Project Portfolio Management
|
|
|
- Roy Charles
- 10 years ago
- Views:
Transcription
1 Project Portfolio Management Using Microsoft Project Server & Enterprise Project Management Preface Most evaluations of Project Portfolio Management (PPM) systems focus on feature comparisons between vendor offerings rather than the operational issues that confront organizations in trying to obtain their benefits. This paper offers unvarnished commentary on the challenges and benefits encountered implementing Microsoft s Project Professional, Project Server, and Enterprise Project Management. The paper offers some realistic expectations which may differ considerably from what Microsoft or an integration provider talks about. Focusing on just Microsoft s offerings allows this paper to be explicit in its discussion and critique. However, the discussion could apply to (roughly) a dozen other PPM vendors as the offerings are similar. This paper assumes the reader is already familiar with the mechanics of project management and the general functions of portfolio management systems. Copyright 2011 On-Fire Associates, All Rights Reserved Page 1
2 Introduction Microsoft Project is the most popular project management tool in the market. Originally developed for internal use by Microsoft, the offering has been commercially extended and expanded over the years and is now a suite of offerings ranging from single project - single user to multi-project - multi-user, and from project management to the management of the enterprise value chain. The suite includes strategic and tactical elements found in Enterprise Resource Planning, Project Lifecycle Management, Business Intelligence, Product Portfolio Management, financial systems etc. Microsoft s Enterprise Project Management offering competes with CA s Clarity-PPM, Hewlett Packard s PPM-Center, IBM s Rational Suite, Planview s Enterprise-PPM among others. Each product has its own strengths and differentiation, but further comparisons are not the point of this paper. For a comparison of vendor offerings refer to The Forrester Wave: Project Portfolio Management Tools by Lewis Cardin available on the web. Project management is a complicated business process, and Microsoft Project has taken many arrows from practitioners who hoped for reduced complexity over the two decades of releases. While many improvements in the tool have in fact been made, scaling the offering to accommodate distributed work teams, web-based workflows, agile software methods etc. have added to its complexity even in the entry-level, single-project, desktop solution. When multiple concurrent projects, enterprise-wide asset assignment and capacity management functions are layered-onto the baseline project capabilities, increasing complexity is unavoidable. Learning how to apply these new capabilities and becoming skilled in using Microsoft EPM takes time and should not be discounted. This will be discussed further below. Successful implementation of EPM highly correlates to the maturity of an enterprise s development practices. Companies with weak process management skills will not succeed with Microsoft Enterprise Portfolio Management or with most other enterprise-wide tools such as Enterprise Resource Management (ERP) or Customer Relationship Management (CRM). EPM tools do not create or define the project planning processes, but help communicate, coordinate and enforce workflows. If the existing process methods are random, then the result of an EPM rollout will be automated chaos. EPM is not an out of the box solution to a business problem. There is considerable configuration, and often customization required to get the system running. The basic costs for the software licenses represent, on the whole, only a small portion of the total implementations costs. It frequently takes more than a year to implement even the initial stages of an EPM solution, so firms with short attention spans or those seeking quick fixes are not likely to be satisfied customers. Once in place, PPM and EPM systems are sticky and difficult to move away from. Vendor support, mission stability and management commitment are needed to grow value from the investment. While Copyright 2011 On-Fire Associates, All Rights Reserved Page 2
3 third party firms can assist in implementing or hosting a system, the enterprise must drive the planning, deploying and on-going governance. This paper continues with the benefits and challenges in implementing Microsoft Enterprise Portfolio Management including Project Professional, Project Server and Project Web Access. This suite of offerings compares favorably to competitive offerings and is representative of the class of software tools available for a portfolio management solution. Microsoft-EPM s strong points License Cost Microsoft Project s software licenses are inexpensive. The Project Professional client retails for around $700 per seat and the Project Server starts at under $5,000. For what these products do, this is appropriate considering what will be added to get them operational. Many EPM users report that implementation costs were many times the license acquisition costs; far higher than what they expected. With the web access features built into Project 2007 and 2010, not every user needs a license. But customers typically buy more licenses than they need. There are likely thousands of unused and unnecessary Project licenses in existence. The high failure rate of enterprise-wide systems (Aberdeen estimates the failure rate at 41%), a goslow approach on license expenditures makes sense. As pilot implementation proceeds, a firm s ability to predict true licensing needs improves. Microsoft has attractive licensing policies that allow enterprises to ramp up over time and get credit for prior acquisitions. Hosted solution vendors will likely be flexible as well. One version of the truth The intent and philosophy of EPM is that all project and portfolio information is available from the Project Server database. One data repository means easier maintenance and much less reconciliation of variances between data systems. But the data comes from many sources. The integrity of the data is a collective responsibility of the project managers, developers and product management. The IT department is not responsible for the underlying data integrity. One version of the truth is a significant but hard to quantify benefit. Copyright 2011 On-Fire Associates, All Rights Reserved Page 3
4 Accessibility In a recently added capability, Microsoft provides secure access to project information via a web browser (the Project Web Access offering). Projects can be sorted / filtered and configurable dashboards allow drill-down into project details from anywhere in the world. The Project Professional client is not needed to view and interact with high-level project information. This global visibility is a big plus. Users who only infrequently interact with the system do not need the Project Professional client nor need they be highly fluent in its features. Vendor / product stability The history of this industry is characterized by consolidation and acquisition. Most of the major vendors got into the business via corporate acquisitions. IBM acquired the Rational, CA Clarity came from Niku, Hewlett Packard PPM-Center came from Mercury Interactive and Oracle acquired its core offering from Primavera. Microsoft is one of the few vendors to have developed much of their suite internally. These vendors are large stable companies, and many now use their products for internal project governance. None is likely to be acquired by a third party. Nor is it likely they will abandon this market. Microsoft s Project / EPM suite will probably remain the most popular portfolio management system for many years to come. As a consequence, there are more professional project managers familiar with MS-Project than any other system. It is relatively easy to recruit project management staff proficient with MS-Project. It is also relatively easy to lose this talent to others. MS-Project has the largest support ecosystem. The server offering is available as a hosted solution from numerous application service providers. There is a lot of help available, both free and for a fee. Microsoft has a history of continually improving its offerings, and this has been true for the Project suite. For all the griping about its complexity and user friendliness, no competitive system is substantially better. Implementing an EPM system, with all the one-time acquisition and startup costs, requires an investment in people and training. Even for experienced Project desktop users, the new skills and features of the enterprise-wide products can take months to learn. Becoming proficient with Project Server s centralized resource planning functions, for example can take 5 6 weeks. Collaboration Project Web Access (PWA) is an effective way to collaborate. In Project Server 2007 and 2010, PWA is coupled with Windows SharePoint Services for team sharing and reporting. The two offering have a highly consistent look and feel. Most developers and stakeholders find the integration comfortable and effective. For two products initially developed independently of each other, this turned out better than expected. Copyright 2011 On-Fire Associates, All Rights Reserved Page 4
5 Portfolio Capacity Management Microsoft Project Server provides a means to graphically view global resource load balancing. This is one of the most highly promoted features of the offering and its major advancement. Visibility into global asset assignments and projects helps stakeholder manage the organization s capacity for work. Copyright 2011 On-Fire Associates, All Rights Reserved Page 5
6 Capacity can be viewed by project, by resource, by resource type, by department or in various aggregates. Visibility into constrained resources is a huge boost to project manager effectiveness. Unanticipated resource problems on one project can create a cascade of conflicts on downstream efforts and affect the delivery of multiple projects. Capacity management visibility provides time to adjust tasks and avoid the upcoming conflict. While the graphics are useful, getting there is a bit clunky. Adjusting assignments to evaluate alternative solutions takes numerous steps on multiple screens and a recompile of the data before the revised graphics can be displayed. The functionality is non-interactive and not as helpful as it could be, especially for real-time decision support or scenario discussions. Portfolio Analysis Another part of the EPM offering helps stakeholders establish the value of projects. Stakeholders are led through screens that define and characterize the enterprise s business strategies and operating tactics. EPM uses a multi-variable decision theory known as the Analytic Hierarchy Process (AHP) to quantify the subjective and objective attributes of projects under consideration. For a detailed discussion on AHP, refer to Wikipedia on the web. EPM uses a Wideband Delphi method to score the quantitative and qualitative factors that establish project valuation. This established quantification method is also described in Wikipedia. The resulting scores create the initial project ranking. Other methods will likely be added in future releases. Frequently EPM s portfolio analysis results in a clustering of projects around a particular value score. When arbitrarily small values separate clusters of projects, stakeholder intervention is needed to reconcile the rankings. While EPM administers this entire work flow, it is not be as user friendly as some wish, nor does it consistently facilitate arriving at the best final result. For example, a graphical Copyright 2011 On-Fire Associates, All Rights Reserved Page 6
7 representation of the relative values between subsets of projects might have been a useful addition, especially as a collaborative decision support tool. Excel exports Microsoft Excel is the preferred analysis tool for just about everyone including project managers. Regardless of how easy it is to view data in a browser or on a server, employees want to analyze local versions of the dataset. The Microsoft Project suite allows virtually any table or worksheet to be exported to Excel at the click of a button. EPM s Process Challenges It s the people, stupid This section starts with people and culture, the most important challenge to consider when contemplating the Microsoft EPM suite. Some of the issues are prerequisites, practices that should be well established prior to piloting the software. Others are cultural red flags warning signals of difficulties ahead. Installing the entry-level Microsoft Project product is a choice often made by an individual project manager for their own personal use. Within the firm, other project managers can make the same or a different tool choice and each instance can operate effectively and independently of the other. But when departments or business units seek to share resources between project managers, tools that do not talk to each other become a limitation. Further, when enterprises want to evaluate their current and future development portfolios or allocate their worldwide development assets effectively, project management tool and process consistency is required. Copyright 2011 On-Fire Associates, All Rights Reserved Page 7
8 Achieving process consistency is far more challenging, time consuming and expensive than bringing in Microsoft EPM software. It is a huge mistake to believe that EPM systems will by themselves create harmonized practices. People and cultures are surprisingly skilled at subverting unwanted software systems. Roughly forty percent of enterprise-wide software tools (ERP, CRM etc.) fail in implementation, primarily because of people and cultural resistance. So what are the cultural warning signs to look out for? 1- A culture that does not distinguish bad news from bad performance 2- A management culture that tends to shoot the messenger 3- Management that is unaccustomed to managing by the numbers 4- A management culture that seeks quick gratification on new process initiatives 5- The culture that creates initiatives yet fails to maintain support and commitment over time 6- A culture that undervalues staff training or process engineering 7- A culture that undervalues system administration and maintenance It is interesting to note that the above list mostly deals with management practices. For Microsoft Project Server and EPM to deliver value, it must be the data repository for all the projects and assets it is being purchased to analyze. It must contain accurate data and be authoritative. In most cases, it must be the sole data repository. To accomplish this, everyone involved in EPM activities must become skilled with Microsoft Project Server and EPM facilities. This does not mean that there are not different levels of training and skills. But it does means everyone, management too; no exceptions. If you think this is easy, you are probably going to stumble badly. Microsoft Project Server customers report that implementation costs greatly exceeded their estimations. User training is a big piece of this. Customization This brings up the topic of customization. To clarify terms, customization refers to custom programming, not the setting of the many configuration parameters that come with the product. There are many third party integrators who can provide MS-Project server and EPM customization services. It is tempting to believe that this will ease the transitions between legacy practices and the EPM system. We strongly urge caution. For one thing, custom programming drives the enterprise away from the standard Microsoft releases. Microsoft regularly makes improvements to the EPM suite, and one may want to take advantage of these in the future. Customizations will make this far more difficult and expensive. Copyright 2011 On-Fire Associates, All Rights Reserved Page 8
9 Secondly, no matter how much customization is done, there will always be significant differences between a legacy system and the new one. It is a trap to think that customization will significantly reduce training costs and / or improve compliance. Thirdly, it is a mistake to undertake customization without a firm understanding of the standard product and how it is actually being used in the organization. This suggests holding off customization until after the pilot phase, or even longer. Even then, stakeholder requests need to be rigorously tested for value considering the support baggage they create. Global Resource Management Project managers experienced with Microsoft Project have a new learning curve to climb when asked to administer global resources and portfolio optimizations. This task goes well beyond the mechanics of using the Project Server and EPM features and facilities. Strategic and tactical tradeoffs are at the core of portfolio management and the business skills needed may be beyond those of many senior program managers. These work flows require executive level thinking. The Chief Operating Officer, VP-Program Management or VP Product Management typically owns of the global resource management decision process. To evaluate the EPM reports, they must understand how the EPM tools work. The complexities introduced by Enterprise Project Management require training and on-going periodic use to keep skills sharp. The tool and global resource allocation process needs to work together smoothly. The core issue is this; for stakeholders to do effective resource and capacity management, they have to know percent of Project Server functionality, otherwise they are unlikely to do it well. The ability to create program scenarios, trade-offs and what-if cases are all features of the product, but are controlled through a long list of check boxes / switches with semi-obscure labels and non-intuitive interactions. Project Server and EPM are not like Adobe Photoshop, Excel or Visio where some value can be derived even with very little tool experience. EPM is a different beast. Resource allocation and resource assignment are different processes each operating at different levels of granularity. The former serves a tactical objective, namely a high-level determination of whether an appropriate skill set is available to work on a project. The latter operates at a lower, more detailed level and determines which specific resource is assigned to what tasks over what timeframe. The two processes are comingled in Microsoft Enterprise Project Management which makes the tactical allocation analysis more complex and awkward than necessary. For example, to test different project and staffing scenarios, stakeholders must go to work breakdown structure details to enable / disable efforts, then rerun the analysis based on the new task / load scenario. Support costs Microsoft Project Server, Enterprise Portfolio Management and SharePoint are SQL database systems that require support and administration. Copyright 2011 On-Fire Associates, All Rights Reserved Page 9
10 As the system grows in breath of application, or deployment within the enterprise, systems maintenance and administration require staffing. A reasonable expectation is one systems support engineer to maintain existing capabilities and one systems support engineer to focus on expansion projects. In addition, one administrator is needed to handle hardware and database responsibilities such as security, access control, backups, updates, patches etc. Conclusions The Microsoft EPM suite clearly targets large, multi-business unit operations where contention over investment resources has been difficult to manage. In tackling this problem, EPM (and its competitors) introduce other challenges like process uniformity, culture and customization. Like all enterprise-wide systems, EPM tools struggle in responding to non-linear business dynamics, for example corporate acquisitions. Careful planning and effort is required in any acquisition integration effort, but Microsoft EPM adds another system to the scope of necessary integrations. As already described, the timeline for this integration is considerable. Businesses that require fast response and adaptation to frequent non-linear events may be poor candidates for enterprise-wide systems. EPM suites are best suited for command and control management operations. They are less suitable in decentralized environments dependent on the abilities of knowledge workers and teams to shape a business response. Where decentralized agility is important, these systems tend to be an inhibitor. Finally, enterprise-class systems are unrealistically promoted by vendors. Cherry-picked case studies emphasize the low hanging fruit and rapid payback, and analyst reports overly emphasize temporary feature differences. Proper buyer diligence should include evaluations at multiple accounts with an extended history with the tools, and with similar cultures and markets. Microsoft EPM and its competitors serve a valuable role in companies that can properly harness its capabilities. This paper has described the benefits and challenges of harnessing these systems. Copyright 2011 On-Fire Associates, All Rights Reserved Page 10
How To Manage Project And Portfolio Management In Microsoft Office 2010
Enterprise Project Management SOLUTIONS THAT LAST Challenges in PPM What is a Project? Why Project Management? Challenges in Project and Portfolio Management (PPM) Problems for PM and PPM Leaders Presentation
The Business Value of a Web Services Platform to Your Prolog User Community
The Business Value of a Web Services Platform to Your Prolog User Community A white paper for project-based organizations that details the business value of Prolog Connect, a new Web Services platform
ORACLE HYPERION PLANNING
ORACLE HYPERION PLANNING ENTERPRISE WIDE PLANNING, BUDGETING, AND FORECASTING KEY FEATURES Hybrid data model facilitates planning, analysis and commentary Flexible workflow capabilities Reliability with
SharePoint as a Business Application, Not Just a Collaboration Tool
SharePoint as a Business Application, Not Just a Collaboration Tool Products, Projects, Services and Work in One System Published March, 2013 http://epmlive.com Contents Introduction...2 Common Uses of
Project Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management
Project Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management Approach Project management solutions for the Smart Grid
The Resource Management Life Cycle
The Resource Management Life Cycle Resource Planning for 2013 Revised November 2012 http://epmlive.com Contents Introduction...2 What is Resource Management?...2 Who Participates in Resource Management?...2
Within Budget and on Time
SAP Solution in Detail SAP Product Lifecycle Management SAP Portfolio and Project Management Plan Well and Manage Efficiently Within Budget and on Time Profitable product and service development in today
Why Choose Microsoft Project Portfolio Management?
Why Choose Microsoft Project Portfolio Management? A comparison between the centralized server solution and Microsoft Project 2013 Client Definition of Microsoft Project Portfolio Management Microsoft
Supply Chain Management Build Connections
Build Connections Enabling a business in manufacturing Building High-Value Connections with Partners and Suppliers Build Connections Is your supply chain responsive, adaptive, agile, and efficient? How
Oracle s Primavera P6 Enterprise Project Portfolio Management
Oracle s Primavera P6 Enterprise Project Portfolio Management Oracle s Primavera P6 Enterprise Project Portfolio Management is the most powerful, robust and easy-to-use solution for prioritizing, planning,
Microsoft Enterprise Project Management (EPM) Solution
Microsoft Enterprise Project Management (EPM) Solution Enterprise Project Management (EPM) Solution Version Comparison The Microsoft Enterprise Project Management (EPM) Solution ensures organizations select
Financial Planning, Budgeting, and Forecasting
Financial Planning, Budgeting, and Forecasting Removing the Hurdles March 2013 Nick Castellina Financial Planning, Budgeting, and Forecasting: Removing the Hurdles Financial planning is the process by
Business Intelligence for Excel
Business Intelligence for Excel White Paper Business Intelligence Technologies, Inc. Copyright 2002 All Rights Reserved Business Intelligence for Excel This white paper concerns business intelligence for
Oracle Hyperion Planning
Oracle Hyperion Planning Oracle Hyperion Planning is an agile planning solution that supports enterprise wide planning, budgeting, and forecasting using desktop, mobile and Microsoft Office interfaces.
CONSIDERING CLOUD and ON-PREMISE ACCOUNTING SOLUTIONS. A Guide to Put Things in Focus
CONSIDERING CLOUD and ON-PREMISE ACCOUNTING SOLUTIONS INTRODUCTION As the world increasingly embraces a 24/7, borderless model for business, the demands on finance have never been greater. Unfortunately,
INTRODUCING TALEO 10. Solutions Built for the Talent Age. Powering the New Age of Talent
TALEO10 TA LEO.COM Solutions Built for the Talent Age Business value is no longer defined by tangible assets. It s powered by people and ideas. Competitive advantage comes from superior talent driving
Extend the value of Microsoft Dynamics ERP with other technology innovations from Microsoft
Extend the value of Microsoft Dynamics ERP with other technology innovations from Microsoft Combined with these products and technologies, Microsoft Dynamics ERP solutions can help you gain momentum in
THE CORNERSTONE DIFFERENCE
THE CORNERSTONE DIFFERENCE INTRODUCTION In a market that has markedly shifted over the last few years towards large, generalist ERP suites and mixed delivery models, it has become quite clear that Cornerstone
".,!520%'$!#)!"#$%&!>#($!#)! <*+,-(./0!/+!567!5+:,($2,+$! @,'/(/#+(!
".,!520%'$!#)!"#$%&!>#($!#)!
Effective Enterprise Performance Management
Seattle Office: 2211 Elliott Avenue Suite 200 Seattle, Washington, 98121 [email protected] www.avanade.com Avanade is a global IT consultancy dedicated to using the Microsoft platform to help enterprises
Unicenter Asset Intelligence r11
Unicenter Asset Intelligence r11 Key Features at a Glance Comprehensive Out of the Box Business Relevant Answers Complete and Accurate IT Asset Information Real-Time Analysis Risk Alerting Compliance Utilization
Microsoft Enterprise Project Management 2010 Licensing Guide
Microsoft Enterprise Project Management 2010 Licensing Guide Microsoft Project 2010 Licensing Microsoft Project 2010 is a family of products that provide a range of functionality depending on organizational
IT Project Portfolio Management Doing The Right Things Right
IT Project Portfolio Management Doing The Right Things Right What is IT Project Portfolio Management? The Project Management Institute (PMI) defines Project Portfolio Management (PPM) as the centralized
Project Management and Accounting in Microsoft Dynamics AX 2012
Project Management and Accounting in Microsoft Dynamics AX 2012 Streamline project management and give your people the tools they need to complete projects on time and within budget. Project management
RealTests.M2020-615.37questions
RealTests.M2020-615.37questions Number: M2020-615 Passing Score: 800 Time Limit: 120 min File Version: 4.5 http://www.gratisexam.com/ M2020-615 IBM Business Analytics Performance Management Sales Mastery
White Paper. Are SaaS and Cloud Computing Your Best Bets?
White Paper Are SaaS and Cloud Computing Your Best Bets? Understanding SaaS and Cloud Computing and Service Delivery Options for Real Estate Technology Solutions Joseph Valeri, MBA, MS President, Lucernex
Project Management through
Project Management through Unified Project and Portfolio Fluent User Interface Management Built on SharePoint Server 2010 Time Reporting Enhancements Project Initiation & Business Case Exchange Server
THE 7 STEPS TO A SUCCESSFUL CRM IMPLEMENTATION DEPLOYING CRM IN THE NEW ERA OF CONNECTED CUSTOMERS
THE NEW ERA OF ABOUT THE AUTHOR Paul Rogers is the Head of Customer Experience and CRM within HCL s Applications Division. Based in London, Paul is responsible for leading HCL s CRM consulting and technology
Deltek Vision 5.1 Analysis and Reporting
WHITE PAPER Deltek Vision 5.1 Analysis and Reporting Using Microsoft SQL Server 2005 Analysis Services and Microsoft Excel Contents Overview of Analysis Cubes...1 Learning How to Configure and Use Vision
IT & Management Consulting Services
2008 Microsoft Corporation. All rights reserved. This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS SUMMARY. Microsoft, Excel, Microsoft Dynamics,
EPM Live s Project Portfolio Management (PPM) Buyer s Guide for the Enterprise
EPM Live s Project Portfolio Management (PPM) Buyer s Guide for the Enterprise Leading customers through critical evaluation decisions relative to project, portfolio and work management solutions. EPM
Choosing the Right Project and Portfolio Management Solution
Choosing the Right Project and Portfolio Management Solution Executive Summary In too many organizations today, innovation isn t happening fast enough. Within these businesses, skills are siloed and resources
Managing the Cloud as an Incremental Step Forward
WP Managing the Cloud as an Incremental Step Forward How brings cloud services into your IT infrastructure in a natural, manageable way white paper [email protected] Table of Contents Accepting the
Manage projects effectively
Business white paper Manage projects effectively HP Project and Portfolio Management Center and HP Agile Manager Table of contents 3 Executive summary 3 The HP Solution Invest in what matters most then
Cloud Computing. Key Initiative Overview
David W. Cearley Research Vice President and Gartner Fellow This overview provides a high-level description of the Cloud Computing Key Initiative. IT leaders can use this guide to understand what they
Modernizing enterprise application development with integrated change, build and release management.
Change and release management in cross-platform application modernization White paper December 2007 Modernizing enterprise application development with integrated change, build and release management.
Business Transformation with Cloud ERP
Photo copyright 2012 Michael Krigsman. Business Transformation with Cloud ERP Prepared by Michael Krigsman February 2012 NetSuite sponsored this independent white paper; Asuret does not endorse any vendor
Microsoft Project Server 2013
Project Server 2013 Project Server 2013 is a flexible on-premises solution for project portfolio management (PPM) and everyday work. Team members, project participants, and business decision makers can
INFORMATION CONNECTED
INFORMATION CONNECTED Business Solutions for the Utilities Industry Primavera Project Portfolio Management Solutions Achieve Operational Excellence with Robust Project Portfolio Management Solutions The
COURSE SYLLABUS COURSE TITLE:
1 COURSE SYLLABUS COURSE TITLE: FORMAT: CERTIFICATION EXAMS: 55043AC Microsoft End to End Business Intelligence Boot Camp Instructor-led None This course syllabus should be used to determine whether the
Avanade Point of View. Getting it right with a project and portfolio management solution
Avanade Point of View Getting it right with a project and portfolio management solution Better control, higher value Orchestrating a portfolio of projects, and the resources for execution, challenges leaders
ENSURING TIMELY AND ACCURATE FINANCIAL PLANS, BUDGETS, AND FORECASTS THROUGH AUTOMATION
ENSURING TIMELY AND ACCURATE FINANCIAL PLANS, BUDGETS, AND FORECASTS THROUGH AUTOMATION April, 2015 Nick Castellina, Research Director, Business Planning and Execution Report Highlights p3 p5 p7 p8 Best-in-Class
Selection Criteria for Performance Management Software
BARC RESEARCH NOTE Selection Criteria for Performance Management Software This Research Note was created by the independent market analysts, BARC, and is part of the comprehensive BARC Research Program
Sage Accpac Integrated Suite. Get a 360 view of your business with Sage Accpac
Sage Accpac Integrated Suite Get a 360 view of your business with Sage Accpac Whether your growth plans include buying and selling in the global marketplace, adding more talent to your team, or expanding
Microsoft Windows 7 and Office. Key Initiative Overview
Michael Silver Research Vice President and Distinguished Analyst IT leaders have questions and concerns about issues associated with Microsoft Windows 7 and Office 2010 migrations. This overview points
eguide: Designing a Continuous Response Architecture 5 Steps For Windows Server 2003 End of Life Success
: Designing a Continuous Response Architecture 5 Steps For Windows Server 2003 End of Life Success FAST FACTS Over 10 Million Windows Server 2003 Devices Still In Use Less Than 250 Days To Windows Server
The Total Economic Impact Of SAS Customer Intelligence Solutions Real-Time Decision Manager
A Forrester Total Economic Impact Study Commissioned By SAS Project Director: Dean Davison May 2014 The Total Economic Impact Of SAS Customer Intelligence Solutions Real-Time Decision Manager Table Of
IBM Cognos Express Essential BI and planning for midsize companies
Data Sheet IBM Cognos Express Essential BI and planning for midsize companies Overview IBM Cognos Express is the first and only integrated business intelligence (BI) and planning solution purposebuilt
SALES AND OPERATIONS PLANNING BLUEPRINT BUSINESS VALUE GUIDE
Business Value Guide SALES AND OPERATIONS PLANNING BLUEPRINT BUSINESS VALUE GUIDE INTRODUCTION What if it were possible to tightly link sales, marketing, supply chain, manufacturing and finance, so that
Guidelines For A Successful CRM
Guidelines For A Successful CRM Salesboom.com Many organizations look to CRM software solutions to address sales or maybe customer service deficiencies or to respond to pressures from outside sources in
Business Intelligence Meets Business Process Management. Powerful technologies can work in tandem to drive successful operations
Business Intelligence Meets Business Process Management Powerful technologies can work in tandem to drive successful operations Content The Corporate Challenge.3 Separation Inhibits Decision-Making..3
PRACTICAL USE CASES BPA-AS-A-SERVICE: The value of BPA
BPA-AS-A-SERVICE: PRACTICAL USE CASES How social collaboration and cloud computing are changing process improvement TABLE OF CONTENTS 1 Introduction 1 The value of BPA 2 Social collaboration 3 Moving to
Food & Beverage Industry Brief
KudzuCreative Content Creation Food & Beverage Industry Brief KudzuCreative kudzucreative.com Content Created for, Microsoft Dynamics AX Gold Partner [email protected] NOT YOUR FATHER S FUNCTIONALITY
Application retirement: enterprise data management strategies for decommissioning projects
Enterprise Data Management Solutions April 2008 IBM Information Management software Application retirement: enterprise data management strategies for decommissioning projects Page 2 Contents 2 Executive
The Business Case for Information Management An Oracle Thought Leadership White Paper December 2008
The Business Case for Information Management An Oracle Thought Leadership White Paper December 2008 NOTE: The following is intended to outline our general product direction. It is intended for information
Table of Contents. Technical paper Open source comes of age for ERP customers
Technical paper Open source comes of age for ERP customers It s no secret that open source software costs less to buy the software is free, in fact. But until recently, many enterprise datacenter managers
Software as a Service Offers Broadening Appeal for Small and Medium-Sized Discrete Manufacturers
Software as a Service Offers Broadening Appeal for Small and Medium-Sized Discrete Manufacturers WHITE PAPER Sponsored by: SAP Simon Ellis November 2010 IDC MANUFACTURING INSIGHTS OPINION Software as a
How To Use Sage Acpac 5.5.5
Sage Accpac Integrated Suite Puts You In The Driver s Seat Get a 360 view of your business with Sage Accpac Sage Accpac supports different languages and multicurrency transactions. Our network of partners
Launch of Serena s SharePoint Workflow Solution
Launch of Serena s SharePoint Workflow Solution 1. Overview Serena controls roughly 20% of the market world wide in the Application Lifecycle Management (ALM) space, mainly at the top end of the market
ENTERPRISEWIZARD WHITE PAPER
ENTERPRISEWIZARD WHITE PAPER THE BENEFITS OF CHANGE MANAGEMENT E N T E R P R I S E W I Z A R D 460 Seaport Court Suite #200 Redwood City, CA 94063 888.727.2209 650.587.8615 [email protected] www.enterprisewizard.com
Symantec Client Management Suite 7.6 powered by Altiris technology
Symantec Client Management Suite 7.6 powered by Altiris technology IT flexibility. User freedom. Data Sheet: Endpoint Management Overview With so many new devices coming into the workplace and users often
Best Practices for Migrating from Lotus Notes to Microsoft Exchange and SharePoint
Best Practices for Migrating from Lotus Notes to Microsoft Exchange and SharePoint A White Paper Written by Technology Strategy Research, LLC and Sponsored by Quest Software - Best Practices for Migrating
Creating Dashboards for Microsoft Project Server 2010
Creating Dashboards for Microsoft Project Server 2010 Authors: Blaise Novakovic, Jean-Francois LeSaux, Steven Haden, Microsoft Consulting Services Information in the document, including URL and other Internet
An Oracle White Paper November 2011. Financial Crime and Compliance Management: Convergence of Compliance Risk and Financial Crime
An Oracle White Paper November 2011 Financial Crime and Compliance Management: Convergence of Compliance Risk and Financial Crime Disclaimer The following is intended to outline our general product direction.
Questions to address while reviewing CRM software
Questions to address while reviewing CRM software Conducting a CRM needs assessment doesn t have to be hard or intimidating. Sage Software has put together the top 10 (plus one) list of things you ll want
The Business Case for Migrating from Oracle to the SharePoint Platform: The Cost Advantages
The Business Case for Migrating from Oracle to the SharePoint Platform: The Cost Advantages JULY 2011 Visit www.piquesolutions.com to learn more about our market research and consulting services. 795 Folsom
BROCHURE ECOSYS EPC. Full Lifecycle Project Cost Controls
BROCHURE ECOSYS EPC Full Lifecycle Project Cost Controls ECOSYS EPC EcoSys EPC is a next generation planning and cost controls software solution delivering best practices for full lifecycle project cost
Integrated business intelligence solutions for your organization
Integrated business intelligence solutions for your organization In the business world, critical information influences individuals goals, affects how people work across teams and ultimately helps organizations
How the PMO wins with cloud services
How the PMO wins with cloud services Discover opportunities for a more efficient Management Office by avoiding expensive dependencies on physical servers with Online, a service offered through Microsoft
How the PMO wins with cloud services
How the PMO wins with cloud services Discover opportunities for a more efficient Management Office by avoiding expensive dependencies on physical servers with Online, a service offered through Microsoft
Microsoft Office. Enterprise Project Management Solution. September 2006
Microsoft Office Enterprise Project Management Solution September 2006 Table of Contents Microsoft Office Enterprise Project Management Solution... 2 Overview... 2 Microsoft Office Project Portfolio Server
P6 Analytics Reference Manual
P6 Analytics Reference Manual Release 3.2 October 2013 Contents Getting Started... 7 About P6 Analytics... 7 Prerequisites to Use Analytics... 8 About Analyses... 9 About... 9 About Dashboards... 10 Logging
Lombardi Whitepaper: Why You (Probably) Cannot Afford to Use IBM for BPM. Why You (Probably) Cannot Afford to Use IBM for BPM
Why You (Probably) Cannot Afford to Use IBM for BPM 1 Why You (Probably) Cannot Afford to Use IBM for BPM You have a project that seems like a good fit for Business Process Management (BPM). And you re
ORACLE HYPERION DATA RELATIONSHIP MANAGEMENT
Oracle Fusion editions of Oracle's Hyperion performance management products are currently available only on Microsoft Windows server platforms. The following is intended to outline our general product
PIVOTAL CRM. CRM that does what you want it to do BROCHURE
PIVOTAL CRM CRM that does what you want it to do BROCHURE THE PIVOTAL CRM PHILOSOPHY THE PIVOTAL ADVANTAGE Today s business world is a fast moving and dynamic environment one in which your teams expect
Microsoft Project 2010 builds on the Microsoft Project 2007 foundation with flexible work management solutions and the right collaboration tools for
Microsoft Project 2010 builds on the Microsoft Project 2007 foundation with flexible work management solutions and the right collaboration tools for occasional and professional project managers. Project
IBM COGNOS PERFORMANCE BLUEPRINT: RETAIL STRATEGIC PROMOTION & MARKETING PLANNING IMPLEMENTATION GUIDE A WEB-BASED PERFORMANCE MANAGEMENT APPLICATION
IBM COGNOS PERFORMANCE BLUEPRINT: RETAIL STRATEGIC PROMOTION & MARKETING PLANNING IMPLEMENTATION GUIDE A WEB-BASED PERFORMANCE MANAGEMENT APPLICATION COVER PHOTO: 2007 JUPITERIMAGES CORPORATION OVERVIEW
Maximizing Your Storage Investment with the EMC Storage Inventory Dashboard
Maximizing Your Storage Investment with the EMC Storage Inventory Dashboard Matt Roberts Application Development Practice Lead Copyright 2008 EMC Corporation. All rights reserved. Today s Agenda Complexity
How To Manage It Asset Management On Peoplesoft.Com
PEOPLESOFT IT ASSET MANAGEMENT KEY BENEFITS Streamline the IT Asset Lifecycle Ensure IT and Corporate Compliance Enterprise-Wide Integration Oracle s PeopleSoft IT Asset Management streamlines and automates
Is it Time to Purchase a Fashion Enterprise Solution?
Is it Time to Purchase a Fashion Enterprise Solution? Determining whether to replace an ERP, PLM or other system is a major decision for any apparel and fashion business. Fortunately, recent technology
BUSINESS INTELLIGENCE. Keywords: business intelligence, architecture, concepts, dashboards, ETL, data mining
BUSINESS INTELLIGENCE Bogdan Mohor Dumitrita 1 Abstract A Business Intelligence (BI)-driven approach can be very effective in implementing business transformation programs within an enterprise framework.
IBM Cognos TM1. Enterprise planning, budgeting and analysis. Highlights. IBM Software Data Sheet
IBM Software IBM Cognos TM1 Enterprise planning, budgeting and analysis Highlights Reduces planning cycles by as much as 75% and reporting from days to minutes Owned and managed by Finance and lines of
EXECUTIVE SUMMARY. For CIOs
SaaS-Based Tools Lower Barriers To PPM Success Flexibility And Lower Barriers To Entry Enable PPM Across Maturity Levels by Lewis Cardin with Alex Cullen and Tim DeGennaro EXECUTIVE SUMMARY As CIOs face
A full spectrum of analytics you can get yourself
Industry area A full spectrum of analytics you can get yourself 5 reasons to choose IBM for self-service business intelligence Contents Self-service business intelligence that paints a full picture 3 Reason
The expression better, faster, cheaper THE BUSINESS CASE FOR PROJECT PORTFOLIO MANAGEMENT
Cloud Solutions for IT Management WHITE PAPER THE BUSINESS CASE FOR PROJECT PORTFOLIO MANAGEMENT How Progressive IT Organizations Are Using Hosted Solutions To Deliver On Time, On Budget, On Quota and
CHAPTER - 5 CONCLUSIONS / IMP. FINDINGS
CHAPTER - 5 CONCLUSIONS / IMP. FINDINGS In today's scenario data warehouse plays a crucial role in order to perform important operations. Different indexing techniques has been used and analyzed using
Business Intelligence and Reporting
Business Intelligence and Reporting With an immense amount of data located in a variety of systems, one of the great challenges organizations face is how to collect, categorize, understand, and make decisions