1 Obstacles in Implementing Safety Management on Hong Kong Building Sites S.W Poon and Francis K.W. Wong Department of Real Estate and Construction The University of Hong Kong Hong Kong * Department of Building and Real Estate The Hong Kong Polytechnic University Hong Kong 1.0 ABSTRACT The accident rate of the Hong Kong construction industry has remained exceptionally high over the years. In recent years the Hong Kong SAR Government adopted the self-regulatory approach to improve site safety and implemented the Site Supervision Plan System on building sites. Based on two surveys, the major difficulties in implementing safety management are identified as control of multi-layered subcontractors, lack of competent technical staff, inadequate safety awareness of workers, tight project schedule, insufficient training, traditional procurement method, limited resources in implementation and monitoring, and developers unwillingness to pay for safety aspects. Recommendations on overcoming these obstacles are highlighted and discussed. 2.0 INTRODUCTION In view of the prolonged high accident rates in the Hong Kong construction industry, the Hong Kong SAR Government has adopted the proactive self-regulatory approach to replace the ineffective enforcement approach. Supervision Plan System has been implemented since end of 1997 and construction companies are encouraged to set up their own safety management system. Two separate surveys were undertaken to assess the effectiveness of the site supervision plan system and the safety management system respectively, and to explore the obstacles and difficulties during their implementation. 3.0 SITE SUPERVISION PLAN SYSTEM The Buildings Department has implemented the site safety supervision system since December As defined in the Building Ordinance, a supervision plan sets out the plan of safety management of building works or street works. The system focuses on the clarification of the safety roles and duties of the Authorised Person (mostly architects), the Registered Structural Engineer and the Contractor, who work together in a typical building construction project. The three parties are required to prepare a site supervision plan before commencement of the works. 369
2 This safety management comprises the traditional quality supervision and the new safety supervision. The former requires the practitioners to ensure the building works are carried out in accordance with the provisions of the Building Ordinance and Regulations. The latter requires the three professionals to pay necessary supervision on the building works so as to minimise hazards and risks to workers on site. Site safety supervision plan can further be classified into two types of supervision, the engineering safety supervision and routine safety supervision. Technically Competent Persons (TCP) are deployed to carry out safety supervision. There are five grades of TCPs for each functional stream and their responsibilities are defined in the documents. 3.1 Survey The survey was undertaken in Eight hundred questionnaires were sent to four types of building professionals including architects, building surveyors, structural engineers and contractors to seek their views on the implementation of the Supervision Plan System. 30 replies from contractors and 48 responses from the architects, structural engineers and building surveyors were received. 3.2 Problems in Implementation Lack of well-trained Technically Competent Persons - A large number of qualified technically competent persons are needed for supervising the building sites in Hong Kong. Lack of safety training for contractors employees - Less than a quarter of the responses have provided safety training to the employees after implementation of the system. Site safety management for multi-layers of subcontracting - Multi-layered subcontracting is very commonly used in the Hong Kong s construction industry. There are always communication problems and disputes arise from this practice. It is often difficult for main contractors to manage and supervise the works carried out by subcontractors. Inadequate understanding of the system by contractors and other building professionals - Over 80% of respondents indicated that they have incomplete or no knowledge about the system. Inadequate systematic safety information and documentation - Only about 46% of respondents have obtained ISO 9000 certification and this implies that over half of them do not have proper information system regarding quality of works. It is doubtful whether they have the competence to handle the safety documents and supervising the construction works simultaneously. Insufficient resources for the Site Monitoring Section of the Buildings Department - The Site Monitoring Section of the Buildings Department has only eleven professionals responsible for safety monitoring and control of 1,500 building sites. 370
3 3.3 Suggested Solutions Training of TCP and site staff - Building related companies should provide compulsory safety training for their site staff. Management control in multi-layers of subcontracting - Subcontractors meetings, usually chaired by the main contractor, should be held either biweekly or even weekly in order to strengthen the communication link among the parties. Site safety performance should also be reviewed in the meetings. Education and promotion of the importance of the supervision system to contractors and other building professionals - Safety promotion activities such as conferences and seminars should be provided to the personnel in construction. Likewise, the building professionals should attend and present their interest and concern on safety matter. Safety information control system - Electronic safety management system should be set up so that information can be managed in a systematic manner and processed within a short duration. Safety audit by external parties - All building sites should be audited by independent professional agents regarding the monitoring of safety performance. 4.0 SAFETY MANAGEMENT SYSTEM Safety management is an organisation arrangement within a company, which will facilitate the proprietor to identify hazards at work and target resources and efforts to eliminate such hazards. It is widely believed that implementation of safety management would improve safety performance. The Hong Kong SAR Government recommended the following components to be included in the safety management system: Safety policy Safety training Job hazard analysis Process control programme In-house safety rules and regulations Accident/incident investigation Personal protection programme Evaluation, selection and control of subcontractor Programme for inspection of hazardous conditions Safety organisation Safety committee Safety promotion Health assurance programme Emergency preparedness 371
4 4.1 Survey A survey was undertaken in 1998 by sending randomly questionnaires to 130 Group B and C contractors as listed in the Hong Kong Builder Directory replies were received representing a response rate of 29.2%. 4.2 Problems in Implementation The following are the difficulties in implementing safety management by contractors. They are listed in the order of descending importance. Difficulty in controlling multi-layered subcontractors - Owing to the subcontractors high mobility, it is difficult to check whether they comply with safety rules and regulations. Inadequate safety awareness of the workers - Many site workers do not adopt safety measures because of the inconvenience that may be caused. Also, they think that adopting safety measures symbolizes the characteristics of unskilled workers. Tight project schedule - Contractors usually take risk as they think the chance of serious accident will not be high and the damages paid in the case of late completion is far more than the losses in the event of accidents, assuming no serious accidents will occur. Insufficient safety training provided - Many training courses provided are not enough in terms of quality and quantity although there have been improvements in recent years. Competitive bidding - Cutting cost is common in order to produce the lowest bid. Safety is always to be considered as the least concern aspect, it is obviously to be sacrificed first. Developers unwillingness to pay for safety aspects - Most developers are reluctant to spend time and money on safety management and consequently put this load wholly on the contractors. Limited resources to support the system - The majority of contractors are not large in scale and lack of sufficient resource in safety management. Poor enforcement of legislation - The deterrent effect of the legislation is not severe enough. Prosecutions are in money terms and the fines are small when compared with the contract sum. Safety policy not communicated down to lower level - The long chain of documents down to lower level subcontractors always result in ineffective communication. 372
5 Poor investigation of accidents - Information from poor accident investigation is neither specific nor detailed. The actual causes can seldom be made known to the construction-related personnel for feedback and improvement purposes. 4.3 Suggested Solutions When selecting subcontractors, past performance should be considered in addition to their tender price. Contractors should include detailed health and safety arrangements in the contract and regular safety evaluation on subcontractors should also be carried out. The main contractor should provide training for subcontractor s workers as far as possible. Sufficient induction training, safety measures promotion, accident publication, awards and punishments should be adopted to make the workers more aware of their safety at work. In the planning and design stage, time and effort should be spent on incorporating the safety needs into the design. Therefore, the chance for changing anything for safety purpose during construction will be lower and construction procedures will be smoother despite the tight schedule. Contractors should pay attention to the safety training courses provided by the Government or relevant organisations. Workers should attend these courses and their attendance would serve as prerequisite to work on sites. Developers should take contractor s past safety performance into account, besides the tender price, when they select the appropriate bidders. Regarding developer s unwillingness to pay for safety performance, the Government should promulgate the adverse impact of poor safety records on the projects and developers interest, and give incentive to developers for good safety records. Companies should allocate resources to implement safety management. The Labour Department should conduct site safety inspection more frequently. The main contractor s site manager should coordinate the activities of all parties on site. All subcontractors must be informed of the new safety policy or new regulation. Safety investigation should be carried out immediately after an accident has occurred. Training for accident investigation is necessary. 373
6 5.0 CONCLUSION Self-regulation is a common and good attempt to improve safety conditions of Hong Kong s construction industry. However, there are many obstacles for the implementation of site supervision plan system and safety management system. From the two surveys, the education and training of workers and site personnel has still an important role to play in overcoming many of these identified problems. 6.0 REFERENCES Wong, H.Y. & Poon, S.W. 1999, 'Implementing Safety Management System in the Hong Kong Construction Industry', Conference on Construction Challenges into the Next Century, HKIE. Francis, K.W. Wong and Donald, C.H. Ding 1999, 'Effective implementation of the Site Supervision Plan System for the Building Industry in Hong Kong', Conference on Construction Challenges into the Next Century, HKIE. Buildings Department (1997) Draft Code for Site Safety Supervision. Buildings Department (1998) Technical Memorandum for Supervision Plans. Ping, T.W. 1998, 'Professionals View on the Effectiveness of the Safety Supervision Plan System in Enhancing Construction Safety Factors', unpublished BSc Dissertation, Department of Real Estate and Construction, The University of Hong Kong. 374
CODE OF PRACTICE. Safety Management. Occupational Safety and Health Branch Labour Department CODE OF PRACTICE ON SAFETY MANAGEMENT 1
CODE OF PRACTICE On Safety Management Occupational Safety and Health Branch Labour Department CODE OF PRACTICE ON SAFETY MANAGEMENT 1 This Code of Practice is prepared by the Occupational Safety and Health
More informationAppendix 18 NEC3 Options
Appendix 18 NEC3 Options December 2007 Page 449 Appendix 18 NEC3 Options NEC3 Main Options There are six main options as set out below. The Contractor carries the greatest risk under options A and B, and
More informationA Guide to the Design Build Process
A Guide to the Design Build Process Essential reading for anyone considering or undertaking building work We are an affiliation of Chartered Architects and Chartered Building Surveyors who together provide
More informationINDEX 1.0 HEALTH, SAFETY & ENVIRONMENT 1.1 INTRODUCTION 1.2 OBJECTIVES 1.3 HEALTH, SAFETY & ENVIRONMENT STATEMENT 1.4 ENVIRONMENTAL STATEMENT
INDEX 1.0 HEALTH, SAFETY & ENVIRONMENT 1.1 INTRODUCTION 1.2 OBJECTIVES 1.3 HEALTH, SAFETY & ENVIRONMENT STATEMENT 1.4 ENVIRONMENTAL STATEMENT 2.0 HEALTH, SAFETY & ENVIRONMENT MANUAL 2.1 HAZARD MANAGEMENT
More informationCorporate Risk Management Policy
Corporate Risk Management Policy Managing the Risk and Realising the Opportunity www.reading.gov.uk Risk Management is Good Management Page 1 of 19 Contents 1. Our Risk Management Vision 3 2. Introduction
More informationHealth and Safety Policy and Procedures
Health and Safety Policy and Procedures Health & Safety Policy & Procedures Contents s REVISION AND AMENDMENT RECORD : Summary of Change Whole Policy 4.0 05 Nov 08 Complete re-issue Whole Policy 4.1 10
More informationAFTRS Health and Safety Risk Management Policy
AFTRS Health and Safety Risk Management Policy Responsible Officer Contact Officer Authorisation Director, Corporate and Student Services Head of Human Resources Chief Executive Officer Effective Date
More informationAct on the Contractor s Obligations and Liability when Work is Contracted Out (1233/2006) (as amended by several Acts, including 678/2015)
Unofficial Translation Ministry of Employment and the Economy, Finland September 2015 Section 1. Objectives of the Act Act on the Contractor s Obligations and Liability when Work is Contracted Out (1233/2006)
More informationFeasibility Study of Contractor Registration System and Contractor Grading System in Macau. Pun I Chung. Master of Science in Civil Engineering
Feasibility Study of Contractor Registration System and Contractor Grading System in Macau by Pun I Chung Master of Science in Civil Engineering 2012 Faculty of Science and Technology University of Macau
More informationContents. 1. Doing Business with Gwynedd Council. 1. 2. Council Structure and Contacts 2
Contents Page 1. Doing Business with Gwynedd Council. 1 2. Council Structure and Contacts 2 3. How to find out about the opportunities offered by Gwynedd Council 3 4. Types of Procurement 3 5. Tendering
More informationIntroduction Building project management
Introduction Building project management Construction management 2. (BMEEPEKT601-BMEEPEKK601) 10-02-2011 Introduction Lecturers: Adrienn Lepel PhD István Vidovszky PhD Guest lecturers Requirements Two
More informationPROGRAMME FOR INTERNATIONAL STUDENT ASSESSMENT (PISA) 2018: CALL FOR TENDER PROCESS. An Overview
PROGRAMME FOR INTERNATIONAL STUDENT ASSESSMENT (PISA) 2018: CALL FOR TENDER PROCESS An Overview Launch of the PISA 2018 Procurement Process In January 2014, the OECD plans to launch the first Call for
More informationPrincipal Designer Guidance
Principal Designer Five or more employees 1 CONTENTS INTRODUCTION 3 Further reading / additional resources 3 QUESTION 1: POLICY AND ORGANISATION 4 4 4 QUESTION 2: ARRANGEMENTS/PROCEDURES FOR HEALTH AND
More informationHealth and safety policy
1. General statement of intent The Company recognises and accepts its responsibilities as an employer to ensure, so far as is reasonably practicable, the health, safety and welfare of its employees and
More informationCHAPTER 9. Leisure and Cultural Services Department. Outsourcing of services in the Leisure and Cultural Services Department
CHAPTER 9 Leisure and Cultural Services Department Outsourcing of services in the Leisure and Cultural Services Department Audit Commission Hong Kong 25 October 2007 This audit review was carried out under
More informationHow has outsourcing affected public service delivery in Hong Kong? Illustrate with relevant cases.
How has outsourcing affected public service delivery in Hong Kong? Illustrate with relevant cases. By Brenda Chan, David Wong, Hooly Leung, Olga Chan and Boris Siu Outsourcing through the eyes of Government
More informationWe are the regulator: Our job is to check whether hospitals, care homes and care services are meeting essential standards.
Inspection Report We are the regulator: Our job is to check whether hospitals, care homes and care services are meeting essential standards. Kumari Care Limited 5 Palace Yard Mews, Queen Square, Bath,
More informationReport on How to Improve Construction Safety in Hong Kong. Kwong Chiu Ling, Victor President of HKOSHA
Report on How to Improve Construction Safety in Hong Kong Kwong Chiu Ling, Victor President of HKOSHA Study Workshop Organized on March 27, 2010 Over 60 local safety practitioners attended 6 sub-groups
More informationContract Management Guideline
www.spb.sa.gov.au Contract Management Guideline Version 3.2 Date Issued January 2014 Review Date January 2014 Principal Contact State Procurement Board Telephone 8226 5001 Contents Overview... 3 Contract
More informationMeasuring your capabilities in Fleet Safety Management ACC Fleet Saver
Measuring your capabilities in Fleet Safety Management ACC Fleet Saver Audit Standard 29 May 2014 Table of Contents Page 2 1. Getting Started...3 2. Critical element 1: Registered Owner Commitment to Safety
More informationNo. 44/2006 PART I GENERAL PROVISIONS AND AUTHORITY ENFORCEMENT
Ministry of Social Affairs and Health Unofficial translation No. 44/2006 Act on Occupational Safety and Health Enforcement and Cooperation on Occupational Safety and Health at Workplaces (as amended by
More informationDerbyshire Trading Standards Service Quality Manual
Derbyshire Trading Standards Service Quality Manual This Quality Manual has been developed to give a broad outline of how the Trading Standards Division s range of services comply with the requirements
More informationDevelopment of a Safety Management System in Hong Kong MTR Corporation. Carl Wu, Safety & Quality Support Manager, MTR Corporation, Hong Kong
Development of a Safety Management System in Hong Kong MTR Corporation Carl Wu, Safety & Quality Support Manager, MTR Corporation, Hong Kong Abstract: Safety of customers, the public, contractors and staff
More informationProcedure: OHS CONTRACTOR MANAGEMENT
Procedure: OHS CONTRACTOR MANAGEMENT. Purpose This procedure outlines the occupational health and safety (OHS) requirements for the management of contractors engaged to perform tasks or services for Greater
More informationCompetence Criteria for Member (MCIBSE)
Competence Criteria for Member (MCIBSE) FACTSHEET M21 The competence criteria for the Member grade of CIBSE (MCIBSE) is directly aligned to the Competence Statements issued by the Engineering Council,
More informationBedford Group of Drainage Boards
Bedford Group of Drainage Boards Risk Management Strategy Risk Management Policy January 2010 1 Contents 1. Purpose, Aims & Objectives 2. Accountabilities, Roles & Reporting Lines 3. Skills & Expertise
More informationConstruction (Design and Management) Regulations 2007
MEETING Finance, Procurement and Property Committee AGENDA ITEM 14 MEETING DATE 9 th July 2007 DOCUMENT NUMBER FEP 1052 SUBJECT REPORT Construction (Design and Management) Regulations 2007 (12/06/07) by
More informationHealth and Safety Policy Part 1 Policy and organisation
Health and Safety Policy Part 1 Policy and organisation ICO H&S Policy Policy and organisation, June 2014 Page 1 of 6 1. Scope 1.1 The Health and Safety policy applies to all employees of the Information
More informationGLASGOW SCHOOL OF ART OCCUPATIONAL HEALTH AND SAFETY POLICY. 1. Occupational Health and Safety Policy Statement 1
GLASGOW SCHOOL OF ART OCCUPATIONAL HEALTH AND SAFETY POLICY CONTENTS PAGE 1. Occupational Health and Safety Policy Statement 1 2. Occupational Health and Safety Management System 2 3. Organisational Management
More informationConsultancy Services Proposal
Consultancy Services Proposal August, 2007 ISO 9001 : 2000 CERTIFIED www.genivar.com 5858 Côte-des-Neiges Rd, 4 th Floor, Montreal, Quebec, Canada, H3S 1Z1 Telephone: (1) 514 340-0046 Fax: (1) 514 340-2847
More informationPROCUREMENT OF MAINTENANCE SERVICES AND HEALTH AND SAFETY AT WORK
63 PROCUREMENT OF MAINTENANCE SERVICES AND HEALTH AND SAFETY AT WORK 1. Introduction Outsourcing has been an increasing trend in modern work organisations throughout many years now. A report and a fact
More informationCAPITAL WORKS GUIDANCE DOCUMENT
COMMUNITY BUILDINGS TRANSFER PROGRAMME CAPITAL WORKS GUIDANCE DOCUMENT This document has been prepared to assist and advise management groups of community buildings who are involved in Durham County Council
More informationOverview of the Transfer of Undertakings (Protection of Employment) Regulations 2006
TUPE Overview of the Transfer of Undertakings (Protection of Employment) Regulations 2006... 1 Service Provision Changes... 1 Employer Liability Information... 2 Liability for Failure to Inform and Consult
More informationASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES
ASSOCIATION OF INDEPENDENT SCHOOLS OF NSW BLOCK GRANT AUTHORITY GUIDE TO PROCUREMENT PROCESSES CAPITAL GRANTS PROGRAM / BUILDING GRANTS ASSISTANCE SCHEME Background Non government schools accepting the
More informationComparative Study on Quality Assurance of Construction Project in Taiwan and Japan
Comparative Study on Quality Assurance of Project in Taiwan and Japan Tsung Chieh, T. National Yunlin University of Science & Technology, Taiwan (email: tctsai@ce.yuntech.edu.tw) Furusaka, S. Kyoto University,
More informationAIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)
AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP) Copyright: Australian Institute of Project Management Document Information Document
More informationRisk Management in the Tendering Process
Risk Management in the Tendering Process Risk Management in the Tendering Process Five key areas of risk: Concluding the Design Tender Processes Selection of Contractors Appointment Contract Risks 1 Risk
More informationCauses, Effects and Minimization of Delays in Construction Projects
Causes, Effects and Minimization of Delays in Construction Projects Divya.R 1, S.Ramya 2 Assistant Professor Department of Civil Engineering Bharathiyar Institute of Engineering for Women, Deviyakurichi
More informationGUIDELINE NO. 22 REGULATORY AUDITS OF ENERGY BUSINESSES
Level 37, 2 Lonsdale Street Melbourne 3000, Australia Telephone.+61 3 9302 1300 +61 1300 664 969 Facsimile +61 3 9302 1303 GUIDELINE NO. 22 REGULATORY AUDITS OF ENERGY BUSINESSES ENERGY INDUSTRIES JANUARY
More informationCHAPTER 11 THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION GENERAL REVENUE ACCOUNT. Information Technology Services Department
CHAPTER 11 THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION GENERAL REVENUE ACCOUNT GOVERNMENT DEPARTMENT Information Technology Services Department Management of information technology outsourcing
More informationNominated Subcontractors on International Projects: Approaches to Risk Allocation
Nominated Subcontractors on International Projects: Approaches to Risk Allocation September 5, 2005 (he following outline was used in a presentation to the Overseas Construction Association of Japan, Inc.
More informationMaintenance Strategy 2015 Owner: Kevin Bullimore Head of Infrastructure Next review 2020
Maintenance Strategy 2015 Owner: Kevin Bullimore Head of Infrastructure Next review 2020 Page 1 of 7 Maintenance Strategy Introduction The requirement for maintenance of premises, plant and equipment arises
More informationWHS CONTRACTOR MANAGEMENT PROCEDURE
1. Overview The Port Augusta City Council as part of its commitment under its WHS Contractor Management policy, recognises its obligation to: Ensure, so far as is reasonably practicable, the health and
More informationGUIDANCE NOTE ON OUTSOURCING
GN 14 GUIDANCE NOTE ON OUTSOURCING Office of the Commissioner of Insurance Contents Page I. Introduction.. 1 II. Application...... 1 III. Interpretation.... 2 IV. Legal and Regulatory Obligations... 3
More informationWHS Contractor Management Procedure
Wudinna District Council 1. Overview Wudinna District Council as part of its commitment under its Policy recognises its obligation to: Ensure, so far as is reasonably practicable, the health and safety
More informationENTERPRISE RISK M A NAGEMENT POLICY
Tablelands Regional Council ENTERPRISE RISK M A NAGEMENT POLICY Draft Final Policy No: PD 3.3.1 File ref: PD 3.3.1 Policy Section: INSURANCE AND RISK MANAGEMENT Version: 1 Date Adopted: 7 July 2010 Review
More informationCONSTRUCTION HEALTH AND SAFETY, AND INJURY PREVENTION Research and develop accident and incident investigation procedures on construction sites
1 of 7 level: 4 credit: 4 planned review date: December 2003 sub-field: purpose: Construction People credited with this unit standard are able to: research accident and/or incident investigation and reporting
More informationConstruction Management and project process
Construction Management and project process Presented by: Vourvoutsiotis Apostolos GSO University of Applied Science Nürnberg 06.04.2000 Table of Contents Construction Management and project process Construction
More informationLegislative Council Panel on Manpower. Safety in the Use of Tower Cranes on Construction Sites
LC Paper No. CB(2)2480/07-08(01) For information on 8 July 2008 Legislative Council Panel on Manpower Safety in the Use of Tower Cranes on Construction Sites PURPOSE This paper briefs Members on the concerted
More informationWharton Construction Ltd. Quality Manual. Kellaw Road Yarm Road Business Park Darlington DL1 4YA
Quality Manual Kellaw Road Yarm Road Business Park Darlington DL1 4YA MANUAL IDENTIFICATION This document is a controlled/uncontrolled copy. Copy Number:...of... Issued to... Title... Holders of controlled
More informationOH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable)
OH&S MANAGEMENT SYSTEM CHECKLIST - AS 4801:2001 (STATUS A = Acceptable; N = Not Acceptable; N/A = Not Applicable) 4.1 General Requirements 4.2 OHS policy Has the organisation an established and maintained
More informationCONCODE Guide to contract strategies for construction projects in the NHS STATUS IN WALES ARCHIVED
CONCODE Guide to contract strategies for construction projects in the NHS 1995 STATUS IN WALES ARCHIVED For queries on the status of this document contact info@whe.wales.nhs.uk or telephone 029 2031 5512
More informationSchedule 11. The Transfer of Undertakings (Protection of Employment) Regulations 2006
Schedule 11 The Transfer of Undertakings (Protection of Employment) Regulations 2006 1 Definitions 1.1 In this Schedule 11 the following definitions apply: Contractor Personnel means any employee, worker,
More informationCompetence Criteria for Associate (ACIBSE)
Competence Criteria for Associate (ACIBSE) FACTSHEET A21 The competence criteria for the Associate grade of CIBSE (ACIBSE) is directly aligned to the Competence Statements issued by the Engineering Council,
More informationProject & Task Work Health and Safety Risk Management Procedure
Project & Task Work Health and Safety Risk Management Procedure Related Policy Work Health and Safety Policy Responsible Officer Executive Director Human Resources Approved by Executive Director Human
More informationPreparation for ISO 45001 OH&S Management Systems
Preparation for ISO 45001 OH&S Management Systems HEALTH & SAFETY MANAGEMENT QUALITY MANAGEMENT ACCESSIBILITY ENVIRONMENTAL MANAGEMENT ENERGY MANAGEMENT ISO 45001 TIMELINE ISO project committee ISO PC
More informationProvisional Measures for Construction Project Management
Provisional Measures for Construction Project Management Article 1 Article 2 Purpose and Basis This Provisional Measure is promulgated in accordance with relevant Chinese laws and administrative regulations
More informationRisk Management Policy
Risk Management Policy DOCUMENT CONTROL Developed by: Date: Origination: Quality, Systems & Shared s March 2014 Authorised by: Colette Kelleher April 2014 DOCUMENT REVIEW HISTORY Original Circulation date:
More informationA Best Practice Guide
A Best Practice Guide Contents Introduction [2] The Benefits of Implementing a Privacy Management Programme [3] Developing a Comprehensive Privacy Management Programme [3] Part A Baseline Fundamentals
More information4 Guidelines on Administration Charges for Reporting of Site Accidents
4 Guidelines on Administration Charges for Reporting of Site Accidents Version 1 August 2008 Disclaimer This publication is prepared by the Construction Industry Council (CIC) to report findings or set
More informationGuide to manual tasks high impact function (HIF) audit 2010 March 2010
Guide to manual tasks high impact function (HIF) audit 2010 March 2010 1 Adelaide Terrace, East Perth WA 6004 Postal address: Mineral House, 100 Plain Street, East Perth WA 6004 Telephone: (08) 9358 8002
More informationRiver Stour (Kent) Internal Drainage Board Risk Management Strategy and Policy
River Stour (Kent) Internal Drainage Board Risk Management Strategy and Policy Page: 1 Contents 1. Purpose, Aims & Objectives 2. Accountabilities, Roles & Reporting Lines 3. Skills & Expertise 4. Embedding
More informationNuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system
Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system Published in the Official State Gazette (BOE) number 270 of November
More informationBawden Contracting Services Ltd Job Profile. Contracts Manager. Purpose of the Job
Contracts Manager Purpose of the Job As Contracts Manager you will manage all aspects of the Grounds Maintenance contracting business safely and efficiently, maximising profitability through the completion
More informationNEC Users Group Workshop Defined Cost
NEC Users Group Workshop Defined Cost Ian.Heaphy@turntown.com; July 2014 Turner & Townsend plc July 14 making the difference Introduction Practicalities in assessing of Defined Cost & Disallowed Cost Assumption
More informationJOB DESCRIPTION. Team Leader Fleet Engineering. Environment & Sustainable Communities / Highways. Transport Operations / Vehicle Fleet & Depot
JOB DESCRIPTION JOB TITLE: DIRECTORATE: SECTION: GRADE: Team Leader Fleet Engineering Environment & Sustainable Communities / Highways Transport Operations / Vehicle Fleet & Depot BBCU11 DATE PREPARED:
More informationSafety Excellence Matrix
Safety Excellence Matrix 1 = Performance just meets minimum standards 2 = Performance is satisfactory got the basics 3 = Performance is good going beyond the norm 4 = Performance is very good best practice
More informationContractor Safety Management
1.0 Introduction Memorial University will ensure that a diligent contractor management process is established. This procedure establishes requirements for contract administration and oversight of contractor
More informationMANAGEMENT SYSTEM FOR A NUCLEAR FACILITY
GUIDE YVL A.3 / 2 June 2014 MANAGEMENT SYSTEM FOR A NUCLEAR FACILITY 1 Introduction 5 2 Scope of application 6 3 Management system 6 3.1 Planning, implementation, maintenance, and improvement of the management
More informationBriefing Session (SWD/T008/2013) Social Welfare Department 7 January 2016. This briefing will introduce part of the Tender Documents.
Briefing Session Invitation to Tender For the Provision of Two Year Full- time Enrolled Nurse (General) and Enrolled Nurse (Psychiatric) Training Programmes for the Welfare Sector for the Social Welfare
More informationProject Management Procedures SECTION 3 PROCUREMENT
Property & Campus Services Project Management Procedures SECTION 3 PROCUREMENT Maintainer: pcs-project-office@unimelb.edu.au Page: 1 of 8 3.1 TABLE OF CONTENTS 3.2 INTRODUCTION...3 3.3 SELECTION OF TENDERERS...3
More informationProject Management. Advice on the provision of Local Decontamination Units (LDUs) Decontamination Services
Advice on the provision of Local Decontamination Units (LDUs) Decontamination Services January 2010 Contents Project Management Page Local Decontamination Units (LDUs) Construction Project Management...3
More informationSUB-CONTRACTING PARTNERSHIP POLICY 2015-2016
SUB-CONTRACTING PARTNERSHIP POLICY 2015-2016 Last review date: October 2015 By: Simon Brewer Next review due: June 2016 Contents 1. 1. Scope... 3 2. 2. Context... 3 3. 3. Overarching Principle... 4 4.
More informationNOTICE FOR THE HOME OWNER
Government of Western Australia Department of Commerce NOTICE FOR THE HOME OWNER Schedule 1 Home Building Contracts Regulations 1992 The Notice for the Home Owner is a requirement under the Home Building
More informationQuality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.
This manual is proprietary and no part thereof shall be copied without written authorisation from the company Ref: Quality Manual.ind Issue: June 2009 INDEX 1 Amendment Status 2 Controlled Distribution
More informationEmily House, Kensal Road, London W10 5BN
JOB SCRIPTION Role: epartment: Location: Reporting to: Supervising: Fire Safety Officer Secretariat mily House, Kensal Road, London W10 5BN Health and Safety Manager No direct line management Grade: The
More informationCHAPTER 8. Labour Department. Work safety at construction sites
CHAPTER 8 Labour Department Work safety at construction sites Audit Commission Hong Kong 22 March 2005 This audit review was carried out under a set of guidelines tabled in the Provisional Legislative
More informationA QUALIFICATION SYSTEM FOR BUILT HERITAGE CONSERVATION AND ANCIENT BUILDING REHABILITATION
A QUALIFICATION SYSTEM FOR BUILT HERITAGE CONSERVATION AND ANCIENT BUILDING Abstract A Web supported system intended to simplify procurement procedures in building rehabilitation and heritage conservation,
More informationManaging Contractor Health and Safety Risks Guidelines for Local Government
Managing Contractor Health and Safety Risks Guidelines for Local Government Acknowledgements This manual has been prepared by Noel Arnold & Associates Pty Ltd, occupational health and safety consultants
More informationMeasuring, Estimating and Tendering Processes in Construction and the Built Environment
Unit 9: Measuring, Estimating and Tendering Processes in Construction and the Built Environment NQF Level 3: Guided learning hours: 60 BTEC National Unit abstract Estimating is concerned with the processes
More informationPROJECT PROCUREMENT MANAGEMENT
12 PROJECT PROCUREMENT MANAGEMENT Project Procurement Management includes the processes required to acquire goods and services from outside the performing organization. For simplicity, goods and services,
More informationExplaining an architect s services. General information on the usual tasks undertaken by an architect
Explaining an architect s services General information on the usual tasks undertaken by an architect June 2008 What an architect may do for you Introduction The root cause of disputes and complaints against
More informationDARLINGTON BOROUGH COUNCIL LEARNING & SKILLS SERVICE SUPPLY CHAIN FEES AND CHARGES POLICY 2015/16
DARLINGTON BOROUGH COUNCIL LEARNING & SKILLS SERVICE SUPPLY CHAIN FEES AND CHARGES POLICY 2015/16 1. POLICY STATEMENT 1.1 Darlington Borough Council s Learning & Skills Service (the Service) is funded
More informationBenchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool
Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool This WHS Auditing System Tool is to be used as a self-assessment of YOUR COMPANY compliance with AS 4801 and the Work Health and Safety Act
More informationDEVELOPING THE TRAINING ROLE OF AN EMPLOYERS' ORGANIZATION
INTERNATIONAL LABOUR ORGANISATION ACT/EMP PUBLICATIONS DEVELOPING THE TRAINING ROLE OF AN EMPLOYERS' ORGANIZATION by Sriyan de Silva International Labour Office January 1997 Table of Contents 1. What is
More informationJOB DESCRIPTION. Position Title and Number: Senior Procurement Officer (100618) Health, Wellbeing & Commissioning
JOB DESCRIPTION Position Title and Number: Senior Procurement Officer (100618) Grade: Department: Section: Responsible to: Responsible for: SO2 People Directorate Health, Wellbeing & Commissioning Team
More informationSteel procurement in major projects: Guidance on the application of social issues. Purpose
Steel procurement in major projects: Guidance on the application of social issues Purpose 1. This is a practical guide on how to incorporate social issues in major projects with a significant steel component.
More informationSweett Group. A Sweett of Regulations Breakfast Seminar. 29 September 2015
Sweett Group A Sweett of Regulations Breakfast Seminar 29 September 2015 Sweett Group New Public Contracts Regulations 29 September 2015 16 Sweett Group CDM 2015 Regulation
More informationEXAMINATIONS OF THE HONG KONG STATISTICAL SOCIETY
EXAMINATIONS OF THE HONG KONG STATISTICAL SOCIETY HIGHER CERTIFICATE IN STATISTICS, 2015 MODULE 1 : Data collection and interpretation Time allowed: One and a half hours Candidates should answer THREE
More informationPOSTGRADUATE CERTIFICATE IN PROFESSIONAL PRACTICE IN ARCHITECTURE
University of Cambridge: Programme Specifications Every effort has been made to ensure the accuracy of the information in this programme specification. Programme specifications are produced and then reviewed
More informationOHSAS 18001 OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEMS
, Certification & Training Services , Certification & Training Services , Certification & Training Services , Certification & Training Services WHAT MAKES YOUR OCCUPATIONAL HEALTH AND SAFETY SYSTEMS BEST-IN-CLASS?
More informationRisk management a practical approach
Risk management a practical approach Introduction Preventing work related accidents and injuries is the primary concern for all those involved in health and safety. Work related accidents and injuries
More informationSix steps to Occupational Health and Safety
Six steps to Occupational Health and Safety This booklet gives basic guidelines for workplace health and safety systems to help industry in NSW comply with the "duty of care" principle outlined in the
More informationDraft Guidelines on Outsourcing of activities by Insurance Companies
November 8, 2010 To All Insurers Draft Guidelines on Outsourcing of activities by Insurance Companies Reference: 1. INV/CIR/031/2004-05 dated 27 th July, 2004 2. INV/CIR/058/2004-05 dated 28 th December,
More informationSMS0045 Construction Health and Safety Policy and Procedures
SMS0045 Construction Health and Safety Policy and Procedures March 2015 Version 8 Please note that for projects utilising a CDM Co-ordinator under the transitional arrangements of CDM 2015 (between 6 April
More informationCAPITAL PROJECTS IMPLEMENTATION
CAPITAL PROJECTS IMPLEMENTATION 2.4 Over the years, I have been reporting on the shortcomings encountered during implementation of projects. These include, among others, excessive delays, variation costs,
More informationContractor s Obligations and Liability when Work is Contracted Out
Contractor s Obligations and Liability when Work is Contracted Out Introduction There are many ways of combating the negative effects caused to enterprises by the grey or undeclared economy and unhealthy
More informationWaveney Lower Yare & Lothingland Internal Drainage Board Risk Management Strategy and Policy
Waveney Lower Yare & Lothingland Internal Drainage Board Risk Management Strategy and Policy Page: 1 Contents 1. Purpose, Aims & Objectives 2. Accountabilities, Roles & Reporting Lines 3. Skills & Expertise
More informationCommunity Learning and Skills Service. Contract Management 2015/16. Guidance for providers. Slough and RBWM
Community Learning and Skills Service Contract Management 2015/16 Guidance for providers Slough and RBWM CONTENTS 1. Purpose... 3 2. About East Berkshire Community Learning and Skills Service... 4 3.
More informationHealth and Safety Management Standards
Health and Safety Management Standards Health and Safety Curtin University APR 2012 PAGE LEFT INTENTIONALLY BLANK Page 2 of 15 CONTENTS 1. Introduction... 4 1.1 Hierarchy of Health and Safety Documents...
More information