1 PUEBLO ROAD CONDITIONS How can we Achieve a Sustainable Roadway System from a Fiscal and Operational Standpoint? Presentation to Pueblo City Council November 24, 2014
2 INVENTORY OF THE STREET NETWORK The City of Pueblo has the responsibility for maintenance of 1,455 lane miles of streets About 1/3 of the City s street network are roads classified as Arterial or Collector
3 INVENTORY OF THE STREET NETWORK Arterial and Collector roads were inventoried and surveyed for condition ratings in 2013 Based on that Survey, about 40% of Pueblo s roadways are in need of immediate attention.
4 Acceptable 29% Good 29% Poor 18% Very Bad 24% ROADWAY ARTERIAL OR COLLECTOR CONDITIONS
5 TYPICAL STREET CONSTRUCTION COSTS Complete reconstruction(*) $ 250,000+/lm yr life Full asphalt remove/replace(*) $140,000/lm yr 2 HMA mill and overlay(*) $110,000/lm yr 1 thin HMA topcoat (*) $70,000/lm 8 12 yr Chip sealing $20,000/lm 6 10 yr Slurry sealing $15,000/lm 4 8 yr (*) Includes installation or replacement of handicap ramps per lane mile (lm) = 12 X 5, figures
6 REASONS FOR INCREASING DECAY Increasing costs of materials ($30 to $73 per ton) Decreasing availability of funds ($1.4m to $580k annually) Poor underlying soil characteristics (in certain areas) Precipitation, traffic, and truck loading Unsustainable maintenance frequency Current Pueblo resurfacing cycle exceeds 100 years
7 $ / ton cost for Hot Mix Asphalt installed Dollars/Ton Year
8 Dollars expended/year Year
9 HIGHLY EXPANSIVE SOILS PRIMARILY IN SOME NORTH AREAS OF CITY
10 Actual Year GOAL Lane Miles of Streets Accumulating Neglected Deterioration
11 CITY-WIDE CITIZEN SURVEYS POINTED AT STREET MAINTENANCE AS A TOP PRIORITY Resident surveys show strong desire for street maintenance (percentage ranking in top 3) % % % In 2010, Pueblo s Highway Users Trust Fund expenditures were directed to fund additional programs, such as: Handicap ramps and pathways Traffic signal projects and materials due to no other available funding
12 OPTIONS MOVING FORWARD Continue current approach of neglecting the majority of pavement surfacing needs Expect increasing deterioration over time Extreme vulnerability to a wet and cold spring Pueblo currently maintains approximately 6 miles of gravel streets and alleys. Therefore, pulverize low volume deteriorated roads in order to reduce service levels to more maintainable gravel or RAP
13 REALLOCATE OR INCREASE FUNDING TO PROVIDE ROADWAY MAINTENANCE Consider restoration to funding impact levels experienced in early 2000 s Rebalancing to increase pavement surfacing expenditures Roughly $3.5M per year will keep road conditions static (overall poor); additional funding could slowly (or quickly) improve road conditions, depending on the level of funding. Creation of a Regional Transportation Authority that would be funded by a dedicated sales tax or mill levy OR - evaluate feasibility of the creation of a Street Maintenance Utility, similar in concept to Pueblo s existing Stormwater Utility
14 STREET MAINTENANCE UTILITY First adopted in Colorado by the City of Ft. Collins Since expanded successfully in Loveland and considered in Boulder Increasing utilization in Montana, Florida, Oregon, Texas, Minnesota Fees based on traffic demands created by all land use types. Approach and methodology tested and upheld in Colorado courts.
15 MODEL AFTER LOVELAND S STREET MAINTENANCE UTILITY Loveland dropped resurfacing frequencies from 12 to 7 years Received strong support from community leaders and residents Fees charged to all land uses, including schools, churches, government operations, non profits 2014 rates range from: $1.87 per unit per month for residential $20-25 per acre per month for Industrial /commercial/ institution $ per acre per month for retail.
16 OTHER RELATED ISSUES Need to revise and update City Standard Specifications to deal with problems caused by expansive soils Considering narrowing of City Standard streets for future developments (less width is less pavement to construct and maintain)
17 OTHER RELATED ISSUES Allow pavement related fees (impact fees, permits) to be retained in the general paving account to support future projects Create a HUTF fund to enable lapse balances to be retained in the fund to also support future projects
18 QUESTIONS??
Pavement Management Program
Pavement Management Program 2014 Street Maintenance Program Executive Summary 01/21/2014 Presented by Mark Thiel Assistant Director of Public Works Program Overview Start of current program 2005 825.1
More informationPAVEMENT MANAGEMENT SYSTEM
PAVEMENT MANAGEMENT SYSTEM 2002 UPDATE prepared by by Willdan Serving Public Agencies PAVEMENT MANAGEMENT SYSTEM CITY OF CALABASAS 2002 UPDATE TABLE OF CONTENTS PART 1 Page GLOSSARY OF TERMS 1 INTRODUCTION
More informationHighway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting
Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting MnDOT Contract No. 1003249 General Project Overview This work is located along Trunk Highway (TH) 23, for State Project (SP) 7305-124.
More informationBenefits of Preventative Maintenance Pavement Sealers
Pavement Coatings Technology Council WWW.PAVEMENTCOUNCIL.ORG Benefits of Preventative Maintenance Pavement Sealers Introduction Pavement Sealers have been used successfully for around 60 years. Recently,
More informationRoadway Cost Per Centerline Mile Revised June 2014
Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743
More informationSUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION:
September 22, 2009 Updated November 16, 2009 SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION: 1. DESCRIPTION: The cross slopes of the roadway are to be constructed as detailed in the plans and within
More informationCITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON
Council Meeting Date: August 11, 2014 Agenda Item: 7(c) CITY COUNCIL AGENDA ITEM CITY OF SHORELINE, WASHINGTON AGENDA TITLE: Motion Authorizing the City Manager to Execute a Contract with Transmap Corporation
More informationHow To Plan For A County Budget
CHAPTER 10 CAPITAL IMPROVEMENTS ELEMENT The 1978 and 1985 Levy County Comprehensive Plans contained a statement of economic feasibility as a part of the Future Land Use Plan. This chapter updates that
More informationDecision Matrix for Pavement Preservation. Mike Mamlouk Arizona State University
Decision Matrix for Pavement Preservation Mike Mamlouk Arizona State University Outline 1. Concept of preventive maintenance 2. Effectiveness of treatments 3. Treatment selection 2 Pavement Pavement Preservation
More informationThe Southwest Florida Water Management District (District) does not discriminate on the basis of disability. This nondiscrimination policy involves
Southwest Florida Water Management District Fiscal Year 2011 2012 through Fiscal Year 2015 2016 Five-Year Capital Improvements Plan (As required by Section 373.536(6)(a)3, Florida Statutes) n e td m e
More informationDRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job
MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION Using the Full Range of Tools for a Challenging Job Report To: TTI Committee May 13, 2014 1 Pavement Management - Suggested Treatments
More informationSurface Transportation Program (STP) Projects
Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE
More informationChapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33
Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33 This page intentionally left blank. PAGE 34 MINNESOTA GO MNDOT TRANSPORTATION ASSET MANAGEMENT PLAN ASSET INVENTORY
More informationColorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding
C Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding These guidelines are intended to provide assistance in selecting OFF-SYSTEM
More informationPavement Management Program
Pavement Management Program 2013 Street Maintenance Program Executive Summary 1/15/2013 Presented by Mark Thiel Assistant Director Public Works Program Overview Start of current program 2005 812.5 Lane
More informationLocal Pavement Asset Management Plan for the Village of Decatur
2014 Local Pavement Asset Management Plan for the Village of Decatur 4/14/14 Table of Contents Summary of Assets and Goals of the Plan 3 Community Finances...4 Managing Lifecycles of Pavement Assets.7
More informationTOWN OF NEW HAVEN ROAD PLAN
1 TOWN OF NEW HAVEN ROAD PLAN BACKGROUND The Town of New Haven, Vermont consists of 42 square miles of land and a population of approximately 1400 people. At the start of the 21 st century, it is served
More informationWESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24
Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge
More informationCOST EFFECTIVE ROAD MAINTENANCE MARCH 2015
COST EFFECTIVE ROAD MAINTENANCE MARCH 2015 According to the University of New Hampshire technology transfer Center the goal of a Road Surface Management Plan should be the following: Maximize Return on
More informationCITY OF GREATER SUDBURY. Municipal Roads, Structures and Related Infrastructure. Final Report. July 10, 2012
CITY OF GREATER SUDBURY Financial Planning for Municipal Roads, Structures and Related Infrastructure Final Report July 10, 2012 Financial Planning for Roads Table of Contents I. Financial Planning for
More information2011 NACE Conference by. Ken Skorseth SDLTAP Program Manager
2011 NACE Conference by Ken Skorseth SDLTAP Program Manager Paving or constructing asphalt surface treatments when asphalt prices were low. May not have been justified based on traffic, but it bought political
More informationSummary of FHWA In-Place Recycling Activities
Summary of FHWA In-Place Recycling Activities 2014 International and 7 th Western States In- Place Recycling Conference Lee Gallivan FHWA Asphalt Materials Engineer Office of Asset Management, Pavement,
More informationPervious Pavement SYSTEMS THINKING. THE NEW DESIGN PROBLEM and the Role of the Civil Engineer. LOW IMPACT DEVELOPMENT Introduction
Pervious Pavement Options and Design Guidelines (with LID example projects) SYSTEMS THINKING Need to think differently about the problem Whole System Design Site & Project Relationships Integrated Design
More informationNevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005
Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Purpose The purpose of this review is to capture for technical deployment the most advanced
More informationCHAPTER 2 PAVEMENT MANAGEMENT SYSTEM
CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM 2.1. INTRODUCTION TO PAVEMENT MANAGEMENT The ability of a pavement system to serve a society is largely a function of planning. Planning is the intersection between
More informationCosts for Green Infrastructure and Stormwater Controls
Costs for Green Infrastructure and Stormwater Controls August 5, 2015 Bob Newport U.S. EPA Region 5 (Chicago Office) Topics to be Covered EPA data collection and cost analysis focused on postconstruction
More informationBituminous Paving and Construction
JOHN OKOREN, CHAIRMAN LORNE HAASE, VICE-CHAIRMAN 85 WEST HIGHWAY M-115 HAROLD FALON, MEMBER BOON, MICHIGAN 49618 ALAN D. COOPER, MANAGER PHONE 231-775-9731 ANDREA HERMAN, FINANCE AND BUSINESS MANAGER FAX
More informationChapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling
7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished
More informationSECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.
Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to
More informationPavement Management Implementation: Success Stories for Maryland Counties
Pavement Management Implementation: Success Stories for Maryland Counties September 25, 2015 Aaron D. Gerber, P.E. How Does Your Organization Manage Pavement Assets? By Experience/Past Practice? By Customer
More informationTransportation Infrastructure Asset Management
2015 NW Region TTAP& BIA Symposium Transportation Infrastructure Asset Management March, 2015 Happy Longfellow, PE hlongfellow@parametrix.com (206) 394-3649 ASSET MANAGEMENT OVERVIEW What? Why? How? Inventory
More informationCosts for Green Infrastructure and Stormwater Retention Practices
Costs for Green Infrastructure and Stormwater Retention Practices Bob Newport U.S. EPA December 9, 2014 Topics to be Covered EPA data collection and cost analysis focused on postconstruction stormwater
More informationPUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN
PUBLIC RIGHT-OF-WAY ACCESSIBILITY TRANSITION PLAN FOR THE VILLAGE OF HUNTLEY, ILLINOIS 2015 Contents Introduction 1 Purpose 1 Officials Responsible for Implementation 2 Public Notice 2 Grievance Procedure
More informationFor Asset Management
For Asset Management By: Larry Weiss SDLTAP It Begins with Accurate Inventory Inventory of existing system: The Local Roads Needs Study conducted in Aug/Sept of 08 indicated by it s results and from LTAP
More informationLife Cycle Cost Analysis
Ronald Collins Pavement Technology a Division of Astec, Inc. LCCA is an analysis technique that builds on the well founded principles of economic analysis to evaluate the over-the-long-term economic efficiency
More informationHIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES
Approved 6/26/01 HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES All new, modified and/or changed use access(es) onto county roads shall be subject to the access and corridor protection guidelines
More informationThe City of Owen Sound Asset Management Plan
The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to
More informationBellevue s ADA Sidewalk and Curb Ramp Compliance Program
Page 6 Bellevue s ADA Sidewalk and Curb Ramp Compliance Program By: Franz Loewenherz, Senior Transportation Planner, City of Bellevue, Washington Phone: (425) 452-4077; E-mail: floewenherz@bellevuewa.gov
More informationThe Roads to Recovery. Facts About Transportation Funding and Spending
The Roads to Recovery Facts About Transportation Funding and Spending How Pima County spends transportation money (F.Y. 2014-15 Transportation Budget) 1 Debt Service (1997 bonds): $19.1 million In 1997,
More informationAsset Management Policy Statement
Asset Management Policy Statement Infrastructure asset management focuses on physical rather than financial assets, such as streets and bridges versus stocks and bonds. The renewal and replacement of the
More informationMAINTENANCE. Infrastructure. Introduction. Safety. Policies & Programs. Summary EXISTING CONDITIONS
PAGE 2-60 installed in September and October 2014. At these locations the City of Greensboro installed Pyro Posts and ZELT Inductive Loops, provided by NCDOT for the program, to differentiate between pedestrians
More informationThe Top 50 Highway Projects to Support Economic Growth and Quality of Life in Alabama
The Top 50 Highway Projects to Support Economic Growth and Quality of Life in Alabama FEBRUARY 2016 Washington, DC 202-466-6706 Founded in 1971, TRIP of Washington, DC, is a nonprofit organization that
More informationAmerican Public Works Association. Utility and Public Right-of-Way Committee. Report on Right-of-Way Permit Fees
American Public Works Association Utility and Public Right-of-Way Committee Report on Right-of-Way Permit Fees 1 A survey of road cut or right-of-way opening fees for various government agencies, municipalities,
More informationEric Ross Federal Highway Administration Proposed Office of Performance Management
Life-Cycle Cost Analysis a Decision Making Tool Eric Ross Federal Highway Administration Proposed Office of Performance Management FHWA Tools Team Evaluation and Economic Investment Team development and
More informationWASHINGTON STATE TRANSPORTATION BY THE NUMBERS:
WASHINGTON STATE TRANSPORTATION BY THE NUMBERS: Meeting the State s Need for Safe and Efficient Mobility MARCH 2014 202-466-6706 www.tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit
More informationAppendix D:When to Pave a Gravel Road
Appendix D:When to Pave a Gravel Road D1 Appendix D: When to Pave a Gravel * Road by Kentucky Transportation Center, University of Kentucky at Lexington,KY Contents A Word About the Term Paved Introduction
More informationTrack Research Sponsors
Preservation Update Track Research Sponsors Washington Montana Oregon Idaho Wyoming Nevada Utah Colorado California New Mexico Arizona Pre-2012, 2012, 2015 North Dakota South Dakota Nebraska Kansas Oklahoma
More informationSection 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES
Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES 11.5.1 Purpose To provide a uniform procedure for determining that the last structural layer meets the applicable straightedge
More informationPaving Capitalization Work Categories and Treatments
Statement of ODOT Infrastructure Capitalization Policy Government Accounting Standards Board (GASB) 34 requires public agencies to capitalize infrastructure assets on their financial statements for periods
More information100 Design Controls and Exceptions
Table of Contents 100 Introduction... 1 101 Functional Classification... 1 101.1 General... 1 101.2 Urban & Rural... 1 101.3 Classification Used In ODOT Design Criteria... 1 102 Traffic Data... 2 102.1
More informationActivity Management Plan Overview
Trevor Kerr Timaru District Council Activity Management Plan Overview 2012 2022 Transport Table of Contents 1. What we do now?... 5 1.1. Transport Assets... 5 1.2. Transport Activities... 5 2. Key Network
More informationTownship of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
More information* Unaudited. FY 2006-07 Revenue Budget. Resource II Franchise Fees and Other Taxes $36,060,759 7% Resource II Franchise Fees and Other Taxes
Resource II Franchise Fees and Other Taxes Franchise Fees and Other Taxes The collection of fees from various franchise licenses awarded to businesses or individuals granting permission to construct, maintain,
More informationPavement Management Office
Department of Transportation and Public Works Puerto Rico Pavement Management Office PAVEMENT PRESERVATION SEPPP 1 GOALS AND OBJECTIVES PRHTA has been collecting data for more than twenty (20) years with
More informationStrategic Business Plan
Williams Gateway Airport Authority Strategic Business Plan Fiscal Years 2011-2015 Adopted May 24, 2010 by the Phoenix-Mesa Gateway Airport Authority Board of Directors Page 2 TABLE OF CONTENTS Purpose...4
More informationEXHIBIT A Accessible Truck Routes Map
EXHIBIT A Accessible Truck Routes Map ASHEVILLE, NORTH CAROLINA ROUTE: A ROUTE: B ROUTE: C ROUTE: D ROUTE: E EXHIBIT A EXHIBIT B Craven Street Improvements Map ASHEVILLE, NORTH CAROLINA EXHIBIT B EXHIBIT
More informationPAVEMENT CUT AND REPAIR STANDARDS MANUAL. Department of Public Works and Transportation. City of Dallas
PAVEMENT CUT AND REPAIR STANDARDS MANUAL Department of Public Works and Transportation City of Dallas October 2003 TABLE OF CONTENTS Preface and Acknowledgements PART 1 Pavement Cut and Repair Standards
More informationStraw Proposal #1 Fund the entire Railroad Quiet Zone implementation through a general obligation bond at an estimated cost of $6,485,000.
Memorandum Date: March 2, 2016 To: Railroad Quiet Zone Citizen Advisory Panel From: Mark Schoening, P.E., City Engineer Subject: Railroad Quiet Zone Potential Funding Sources for Implementation An outline
More informationKENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS
KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS I. GENERAL The following policy shall apply when the intent of the project is to
More informationNEW YORK S TOP TRANSPORTATION ISSUES:
NEW YORK S TOP TRANSPORTATION ISSUES: Meeting the State s Need for Safe, Smooth and Efficient Mobility JANUARY 2016 202-466-6706 tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit organization
More informationCrack Sealing & Filling. Crack Sealing Why, Where, & How. 5 Benefits of Crack Sealing. Crack Sealing - Overview. Repair Many Types of Cracks
Crack Sealing Why, Where, & How Dennis Roberts Remac Asphalt Maintenance, Inc. Freeman, Virginia www.remacus.com 434-634-2111 Crack Sealing & Filling Crack repair treatments are an important part of all
More informationNarrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22)
Narrative Response/Attachment 1 (WisDOT 2014-2018 TAP- Second Round Application ID-SWBP22) 2. For Bicycle and Pedestrian Projects: Clearly indicate the location, length, width, surface materials, and any
More informationHow does CDOT rank among state DOTs?
1 Colorado Department of Spring 2014 How does CDOT rank among state DOTs? State transportation departments, the federal government and third-party groups use a variety of metrics to judge the performance
More informationHow To Improve Road Quality
A Customer Service Level Approach for Maine DOT s Asset Management System Jeffrey L. Zavitski, B.A. Senior Implementation Specialist Deighton Associates Limited Chip Getchell, P.E. Director, Work Plan
More informationMISSOURI TRANSPORTATION BY THE NUMBERS:
MISSOURI TRANSPORTATION BY THE NUMBERS: Meeting the State s Need for Safe and Efficient Mobility APRIL 2015 202-466-6706 tripnet.org Founded in 1971, TRIP of Washington, DC, is a nonprofit organization
More informationAREA: 0.16 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF
FILE NO.: Z-9020 NAME: Hometown Tax Service Short-form PD-O LOCATION: Located at 3008 West 12 th Street DEVELOPER: Mark Green 65 Westfield Loop Little Rock, AR 72210 SURVEYOR: Kittler-Roberts Group, LLP
More informationArriving at Depreciated Replacement Cost. Supported by HAMFIG
Arriving at Depreciated Replacement Cost Supported by HAMFIG What is DRC? a method of valuation which provides the current cost of replacing an asset with its modern equivalent asset less deductions for
More informationPavement Management System Overview
TABLE OF CONTENTS The Home Screen... 3 The Gutter... 4 Icons... 4 Quick Links... 5 Miscellaneous... 6 PMS Menus... 7 Setup Menu... 7 Construction Setup... 7 1. Material Codes... 8 2. Standard Sections...
More informationAssessment Procedures for Paved and Gravel Roads. Indiana Local Technical Assistance Program
Assessment Procedures for Paved and Gravel Roads April 15, 2013 SP-28-2013 Indiana Local Technical Assistance Program Purdue University School of Civil Engineering Indiana Local Technical Assistance Program
More informationCity Manager s FY 2017 Proposed Budget. City of Fairfax, VA City Council Meeting February 23, 2016
City Manager s FY 2017 Proposed Budget City of Fairfax, VA City Council Meeting February 23, 2016 FY 2017 Budget Calendar March 1, 2016 (Work Session) March 8, 2016 (Regular Meeting) March 22, 2016 (Regular
More informationPavement Rehabilitation Using Hot Mix Asphalt. - National Perspective -
Pavement Rehabilitation Using Hot Mix Asphalt - National Perspective - Rehabilitation Process Evaluate Existing Pavement and Conditions Evaluate Options Construct Project Monitor Performance Evaluate Existing
More informationRehabilitation for Concrete Pavements
Rehabilitation for Concrete Pavements www.asphaltalliance.com Overview Effective rehab for PCC Break PCC into small segments Overlay with Hot Mix Asphalt Road-userfriendly Rubblize and pave in off-peak
More informationSNOW REMOVAL AND ICE CONTROL OPERATIONS MANUAL TABLE OF CONTENTS
1 TABLE OF CONTENTS SECTION: 1) Introduction Page 2 2) Scope of Program Page 2 3) General Instructions Page 3 4) Storm Procedures Page 3 5) Snow Removal Operating Procedures Page 4 6) Snow Ordinance Page
More informationThe Need for Traffic Incident Management
The Need for Traffic Incident Management With traffic incidents responsible for approximately 50-60% of the congestion delays motorists encounter on the nation s roadways every day, increased roadway capacity
More informationWARM MIX ASPHALT AND RECYCLED MATERIALS
KENTUCKY RIDES ON US Asphalt. WARM MIX ASPHALT AND RECYCLED MATERIALS A publication dedicated to asphalt pavements and the environment. www.paiky.org ASPHALT. EARTH FRIENDLY Overview Asphalt is the preferred
More informationHERS_IN. HIGHWAY ECONOMIC REQUIREMENTS SYSTEM (for) INDIANA. AASHTO Transportation Estimator Association Conference October 16, 2001
AASHTO Transportation Estimator Association Conference October 16, 2001 HERS_IN HIGHWAY ECONOMIC REQUIREMENTS SYSTEM (for) INDIANA OVERVIEW HERS Background System Planning Tool Development HERS_IN Structure
More informationCHAPTER 2 LCCA APPROACHES
2.1 LCCA Basis CHAPTER 2 LCCA APPROACHES When making decisions about pavement design, LCCA: Compares pavement alternatives; and Identifies the best strategy based on current information as well as meeting
More informationCity of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN
Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,
More informationAcknowledgments. Technical assistance and printing provided by Division of Business, Facilities and Asset Management, Reprographics Unit.
Acknowledgments This report is prepared by the California Department of Transportation, Division of Maintenance, Pavement Program, Office of Planning and Programming and Office of Pavement Management and
More informationTRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES
TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES Background One of the most critical public services provided by a community is the community s transportation system. An effective
More informationPavement Management Systems
Pavement Management Systems Presented by Bill Weiss, P.E. Applied Pavement Technology, Inc. (APTech) At the 2015 Municipal Streets Seminar Ames, Iowa Why Pavement Management??? Pavements are expensive
More informationSTORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F
STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection
More informationFinal Report Evaluation of I-Pave Low Volume Road Design Software
Final Report Evaluation of I-Pave Low Volume Road Design Software May 2015 Michael I Darter, William R. Vavrik, Dinesh Ayyala 2015 2014 Applied Research Associates, Inc. 1 Objectives 1. Obtain all documentation
More informationSECTION 3.3 - PAVEMENT DESIGN
SECTION 3.3-3.3.1 GENERAL 3.3.2 SUBSURFACE DRAINAGE 3.3.3 DETERMINATION OF DESIGN TRAFFIC 3.3.4 SUBGRADE EVALUATION 3.3.5 PAVEMENT THICKNESS 3.3.5.1 GRANULAR PAVEMENTS WITH THIN BITUMINOUS SURFACING 3.3.5.2
More informationExpected Service Life and Performance Characteristics of HMA Pavements in LTPP
Expected Service Life and Performance Characteristics of HMA Pavements in LTPP Expected Service Life and Performance Characteristics of HMA Pavements in LTPP Submitted to: Asphalt Pavement Alliance Prepared
More informationDESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
More informationTransportation Asset Management Case Studies. Presented by ECONOMICS IN ASSET MANAGEMENT. The Hillsborough County, Florida, Experience
Transportation Asset Management Case Studies c1 Presented by ECONOMICS IN ASSET MANAGEMENT The Hillsborough County, Florida, Experience c2 1 The Federal Highway Administration Office of Asset Management
More informationPLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
More informationConstruction of Quality Hot Mix Asphalt Pavements
59 th Annual Asphalt Paving Conference Outline Best Practices for Pavement Construction Placement Best Practices Surface Prep Project planning Understanding the paver Factors affecting the screed Screed
More informationHIGHWAYS AND PUBLIC IMPROVEMENTS DEPARTMENT
HIGHWAYS AND PUBLIC IMPROVEMENTS DEPARTMENT 181 182 PUBLIC WORKS 183 PUBLIC WORKS PLANNING PERIOD: FY2010-11 THROUGH FY2014-15 FISCAL BUDGET PLANNING YEAR: FY2012-13 FUND: General Fund COST CENTER NUMBER
More informationTOWN OF ALTONA 2016 FINANCIAL PLAN
TOWN OF ALTONA 2016 FINANCIAL PLAN Town of Altona 2016 Financial Plan Page 1 of 21 April 11, 2016 TOWN OF ALTONA 2016 FINANCIAL PLAN Executive Summary Municipal Taxes The enclosed budget documentation
More informationStop The stop sign, a red octagon with white lettering, means come to a full stop and be sure the way is clear before proceeding.
Tr a f f i c S i g n s 7 7. TRAFFIC SIGNS Many collisions and near crashes occur as a result of drivers who ignore or fail to respond appropriately to traffic signs. It is essential that the meaning of
More informationNew Jersey Micro-Surface Pavement Noise Evaluation Submitted on: August 29, 2014
New Jersey Micro-Surface Pavement Noise Evaluation Submitted on: August 29, 2014 John Hencken* Research Engineer Edwin Haas Graduate Assistant Michael Tulanowski Research Assistant Thomas Bennert, Ph.D.
More informationFly Ash Slurry Injection (FASI) of Bituminous Thermal Cracks
Fly Ash Slurry Injection (FASI) of Bituminous Thermal Cracks Schedule What is Fly Ash Slurry Injection (FASI) Thermal Cracks and Why They Depress Pavement Rehab Strategies Special Provisions Upcoming Projects
More informationLIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS
LIFE-CYCLE COST COMPARISON FOR MUNICIPAL ROAD PAVEMENTS HEIN, David K., P.Eng. Applied Research Associates, Inc., 5401 Eglinton Avenue West, Suite 105, Toronto, ON, CANA- DA, M9C 5K6. Tel: 416-621-9555
More informationInfrastructure assets are distinguished from other capital assets because they normally:
4. REPORTING 4.2 Government-Wide Financial Statements 4.2.6 Infrastructure Reporting 4.2.6.10 Governments are required to report all of their capital assets in the statement of net position. Infrastructure
More informationCity of St. Petersburg Development Services. February 2006. Driveways for Residential Properties
City of St. Petersburg Development Services February 2006 Citizen s s Guide to Driveways for Residential Properties Pursuant to Section 29-909 of the City s Zoning Ordinance, all passenger motor vehicles
More informationPUBLIC WORKS COMMISSION: PAVING WORK GROUP
Permeable Interlocking Concrete Pavers (PICP) PUBLIC WORKS COMMISSION: PAVING WORK GROUP IT S NOT ABOUT FILLING POTHOLES ANY MORE ENVIRONMENTALLY SUSTAINABLE INTEGRATED PAVING STRATEGIES FOR THE 21 ST
More informationMETHODS FOR ESTABLISHING SAFE SPEEDS ON CURVES
Page 1 of 4 PRACTICES PART SECTION SUB-SECTION TRAFFIC OPERATIONS General Collision exposure is usually greater along horizontal curves than along tangent sections of a highway. The potential for collisions
More informationPROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
More information