Frequently Asked Questions For Engineering and Public Works
|
|
- Patrick Nicholson
- 7 years ago
- Views:
Transcription
1 Frequently Asked Questions For Engineering and Public Works How do I report maintenance issues? If the issues are related to roads, sewers, signs, streetlights, traffic signals, snow removal you can contact Public Works at Issues related to water and hydro are to be directed to COLLUS and Collingwood Public Utilities at How do I report an emergency situation (sewer blockage, stop sign down, or traffic signal out) when Public Works is closed? During an emergency when the offices are closed you can call , and you will be directed to an answering service. The service will take the call and contact the necessary department. When will my street be swept? Collingwood Public Works begins sweeping in mid- April removing sand from boulevards on the Arterial and Collector roads within Town. Once Arterial and Collector roads are completed, local roads will follow. It is the intent that all streets will be swept once by May 15. When do I need an Entrance Permit? Do I need a permit to widen or pave my driveway? An Entrance Permit is needed when planning to do the any of the following work: Construct an unpaved entrance Construct a paved entrance Construct curbs, gutters or other permanent works related to an entrance Pave an existing entrance Add curbs, gutters or other permanent works to an existing entrance Change design of an existing driveway Change the location of an existing driveway Use an existing entrance for other than its original, present or normal use (change classification from residential to commercial etc.) Install a culvert on municipally controlled lands Construct a temporary entrance or use any part of the right-of-way of a Town road as a means of temporary access to and from a property. How do I report a Street Light /Traffic Light issue? Streetlight issues can be addressed by contacting the Public Works office at
2 Tree trimming Tree removal and Tree replacement program? Each year the Town of Collingwood completes a tree trimming program throughout Town to ensure dangerous limbs are removed. The Town contracts a professional tree trimming service to determine the areas that require the most immediate attention. If a tree is to be removed, Collingwood Public Works will only remove trees if they are on the Town s property, generally within the boulevard portion of the right of way. If you have a tree that is located within the right of way and needs to be removed, please contact the Public Works office at Once a request is made, a supervisor will make a site visit to determine if it is necessary that the tree be removed. If it is necessary that the tree be removed you will be contacted when it will take place. Once removed, the Town will ensure that the cleanup is complete and a new tree is planted. What is the status of the construction on my street? If the Town is undertaking construction on your street and you would like to be updated, please visit and weekly updates will be provided on all major capital projects. If there are any other construction projects not listed on the website, please phone to inquire. Who is in charge of Stormwater Management Pond Maintenance? The Town carries out the maintenance, once the pond has been assumed through the Development process. Routine maintenance includes removal of debris in and around the pond; removal of invasive vegetation; maintenance of structures (i.e. gates, locks, valves etc.), and maintenance of surrounding vegetation and plants. The vegetation planted around the pond is dense and appropriate for the area. Aggressive weed control operations, including the use of pesticides, are not required. Grass cutting is not recommended for the ponds in order to maintain a natural environment. The Town carries out maintenance of these ponds, including vegetation replacement. Non-routine maintenance includes bank stabilization, structure repairs, and removal of excess sediment. A clean-out of the SWMP will be required approximately once every 5-10 years to remove accumulated sediment to ensure the pond continues to function as intended. Drainage of the SWMP will be required to facilitate the clean-out. Part of this clean-out involves soil sampling and testing to ensure proper disposal of the sediment removed. Who do I speak to about garbage and recycling pickup? Garbage and recycling is administered by the County of Simcoe. Any questions related to garbage or recycling can be addressed by calling
3 Where do I get a blue box for recycling? Blue boxes are available at the County of Simcoe landfill site at 470 Tenth Line, Collingwood, Ontario or at the Engineering & Public Works Department located at 545 Tenth Line North, Collingwood. Hours of Operation: Monday to Friday 8:30 am to 4:30 pm Saturday Hours: 8:00 am - 4:00 pm. Does the Town pick up dead animals on the roadway? If the dead animal is non-domestic, you can contact the Public Works office at If the animal is domestic (either cat or dog) Animal Control services must be called at Who do I call for a sewer blockage? Contact the Public Works office at Which streets are the first to be plowed/sanded? The Municipality is divided into 6 routes. Each route is made up of streets categorized in priority order, with priority streets cleared first. Priority roads are arterial roads or secondary collector roads that carry the highest volumes of traffic. These roads are used to access business areas, fire and police and the hospital. Other roads are primarily residential, residential rural or secondary routes. These are systematically ploughed after the priority routes have been completed. Why does it seem to take a long time for other streets to be cleared of snow? Snowfalls or snowstorms that last many hours, and windy conditions or freezing rain that turns into snow pose unique challenges. In these conditions, priority streets may be plowed more than once before other local streets. Why are cul-de-sac streets cleared last? Due to varied shapes and sizes, cul-de-sacs pose a challenge to snowplow equipment. The roads are plowed to the cul-de-sac and then specialized equipment is brought in to remove the snow. Most cul-de-sacs are serviced after priority and other roads have been plowed. This process is time consuming and generally left until last to be fully cleared. The Municipality understands the frustration that can occur for affected residents. We continually review our process in an effort to reduce delays that occur in clearing snow in cul-de-sacs. What do I do if my street was missed by the plow? Although crews are very conscientious in following route schedules, sometimes streets may be missed due to an oversight. Please contact the administration office ( ) and crews will be notified and arrangements will be made to have the street cleared as soon as possible.
4 Who determines the plowing/sanding schedule? Weather conditions determine how quickly the streets can be cleared. Snow clearing schedules change due to winter weather systems and temperature variances. Staff must assess several variables and quality standards for clearing snow when determining schedules. Everyone's safety is considered. How long does snow clearance usually take? Most routes are completed within the quality standard depending on the type of storm. Clearance time may be longer when snowfalls are heavy, there are complications due to freezing rain, many cars are parked on the street, or crews are clearing snow during peak traffic times. In accordance with Ministry of Labour regulations, drivers cannot work for more than 13 hours without a rest period. This can sometimes impact on snow clearance time. Why does the plow operator fill in my driveway? Can you come and clean it out? The Town makes every attempt to minimize the amount of snow plowed into the driveways during its snow plowing operations; however it does not clear private driveways. Why can't I shovel the snow back on the street - the snow came from the street? The snow plow works by pushing all the snow off the road to the right of the direction of travel. Snow plows have to travel in the same direction as other drivers on your street. Shoveling the snow back on to the street defeats the purpose of plowing the roads. The Town has an obligation to provide a safe passable street under the Municipal Act. In addition, it is an offence under the Highway Traffic Act to deposit snow or ice on the roadway. My driveway was filled in by the snow plow right after I shovelled it out. What can be done about this? It is important to note that our plow operators do not intentionally block driveways. Due to the difficulty of removing large amounts of snow, many people find it easier to clear the snow before it becomes too heavy. Often this is before the storm has ended and while snowplowing operations are still underway. Please understand that until roads are completely cleared, it should be anticipated that you might have to clear your driveway several times during and after storm events. I live on a corner lot and when the snow plow turns the corner, excessive amounts of snow seem to accumulate on my driveway. Why can't the operator prevent this from happening? In order to completely clear an intersection the plow must make two passes. First, swing wide into the intersection to reach the centre area then to return to push snow back to the curb line. Also, speed is reduced and snow is placed at the curb line and is not spread over a wider swath in the boulevard.
5 My street is slippery, what are the sanding priorities? When the streets become slippery due to snowfall or simply cold, moist weather, the Town s streets are sanded by the following priority ranking: Highways and Arterial Roads such as Highway 26, Hwy 124, Mountain Road Bus Routes and other collector routes, and Town owned parking lots Major intersections and inclines in residential areas This ranking reflects the speed and traffic levels, and therefore the degree of risk involved in each roadway category. Why is salt and sand used? Salt use is kept to a minimum. It is spread only on main roads and occurs at the beginning of a snowfall's melting point. The mixture used on the local streets is usually 4%. On priority streets 100% salt is applied. Salt reducing measures are implemented as appropriate. Our goal is to be proactive in the area while recognizing the safety of Municipal streets during slippery conditions. When will the sidewalk be sanded/plowed? What are our priority sidewalks? Similar to snow maintenance on the roads, the Town is divided into 4 routes with Arterial and Collector roads completed first. Priority sidewalks include sidewalks around schools, medical facilities, community safety zones, and business areas. How do I report sod or boulevard damage caused by the snow plow or sidewalk plow? If there is damage to your sod or boulevard during the winter months from maintenance, please call the Public Works office at to report the issue. Public works repairs damaged sod or boulevard damage in the spring and summer months. Where can I learn about rules and regulations on drainage? The Ontario Ministry of Agriculture, Food and Rural Affairs provide a Fact Sheet on Drainage law. It can be accessed from the following link: Stop Sign Requests Requests relating to stop signs are the most common calls we receive. All-way stops are the most common request. Warrants are used to determine if an all-way stop is required at an intersection. Please note that a stop sign isn t installed to reduce speeding, and may in fact have the opposite effect. Stop signs are designed to assign the right-of-way at an intersection.
SNOW REMOVAL AND ICE CONTROL OPERATIONS MANUAL TABLE OF CONTENTS
1 TABLE OF CONTENTS SECTION: 1) Introduction Page 2 2) Scope of Program Page 2 3) General Instructions Page 3 4) Storm Procedures Page 3 5) Snow Removal Operating Procedures Page 4 6) Snow Ordinance Page
More informationTown of Bellingham DEPARTMENT OF PUBLIC WORKS. Snow and Ice Control FAQs. Q. Can I push snow from my property onto the sidewalk or street?
Frequently Asked Questions Town of Bellingham DEPARTMENT OF PUBLIC WORKS Snow and Ice Control FAQs Q. Can I push snow from my property onto the sidewalk or street? Bylaw 15.02 restricts this act and you
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More informationChapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations
SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,
More informationGuidelines for. Permeable Pavement
What is permeable pavement? Guidelines for Permeable Pavement When rainwater falls on conventional pavement, such as concrete, it accumulates and then flows across and off of this impervious surface as
More informationTOWN OF BELLINGHAM DEPARTMENT OF PUBLIC WORKS. Snow and Ice Control FY 2010
TOWN OF BELLINGHAM DEPARTMENT OF PUBLIC WORKS Snow and Ice Control FY 2010 Introduction: The Bellingham Department of Public Works maintains the community s 100 miles of roads. In addition to plowing,
More informationHIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES
Approved 6/26/01 HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES All new, modified and/or changed use access(es) onto county roads shall be subject to the access and corridor protection guidelines
More informationOperations and Maintenance Plan The Residences at Johnson Farm 189 Landham Road Sudbury, Massachusetts. Submitted to: Town of Sudbury
Operations and Maintenance Plan The Residences at Johnson Farm 189 Landham Road Sudbury, Massachusetts Submitted to: Town of Sudbury December 2011 Table of Contents 1.0 Introduction... 1 1.1 Responsibility...
More informationTOWN OF NEW HAVEN ROAD PLAN
1 TOWN OF NEW HAVEN ROAD PLAN BACKGROUND The Town of New Haven, Vermont consists of 42 square miles of land and a population of approximately 1400 people. At the start of the 21 st century, it is served
More informationTown of Bristol, New Hampshire Winter and Inclement Weather Policy and Priorities
Town of Bristol, New Hampshire Winter and Inclement Weather Policy and Priorities Pursuant to RSA 231:92-a, the Bristol Board of Selectmen hereby establishes the following policy and procedure for winter
More informationBest Practice For Selecting Bus Stop Locations
Best Practice For Selecting Bus Stop Locations There is no perfect school bus stop, because it is impossible to eliminate all potential hazards, but guidelines and training are still necessary to ensure
More informationEngineering and Public Works
Table of Contents Executive Summary SWOT Analysis Review Process 1 Department Staffing and Service Delivery 2 Waste Management 4 Waste Management Budget 6 Benchmarking Waste Management 7 Garbage Collection
More informationWESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24
Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge
More informationPosition: HEAVY EQUIPMENT OPERATOR Classification: 3 Highway Personnel Member B & C
Position: HEAVY EQUIPMENT OPERATOR Classification: 3 Highway Personnel Member B & C Position Purpose: The purposes of this position are to assist in maintaining all town rights-of-way, equipment and other
More informationCONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.
More informationPreventing Storm Water Pollution: What We Can Do
Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Streets and Drainage Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S. ENVIRONMENTAL
More informationStorm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
More informationWaste Handling & Disposal
Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended
More informationHow To Plan A Buffer Zone
Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other
More informationBond Release Process for New Subdivision Developments in Fairfax County
Bond Release Process for New Subdivision Developments in Fairfax County An Overview for Homeowners Associations A Fairfax County, Va., publication April 2009 For more information or to request this document
More informationENGINEERING & PUBLIC WORKS ASSET MANAGEMENT PLAN
ENGINEERING & PUBLIC WORKS ASSET MANAGEMENT PLAN NOVEMBER 2010 TABLE OF CONTENTS TABLE OF CONTENTS 1. Introduction...4 2. Mission Statements and Goals...5 3. How does the Asset Management Plan Support
More informationSTAFF REPORT TO COMMITTEE OF THE WHOLE
STAFF REPORT TO COMMITTEE OF THE WHOLE DATE: November 7 2012 TO: FROM: SUBJECT: ATTACHMENT(S): COMMITTEE OF THE WHOLE GINA LAYTE-LISTON, SUPERVISOR, WASTEWATER Stormwater Management Funding Strategy None
More informationTown of Manchester Department of Public Works Winter Information Guide
1 Town of Manchester Department of Public Works Winter Information Guide This brochure contains information regarding snow removal, parking bans, and other important information. 2 The goals of the Town
More informationBEYOND THE STORM: Toronto s Climate Change Adaptation Program. Its about Risk and Cost Management. David MacLeod Toronto Environment Office
BEYOND THE STORM: Toronto s Climate Change Adaptation Program Its about Risk and Cost Management David MacLeod Toronto Environment Office June 16, 2011 Agenda Mitigation & Adaptation: Both are needed Impacts
More informationGUIDELINE FOR MUNICIPAL MANAGEMENT PRACTICES FOR STREET SWEEPINGS & CATCH BASIN CLEANINGS
GUIDELINE FOR MUNICIPAL MANAGEMENT PRACTICES FOR STREET SWEEPINGS & CATCH BASIN CLEANINGS STATE OF CONNECTICUT August 2007 DEPARTMENT OF ENVIRONMENTAL PROTECTION 79 Elm Street, Hartford, CT 06106-5127
More informationSUBDIVISION APPLICATION GUIDE
SUBDIVISION APPLICATION GUIDE August 2013 This brochure provides an overview of the steps involved in the Subdivision Application process. This is a general guide only. It is not meant to replace bylaws
More informationRoadway Cost Per Centerline Mile Revised June 2014
Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743
More informationThe Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08
The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are
More informationNEW HOME CONSTRUCTION
NEW HOME CONSTRUCTION A New Home Purchaser s Guide to the Construction of New Subdivisions and Homes in the City of Brampton Provided by Developer/Builder Responsibilities Ontario Building Code Compliance
More informationStorm Restoration. Bill Smeaton Distribution Superintendent Provincial Lines
Storm Restoration Bill Smeaton Distribution Superintendent Provincial Lines About Hydro One Hydro One owns and operates Ontario's 29,000 km high voltage transmission network that delivers electricity to
More informationGeneral Statement of Duties
VILLAGE OF LA GRANGE JOB DESCRIPTION POSITION TITLE: DEPARTMENT: REPORTS TO: General Utility Worker Public Works Director of Public Works Appointment Appointment of this position is made by the Director
More informationARTICLE IV, Snow and Ice Removal; Obstructions [Adopted 9-16-1964 by Ord. No. 1836 (Art. 713 of the 1965 Codified Ordinances)]
(Art. 713 of the 1965 Codified Ordinances)] ARTICLE IV, Snow and Ice Removal; Obstructions [Adopted 9-16-1964 by Ord. No. 1836 (Art. 713 of the 1965 Codified Ordinances)] (Art. 713 of the 1965 Codified
More informationDefinition of Tower from the Bradley County Zoning Resolution
Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio
More informationPesticide Spills. Chapter 26. In This Chapter. Keywords. Accidents. Pesticides Act and Environmental Protection Act
Chapter 26 Pesticide Spills In This Chapter Keywords Accidents After learning the information in this chapter, you will be able to: 1. Define a spill. 2. Describe when a spill must be reported to the Spills
More informationTOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion
TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion Project Overview Sanitary Sewer System 2 Town of Surfside Project Overview Potable Water System 3 Town of Surfside Project Overview Storm Water
More informationVILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES
VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES SEWER BACK-UP POLICY General Sewer back-ups are an unfortunate, but common problem in older communities. A sewer back-up can create a health or
More informationFIBER-OPTIC CABLE PLAN CHECK
Engineering Division 201 North Broadway, Escondido, CA 92025 (760) 839-4651, FAX (760) 839-4597 FIBER-OPTIC CABLE PLAN CHECK To: Date: Project: Project No. Address: Check No. Attn: Via: The attached plans
More informationRoof Maintenance Scope of Work
Roof Maintenance Scope of Work Reviewed By: Approved By: Version 3.0 Date 08-09-07 Author K. Vandenbussche 1 BACKGROUND The Integrated Service Provider s program will provide superior on-site equipment,
More informationGood? Bad? Why? http://uncultured.com/2007/09/20/notre-dame-and-watering-sidewalks/ Training Module 4
Good? Bad? Why? http://uncultured.com/2007/09/20/notre-dame-and-watering-sidewalks/ Solution Sprinklers should be directed at lawn areas Spraying water on pavement increases runoff Look for more water-efficient
More informationSanitation Pilot: Overview, FAQ and Mission Critical Path April 16, 2014
Sanitation Pilot Overview DeKalb County s 3 month Sanitation Pilot will begin April 28, 2014. The Sanitation Pilot is designed to test consolidating collections of all materials to one day per week. Items
More informationIce Melter Facts. Dry Powdery Snow: Can be shoveled or swept, and may not require the use of Ice Melter.
Ice Melter Facts There are many factors that should be reviewed when planning your Ice Melter program. The following information provides facts about Ice Melting products that will allow your customer
More informationEmpire Landscaping Company, Plano Texas
** Lawn Maintenance Service Details from Empire Landscaping ** The following is a guideline of our service details. Please read carefully and email me with confirmation, questions and/or information or
More informationStorm Drain Inlet Protection for Construction Sites (1060)
Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain
More informationThe Town of Lakeshore Basement Flooding Information to Residents
The Town of Lakeshore Basement Flooding Information to Residents The following information is intended for residents that have homes connected to Municipal storm and sanitary sewers. However, rural residents
More informationSolid Waste Twice a Week Automated Service FAQs
Solid Waste Twice a Week Automated Service FAQs What time should the cart be at the curb? Place the cart out for pickup by 7:00 a.m. on the day designated for pickup at your address and remove cart the
More information5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons)
DATE: March 8, 2006 TO: FROM: SUBJECT: Plan Commission Larry D. Nelson, P.E., City Engineer 5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons) The City Engineering
More informationSCOPE OF WORK Specifications for Landscaping, Lawn Maintenance & Pest Control
January 10, 2013 Request for Proposal for WINDRUSH BAY CONDOMINIUM ASSOCIATION, INC 700 Windrush Bay Drive, Tarpon Springs, FL 34689 www.windrushbay.org SCOPE OF WORK Specifications for Landscaping, Lawn
More informationEngineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted
Engineering Agency Number: 53 Budget Function: Public Works and Transportation The Engineering Division is responsible for the design, supervision and inspection of all street, highway, sidewalk and bike
More informationMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report
Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. A. Introduction A Stormwater Report must be submitted with the Notice of Intent
More informationTree Trimming, Removal & Replacement Policy Township of Springwater
Township of Springwater Approved: November 2, 2009 Effective: November 2, 2009 Next Review: TBD Department: Public Works Subject: tree removal, tree trimming, tree replacement, stump removal Policy Number:
More informationDRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS
DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS The City of DeSoto s Department of Development Services is the point of contact for storm drainage related issues. The following are some frequently
More information1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.
SECTION 6: REQUIREMENTS FOR A DRIVEWAY CONNECTION A. Required information. The application shall be accompanied by a sketch of the proposed driveway which at a minimum shall indicate: 1. Geometric information
More informationSection 801 Driveway Access Onto Public Right-of-Ways
Section 801:00 Section 801 Driveway Access Onto Public Right-of-Ways Section 801:00. Definitions. The following words and terms, when used in this Article, shall have the following meanings, unless the
More informationSeattle Public Utilities. Natural Drainage Systems (NDS) Maintenance Manual
Seattle Public Utilities Natural Drainage Systems (NDS) Maintenance Manual 1 Revision Date: December 2007 2 Table of Contents I. Overview... 4 II. How to Use This Manual... 4 III. NDS Contacts... 4 List
More informationSECTION B: STRUCTURE OF OUR COMMUNITY AND OWNER GUIDELINES. Condo 1079 - Who Are We?... B2. Ownership - Who Owns What?... B2
SECTION B: STRUCTURE OF OUR COMMUNITY AND OWNER GUIDELINES CONTENTS Condo 1079 - Who Are We?... B2 Ownership - Who Owns What?... B2 Postal Codes for YRVLCC 1079... B3 Ballantrae Community Map... B5 The
More informationDate Prepared: 11-3-09 By: Wastewater Best Practices Subgroup Final Document: 12-3-09
Date Prepared: 11-3-09 By: Wastewater Best Practices Subgroup Final Document: 12-3-09 SAMPLE SANITARY SEWER OVERFLOW RESPONSE S.O.P. TABLE OF CONTENTS SECTION 1: PURPOSE SECTION 2: SPILL RESPONSE SECTION
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific
More informationCity of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN
Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,
More informationVicken municipality - $1.2 Billion Dollar Tax Rebate
Village of Fruitvale 5 Year Financial Plan What is a Financial Plan Required under the Community Charter Future planning for works and services Maintaining current service levels Consider future service
More informationBEST MANAGEMENT PRACTICES (BMPs)... What are They? GOOD HOUSEKEEPING PRACTICES Your Business Should Employ
BEST MANAGEMENT PRACTICES (BMPs)... What are They? CLEAN STREETS MEAN CLEAN STREAMS Inexpensive to implement and easy to use, BMPs help you to do your share to protect the environment. The term Best Management
More informationCity of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
More informationNumber 2014-20 September 2014 SEWER LIABILITY
Number 2014-20 September 2014. SEWER LIABILITY Sewer Backups: Most of us take the use of our wastewater and sewer systems for granted, while municipalities must be vigilant to ensure that citizens of the
More information2014 ANNUAL REPORT. Department: Highway Department Head: David Hartman Departmental Employees: 27
2014 ANNUAL REPORT Department: Highway Department Head: David Hartman Departmental Employees: 27 Department Mission: The Yates County Highway Department is responsible for the construction, maintenance
More information5. Builder/Contractor Guidelines/Work Rules
Architectural Standards Committee 5. Builder/Contractor Guidelines/Work Rules 5.1 Builder/Contractor Responsibilities 5.2 Work Time and Days 5.3 Posting of Permits The builder/contractor is responsible
More informationCITY OF BEAVERCREEK, OHIO QUOTES FOR MOWING AND GENERAL CLEANUP OF PRIVATE PROPERTIES
CITY OF BEAVERCREEK, OHIO QUOTES FOR MOWING AND GENERAL CLEANUP OF PRIVATE PROPERTIES The City of Beavercreek is seeking quotes for mowing, trimming and general cleanup of private properties found to be
More informationTORONTO MUNICIPAL CODE CHAPTER 880, FIRE ROUTES. Chapter 880 FIRE ROUTES
Chapter 880 FIRE ROUTES 880-1. Definitions. 880-2. Application for designation of private road as fire route. 880-3. Consideration of application. 880-4. Disposition of application. 880-5. Appeals. 880-6.
More information"God Sent A Dog for every Human - OUR GOAL is to hold each dog until we find their Human" Dr.
Posted 5/9/16 The Wynne Friends of Animals Rescue Shelter is looking for a kennel work/ light maintenance worker - Hours are 8 till 5. Once trained - 5 days on schedule - some weekends. Starts at $50.00
More informationCITY OF LAKEVILLE. City Budget Open House. Streets Department
CITY OF LAKEVILLE City Budget Open House Streets Department Program Description: The Streets Division is responsible for the safe and reliable maintenance of the City s transportation infrastructure including
More informationCITY OF EAGAN SNOW AND ICE CONTROL POLICY FOR CITY STREETS (adopted by City Council on December 20, 1999)
CITY OF EAGAN SNOW AND ICE CONTROL POLICY FOR CITY STREETS (adopted by City Council on December 20, 1999) I. PURPOSE The purpose of this policy is to establish and maintain uniform definitions and procedures
More informationSnow and ice removal plans for public places
Snow and ice removal plans for public places Introduction When snow and ice accumulate on walking surfaces, the potential for slip and fall accidents and associated risk of liability greatly increases.
More informationKennebecasis Valley Fire Department Inc.
Inc. Chief Bill Ireland Deputy Chief Dan McCoy 7 Campbell Drive, Rothesay, NB E2E 5B6 Phone (506 848-6604 Fax (506 848-6608 Email: admin.kvfd@nb.aibn.com REQUEST FOR QUOTATION RFQ No. 15-1030 Winter Maintenance
More informationIndex. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
More informationCommercial Roof Management
Disclaimer: This material is designed and intended for general informational purposes only, and is not intended, nor shall it be construed or relied upon, as specific legal advice. Roof damage is a leading
More informationHow Your Business Can Prevent Stormwater Pollution
Tips for a Cleaner Bay How Your Business Can Prevent Stormwater Pollution alameda county You Can Prevent Water Pollution! Storm drains flow directly into creeks and the Bay without any treatment. Because
More informationCASFM Stormwater Quality Field Trip June 23rd, 2011
CASFM Stormwater Quality Field Trip June 23rd, 2011 The 2011 CASFM Stormwater field trip included 42 attendees coming from as far south as Colorado Springs up to the Denver area and another 12 who joined
More informationMinimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
More informationDuring sewer backup situations, please do not rely on voice or e-mail messages as these are generally only reviewed during normal business hours.
SEWER BACKUPS Sewage typically moves from the pipes inside your home or business through your sewer lateral to the public sewer mains, to the City s wastewater plant for treatment. However, when the line
More informationTown of Greenville Policy
Town of Greenville Policy Piping/Filling in of Roadside Ditches The Town owns its road right of way, not the abutting landowner. Purpose of Town roadside ditches: Town roadside ditches perform three primary
More informationSTORM WATER MANAGEMENT PLAN (SWMP)
ENVIRONMENTAL HEALTH, SAFETY & RISK MANAGEMENT OFFICE STORM WATER MANAGEMENT PLAN (SWMP) DEL MAR COLLEGE CO-PERMITEE (Previously TXS 000601) January 24, 2009 1.0 INTRODUCTION S TORM W ATER M ANAGEMENT
More informationINFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction
ACE GLOBAL RISK ENGINEERING INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE Introduction The most common cause of flooding is due to established water storage areas (natural and man-made)
More informationOutdoor Storage of Raw Materials SC-33
Objectives Cover Contain Educate Reduce/Minimize Description Raw materials, by-products, finished products, containers, and material storage areas exposed to rain and/or runoff can pollute stormwater.
More informationSECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
More informationFREEDOM AREA SCHOOL DISTRICT & LAMERS BUS LINES, INC FREEDOM TERMINAL BUS RULES
FREEDOM AREA SCHOOL DISTRICT & LAMERS BUS LINES, INC FREEDOM TERMINAL BUS RULES Updated 7/01/2015 Dear Parents and Students: It is the responsibility of the Freedom Area School District to transport approximately
More information8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:
. Introduction Presented in this chapter are the criteria and methodology for design and evaluation of storm sewer inlets located in Town of Castle Rock. The review of all planning submittals will be based
More informationPRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS
BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS Check here for Address or phone number change the fiscal year (July 1 June 30), and date(s) maintenance was performed. Under Inspection,
More informationALBUQUERQUE BERNALILLO COUNTY WATER UTILITY AUTHORITY WATER WASTE ORDINANCE
4-1-1 SHORT TITLE... 1 4-1-2 INTENT... 1 4-1-3 DEFINITIONS... 1 4-1-4 WATERING RESTRICTIONS... 4 4-1-5 WATER WASTE... 5 4-1-6 SPECIAL PERMITS... 6 4-1-7 VARIANCES, EXEMPTIONS AND APPEALS... 7 4-1-8 FEES;
More informationSmall Dam Hazard Assessment Inventory
Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible
More informationCONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL
CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL This manual applies to all development projects within Pitkin County. A Construction Management Plan (CMP) shall be submitted for all projects in Pitkin
More information12/3/2015 MUNICIPAL STORMWATER RESPONSIBILITIES YOU NEED TO KNOW WHAT IS STORMWATER? WHY?
MUNICIPAL STORMWATER RESPONSIBILITIES YOU NEED TO KNOW WHAT IS STORMWATER? Stormwater occurs when precipitation from rain or snowmelt flows over the ground WHY? 1 DEP/EPA AUDITING It is happening! Here
More informationPROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
More informationFairlington Community Center
Williamsburg Boulevard Green Street Project June 13, 2012 Williamsburg Middle School Relevant Outreach November 12, 2008: Introduction to Little Pimmit Run Watershed Retrofits Workshop, Yorktown High School
More informationSTORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local
More informationSoil and Materials Engineers, Inc. Mark J. Quimby Project Consultant
Soil and Materials Engineers, Inc. Mark J. Quimby Project Consultant Michigan Indiana Ohio www.sme-usa.com consultants in the environment, geosciences and materials OVERVIEW Site Description and History
More informationGarbage and Debris. Zoning/Use Violations. Tall Grass and Weeds. Vehicle Violations. Recreational Vehicle/Trailer Parking. Property Maintenance
Garbage and Debris Zoning/Use Violations Tall Grass and Weeds Vehicle Violations Property Maintenance Building without a permit Recreational Vehicle/Trailer Parking Sign Violations Animal Violations Right
More informationTown of Huntsville Municipal Asset Management Plan
Town of Huntsville Municipal Asset Management Plan Adopted by Council (Resolution 470-13) December 20, 2013 1 P age Table of Contents Executive Summary... 3 Introduction... 4 State of Local Infrastructure...
More informationSchool Bus Safety Transportation Rules & Regulations
Transportation Office The State Department of Education (SDE) Regulates School Bus Transportation A local school system can give service only within the limits of the resources made available by state
More informationTownship of Georgian Bluffs POLICY USE OF UNOPENED ROAD ALLOWANCES
Township of Georgian Bluffs POLICY USE OF UNOPENED ROAD ALLOWANCES 1.0 Background An unopened road allowance as defined by the Municipal Act is a public highway that has not been opened and assumed for
More informationModel Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview. Why Subdivision and Land Development Regulations?
Model Subdivision and Land Development (SALDO) Subdivision/ Land Development Presentation Overview Purpose of Subdivision/ Land Development Ordinances (SALDO) Municipalities Planning Code Process Design
More informationChallenges. Estimated Damages from 100-Year Flood
Suffield Suffield is a rural community located along the Massachusetts border. It encompasses about 42.2 square miles and has a population of about 15,735. Suffield s terrain rises from an elevation of
More informationB. Improve the appearance and character of areas surrounding new development.
Chapter 4.3: Landscape Regulations Sections: 4.301 Purposes 4.302 Applicability 4.303 General Provisions 4.304 Landscape Maintenance 4.301 Purposes The purposes of these regulations are to: A. Promote
More information