DCC User Interface Specification (DUIS) and Message Mapping Catalogue (MMC) DCC conclusions and report to Secretary of State

Size: px
Start display at page:

Download "DCC User Interface Specification (DUIS) and Message Mapping Catalogue (MMC) DCC conclusions and report to Secretary of State"

Transcription

1 DCC User Interface Specification (DUIS) and Message Mapping Catalogue (MMC) DCC conclusions and report to Secretary of State Date: 27 May 2016 Classification: DCC Public

2 Table of Contents 1 Executive Summary Report structure Summary of the DUIS and MMC consultation Document development process for DUIS and MMC DCC Conclusions in light of consultation responses and feedback sessions 6 6 Why DCC considers the SSD to be fit for purpose Appendix A Summary of DUIS Amendments made post consultation Appendix B Summary of MMC Amendments made post consultation DUIS/MMC consultation response DCC Public Page 2 of 15

3 1 Executive Summary This report covers the submission of the draft DCC User Interface Specification (DUIS) and Message Mapping Catalogue (MMC). Each are resubmitted to the Secretary of State in accordance with requirements described in Schedule 5 Annex 5 of the Smart Meter Communication Licence. The DUIS sets out the technical details of the DCC User Interface, which is the means by which Users interact with Devices. Communications from Devices are received by the User via the DCC User Interface, in a format as set out in the Great Britain Companion Specification (GBCS). The MMC specifies the translation of data created by Devices in GBCS format, into a format that is standardised and interpretable (the MMC Output Format ). Following their baselining under the Smart Meter Implementation Programme Transitional Governance Framework on 26 August 2015, draft versions of both the DUIS and MMC are set to be designated into the SEC in time for DCC Live. In order to finalise the DCC solution design to support the DCC 1.3 Release, DCC has made updates to the draft baselined versions of the documents and their supporting schema. Between 1 April and 29 April 2016, DCC consulted on updates made to these documents. DCC did not seek comments on the un-amended sections of the documents, which are already part of the baselined technical specification documents under SMIP Transitional Governance. DCC can confirm that it has taken into account consultation feedback such that it has sought to reach an agreed solution with parties raising disagreements. The proposed updates have been discussed with relevant parties during the feedback on the consultation and, following this process, these updates have been included in the draft DUIS and draft MMC (and their supporting schema) submitted to the TBDG. In some cases DCC has amended the proposed updates in light of feedback received (but without prejudice to the particular purposes of the documents), as set out in the consultation feedback and response tracker document submitted alongside this report. It is DCC s view that we have fulfilled our obligations in relation to Annexes 6 and 9 of Schedule 5 of the Licence by consulting with Parties, responding to feedback and resubmitting the DUIS and MMC to the Secretary of State via the TDBG. DCC considers both the DUIS and MMC are defined to a sufficient level of detail for the Technical Baseline Design Forum (TBDG) to reincorporate each within its baseline, and that both the DUIS and MMC are defined to a sufficient level of detail for incorporation into the Smart Energy Code (SEC). DCC Public Page 3 of 15

4 2 Report structure This document has four core sections: firstly, it sets out summary detail of the DUIS and MMC consultation; secondly, it outlines the process followed to consult with Parties and respond to their feedback; thirdly, it outlines DCC s conclusions in light of the consultation response review and post-consultation feedback sessions; and lastly, it summarises why DCC believes the DUIS and MMC are fit for purpose. Provided along with this report are the following documents: DUIS - final draft SEC Subsidiary Document; supporting Schema for the DUIS; MMC - final draft SEC Subsidiary Document; supporting Schema for the MMC; and the Consultation feedback and response tracker document 3 Summary of the DUIS and MMC consultation The DUIS and MMC documents and associated XML schemas were updated from the baselined versions in response to the following activity: DECC s legal review of the DUIS and MMC documents and their suitability for inclusion within the SEC as SEC Subsidiary Documents; the identification of updates required to support the design of the DCC Systems for the DCC 1.3 Release; updates based on review comments received by DCC from Parties and feedback received from Design forums on the baselined v0.8.2 documents; and non-material issues identified by DCC where ambiguities existed or additional clarification was required within the specifications. 3.1 Changes DUIS and XML Schema Changes were made to the DUIS in relation to each of the four change categories identified above, but with the vast majority relating to either review comments received from DECC following their legal review of both the DUIS and MMC, or where ambiguities existed or additional clarification was required. Updates were considered to have not caused a material impact on the technical specifications which would not result in changes to either the design of the DCC Systems or User Systems. For the supporting DUIS schema, inclusion of new functionality to support the SMKI Recovery Procedure led to changes into the DCC solution, requiring two new Smart Metering Inventory (SMI) DeviceStatus attribute enumeration values, Recovery and Recovered within the DUIS XML Schema, and two new additional DCC Alerts. DCC Public Page 4 of 15

5 3.2 Changes to MMC and XML Schema Changes made to MMC related to either review comments received from DECC following their legal review of both the DUIS and MMC or where ambiguities existed or additional clarification was required. Updates were considered to have not caused a material impact on the technical specifications. DCC informed stakeholders that as a result of changes to the MMC schema, an updated Parse and Correlate software version aligned to this new schema would be required. 3.3 Versioning of the DUIS and MMC schemas Following feedback from stakeholders suggesting that the DUIS and MMC XML schemas should have more precise definitions with respect to version numbers, DCC proposed to add a separate DUIS/MMC development schema version to be notified within the schema comments. 3.4 Changes to support potential amendments to GBCS DCC was asked by DECC if the DUIS and MMC documents could be changed as part of the consultation to support a Change Resolution Proposal for GBCS, changing the Units value for the UncontrolledGasFlowRate data item defined in DUIS under Service Reference Variant UpdateDeviceConfiguration(GasFlow) and in MMC under Service Reference Variant ReadDeviceConfiguration(Gas), to support Industry s requirement for granular control of this function. 4 Document development process for DUIS and MMC DCC has followed the process below to comply with its regulatory obligations: discuss procedures and requirements in technical design forums with industry; circulate work-in-progress drafts to DECC for discussion; formally, publicly consult for an appropriate number of weeks (in this case 4 weeks); collate and review consultation feedback; provide feedback to, and seek agreement with, consultation respondents that commented on the consultation proposals; and produce amended and assured draft for submission to Secretary of State. DCC issued a formal consultation on its public-facing website on 1 April Parties were notified of its release by . The consultation was open for 4 weeks; closing on 29 April DCC Public Page 5 of 15

6 5 DCC Conclusions in light of consultation responses and feedback sessions Activity during consultation DCC asked 6 specific questions on the key proposals set out in the consultation and received 132 comments in writing from 12 separate parties (Critical Software provided only technical review comments and answered no questions as part of the consultation response). 5.1 Question 1 DCC asked consultees: [Question 1] Do you agree with the updates that the DCC has made to the DUIS and its associated XML schema to support its designation within the SEC as a Subsidiary Document? If not, please provide any specific issues and the rationale to support your response DCC received responses from 10 parties, 5 of whom responded positively with no other comments, 3 responded positively with comments and 2 responded negatively with issues. All comments received from respondents have been addressed via the response tracker spreadsheet and responses provided to parties, with minor changes made to the DUIS where appropriate. The two parties which responded negatively with issues were both Network Operators who both had similar concerns regarding the new DCC Alert definitions to support the SMKI Recovery Procedure. These concerns were also raised by the same parties as feedback to the recent SMKI Recovery Procedure consultation. DCC has noted concerns raised by Network Operators during both the recent SMKI Recovery process and DUIS/MMC consultations regarding the absence of DCC Alerts to support the SMKI Recovery Process and has concluded that the current proposed solution could be extended to incorporate the changes suggested. DCC recommends that these changes are progressed as part of the change process and be submitted as a change candidate for inclusion in a subsequent release of the DCC systems. On this basis, DCC is not proposing to change the current design of the DCC Systems at this point in time as part of the consultation responses for the SMKI Recovery process and DUIS/MMC consultations. Instead, the design changes to support the concerns raised by Network Operators regarding the absence of DCC Alerts to support the SMKI Recovery Process will be discussed with Users separately and agreed as part of the change process. In summary, taking all consultation responses to Question 1 into account, DCC concludes that on balance the majority of parties agree with the updates that DCC has made to the DUIS and its associated XML schema and support their designation within the SEC as a Subsidiary Document. DCC Public Page 6 of 15

7 5.2 Question 2 DCC asked consultees: [Question 2] Do you agree with DCC s recommended approach for changing the DUIS XML schema to support the SMKI Recovery Procedure functionality in time for the DCC 1.2 release as a forward compatibility change to prevent the need to change XML schema versions between the DCC 1.2 and 1.3 Release? If not, please provide rationale to support your response and your preferred implementation option. DCC received responses from 10 parties, 5 of whom responded positively with no comments, 4 responded positively with comments and 1 responded negatively with issues. All but one respondent agreed with DCC s recommended approach. The one respondent who disagreed believed that the timing of this change creates unacceptable additional risks to the programme and to DCC Users, and would not like to see any further changes included for R1.2. DCC notes the concerns raised and the potential risk highlighted, but considers that the only other realistic option regarding DCC s proposals in this area is to not include the additional functionality now, and instead release an updated schema for DCC R1.3, which creates different and significant risks at a critical point in the programme plan, whilst also increasing effort for all parties by requiring an additional change process to be undertaken. DCC does not consider this to be appropriate and agrees with most other respondents who supported DCC s proposed position. DCC is therefore not planning to change its proposed approach. In addition to the responses to this question, there were two points of clarification raised by several users: Several respondents requested clarification regarding a scenario where a Device has an SMI status of Recovery and the responsibility for a Device is switched to a new supplier as part of the Change of Supply (CoS) process. It was queried whether the CoS process would recover the Device without the new supplier needing to issue a Service Request 6.21 Handover of DCC Controlled Device. DCC can confirm that as defined in the SMKI Recovery Procedure a Device must complete the SMKI Recovery Process before any change of supplier (replacement of security credentials) can occur on a Device. When a Device has an SMI status of Recovery all communication to that Device via the DCC core communications service is prevented, as are all Service Requests targeted to that Device, as defined by the SMKI Recovery Process. The CoS Party processing within the DCC solution will NOT recover a Device as part of its standard processing and is not designed to do so. CoS and Recovery are two separate processes that must complete individually in their own right and are not designed to be linked within the DCC solution. All other comments received from respondents have been addressed via the tracker spreadsheet and responses provided to parties and minor changes made to the DUIS where appropriate. In summary, taking all consultation responses to Question 2 into account, DCC concludes that the majority of parties agree with DCC s recommended approach for changing the DUIS XML schema to support the SMKI Recovery Procedure functionality in time for the DCC Public Page 7 of 15

8 DCC 1.2 release. On this basis DCC intends to proceed and submit the DUIS and its associated XML schema at v to the Secretary of State as the recommended version for designation into the SEC. 5.3 Question 3 DCC asked consultees: [Question 3] Do you agree with the updates that the DCC has made to the MMC and its associated XML schema to support its designation within the SEC as a Subsidiary Document? If not, please provide any specific issues and the rationale to support your response. DCC received responses from 10 parties, 7 of whom responded positively with no comments, 3 responded positively with a few minor comments and none responded negatively with issues. All comments received from respondents have been addressed via the tracker spreadsheet and responses provided to parties. Minor changes have been made to the MMC where appropriate. In summary, as all respondents agreed with updates made to the MMC and its associated schema, DCC will incorporate the updates made to the MMC and its associated XML schema in preparation for their designation into the SEC as a Subsidiary Document. 5.4 Question 4 DCC asked consultees: [Question 4] Do you agree with the proposed versioning approach and support its implementation in all future versions of the DUIS and MMC XML schemas? If not, please provide the rationale to support your response. DCC received responses from 10 parties, 6 of whom responded positively with no comments, 4 responded positively with a few minor comments and none responded negatively with issues. Whilst all respondents agreed with the DCC proposals, several included some minor points for DCC to consider and some wider comments. These have been noted and addressed as appropriate in the tracker spreadsheet and the responses provided to parties. In summary, as all respondents agreed with the proposed versioning approach, DCC will follow its intended implementation approach for all future versions of the DUIS and MMC XML schemas. DCC will continue to work with Parties to review this and discuss future improvements to incorporate some of the comments made as appropriate. DCC Public Page 8 of 15

9 5.5 Question 5 DCC asked consultees: [Question 5] Do you agree that DCC should update the Units value for the UncontrolledGasFlowRate data item in both DUIS and MMC within the consultation response versions as requested by DECC to support the GBCS CRP449? If not, please provide the rationale to support your response. DCC received responses from 11 parties, only 1 of whom responded with wholehearted support for the proposed change. 3 parties responded positively with a few minor comments agreeing with the intent of the change but disagreeing with the solution proposed, 4 responded with no comment responses and 3 responded negatively with issues and were not supportive of the proposed change. The majority of respondents disagreed with the solution proposed by DCC, and many of the responses received noted an alternative recommendation for wider changes than the simple documentation update proposed. This implies that a wider, more detailed solution is required to resolve this issue than the one proposed in this consultation. On the basis that only one respondent agreed that the DCC should update the Units value for the UncontrolledGasFlowRate data item in both DUIS and MMC to support the GBCS IRP, and noting that there were a number of significant objections received from different parties, DCC has concluded that it will not introduce the proposed changes to the Units value for the UncontrolledGasFlowRate data item. Both the DUIS and MMC will remain as they are without change in this regard. This response will be circulated to DECC and all interested parties at the next TSIRS meeting for DECC to decide how to proceed with this issue and advise industry of the next steps for the issues identified as part of GBCS CRP449. To confirm, the Unit value for the UncontrolledGasFlowRate data item will remain as m 3 per hour. 5.6 Question 6 DCC asked consultees: [Question 6] Do you agree with DCC s recommended approach for the re-baselining of DUIS and MMC and the submitting of any required updates post v in order to get to a designated version of DUIS and MMC in time for DCC Live? If not, please provide rationale to support your response. DCC received responses from 10 parties, of whom 2 responded positively with no comments; 6 responded offering support for the approach but raising detailed comments and concerns in the process; and 2 responded negatively, raising issues with the approach. Whilst there was broad support for the concepts outlined by DCC in response to this question, respondents generally wanted more clarity and certainly over the proposals put forward by DCC. Whilst we recognise that, in an ideal world, there would be no need to change DUIS and MMC from the existing v0.8.2 baseline, adopting this approach creates issues which will persist through to DCC Live, as subsequent changes would still be required at a later date to support the DCC R1.3 Release and to resolve issues already identified through testing (unless functional defects are accepted by Industry). DCC Public Page 9 of 15

10 DCC would like to confirm that any further changes to the DCC User Interface will only be made in line with the scope of the 1.x release strategy and changes will only be proposed to ensure that the existing defined functionality operates correctly without any known issues. It is not DCC s intent to create any unnecessary new versions that could become active during testing, as this approach may lead to issues that could affect all parties at what is a critical period of delivery. It is DCC s intent to only change the DUIS and MMC when it is clear that there are issues that would prevent expected functionality from successfully operating as intended, and DCC would consult on all possible changes with all impacted parties at the earliest point, were these issues to arise. DCC would seek collective agreement with parties prior to any new versions being activated. It is anticipated that this process would be managed by the DCC s Issue Resolution Board (IRB) process. DCC recognise and fully support several respondents comments that any release approach for MMC must also consider the delivery to users of the aligned version of Parse and Correlate (P&C) software, and that designating an updated MMC is insufficient without the delivery of an updated software release of P&C that is aligned to MMC. DCC confirm that any change to the MMC XML schema will result in an updated version of the P&C software being made available to Users. Considerations regarding re-baselining of DUIS By continuing to implement DUIS v0.8.2 for R1.2 there would be no impact on the functionality of the R1.2. However, this would mean that the two new DCC Alerts associated with the SMKI Recovery Procedure would still need to be implemented at R1.3 implementation. This would require Users to use a changed DUIS XML schema as part of this release. In Design forum discussions with Parties, it was agreed that this was desirable for neither DCC nor Users, and on this basis DCC will include the change as a forward compatibility change to prevent the need to change XML schema versions between the DCC R1.2 and R1.3. DCC s view that implementing the v version of DUIS for R1.2, as opposed to the existing v0.8.2 is the most appropriate option and this remains DCC s position. Considerations regarding re-baselining of MMC It remains DCC s view that implementing v and an updated associated Parse and Correlate software version for R1.2 and not the existing v0.8.2 and associated Parse and Correlate software version is the most appropriate approach. The need for an updated Parse and Correlate software version has already been established by the issues that have been raised and noted in the MMC consultation, so there is an existing need for v at some point prior to DCC Live in order to avoid these issues. DCC considers the implementation of v as soon as practically possible the most sensible option to avoid going into live with known issues, which would also require the implementation of the new MMC schema and associated Parse and Correlate software version. Of key consideration therefore is the question of whether is it appropriate for all Parties to implement the new MMC schema and associated Parse and Correlate software version for R1.2 or at a later release. DCC Public Page 10 of 15

11 Several respondents commented that DCC needed to explain how the updated P&C software version associated with the proposed MMC changes should be managed by Users in time for User Entry Process Testing (UEPT). There are no direct requirements on Users to indicate which version of Parse and Correlate software they will be using for UEPT, and DCC notes that no party is required to use the DCC-provided P&C software, as it is made available for use on an optional basis, depending on Users own implementation decisions. DCC would strongly recommend that parties test with the latest version of the Parse and Correlate software wherever possible, but we recognise that there may be some constraints to this approach; the timing of testing being one of these. Whilst conducting UEPT on the current version of the P&C software is not incorrect, DCC would note that some testing issues may arise in the areas where changes have been made to the current version of P&C software. If these issues are identified during UEPT then they can be noted and resolved with the use of the updated P&C software, and DCC s testing issues resolution process can be used to manage these situations. Given this flexibility, the timing of when each party updates its P&C software version should be decided by that individual party, based on their test approach and their willingness to accept the issues already identified within the existing P&C software, as well as their risk appetite given the increased likelihood of known issues with the software impacting their test schedules and results. A Testing Participant may therefore commence UEPT using DUIS and MMC versions but are likely to have to upgrade to version (of at least MMC) in order to complete UEPT, on the basis that most Testing Participants are likely to provide evidence of successful UEPT tests using Service Responses that have been through Parse. Conclusions After taking all comments from respondents into consideration, DCC considers that the most appropriate next step is to continue with its recommended approach for the rebaselining of DUIS and MMC at the v versions. These will be submitted to the Secretary of State with a DCC recommendation to designate these versions into the SEC at the appropriate point in time as determined by the Secretary of State. This will ensure that designated versions of DUIS and MMC are in place in time for DCC Live. However, DCC recognises that careful consideration must be paid to any future versions of the documents, and it will be crucial that DCC continues regular and direct communication with Users prior to any further potential changes to DUIS and MMC before the designation date. DCC recommends that these communications, if required, will be made via the DCC s IRB (Issue Resolution Board) and the TBDG. Activity post consultation DCC is confident that the revised draft documents, submitted to the Secretary of State, do indeed reflect, and where necessary address, the relevant comments made by Parties, in terms of definitions, consistency, timescales and other SEC-related alignment issues. It is DCC s view that it has met its SEC obligation to consult with Parties, to address the points of disagreement that have arisen and that have not been resolved in line with the purpose of the document, and that it has met its regulatory obligation in this regard. DCC Public Page 11 of 15

12 6 Why DCC considers the SSD to be fit for purpose The DUIS and MMC are in line with the overall solution design, security requirements and other relevant documents. The contents of both documents were discussed and approved for submission to the Secretary of State at the DCC s internal Design Assurance Board on 25 th May The DUIS and MMC have been assured and approved against the requirements defined in the version of the SEC available at the time. DCC considers that the DUIS and MMC are defined to a sufficient level of detail for inclusion within the baseline and for designation into the SEC because each document is useful and meaningful to Parties, is clear and unambiguous, is consistent / aligned with the rest of SEC, in respect of common terminology and appropriate use of references. Each document does not contradict other parts of the SEC and does not introduce new rights or obligations not already provided for by policy upon which we have consulted, or which are included in the SEC. The DCC asserts its view that the documents deliver the regulatory requirements specified in the SEC and the Licence, are materially complete, and the content of each is technically accurate. DCC Public Page 12 of 15

13 Appendix A Summary of DUIS Amendments made post consultation Change Ref # A summary of the changes made to the DUIS document as a result of consultation responses in contained below. No further changes were made to the DUIS XML Schema as a result of consultation responses received. Summary of Changes 1 The definition of Transport Layer Security (TLS) has been aligned with other SSDs. The requirement for TLS 1.2 is retained within the DUIS at section 2.2 Establishment of Logical Connection. 2 Section has been corrected to be 3.1 causes several changes to crossreferences. 3 References to 31/12/3000 within sections and have been updated to use the full date and time format T00:00:00Z 4 Some typos have been corrected including: a. 'an SMI Status' (from 'a SMI Status') b. Security from Security c. Supplier from Supplier 5 The Error Handling Strategy procedure for Response Code E50 is updated to remove procedure Z1 as there will already be an Incident in this instance. 6 The descriptions for the 'true' and 'false' values of SuspendDebtDisabled and SuspendDebtEmergency have been updated to align with GBCS. (Table 89) 7 The correction of descriptions/valid set definitions where appropriate: a. DayOfWeekApplicability - table 99 b. DebtRecoveryRate - table 114 c. Index - table 174, Index - table 201 d. Index - table 203, Index - table 206 e. FirmwareVersion - table 219 f. InstallCode - table Table XML group name corrected 9 Table XML group name corrected DCC Public Page 13 of 15

14 10 The cross-reference for DSPScheduleRemoval in table 249 is corrected. 11 The reference to the alert code (under 'mandatory') for RecoveryComplete in table 252 is corrected. 12 References to values being in binary format have been removed from the firmware version Description / Values, table 219, and InstallCode Description / Values table 232 DCC Public Page 14 of 15

15 Appendix B Summary of MMC Amendments made post consultation A summary of the changes made to the DUIS document as a result of consultation responses in contained below. No further changes were made to the MMC XML Schema as a result of consultation responses received. Change Ref # Summary of Changes 1 A reference to the data and time formatting has been added to section 2.3 to reflect the inclusion of the UTC character of Z within the time and date formats. 2 Descriptions/Valid set definitions for the following have been updated: a. TariffThesholds table 88 b. PriceScale table 90 c. CertificationRequest table 162 DCC Public Page 15 of 15

Smart Metering Implementation Programme: Testing Baseline Requirements Document

Smart Metering Implementation Programme: Testing Baseline Requirements Document Smart Metering Implementation Programme: Testing Baseline Requirements Document 10 th August 2015 Testing Baseline Requirements Document Technical and Procedural requirements for demonstrating the testing

More information

Data Communications Company 2 nd Floor, Ludgate House 245 Blackfriars Road London, SE1 9UF

Data Communications Company 2 nd Floor, Ludgate House 245 Blackfriars Road London, SE1 9UF Data Communications Company 2 nd Floor, Ludgate House 245 Blackfriars Road London, SE1 9UF 6th Floor Dean Bradley House 52 Horseferry Road London SW1P 2AF T +44 (0)20 7706 5100 F +44 (0)20 7706 5101 info@energynetworks.org

More information

DCC Release Management Strategy

DCC Release Management Strategy DCC Release Management Strategy Version 1 24/03/2015 DRAFT Document Control Version Number Date Version 1 24/03/2015 Initial Draft for publication Documentation Approval Name Role Date Signature Dave Broady

More information

Consultation on DCC Enduring Release Management Policy. Consultation opens: 18 September 2015

Consultation on DCC Enduring Release Management Policy. Consultation opens: 18 September 2015 Consultation on DCC Enduring Release Management Policy Consultation opens: 18 September 2015 Consultation closes: 16 October 2015 Classification: DCC Public Table of Contents 1 Introduction... 4 1.1 Objective...

More information

Data Communications Company (DCC) price control guidance: process and procedures

Data Communications Company (DCC) price control guidance: process and procedures Guidance document Contact: Tricia Quinn, Senior Economist Publication date: 27 July 2015 Team: Smarter Metering Email: tricia.quinn@ofgem.gov.uk Overview: The Data and Communications Company (DCC) is required

More information

SMKI Recovery Procedure

SMKI Recovery Procedure - file formats Consultation opens: 23 September 2015 Consultation closes: 7 October 2015 Version: v1.0 Date: 23 September 2015 Author: Classification: Jonathan Jennings, Andy Barraclough DCC Public Document

More information

SEC Guidance I Processing of Service Requests, Responses and Alerts

SEC Guidance I Processing of Service Requests, Responses and Alerts Overview Communications with Devices comprising Enrolled Smart Metering Systems will be managed through the submission of Service Requests by users of the DCC s Enrolment and Communications Services (

More information

(SEC4.0) and (SEC4.1) indicates when new sections and appendices were added to the SEC. Section Title Section Title Definitions and Interpretation

(SEC4.0) and (SEC4.1) indicates when new sections and appendices were added to the SEC. Section Title Section Title Definitions and Interpretation . Key SEC Section headings Active Sections Active Sections varied by Section X Inactive but designated Sections Blank sections and (SEC4.1) indicates when new sections and appendices were added to the

More information

Smart Meters Programme Schedule 8.6. (Business Continuity and Disaster Recovery Plan) (CSP North version)

Smart Meters Programme Schedule 8.6. (Business Continuity and Disaster Recovery Plan) (CSP North version) Smart Meters Programme Schedule 8.6 (Business Continuity and Disaster Recovery Plan) (CSP North version) Schedule 8.6 (Business Continuity and Disaster Recovery Plan) (CSP North version) Amendment History

More information

Incident Management Policy

Incident Management Policy Incident Management Policy Draft SEC Subsidiary Document DCC Public 01 July 2015 BASELINED VERSION 1 DEFINITIONS Term Black Start CPNI Code of Connection Crisis Management Disaster HMG Incident Party Interested

More information

Smart Meters Programme Schedule 2.5. (Security Management Plan) (CSP South version)

Smart Meters Programme Schedule 2.5. (Security Management Plan) (CSP South version) Smart Meters Programme Schedule 2.5 (Security Management Plan) (CSP South version) Schedule 2.5 (Security Management Plan) (CSP South version) Amendment History Version Date Author Status v.1 Signature

More information

Smart Meter Wide Area Network DCC Assurance Strategy

Smart Meter Wide Area Network DCC Assurance Strategy Smart Meter Wide Area Network DCC Describing the means by which DCC seeks to ensure that Communication Service Providers meet their connectivity and coverage service commitments Version: v1.0 Date: 2016-03-07

More information

ITS specification Handover and commissioning process (ITS-10-01)

ITS specification Handover and commissioning process (ITS-10-01) ITS specification Handover and commissioning process (ITS-10-01) NZ Transport Agency Effective from September 2011 Copyright information This publication is copyright NZ Transport Agency (NZTA). Material

More information

Pre-application service for Nationally Significant Infrastructure Projects

Pre-application service for Nationally Significant Infrastructure Projects Pre-application service for Nationally Significant Infrastructure Projects Prospectus for Applicants Version 1 (May 2014) In this prospectus... This is a clickable PDF Executive summary 3 1 2 3 Purpose

More information

Section Development History/Status Origin Link (to relevant. documentation) SEC stage 4 consultation. SEC Stage 4 consultation Content first proposed

Section Development History/Status Origin Link (to relevant. documentation) SEC stage 4 consultation. SEC Stage 4 consultation Content first proposed SECTION O development version [This is a development version of Section O. It contains: The designated content (currently SEC4.5 as at 28 th September 2015) Black text Content that has been concluded on

More information

7 Directorate Performance Managers. 7 Performance Reporting and Data Quality Officer. 8 Responsible Officers

7 Directorate Performance Managers. 7 Performance Reporting and Data Quality Officer. 8 Responsible Officers Contents Page 1 Introduction 2 2 Objectives of the Strategy 2 3 Data Quality Standards 3 4 The National Indicator Set 3 5 Structure of this Strategy 3 5.1 Awareness 4 5.2 Definitions 4 5.3 Recording 4

More information

SMKI Recovery Procedure

SMKI Recovery Procedure SMKI Recovery Procedure Consultation open: 1 July 2015 Consultation closes: 29 July 2015 DCC Public Page 1 of 55 Contents 1 Introduction... 3 1.1 Purpose & Interpretation...3 1.2 Scope...3 2 Overview of

More information

The ITIL v.3. Foundation Examination

The ITIL v.3. Foundation Examination The ITIL v.3. Foundation Examination ITIL v. 3 Foundation Examination: Sample Paper 3, version 3.0 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. There are no trick questions.

More information

Updated SIT1 functionality (annex to SIT Approach Document) request for SEC Panel approval

Updated SIT1 functionality (annex to SIT Approach Document) request for SEC Panel approval To: SEC Panel 2 nd Floor, Ibex House 42 47 Minories London EC3N 1DY 15 th July 2015 Dear colleague, Updated SIT1 functionality (annex to SIT Approach Document) request for SEC Panel approval Purpose This

More information

Nomination of the Director-General

Nomination of the Director-General EXECUTIVE BOARD EB130/INF.DOC./1 130th session 15 November 2011 Provisional agenda item 3.1 Nomination of the Director-General Nomination for the post Note by the Legal Counsel 1. The purpose of this document

More information

Proposed debt assignment protocol for prepayment customers. A consultation document

Proposed debt assignment protocol for prepayment customers. A consultation document Proposed debt assignment protocol for prepayment customers A consultation document Summary Ofgem is committed to removing any unnecessary barriers preventing customers from switching suppliers. This document

More information

1.1 Terms of Reference Y P N Comments/Areas for Improvement

1.1 Terms of Reference Y P N Comments/Areas for Improvement 1 Scope of Internal Audit 1.1 Terms of Reference Y P N Comments/Areas for Improvement 1.1.1 Do Terms of Reference: a) Establish the responsibilities and objectives of IA? b) Establish the organisational

More information

NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY

NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY AUTHOR/ APPROVAL DETAILS Document Author Written By: Human Resources Authorised Signature Authorised By: Helen Shields Date: 20

More information

OF CPAB INSPECTION FINDINGS

OF CPAB INSPECTION FINDINGS PROTOCOL FOR AUDIT FIRM COMMUNICATION OF CPAB INSPECTION FINDINGS WITH AUDIT COMMITTEES CONSULTATION PAPER NOVEMBER 2013 The Canadian Public Accountability Board ( CPAB ) is requesting comments on the

More information

Achieve. Performance objectives

Achieve. Performance objectives Achieve Performance objectives Performance objectives are benchmarks of effective performance that describe the types of work activities students and affiliates will be involved in as trainee accountants.

More information

PUBLIC. Response to consultation on EMR data flows

PUBLIC. Response to consultation on EMR data flows PUBLIC Response to consultation on 28 April 2014 CONTENTS INTRODUCTION... 3 1. Background... 3 2. ELEXON s proposal to the CfD Counterparty... 3 RECOMMENDATION TO DECC ON MECHANISMS FOR PARTIES TO EXCHANGE

More information

Joint Steering Committee for Development of RDA. Subject: Statement of policy and procedures for JSC

Joint Steering Committee for Development of RDA. Subject: Statement of policy and procedures for JSC Page 1 of 14 To: From: Joint Steering Committee for Development of RDA Gordon Dunsire, Chair, JSC Subject: Statement of policy and procedures for JSC Related document: 6JSC/Policy/2 (JSC Meetings) This

More information

Reporting Service Performance Information

Reporting Service Performance Information AASB Exposure Draft ED 270 August 2015 Reporting Service Performance Information Comments to the AASB by 12 February 2016 PLEASE NOTE THIS DATE HAS BEEN EXTENDED TO 29 APRIL 2016 How to comment on this

More information

Implementation Guidance for ISO 9001:2015

Implementation Guidance for ISO 9001:2015 International Organization for Standardization BIBC II, Chemin de Blandonnet 8, CP 401, 1214 Vernier, Geneva, Switzerland Tel: +41 22 749 01 11, Web: www.iso.org Implementation Guidance for ISO 9001:2015

More information

Appendix 14 CORPORATE GOVERNANCE CODE AND CORPORATE GOVERNANCE REPORT

Appendix 14 CORPORATE GOVERNANCE CODE AND CORPORATE GOVERNANCE REPORT Appendix 14 CORPORATE GOVERNANCE CODE AND CORPORATE GOVERNANCE REPORT The Code This Code sets out the principles of good corporate governance, and two levels of recommendations: code provisions; and recommended

More information

IFAC s STANDARDS-SETTING PUBLIC INTEREST ACTIVITY COMMITTEES

IFAC s STANDARDS-SETTING PUBLIC INTEREST ACTIVITY COMMITTEES IFAC s STANDARDS-SETTING PUBLIC INTEREST ACTIVITY COMMITTEES DUE PROCESS AND WORKING PROCEDURES March 2010 In promulgating international pronouncements, including international Standards, IFAC s standardssetting

More information

NHS CHOICES COMPLAINTS POLICY

NHS CHOICES COMPLAINTS POLICY NHS CHOICES COMPLAINTS POLICY 1 TABLE OF CONTENTS: INTRODUCTION... 5 DEFINITIONS... 5 Complaint... 5 Concerns and enquiries (Incidents)... 5 Unreasonable or Persistent Complainant... 5 APPLICATIONS...

More information

1. Introduction. 1 http://www.centralbank.ie/regulation/poldocs/consultationpapers/documents/cp75/consultation%20paper%20cp75%20final.

1. Introduction. 1 http://www.centralbank.ie/regulation/poldocs/consultationpapers/documents/cp75/consultation%20paper%20cp75%20final. National Consumer Agency submission to the Central Bank of Ireland s consultation paper: Additional Consumer Protection Requirements for Debt Management Firms 1. Introduction 1.1. The National Consumer

More information

Implementation of the EU payment accounts directive: Consultation response

Implementation of the EU payment accounts directive: Consultation response Implementation of the EU payment accounts directive: Consultation response November 2015 Implementation of the EU payment accounts directive: Consultation response November 2015 Crown copyright 2015 This

More information

Smart Metering Implementation Programme. Smart Metering Equipment Technical Specifications Version 1.58

Smart Metering Implementation Programme. Smart Metering Equipment Technical Specifications Version 1.58 Smart Metering Implementation Programme Smart Metering Equipment Technical Specifications Version 1.58 Draft document V1.58 28 November 2014 Department of Energy and Climate Change 3 Whitehall Place London

More information

Incident Management Policy

Incident Management Policy Incident Management Policy Author: DCC Date: 9th May 2014 Page 1 of 10 Contents 1 Incident Management Policy 3 1.1 Incident Management Policy General Provisions 3 1.2 Pre-requisites to log an Incident

More information

Smart Metering Implementation Programme: Data Privacy and Security

Smart Metering Implementation Programme: Data Privacy and Security Smart Metering Implementation Programme: Data Privacy and Security Document type: Supporting Document Ref: 94e/10 Date of publication: 27 July 2010 Deadline for response: 28 October 2010 Target audience:

More information

Business Administration. Level 3 Diploma in Business Administration (QCF) 2014 Skills CFA Level 3 Diploma in Business Administration (QCF) Page 1

Business Administration. Level 3 Diploma in Business Administration (QCF) 2014 Skills CFA Level 3 Diploma in Business Administration (QCF) Page 1 Business Administration Level 3 Diploma in Business Administration (QCF) 2014 Level 3 Diploma in Business Administration (QCF) Page 1 Level 3 Diploma in Business Administration (combined qualification)

More information

Contact address: Global Food Safety Initiative Foundation c/o The Consumer Goods Forum 22/24 rue du Gouverneur Général Eboué 92130 Issy-les-Moulineaux

Contact address: Global Food Safety Initiative Foundation c/o The Consumer Goods Forum 22/24 rue du Gouverneur Général Eboué 92130 Issy-les-Moulineaux Version 6.3 Contact address: Global Food Safety Initiative Foundation c/o The Consumer Goods Forum 22/24 rue du Gouverneur Général Eboué 92130 Issy-les-Moulineaux France Secretariat email: gfsinfo@theconsumergoodsforum.com

More information

Project Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee

Project Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee Page 1 2 Contents 1. Introduction... 3 1.1 Definition of a... 3 1.2 Why have

More information

E Lighting Group Holdings Limited 壹 照 明 集 團 控 股 有 限 公 司 (incorporated in the Cayman Islands with limited liability) Stock Code : 8222

E Lighting Group Holdings Limited 壹 照 明 集 團 控 股 有 限 公 司 (incorporated in the Cayman Islands with limited liability) Stock Code : 8222 1. ORGANIZATION E Lighting Group Holdings Limited 壹 照 明 集 團 控 股 有 限 公 司 (incorporated in the Cayman Islands with limited liability) Stock Code : 8222 TERMS OF REFERENCE OF AUDIT COMMITTEE The board (the

More information

Research and information management strategy 2015-18. Using research and managing information to ensure delivery of the Commission s objectives

Research and information management strategy 2015-18. Using research and managing information to ensure delivery of the Commission s objectives Research and information management strategy 2015-18 Using research and managing information to ensure delivery of the Commission s objectives 1 1. Introduction This strategy sets out a range of research

More information

The Foundation Examination

The Foundation Examination The Foundation Examination Sample Paper 2 January 2013 Release Multiple Choice 1-hour paper Instructions 1. All 75 questions should be attempted. 2. 5 of the 75 questions are under trial and will not contribute

More information

CHECKLIST OF COMPLIANCE WITH THE CIPFA CODE OF PRACTICE FOR INTERNAL AUDIT

CHECKLIST OF COMPLIANCE WITH THE CIPFA CODE OF PRACTICE FOR INTERNAL AUDIT CHECKLIST OF COMPLIANCE WITH THE CIPFA CODE OF PRACTICE FOR INTERNAL AUDIT 1 Scope of Internal Audit 1.1 Terms of Reference 1.1.1 Do terms of reference: (a) establish the responsibilities and objectives

More information

Financial Services Guidance Note Outsourcing

Financial Services Guidance Note Outsourcing Financial Services Guidance Note Issued: April 2005 Revised: August 2007 Table of Contents 1. Introduction... 3 1.1 Background... 3 1.2 Definitions... 3 2. Guiding Principles... 5 3. Key Risks of... 14

More information

BUSINESS CONTINUITY POLICY

BUSINESS CONTINUITY POLICY BUSINESS CONTINUITY POLICY Document Type Corporate Policy Unique Identifier CO-038 Document Purpose To provide a structure through which: i. A comprehensive business continuity management system (BCMS)

More information

1 What does the 'Service V model' represent? a) A strategy for the successful completion of all service management projects

1 What does the 'Service V model' represent? a) A strategy for the successful completion of all service management projects 1 What does the 'Service V model' represent? a) A strategy for the successful completion of all service management projects b) The path to Service Delivery and Service Support for efficient and effective

More information

Insurer audit manual

Insurer audit manual Insurer audit manual Disclaimer This publication may contain work health and safety and workers compensation information. It may include some of your obligations under the various legislations that WorkCover

More information

Promoting Financial Resilience for Major Airports: Analysis of Consultation Responses and Government s Decision

Promoting Financial Resilience for Major Airports: Analysis of Consultation Responses and Government s Decision Promoting Financial Resilience for Major Airports: Analysis of Consultation Responses and Government s Decision Executive Summary Following consultation, this Government has set out its intention to introduce

More information

Vocational qualifications for 16 to 19 year olds

Vocational qualifications for 16 to 19 year olds Vocational qualifications for 16 to 19 year olds 2017 and 2018 performance tables: technical guidance for awarding organisations Updated March 2015 (Annex F: 2018 Addendum added) Contents Summary 4 About

More information

i-control Holdings Limited 超 智 能 控 股 有 限 公 司 (incorporated in the Cayman Islands with limited liability) (the Company )

i-control Holdings Limited 超 智 能 控 股 有 限 公 司 (incorporated in the Cayman Islands with limited liability) (the Company ) 1 Membership i-control Holdings Limited 超 智 能 控 股 有 限 公 司 (incorporated in the Cayman Islands with limited liability) (the Company ) TERMS OF REFERENCE OF THE AUDIT COMMITTEE (AMENDED AND ADOPTED BY THE

More information

This Report is provided for: Decision Endorsement Assurance Information

This Report is provided for: Decision Endorsement Assurance Information Agenda item 12 Enclosure PAPER G Report to: Author: Presented by: SUBJECT: Trust Board 24 November 2014 John McIlveen, Trust Secretary John McIlveen, Trust Secretary Well-Led Framework for Governance reviews

More information

Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. on electronic invoicing in public procurement. (Text with EEA relevance)

Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL. on electronic invoicing in public procurement. (Text with EEA relevance) EUROPEAN COMMISSION Brussels, 26.6.2013 COM(2013) 449 final 2013/0213 (COD) Proposal for a DIRECTIVE OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on electronic invoicing in public procurement (Text with

More information

Position Description

Position Description Position Description Job title Group Section Responsible to Responsibility for staff Project Coordinator Natural Resource Operations Rotorua Lakes Protection & Restoration Programme Rotorua Lakes Business

More information

EASYWAY ES5 RULES OF PROCEDURE FOR CHANGE CONTROL AND RELEASE MANAGEMENT OF DATEX II. Page 1 of 21. March 2011

EASYWAY ES5 RULES OF PROCEDURE FOR CHANGE CONTROL AND RELEASE MANAGEMENT OF DATEX II. Page 1 of 21. March 2011 EASYWAY ES5 RULES OF PROCEDURE FOR CHANGE CONTROL AND RELEASE MANAGEMENT OF DATEX II March 2011 European Commission Directorate General for Mobility and Transport Copyright 2011 Page 1 of 21 Document Control

More information

Maturity Model. March 2006. Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce

Maturity Model. March 2006. Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce Maturity Model March 2006 Version 1.0 P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value Added product which is outside the scope of the HMSO

More information

Independent Pricing and Regulatory Tribunal. Customer engagement on prices for monopoly services

Independent Pricing and Regulatory Tribunal. Customer engagement on prices for monopoly services Independent Pricing and Regulatory Tribunal Customer engagement on prices for monopoly services Research Final Report August 2012 Customer engagement on prices for monopoly services Research Final Report

More information

Network Rail Infrastructure Projects Joint Relationship Management Plan

Network Rail Infrastructure Projects Joint Relationship Management Plan Network Rail Infrastructure Projects Joint Relationship Management Plan Project Title Project Number [ ] [ ] Revision: Date: Description: Author [ ] Approved on behalf of Network Rail Approved on behalf

More information

The Cabinet Committee on Performance Improvement is asked to review and comment on the report.

The Cabinet Committee on Performance Improvement is asked to review and comment on the report. Cabinet Committee on Performance Improvement Meeting to be held on 28 th July 2015 Report of the Head of Exchequer Services Electoral Divisions affected: All Debt Management Recovery Plan Update Report

More information

Our Services for Partners

Our Services for Partners Our Services for Partners ElectraLink as the central body providing the infrastructure for the British retail electricity industry can provide unique services to support Partner s projects with utility

More information

Accreditation of qualifications for registration as an oral health practitioner

Accreditation of qualifications for registration as an oral health practitioner Accreditation of qualifications for registration as an oral health practitioner Purpose Approved by the Dental Council: August 2005 Updated: May 2008 Governance Structure Update: 8 August 2011 Updated:

More information

EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014. 2014 No. [XXXX]

EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014. 2014 No. [XXXX] EXPLANATORY MEMORANDUM TO THE CONTRACTS FOR DIFFERENCE (ELECTRICITY SUPPLIER OBLIGATIONS) REGULATIONS 2014 2014 No. [XXXX] 1. This explanatory memorandum has been prepared by the Department for Energy

More information

Business Solution Assessment

Business Solution Assessment Self-assessment where applicants are required to undertake their own assurance to gain confidence they have the required capability to deliver their market obligations. Business Solution Assessment Market

More information

Planning Act 2008: Guidance on the pre-application process

Planning Act 2008: Guidance on the pre-application process Planning Act 2008: Guidance on the pre-application process March 2015 Department for Communities and Local Government Crown copyright, 2015 Copyright in the typographical arrangement rests with the Crown.

More information

HK Electric Investments Limited

HK Electric Investments Limited HK Electric Investments Limited 港 燈 電 力 投 資 有 限 公 司 (Incorporated in the Cayman Islands with limited liability) together with HK Electric Investments (Stock Code: 2638) 1. Membership AUDIT COMMITTEE TERMS

More information

TERMS OF REFERENCE OF THE AUDIT COMMITTEE

TERMS OF REFERENCE OF THE AUDIT COMMITTEE MODERN DENTAL GROUP LIMITED (Incorporated in the Cayman Islands with limited liability) TERMS OF REFERENCE OF THE AUDIT COMMITTEE (adopted on 25 November 2015) 1 MODERN DENTAL GROUP LIMITED Terms of Reference

More information

Planning Act 2008: Guidance on Changes to Development Consent Orders. December 2015 Department for Communities and Local Government

Planning Act 2008: Guidance on Changes to Development Consent Orders. December 2015 Department for Communities and Local Government Planning Act 2008: Guidance on Changes to Development Consent Orders December 2015 Department for Communities and Local Government Crown copyright, 2015 Copyright in the typographical arrangement rests

More information

Risk management systems of responsible entities: Further proposals

Risk management systems of responsible entities: Further proposals CONSULTATION PAPER 263 Risk management systems of responsible entities: Further proposals July 2016 About this paper This paper sets out our proposals to provide guidance to responsible entities on our

More information

Consultation requirements under the Offshore Petroleum and Greenhouse Gas Storage (Environment) Regulations 2009

Consultation requirements under the Offshore Petroleum and Greenhouse Gas Storage (Environment) Regulations 2009 Information Paper N-04750-IP1411 Revision No 2 December 2014 Consultation requirements under the Offshore Petroleum and Core concepts The requirement that effective consultation be undertaken by titleholders

More information

Request for feedback on the revised Code of Governance for NHS Foundation Trusts

Request for feedback on the revised Code of Governance for NHS Foundation Trusts Request for feedback on the revised Code of Governance for NHS Foundation Trusts Introduction 8 November 2013 One of Monitor s key objectives is to make sure that public providers are well led. To this

More information

Smart Metering Implementation Programme

Smart Metering Implementation Programme Smart Metering Implementation Programme Foundation Smart Market The Government s final response to the consultation on the Foundation Smart Market 24 July 2013 Department of Energy and Climate Change 3

More information

CONSULTATION CONCLUSIONS REVIEW OF THE ENVIRONMENTAL, SOCIAL AND GOVERNANCE REPORTING GUIDE

CONSULTATION CONCLUSIONS REVIEW OF THE ENVIRONMENTAL, SOCIAL AND GOVERNANCE REPORTING GUIDE CONSULTATION CONCLUSIONS REVIEW OF THE ENVIRONMENTAL, SOCIAL AND GOVERNANCE REPORTING GUIDE December 2015 CONTENTS Page No. CHAPTER 1: INTRODUCTION... 1 CHAPTER 2: MARKET FEEDBACK AND CONCLUSIONS... 4

More information

Business Continuity Management

Business Continuity Management Business Continuity Management Standard Operating Procedure Notice: This document has been made available through the Police Service of Scotland Freedom of Information Publication Scheme. It should not

More information

Standard 1. Governance for Safety and Quality in Health Service Organisations. Safety and Quality Improvement Guide

Standard 1. Governance for Safety and Quality in Health Service Organisations. Safety and Quality Improvement Guide Standard 1 Governance for Safety and Quality in Health Service Organisations Safety and Quality Improvement Guide 1 1 1October 1 2012 ISBN: Print: 978-1-921983-27-6 Electronic: 978-1-921983-28-3 Suggested

More information

Dear Colleague, Summary

Dear Colleague, Summary System Operators, Transmission and Transportation System Owners, Generators, Shippers, Suppliers, Customers, Investors and other interested parties Date: 20 December 2013 Dear Colleague, Consultation on

More information

Accreditation Guidelines for Masters Degree Level Programmes

Accreditation Guidelines for Masters Degree Level Programmes Accreditation Guidelines for Masters Degree Level Programmes 2015 Contents 1. Introduction 2 2. Partnered educational establishments 3 3. Application for Accreditation 4 4. Accreditation Review 6 5. Alteration

More information

Guidance for the instruction of experts in civil claims

Guidance for the instruction of experts in civil claims Guidance for the instruction of experts in civil claims Introduction 1. The purpose of this guidance is to assist litigants, those instructing experts and experts to understand best practice in complying

More information

Spotlight on the SEC Seminar. 23 rd October 2015 10:00 15:00

Spotlight on the SEC Seminar. 23 rd October 2015 10:00 15:00 Spotlight on the SEC Seminar 23 rd October 2015 10:00 15:00 Welcome Jill Ashby Head of Code 10:00 10:10 Gemserv 2 Housekeeping Gemserv 3 Speakers Today Jill Ashby Alys Garrett David Barber George McGregor

More information

Efficiency Scrutiny Committee 16 th September 2014 IT - Scrutiny of the Service Review process and viability of options for change

Efficiency Scrutiny Committee 16 th September 2014 IT - Scrutiny of the Service Review process and viability of options for change Efficiency Scrutiny Committee 16 th September 2014 IT - Scrutiny of the Service Review process and viability of options for change For Decision Member Champion(s): Cllr A Alford, Corporate - Director:

More information

Appendix 10: Improving the customer experience

Appendix 10: Improving the customer experience Appendix 10: Improving the customer experience Scottish Water is committed to delivering leading customer service to all of our customers. This means we deliver the following activities: We will ensure

More information

Medical Device Software Standards for Safety and Regulatory Compliance

Medical Device Software Standards for Safety and Regulatory Compliance Medical Device Software Standards for Safety and Regulatory Compliance Sherman Eagles +1 612-865-0107 seagles@softwarecpr.com www.softwarecpr.com Assuring safe software SAFE All hazards have been addressed

More information

Government response: EMR consultation on BSC subsidiary documents

Government response: EMR consultation on BSC subsidiary documents Government response: EMR consultation on BSC subsidiary documents June 2014 Crown copyright 2014 Copyright in the typographical arrangement and design rests with the Crown. This publication (excluding

More information

Draft Comment Letter

Draft Comment Letter Draft Comment Letter Comments should be submitted by 22 October 2015 to commentletters@efrag.org International Accounting Standards Board 30 Cannon Street London EC4M 6XH United Kingdom [Date] Dear Sir/Madam,

More information

National Occupational Standards. Compliance

National Occupational Standards. Compliance National Occupational Standards Compliance NOTES ABOUT NATIONAL OCCUPATIONAL STANDARDS What are National Occupational Standards, and why should you use them? National Occupational Standards (NOS) are statements

More information

ACADEMIC POLICY FRAMEWORK

ACADEMIC POLICY FRAMEWORK ACADEMIC POLICY FRAMEWORK Principles, Procedures and Guidance for the Development & Review of Academic Policies [V.1] Page 2 of 11 TABLE OF CONTENTS 1. FRAMEWORK OVERVIEW... 3 2. PRINCIPLES... 4 3. PROCESS...

More information

AGENDA ITEM: SUMMARY. Author/Responsible Officer: John Worts, ICT Team Leader

AGENDA ITEM: SUMMARY. Author/Responsible Officer: John Worts, ICT Team Leader AGENDA ITEM: SUMMARY Report for: Committee Date of meeting: 30 May 2012 PART: 1 If Part II, reason: Title of report: Contact: Purpose of report: Recommendations Corporate objectives: Implications: INFORMATION

More information

Qualification details

Qualification details Qualification details Title New Zealand Diploma in Organisational Risk and Compliance (Level 6) Version 1 Qualification type Diploma Level 6 Credits 120 NZSCED 080317 Quality Management DAS classification

More information

Report on: Strategic and operational planning 2016/17 to 2020/21

Report on: Strategic and operational planning 2016/17 to 2020/21 To: The Board For meeting on: 25 February 2016 Agenda item: 7 Report by: Bob Alexander Report on: Strategic and operational planning 2016/17 to 2020/21 Purpose 1. The purpose of this paper is to invite

More information

Investment & Performance Board (IPB)

Investment & Performance Board (IPB) Investment & Performance Board (IPB) Date of IPB meeting: 23 October 2012 Title of paper: To be presented by: Cleared by: (name Adviser & Director) Classification: Developing a new junior electricity supply

More information

GP Systems of Choice (GPSoC)

GP Systems of Choice (GPSoC) GP Systems of Choice (GPSoC) Update October 2006 Contents 1 Introduction 3 2 Scheme status 4 3 Overview of the scheme 5 4 Funding 4.1 IT infrastructure 6 4.2 Annual service charges 6 4.3 Migration 6 5

More information

Submission on the Gas Industry Company consultation on Current Issues for Domestic and Small Business Gas Consumers

Submission on the Gas Industry Company consultation on Current Issues for Domestic and Small Business Gas Consumers Submission on the Gas Industry Company consultation on Current Issues for Domestic and Small Business Gas Consumers From Contact Energy Limited 25 September 2008 Introduction Contact Energy Limited ( Contact

More information

Clinical Risk Management: its Application in the Manufacture of Health IT Systems - Implementation Guidance

Clinical Risk Management: its Application in the Manufacture of Health IT Systems - Implementation Guidance Document filename: ISB 0129 Implementation Guidance v2.1 Directorate Solution Design Standards and Assurance Project Clinical Safety Document Reference NPFIT-FNT-TO-TOCLNSA-1300.03 Director Rob Shaw Status

More information

Constitution Amendment

Constitution Amendment Meeting and date Title Summary of paper JOINT MEETING OF THE BOARD OF DIRECTORS AND COUNCIL OF GOVERNORS 9 JUNE 2016 Constitution Amendment This report invites the Board of Directors and the Council of

More information

Service Integration &

Service Integration & This is a DRAFT document, being published for review & comment The content is therefore subject to change & revision This document is part of the XGOV Strategic SIAM reference set Service Integration &

More information

Consultation document Helping users of HMRC s Basic PAYE Tools undertake automatic enrolment calculations

Consultation document Helping users of HMRC s Basic PAYE Tools undertake automatic enrolment calculations Consultation document Helping users of HMRC s Basic PAYE Tools undertake automatic enrolment calculations March 2015 Introduction This consultation document presents a proposal for mitigating the risk

More information

ITIL Introducing service transition

ITIL Introducing service transition ITIL Introducing service transition The goals of service transition Aligning the new or changed service with the organisational requirements and organisational operations Plan and manage the capacity and

More information

GUIDELINE ON THE APPLICATION OF THE OUTSOURCING REQUIREMENTS UNDER THE FSA RULES IMPLEMENTING MIFID AND THE CRD IN THE UK

GUIDELINE ON THE APPLICATION OF THE OUTSOURCING REQUIREMENTS UNDER THE FSA RULES IMPLEMENTING MIFID AND THE CRD IN THE UK GUIDELINE ON THE APPLICATION OF THE OUTSOURCING REQUIREMENTS UNDER THE FSA RULES IMPLEMENTING MIFID AND THE CRD IN THE UK This Guideline does not purport to be a definitive guide, but is instead a non-exhaustive

More information

IRCA Briefing note ISO/IEC 20000-1: 2011

IRCA Briefing note ISO/IEC 20000-1: 2011 IRCA Briefing note ISO/IEC 20000-1: 2011 How to apply for and maintain Training Organization Approval and Training Course Certification IRCA 3000 Contents Introduction 3 Summary of the changes within ISO/IEC

More information

Initial Professional Development - Professional Values, Ethics, and Attitudes (Revised)

Initial Professional Development - Professional Values, Ethics, and Attitudes (Revised) IFAC Board Exposure Draft July 2012 Comments due: October 11, 2012 Proposed International Education Standard (IES) 4 Initial Professional Development - Professional Values, Ethics, and Attitudes (Revised)

More information

IAS 28 Investments in Associates Impairment of investments in associates in separate financial statements

IAS 28 Investments in Associates Impairment of investments in associates in separate financial statements STAFF PAPER IFRS Interpretations Committee Meeting September 2012 Project IAS 28 Investments in Associates Impairment of investments in associates in separate financial statements CONTACT(S) Leonardo Piombino

More information