1 Santa Clara County Rubberized Asphalt Concrete (RAC) Theron Roschen, PE - Quincy Engineering With assistance from: The California Department of Resources Recycling and Recovery (CalRecycle)

2 Why choose asphalt rubber? Less maintenance Resistance to reflective cracking Established life cycle cost-effectiveness Can be used in reduced thickness Proven alternative to costly reconstruction Quieter pavements (4dB 6-years post overlay)

3 NO COST TECHNOLOGY TRANSFER THROUGH Seminars Field Assistance Technical Reviews Guidelines Grant Assistance

4 California Scrap Tire Overview Generates million scrap tires/year $1.75 per tire collected from CalRecycle Grants

5 Asphalt-Rubber as defined by ASTM D8-88 Asphalt-Rubber is a blend of asphalt cement, reclaimed tire rubber and certain additives, in which the rubber component is at least 15% by weight of the total blend and has reacted in the hot asphalt cement sufficiently to cause swelling of the rubber particles.

6 Type 1 Asphalt-Rubber Binder - Paving grade asphalt and reclaimed vulcanized rubber. Type 2 Asphalt-Rubber Binder - Paving grade asphalt, extender oil, high natural and reclaimed vulcanized rubber. Terminal Blend - Paving grade asphalt, polymers, and reclaimed vulcanized rubber digested into asphalt at the refinery

7 80% +/- 2% of total binder 20% +/- 2% of total binder Paving Asphalt AR-4000 Asphalt Modifier (extender oil) 2.5% to 6% by weight of paving asphalt High Natural Rubber 25% +/- 2% of total rubber Scrap Tires 75% +/- 2% of total rubber Type II Asphalt Rubber

8 Terminal Blend Tire Rubber Asphalt Recycled tire rubber completely digests tire rubber particles into an asphalt binder Refined for 16 hours, under pressure and temperature Non proprietary Meets PG grading system Material comes ready to use upon arrival Polymers may be added Meets CalRecycle Grants

9 Viscosity is what defines Asphalt-Rubber Binder Asphalt-Rubber 1,500 to 2,500 Centipoises At 375 Extremely Viscous Rubberized Asphalt Terminal Blend 300 to 600 Centipoises At 325

10 Granulation 2 Inch Chips Reduced to ¾ Inch While Separating Steel

11 Granulation ¾ Inch Reduced to 3/8 Inch While Separating Fabric and Steel

12 Finish Product and Bagging

13

14 Ground tire rubber in 2,000 pound Supersacks

15 Rubber is fed from the weigh hopper into a high shear mixer.

16 liquid asphalt and modifier at 375 to 425 F

17 Aggregate Gradation Comparison Open Graded Gap Graded Dense Graded

18 % Passing Composite Power 45 Chart 100 Maximum Density Gap Grade 80 Dense Grade Open Grade SMA RAC Presentation 12.7 West 19 Covina 25 January 27,

19 HMA vs. RAC RAC Presentation West Covina January 27,

20 Cost Factors When AR is in production the plant can not make conventional Haul distance and ambient temperatures Traffic control for cooling time KLEINFELDER Mike Robinson Lincoln / Rocklin PMAR March 5,

21 Contractor s Cost Issues Small Projects = LARGE UNIT COSTS!! Expensive move-in Agencies can save $$ with coordination/procurement Follow Caltrans Bidding in the Winter will allow efficient scheduling for the upcoming season Be flexible KLEINFELDER Mike Robinson Lincoln / Rocklin PMAR March 5,

22

23

24 Design of Asphalt Rubber Pavements Uses a deflection based design method Up to 50 % reduction in thickness compared to conventional AC design thickness to retard reflective cracking Over 1000 reduced thickness projects KLEINFELDER Mike Robinson Lincoln / Rocklin PMAR March 5,

25 Heavy Vehicle Simulator UC Davis

26 Heavy Vehicle Simulator UC Davis

27 Page 27 Agenda

28 3 Conv. AC 1 1/2 ARHM 1 ARHM

29 Performance in Indio, CA

30

31 SHOULD BE A MINIMUM OF 315 F LEAVING PLANT Temp of ARHM-GG

32 Virgin Asphalt Temp: Reaction Temperature: Mix Plant: 1 st Breakdown: All compaction: Ambient/Surface Temp: >375 F F F >280 F >250 F >55 F RAC Presentation West Covina January 27,

33 Multicool 55 o, 5 mph wind, 2 less than 10 minutes RAC Presentation West Covina January 27,

34 65 o Ambient & Surface, 5 mph wind Temp ( o F) " 1.5" 1.2" 1" Minutes RAC Presentation West Covina January 27,

35 But it s not just cooling RAC Presentation West Covina January 27,

36 But it s not just cooling Roller Not enough densification here Too thin and too cold here RAC Presentation West Covina January 27,

37 StreetSaver PCI Curve Pavement Condition Index (PCI) Asphalt Rubber vs. Conventional for Arterial Streets About 300 data points Conventional HMA Family Curve New RAC Family Curve Age of Pavement (Year) 37

38 RAC pricing can be volatile based on many factors: Cost of Oil Tonnage Bid Blender Availability Geographic Location Urban vs. Rural Locations Contractor Familiarity Proximity of Crumb Plants Haul Distance to Site Seasonal Temps Terminal Blend RAC vs. Field Blend RAC

39

40 310 Caltrans and local agency projects were analyzed: The average of all projects - RAC projects cost 15.5% higher. ($95.40 per ton vs. $80.55 per ton) The differential between RAC and conventional has been trending down by 29% over the past 3- years. The average differential between RAC and conventional for local agency projects was approximately $20 per ton. For lower tonnage projects (3,000 to 7,000 tons), the average cost increase was 14.5% higher than a 12,000 ton project.

41 Statewide Local Streets and Roads Needs Assessment

42 Cities (44%) and counties (37%) own and maintain 81% of California s roads ~ 143,000 centerline-miles In 10 years - 25 % of roads will be in failed category Current funding for local system is $2.5 billion a year Status quo will require an additional $1.9 billion a year Shortfall >$82 billion over the next 10 years to bring the system up to date

43 National Transportation Group (TRIP): Added cost to California drivers up to $800 per year in repair and other costs International Pavement Management Assoc.: Replacement value of roadway is $50 per SY. Maintenance should be 1.5% of the replacement value annually to keep PCI as is

44 How Did We Get Here? Population grew from 30M 1990 to 38M (27%) New regulations ADA, NPDS, name your poison Last 15 years, paving costs have increased more than eight-fold Gas tax has not increased in over 20 years, EV s, Hybrids Every additional dollar invested will result in cost savings of almost $2.

45

46

47 350 o F Stir binder Read peak viscosity Average 3 readings Viscometer Testing

48 Process Plant Check plant certification Samples Paving asphalt Crumb rubber AR binder Aggregate Certificates of Compliance Temperatures Plant, site, screed, rollers

49 SHOULD BE A MINIMUM OF 315 F LEAVING PLANT Temp of ARHM-GG

50 Virgin Asphalt Temp: >375 F Reaction Temperature: F Mix Plant: F 1 st Breakdown: >280 F All compaction: >250 F Ambient/Surface Temp: >55 F (higher temperatures recommended)

51 INSPECTION AT THE JOB SITE PRIOR TO PAVING Pre-Construction Meeting: Approved mix design Surface preparation Delivery method Rate of delivery Equipment in good working order Number and type of rollers Acceptance Testing Other Issues (Refer to A-R Design Guide) Ambient and surface temperatures (>55 ο F)

52 Surface Preparation Cracks filled in advance? R & R obvious subgrade failures Leveling course Remove thermoplastic markings Mill conforms at curb and end match Sweep / power wash

53 Surface Preparation Clean & Dry Tack Uniformly applied No more than necessary Emulsions must break before paving Coldmilled surfaces Texture provides aggregate interlock Application of tack can be tricky

54 Automated ski Windrow/pick-up machine or end dump Pave on lane lines Slow down the paver Extra Roller? Keep traffic off till 150 F Consider I/S closure and/or night paving if ambient met

55

56

57

58 Application 375 o F to 400 o F 0.60 to 0.65 gallons/sy 70% Embedment

59 (Hot Pre-Coated Aggregate)

60 Aggregate 3/8 and ¼ Precoated w/ 0.5 to 1.0% PG binder Supplied to project at 225 o F to 325 o F lbs/sy Clean & dry Apply IMMEDIATELY!

61 Rollers Minimum of 3 pneumatic 3,000 lbs/wheel minimum 90 psi minimum, or foam-filled 1 steel drum

62 Set & Cure Time No traffic of any kind for at least 15 minutes No traffic other than necessary haul traffic on either seal coat for at least 25 minutes. Keep speeds below 10 mph Sweep 1 hour and next day

63

64

65

66 Double Chip Seal Two Layer System

67 SAMI - Stress Absorbing Membrane Interlayer Pre-existing Pavement AC or ARC Overlay

68 SAMI in a three layer system AC or ARC Overlay SAMI Leveling Course Pre-existing Pavement

69 Noise Reduction and Asphalt Rubber

70 Vehicle-generated noise comes from: engine, exhaust system, aerodynamic noise tire noise. Power train noise External factors For > 30 mph, pavement/tire noise dominates.

71 Walls Effective only for those in line-of-sight. Do not reduce noise at source.

72 A reduction of 3 db(a) is like doubling the distance from the noise, reducing traffic volume by 50%, or reducing traffic speed by 25% 67 db(a) - 3 db(a) = 64 db(a) 100 ft

73 6-year Noise Study Reduction compared to pre-overlay condition Alta Arden AR 1month -6dB 16 months -5dB 6 years -5dB Antelope* AR 6 months -4dB * (speed increase) 5 years -3dB Bond CA 1 month -2dB 4 year 0dB

74 ADOT included rubber asphalt surfacing as a pavement preservation strategy. Independent studies indicate a noise reduction up to 4.5 dba using rubber asphalt.

75 Rubberized Asphalt Concrete Grants Max. grant is $250,000 Program Currently Being Updated Next Cycle August

76 Rubberized Asphalt Concrete Grants: AB 513 (Frazier), grant program will change for the FY 2014/15 solicitation Fixed amount $10 per ton up to $250,000 (3,500 ton min) Chip Seals $0.50 per SY up to $250,000 (40,000 SY min) Prior Grantees eligible 2 to 3 prior grants $7 per ton > 4 prior grants $4 per ton If Budget Proposal approved, a total $8 million available

77 Rubberized Asphalt Concrete Cooperative Purchasing Program (RCPP) 2013

78 New Program, But Not a New Concept Sacramento County Implemented a RCPP Net RAC savings was 15% Introduced new bidders Eliminated Project Delays due to Unavailability of the Mobile Blender Units

79 RCPP Overview Slide 79

80 Quals: New RAC Champion Requirements 1+yrs. experience with RAC and completed 1 or more RAC projects Supports 1 to 3 RCPP Partners RCPA in excess of 15,000 tons RAC, minimum of 2,000 tons/day Each Qualifying New Partners must account for 15% of total RAC Provide a RCPP Final Report for CalRecycle Reimbursements RCPP Reimbursements ranging from $80,000 for one partner up to $200,000 for 3 participants RAC Partner RCPP Reimbursements ranging from $25K for each partner using 3K tons of RAC to $50K for each partner using 7.5K tons of RAC Services valued at approximately $116,000 Cannot be receiving funds through the RAC Grant Program

81 Quals: Experienced RAC Champion Requirements 3+yrs. experience with RAC and used at least 15,000 tons of RAC Supports 2 to 3 RCPP Partners RCPA in excess of 20,000 tons RAC, minimum of 2,000 tons/day Each Qualifying New Partners must account for 15% of total RAC Provide a RCPP Final Report for CalRecycle Cannot be receiving funds through the RAC Grant Program Reimbursements Experience RAC Champion RCPP Reimbursements ranging from $122,500 for 2 partners up to $175,000 for 3 partners RAC Partner RCPP Reimbursements ranging from $25K for each partner using 3K tons of RAC to $50K for each partner using 7.5K tons of RAC Services valued at approximately $88,000

82 Questions? Theron Roschen, PE Quincy Engineering Questions? Questions? Page 82

Florida s Experience with Crumb Rubber

Florida s Experience with Crumb Rubber Florida s Experience with Crumb Rubber Jim Warren Executive Director Asphalt Contractors Association of Florida, Inc. www.floridaridesonus.org Slides Courtesy of FDOT State Materials Office Background

More information

Asphalt-Rubber Chip Seal (SAM and SAMI) applications have been Main Stream since 1985! By: Jeff Smith

Asphalt-Rubber Chip Seal (SAM and SAMI) applications have been Main Stream since 1985! By: Jeff Smith Asphalt-Rubber Chip Seal (SAM and SAMI) applications have been Main Stream since 1985! By: Jeff Smith Background Asphalt-rubber binder and asphalt-rubber pavement preservation systems have been utilized

More information

Definitions...1. Asphalt Rubber Makeup...1. Wet Process High viscosity...1 Wet Process No Agitation...2 Dry Process...2

Definitions...1. Asphalt Rubber Makeup...1. Wet Process High viscosity...1 Wet Process No Agitation...2 Dry Process...2 Introduction to Rubberized Asphalt Concrete Usage RAC-101 Index Definitions...1 Asphalt Rubber Makeup...1 Wet Process High viscosity...1 Wet Process No Agitation...2 Dry Process...2 Asphalt Rubber Binder

More information

AASHTO Subcomittee on Materials Biloxi, Mississippi August 4-10, 2012 Chris Abadie, P.E.

AASHTO Subcomittee on Materials Biloxi, Mississippi August 4-10, 2012 Chris Abadie, P.E. Louisiana Case Study: Implementation of CRM Binder in PG specification. AASHTO Subcomittee on Materials Biloxi, Mississippi August 4-10, 2012 Chris Abadie, P.E. My Story Background Approach Phase I Evaluation:

More information

Reduced Thickness Asphalt Rubber Concrete Leads to Cost Effective Pavement Rehabilitation

Reduced Thickness Asphalt Rubber Concrete Leads to Cost Effective Pavement Rehabilitation Reduced Thickness Asphalt Rubber Concrete Leads to Cost Effective Pavement Rehabilitation By Jack Van Kirk Director of Asphalt Technology Basic Resources Inc. 3050 Beacon Blvd. Suite 205 West Sacramento,

More information

Recycling with CRM. John D Angelo D Angelo Consulting, LLC Phone 571-218-9733 johndangelo@dangeloconsultingllc.com

Recycling with CRM. John D Angelo D Angelo Consulting, LLC Phone 571-218-9733 johndangelo@dangeloconsultingllc.com Recycling with CRM John D Angelo D Angelo Consulting, LLC Phone 571-218-9733 johndangelo@dangeloconsultingllc.com Tire Rubber Crumb Rubber Modifier There are several different processes used to with CRM.

More information

Rubber Pavements Association Draft Guide Asphalt-Rubber Plant Equipment Certification Program

Rubber Pavements Association Draft Guide Asphalt-Rubber Plant Equipment Certification Program 2011 Rubber Pavements Association Draft Guide Asphalt-Rubber Plant Equipment Certification Program Contents Introduction..... 1 Chapter I Asphalt Rubber Blending Plant Equipment Requirements A. General...

More information

Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005

Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Nevada DOT Cold In-Place Recycling Federal Highway Administration National Review Close out meeting, August 25, 2005 Purpose The purpose of this review is to capture for technical deployment the most advanced

More information

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES 1. DESCRIPTION. Asphalt Waterproofing Mix (AWM) is a highly elastomeric, polymermodified, impermeable asphalt

More information

ASPHALT RUBBER USAGE GUIDE

ASPHALT RUBBER USAGE GUIDE ASPHALT RUBBER USAGE GUIDE State of Division of Engineering Services Materials Engineering and Testing Services-MS #5 Office of Flexible Pavement Materials 5900 Folsom Boulevard Sacramento, CA 95819-4612

More information

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling Asphalt Pavements 7-7 Chapter 7 Pavement Rehabilitation Pavement rehabilitation can be accomplished

More information

OHIO ASPHALT PAVING CONFERENCE

OHIO ASPHALT PAVING CONFERENCE OHIO ASPHALT PAVING CONFERENCE 38 th Annual Conference Wednesday, 2/6/2013 Fawcett Center Campus of The Ohio State University 2400 Olentangy River Road Columbus, Ohio 43210 REHAB STRATEGIES FOR LOCAL

More information

SECTION 4Aggegate Subbase

SECTION 4Aggegate Subbase The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages

More information

R.G. Hicks, P.E. Professor Emeritus Department of Civil Engineering Oregon State University Corvallis, OR 97331. prepared for

R.G. Hicks, P.E. Professor Emeritus Department of Civil Engineering Oregon State University Corvallis, OR 97331. prepared for ASPHALT RUBBER DESIGN AND CONSTRUCTION GUIDELINES VOLUME I DESIGN GUIDELINES by R.G. Hicks, P.E. Professor Emeritus Department of Civil Engineering Oregon State University Corvallis, OR 97331 prepared

More information

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,

More information

High-Speed Nondestructive Testing and Intelligent Construction Systems

High-Speed Nondestructive Testing and Intelligent Construction Systems High-Speed Nondestructive Testing and Intelligent Construction Systems 1st International Conference on Transportation Construction Management February 9-11, 9 2008 Orlando, Florida Ted Ferragut, P.E. NDT

More information

Section 300 Base Courses

Section 300 Base Courses Table of Contents 1. Importance of Base Courses... 300-1 2. Types of Bases... 300-3 A. Cement Treated Permeable Base Course... 300-3 B. Bituminous Concrete Base Courses... 300-6 C. Superpave Asphalt HMA

More information

Construction of Quality Hot Mix Asphalt Pavements

Construction of Quality Hot Mix Asphalt Pavements 59 th Annual Asphalt Paving Conference Outline Best Practices for Pavement Construction Placement Best Practices Surface Prep Project planning Understanding the paver Factors affecting the screed Screed

More information

Asphaltic Wedge Paving

Asphaltic Wedge Paving OFFICIAL NOTICE ADVERTISEMENT FOR BIDS Notice is hereby given by the Town of Oregon, Dane County, Wisconsin, will receive sealed bids for Road Construction as listed in this request until 4:00 P.M., Local

More information

Introduction. Emulsify with water. Asphalt Emulsions 101. Asphalt Binder Properties. Why Heat Asphalt? So It Can Be:

Introduction. Emulsify with water. Asphalt Emulsions 101. Asphalt Binder Properties. Why Heat Asphalt? So It Can Be: Asphalt Emulsions 101 Introduction Chris Lubbers Technical Sales and Marketing Mgr Kraton Polymers, LLC 50 TH Annual Idaho Asphalt Conference Moscow, ID October 28, 2010 Semi Solid Liquid Asphalt Binder

More information

Application and Usage...1. Definitions...1 Crumb Rubber Modifier (CRM)...1 High Natural Rubber (High Natural CRM)...1 Wet Process...

Application and Usage...1. Definitions...1 Crumb Rubber Modifier (CRM)...1 High Natural Rubber (High Natural CRM)...1 Wet Process... Application and Usage Guide RAC-102 Index Application and Usage...1 Definitions...1 Crumb Rubber Modifier (CRM)...1 High Natural Rubber (High Natural CRM)...1 Wet Process...2 Binder Design...4 Binder Blend

More information

Rock Products Committee SCOPING DOCUMENT Increasing Crumb Rubber Usage Small Amount of CRM in Hot Mix Asphalt March 4, 2015

Rock Products Committee SCOPING DOCUMENT Increasing Crumb Rubber Usage Small Amount of CRM in Hot Mix Asphalt March 4, 2015 SCOPING DOCUMENT Task Group Problem Process Annual Title by Using a Issue/Problem Statement Expedited Emerging Initiative Section 42703 of the Public Resources Code (AB 338) requires Caltrans to use a

More information

Resurfacing Concrete. Page 1 of 5

Resurfacing Concrete. Page 1 of 5 Resurfacing Concrete Materials List QUIKRETE Concrete Resurfacer (No. 1131) (see calculator on page 5 for quantity needed) QUIKRETE Concrete and Stucco Wash (No. 8601) QUIKRETE Concrete Sealer (No. 8800)

More information

Proposed Revision to Bridge Design & Drafting Manual

Proposed Revision to Bridge Design & Drafting Manual INTEROFFICE MEMO TECHNICAL SERVICES Bridge Engineering Section Office Phone: (503) 986-4200 Fax Number: (503) 986-3407 DATE: February 5, 2014 TO: Scott Liesinger Bridge Design Standards Engineer FROM:

More information

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries

Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or

More information

COST EFFECTIVE ROAD MAINTENANCE MARCH 2015

COST EFFECTIVE ROAD MAINTENANCE MARCH 2015 COST EFFECTIVE ROAD MAINTENANCE MARCH 2015 According to the University of New Hampshire technology transfer Center the goal of a Road Surface Management Plan should be the following: Maximize Return on

More information

Asphalt Pavement Association Of Michigan Selecting the Right Mix. 2937 Atrium Drive, Suite 202 Okemos, MI 48864 517-323-7800 www.apa-mi.

Asphalt Pavement Association Of Michigan Selecting the Right Mix. 2937 Atrium Drive, Suite 202 Okemos, MI 48864 517-323-7800 www.apa-mi. 2937 Atrium Drive, Suite 202 Okemos, MI 48864 517-323-7800 www.apa-mi.org History Performance Graded Binders MDOT Local Agency Guide NAPA Guide Outline Other Considerations For each there are: Right

More information

CONSTRUCTION AND PERFORMANCE OF ULTRATHIN ASPHALT FRICTION COURSE

CONSTRUCTION AND PERFORMANCE OF ULTRATHIN ASPHALT FRICTION COURSE NCAT Report No. 97-5 CONSTRUCTION AND PERFORMANCE OF ULTRATHIN ASPHALT FRICTION COURSE by Prithvi S. Kandhal Larry Lockett September 1997 CONSTRUCTION AND PERFORMANCE OF ULTRATHIN ASPHALT FRICTION COURSE

More information

Transportation Infrastructure Asset Management

Transportation Infrastructure Asset Management 2015 NW Region TTAP& BIA Symposium Transportation Infrastructure Asset Management March, 2015 Happy Longfellow, PE hlongfellow@parametrix.com (206) 394-3649 ASSET MANAGEMENT OVERVIEW What? Why? How? Inventory

More information

Benefits of Preventative Maintenance Pavement Sealers

Benefits of Preventative Maintenance Pavement Sealers Pavement Coatings Technology Council WWW.PAVEMENTCOUNCIL.ORG Benefits of Preventative Maintenance Pavement Sealers Introduction Pavement Sealers have been used successfully for around 60 years. Recently,

More information

SC2000 CEMENT BONDING PROCEDURES

SC2000 CEMENT BONDING PROCEDURES Pg.1 SC2000 CEMENT BONDING PROCEDURES Widely recognized as the world s finest cold vulcanizing cement REMA SC2000 is the solution to your industrial bonding problems. By using REMA UTR20 hardener with

More information

Robert E. (Bob) Winters Treasurer and Member of the Board of Directors Rubber Pavements Association PresidenVCEO Atlas Rubber, Inc.

Robert E. (Bob) Winters Treasurer and Member of the Board of Directors Rubber Pavements Association PresidenVCEO Atlas Rubber, Inc. ~The use of Crumb Rubber Modifiers (CR M) in Asphalt Pavements" Robert E. (Bob) Winters Treasurer and Member of the Board of Directors Rubber Pavements Association PresidenVCEO Atlas Rubber, Inc. For presentation

More information

40-9 PERMEABLE INTERLOCKING CONCRETE PAVEMENT

40-9 PERMEABLE INTERLOCKING CONCRETE PAVEMENT 40-9 PERMEABLE INTERLOCKING CONCRETE PAVEMENT 40-9.01 GENERAL 40-9.01A Summary Section 40-9 includes specifications for furnishing and installing concrete pavers for permeable interlocking concrete pavement

More information

Asphalt for Athletic Uses

Asphalt for Athletic Uses AMERICAN SPORTS BUILDERS ASSOCIATION ASPHALT GUIDELINES This Guideline is intended to assist owners, contractors, design professionals, and hot mix asphalt suppliers in the design and installation of hot

More information

City of Phoenix, Arizona. Engineering and Architectural Services Department PROJECT SPECIFICATIONS AND CONTRACT DOCUMENTS

City of Phoenix, Arizona. Engineering and Architectural Services Department PROJECT SPECIFICATIONS AND CONTRACT DOCUMENTS City of Phoenix, Arizona Engineering and Architectural Services Department PROJECT SPECIFICATIONS AND CONTRACT DOCUMENTS 2007 MAJOR AND COLLECTOR STREET OVERLAY PROGRAM ST87400102 WS85500049 MAYOR PHIL

More information

SEAUPG Annual Meeting Williamsburg, VA Thursday, November 19, 2015

SEAUPG Annual Meeting Williamsburg, VA Thursday, November 19, 2015 LADOTD Balanced Mixture Design Samuel Cooper III, Ph.D., P.E. Southeastern Asphalt User Producer Group November 6 9, 25 Williamsburg, Va. Acknowledgements LTRC Asphalt Research Group Jeremy Icenogle, Patrick

More information

Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES

Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES Page 1 Table of Contents WHAT IS REFLECTEX TM?... 2 STORAGE AND HANDLING... 3 SITE PREPARATION... 3 PREPARATION OF EXISTING

More information

Pavement Patching Repair for AC and PCC Pavement Surfaces. Vern Thompson www.crafco.com

Pavement Patching Repair for AC and PCC Pavement Surfaces. Vern Thompson www.crafco.com Pavement Patching Repair for AC and PCC Pavement Surfaces Vern Thompson www.crafco.com Overview and Objective New Methods For Pavement Patching-Overview What are they How they are applied New Methods Secti

More information

COMPACTING BITUMINOUS SPECIMENS USING THE SUPERPAVE GYRATORY COMPACTOR (SGC)

COMPACTING BITUMINOUS SPECIMENS USING THE SUPERPAVE GYRATORY COMPACTOR (SGC) Test Procedure for COMPACTING BITUMINOUS SPECIMENS USING THE SUPERPAVE TxDOT Designation: Tex-241-F Effective Date: December 2015 1. SCOPE 1.1 Use this test method to: compact cylindrical specimens of

More information

CID STREET INFRASTRUCTURE ASSESSMENT

CID STREET INFRASTRUCTURE ASSESSMENT ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for

More information

Performance Graded Asphalt Binders Bob Horan, P.E. Consulting Engineer Mechanicsville, VA

Performance Graded Asphalt Binders Bob Horan, P.E. Consulting Engineer Mechanicsville, VA Performance Graded Asphalt Binders Bob Horan, P.E. Consulting Engineer Mechanicsville, VA October 30, 2003 T3S - Superpave for Low Volume Roads - R. Horan 1 What is Asphalt? October 30, 2003 T3S - Superpave

More information

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials SECTION 03 92 50 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings,

More information

WATERPROOFING FOR CONCRETE STRUCTURES

WATERPROOFING FOR CONCRETE STRUCTURES MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck

More information

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to

More information

Summary of FHWA In-Place Recycling Activities

Summary of FHWA In-Place Recycling Activities Summary of FHWA In-Place Recycling Activities 2014 International and 7 th Western States In- Place Recycling Conference Lee Gallivan FHWA Asphalt Materials Engineer Office of Asset Management, Pavement,

More information

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements University of Pittsburgh Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements Authors: J. M Vandenbossche S. Sachs August 2013 1. Introduction Bonded concrete overlays of asphalt

More information

Case Studies - Concrete Overlays

Case Studies - Concrete Overlays Case Studies - Concrete Overlays Lessons Learned - Concrete Overlays Purdue Road School March 6, 2013 Today s Topic 1. Overlays 2. New Full-depth 3. Pervious 4. Roller Compacted 5. Full Depth Patching

More information

Using Accelerated Pavement Testing to Evaluate Permeable Interlocking Concrete Pavement Performance

Using Accelerated Pavement Testing to Evaluate Permeable Interlocking Concrete Pavement Performance Using Accelerated Pavement Testing to Evaluate Permeable Interlocking Concrete Pavement Performance Rongzong Wu, David Jones, Hui Li and John Harvey University of California Pavement Research Center Prepared

More information

SECTION 32 1816 PLAYGROUND SURFACING TILES

SECTION 32 1816 PLAYGROUND SURFACING TILES SECTION 32 1816 PLAYGROUND SURFACING TILES PART 1 GENERAL 1.01 SECTION INCLUDES A. Resilient playground safety surfacing tiles. B. Coordinate with work shown in other sections so the work is installed

More information

SECTION 334 (Pages 243-266) is deleted and the following substituted: SECTION 334 SUPERPAVE ASPHALT CONCRETE

SECTION 334 (Pages 243-266) is deleted and the following substituted: SECTION 334 SUPERPAVE ASPHALT CONCRETE 334 SUPERPAVE ASPHALT CONCRETE. (REV 12-20-04) (FA 1-6-05) (7-05) SECTION 334 (Pages 243-266) is deleted and the following substituted: SECTION 334 SUPERPAVE ASPHALT CONCRETE 334-1 Description. 334-1.1

More information

Closing the loop: Rubber Recycling. Joint seminar Kumi-instituutti instituutti & MOL

Closing the loop: Rubber Recycling. Joint seminar Kumi-instituutti instituutti & MOL Closing the loop: 1 Rubber Recycling Joint seminar Kumi-instituutti instituutti & MOL Contents 2 - Introduction - Present: Rubber crumb Surface activated rubber crumb Reclaim / devulcanizate - Future Introduction

More information

ITEM 330 LIMESTONE ROCK ASPHALT PAVEMENT

ITEM 330 LIMESTONE ROCK ASPHALT PAVEMENT ITEM 330 LIMESTONE ROCK ASPHALT PAVEMENT 330.1. Description. Construct a base course, a surface course, a level-up course, or any combination of these courses of the types and grades shown on the plans

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR HOT- MIX ASPHALT (HMA) BINDER AND SURFACE COURSE

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR HOT- MIX ASPHALT (HMA) BINDER AND SURFACE COURSE State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR HOT- MIX ASPHALT (HMA) BINDER AND SURFACE COURSE While its use is not required, this checklist has been prepared to

More information

Evaluation of Long-Lasting Perpetual Asphalt Pavement Using Life-Cycle Cost Analysis. Arnar Agustsson Sulton Azamov

Evaluation of Long-Lasting Perpetual Asphalt Pavement Using Life-Cycle Cost Analysis. Arnar Agustsson Sulton Azamov Evaluation of Long-Lasting Perpetual Asphalt Pavement Using Life-Cycle Cost Analysis Arnar Agustsson Sulton Azamov Contents 1. Perpetual Asphalt Pavement 2. Scope 3. Methodology 4. Performance 5. Alternatives

More information

Greening our Roads. Approach

Greening our Roads. Approach Greening our Roads Approach To create a Sustainable Future for the world, by achieving Resource Extension economically, by reducing usage of limiting resources and extending life cycle Ensuring Green Roads

More information

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP) SPECIFICATIONS INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP) Part 1 General 1.1 CONFORMITY Conforms to the requirements of the general conditions of the contract.

More information

Asphalt Institute Technical Bulletin. Laboratory Mixing and Compaction Temperatures

Asphalt Institute Technical Bulletin. Laboratory Mixing and Compaction Temperatures ASPHALT INSTITUTE EXECUTIVE OFFICES AND RESEARCH CENTER Research Park Drive P.O. Box 14052 Lexington, KY 40512-4052 USA Telephone 859-288-4960 FAX No. 859-288-4999 Asphalt Institute Technical Bulletin

More information

2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA

2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA 2014/2015 PAVING PROJECT MILLING AND PATCHING BID DOCUMENTS JASPER COUNTY, GEORGIA Issued on January 7, 2015 1 ADVERTISEMENT FOR BIDS 2014/2015 ROADWAY PATCHING PROJECT JASPER COUNTY, GEORGIA Separate,

More information

A View From The Bureau of Materials & Physical Research. IAPA March 2015 Matt Mueller, PE BMPR Illinois Dept of Transportation

A View From The Bureau of Materials & Physical Research. IAPA March 2015 Matt Mueller, PE BMPR Illinois Dept of Transportation A View From The Bureau of Materials & Physical Research IAPA March 2015 Matt Mueller, PE BMPR Illinois Dept of Transportation HMA Issues HMA Issues HMA Issues HMA Issues a Technical Opinion Cautious HMA

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

APPENDIX B. I. Background Information

APPENDIX B. I. Background Information APPENDIX B GUIDELINES FOR IDENTIFYING AND REPAIRING LOCALIZED AREAS OF DISTRESS IN AC PAVEMENTS PRIOR TO CAPITAL PREVENTIVE MAINTENANCE OR REHABILITATION REPAIRS I. Background Information A. AC Pavement

More information

Fly Ash Slurry Injection (FASI) of Bituminous Thermal Cracks

Fly Ash Slurry Injection (FASI) of Bituminous Thermal Cracks Fly Ash Slurry Injection (FASI) of Bituminous Thermal Cracks Schedule What is Fly Ash Slurry Injection (FASI) Thermal Cracks and Why They Depress Pavement Rehab Strategies Special Provisions Upcoming Projects

More information

Minor Cracks in Horizontal Surfaces

Minor Cracks in Horizontal Surfaces Cracks, chips and broken or flaking areas in concrete are not only unsightly, they can lead to further deterioration of the surface. The result is a costly replacement project as opposed to a simple repair.

More information

Division 2 Section 32 14 13.19 Section 02795

Division 2 Section 32 14 13.19 Section 02795 Note: The text must be edited to suit specific project requirements. It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. Edit

More information

Oh No, We Got an Airport Job! Contractor Quality Control. Investment in Staff, Labs and Equipment. We ve Come A Long Way.

Oh No, We Got an Airport Job! Contractor Quality Control. Investment in Staff, Labs and Equipment. We ve Come A Long Way. Contractor Quality Control Oh No, We Got an Airport Job! John Savastio Quality Control Manager Highway Materials, Inc. We ve Come A Long Way. Investment in Staff, Labs and Equipment Acceptance based on

More information

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland

More information

New Jersey Micro-Surface Pavement Noise Evaluation Submitted on: August 29, 2014

New Jersey Micro-Surface Pavement Noise Evaluation Submitted on: August 29, 2014 New Jersey Micro-Surface Pavement Noise Evaluation Submitted on: August 29, 2014 John Hencken* Research Engineer Edwin Haas Graduate Assistant Michael Tulanowski Research Assistant Thomas Bennert, Ph.D.

More information

CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS

CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS HIGHWAY DESIGN MANUAL 600-1 May 7, 2012 CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS Topic 601 - Introduction Pavement engineering involves the determination of the type and thickness

More information

QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park

QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park The purpose of this program is to provide assurance that the materials incorporated into the construction projects are in conformance with the contract

More information

Stabilization of Soil with Self-Cementing Coal Ashes

Stabilization of Soil with Self-Cementing Coal Ashes 2005 World of Coal Ash (WOCA), April 11-15, 2005, Lexington, Kentucky, USA http://www.flyash.info Stabilization of Soil with Self-Cementing Coal Ashes Scott M. Mackiewicz, 1 E. Glen Ferguson, 2 1 & 2 Kleinfelder,

More information

Section 501. PLANT PRODUCED HOT MIX ASPHALT

Section 501. PLANT PRODUCED HOT MIX ASPHALT 501.02 Section 501. PLANT PRODUCED HOT MIX ASPHALT 501.01. Description. This work consists of providing and placing Hot Mix Asphalt (HMA) mix using Superpave Mixture Design Methods. A. Terminology. Broken

More information

Best Practices for RAP Management. 60th Annual Asphalt Paving Conference Asphalt Pavement Association of Michigan March 29, 2016 Kalamazoo, MI

Best Practices for RAP Management. 60th Annual Asphalt Paving Conference Asphalt Pavement Association of Michigan March 29, 2016 Kalamazoo, MI Best Practices for RAP Management 60th Annual Asphalt Paving Conference Asphalt Pavement Association of Michigan March 29, 2016 Kalamazoo, MI Outline Current RAP usage and practices Motivations for using

More information

CAPITAL PREVENTIVE MAINTENANCE

CAPITAL PREVENTIVE MAINTENANCE CAPITAL PREVENTIVE MAINTENANCE 2003 EDITION April 8, 2010 CONSTRUCTION AND TECHNOLOGY DIVISION Attention Manual Holders This manual is to remain with the assigned user. If the user relocates within the

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING. 16.1 General...16-1. 16.2 Materials...16-1. 16.3 Equipment...

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING. 16.1 General...16-1. 16.2 Materials...16-1. 16.3 Equipment... SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING TABLE OF CONTENTS 16.1 General...16-1 16.2 Materials...16-1 16.3 Equipment...16-1 16.4 Installation...16-2 16.4.1 Traffic Restrictions...16-2

More information

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS AN ERGONARMOR COMPANY TECHNICAL INFORMATION SPECIFICATION FOR INSTALLATION 07/11 SUPERSEDES 04/00 PAGE 1 OF 6 CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS 1. SCOPE 1.1 This specification

More information

NorthEast Transportation Training and Certification Program (NETTCP) Course Registration Form

NorthEast Transportation Training and Certification Program (NETTCP) Course Registration Form (NETTCP) Course Registration Form Interim Certification (Cost $300 members / $425 non-members) HMA Plant Technician* HMA Paving Inspector* Soils & Aggregate Inspector* Soils & Aggregate Lab Technician*

More information

I-66 Pavement Rehabilitation

I-66 Pavement Rehabilitation I-66 Pavement Rehabilitation Fall Asphalt Conference Richmond, VA David Shiells, P.E. Virginia Department of Transportation David White Superior Paving Corporation October 2, 2012 Project Location 2 Goal

More information

Temporary Batch Plants

Temporary Batch Plants Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category

More information

Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications.

Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications. Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications. Author: Gary L. Mitchell, P.E. Director Airports, American Concrete Pavement Association

More information

Bituminous Paving and Construction

Bituminous Paving and Construction JOHN OKOREN, CHAIRMAN LORNE HAASE, VICE-CHAIRMAN 85 WEST HIGHWAY M-115 HAROLD FALON, MEMBER BOON, MICHIGAN 49618 ALAN D. COOPER, MANAGER PHONE 231-775-9731 ANDREA HERMAN, FINANCE AND BUSINESS MANAGER FAX

More information

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS HIGHWAYS DEPARTMENT GUIDANCE NOTES ON ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS AND HIGH SPEED ROADS Research & Development Division RD/GN/032 June 2007 1. Purpose ROAD SURFACE REQUIREMENTS FOR EXPRESSWAYS

More information

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced

More information

Pavement Rehabilitation Using Hot Mix Asphalt. - National Perspective -

Pavement Rehabilitation Using Hot Mix Asphalt. - National Perspective - Pavement Rehabilitation Using Hot Mix Asphalt - National Perspective - Rehabilitation Process Evaluate Existing Pavement and Conditions Evaluate Options Construct Project Monitor Performance Evaluate Existing

More information

and Fuel Use/GHG Emissions: Model

and Fuel Use/GHG Emissions: Model Life Cycle Assessment of Pavement and Fuel Use/GHG Emissions: Model and Initial Results Ting Wang, In-Sung Lee, Chang-Mo Kim, EB Lee, Alissa Kendall, John Harvey FHWA Pavement Performance Prediction Symposium

More information

AGREGADOS RECICLADOS MITOS Y REALIDADES

AGREGADOS RECICLADOS MITOS Y REALIDADES The Production and Use of Recycled Concrete in the USA Thomas Van Dam, Ph.D., P.E., FACI Principal Engineer CTL Group Introduction In the United States, concrete is the most commonly used recycled material

More information

Construction Productivity Analysis for Asphalt Concrete Pavement Rehabilitation in Urban Corridors. Paper No.: 02-2876

Construction Productivity Analysis for Asphalt Concrete Pavement Rehabilitation in Urban Corridors. Paper No.: 02-2876 Eul-Bum Lee Page 1 Construction Productivity Analysis for Asphalt Concrete Pavement Rehabilitation in Urban Corridors Submitted to A2F05 - CONSTRUCTION MANAGEMENT Paper No.: 02-2876 Eul-Bum Lee* Assistant

More information

Laboratory Evaluation of Asphalt Rubber Mixtures Using the Dynamic Modulus (E*) Test

Laboratory Evaluation of Asphalt Rubber Mixtures Using the Dynamic Modulus (E*) Test Laboratory Evaluation of Asphalt Rubber Mixtures Using the Dynamic Modulus (E*) Test By Kamil E. Kaloush, Ph.D., P.E. (corresponding author) Assistant Professor Arizona State University Department of Civil

More information

Pace s plant had minimal problems producing warm-mix asphalt for the paving project.

Pace s plant had minimal problems producing warm-mix asphalt for the paving project. Pace s plant had minimal problems producing warm-mix asphalt for the paving project. 22 Hot Mix Asphalt Technology SEPTEMBER/OCTOBER 2006 By Chuck MacDonald Tractor-trailer trucks crawled along an open

More information

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...

More information

Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES

Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES 11.5.1 Purpose To provide a uniform procedure for determining that the last structural layer meets the applicable straightedge

More information

NOTES TO THE PERFORMANCE BASED SPECIFICATION FOR HOTMIX ASPHALT WEARING COURSE SURFACING

NOTES TO THE PERFORMANCE BASED SPECIFICATION FOR HOTMIX ASPHALT WEARING COURSE SURFACING TNZ P/23 NOTES: 2005 FOR HOTMIX ASPHALT WEARING COURSE SURFACING 1. BACKGROUND 1.1 Specification Use The specification is to be used where the Engineer requires a dense graded, open graded (permeable)

More information

Pavement Rehabilitation Selection Rehabilitation Techniques

Pavement Rehabilitation Selection Rehabilitation Techniques Pavement Rehabilitation Selection Rehabilitation Techniques Bituminous Pavement Rehabilitation Techniques Overlays Bituminous Concrete Pre-overlay Treatments Mill and Overlay Mill and Inlay Recycling Options

More information

4-02 Gravel Base. 4-04 Ballast and Crushed Surfacing

4-02 Gravel Base. 4-04 Ballast and Crushed Surfacing Chapter 4 Bases 4-02 Gravel Base GEN 4-02.1 General Instructions Gravel Base is typically used in the construction of the roadway section and provides support for the pavement. For the pavement to provide

More information

ASPHALT & CONCRETE SPECIFICATIONS

ASPHALT & CONCRETE SPECIFICATIONS ASPHALT REPAIR & RESURFACE GENERAL PARAMETERS The intent of these specifications is to provide detailed specifications for contractors to fallow for parking lot repairs. The property manager or construction

More information

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors The Right Concrete Mix Placing and Finishing Joints Correctly Spaced Curing for Durability "Concrete durability is the ability to

More information

September 1, 2003 CONCRETE MANUAL 5-694.900 CONCRETE PAVEMENT REHABILITATION 5-694.900

September 1, 2003 CONCRETE MANUAL 5-694.900 CONCRETE PAVEMENT REHABILITATION 5-694.900 September 1, 2003 CONCRETE MANUAL 5-694.900 5-694.901 GENERAL CONCRETE PAVEMENT REHABILITATION 5-694.900 Concrete Pavement Rehabilitation is an extremely valuable tool of the Minnesota Department of Transportation

More information

Joint Rehabilitation. Driving Forces for Concrete Pavement Joint Repairs

Joint Rehabilitation. Driving Forces for Concrete Pavement Joint Repairs Long Life Concrete Pavement Joint Performance Joint Rehabilitation Gary Fick, Trinity Construction Management Services, Inc. Representing the National CP Tech Center Driving Forces for Concrete Pavement

More information

Advancements in Permeable Pavements

Advancements in Permeable Pavements Advancements in Permeable Pavements Engineers Workshop Saint Vincent College March 14 & 15 2013 Permeable Pavements There are several different words that are used to describe a pavement that water drains

More information

Center for By-Products Utilization

Center for By-Products Utilization Center for By-Products Utilization UTILIZATION OF DISCARDED TIRES AS CONSTRUCTION MATERIALS FOR TRANSPORTATION FACILITIES By Tarun R. Naik, Shiw S. Singh Report No. CBU-1991-02 January 1991 Department

More information

Concrete Waste Management

Concrete Waste Management Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category

More information