SolarEdge, Now in Mega-Size
|
|
|
- Adelia Conley
- 9 years ago
- Views:
Transcription
1 SolarEdge, Now in Mega-Size Region Solar Installed a 1 MW ground mount array in Monticello, Florida using 45 SE20k inverters, over 1,600 P700 power optimizers and more than 3,200 Lightway 72-cell solar modules. With SolarEdge, you have just two strings per inverter, and BAM! you re done! There is a simple elegance to being able to do that. Brad Carlson, Sol Integrators At the beginning of the U.S. PV solar ramp, the industry focused mainly on the Day-1 costs of building the solar array. Today, as we see more systems reach Day 1,000, the focus has shifted. Owners now realize that PV assets can be profit-generating machines when properly designed, operated and maintained. To generate more revenue, owners must place greater focus on risk management. Moving away from the lowest cost wins idea and focusing instead on highest power production wins is driving the industry to capitalize on distributed generation and optimized inverters. And when it comes to optimization of plant production, there is no better choice than SolarEdge.
2 SolarEdge Optimized Inverters SolarEdge s module-level power electronics solution consists of three parts: a power optimizer, an inverter and a monitoring portal. Power optimizers improve energy harvest by placing a maximum power point tracker (MPPT) at the module level, with 15 milliseconds resolution. Power optimizers also condition the modules power output by eliminating losses stemmed from current mismatch, while decreasing voltage to increase string length. SolarEdge s power optimizers can improve string length up to 12,750 watts per string over 100 percent longer than traditional string inverters. Furthermore, the 2:1 power optimizer configuration helps bring down costs on the rooftop through a 50-percent reduction in parts count. SolarEdge offers 2:1 configuration for both 60 and 72-cell modules. inverter, each string would have required attention to the specific wattage and current levels on the modules. However, because they used SolarEdge, they were able to incorporate varying module power levels within the same string. SolarEdge s module-level MPPTs have the ability to condition the current and voltage output for each module pair. Power Optimizer 2:1 configuration Inverter 9kW - 20kW Monitoring Communication & Control Gateway Firefighter Gateway Designing with Optimized Inverters Region Solar created a two-module-high portrait configuration with a separate string at each level. The two strings were connected directly into a SolarEdge inverter at the end of the racking. Modules were wired in 2:1 configuration horizontally. Each module pair was connected in series to a single power optimizer. By keeping the top or bottom row on a single optimizer, the installer could reduce the impact of inter-row shading on the module pair. Region Solar sought to simplify its installation process as much as possible. By deploying SolarEdge SE20k inverters, this was easy; installers were able to connect up to 12,750 watts on a single string. So, with 310-watt modules, installers could create two strings of 40 modules and directly connect them to the SolarEdge SE20k inverters. Fully loaded on just two strings, the inverters did not require combiner boxes or fuses, which greatly simplified the installation process 1. Region Solar installed modules ranging from 300 to 310 watts. Had Region Solar designed the system with a central 1
3 The inverters were located on the same side near the center of the array for easy AC homerun construction. This design lowered the cost of wiring and the labor required to install cables. With SolarEdge s 2:1 architecture, connecting two solar modules to a single power optimizer, the cost of the SolarEdge solution was highly competitive with traditional inverter designs. Performance on larger inverters is risky. If you lose the inverter, you lose a large amount of the production. If any part for the array sees lower production due to clouds, vegetation or other reasons, it will create a high amount of mismatch losses. Andrew Tanner, President, Region Solar Why Not a Central Inverter? In the past, large PV installations traditionally featured large central inverters. This was an effort to decrease the upfront, day-1 cost as much as possible. However, as the industry matures and contracts are calling for more guarantees around production, lifetime energy yield is more critical to winning contracts. This puts an emphasis on risk reduction during the project s lifetime and motivates installers to build with string-level inverters in an effort to reduce the financial burden of servicing a large central inverter system. Originally, the system designed by Region Solar called for a central inverter. However, installations in Florida typically see variable cloud cover throughout the day, combined with rapid vegetation growth and soiling, which can severely affect production. With central inverters, having part of the array shaded results in performance issues that ripple throughout the remainder of the modules power_optimization.pdf SolarEdge can easily mitigate cloud cover effects. The power optimizers ability to adjust their MPPT within 15 milliseconds allows them to keep modules at their highest production levels throughout the entire lifetime of the array. Additionally, maintenance can cause a large central inverter to be down for many days. Service is complicated and typically involves an onsite visit from a highly trained technician often an employee of the inverter company. With smaller string inverters, spare parts can be stored on site. The technical knowhow to repair or replace an inverter is also lower. Furthermore, replacements are often as easy as with a small residential inverter. Smaller inverters also mean less energy loss during a service call. With a large central inverter, the entire site may be unable to produce energy. This can equal up to $1,000 in lost revenues. With a smaller string inverter (eg: 20kWac), the energy loss can be mitigated to only two percent of the array, or just $20 in lost revenues. The combined benefits of reduced green-to-green time (the time from component servicing required until the system is back up and running again) and reduced financial impact of a service event (two percent of energy yield vs. 100 percent with a central inverter) help the PV sites stay up and running longer. They are also better able to meet their contracted energy commitments under power purchase agreements (PPAs).
4 Savings with Optimized Inverters SolarEdge s inverters operate in an advanced, fixed-voltage mode and have been designed to work exclusively with power optimizers. SolarEdge three-phase inverters offer native support for 208Vac and 480Vac grids, avoiding additional transformer costs and energy losses. When the 20kWac inverter is loaded with a 1.25 DC:AC ratio or 25kWdc, an installer can build with only two strings. This eliminates the need to combine or fuse the DC side of a SolarEdge system, using instead the SE20kW inverters two native inputs to make all connections. The cost of homerun cables can be greatly reduced as well. 12,750 Watts 600V 1000V SolarEdge In an independent study conducted by third-party engineering firm Solvida Energy Group, engineers compared three inverter solutions: 600V central inverters, 1,000V string inverters, and SolarEdge s three-phase commercial inverters. SolarEdge demonstrated the greatest cost reduction in ebos costs, nearly eliminating the DC-side ebos entirely. Central 600 String 1000 SolarEdge c/w c/w c/w DC Labor DC Materials AC Labor AC Materials Total More specifically, SolarEdge reduced 50 percent of the ebos cost of wiring, labor, combiners and fuses when compared to a traditional 600V central inverter; when compared to a 1,000V string inverter, SolarEdge was able to reduce the ebos cost by over 30 percent, or about 4-5 cents per watt. Most inverters today come with a standard 10-year warranty. Thus, to avoid any hidden charges, installation owners should include the cost of an inverter replacement to accurately forecast the cost of electricity during a system s 20-year lifetime. For the central and string inverters that cost can be modeled in a few different ways: warranty extensions to 25 years, net present value of replacement inverters or service contracts. If we look at the warranty extension price for 25 years, we discover additional lifetime benefits to owning SolarEdge. Lifetime Costs Commercial Inverter System SolarEdge 1000V String ebos (M+L) Power Optimizer Inverter Replacement AC Materials AC Labor DC Materials DC Labor Central 600 String 1000 SolarEdge V Central The SolarEdge system offers the lowest lifetime costs. The SolarEdge inverter includes a standard 12-year warranty, while the power optimizer s warranty guarantees 25 years. Thus, the warranty extension is only required for the inverter portion of the SolarEdge installation. As a result, the warranty extension total cost is about one-third the cost of competing warranty extensions.
5 By comparing the material costs, ebos and life time costs of a central inverter, 1,000V string inverter and SolarEdge system, the Solvida study demonstrates that the SolarEdge system offers the lowest total cost of electricity. The SolarEdge system is able to achieve the lowest cost through the elimination of ebos components and the efficient deployment of fixed-voltage inverters and power optimizers. System Production Modeling To estimate energy yield over the system s lifetime, we use a PVsyst model to determine year-1 production. Production in years 2-20 are modeled with standard degradation rates for PV modules and a degradation rate for string induced mismatch losses. The array was built into PVsyst to build an accurate shading profile. Overall, the SolarEdge optimized inverter system recovered 1.5 percent more energy in year 1. This assumes that the site does not see added shade from vegetation or induced mismatch from varying cloud cover. A study of the loss diagrams in PVsyst reveals the sources of energy boost for the SolarEdge system: an elimination of module mismatch due to module-level MPP tracking. Since there is only one current (amps) value in series connections, all current outputs in the circuit must be the same. Typical PV modules accomplish this by moving away from their MPP, which results in lost energy. SolarEdge is able to isolate the module pair from the series connection. The power optimizers keep the modules at their individual MPP points while conditioning the output current from the optimizers to all match. Perspective of the PV-field and surrounding shading scene Production for each month was estimated to create a final yearly energy yield. Normalized productions (per installed kwp): Nominal power 1000kWp To calculate lifetime energy production, years 2-20 must also be modeled. Most simulation tools generate the simulation for the first year of installation, and do not take into account the module aging and mismatch growth. Lifetime yield must include module aging degradation of -0.5 percent to -1 percent per year (depending upon module manufacturer) and induced string-level losses due to additional module mismatch. A conservative value for this loss is an additional percent per year.
6 Inverter Over the lifetime of the system, the total advantages of optimized production yield an additional 2.7 percent greater energy output. This will generate an expected increase in revenues of $150,000 over the lifetime of the array 3. Monitoring Portal Year 1 Year 20 Lifetime Deg. (MWh) (MWh) (MWh) SolarEdge % Central % Benefit 1.5% 4.0% 2.7% The layout tab provides a birds eye view of the array s performance, inverter by inverter. Here, one can also observe the difference between residential and commercial layout tabs. In commercial sites, SolarEdge provides the option to consolidate modules down to the inverter level. This reduces the amount of data required to populate the view, while also increasing the speed and usability of the site. SolarEdge s dashboard view gives users an overlay of an entire site s production with real-time weather information and a comparison of performance by day, month or year. Installers are also able to place their logos on this page if desired. 3 Assumes $0.15/kWh electricity price with 3% escalator per year. Energy year 1 modeled using PVsyst. Years 2 20 modeled using -0.70% degradation rate for SolarEdge array and -0.82% degradation for central array. By selecting inverter groups and expanding the data, a user can see the individual module-level performance. Lighter blue modules indicate a higher energy production level, while darker blue modules indicate a lower production level.
7 By selecting any group of modules and right-clicking, a user can create graphs of power, energy, current or voltage. For this example, we we will create a current graph. Current Curve with Inter-row Shading Current Curve A graph of current production is useful to see the effect of varying light levels that strike the cells. Differences in current can be caused by a number of environmental or design factors. Installations with shading, soiling, vegetation or narrow ground coverage ratio (GCR) can display different levels of current production. In this graph, we are displaying the current production for a group of modules. Some of the modules are producing less current early in the day, which is due to inter-row shading on the site. You can also see how modules not affected by the shade are still producing at maximum power, although they may be in the same string as modules that are shaded. Voltage Curve with Inter-Row Shading Voltage Curve Voltage graphs have a different profile, as they tend to have a top hat shape since the voltage for a PV cell is not as sensitive to light. Voltages will increase rapidly in the morning, stay consistent throughout the day, and then decrease rapidly in the afternoon. It is common to see a bow in the middle of the day as rising heat levels will cause a decrease in voltage. This is a voltage graph of the exact same modules that have been shaded. In the morning, we can see a voltage increase relative to other modules that are unshaded. This is mainly due the shaded modules running cooler than the ones exposed to full sunlight. In some cases, you may also see the voltage decline by 33 percent in shaded conditions. This would be evidence of diode activation at the module level. Both conditions are examples of the modules and optimizers performing as designed.
8 Economics of Going Solar Overall, SolarEdge proved to be the best cost option to create an optimized system. With the ability to offset many production risks like cloud cover, soiling and vegetation, and to lower the cost of the 20-year warranty extension, the value for the customer, Florida-based VizCO-US, was compelling. I wanted to move to solar to mitigate the effect of brownouts. Each brownout costs between $300 and $400 in lost output from our manufacturing facility, said Chris Cantolino, Owner of VizCO-US Inc. Now, VizCO- US generates enough solar energy to cover 100 percent of its manufacturing needs. We are probably the only 100-percent solar-powered plastics manufacturer in the United States.
Application Note - How to Design a SolarEdge System Using PVsyst
March 2015 Application Note - How to Design a SolarEdge System Using PVsyst As of version 5.20, PVsyst - the PV system design software - supports the design of SolarEdge systems. This application note
Solar Cell Optimization: Cutting Costs and Driving Performance
Solar Cell Optimization: Cutting Costs and Driving Performance 1 Executive Summary Over the past several years, DC optimizers have become an important technological ingredient in many residential, commercial
How oversizing your array-to-inverter ratio can improve solar-power system performance
How oversizing your array-to-inverter ratio can improve solar-power system performance By Jon Fiorelli and Michael Zuercher-Martinson, Solectria Renewables, Contributors PV system designers are tasked
8 Ways Power Optimizers are Better by Design
8 Ways Power Optimizers are Better by Design Microinverters & Power Optimizers - a Technical Comparison HOW BOTH APPROACHES ARE SIMILAR Module-level electronics, namely microinverters and power optimizers,
White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5
White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code June 2015 Revision 1.5 Shalhevet Bar-Asher; SolarEdge Technologies, Inc. Bill Brooks, PE; Brooks Engineering LLC
Yield Reduction due to Shading:
1x4 1x16 10 x CBC Energy A/S x Danfoss Solar Inverters CBC-40W Poly 40 W TLX 1,5k 5 ; 1x11 3x4 0 1,5kW 1536 x CBC Energy A/S 1 x Power-One CBC-40W Poly 40 W TRIO-7,6-TL-OUTD 30 ; 4x14 0 7,6kW Location:
THE SUPERFLEX DESIGN OF THE FRONIUS SYMO INVERTER SERIES
THE SUPERFLEX DESIGN OF THE FRONIUS SYMO INVERTER SERIES 1. Introduction The PV applications where the use of more than one Maximum Power Point Tracker (MPPT) makes sense are manifold and diverse. This
1 Table of Contents SolarEdge Site Design Tool
1 Table of Contents SolarEdge Site Design Tool SolarEdge Site Designer V2.2 2 Table of Contents Table of Contents... 2 Introduction... 3 Starting to Use the Site Designer... 4 Begin a New Project... 9
Gross/Active PV Surface Area: 13.094,40 / 13.086,29 m². Energy Produced by PV Array (AC):
1x17 1x17 1x 8 x Trina Solar Trina TSM-PC5A 6 6 W 5 ; x Danfoss Solar Inverters TLX 1,5k 1,5kW Location: Arrondissement d'issoire Climate Data Record: Arrondissement d'issoire PV Output:.8, kwp Gross/Active
Photovoltaic Systems II EE 446/646
Photovoltaic Systems II EE 446/646 Components of a grid-connected residential PV system (net meter) The inverter contains: Ground Fault Circuit Interrupter (GFCI) MPPT and Circuitry to disconnect the PV
EFFICIENT EAST-WEST ORIENTATED PV SYSTEMS WITH ONE MPP TRACKER
EFFICIENT EAST-WEST ORIENTATED PV SYSTEMS WITH ONE MPP TRACKER A willingness to install east-west orientated photovoltaic (PV) systems has lacked in the past. Nowadays, however, interest in installing
Minor maintenance issues proving difficult to detect for many solar PV system owners
Minor maintenance issues proving difficult to detect for many solar PV system owners Challenges occurring even when system owners have access to their realtime and historical generation data Lack of detection
Satcon Solstice 100 kw System Solution
Clean power. SDMS-0100-208-LNU SDMS-0100-240-LNU SDMS-0100-480-LNU 5-12% mprovement in Total Energy Harvest 20-25% Reduction in Balance of System Expense The industry s first complete power-harvesting
SolarEdge Monitoring Portal. User Guide 1.1. Table of Contents
Table of Contents Table of Contents... 2 About This Guide... 3 Support and Contact Information... 4 Chapter 1 - Introducing the SolarEdge Monitoring Portal... 5 Chapter 2 - Using the SolarEdge Monitoring
Table of Contents. Table of Contents
Table of Contents Table of Contents Table of Contents... 2 About This Guide... 3 Support and Contact Information... 4 Chapter 1 - Introducing the SolarEdge Monitoring Portal... 5 Chapter 2 - Using the
INVERTER WITH MULTIPLE MPP TRACKERS: REQUIREMENTS AND STATE OF THE ART SOLUTIONS
INVERTER WITH MULTIPLE MPP TRACKERS: REQUIREMENTS AND STATE OF THE ART SOLUTIONS ABSTRACT: For most people inverters with multiple MPP Trackers (MPPT) seem to be more flexible compared to inverters with
Performance ratio. Contents. Quality factor for the PV plant
Performance ratio Quality factor for the PV plant Contents The performance ratio is one of the most important variables for evaluating the efficiency of a PV plant. Specifically, the performance ratio
Replacing Fuel With Solar Energy
Replacing Fuel With Solar Energy Analysis by Michael Hauke, RSA Engineering January 22, 2009 The Right Place for Solar Energy Harvesting solar energy at South Pole can reduce the fuel consumption needed
Fronius IG Plus. The next generation grid-connected PV inverter
Fronius IG Plus The next generation grid-connected PV inverter Maximum energy harvest cloudy or clear The first complete inverter solution. Reliable. Proven. Smart. An outstanding addition to the family:
CHAPTER 5 PHOTOVOLTAIC SYSTEM DESIGN
CHAPTER 5 PHOTOVOLTAIC SYSTEM DESIGN 5.1 Introduction So far in the development of this research, the focus has been to estimate the available insolation at a particular location on the earth s surface
sma FlexIble storage system
sma FlexIble storage system now even more attractive with the german incentive program for storage systems easy to use efficient Flexible Future-proof Comprehensive and easy-to-understand visualizations
Photovoltaic String Inverters and Shade-Tolerant Maximum Power Point Tracking: Toward Optimal Harvest Efficiency and Maximum ROI
Figure at left Ut alissen dignibh esse dipsumsan velisse tem zzriliquis alit lore facidui etum zzrillan hendignit, ver irit augait luptat faccum iliquatue facilit aliquis molore. Photovoltaic String Inverters
One. Invest with confidence Smart Solar Inverter Solutions. solarinvertersolutions.com. Residential, commercial and large scale applications
MAKING MODERN LIVING POSSIBLE Invest with confidence Smart Solar Inverter Solutions Residential, commercial and large scale applications One inverter supplier of reliable, flexible and user friendly inverter
ABB central inverters PVS800 100 to 1000 kw
Solar inverters ABB central inverters PVS800 100 to 1000 kw ABB central inverters raise reliability, efficiency and ease of installation to new levels. The inverters are aimed at system integrators and
We develop the technology for a blue sky...
We develop the technology for a blue sky... MAVİSİS TECHNOLOGY Mavisis Technology A.Ş. is a leader technology company in power electronics area in renewable energy. Mavisis Technology, as a brand, states
Valuing The Return on Solar Projects for Businesses and Government Agencies
Valuing The Return on Solar Projects for Businesses and Government Agencies EXECUTIVE SUMMARY With rising grid electricity prices and declining solar technology costs, the economic benefits of solar power
Application Note: String sizing Conext CL Series
: String sizing Conext CL Series 965-0066-01-01 Rev A DANGER RISK OF FIRE, ELECTRIC SHOCK, EXPLOSION, AND ARC FLASH This Application Note is in addition to, and incorporates by reference, the installation
INTRODUCTION WARNING S!!! VOC SHOULD BE BETWEEN 78 95. MUST NOT EXCEED 96 VOC USE DC CIRCUIT BREAKER/ISOLATOR BETWEEN SOLAR PANELS & CONTROLLER
INTRODUCTION Thank you for purchasing a WATERBOY pumping system. We set the standard for quality and economy in solar pumping. The WATERBOY range incorporates the best solar pump technologies that were
3.36 kw Solar PV Kit Pricing
3.36 kw Solar PV Kit Pricing Standard 3.36 kw Solar PV System Pricing $ 13,440 MI Solar Works Pricing $ 11,760 Less Federal Tax Incentives (30% of System Cost) - 3,528 Final 3.36 kw Solar PV System Cost
Bigger is Better: Sizing Solar Modules for Microinverters
Bigger is Better: Sizing Solar Modules for Microinverters Authors: David Briggs 1 ; Dave Williams 1 ; Preston Steele 1 ; Tefford Reed 1 ; 1 Enphase Energy, Inc. October 25, 2012 SUMMARY This study analyzed
Roy Allen, Technical Training, 17FEB2015 ABB Solar Days Residential Products, Design & Application Rapid Shutdown. ABB Feb 27, 2014 Slide 1
Roy Allen, Technical Training, 17FEB2015 ABB Solar Days Residential Products, Design & Application Rapid Shutdown Feb 27, 2014 Slide 1 ABB Single-Phase Products MICRO Inverter Single MPPT Dual MPPT MICRO-0.25-I
Solar Photovoltaic Frequently Asked Questions
Table of Contents 1. What is Solar Energy?... 2 2. What are the basic component of a Solar PV system?.2 3. What are the different types of PV systems ATL offers?...2 4. What is the difference between mono-crystalline
JSI Series Single Phase String Inverter. Features. Typical Efficiency Curve JSI-1500TL JSI-2000TL JSI-2500TL
JSI Series Single Phase String Inverter Features JSI-500TL JSI-000TL JSI-500TL High performance string inverters ØFrom.5KW to 6.0KW ØWide PV input voltage range ØRapid MPPT tracking technology ØSuperior
MORE POWER. A BETTER INVESTMENT.
SUNPOWERCORP.COM US HEADQUARTERS SunPower Corporation 3939 N. 1st Street San Jose, California 95134 USA 1-800-SUNPOWER sunpowercorp.com MORE POWER. A BETTER INVESTMENT. Established Incorporated in 1985
SMA SERVICE FOR PV POWER PLANTS
SMA SERVICE FOR PV POWER PLANTS EN Successful Projects with Sunny Central System Solutions SMA SERVICE Top Performance and Maximum Yields One thing is certain: PV power plants are investments in the future.
Solar Power HourSM. Solar educa on for your community.
Solar Power HourSM Solar educa on for your community. 1 Contents About. 1 Commonly Asked Questions.. 2-3 The Solar Site Assessment.. 3-4 Selecting a Solar Installer. 5-7 Certified Installers by State.
Application of photovoltaic s in the building and construction industry as a power generating facility
Application of photovoltaic s in the building and construction industry as a power generating facility Matthew P. Peloso Science and Technology Business Services LLP 10 Gopeng Street, ICON #34-22 Singapore,
Green Education through Green Power: Photovoltaics as a Conduit to Interdisciplinary Learning
Green Education through Green Power: Photovoltaics as a Conduit to Interdisciplinary Learning The proposed project will enable ABC University to: 1) develop an interdisciplinary educational program to
APPLICATION NOTE TESTING PV MICRO INVERTERS USING A FOUR QUADRANT CAPABLE PROGRAMMABLE AC POWER SOURCE FOR GRID SIMULATION. Abstract.
TESTING PV MICRO INVERTERS USING A FOUR QUADRANT CAPABLE PROGRAMMABLE AC POWER SOURCE FOR GRID SIMULATION Abstract This application note describes the four quadrant mode of operation of a linear AC Power
Is Overproduction Costing You?
Is Overproduction Costing You? A review of the impacts of solar resource data on financing and revenues for PV plants Presented by: Marie Schnitzer Vice President of Consulting Services Paul Thienpont
Solar Matters III Teacher Page
Solar Matters III Teacher Page Solar Powered System - 2 Student Objective Given a photovoltaic system will be able to name the component parts and describe their function in the PV system. will be able
Consumer guide. be brighter. actewagl.com.au/solar [email protected] 13 14 93
be brighter. Consumer guide. Your guide on how solar works, how much you can save on your electricity bills and how to choose the right provider and system for you. actewagl.com.au/solar [email protected]
ANALYSIS 2: Photovoltaic Glass Replacement
ANALYSIS 2: Photovoltaic Glass Replacement Problem Identification Bridgeside II is designed to accommodate 80 percent lab space and 20 percent office space. Laboratory equipment can consume a considerable
Designing PV Plants Optimised for Economic Efficiency
Technical Information Designing PV Plants Optimised for Economic Efficiency Content The most efficient PV plant design is usually not far from the operating limits, for example, the minimum input voltage
TECHNICAL BRIEF. Commercial PV in Australia and New Zealand Using the Enphase Microinverter System
TECHNICAL BRIEF Commercial PV in Australia and New Zealand Using the Enphase Microinverter System 2015 Enphase Energy Inc. All rights reserved May 2015 Table of Contents Commercial PV in Australia and
Leasing Residential PV Systems BY MICHAEL RUTBERG; ANTONIO BOUZA, ASSOCIATE MEMBER ASHRAE
This article was published in ASHRAE Journal, December 2013. Copyright 2013 ASHRAE. Posted at www.ashrae.org. This article may not be copied and/or distributed electronically or in paper form without permission
Preserve the sun s energy. BP Solar warranties
Preserve the sun s energy. BP Solar warranties Safeguarding your investment in solar BP Solar s energy solutions are a great investment in forward looking and environmentally responsible technology. Now
Residential Consumer Guide to Solar Power
Residential Consumer Guide to Solar Power 505 9 th Street NW Suite 800 Washington DC 20004 202.682.0556 www.seia.org Table of Contents Residential Consumer Guide to Solar Power... 2 Introduction... 2 How
A SOLAR GUIDE - EVERYTHING YOU NEED TO KNOW
WE BRING GREEN SOLUTIONS TO YOU A SOLAR GUIDE - EVERYTHING YOU NEED TO KNOW Provided by A COOLER PLANET A Cooler Planet 1 The Complete Solar Guide WHY GO SOLAR? TOP FIVE FACTORS TO CONSIDER FOR ADDING
YSmart Technology Co.,Ltd
YSmart Technology Co.,Ltd GWV Series Grid Tie Microinverter User Manual The copyright of this user manual belong to YSmart TechnologyCompany Limited. Without the written permission of the copyright holder,
SolarEdge Installation Guide MAN-01-00057-2.1. Cover goes here (right-side [odd] page)
1 Cover goes here (right-side [odd] page) Disclaimers 2 Disclaimers Important Notice Copyright SolarEdge Inc. All rights reserved. No part of this document may be reproduced, stored in a retrieval system
Building Integrated Combined Solar Thermal and Electric Generation Demonstration Project at Concordia University
Building Integrated Combined Solar Thermal and Electric Generation Demonstration Project at Concordia University Summary An innovative solar energy installation has been installed at Concordia University
SOLAR MICRO INVERTER 260 COMMUNICATION GATEWAY. Apparent Power Control (APC) unique micro inverter with
SOLAR MICRO INVERTER 260 COMMUNICATI GATEWAY Apparent Power Control (APC) P Q unique micro inverter with REAL & REACTIVE POWER CTROL 2 Micro Inverters unique micro inverter with real & reactive power control
LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems
LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems A. General This Net Metering Standard for Customer-Owned Grid Connected Electric Generating Systems sets forth the
PERFORMANCE OF MPPT CHARGE CONTROLLERS A STATE OF THE ART ANALYSIS
PERFORMANCE OF MPPT CHARGE CONTROLLERS A STATE OF THE ART ANALYSIS Michael Müller 1, Roland Bründlinger 2, Ortwin Arz 1, Werner Miller 1, Joachim Schulz 2, Georg Lauss 2 1. STECA ELEKTRONIK GMBH, Mammostr.
Fact Sheet March 2013. Solar Photovoltaic Systems Electricity from Sunshine
Fact Sheet March 2013 Solar Photovoltaic Systems Electricity from Sunshine Farming connect Introduction Farming has always been about harvesting energy from the sun after all, every green leaf is a solar
Model Number Electrical Compatibility Module Connector Type. M250-60-2LL-S22 60 cell PV module MC-4 Type 2 Locking
TECHNICAL BRIEF M250 Microinverter System Installation Planning The M250 Microinverter The Enphase M250 Microinverter is a powerful and efficient grid-tied microinverter. It is compatible with most 60-cell
Enphase Microinverters and Ungrounded Renewable Energy Systems: Canadian Electrical Code Compliance
WHITE PAPER Enphase Microinverters and Ungrounded Renewable Energy Systems: Canadian Electrical Code Compliance Overview Enphase has developed a new microinverter family that includes the M250 and new
Distributed Power, Renewables, Stored Energy and the Grid Blinkless Synchronous Inverter System
Distributed Power, Renewables, Stored Energy and the Grid Blinkless Synchronous Inverter Go Electric Inc. www.goelectricinc.com 1 Distributed Power, Renewables, Stored Energy and the Grid Blinkless Synchronous
Irradiance. Solar Fundamentals Solar power investment decision making
Solar Fundamentals Solar power investment decision making Chilean Solar Resource Assessment Antofagasta and Santiago December 2010 Edward C. Kern, Jr., Ph.D., Inc. Global Solar Radiation Solar Power is
SA Power Networks Planning for Solar PV? Customer information guide to network connected solar PV inverter systems
SA Power Networks Planning for Solar PV? Customer information guide to network connected solar PV inverter systems Contents Introduction 3 How solar PV power systems work 4 Solar modules 5 Is solar power
Life-cycle automation and services
Life-cycle and services A holistic approach to photovoltaic plant, operation and maintenance ADRIAN TIMBUS, MARC ANTOINE, LUIS DOMINGUEZ The photovoltaic power industry is rapidly growing, with worldwide
Residential Consumer Guide to Solar Power June 2015
Residential Consumer Guide to Solar Power 505 9 th Street NW Suite 800 Washington DC 20004 202.682.0556 www.seia.org SEIA RESIDENTIAL CONSUMER GUIDE TO SOLAR POWER Introduction How Solar Works Panels (or
Operations & Maintenance for Maximum Energy Yield
Operations & Maintenance for Maximum Energy Yield Plant-wide operations and maintenance (O&M) has emerged as a necessary component of a healthy, productive and profitable PV system. In fact, a properly
How To Use The Csi Ebpp Calculator
CSI EPBB Design Factor Calculator User Guide 1. Guide Overview This User Guide is intended to provide background on the California Solar Initiative (CSI) Expected Performance Based Buydown (EPBB) Design
Technology Advantage
Technology Advantage 2 FIRST SOLAR TECHNOLOGY ADVANTAGE 3 The Technology Advantage Cadmium Telluride (CdTe) photovoltaic (PV) technology continues to set performance records in both research and real-world
Japan s Largest Photovoltaic Power Plant
Hitachi Review Vol. 63 (2014), No. 7 398 Featured Articles Japan s Largest Photovoltaic Power Plant Turnkey Construction Contract and Commissioning of Oita Solar Power Yuichi Nagayama Tetsuharu Ohya Hiroaki
Increasing Data Center Efficiency by Using Improved High Density Power Distribution
Increasing Data Center Efficiency by Using Improved High Density Power Distribution By Neil Rasmussen White Paper #128 Executive Summary A new approach to power distribution for high density server installations
NOTICE OF INTENT Department of Revenue Policy Services Division. Income Tax Credits for Wind or Solar Energy Systems (LAC: 61:I.
NOTICE OF INTENT Department of Revenue Policy Services Division Income Tax Credits for Wind or Solar Energy Systems (LAC: 61:I.1907) Under the authority of R.S. 47:287.785, R.S. 47:295, R.S. 47:1511, and
Calculating Solar Energy System Performance & Payback
Calculating Solar Energy System Performance & Payback Our integrator experts from A&R Solar, Sunergy Systems, and Whidbey Sun & Windwill present and discuss how to determine and calculate real world performance,
UPS Applications and VRLA Battery Sizing
TECHNICAL BULLETIN 41-7334 UPS Applications and VRLA Battery Sizing 41-7334/0213/CD www.cdtechno.com The uninterruptable power system (UPS) is used to protect critical equipment and processes from the
Corona Department of Water & Power (DWP) Solar Partnership Program Guidelines and Application
Corona Department of Water & Power (DWP) Solar Partnership Program Guidelines and Application DWP s new Solar Partnership Program is available to help offset your investment in a PV system and get you
PID - The Problem and How to Solve It
Technical Information PID - The Problem and How to Solve It Module Regeneration with the PV Offset Box Content Potential Induced Degradation (PID) is a phenomenon which affects some PV modules with crystalline
SolarMax P series The power package for residential solar plants
SolarMax P series The power package for residential solar plants The future-proof solution The requirements for residential photovoltaic plants have increased continuously in the past years. Due to our
PHOTOVOLTAIC SYSTEM DESIGN AND INSTALLATION From the pre-feasibility study to the commissioning
FEBRUARY, 2011 PHOTOVOLTAIC SYSTEM DESIGN AND INSTALLATION From the pre-feasibility study to the commissioning [email protected] www.a-sunenergy.com FEBRUARY, 2011 TABLE OF CONTENT PROJECT OVERVIEW
Solar Solutions and Large PV Power Plants. Oscar Araujo Business Development Director - Americas
Solar Solutions and Large PV Power Plants Oscar Araujo Business Development Director - Americas Solar Business of Schneider Electric The Solar Business of Schneider Electric is focused on designing and
White Paper: Pervasive Power: Integrated Energy Storage for POL Delivery
Pervasive Power: Integrated Energy Storage for POL Delivery Pervasive Power Overview This paper introduces several new concepts for micro-power electronic system design. These concepts are based on the
Technical Note SolarEdge Reliability Methodology
Technical Note SolarEdge Reliability Methodology Summary SolarEdge Technologies develops and sells power electronics for the Photovoltaic market. The heart of the SolarEdge power harvesting system is a
Section III Schedule of Requirements TECHNICAL SPECIFICATIONS OF THE REQUIRED SYSTEMS
PART III TECHNICAL SPECIFICATIONS OF THE REQUIRED SYSTEMS I. GENERAL The objective of this specification is to describe a system which uses solar energy to produce electricity. For each site (lot) one
The Solar Power Specialists. Elm Park House, Elm Park Court, Pinner, Middlesex, HA5 3NN Solutions House, Unit A19, 20 Heron Road, Belfast, BT3 9LE
The Solar Power Specialists GB: 0845 64 39 772 NI: 0845 50 40 444 Email: [email protected] Visit: www.metartecsolar.com Elm Park House, Elm Park Court, Pinner, Middlesex, HA5 3NN Solutions House,
Electricity from PV systems how does it work?
Electricity from photovoltaic systems Bosch Solar Energy 2 Electricity from PV systems Electricity from PV systems how does it work? Photovoltaics: This is the name given to direct conversion of radiant
SunEdison Global Services. Safeguard Your Assets, Maximize Your Performance
SunEdison Global Services Safeguard Your Assets, Maximize Your Performance ASSET MANAGEMENT SOLUTIONS 2 ENSURING SAFETY, QUALITY, AND VALUE Solar technology is rapidly changing the way people work and
FREQUENTLY ASKED QUESTIONS
1. How do solar panels work? FREQUENTLY ASKED QUESTIONS Your solar panels capture sunlight and convert it to DC electricity Your solar system converts that energy to an AC current that can power your home
TESTS OF 1 MHZ SIGNAL SOURCE FOR SPECTRUM ANALYZER CALIBRATION 7/8/08 Sam Wetterlin
TESTS OF 1 MHZ SIGNAL SOURCE FOR SPECTRUM ANALYZER CALIBRATION 7/8/08 Sam Wetterlin (Updated 7/19/08 to delete sine wave output) I constructed the 1 MHz square wave generator shown in the Appendix. This
PVWATTS DERATING FACTORS FOR SOLARBRIDGE PANTHEON MICROINVERTERS AND ACPV SYSTEMS
PVWATTS DERATING FACTORS FOR SOLARBRIDGE PANTHEON MICROINVERTERS AND ACPV SYSTEMS AUTHOR Vincent Bartlett Senior Member of Technical Staff Version 1.5 March 22, 2013 SolarBridge Technologies 1 INTRODUCTION
SMART SOLAR SOLUTIONS FOR ROOFTOP ENERGY IN NORTH AMERICA
SMART SOLAR SOLUTIONS FOR ROOFTOP ENERGY IN NORTH AMERICA CANADIAN SOLAR SOLUTIONS FOR ROOFTOP ENERGY APPLICATIONS INTRODUCTION Canadian Solar partnered with SolarEdge - one of the top 10 global suppliers
PV O&M Best Practices Nadav Enbar, Sr. Project Manager, [email protected] 303.551.5208
Utility/Lab Workshop on PV Technology and Systems November 8-9, 2010 Tempe, Arizona PV O&M Best Practices Nadav Enbar, Sr. Project Manager, [email protected] 303.551.5208 EPRI Survey-Driven White Paper on
Stand Alone PV System Sizing Worksheet (example)
Stand Alone PV System Sizing Worksheet (example) Application: Stand alone camp system 7 miles off grid Location: Baton Rouge, La Latitude: 31.53 N A. Loads A1 Inverter efficiency 85 A2 Battery Bus voltage
INSTALLING SOLAR PHOTOVOLTAIC PANELS
INSTALLING SOLAR PHOTOVOLTAIC PANELS ONE FAMILY S EXPERIENCE January-April, 2014 Page 1 v3 (04/17/14) THE RESIDENTIAL SOLAR PANEL INSTALLATION PROCESS ONE FAMILY S EXPERIENCE January-April, 2014 PURPOSE.
KADUNA CLINICS SOLAR SYSTEMS PERFORMANCE TESTING
KADUNA CLINICS SOLAR SYSTEMS PERFORMANCE TESTING Oct 24, 2015 KADUNA PERFORMANCE TESTING PROCESS OFFGRID PV SOLAR SYSTEMS FOR PRIMARY HEALTHCARE CENTERS IN KADUNA STATE Prepared for: Crown Agents Limited
Solar Asset Management and Performance Monitoring: Panel-to- Grid
High Performance Monitoring Solar Asset Management and Performance Monitoring: Panel-to- Grid Justin Robinson Program Manager DAS October 1, 2012 Draker Company Overview Oldest, largest U.S. Based independent