Schedule No. OGS-3-HOPU OPTIONAL LARGE GENERAL SERVICE - HIGH OFF-PEAK USE APPLICABLE
|
|
- Stephanie Price
- 4 years ago
- Views:
Transcription
1 6100 Neil Road, Reno, Nevada 67th Revised PUCN Sheet No. 79 Tariff No. Electric No. 1 Cancelling 66th Revised PUCN Sheet No. 79 APPLICABLE This schedule is available as an option to Schedule No. GS-3 for an existing Customer with a complete billing history in the preceding twelve (12) months with three or more monthly metered maximum demands greater than or equal to one thousand (1,000) kilowatts who, based on past usage history or by other means acceptable to the Utility, demonstrates that a minimum of sixty (60) percent of its annual (12-month) kilowatt-hour (kwh) energy consumption will occur in the off-peak period. It is at the sole discretion of the Utility to allow a Customer to take service under this schedule if there is not a full 12 months of usage history or if, due to unique circumstances, the Customer did not meet the 60% off peak annual use requirement, provided that sufficient evidence exists that indicates the Customer will meet the 60% minimum requirement in the next twelve (12) month period. Service under this schedule is limited to the first 75 MWs of aggregate load subscribed to, or contracted for, under this schedule and the two other optional high off-peak usage schedules of OGS-2-HOPU and OGS-2-TOU-HOPU. An exception to the capacity limit is made for any eligible Customer willing to sign a service contract committing to remain on this schedule or the otherwise applicable bundled schedule for a minimum term of 10 years, as further set forth in Special Condition 13 below. This Rate Schedule is differentiated by the following voltage levels at the Customer s effective point of delivery: TERRITORY RATES Secondary (less than or equal to 600 volts); Primary (greater than 600 and less than 25,000 volts); and High Voltage Distribution or Transmission (greater than or equal to 25,000 volts). Entire Nevada Service Area, as specified. The charges applicable to this rate schedule are set forth in the currently effective Statement of Rates and are incorporated herein by reference. Bundled rates can be found beginning on PUCN Sheet No. 63G MINIMUM CHARGE The minimum charge for service hereunder shall be the Basic Service Charge, Additional Meter Charge, and Customer Specific Facilities Charge if applicable. LATE CHARGE The Utility may charge a fee as set forth in Schedule MC for the late payment of a bill.
2 6100 Neil Road, Reno, Nevada 10th Revised PUCN Sheet No. 79A Tariff No. Electric No. 1 Cancelling 9th Revised PUCN Sheet No. 79A SPECIAL CONDITIONS 1. UEC. The Universal Energy Charge (UEC), pursuant to NAC through , will go to fund the Nevada fund for energy assistance and conservation. Under certain circumstances, Customers will be refunded amounts paid in excess of $25,000 per calendar quarter. The Commission will administer the collection of the UEC, certify exemptions, and administer refunds. Exemptions are generally kwh sold to a) Any governmental agency, including the State of Nevada and any political subdivision thereof, and b) Any Customer using electrolytic-manufacturing processes. Except as provided above, all kwh sold are subject to the charge. The UEC is not subject to the charges applicable under the Tax Adjustment Charge. 2. Time of Use Periods. Daily time periods will be based on Pacific Standard Time and are defined as follows: Winter Period (October June) On-Peak 5:01 p.m. to 9:00 p.m. daily Mid-Peak 7:01 a.m. to 5:00 p.m. daily Off-Peak All Other Hours Summer Period (July September) On-Peak 1:01 p.m. to 6:00 p.m. Weekdays Mid-Peak 10:01 a.m. to 1:00 p.m. and 6:01 p.m. to 9:00 p.m. Weekdays Off-Peak All Other Hours The winter period will consist of nine regularly scheduled billing periods for service provided in the months of October through June. The summer period will consist of three regularly scheduled billing periods for service provided in the months of July through September. 3. Power Factor Adjustment. The power factor adjustment shall be at a rate of $ per kvarh. The rate shall be applied to the difference between actual kvarh and the kvarh equivalent to a ninety percent (90%) power factor level. If the actual kvarh are greater than the kvarh equivalent to a ninety percent (90%) power factor, then the adjustment shall be a charge to the Customer. Kvarh equivalent to a 90% power factor level shall be estimated as times total billed kwh during the billing period. 4. Application for Service. Application for service under this schedule will be accepted by the Company on a first-come, first serve basis.
3 6100 Neil Road, Reno, Nevada 5th Revised PUCN Sheet No. 79B Tariff No. Electric No. 1 Cancelling 4th Revised PUCN Sheet No. 79B SPECIAL CONDITIONS 5. Billing Period. Service under this schedule shall commence with the first full billing period following the Customer executing the necessary contract set forth in Special Condition Meter Readings. Except where multiple metering points are provided at the Utility's convenience, meter readings shall not be combined for billing hereunder. 7. Billing Demand / Demand Charge. For the billing period, the Billing Demand upon which the Demand Charge is applied is the Customer s average kilowatt load measured during the fifteen minute period of maximum use during the respective Time of Use Period, unless otherwise specified by contract. In instances, however, where the use of energy by a Customer is intermittent or subject to extreme fluctuations, a shorter time interval may be used and the demand determined from special measurements. At Utility s option, a thermal type of demand meter which does not reset after a definite time interval may be used for demand measurements. 8. Billing Demand / Facilities Charge. Except as described in Special Condition 9 (Facilities Charges, Transmission Voltage Customers), the Billing Demand upon which the Facilities Charge is applied is the highest measured billing demand for the billing period. 9. Facilities Charges, Transmission Voltage Customers. Facilities Charges for Customers receiving service at transmission-level voltages will be calculated based upon: a) Customer-specific investments by the Utility using the Facilities Charge per dollar of Utility investment identified in the Statement of Rates; and b) Customer-specific investments contributed to the Utility using the Facilities Charge per dollar of contributed investment identified in the Statement of Rates. The Facilities Charge and the Customer specific investment amounts identified above will be updated in each General Rate Case ( GRC ) for all transmission voltage Customers. Between GRCs the Utility will establish or revise Customer specific investment amounts for new or existing Customers as service changes occur, and will bill the applicable Customers at the established Facilities Charge per dollar of contributed investment. In the event that a Customer specific investment amount cannot be identified for the Customer when service commences, the standard per kw Facilities Charge identified in the Statement of Rates will be applied by the Utility for billing purposes until the Customer specific investment is determined. The per kw Facility Charge will be used on a temporary basis only until the information for the Customer-specific facility investment can be developed for the Customer.
4 6100 Neil Road, Reno, Nevada 4th Revised PUCN Sheet No. 79C Tariff No. Electric No. 1 Cancelling 3rd Revised PUCN Sheet No. 79C SPECIAL CONDITIONS 10. Line Voltage. Utility retains the right to change its line voltage at any time. 11. Contract for Service, Minimum Term of Service. Utility shall require a one year contract for service under this schedule, or alternatively, as set forth in Special Condition 13, a minimum 10-year service contract. Upon commencing service under this schedule the Customer shall be required to continue service under this schedule for the full oneyear term (twelve consecutive Billing Periods), unless the Customer permanently terminates electric service at the premise. This contract requirement and one-year commitment term also applies to a Customer that has previously been served under this schedule and later returns to service under this schedule. Once elected, this schedule will be applied in every billing period for the duration of the contract term, and will continue unless service is discontinued by the Customer or is terminated by the Utility as set forth in Special Condition 12, applicability conditions for other rate schedules notwithstanding. After the contract term has been satisfied, the Customer may elect to discontinue service under this schedule but if the Customer discontinues service under this schedule, the Customer will not be permitted to request a return to service under this schedule for a period of one year (12 Billing Periods). After the contract term is completed and the Customer notifies the Utility of its request to discontinue service under this schedule, service hereunder will end at the conclusion of the billing cycle in which the notification to discontinue service is made and service will commence under the otherwise applicable rate schedule. 12. Annual Utility Review of Applicability. Utility will review the off-peak kwh use of the Customer in the previous 12 month period to assess compliance with the requirement of at least 60% of annual kwh use being in the off-peak periods. For purposes of this evaluation, any off-peak usage percentage that is on a fractional basis above 59.0% will be considered to meet the 60% requirement. If the Customer is not in compliance with the 60% requirement, the Customer will be contacted and provided the opportunity to demonstrate any extraordinary circumstances that may have contributed to the lower than 60% annual off-peak usage during the review period. If there is not sufficient evidence to demonstrate that the 60% minimum will be met in the subsequent 12 month period the Customer will be removed from this schedule and placed, at the Customer s choice, under the GS-2 or OGS-2-TOU schedule at the conclusion of the billing cycle in which the cancellation notification is made. Customers whose service under this schedule is cancelled by the Utility pursuant to this Special Condition will not be eligible to apply for service under this schedule for a minimum period of one year (12 Billing Periods) after its last billing under this schedule.
5 6100 Neil Road, Reno, Nevada 4th Revised PUCN Sheet No. 79D Tariff No. Electric No. 1 Cancelling 3rd Revised PUCN Sheet No. 79D SPECIAL CONDITIONS 13. Exception to Capacity Cap. At the Utility s sole discretion, Utility may enter into a 10 year, or longer term, contract for service with the Customer under this schedule, if the Customer agrees to remain a bundled Customer of the Utility for the entire term of the service contract and remain under this schedule for a minimum of the first 12 months of the service contract. This requirement shall remain regardless of on-going eligibility for continued service under this schedule pursuant to the applicability or Special Condition 12. Should the Customer loose eligibility for service under this schedule, Customer shall be served instead under the otherwise applicable rate schedule. Application of this schedule to Customers meeting this special condition may be delayed until the next general rate case at the Utility s discretion. The capacity of any Customer served under such 10 year or longer term service contract will not be counted toward, or constrained by, the aggregate capacity limit set forth in the Applicable section above. 14. Assumption of Risk for Potentially Higher Bills. Customer understands that this schedule has substantially higher summer on and mid-peak demand and energy rates than the standard, otherwise applicable rate schedule ( OARS ). If the Customer shifts usage away from the off-peak periods to the on-peak periods, higher bills may result under this schedule compared to the OARS. Furthermore, having 60% or more of its annual electric use in the off-peak rate periods does not, in and of itself, guarantee that the Customer will incur lower billing charges under this schedule compared to the OARS. By accepting service under this schedule, the Customer fully assumes the potential risk of higher bills under this schedule. For Customers under this schedule who provide utility or public welfare services, an exception will be made during periods of emergency, such as a natural disaster, a declared public emergency, or a catastrophic failure of equipment used in the delivery of utility or public welfare services that was beyond the control and foresight of the Customer, that affects the Customer s usage. For the billing period in which a documented emergency occurs, the Customer will be billed the lower monthly bill resulting from application of the OARS or this schedule without impacting the Customer s eligibility for this schedule going forward.
SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-33 EXPERIMENTAL PRICE PLAN FOR SUPER PEAK TIME-OF-USE GENERAL SERVICE
SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-33 EXPERIMENTAL PRICE PLAN FOR SUPER PEAK TIME-OF-USE GENERAL SERVICE Effective: April 2015 Billing Cycle Supersedes: November 2012 Billing
NEVADA POWER COMPANY dba NV Energy P.O. Box 98910 Las Vegas, NV 89151-0001 Tariff No. 1-B cancels Tariff No. 1-A (withdrawn)
101 st Revised PUCN Sheet No. 10 Cancelling 100 th Revised PUCN Sheet No. 10 RS Residential Service Basic Service Charge, per month $12.75 All Usage $0.06999 $0.04488 $0.00062 $0.00051 $0.00039 $0.00000
Southern California Edison Revised Cal. PUC Sheet No. 59134-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.
Southern California Edison Revised Cal. PUC Sheet No. 59134-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 58300-E Schedule TOU-8-RBU Sheet 1 APPLICABILITY Applicable to the additional
SIERRA PACIFIC POWER COMPANY dba NV Energy 6100 Neil Road Reno, NV 89511 Tariff No. Electric No. 1
53 rd Revised PUCN Sheet No. 63G Cancelling 52 nd Revised PUCN Sheet No. 63G D-1 - Domestic Service Basic Service Charge, per month $15.25 $0.05793 $0.03616 $0.00105 ($0.00422) $0.00039 ($0.00500) $0.00198
Southern California Edison Revised Cal. PUC Sheet No. 59118-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.
Southern California Edison Revised Cal. PUC Sheet No. 59118-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 58285-E Schedule TOU-GS-3-SOP Sheet 1 APPLICABILITY Applicable to single-
Duke Energy Carolinas, LLC Electricity No. 4 North Carolina Fourth Revised Leaf No. 78 Superseding North Carolina Third Revised Leaf No.
AVAILABILTY (North Carolina only) Available on a limited and voluntary basis, at the Company s option to nonresidential customers receiving concurrent service from the Company on Schedule LGS, I, OPT-V
Electric Rate Book Revision: 13 (12-17-15) Page No. 1 Effective date: 1-1-16 SMALL COMMERCIAL
Connexus Energy Section III - Business Electric Rate Book Revision: 13 (12-17-15) Page No. 1 Effective date: 1-1-16 SMALL COMMERCIAL Availability Available to non-residential customers for either single-phase
Schedule TOU-GS-1-RTP Sheet 1 GENERAL SERVICE - SMALL REAL TIME PRICING
Southern California Edison Revised Cal. PUC Sheet No. 58261-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 57813-E APPLICABILITY Schedule TOU-GS-1-RTP Sheet 1 Applicable to Bundled
Southern California Edison Revised Cal. PUC Sheet No. 57592-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.
Southern California Edison Revised Cal. PUC Sheet No. 57592-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 55646-E Schedule TOU-GS-2 Sheet 1 APPLICABILITY Applicable to single-
Demand Response Programs
Southern California Edison Demand Response Programs Join thousands of businesses that work with us to reduce peak electricity use when California needs it most. By participating in Demand Response programs,
SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-26 STANDARD PRICE PLAN FOR RESIDENTIAL TIME-OF-USE SERVICE
SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-26 STANDARD PRICE PLAN FOR RESIDENTIAL TIME-OF-USE SERVICE Effective: April 2015 Billing Cycle Supersedes: November 2012 Billing Cycle AVAILABILITY:
Southern California Edison Original Cal. PUC Sheet No. 52386-E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.
Southern California Edison Original Cal. PUC Sheet No. 52386-E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No. Schedule TOU-PA-3-SOP Sheet 1 APPLICABILITY Applicable where SCE determines that
ELECTRIC SCHEDULE AG-V Sheet 1 SHORT-PEAK TIME-OF-USE AGRICULTURAL POWER
Revised Cal. P.U.C. Sheet No. 35786-E Cancelling Revised Cal. P.U.C. Sheet No. 35141-E ELECTRIC SCHEDULE AG-V Sheet 1 1. APPLICABILITY: This schedule is closed to new customers. Customers taking service
Commercial and Industrial Electric Rates
Commercial and Industrial Electric Rates INTERIM DAKOTA ELECTRIC ASSOCIATION SECTION: V 4300 220 th Street West SHEET: 4 Farmington, MN 55024 REVISION: 16 SCHEDULE 36 IRRIGATION SERVICE Availability Available
REAL TIME PRICING - HOUR AHEAD SCHEDULE: RTP-HA-5
ELECTRIC SERVICE TARIFF: REAL TIME PRICING - HOUR AHEAD SCHEDULE: RTP-HA-5 1 of 5 With Bills Rendered for the Billing Month of April, 2015 Original 6.30 AVAILABILITY: Throughout the Company's service area
Schedule GS-3 LARGE GENERAL SERVICE SECONDARY VOLTAGE I. APPLICABILITY AND AVAILABILITY
I. APPLICABILITY AND AVAILABILITY A. Except as modified herein, this schedule is applicable only to a non-residential secondary voltage Customer (as defined in Paragraph XII.) who (1) elects (a) to receive
Southern California Edison Revised Cal. PUC Sheet No. 53885-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.
Southern California Edison Revised Cal. PUC Sheet No. 53885-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 52432-E Schedule CPP Sheet 1 APPLICABILITY This Schedule is optional for
RESIDENTIAL SERVICE SCHEDULE R
SOUTH CENTRAL POWER COMPANY Lancaster, Ohio RESIDENTIAL SERVICE SCHEDULE R AVAILABILITY AND APPLICABILITY: This South Central Power Company (Cooperative) rate schedule is available and applicable for electric
SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-29
SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-29 EXPERIMENTAL PRICE PLAN FOR TIME-OF-USE SERVICE WITH SUPER OFF-PEAK FOR ELECTRIC VEHICLES Effective: April 2015 Billing Cycle AVAILABILITY:
ORDINANCE NUMBER 12-047. An ordinance to establish electric utility rates in the City of Beatrice, Nebraska, in
ORDINANCE NUMBER 12-047 An ordinance to establish electric utility rates in the City of Beatrice, Nebraska, in accordance with Section 26-41 of the Beatrice City Code; to repeal Ordinance Number 11-031
MASSACHUSETTS ELECTRIC COMPANY
MASSACHUSETTS ELECTRIC COMPANY Residential Regular R-1 Effective M.D.P.U. No.1119 March 1, 2008 Adjusted By: Transition Cost Adjustment March 1, 2008 Transmission Service Cost Adjustment March 1, 2008
P.S.C.U. No. 50 Original Sheet No. 135.1 ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 135 STATE OF UTAH. Net Metering Service
P.S.C.U. No. 50 Original Sheet No. 135.1 ROCKY MOUNTAIN POWER ELECTRIC SERVICE SCHEDULE NO. 135 STATE OF UTAH Net Metering Service AVAILABILITY: At any point on the Company's interconnected system. APPLICATION:
STANDARD ELECTRIC PRICE PLANS SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT. Corporate Pricing
STANDARD ELECTRIC PRICE PLANS SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT Corporate Pricing For additional information, please call 602-236-5522 or 602-236-2950 TEMPORARY Prices Effective
THE NARRAGANSETT ELECTRIC COMPANY OPTIONAL LARGE DEMAND BACK-UP SERVICE RATE (B-62) RETAIL DELIVERY SERVICE
Sheet 1 AVAILABILITY This service shall apply to Customers in the class identified below: (i) (ii) who receive all or any portion of their electric supply from non-emergency generation unit(s) with a nameplate
SCHEDULE OF RATES FOR ELECTRIC SERVICE
Colo. PUC No. 9 105 South Victoria Original Sheet No. 1 1-888-890-5554 www.blackhillscorp.com SCHEDULE OF RATES FOR SERVICE BLACK HILLS/COLORADO UTILITY COMPANY, LP d/b/a BLACK HILLS ENERGY Title: Director
SCHEDULE OF RATES FOR ELECTRIC SERVICE
Colo. PUC No. 9 105 South Victoria Original Sheet No. 1 1-888-890-5554 www.blackhillscorp.com SCHEDULE OF RATES FOR SERVICE BLACK HILLS/COLORADO UTILITY COMPANY, LP d/b/a BLACK HILLS ENERGY Title: Director
AUSTIN UTILITIES. CHARACTER OF SERVICE: AC, 60 cycles, 120/240 Volt, three wire, single-phase; or 120 Volt, two wire.
AVAILABLE: Within established City Limits. AUSTIN UTILITIES Schedule (110) Issued 11/12/13 Supersedes (110) Issued 11/13/12 Sheet No. 1 of 1 RESIDENTIAL SERVICE APPLICABLE: To single-family residences
Portland General Electric Company Ninth Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Eighth Revision of Sheet No.
Portland General Electric Company Ninth Revision of Sheet No. 7-1 P.U.C. Oregon No. E-18 Canceling Eighth Revision of Sheet No. 7-1 AVAILABLE In all territory served by the Company. APPLICABLE To Residential
TITLE PAGE MINNESOTA POWER ELECTRIC RATE BOOK
MINNESOTA POWER SECTION I PAGE NO. 1 ELECTRIC RATE BOOK REVISION 4 th TITLE PAGE MINNESOTA POWER ELECTRIC RATE BOOK This book contains Minnesota Power's retail rates and related information per the Minnesota
Example Solar Program Subscription Payments. 1.0 kw subscription 1,490 1,490 1,490. (kwh) Annual Production. for 1kW Subscription.
MICHIGAN PUBLIC SERVICE COMMISSION Exhibit: A-1 (NAP-1 Revised) CONSUMERS ENERGY COMPANY Page: 1 of 1 Example Solar Program Subscription Payments 1.0 kw subscription Line No. Project Costs Monthly Payments
Schedule 6VP LARGE GENERAL SERVICE VARIABLE PRICING
I. APPLICABILITY This Schedule is applicable, on a voluntary basis, to the supply of 10,000 kw or more to any Customer who has an annual average demand of 5,000 kw or more as determined by dividing the
Southern California Edison Revised Cal. PUC Sheet No. 55628-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.
Southern California Edison Revised Cal. PUC Sheet No. 55628-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 53984-E Schedule D Sheet 1 APPLICABILITY Applicable to domestic service
HPUC ECONOMIC DEVELOPMENT INCENTIVE (EDI) RATE SUMMARY
HPUC ECONOMIC DEVELOPMENT INCENTIVE (EDI) RATE SUMMARY Effective January 1, 2009 AVAILABILITY 1. For existing HPUC commercial electric customers presently under the Power Service Rate or the Large Power
REVISION: 22 SHEET NO. E 10 POWER COMPANY SCHEDULE Rg-1 WISCONSIN WISCONSIN ELECTRIC RATE BOOK VOLUME NO. 7 AMENDMENT NO. 739 RESIDENTIAL SERVICE
NSP NOTHEN STATES EVISION: 22 SHEET NO. E 10 SCHEDULE g-1 ELECTIC ATE BOOK VOLUME NO. 7 AMENDMENT NO. 739 ESIDENTIAL SEVICE Availability: Available for single- or three-phase electric service for residential
SERVICE CLASSIFICATION NO. 14-RA STANDBY SERVICE
Fourth Revised Leaf No. 135 Consolidated Edison Company Superseding Second Revised Leaf No. 135 (Third Revised Leaf No. 135 Canceled) Applicable to Use of Service for SERVICE CLASSIFICATION NO. 14-RA STANDBY
CITY OF AUSTIN ELECTRIC RATE SCHEDULES
Time-Of-Use Option In lieu of the Charges above, customers receiving service under this rate schedule may choose the following time-of-use charges to be applied for a term of not less than twelve consecutive
Business Rate Summary
Business Summary The following is a summary of Southern California Edison s (SCE) tariffs and programs for small, medium, and large power customers, typically called General Service (GS) customers. Eligibility
TEXARKANA, TEXAS SERVICE AREA
Original 1-2.1/5 2. SMALL COMMERCIAL FIRM SALES SERVICE (SCS-1) 2.1. AVAILABILITY 2.1.1. This rate schedule is available at points of adequate capacity and suitable pressure on the Company s existing facilities.
NORTHERN IRELAND ELECTRICITY Ltd STATEMENT OF CHARGES FOR USE OF. THE NORTHERN IRELAND ELECTRICITY Ltd ELECTRICITY DISTRIBUTION SYSTEM
NORTHERN IRELAND ELECTRICITY Ltd STATEMENT OF CHARGES FOR USE OF THE NORTHERN IRELAND ELECTRICITY Ltd ELECTRICITY DISTRIBUTION SYSTEM BY AUTHORISED PERSONS Effective from 1 October 2011 to 30 September
CITY OF CUERO ELECTRIC RATE -- SCHEDULE R (Residential)
ELECTRIC RATE -- SCHEDULE R (Residential) To single family residential customers where all energy is taken through a single meter. Service will be furnished under this rate schedule subject to the established
Power Options. Power Options At a Glance... 1. Direct Access... 3 10. Getting started... 4. Important dates... 4. The enrollment process...
P A C I F I C P O W E R Power Options 2013 F o r O r e g o n C u s t o m e r s Power Options At a Glance... 1 Direct Access... 3 10 Getting started... 4 Important dates... 4 The enrollment process... 5
We Energies Electric Rates
We Energies Electric Rates for Michigan customers July 2015 The rates in this brochure reflect the authorized base rates of Wisconsin Electric Power Company, doing business under the name of We Energies,
COMMON COMMERCIAL ELECTRIC RATES
2013 COMMON COMMERCIAL ELECTRIC RATES The rate you are currently billed under is listed on your bill. Please review this entire guide to determine which rate is best suited for you. You may have made significant
Tariff. For Electric Service Provided by. Pedernales Electric Cooperative, Inc. 201 South Avenue F P.O. Box 1 Johnson City, Texas 78636-0001
Tariff For Electric Service Provided by Pedernales Electric Cooperative, Inc. 201 South Avenue F P.O. Box 1 Johnson City, Texas 78636-0001 Adopted 06-15-2009; Amended 08-16-2010; 9-20- 2010; 12-20-2010;
ELECTRIC SCHEDULE E-6 Sheet 1 RESIDENTIAL TIME-OF-USE SERVICE
Revised Cal. P.U.C. Sheet No. 27605-E* Cancelling Original Cal. P.U.C. Sheet No. 24801-E ELECTRIC SCHEDULE E-6 Sheet 1 APPLICABILITY: This voluntary schedule is available to customers for whom Schedule
THE CONNECTICUT LIGHT AND POWER COMPANY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18
TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18 1. Applicability 1A. The following Terms and Conditions shall apply to every registered Electric Supplier authorized to do business within Connecticut
STANDARD SUPPLY CONDITIONS FOR SPECIFIED POWER DEMAND
STANDARD SUPPLY CONDITIONS FOR SPECIFIED POWER DEMAND NOTICE This is unofficial English translation of KYEPCO s STANDARD SUPPLY CONDITIONS FOR SPECIFIED POWER DEMAND ( tokutei kibo juyo hyojun kyokyu joken
NEW JERSEY ELECTRICITY SUPPLIER LICENSE NUMBER PSEL 0016
TERMS & CONDITIONS NEW JERSEY ELECTRICITY SUPPLIER LICENSE NUMBER PSEL 0016 Purchase of Electric Generation Service Constellation NewEnergy, Inc. ("Constellation") agrees to sell, and you agree to buy,
Domestic Use Tariffs. Codes 05, 06, 07 and 08
Domestic Use Tariffs Codes 05, 06, 07 and 08 Tariffs for Domestic Use Tariffs for Domestic Use are applicable where the electricity is solely used for domestic purposes to private dwellings. They are not
THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20
TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20 1. Applicability 1A. The following Terms and Conditions shall apply to every registered Electric Supplier authorized to do business within Connecticut
Power Options. For Oregon Customers. Power Options At a Glance 1. Direct Access...3 10. Getting started... 4. Important dates... 4
P A C I F I C P O W E R Power Options 2016 For Oregon Customers Power Options At a Glance 1 Direct Access...3 10 Getting started... 4 Important dates... 4 The enrollment process... 5 Choosing an Electricity
MASSACHUSETTS ELECTRIC COMPANY NANTUCKET ELECTRIC COMPANY NET METERING PROVISION
Sheet 1 Applicability The following tariff provisions shall be applicable to a Host Customer, as defined herein, that requests net metering services from the Distribution Company, with the exception of
ELECTRIC SCHEDULE E-9 EXPERIMENTAL RESIDENTIAL TIME-OF-USE SERVICE FOR LOW EMISSION VEHICLE CUSTOMERS
Revised Cal. P.U.C. Sheet No. 31575-E Cancelling Revised Cal. P.U.C. Sheet No. 29680-E ELECTRIC SCHEDULE E-9 APPLICABILITY: This optional experimental schedule applies to electric service to customers
INDEPENDENCE POWER & LIGHT DEPARTMENT Independence, Missouri. Schedule NM-1 Customer-Generator Net Metering Contract Service Rider
AVAILABLE Electric Service is available under this schedule in the entire area served by the Department s existing secondary and primary voltage distribution systems. APPLICABLE To any customer normally
SERVICE CLASSIFICATION NO. 14-RA STANDBY SERVICE
Fourth Revised Leaf No. 135 Consolidated Edison Company Superseding Second Revised Leaf No. 135 of New York, Inc. (Third Revised Leaf No. 135 Canceled) Applicable to Use of Service for SERVICE CLASSIFICATION
Schedule NEM Sheet 1 NET ENERGY METERING
Southern California Edison Revised Cal. PUC Sheet No. 50927-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 49175-E* Schedule NEM Sheet 1 APPLICABILITY Applicable to Eligible Customer-Generators
Portland General Electric Company Tenth Revision of Sheet No. 76R-1 P.U.C. Oregon No. E-18 Canceling Ninth Revision of Sheet No.
Portland General Electric Company Tenth Revision of Sheet No. 76R-1 P.U.C. Oregon No. E-18 Canceling Ninth Revision of Sheet No. 76R-1 PURPOSE SCHEDULE 76R PARTIAL REQUIREMENTS ECONOMIC REPLACEMENT POWER
Chris Kilpatrick Director of Rates
Original Sheet No. 1 P.S.C. Wyo. No. 12 Cancels in its entirety P.S.C. Wyo. No. 11 SCHEDULE OF RATES FOR ELECTRIC SERVICE AVAILABLE IN THE ENTIRE TERRITORY SERVED BY CHEYENNE LIGHT, FUEL & POWER COMPANY
COMMON COMMERCIAL ELECTRIC RATES
COMMON COMMERCIAL ELECTRIC RATES 2015 The rate you are currently billed under is listed on your bill. Please review this entire guide to determine which rate is best suited for you. You may have made significant
ELECTRIC SCHEDULE E-1 Sheet 1 RESIDENTIAL SERVICES
Revised Cal. P.U.C. Sheet No. 37050-E Cancelling Revised Cal. P.U.C. Sheet No. 36706-E ELECTRIC SCHEDULE E-1 Sheet 1 APPLICABILITY: TERRITORY: RATES: This schedule is applicable to single-phase and polyphase
Gibraltar Electricity Authority ELECTRICITY (CHARGES AND TARIFFS) REGULATIONS 2010
Legislation made under s. 10 and 14. ELECTRICITY (CHARGES AND TARIFFS) REGULATIONS 2010 (LN. ) Commencement 1.7.2010 Amending enactments None Relevant current provisions Commencement date EU Legislation/International
NEW COMMERCIAL Rates. Understanding the. Commercial Customers
Understanding the NEW COMMERCIAL Rates The Austin City Council increased Austin Energy s base rates, which pay for operations and maintenance, for the first time in 18 years. The new rates, which amount
GENERAL RULES AND REGULATIONS FOR ELECTRIC SERVICE CUSTOMER'S UTILIZATION OF ELECTRIC SERVICE
Filed with the I. U. B. Substitute Fourth Revised Sheet No. 217 ORIGINAL TARIFF NO. 1 Canceling Third Revised Sheet No. 217 SECTION 5 5.01 APPLICATION FOR SERVICE: Any person, firm, association, or corporation,
SCHEDULED ELECTRIC RATES
SCHEDULED RATES Volume lll,16 th Revision, Sheet No. 2.00 Amendment 508, Schedule TOC TABLE OF CONTENTS Item Rate Sheet No. Fuel Adjustment 3.00 GENERAL SERVICE General Service Gs-1 4.00 General Service
MISCELLANEOUS SCHEDULE TITLE SHEET NO. Levelized Payment Plan (Optional) 3.020. Summary Billing Plan (Optional) 3.025. Service Charges 3.
THIRTEENTH REVISED SHEET NO. 3.010 CANCELS TWELFTH REVISED SHEET NO. 3.010 MISCELLANEOUS SCHEDULE TITLE SHEET NO. Levelized Payment Plan (Optional) 3.020 Summary Billing Plan (Optional) 3.025 Service Charges
Tariff Development II: REVIEW of Basic Allocation and Rate Design Principles
Tariff Development II: REVIEW of Basic Allocation and Rate Design Principles Robert Manning Public Utility Commission of Texas Briefing for the NARUC/INE Partnership 1 Overview Steps in Setting Rates Establish
RETAIL ACCESS SERVICE RIDER RIDER EC2
Original Sheet No. E-1.00 RETAIL ACCESS SERVICE RIDER RIDER EC2 E1 INTRODUCTION This Rider is designed to express the terms and conditions associated with retail access service in the DTE Electric Choice
CITY OF HIGH POINT ELECTRIC RATE SCHEDULE RATE 10 GENERAL SERVICE (Formally Rate Schedule C)
RATE 10 GENERAL SERVICE (Formally Rate Schedule C) (a) Available to the individual customer. (b) Service under this Schedule shall be used only by the contracting customer in a single enterprise, located
ELECTRIC SCHEDULE LS-2 Sheet 1 CUSTOMER-OWNED STREET AND HIGHWAY LIGHTING
Revised Cal. P.U.C. Sheet No. 33883-E Cancelling Revised Cal. P.U.C. Sheet No. 28182-E ELECTRIC SCHEDULE LS-2 Sheet 1 APPLICABILITY: TERRITORY: RATES: This schedule is applicable to services for lighting
Schedule GS-1 SMALL GENERAL SERVICE
I. APPLICABILITY AND AVAILABILITY A. Except as modified herein, this schedule is applicable only to a non-residential Customer (1) who elects (a) to receive Electricity Supply Service and Electric Delivery
Energy Price Fact Sheet
Tariff 20 - ERG69764RS Small Business Electricity Ergon Single rate Regulated offer 01-Jul-2015 Tariff 20 Business General Supply 1st July to 30th June All consumption. Anytime All consumption 22.481 cents
ELECTRIC SCHEDULE ET Sheet 1 MOBILEHOME PARK SERVICE
Revised Cal. P.U.C. Sheet No. 37110-E Cancelling Revised Cal. P.U.C. Sheet No. 36741-E ELECTRIC SCHEDULE ET Sheet 1 APPLICABILITY: TERRITORY: RATES: This schedule is applicable to single-phase and polyphase
Electric Generation Supplier Contract Summary
Electric Generation Supplier Contract Summary Electric Generation Supplier Information Spark Energy, LLC 12140 Wickchester Ln, Suite 100 Houston, TX 77079 Phone Number: 800-684-1696 Email: customercare@sparkenergy.com
To complete the process for a net metering interconnection, please follow the steps below:
We appreciate your interest in Pacific Power s net metering program. Before purchasing any net metering equipment, we recommend you review the requirements for interconnecting a net metering system to
RATE 834 RATE FOR ELECTRIC SERVICE GENERAL SERVICE
Original Sheet No. 15 No. 1 of 6 Sheets TO WHOM AVAILABLE Available to GENERAL service Customers for electric service, who have auxiliary 60 Hertz electric generation equipment and who are located on the
APPENDIX A: SYSTEM OF ASSURANCE OF NET METERING ELIGIBILITY
APPENDIX A: SYSTEM OF ASSURANCE OF NET METERING ELIGIBILITY Sections 1. Purpose... 1 2. Scope... 1 3. Definitions... 1 4. Obtaining a Cap Allocation... 3 5. Duties of the Administrator and Fees... 5 6.
RESIDENTIAL AND SMALL COMMERCIAL UNIFORM DISCLOSURE STATEMENT FOR ILLINOIS
RESIDENTIAL AND SMALL COMMERCIAL UNIFORM DISCLOSURE STATEMENT FOR ILLINOIS Our Contact Information Type of Plan Term of Agreement Rate Renewal Early Termination Fee Rescission Nature of Sale Delivery Notification
GENERAL INFORMATION. 8. LIMITATIONS OF SERVICE CLASSIFICATIONS (Continued)
P.S.C. NO. 3 ELECTRICITY LEAF: 114 8. LIMITATIONS OF SERVICE CLASSIFICATIONS (Continued) 8.3 STANDBY AND BUY-BACK SERVICES (Continued) A customer who operates a Qualifying Facility or a Qualifying Small
SCHUYLER DEPARTMENT OF UTILITIES SCHUYLER, NEBRASKA ELECTRIC RATES
SCHUYLER DEPARTMENT OF UTILITIES SCHUYLER, NEBRASKA ELECTRIC RATES TABLE OF CONTENTS SECTION I SECTION II SECTION III SECTION IV SECTION V SECTION VI SECTION VII SECTION VIII SECTION IX SECTION X SECTION
NORTHWEST NATURAL GAS COMPANY WN U-6 Fourth Revision of Sheet B.1 Cancels Third Revision of Sheet B.1
WN U-6 Fourth Revision of Sheet B.1 Cancels Third Revision of Sheet B.1 AVAILABLE: In all territory served by the Company under the Tariff of which this Schedule is a part. APPLICABLE: This Schedule describes
ORDINANCE NO. 363-94
ORDINANCE NO. 363-94 AN ORDINANCE APPROVING TEXAS UTILITIES ELECTRIC COMPANY S PROPOSED RIDER ED - ECONOMIC DEVELOPMENT SERVICE, RATE GC - GENERAL SERVICE COMPETITIVE PRICING, RATE WPC - WHOLESALE POWER
Schedule GS-2 INTERMEDIATE GENERAL SERVICE
I. APPLICABILITY AND AVAILABILITY A. Except as modified herein, this schedule is applicable only to a non-residential Customer (1) who elects (a) to receive Electricity Supply Service and Electric Delivery
ELECTRICITY [CH.194 35
ELECTRICITY [CH.194 35 ABACO ELECTRIC COMPANY LIMITED REGULATIONS (SECTION 60) [Commencement 15th May, 1972] 1. These Regulations may be cited as the Abaco Electric Company Limited Regulations. 2. In these
I USE OF SYSTEM CHARGES EFFECTIVE FROM 1 APRIL 2015
I USE OF SYSTEM CHARGES EFFECTIVE FROM 1 APRIL 2015 Contracted Capacity Peak Period ( /kwh) Off-Peak Period ( /kwh) Reactive Power ( /kvarh) Uncontracted Capacity 7 Uncontracted Standby Capacity CCS 8
Large Power -Secondary 46,50,51 Monthly Charge $ 120.00 All kwh 0.0275 All kw 18.50
ELECTRIC SERVICE RATES The following electric service rates are effective December 1, 2014. The energy rates, before other adjustments, will be decreased or increased for the changes in the cost of electric
For the convenience of Customers there are a number of ways to pay CPAU bills:
A. BILLING UNITS All metered billing units used for billing purposes shall be determined to the nearest whole unit. Such units may include, kw, kwh, kva, kvar, hp, Therms, and/or ccf. B. PAYMENT OF BILLS
TRANSMISSION SERVICE RATE SCHEDULE Effective from 1 April 2015
TRANSMISSION SERVICE RATE SCHEDULE Effective from 1 April 2015 A SERVICE CONNECTION CHARGES Note : All charges in this Schedule are exclusive of GST. 1 Service Connection This includes cables, associated
Emergency Water Conservation Plan. The Utilities Board of the City of Sylacauga
Emergency Water Conservation Plan The Utilities Board of the City of Sylacauga Emergency Water Conservation Plan The Utilities Board of the City of Sylacauga Section 100.00 Section 100.01 Section 100.02
SCHEDULE NO. D-1 DOMESTIC SERVICE
SOUTH LAKE TAHOE, CALIFORNIA 10th Revised CPUC Sheet No. 76 Canceling 9th Revised CPUC Sheet No. 76 APPLICABILITY This rate schedule is applicable to all domestic power service to separately metered single
electric service rates 1701 W. Carroll Street Kissimmee, Florida 34741 (407) 933-7777 www.kua.com
electric service rates 1701 W. Carroll Street Kissimmee, Florida 34741 (407) 933-7777 www.kua.com 2011 RESIDENTIAL SERVICE (RS) AVAILABILITY - Available exclusively to residential customers for residential
ELECTRIC SCHEDULE E-20 Sheet 1 SERVICE TO CUSTOMERS WITH MAXIMUM DEMANDS of 1000 KILOWATTS or MORE
Revised Cal. P.U.C. Sheet No. 29098-E Cancelling Revised Cal. P.U.C. Sheet No. 26954-E ELECTRC SCHEDULE E-20 Sheet 1 SERVCE TO CUSTOMERS WTH MAXMUM DEMANDS of 1000 KLOWATTS or MORE (D) 1. APPLCABLTY: nitial
TERMS & CONDITIONS Page 18.8 SECTION 18 GENERAL
TERMS & CONDITIONS Page 18.8 CENTRAL MAINE POWER COMPANY Sixth Revision 18.12 CUSTOMER SERVICE GUARANTEE SECTION 18 GENERAL The Company may implement a Customer Service Guarantee program under which the
Net Energy Metering Southern California Edison
NET ENERGY METERING To encourage small electrical customers to install environmentally friendly sources of electrical power, the State of California has passed laws to make the process of interconnecting
ELECTRIC RATE SCHEDULE FOR STANDARD SUPPLY CONDITIONS FOR SPECIFIED POWER DEMAND
ELECTRIC RATE SCHEDULE FOR STANDARD SUPPLY CONDITIONS FOR SPECIFIED POWER DEMAND NOTICE This is unofficial English translation of KYEPCO s ELECTRIC RATE SCHEDULE FOR STANDARD SUPPLY CONDITIONS FOR SPECIFIED
First Revised Sheet No. D-13.01
First Revised Sheet No. D-13.01 Cancels Original Sheet No. D-13.01 SERVICE FOR COMMERCIAL & INDUSTRIAL LOADS AUTOMATED POWER MONITORING SCHEDULE D-APM (Contd) (Continued from Sheet No. D-13.00) Subject
ELECTRIC SCHEDULE A-6 Sheet 1 SMALL GENERAL TIME-OF-USE SERVICE
Revised Cal. P.U.C. Sheet No. 36652-E Cancelling Revised Cal. P.U.C. Sheet No. 35782-E ELECTRC SCHEDULE A-6 Sheet 1 SMALL GENERAL TME-OF-USE SERVCE APPLCABLTY: This time-of-use schedule applies to single-phase
DELMARVA POWER & LIGHT COMPANY MARYLAND ELECTRICITY SUPPLIER COORDINATION TARIFF
MD Electric Supplier Tariff - P.S.C. MD No. 10 DELMARVA POWER & LIGHT COMPANY MARYLAND ELECTRICITY SUPPLIER COORDINATION TARIFF Approved at the MD PSC Administrative Meeting on May 7, 2014 and Effective
THE NARRAGANSETT ELECTRIC COMPANY Terms and Conditions for Nonregulated Power Producers
Sheet 1 THE NARRAGANSETT ELECTRIC COMPANY Terms and Conditions for Nonregulated Power Producers The delivery of electricity shall be in accordance with the provisions of law, regulation and these Terms
J. Classifications of Service
J. Classifications of Service The Cooperative offers a variety of rate classes to its members. The appropriate class for you will depend on your current electric usage and system requirements. Refer to
Action to opt-out required by June 15, 2012.
1221 Lamar Street Suite 750 Houston, TX 77010 Important information regarding your city s electricity aggregation program. Action to opt-out required by June 15, 2012. Evanston Opt-OutEnvelope_NewLogo.indd