1 1 Purpose a Notification of Automatic Voltage The purpose of this procedure is to ensure Generator Operators (GOPs) within the MISO Reliability Coordinator Area inform the MISO Reliability Coordinator (RC) of changes in the status of Automatic Voltage Regulator (AVR) equipment. MISO must also know the status of Dynamic Reactive Power Reserves in its Reliability Coordinator Area. GOPs, Transmission Operators (TOPs), Balancing Authorities (BAs), Local Balancing Authorities (LBAs), and the RC must coordinate outages of AVR equipment to ensure reliability of the Interconnection. This procedure assumes that the GOP plans and coordinates AVR outages with the TOP per the North American Electric Reliability Corporation (NERC) Standards. This procedure also assumes that the TOP informs the affected BAs and LBAs of any AVR outages per the NERC Standards. AVR outages are any actions that impair the automatic function of the AVR including complete failure, manual operation, or equipment testing. 2 References NERC: 2.1 TOP Planned Outage Coordination 2.2 IRO a Reliability Coordination - Current Day Operations MISO: 2.3 MISO Open Access Transmission, Energy and Operating Reserve Markets Tariff 2.4 RTO-SPEC-006 MISO Reliability Data Specification 3 Procedure Description 3.1 Responsibilities: GOP/Designee The GOP will coordinate planned and forced outages of AVR equipment on commercially operational generating units with affected TOPs, BAs, LBAs, and the MISO RC. b As soon as the GOP is aware of the need for a planned AVR outage, it will notify the TOP and the MISO RC to allow time to study impacts of the outage The GOP will notify the TOP and the MISO RC of a forced AVR outage as soon as possible, but within 30 minutes, and provide details on the cause and estimated return time. ADM-01 Page 1 of 6

2 3.1.4 The GOP shall enter the AVR outage information in the MISO CROW outage request system and notify the MISO RC via phone communications The GOP will keep the TOP and the MISO RC informed of changes to outages and when the outages have ended The GOP will reschedule AVR outages when the TOP, BA, LBA, or MISO RC cannot support the outage, when possible. 3.2 Responsibilities: Transmission Operator (TOP) The TOP will notify the MISO RC of any adverse impacts of the AVR outage If the TOP, BA, LBA, or the MISO RC cannot support a planned AVR outage, the TOP will contact the GOP and the GOP will reschedule as appropriate. 3.3 Responsibilities: Balancing Authority and Local Balancing Authority (BA/LBA) The BA or LBA will inform the TOP if it cannot support the AVR outage. 3.4 Responsibilities: MISO (MISO RC and BA) c The RC or Regional Operations Engineer (ROE) shall track AVR status changes in the MISO CROW outage request system The RC or ROE will conduct any current day analysis, as applicable The ROE will review the AVR outages in the MISO CROW outage request system to ensure the information is up to date and contact the GOP for updates if necessary. The GOP will only be contacted if the AVR outage information is in conflict with dates (for example, the date of the outage has expired, but MISO has not been contacted) The ROE will notify the EMS Engineer of any AVR status changes The EMS Engineer will update the status of AVRs in the MISO Energy Management System (EMS), as applicable. d The ROE will review the daily AVR status report from the MISO CROW outage request system and share any applicable information with the Shift Manager (SM), the RC, the Regional Generation Dispatcher (RGD), and the MISO BA Operator The ROE will provide the daily AVR status report to MISO Transmission Security Planning (TSP) Engineers for inclusion in forward analysis The RC will notify the TOP of any concerns regarding adverse impacts of an AVR outage. ADM-01 Page 2 of 6

3 3.4.9 If a forced AVR outage has adverse impacts which cannot be mitigated with the available reactive resources, the MISO RC will utilize market generation to provide additional reactive support. ADM-01 Page 3 of 6

4 4 Disclaimer Notification of Automatic Voltage This document is prepared for informational purposes only to support the application of the provisions of the MISO Tariff and the services provided thereunder. MISO may revise or terminate this document at any time at its discretion without notice. However, every effort will be made by MISO to update this document and inform its users of changes as soon as practicable. Nevertheless, it is the user s responsibility to ensure you are using the most recent version of this document in conjunction with the MISO Tariff and other applicable procedures, including, but not limited to, the applicable NERC Reliability Standards as they may be revised from time to time. In the event of a conflict between this document and the MISO Tariff, the MISO Tariff will control, and nothing in this document shall be interpreted to contradict, amend or supersede the MISO Tariff. MISO is not responsible for any reliance on this document by others, or for any errors or omissions or misleading information contained herein. ADM-01 Page 4 of 6

5 5 Revision History Issue No Reason for Issue Revised By Issue Date Effective Date RTO-OP-051-r6 RTO-OP-051-r5 RTO-OP-051-r4 RTO-OP-051-r3 RTO-OP-051-r2 RTO-OP-051-R1 Added reference to RTO- SPEC-006, and changed language in Section Annual Review. Updated to better define the requirements for reporting of AVR status changes. Changed Midwest ISO to MISO. Compliance Review completed. Procedure owner approval on file. Annual Review/ Change to include use of CROW outage request system/compliance Review/Owner Approval on File Revised scope of notification responsibilities, removed language on conflicting procedures, and clarified notification times based on member comments Andy Witmeier FEB 05, 2016 FEB 05, 2016 Andy Witmeier JAN 30, 2015 JAN 30, 2015 Andy Witmeier DEC 31, 2013 DEC 31, 2013 Joe Reddoch JAN 04, 2013 JAN 04, 2013 Joe Reddoch FEB 24, 2012 FEB 24, 2012 Joe Reddoch OCT 06, 2010 OCT 06, 2010 Joe Reddoch MAY 12, 2009 MAY 12, 2009 RTO-OP-051-R0 Creation of Procedure Joe Reddoch FEB 06, 2009 FEB 06, 2009 ADM-01 Page 5 of 6

6 Compliance References a MISO Open Access Transmission, Energy and Operating Reserve Markets Tariff - Attachment X, Appendix 6, Section b IRO a:R1.1 c TOP-003-1:R2 d IRO a:R1.1 ADM-01 Page 6 of 6

Addressing Affected System Impacts of Generator Interconnection: Processes and Principles. Stakeholder Call August 23, 2013 9:30 a.m. - 12:00 p.m.

Addressing Affected System Impacts of Generator Interconnection: Processes and Principles. Stakeholder Call August 23, 2013 9:30 a.m. - 12:00 p.m. Addressing Affected System Impacts of Generator Interconnection: Processes and Principles Stakeholder Call August 23, 2013 9:30 a.m. - 12:00 p.m. 1. Introduction Mercy Parker Helget Sr. Stakeholder Engagement

More information

Responsibility for Outage Coordination is designated by 4 key artifacts: 1. FERC Order 2000 FERC Order 2000 (Docket No. RM99-2-000; Order No.

Responsibility for Outage Coordination is designated by 4 key artifacts: 1. FERC Order 2000 FERC Order 2000 (Docket No. RM99-2-000; Order No. 1 2 3 4 Responsibility for Outage Coordination is designated by 4 key artifacts: 1. FERC Order 2000 FERC Order 2000 (Docket No. RM99-2-000; Order No. 2000) comments regarding Transmission and Generation

More information

Updated November 20, 2015. Director, System Planning

Updated November 20, 2015. Director, System Planning Updated November 20, 2015 Job Descriptions Job Title Reports To Job Description SYSTEM PLANNING & SERVICES VP Compliance Manages the system planning and services staff. The director is responsible for

More information

New Brunswick Electricity Business Rules

New Brunswick Electricity Business Rules New Brunswick Electricity Business Rules Table of Contents Chapter 1 Chapter 2 Chapter 3 Chapter 4 Administration and Participation Transmission Planning and Connections Reliable Operations Billing and

More information

Risks and Controls for VAR-001-4 and EOP-004-2. Richard Shiflett Ruchi Ankleshwaria

Risks and Controls for VAR-001-4 and EOP-004-2. Richard Shiflett Ruchi Ankleshwaria Risks and Controls for VAR-001-4 and EOP-004-2 Richard Shiflett Ruchi Ankleshwaria 2 Introductions Richard Shiflett Compliance Risk Engineer Joined WECC in February 2014 11 years experience with Bureau

More information

Generation and Transmission Interconnection Process

Generation and Transmission Interconnection Process PJM Manual 14A Generation and Transmission Interconnection Process Revision: 18 Effective Date: January 28, 2016 Prepared by Planning Division Generation Interconnection Department PJM 2016 Table of Contents

More information

Job Descriptions. Job Title Reports To Job Description TRANSMISSION SERVICES Manager, Transmission Services. VP Compliance & Standards

Job Descriptions. Job Title Reports To Job Description TRANSMISSION SERVICES Manager, Transmission Services. VP Compliance & Standards Updated July 11, 2013 Job Descriptions Job Title Reports To Job Description TRANSMISSION SERVICES VP Compliance & Standards Develops strategy and business plans for efficient, safe, reliable, regulatorycompliant

More information

GIP. 3.2.3 Net Zero Interconnection Service.

GIP. 3.2.3 Net Zero Interconnection Service. GIP and GIA Energy Displacement Agreement shall mean an agreement between an Interconnection Customer with a commercially operating Generating Facility on the Transmission Provider s Transmission System

More information

SOP-RTMKTS.0060.0005 - Test and Approve Operations Software Applications. Contents

SOP-RTMKTS.0060.0005 - Test and Approve Operations Software Applications. Contents SOP-RTMKTS.0060.0005 - Test and Approve Operations Software Applications Contents 1. Objective... 2 2. Background... 2 3. Responsibilities... 3 4. Controls... 4 5. Instructions... 5 5.1 Document Operations

More information

Analysis One Code Desc. Transaction Amount. Fiscal Period

Analysis One Code Desc. Transaction Amount. Fiscal Period Analysis One Code Desc Transaction Amount Fiscal Period 57.63 Oct-12 12.13 Oct-12-38.90 Oct-12-773.00 Oct-12-800.00 Oct-12-187.00 Oct-12-82.00 Oct-12-82.00 Oct-12-110.00 Oct-12-1115.25 Oct-12-71.00 Oct-12-41.00

More information

ReliabilityFirst CIP Evidence List CIP-002 through CIP-009 are applicable to RC, BA, IA, TSP, TO, TOP, GO, GOP, LSE, NERC, & RE

ReliabilityFirst CIP Evidence List CIP-002 through CIP-009 are applicable to RC, BA, IA, TSP, TO, TOP, GO, GOP, LSE, NERC, & RE R1 Provide Risk Based Assessment Methodology (RBAM) R1.1 Provide evidence that the RBAM includes both procedures and evaluation criteria, and that the evaluation criteria are riskbased R1.2 Provide evidence

More information

Master/Local Control Center Procedure No. 13 (M/LCC 13) Communications Between the ISO and Local Control Centers

Master/Local Control Center Procedure No. 13 (M/LCC 13) Communications Between the ISO and Local Control Centers Master/LCC Procedure No. 13 - Communications Master/Local Control Center Procedure No. 13 (M/LCC 13) Communications 1. References... 2 2. Background... 3 3. Responsibilities... 3 4. Procedure... 4 4.1

More information

Pre-Scheduling Operations

Pre-Scheduling Operations PJM Manual 10: Pre-Scheduling Operations Revision: 33 Effective Date: December 22, 2015 Prepared by Operations Support Division Generation Department PJM 2015 i Table of Contents PJM Manual 10: Pre-Scheduling

More information

Effective: 2015-03-27 Page 1 of 7

Effective: 2015-03-27 Page 1 of 7 Applicability 1 Section 502.4 applies to: (a) (b) (c) (d) (e) (f) the legal owner of a generating unit; the legal owner of an aggregated generating facility; the legal owner of a transmission facility;

More information

FRCC Coordination Procedure. Title: FRCC Reliability Coordinator Contingency Analysis Monitoring Criteria

FRCC Coordination Procedure. Title: FRCC Reliability Coordinator Contingency Analysis Monitoring Criteria A. Purpose: The FRCC Reliability Coordinator (RC) Contingency Analysis (CA) application is essential to maintaining the reliability of the FRCC Bulk Electric System. The application has the capability

More information

CURTAILABLE RATE PROGRAM FOR INDIVIDUAL CUSTOMER LOADS

CURTAILABLE RATE PROGRAM FOR INDIVIDUAL CUSTOMER LOADS Page 1 of 16 CURTAILABLE RATE PROGRAM FOR INDIVIDUAL CUSTOMER LOADS PROPOSED TERMS AND CONDITIONS January 2015 Page 2 of 16 TABLE OF CONTENTS 1. Definitions... 3 2. Curtailable Load Options... 6 3. Nomination

More information

Preferred Professional Insurance Company Subcontractor Business Associate Agreement

Preferred Professional Insurance Company Subcontractor Business Associate Agreement Preferred Professional Insurance Company Subcontractor Business Associate Agreement THIS SUBCONTRACTOR BUSINESS ASSOCIATE AGREEMENT ( Agreement ) amends and is made a part of all Services Agreements (as

More information

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-26 STANDARD PRICE PLAN FOR RESIDENTIAL TIME-OF-USE SERVICE

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-26 STANDARD PRICE PLAN FOR RESIDENTIAL TIME-OF-USE SERVICE SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-26 STANDARD PRICE PLAN FOR RESIDENTIAL TIME-OF-USE SERVICE Effective: April 2015 Billing Cycle Supersedes: November 2012 Billing Cycle AVAILABILITY:

More information

PG&E Web Tool for Reporting Information Related to. NERC Reliability Requirement Compliance

PG&E Web Tool for Reporting Information Related to. NERC Reliability Requirement Compliance PG&E Web Tool for Reporting Information Related to NERC Reliability Requirement Compliance Overview On June 18, 2007, mandatory reliability standards adopted by the Federal Energy Regulatory Commission

More information

State Of California's Energy Bill

State Of California's Energy Bill 2750 Monroe Boulevard Valley Forge Corporate Center Audubon, PA 19403 James M. Burlew Counsel Telephone: (610) 666-4345 Fax (610) 666-8211 Email Address: james.burlew@pjm.com December 15, 2015 The Honorable

More information

MEMORANDUM OF UNDERSTANDING THE INDEPENDENT ELECTRICITY SYSTEM OPERATOR THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION

MEMORANDUM OF UNDERSTANDING THE INDEPENDENT ELECTRICITY SYSTEM OPERATOR THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION MEMORANDUM OF UNDERSTANDING BETWEEN THE INDEPENDENT ELECTRICITY SYSTEM OPERATOR AND THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION AND THE NORTHEAST POWER COORDINATING COUNCIL, CROSS-BORDER REGIONAL

More information

ICO GROUP LIMITED 揚 科 集 團 有 限 公 司

ICO GROUP LIMITED 揚 科 集 團 有 限 公 司 Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness

More information

THE CONNECTICUT LIGHT AND POWER COMPANY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18

THE CONNECTICUT LIGHT AND POWER COMPANY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18 TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 18 1. Applicability 1A. The following Terms and Conditions shall apply to every registered Electric Supplier authorized to do business within Connecticut

More information

LOGIX Fax to Email Service

LOGIX Fax to Email Service LOGIX Fax to Email Service ACCEPTANCE OF TERMS AND CONDITIONS This agreement is between LOGIX Communications, L.P. dba LOGIX Communications ("LOGIX") and Customer ("you" or "Customer"), as an authorized

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Joseph T. Kelliher, Chairman; Nora Mead Brownell, and Suedeen G. Kelly. Midwest Independent Transmission System Operator,

More information

THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20

THE CONNECTICUT LIGHT AND POWER COMPANY, DBA EVERSOURCE ENERGY TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20 TERMS AND CONDITIONS FOR ELECTRIC SUPPLIERS PAGE 1 OF 20 1. Applicability 1A. The following Terms and Conditions shall apply to every registered Electric Supplier authorized to do business within Connecticut

More information

Project Management Fact Sheet:

Project Management Fact Sheet: Project Management Fact Sheet: Document Control Version: 1.3, November 2008 DISCLAIMER This material has been prepared for use by Tasmanian Government agencies and Instrumentalities. It follows that this

More information

Firm Flow Entitlement on M2M Flowgates Readers' Guide. Last Updated: February 01, 2016 Version: 4.0

Firm Flow Entitlement on M2M Flowgates Readers' Guide. Last Updated: February 01, 2016 Version: 4.0 Firm Flow Entitlement on M2M Flowgates Readers' Guide Last Updated: February 01, 2016 Version: 4.0 1 Table of Contents 1 DISCLAIMER...3 2 INTRODUCTION...3 3 GLOSSARY OF TERMS...3 4 FFE FILE...3 4.1 DESCRIPTION...

More information

APPENDIX I: STANDARD FORM BUSINESS ASSOCIATE CONTRACT AND DATA USE AGREEMENT (2012 Version)

APPENDIX I: STANDARD FORM BUSINESS ASSOCIATE CONTRACT AND DATA USE AGREEMENT (2012 Version) APPENDIX I: STANDARD FORM BUSINESS ASSOCIATE CONTRACT AND DATA USE AGREEMENT (2012 Version) THIS AGREEMENT is entered into and made effective the day of, 2012 (the Effective Date ), by and between (a)

More information

ATTACHMENT G. Network Operating Agreement

ATTACHMENT G. Network Operating Agreement ATTACHMENT G Network Operating Agreement 1. PURPOSE OF NETWORK OPERATING AGREEMENT The purpose of this Agreement is to identify contractual requirements related to Network Integration Transmission Service

More information

Ashley Institute of Training Schedule of VET Tuition Fees 2015

Ashley Institute of Training Schedule of VET Tuition Fees 2015 Ashley Institute of Training Schedule of VET Fees Year of Study Group ID:DECE15G1 Total Course Fees $ 12,000 29-Aug- 17-Oct- 50 14-Sep- 0.167 blended various $2,000 CHC02 Best practice 24-Oct- 12-Dec-

More information

Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8

Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138 Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 2 of 138 Domain Name: CELLULARVERISON.COM Updated Date: 12-dec-2007

More information

European Freight Forwarding Index

European Freight Forwarding Index European Freight Forwarding Index 14 January 13 Erik Bergöö erbe@danskebank.dk +45 45 12 36 Søren Toft stof@danskebank.dk +45 45 12 53 Important disclosures and certifications are contained from page 12

More information

Rules on Southern Companies Energy Auction Participation

Rules on Southern Companies Energy Auction Participation Southern Company Services, Inc. First Revised Sheet No. 20B Superseding Original Sheet No. 20B Rules on Southern Companies Energy Auction Participation 1.0 Participation; Definitions 1.1 Southern Companies

More information

IICLE ONLINE SUBSCRIPTIONS TERMS AND CONDITIONS

IICLE ONLINE SUBSCRIPTIONS TERMS AND CONDITIONS IICLE ONLINE SUBSCRIPTIONS TERMS AND CONDITIONS IICLE Online Library, IICLE Online CLE, and IICLE Online All Access subscriptions are accepted and approved with the understanding that the Subscriber has

More information

Resource Monitoring and Deliverability Tool Paper

Resource Monitoring and Deliverability Tool Paper Resource Monitoring and Deliverability Tool Paper NWPP MC Phase 3 Operations Integration Work Group 11/30/2014 Page 1 of 16 Table of Contents Executive Summary... 3 1. Purpose... 5 2. Existent Methods

More information

BUSINESS ASSOCIATE AGREEMENT

BUSINESS ASSOCIATE AGREEMENT BUSINESS ASSOCIATE AGREEMENT This BUSINESS ASSOCIATE AGREEMENT ( BAA ) is entered into as of ( Effective Date ) by and between ( Covered Entity ) and American Academy of Sleep Medicine ( Business Associate

More information

Table of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure

Table of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure No. 2310 Table of Contents Purpose... 2 1. Responsibilities... 2 2. Scope/Applicability... 2 2.1 Background... 2 2.2 Scope / Applicability... 2 3. Detail... 3 3.1 Energy Dispatching... 3 3.1.2 Real-Time

More information

DOCUMENT CONTROL PROCEDURE

DOCUMENT CONTROL PROCEDURE Page 1 of 14 Purpose: To provide a process outline for the review, approval, release, control, retention and disposal of any controlled document. As an integral process the procedure ensures conformance

More information

PJM Compliance Bulletin

PJM Compliance Bulletin PJM Compliance Bulletin CB006 PJM Control Room Interactions This Compliance Bulletin provides an explanation of the interactions and coordination between operators in PJM s control room as they relate

More information

PJM LMP Market Overview

PJM LMP Market Overview PJM LMP Market Overview Andrew Ott Senior Vice President, Markets June 10, 2010 PJM as Part of the Eastern Interconnection 6,038 substations KEY STATISTICS PJM member companies 600+ millions of people

More information

ISO 9001:2008 Clause 4.2.3 PR001 Document Control Procedure

ISO 9001:2008 Clause 4.2.3 PR001 Document Control Procedure ISO 9001:2008 Clause 4.2.3 PR001 Document Control Procedure Strode Park Foundation for People with Disabilities Approvals The signatures below certify that this procedure has been reviewed and accepted,

More information

Docket No. ER10- -000. ISO Service Agreement No. 1464, Non-Conforming Large Generator Interconnection Agreement

Docket No. ER10- -000. ISO Service Agreement No. 1464, Non-Conforming Large Generator Interconnection Agreement California Independent System Operator Corporation September 27, 2010 The Honorable Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: California

More information

Methodology for Merit Order Dispatch. Version 1.0

Methodology for Merit Order Dispatch. Version 1.0 Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...

More information

Compliance Open Webinar. Thursday, August 20th, 2015

Compliance Open Webinar. Thursday, August 20th, 2015 Compliance Open Webinar Thursday, August 20th, 2015 2 Upcoming Events CIP Advanced Concepts September 9-10, 2015 Compliance Open Webinar September 17, 2015 WECC CIPUG/CUG October 13-15, 2015 Compliance

More information

September 29, 2014. Docket No. ER14- -000 Amendment to CAISO FERC Electric Tariff to Eliminate Annual External Operations Review

September 29, 2014. Docket No. ER14- -000 Amendment to CAISO FERC Electric Tariff to Eliminate Annual External Operations Review California Independent System Operator Corporation September 29, 2014 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

References... 4. Appendices... 5. I. INTRODUCTION... 6 A. Background... 6 B. Standards... 6

References... 4. Appendices... 5. I. INTRODUCTION... 6 A. Background... 6 B. Standards... 6 ISO New England Operating Procedure No. 14 - Technical Requirements for Generators, Demand Resources, Asset Related Demands and Alternative Technology Regulation Resources Effective Date: January 29, 2015

More information

EP 95 00 30 03 SP RAILCORP NETWORK MANAGEMENT PLAN CHAPTER 2 - CUSTOMER INSTALLATION SAFETY. Authorised by: Neal Hook Chief Engineer Electrical

EP 95 00 30 03 SP RAILCORP NETWORK MANAGEMENT PLAN CHAPTER 2 - CUSTOMER INSTALLATION SAFETY. Authorised by: Neal Hook Chief Engineer Electrical Engineering Standard Electrical RAILCORP NETWORK MANAGEMENT PLAN CHAPTER 2 - CUSTOMER INSTALLATION SAFETY Owner: Approved by: Chief Engineer, Electrical Neal Hook Chief Engineer Electrical Authorised by:

More information

PLANTTOGETHER REFERRAL PARTNER AGREEMENT. Updated: January 1, 2015

PLANTTOGETHER REFERRAL PARTNER AGREEMENT. Updated: January 1, 2015 PLANTTOGETHER REFERRAL PARTNER AGREEMENT Updated: January 1, 2015 Welcome to PlanetTogether s online referral program (the Referral Program ) provided by PlanetTogether, Inc. a California corporation with

More information

ILLINOIS REGISTER DEPARTMENT OF STATE POLICE NOTICE OF ADOPTED RULES TITLE 83: PUBLIC UTILITIES CHAPTER IV: DEPARTMENT OF STATE POLICE

ILLINOIS REGISTER DEPARTMENT OF STATE POLICE NOTICE OF ADOPTED RULES TITLE 83: PUBLIC UTILITIES CHAPTER IV: DEPARTMENT OF STATE POLICE TITLE 83: PUBLIC UTILITIES CHAPTER IV: PART 1328 STANDARDS OF SERVICE APPLICABLE TO WIRELESS 9-1-1 EMERGENCY SYSTEMS Section 1328.100 Application of Part 1328.105 Definitions SUBPART A: GENERAL PROVISIONS

More information

Operations Reliability Coordination Agreement

Operations Reliability Coordination Agreement Operations Reliability Coordination Agreement This Agreement regarding Operations Reliability Coordination ( Agreement ) is made and entered into as of the 19th day of June, 2013, by and between Midcontinent

More information

Rail Network Configuration Management

Rail Network Configuration Management Division / Business Unit: Function: Document Type: Enterprise Services Engineering Procedure Rail Network Configuration Management Applicability ARTC Network Wide SMS Publication Requirement Internal /

More information

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network

More information

Article 5.--CODE OF PROFESSIONAL CONDUCT

Article 5.--CODE OF PROFESSIONAL CONDUCT Article 5.--CODE OF PROFESSIONAL CONDUCT Part I.--DEFINITIONS, INDEPENDENCE, INTEGRITY AND OBJECTIVITY, COMMISSIONS AND REFERRAL FEES, CONTINGENT FEES 74-5-2. Definitions. Each of the following terms,

More information

Terms of Use & Privacy Policy

Terms of Use & Privacy Policy Terms of Use & Privacy Policy These terms and conditions apply to your access and use of the Registration website and the Live Streaming website to UOB Privilege Conversations Live Webcast(collectively

More information

U.S. COMMODITY FUTURES TRADING COMMISSION

U.S. COMMODITY FUTURES TRADING COMMISSION U.S. COMMODITY FUTURES TRADING COMMISSION a Three Lafayette Centre 1155 21st Street, NW, Washington, DC 20581 Telephone: (202) 418-5000 Facsimile: (202) 418-5521 www.cftc.gov CFTC Letter No. 15-05 No-Action

More information

INVESTMENT ADVISORY AGREEMENT

INVESTMENT ADVISORY AGREEMENT Wealth through ingenuity. INVESTMENT ADVISORY AGREEMENT AGREEMENT, made this day of, 20 between the undersigned party,, whose mailing address is (hereinafter referred to as the CLIENT ), and CMG CAPITAL

More information

AGREEMENT AND TERMS OF USE FOR INTERNET ADVERTISING SERVICES

AGREEMENT AND TERMS OF USE FOR INTERNET ADVERTISING SERVICES AGREEMENT AND TERMS OF USE FOR INTERNET ADVERTISING SERVICES This Agreement and Terms of Use for Internet Advertising Services (the "Agreement") is made and effective on the [DATE] date of submission BETWEEN:

More information

Agreement for Net Metering and Interconnection Services (Level 1, 2 and 3 Interconnection)

Agreement for Net Metering and Interconnection Services (Level 1, 2 and 3 Interconnection) Agreement for Net Metering and Interconnection Services (Level 1, 2 and 3 Interconnection) This Agreement for Net Metering and Interconnection Services ( Agreement ) is made and entered into this day of

More information

PacifiCorp Original Sheet No. 322 FERC Electric Tariff, Substitute 6 th Rev Volume No. 11 ATTACHMENT H

PacifiCorp Original Sheet No. 322 FERC Electric Tariff, Substitute 6 th Rev Volume No. 11 ATTACHMENT H PacifiCorp Original Sheet No. 322 ATTACHMENT H Form of Service Agreement For Network Integration Transmission Service 1.0 This Service Agreement, dated as of, is entered into, by and between PacifiCorp

More information

DISPATCH AGREEMENT RECITALS

DISPATCH AGREEMENT RECITALS DISPATCH AGREEMENT This DISPATCH AGREEMENT (the Agreement ) is made and entered into as of May 2, 2002, by and between the Department of Water Resources, an agency of the State of California, with respect

More information

June 22, 2015. Via Electronic Submission

June 22, 2015. Via Electronic Submission Via Electronic Submission Christopher Kirkpatrick, Secretary Commodity Futures Trading Commission Three Lafayette Center 1155 21 st Street, N.W. Washington, D.C. 20581 Re: Comments of the Joint Trade Association

More information

S~OPP MASTER ..- DISTRIBUTION OF THIS DOCUMENT IS UNLIMITED

S~OPP MASTER ..- DISTRIBUTION OF THIS DOCUMENT IS UNLIMITED S~OPP..- DISTRIBUTION OF THIS DOCUMENT IS UNLIMITED f MASTER DISCLAIMER Portions of this document may be illegible in electronic image products. Images are produced from the best available original document.

More information

ALCOA POWER GENERATING INC. Long Sault Division. Open Access Transmission Tariff

ALCOA POWER GENERATING INC. Long Sault Division. Open Access Transmission Tariff Alcoa Power Generating Inc. Long Sault Division ALCOA POWER GENERATING INC. Long Sault Division Open Access Transmission Tariff The following sheets reflect all revisions submitted to the Federal Energy

More information

Outage Scheduling Manual

Outage Scheduling Manual MANUAL 29 Outage Scheduling Manual July 2015 Version: 4.3.1 Effective Date: 07/29/2015 Committee Acceptance: 6/11/2015 OC This document was prepared by: NYISO Energy Market Operations New York Independent

More information

The Compliance Model: A Framework for All Things Compliance. Director Corporate Compliance & Risk Management jutter@midwestiso.org.

The Compliance Model: A Framework for All Things Compliance. Director Corporate Compliance & Risk Management jutter@midwestiso.org. The Compliance Model: A Framework for All Things Compliance Jana Utter Director Corporate Compliance & Risk Management jutter@midwestiso.org Disclaimer The information contained in this presentation is

More information

GENERATING FACILITY INTERCONNECTION AGREEMENT (3 RD PARTY INADVERTENT-EXPORTING) FORM 14-743

GENERATING FACILITY INTERCONNECTION AGREEMENT (3 RD PARTY INADVERTENT-EXPORTING) FORM 14-743 Southern California Edison Revised Cal. PUC Sheet No. 50718-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 31122-E Sheet 1 GENERATING FACILITY INTERCONNECTION AGREEMENT (3 RD PARTY

More information

TRANSMISSION OPERATIONS (August 5, 2010)

TRANSMISSION OPERATIONS (August 5, 2010) TRANSMISSION OPERATIONS (August 5, 2010) Managing Director Transmission Operations: Paul B. Johnson The Managing Director - Transmission Operations is responsible for the safe, reliable, costeffective,

More information

COVERMYMEDS BUSINESS ASSOCIATE AGREEMENT

COVERMYMEDS BUSINESS ASSOCIATE AGREEMENT COVERMYMEDS BUSINESS ASSOCIATE AGREEMENT THIS BUSINESS ASSOCIATE AGREEMENT (the Agreement ) is entered into between Covered Entity and CoverMyMeds LLC, a Delaware limited liability company ( Business Associate

More information

PROCEDURES FOR IMPLEMENTATION of FERC STANDARDS OF CONDUCT for OHIO VALLEY ELECTRIC CORPORATION AND INDIANA KENTUCKY ELECTRIC CORPORATION

PROCEDURES FOR IMPLEMENTATION of FERC STANDARDS OF CONDUCT for OHIO VALLEY ELECTRIC CORPORATION AND INDIANA KENTUCKY ELECTRIC CORPORATION PROCEDURES FOR IMPLEMENTATION of FERC STANDARDS OF CONDUCT for OHIO VALLEY ELECTRIC CORPORATION AND INDIANA KENTUCKY ELECTRIC CORPORATION In accordance with Rule 358.7(d) of the Federal Energy Regulatory

More information

Electric Generation Supplier Contract Summary

Electric Generation Supplier Contract Summary Electric Generation Supplier Contract Summary Electric Generation Supplier Information Spark Energy, LLC 12140 Wickchester Ln, Suite 100 Houston, TX 77079 Phone Number: 800-684-1696 Email: customercare@sparkenergy.com

More information

Memo. AESO Board. Should you have any questions or additional information requirements please let me know. Yours truly, Todd Fior

Memo. AESO Board. Should you have any questions or additional information requirements please let me know. Yours truly, Todd Fior Memo To: AESO Board From: Vice-President, Finance Date: October 29, 2015 Subject: AESO 2016 Busines Plan Enclosed is the AESO 2016 Business Plan (Business Plan). This document was prepared by AESO Management

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Rock Island Clean Line LLC ) Docket No. ER12-365-000

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Rock Island Clean Line LLC ) Docket No. ER12-365-000 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Rock Island Clean Line LLC ) Docket No. ER12-365-000 ROCK ISLAND CLEAN LINE LLC S ANSWER TO COMMENTS OF INTERSTATE POWER AND LIGHT

More information

Important Information From Charter Communications

Important Information From Charter Communications Important Information From Charter Communications GENERAL TERMS AND CONDITIONS APPLICABLE TO CHARTER RETAIL TELECOMMUNICATION SERVICES IN CALIFORNIA Please read this important message carefully. Effective

More information

Alberta Reliability Standard Cyber Security Security Management Controls CIP-003-AB-5

Alberta Reliability Standard Cyber Security Security Management Controls CIP-003-AB-5 A. Introduction 1. Title: 2. Number: 3. Purpose: To specify consistent and sustainable security management controls that establish responsibility and accountability to protect BES cyber systems against

More information

AGREEMENT FOR PRELIMINARY ENGINEERING DESIGN MISO PROJECT J233

AGREEMENT FOR PRELIMINARY ENGINEERING DESIGN MISO PROJECT J233 SA 2507 INTERSTATE POWER AND LIGHT COMPANY E&P AGREEMENT VERSION 1.0.0 EFFECTIVE 3/1/2013 AGREEMENT FOR PRELIMINARY ENGINEERING DESIGN MISO PROJECT J233 Agreement for Preliminary Engineering Design - MISO

More information

OE-417 ELECTRIC EMERGENCY INCIDENT AND DISTURBANCE REPORT...

OE-417 ELECTRIC EMERGENCY INCIDENT AND DISTURBANCE REPORT... U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY Washington, D.C. 20585 OMB No. 1901-0288 Expiration Date: 03/31/2018 Burden Per Response: 2.16 hours Revised: November 2014

More information

SERVICE LEVEL AGREEMENT (SLA)

SERVICE LEVEL AGREEMENT (SLA) SERVICE LEVEL AGREEMENT (SLA) This agreement covers the provision and support of the Managed Networking Services and details the service targets and obligations set and maintained by One...Solutions. Further,

More information

MORTGAGE BROKER AGREEMENT

MORTGAGE BROKER AGREEMENT MORTGAGE BROKER AGREEMENT This Mortgage Broker Agreement (the "Agreement") is entered into by and between: ST. CLOUD MORTGAGE, a California Corporation (the "Lender"), and (the "Mortgage Broker") as of

More information

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-29

SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-29 SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT E-29 EXPERIMENTAL PRICE PLAN FOR TIME-OF-USE SERVICE WITH SUPER OFF-PEAK FOR ELECTRIC VEHICLES Effective: April 2015 Billing Cycle AVAILABILITY:

More information

Renewable Energy Interconnection Requirements for the US. IEEE PES Meeting Denver, CO July 26-30, 2015 J. Charles Smith, Executive Director, UVIG

Renewable Energy Interconnection Requirements for the US. IEEE PES Meeting Denver, CO July 26-30, 2015 J. Charles Smith, Executive Director, UVIG 1 Renewable Energy Interconnection Requirements for the US IEEE PES Meeting Denver, CO July 26-30, 2015 J. Charles Smith, Executive Director, UVIG 2 Outline of Topics Background and Introduction NERC Integrating

More information

PJM Seams Update: Day-Ahead M2M Revisions to MISO- PJM Joint Operating Agreement

PJM Seams Update: Day-Ahead M2M Revisions to MISO- PJM Joint Operating Agreement PJM Seams Update: Day-Ahead M2M Revisions to MISO- PJM Joint Operating Agreement Asanga Perera Market-to-Market Lead Market Implementation Committee August 12, 2015 Purpose Overview This presentation provides

More information

FORM OF SURETY BOND. NOW, THEREFORE, Surety hereby agrees and covenants as follows:

FORM OF SURETY BOND. NOW, THEREFORE, Surety hereby agrees and covenants as follows: FORM OF SURETY BOND Surety Bond No. THIS SURETY BOND is issued on [October 6, 2011] by [full legal name of surety] ( Surety ) on behalf of [New Wave Energy Corp] ( Principal ), and in favor of the New

More information

TERMS AND CONDITIONS

TERMS AND CONDITIONS TERMS AND CONDITIONS These terms and conditions (this "Agreement") govern the My Chili's Rewards Program ("Program"). The My Chili's Rewards Program is a loyalty Program brought by Brinker International

More information

RESIDENTIAL AND SMALL COMMERCIAL UNIFORM DISCLOSURE STATEMENT FOR ILLINOIS

RESIDENTIAL AND SMALL COMMERCIAL UNIFORM DISCLOSURE STATEMENT FOR ILLINOIS RESIDENTIAL AND SMALL COMMERCIAL UNIFORM DISCLOSURE STATEMENT FOR ILLINOIS Our Contact Information Type of Plan Term of Agreement Rate Renewal Early Termination Fee Rescission Nature of Sale Delivery Notification

More information

HART TELEPHONE COMPANY SERVICE TERMS AND CONDITIONS OF SERVICE

HART TELEPHONE COMPANY SERVICE TERMS AND CONDITIONS OF SERVICE HART TELEPHONE COMPANY SERVICE TERMS AND CONDITIONS OF SERVICE I. GENERAL TERMS These Terms and Conditions of Services govern all services provided by Hart Telephone Company ( Hart ). When you, the Customer,

More information

SINGLE MARKET-BASED RATE TARIFF

SINGLE MARKET-BASED RATE TARIFF Fairless Energy, LLC,Single Market-Based Rate Tariff Filing Category: Compliance Filing Date: 05/01/2013 FERC Docket: ER13-01398-000 FERC Action: Accept FERC Order: Delegated Letter Order Order Date: 07/01/2013

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

MGIC Master Policy Endorsement Delegated Underwriting Program Montana

MGIC Master Policy Endorsement Delegated Underwriting Program Montana Mortgage Guaranty Insurance Corporation 270 E. Kilbourn Avenue, Milwaukee, Wisconsin 53202 P.O. Box 488, Milwaukee, Wisconsin 53201 The provisions of this endorsement shall apply if the principal place

More information

Alberta Reliability Standard Cyber Security Configuration Change Management and Vulnerability Assessments CIP-010-AB-1

Alberta Reliability Standard Cyber Security Configuration Change Management and Vulnerability Assessments CIP-010-AB-1 A. Introduction 1. Title: 2. Number: 3. Purpose: To prevent and detect unauthorized changes to BES cyber systems by specifying configuration change management and vulnerability assessment requirements

More information

2018-04 SEK ING Sprinter Sverige ING Bank NV (NL) 20 Units Outperformance Bonus Certificates linked to OMX due 2018-04

2018-04 SEK ING Sprinter Sverige ING Bank NV (NL) 20 Units Outperformance Bonus Certificates linked to OMX due 2018-04 2018-04 SEK ING Sprinter Sverige ING Bank NV (NL) 20 Units Outperformance Bonus Certificates linked to OMX due 2018-04 Product Description This 5YR SEK Outperformance Bonus Certificate is linked to the

More information

Referral Agency and Packaging Agency Agreement

Referral Agency and Packaging Agency Agreement Referral Agency and Packaging Agency Agreement Please read this agreement carefully. In signing this agreement, you acknowledge that you have read, understood and agree to be bound by each and every provision

More information

PROCEDURE. Part 3.1: Metering Service Provider (MSP) Registration, Revocation, and Deregistration PUBLIC. Market Manual 3: Metering. Issue 14.

PROCEDURE. Part 3.1: Metering Service Provider (MSP) Registration, Revocation, and Deregistration PUBLIC. Market Manual 3: Metering. Issue 14. PUBLIC MDP_PRO_0007 PROCEDURE Market Manual 3: Metering Part 3.1: Metering Service Provider (MSP) Registration, Revocation, and Deregistration Issue 14.0 This document provides an overview of the steps

More information

Southwest Power Pool SPP REGIONAL COMPLIANCE WORKING GROUP (RCWG) CONFERENCE CALL. August 7, 2015 MINUTES

Southwest Power Pool SPP REGIONAL COMPLIANCE WORKING GROUP (RCWG) CONFERENCE CALL. August 7, 2015 MINUTES Southwest Power Pool SPP REGIONAL COMPLIANCE WORKING GROUP (RCWG) CONFERENCE CALL Agenda Item 1 Administrative Items August 7, 2015 MINUTES Chair Jennifer Flandermeyer called the meeting to order at 2:00

More information

Closing the Gap Between Wholesale and Retail

Closing the Gap Between Wholesale and Retail Closing the Gap Between Wholesale and Retail Transactive Energy Workshop March 28-29 Robert B. Burke GWAC MEMBER & PRINCIPAL ANALYST ISO NEW ENGLAND INC. Disclaimer This presentation represents the thoughts

More information

Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS

Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS EVP, Chief Operations Officer, has primary responsibility for the overall planning, operations and control of the transmission

More information

LENDERS INSURANCE POLICY ENDORSEMENT

LENDERS INSURANCE POLICY ENDORSEMENT NDS LENDERS INSURANCE POLICY ENDORSEMENT It is hereby noted and agreed by Insurers that all wordings incorporated in this Policy and all subsequent endorsements are accepted by Insurers as their own Notwithstanding

More information

124 FERC 61,317 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Communication Protocols for Public Utilities ORDER NO.

124 FERC 61,317 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Communication Protocols for Public Utilities ORDER NO. 124 FERC 61,317 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Joseph T. Kelliher, Chairman; Suedeen G. Kelly, Marc Spitzer, Philip D. Moeller, and Jon Wellinghoff.

More information