1 LR Verification Guidelines for the application of the Performance Standard for Protective Coatings (PSPC) for Dedicated Seawater Ballast Tanks Version 05 Date: January 2013

2 MARINE SERVICES Contents 1. Introduction Verification Requirements by the LR Surveyor 1. Before coating application is started 3 2. During coating application 7 3. After coating completion and prior to ship delivery 8 3. Procedural Flow Chart 9 APPENDIX 1 - CTF Check List. 10 APPENDIX 2 A1 Shop Priming Application 11 A2 Shop Priming Verification 12 B1 Verification Procedures PSPC- BWT 13 APPENDIX 3 - Example Working Records (for the Approved Inspector) Coating Log Primary Surface Preparation. 16 Coating Log Edge and Weld Condition. 17 Coating Log Coating Application. 18 Coating Log DFT Measurement Version 05 1

3 MARINE SERVICES 1. Introduction Lloyd s Register s verification requirements and procedures for new construction are to be built under the regulations detailed by the documents listed below, collectively referred to as PSPC-BWT in this document. The related standards and documents for reference are: All Ship Types MSC.215(82) UI SC223 1 Rec.87 2 MSC.1/Cir Z17 Rec.101 Rec UI SC223 specifically makes all footnoted standards in MSC.215(82) mandatory 2 Rec.87 and MSC.1/Cir 1330 refer to in-service inspection and maintenance respectively It is anticipated that a pre- job meeting and agreement will be carried out and form the basis of the verification guidelines, this should include the items listed below but not be limited to this: Confirmation of the coating suppliers, if not already agreed. Coating Specification. Treatment of fixtures and fittings, if not included in the coating specification. Inspection schedule and standards. Number of tests to be carried out e.g. salt tests, profile assessment, dust tape tests etc. Applicators working procedures and equipment including e.g. supervision organisation chart, experience of supervisors and operatives, access to surfaces (staging), lighting, equipment capacities and availability etc Version 05 2

4 MARINE SERVICES Applicator s QC procedures (e.g. monitoring of ambient conditions / ventilation and pre-official inspections for surface preparation, cleaning, DFT etc.) Communications including procedures for calling inspections (e.g. minimum acceptable advance notice and acceptable hours, including weekends evenings, holidays). Also procedures for informing LR of forthcoming inspections. Reporting procedures and report formats (see Appendix 3 for recommended reporting templates). Procedures for reporting non-conformances and resolving their satisfactory repair. Appointment of the inspection body or bodies (i.e. shipyard, coating supplier, ship owner, independent or a combination of two or more). Clarification of how many inspectors will be required. Assistance to be given to the inspectors. Names and qualifications of inspectors (copies of current certificates including information to allow traceability and confirmation will be required). Procedures for the settlement of disputes. Health and safety. The Lloyd s Register PSPC-BWT new building verification process for surveyors can be broken into three stages: i. Before coating application is started. ii. During coating application. iii. After coating completion and prior to ship delivery. Any deviation should be raised to the shipyard, or the Approved Inspector, as deemed appropriate by LR. In the event of corrective action a Class Certificate will not be issued until all corrective actions have been closed out. 2. Verification Requirements by the LR Surveyor 2.1 Before coating application is started The minimum PSPC-BWT requirements are included in the CTF check list (see appendix 1). The CTF is to be compiled by the shipyard before work is started. Notes: The minutes of the pre job agreement are to be reviewed by LR Version 05 3

5 MARINE SERVICES Selection of coating System - See MSC 215(82) Table 1.1. The criteria for selection are to be confirmed by the shipyard, ship owner and coating supplier. PSPC Type Approval Certificate or Statement of Compliance. Details are held at LR London. The PTDS will comply with The Type Approval Certificate. The Coating Specification will include at least the following: Shop primer. Manufacturer. Name of Product. Code of Product. Type. Specified DFT. Surface Preparation. Compatibility with the main coating. Main Coating Manufacturer. Name of Product. Code of Product. Type. Number, sequence and colour of Full coats. Method of Application (Airless Spray). NDFT of Each Coat. NDFT of the Total System. Number, sequence and colour of Stripe coats including method of application. Surface preparation requirements will include Intact shop primer. Corrosion. Broken down and damaged shop primer. Block pre-erection (if applicable). Erection welds. Main ballast coating damages. The MSC.215(82) specifies minimum surface preparation and application standards. Any additional requirements of the coating supplier, Flag, Class or Owner should also be included into the specification. All interpretations shall be in compliance with SC223. The inspection and coating procedure stages should be agreed between the ship-owner, shipyard and coating manufacturer Version 05 4

6 MARINE SERVICES Bodies responsible for inspection are required to provide the names of their respective Approved Inspectors, together with verified copies of the inspector s certificates. Evidence will be available to confirm that all certificates are current. If there is to be more than one inspection body, there must be a clear line of authority. Typical examples of the builder s quality control documentation include the following: Shop Priming Plant Verification and Daily Record. Daily Log - To list all inspections for each working day. Preparation & Application Progress Report. Block Report - Secondary Surface Preparation & Cleaning Inspection Report. Pre-Erection joint Report -Secondary Surface Preparation & Cleaning Inspection Report. Hull Stage Erection Joint & Damages Report -Secondary Surface. Preparation & Cleaning Inspection Report. Block Report- Coating Inspection Report. Block Pre-erection / Hull Stage Coating Inspection Report. Pre-Delivery Inspection Report - (Completion Report). Non Conformity Report. The format of reports may vary as agreed between the shipyard, shipowner and the Approved Inspector but must comply with the requirements of the PSPC-BWT. Note: The shop priming plant QC procedures will normally be subject to a separate audit by the Approved Inspector. The minimum QC Working Report contents for the PSPC-BWT (See MSC.215(82) 3.4.2) are: Applied Actual Space and area (in square metres) for each compartment. Applied coating system. Time of coating, thickness, number of layers. Ambient conditions during coating. Method of surface preparation. Statement by the Approved Coating Inspector that the coating was applied in accordance with the specifications and to the satisfaction of the coating supplier representative. Deviations from the specifications and their correction will be reported. LR will confirm the relevant boxes in the CTF Check List and the Shoppriming Plant Verification as appropriate before work is started Version 05 5

7 MARINE SERVICES Verification Requirements: All documentation required to satisfy the terms of the PSPC-BWT has been prepared by the ship-yard as listed in the CTF Check List. LR will complete a CTF Check List for each vessel to which the PSPC-BWT regulations apply. Inspection procedures have been agreed between the shipyard, the ship owner and the main coating supplier before work is started. These are most likely to be discussed and agreed at a pre-job meeting or meetings. The pre-job agreement must satisfy all of the requirements of the PSPC- BWT and the shipyard is to present the minutes of the agreement to LR for review. LR may also request to participate in the pre-job agreement process. That the Shop Priming Plant Verification Report (see Appendix 2) is available for the pre-job agreement process and that the standards achieved are acceptable to the shop primer supplier, the main coating supplier and the Approved Inspector. If the shop primed steel is purchased from a location or supplier different from the shipyard, the steel shall have all the relevant quality control documents from that supplier or location, and that the local LR surveyor has witnessed and also supplied the relevant completed forms. This also includes finished or semi-finished blocks supplied from a different site or manufacturer. The shop primer must be approved in accordance with PSPC- BWT otherwise it must be removed. The Approved Inspector should participate in the shop primer verification process as early as possible after being appointed. The Approved Inspector will then be included as a signatory in the verification process. It may also be decided that the main coating supplier participates in the verification process. The shop-priming plant documentation may require modification depending upon the agreed inspection bodies. The date of the verification must be valid from the start of plate processing Version 05 6

8 MARINE SERVICES 2.2 During coating application For Approved Inspectors unknown to Lloyds Register, verification will be required as early as possible in the contract. For inspectors known to LR or when acceptable standards have been established, spot check verification is acceptable. LR will record their monitoring verification details in the LR Form1215. For automatic shop primer application regular audits of QC records, without a physical check of the plants operations is acceptable. Note: LR is to confirm that the ship yard s QC system ensures that all calibration certificates for inspection instruments are maintained up to date. If not, LR will require all current certificates for review. All sections of the form 1215 pertaining to the relevant sections of MSC.215 (82) section 6.2 and SC223 shall be completed on a regular basis and be retained for future reference. Details will include: Area inspected. Date & time. Official report number. Block or location on the vessel. Approved Inspector s findings. Any unresolved disagreements between inspection bodies and the eventual outcome. NCR details, if applicable. Verification Requirements: Through document audits and / or physical spot checks, that all the requirements of the PSPC-BWT are fulfilled. Monitoring of the coating inspection requirements, as required by the MSC.215(82) (Section 7.5) means checking, on a representative sampling basis, that the inspectors are using correct equipment, techniques and reporting methods, as described in SC223. This will require that the Approved Inspector physically demonstrates to the LR Surveyor that inspection procedures are properly carried out and are accurately recorded in the appropriate reports. Examples of these reports are shown in Appendix 3. An appropriate level of inspection should be agreed within the pre-job agreement, for example: 2013 Version 05 7

9 MARINE SERVICES Approximately 10% of block inspections. A minimum of two hull stage tank inspections. A minimum of two pre-delivery tank inspections. The Approved Inspector should be able to show compliance to items listed in Appendix 1 and Appendix 2. Note: Non-conformances are to be documented in a Non - Conformance Report (NCR) and closed off by the Approved Inspector after correction. Non-conformances are considered non-compliances, if the shipyard or contractor refuses to repair, or where the repair is to be carried out later in the contract, when the NCR will remain in place to act as a reminder. Routine requirements for repair after inspection will not be subject to an NCR if repair is to be carried out immediately. Inspections resulting in rejection should be detailed in the Preparation & Application Progress Report. 2.3 After coating completion and prior to ship delivery Verification Requirements: The shipyard has completed the CTF in accordance with the PSPC-BWT and that all relevant documentation required for the CTF is included. That the Approved Inspector(s) has signed all the relevant reports confirming that standards complied with the MSC.215(82) and all other agreed documentation, the PTDS and were carried out to the satisfaction of the coating supplier's representative. That the owner has been given a copy of the CTF for placement onboard. Note: The CTF should include the maintenance specification Version 05 8

10 MARINE SERVICES 3.0. Procedural Flow Chart The chart outlines the key stages listed in the PSPC-BWT requirements. Items 1 and 2 are to be agreed by the shipyard ship-owner and coating supplier. LR verification requirements are items 3 to 12. Example reports are attached for items 6 to items 11 in Appendix 1 and 2. 1) Confirmation of Coating supplier, and surface preparation requirements 2) Selectioon of the coating system (PSPC: Table 1.1.1) 3) Verification of Type Approval Certificate and Contents of PTDS (PSPC: 3.4.1,3.4.2 &7.2) Details held centrally by LR. 4) Verifacation that all documentation required for the PSPC is available. LR will verify the contents of the CTF..All documentation is to be available at the pre-job meetiing. 8) Block surface preparation, application and inspection (PSPC: Table & to 1.3,6) or insitu tank surface preparation and coating application if not carried out in block stage 7) Steel dressing & inspection (PSPC Tables and 6.2) 6) Confirmation of application conditions of the shop primer (PSPC: Tables1.2.1 to 1.2.3) Confirmation of the location of all block and tank coating operations i.e. shipyard or external 5) Pre-job meeting to agree procedures of inspection and coating processes. (PSPC: 3.2). The Approved Inspector may be appointed at this meeting. LR will verify the Approved inspector's qualifications. Shipyard to present LR with meeting notes for review. 9) Block pre-erection, surface preparation, application and inspection (If applicable) 10) Insitu Tank Erection and Damage Inspection & repair 11) Pre-delivery (Completion Inspection, repair and verification (PSPC 1.3.C) 12) Confirmation of Completion of all documentation (see section: Contents of CTF and appended Tables) Notes: PSPC: LRYAG: IACS UI SC223 IMO Resolution MSC,215(82) PSPC Performance standard for Protective Coatings for Dedicated Seawater Ballast Tanks in all Types of ships and Double-sided Skin Spaces of Bulk Carriers LR PSPC Yard Auditing Procedures For Application of SOLAS Regulation 11-1/3-2 Performance Standard for Protective Coatings (PSPC) for Dedicated Sea Water Ballast Tanks in Al Types of Ships and Double-Side Skin Spaces of Bulk Carriers, adopted by Resolution MSC 215(82) 2013 Version 05 9

11 Shipyard: Location: Document Coating Selection & Specification Builder Approved Inspector Owner Supplier i Ballast tank description and drawings P P P ii Selection of Coating System P P P iii Type Certificate of Approval P P (1) (1) (1) Document included Project/NB No: Shipowner: Conformance Agreed P Coating supplier to be aware of service conditions. Compatibility of primer (1) LR will verify it coplies with the current Type Approval v Product Technical Data Sheet (PTDS) P P P Certificate. (4) (1) v Coating specification P P P See coating specification requirements. vi Product Safety Data Sheet (PSDS ) P P vii Pre-job agreement and job specification P (4) Appendix 1. CONTENTS OF THE CTF Mandatory Signatories P P (1) (3) Lloyd's Verification Requirement P Comment The participation of the ship yard, owner and coating supplier is mandatory. LR may participate in the pre-job meeting at their discretion. Shipyard to present LR with meeting notes for review. vii Inspection Inspection procedures for surface preparation and application ix Inspection bodies P P P x Name(s) of Approved Inspector(s) and verified copies of their certificates(s) Reports xi Shop Primer Application P xii Preparation & Application P X xiii Block/Hull Preparation & Application P X xiv Pre-delivery Inspection and Repair Reports P X xv Non Conformance and Correction Reports P X P (4) P P P P P P: Shopprimer Supplier xvi Maintance procedures for in-service repair P P (3) (1) (1) x(1)(2)(5) P P To be agreed at the pre-job meeting. To be agreed at the pre-job meeting. To be agreed at the pre-job meeting. See attached tables - Shop Promer Plant Daily Record and Audit Check List. Shipyard to confirm Ballast/DSS supplier is copied with all updated audits. (1)(2) Examples to be available at the pre-job meeting. Prior to delivery LR will verify See attached tables for recommended contents. (1)(2) that the Approved Inspector(s) has Details of manufactures technical assistance (if given) to signed confirmation that standards be included. (1)(2) comply with PSPC, the PTDS and have been carried out to the satisfaction of the (1)(2) coating supplier's representitive Owner to acknowledge receipt and agreement to the maintenance programme. Shipyard to supply all necessary documents for the CTF LR will verify all neccessary documents are included in the CTF P Parties to indicate their agreement to the document subject matter. (1) To be signed by LR as available for the pre-job agreement Completed reports to be signed by the (2) To be signed by LR as completed by the Approved Inspector prior to delivery. X Approved (3) Agreement to be presented to LR for review before work is started Inspector as work progressess and included (4) There should be scope for review. -See also LR Document Contents of CTF- Section 4 in the finalised CTF before delivery. (5) Shipyard to present verification of the main coating supplier's acceptance of application See also section 2.A - Shop Primer conditions Verification. See also LR Document - Contents of the CTF The completed CTF is to be kept permanently on-board and copied to Lloyd's Register, London. Names of LR Signatories:

12 Appendix 2 A1 SHOP PRIMING PLANT VERIFICATION AT Shop Primer Manufacturer: Shop primer Name and Code: The shipyard has copied Ballast/DSS coating suppliers the attached audit. The Ballast/DSS coating suppliers have indicated their agreement to the following standards for: o o o o Blasting and Profile Salt removal. Ambient application conditions Measured DFT s The Ballast / DSS coating suppliers accept the primer and the conditions of its application as the substrate for spaces where their coatings are to be applied is in compliance with MSC.215(82). The yard shall ensure that primers used are LR approved prefabrication primers and their compatibility with intended top coating systems has been approved On behalf of the ship-yard Signature Name Position Date 2013 Version 05 11

13 Appendix 2 A2 SHOP PRIMING PLANT VERIFICATION Shipyard or Contractor: Manufacturer: Location: Date of Audit: Product Name & Code: Standard Conditions and Settings Standardised Settings Comment General Condition Before Blasting Steel surface condition Grade 'B' or better Oil and grease removal To be acceptable Water removal To be acceptable RH < 85% Dew point 3 C Surface Condition After blasting Blast Standard - above Sa 2½ ISO Or better Blast Standard - below Sa 2½ ISO or better Blast Profile -above (shipyard to clarify method of test) 30-75μm ISO and 2 Blast Profile - below (shipyard to clarify method of test) 30-75μm ISO and 2 Salt contamination ISO or NACE SP mg/m 2 Air temperature (range) C to C Surface temperature (range) C to C RH < 85% Dew point 3 C Application Specified NDFT Min μm Max μm Measured DFT - above (Smooth plate) Min μm Max μm Measured DFT - below (Smooth plate) Min μm Max μm Film continuity - above (viewed using clear film) Acceptable Film continuity - below (viewed using clear film) Acceptable Abrasive inclusion - above and below Acceptable Date of introduction of this shop-primer variant The formulation will not be modified without prior approval of Lloyd's Register Applicator's QC: Date Conditions confirmed and agreed: Conformance based on applicators QC records: Shop Primer Supplier: date Shisyard Date Lloyd's Register: date 2013 Version 05 12

14 Appendix 2 B1. PSPC-BWT VERIFICATION PROCEDURES These Guidelines are intended to assist in the LR verification and should be used together with the working Procedures agreed in the Pre-job Meeting and the LR Shipyard Auditing/Gap Analysis Guidelines. LR is to check, on a sampling basis, that the Approved Inspector uses correct equipment, techniques & reporting methods Item PSPC Requirement Comment Removal of sharp edges Removal of undercuts/laminations/ spatter/other steel defects Removal of oil and grease Blocks.Block pre-erection & Tanks Welds and corroded areas Damaged Shop primer Intact shop primer Erection Joints Damages Areas >25 m 2 Overlap areas Soluble Salt test - Surfaces ISO Grade P2 (2mm radius) ISO Grade P2 To be removed Sa 2½ ISO Profile 30μm to 75μm ISO and 2 See the coating s Type Approval Certificate St 3 ISO or Sa 2½ ISO Blast profile as above St 3 ISO or Sa 2½ ISO Blast profile as above Sa 2½ ISO Blast profile as above ISO or NACE SP mg/m 2 (250 μs/cm) - Before Start Steel dressing & Pre-Cleaning All sharp edges should be rounded to a minimum of 2 mm radius. The PSPC requires 3 pass grinding however, other methods will be acceptable to LR provided the required standard is achieved. Visual or Water droplet test - Water must wet out surface to be tested. (UV lamp may be proposed but this method will only be effective with certain types of oil and grease) Surface Preparation The ISO 8503 Comparator method does not include grade 30μm to 75 μm. The profile will therefore be judged using the appropriate medium grade comparator. Note that there are two types of comparator, one for grit and one for shot. The Type Approval Certificate PTDS and the PSPC will indicate the minimum required standard of preparation. The coating supplier may require a minimum surface profile after grinding / discing (see PTDS). If areas are to be blasted suitable procedures should be place to avoid over blast damage. If damages >2 % of the total area then blasting to Sa 2½ is mandatory. The Hull Stage Tank report requires that the damaged area be estimated and recorded If damages are to be blasted, a minimum area per damaged spot must be agreed prior to the start of blasting and steps taken to avoid over blast damage. Small isolated areas of damage should be mechanically repaired. If widespread small damages are present then the entire affected area should be blasted to avoid unnecessary over blast damage. Note over blast damage can be very difficult to see, hence the importance taking adequate steps for its prevention. For areas greater than 25 m 2 blasting to Sa 2½ is mandatory. The agreed method of abrasive cleaning must be acceptable to coating supplier and ensure acceptable inter-coat adhesion. The minimum number of tests per block or tank should have been agreed at the pre - job meeting. Additional tests may be necessary depending on conditions at the time of verification. PSPC requires a minimum of one test per block. Sampling should be by Bresle Patch or similar (Size A-1250 i.e ± 13 mm 2 ) and conductivity measured in accordance with ISO Tests areas should focus on areas most likely to be contaminated or on areas likely to have been 'missed' during the cleaning process e.g. behind bars, tank floors, areas of corrosion etc Version 05 13

15 2013 Version Appendix 2 B1 (cont) PSPC- BWT VERIFICATION PROCEDURES These Guidelines are intended to assist in the LR verification and should be used together with the working procedures agreed in the Pre-job Meeting and the LR Shipyard Auditing/Gap Analysis Guidelines. LR is to check, on a sampling basis, that the Approved Inspector uses correct equipment, techniques & reporting methods Dust removal Item PSPC Requirement ISO Rating 1 Class '3',4' or '5' Air Temp C RH 85% Steel Temp ( 3 C than Dew Point) Dew Point C Drum identification and batch number to be verified To comply with the PSPC and the PTDS After surface Preparation and before 1st coat Comment The dust quantity rating is not to exceed quantity rating 1 for dust classes 3, 4, or 5. Dust of lower classes is to be removed if visible on the surface without magnification. Q.C. to monitor conditions during and after application until work is completed. Batch number of both the base and curing agent to be recorded in the coating report. Normally only one batch will be required for any single area. The Approved Inspector must agree if more than two batches are to be used in any area and record the reasons in the Preparation & Application Record. Note; The PSPC does not specify ambient conditions during surface preparation: it is important, however, to confirm that ambient conditions required for coating are achieved before the cleaning inspection is started. If ambient conditions do not meet dew point/rh/surface and air temperature criteria, the quality of surface preparation is likely to deteriorate before application of the first full coat and stripe coat is complete. Coating application should commence as soon as possible after surface preparation has been accepted and must be completed before any visible deterioration has occurred. Separate preparation and cleaning inspections may be preferred to avoid re-cleaning if surface preparation is not accepted. Depending on shipyard practice, however, cleaning and surface preparation inspections may be carried out simultaneously. Loose spatter should be removed before the cleaning inspection. Cleaning inspections should always be carried out from the tank top down. Coatings to be free from: Sags, runs and puddles Craters Pinholes Bubbles Holidays Inclusions Other defects Steps must be taken to avoid similar problems in the future After 1st Spray Coat application See section H - final coat verification. If defects are widespread or if considered significant the cause must be urgently investigated. If necessary coating activities should be halted until the cause of the defect is remedied. DFT Spot Check Flat surfaces Longitudinal stiffeners Transverse stiffeners and girders As considered necessary by the Approved Inspector. Large brackets and primary supports Around openings Areas Inaccessible by airless spray Excessive thickness removed To be repaired in accordance with the suppliers recommendations. Over coating interval To comply with the PTDS See section 3.4 above Adequate ventilation in place Bulk contamination removed Dust removal Inclusions Air Temp RH Steel Temp Dew Point Drum identification and batch no verified Before subsequent full coats and stripe coats Same as section 3.4 but with confirmation of acceptable over coating interval and the exclusion of salt tests, unless contamination is suspected). Inclusions to be removed and the coating repaired in accordance with the suppliers instructions.

16 Appendix 2 B1 (Cont) PSPC - BWT VERIFICATION PROCEDURES These Guidelines are intended to assist in the LR verification and should be used together with the working procedures agreed in the Pre-job meeting and the LR Shipyard Auditing/Gap Analysis Guidelines. LR is to check, on a sampling basis, that the Approved Inspector uses correct equipment, techniques & reporting methods Item PSPC Requirement Comment Coatings free from: Inclusions Pinholes Sags, runs and puddles Other defects Film Continuity Welds Edges Cut outs Areas Inaccessible by airless spray See Section 3.8 After Stripe Coating Scallops & rat holes etc. to be verified using a mirror as necessary The substrate should not to be visible The sequence of stripe coats will normally be agreed at the pre - job meeting. It may be that both stripe coats are applied between the first and second full coats. Normally each full coat and intermediate stripe coat will be a different colour to its substrate. If the second stripe coat is to by applied after the second full coat it is normal practice to apply the same colour as the last full coat. The extent of the second stripe coat will be agreed at the pre-job meeting Coatings to be free from: Inclusions Sags, runs and puddles Craters Pinholes Bubbles Other defects Film Continuity: Flat surfaces Welds Edges Cut outs Areas inaccessible by airless spray DFT Check: Flat surfaces Longitudinal stiffeners Transverse stiffeners and girders Large brackets and primary supports Around openings Areas inaccessible by airless spray Steps must be taken to avoid similar problems in the future SSPS-PA2:2004 & PSPC Annex 3 Final Coat Verification 1. Inclusions to be removed and repaired according to the suppliers recommendations 2. Sags, runs and puddles if present, will normally be caused by poor application technique. In exceptional cases the cause may be a batch or formulation problem. 3. Defects such as craters, pinholes & bubbles may be causes by surface contamination or surface condition, ambient conditions application techniques or problems with the product. If present, the cause should be investigated immediately to avoid re-occurrence in other blocks or tanks. Depending on the extent of the defect it may be necessary to halt production until the problem can be resolved. Scallops & rat holes etc. to be verified using a mirror as necessary. The substrate should not to be visible LR will confirm that the DFT procedures as detailed in PSPC Annex 3 are being followed by the Approved Inspector. The Approved Inspector will demonstrate to LR by a series of spot checks that measurements are taken in the areas as required by the PSPC. The Approved Inspector will also demonstrate that measured DFT's are in accordance with the Type Approval Certificate, the PTDS and the PSPC. Note; The PSPC refers to NDFT (Nominal dry film thickness) and a 90/10 rule. This means 90% of all thickness measurements shall by greater than, or equal to the NDFT, and none of the remaining 10% shall be below 0.9 x NDFT (See Table 1.1,5 of the PSPC). Excessive thickness must also be avoided and be within the coating supplier's maximum values quoted in the PTDS It is not the responsibility of LR to verify the overall condition of the block or tank or to carry out the verification without the presence of the Approved Inspector. Excessive thickness: To be repaired in accordance with the suppliers recommendations Note: The Pre-delivery (Completion) Inspection should be carried out after sea trials / ballasting whenever possible Version 05 15

17 Appendix 3 Example Reporting Form PSP COATING LOG (PRIMARY SURFACE PREPARATION) Sheet No. NAME/NO. OF SHIP PLATE NUMBERS INSPECTION DATE ENVIRONMENT MEASURED TIME DRY TEMP. ( C) RELATIVE HUMIDITY (%) DEW POINT (%) SURFACE TEMP. ( C) BEFORE WEATHER CHANGES REMARKS: SURFACE PREPARATION SURFACE PROFILES REMARKS: WATER SOLUBLE SALTS (mg/m 2 of NaCl) SHOP PRIMER MANUFACTURER REMARKS: PRODUCT NAME IDENTIFICATION MARK/NUMBER MANUFACTURE S RECOMMENDED D.F.T. MEASURED D.F.T. CURING COATING INSPECTOR S NAME: SIGNATURE 2013 Version 05 16

18 Form SSP COATING LOG (EDGE & WELD CONDITION) Sheet No. NAME/NO. OF SHIP PART OF STRUCTURE (BLOCK /TANK No., etc.) CONSTRUCTION STAGE BLOCK ASSEMBLY / ERECTION STEEL CONDITION Type of Defect Repair Method Repair Confirm / Date SURFACE TREATMENT INSPECTION DATE METHOD, GRADE REMARKS COATING INSPECTOR S NAME: SIGNATURE: 2013 Version 05 17

19 Form CA COATING LOG (COATING APPLICATION) Sheet No. FIRST COAT SECOND COAT BEFORE AFTER BEFORE AFTER INSPECTION DATE ENVIRONMENT DRY TEMP. ( C) RELATIVE HUMIDITY (%) DEW POINT (%) SURFACE TEMP. ( C) WATER SOLUBLE SALTS (mg/m 2 of NaCl) X X X DUST X X X OIL CONTAMINATION X X ABRASIVE INCLUSION X X STRIPE COATS MANUFACTURER PRODUCT NAME OF COATING PRODUCT IDENTIFICATION MARK/ NUMBER REMARKS: COATING INSPECTOR S NAME: SIGNATURE: 2013 Version 05 18

20 Form DFT COATING LOG (DRY FILM THICKNESS MEASUREMENT) NAME/NO. OF SHIP PART OF STRUCTURE (BLOCK /TANK No., etc.) CONSTRUCTION STAGE BLOCK ASSEMBLY / ERECTION Sheet No. DRY FILM THICKNESS MEASUREMENT DRY FILM THICKNESS (µm) NUMBER OF POINTS RATIO TOTAL 100% MAXIMUM THICKNESS (µm) MINIMUM THICKNESS (µm) REMARKS: FINAL COATING CONDITION TYPE OF DEFECT REPAIR METHOD REPAIR DATE / CONFIRMED COATING INSPECTOR S NAME: SIGNATURE: 2013 Version 05 19

21 Lloyd's Register Group Limited, its affiliates and subsidiaries and their respective officers, employees or agents are, individually and collectively, referred to in this clause as Lloyd's Register. Lloyd's Register assumes no responsibility and shall not be liable to any person for any loss, damage or expense caused by reliance on the information or advice in this document or howsoever provided, unless that person has signed a contract with the relevant Lloyd's Register entity for the provision of this information or advice and in that case any responsibility or liability is exclusively on the terms and conditions set out in that contract. Lloyd s Register 2013

Corrosion protection of crude oil cargo tanks new IMO regulations

Corrosion protection of crude oil cargo tanks new IMO regulations Guidance note oil cargo tanks new IMO regulations Guidance for shipowners and operators, manufacturers and ship builders 1. Background to the new requirements Following incidents resulting from structural

More information

SIGMACOVER 280. PRODUCT DATA SHEET December 10, 2014 (Revision of March 1, 2014) DESCRIPTION

SIGMACOVER 280. PRODUCT DATA SHEET December 10, 2014 (Revision of March 1, 2014) DESCRIPTION DESCRIPTION Universal epoxy anticorrosive primer, based upon pure epoxy technology PRINCIPAL CHARACTERISTICS Universal epoxy primer system suitable for Ballast Tanks, Decks, Topside, Superstructure, Hull

More information

SIGMACOVER 300. PRODUCT DATA SHEET December 12, 2014 (Revision of November 1, 2013) DESCRIPTION

SIGMACOVER 300. PRODUCT DATA SHEET December 12, 2014 (Revision of November 1, 2013) DESCRIPTION DESCRIPTION Two-component, high-build, polyamine adduct-cured, coal tar epoxy coating PRINCIPAL CHARACTERISTICS Outstanding (sea)water resistance (outside hull and ballast tanks) Outstanding water- and

More information

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 28 C calculated VOC-US/Hong Kong. US EPA method 24 (tested)

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 28 C calculated VOC-US/Hong Kong. US EPA method 24 (tested) Approved 735;739 1 735 phenolic/novolac epoxy ^(ValidationDate) 1 Product description This is a two component polyamine cured phenolic/novolac epoxy coating. It is a specially designed tank lining with

More information

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 27 C calculated IED (2010/75/EU) (calculated)

Approved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 27 C calculated IED (2010/75/EU) (calculated) Approved 402;2521 1 2521 zinc epoxy ^(ValidationDate). 1 Product description This is a two component polyamide cured zinc rich epoxy coating. It is a very high zinc dust containing product. It conforms

More information

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment:

BRIDGE FIELD PAINTING, REPAINTING, 412 AND PAINT RESIDUE CONTAINMENT. A. Field Painting, Bridge Repainting and Residue Containment: 412.1 DESCRIPTION BRIDGE FIELD PAINTING, REPAINTING, 412 This specification contains the requirements for the removal, containment, and disposal of existing paint on steel surfaces, preparing the steel

More information

Evaluating Protective Coatings for Ballast Tanks

Evaluating Protective Coatings for Ballast Tanks Evaluating Protective s for Ballast Tanks The lifetime of vessels, such as tankers and bulk carriers, is determined to a large extent by the condition of their ballast tanks. In recent years, serious accidents

More information

Property Test/Standard Description. gloss (70-85) Flash point ISO 3679 Method 1. 212 F (100 C) calculated VOC-US/Hong Kong. US EPA method 24 (tested)

Property Test/Standard Description. gloss (70-85) Flash point ISO 3679 Method 1. 212 F (100 C) calculated VOC-US/Hong Kong. US EPA method 24 (tested) Not approved 2063;2064 1,2 2063 ^(ValidationDate) 1 Product description This is a two component solvent free polyamine cured coating. It is a general purpose tank lining with good chemical resistance.

More information

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents.

A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. POLYURETHANE COATING ON STEEL PIPE PART 1 -- GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. 1.2 REFERENCE SPECIFICATIONS,

More information

Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables

Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables (1987) Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables 1. General 1.1 Introduction 1.1.1 The present guidelines are to serve as a supplement to the IACS

More information

UNCONTROLLED COPY FOR REFERENCE ONLY

UNCONTROLLED COPY FOR REFERENCE ONLY CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President

More information

Property Test/Standard Description. semi gloss (35-70) Flash point ISO 3679 Method 1 34 C IED (2010/75/EU) (calculated)

Property Test/Standard Description. semi gloss (35-70) Flash point ISO 3679 Method 1 34 C IED (2010/75/EU) (calculated) 408;21800;21820;21740;21760;21840 1,2 408 unsaturated vinyl ester ^(ValidationDate). 1 Product description This is a glass flake reinforced unsaturated vinyl ester coating. It is an ultra high build, extremely

More information

JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management

JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management JOHN HART GENERATING STATION REPLACEMENT PROJECT Schedule 9 Quality Management SCHEDULE 9 QUALITY MANAGEMENT TABLE OF CONTENTS 1. QUALITY MANAGEMENT SYSTEM... 1 1.1 Quality Management System...1 1.2 Project

More information

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,

More information

Generic CMMS Quality Assurance Plan

Generic CMMS Quality Assurance Plan Generic CMMS Quality Assurance Plan Scope In accordance with the Quality Policy, the Quality System of CMMS is based upon the requirements and structure of ISO (the International Organization for Standardization)

More information

SIGMAFAST 210. PRODUCT DATA SHEET December 12, 2014 (Revision of April 1, 2013) DESCRIPTION

SIGMAFAST 210. PRODUCT DATA SHEET December 12, 2014 (Revision of April 1, 2013) DESCRIPTION DESCRIPTION Two-component, high-build zinc phosphate polyurethane primer/finish PRINCIPAL CHARACTERISTICS Specially designed for in-shop application Fast-curing Easy application by airless spray Unlimited

More information

POLYURETHANE LINING AND COATING ON PIPE RAW WATER

POLYURETHANE LINING AND COATING ON PIPE RAW WATER POLYURETHANE LINING AND COATING ON PIPE RAW WATER PART 1 -- GENERAL 1.1 THE REQUIREMENT A. The CONTRACTOR shall provide pipe coating, complete and in place, in accordance with the Contract Documents. 1.2

More information

NORSOK STANDARD COMMON REQUIREMENTS SURFACE PREPARATION AND PROTECTIVE COATING

NORSOK STANDARD COMMON REQUIREMENTS SURFACE PREPARATION AND PROTECTIVE COATING NORSOK STANDARD COMMON REQUIREMENTS SURFACE PREPARATION AND PROTECTIVE COATING CONTENTS 1 FOREWORD...2 2 SCOPE...2 3 NORMATIVE REFERENCES...2 4 DEFINITIONS AND ABBREVIATIONS...3 5 GENERAL REQUIREMENTS...4

More information

COATING & WRAPPING OF UNDERGROUND PIPING

COATING & WRAPPING OF UNDERGROUND PIPING CONSTRUCTION STANDARD SPECIFICATION DOCUMENT NO :SEC-PJ-000-SPC-PI-008 TOTAL PAGES : 8 Page 1 of 8 CONTENTS 1. SCOPE 2. DEFINITION 3. CODES AND STANDARDS 4. MATERIALS Page 2 of 8 1. SCOPE This specification

More information

The Application Guide offers product details and recommended practices for the use of the product.

The Application Guide offers product details and recommended practices for the use of the product. Technical Data Sheet Application Guide Approved 720 1,2 720 silicone acrylic ^(ValidationDate) 1 Product description This is a one component physically drying silicone acrylic coating. It is heat resistant

More information

SURFACE PREPARATION STANDARDS

SURFACE PREPARATION STANDARDS SURFACE PREPARATION STANDARDS TE SWEDIS STANDARDS INSTITUTION: Surface Preparations Standards for Painting Steel Surface (SIS 055900-1967) has gained prominence and acceptance and has served as a model

More information

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14)

738-B-297 POLYMERIC CONCRETE BRIDGE DECK OVERLAY. (Adopted 02-20-14) POLYMERIC CONCRETE BRIDGE DECK OVERLAY (Adopted 02-20-14) Description The polymeric concrete bridge deck overlay shall consist of an epoxy polymer that acts together with special aggregate to form an overlay

More information

Cold trichloroethylene degreasing Film Thickness 70± 10 µm 10 minutes at 170 C (PZ 770 alone) 5 minutes 30 sec. at 220 C (maximum curing conditions)

Cold trichloroethylene degreasing Film Thickness 70± 10 µm 10 minutes at 170 C (PZ 770 alone) 5 minutes 30 sec. at 220 C (maximum curing conditions) Product Datasheet Product Description Powder Properties Test Conditions BU Powder Coatings Interpon PZ 77 Interpon PZ 77 is a powder coating primer containing zinc which is designed to give enhanced corrosion

More information

BENTLEY ELEMENTS COLLECTION LVT

BENTLEY ELEMENTS COLLECTION LVT This document refers to the following products: Product Size Installation direction Seams treatment Elements Tiles See specifications 90 None Elements Planks See specifications Stair Step None Note: This

More information

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM CONTENTS Page No 1 GENERAL REQUIREMENTS 1 1.1 Requirements 1

More information

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE Community Development Permit Services SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE PROJECT NAME PROJECT ADDRESS PERMIT NUMBER CITY RECEIVED STAMP AND INITIALS Instructions: BEFORE

More information

Pictorial Surface Preparation Standards For Painting Steel Surfaces

Pictorial Surface Preparation Standards For Painting Steel Surfaces Pictorial Surface Preparation Standards For Painting Steel Surfaces Printed by Manchester Contents Contents 3 Foreword 4 Scope 5 Rust grades 6 Preparation grades. Scraping and wire-brushing 6 Preparation

More information

Procedural Requirements for ISM Code Certification

Procedural Requirements for ISM Code Certification (Rev.0 July 2009) (Rev.1 Jan 2010) (Corr.1 Mar 2010) (Rev.2 Sep 2012) Procedural Requirements for ISM Code Certification INTRODUCTION The IACS "Procedural Requirements for ISM Code Certification" reflect,

More information

NORSOK STANDARD M-501 Rev. 5, June 2004. Surface preparation and protective coating

NORSOK STANDARD M-501 Rev. 5, June 2004. Surface preparation and protective coating NORSOK STANDARD M-501 Rev. 5, June 2004 Surface preparation and protective coating This NORSOK standard is developed with broad petroleum industry participation by interested parties in the Norwegian petroleum

More information

Approved. Property Test/Standard Description. gloss (70-85) Flash point ISO 3679 Method 1 30 C calculated VOC-US/Hong Kong. US EPA method 24 (tested)

Approved. Property Test/Standard Description. gloss (70-85) Flash point ISO 3679 Method 1 30 C calculated VOC-US/Hong Kong. US EPA method 24 (tested) Approved 3140;3240;4320 1,2 3140 polyurethane ^(ValidationDate) 1 Product description This is a two component chemically curing aliphatic acrylic polyurethane coating. It has a glossy finish with very

More information

M/V Eleranta IMO 9081198. Water Ballast Tank Inspection Report. China Shipping International Shipyard Co. Ltd (CSIS), Changxing Island, Shanghai

M/V Eleranta IMO 9081198. Water Ballast Tank Inspection Report. China Shipping International Shipyard Co. Ltd (CSIS), Changxing Island, Shanghai M/V Eleranta IMO 9081198 Water Ballast Tank Inspection Report China Shipping International Shipyard Co. Ltd (CSIS), Changxing Island, Shanghai 24 June 2010 Report prepared by: Andrew Cass Page 1 of 17

More information

QUALITY POLICY MANUAL Document: 01-090000 Revision: E Effective Date: January 15, 2010

QUALITY POLICY MANUAL Document: 01-090000 Revision: E Effective Date: January 15, 2010 Section i INTRODUCTION QUALITY POLICY STATEMENT: The purpose of our business is to provide continuity of electrical power to keep businesses in business. We do this by helping clients solve their power

More information

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet. INTRODUCTION This document describes an inspection system broken down into four separate levels. When Inspection Level IV is invoked, this system meets the requirements of former MIL-I-45208A. The primary

More information

Note: Minor color change may occur in exposed service, but corrosion protection will not be compromised

Note: Minor color change may occur in exposed service, but corrosion protection will not be compromised DESCRIPTION One component, high-build heat-resistant inert multipolymeric matrix coating to prevent corrosion under insulation (CUI) of carbon and stainless steel to temperatures ranging up to 650 C (1200

More information

STEEL fabrication quality SySTEmS guideline

STEEL fabrication quality SySTEmS guideline STEEL fabrication quality systems guideline Copyright 2002 by Canadian Institute of Steel Construction All rights reserved. This book or any part therof must not be reproduced in any form without written

More information

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan) ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan) Part 1: Project-Specific Quality Plan Part 2: Company Quality Manual Part 3: Submittal Forms Part 4:

More information

GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059

GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059 QUALITY MANUAL GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059 Distribution: Position Location Copy # President / CEO Office 1 Operations Manager Office 2 Quality Assurance Office

More information

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual Specialties Manufacturing Talladega Castings & Machine Co., Inc. ISO 9001:2008 This document is the property of TMS and may not be reproduced, wholly, or in part, without the express consent of TMS. Rev.

More information

COATINGS MANUAL HRSD 9.0 THIRD PARTY INSPECTION GUIDELINES. 9.1 The Value of Third Party Inspection. 9.2 When to Use Third Party Inspection

COATINGS MANUAL HRSD 9.0 THIRD PARTY INSPECTION GUIDELINES. 9.1 The Value of Third Party Inspection. 9.2 When to Use Third Party Inspection 9.0 THIRD PARTY INSPECTION GUIDELINES 9.1 The Value of Third Party Inspection 9.2 When to Use Third Party Inspection 9.3 Qualifications for Third Party Inspectors 9.4 Documentation System for Third Party

More information

SECTION 15420 WATER STORAGE TANK PAINTING

SECTION 15420 WATER STORAGE TANK PAINTING SECTION 15420 WATER STORAGE TANK PAINTING PART 1 GENERAL.01 SCOPE A. Section Includes Surface preparation, shop priming, and field coating for interior wet, interior dry, and exterior surfaces of steel

More information

CLASSIFICATION SOCIETIES - their key role

CLASSIFICATION SOCIETIES - their key role CLASSIFICATION SOCIETIES - their key role Leading the way: dedicated to safe ships and clean seas, IACS Members make a unique contribution to maritime safety and regulation through technical support, compliance

More information

ISO/IEC 17025 QUALITY MANUAL

ISO/IEC 17025 QUALITY MANUAL 1800 NW 169 th Pl, Beaverton, OR 97006 Revision F Date: 9/18/06 PAGE 1 OF 18 TABLE OF CONTENTS Quality Manual Section Applicable ISO/IEC 17025:2005 clause(s) Page Quality Policy 4.2.2 3 Introduction 4

More information

Intershield 300 The industry benchmark in corrosion protection

Intershield 300 The industry benchmark in corrosion protection Intershield 300 The industry benchmark in corrosion protection Delivering long term asset protection Outstanding corrosion control Intershield 300 is our highest performing anticorrosive universal primer,

More information

Additional Information. Paint Application

Additional Information. Paint Application Additional Information Paint Prepared by: International Paint Ltd. www.international-pc.com The information in this guideline is not intended to be exhaustive; any person using the product for any purpose

More information

SSPC-SP 6/NACE NO. 3

SSPC-SP 6/NACE NO. 3 Joint Surface Preparation Standard SSPC-SP 6/NACE NO. 3 Commercial Blast Cleaning This SSPC: The Society for Protective Coatings and NACE International standard represents a consensus of those individual

More information

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F MEDFORD FABRICATION CSC, INC Quality System Manual Date of issue: 03/25/2010 Revision : F Table of Contents System Description 1.0 Introduction 2.0 Company Quality Policy 3.0 Organization Charts 4.0 Quality

More information

Colorado State University. Durrell Center Roof Repair

Colorado State University. Durrell Center Roof Repair Colorado State University Durrell Center Roof Repair SPECIFICATION: POLYURETHANE FOAM ROOFING l.0 GENERAL REQUIREMENTS The successful application of a polyurethane foam roofing system is dependent upon

More information

Quality Management System Manual Revision L

Quality Management System Manual Revision L This Page 1 of 35 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies

More information

Good Manufacturing Practices for the Production of Packaging Inks formulated for use on the non food contact surfaces of food packaging and articles

Good Manufacturing Practices for the Production of Packaging Inks formulated for use on the non food contact surfaces of food packaging and articles Good Manufacturing Practices for the Production of Packaging Inks formulated for use on the non food contact surfaces of food packaging and articles intended to come into contact with food October 2005

More information

A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society

A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society (Rev.0 July 2009) (Rev.1 June 2012) (Rev.2 Oct 2013) (Rev.3 Jan 2015) (Rev.4 July 2015) (Rev.5 Jan 2016) Procedure for Transfer of Class TABLE OF CONTENTS Procedure for Transfer of Class Application Definitions

More information

Technical Services. Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking)

Technical Services. Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking) INSTALLATION INSTRUCTIONS FOR GTI CONNECT TILES This document refers to the following products: Product MM INCH Installation direction Seams treatment GTI CONNECT (interlocking) 635 X 635 mm 25.5 x 25.5

More information

10P20-44 High Solids Epoxy Primer

10P20-44 High Solids Epoxy Primer Technical Data Sheet Product Group High solids epoxy primer Characteristics Product Information A high solids urethane compatible, Skydrol resistant primer for the exterior of aircraft. It provides excellent

More information

IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality

IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION. Generated: Sergiy Papyshev Engineering. Approved: Don Prysi Manufacturing. Approved: Merzuk Ramic Quality IHSS-N1 WELDED HONEYCOMB CORE SPECIFICATION Generated: Sergiy Papyshev Engineering Approved: Don Prysi Manufacturing Approved: Merzuk Ramic Quality Approved: Steven Barnett Administrative DATE DATE DATE

More information

Australian Transport Council. National Standard for the Administration of Marine Safety SECTION 4 SURVEYS OF VESSELS

Australian Transport Council. National Standard for the Administration of Marine Safety SECTION 4 SURVEYS OF VESSELS Australian Transport Council National Standard for the Administration of Marine Safety SECTION 4 SURVEYS OF VESSELS Edition 1 Draft for comment issued 20 December 2005 Endorsed by the Australian Transport

More information

Non-destructive testing of steel forgings - Part 2: Penetrant testing (BS EN 10228-2:1998)

Non-destructive testing of steel forgings - Part 2: Penetrant testing (BS EN 10228-2:1998) Non-destructive testing of steel forgings - Part 2: Penetrant testing (BS EN 10228-2:1998) 1 Scope This part of EN 10228 describes the method and acceptance criteria to be used for the penetrant testing

More information

How To Check If A Shipyard Is Asbestos Free

How To Check If A Shipyard Is Asbestos Free (June 2013) Procedures for verifying that materials are asbestos free 1. New Building Shipyards 1.1 As per UI SC249, the RO should verify that the shipyard has established written procedures for purchasing

More information

Division 9. SignaFlor Pad and Pour Flooring System

Division 9. SignaFlor Pad and Pour Flooring System Division 9 SignaFlor Pad and Pour Flooring System SPECIFICATIONS Page 1. General... 2 1.1 Description 2 1.2 Quality Assurance 2 1.3 Submittals 2 1.4 Delivery and Storage 3 1.5 Warranty 3 1.6 Working Conditions

More information

SECTION 560 COATING NEW STRUCTURAL STEEL

SECTION 560 COATING NEW STRUCTURAL STEEL 560 COATING NEW STRUCTURAL STEEL. (REV 10-1-132911121-131416-1213) (FA 1-162-1-13) (7-13) SECTION 560 COATING NEW STRUCTURAL STEEL 560-1 Description Coat new structural steel in accordance with the requirements

More information

Quality Management System

Quality Management System LH Sleightholme Ltd, Westfield Works, Helperthorpe, Malton, North Yorkshire YO17 8TQ Quality Management System MANUAL ISO 9001:2008 This Quality Management System Manual has been issued on the authority

More information

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev

More information

Joint Surface Preparation Standard. NACE No. 1/SSPC-SP 5 White Metal Blast Cleaning

Joint Surface Preparation Standard. NACE No. 1/SSPC-SP 5 White Metal Blast Cleaning Item No. 21065 Joint Surface Preparation Standard NACE No. 1/SSPC-SP 5 White Metal Blast Cleaning This NACE International (NACE)/SSPC: The Society for Protective Coatings standard represents a consensus

More information

STANDARD PDCA P2-04 THIRD PARTY INSPECTIONS: QUALIFICATIONS, RESPONSIBILITIES, AND PROCEDURES

STANDARD PDCA P2-04 THIRD PARTY INSPECTIONS: QUALIFICATIONS, RESPONSIBILITIES, AND PROCEDURES 1. Scope STANDARD PDCA P2-04 THIRD PARTY INSPECTIONS: QUALIFICATIONS, RESPONSIBILITIES, AND PROCEDURES 1.1. The purpose of this standard is to establish third party inspection qualifications, responsibilities

More information

WATERPROOFING FOR CONCRETE STRUCTURES

WATERPROOFING FOR CONCRETE STRUCTURES MANUAL OF CONTRACT DOCUMENTS FOR ROAD WORKS VOLUME 1 SPECIFICATION FOR ROAD WORKS SERIES 2000 WATERPROOFING FOR CONCRETE STRUCTURES Contents Clause Title Page 2001 General 2 2002 Protection of Bridge Deck

More information

UGVCL/SP/591/11KV HT AB CABLE

UGVCL/SP/591/11KV HT AB CABLE TECHNICAL SPECIFICATION FOR 11KV AERIAL BUNCHED CABLES FOR OVERHEAD LINES (CROSSED LINKED POLYTHENE DRY GAS CURED) 1. SCOPE This specification covers requirements of XLPE insulated, 11 KV Aerial Bunched

More information

Implementing a Ship Energy Efficiency Management Plan (SEEMP) Guidance for shipowners and operators

Implementing a Ship Energy Efficiency Management Plan (SEEMP) Guidance for shipowners and operators Implementing a Ship Energy Efficiency Management Plan (SEEMP) Guidance for shipowners and operators Lloyd s Register, its affiliates and subsidiaries and their respective officers, employees or agents

More information

NABL NATIONAL ACCREDITATION

NABL NATIONAL ACCREDITATION NABL 160 NABL NATIONAL ACCREDITATION BOARD FOR TESTING AND CALIBRATION LABORATORIES GUIDE for PREPARING A QUALITY MANUAL ISSUE NO. : 05 AMENDMENT NO : 00 ISSUE DATE: 27.06.2012 AMENDMENT DATE: -- Amendment

More information

Supplier Requirements Manual M M 0 3

Supplier Requirements Manual M M 0 3 Supplier Requirements Manual M M 0 3 Conformance to this manual is a requirement for all of Merrill Technologies Group and Ranger s suppliers & subcontractors, unless otherwise specified on purchase orders.

More information

Understanding the Indian Boiler Regulations (1950)

Understanding the Indian Boiler Regulations (1950) Working together for a safer world Understanding the Indian Boiler Regulations (1950) A Lloyd s Register Guide Contents IBR: A brief history 04 IBR certification process 05 IBR Basics 06 IBR material certification

More information

Offshore Substation. Protective Coating of Steel. ETS-25 Rev. 2. technical standards. Document no. 44972-09, case 10/4054 ETS-25 v.

Offshore Substation. Protective Coating of Steel. ETS-25 Rev. 2. technical standards. Document no. 44972-09, case 10/4054 ETS-25 v. technical standards Offshore Substation Protective Coating of Steel ETS-25 Rev. 2 Document no. 44972-09, case 10/4054 ETS-25 v. 2 Revision survey Document title Protective Coating of Steel Document no.

More information

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of

More information

Crystal Clear Sealant

Crystal Clear Sealant Crystal Clear Sealant Technical Data February, 2012 Product Description 3M Crystal Clear Sealant is a one component thermoplastic elastomer which forms permanent elastic bonds when used in surface sealing

More information

OMCL Network of the Council of Europe QUALITY MANAGEMENT DOCUMENT

OMCL Network of the Council of Europe QUALITY MANAGEMENT DOCUMENT OMCL Network of the Council of Europe QUALITY MANAGEMENT DOCUMENT PA/PH/OMCL (12) 77 7R QUALIFICATION OF EQUIPMENT ANNEX 8: QUALIFICATION OF BALANCES Full document title and reference Document type Qualification

More information

PRODUCT DATA SHEET Sika Cable System

PRODUCT DATA SHEET Sika Cable System PRODUCT DATA SHEET Corrosion protection for bridge cables of steel and galvanized steel PRODUCT DESCRIPTION The Sika Cable System consists of coating materials as well as a sealing respectively injection

More information

Construction. Sikadur-Combiflex. Sealing system for cracks and problem joints with large movements DESCRIPTION

Construction. Sikadur-Combiflex. Sealing system for cracks and problem joints with large movements DESCRIPTION Sikadur-Combiflex REVISED JULY 2002 Sealing system for cracks and problem joints with large movements Construction DESCRIPTION USES ADVANTAGES The Sikadur-Combiflex joint sealing system consists of two

More information

Forth Engineering (Cumbria) Limited QUALITY MANUAL. Quality Manual Issue 4 Updated April 2012. Authorised by: Managing Director.

Forth Engineering (Cumbria) Limited QUALITY MANUAL. Quality Manual Issue 4 Updated April 2012. Authorised by: Managing Director. Quality Manual Issue 4 Forth Engineering (Cumbria) Limited QUALITY MANUAL Copy Number: 1 The information contained in this Manual is the property of Forth Engineering (Cumbria) Limited and must not be

More information

SC2000 CEMENT BONDING PROCEDURES

SC2000 CEMENT BONDING PROCEDURES Pg.1 SC2000 CEMENT BONDING PROCEDURES Widely recognized as the world s finest cold vulcanizing cement REMA SC2000 is the solution to your industrial bonding problems. By using REMA UTR20 hardener with

More information

3 Scotch-Weld TM. Urethane Adhesives 3532 B/A 3535 B/A 3549 B/A. Technical Data January, 2010

3 Scotch-Weld TM. Urethane Adhesives 3532 B/A 3535 B/A 3549 B/A. Technical Data January, 2010 3 Scotch-Weld TM Technical Data January, 2010 Product Description 3M Scotch-Weld 3532 B/A, 3535 B/A and 3549 B/A are two-component, polyurethane adhesives which cure at room temperature or with heat to

More information

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier

More information

STATUTORY INSTRUMENT. No. of 2007. Merchant Shipping (Safe Ship Management Systems) Regulation 2007. ARRANGEMENT OF SECTIONS.

STATUTORY INSTRUMENT. No. of 2007. Merchant Shipping (Safe Ship Management Systems) Regulation 2007. ARRANGEMENT OF SECTIONS. STATUTORY INSTRUMENT. No. of 2007. Merchant Shipping (Safe Ship Management Systems) Regulation 2007. ARRANGEMENT OF SECTIONS. PART I. INTRODUCTION. 1. Interpretation accident Act approved safe ship management

More information

TYPE APPROVAL CERTIFICATION SCHEME MASS PRODUCED DIESEL ENGINES

TYPE APPROVAL CERTIFICATION SCHEME MASS PRODUCED DIESEL ENGINES 1. Introduction TYPE APPROVAL CERTIFICATION SCHEME MASS PRODUCED DIESEL ENGINES 1.1 This scheme details the tests and inspection of diesel engines manufactured by mass production system for use in marine

More information

QUALITY MANAGEMENT SYSTEM REQUIREMENTS

QUALITY MANAGEMENT SYSTEM REQUIREMENTS QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR TRADE CONTRACTORS 2014 400 Prince George s Blvd. Upper Marlboro, MD 20774 800.638.8556 HomeInnovation.com TABLE OF CONTENTS Introduction... iii Notes... iii

More information

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Technical Guideline Audit and Inspection Version 2.0 February 2012 Table of Contents 1. Introduction... 3 2. Definitions... 3 3. Internal Audit... 3 3.1

More information

Integrated management systems Ship operating companies

Integrated management systems Ship operating companies Integrated management systems Ship operating companies Safety, Quality, Environment and Occupational Health and Safety DNV Maritime Preamble Organisations of all kinds are increasingly concerned about

More information

INTRODUCTION: PURPOSE:

INTRODUCTION: PURPOSE: UMBRA CUSCINETTI, INC. 2916 100 th Street SW Everett, WA 98204-1340 USA 425-743-2577 FAX: 425-347-0682 Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

TIGER Drylac U.S.A., Inc. 3855 Swenson Avenue St Charles, IL T 800 243 8148 F 877 926 8148 office.us@tiger-coatings.us www.tiger-coatings.

TIGER Drylac U.S.A., Inc. 3855 Swenson Avenue St Charles, IL T 800 243 8148 F 877 926 8148 office.us@tiger-coatings.us www.tiger-coatings. Product Data Sheet SERIES 69 - DRYZINC ZINC-RICH PRIMER (69/90500) Epoxy zinc-rich powder coating primer. Part of a two-coat TIGER Shield system. Designed to impart superior corrosion protection to steel

More information

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No... 2011

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No... 2011 BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT Notice No.... 2011 NOTICE IN TERMS OF THE COUNCIL FOR THE BUILT ENVIRONMENT ACT, 2000 (ACT NO. 43 OF 2000) The Council for the Built Environment has under

More information

Schweppes Australia Head Office Level 5, 111 Cecil Street South Melbourne Victoria 3205. www.schweppesaustralia.com.au

Schweppes Australia Head Office Level 5, 111 Cecil Street South Melbourne Victoria 3205. www.schweppesaustralia.com.au Schweppes Australia Head Office Level 5, 111 Cecil Street South Melbourne Victoria 3205 www.schweppesaustralia.com.au Quality Management Systems 1. Quality Management Systems develop, implement, verify

More information

NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE

NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE NAPCA BULLETIN 18-99 APPLICATION PROCEDURES FOR CONCRETE WEIGHT COATING APPLIED BY THE COMPRESSION METHOD TO STEEL PIPE GENERAL a. These specifications may be used in whole or in part by any party without

More information

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials

ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials SECTION 03 92 50 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings,

More information

NORSOK STANDARD M-501 Edition 6 (2012)

NORSOK STANDARD M-501 Edition 6 (2012) Date: 2015-02-17 NORSOK STANDARD M-501 Edition 6 (2012) Surface preparation and protective coating Frequently asked questions INTRODUCTION NORSOK standard M501 Edition 6 was issued in 2012. The standard

More information

Pharmaceutical Wholesaler Site Inspection Checklist

Pharmaceutical Wholesaler Site Inspection Checklist Pharmaceutical Wholesaler Site Inspection Checklist Date and time of inspection: Legal business name and plant name: Location (address): Phone number: Fax number: Email address: Web site URL: Contact Person:

More information

Quality Management System Policy Manual

Quality Management System Policy Manual Quality Management System Burns Engineering, Inc. 10201 Bren Road East Minnetonka, MN 55343 4. 4.1 General Requirements The Quality Manual consists of the quality system policy documents and the quality

More information

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES 1.0 SCOPE CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES This document establishes the minimum quality program requirements for a contractor providing equipment, material, and construction

More information

3.8 HSP (High Solids Polyurethane)

3.8 HSP (High Solids Polyurethane) Description is a single-stage topcoat designed for commercial and automotive refinishing. This product provides Superior UV durability as well as commercial grade chemical resistance. 3.8 HSP has excellent

More information

FMC Technologies Measurement Solutions Inc.

FMC Technologies Measurement Solutions Inc. Table of Contents 1 Revision History... 4 2 Company... 5 2.1 Introduction... 5 2.2 Quality Policy... 6 2.3 Quality Organization... 6 2.4 Company Processes... 7 3 Scope and Exclusions... 8 3.1 Scope...

More information

QUALITY & TECHNICAL CERTIFICATIONS

QUALITY & TECHNICAL CERTIFICATIONS QUALITY & TECHNICAL CERTIFICATIONS October 2015 ODIN Underwater Inspection in Lieu of Drydocking I am writing in regard to the EM&I ODIN System for Underwater Inspection in Lieu of Drydocking. ABS has

More information

Owner-User Pressure Equipment Integrity Management Requirements

Owner-User Pressure Equipment Integrity Management Requirements the pressure equipment safety authority Owner-User Pressure Equipment Integrity Management Requirements AB-512 Edition 2, Revision 0 Issued 2015-06-25 Owner-user Pressure Equipment Integrity Management

More information

PHOENIX 370-120 Product Data Sheet (Updated on 14-Jan-2012) www.phoenixasia.com.hk

PHOENIX 370-120 Product Data Sheet (Updated on 14-Jan-2012) www.phoenixasia.com.hk DESCRIPTION A water borne thin film intumescent coating for the fire protection of structural steelwork. PRODUCT FEATURES AND RECOMMENDED USES Provides up to 120 minutes fire resistance to structural steelwork.

More information

MP Plumbing & Heating Ltd Quality Policy Manual THE QUALITY POLICY STATEMENT OF:

MP Plumbing & Heating Ltd Quality Policy Manual THE QUALITY POLICY STATEMENT OF: THE QUALITY POLICY STATEMENT OF: MP Plumbing & Heating Ltd Unit 8,The Metro Centre, Bridge Road, Orpington BR5 2BE Telephone: 01689 822188 Fax: 01689 897 733 E-Mail: info@mpplumbingheating.co.uk Web page:

More information