1 B-1 Janet Fraser Chief Regulatory Officer Phone: Fax: September 9, 2013 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission Sixth Floor 900 Howe Street Vancouver, BC V6Z 2N3 Dear Ms. Hamilton: RE: British Columbia Utilities Commission (BCUC) British Columbia Hydro and Power Authority (BC Hydro) Electric Tariff and Open Access Transmission Tariff (OATT) Application to Replace S&P Dow Jones Mid Columbia Indices BC Hydro writes pursuant to sections 58 to 61 of the Utilities Commission Act (UCA) to submit an application for approval of amendments to BC Hydro's Electric Tariff and OATT to reflect the discontinuation of the S&P Dow Jones Indices LLC (SPDJI) United States (U.S.) electricity price indices that are used to calculate certain rates under each of the tariffs (the Application). Effective after the close of business on Friday, September 13, 2013, SPDJI will no longer calculate the Dow Jones U.S. electricity Indices. In the Application, BC Hydro proposes that all references to the SPDJI Mid Columbia (Mid-C) electricity price indices for high load hours (HLH), low load hours (LLH) and Sundays and North American Electric Reliability Corporation (NERC) holidays be replaced with the equivalent index published by Platts, McGraw Hill Financial (Platts) as follows: Electric Tariff Rate Schedule (RS) 1253 Distribution Service IPP Station Service: BC Hydro proposes to amend RS 1253 to replace all references in the energy charge rate calculation from the Dow Jones Mid-C Firm Electricity Price Index for HLH and LLH with the Platts Mid-C Firm on-peak (HLH) and Firm off-peak (LLH) daily price indices RS 1853 Transmission Service IPP Station Service: BC Hydro proposes to amend the RS 1853 to replace all references in the energy charge rate calculation from the Dow Jones Mid-C Firm Electricity Price Index for HLH and LLH with the Platts Mid-C Firm on-peak (HLH) and Firm off-peak (LLH) daily price indices Tariff Supplement (TS) 54 Modified Demand Agreement RS 1852: BC Hydro proposes to amend the definition of Mid-C Price in section 1.1 (c) to replace the Dow Jones Mid-C Firm Electricity Price Index for HLH with the Platts Mid-C Firm on-peak (HLH) daily price indices British Columbia Hydro and Power Authority, 333 Dunsmuir Street, Vancouver BC V6B 5R3

2 September 9, 2013 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission Electric Tariff and Open Access Transmission Tariff (OATT) Application to Replace S&P Dow Jones Mid Columbia Indices Page 2 of 4 OATT RS 06 Energy Imbalance Service: BC Hydro proposes to amend RS 06 to replace all references in the Energy Imbalance rate calculations to the Dow Jones Firm Daily Mid-C Index for HLH, LLH or Sundays and NERC Holidays with Platts Mid-C Firm on-peak (HLH), Firm off-peak (LLH), and Firm Sunday and NERC Holiday daily price indices RS 09 Loss Compensation Service (LCS): BC Hydro proposes to amend RS 09 to replace all references in the LCS sell price rate calculations to the Dow Jones Firm Daily Mid Columbia Index for HLH, LLH or Sundays and NERC Holidays with Platts Mid-C Firm on-peak (HLH), Firm off-peak (LLH), and Firm Sunday and NERC Holiday daily price indices TS 80 Network Economy: BC Hydro proposes to amend TS 80 section 2 (c)(i) and (ii) to replace the references to the Mid-C Heavy Load Hour price and Mid-C Light Load Hour price, as reported by Dow Jones, with Platts Mid-C Firm on-peak (HLH) and Firm off-peak (LLH) daily price indices OATT Attachments A and B: BC Hydro also proposes to replace the reference to CME Group Index Services LLC, Dow Jones & Company, Inc. and their respective affiliates in Attachment A section 10.4 and Attachment B section 9(c) with any index publishing services firms or their respective affiliates that are identified in the OATT, including its schedules, and supplements Consultation Concurrent with its filing of the Application, BC Hydro notified its customers of its filing of the Application. Customers were notified by way of an and/or a bulletin was also posted on BC Hydro s transmission website. Implementation BC Hydro respectfully requests an interim approval before September 30, 2013 to allow it to utilize equivalent indices provided by Platts effective September 13, 2013, Following September 30, BC Hydro will calculate the monthly settlements under the affected rate schedules and tariff supplements for September 2013 and requires approval to utilize the Platts indices for such calculations. Proposed Process BC Hydro believes that a minimal written regulatory process is appropriate. BC Hydro includes a draft Order and a draft Interim Order in Appendix E of the Application.

3 September 9, 2013 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission BChgdro "' Electric Tariff and Open Access Transmission Tariff (OATT) Application to Replace S&P Dow Jones Mid Columbia Indices Page 3 of 4 For further information, please contact Gordon Doyle at or by at bchydroregulatorygroup@bchydro.com. Janet Fraser Chief Regulatory Officer Enclosures (5)... 4/

4 September 9, 2013 Ms. Erica Hamilton Commission Secretary British Columbia Utilities Commission Electric Tariff and Open Access Transmission Tariff (OATT) Application to Replace S&P Dow Jones Mid Columbia Indices Page 4 of 4 Copy to: AMPC Attention: Richard Stout roninconsult@live.com Attention: Brian R. Wallace rbw@bht.com BCPSO Attention: Tannis Braithwaite ltbraithwaite@bcpiac.com Capital Power Corporation Attention: Daniel Jurijew djurijew@capitalpower.com Cargill Attention: Philip Pauls Philip_Pauls@cargill.com Attention: Robert Walker Robert_Walker@cargill.com Clean Energy Association Attention: David Austin daustin@securitieslaw.bc.ca Commercial Energy Consumers Association of BC Attention: Christopher Weafer cweafer@owenbird.com Enmax Attention: Darren Gogol dgogol@enmax.com Morgan Stanley Attention: Deborah Hart deborah.hart@morganstanley.com Attention: Jasper D Wright Jasper.D.Wright@morganstanley.com Attention: Murray Margolis murray.margolis@morganstanley.com Attention: Sabrina Kikkert Sabrina.Kikkert@morganstanley.com Attention: Steve Huhman Steven.Huhman@morganstanley.com Attention: Lisa Cherkas Lisa.Cherkas@morganstanley.com NorthPoint Energy Attention: Dean K. Krauss dkrauss@northpointenergy.com Attention: Dean Jones djones@northpointenergy.com Partner, The Progressive Group Attention: Cynthia Burton cynthia.burton@shaw.ca Powerex Attention: Mike MacDougall mike.macdougall@powerex.com Attention: Mark Thompson mark.thompson@powerex.com Attention: Michael McWilliams michael.mcwilliams@powerex.com Attention: Dan O Hearn dan.ohearn@powerex.com Attention: Tom Bechard tom.bechard@powerex.com REMC Rainbow Energy Marketing Corporation Attention: Bob Friessen b.friesen@rainbowenergy.com Teck Metals Ltd Attention: Richard Deane Richard.Deane@teck.com TransAlta Attention: Marcy Cochlan marcy_cochlan@transalta.com TransCanada Attention: Regulatory Department tce_regulatory@transcanada.com

5 Electric Tariff and Open Access Transmission Tariff Application to Replace S&P Dow Jones Mid Columbia Indices

6 Application to Replace S&P Dow Jones Mid Columbia Indices Table of Contents 1 Introduction Application Order Sought Consultation Interim Approval Sought before September 30, Proposed Process Tariff Amendments Electric Tariff OATT Background and Options SPDJI Mid-C Electricity Price Indices SPDJI Methodology SPDJI Cost Platts Mid-C Electricity Price Indices Platts Methodology Cost of replacement with Platts Suitability of Platts for BC Hydro Purposes Powerdex Mid-C Electricity Price Indices Powerdex Methodology Cost of replacement with Powerdex Suitability of Powerdex for BC Hydro Purposes ICE Mid-C Electricity Price Indices ICE Methodology Cost of replacement with ICE Suitability of ICE for BC Hydro Purposes Conclusion and Recommendation List of Appendices Appendix A Appendix B Appendix C Appendix D Appendix E Electric Tariff - Clean and Black-lined Versions of the Affected Pages Open Access Transmission Tariff - Clean and Black-lined Versions of the Affected Pages /Bulletin to Affected Customers Letter of Notification from S&P Down Jones Indices Draft Orders Electric Tariff and Open Access Transmission Tariff Page i

7 Application to Replace S&P Dow Jones Mid Columbia Indices Introduction 1.1 Application British Columbia Hydro and Power Authority (BC Hydro) files this application pursuant to sections 58 to 61 of the Utilities Commission Act (UCA), R.S.B.C. 1996, c. 473 to amend its Electric Tariff and its Open Access Transmission Tariff 1 (OATT) to reflect the discontinuation of the S&P Dow Jones Indices LLC (SPDJI) U.S. electricity price indices that are used to calculate certain rates under each of the tariffs (Application). Effective after the close of business on Friday, August 30, 2013, SPDJI will no longer calculate the Dow Jones U.S. hourly electricity indices and effective after the close of business on Friday, September 13, 2013, SPDJI will no longer calculate the Dow Jones U.S. daily electricity indices. BC Hydro uses the certain daily indices in its rate calculations so as a result, BC Hydro must transition to different equivalent indices effective September 13, The Application seeks amendments to both the Electric Tariff and the OATT to replace all references to the SPDJI Mid Columbia (Mid-C) electricity price indices for high load hours (HLH), low load hours (LLH) and Sundays and North American Electric Reliability Corporation (NERC) holidays. BC Hydro proposes that the tariff language be amended to reflect the equivalent index published by Platts, McGraw Hill Financial (Platts). The following tariff pages are affected by the proposed changes: Electric Tariff: Rate Schedule (RS) 1253, RS 1853, Tariff Supplement (TS) 54 OATT: RS 06, RS 09 and TS 80 OATT: Attachments A and B also make reference to index publishing service companies including CME Group Index Services Inc. and Dow Jones Inc. These index publisher references are obsolete. 1 Electric Tariff and OATT available at: Electric Tariff and Open Access Transmission Tariff Page 1

8 Application to Replace S&P Dow Jones Mid Columbia Indices Order Sought In this Application, BC Hydro seeks two Orders pursuant to sections 58 to 61 of the UCA as follows: Since the SPDJI indices specified in Electric Tariff and in the OATT will no longer be available after close of business on September 13, 2013, BC Hydro seeks an interim order to allow it to utilize equivalent indices provided by Platts for rate calculation purposes under the Electric Tariff and OATT, all as described in the Application and as reflected in the revised tariff pages attached in Appendix A (Electric Tariff) and Appendix B (OATT), to be effective from September 13, 2013 until such time as the BCUC renders a final decision on the Application BC Hydro seeks a final order approving its proposed changes to the Electric Tariff and to the OATT to reflect the replacement of the SPDJI U.S. electricity price indices with equivalent indices, all as described in the Application and as reflected in the revised tariff pages attached in Appendix A (Electric Tariff) and Appendix B (OATT) Draft forms of the order for each of the interim order and the final order sought by BC Hydro are included in Appendix E. 1.3 Consultation Concurrent with its filing of the Application, BC Hydro notified its customers of its filing of the Application with the BCUC and that the Application would seek approval to replace the SPDJI electricity price indices that are referenced in the Electric Tariff and OATT with an equivalent index as appropriate. Customers were notified by way of an and/or a bulletin was also posted on BC Hydro s transmission website. A copy of the /bulletin is attached as Appendix C. Electric Tariff and Open Access Transmission Tariff Page 2

9 Application to Replace S&P Dow Jones Mid Columbia Indices Interim Approval Sought before September 30, 2013 BC Hydro respectfully requests that interim approval of the changes that are included in the Application be provided before September 30, 2013, since this is the date following which BC Hydro will calculate the monthly settlements under the affected rate schedules and tariff supplements for September Proposed Process BC Hydro believes that a written process is appropriate for the BCUC to consider the amendments proposed by BC Hydro in the Application Tariff Amendments 2.1 Electric Tariff BC Hydro is proposing amendments to the Electric Tariff to revise references to the SPDJI electricity price indices as follows: RS 1253 Distribution Service IPP Station Service: BC Hydro proposes to amend RS 1253 to the reference in the energy charge rate calculation from the Dow Jones Mid-C Firm Electricity Price Index for HLH and LLH with the Platts Mid-C Firm on-peak (HLH) and Firm off-peak (LLH) daily price indices RS 1853 Transmission Service IPP Station Service: BC Hydro proposes to amend the RS 1853 to replace all references in the energy charge rate calculation from the Dow Jones Mid-C Firm Electricity Price Index for HLH and LLH with the Platts Mid-C Firm on-peak (HLH) and Firm off-peak (LLH) daily price indices TS 54 - Modified Demand Agreement RS 1852: BC Hydro proposes to amend the definition of Mid-C Price in section 1.1 (c) to replace the Dow Jones Mid-C Firm Electricity Price Index for HLH with the Platts Mid-C Firm on-peak (HLH) daily price indices Clean and black-lined versions of the affected tariff pages are included in Appendix A. Electric Tariff and Open Access Transmission Tariff Page 3

10 Application to Replace S&P Dow Jones Mid Columbia Indices OATT BC Hydro is proposing amendments to the OATT to revise references to the Dow Jones electricity price indices as follows: RS 06 - Energy Imbalance Service: BC Hydro proposes to amend RS 06 to replace all references in the Energy Imbalance rate calculations to the Dow Jones Firm Daily Mid-C Index for HLH, LLH or Sundays and NERC Holidays with Platts Mid-C Firm on-peak (HLH), Firm off-peak (LLH), and Firm Sunday and NERC Holiday daily price indices RS 09 - Loss Compensation Service (LCS): BC Hydro proposes to amend RS 09 to replace all references in the LCS sell price rate calculations to the Dow Jones Firm Daily Mid Columbia Index for HLH, LLH or Sundays and NERC Holidays with Platts Mid-C Firm on-peak (HLH), Firm off-peak (LLH), and Firm Sunday and NERC Holiday daily price indices TS 80 - Network Economy: BC Hydro proposes to amend TS 80 section 2(c)(i) and (ii) to replace the references to the Mid-C Heavy Load Hour price and Mid-C Light Load Hour price, as reported by Dow Jones, with Platts Mid-C Firm on-peak (HLH) and Firm off-peak (LLH) daily price indices OATT Attachments A and B: BC Hydro also proposes to replace the reference to CME Group Index Services LLC, Dow Jones & Company, Inc. and their respective affiliates in Attachment A section 10.4 and Attachment B section 9(c) with any index publishing services firms or their respective affiliates that are identified in the Open Access Transmission Tariff, including its schedules and supplements Clean and black-lined versions of the affected tariff pages are included in Appendix B (OATT). Electric Tariff and Open Access Transmission Tariff Page 4

11 Application to Replace S&P Dow Jones Mid Columbia Indices Background and Options On August 14, 2013, BC Hydro was notified that effective after the close of business on Friday, September 13, 2013, S&P Dow Jones Indices (a division of McGraw Hill Financial) will no longer calculate the SPDJI U.S. electricity indices and that these indices would be replaced by indices calculated by Platts (also a division of McGraw Hill Financial) as of September 13, BC Hydro has confirmed that the SPDJI U.S. electricity indices will no longer be available from any vendor and as a result, BC Hydro is required to transition its affected tariff rates so that they are based on different indices effective September 13, As a result, BC Hydro undertook to identify which indices were the most appropriate indices to transition to, based on its specific business requirements. Hydro identified three options. 1. Replace the SPDJI U.S. electricity indices with the equivalent indices calculated by Platts 2. Replace the SPDJI U.S. electricity indices with the equivalent indices calculated by Powerdex Inc. (Powerdex) 3. Replace the SPDJI U.S. electricity indices with the equivalent indices calculated by Intercontinental Exchange Inc. (ICE) 2.4 SPDJI Mid-C Electricity Price Indices As mentioned above, the Electric Tariff and the OATT currently refer to the SPDJI Mid-C electricity price indices for the determination of certain rates. These are being discontinued by SPDJI. The following indices are calculated by SPDJI and each is used by BC Hydro as appropriate in its monthly settlements of rate charges under the Electric Tariff and OATT as applicable: Electric Tariff and Open Access Transmission Tariff Page 5

12 Application to Replace S&P Dow Jones Mid Columbia Indices Firm On-Peak: Daily index of hourly average $/MWh for On-Peak (HLH) transactions at Mid-C (hours ending (HE) Monday through Saturday) Firm Off-Peak: Daily index of hourly average $/MWh for Off-Peak (LLH) transactions at Mid-C (HE Monday through Saturday) Firm Sunday & NERC Holidays: At Mid-C (24 hours) SPDJI Methodology The SPDJI Mid-C electricity price indices are based on the volumetric weighted average price of Megawatt-hours sold at the Mid-C hub as follows: Index Value [$/MWh] = Σ (Transaction Price [$/MWh] Transaction Volume [MWh]) Total Volume of Qualifying Transactions [MWh] Index prices are published on the flow date SPDJI Cost BC Hydro currently pays a subscription fee for use of the SPDJI indices in the amount of USD $4,500/year. The last such payment was for the one-year period commencing July 4, Platts Mid-C Electricity Price Indices By way of a letter to affected SPDJI Clients, a copy of which is attached as Appendix D, BC Hydro was advised that effective September 13, 2013, Platts, the energy information business of McGraw Hill Financial, will begin providing electricity price data to replace the U.S. electricity prices being provided by SPDJI Indices. SPDJI subscriptions will also be transferred to Platts for the remainder of their term. The following indices calculated by Platts would be applicable to BC Hydro s tariffs and could replace the SPDJI indices: On-Peak Hours: Daily index of hourly average $/MWh for On-Peak (HLH) transactions at Mid-C (HE ) Electric Tariff and Open Access Transmission Tariff Page 6

13 Application to Replace S&P Dow Jones Mid Columbia Indices Off-Peak Hours: Daily index of hourly average $/MWh for Off-Peak (LLH) transactions at Mid-C (HE ) There is currently no Sunday and NERC holiday index calculated by Platts. Sunday prices are currently included in the Monday off-peak values and Holiday prices are included in the next day off-peak prices. During discussions with BC Hydro, Platts has stated that they intend to establish a Sunday and NERC Holiday Daily index of hourly average $/MWh for Mid-C, prior to September 13, BC Hydro would utilize this index, or if not available, the appropriate off-peak pricing for these periods as required to calculate charges under the tariffs for Sundays and NERC holidays until the Platts Sunday and NERC Holiday index is available Platts Methodology The Platts Price indices are based on the weighted average price of Megawatts sold at the Mid-C hub as follows: Index Value [$/MWh] = Σ (Transaction Price [$/MW] Transaction Volume [MW]) Qualifying Transactions in period [MW] hours in period There is no impact to using MW instead of MWh in the calculation. Index prices are published on the trade date. Standard deals (e.g., standard delivery times and multiples of 25 MW) are included in the indices. Outliers (greater than two standard deviations from the mean) may be excluded. These are flagged and a determination is made on whether they should be included or excluded (e.g., if they appear to represent a reporting error) Cost of replacement with Platts Platts has not yet established the subscription cost for the replacement indices; however, BC Hydro does not expect the subscription to exceed the USD $4,500/year that it currently pays for the SPDJI indices. BC Hydro has paid the Electric Tariff and Open Access Transmission Tariff Page 7

14 Application to Replace S&P Dow Jones Mid Columbia Indices annual renewal fee for the SPDJI indices and this will be transferred so that BC Hydro is provided with the equivalent Platts indices until July 4, BC Hydro does not expect to incur any significant information technology (IT) costs since Platts data is provided in the same format as the SPDJI indices and could be scraped and parsed using existing systems so that it could be automatically imported it into BC Hydro s Market Operations and Development System (MODS). BC Hydro also does not expect to incur any significant IT costs related to importing the Platts data into BC Hydro s Electric Tariff customer billing system Suitability of Platts for BC Hydro Purposes The transition to Platts indices could be accomplished immediately since the data is provided in the same format as SPDJI data and can be imported into BC Hydro s MODS system with no modification. The Platts indices have a high degree of correlation with the equivalent SPDJI indices. For the test period of August 1 to 13, 2013, Peak index values were within a range of -0.3 per cent to +0.8 per cent with and average error of +/- 0.2 per cent of the SPDJI values. Off-Peak index values were within a range of -0.2 per cent to +1.3 per cent with and average error of +/- 0.4 per cent of the SPDJI values and Sunday and NERC holiday index values were within a range of -0.2 per cent to +0.1 per cent with and average error of +/- 0.1 per cent of the SPDJI values. 2.6 Powerdex Mid-C Electricity Price Indices Powerdex is an index publisher that publishes hourly and prescheduled indexes of wholesale power transactions for eight hubs in the Western Interconnect. The following indices calculated by Powerdex would be applicable to BC Hydro s tariffs and could replace the SPDJI indices: Standard On-peak: Daily index of hourly average $/MWh for On-Peak (HLH) transactions at Mid-C (HE Monday through Saturday) Electric Tariff and Open Access Transmission Tariff Page 8

15 Application to Replace S&P Dow Jones Mid Columbia Indices Standard Off-peak: Daily index of hourly average $/MWh for Off-Peak (LLH) transactions at Mid-C (HE Monday through Saturday) Non-Standard Day-Ahead 1x16s: Daily index of hourly average $/MWh for Mid-C (HE ) on Sundays and NERC holidays Powerdex Methodology The Powerdex Price indices are based on the volumetric weighted average price of Megawatt-hours sold at the Mid-C hub as follows: Index Value [$/MWh] = Σ (Transaction Price [$/MWh] Transaction Volume [MWh]) Total Volume of Qualifying Transactions [MWh] This is the same calculation methodology as is used in the SPDJI indices. Index prices are published on the following business day that is not a NERC holiday. Standard deals (e.g., standard delivery times and multiples of 25 MW) are included in the indices. Non-standard deals are included in separate indices Cost of replacement with Powerdex BC Hydro expects that the subscription fee for the use of the Powerdex indices would be in the amount of USD $2,000/year. Data is available in Comma Separated Value (CSV) format; however, BC Hydro expects IT costs would be required to develop a parsing methodology to allow auto population into MODS. The expected cost of this work is expected to be $5,000 to $10, Suitability of Powerdex for BC Hydro Purposes Auto population into MODS could likely not be completed prior to September 30, 2013; however, a manual work around until the parsing methodology is complete is feasible. Electric Tariff and Open Access Transmission Tariff Page 9

16 Application to Replace S&P Dow Jones Mid Columbia Indices The Powerdex data correlation with the equivalent SPDJI indices is not as good as Platts. For the test period of August 1 to 13, 2013, Peak index values were within a range of -0.3 per cent to +0.8 per cent with and average error of +/- 0.4 per cent of the SPDJI values. Off-Peak index values were within a range of -1.0 per cent to +1.1 per cent with and average error of +/- 0.5 per cent of the SPDJI values and Sunday and NERC holiday index values were within a range of -1.0 per cent to +0.5 per cent with and average error of +/- 0.7 per cent of the SPDJI values. 2.7 ICE Mid-C Electricity Price Indices ICE is an operator of regulated exchanges and clearing houses for agricultural, credit, currency, emissions, energy and equity index products. The following indices calculated by ICE would be applicable to BC Hydro s tariffs and could replace the SPDJI indices: Mid-C Peak: Daily index of hourly average $/MWh for On-Peak (HLH) transactions at Mid-C (HE Monday through Saturday) Mid-C Off-Peak: Daily index of hourly average $/MWh for Off-Peak (LLH) transactions at Mid-C (HE Monday through Saturday) Mid-C Off-Peak Sunday 1x16: Daily index of hourly average $/MWh for Sunday Off-Peak transactions at Mid-C (HE ) ICE Methodology ICE indices are based on the weighted average price of Megawatt-hours sold at the Mid-C hub as follows: Index Value [$/MWh] = Σ (Transaction Price [$/MWh] Transaction Volume [MWh]) Total Volume of Qualifying Transactions [MWh] This is the same calculation methodology as is used in the SPDJI indices. Electric Tariff and Open Access Transmission Tariff Page 10

17 Application to Replace S&P Dow Jones Mid Columbia Indices Trades done between two companies that are owned by the same parent company are excluded as are option trades that fall outside of the given time period for each index Cost of replacement with ICE There is no subscription fee for use of the ICE indices; however, 3rd party IT data parsing may be required. Data is provided in a format that is not compatible with MODS. Data is available in Comma Separated Value (CSV) format; however, BC Hydro expects IT costs would be required to develop scraping and parsing methodologies to allow auto population into MODS. The expected cost of this methodology could be $15,000 to $20, Suitability of ICE for BC Hydro Purposes The indices are based upon verifiable trade data and underlying historical prices are available through subscription. The ICE data correlation with the equivalent SPDJI indices is also not as good as Platts. For the test period of August 1 to 13, 2013, Peak index values were within a range of -0.6 per cent to +1.7 per cent with and average error of +/- 0.5 per cent of the SPDJI values. Off-Peak index values were within a range of -1.0 per cent to +1.1 per cent with and average error of +/- 0.5 per cent of the SPDJI values and Sunday and NERC holiday index values were within a range of -0.6 per cent to -0.1 per cent with and average error of +/- 0.5 per cent of the SPDJI values. Electric Tariff and Open Access Transmission Tariff Page 11

18 Application to Replace S&P Dow Jones Mid Columbia Indices Conclusion and Recommendation BC Hydro proposes to amend its Electric Tariff and its OATT to reflect the discontinuation of the SPDJI electricity price indices as of close of business on Friday, September 13, BC Hydro proposes to amend both the Electric Tariff and the OATT to replace all references to the SPDJI Mid-C electricity price indices for HLH, LLH or Sundays and NERC holidays with the appropriate Platts Mid-C Firm on-peak (HLH), Firm off-peak (LLH), and Firm Sunday and NERC Holiday daily price indices. Affected tariff pages are: Electric Tariff: RS 1253, RS 1853 and TS 54 OATT: RS 06, RS 09 and TS 80. OATT: Attachments A and B to amend references to index publishing service companies BC Hydro s proposal to use the equivalent Platts indices is based on data compatibility and high degree of correlation with SPDJI indices. Electric Tariff and Open Access Transmission Tariff Page 12

19 Electric Tariff and Open Access Transmission Tariff Application to Replace S&P Dow Jones Mid Columbia Indices Appendix A Electric Tariff Clean and Black-lined Versions of the Affected Pages

20 Electric Tariff and Open Access Transmission Tariff Application to Replace S&P Dow Jones Mid Columbia Indices Appendix A-1 Electric Tariff Black-lined Version of the Affected Pages

21 Appendix A-1 BC Hydro Rate Schedules Effective: 01 April September 2013 Twelfth Thirteenth Revision of Page 24 SCHEDULE 1253 DISTRIBUTION SERVICE IPP STATION SERVICE Availability: Applicable in: For Customers who are Independent Power Producers (IPPs) served at distribution voltage, subject to the Special Conditions below. Rate Zone I excluding Districts of Kingsgate-Yahk and Lardeau-Shutty Bench. Rate: Energy Charge: The sum, over the Billing Period, of the hourly energy consumed multiplied by the entry in the Dow JonesPlatts Mid- Columbia (Mid-C) Firm Electricity Price Index foron-peak (HLH) and Firm off-peak (LLH) daily price indices that corresponds to the time when consumption occurred, during that hour. Monthly Minimum Charge: Special Conditions: $ BC Hydro agrees to provide Electricity under this Schedule to the extent that it has energy and capacity to do so. 2. BC Hydro may, without notice to the Customer, terminate the supply of Electricity under this Schedule if at any time BC Hydro does not have sufficient energy or capacity. 3. Prior to taking Electricity under this Schedule, the Customer may be required to obtain approval from BC Hydro. BC Hydro will advise the Customer of the need to obtain approval prior to the taking of energy under this Schedule. 4. Electricity taken under this Schedule is to be used solely for maintenance and black-start requirements and shall not displace Electricity that would normally be generated by the Customer. Rate Rider: Rate Increase: The Deferral Account Rate Rider as set out in Rate Schedule 1901 applies to all charges payable under this Rate Schedule, before taxes and levies. Effective April 1, 2013 the Rates and Minimum Charge under these schedules include an increase of 1.44% before rounding, approved by BCUC Order No. G-77-12A, subject only to a Commission order under section 44.2 of the Utilities Commission Act respecting BC Hydro s F2014 expenditures on DSM. ACCEPTED: ORDER NO. COMMISSION SECRETARY BC Hydro Electric Tariff and Open Access Transmission Tariff Application to Replace S&P Dow Jones Mid Columbia Indices Page 1 of 3

22 Appendix A-1 BC Hydro Rate Schedules Effective: 01 April September 2013 Twelfth Thirteenth Revision of Page 57 SCHEDULE 1853 TRANSMISSION SERVICE IPP STATION SERVICE Availability: Applicable in: For Customers who are Independent Power Producers (IPPs) served at transmission voltage subject to the Special Conditions below. Rate Zone I excluding Districts of Kingsgate-Yahk and Lardeau-Shutty Bench. Rate: Energy Charge: The sum, over the Billing Period, of the hourly energy consumed multiplied by the entry in the Dow JonesPlatts Mid- Columbia (Mid-C) Firm Electricity Price Index for on-peak (HLH) and Firm off-peak (LLH) daily price indices that corresponds to the time when consumption occurred, during that hour. Minimum Monthly Charge: $35.81 Special Conditions: BC Hydro agrees to provide Electricity under this Schedule to the extent that it has energy and capacity to do so. BC Hydro may, without notice to the Customer, terminate the supply of Electricity under this Schedule if at any time BC Hydro does not have sufficient energy or capacity. Prior to taking Electricity under this Schedule, the Customer may be required to obtain approval from BC Hydro. BC Hydro will advise the Customer of the need to obtain approval prior to the taking of energy under this Schedule. Electricity taken under this Schedule is to be used solely for maintenance and black-start requirements and shall not displace Electricity that would normally be generated by the Customer. Taxes: Rate Rider: Rate Increase: The rates and minimum charge contained herein are exclusive of the Goods and Services tax and the Social Services tax. The Deferral Account Rate Rider as set out in Rate Schedule 1901 applies to all charges payable under this Rate Schedule, before taxes and levies. Effective April 1, 2013 the Rates and Minimum Charge under these schedules include an increase of 1.44% before rounding, approved by BCUC Order No. G-77-12A, subject only to a Commission order under section 44.2 of the Utilities Commission Act respecting BC Hydro s F2014 expenditures on DSM. ACCEPTED: ORDER NO. COMMISSION SECRETARY BC Hydro Electric Tariff and Open Access Transmission Tariff Application to Replace S&P Dow Jones Mid Columbia Indices Page 2 of 3

23 BC Hydro Electric Tariff Supplement No. 54 Appendix A-1 of September 13, 2013 Fourth Fifth Revision of Page 1 Effective: April 27, MODIFIED DEMAND AGREEMENT Rate Schedule 1852 This Agreement, which together with all Demand Reduction Transactions is referred to as the "Agreement", is made to be effective on the day of 200_, BETWEEN: AND: BRITISH COLUMBIA HYDRO AND POWER AUTHORITY, a body corporate with its head office at 333 Dunsmuir Street, Vancouver, British Columbia ("B.C. Hydro") ("the Customer''} (Each of B.C. Hydro and the Customer are referred to individually as the "Party" and collectively, as the "Parties") WHEREAS the Customer is currently receiving service from B.C. Hydro pursuant to Rate Schedule 1821 and the Electricity Supply Agreement approved by the British Columbia Utilities Commission, and in addition, wishes to take service from B.C. Hydro under Rate Schedule NOW THEREFORE, THIS AGREEMENT WITNESSES that the Parties agree as follows: 1. INTERPRETATION 1.1. Definitions The following definitions and any terms defined internally in this Agreement will apply to this Agreement and all notices and communications made pursuant to this Agreement: (a) (b) (c) "Business Day" means any day other than a Saturday, Sunday or a Statutory Holiday. "Calendar Hour" means a 60 minute period commencing at the start of the first minute of one of the 24 one hour periods in a day. "Mid-C Price" means the daily entry in the Dow JonesPlatts Mid Columbia (Mid- C) Firm Electricity on-peak (HLH) daily Price lndex for the High Load Hours (HLH) ACCEPTED: ORDER NO. COMMISSION SECRETARY BC Hydro Electric Tariff and Open Access Transmission Tariff Application to Replace S&P Dow Jones Mid Columbia Indices Page 3 of 3

24 Electric Tariff and Open Access Transmission Tariff Application to Replace S&P Dow Jones Mid Columbia Indices Appendix A-2 Electric Tariff Clean Version of the Affected Pages

25 Appendix A-2 BC Hydro Rate Schedules Effective: 13 September 2013 Thirteenth Revision of Page 24 SCHEDULE 1253 DISTRIBUTION SERVICE IPP STATION SERVICE Availability: Applicable in: For Customers who are Independent Power Producers (IPPs) served at distribution voltage, subject to the Special Conditions below. Rate Zone I excluding Districts of Kingsgate-Yahk and Lardeau-Shutty Bench. Rate: Energy Charge: The sum, over the Billing Period, of the hourly energy consumed multiplied by the entry in the Platts Mid Columbia (Mid-C) Firm on-peak (HLH) and Firm off-peak (LLH) daily price indices that corresponds to the time when consumption occurred, during that hour. Monthly Minimum Charge: Special Conditions: $ BC Hydro agrees to provide Electricity under this Schedule to the extent that it has energy and capacity to do so. 2. BC Hydro may, without notice to the Customer, terminate the supply of Electricity under this Schedule if at any time BC Hydro does not have sufficient energy or capacity. 3. Prior to taking Electricity under this Schedule, the Customer may be required to obtain approval from BC Hydro. BC Hydro will advise the Customer of the need to obtain approval prior to the taking of energy under this Schedule. 4. Electricity taken under this Schedule is to be used solely for maintenance and black-start requirements and shall not displace Electricity that would normally be generated by the Customer. Rate Rider: Rate Increase: The Deferral Account Rate Rider as set out in Rate Schedule 1901 applies to all charges payable under this Rate Schedule, before taxes and levies. Effective April 1, 2013 the Rates and Minimum Charge under these schedules include an increase of 1.44% before rounding, approved by BCUC Order No. G-77-12A, subject only to a Commission order under section 44.2 of the Utilities Commission Act respecting BC Hydro s F2014 expenditures on DSM. ACCEPTED: ORDER NO. COMMISSION SECRETARY BC Hydro Electric Tariff and Open Access Transmission Tariff Application to Replace S&P Dow Jones Mid Columbia Indices Page 1 of 3

26 Appendix A-2 BC Hydro Rate Schedules Effective: 13 September 2013 Thirteenth Revision of Page 57 SCHEDULE 1853 TRANSMISSION SERVICE IPP STATION SERVICE Availability: Applicable in: For Customers who are Independent Power Producers (IPPs) served at transmission voltage subject to the Special Conditions below. Rate Zone I excluding Districts of Kingsgate-Yahk and Lardeau-Shutty Bench. Rate: Energy Charge: The sum, over the Billing Period, of the hourly energy consumed multiplied by the entry in the Platts Mid- Columbia (Mid-C) Firm on-peak (HLH) and Firm off-peak (LLH) daily price indices that corresponds to the time when consumption occurred, during that hour. Minimum Monthly Charge: $35.81 Special Conditions: BC Hydro agrees to provide Electricity under this Schedule to the extent that it has energy and capacity to do so. BC Hydro may, without notice to the Customer, terminate the supply of Electricity under this Schedule if at any time BC Hydro does not have sufficient energy or capacity. Prior to taking Electricity under this Schedule, the Customer may be required to obtain approval from BC Hydro. BC Hydro will advise the Customer of the need to obtain approval prior to the taking of energy under this Schedule. Electricity taken under this Schedule is to be used solely for maintenance and black-start requirements and shall not displace Electricity that would normally be generated by the Customer. Taxes: Rate Rider: Rate Increase: The rates and minimum charge contained herein are exclusive of the Goods and Services tax and the Social Services tax. The Deferral Account Rate Rider as set out in Rate Schedule 1901 applies to all charges payable under this Rate Schedule, before taxes and levies. Effective April 1, 2013 the Rates and Minimum Charge under these schedules include an increase of 1.44% before rounding, approved by BCUC Order No. G-77-12A, subject only to a Commission order under section 44.2 of the Utilities Commission Act respecting BC Hydro s F2014 expenditures on DSM. ACCEPTED: ORDER NO. COMMISSION SECRETARY BC Hydro Electric Tariff and Open Access Transmission Tariff Application to Replace S&P Dow Jones Mid Columbia Indices Page 2 of 3

27 BC Hydro Electric Tariff Supplement No. 54 Appendix A-2 Fifth Revision of Page 1 of 15 Effective: September 13, 2013 MODIFIED DEMAND AGREEMENT Rate Schedule 1852 This Agreement, which together with all Demand Reduction Transactions is referred to as the "Agreement", is made to be effective on the day of 200_, BETWEEN: AND: BRITISH COLUMBIA HYDRO AND POWER AUTHORITY, a body corporate with its head office at 333 Dunsmuir Street, Vancouver, British Columbia ("B.C. Hydro") ("the Customer''} (Each of B.C. Hydro and the Customer are referred to individually as the "Party" and collectively, as the "Parties") WHEREAS the Customer is currently receiving service from B.C. Hydro pursuant to Rate Schedule 1821 and the Electricity Supply Agreement approved by the British Columbia Utilities Commission, and in addition, wishes to take service from B.C. Hydro under Rate Schedule NOW THEREFORE, THIS AGREEMENT WITNESSES that the Parties agree as follows: 1. INTERPRETATION 1.1. Definitions The following definitions and any terms defined internally in this Agreement will apply to this Agreement and all notices and communications made pursuant to this Agreement: (a) (b) (c) "Business Day" means any day other than a Saturday, Sunday or a Statutory Holiday. "Calendar Hour" means a 60 minute period commencing at the start of the first minute of one of the 24 one hour periods in a day. "Mid-C Price" means the daily entry in the Platts Mid Columbia (Mid-C) Firm onpeak (HLH) daily Price lndex ACCEPTED: ORDER NO. COMMISSION SECRETARY BC Hydro Electric Tariff and Open Access Transmission Tariff Application to Replace S&P Dow Jones Mid Columbia Indices Page 3 of 3

28 Electric Tariff and Open Access Transmission Tariff Application to Replace S&P Dow Jones Mid Columbia Indices Appendix B OATT Clean and Black-lined Versions of the Affected Pages

29 Electric Tariff and Open Access Transmission Tariff Application to Replace S&P Dow Jones Mid Columbia Indices Appendix B-1 OATT Black-lined Version of the Affected Pages

30 Schedule 06 Energy Imbalance Service (continued) Appendix B-1 BC Hydro Open Access Transmission Tariff Effective: 09 December September 2013 OATT Schedule 06 First Revision of Page 2 Energy Imbalance Energy imbalances are calculated hourly based on deviations from scheduled generation and load. Positive imbalances occur when actual generation is greater than scheduled generation or when actual load is less than scheduled load. Negative imbalances occur when actual generation is less than scheduled generation or when actual load is greater than scheduled load. 1. Positive imbalances that do not exceed 20 MWh over an Energy Imbalance Period, will be settled at BC Hydro s hourly Energy Imbalance Price for the amount of the imbalance that does not exceed 4 MW in any hour, and at BC Hydro's hourly buy price for the amount of the imbalance in any hour that exceeds that amount. 2. Positive imbalances that exceed 20 MWh over an Energy Imbalance Period will be settled at BC Hydro's hourly buy price for the entire amount of the imbalance over that Energy Imbalance Period. 3. Negative imbalances that do not exceed 20 MWh over an Energy Imbalance Period, will be settled at BC Hydro s hourly Energy Imbalance Price for the amount of the imbalance that does not exceed 4 MW in any hour, and at BC Hydro's hourly sell price for the amount of the imbalance in any hour that exceeds that amount. 4. Negative imbalances that exceed 20 MWh over an Energy Imbalance Period will be settled at BC Hydro's hourly sell price for the entire amount of the imbalance over that Energy Imbalance Period. BC Hydro s Energy Imbalance Price will be calculated hourly based on the average of BC Hydro's hourly buy price and BC Hydro's hourly sell price. Rate BC Hydro's hourly buy price for energy received is equal to the Dow JonesPlatts Mid-C Firm off-peak Daily Mid Columbia (LLH) Daily Index Price, less Bonneville Power Authority's (BPA) wheeling rate from B.C.- U.S Border to Mid- Columbia (Mid-C). On Sundays and NERC Holidays, BC Hydro's hourly buy price is equal to the Platts Mid-C Firm Sunday and NERC Holidays Daily Index Price, less the wheeling rate from B.C.-U.S. Border to Mid-C. If a BC Hydro system spill occurs during the month, the buy price for all hours of the month will be zero. ACCEPTED: ORDER NO. COMMISSION SECRETARY BC Hydro Electric Tariff and Open Access Transmission Tariff Application to Replace S&P Dow Jones Mid Columbia Indices Page 1 of 7

31 Appendix B-1 BC Hydro Open Access Transmission Tariff Effective: 09 December September 2013 OATT Schedule 06 First Revision of Page 3 BC Hydro's hourly sell price for energy provided during High Load Hours(HLH are hours ending 0700 to 2200) is set hourly as follows: BPA's Mid-C to U.S.-B.C. Border wheeling rate will be added to the Dow JonesPlatts Mid-C Firm on-peak Daily Mid Columbia (HLH) Daily Index Price and the result will be multiplied by the following factors to derive hourly prices. Hour Hour Hour Hour Hour Hour Hour Hour Hour Hour Hour Hour Hour Hour Hour Hour BC Hydro's hourly sell price for energy provided during Low Load Hours (LLH are hours ending 2300 to 0600) is equal to the Dow JonesPlatts Mid-C Firm off-peak (LLH) Daily Mid Columbia LLH Index Price, plus BPA's wheeling rate from Mid-C to the U.S.-B.C. Border. BC Hydro's hourly sell price for energy provided during Sundays and NERC Holidays is equal to the Dow JonesPlatts Mid-C Firm Sunday and NERC Holidays Daily Index Price, plus BPA's wheeling rate from Mid-C to the U.S.-B.C. Border. BPA's wheeling rate is available on the BPA OASIS website. Taxes Note The Charges contained herein are exclusive of applicable taxes. A description of the methodology for discounting Energy Imbalance Services provided under this Schedule is contained in Section 3 of the BC Hydro OATT. ACCEPTED: ORDER NO. COMMISSION SECRETARY BC Hydro Electric Tariff and Open Access Transmission Tariff Application to Replace S&P Dow Jones Mid Columbia Indices Page 2 of 7

32 BC Hydro Open Access Transmission Tariff Effective: April 18, 2013September 13, 2013 OATT Schedule 09 Fourth Fifth Revision of Page 1 Schedule 09 Appendix B-1 Loss Compensation Service Preamble To Transmission Customers taking Network Integration Transmission Service, Long and Short-Term Firm Point-to-Point Transmission Service, and Non-Firm Point to Point Transmission Service who have elected to take the Loss Compensation Service. Termination Date 1 March 2018 Rate Loss Compensation Service will be priced at BC Hydro s hourly sell price. BC Hydro's hourly sell price for energy provided during any hour in which the intertie for US to BC is fully utilized, as measured by zero Available Transmission Capacity at the close of the scheduling period for that hour, is the AESO Export Opportunity Service Rate (XOS) added to the greater of $0/MWh or the Alberta Power Pool price corresponding to that hour. If the intertie for the US to BC is not fully utilized, the following hourly prices apply. BC Hydro's hourly sell price for energy provided during High Load Hours (HLH are hours ending 0700 to 2200) is set hourly as follows: BPA's wheeling rate from Mid-C to the U.S.-B.C. Border will be added to the greater of $0/MWh or the Dow Jones Firm Daily Mid Columbia HLH IndexPlatts Mid-C Firm on-peak (HLH) Daily Index Price and the result will be multiplied by the following factors to derive hourly prices. Hour Hour Hour Hour Hour Hour Hour Hour Hour Hour Hour Hour Hour Hour Hour Hour ACCEPTED: ORDER NO. COMMISSION SECRETARY BC Hydro Electric Tariff and Open Access Transmission Tariff Application to Replace S&P Dow Jones Mid Columbia Indices Page 3 of 7

33 Appendix B-1 BC Hydro Open Access Transmission Tariff Effective: April 18, 2013September 13, 2013 OATT Schedule 09 Fourth Fifth Revision of Page 2 BC Hydro's hourly sell price for energy provided during Low Load Hours (LLH are hours ending 2300 to 0600) is equal to BPA's wheeling rate from Mid-C to the U.S.-B.C. Border plus the greater of $0/MWh or the Dow Jones Firm Daily Mid Columbia LLH IndexPlatts Mid-C Firm off-peak (LLH) ddaily Index Price. BC Hydro's hourly sell price for energy provided during Sundays and NERC Holidays is equal to BPA's wheeling rate from Mid-C to the U.S.- B.C. Border plus the greater of $0/MWh or the Dow JonesPlatts Mid-C Firm Sunday and NERC Holidays ddaily Index Price. AESO's XOS Rate is available on the AESO website. BPA's wheeling rate is available on the BPA OASIS website Taxes The Rate and Charges contained herein are exclusive of applicable taxes. ACCEPTED: ORDER NO. COMMISSION SECRETARY BC Hydro Electric Tariff and Open Access Transmission Tariff Application to Replace S&P Dow Jones Mid Columbia Indices Page 4 of 7

34 BC Hydro Tariff Supplements Effective: April 18, 2013September 13, 2013 Tariff Supplement No. 80 First Second Revision of Page 1 of 2 Network Economy Service Appendix B-1 1. In this Tariff Supplement: Burrard Heat Rate means the heat rate used by British Columbia Hydro and Power Authority (BC Hydro) in making economic decisions about whether to run Burrard Thermal Generating Station. Sumas 2 Gas Index means the Midpoint Price listed in Gas Daily for Northwest, Canadian Border (Sumas). Threshold Purchase Price means the Threshold Purchase Price, as defined, and as determined from time to time, in the Transfer Pricing Agreement for Electricity and Gas between BC Hydro and Powerex Corp, dated April 1, Network Economy Service is as defined in section 1 of Attachment Q For the purposes of section 2 of Attachment Q-2 to the Tariff: (a) (b) During the period from March 1 to October 31, the Trigger Price is the Threshold Purchase Price; During the period from November 1 to February 28 or February 29, as applicable, the Trigger Price is: (i) (ii) for transactions at the BC-US intertie, the Sumas 2 Gas Index multiplied by the Burrard Heat Rate; and for transactions at the BC-Alberta intertie, the Threshold Purchase Price. (c) At all times, in the case of imports using Network Economy Service over the US- BC intertie, the Market Price is: (i) (ii) for Hours Ending 07:00:00 to 22:00:00 (Monday to Saturday, excluding US NERC Holidays) the Mid-C Heavy Load Hour price as reported by Dow JonesPlatts Mid-C Firm on-peak (HLH) Daily Index Price, net of transmission losses, from the last day available as of 17:00:00 of each current day; and for Hours Ending 01:00:00 to 06:00:00, Hour Ending 23:00:00 and Hour Ending 24:00:00, Monday to Saturday; all day Sunday; and all US NERC Holidays: the Platts Mid-C Firm off-peak (LLH) ddaily Index PriceMid-C Light Load Hour price as reported by Dow Jones, net of transmission losses, from the last day available as of 17:00:00 of each current day. ACCEPTED: ORDER NO. COMMISSION SECRETARY BC Hydro Electric Tariff and Open Access Transmission Tariff Application to Replace S&P Dow Jones Mid Columbia Indices Page 5 of 7

Portland General Electric Company Tenth Revision of Sheet No. 76R-1 P.U.C. Oregon No. E-18 Canceling Ninth Revision of Sheet No.

Portland General Electric Company Tenth Revision of Sheet No. 76R-1 P.U.C. Oregon No. E-18 Canceling Ninth Revision of Sheet No. Portland General Electric Company Tenth Revision of Sheet No. 76R-1 P.U.C. Oregon No. E-18 Canceling Ninth Revision of Sheet No. 76R-1 PURPOSE SCHEDULE 76R PARTIAL REQUIREMENTS ECONOMIC REPLACEMENT POWER

More information

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-26 STANDARD PRICE PLAN FOR RESIDENTIAL TIME-OF-USE SERVICE

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-26 STANDARD PRICE PLAN FOR RESIDENTIAL TIME-OF-USE SERVICE SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-26 STANDARD PRICE PLAN FOR RESIDENTIAL TIME-OF-USE SERVICE Effective: April 2015 Billing Cycle Supersedes: November 2012 Billing Cycle AVAILABILITY:

More information

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-29

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-29 SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-29 EXPERIMENTAL PRICE PLAN FOR TIME-OF-USE SERVICE WITH SUPER OFF-PEAK FOR ELECTRIC VEHICLES Effective: April 2015 Billing Cycle AVAILABILITY:

More information

Errata to BPA POWER PRODUCTS CATALOG September 1999. Factoring Product Availability section remove second sentence. See attached replacement page.

Errata to BPA POWER PRODUCTS CATALOG September 1999. Factoring Product Availability section remove second sentence. See attached replacement page. Errata to BPA POWER PRODUCTS CATALOG September 1999 Page 16: Page 17: Page 24: Page 25: Factoring Product Availability section remove second sentence. See attached replacement page. Detailed Description:

More information

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-33 EXPERIMENTAL PRICE PLAN FOR SUPER PEAK TIME-OF-USE GENERAL SERVICE

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-33 EXPERIMENTAL PRICE PLAN FOR SUPER PEAK TIME-OF-USE GENERAL SERVICE SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-33 EXPERIMENTAL PRICE PLAN FOR SUPER PEAK TIME-OF-USE GENERAL SERVICE Effective: April 2015 Billing Cycle Supersedes: November 2012 Billing

More information

ALCOA POWER GENERATING INC. Long Sault Division. Open Access Transmission Tariff

ALCOA POWER GENERATING INC. Long Sault Division. Open Access Transmission Tariff Alcoa Power Generating Inc. Long Sault Division ALCOA POWER GENERATING INC. Long Sault Division Open Access Transmission Tariff The following sheets reflect all revisions submitted to the Federal Energy

More information

SERVICE CLASSIFICATION NO. 14-RA STANDBY SERVICE

SERVICE CLASSIFICATION NO. 14-RA STANDBY SERVICE Fourth Revised Leaf No. 135 Consolidated Edison Company Superseding Second Revised Leaf No. 135 of New York, Inc. (Third Revised Leaf No. 135 Canceled) Applicable to Use of Service for SERVICE CLASSIFICATION

More information

CITY OF AUSTIN ELECTRIC RATE SCHEDULES

CITY OF AUSTIN ELECTRIC RATE SCHEDULES Time-Of-Use Option In lieu of the Charges above, customers receiving service under this rate schedule may choose the following time-of-use charges to be applied for a term of not less than twelve consecutive

More information

SERVICE CLASSIFICATION NO. 14-RA STANDBY SERVICE

SERVICE CLASSIFICATION NO. 14-RA STANDBY SERVICE Fourth Revised Leaf No. 135 Consolidated Edison Company Superseding Second Revised Leaf No. 135 (Third Revised Leaf No. 135 Canceled) Applicable to Use of Service for SERVICE CLASSIFICATION NO. 14-RA STANDBY

More information

MISO Schedule 41 Charge to Recover Costs of Entergy Storm Securitization SCHEDULES 33.0.0 SCHEDULE 41

MISO Schedule 41 Charge to Recover Costs of Entergy Storm Securitization SCHEDULES 33.0.0 SCHEDULE 41 SCHEDULE 41 Charges from Entergy Operating Companies Pricing Zones I. GENERAL This Schedule 41 provides for the recovery of the storm securitization charges consistent with settlement agreements approved

More information

TENNESSEE VALLEY AUTHORITY. TRANSMISSION SERVICE GUIDELINES 2013 Edition

TENNESSEE VALLEY AUTHORITY. TRANSMISSION SERVICE GUIDELINES 2013 Edition TENNESSEE VALLEY AUTHORITY TRANSMISSION SERVICE GUIDELINES EFFECTIVE DECEMBER 1, 2013 Original Sheet No. 2 TABLE OF CONTENTS FOREWORD... 9 I. COMMON SERVICE PROVISIONS... 9 1 Definitions... 9 1.1 Affiliate...

More information

NEW JERSEY ELECTRICITY SUPPLIER LICENSE NUMBER PSEL 0016

NEW JERSEY ELECTRICITY SUPPLIER LICENSE NUMBER PSEL 0016 TERMS & CONDITIONS NEW JERSEY ELECTRICITY SUPPLIER LICENSE NUMBER PSEL 0016 Purchase of Electric Generation Service Constellation NewEnergy, Inc. ("Constellation") agrees to sell, and you agree to buy,

More information

SCHEDULE 1. Scheduling, System Control and Dispatch Service

SCHEDULE 1. Scheduling, System Control and Dispatch Service Seventh Revised Volume No. 5 (MT) Original Sheet No. 71 SCHEDULE 1 Scheduling, System Control and Dispatch Service This service is required to schedule the movement of power through, out of, within, or

More information

TARIFF FOR ELECTRIC SERVICE. I.U.R.C. No. E-13

TARIFF FOR ELECTRIC SERVICE. I.U.R.C. No. E-13 Southern Indiana Gas and Electric Company D/B/A Sheet No. 1 Vectren Energy Delivery of Indiana, Inc. (Vectren South) Original Title Page SOUTHERN INDIANA GAS AND ELECTRIC COMPANY D/B/A VECTREN ENERGY DELIVERY

More information

TRANSMISSION SERVICES MANUAL

TRANSMISSION SERVICES MANUAL TRANSMISSION SERVICES MANUAL Transmission Services Manual Version: 2.0 Revision Date: January 20, 2005 Committee Approved: January 19, 2005 Effectivity Date: February 1, 2005 Disclaimer The information

More information

Response to Jean Binette Information Request No. 1. Terasen Gas respectfully submits the attached responses to the above noted Information Request.

Response to Jean Binette Information Request No. 1. Terasen Gas respectfully submits the attached responses to the above noted Information Request. Scott A. Thomson VP, Finance & Regulatory Affairs and Chief Financial Officer 16705 Fraser Highway Surrey, B.C. V3S 2X7 Tel: (604) 592-7784 Fax: (604) 592-7890 Email: scott.thomson@terasengas.com www.terasengas.com

More information

CANTOR EXCHANGE FOREIGN EXCHANGE RATE SPOT INDEX DAILY FUTURES AND BINARY FLEX OPTION CONTRACT RULES

CANTOR EXCHANGE FOREIGN EXCHANGE RATE SPOT INDEX DAILY FUTURES AND BINARY FLEX OPTION CONTRACT RULES CANTOR EXCHANGE FOREIGN EXCHANGE RATE SPOT INDEX DAILY FUTURES AND BINARY FLEX OPTION CONTRACT RULES I-1. Scope and Underlying (a) This Chapter governs transactions involving all Contracts derived from

More information

Schedule 19 POWER PURCHASES FROM COGENERATION AND SMALL POWER PRODUCTION QUALIFYING FACILITIES

Schedule 19 POWER PURCHASES FROM COGENERATION AND SMALL POWER PRODUCTION QUALIFYING FACILITIES I. APPLICABILITY & AVAILABILITY This Schedule is applicable to any Cogenerator or Small Power Producer (Qualifying Facility), as defined in the Public Utility Regulatory Policies Act of 1978 (PURPA), which

More information

A Guide to the. BC Hydro Last Updated: July, 2012

A Guide to the. BC Hydro Last Updated: July, 2012 A Guide to the Large General Service Conservation Rate BC Hydro Last Updated: July, 2012 Executive summary Large General Service (LGS) accounts pay for electricity according to the LGS Conservation Rate

More information

ELECTRIC SCHEDULE E-9 EXPERIMENTAL RESIDENTIAL TIME-OF-USE SERVICE FOR LOW EMISSION VEHICLE CUSTOMERS

ELECTRIC SCHEDULE E-9 EXPERIMENTAL RESIDENTIAL TIME-OF-USE SERVICE FOR LOW EMISSION VEHICLE CUSTOMERS Revised Cal. P.U.C. Sheet No. 31575-E Cancelling Revised Cal. P.U.C. Sheet No. 29680-E ELECTRIC SCHEDULE E-9 APPLICABILITY: This optional experimental schedule applies to electric service to customers

More information

The Empire District Electric Company. Rate Sheet for Point-To-Point Transmission Service

The Empire District Electric Company. Rate Sheet for Point-To-Point Transmission Service The Empire District Electric Company Rate Sheet for Point-To-Point Transmission Service Firm Point-To-Point Transmission Service The Transmission Customer shall compensate the Transmission Provider each

More information

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION. No. L-1/(3)/2009-CERC Dated the 7 th August 2009

CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION. No. L-1/(3)/2009-CERC Dated the 7 th August 2009 CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI NOTIFICATION No. L-1/(3)/2009-CERC Dated the 7 th August 2009 In exercise of powers conferred by section 178 of the Electricity Act, 2003 and all other

More information

Re: FortisBC Energy Inc. An Application to Recover Final Project Costs in the Fraser River South Arm Crossing Upgrade Project

Re: FortisBC Energy Inc. An Application to Recover Final Project Costs in the Fraser River South Arm Crossing Upgrade Project ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA EMAIL gas. regu latory.affa irs@fortisbc.com September 17, 2012 SIXTH FLOOR, 900 HOWE STREET, BOX 250

More information

Standard conditions of the Electricity Distribution Licence

Standard conditions of the Electricity Distribution Licence Gas and Electricity Markets Authority ELECTRICITY ACT 1989 Standard conditions of the Electricity Distribution Licence Statutory Consultation: 29 April 2008 SECTION A: STANDARD CONDITIONS FOR ALL ELECTRICITY

More information

VIA EMAIL February 20, 2015. Regulated Utilities Stakeholders

VIA EMAIL February 20, 2015. Regulated Utilities Stakeholders ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL FREE:

More information

STANDARD ELECTRIC PRICE PLANS SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT. Corporate Pricing

STANDARD ELECTRIC PRICE PLANS SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT. Corporate Pricing STANDARD ELECTRIC PRICE PLANS SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT Corporate Pricing For additional information, please call 602-236-5522 or 602-236-2950 TEMPORARY Prices Effective

More information

Demand Response Programs

Demand Response Programs Southern California Edison Demand Response Programs Join thousands of businesses that work with us to reduce peak electricity use when California needs it most. By participating in Demand Response programs,

More information

February 2, 2015. Honourable Robert R. McLeod Premier, Government of the Northwest Territories P.O. Box 1320 Yellowknife, NT X1A 2L9.

February 2, 2015. Honourable Robert R. McLeod Premier, Government of the Northwest Territories P.O. Box 1320 Yellowknife, NT X1A 2L9. February 2, 2015 Honourable Robert R. McLeod Premier, Government of the Northwest Territories P.O. Box 1320 Yellowknife, NT X1A 2L9 Dear Sir: Re: 2014 Northwest Territories Energy Charrette Report released

More information

AGCS Gas Clearing and Settlement AG

AGCS Gas Clearing and Settlement AG Annex to the General Terms and Conditions of the Balance Group Coordinator (GTC BGC) Balancing energy management in the Eastern distribution area V 5.0 Annex Balancing energy management Version 5.0 Page

More information

Wrap ISA and Wrap Personal Portfolio 1/26

Wrap ISA and Wrap Personal Portfolio 1/26 Wrap ISA and Wrap Personal Portfolio 1/26 Terms and conditions These terms govern your relationship with Standard Life Savings, a company authorised and regulated by the FCA which is part of the Standard

More information

Key Take Away : There are 4 types of MISO transmission transactions : 1) Drive- In, 2) Drive-Within, 3) Drive-through, and 4) Drive-Out

Key Take Away : There are 4 types of MISO transmission transactions : 1) Drive- In, 2) Drive-Within, 3) Drive-through, and 4) Drive-Out 1 2 3 Key Take Away : There are 4 types of MISO transmission transactions : 1) Drive- In, 2) Drive-Within, 3) Drive-through, and 4) Drive-Out Speaker Notes: Drive-In refers to transactions that originate

More information

SETTLEMENT AND BILLING PROTOCOL (SABP) OBJECTIVES, DEFINITIONS AND SCOPE

SETTLEMENT AND BILLING PROTOCOL (SABP) OBJECTIVES, DEFINITIONS AND SCOPE SETTLEMENT AND BILLING PROTOCOL (SABP) SABP 1 OBJECTIVES, DEFINITIONS AND SCOPE SABP 1.1 Objectives The objective of this Protocol (and of Annex 1) is to inform Scheduling Coordinators, Participating TOs

More information

Southern California Edison Revised Cal. PUC Sheet No. 55628-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No. 55628-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 55628-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 53984-E Schedule D Sheet 1 APPLICABILITY Applicable to domestic service

More information

1. Key Dates for Pool Settlement 1. 2. Where to find the Pool Statements 2. 3. On-going Reporting to Pool Participants 2

1. Key Dates for Pool Settlement 1. 2. Where to find the Pool Statements 2. 3. On-going Reporting to Pool Participants 2 Settlement Process Your Guide to the wholesale electricity market January 2010 Table of Contents 1. Key Dates for Pool Settlement 1 2. Where to find the Pool Statements 2 3. On-going Reporting to Pool

More information

Appendix D: Electricity Price Forecast Preliminary Draft

Appendix D: Electricity Price Forecast Preliminary Draft Preliminary Draft Introduction... 1 Findings... 2 Approach and Assumptions... 5 Demand Growth... 5 Firm Capacity Standards... 6 Planning Reserve Margin Targets... 6 Firm Capacity Credit... 7 Existing Resources...

More information

GIP. 3.2.3 Net Zero Interconnection Service.

GIP. 3.2.3 Net Zero Interconnection Service. GIP and GIA Energy Displacement Agreement shall mean an agreement between an Interconnection Customer with a commercially operating Generating Facility on the Transmission Provider s Transmission System

More information

Appendix A. Glossary. For. 2016 Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC

Appendix A. Glossary. For. 2016 Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC Appendix A Glossary For 2016 Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC Entergy Services, Inc. June 8, 2016 Website means the internet website https://spofossil.entergy.com/entrfp/send/2016ellrenewablerfp/index.htm.

More information

Nodal Exchange Contract Specifications

Nodal Exchange Contract Specifications Nodal Exchange Contract Specifications Monthly Day Ahead On-Peak Power Contract Specification Cash Settled Financial On-Peak Power. Financial On-Peak, [PJM/NYISO/MISO/MISO-RTO/ISO- NE/CAISO/ERCOT] [Nodal

More information

ELECTRIC SCHEDULE AG-V Sheet 1 SHORT-PEAK TIME-OF-USE AGRICULTURAL POWER

ELECTRIC SCHEDULE AG-V Sheet 1 SHORT-PEAK TIME-OF-USE AGRICULTURAL POWER Revised Cal. P.U.C. Sheet No. 35786-E Cancelling Revised Cal. P.U.C. Sheet No. 35141-E ELECTRIC SCHEDULE AG-V Sheet 1 1. APPLICABILITY: This schedule is closed to new customers. Customers taking service

More information

CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007

CANADIAN RENEWABLE ENERGY POLICIES. Matthew H. Brown InterEnergy Solutions 2007 CANADIAN RENEWABLE ENERGY POLICIES Matthew H. Brown InterEnergy Solutions 2007 The following offers an overview of Canadian federal and provincial policies that promote renewable energy. It is excerpted

More information

THE CONNECTICUT LIGHT AND POWER COMPANY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18

THE CONNECTICUT LIGHT AND POWER COMPANY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18 TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18 1. Applicability 1A. The following Terms and Conditions shall apply to every registered Electric Supplier authorized to do business within Connecticut

More information

YANKEE GAS SERVICES COMPANY, DBA EVERSOURCE ENERGY. TRANSPORTATION RECEIPT SERVICE Page 1 of 11

YANKEE GAS SERVICES COMPANY, DBA EVERSOURCE ENERGY. TRANSPORTATION RECEIPT SERVICE Page 1 of 11 Page 1 of 11 AVAILABILITY: Available to any Customer acting as its own supplier or approved Operator of gas supply (Operator) delivering gas supplies to a customer or Pool(s) of customers using Rates 03,

More information

Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme

Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme Model Renewable Energy Wheeling Agreement under Renewable Energy Certificate (REC) scheme This agreement made at on this day of two thousand between M/s. (Renewable Energy Generator name and address) hereinafter

More information

March 2, 2007. British Columbia Utilities Commission 6th Floor, 900 Howe Street Vancouver, B.C. V6Z 2N3

March 2, 2007. British Columbia Utilities Commission 6th Floor, 900 Howe Street Vancouver, B.C. V6Z 2N3 Scott A. Thomson VP, Finance & Regulatory Affairs and Chief Financial Officer 16705 Fraser Highway Surrey, B.C. V4N 0E8 Tel: (604) 592-7784 Fax: (604) 576-7074 Email: scott.thomson@terasengas.com www.terasengas.com

More information

Virginia Electric and Power Company Subsection A 4 Rate Adjustment Clause. Direct Testimony and Exhibits

Virginia Electric and Power Company Subsection A 4 Rate Adjustment Clause. Direct Testimony and Exhibits Virginia Electric and Power Company Subsection A 4 Rate Adjustment Clause Table of Contents Direct Testimony and Exhibits David M. Wilkinson James D. Jackson, Jr. Paul B. Haynes Filing Schedule 46 Filing

More information

Table of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure

Table of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure No. 2310 Table of Contents Purpose... 2 1. Responsibilities... 2 2. Scope/Applicability... 2 2.1 Background... 2 2.2 Scope / Applicability... 2 3. Detail... 3 3.1 Energy Dispatching... 3 3.1.2 Real-Time

More information

FERC Gas Tariff. Original Volume No. 1 RYCKMAN CREEK RESOURCES, LLC. Filed with the FEDERAL ENERGY REGULATORY COMMISSION

FERC Gas Tariff. Original Volume No. 1 RYCKMAN CREEK RESOURCES, LLC. Filed with the FEDERAL ENERGY REGULATORY COMMISSION FERC Gas Tariff Original Volume No. 1 Of RYCKMAN CREEK RESOURCES, LLC Filed with the FEDERAL ENERGY REGULATORY COMMISSION Communications covering this tariff should be addressed to: Jeff Foutch, Managing

More information

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations G1 DEFINITIONS In the ISO rules: acceptable operational reason means with respect to a source asset, any one or more of the following: i) a circumstance related to the operation of the generating asset

More information

Schedule No. OGS-3-HOPU OPTIONAL LARGE GENERAL SERVICE - HIGH OFF-PEAK USE APPLICABLE

Schedule No. OGS-3-HOPU OPTIONAL LARGE GENERAL SERVICE - HIGH OFF-PEAK USE APPLICABLE 6100 Neil Road, Reno, Nevada 67th Revised PUCN Sheet No. 79 Tariff No. Electric No. 1 Cancelling 66th Revised PUCN Sheet No. 79 APPLICABLE This schedule is available as an option to Schedule No. GS-3 for

More information

December 11, 2015. CBOE Futures Exchange, LLC Rule Certification Submission Number CFE-2015-034

December 11, 2015. CBOE Futures Exchange, LLC Rule Certification Submission Number CFE-2015-034 December 11, 2015 Mr. Christopher Kirkpatrick Secretary Commodity Futures Trading Commission Three Lafayette Centre 1155 21st Street, N.W. Washington, D.C. 20581 Re: CBOE Futures Exchange, LLC Rule Certification

More information

THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20

THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20 TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20 1. Applicability 1A. The following Terms and Conditions shall apply to every registered Electric Supplier authorized to do business within Connecticut

More information

Electric Rate Book Revision: 13 (12-17-15) Page No. 1 Effective date: 1-1-16 SMALL COMMERCIAL

Electric Rate Book Revision: 13 (12-17-15) Page No. 1 Effective date: 1-1-16 SMALL COMMERCIAL Connexus Energy Section III - Business Electric Rate Book Revision: 13 (12-17-15) Page No. 1 Effective date: 1-1-16 SMALL COMMERCIAL Availability Available to non-residential customers for either single-phase

More information

American Electric Power Service Corporation. Order No. EA-200

American Electric Power Service Corporation. Order No. EA-200 American Electric Power Service Corporation Order No. EA-200 I. BACKGROUND Exports of electricity from the United States to a foreign country are regulated and require authorization under section 202(e)

More information

Commercial and Industrial Electric Rates

Commercial and Industrial Electric Rates Commercial and Industrial Electric Rates INTERIM DAKOTA ELECTRIC ASSOCIATION SECTION: V 4300 220 th Street West SHEET: 4 Farmington, MN 55024 REVISION: 16 SCHEDULE 36 IRRIGATION SERVICE Availability Available

More information

FORTISBC INC. - KOOTENAY OPERATIONS CENTRE CPCN EXHIBIT A-7

FORTISBC INC. - KOOTENAY OPERATIONS CENTRE CPCN EXHIBIT A-7 ERICA HAMILTON COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL FREE:

More information

A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM)

A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM) A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM) Non-technical summary High level design Draft Decision Paper SEM -14-047 June 2014 1 INTRODUCTION

More information

CMS Marketing, Services and Trading Company

CMS Marketing, Services and Trading Company I. BACKGROUND CMS Marketing, Services and Trading Company Order No. EA-223 Exports of electricity from the United States to a foreign country are regulated and require authorization under section 202(e)

More information

Network Upgrades andSIAs Under California Tariff Clarifications

Network Upgrades andSIAs Under California Tariff Clarifications California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 July 11, 2013 Re: California Independent

More information

Exshaw Oil Corporation

Exshaw Oil Corporation Decision 2014-136 10.7-MW Power Plant Exemption May 16, 2014 The Alberta Utilities Commission Decision 2014-136: 10.7-MW Power Plant Exemption Application No. 1610332 Proceeding No. 3087 May 16, 2014 Published

More information

CLERMONT COUNTY PUBLIC LIBRARY BOARD OF TRUSTEES BY-LAWS

CLERMONT COUNTY PUBLIC LIBRARY BOARD OF TRUSTEES BY-LAWS Article I Name This organization shall be called The Board of Trustees of the Clermont County Public Library existing by virtue of the provision of section 3375.22 of the ORC, and exercising the powers

More information

THE NT EUROPE (ex-uk) EQUITY INDEX FUND

THE NT EUROPE (ex-uk) EQUITY INDEX FUND THE NT EUROPE (ex-uk) EQUITY INDEX FUND 1 2 02 Supplement to the Prospectus Northern Trust Investment Funds plc THE NT EUROPE (ex-uk) EQUITY INDEX FUND 3 This Supplement contains specific information in

More information

BRITISH COLUMBIA TRANSIT

BRITISH COLUMBIA TRANSIT Audited Financial Statements of BRITISH COLUMBIA TRANSIT Years ended March 31, 2005 and 2004 AUDITOR S REPORT BC TRANSIT 41 REPORT OF MANAGEMENT Years ended March 31, 2005 and 2004 The financial statements

More information

TARIFF APPLICABLE TO GAS SERVICE MOBILE GAS SERVICE CORPORATION. Original Volume 1. Superseding:

TARIFF APPLICABLE TO GAS SERVICE MOBILE GAS SERVICE CORPORATION. Original Volume 1. Superseding: TARIFF APPLICABLE TO GAS SERVICE OF MOBILE GAS SERVICE CORPORATION Original Volume 1 Superseding: The company s tariffs effective December 1, 1995 and all subsequent revisions thereof. Communications covering

More information

BC Hydro will submit its further report by September 16, 2008 as requested in the BCUC's letter of July 21, 2008.

BC Hydro will submit its further report by September 16, 2008 as requested in the BCUC's letter of July 21, 2008. BChydro Joanna Sofield Chief Regulatory Officer Phone: (604) 623-4046 Fax: (604) 623-4407 regulatory.group@bchydro.com August 5,2008 Ms. Erica M. Hamilton Commission Secretary British Columbia Utilities

More information

Synergy Global Advantage Gold. Fixed Indexed Universal Life Insurance Consumer Brochure. Distributed by:

Synergy Global Advantage Gold. Fixed Indexed Universal Life Insurance Consumer Brochure. Distributed by: Synergy Global Advantage Gold Fixed Indexed Universal Life Insurance Consumer Brochure Distributed by: ADV 1188 (12-2011) Fidelity & Guaranty Life Insurance Company Rev. 09-2014 14-680 Synergy Global Advantage

More information

Piedmont Natural Gas Company, Inc. Tennessee Index of Tariff & Service Regulations

Piedmont Natural Gas Company, Inc. Tennessee Index of Tariff & Service Regulations Tennessee Index of Tariff & Service Regulations Rate Schedule 301 Rate Schedule 302 Rate Schedule 303 Rate Schedule 304 Rate Schedule 306 Rate Schedule 307 Rate Schedule 309 Rate Schedule 310 Rate Schedule

More information

BILLING & COLLECTIONS SERVICES STATEMENT OF GENERALLY AVAILABLE TERMS AND CONDITIONS

BILLING & COLLECTIONS SERVICES STATEMENT OF GENERALLY AVAILABLE TERMS AND CONDITIONS BILLING & COLLECTIONS SERVICES STATEMENT OF GENERALLY AVAILABLE TERMS AND CONDITIONS Description of Service This Statement of Generally Available Terms and Conditions ( Statement ) provides details under

More information

Introduction to Ontario's Physical Markets

Introduction to Ontario's Physical Markets Introduction to Ontario's Physical Markets Introduction to Ontario s Physical Markets AN IESO MARKETPLACE TRAINING PUBLICATION This document has been prepared to assist in the IESO training of market

More information

SERVICE CLASSIFICATION NO. 9. TRANSPORTATION SERVICE (TS) Table of Contents. (Service Classification No. 9 - Continued on Leaf No. 255.

SERVICE CLASSIFICATION NO. 9. TRANSPORTATION SERVICE (TS) Table of Contents. (Service Classification No. 9 - Continued on Leaf No. 255. PSC NO: 9 GAS LEAF: 254 COMPANY: CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. REVISION: 2 INITIAL EFFECTIVE DATE: 10/01/08 SUPERSEDING REVISION: 1 STAMPS: Issued in Compliance with Order in Case 06-G-1332

More information

IN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473. and

IN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473. and BRITISH C OLUMBIA U TILITIES C OMMISSION O RDER N UMBER G-86-03 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. V6Z 2N3 CANADA web site: http://www.bcuc.com TELEPHONE: (604) 660-4700 BC TOLL FREE:

More information

Ancillary Services and Flexible Generation

Ancillary Services and Flexible Generation Ancillary Services and Flexible Generation Contents Ancillary Services Overview Types of Ancillary Services Market Impact Benefits of Medium Speed Solution Contact Information What are Ancillary Services?

More information

IMPORTANT INFORMATION FOR SHAREHOLDERS. Notice of the Special Meeting of Shareholders and Information Circular. March 4, 2013

IMPORTANT INFORMATION FOR SHAREHOLDERS. Notice of the Special Meeting of Shareholders and Information Circular. March 4, 2013 IMPORTANT INFORMATION FOR SHAREHOLDERS Notice of the Special Meeting of Shareholders and Information Circular March 4, 2013 CARDIOME PHARMA CORP. 6190 Agronomy Road, Suite 405 Vancouver, B.C. V6T 1Z3 NOTICE

More information

Florida Corporate Short Form Income Tax Return. For tax year beginning on or after January 1, (Continued on Page 2)

Florida Corporate Short Form Income Tax Return. For tax year beginning on or after January 1, (Continued on Page 2) FEIN: Taxable Year End: Florida Corporate Short Form Income Tax Return For tax year beginning on or after January 1 F-1120A Rule 12C-1.051 Florida Administrative Code Effective 01/15 Where to Send Payments

More information

The Alberta Electricity Market Frequently Asked Questions

The Alberta Electricity Market Frequently Asked Questions The Alberta Electricity Market Frequently Asked Questions NOTE: Responses have been gathered from the official websites and public materials of the Government of Alberta, Alberta Utilities Commission,

More information

N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS

N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS 14:8-4.1 Scope This subchapter sets forth net metering requirements that apply to electric power suppliers, basic generation service providers

More information

AND IN THE MATTER OF THE MUTUAL RELIANCE REVIEW SYSTEM FOR EXEMPTIVE RELIEF APPLICATIONS AND IN THE MATTER OF SNC-LAVALIN GROUP INC.

AND IN THE MATTER OF THE MUTUAL RELIANCE REVIEW SYSTEM FOR EXEMPTIVE RELIEF APPLICATIONS AND IN THE MATTER OF SNC-LAVALIN GROUP INC. IN THE MATTER OF THE SECURITIES LEGISLATION OF BRITISH COLUMBIA, ALBERTA, SASKATCHEWAN, MANITOBA, ONTARIO, QUÉBEC, NEWFOUNDLAND AND LABRADOR AND NOVA SCOTIA AND IN THE MATTER OF THE MUTUAL RELIANCE REVIEW

More information

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY NET METERING PROVISION

MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY NET METERING PROVISION Sheet 1 Applicability The following tariff provisions shall be applicable to a Host Customer, as defined herein, that requests net metering services from the Distribution Company, with the exception of

More information

Blue NRG Terms and Conditions Solar Feed in tariff customers (Victoria)

Blue NRG Terms and Conditions Solar Feed in tariff customers (Victoria) PREAMBLE These terms and conditions are annexed as an addendum to your market retail contract between you and us. This contract addendum concerns the sale of energy from a small renewable energy generation

More information

PROFESSIONAL SERVICES AGREEMENT FOR FINANCIAL ADVISOR

PROFESSIONAL SERVICES AGREEMENT FOR FINANCIAL ADVISOR PROFESSIONAL SERVICES AGREEMENT FOR FINANCIAL ADVISOR This agreement for the provision of financial advisory services ( Agreement ) has been entered into this 21 st day of April, 2015 ( Effective Date

More information

135 FERC 61,202 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

135 FERC 61,202 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 135 FERC 61,202 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. Entergy

More information

Columbia Gas Transmission, LLC Section 4.11. Original Volume No. 1.1 Version 0.0.0. Non-Conforming Service Agreement No. 155679.

Columbia Gas Transmission, LLC Section 4.11. Original Volume No. 1.1 Version 0.0.0. Non-Conforming Service Agreement No. 155679. Columbia Gas Transmission, LLC Section 4.11 FERC NGA Gas Tariff Non-Conf Neg Rate Svc Agmts Original Volume No. 1.1 Version 0.0.0 Non-Conforming Service Agreement No. 155679 City of Richmond Agreement

More information

Kaua' i Island Utility Cooperative Your Touchstone Energy' Cooperative r ^ ^

Kaua' i Island Utility Cooperative Your Touchstone Energy' Cooperative r ^ ^ Kaua' i Island Utility Cooperative Your Touchstone Energy' Cooperative r ^ ^ May 6, 2013 The Honorable Chair and Members of the ^ o "^ " " Hawaii Public Utilities Commission ^ ^ oo ^ 465 South King Street

More information

Platinum Series Fixed Indexed Universal Life Insurance Disclosure Supplement to Application

Platinum Series Fixed Indexed Universal Life Insurance Disclosure Supplement to Application 4343 N. Scottsdale Rd., Suite 300 Scottsdale, Arizona 85251 888-724-4267 Platinum Series Fixed Indexed Universal Life Insurance Disclosure Supplement to Application This Disclosure Supplement describes

More information

Saudi Arabian Oil Company (Saudi Aramco)

Saudi Arabian Oil Company (Saudi Aramco) Saudi Arabian Oil Company (Saudi Aramco) Summary Plan Description Retirement Income Plan U.S. Dollar Employees January 1, 2016 Table of Contents WHO IS ELIGIBLE... 1 COST AND FUNDING... 2 VESTING... 2

More information

Energy and Consumer Impacts of EPA s Clean Power Plan. Prepared for the American Coalition for Clean Coal Electricity

Energy and Consumer Impacts of EPA s Clean Power Plan. Prepared for the American Coalition for Clean Coal Electricity Energy and Consumer Impacts of EPA s Clean Power Plan Prepared for the American Coalition for Clean Coal Electricity Contents Executive Summary Overview of the Clean Power Plan NERA Methodology Baseline

More information

Wrap ISA and Wrap Personal Portfolio 1/25

Wrap ISA and Wrap Personal Portfolio 1/25 Wrap ISA and Wrap Personal Portfolio 1/25 Terms and conditions Words in bold have a particular meaning when we use them in these terms. The meaning of these words can be found in the Glossary section in

More information

Duke Energy Carolinas, LLC Electricity No. 4 North Carolina Fourth Revised Leaf No. 78 Superseding North Carolina Third Revised Leaf No.

Duke Energy Carolinas, LLC Electricity No. 4 North Carolina Fourth Revised Leaf No. 78 Superseding North Carolina Third Revised Leaf No. AVAILABILTY (North Carolina only) Available on a limited and voluntary basis, at the Company s option to nonresidential customers receiving concurrent service from the Company on Schedule LGS, I, OPT-V

More information

Alberta Wholesale Market A description of basic structural features undertaken as part of the 2012 State of the Market Report

Alberta Wholesale Market A description of basic structural features undertaken as part of the 2012 State of the Market Report Alberta Wholesale Market A description of basic structural features undertaken as part of the 2012 State of the Market Report August 30, 2012 Market Surveillance Administrator 403.705.3181 #500, 400 5th

More information

PROVO CITY UTILITIES NET METERING LICENSE AGREEMENT

PROVO CITY UTILITIES NET METERING LICENSE AGREEMENT PROVO CITY UTILITIES NET METERING LICENSE AGREEMENT Customer-Owned Electric Generating Systems of 25kW or Less This NET METERING LICENSE AGREEMENT ( Agreement ) is between ( Customer ) and Provo City -

More information

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015

DRAFT KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE. No. 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015 DRAFT 31.3.2015 KERALA STATE ELECTRICITY REGULATORY COMMISSION, NOTICE 442/CT/2014/KSERC Dated, Thiruvananthapuram 31 st March, 2015 The Kerala State Electricity Regulatory Commission hereby publishes

More information

Addendum to HSBC Consumer Deposit (excluding Certificate of Deposit) Terms & Charges Disclosure

Addendum to HSBC Consumer Deposit (excluding Certificate of Deposit) Terms & Charges Disclosure Addendum to HSBC Consumer Deposit (excluding Certificate of Deposit) Terms & Charges Disclosure Effective November 2, 2015, HSBC Bank USA, N.A. no longer issues official bank checks in foreign currency.

More information

KERALA STATE ELECTRICITY REGULATORY COMMISSION

KERALA STATE ELECTRICITY REGULATORY COMMISSION KERALA STATE ELECTRICITY REGULATORY COMMISSION Dated 24 th January 2014 NOTICE Notice is hereby given that Kerala State Electricity Regulatory Commission has published the Draft Kerala State Electricity

More information

PRICING SUPPLEMENT CONTRACTUAL TERMS

PRICING SUPPLEMENT CONTRACTUAL TERMS PRICING SUPPLEMENT 16 December 2010 European Bank for Reconstruction and Development USD 230,000,000 Callable Zero Coupon Notes due 20 December 2040 issued pursuant to a Global Medium Term Note Programme

More information

Natural Gas. Fact sheet. Introduction. Natural gas Trading

Natural Gas. Fact sheet. Introduction. Natural gas Trading Natural Gas Fact sheet Introduction Natural gas Trading Natural gas accounts for almost a quarter of United States energy consumption, and the NYMEX Division natural gas futures contract is widely used

More information

Terms and conditions of the ACT Bundle Offer - discontinued

Terms and conditions of the ACT Bundle Offer - discontinued Terms and conditions of the ACT Bundle Offer - discontinued Effective 2 March 2015 this offer is no longer available Your agreement dictionary 1. Interpretation 1.1 A reference to: Account Holder means

More information

POLICY CONDITIONS Conductor Personal Pension Plan (PC CPPP 06/11)

POLICY CONDITIONS Conductor Personal Pension Plan (PC CPPP 06/11) POLICY CONDITIONS Conductor Personal Pension Plan (PC CPPP 06/11) Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Contract and definitions Contributions The funds Unit linking Benefits General

More information

HSBC Global Investment Centre

HSBC Global Investment Centre HSBC Global Investment Centre Terms and Conditions These terms are effective for all Global Investment Centre Account customers on and from 6 April 2016. 2 Global Investment Centre Terms and Conditions

More information

June 17, 2016. CBOE Futures Exchange, LLC Rule Certification Submission Number CFE-2016-012

June 17, 2016. CBOE Futures Exchange, LLC Rule Certification Submission Number CFE-2016-012 June 17, 2016 Mr. Christopher Kirkpatrick Secretary Commodity Futures Trading Commission Three Lafayette Centre 1155 21st Street, N.W. Washington, D.C. 20581 Re: CBOE Futures Exchange, LLC Rule Certification

More information

CIB BANK LTD S SPECIFIC BUSINESS REGULATIONS PERTAINING TO CREDIT AND LOAN AGREEMENTS FOR SOLE TRADERS

CIB BANK LTD S SPECIFIC BUSINESS REGULATIONS PERTAINING TO CREDIT AND LOAN AGREEMENTS FOR SOLE TRADERS 1 CIB BANK LTD S SPECIFIC BUSINESS REGULATIONS PERTAINING TO CREDIT AND LOAN AGREEMENTS FOR SOLE TRADERS Effective from: 15 March 2014 2 TABLE OF CONTENTS 1. Interpretive provisions...3 2. Content of the

More information

Be prepared for the opportunities retirement may offer.

Be prepared for the opportunities retirement may offer. LIFETIME INCOME BENEFIT RIDER NATIONWIDE HIGH POINT 365 Be prepared for the opportunities retirement may offer. Nationwide High Point 365 Lifetime Income Benefit rider A rider for the Nationwide New Heights

More information