Save Money by Saving Carbon

Size: px
Start display at page:

Download "Save Money by Saving Carbon"

Transcription

1 Save Money by Saving Carbon Decision Making in the NHS using Marginal Abatement Cost Curves Version 1.1 [1]

2 Save Money by Saving Carbon Decision Making in the NHS using Marginal Abatement Cost Curves Contents Background 2 What is a Marginal Abatement Cost (MAC) Curve? 2 Purpose of this document 3 Why would you create a MAC Curve 3 Reading a MAC Curve 4 NHS England MAC Curve 5 Combining a MAC Curve with other investment appraisals concepts 6 How to create a MAC Curve 7 Tools 11 Annex 1. What is Net Present Value 12 Annext 2. Examples using NHS Evidence QIPP case studies 14 Glossary 15 Reference 15 Background The 2008 Climate Change Act has been ground-breaking. It made the UK the first country in the world to have a legally binding long-term framework to cut carbon emissions. This means by law we must reduce greenhouse gases by 34% by 2020 and 80% by The NHS is a major contributor to the UK s carbon footprint and one of the planets largest public sector polluters. It must therefore play its part in reducing emissions and help the UK meet its legally binding targets. To help the NHS achieve its pledge of reducing greenhouse gas emissions the NHS Sustainable Development Unit has published A Marginal Abatement Cost Curve for NHS England. What is a Marginal Abatement Cost (MAC) Curve? A MAC Curve is an investment analysis tool. It will help NHS organisations work out which investment decisions will save most money and most carbon. The MAC Curve will aid the consideration of sustainability principles in the business decision making process. It will be particularly beneficial to professionals in both Estates and Finance. A MAC Curve condenses technical data into an easily understandable graph showing cost effectiveness and magnitude of carbon saved for different measures. Many measures taken specifically to reduce carbon emissions will also save money. These carbon and financial savings can be achieved in many ways, including: investment in NHS estates, facilities and services making current activities more efficient altering service delivery models [2]

3 Purpose of this document The NHS Sustainable Development Unit (SDU) is keen to promote the appropriate use of MAC Curves as part of investment appraisal and to help organisations make changes to their service delivery or business activities. This document will consider: The benefits of a MAC Curve for your NHS organisation How to create one Where to source data to support MAC Curve calculations How to mitigate risks surrounding this information and its use How MAC Curves empower decision making Potential future uses of MAC Curves MAC Curves can be used to illustrate many measures from transformative changes in service delivery models to investments in energy savings and estates management. In all cases good data is essential to produce a worthwhile MAC Curve. Why would you create a MAC Curve? A MAC Curve has many useful applications for a Trust. For example it could use a MAC Curve: to support prioritisation of one investment over another, where a Trust is assessing the carbon emission and financial impact of a project; to support the case being made for specific investments or canges, for example during the business case process; as part of its annual reporting process, highlighting which steps have beentaken to reduce the environmental impact of the organisation, and which will form its priorities in the future; to contribute to the QIPP case for a capital or revenue investment; and in conjunction with payback period analysis to identify quick wins, particularly where legislation such as the Carbon Reduction Commitment Energy Efficiency Scheme (CRC) pressurises organisations to reduce emissions quickly with limited resources. One of the benefits of the MAC Curve is that it allows you to compare very dissimilar investments, capital programmes or programme activities on the same basis. [3]

4 Reading a MAC Curve In brief 1. The width of each block illustrates the amount of greenhouse gas emissions saved per year. The greater the width, the greater the carbon saving. 2. The height of the block illustrates the net financial saving or cost (of a measure) per tonne of carbon. 3. If a block is below the line this carbon reduction measure will save more money than it originally cost to introduce. If it is above the line the cash invested will not be recovered over the lifetime of the project. In detail Organisations considering making changes or investments that will affect their emissions can easily reproduce the carbon and cost implications on a MAC Curve. If an organisation is considering measures which increase carbon emissions, these will appear to the left of the vertical line. The combined carbon and financial win-wins are those measures which appear as tall, broad columns below the line. This signifies a significant carbon and financial saving will be generated by a project with a high Net Present Value (NPV). NPV is an investment decision making calculation which offsets financial costs and benefits and takes into consideration the idea that money now is worth more to an organisation than the same amount of money received in the future. This document contains a quick guide on how to calculate this value. It is likely that the cause of a high NPV in the context of estates management will be low initial capital costs and/ or, large reductions in organisational running costs. The value for each measure on the graph is calculated by dividing the project s NPV by the annual emissions saving (either an average value for the project, or the emissions saving in a given year). The result is the Marginal Abatement Cost. Options which result in less financial savings per tonne of CO 2 will appear as increasingly shallow columns below the horizontal line. In A Marginal Abatement Cost Curve for NHS England the carbon savings used are what could be achieved in 2015 if all the measures were enacted immediately. It is worth revisiting and reviewing the MAC Curve periodically. As changes arise in the costs of technologies or the value of incentives, such as the price of carbon in the CRC scheme then some projects will become more cost effective. This should be factored into the decision making process. [4]

5 NHS England MAC Curve [5]

6 Combining MAC Curves with other investment appraisal concepts MAC Curves are an ideal way to compare different investments or changes on a similar basis. However, they do not include all of the criteria upon which an investment decision should be made. NPV and MAC Curves A key investment decision making concept is NPV. This is the result of comparing the future cash flows, both positive and negative, to determine whether a project will have a net positive impact upon an organisation. The design of the MAC Curve recognises the utility and importance of NPV by making the Marginal Abatement Cost dependent on NPV. A project s NPV is a summary of the costs and changes to future cash flows. Payback period, Rate of Return and MAC Curves An investment concept which coexists with MAC Curves and NPV is Payback Period. This is an indicator of how long it will take to recoup an initial investment from savings generated. Payback Period is the length of time over which savings must accrue or additional revenue be generated before the NPV of a project is zero. Payback Period is widely used in the commercial, construction and facilities management sector, where it is a key part of the decision making process. As budgets are increasingly constrained, the NHS may find this concept of increasing value especially if a choice needs to be made between two investments. For example, an investment where expenditure can be classified as revenue, and the impact on the bottom line is immediate may be preferred to a capital investment with a more long lasting impact, or which delivers more environmental benefits. The opportunity cost or knock on effects of such investments should be considered, and this is an area in which MAC Curves can play a role. Rate of Return (RoR) is an alternative method of displaying the speed with which an investment improves the bottom line. Rate of Return is given as a percentage, and is calculated by dividing the average annual benefit (saving plus increase in revenue) by the total investment cost. It might also be useful to rank projects by the total investment required. This will allow a distinction to be drawn between projects that require significant capital input and which may require external funding, through PFI, loans or grants, and those which fit within the Trust s own spending limits and plans. Timelines and MAC Curves The timing and volume of carbon savings might prove critical you might want to consider projecting the timing of various carbon savings on a timeline or bar chart, to make sure that the measures you are considering will help you to meet your targets. The MAC Curve could then be used to help bridge the gaps which arise. How to spot a quick win The combination of short payback periods and carbon reductions can be seen as quick wins. With the increasing demands on NHS organisations to reduce their carbon footprints, there is pressure to find ways to swiftly reduce carbon and costs. This pressure might combine or compete with the need for a longer term strategy if an organisation is to match or exceed average performance in the CRC scheme. If the NHS needs to cut its greenhouse gas emissions by 80% by 2050 then organisations will need to reduce their energy usage year on year by 3% or more. To identify a quick win, combine your MAC Curve with the most relevant constraint faced by your organisation. This might be achieving a short payback period or high rate of return, a limited pool of capital for initial investment, or achieving the highest net present value. The tall, broad bars on the resulting MAC Curve will then be the most appropriate courses to pursue. The best way of combining either investment appraisal method with a MAC Curve is by creating MAC Curves with similar Rates of Return or Payback Periods or by highlighting on the MAC Curve itself what the Rates of Return or Payback periods are for various projects. [6]

7 How to create a MAC Curve Approximate costs and CO 2 savings for certain carbon reduction measures (CRM) can be acquired by scaling the results from the SDU s previous publication on MAC Curves. This will provide a high-level overview and identify measures meriting further investigation. Before making investments Trusts may wish to compile an organisation specific MAC Curve, gathering a clear picture of the cost effectiveness of a range of investments or changes relevant to their specific circumstances. A MAC Curve relies on calculating the marginal changes to an organisation, both in terms of the amount of expenditure required to enact each change, and in terms of the impact the change will have on carbon emissions (for a description of what this entails, see the NPV calculation annex). MAC Curves need to be approached in a logical sequence: A. What is the current situation? B. What types of changes are you making? C. What will the impact of these changes be on the current position? What is the current situation? Data needs to be gathered to establish the current situation. At this point it is crucial that the quality and source of the information is understood. The following questions may prove useful: Where can you get the information from? Is there a difference between standard/average data and specific data for your organisation? What risks are associated with this data? Where appropriate, can you mitigate these risks? What assurance exists around the valuations you are using? Standard/average data To save time and money some information can be drawn directly from the SDU s existing NHS MAC Curves which are available on the SDU website 1. For example obtaining a market cost for a combined heat and power plant is unnecessary since it can be drawn from the appropriate MAC Curves. Other examples are: Unusual revenue costs (e.g. Biomass fuel costs) Assumptions about interactions and overlaps By the latter we mean that some decisions will have an impact on the same consumption value for example, changes to the insulation of a building might reduce the fuel needed to heat it, but reducing the thermostat temperature by 1 degree will also affect this value. The NHS wide MAC Curve contains assumptions about the order that these actions will be taken in, in order that the cost and impact reflects the marginal change in costs and benefits. Energy consumption will need to be converted from its raw form to show the carbon impact it generates. Conversion factors for gas, electricity, transport and other activities are provided on the Defra website 2. Data sources Specific Data Some data to generate the MAC Curve is already likely to exist within your organisation. When collating the support for Display Energy Certificates (DEC), Estates Return Information Collection (ERIC) returns and CRC requirements you will have measured information as the electricity consumption of your sites, relevant floor spaces, building heated volume and site-by-site fuel consumption. Carbon footprint data could also be used to support the calculation of the baseline for carbon emissions for the organisation. A carbon footprint is the expression of how large the greenhouse gas emissions for an organisation are. Guidance on how these values are arrived at is available on the NHS SDU website 3 based on national guidance from Defra. The Carbon Trust also provide free tools, aligned with this advice, for creating an organisation carbon footprint. [7]

8 The organisation carbon footprint may also be useful as a basis for the documentation required for CRC. MAC curves can be created on a building-by-building basis, to give a more detailed picture about the impact of changes proposed. Gathering data that sets out energy consumption, floor space, heating and lighting requirement for the components of your Estate may well be a good starting point for helping your organisation become more environmentally sustainable, regardless of the level of granularity required for your MAC Curves. When looking at Estates investments, the information collected for DEC may be useful for individual buildings. In order to assess changes to service delivery, staff operating hours, patient demand and potential alterations to site use then analysis of the current position and projections of future provision need to be considered. Data sources Estimates and Assumptions Estimates and assumptions may be the basis for some data used in MAC Curve calculations. For example, when creating a MAC Curve, it might be desirable to calculate the relevant heating demand for a building, (or section of it), based on its floor area here the assumption is that heating demand is consistent between floors and buildings. Of course any actual site-specific data should be used wherever possible to provide the best MAC results. Site/building opening or operating hours will also influence consumption of electricity for medical equipment, lighting, computers etc, and could also inform the calculation of potential saving in these areas. Travel of staff, patients and visitors to the Trust is an example of a situation where activity might not be heavily monitored. In such cases, it is best to develop estimates allowing for degrees of error or variance. It is also worth considering what data sources you could use to substitute for missing data groups such as the results of surveys, or information gathered by partner organisations or stakeholders. Using Data - Risks and Assurance When relying on data it is important to consider the risks related to its creation. Accurate, quality and reliable data is essential. In the future the performance of teams in the estates function might be measured in part based on the reduction in electricity meter readings from one year to the next. This could create an incentive to only include electricity meters for areas where reductions are likely to occur. It would be worthwhile considering what incentives for underreporting exist in your organisation. Another risk might occur where no monitoring or measurement of local data occurs, because in this instance there is no incentive for accuracy in measurement. With each risk, and each piece of data, it would be appropriate to consider whether to gather additional information or assurance. If the impact of a change is likely to be low, then the extra assurance gained might not be worth the additional work. Another source of data for the MAC Curve will be a third party (electricity bills, gas bills etc). In these instances it is important to know whether these bills make estimates in the billing or consumption statistics reported, and what work if any the Trust is performing to reconcile measurements back to the underlying data (meter readings by the supplier against meter readings by Estates staff, for instance). These good governance processes are useful for highlighting unnecessary expenditure and will also help create an accurate MAC Curve. For much of your information, it is likely that you are already seeking and gathering assurance. Perhaps outside consultants conducted work with other goals in mind, the data from which remains valid and can be applied to MAC Curve creation. Perhaps the data comes from verified independent sources. Perhaps the information is audited, and so audit packs are created periodically. When creating a MAC Curve it will not be necessary to repeat these types of activties, indeed a significant amount of the work which would be required to create a MAC Curve for a new organisation will already have been conducted in the NHS. [8]

9 What type of change are you making? Some carbon reduction measures are unlikely to suit all organisations, and this is reflected in the NHS MAC Curve uptake rates. It is worth considering which measures match your specific circumstances, and the proportion of your activity to which the measures apply the uptake rate. Options Selection A Central London Acute Trust might struggle to gather sufficient fuel for a biomass heating system from local sources, and shipping biomass in would negate the carbon savings intended in the investment. Equally, a small rural site might find that investing in a Combined Heat and Power plant is not cost effective. Uptake rate For Estates - understanding the site-by-site situation in your organisation could lead to significant adjustments to the wider MAC Curves. For instance improving the glazing and draft proofing of all buildings might be something that would create a substantial benefit for your organisation, whereas in the Large Acute Trust MAC Curve only 20% uptake is assumed. When considering uptake the specificities of a site s operation will also be important, as hours of opening will have a significant impact on technologies such as lighting controls. For changes to service delivery the uptake rate appropriate will be driven by how much of the service you are proposing to change for example, if your Trust is pursuing a larger proportion of home births as opposed to births in hospital, how large a percentage of your service is intended to be transferred? Another important consideration will be how much of the service patients will be willing to see transferred? In the case of maternity, some expectant mothers will always prefer a hospital birth, but this consideration applies to other areas too whether it is Accident and Emergency care or shifting from face to face to telephone based outpatient appointments. Impact of these changes on the current position With some investment decisions the impact of a change will be relatively simple to find if a boiler uses 10% less fuel than an alternative, then a simple substitution calculation will suffice to identify the carbon saving. Some changes will require more consideration. For example: If a clinic is going to be open for 3 more hours in the evening, then staff will have to be paid to man it for that time but the clinic will also require extra heating and lighting. If patients are asked to come to a new centre, rather than have a nurse visit them, the nurse s time will be more efficiently spent and her travelling mileage reduced but the patients travel needs to be taken into account. The same basic considerations will apply to the projections of future activity as apply to the establishment of the baseline, namely, what is the source of the data for the projections, what variance might exist, what are the risks and how do we mitigate them. As with costs and benefits, pilots, best practice guidance and surveys are all good places to start. [9]

10 Impact of these changes on the current position With some investment decisions the impact of a change will be relatively simple to find if a boiler uses 10% less fuel than an alternative, then a simple substitution calculation will suffice to identify the carbon saving. Some changes will require more consideration. For example: If a clinic is going to be open for 3 more hours in the evening, then staff will have to be paid to man it for that time but the clinic will also require extra heating and lighting. If patients are asked to come to a new centre, rather than have a nurse visit them, the nurse s time will be more efficiently spent and her travelling mileage reduced but the patients travel needs to be taken into account. The same basic considerations will apply to the projections of future activity as apply to the establishment of the baseline, namely, what is the source of the data for the projections, what variance might exist, what are the risks and how do we mitigate them. As with costs and benefits, pilots, best practice guidance and surveys are all good places to start. [10]

11 Tools When considering whether to create a MAC Curve there are several options. You might rely on an existing MAC Curve creation tool, sourced from the internet 4, to create your own tool to generate a MAC Curve, or to outsource some or all of the work of creating a MAC Curve to a specialist consultancy. Whichever route you opt for, the same basic requirements exist: 1. Ongoing ownership of the underlying source data Your organisation needs to retain intellectual property rights data and methodologies, to ensure that software licences are in the appropriate name and protect commercially sensitive information. Included in this necessity is a requirement to ensure that knowledge of where data has been drawn from, and how it was collected. Without this, making changes and adjustments in the future becomes a lot harder. 2. The capacity to adjust your output based on new or changing information As discussed above, you may want to adjust the MAC Curve output to include other decision-making information or outputs in the graph. This might be more challenging if using a stock tool. 3. Time required to create the MAC Curve Outsourcing the creation of a MAC Curve to a specialist consultancy provider may save your staff time. However, there will need to be a balance struck between the value of having external expertise bought in, and the need to support and inform their work, and the relative financial cost. [11]

12 Annex 1 What is Net Present Value? Net Present Value (NPV) is the current value of the future cash flows of a project or investment. The method takes into account the timing of future cash flows, as well as their values. Future income or savings generated by the project are offset against any initial investment or ongoing increases in cost, after a required rate of return is applied. The result of this calculation is an expression of the benefit an organisation will gain from a course of action, expressed in monetary terms. To calculate a project s NPV the following pieces of information are required: the investment cost, any impacts on ongoing expenditure, the projected timing of these impacts, and the discount rate. When calculating an NPV only the marginal increase in cost should be used. For example, if the investment being appraised was the introduction of a new type of boiler, instead of continuing with the current boiler replacement programme, then only the increase in costs between the new type of boiler and the old type would be relevant for assessment. The discount factor is calculated using the required rate of return for an investment. As such it includes both interest and inflation. Using this to calculate NPV is based on the principle that money now is worth more than money in the future and ensures that this is reflected in the project valuation. [12]

13 Example NPV LED lighting Cash Flow Y0 Y1 Y2 Y3 Y4 Installation of LEDs ( 5,000) Increase in maintenance costs ( 100) ( 100) ( 100) ( 100) Reduced electricity cost 1,500 1,500 1,500 1,500 Discount 3.5% Present Value ( 5,000) ,219 Net Present Value 142 In this example the installation cost of LED lighting is 5,000. The new system also requires 100 of extra maintenance costs, but it does bring a significant reduction in the electricity cost of 1,500 per annum for each of LED lighting system s four years of life. It is convention that costs which occur during a period, whether it is a year or a month, are recorded as having occurred at the end of that financial period. The initial outlay/investment in a project is recorded as occurring at the start of the first financial period, and hence is not discounted. The amount by which cash flows are reduced (the discount factor) escalates each year. This reflects how much the money initially invested would have been worth if it had been spent in other ways (the opportunity cost). The future cash flows are reduced by the discount factor, which is given by the formula (1+DF) y Where DF is the discount factor (in the example, we have used 3.5% which is the Treasury s required rate of return) and y is the number of years that have passed. The sum of these discounted flows forms the NPV of the project. In this example the project s NPV is 142, which means that the organisation will gain 142 more benefit than its overall investment during the project s life. [13]

14 Annex 2 Examples using NHS Evidence QIPP case studies The NHS Sustainable Development Unit has created a MAC Curve graph for three recommended examples from NHS Evidence. These examples are of initiatives taking place in the NHS that support quality and productivity at a local level. These have been used and scaled up to calculate the impact if implemented across the whole of NHS England, based on a 50% uptake rate. Where possible all figures have been extracted from the evidence submission on the NHS Evidence website. Where there has been missing data this has been requested from the leads of each initiative and the best estimates possible have been used. In order to convert the information into a MAC Curve it has been assumed that all initiatives will run over a ten year period. [14]

15 Glossary CO 2 Carbon Dioxide DF Discount Factor MACC Marginal Abatement Cost Curve NHS SDU National Health Service Sustainable Development Unit NPV Net Present Value DEC Displayed Energy Certificate References care should be used to ensure that CO 2 e factors are used Two examples of these are available from low carbon cities or the Carbon Trust: [15]

16 NHS Sustainable Development Unit Victoria House, Capital Park Fulbourn, Cambridge CB21 5XB Tel: Fax: Web: The NHS Sustainable Development Unit develops organisations, people, tools, policy, and research to help the NHS in England fulfil its potential as a leading sustainable and low carbon organisation. Published September 2010 NHS Sustainable Development Unit, All rights reserved. [16]

POLICY BRIEF WHAT IS A MARGINAL ABATEMENT COST (MAC) CURVE? HOW TO READ A MAC CURVE. Marginal Abatement Cost (MAC) Curve. Abstract

POLICY BRIEF WHAT IS A MARGINAL ABATEMENT COST (MAC) CURVE? HOW TO READ A MAC CURVE. Marginal Abatement Cost (MAC) Curve. Abstract POLICY BRIEF Marginal Abatement Cost (MAC) Curve This policy brief is part of the Technical Assistance to the Ghanaian National Climate Change Policy Framework (NCCPF). The analysis is supported by DFID

More information

Corporate Carbon Neutral Plan

Corporate Carbon Neutral Plan This Carbon Neutral Plan will guide the District of 100 Mile House decision making process in terms of reducing corporate energy consumption and greenhouse gas emissions and in achieving carbon neutrality.

More information

Quantifying the energy and carbon effects of water saving summary report

Quantifying the energy and carbon effects of water saving summary report Quantifying the energy and carbon effects of water saving summary report Domestic water use in the UK is around 150 litres per person per day. Taking water from the environment, treating it, distributing

More information

Managing Rising Energy Costs for Seniors in the ACT

Managing Rising Energy Costs for Seniors in the ACT FINAL COTA ACT Managing Rising Energy Costs for Seniors in the ACT Issues and Options related to the future of ACT Energy and Utility Concessions Submission to the ACT Government Review of Concessions

More information

How To Boost Your Cash Flow With The Enhanced Capital Allowance Scheme

How To Boost Your Cash Flow With The Enhanced Capital Allowance Scheme ECA272 The Enhanced Capital Allowance scheme for energy-saving technologies The Enhanced Capital Allowance scheme Boost your cash flow Enhanced Capital Allowances (ECAs) are a straightforward way for a

More information

Climate Local Hampshire County Council Our progress on November 2013

Climate Local Hampshire County Council Our progress on November 2013 Climate Local Hampshire County Council Our progress on November 2013 Since signing up to Climate Local on in July 2013 we have made the following progress towards achieving the commitments and actions

More information

carbon footprinting a guide for fleet managers

carbon footprinting a guide for fleet managers carbon footprinting a guide for fleet managers Introduction For some organisations, carbon footprinting is perceived to be about reducing emissions purely for environmental reasons. But it is primarily

More information

2010 MTEF: Budgeting for infrastructure and capital expenditure guidelines

2010 MTEF: Budgeting for infrastructure and capital expenditure guidelines 2010 MTEF: Budgeting for infrastructure and capital expenditure guidelines Introduction The guidelines below provide departments and entities with information to make budget submissions for capital projects

More information

ASSET & FACILITIES MANAGEMENT CORPORATE ENERGY EFFICIENCY POLICY

ASSET & FACILITIES MANAGEMENT CORPORATE ENERGY EFFICIENCY POLICY ASSET & FACILITIES MANAGEMENT CORPORATE ENERGY EFFICIENCY POLICY Paul Stokes Kevin Munford Asset & Facilities Manager Energy Officer 01/03/2006 THE COUNCIL S ENERGY POLICY FOR PUBLIC BUILDINGS AND TRANSPORT

More information

PEAK DISTRICT NATIONAL PARK AUTHORITY ENVIRONMENTAL MANAGEMENT ANNUAL PERFORMANCE REPORT 2013/2014

PEAK DISTRICT NATIONAL PARK AUTHORITY ENVIRONMENTAL MANAGEMENT ANNUAL PERFORMANCE REPORT 2013/2014 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 Carbon emissions (kgco2) Page 1 PEAK DISTRICT NATIONAL PARK AUTHORITY ENVIRONMENTAL MANAGEMENT ANNUAL PERFORMANCE REPORT 2013/2014 1. INTRODUCTION

More information

The Levy Control Framework

The Levy Control Framework Report by the Comptroller and Auditor General Department of Energy & Climate Change The Levy Control Framework HC 815 SESSION 2013-14 27 NOVEMBER 2013 4 Key facts The Levy Control Framework Key facts 2bn

More information

Extra help where it is needed: a new Energy Company Obligation

Extra help where it is needed: a new Energy Company Obligation Extra help where it is needed: a new Energy Company Obligation May 2011 The content of this paper is subject to the consultation outcome Contents 1 Our objectives for the ECO 1.1 Householder support: Lower

More information

Supplier Guidance Document. Energy and Fuel Use Data from Hertfordshire County Council Outsourced Services

Supplier Guidance Document. Energy and Fuel Use Data from Hertfordshire County Council Outsourced Services Supplier Guidance Document Energy and Fuel Use Data from Hertfordshire County Council Outsourced Services Hertfordshire County Council Version 5.1 January 2014 Contents Page 1. Background 3 2. Who we need

More information

PROJECT FINANCIAL EVALUATION

PROJECT FINANCIAL EVALUATION Introduction to Financial Figures of Merit PROJECT FINANCIAL EVALUATION An investor, energy policy analyst, or developer may use a variety of figures of merit to evaluate the financial attractiveness of

More information

7 Directorate Performance Managers. 7 Performance Reporting and Data Quality Officer. 8 Responsible Officers

7 Directorate Performance Managers. 7 Performance Reporting and Data Quality Officer. 8 Responsible Officers Contents Page 1 Introduction 2 2 Objectives of the Strategy 2 3 Data Quality Standards 3 4 The National Indicator Set 3 5 Structure of this Strategy 3 5.1 Awareness 4 5.2 Definitions 4 5.3 Recording 4

More information

3.0 COST BENEFIT ANALYSIS

3.0 COST BENEFIT ANALYSIS 3.0 Key findings: Compared to a black roof, a 3-inch to 6-inch green roof covering 10,000 feet has a Net Present Value of $2.70 per square foot per year, Payback of 6.2 years and an Internal Rate of Return

More information

Solar PV For Surrey Schools - Information Pack

Solar PV For Surrey Schools - Information Pack Solar PV For Surrey Schools - Information Pack Solar PV for Surrey Schools: Summary of options and key considerations School interested in solar PV OPTION 1 Own investment: School is responsible for the

More information

KIRKLEES. Visions and Strategies related to Energy and Climate Issues

KIRKLEES. Visions and Strategies related to Energy and Climate Issues KIRKLEES Visions and Strategies related to Energy and Climate Issues In recognition of the urgency of climate, the UK Government has committed to take action now and has introduced the Climate Change Act

More information

Energy Management Strategy

Energy Management Strategy Energy Management Strategy Gloucester s Energy Management Strategy sets out the way for the organisation to measure and manage all the energy and water resources it uses. The main areas it looks at are

More information

The Enhanced Capital Allowance scheme for energy-saving technologies

The Enhanced Capital Allowance scheme for energy-saving technologies The Enhanced Capital Allowance scheme for energy-saving technologies Boost your cash flow Enhanced Capital Allowances (ECAs) are a straightforward way for a business to improve its cash flow through accelerated

More information

Scope 1 describes direct greenhouse gas emissions from sources that are owned by or under the direct control of the reporting entity;

Scope 1 describes direct greenhouse gas emissions from sources that are owned by or under the direct control of the reporting entity; 9 Greenhouse Gas Assessment 9.1 Introduction This chapter presents an assessment of the potential greenhouse gas emissions associated with the Simandou Railway and evaluates the significance of these in

More information

BUSINESS OCR LEVEL 2 CAMBRIDGE TECHNICAL. Cambridge TECHNICALS FINANCIAL FORECASTING FOR BUSINESS CERTIFICATE/DIPLOMA IN K/502/5252 LEVEL 2 UNIT 3

BUSINESS OCR LEVEL 2 CAMBRIDGE TECHNICAL. Cambridge TECHNICALS FINANCIAL FORECASTING FOR BUSINESS CERTIFICATE/DIPLOMA IN K/502/5252 LEVEL 2 UNIT 3 Cambridge TECHNICALS OCR LEVEL 2 CAMBRIDGE TECHNICAL CERTIFICATE/DIPLOMA IN BUSINESS FINANCIAL FORECASTING FOR BUSINESS K/502/5252 LEVEL 2 UNIT 3 GUIDED LEARNING HOURS: 30 UNIT CREDIT VALUE: 5 FINANCIAL

More information

The Enhanced Capital Allowance scheme for energy-saving technologies. A guide to equipment eligible for Enhanced Capital Allowances

The Enhanced Capital Allowance scheme for energy-saving technologies. A guide to equipment eligible for Enhanced Capital Allowances The Enhanced Capital Allowance scheme for energy-saving technologies A guide to equipment eligible for Enhanced Capital Allowances 2 Contents Boost your cash flow 03 1. Check it s on the Energy Technology

More information

The Gateway Review Process

The Gateway Review Process The Gateway Review Process The Gateway Review Process examines programs and projects at key decision points. It aims to provide timely advice to the Senior Responsible Owner (SRO) as the person responsible

More information

FINDINGS AND RECOMMENDATIONS OF THE SURVEY OF ENGINEERING ENTERPRISE LEADERS GROUP ENERGY EFFICIENCY AND GREENHOUSE GAS REDUCTIONS

FINDINGS AND RECOMMENDATIONS OF THE SURVEY OF ENGINEERING ENTERPRISE LEADERS GROUP ENERGY EFFICIENCY AND GREENHOUSE GAS REDUCTIONS FINDINGS AND RECOMMENDATIONS OF THE SURVEY OF ENGINEERING ENTERPRISE LEADERS GROUP ENERGY EFFICIENCY AND GREENHOUSE GAS REDUCTIONS Contact: Lynne Reeder Senior Policy Analyst ph: 02 62706581 email: Lynne_Reeder@ieaust.org.au

More information

Accounting for ethical, social, environmental and economic issues: towards an integrated approach

Accounting for ethical, social, environmental and economic issues: towards an integrated approach Accounting for ethical, social, environmental and economic issues: towards an integrated approach Research Executive Summaries Series Vol. 2, No. 12 By Professor Carol A Adams La Trobe University and Dr

More information

SUPPLEMENTARY GREEN BOOK GUIDANCE

SUPPLEMENTARY GREEN BOOK GUIDANCE SUPPLEMENTARY GREEN BOOK GUIDANCE ADJUSTING FOR TAXATION IN PFI vs PSC COMPARISONS 1 INTRODUCTION 1.1 This guidance looks at the differential tax receipts that arise from the use of the Private Finance

More information

Developing a Public-Private Partnership Framework: Policies and PPP Units

Developing a Public-Private Partnership Framework: Policies and PPP Units Note 4 May 2012 Developing a Public-Private Partnership Framework: Policies and PPP Units This note is the fourth in a series of notes on developing a comprehensive policy, legal, and institution framework

More information

1 Annex 11: Market failure in broadcasting

1 Annex 11: Market failure in broadcasting 1 Annex 11: Market failure in broadcasting 1.1 This annex builds on work done by Ofcom regarding market failure in a number of previous projects. In particular, we discussed the types of market failure

More information

Rotherham Metropolitan Borough Council. Appendix A. Street Lighting. Sustainable Energy Action Plan

Rotherham Metropolitan Borough Council. Appendix A. Street Lighting. Sustainable Energy Action Plan Rotherham Metropolitan Borough Council Appendix A Street Lighting Sustainable Energy Action Plan October 2010 Streetpride Service Summary Modern street lighting provides many benefits to the community

More information

Changes in regulated electricity prices from 1 July 2012

Changes in regulated electricity prices from 1 July 2012 Independent Pricing and Regulatory Tribunal FACT SHEET Changes in regulated electricity prices from 1 July 2012 Based on Final Determination, 13 June 2012 The Independent Pricing and Regulatory Tribunal

More information

Best Practice Guide BPGCS007

Best Practice Guide BPGCS007 Best Practice Guide BPGCS007 ENERGY MANAGEMENT Introduction: With rising fuel costs, opening of electricity and gas markets to alternate suppliers and climate change, the requirement to monitor and reduce

More information

CABINET. 24 March 2015

CABINET. 24 March 2015 CABINET 24 March 2015 Title: Procurement of Electricity and Gas Supplies Report of the Cabinet Member for Finance Open Report with Exempt Appendix 4 Wards Affected: All Report Author: Andrew Sivess Group

More information

ECA272. The Enhanced Capital Allowance scheme for energy-saving technologies

ECA272. The Enhanced Capital Allowance scheme for energy-saving technologies ECA272 The Enhanced Capital Allowance scheme for energy-saving technologies The Enhanced Capital Allowance scheme Boost your cash flow Enhanced Capital Allowances (ECAs) are a straightforward way for a

More information

Rainwater Harvesting

Rainwater Harvesting Rainwater Harvesting With climate change now a reality rather than a speculated possibility, the demand on water resources has gone up, whilst the amount of water available for supply has gone down. Forth

More information

Lease Car Scheme Managers Guide

Lease Car Scheme Managers Guide NHS Fleet Lease Car Scheme Managers Guide The administration of the scheme is outsourced to a specialist management company (Knowles Associates) who provides quotations, scheme management, driver support

More information

The table at Annex A table shows where the carbon savings have come from. Projects to note include:

The table at Annex A table shows where the carbon savings have come from. Projects to note include: A Carbon Budget for the Lake District National Park: Progress report, June 2013 The Lake District National Park Partnership is committed to leading the way on climate change. The Lake District is one of

More information

Zero cost solutions for driving energy savings

Zero cost solutions for driving energy savings Zero cost solutions for driving energy savings Zero cost solutions for driving energy savings and delivering sustainability through LED Lighting Businesses looking to cut energy costs, reduce carbon emissions

More information

Accessing finance. Developing a business case for your resource efficiency projects

Accessing finance. Developing a business case for your resource efficiency projects Accessing finance Developing a business case for your resource efficiency projects Developing a business case for your resource efficiency projects 2 Contents 1 Planning a resource efficiency project?

More information

Monitoring Social Impact: How does business measure up?

Monitoring Social Impact: How does business measure up? BUSINESS INTELLIGENCE FOR CORPORATE RESPONSIBILITY AND SUSTAINABILITY Monitoring Social Impact: How does business measure up? 1 Monitoring Social Impact: How does business measure up? Executive summary

More information

National Energy Action s Northern Ireland response to CFD Implementation in NI Strategic issues Discussion Paper

National Energy Action s Northern Ireland response to CFD Implementation in NI Strategic issues Discussion Paper National Energy Action s Northern Ireland response to CFD Implementation in NI Strategic issues Discussion Paper May 2015 National Energy Action Northern Ireland (NEA NI), the leading national fuel poverty

More information

Accessing finance. Developing a business case for your resource efficiency projects

Accessing finance. Developing a business case for your resource efficiency projects Accessing finance Developing a business case for your resource efficiency projects Developing a business case for your resource efficiency projects 2 Contents 1 Planning a resource efficiency project?

More information

a) raises the funds required by the Council to meet approved service levels in the most effective manner;

a) raises the funds required by the Council to meet approved service levels in the most effective manner; ITEM FINANCIAL STRATEGY 2016/17 2020/21 Report By Chief Financial Officer SCOTTISH BORDERS COUNCIL 11 February 2016 1 PURPOSE AND SUMMARY 1.1 This report seeks approval for the financial strategy for the

More information

PERTH AND KINROSS COUNCIL. Strategic Policy and Resources Committee 14 September 2011 CORPORATE ENERGY MANAGEMENT AND CONSERVATION POLICY

PERTH AND KINROSS COUNCIL. Strategic Policy and Resources Committee 14 September 2011 CORPORATE ENERGY MANAGEMENT AND CONSERVATION POLICY PERTH AND KINROSS COUNCIL 10 11/465 Strategic Policy and Resources Committee 14 September 2011 CORPORATE ENERGY MANAGEMENT AND CONSERVATION POLICY Report by Depute Director (Environment) This report seeks

More information

Scope 2 Accounting Guidance: What it means for corporate decisions to purchase environmental instruments

Scope 2 Accounting Guidance: What it means for corporate decisions to purchase environmental instruments Scope 2 Accounting Guidance: What it means for corporate decisions to purchase environmental instruments January 2015 Corporate Scope 2 accounting has traditionally been relatively straight forward. Common

More information

A Guide For Preparing The Financial Information Component Of An Asset Management Plan. Licensing, Monitoring and Customer Protection Division

A Guide For Preparing The Financial Information Component Of An Asset Management Plan. Licensing, Monitoring and Customer Protection Division A Guide For Preparing The Financial Information Component Of An Asset Management Plan Licensing, Monitoring and Customer Protection Division July 2006 Contents 1 Important Notice 2 2 Scope and purpose

More information

whole life costing (+ CO2) user guide

whole life costing (+ CO2) user guide 2009 Forum for the Future - the not-for-profit sustainable development organisation - works in partnership with more than 120 leading businesses and public sector bodies, helping them devise more sustainable

More information

Building Energy Efficiency Opportunity Report

Building Energy Efficiency Opportunity Report Building Energy Efficiency Opportunity Report September 2013 Building Energy Efficiency Opportunity Report TABLE OF CONTENTS Introduction 3 Building Efficiency Opportunities 4 #1: High Potential Buildings

More information

Bespoke Gas CHP Policy

Bespoke Gas CHP Policy Bespoke Gas CHP Policy Summary of Analysis Results & Conclusions December 2014 Crown copyright 2014 URN 14D/469 You may re-use this information (not including logos) free of charge in any format or medium,

More information

Thames Valley Police Carbon Management Plan 2015-2020

Thames Valley Police Carbon Management Plan 2015-2020 Thames Valley Police Carbon Management Plan 2015-2020 Date: 20 th February 2015 Version number: Owner: Approval route: Approval status: V5 Francis Habgood (Deputy Chief Constable) Business Support Programme

More information

A Guide to Woodland Carbon for Business

A Guide to Woodland Carbon for Business A Guide to Woodland Carbon for Business Contents: 1. Investing in Woodland Carbon: an overview 2. Why Woodland Carbon? 3. How much does it cost? 4. Woodland Carbon Code 5. Woodland Carbon compliance 6.

More information

(92 plus) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20)

(92 plus) (81-91) (69-80) (55-68) (39-54) (21-38) (1-20) Energy Performance Certificate Georgia House Stud Bradley Road Burrough Green NEWMARKET CB8 9NH Dwelling type: Detached house Date of assessment: 17 August 2011 Date of certificate: 17 August 2011 Reference

More information

Preparing cash budgets

Preparing cash budgets 3 Preparing cash budgets this chapter covers... In this chapter we will examine in detail how a cash budget is prepared. This is an important part of your studies, and you will need to be able to prepare

More information

GUIDELINES FOR PILOT INTERVENTIONS. www.ewaproject.eu ewa@gencat.cat

GUIDELINES FOR PILOT INTERVENTIONS. www.ewaproject.eu ewa@gencat.cat GUIDELINES FOR PILOT INTERVENTIONS www.ewaproject.eu ewa@gencat.cat Project Lead: GENCAT CONTENTS A Introduction 2 1 Purpose of the Document 2 2 Background and Context 2 3 Overview of the Pilot Interventions

More information

Biomass Funding Solutions. Have Your Investment Pay its Way. The renewable energy experts throughout East Anglia

Biomass Funding Solutions. Have Your Investment Pay its Way. The renewable energy experts throughout East Anglia Biomass Funding Solutions Have Your Investment Pay its Way Biomass The renewable energy experts throughout East Anglia Installing Biomass since 2011. Abel Energy s finance solutions allow you to invest

More information

SCRA Sustainability Report 2012/13. Changing f or children and young people

SCRA Sustainability Report 2012/13. Changing f or children and young people SCRA Sustainability Report 2012/13 Changing f or children and young people SCRA Sustainability Report 2012/13 This report contains information about SCRA s environmental impact during 2012/13. This information

More information

Annex B: Strike price methodology July 2013

Annex B: Strike price methodology July 2013 July 2013 URN 13D/189 Contents Introduction... 3 Overview of methodology for deriving a CfD strike price... 3 Strike Prices during the cross-over period with the RO (2014/15 2016/17)... 4 Comparison of

More information

The Enhanced Capital Allowance Scheme for energy saving plant and machinery

The Enhanced Capital Allowance Scheme for energy saving plant and machinery CIBSE Briefing The Enhanced Capital Allowance Scheme for energy saving plant and machinery An cash incentive for your clients to invest in energy and tax efficiency What are Capital Allowances? Capital

More information

alternative collection

alternative collection 01 technical this article considers two methods a company could adopt in order to speed up the collection of cash from its customers. Additionally, worked examples show how these methods can be evaluated

More information

ICT Digital Transformation Programme

ICT Digital Transformation Programme Officer and Date Item Cabinet 11 th May 2016 Public ICT Digital Transformation Programme Responsible Officer: Clive Wright, Chief Executive Email: Clive.wright@shropshire.gov.uk Tel: 01743 252007 1.0 Summary

More information

EU Life+ Project: Combining Water and Energy Efficiency. A report by the Energy Saving Trust and Waterwise UK.

EU Life+ Project: Combining Water and Energy Efficiency. A report by the Energy Saving Trust and Waterwise UK. : Combining Water and Energy Efficiency A report by the Energy Saving Trust and Waterwise UK. Combining Water and Energy Effi ciency Water in the home External to household Overview The EU Life+ RENEW

More information

Electrical infrastructure serving the city of London CITY OF LONDON. 2012 Corporate Energy Consumption Report

Electrical infrastructure serving the city of London CITY OF LONDON. 2012 Corporate Energy Consumption Report Electrical infrastructure serving the city of London CITY OF LONDON 2012 Corporate Energy Consumption Report September 2013 TABLE OF CONTENTS CORPORATE ENERGY MANAGEMENT - UPDATE... 3 1 CORPORATE ENERGY

More information

Carbon Footprint Report 2011 2012

Carbon Footprint Report 2011 2012 Carbon Footprint Report 2011 2012 Electricity North West Carbon Footprint Report 2011-2012 1. Introduction This report details the carbon consumption arising from the undertakings of Electricity North

More information

Foreword. Contents. Sustainability in the NHS. The Carbon Footprint 3. The Views and Values of NHS Leaders 4. The People s Perspective 5

Foreword. Contents. Sustainability in the NHS. The Carbon Footprint 3. The Views and Values of NHS Leaders 4. The People s Perspective 5 SUSTAINABILITY IN THE NHS HEALTH CHECK 2012 Foreword Contents It is essential we strive to improve patient care today at the same time as enabling the system to deliver high quality healthcare tomorrow.

More information

Sustainable Schools 2009. Renewable Energy Technologies. Andrew Lyle RD Energy Solutions

Sustainable Schools 2009. Renewable Energy Technologies. Andrew Lyle RD Energy Solutions Sustainable Schools 2009 Renewable Energy Technologies Andrew Lyle RD Energy Solutions RD Energy Solutions Energy efficiency and renewable energy consultancy Project management of installations Maintenance

More information

P. Locker, Photo Graphic Design, Bolton

P. Locker, Photo Graphic Design, Bolton DfEE Project Team: Chris Bissell Principal Architect Richard Daniels Senior Engineer Graphics: Paul Isbell Photographs: P. Locker, Photo Graphic Design, Bolton Cover Design and typesetting: The Stationery

More information

SSE s criteria used for GHG emissions reporting

SSE s criteria used for GHG emissions reporting SSE s criteria used for reporting 1 Introduction This document details the annual greenhouse gas emissions reporting approach used by SSE Plc to report the tonnes of carbon dioxide equivalent (CO2e) during

More information

An introduction to the Sustainable Biomass Partnership

An introduction to the Sustainable Biomass Partnership An introduction to the Sustainable Biomass Partnership March 2015 Outline 1. The sustainability challenge 2. A sector solution 3. Progress to date 4. What next? The challenge To tackle global warming,

More information

GE Capital. Fleet Policy. A step-by-step guide to writing your fleet policy. Key Solutions Thought Leadership

GE Capital. Fleet Policy. A step-by-step guide to writing your fleet policy. Key Solutions Thought Leadership GE Capital Fleet Policy A step-by-step guide to writing your fleet policy Key Solutions Thought Leadership A step by step guide to writing a fleet policy Any organisation that runs a company car or van

More information

FINDING YOUR CHEAPEST WAY TO A LOW CARBON FUTURE. The Danish Levelized Cost of Energy Calculator

FINDING YOUR CHEAPEST WAY TO A LOW CARBON FUTURE. The Danish Levelized Cost of Energy Calculator FINDING YOUR CHEAPEST WAY TO A LOW CARBON FUTURE The Danish Levelized Cost of Energy Calculator Low carbon transition is a multifaceted challenge involving political, technical and economic elements. Denmark

More information

place-based asset management

place-based asset management place-based asset management Managing public sector property to support aligned local public services TOWN HALL CIPFA, the Chartered Institute of Public Finance and Accountancy, is the professional body

More information

CE Entrepreneurship. Investment decision making

CE Entrepreneurship. Investment decision making CE Entrepreneurship Investment decision making Cash Flow For projects where there is a need to spend money to develop a product or establish a service which results in cash coming into the business in

More information

Carbon Emissions Trading and Carbon Taxes

Carbon Emissions Trading and Carbon Taxes Carbon Emissions Trading and Carbon Taxes EU Environmental Policy The challenge reaching towards a low carbon economy 1 This presentation covers Can carbon markets be part of the answer in controlling

More information

Implementing Carbon Reduction Without Impacting Working Capital. Presented by Dylan Crompton

Implementing Carbon Reduction Without Impacting Working Capital. Presented by Dylan Crompton Implementing Carbon Reduction Without Impacting Working Capital Presented by Dylan Crompton Evolution of a Carbon Strategy Proactive organisations are on a journey to reduce carbon emissions. Marginal

More information

Boiler efficiency for community heating in SAP

Boiler efficiency for community heating in SAP Technical Papers supporting SAP 2009 Boiler efficiency for community heating in SAP Reference no. STP09/B06 Date last amended 26 March 2009 Date originated 28 May 2008 Author(s) John Hayton and Alan Shiret,

More information

Reporting Service Performance Information

Reporting Service Performance Information AASB Exposure Draft ED 270 August 2015 Reporting Service Performance Information Comments to the AASB by 12 February 2016 PLEASE NOTE THIS DATE HAS BEEN EXTENDED TO 29 APRIL 2016 How to comment on this

More information

A target cost is arrived at by identifying the market price of a product and then subtracting a desired profit margin from it.

A target cost is arrived at by identifying the market price of a product and then subtracting a desired profit margin from it. Answers Fundamentals Level Skills Module, Paper F5 Performance Management June 2015 Answers Section A 1 C Divisional profit before depreciation = $2 7m x 15% = $405,000 per annum. Less depreciation = $2

More information

Foundations in Financial Management (FFM) September 2016 to June 2017

Foundations in Financial Management (FFM) September 2016 to June 2017 Foundations in Financial Management (FFM) September 2016 to June 2017 This syllabus and study guide is designed to help with teaching and learning and is intended to provide detailed information on what

More information

Thorn Energy Solutions. The power to save. Reduce costs. Improve efficiency. Embrace sustainability.

Thorn Energy Solutions. The power to save. Reduce costs. Improve efficiency. Embrace sustainability. To find out more contact: Thorn Lighting Limited Durhamgate Spennymoor County Durham DL16 6HL Tel: 0844 855 4810 energy@thornlighting.com Thorn Energy Solutions. The power to save. Reduce costs. Improve

More information

Reporting criteria for selected key performance indicators in the 2014 Responsible Business Report

Reporting criteria for selected key performance indicators in the 2014 Responsible Business Report Reporting criteria for selected key performance indicators in the 2014 Responsible Business Report Introduction This Reporting Criteria document details the approach and scope applied to key environmental

More information

UK Government proposals on energy tax changes

UK Government proposals on energy tax changes Main Tel: 01685 725000 Civic Centre, Castle Street, Merthyr Tydfil CF47 8AN www.merthyr.gov.uk CABINET - INFORMATION REPORT Date Written 21 October 2015 Report Author Mick Campbell Service Area Neighbourhood

More information

Our financing of the energy sector in 2013

Our financing of the energy sector in 2013 Our financing of the energy sector in 213 rbs.com/sustainable About this document This report is the fourth Our financing of the energy sector briefing that we have produced since 21. The aim remains the

More information

The Net Present Value Rule in Comparison to the Payback and Internal Rate of Return Methods

The Net Present Value Rule in Comparison to the Payback and Internal Rate of Return Methods The Net Present Value Rule in omparison to the Payback and Internal Rate of Return Methods Sascha Rudolf, 8-- Preamble In the context of investment decisions companies have a large variety of investment

More information

Economics of Energy Efficiency in a CO 2 Constrained World

Economics of Energy Efficiency in a CO 2 Constrained World Economics of Energy Efficiency in a CO 2 Constrained World Daniel Trombley and Kelly Kissock, University of Dayton John Seryak, Go Sustainable Energy ABSTRACT Greenhouse gas emission trading programs have

More information

- Internal distribution only. Corporate Real Estate and Facilities Cost Reduction

- Internal distribution only. Corporate Real Estate and Facilities Cost Reduction - Internal distribution only Corporate Real Estate and Facilities Cost Reduction Summary By moving from typical to best practice, organisations can improve value for money and reduce their real estate

More information

Carbon Management Plan

Carbon Management Plan E-2015-02-02 Addendum Carbon Management Plan Date: 14 May 2014 Owners: Approval: K.W.Bullimore & M.Sackett A.Burrell Executive Summary This document sets out the Carbon Management Plan (CMP) for The Open

More information

CAPITAL PLANNING GUIDELINES

CAPITAL PLANNING GUIDELINES CAPITAL PLANNING GUIDELINES 1. INTRODUCTION... 2 2. EXTENSION OF EXISTING INFRASTRUCTURE PROJECTS... 2 3. NEW CAPITAL PROJECTS... 2 4. MINIMUM INFORMATION REQUIRED... 3 5. PREPARATORY WORK... 3 5.1 NEEDS

More information

ICASL - Business School Programme

ICASL - Business School Programme ICASL - Business School Programme Quantitative Techniques for Business (Module 3) Financial Mathematics TUTORIAL 2A This chapter deals with problems related to investing money or capital in a business

More information

Stocktake of access to general practice in England

Stocktake of access to general practice in England Report by the Comptroller and Auditor General Department of Health and NHS England Stocktake of access to general practice in England HC 605 SESSION 2015-16 27 NOVEMBER 2015 4 Key facts Stocktake of access

More information

2. THE ECONOMIC BENEFITS OF EDUCATION

2. THE ECONOMIC BENEFITS OF EDUCATION 2. THE ECONOMIC BENEFITS OF EDUCATION How much more do tertiary graduates earn? How does education affect employment rates? What are the incentives for people to invest in education? What are the incentives

More information

FINAL ACCOUNTS FINAL ACCOUNTS AND THE TRIAL BALANCE

FINAL ACCOUNTS FINAL ACCOUNTS AND THE TRIAL BALANCE 12 FINAL ACCOUNTS For most businesses, the final accounts, which are produced at the end of each financial year, comprise: trading account profit and loss account balance sheet Final accounts can be presented

More information

Social Return on Investment

Social Return on Investment Social Return on Investment Case study - London Borough September 2014 Overview The Social Value Act is transforming public sector procurement. Business needs to embrace this opportunity and use it to

More information

It s not just about the environment

It s not just about the environment Supply Chain Consultancy It s not just about the environment Sustainable Supply Chains Paul Goose discusses the need to take a wider, more integrated view of operations to ensure long term growth. A great

More information

Renewable Choice Energy

Renewable Choice Energy Catawba College Table of Contents About Renewable Choice The Problem: Electricity Production Today The Solutions: Renewable Energy Sources Renewable Energy Credits (RECs) Who can participate in Renewable

More information

Advanced metering for SMEs

Advanced metering for SMEs Advanced metering for SMEs Carbon and cost savings Executive Summary The Carbon Trust would like to thank everyone who has contributed to this report, either through direct involvement in the trial, general

More information

Carbon Dioxide Emission Savings Potential of Household Water Use Reduction in the UK

Carbon Dioxide Emission Savings Potential of Household Water Use Reduction in the UK Vol. 2, No. 1 Journal of Sustainable Development 36 Carbon Dioxide Emission Savings Potential of Household Water Use Reduction in the UK M.J. Hackett & N.F. Gray (Corresponding author) Centre for the Environment,

More information

Driving down corporate carbon emissions through sustainable property management

Driving down corporate carbon emissions through sustainable property management Driving down corporate carbon emissions through sustainable property management Driving down corporate carbon emissions through sustainable property management Challenge IBM proposal Business opportunity

More information

Air Quality Appraisal Damage Cost Methodology

Air Quality Appraisal Damage Cost Methodology www.defra.gov.uk Air Quality Appraisal Damage Cost Methodology Interdepartmental Group on Costs and Benefits, Air Quality Subject Group February 2011 Damage costs are one way of approximating the impacts

More information

Impact Assessment (IA)

Impact Assessment (IA) Title: Use of works for public administration and reporting IA No: BIS0309 Lead department or agency: IPO Other departments or agencies: Summary: Intervention and Options Impact Assessment (IA) Date: 13/12/12*

More information