1 CONNECTING Energy Infrastructure Postage Stamp Cost Allocation for MEP projects 345 kv and above Dave Grover ITC Holdings Corp. September 20,

2 Overview of Presentation Review of Postage Stamp Pricing for Transmission across other regions of the U.S. History of Postage Stamp pricing for transmission facilities in MISO Why a Postage Stamp component is appropriate for MEP Projects at 345 kv and above In-Service, Approved and Planned 345 kv Projects in MISO and their Cost Allocation Case for Postage Stamp Pricing for EHV Networked Transmission Facilities 2

3 Postage Stamp Pricing for New Transmission in the US PJM: 50% postage stamp for 500 kv and 345 kv double circuit SPP: Highway-Byway-100% postage stamp for Highway (300 kv and above); 1/3 postage stamp for Byway ( kv) ISO-NE: Reliability Projects and Market Efficiency Transmission Upgrades 115 kv and above 100% postage stamp; public policy projects 70% postage stamp CAISO: Regional Transmission Facilities >200 kv 100% postage stamp 3

4 History of Postage Stamp Pricing for New 345 kv Facilities in MISO Transmission Owners Agreement filed in 1998 After 6 year transition period (Feb. 1, 2002-January 31, 2008), MISO shall file to implement Midwest ISO system-wide transmission rates (i.e. the same transmission rate shall apply to all customers) (i) if all Owners paying the Midwest ISO for transmission service associated with Bundled Load agree; (ii) if all Owners that are paying the Midwest ISO for transmission service associated with Bundled Load are allowed to recover such payments; or (iii) there are no Owners paying the Midwest ISO for transmission service associated with Bundled Load. Postage stamp would have included all voltages in rates The Transmission Owners and MISO filed in 2007 to retain license plate pricing after the end of the transition period 4

5 History of Postage Stamp Pricing for New 345 kv Facilities in MISO RECB I filing (October 7, 2005) included a 20% postage stamp for 345 kv and above Baseline Reliability Projects Task Force began with a key concept that some portion of Network Upgrade costs should be allocated on a regional or postage stamp basis to capture the system-wide benefits of a Transmission System expansion MISO staff produced various analyses which demonstrated that when loads in a single Control Area are supplied only from Network Resources contained within that Control Area, the total Transmission System usage for such a transaction occurs on average 20% to 30% on systems external to the Control Area Filing included a compromise proposal to include a postage stamp component, provided that the component comprises no greater than 20% of the project costs, and that it is applied to Network Upgrades of 345 kv and higher voltage class 5

6 History of Postage Stamp Pricing for New 345 kv Facilities in MISO RECB II filing (November 1, 2006) included a 20% postage stamp for 345 kv and above Regionally Beneficial Projects (now MEPs) Task Force addressed to what extent should the allocation of costs reflect broad system-wide benefits of grid expansions, via a system-wide rate based on load shares (i.e. on a postage stamp basis ) as opposed to a more targeted allocation to specific transmission customers based on evaluations of long term beneficiaries The region-wide component was set a 20%, consistent with the level of postage stamp applied to Baseline Reliability Projects 345 kv and higher Additional analyses presented showed that when the loads of a single zone were served by all market generators in aggregate, the relative usage of others transmission systems was at least as high as the 20% figure in the RECB I filing 6

7 History of Postage Stamp Pricing for New 345 kv Facilities in MISO RECB III filing-phase I (July 9, 2009) modified cost allocation for generator interconnectionrelated network upgrades, eliminating the majority of the cost sharing for 50% of upgrade costs, but retaining a 10% postage stamp component for projects 345 kv and above 7

8 History of Postage Stamp Pricing for New 345 kv Facilities in MISO RECB III filing-phase II (July 15, 2010) established a 100% postage stamp for Multi- Value Projects (MVPs) Economic studies show that MVP-type projects will provide widespread regional benefits, including; substantial reductions in regional congestion costs; reductions in transmission losses, effecting significant, broadly shared cost savings; reductions in the region s installed capacity requirements, thus measurably reducing capacity costs throughout the region Broad regional cost-sharing for MVPs. avoids the disproportionate impacts that threatened continued access. to prime wind-power development areas MVPs will strengthen and enhance reliability across the integrated transmission system on which all regional load and exports rely 8

9 Is the current 20% Postage Stamp for MEPs 345 kv and above still appropriate? Yes. If there is any change considered, the postage stamp component should probably be a higher percentage of the total Networked facilities 345 kv and above provide regional benefits Reduction of Congestion and Production Costs is just one of many benefits, and the hardest to predict over the long term Examining APC results across model years and across futures shows changes in benefits and beneficiaries identifying beneficiaries is very sensitive to assumptions about many items that are inherently uncertain Over the long term, the usage or function of new networked 345 kv transmission lines that have been justified based on different types of initial drivers (reliability, economics or public policy) may not be very different All networked 345 kv lines are Multi-Value lines 9

10 Transmission 345 kv and above Pre kv Lines Pre kv lines Pre

11 Transmission 345 kv and above Existing, Approved and Planned 345 kv 2010 & after Pre kv Pre

12 Transmission 345 kv and above, by Type Existing, Approved and Planned 345 kv % P.S Baseline Reliability 20% Market Efficiency 20% Multi-Value 100% Zonal 0% Pre % 500 kv Pre % 12

13 The North-South MISO Divide Since MISO South was added to the footprint in December 2013, there has been much discussion about how to allocate costs across the new larger region Is the combined region too large, or the two sub-regions too disconnected for projects to provide region-wide benefits? Entergy Transition Period limits cost sharing for at least 5 years across both North and South MISO has proposed to eliminate postage stamp for MISO- SPP 345 kv Tariff Gap Interregional Projects Allocation of costs in MISO for these 345 kv projects would be 100% based on APC benefits It will be difficult to get consensus on tariff changes to treat the north and south differently Cost allocation is a zero-sum game 13

14 Benefits of a MISO-wide (North and South) Postage Stamp charge Avoids need to change existing tariff provisions Stakeholder consensus on cost allocation changes is often difficult to achieve It is hard to identify today if there would be a cost shift bias (and in which direction) over the long term Better Planning The more that all projects are paid for the same way, the more that the focus becomes the most efficient, least cost solutions to identified needs Unity Region-wide postage stamp best supports the vision of MISO as a single, strong RTO region 14

15 QUESTIONS? 16

Potential Attachment FF-6 Tariff Gap Options. Regional Expansion Criteria & Benefits Working Group (RECBWG)

Potential Attachment FF-6 Tariff Gap Options. Regional Expansion Criteria & Benefits Working Group (RECBWG) Potential Attachment FF-6 Tariff Gap Options Regional Expansion Criteria & Benefits Working Group (RECBWG) April 19, 2016 Overview Objective Review original intent of Attachment FF-6 Highlight tariff gap

More information

Attachment FF-6 and Potential Tariff Gap

Attachment FF-6 and Potential Tariff Gap Attachment FF-6 and Potential Tariff Gap Regional Expansion Criteria & Benefits Working Group Workshop (RECBWG) May 26, 2016 Revised 5/31/2016 Overview Objective Review original intent of Attachment FF-6

More information

MISO Transmission Cost Allocation Overview. October 21, 2013

MISO Transmission Cost Allocation Overview. October 21, 2013 MISO Transmission Cost Allocation Overview October 21, 2013 The MISO transmission cost allocation approach seeks to match the business case with the allocation method * Allocation Category Driver(s) Allocation

More information

Transmission Access Charge Options for Integrating New Participating Transmission Owners

Transmission Access Charge Options for Integrating New Participating Transmission Owners Transmission Access Charge Options for Integrating New Participating Transmission Owners Issue Paper October 23, 2015 Market & Infrastructure Policy Table of Contents 1. Introduction and Scope of Effort...

More information

MISO Transmission Expansion Planning Training Transmission Project Exercise Worksheet

MISO Transmission Expansion Planning Training Transmission Project Exercise Worksheet Baseline Reliability Project Exercises 1. The date is August 2015. During your annual reliability analysis, you find low voltage at the 138kV substation SUB1 when the 230kV line from SUB2 to SUB3 is removed

More information

Transmission Access Charge Options. Stakeholder Working Group Meeting August 11, 2016

Transmission Access Charge Options. Stakeholder Working Group Meeting August 11, 2016 Transmission Access Charge Options Stakeholder Working Group Meeting August 11, 2016 August 11, 2016 working group agenda Time (PST) Topic Presenter 10:00-10:10 10:10-12:30 12:30-1:15 Lunch break Introduction

More information

RTO/ISO Competitive Transmission Programs

RTO/ISO Competitive Transmission Programs RTO/ISO Competitive Transmission Programs As FERC continues to implement Order No. 1000, it is important that those interested in competitive transmission understand the processes and time frames each

More information

New York s Transmission Challenges and Opportunities: An Overview

New York s Transmission Challenges and Opportunities: An Overview New York s Transmission Challenges and Opportunities: An Overview By: Dr. Matthew Cordaro 2012 is shaping up to be the year of the grid. Governor Cuomo has proposed an energy highway aimed at finding ways

More information

PJM LMP Market Overview

PJM LMP Market Overview PJM LMP Market Overview Andrew Ott Senior Vice President, Markets June 10, 2010 PJM as Part of the Eastern Interconnection 6,038 substations KEY STATISTICS PJM member companies 600+ millions of people

More information

INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO)

INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO) INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO) Paul L. Joskow September 28, 2007 ALTERNATIVE SYSTEM OPERATOR MODELS System operator (SO) is vertically integrated utility (G+T) Functional

More information

Key Take Away : There are 4 types of MISO transmission transactions : 1) Drive- In, 2) Drive-Within, 3) Drive-through, and 4) Drive-Out

Key Take Away : There are 4 types of MISO transmission transactions : 1) Drive- In, 2) Drive-Within, 3) Drive-through, and 4) Drive-Out 1 2 3 Key Take Away : There are 4 types of MISO transmission transactions : 1) Drive- In, 2) Drive-Within, 3) Drive-through, and 4) Drive-Out Speaker Notes: Drive-In refers to transactions that originate

More information

The Wind Coalition WIND ENERGY IS HERE TODAY AND IN AMERICA S FUTURE

The Wind Coalition WIND ENERGY IS HERE TODAY AND IN AMERICA S FUTURE The Wind Coalition 1 WIND ENERGY IS HERE TODAY AND IN AMERICA S FUTURE We will harness the sun and the winds and the soil to fuel our cars and run our factories. And we will transform our schools and colleges

More information

June 10, RE: Comments on Revised Straw Proposal on Transmission Access Charge Options

June 10, RE: Comments on Revised Straw Proposal on Transmission Access Charge Options BRYCE FREEMAN ADMINISTRATOR MATTHEW H. MEAD GOVERNOR DENISE PARRISH DEPUTY ADMINISTRATOR Office of Consumer Advocate 2515 Warren Ave., Suite 304 Telephone 307-777-7427 FAX 307-777-5748 TTY 307-777-5723

More information

Electricity from the Power Plant To the Consumer

Electricity from the Power Plant To the Consumer Electric Transmission Lines Electricity from the Power Plant To the Consumer The Nature of Electricity Electricity must be used as it is generated. Unlike other commodities, there is very little ability

More information

Comments of Louisiana Energy Users Group and Texas Industrial Energy Consumers. MISO South Market Congestion Planning Study. September 18, 2015

Comments of Louisiana Energy Users Group and Texas Industrial Energy Consumers. MISO South Market Congestion Planning Study. September 18, 2015 Comments of Louisiana Energy Users Group and Texas Industrial Energy Consumers On MISO South Market Congestion Planning Study September 18, 2015 In response to the MISO Staff s September 11, 2015 request

More information

BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION

BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION Electric Generation Alternatives Analysis for Proposed ) Permit, to Install No. 341-07, for an Advanced Supercritical ) Case No. U-15996 Pulverized Coal Boiler

More information

A Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations

A Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations A Survey of Transmission Cost Allocation Methodologies for Regional Transmission Organizations S. Fink, K. Porter, C. Mudd, and J. Rogers Exeter Associates, Inc. Columbia, Maryland NREL is a national laboratory

More information

California Independent System Operator Corporation Fifth Replacement FERC Electric Tariff

California Independent System Operator Corporation Fifth Replacement FERC Electric Tariff Table of Contents 24. Comprehensive Transmission Planning Process... 3 24.1 Overview... 3 24.1.1 [NOT USED]... 3 24.1.2 [NOT USED]... 3 24.1.3 [NOT USED]... 3 24.1.4 [NOT USED]... 3 24.2 Nature of the

More information

Template for Submission of Comments on Convergence Bidding and Bid Cost Recovery

Template for Submission of Comments on Convergence Bidding and Bid Cost Recovery Template for Submission of Comments on Convergence Bidding and Bid Cost Recovery The CAISO is requesting written comments to presentations and documents discussed at the October 16 th Convergence Bidding

More information

Transmission Leadership. Teresa Mogensen Vice President, Transmission

Transmission Leadership. Teresa Mogensen Vice President, Transmission Transmission Leadership Teresa Mogensen Vice President, Transmission 1 Safe Harbor This material contains forward-looking statements that are subject to certain risks, uncertainties ies and assumptions.

More information

Market Solutions to Loop Flow

Market Solutions to Loop Flow Market Solutions to Loop Flow Robert Pike Director, Market Design New York Independent System Operator Business Issues Committee September 9, 2009 1 Agenda Background Recommendation Next Steps Solution

More information

AAPG 2011 Annual Convention & Exhibition April 10, 2011

AAPG 2011 Annual Convention & Exhibition April 10, 2011 Generator Transmission Grid Interconnection Guidelines AAPG 2011 Annual Convention & Exhibition April 10, 2011 Hala Ballouz, B.Sc., M.Sc. TAMU, P.E. President, Electric Power Engineers, Inc. Partner &

More information

Great Plains Energy. Transource Energy, LLC. Investor Presentation. April 2012

Great Plains Energy. Transource Energy, LLC. Investor Presentation. April 2012 Great Plains Energy Transource Energy, LLC April 2012 Forward-Looking Statement Statements made in this presentation that are not based on historical facts are forward-looking, may involve risks and uncertainties,

More information

THE FERC STANDARD MARKET DESIGN GIGANOPR: RESEARCH NEEDS

THE FERC STANDARD MARKET DESIGN GIGANOPR: RESEARCH NEEDS THE FERC STANDARD MARKET DESIGN GIGANOPR: RESEARCH NEEDS Presentation by George Gross University of Illinois at Urbana-Champaign Modernizing the National Electric Power Grid NSF Workshop November 18-19,

More information

Transmission Planning: The Challenges Ahead

Transmission Planning: The Challenges Ahead Transmission Planning: The Challenges Ahead PRESENTED TO Harvard Electricity Policy Group Meeting PRESENTED BY Judy Chang February 27, 2014 Copyright 2013 The Brattle Group, Inc. Content A. Proposed Framework

More information

Generation and Transmission Interconnection Process

Generation and Transmission Interconnection Process PJM Manual 14A Generation and Transmission Interconnection Process Revision: 18 Effective Date: January 28, 2016 Prepared by Planning Division Generation Interconnection Department PJM 2016 Table of Contents

More information

Renewable Energy Transmission Planning Process (RETPP) Second Draft Final Proposal

Renewable Energy Transmission Planning Process (RETPP) Second Draft Final Proposal Renewable Energy Transmission Planning Process (RETPP) Second Draft Final Proposal April 2, 2010 Second Draft Final Proposal Introduction The central objective of the ISO s proposed renewable energy transmission

More information

The Benefits of Electric Transmission:

The Benefits of Electric Transmission: A WIRES Report on The Benefits of Electric Transmission: Identifying and Analyzing the Value of Investments The Brattle Group Judy W. Chang Johannes P. Pfeifenberger J. Michael Hagerty July 2013 www.wiresgroup.com

More information

Wind Power and Electricity Markets

Wind Power and Electricity Markets PO Box 2787 Reston, VA 20195 Phone: 703-860-5160 Fax: 703-860-3089 E-mail: info@uwig.org Web: www.uwig.org Wind Power and Electricity Markets A living summary of markets and market rules for wind energy

More information

Competition in Transmission Planning and Development:

Competition in Transmission Planning and Development: Competition in Transmission Planning and Development: Current Status and International Experience Presented at EUCI Transmission Policy: A National Summit Washington, DC Prepared by Johannes Pfeifenberger

More information

MISO-SPP Market-to-Market Process: Creation of New Flowgates and M2M Resettlements

MISO-SPP Market-to-Market Process: Creation of New Flowgates and M2M Resettlements MISO-SPP Market-to-Market Process: Creation of New Flowgates and M2M Resettlements Presented to: FERC Technical Conference David Patton President, Potomac Economics MISO IMM September 22, 2014 Restrictions

More information

Demand Response and Energy Efficiency in the Midwest ISO. A Primer

Demand Response and Energy Efficiency in the Midwest ISO. A Primer Demand Response and Energy Efficiency in the Midwest ISO A Primer John Moore Bruce Campbell Kevin Murray September 28, 2010 1 Agenda Types of Midwest ISO Demand Response (DR). Products DR is eligible to

More information

Southwest Power Pool REGIONAL TARIFF WORKING GROUP Meeting Minutes January 11, 2001 Embassy Suites, Outdoor World

Southwest Power Pool REGIONAL TARIFF WORKING GROUP Meeting Minutes January 11, 2001 Embassy Suites, Outdoor World Southwest Power Pool REGIONAL TARIFF WORKING GROUP Meeting Minutes January 11, 2001 Embassy Suites, Outdoor World Second Revised Minutes Distributed February 15, 2001 Agenda Item 1 Call to Order & Introduction

More information

1.0 03/02/2014 N/A Adrian Searle N/A Initial version (ED1 July 2013 submission baseline) 1.1 13/02/2014 Chris Ong All Reformatting of initial version

1.0 03/02/2014 N/A Adrian Searle N/A Initial version (ED1 July 2013 submission baseline) 1.1 13/02/2014 Chris Ong All Reformatting of initial version Document History Version Date Revision Class Originator Section Update Details 1.0 03/02/2014 N/A Adrian Searle N/A Initial version (ED1 July 2013 submission baseline) 1.1 13/02/2014 Chris Ong All Reformatting

More information

Technical and Institutional Barriers to the Expansion of Wind and Solar Energy

Technical and Institutional Barriers to the Expansion of Wind and Solar Energy Technical and Institutional Barriers to the Expansion of Wind and Solar Energy Near term measures to foster development Prepared for Peter Fiekowsky, Citizen s Climate Lobby June 19, 2015 AUTHORS Patrick

More information

Merchant Interconnectors

Merchant Interconnectors Merchant Interconnectors David Newbery EPRG Winter Research Seminar Cambridge 15 December 2006 http://www.electricitypolicy.org.uk Outline Strong pressure from EC to increase interconnection impeded by

More information

153 FERC 61,221 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER DIRECTING REPORTS. (Issued November 20, 2015) TABLE OF CONTENTS

153 FERC 61,221 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER DIRECTING REPORTS. (Issued November 20, 2015) TABLE OF CONTENTS 153 FERC 61,221 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable. Price Formation in

More information

Generator Interconnection and Deliverability Study Methodology Technical Paper

Generator Interconnection and Deliverability Study Methodology Technical Paper Generator Interconnection and Deliverability Study Methodology Technical Paper July 2, 2013 Generator Interconnection and Deliverability Study Methodology Table of Contents Introduction... 1 Section One:

More information

2011 Proposed Product Enhancements. Project Title Project Description. Auxiliary Market Products. Business Intelligence Products

2011 Proposed Product Enhancements. Project Title Project Description. Auxiliary Market Products. Business Intelligence Products Auxiliary Market Products Additional Capacity Zones The NYISO and stakeholders are developing the rationale in 2010 for creating additional capacity zones, identified as a recommendation in the 2009 State

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Rock Island Clean Line LLC ) Docket No. ER12-365-000

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Rock Island Clean Line LLC ) Docket No. ER12-365-000 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Rock Island Clean Line LLC ) Docket No. ER12-365-000 ROCK ISLAND CLEAN LINE LLC S ANSWER TO COMMENTS OF INTERSTATE POWER AND LIGHT

More information

September 29, 2014. Docket No. ER14- -000 Amendment to CAISO FERC Electric Tariff to Eliminate Annual External Operations Review

September 29, 2014. Docket No. ER14- -000 Amendment to CAISO FERC Electric Tariff to Eliminate Annual External Operations Review California Independent System Operator Corporation September 29, 2014 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

Public Interest Organization Perspectives on Planning Reform. April 29, 2011 Regional Planning Process Task Force

Public Interest Organization Perspectives on Planning Reform. April 29, 2011 Regional Planning Process Task Force Public Interest Organization Perspectives on Planning Reform April 29, 2011 Regional Planning Process Task Force RPPTF Process Appreciate that PJM Board is supportive of changes to planning Substantial

More information

Gas transport tariffs calculation

Gas transport tariffs calculation Ad Hoc Expert Facility under the INOGATE project Support to Energy Market Integration and Sustainable Energy in the NIS (SEMISE) Gas transport tariffs calculation 1 TABLE OF CONTENTS 1. INTRODUCTION...

More information

Portfolio Manager and Green Power Tracking

Portfolio Manager and Green Power Tracking Building owners and operators can buy green power products as a way of reducing the environmental impacts associated with purchased electricity use in their facilities. The Environmental Protection Agency

More information

A market design to support climate policy

A market design to support climate policy A market design to support climate policy Karsten Neuhoff, karsten.neuhoff@cpiberlin.org David Newbery, Christian von Hirschhausen, Benjamin Hobbs, Christoph Weber, Janusz Bialek, Frieder Borggrefe, Julian

More information

Transmission Cost Allocation and Cost Recovery in the West

Transmission Cost Allocation and Cost Recovery in the West Transmission Cost Allocation and Cost Recovery in the West Presented at: Transmission Executive Forum WEST 2011 Strategies for Meeting the Transmission Needs in the West Presented by: Johannes Pfeifenberger

More information

Service Agreement for Network Integration Transmission Service

Service Agreement for Network Integration Transmission Service Service Agreement for Network Integration Transmission Service 1.0 This Service Agreement, dated as of, is entered into, by and between the Midwest ISO and ( Transmission Customer ). 2.0 The Transmission

More information

MINNESOTA POWER. Company Background: CapX2020 Transmission Plan

MINNESOTA POWER. Company Background: CapX2020 Transmission Plan TRANSMISSION PROJECTS: AT A GLANCE MINNESOTA POWER MINNESOTA POWER Company Background: Minnesota Power, a division of ALLETE, provides electricity in a 26,000 square mile electric service area located

More information

Performance Metrics. For Independent System Operators And Regional Transmission Organizations

Performance Metrics. For Independent System Operators And Regional Transmission Organizations Performance Metrics For Independent System Operators And Regional Transmission Organizations A Report to Congress In Response to Recommendations of the United States Government Accountability Office April

More information

Retail Electric Rates in Deregulated and Regulated States: 2012Update

Retail Electric Rates in Deregulated and Regulated States: 2012Update Retail Electric Rates in Deregulated and Regulated States: 2012Update Published April 2013 1875 Connecticut Avenue, NW Washington, D.C. 20009-5715 202/467-2900 www.publicpower.org Retail Electric Rates

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 101. (Docket No. RM04-12-000; Order No. 668)

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 101. (Docket No. RM04-12-000; Order No. 668) UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 18 CFR Part 101 (Docket No. RM04-12-000; Order No. 668) Accounting and Financial Reporting for Public Utilities Including RTOs (Issued December

More information

Uplift in RTO and ISO Markets

Uplift in RTO and ISO Markets i Staff Analysis of Uplift in RTO and ISO Markets August 2014 For further information, please contact: William Sauer Office of Energy Policy and Innovation Federal Energy Regulatory Commission 888 First

More information

Transmission INTRODUCTION DESCRIPTION OF THE PROBLEMS

Transmission INTRODUCTION DESCRIPTION OF THE PROBLEMS Transmission INTRODUCTION An electrical power system requires constant, second by second, balancing of supply, demand, and transmission capability. Transmission system operators are primarily responsible

More information

Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055

Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055 Generation Interconnection Feasibility Study Report-Web Version For PJM Generation Interconnection Request Queue Position Z1-055 South Bend Generation Project March 2014 PJM Interconnection 2014. All rights

More information

Instructions for use:

Instructions for use: TRANSMISSION MONTHLY PROJECT PROGRESS REPORT INSTRUCTIONS FOR COMPLETION TEMPLATE Instructions for use: PURPOSE OF FORM: The Transmission monthly Project Progress Report form is to be used by the Transmission

More information

Convergence Bidding Stakeholder Conference Call

Convergence Bidding Stakeholder Conference Call Convergence Bidding Stakeholder Conference Call Margaret Miller Senior Market Design & Policy Specialist Convergence Bidding Stakeholder Conference Call August 13, 2009 Agenda 1:00 1:15 - Plan for Stakeholder

More information

Rwanda Natural Capital Accounting

Rwanda Natural Capital Accounting Rwanda Natural Capital Accounting Presented for: Mrs. Fatina Mukarubibi PS Ministry of Natural Resources Date: June 1, 2015 Wealth Accounting and the Valuation of Ecosystem Services www.wavespartnership.org

More information

New England s Bulk Electric Power Grid. Mark Babula System Planning ISO New England Inc.

New England s Bulk Electric Power Grid. Mark Babula System Planning ISO New England Inc. New England s Bulk Electric Power Grid Mark Babula System Planning ISO New England Inc. ISO New England Overview Private, not-for-profit corporation created in 1997 to oversee New England s deregulated

More information

Winter 2013-14 Energy Market Assessment Report to the Commission

Winter 2013-14 Energy Market Assessment Report to the Commission Winter 2013-14 Energy Market Assessment Report to the Commission Docket No. AD06-3-000 October 2013 Disclaimer: The matters presented in this staff report do not necessarily represent the views of the

More information

Retail Electric Rates in Deregulated and Regulated States: A Ten Year Comparison

Retail Electric Rates in Deregulated and Regulated States: A Ten Year Comparison Retail Electric Rates in Deregulated and Regulated States: A Ten Year Comparison Published March 2008 1875 Connecticut Avenue, NW Washington, D.C. 20009-5715 202/467-2900 www.appanet.org Retail Electric

More information

TRANSMISSION GRID DEVELOPMENT & PORTFOLIO SERVICES December 22, 2014. Senior Vice President Trans Grid Development & Portfolio Services

TRANSMISSION GRID DEVELOPMENT & PORTFOLIO SERVICES December 22, 2014. Senior Vice President Trans Grid Development & Portfolio Services TRANSMISSION GRID DEVELOPMENT & PORTFOLIO SERVICES December 22, 2014 Senior Vice President Trans Grid Development & Portfolio Services The Senior Vice President Transmission Grid Development & Portfolio

More information

COMMENTS OF THE SOLAR ALLIANCE NEW JERSEY INTERCONNECTION RULES APRIL 29 TH, 2011

COMMENTS OF THE SOLAR ALLIANCE NEW JERSEY INTERCONNECTION RULES APRIL 29 TH, 2011 COMMENTS OF THE SOLAR ALLIANCE NEW JERSEY INTERCONNECTION RULES APRIL 29 TH, 2011 I. Background The Solar Alliance is a group of approximately 30 of the largest photovoltaic (PV) solar development and

More information

Tehachapi Wind Energy Storage Project (TSP)

Tehachapi Wind Energy Storage Project (TSP) Tehachapi Wind Energy Storage Project (TSP) Peer Review Presented by Mr. Loïc Gaillac October 20, 2011 San Diego, CA 1 Outline Policy Challenges SCE s Position SCE Smart Grid Vision Project Description

More information

Section 4: Integrating Public Policy Drivers

Section 4: Integrating Public Policy Drivers Public Policy Drivers Section : Integrating Public Policy Drivers PJM DE DC IL IN KY MD MI NJ NC OH PA TN VA WV Section.0: The Role of Public Policy in the RTEP Process Figure.1: Public Policy Drivers

More information

NV Energy ISO Energy Imbalance Market Economic Assessment

NV Energy ISO Energy Imbalance Market Economic Assessment March 25, 2014 NV Energy ISO Energy Imbalance Market Economic Assessment NV Energy ISO Energy Imbalance Market Economic Assessment 2014 Copyright. All Rights Reserved. Energy and Environmental Economics,

More information

Analysis and Selection of Analytical Tools to Assess National-Interest Transmission Bottlenecks Final Report

Analysis and Selection of Analytical Tools to Assess National-Interest Transmission Bottlenecks Final Report Analysis and Selection of Analytical Tools to Assess National-Interest Transmission Bottlenecks Final Report This work described in this report was coordinated by the Consortium for Electric Reliability

More information

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations PJM Overview and Wholesale Power Markets John Gdowik PJM Member Relations PJM s Role Ensures the reliability of the high-voltage electric power system Coordinates and directs the operation of the region

More information

Robust Adaptive Topology Control

Robust Adaptive Topology Control Robust Adaptive Topology Control Mladen Kezunovic, PI Texas A&M University Kory W. Hedman, Co-PI Arizona State University January 14-15, 2015 System Integration Robust Adaptive Topology Control (RATC)

More information

103 FERC 61, 044 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

103 FERC 61, 044 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 103 FERC 61, 044 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Pat Wood, III, Chairman; William L. Massey, and Nora Mead Brownell. Ontario Energy Trading International

More information

of the Federal Energy Regulatory Commission ( FERC or Commission ), 2

of the Federal Energy Regulatory Commission ( FERC or Commission ), 2 2750 Monroe Boulevard Valley Forge Corporate Center Audubon, PA 19403 James M. Burlew Counsel Telephone: (610) 666-4345 Fax (610) 666-8211 Email Address: james.burlew@pjm.com December 15, 2015 The Honorable

More information

Briefing paper: Rent-based Finance

Briefing paper: Rent-based Finance Briefing paper: Rent-based Finance Overview One of the key barriers to uptake of new energy technologies by low-income customers and renters is the high up-front cost. To overcome this issue a range of

More information

Interconnection Basics

Interconnection Basics Interconnection Basics Interconnection: the rules and processes that an energy resource provider must follow in order to connect its source into the electricity grid Nov 2014 The following slides will

More information

Memorandum. This memorandum requires Board action. Executive Summary

Memorandum. This memorandum requires Board action. Executive Summary California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: July 8, 2014 Re: Decision on the Delaney-Colorado

More information

Grid of the Future. Integration of Renewables Energy Storage Smart Grid. Presentation by David Hawkins Lead Renewables Power Engineer Grid Operations

Grid of the Future. Integration of Renewables Energy Storage Smart Grid. Presentation by David Hawkins Lead Renewables Power Engineer Grid Operations Grid of the Future Integration of Renewables Energy Storage Smart Grid Presentation by David Hawkins Lead Renewables Power Engineer Grid Operations Grid of the Future Current Power System Gen. Trans. Dist.Cust.

More information

Addressing Affected System Impacts of Generator Interconnection: Processes and Principles. Stakeholder Call August 23, 2013 9:30 a.m. - 12:00 p.m.

Addressing Affected System Impacts of Generator Interconnection: Processes and Principles. Stakeholder Call August 23, 2013 9:30 a.m. - 12:00 p.m. Addressing Affected System Impacts of Generator Interconnection: Processes and Principles Stakeholder Call August 23, 2013 9:30 a.m. - 12:00 p.m. 1. Introduction Mercy Parker Helget Sr. Stakeholder Engagement

More information

BENCHMARK YOUR TEST FUNCTION AGAINST A WORLD-CLASS TESTING ORGANIZATION

BENCHMARK YOUR TEST FUNCTION AGAINST A WORLD-CLASS TESTING ORGANIZATION BENCHMARK YOUR TEST FUNCTION AGAINST A WORLD-CLASS TESTING ORGANIZATION PRACTICE OBJECTIVE This practice will enable you to conduct an assessment of your testing organization, using eight criteria that

More information

Natural Gas Pipeline Penalty Recovery Issue Paper

Natural Gas Pipeline Penalty Recovery Issue Paper Natural Gas Pipeline Penalty Recovery Issue Paper September 16, 2014 Table of Contents I. Introduction and Background... 3 II. Scope of Initiative and Plan for Stakeholder Engagement... 4 III. The Approved

More information

COLORADO SPRINGS UTILITIES ATTACHMENT K TO OPEN ACCESS TRANSMISSION TARIFF

COLORADO SPRINGS UTILITIES ATTACHMENT K TO OPEN ACCESS TRANSMISSION TARIFF COLORADO SPRINGS UTILITIES ATTACHMENT K TO OPEN ACCESS TRANSMISSION TARIFF I. INTRODUCTION The City of Colorado Springs, Colorado ( City ) is a Colorado home-rule municipal corporation with a population

More information

FERC Order 1000 Transmission Planning and Cost Allocation. FRCC Board Briefing June 28, 2012

FERC Order 1000 Transmission Planning and Cost Allocation. FRCC Board Briefing June 28, 2012 FERC Order 1000 Transmission Planning and Cost Allocation FRCC Board Briefing June 28, 2012 Agenda Background Order 1000 Compliance Filings Regional Compliance Concepts Florida Sponsors Proposal Florida

More information

Stakeholder Comments Template

Stakeholder Comments Template Stakeholder Comments Template Submitted by Company Date Submitted Edward G. Cazalet TeMix Inc. August 10, 2015 ed@temix.com 408-621-2772 General Comments TeMix respectfully suggests that this CAISO Proposal

More information

EXHIBIT PH-1. TEXAS CREZ AND LONG TERM NEEDS, A COMPREHENSIVE TRANSMISSION PROPOSAL BY ELECTRIC TRANSMISSION TEXAS, LLC (ETT) February 27, 2007

EXHIBIT PH-1. TEXAS CREZ AND LONG TERM NEEDS, A COMPREHENSIVE TRANSMISSION PROPOSAL BY ELECTRIC TRANSMISSION TEXAS, LLC (ETT) February 27, 2007 TEXAS CREZ AND LONG TERM NEEDS, A COMPREHENSIVE TRANSMISSION PROPOSAL BY ELECTRIC TRANSMISSION TEXAS, LLC (ETT) February 27, 2007 1 ETT CREZ TRANSMISSION PROPOSAL I. EXECUTIVE SUMMARY II. KEY ISSUES ADDRESSED

More information

Data Center Life Cycle Analysis. Christophe Garnier EMEA Technical Work Group Member Schneider Electric

Data Center Life Cycle Analysis. Christophe Garnier EMEA Technical Work Group Member Schneider Electric Data Center Life Cycle Analysis Christophe Garnier EMEA Technical Work Group Member Schneider Electric V3 The 3 Pillars of Sustainability Sustainability = meet the needs of the present without compromising

More information

To: Honorable Public Utilities Board Submitted by: /s/ Janet Oppio AGM - Energy Resource Planning From: Brian Frus

To: Honorable Public Utilities Board Submitted by: /s/ Janet Oppio AGM - Energy Resource Planning From: Brian Frus AGENDA ITEM NO: 4.G.1 MEETING DATE: 06/25/2012 ADMINISTRATIVE REPORT NO.: 2012-77 To: Honorable Public Utilities Board Submitted by: /s/ Janet Oppio AGM - Energy Resource Planning From: Brian Frus Energy

More information

QUANTA ENERGIZED SERVICES

QUANTA ENERGIZED SERVICES QUANTA ENERGIZED SERVICES Quanta s patented LineMaster robotic arm enables: Increasing utilization of existing transmission assets Safely reconductoring, ctoring rebuilding and replacing/adding lines and

More information

SETTLEMENT AND BILLING PROTOCOL (SABP) OBJECTIVES, DEFINITIONS AND SCOPE

SETTLEMENT AND BILLING PROTOCOL (SABP) OBJECTIVES, DEFINITIONS AND SCOPE SETTLEMENT AND BILLING PROTOCOL (SABP) SABP 1 OBJECTIVES, DEFINITIONS AND SCOPE SABP 1.1 Objectives The objective of this Protocol (and of Annex 1) is to inform Scheduling Coordinators, Participating TOs

More information

Retail Electric Rates

Retail Electric Rates Retail Electric Rates in Deregulated and Regulated States: Update Published April 2016 2451 Crystal Dr. Arlington, VA 22202 202.467.2900 www.publicpower.org Retail Electric Rates in Deregulated and Regulated

More information

Lessons Learned: Integrating Bulk Renewable Energy

Lessons Learned: Integrating Bulk Renewable Energy Lessons Learned: Integrating Bulk Renewable Energy Gridweek 2011 Integrating Renewables and DER 15 September 2011 Robert Zavadil Executive Vice President EnerNex 620 Mabry Hood Road, Suite 300 Knoxville,

More information

Appendix C-2. Entergy Services, Inc. June 8, 2016

Appendix C-2. Entergy Services, Inc. June 8, 2016 Appendix C-2 Preliminary Due Diligence List (Existing Resources) For 2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Louisiana, LLC Entergy Services, Inc. June 8, 2016

More information

New York Independent System Operator (NYISO)

New York Independent System Operator (NYISO) New York Independent System Operator (NYISO) 2010 ISO/RTO Metrics Report 196 Section 5 NYISO Performance Metrics and Other Information The New York Independent System Operator ( NYISO ) is a not-for-profit

More information

Next Generation Gigabit WiFi 802.11ac

Next Generation Gigabit WiFi 802.11ac Next Generation Gigabit WiFi 802.11ac WHITE PAPER NEXT GENERATION GIGABIT WIFI - 802.11AC The first WiFi-enabled devices were introduced in 1997. For the first time, we were liberated from a physical Internet

More information

2012-2016 Strategic Plan

2012-2016 Strategic Plan 2012-2016 Strategic Plan A Message from John R. Bear, President and CEO J. Michael Evans, Chairman of the Board of Directors MISO prides itself on continually fostering a transparent, effective stakeholder

More information

2014 Retail Electric Rates. in Deregulated and Regulated States

2014 Retail Electric Rates. in Deregulated and Regulated States 2014 Retail Electric Rates in Deregulated and Regulated States Published April 2015 2014 Retail Electric Rates in Deregulated and Regulated States Prepared by Paul Zummo, Manager, Policy Research and Analysis

More information

Electric Transmission Planning under FERC Order No. 1000

Electric Transmission Planning under FERC Order No. 1000 Electric Transmission Planning under FERC Order No. 1000 The Essentials: The Federal Energy Regulatory Commission (FERC) regulates interstate electricity commerce over long- distance transmission lines.

More information

152 FERC 61,218 DEPARTMENT OF ENERGY FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 35. [Docket No. RM15-24-000]

152 FERC 61,218 DEPARTMENT OF ENERGY FEDERAL ENERGY REGULATORY COMMISSION. 18 CFR Part 35. [Docket No. RM15-24-000] 152 FERC 61,218 DEPARTMENT OF ENERGY FEDERAL ENERGY REGULATORY COMMISSION 18 CFR Part 35 [Docket No. RM15-24-000] Settlement Intervals and Shortage Pricing in Markets Operated by Regional Transmission

More information

PUBLIC UTILITIES COMMISSIO~t~ Docket No. DE 15-

PUBLIC UTILITIES COMMISSIO~t~ Docket No. DE 15- Th~NALZZ~ Exhibit STATE OF NEW HAMPSHIRE t~~eeee BEFORE THE FROM FILE PUBLIC UTILITIES COMMISSIO~t~ Liberty Utilities (Granite State Electric) Corp. dibla Liberty Utilities Calendar Year 2014 Reliability

More information

Facing a DR Future & The Role of AMI Enabled Products

Facing a DR Future & The Role of AMI Enabled Products Facing a DR Future & The Role of AMI Enabled Products AEIC 2013 Spring Workshop Orlando Mike Alexander Senior Manager Customer Energy Solutions PG&E April 9th, 2013 1 Pacific Gas and Electric Company Services

More information

The PNC Financial Services Group, Inc. Business Continuity Program

The PNC Financial Services Group, Inc. Business Continuity Program The PNC Financial Services Group, Inc. Business Continuity Program 1 Content Overview A. Introduction Page 3 B. Governance Model Page 4 C. Program Components Page 4 Business Impact Analysis (BIA) Page

More information

PG&E Transmission Interconnection Handbook. Section L3: SUBSTATION DESIGN FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES

PG&E Transmission Interconnection Handbook. Section L3: SUBSTATION DESIGN FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES Section L3: SUBSTATION DESIGN FOR LOAD-ONLY ENTITIES AND TRANSMISSION-ONLY ENTITIES PURPOSE This section provides substation design information for Load Entities interconnected at transmission voltage

More information

Data Management Issues associated with the August 14, 2003 Blackout Investigation

Data Management Issues associated with the August 14, 2003 Blackout Investigation Material derived from PNNL-SA-40401 Originally presented June 8, 2004 Data Management Issues associated with the August 14, 2003 Blackout Investigation Jeff Dagle, PE Chief Electrical Engineer and Team

More information

Gas pricing and network access

Gas pricing and network access OIL & GAS Gas pricing and network access Regional Gas Competence Seminar - Mozambique 22 September - 2015 Bert Kiewiet 1 DNV GL 2015 DNV GL - Bert Kiewiet 22 September, 2015 SAFER, SMARTER, GREENER About