A. Pre-Fabricated planetarium dome; see drawings for size.
|
|
- Laurel Butler
- 7 years ago
- Views:
Transcription
1 SECTION PART I - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section SECTION INCLUDES A. Pre-Fabricated planetarium dome; see drawings for size. 1. Outer dome shell. 2. Radius curved metal studwork, with 6 batt insulation and curved drywall finish. 3. Inner projection dome. B. Re-installation of existing planetarium dome Alternate RELATED SECTIONS A. Section Cold Formed Metal Framing, outer dome. B. Section Structural Steel. C. Section Rough Carpentry. D. Section Insulation, sound insulation in outer dome. E. Section Gypsum Board, curved drywall, outer dome. F. Division 26 - Electrical G. Section Sheet Metal Roofing; outer dome (ADD#1) 1.04 SUBMITTALS A. Shop and Installation Drawings: Submit detailed specifications for the components, assembly and installation drawings, operating instructions, electrical and maintenance information. B. Provide a materials list of all components included with the dome and wall kits, including a list of components to be furnished by the Contractor for installation QUALITY ASSURANCE A. Manufacturer shall provide on-site technical field representative to advise and assist the Contractor during installation. B. At the completion of the project, manufacturer shall provide one day of on-site training to the University's operating personnel on use and maintenance of the planetarium dome. PART 2 - PRODUCTS 2.01 MANUFACTURERS OF OUTER DOME (ADD#1) A. Tremcor, Gardena, CA B. Approved Equal ( )
2 2.02 MANUFACTURERS OF INNER PERFORATED DOME A. Astro-Tech Manufacturing, Canal Fulton, OH B. Spitz, Inc. Chadds Ford, PA OUTER DOME (ADD#1) A. Description: fully triangulated all aluminum space truss with aluminum closure panels, clear span and designed to be selfsupporting from the periphery structure, primary thrust shall be contained by an integral tension ring. The dead weight of the dome structure shall not exceed 3.5 pounds per square foot of surface area. B. Materials: 1. Triangulated dome frame struts: 6061-T6 aluminum. 2. Structural frame gussets: 6061-T6 aluminum,.375" nominal thickness. 3. Triangular closure panels:.050" nominal thickness 3003-H16 aluminum Sheet. 4. Perimeter tension/compression ring: 6061-T6 aluminum. 5. Fasteners: 7075-T73 anodized aluminum or Series 300 stainless steel. 6. Anchor Bolts: Series 300 stainless steel. C. Outer Dome manufacturer shall have a registered engineer certified in the State of Pennsylvania to design outer dome per all local and National codes. D. Finish: manufacturers standard mill finish INNER PERFORATED DOME A. Work by General Contractor ( )
3 1. Before installation of the projection dome, the entire room in which the installation is to be made must be clean, free of dust and dust-producing surfaces, and free of debris or other obstacles. Additional completed work shall include, but not be limited to: B. Frame a. Completion of load-bearing supports and/or suspension and lateral tie eyebolts. b. HVAC and filtration systems purged and operational. c. Sound insulation installed. d. Speakers hung and positioned (unless speakers are attached to dome or supplied by dome contractor). Final positioning not required if catwalks allow access with dome installed. e. Electrical work completed. f. All surfaces and equipment behind the dome painted flat black. g. Once the dome has been installed, carpeting, seating, and other interior finishes, not including drywall and the finishing of drywall, will be completed by General Contractor. h. No dust-producing activities shall take place in the theater after installation of the projection surface. i. General Contractor shall supply all equipment necessary to unload and transport dome materials to the theater chamber. j. General Contractor shall supply sufficient temporary electrical power and lighting for dome erection. 1. The support frame of the dome shall consist of primary longitudinal members that divide the dome into 20 gores, and primary latitudinal members that divide the dome into three (3) zones. Primary members shall be 6061-T6 aluminum tubing measuring 1.75x1.25x0.125in rolled to an inner radius of ±0.50in. Secondary 1.00in tubular, Grade 1008 steel chord members shall be employed to maintain the desired geometry of the frame. 5/16-18 Grade 5 hardware shall be used in conjunction with 0.31in thick 6061-T6 gussets to secure member junctures. 2. The frame's structural integrity shall allow the dome to maintain its desired geometry and be self-supported when mounted at its base to a load-bearing structure, or when suspended ( )
4 3. The dome shall be reinforced to allow for chain suspension. If the dome is chain suspended, the dome contractor shall provide chains and all suspension hardware except for eyebolts. The General Contractor shall provide suspension and lateral tie eyebolts. The dome contractor shall provide drawings defining eyebolt locations to the owner, architect, and general contractor. 4. Frame members shall be degreased and finished matte, flat black prior to installation. Hardware shall be painted matte, flat black during installation. 5. The depth of the frame shall be no more than 6.00in from the projection surface, resulting in a clearance envelope of ±0.50in. 6. The frame shall be capable of supporting at least one person without causing plastic deformation to the frame or panels, or visible projection surface distortion. 7. The frame shall be capable of supporting a reasonable amount of theater equipment as determined by the General Contractor and the dome contractor. Equipment may include, but not be limited to, speakers, projectors, catwalks, ladders (both fixed and rolling), lights, and insulation. C. Panels 1. The inner skin shall consist of 51 stretched-formed, perforated, 0.040in thick, 5052-H32 aluminum panels. Panels shall be stretched-formed over a compoundly curved die. An array of 0.063in diameter holes on 0.125in staggered centers shall render the panels 23% void. A powder-coated finish shall supply the desired optical characteristics as described below. Panel edges shall be coincident with primary frame members, permitting attachment with 0.125in blind fasteners on 4.00in centers. 2. Panels shall butt on the center of primary frame members and shall be backed with a black material of negligible thickness. The black material shall have a zero-degree incident gain of no more than 0.01 before and after installation. Seams between panels shall be no more than 0.02in. 3. Panels shall be degreased and powder coated prior to installation. Panel fasteners shall be pre-finished to match the panel gain, and touched up with computer-matched paint during installation. D. LED Cove Trough 1. The LED cove trough shall be 360 degrees in plan and consist of a base plate and fascia. The fascia shall be spaced 4.00in from the inner surface of the dome. Both the inner and outer surfaces of the trough shall be finished flat black ( )
5 2. The base plate of each segment shall be made from 0.090in thick 6061-T6 aluminum sheet, with an inner radius of in and an outer radius of in. The fascia shall be 2.50in tall and shall be made from 0.063in thick 6061-T6 aluminum sheet. The fascia shall be attached to the base plate via rolled 1.00x0.50x0.125in aluminum tube and 3/32in round head rivets on 6.00in centers. 3. The outer radius of the trough shall be coincident with the outer radius of the dome base ring, permitting attachment to the bottom side of the dome base ring using 3/16in round head rivets on 12.00in centers. Each trough segment shall be machined at both ends so as to permit attachment to each other via a lap joint and 3/32in round head rivets on 3.00in centers. The lap joint shall render the base plate and fascia joints light tight. E. Miscellaneous 1. The dome contractor shall coordinate dome installation with the general contractor so as not to delay the general building schedule. 2. Dome parts shall be manufactured and packaged so that they may be carried through standard double door openings. 3. The dome contractor can analyze the dome for seismic considerations at additional cost to the owner. 4. The dome (frame and panels) shall weigh approximately 1200lb. F. Projection Surface Characteristics Optical 1. The projection surface shall be suitable for viewing bright projected scenes with high resolution, true color, and high contrast. The surface shall maintain specified reflectance values and exhibit no gloss characteristics when subjected to a projected image or light under typical viewing angles. 2. The projection surface shall be pre-finished with a powdercoated, achromatic finish, and shall have an overall reflectance of 0.65, or a mutually agreed upon finish. 3. Should the factory-applied projection surface finish be soiled, marred, scratched, burnished, or otherwise disfigured by the dome contractor during or prior to completion of all work under these specifications, the dome contractor shall correct such disfigurement. G. Projection Surface Characteristics Flame Spread 1. ASTM E-84 Flame Spread Tests were conducted on powder coated perforated panel samples. The tests returned a Flame Spread rating of 15, and a Smoke Density rating of 10. To obtain a Flame Spread Classification, the above results should be compared with the Table 1 below: ( )
6 Table 1 Flame Spread Classification NFPA Class UBC Class Flame Spread A I 0 through 25 B II 26 through 75 C III 76 through 200 Building codes cited: National Fire Protection Association, NFPA No. 101, "Life Safety Code", 1988 Edition and Uniform Building Code, 1988 Edition, Part VII, " Fire Resistive Standard for Fire Protection", Sections H. Acceptance Test Procedure 1. The dome shall be examined with a bright light (supplied by dome contractor) to evaluate installation workmanship prior to the removal of the scaffolding. The dome contractor shall correct workmanship issues. PART 3 - EXECUTION 3.01 INSPECTION A. The manufacturer's representative must examine the substrate and the conditions under which the work is to be installed and notify the contractor in writing of any conditions detrimental to the proper and timely installation of the work. Do not proceed with the work until unsatisfactory conditions have been corrected in the manner acceptable to the manufacturer INSTALLATION A. Set all items in their correct locations as shown in the details level, square, plumb, at proper elevations and in alignment with other work in accordance with the manufacturer's installation instructions and approved shop drawings. B. All joints between dome and the building structure shall be flashed and sealed in order to secure a water tight installation. C. Install all components under and in direct supervision of a manufacturer's qualified representative. D. Upon completion of the installation, it shall be the contractor's responsibility to make all necessary final adjustments to attain normal operation of dome. E. If existing dome is to be re-installed, work to include transporting dome components to jobsite, re-assembling dome, cleaning, priming and painting dome unit PROTECTION AND CLEANING (AFTER INSTALLATION) A. Metal and surfaces shall be cleaned, on both interior and exterior. After being cleaned, all work shall be protected against damage until it is accepted by the Architect. END OF SECTION ( )
SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)
SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2
More informationSECTION 07 61 13 STANDING SEAM METAL ROOFING
SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced
More informationSECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront
PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system
More informationSECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK
SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK A. This section covers the pre-finished, pre-fabricated Architectural standing seam roof system. All metal trim,
More informationDENVER MODEL 30 X 30 SPECIFICATIONS
DENVER MODEL 30 X 30 SPECIFICATIONS Dimensions: Roof Dimensions 30-0 x 30-0 (4) Columns (Center to Center) 25-6½ x 25-6½ Minimum Clearance 8-0 Roof Height @ Peak Dependent on Col. Ht. Hip Roof 4:12 pitch
More informationPreformed Metal Roofing and Siding
Page -1-1. GENERAL 1.1. Description This specification along with the drawings covers the furnishing of all material, products, equipment, accessories, tools, services, transportation, labor and supervision
More informationWHI 90-Minute Rated Veneered Door Frame Installation Instructions
No. 940-03-10 INSTALLATION INSTRUCTIONS 90 MINUTE RATED VENEERED DOOR FRAME DOOR REQUIREMENTS: Consult the door manufacturer to make sure that the doors are qualified for the hardware to be installed,
More informationSECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS
SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word
More informationSpecifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023
Specifications Preformed Metal Wall and Roof Panels Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023 Section 07410 Preformed Metal Wall and Roof Panels Structural
More informationPART 1 GENERAL 1.1 SECTION INCLUDES
J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including
More informationINSTRUCTIONS FOR COORDINATION SECTION 06651 SOLID SURFACE FABRICATIONS
INSTRUCTIONS FOR COORDINATION SECTION 06651 SOLID SURFACE FABRICATIONS 1. Paragraph 1.02 Provide solid surface countertops at sinks locations. Provide solid surface window sills at drywall framing walls.
More informationCOLORADO MODEL. 35 x 65 SPECIFICATIONS
COLORADO MODEL 35 x 65 SPECIFICATIONS Dimensions: Roof Dimensions 35-0 x 65-0 Column Dimensions (center to center) 31-0 x 30-6 Minimum Clearance 14-0 Roof Height @ Peak ±18-8 Curved Roof ±42-6 radius Square
More informationSECTION 07720 PREFORMED METAL STANDING SEAM ROOFING
SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING PART ONE GENERAL DESCRIPTION This section includes pre-formed standing seam metal roofing and related flashings, closures, trim and accessories including,
More informationGUIDELINE SPECIFICATIONS
GUIDELINE SPECIFICATIONS GORDON SOFFIT-SHIELD - An Exterior Metal Soffit System DIVISION 05 5800 or DIVISION 07 7700 Note To Specifier: SOFFIT-SHIELD should be installed by tradesmen that are experienced
More informationDisplay hidden notes to specifier. (Don't know how? Click Here) A. Advanced Upcoiling Security Grilles, power operated.
SECTION 08333 ADVANCED UPCOILING SECURITY GRILLE MODEL 600 ADV Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Advanced Upcoiling Security Grilles,
More informationSECTION 05 7360 ALUMINUM HANDRAIL AND RAILING SYSTEMS WITH DECORATIVE METAL PANEL INFILLS
1 SECTION 05 7360 ALUMINUM HANDRAIL AND RAILING SYSTEMS WITH DECORATIVE METAL PANEL INFILLS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and
More information2. Division 05 Structural Steel Framing for steel framework requirements
SECTION 131200 - CLIMBING WALLS PART 1 GENERAL 1.1 SUMMARY A. This section includes the following: 1. GFRC Rock Realistic Climbing Wall System B. Related Sections 1. Division 04 Unit Masonry 2. Division
More informationBrick Veneer Construction
Brick Veneer Construction Check list of suggested tools & support items Claw hammer Tape measure 3/4" [19 or 20] Wood chisel Wood or plastic shims Pry bar Utility knife Caulking and caulking gun Power
More informationMarch 14, 2007. Installation of Bay, Bow and Garden Windows
March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed
More informationRESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
More informationSECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
More informationCode of Standard Practice for Timber Frame Structures
TFEC 2-2013 Code of Standard Practice for Timber Frame Structures August 2013 Preface This Code is intended to represent a reasonable consensus of what constitutes ordinary and acceptable practice within
More informationUniform Construction Code (UCC) Manufactured Homes. Modular Homes. Building Permit Application Package
Uniform Construction Code (UCC) Manufactured Homes (Single-Wide, Double-Wide) Modular Homes Building Permit Application Package Per the Uniform Construction Code (UCC) all structures must be built per
More informationSECTION 14 20 10 - FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL
SECTION 14 20 10 - FREIGHT & PARKING GARAGE PART I - GENERAL 1.1 SECTION INCLUDES [NOTE to AE: The following lists requirements that are specific to freight elevators. These requirements are in addition
More informationCity of San Diego, CWP Guidelines
PART 1 -- GENERAL SECTION 08520-1.1 WORK OF THIS SECTION City of San Diego, CWP Guidelines A. The WORK of this Section includes providing aluminum windows with frames, bracing, glazing attachments, screens,
More informationEcoTouch Insulation with PureFiber Technology
PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.
More informationTechPractices: Home Front Homes:
TechPractices: Home Front Homes: PATH's Technologies in Practice are large scale housing projects throughout the U.S. where innovative technologies are being installed and used. Information is presented
More informationATLANTA MODEL SPECIFICATIONS
ATLANTA MODEL 50 SPECIFICATIONS Dimensions: Roof Dimensions (point to point) 50-0 Column Dimensions (out to out of columns) 44-0 Eave Height 8-0 Roof Height @ Peak ±21-8⅞ Hip Roof 6:12 pitch Square Feet
More informationPOST AND FRAME STRUCTURES (Pole Barns)
POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:
More informationBest Barns USA Assembly Book
Best Barns USA Assembly Book Revised November 27, 2013 the Easton - R 12'x 20' Manufactured by Reynolds Building Systems, Inc. 205 Arlington Drive Greenville, PA 16125 724-646-3775 This manual is copyrighted.
More informationCLEAR-DIVISIONS APERTO
CLEAR-DIVISIONS Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS moveable glass wall system. The yellow highlighted areas in the
More informationFire Barrier Duct Wrap 15A
3 Fire Barrier Duct Wrap 15A Commerical Kitchen Grease Duct Fire Protection System Product Data and Installation Instructions Compliance 1998 Edition Complies with International Mechanical Code Complies
More informationPART E SPECIFICATIONS
PART E SPECIFICATIONS Page 1 of 5 PART E - SPECIFICATIONS GENERAL E1. APPLICABLE SPECIFICATIONS, STANDARD DETAILS AND DRAWINGS E1.1 The City of Winnipeg Works and Operations Division Standard Construction
More information1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.
SECTION 075416 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. 1.2 PERFORMANCE REQUIREMENTS A. Solar Reflectance
More informationFiberglas, Exterior Wall Thermal Insulation
PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.
More informationThe Butler MR-24 Standing Seam Roof Difference. A comparison between metal roof systems
The Butler MR-24 Standing Seam Roof Difference A comparison between metal roof systems Roof Systems Necessities Weathertight (don t leak!) Low maintenance Weathertightness Roof clips, seams, panel alignment
More informationSECTION 08560 SERIES 1500 VINYL PATIO DOORS
SERIES 1500 VINYL PATIO DOORS PART 1 GENERAL 1.1 SECTION INCLUDES A. Patio Doors 1.2 RELATED SECTIONS A. Section 05450: Cold Formed Metal Framing. B. Section 06100: Rough Carpentry. C. Section 06200: Finish
More informationSECTION 15410 GROUND WATER STORAGE TANKS
SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design
More informationCLEAR-DIVISIONS CENTERFOLD
CLEAR-DIVISIONS CENTERFOLD Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS CENTERFOLD moveable The yellow highlighted areas in
More informationA D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, 2012. All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA
Page 1 of 10, Addendum No. 3 Temporary Garage Structure City of Chelsea, MA November 5, 2012 CBI Job No.: 12055-A A D D E N D U M # 3 DATE: November 5, 2012 TO: FROM: PROJECT: All Bidders Jenne dos Santos,
More informationSECTION 098400 ACOUSTICAL WALL TREATMENT. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 098400 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationReplacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin
Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin americancraftsmanwindows.com Project Requirements: Failure to follow these instructions may void product
More informationMaterials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections
Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built
More informationSECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
More informationSTANDARD FOR NON-FIRE RATED ROLLING DOORS
ANSI/DASMA 203-2004 AMERICAN NATIONAL STANDARD STANDARD FOR NON-FIRE RATED ROLLING DOORS Door & Access Systems Manufacturers Association, International Sponsor: 1300 Sumner Ave Cleveland, Ohio 44115-2851
More informationINSTALLATION OF A BAY WINDOW
INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening
More informationSECTION 07400 STANDING SEAM METAL ROOF
SECTION 07400 STANDING SEAM METAL ROOF PART 1 - GENERAL 1.01 SECTION INCLUDES A. Work described in this section includes pre-formed standing seam metal roofing system complete with clips, perimeter and
More informationC. Codes and References: Comply with the version year adopted by the Authority Having Jurisdiction.
SECTION 081216 - INTERIOR ALUMINUM DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationTundra Series Windows January 2016
Tundra Series Windows January 2016 New Construction Installation Instructions Nail Fin, J-Fin and Brickmold Aplications product. ATTENTION! Read and understand all installation instructions before installing
More informationfoot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.
Skylight Installation Instructions This document provides instruction and guidelines for installation of both curb mount (CM) and self flashing (SF) unit skylights on flat, pitched (> or equal to 3/12
More informationGigaCrete Specification PlasterMax
GigaCrete Inc. 6775 Speedway Blvd. Suite M105 Las Vegas, NV 89115 Ph (702) 643-6363 Fax (702) 643 1453 www.gigacrete.com GigaCrete Specification PlasterMax PlasterMax : Fire Rated Plaster for Direct Application
More informationRESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS
RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS The following guidelines are intended to assist with the permit acquisition process with regard to Plumbing Alterations. Not all information, or additional
More informationResidential Deck Safety, Construction, and Repair
Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the
More informationCLEAR-DIVISIONS VARIOFOLD
CLEAR-DIVISIONS VARIOFOLD Introduction: The following three (3) part specification offers the Standard and Optional features for the CLEAR-DIVISIONS VARIOFOLD moveable The yellow highlighted areas in the
More information1.02 DESCRIPTION A. This Section specifies furnishing and installing Cast in Place Detectable/Tactile Warning Surface tiles where indicated.
CAST IN PLACE DETECTABLE/TACTILE WARNING SURFACE TILE PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Special Conditions and Division 1 Specifications
More informationWastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
More informationDESIGN CLARIFICATION (DC)
DESIGN CLARIFICATION (DC) Owner: Victor Valley Wastewater Reclamation Authority Date: 03/03/2015 Contractor: W M Lyles Carollo Project No.: 8299A.20 Project Name: Subregional WRPs DC No.: 001 DC Title:
More informationDE Frame with C Series Sidelight
TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Screw gun with clutch adjusted #2 phillips tip #3 phillips tip Screwdriver (used to adjust frame on will using oval slots) Pry Bar Powder
More informationSTANDARD SPECIFICATIONS SECTION 05500 METAL FABRICATIONS
STANDARD SPECIFICATIONS SECTION 05500 METAL FABRICATIONS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for providing metal fabricated items like castings, gratings, hatchways, ladders,
More informationSports and High Mast Lighting Poles Phone: (866) 474-7200 Fax: (817) 924-7049
Sports and High Mast Lighting Poles 4 High Mast Lighting Poles General American LitePole offers a raising and lowering system that allows for ease of maintaining the lighting system at ground level. Ideal
More information09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec 03500 Master Spec. 03 49 00 Page 1
C. S. I. Spec 03500 Page 1 PART 1 - GENERAL 1.01 SUMMARY:.01 Provide special glassfiber reinforced cement (GRC) shapes in accordance with the requirements of the contract documents..02 The installing contractor
More informationC. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters.
SCOPE OF WORK Project Title: Replace Deteriorated Roof Singles at Cape Lookout National Seashore Maintenance Shop PMIS # 159350 Prepared By: Mike Baker Cape Lookout National Seashore 131Charles St Harkers
More informationSTANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES
ROOFING APPLICATION STANDARD (RAS) No. 117 STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES Scope 1.1.
More informationWe urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.
Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden
More informationHURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES
HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES 101 Retrofits Required. Pursuant to Section 553.844 553.884, Florida Statutes, strengthening of existing site-built,
More informationSub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders
INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids
More informationENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES
ENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES PART 1 - GENERAL 1.1 SCOPE OF WORK SECTION 06610 FIBERGLASS REINFORCED PLASTICS (FRP) FABRICATIONS PULTRUDED SQUARE TUBE LADDER
More informationWhitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman.
Building Type Building Code Whitley Classroom Buildings BOCA, UBC, SBCCI, NEC, ADA Structural Support Outrigger construction standard, Whitley model classrooms. Main support beams to be 12 11.8# per lineal
More informationSimplified Steel Stair Design for Commercial and Institutional Buildings
Simplified Steel Stair Design for Commercial and Institutional Buildings Collaborating with steel stair fabricators during the design of commercial and institutional buildings promotes integrated practice
More informationWindow Installation Instructions
Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for
More informationInstallation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows
Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read
More informationSECTION 07 42 13 METAL WALL PANELS
Mitsubishi Plastics Composites America, Inc. 401 Volvo Parkway Chesapeake, VA 23320 Phone: (800) 422-7270 Fax: (757) 436-1896 E-mail: info@alpolic.com www.alpolic-northamerica.com This MANU-SPEC utilizes
More informationPUMP JACK SYSTEM AND ACCESSORIES
Pump Jack Model # 2200 A low cost, easy to operate, safe, portable scaffolding built of rugged steel. It's perfect for shingling, siding, sheathing, insulating, painting, building, roofing, home repair
More informationDIVISION 8, METAL SOUND CONTROL DOOR ASSEMBLIES PART 1 GENERAL 1.1 RELATED DOCUMENTS
DIVISION 8, METAL SOUND CONTROL DOOR ASSEMBLIES PART 1 GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the contract, including general and supplementary conditions and other Division 1
More informationPackaged Terminal Air Conditioner Wall Sleeve Installation
Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation
More informationChapter 36 - STRAW BALE CONSTRUCTION SECTION 3601 - PURPOSE. SECTION 3602 - SCOPE. SECTION 3603 - DEFINITIONS.
Austin City Code - Volume II TITLE 25 LAND DEVELOPMENT\CHAPTER 25-12 TECHNICAL CODES\ARTICLE 1: UNIFORM BUILDING CODE\25-12-3 LOCAL AMENDMENTS TO THE BUILDING CODE Chapter 36 - STRAW BALE CONSTRUCTION
More informationCRASH RAIL INSTALLATION HEIGHT
PLEASE READ PLEASE READ THESE INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING THE INSTALLATION! THIS INSTRUCTION SHEET IS INTENDED TO PROVIDE A SPECIFIC GUIDE TO FOLLOW FOR THE INSTALLATION OF THIS. CONTAINED
More informationDrexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood
Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood Section 07411 Metal Roof Panels Part 1 General 1.1 Summary A. This section includes the following: a. Factory-formed
More informationAutomatic Door Selection Guide
Automatic Door Selection Guide AAADM 1300 Sumner Avenue Cleveland, OH 44115 P: 216-241-7333 F: 216-241-0105 aaadm@aaadm.com Automatic Door Selection Guide General: The members of AAADM manufacture an assortment
More informationBRIDGE & SUPPLY COMPANY. Installation Guide. Ultra 2000. Includes:
BRIDGE & SUPPLY COMPANY Installation Guide Ultra 2000 Includes: Ultra 2000 Installation Guide Stock Trim Profiles Ultra 2000 Trim Installation Guide Page 2 Table of Contents Ultra 2000 Profile, Colors
More informationChapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
More informationSTANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS
ROOFING APPLICATION STANDARD (RAS) No. 133 STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS 1. Scope 1.1 This application standard has been developed to provide consistent information for the
More informationWe urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.
Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden
More informationSECTION 05 42 16 COLD-FORMED METAL DECK FRAMING Elevations Steel Deck Framing by Trex
(Specifier Note: The purpose of this guide specification is to assist the specifier in correctly specifying cold-formed metal deck framing products and execution. The specifier needs to edit the guide
More informationCalvert USA, Inc. Attic Stairs
Calvert USA, Inc. Attic Stairs Instructions for installation of vertical opening access stairs Model numbers: 7035 through 7047 Calvert USA, Inc., P.O. Box 841, Solomons, MD 20688, Tel. (410) 286-1430,
More informationREDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES
REDI-EXIT COMMERCIAL FIRE DOOR AND EXTERIOR DOOR KITS INSTALLATION GUIDELINES Tools Required Tape Measure Hammer Slotted Screw Driver #2 & #3 Philips Screw Driver 3-4 Foot Level 12 Pry Bar Cold Chisel
More informationResidential Decks. Planning and Development Services Department
Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Planning and Development Services Department Residential Decks
More informationBLADDER SURGE CONTROL SYSTEM
PART I GENERAL 1.01 Description BLADDER SURGE CONTROL SYSTEM This specification describes the requirements for a Bladder Surge Control System. The purpose of the system is to minimize transient pressures
More informationAutobody/Collision and Repair Technology/Technician CIP 47.0603 Task Grid
1 Secondary Task List 100 ORIENTATION 101 Identify opportunities in the auto body field. 102 Identify basic auto body construction. 103 Identify program rules and policies. 104 Identify government agencies
More informationSECTION 10680 MediaStation Model 125 Electric Lateral Files (ELF)
SECTION 10680 MediaStation Model 125 Electric Lateral Files (ELF) PART 1-GENERAL 1.01 RELATED WORK SPECIFIED IN OTHER SECTIONS A. Electrical connections see electrical specifications. 1.02 SUBMITTALS A.
More informationProduct Guide Specification
Reef Industries, Inc. 9209 Almeda Genoa Rd. Houston, Texas 77075 Toll Free (800) 231-6074 Phone (713) 507-4251 Fax (713) 507-4295 Web Site www.reefindustries.com E-Mail ri@reefindustries.com Product Guide
More informationSECTION 08 5656 GUARDA SECURITY WINDOW SCREENS
Page 1 of 5 SECTION 08 5656 GUARDA SECURITY WINDOW SCREENS Guarda Security Window Screens in this specification are appropriate for use in windows, storefronts, curtain walls, vents, and any other applications
More informationCity of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures
City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures SECTION 7201 - PURPOSE The purpose of this appendix chapter is to establish minimum prescriptive standards
More informationSTRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM
Chapter 9 STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM 9.1 BACKGROUND Steel is widely used in the construction of multi-storey buildings. However, steel construction is seldom used and is traditionally
More informationRoof Curbs, Extensions and Equipment Supports
Roof s, Extensions and Equipment Supports December 2012 Roof Page s, Header Extensions and Equipment Supports Table of Contents Model GPI Standard and Optional Construction Features... 3 Model Number Code....
More informationENGINEERING SPECIFICATION FIBERGRATE MOLDED GRATING. January 24, 2014 06610-1
ENGINEERING SPECIFICATION FIBERGRATE MOLDED GRATING January 24, 2014 06610-1 SECTION 06610 FIBERGLASS REINFORCED PLASTICS (FRP) FABRICATIONS MOLDED GRATING PART 1 - GENERAL 1.1 SCOPE OF WORK A. The CONTRACTOR
More informationSapa: SECTION 05520 ARCHITECTURAL ALUMINUM HANDRAILS AND RAILINGS
PART 1 GENERAL Sapa: SECTION 05520 ARCHITECTURAL ALUMINUM HANDRAILS AND RAILINGS 1.1 SECTION INCLUDES A. Aluminum and Glass Handrails B. Aluminum Railings 1.2 RELATED SECTIONS A. Section 05700 - Ornamental
More information- - - - Steel Panel Frame. Exterior Steel Sheeting. Optional Rigid Insulation. Optional Steel Insulation Liner
The Kelly Klosure pre-framed modular panel has 4 components that are factory finished to create an easy and versatile bolt-together system in the field. Steel Panel Frame Exterior Steel Sheeting Optional
More informationA. The shade structure contractor shall be responsible for the design, engineering, fabrication, and supply of the work specified herein.
13310 FABRIC SHADE STRUCTURES FOR PLAYGROUND AREAS ************************************************************************************************************************ SPECIFIER: CSI Master Format
More informationPANELIZED HOME INSTALLATION GUIDELINE
PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.
More information