be exempted from such testing for other tanks which have the structural similarity to the tested tank, provided that the water-tightness in all boundaries of exempted tanks are verified by leak tests and thorough inspection. For sister ships built several years after the last ship of the series, such exemption may be reconsidered. In any case, structural testing is to be carried out for at least one tank for each vessel in order to verify structural fabrication adequacy. The relaxation to accept leak testing and thorough inspections instead of a structural test on subsequent vessels in the series does not apply to cargo space boundaries in tankers and combination carriers and tanks for segregated cargoes or pollutants. For watertight boundaries of spaces other than tanks (excluding chain lockers), structural testing may be exempted, provided that the watertightness in all boundaries of exempted spaces are verified by leak tests and thorough inspection. These subsequent tanks may require structural testing if found necessary after the structural testing of the first tank. Tanks for structural test are to be selected so that all representative structural members are tested for the expected tension and compression. (Replace existing Paragraphs 3-7-1/3.5 and 3-7-1/3.7 with the following:) 3.5 Leak Testing (1 July 2013) For leak testing specified in 3-7-1/Table 1, air testing, compressed air fillet weld testing, vacuum box testing in accordance with 3-7-1/5.5, 3-7-1/5.9, and 3-7-1/5.11, or their combination will be acceptable. Hydrostatic or hydropneumatic testing may also be accepted as leak testing provided 3-7-1/5.1 and 3-7-1/5.3 are complied with. Hose testing is applied to structures not subjected to structural or air testing but required to be watertight or weathertight as specified in 3-7-1/Table 1. For the details of hose testing, see 3-7-1/5.7. Air testing or structural testing may be accepted in lieu of hose testing. Joint air testing may be carried out in the block stage provided all work on the block that may affect the tightness of the joint is completed before the test. See also 3-7-1/7.1 for the application of final coating and 3-7-1/7.5 for safe access to the joint and their summary in 3-7-1/Table 3. 4 ABS RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS. 2013

5 5 Details of Testing (1 July 2013) (Revise Subsection 3-7-1/5, as follows:) 5.1 Hydrostatic Testing Hydrostatic Testing is a test to verify the structural adequacy of the design and the tightness of the tank s structure by means of water pressure. Hydrostatic testing is the normal means for structural testing with exception as per 3-7-1/3.3. Hydrostatic testing is to consist of a head of water to the level specified in 3-7-1/Table 1 or 3-7-1/Table Hydropneumatic Testing Hydropneumatic Testing is a combined hydrostatic and air testing wherein a tank is filled by water with air pressure applied on top. When approved, the combined water level and air pressure used for hydropneumatic testing is to simulate the actual loading as far as practicable. The requirements and recommendations in 3-7-1/5.5 relative to air pressure will also apply. 5.5 Air Testing Air Testing is a test to verify the tightness of the structure by means of air pressure difference. All boundary welds, erection joints, and penetrations including pipe connections are to be examined in accordance with the approved procedure and under a pressure differential not less than 0.15 bar (0.15 kgf/cm 2, 2.2 psi) with a leak indicating solution. It is recommended that the air pressure in the tank be raised to and maintained at 0.20 bar (0.20 kgf/cm 2, 2.9 psi) for approximately one hour, with a minimum number of personnel around the tank, before being lowered to the test pressure. A U-tube with a height sufficient to hold a head of water corresponding to the required test pressure is to be arranged. The cross sectional area of the U-tube is to be not less than that of the pipe supplying air. In addition to the U-tube, a master gauge or other approved means is to be provided to verify the pressure. Other effective methods of air testing, including compressed air fillet weld testing or vacuum testing, may be considered in accordance with 3-7-1/ Hose Testing Hose Testing is a test to verify the tightness of the joint by a jet of water. Hose testing is to be carried out with the pressure in the hose of at least 2 bar (2 kgf/cm 2, 30 psi) during test. The nozzle is to have minimum inside diameter of 12 mm (0.5 in.) and is to be located at a distance to the joint not exceeding 1.5 m (5 ft). For structural welds, where hose testing is not practical because of possible damage to machinery, electrical equipment insulation or outfitting items, it may be replaced by a careful visual examination of welded connections, supported where necessary by means such as penetration testing, ultrasonic testing, or an equivalent. For cable penetrations, where hose testing is not practical because of possible damage to machinery, electrical equipment insulation or outfitting items, other methods of testing may be considered upon submission of full particulars to the attending Surveyor. 5.9 Compressed Air Fillet Weld Testing Compressed Air Fillet Weld Testing is an air test of a fillet welded tee joint with a leak indicating solution applied on the fillet welds. In this air testing, compressed air is injected from one end of fillet welded joint and the pressure verified at the other end of the joint by a pressure gauge on the opposite side. Pressure gauges are to be arranged so that an air pressure of at least 0.15 bar (0.15 kgf/cm 2, 2.2 psi) can be verified at each end of all passages within the portion being tested. Where a leaking test of partial penetration welding is required and the root face is sufficiently large such as 6-8 mm ( inch), the compressed air test is to be applied in the same manner as for a fillet weld. ABS RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS

6 5.11 Vacuum Box Testing Vacuum Box Testing is a test to detect any leaks on the structure. A box over a joint with leak indicating solution applied on the fillet or full penetration welds. A vacuum is created inside the box to detect any leaks. A box (vacuum tester) with air connections, gauges and inspection window is placed over the joint with leak indicator applied. The air within the box is removed by an ejector to create a vacuum of 0.20 bar (0.20 kgf/cm 2, 2.9 psi) 0.26 bar (0.27 kgf/cm 2, 3.8 psi) inside the box Ultrasonic Testing Ultrasonic Testing is a test to verify the tightness of a sealing by means of ultrasound. An arrangement of an ultrasonic echoes transmitter placed inside a compartment and a receiver outside. A location where the sound is detectable by the receiver displays a leakage in the sealing of the compartment Penetration Testing Penetration Testing is a test to verify that no leakage exist in the boundaries of a compartment by the application of low surface tension liquids. A test of butt welds by applying a low surface tension liquid to one side of a compartment boundary. When no liquid is detected on the opposite side of the boundary after expiration of a definite time, verification of the tightness of the compartment boundary can be assumed Other Methods of Testing Other methods of testing may be considered upon submission of full particulars. 7 Application of Coating 7.1 Final Coating (1 July 2013) (Revise Paragraph 3-7-1/7.1, as follows:) Structural Testing For all weld joint types excluding butt joints by automatic process, final coating may be applied prior to the structural testing. See 3-7-1/Table Leak Testing For all manual or semi-automatic erection welds and all fillet weld tank boundary connections including penetrations, the final coating is to be applied after leak testing. For other welds, the final coating may be applied prior to leak testing provided the Surveyor, after examination prior to the application of the coating, is satisfied with the weld. The Surveyor reserves a right to require leak testing prior to the final coating of automatic erection welds and manual or automatic preerection welds. See 3-7-1/Table 3. (Add new Paragraph 3-7-1/7.5, as follows:) 7.5 Safe Access to Joints (1 July 2013) For leak testing, a safe access to all joints under examination is to be provided. See 3-7-1/Table 3. 6 ABS RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS. 2013

7 (Replace existing 3-7-1/Table 1 with the following:) TABLE 1 Testing Requirements for Tanks and Boundaries (1 July 2013) Tank or Boundary to be Tested Test Type Test Head or Pressure Remarks 1 Double bottom tanks (4) - top of the overflow, tank (2), or - to bulkhead deck 2 Double bottom voids (5) Leak See 3-7-1/5.5, 3-7-1/.5.9, and 3-7-1/ 5.11, 3 Double side tanks 4 Double side voids Leak 5 Deep tanks other than those listed elsewhere in this table 6 Cargo oil tanks 7 Ballast hold of bulk carriers 8 Peak tanks 9 a. Fore peak voids Leak b. Aft peak voids Leak - top of the overflow, tank (2), or - to bulkhead deck See 3-7-1/5.5, 3-7-1/.5.9, and 3-7-1/ 5.11, - top of the overflow, or tank (2) - top of the overflow, tank (2), or - to top of tank (2) plus setting of any pressure relief valve - top of the overflow, or - top of cargo hatch coaming - top of the overflow, or tank (2) See 3-7-1/5.5, 3-7-1/.5.9, and 3-7-1/ 5.11, See 3-7-1/5.5, 3-7-1/.5.9, and 3-7-1/ 5.11, 10 Cofferdams Leak See 3-7-1/5.5, 3-7-1/.5.9, and 3-7-1/ 5.11, a. Watertight bulkheads Leak See 3-7-1/5.5 through 3-7-1/5.11 (7) 11 See 3-7-1/5.5 through 3-7-1/5.11 b. Superstructure end bulkhead Leak c. Cable penetrations in watertight bulkheads Hose See 3-7-1/ Watertight doors below freeboard or bulkhead deck 13 Double plate rudder blade Leak Leak (6, 8) See 3-7-1/5.5 through 3-7-1/5.11 See 3-7-1/5.5 through 3-7-1/5.11 See item 16 for hatch covers. After peak to be tested after installation of stern tube After peak to be tested after installation of stern tube See 3-2-9/9.11 of the Steel Vessel Rules for additional test at the manufacturer. ABS RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS

8 14 Shaft tunnel clear of deep tanks Leak (3) See 3-7-1/5.5 through 3-7-1/ Shell doors Leak (3) See 3-7-1/5.5 through 3-7-1/ Weathertight hatch covers and closing appliances Leak (3, 8) See 3-7-1/5.5 through 3-7-1/ Dual purpose tank/dry cargo hatch cover Leak (3, 8) See 3-7-1/5.5 through 3-7-1/ Chain locker Structural Top of chain pipe 19 Independent tanks 20 Ballast ducts - top of the overflow, or - to 0.9 m (3 ft) above top of tank - ballast pump maximum pressure, or - setting of any pressure relief valve Hatch covers closed by tarpaulins and battens excluded In addition to structural test in item 6 or 7 Notes: 1 Provided the structural similarity of a group of tanks is recognized by ABS and a representative tank as selected by ABS is structurally tested based on the design approval, all subsequent tanks on each vessel are tested for leaks by an air testing in accordance with 3-7-1/5.5. However, where structural adequacy of a tank was verified by structural testing, the subsequent vessels of a series of identical new buildings may be exempted from such testing for other tanks which have the structural similarity to the tested tank, provided that the water-tightness in all boundaries of exempted tanks are verified by leak tests and thorough inspection are to be carried out. In any case, structural testing is to be carried out for at least one tank for each vessel in order to assure structural fabrication adequacy. These relaxations do not apply to cargo space boundaries in tankers and combination carriers and tanks for segregated cargoes or pollutants. (See 3-7-1/3.3.2i).) 2 Top of tank is deck forming the top of the tank, excluding any hatchways. 3 Hose Testing may also be considered as a medium of the test. See 3-7-1/ Including tanks arranged in accordance with the provisions of SOLAS regulation II-1/9.4 5 Including duct keels and dry compartments arranged in accordance with the provisions of SOLAS regulation II-1/9.4 6 Where water tightness of watertight door has not confirmed by prototype test, testing by filling watertight spaces with water is to be carried out. See SOLAS regulation II-1/16.2 and MSC/Circ Where a hose test is not practicable, other testing methods listed in 3-7-1/5.13 through 3-7-1/5.17 may be applicable subject to adequacy of such testing methods being verified. See SOLAS regulation II-1/ As an alternative to the hose testing, other testing methods listed in 3-7-1/5.13 through 3-7-1/5.17 may be applicable subject to adequacy of such testing methods being verified. See SOLAS regulation II-1/ ABS RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS. 2013

9 (Revise 3-7-1/Table 2, as follows:) TABLE 2 Additional Testing Requirements for Tanks of Special Service (1 July 2013) Type of Vessels or Tanks 1 Liquefied Gas Carriers 3 Chemical Carriers Notes: Structures to be Tested Ballast or Fuel Oil Tanks adjacent to or between the Tank Holding Spaces Integral or Independent Tanks Type of Testing Structural & Leak Structural & Leak Hydrostatic Testing Head water head - to the top of overflow, or tank (1) water head tank (1), or - to top of tank (1) plus setting of any pressure relief valve 1 (1 July 2013) Top of tank is deck forming the top of the tank, excluding any hatchways. Remarks Gas such as liquefied Nitrogen Chemicals such as: Hydrochloric, Hydrofluoric and Acetic Acid etc. Butt Fillet Notes: (Add new 3-7-1/Table 3, as follows:) TABLE 3 Application of Leak Testing, Coating and Provision of Safe Access for Type of Welded Joints (1 July 2013) Type of Welded Joints Leak Testing Before Leak Testing Coating (1) Safe Access (2) After Leak Testing & Before Structural Test Leak Testing Structural Test Automatic Not required Allowed (3) N/A Not required Not required Manual or Semi-automatic (4) Required Not allowed Allowed Required Not required Boundary including Required Not allowed Allowed Required Not required penetrations 1 Coating refers to internal (tank/hold coating), where applied, and external (shell/deck) painting. It does not refer to shop primer. 2 Temporary means of access for verification of the leak testing. 3 The condition applies provided that the welds have been carefully inspected visually to the satisfaction of the Surveyor. 4 Flux Core Arc Welding (FCAW) semiautomatic butt welds need not be tested provided that careful visual inspections show continuous uniform weld profile shape, free from repairs, and the results of NDE testing show no significant defects. ABS RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS

10 PART 4 CHAPTER 8 SECTION 4 VESSEL SYSTEMS AND MACHINERY ELECTRICAL SYSTEMS SHIPBOARD INSTALLATION AND TESTS 21 Cable Installation Deck and Bulkhead Penetrations (Revise Subparagraph 4-8-4/ , as follows:) General (1 July 2013) Where cables pass through watertight or fire-rated bulkheads or decks, the penetrations are to be made through the use of approved stuffing tubes, transit devices or pourable materials installed in accordance with manufacturer s installation procedures to maintain the watertight integrity or firerating of the bulkheads or decks. These devices or materials are not to cause damage to the cable and are to be examined and tested as specified in 3-7-1/Table 1 and 4-8-4/ Where cable conduit pipe or equivalent is carried through decks or bulkheads, arrangements are to be made to maintain the integrity of the water or gas tightness of the structure. 31 Shipboard Tests (Add new Paragraph 4-8-4/31.15, as follows:) Watertight and Fire-rated Deck and Bulkhead Cable Penetrations (1 July 2013) During installation of deck and bulkhead watertight and fire-rated cable penetrations, the attending Surveyor is to confirm that the installer is familiar with and has access to the manufacturer s installation procedures for stuffing tubes, transit devices or pourable materials. After installation, all watertight and fire-rated cable penetrations are to be visually examined. Watertight cable penetrations are to be tested as required by 3-7-1/Table ABS RULES FOR BUILDING AND CLASSING OFFSHORE SUPPORT VESSELS. 2013

Thickness measurement and close-up survey guidance

Thickness measurement and close-up survey guidance Working together for a safer world Thickness measurement and close-up survey guidance Part 2, Special survey requirements Other ship types & general dry cargo ships October 2014 Part 2 Special Survey Requirements

More information

STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH 2012

STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH 2012 RULES FOR BUILDING AND CLASSING STEEL VESSELS UNDER 90 METERS (295 FEET) IN LENGTH 2012 NOTICES AND GENERAL INFORMATION American Bureau of Shipping Incorporated by Act of Legislature of the State of New

More information

Leaflet for damage stability calculation according to SOLAS 2009

Leaflet for damage stability calculation according to SOLAS 2009 Hamburg 2008-07-23 Version 1.2 Leaflet for damage stability calculation according to SOLAS 2009 Table of contents: 1 Background... 2 2 Intention of this paper...2 3 Formal application... 2 3.1 Application

More information

CLASSIFICATION NOTES

CLASSIFICATION NOTES CLASSIFICATION NOTES Type Approval, Installation and Testing of Water Level Detectors on Bulk Carriers and Single Hold Cargo Ships other than Bulk Carriers General Information This edition of the classification

More information

GUIDELINES FOR THE DRAINAGE OF FIRE-FIGHTING WATER FROM CLOSED VEHICLE AND RO-RO SPACES AND SPECIAL CATEGORY SPACES OF PASSENGER AND CARGO SHIPS

GUIDELINES FOR THE DRAINAGE OF FIRE-FIGHTING WATER FROM CLOSED VEHICLE AND RO-RO SPACES AND SPECIAL CATEGORY SPACES OF PASSENGER AND CARGO SHIPS INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref. T4/4.01 MSC.1/Circ.1320 11 June 2009 GUIDELINES FOR THE DRAINAGE OF FIRE-FIGHTING

More information

OVERSEAS MARINE CERTIFICATION SERVICES (OMCS)

OVERSEAS MARINE CERTIFICATION SERVICES (OMCS) SURVEYOR S MANUAL - STATUTORY TD-SP-DGC Page. 1 de 8 CARRIAGE OF DANGEROUS GOODS SECTION 1 General 1.1 Surveyors carrying out surveys for the carriage of dangerous goods should be familiar with the applicable

More information

Classification of Compressed Natural Gas Carriers

Classification of Compressed Natural Gas Carriers Classification of Compressed Natural Gas Carriers Rule Note NR 517 DR R00 E 17 bis, Place des Reflets La Défense 2 92400 Courbevoie Postal Address: 92077 Paris La Défense Cedex Tel. 33 (0) 1 42 91 52 91

More information

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES Interpretations of the FTP CONTENTS FTP1 Adhesives used in A or B class divisions (FTP Code 3.1, Res A.754 para. 3.2.3) June 2000 FTP2 Pipe and duct

More information

Best Practices for Tank Boundary and Penetration Testing Final Report Revision - Technology Investment Agreement #2005-333

Best Practices for Tank Boundary and Penetration Testing Final Report Revision - Technology Investment Agreement #2005-333 Best Practices for Tank Boundary and Penetration Testing Final Report Revision - Technology Investment Agreement #2005-333 National Steel and Shipbuilding Company Project Engineering / Machinery Systems

More information

Module Title: General Ship Knowledge

Module Title: General Ship Knowledge CORK INSTITUTE OF TECHNOLOGY INSTITIÚID TEICNEOLAÍOCHTA CHORCAÍ Semester 1 FINAL Examinations 2009/10 School: National Maritime College of Ireland Programme Title: Bachelor of Science (Ordinary) in Nautical

More information

Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01

Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01 Code Edition I - Ship Technology Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01 Part 1 - Seagoing Ships Chapter 1 - Hull Structures I-1-1 2016-01 Chapter 1 - Hull Structures

More information

Corrosion protection of crude oil cargo tanks new IMO regulations

Corrosion protection of crude oil cargo tanks new IMO regulations Guidance note oil cargo tanks new IMO regulations Guidance for shipowners and operators, manufacturers and ship builders 1. Background to the new requirements Following incidents resulting from structural

More information

Rules for Classification and Construction Ship Technology

Rules for Classification and Construction Ship Technology I Rules for Classification and Construction Ship Technology 1 Seagoing Ships 7 Chemical Tankers Edition 2014 The following Rules come into force on 1 July 2014. Alterations to the preceding Edition are

More information

A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society

A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society (Rev.0 July 2009) (Rev.1 June 2012) (Rev.2 Oct 2013) (Rev.3 Jan 2015) (Rev.4 July 2015) (Rev.5 Jan 2016) Procedure for Transfer of Class TABLE OF CONTENTS Procedure for Transfer of Class Application Definitions

More information

Use of Steel Grades for Various Hull Members - Ships of 90 m in Length and Above

Use of Steel Grades for Various Hull Members - Ships of 90 m in Length and Above (1978) (Rev.1 1980) (Rev.2 1996) (Rev.3 May 2002) Rev.4 July 2003) (Rev.5 Sept 2007) (Rev.6 May 2010) Use of Steel Grades for Various Hull Members - Ships of 90 m in Length and Above.0 Application This

More information

Survey Guidelines for MARPOL Annex I under the Harmonized System of Survey and Certification (HSSC), 2011

Survey Guidelines for MARPOL Annex I under the Harmonized System of Survey and Certification (HSSC), 2011 ANNEX Survey Guidelines for MARPOL Annex I under the Harmonized System of Survey and Certification (HSSC), 2011 Table of Contents 1 DESCRIPTION OF THE VARIOUS TYPES OF SURVEY 1.1 Initial surveys 1.2 Annual

More information

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY Office of Deputy Commissioner of Maritime Affairs THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY Marine Notice FIR-001 Rev. 06/12 TO: SUBJECT: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT

More information

Simple Damage Control Aboard

Simple Damage Control Aboard Simple Damage Control Aboard By Marc A. Barredo Damage control aboard ship involves any prudent action that will; prevent or reduce expected damage to the ship, stabilize the situation caused by the damage,

More information

MOBILE OFFSHORE UNITS

MOBILE OFFSHORE UNITS Guide for Building and Classing Mobile Offshore Units GUIDE FOR BUILDING AND CLASSING MOBILE OFFSHORE UNITS JULY 2008 (Updated February 2014 see next page) American Bureau of Shipping Incorporated by Act

More information

Repair of a Hull 15 m below the Waterline

Repair of a Hull 15 m below the Waterline Repair of a Hull 15 m below the Waterline Fig. 1 This 189 m vessel required an underwater repair after it had its hull pierced sufficiently enough to let seawater enter its water ballast tank. Since circumstances

More information

5 OIL TANKER DESIGN AND EQUIPMENT

5 OIL TANKER DESIGN AND EQUIPMENT 5 OIL TANKER DESIGN AND EQUIPMENT Learning objectives: that oil tankers can be divided into fore part, tank area and after part that means must be provided to keep spills away from the accommodation how

More information

CODE OF SAFETY FOR CARIBBEAN CARGO SHIPS CCSS CODE

CODE OF SAFETY FOR CARIBBEAN CARGO SHIPS CCSS CODE CODE OF SAFETY FOR CARIBBEAN CARGO SHIPS (Cargo Ships less than 500 Gross Tonnage) CCSS CODE CARIBBEAN MEMORANDUM OF UNDERSTANDING ON PORT STATE CONTROL SECRETARIAT BARBADOS FORWORD The Code of Safety

More information

ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16. Part B Prevention of fire and explosion

ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16. Part B Prevention of fire and explosion Annex 17, page 1 ANNEX 17 DRAFT AMENDMENTS TO SOLAS REGULATIONS II-2/4 AND II-2/16 Part B Prevention of fire and explosion Regulation 4 Probability of ignition 1 The existing paragraph 5.5 is replaced

More information

SECTION 15410 GROUND WATER STORAGE TANKS

SECTION 15410 GROUND WATER STORAGE TANKS SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design

More information

NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: info@nccer.org. Task Number Item Date(s) Recorded By

NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: info@nccer.org. Task Number Item Date(s) Recorded By NCCER 13614 Progress Blvd., Alachua, FL 32615 Tel: (888) 622-3720 E-mail: info@nccer.org PIPELINE MAINTENANCE On-the-Job Training Level One MODULE 66101-02 INTRODUCTION TO THE PIPELINE INDUSTRY This is

More information

WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL

WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL WASHING PROCESS OF CARGO TANKS ON TANKERS FOR TRANSPORTATION OF CRUDE OIL Siniša Stojan, Ph.D. student Damir Dražić, Ph.D. student Brodotrogir, HR - 21220 Trogir, Croatia sinisa.stojan@brodotrogir.hr,

More information

Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations

Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations VI Rules for Classification and Construction Additional Rules and Guidelines 3 Machinery Installations 5 Guidelines for Design, Equipment and Testing of Gas Welding Installations on Seagoing Ships Edition

More information

BLADDER SURGE CONTROL SYSTEM

BLADDER SURGE CONTROL SYSTEM PART I GENERAL 1.01 Description BLADDER SURGE CONTROL SYSTEM This specification describes the requirements for a Bladder Surge Control System. The purpose of the system is to minimize transient pressures

More information

Rules for Classification and Construction Additional Rules and Guidelines

Rules for Classification and Construction Additional Rules and Guidelines VI Rules for Classification and Construction Additional Rules and Guidelines 7 Guidelines for the Performance of Type Approvals 4 Test Requirements for Sealing Systems of Bulkhead and Deck Penetrations

More information

Emergency Response Plan. at sea also valid in case of Flooding, where applicable

Emergency Response Plan. at sea also valid in case of Flooding, where applicable Plan 1. Grounding, Stranding at sea also valid in case of Flooding, where applicable 2. Application Shorebased Organisation All Ships prepared: approved: released: Revision 0 HLS Management 2006-11-24

More information

NFPA31FuelOilPiping 1 Revised 3-1-11

NFPA31FuelOilPiping 1 Revised 3-1-11 NFPA 31 Fuel Oil Piping, Installation and Testing Chapter 8 Fuel Piping Systems and Components 8.1 Scope. This chapter shall apply to piping systems and their components used to transfer fuel oil from

More information

Structural welding is a process by which the parts that are to be connected are heated and

Structural welding is a process by which the parts that are to be connected are heated and CHAPTER 6. WELDED CONNECTIONS 6.1 INTRODUCTORY CONCEPTS Structural welding is a process by which the parts that are to be connected are heated and fused, with supplementary molten metal at the joint. A

More information

Trends in the Development of Container Vessels

Trends in the Development of Container Vessels Trends in the Development of Container Vessels Presentation at NTU Athens 2005-05-25 Contents Technological Development of Container Vessels The current size limits and future prospects The 9200TEU Post-Panamax

More information

PROPULSION AND AUXILIARY SYSTEMS FOR GAS FUELED SHIPS

PROPULSION AND AUXILIARY SYSTEMS FOR GAS FUELED SHIPS Guide for Propulsion and Auxiliary Systems for Gas Fueled Ships GUIDE FOR PROPULSION AND AUXILIARY SYSTEMS FOR GAS FUELED SHIPS MAY 2015 American Bureau of Shipping Incorporated by Act of Legislature of

More information

REPUBLIC OF ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AND RECOGNIZED ORGANIZATIONS

REPUBLIC OF ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AND RECOGNIZED ORGANIZATIONS REPUBLIC OF Marine Notice THE MARSHALL ISLANDS No. 2-011-14 OFFICE OF THE MARITIME ADMINISTRATOR Rev. 2/12 TO: SUBJECT: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT SHIPS, AND RECOGNIZED

More information

Thickness measurement and close-up survey guidance

Thickness measurement and close-up survey guidance Working together for a safer world Thickness measurement and close-up survey guidance Part 1, Thickness measurement process October 2014 Contents Part 1 Part 1 Thickness Measurement Process Chapter 1 Introduction

More information

PANAMA MARITIME AUTHORITY MERCHANT MARINE CIRCULAR MMC-281

PANAMA MARITIME AUTHORITY MERCHANT MARINE CIRCULAR MMC-281 PANAMA MARITIME AUTHORITY MERCHANT MARINE CIRCULAR MMC-281 PanCanal Building Albrook, Panama City Republic of Panama Tel: (507) 501-5355 jortega@segumar.com To: Ship-owners/Operators, Company Security

More information

CODES OF PRACTICE. What one needs to know concerning regulations REGULATION

CODES OF PRACTICE. What one needs to know concerning regulations REGULATION What one needs to know concerning regulations CODES OF PRACTICE Many yachts that are registered in London, Southampton, Guernsey or Gibraltar, and fly the British flag, call Italian and French Riviera

More information

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm: Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section

More information

GUIDELINES FOR FLOODING DETECTION SYSTEMS ON PASSENGER SHIPS

GUIDELINES FOR FLOODING DETECTION SYSTEMS ON PASSENGER SHIPS INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref. T1/2.04 MSC.1/Circ.1291 9 December 2008 GUIDELINES FOR FLOODING DETECTION SYSTEMS

More information

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General General All sanitary sewers, manholes and force mains shall be acceptance tested, as hereinafter specified in the presence of a City representative. Acceptance testing shall be performed after backfilling

More information

ANNEX 3. RESOLUTION MSC.339(91) (adopted on 30 November 2012) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE)

ANNEX 3. RESOLUTION MSC.339(91) (adopted on 30 November 2012) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) Annex 3, page 1 ANNEX 3 RESOLUTION MSC.339(91) (adopted on 30 November 2012) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) THE MARITIME SAFETY COMMITTEE, RECALLING

More information

5.2. Vaporizers - Types and Usage

5.2. Vaporizers - Types and Usage 5.2. Vaporizers - Types and Usage 5.2.1. General Vaporizers are constructed in numerous designs and operated in many modes. Depending upon the service application the design, construction, inspection,

More information

Application for the Construction or Installation of Aboveground Storage Tank (AST) Systems or Associated Underground or Over-water Piping Systems

Application for the Construction or Installation of Aboveground Storage Tank (AST) Systems or Associated Underground or Over-water Piping Systems Page 1 of 5 Application for the Construction or Installation of Aboveground Storage Tank (AST) Systems or Associated Underground or Over-water Piping Systems New Hampshire Department of Environmental Services

More information

SOLAS CONSOLIDATED EDITION 2014. Supplement December 2015

SOLAS CONSOLIDATED EDITION 2014. Supplement December 2015 SOLAS CONSOLIDATED EDITION 2014 Supplement December 2015 Since the publication of the SOLAS Consolidated Edition 2014, the following amendments have been adopted by the Maritime Safety Committee: Resolution

More information

Watertight Doors in Passenger ship design

Watertight Doors in Passenger ship design 1 Watertight Doors in Passenger ship design ty Henning Luhmann Meyer Werft 2 Founded in 1795 100% family owned 2 locations 1 shipyard Meyer Werft in Papenburg Neptun Werft in Rostock 11 production halls

More information

PANAMA MARITIME AUTHORITY

PANAMA MARITIME AUTHORITY PANAMA MARITIME AUTHORITY MERCHANT MARINE CIRCULAR MMC-226 PanCanal Building Albrook, Panama City Republic of Panama Tel: (507) 501-5000 segumar@segumar.com To: Ship-owners/Operators, CSO, Legal Representatives

More information

Ship Structure Committee Case Study. BULK CARRIERS: Design, Operation, and Maintenance Concerns for Structural Safety of Bulk Carriers

Ship Structure Committee Case Study. BULK CARRIERS: Design, Operation, and Maintenance Concerns for Structural Safety of Bulk Carriers Member Agencies: American Bureau of Shipping Defence Research and Development Canada Maritime Administration Military Sealift Command Naval Sea Systems Command Society of Naval Architects & Marine Engineers

More information

M-20.2 SOLAS II-2. The latest IMO Briefing (IMO 29,2000) offered the following description of the 73rd Meeting of the Maritime Safety Committee:

M-20.2 SOLAS II-2. The latest IMO Briefing (IMO 29,2000) offered the following description of the 73rd Meeting of the Maritime Safety Committee: M-20.2 SOLAS II-2 THE PREFERRED EEBD SOLUTION The latest IMO Briefing (IMO 29,2000) offered the following description of the 73rd Meeting of the Maritime Safety Committee: The 73rd meeting of the IMO s

More information

GAS FLAWLESS - FORM C

GAS FLAWLESS - FORM C DESCRIPTION OF THE VESSEL 1. GENERAL 1.1 Builder and Yard HIGAKI S/Y Hull No. H/N 595 1.2 Year built 2007 1.3 Flag MALTA 1.4 Signal Letters and Normal Station Watched 9HVB8 1.5 Classification Lloyds 1.6

More information

ST. VINCENT AND THE GRENADINES

ST. VINCENT AND THE GRENADINES ST. VINCENT AND THE GRENADINES MARITIME ADMINISTRATION CIRCULAR N SOL 038 Amendment to SOLAS Regulation II-1/3-4 (RES. MSC.256 (84) - Emergency Towing Arrangements and Procedures TO: SHIPOWNERS, SHIPS

More information

BALLAST WATER EXCHANGE

BALLAST WATER EXCHANGE Guide for Ballast Water Exchange GUIDE FOR BALLAST WATER EXCHANGE JULY 2010 (Updated October 2010 see next page) American Bureau of Shipping Incorporated by Act of Legislature of the State of New York

More information

Standard Pneumatic Test Procedure Requirements for Piping Systems

Standard Pneumatic Test Procedure Requirements for Piping Systems the pressure equipment safety authority Standard Pneumatic Test Procedure Requirements for Piping Systems AB-522 Edition 2, Rev. 0 Issued 2012-06-28 Table of Contents FOREWORD... 3 1.0 INTRODUCTION...

More information

BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION November 2015, March 2016 and July 2016 (Replaces October 2013)

BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION November 2015, March 2016 and July 2016 (Replaces October 2013) BODY OF KNOWLEDGE API-653 ABOVEGROUND STORAGE TANK INSPECTOR CERTIFICATION EXAMINATION November 2015, March 2016 and July 2016 (Replaces October 2013) API Authorized Aboveground Storage Tank Inspectors

More information

GK Packing System Welding Instructions

GK Packing System Welding Instructions GK Packing System Welding Instructions Roxtec GmbH Neuer Höltigbaum 1-3, 22143 Hamburg GERMANY Tel +49 (040) 657398-0, Fax +49 (040) 657398-50 EMAIL info@de.roxtec.com, www.roxtec.de Welding instructions

More information

Safety of Life at Sea, 1974 (SOLAS)

Safety of Life at Sea, 1974 (SOLAS) Safety of Life at Sea, 1974 (SOLAS) Prof. Manuel Ventura Ship Design I MSc in Marine Engineering and Naval Architecture Chap. III. Lifesaving Appliances and Arrangements 1 Cargo Ships Cargo Ships - Case

More information

The Versatile Differential Pressure Transmitter. By David Gunn Honeywell Process Solutions

The Versatile Differential Pressure Transmitter. By David Gunn Honeywell Process Solutions The Versatile Differential Pressure Transmitter By David Gunn Honeywell Process Solutions The Versatile Differential Pressure Transmitter 2 Table of Contents Abstract... 3 Pressure Fundamentals... 3 Applications...

More information

Fire Pump Plan Review March 2010

Fire Pump Plan Review March 2010 Fire Pump Plan Review March 2010 Date of Review: / / Permit Number: Business/Building Name: Address of Project: Designer Name: Designer s Phone: Contractor: Contractor s Phone: Occupancy Classification:

More information

P O B o x 3 11 5 4 S t. L o u i s, M O 6 3 1 3 1-0 1 5 4 P h o n e : ( 3 1 4 ) 9 6 6-8 9 1 9 ~ E m a i l : w m h u I t t @ a o l.

P O B o x 3 11 5 4 S t. L o u i s, M O 6 3 1 3 1-0 1 5 4 P h o n e : ( 3 1 4 ) 9 6 6-8 9 1 9 ~ E m a i l : w m h u I t t @ a o l. P O B o x 3 11 5 4 S t. L o u i s, M O 6 3 1 3 1-0 1 5 4 P h o n e : ( 3 1 4 ) 9 6 6-8 9 1 9 ~ E m a i l : w m h u I t t @ a o l. c o m Determining Code Compliance and Pipe System Leak ing by William M.

More information

Excerpts from the Canadian National Building Code (NBC)

Excerpts from the Canadian National Building Code (NBC) Excerpts from the Canadian National Building Code (NBC) Reproduced here with Permission of the Copyright Owner, the National Research Council of Canada, Institute for Research in Construction. For more

More information

Tentative Interim Amendment NFPA 59A. Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG) 2016 Edition

Tentative Interim Amendment NFPA 59A. Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG) 2016 Edition Tentative Interim Amendment NFPA 59A Standard for the Production, Storage, and Handling of Liquefied Natural Gas (LNG) 2016 Edition Reference: Various TIA 16-1 (SC 15-12-4 / TIA Log #1187R) Note: Text

More information

VLCC Structural Design - Past, Present and Future

VLCC Structural Design - Past, Present and Future TSCF 2007 Shipbuilders Meeting VLCC Structural Design - Past, Present and Future Seong Ki Kim 1), Minsu Cho 2), Theodore W. Kang 3) Sungkon Han 4) and ManSoo Kim 5) 1) Hull Basic Design Team, DSME, Seoul,

More information

VESSEL SAFETY INSPECTION

VESSEL SAFETY INSPECTION VESSEL SAFETY INSPECTION 1 LNG TANKER INSPECTION One of the main concerns of gas operator is to ensure throughout the transportation and distribution network a safe and efficient service with strict respect

More information

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542 1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated

More information

Spill Prevention, Control and Countermeasure Plan (SPCC) Program

Spill Prevention, Control and Countermeasure Plan (SPCC) Program United States Environmental Protection Agency Office of Emergency Management August 2013 www.epa.gov/emergencies Spill Prevention, Control and Countermeasure Plan (SPCC) Program Bulk Storage Container

More information

STATUTORY INSTRUMENT. No. of 2007. Merchant Shipping (Safe Ship Management Systems) Regulation 2007. ARRANGEMENT OF SECTIONS.

STATUTORY INSTRUMENT. No. of 2007. Merchant Shipping (Safe Ship Management Systems) Regulation 2007. ARRANGEMENT OF SECTIONS. STATUTORY INSTRUMENT. No. of 2007. Merchant Shipping (Safe Ship Management Systems) Regulation 2007. ARRANGEMENT OF SECTIONS. PART I. INTRODUCTION. 1. Interpretation accident Act approved safe ship management

More information

WATERJET VISUAL TECHNICAL INSPECTION REPORT

WATERJET VISUAL TECHNICAL INSPECTION REPORT WATERJET VISUAL TECHNICAL INSPECTION REPORT TYPE OF INSPECTION: PREREPAIR [ ] POST REPAIR/MANUFACTURE [ ] IN-SERVICE [ ] SHIP CLASS IDENTIFICATION DATA HULL NUMBER WATERJET IS INSTALLED? YES [ ] NO [ ]

More information

Rules for Classification and Construction Ship Technology

Rules for Classification and Construction Ship Technology I Rules for Classification and Construction Ship Technology 1 Seagoing Ships 6 Liquefied Gas Carriers Edition 008 The following Rules come into force on 1 July 008. Alterations to the preceding Edition

More information

Revised April (May) 2015

Revised April (May) 2015 Section 19.0 Cross Connection Control Policy 19.1 Responsibility 19.1.1 The Elkhart Water Utility has the responsibility to supply safe, potable water from the source to the point of delivery defined as

More information

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Requirements concerning MOORING, ANCHORING AND TOWING

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Requirements concerning MOORING, ANCHORING AND TOWING INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES Requirements concerning MOORING, ANCHORING AND TOWING CONTENTS Equipment Rev.5 June 2005 A2 Shipboard fittings and supporting hull structures associated

More information

The following definitions apply with regard to requirements specified in this document:

The following definitions apply with regard to requirements specified in this document: GUIDELINES FOR INSTALLATION OF TEMPORARY AND PERMANENT ABOVEGROUND DIESEL FUEL TANKS FOR EMERGENCY AND STANDBY POWER SYSTEMS LOCATED OUTSIDE OF BUILDINGS For Use by Unidocs Member Agencies or where approved

More information

Carefully to Carry. There is a common failure to fully understanding the strength limits of tank tops, tween decks, hatchcovers and weather-decks

Carefully to Carry. There is a common failure to fully understanding the strength limits of tank tops, tween decks, hatchcovers and weather-decks UK P&I CLUB Carefully to Carry SEPTEMBER 2006 Preparing cargo plans structural limitations There is a common failure to fully understanding the strength limits of tank tops, tween decks, hatchcovers and

More information

1 Seagoing Ships 21 Ventilation

1 Seagoing Ships 21 Ventilation I Rules for Classification and Construction Ship Technology 1 Seagoing Ships 21 Edition 2014 The following Rules come into force on 1 July 2014. Alterations to the preceding Edition are marked by beams

More information

Building an LNG driven vessel. LNG developments at Meyer Werft Viking Grace 18_09_2013

Building an LNG driven vessel. LNG developments at Meyer Werft Viking Grace 18_09_2013 1 Building an LNG driven vessel LNG developments at Meyer Werft Viking Grace 18_09_2013 Berufsbildung 13.09.2013 2 Meyer Werft Papenburg MEYER WERFT is a company with tradition, which started operations

More information

Fuel Treatment and Conditioning Systems

Fuel Treatment and Conditioning Systems RULES FOR CLASSIFICATION OF Ships PART 6 CHAPTER 14 NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS Fuel Treatment and Conditioning Systems JULY 2006 This chapter has been amended since the

More information

Reticulation sewers in basements Technical guidelines

Reticulation sewers in basements Technical guidelines Reticulation sewers in basements Technical guidelines Overview What These guidelines explain our technical requirements for laying sewers in building basements. The scope of the guide is restricted to

More information

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT GENERAL INFORMATION 1.1 This section applies to piping systems for chilled water, hot water, condenser water, steam, condensate return, fuel oil, refrigerant

More information

STANDARD SPECIFICATIONS SECTION 02959 SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT

STANDARD SPECIFICATIONS SECTION 02959 SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT STANDARD SPECIFICATIONS SECTION 02959 SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for rehabilitation of defective mainline

More information

5.2 Transportation And Marketing Of Petroleum Liquids 1-3. 5.2.1 General

5.2 Transportation And Marketing Of Petroleum Liquids 1-3. 5.2.1 General 5.2 Transportation And Marketing Of Petroleum Liquids 1-3 5.2.1 General The transportation and marketing of petroleum liquids involve many distinct operations, each of which represents a potential source

More information

TO TEST OR NOT TO TEST: A COMPARISON OF THE PRESSURE TESTING REQUIREMENTS BETWEEN ASME B31.3 AND ASME SECTION VIII, DIVISION 1

TO TEST OR NOT TO TEST: A COMPARISON OF THE PRESSURE TESTING REQUIREMENTS BETWEEN ASME B31.3 AND ASME SECTION VIII, DIVISION 1 ASSET INTEGRITY INTELLIGENCE Featured Article TO TEST OR NOT TO TEST: A COMPARISON OF THE PRESSURE TESTING REQUIREMENTS BETWEEN ASME B31.3 AND ASME SECTION VIII, DIVISION 1 SERGE BISSON, GCM Consultants,

More information

Model 1210C Battery Powered Pump Shown. Description

Model 1210C Battery Powered Pump Shown. Description 12 Volt DC Rotary Vane Pump Series 1200C Model 1210C Battery Powered Pump Shown Description of Included Models Model Number FR1205C FR1210C FR1211C FR2410C FR2411C Description Basic 12 volt DC pump with

More information

UX-30 PERFORMANCE TESTING SUMMARY REPORT Revision 0

UX-30 PERFORMANCE TESTING SUMMARY REPORT Revision 0 UX-30 PERFORMANCE TESTING SUMMARY REPORT Revision 0 Prepared By: Patrick L. Paquin, EnergySolutions Date Reviewed By: Mirza I. Baig, EnergySolutions Date Approved By: Thomas F. Dougherty, Columbiana Hi

More information

To: All Shipowners, Ship Managers, Ship Masters and Classification Societies

To: All Shipowners, Ship Managers, Ship Masters and Classification Societies 海 事 處 船 舶 事 務 科 香 港 中 環 統 一 碼 頭 道 38 號 海 港 政 府 大 樓 ---------- 香 港 郵 箱 4155 號 MARINE DEPARTMENT Shipping Division Harbour Building 38 Pier Road, Central, Hong Kong ----------- G.P.O.Box 4155 網 站 Website

More information

IMO WORK PROGRAMME OF THE COMMITTEE AND SUBSIDIARY BODIES

IMO WORK PROGRAMME OF THE COMMITTEE AND SUBSIDIARY BODIES INTERNATIONAL MARITIME ORGANIZATION E IMO MARINE ENVIRONMENT PROTECTION COMMITTEE 51st session Agenda item 20 MEPC 51/INF.6 23 January 2004 ENGLISH ONLY WORK PROGRAMME OF THE COMMITTEE AND SUBSIDIARY BODIES

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 32 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia INSTALLATION, FLUSHING AND TABLE OF

More information

Supply, storage and handling of LNG as ship s fuel Björn Munko LNG 17, Houston

Supply, storage and handling of LNG as ship s fuel Björn Munko LNG 17, Houston Supply, storage and handling of LNG as ship s fuel Björn Munko LNG 17, Houston Content Short Company Introduction Small LNGC and LNG tanks Bunker supply chain LNG fuel gas systems Conclusions LNG 17 -

More information

Recommendations for the Safety of Cargo Vessels of less than Convention Size

Recommendations for the Safety of Cargo Vessels of less than Convention Size (Dec 2007) (Rev.1 Apr 2013) Recommendations for the Safety of Cargo Vessels of less than Convention Size Preamble Cargo vessels of less than 500 Gross Tonnage (except vessels down to 300 GT with respect

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

(Adopted July 7, 1989)(Amended December 7, 1990) (Amended May 13, 1994) FUGITIVE EMISSIONS OF VOLATILE ORGANIC COMPOUNDS

(Adopted July 7, 1989)(Amended December 7, 1990) (Amended May 13, 1994) FUGITIVE EMISSIONS OF VOLATILE ORGANIC COMPOUNDS (Adopted July 7, 1989)(Amended December 7, 1990) (Amended May 13, 1994) RULE 1173. FUGITIVE EMISSIONS OF VOLATILE ORGANIC COMPOUNDS (a) (b) Purpose This rule is intended to control volatile organic compounds

More information

LNG Storage and Fuel Gas Systems. LNG: Fuel for Shipping, London 15-Feb-2011. Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager

LNG Storage and Fuel Gas Systems. LNG: Fuel for Shipping, London 15-Feb-2011. Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager LNG Storage and Fuel Gas Systems LNG: Fuel for Shipping, London 15-Feb-2011 Carriers & Offshore Units Jürgen Harperscheidt Sales Manager CONTENT TGE Company Profile Small LNG carriers Bunkering LNG fuel

More information

Rules for Classification and Construction Additional Rules and Guidelines

Rules for Classification and Construction Additional Rules and Guidelines VI Rules for Classification and Construction Additional Rules and Guidelines 11 Other Operations and Systems 7 Guidelines for Edition 2013 The following Guidelines come into force on 1 July 2013. Alterations

More information

SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN XXXX FARM (CITY OR COUNTY), MICHIGAN CONTACT (NAME), OWNER CERTIFICATION: I hereby certify that I have examined the facility, and being familiar with the

More information

Rules for Classification and Construction Ship Technology

Rules for Classification and Construction Ship Technology I Rules for Classification and Construction Ship Technology 1 Seagoing Ships 8 Fishing Vessels Edition 2007 The following Rules come into force on October 1 st, 2007 Germanischer Lloyd Aktiengesellschaft

More information

Installation of Underground LP-Gas Systems

Installation of Underground LP-Gas Systems NPGA #412-94 Installation of Underground LP-Gas Systems SCOPE This bulletin provides guidelines for the installation and inspection of underground LP-Gas systems and outlines song of the unique problems

More information

Welding Codes and How They're Used (DOD) (ANSI). (AWS), (ASME) (API). not American Welding Society AWS D1.1 AWS D1.2 AWS D1.3 AWS D1.4 AWS D1.

Welding Codes and How They're Used (DOD) (ANSI). (AWS), (ASME) (API). not American Welding Society AWS D1.1 AWS D1.2 AWS D1.3 AWS D1.4 AWS D1. Welding Codes and How They're Used Almost all design, welding, fabrication, material, repair, testing, and inspection requirements are covered under three main governing organizations. Even the Department

More information

Technical Requirements for Aboveground Storage Tanks (ASTs) Storing Class IIIB Liquids (other than used oil)

Technical Requirements for Aboveground Storage Tanks (ASTs) Storing Class IIIB Liquids (other than used oil) Technical Requirements for Aboveground Storage Tanks (ASTs) Storing Class IIIB Liquids (other than used oil) References: Comm 10 2009 EDITION / NFPA 30 2008 EDITION ITEM DESCRIPTION Comm 10 / NFPA General

More information

Morrison Bros. Co. General Product Specifications

Morrison Bros. Co. General Product Specifications Morrison Bros. Co. General Product Specifications Tank Mounted Spillbox The spill containment device is manufactured to contain spills and drips that may occur at the fill point on aboveground storage

More information

LIST OF CERTIFICATES AND DOCUMENTS REQUIRED TO BE CARRIED ON BOARD SHIPS, 2013

LIST OF CERTIFICATES AND DOCUMENTS REQUIRED TO BE CARRIED ON BOARD SHIPS, 2013 E 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0)20 7735 7611 Fax: +44 (0)20 7587 3210 LIST OF CERTIFICATES AND DOCUMENTS REQUIRED TO BE CARRIED ON BOARD SHIPS, 2013 FAL.2/Circ.127 1 July 2013 1

More information