Highlights. ASX Announcement ASX Code: VXR Released: 4 July 2016

Size: px
Start display at page:

Download "Highlights. ASX Announcement ASX Code: VXR Released: 4 July 2016"

Transcription

1 Well Defined IP Drill Targets at Mons Cupri Potential extensions to mineralisation at Mons Cupri and Mons Cupri North West pits and potential new zone of mineralisation identified by IP survey and detailed mapping Highlights Three high priority drill targets identified following detailed analysis of data from recent successful IP survey Targets include potential direct extensions of the known high grade VMS mineralisation at Mons Cupri and a potential repeat of Mons Cupri to the south of the historical Mons Cupri open pits Drilling of these outstanding new targets planned for the current quarter Additional targets identified to the east and north of the Mons Cupri open pits Venturex Resources (ASX: VXR "Venturex" and the "Company") is pleased to advise that it has generated three well defined drill targets with potential to extend known VMS mineralisation at the at the Mons Cupri deposit, part of its 100% owned Whim Creek Copper Zinc Project, located 115km to the southwest of Port Hedland in Western Australia. The high quality targets were generated by the compilation of a new geological model, re evaluation of historical drilling results, detailed geological mapping of the Mons Cupri open pits and surrounding area that identified the main structural and stratigraphic controls of the mineralisation (see ASX Release 17 May 2016) and analysis of the IP survey results which represent potential extensions to or repetitions of the Mons Cupri mineralised system. The identification of these targets, which stems from the back to basics reevaluation of the exploration potential of Whim Creek, is the latest step in the Company's efforts to identify near term production opportunities at Whim Creek that are viable at spot metal prices. A new geological model of the Mons Cupri mineralisation based on a reinterpretation of the metal zonation in the deposit has been developed by Venturex s geological team. The high grade massive zinc mineralisation sitting above a zone of high grade stringer copper gold sulphide mineralisation observed in drilling completed by the Company during is typical of volcanogenic massive sulphide (VMS) style deposits (see Figure 1 and ASX Announcement 30 June 2010). ASX Announcement ASX Code: VXR Released: 4 July 2016 For further details John Nitschke Managing Director T: admin@venturexresources.com Board Tony Kiernan Chairman John Nitschke Managing Director Anthony Reilly Non-Executive Director Darren Stralow Non-Executive Director Trevor Hart Company Secretary Contact Details Registered Office Level 2 91 Havelock Street West Perth WA 6005 T: F: admin@venturexresources.com ABN:

2 Some of the more significant historical intersections include: MCR to 45 m 5m at 4.7% Zn and 1.1% Cu 45 to 65 m 20m at 0.3% Zn and 2.95% Cu MCR to 53 m 5m at 10.8% Zn, 2.7% Cu and 1.2 g/t Au 53 to 63 m 10m at 0.9% Zn, 4.1% Cu and 1 g/t Au MCD to 43 m 10m at 4.1% Zn, 4.6% Cu and 3.6 g/t Au 43 to 58 m 15m at 0.3% Zn, 4.0% Cu and 2.1 g/t Au MCR to 40 m 7m at 7.3% Zn, 1.0% Cu and 0.4 g/t Au 40 to 48 m 8m at 0.4% Zn, 3.6% Cu and 0.3 g/t Au Venturex is targeting extensions of this high grade mineralisation. Recent petrophysical testing conducted by Venturex indicates that the copper stringer zone (see Figure 1) would have a strong geophysical response and would act as a vector toward the high grade massive zinc and high grade stringer copper gold mineralisation sitting above it. The chargeability achieved in the IP survey appears to confirm this. A plan view showing the simplified Mons Cupri geology and the multiple targets that have been generated is shown in Figure 2 and an isometric view of the IP stacked sections demonstrating the continuity of the chargeability anomalies is shown in Figure 3. The Company believes that these anomalies are related to copper stringer style mineralisation. Ranking of the targets has identified three priority drill targets of primary interest: Possible extensions along the inferred strike of the structures controlling high grade massive zinc and associated high grade stringer copper gold sulphide mineralisation in the existing Resources to the west and down plunge of both the Mons Cupri and Mons Cupri North West open pits ( Drill Targets 1 and 2 in Figure 2, IP Profile in Figure 4); and A possible new VMS system 1 km south of the Mons Cupri open pits. This target has a chargeability anomaly over two lines close to the top of the Cistern Formation, where the high grade sulphide mineralisation is observed in drilling around the Mons Cupri open pits (Drill Target 3 in Figure 3, IP Profile in Figure 5). Other targets of interest include a continuous chargeability anomaly stretching east of the Mons Cupri deposit, which is likely to represent an extension of the controlling structure to the Mons Cupri mineralisation and would be prospective for high grade stringer copper mineralisation deep in the feeder structure (IP Profile in Figure 5). This work has continued to reinforce the significant untapped exploration potential for the broader Whim Creek Project, which includes the Mons Cupri, Whim Creek, Evelyn and Salt Creek copper zinclead and precious metal Resources, together with 18,500 hectares of tenements covering the Whim Creek, Salt Creek and Liberty VMS basins. Venturex's Managing Director John Nitschke said: Not only has the systematic exploration work carried out over the past six months identified standout drill targets that have the potential to both extend the high grade massive zinc and associated high grade stringer copper gold sulphides already contained in the Mons Cupri Resource and delineate new areas of mineralisation, we now also have a greatly enhanced understanding of the underlying geological architecture of the broader mineralisation events at Mons Cupri. All of the 70,000 tonnes of copper mined at Whim Creek over the past 100 years has come from copper oxide ores that outcropped on the surface. We now have a clear roadmap that we can use to unlock the sulphide resource potential of this highly prospective area," he added. The gold assays observed in the high grade stringer copper mineralisation in what is the core of the VMS system are of particular interest, Mr Nitschke added. 2

3 We plan to drill these targets during the current quarter with the clear objective of extending the existing Resource base with mineralisation that is economic at spot metal prices." JOHN NITSCHKE Managing Director For further information, please contact: Investors John Nitschke / Trevor Hart Media: Venturex Resources Limited Nicholas Read Read Corporate Ph: +61 (08) Ph: (08) admin@venturexresources.com info@readcorporate.com.au About Venturex Resources Limited Venturex Resources Limited (ASX: VXR) is an exploration and development company with two advanced Copper Zinc Projects near Port Hedland in the Pilbara region of Western Australia. The two projects are the Sulphur Springs Project which includes the Sulphur Springs Project, Kangaroos Caves Resource plus 27km of prospective tenements on the Panorama trend and the Whim Creek Project which includes the Resources at the Whim Creek, Mons Cupri and Salt Creek mines together with the Evelyn project and 18,100 ha of prospective tenements over the Whim Creek basin. Our strategy is to work with our partners Blackrock Metals to expand and extend the existing 4 tonne per day oxide copper heap leach and SXEW operation at Whim Creek, identify other near term production options at Whim Creek, Mons Cupri and Sulphur Springs and fully optimise the Sulphur Springs Project have it shovel ready to take advantage of forecast improvements in base metal prices. Competency Statements The information in this announcement that relates to Exploration Results, Mineral Resources and Ore Reserves is based on information compiled or reviewed by Mr James Guy who is a Member of the Australasian Institute of Mining and Metallurgy. The information contained in this announcement was previously released in announcements Company Resource and Reserve Statement Revised released 8 October The Company confirms that: a. The form and context of the material in this presentation has not been materially modified from the above previous announcements; b. It is not aware of any new information or data that materially affects the information included in the 8 October 2013 announcement and that all material assumptions and technical parameters underpinning the estimate in the 8 October 2013 announcement s continue to apply and have not materially changed; and c. It is uncertain that following further exploration and evaluation that the historical estimates will be able to be reported as mineral resources or ore reserves in accordance with the JORC 2012 Code. The information in this announcement that relates to Geophysical Exploration Results is based on information compiled by Mr Russell Mortimer, who is employed as a Consultant to the Company through geophysical consultancy Southern Geoscience Consultants Pty Ltd. Mr Mortimer is a member of the Australian Institute of Geoscientists and a member of the Australian Society of Exploration Geophysicists and has sufficient experience of relevance to the styles of mineralisation and the types of deposits under consideration, and activities undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Mortimer consents to the inclusion in the report of matters based on information in the form and context in which it appears. 3

4 Figure 1 Cross Section through sulphide resource at Mons Cupri Deposit. (Line of section A A is shown on Figure2) Figure 2 Map showing Mons Cupri Open Pits and IP anomalies 4

5 Section B B Mons Cupri Mine Area Section C C Figure 3 Screen shot of 2D IP inversion stacked sections (looking to the west) Figure 4 Section B B IP Inversion Line 3 (looking East) Figure 5 Section C C IP Inversion Line 6 (looking West) 5

6 Notes relating to the Whim Creek IP Survey Section 1 Sampling Techniques and Data (Criteria in this section apply to all succeeding sections.) Criteria JORC Code explanation Commentary Sampling techniques Drilling techniques 1. Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc.). These examples should not be taken as limiting the broad meaning of sampling. 2. Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used. 3. Aspects of the determination of mineralisation that are Material to the Public Report. 4. In cases where industry standard work has been done this would be relatively simple (e.g. reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay ). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information. 5. Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc.). Ground IP Survey Zonge Research and Engineering Organisation Pty Ltd (Zonge) were contracted to conduct the ground IP survey. Equipment and sampling techniques employed by the survey are listed as follows: Equipment GDD Receiver (16 Channel) 2XGDD Txll slaved high voltage transmitters 10 kva Specifications 100m dipole spacing - receiver transmitter 200m line spacing 2D in-line/collinear configuration 0.125Hz Base frequency Average Current approx. 4-5 amps A number of generations of drilling have been undertaken on the Mons Cupri Deposit since the 1960s. The drilling results detailed in this report were based on drilling undertaken by Venturex Resources between and reported under JORC 2004 reported standard to the Australian Stock Exchange during MCR Series Drilling was undertaken using an industry standard 5.5 inch face sampling hammer MCD Series Drilling was undertaken using NQ2 sized core bit. 6

7 Drill sample recovery 6. Method of recording and assessing core and chip sample recoveries and results assessed. 7. Measures taken to maximise sample recovery and ensure representative nature of the samples. 8. Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material. MCR Series Drilling: RC samples were collected to industry standards of the day. The locations of intervals of damp or wet samples or low recovery were recorded and entered into the database. The cyclone and splitter were routinely inspected and cleaned during the drilling ensuring no excessive material buildup. Care was taken to ensure the split samples were of a consistent volume. There is no detected or material bias or relationships of sample recovery and grade. MCD Series Drilling: All operators recorded diamond drill core recovery as a percentage of measured recovered cores versus drilled distance. Recoveries were generally high except for cavity zones in the oxide zone. Logging 9. Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies. 10. Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc.) photography. 11. The total length and percentage of the relevant intersections logged. MCR Series: RC drill holes were geological logged using a Company standard logging legend. All holes were logged at one metre interval taking a sample from the bulk sample bag. One metre samples were stored in a chip tray for future reference. MCD Series: Diamond drill holes were geologically logged in their entirety and photographed. Diamond drilling was logged for geotechnical purposes. Logging was at an appropriate detailed quantitative standard to support future geological, resource, reserve estimations and technical/economic studies. All holes were logged in full. 7

8 Sub-sampling techniques and sample preparation 12. If core, whether cut or sawn and whether quarter, half or all core taken. 13. If non-core, whether riffled, tube sampled, rotary split, etc. and whether sampled wet or dry. 14. For all sample types, the nature, quality and appropriateness of the sample preparation technique. 15. Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples. 16. Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for field duplicate/second-half sampling. 17. Whether sample sizes are appropriate to the grain size of the material being sampled. MCD Series: Diamond core was sawn with a diamond saw and half core samples taken for assay. MCR Series: 1 metre RC samples were collected and split off the drill rig using a cone splitter. Approximately 90% of the samples were dry in nature. The sampling techniques for collection of the sample to be submitted to the assay facility for both diamond drilling and RC drilling are of consistent quality and appropriate. During drilling and sampling operations Venturex had on site, technically competent supervision and procedures in place to ensure sample preparation integrity and quality. Some field duplicates were taken for RC drilling but not for diamond drilled samples. The sample sizes are considered appropriate given the relatively fine grained nature of the sulphide mineralisation which is not nuggetty in nature, the sampling methodology and the percent assay value ranges involved. Quality of assay data and laboratory tests 18. The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total. 19. For geophysical tools, spectrometers, handheld XRF instruments, etc., the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc. 20. Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have been established. For the majority of both diamond and RC drilling Venturex has used Ultratrace Laboratories Pty Ltd (ALS). ALS has been used for the analysis of one batch of samples. Analytical techniques involve either a three or a four acid digest with a multielement suite. MCR Series: Ultratrace analysed elements Ag, Cu, Cr, Pb, Zn. Ag, Pb by ICPMS. Cu, Zn, Cr by ICPOES. ALS Laboratories Perth - elements analysed Ag, Au, Cu, Pb, Zn. Au by Fire assay with an AAS finish. Ag, Cu, Pb, Zn four acid digestion ICPES. MCD Series: 8

9 ALS Laboratories Perth - elements analysed Au, Pt, Pd, Ag, Pb, Cu, Cr, In, Zn Au, Pt, Pd by fire assay AAS finish. Ag, Pb, In by ICP103, and Cu, Cr, Zn by ICP 104 All methods of analysis are considered to provide total assay values. No geophysical tools were used to determine any element concentrations reported. Field duplicates were submitted by the company. Only laboratory inserted blanks and reference standards were inserted for QA/QC checks. The available results of this QA/QC work indicate no material bias to assay results used by this report. Verification of sampling and assaying 21. The verification of significant intersections by either independent or alternative company personnel. 22. The use of twinned holes. 23. Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols. 24. Discuss any adjustment to assay data. The drill intersections reported in this announcement are based on the the results previously reported in the company s June 2010 and August 2010 announcements to the ASX. A competent person recalculated the results from the database records for this announcement under the auspices of the Competent Person. No specific twinned holes have been drilled. Data recording used a set of standard Excel templates on a data logger and uploaded to note book computer. The data were sent to the Perth office for verification and compilation into an SQL database by the in-house database administrator. Full copies are stored offsite. Full database verification of all historical information has been completed by the company. Location of data points 25. Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation. 26. Specification of the grid system used. 27. Quality and adequacy of topographic control. Ground IP Survey Transmitter and receiver stations were laid out by Whelan s Surveys of Port Hedland using a DGPS. The IP crew took a GPS reading of each site allowing for adjustments as a result of local topography during the survey. 9

10 The collar positions of both the MCR and MCD series drilling were surveyed using a DGPS unit owned by the company with an accuracy of 0.1cm. Downhole surveys were performed on all holes by either single shot Eastman camera or Reflex gyro readings at metre down whole intervals. The grid system used for the location of all drill holes is MGA_GDA94, Zone 50. Topographic control is provided by combination of external survey control, photogrammetry analysis and DGPS reading. Data spacing and distribution 28. Data spacing for reporting of Exploration Results. 29. Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied. 30. Whether sample compositing has been applied. Ground IP Survey The IP survey lines around the Mons Cupri and Northwest pits have been positioned to fit around disturbances caused by mining and are not perpendicular to the assumed strike of the stringer mineralisation. Away from the mine areas the lines are perpendicular to the assumed strike of the stringer mineralisation. The MCR and MCD drilling was planned to infill existing pre 2010 drilling. Due to access for drill sites, drilling patterns vary from nominally 40m by 40m to 30m by 30m in the plane of the mineralisation. The current spacing is adequate to assume geological and grade continuity of the mineralised domain to an Indicated and Inferred resource level. 10

11 Orientation of data in relation to geological structure 31. Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type. 32. If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material. Ground IP Survey The lines around the Mons Cupri and Mons Cupri Northwest pits are not perpendicular to the assumed strike of the deposit and could introduce a bias with respect to the magnitude and position of the anomalies which will have to be taken into account when interpreting the data. The IP technique is not suitable to detect massive sulphide mineralisation and the survey has been planned to detect stringer mineralisation that will act as a pathfinder for massive sulphides. Limitations imposed by the rugged terrain dictate that some drilling is conducted at angles not perpendicular to the dip of the mineralised system. The massive sulphide body above the stringer mineralisation strike approximately NW-SE and dips 25 deg to the SW. The stringer mineralisation strikes approximately EW and dips 85 deg to the north. Depending on the orientation of the drill hole it may intersect one style of mineralisation and not the other which will introduce a bias to the interpretation. Sample security 33. The measures taken to ensure sample security. The IP data is collated electronically in the field, and sent electronically via to Zonge head office for QA/QC and verification before being ed to Southern Geoscience Consulting for processing and interpretation. For the drill samples the chain of custody is managed by Venturex. The samples are transported by Venturex personnel to Whim Creek, stored in a secure facility and collected from site by Toll IPEC and delivered to the assay laboratory in Perth. Online tracking is utilised to track the progress of batches of samples. Audits or reviews 34. The results of any audits or reviews of sampling techniques and data. No independent audits have been undertaken. 11

12 Section 2 Reporting of Exploration Results (Criteria listed in the preceding section also apply to this section.) Criteria JORC Code explanation Commentary Mineral tenement and land tenure status 35. Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings. 36. The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area. The Mons Cupri Deposit is located within M47/238, the registered owner of the tenement is Venturex Pilbara Pty Ltd, a wholly owned subsidiary of Venturex Resources Ltd. The tenement is within land where native title has been determined. The traditional owners of the land are the Ngarluma People. The grant of the tenement predates native title, and is not subject to native title claim; however the company has a mining agreement in place with the Ngarluma People that sets out a relationship between the two parties. There are no royalties over the tenement. The tenement is a granted Mining Lease, is in good standing and no known impediments exist. Exploration done by other parties 37. Acknowledgment and appraisal of exploration by other parties. Previous exploration and mining has been undertaken by a number of parties going back over 90 years. Modern exploration and mining has been undertaken by Texasgulf Australia Pty Ltd, Whim Creek Consolidated Pty Ltd, Dominion Mining Ltd and Straits Resources Ltd. Geology 38. Deposit type, geological setting and style of mineralisation. The Mons Cupri Deposit is located with the Archaean Whim Creek Basin, a sequence of intermediate to felsic volcanic, volcanoclastic and sedimentary units. The deposit is classed as a volcanogenic massive sulphide deposit. Massive sulphide and stringer sulphide mineralisation has been deposited at the top of the Cistern Formation which comprises a thick sequence of volcanogenic conglomerate/breccia with minor sandstone and shale units. The Cistern Formation is overlain by the Rushall Shale Formation. 12

13 Drill hole Information 39. A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes: 40. easting and northing of the drill hole collar 41. elevation or RL (Reduced Level elevation above sea level in metres) of the drill hole collar 42. dip and azimuth of the hole 43. down hole length and interception depth 44. hole length. 45. If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should clearly explain why this is the case. Ground IP Survey The IP anomalies identified in this report have been interpreted on the basis of preliminary processing of field data, after routine QA/QC checks of data quality have been completed. Final processing of the data has been completed. This provides more accurate interpretation of the anomalies including position and depth to top of anomaly. The table below lists the drill holes completed by Venturex Resources between on the Mons Cupri deposit. Hole_ID Hole Type Max Depth MGA_ Grid_ID MGA_East MGA_North MGA_ RL Collar_ Dip Collar Mag_A z Date_ Completed MCD001 DD 86.4 MGA94_ Nov 10 MCD002 DD MGA94_ Nov 10 MCD003 DD MGA94_ Jun 11 MCD004 DD MGA94_ Jun 11 MCD005 DD MGA94_ Jun 11 MCD006 DD MGA94_ Jul 11 MCD007 DD MGA94_ Jul 11 MCD008 DD MGA94_ Dec 11 MCR001 RC 98 MGA94_ /05/2010 MCR002 RC 65 MGA94_ /05/2010 MCR003 RC 100 MGA94_ /05/2010 MCR004 RC 92 MGA94_ /05/2010 MCR005 RC 119 MGA94_ /05/2010 MCR006 RC 113 MGA94_ /05/2010 MCR007 RC 120 MGA94_ /05/2010 MCR008 RC 47 MGA94_ /07/2010 MCR009 RC 65 MGA94_ /07/2010 MCR010 RC 83 MGA94_ /07/2010 MCR011 RC 128 MGA94_ /07/2010 MCR012 RC 131 MGA94_ /07/2010 MCR013 RC 134 MGA94_ /07/2010 MCR014 RC 143 MGA94_ /07/2010 MCR015 RC 98 MGA94_ /07/

14 MCR016 RC 137 MGA94_ /10/2010 MCR017 RC 131 MGA94_ /10/2010 MCR018 RC 212 MGA94_ /10/2010 MCR019 RC 161 MGA94_ /10/2010 MCR020 RC 143 MGA94_ /10/2010 MCR021 RC 174 MGA94_ /10/2010 MCR022 RC 119 MGA94_ /10/2010 MCR023 RC 130 MGA94_ /10/2010 MCR024 RC 106 MGA94_ /10/2010 MCR025 RC 101 MGA94_ /10/2010 MCR026 RC 142 MGA94_ /10/2010 MCR027 RC 128 MGA94_ /03/2011 MCR028 RC 90 MGA94_ /03/2011 MCR029 RC 105 MGA94_ /03/2011 MCR030 RC 87 MGA94_ /03/2011 MCR031 RC 132 MGA94_ /03/2011 MCR032 RC 150 MGA94_ /03/2011 MCR033 RC 105 MGA94_ /03/2011 MCR034 RC 149 MGA94_ /03/2011 MCR035 RC 41 MGA94_ /03/2011 MCR036 RC 131 MGA94_ /03/2011 MCR037 RC 147 MGA94_ /03/2011 Data aggregation methods 46. In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (e.g. cutting of high grades) and cut-off grades are usually Material and should be stated. 47. Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of low grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail. 48. The assumptions used for any reporting of metal equivalent values should be clearly stated. Ground IP Surveying Anomalies reported in this announcement have been determined on processed field data. ASX Release 17/8/2010, Drilling Success Paves Way for Enhanced JORC Resource at Pilbara VMS Project. ASX Release 30/06/2010, Outstanding Copper Gold Intersections at Whim Creek. 14

15 Relationship between mineralisation widths and intercept lengths Diagrams Balanced reporting Other substantive exploration data 49. These relationships are particularly important in the reporting of Exploration Results. 50. If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported. 51. If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (e.g. down hole length, true width not known ). 52. Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views. 53. Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results. 54. Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating substances. All reported assays have been length weighted. No top cut has been applied. For reporting exploration drill results in this announcement a 1% Copper or 2% lower cut off for Zinc was used and up to 2 metres of internal dilution,. No metal equivalent vales are reported. Previous reports highlight down hole intercept and widths. See plan and cross section attached to the report All representative results have been reported or publically released. The Mons Cupri Deposit has had a significant body of work completed on it, including geophysical studies, metallurgical test work, geotechnical and ground water studies. The current IP survey was planned after recently completing petrophysical test work on drill core indicating that modern IP techniques would be successful in delineating stringer mineralisation. The last IP survey over the deposit was completed in 1968 and was only capable of reading to approximately 40 m depth. The current survey appears to read to a depth of m. Further work 55. The nature and scale of planned further work (e.g. tests for lateral extensions or depth extensions or large-scale step-out drilling). 56. Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive The IP results reported are from the completed program and the resultant data has been fully processed and pseudo 3D modelling undertaken. This work hasl refined the location and depth of the preliminary anomalies allowing for more precise interpretation and drill targeting. 15

BOADICEA RESOURCES. Additional Conductors Identified at Symons Hill in the Fraser Range from VTEM max Survey.

BOADICEA RESOURCES. Additional Conductors Identified at Symons Hill in the Fraser Range from VTEM max Survey. ASX Announcement- 17th June 2014 ASX Code: BOA BOADICEA RESOURCES Additional Conductors Identified at Symons Hill in the Fraser Range from VTEM max Survey. Highlights The final interpretation of the 2013

More information

ASX Announcement (ASX: HMX)

ASX Announcement (ASX: HMX) ASX Announcement (ASX: HMX) 18 th March 2015 Drilling at Hammertime and Overlander to commence 3D-IP enhances gravity and magnetic target at Overlander North IOCG Hammer Metals Limited (ASX: HMX) ( Hammer

More information

ST GEORGE ACQUIRES NICKEL SULPHIDE PROJECTS

ST GEORGE ACQUIRES NICKEL SULPHIDE PROJECTS ASX / MEDIA RELEASE 18 September 2015 HIGHLIGHTS: ST GEORGE ACQUIRES NICKEL SULPHIDE PROJECTS St George acquires 100% of the Hawaii and Mt Alexander North nickel sulphide exploration projects from BHP

More information

FINAL FURTHER HIGH GRADE COPPER RESULTS IN SURFACE FLOAT SAMPLES AT NAKRU

FINAL FURTHER HIGH GRADE COPPER RESULTS IN SURFACE FLOAT SAMPLES AT NAKRU 5 June 2015 ASX Code: COY FINAL FURTHER HIGH GRADE COPPER RESULTS IN SURFACE FLOAT SAMPLES AT NAKRU Mineral explorer Coppermoly Limited (Coppermoly and the Company) is pleased to announce final assay results

More information

Exploration Update - Corunna

Exploration Update - Corunna ASX RELEASE 27 th August 2015 ASX: MGV Exploration Update - Corunna Anomalous lead, zinc and silver identified in aircore drilling at the Corunna project in South Australia Anomalous silver-lead-zinc zone

More information

ASX ANNOUNCEMENT Date: 3 February 2016 Number: 449/030216

ASX ANNOUNCEMENT Date: 3 February 2016 Number: 449/030216 ASX ANNOUNCEMENT Date: 3 February 2016 Number: 449/030216 VERY HIGH GRADE PGM-COPPER-NICKEL IN MASSIVE NICKEL COPPER SULPHIDE AT PLATINUM SPRINGS, N.S.W. 0.6 metres at 11.5 g/t platinum, 25.6 g/t palladium,

More information

MINERAL RESOURCES LIMITED MT MARION EXPLORATION 18 May 2016

MINERAL RESOURCES LIMITED MT MARION EXPLORATION 18 May 2016 MINERAL RESOURCES LIMITED MT MARION EXPLORATION 18 May 2016 DEEP DRILLING AT MT MARION INSECTS SIGNIFICANT BROAD ZONE OF PEGMATITE Neometals Ltd (ASX: NMT) ( Neometals ), Mineral Resources Limited (ASX:

More information

DRILLING COMMENCES AT REMBRANDT GOLD PROJECT

DRILLING COMMENCES AT REMBRANDT GOLD PROJECT ASX Release 8 th October 2015 DRILLING COMMENCES AT REMBRANDT GOLD PROJECT HIGHLIGHTS Terrain has commenced drilling at the Rembrandt Gold Project and is targeting high grade near surface gold at the Monet

More information

Expansion drilling at Mt Marion Lithium Project yields positive results

Expansion drilling at Mt Marion Lithium Project yields positive results 29 January 2016 Level 1, 672 Murray Street West Perth WA 6005 Locked Bag 8 West Perth WA 6872 t. +61 8 9322 1182 f. +61 8 9321 0556 info@neometals.com.au neometals.com.au Neometals Ltd ABN 89 099 116 631

More information

Significant Nickel Sulphides at Killaloe JV Project

Significant Nickel Sulphides at Killaloe JV Project Decem000000000000000000000000000000000000000 000ber 2012 LIMITED ABN 48 106 732 487 ASX Announcement 16 June 2014 Significant Nickel s at Killaloe JV Project Highlights 14.65m of komatiite hosted nickel

More information

New Lithium Project includes largest tin tantalum mine in NT HIGHLIGHTS. Core has extended its lithium focus in the prospective Bynoe pegmatite field

New Lithium Project includes largest tin tantalum mine in NT HIGHLIGHTS. Core has extended its lithium focus in the prospective Bynoe pegmatite field ASX ANNOUNCEMENT ASX : CXO 8 th February 2016 New Lithium Project includes largest tin tantalum mine in NT HIGHLIGHTS Core has extended its lithium focus in the prospective Bynoe pegmatite field NT into

More information

New Cascade drill results and Ulanzi drill update

New Cascade drill results and Ulanzi drill update New Cascade drill results and Ulanzi drill update 1 October 2015 Highlights Assays from the next two Cascade drill holes continue returning excellent intervals: o 98m@ 8.92% TGC including 40m@ 10.18% from

More information

NORTH PORTIA RESOURCE SUPPORTED BY NEW DRILLING RESULTS

NORTH PORTIA RESOURCE SUPPORTED BY NEW DRILLING RESULTS Havilah Resources Limited plans to sequentially develop its portfolio of gold, copper, iron, cobalt, tin and other mineral resources in South Australia. Our vision is to become a new mining force, delivering

More information

MORE STRONG NICKEL HITS FOR MINCOR AS KAMBALDA DISCOVERIES GROW

MORE STRONG NICKEL HITS FOR MINCOR AS KAMBALDA DISCOVERIES GROW MEDIA RELEASE Thursday, 11 December 2014 MORE STRONG NICKEL HITS FOR MINCOR AS KAMBALDA DISCOVERIES GROW High-grade intersections at Cassini and Burnett Drilling ramps up Strong new intersections returned

More information

Attractive gold assays from Chameleon Deposit, Kalgoorlie

Attractive gold assays from Chameleon Deposit, Kalgoorlie MINOTAUR EXPLORATION LIMITED ACN 108 483 601 ASX: MEP 4 July 2016 MINOTAUR EXPLORATION ASX Release Attractive gold assays from Chameleon Deposit, Kalgoorlie Highlights Positive results returned from infill

More information

IP survey expands gold prospectivity at Dixon, Doolgunna Marymia Project

IP survey expands gold prospectivity at Dixon, Doolgunna Marymia Project 27 January 2016 IP survey expands gold prospectivity at Dixon, Doolgunna Marymia Project 200 metre long chargeability zone detected at the Dixon gold prospect o Sulphidic quartz veining the likely source

More information

DEEP DIAMOND DRILLING TO COMMENCE AT DOOLGUNNA

DEEP DIAMOND DRILLING TO COMMENCE AT DOOLGUNNA ASX Announcement28 June 2016 DEEP DIAMOND DRILLING TO COMMENCE AT DOOLGUNNA Key Points Reverse circulation (RC) drilling at the Cuba prospect at Doolgunna identifies significant intersections of key pathfinder

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 6 May 2013 SIRIUS RESOURCES NL ASX: SIR ABN: 46 009 150 083 Street address: LA NICKE BOLLINGER UPDATE Sirius Resources NL (ASX:SIR) ( Sirius or the Company ) advises that ongoing drilling

More information

Further Basement Gold Results Confirm Yamarna Gold Potential

Further Basement Gold Results Confirm Yamarna Gold Potential ABOUT MONTEZUMA MINING Listed in 2006, Montezuma Mining Company Ltd (ASX: MZM) is a diversified explorer primarily focused on manganese, copper and gold. The Company s primary objective is to achieve returns

More information

OUTSTANDING NEW RESULTS AT WESTRALIA UNDERGROUND CONFIRM POTENTIAL FOR MINE DEVELOPMENT

OUTSTANDING NEW RESULTS AT WESTRALIA UNDERGROUND CONFIRM POTENTIAL FOR MINE DEVELOPMENT 28 JUNE 2016 OUTSTANDING NEW RESULTS AT WESTRALIA UNDERGROUND CONFIRM POTENTIAL FOR MINE DEVELOPMENT High grade mineralisation identified only 60m below Westralia open pit floor KEY POINTS Numerous high-grade

More information

PORPHYRY INTERSECTED AT CASCADA

PORPHYRY INTERSECTED AT CASCADA ASX: AZS 15 JANUARY 2014 PORPHYRY INTERSECTED AT CASCADA HIGHLIGHTS Hole APR-DD-109 intersects 240m of alteration, veining and copper sulphide mineralisation consistent with the margin of a porphyry copper

More information

For personal use only

For personal use only L4 66 Kings Park Road West Perth WA 6005 P: +61 8 6141 3585 F: +61 8 6141 3599 E: info@drakeresources.com.au ASX Announcement 8 th August 2014 Nordgruva Drilling Final Assays Drake / Panoramic JV Final

More information

RC drilling results reveal controls of mineralisation at Dixon ahead of Government co-funded diamond drilling

RC drilling results reveal controls of mineralisation at Dixon ahead of Government co-funded diamond drilling 28 June 2016 RC drilling results reveal controls of mineralisation at Dixon ahead of Government co-funded diamond drilling Drill program confirms lithological control of primary gold mineralisation at

More information

DRILLING INTERSECTS WIDE ZONES OF GOLD MINERALISATION AT DUSK TIL DAWN

DRILLING INTERSECTS WIDE ZONES OF GOLD MINERALISATION AT DUSK TIL DAWN ASX Announcement 21 st October 2015 DRILLING INTERSECTS WIDE ZONES OF GOLD MINERALISATION AT DUSK TIL DAWN Intersections of significant thick zones of gold mineralisation confirm a new greenfields gold

More information

Highlights from Target H HDD_005 include: 38.5 metres at 1.58% copper from 8.5 metres including;

Highlights from Target H HDD_005 include: 38.5 metres at 1.58% copper from 8.5 metres including; SYDNEY, 8 February 2016: Intrepid Mines Limited (ASX: IAU ) ( Intrepid or the Company ) is pleased to provide the final results from the 2015 phase 9 drilling program at the Mumbwa Project in west-central

More information

For personal use only

For personal use only Investigator Resources Limited Date: 7 th February 2012 up to 2.25% Ag at the new Paris prospect in South Australia First assays received for new drilling on Paris Line 7 with all three holes assayed returning

More information

For personal use only

For personal use only ORA BANDA SOUTH GOLD PROJECT KALGOORLIE GOLDFIELDS WESTERN AUSTRALIA ASX RELEASE 17 FEBRUARY 2016 HIGHLIGHTS Aircore drilling program confirms the presence of primary bedrock gold mineralisation in the

More information

Cannon Mine on Track

Cannon Mine on Track ASX Release Thursday 1 October 2015 Cannon Mine on Track Pit development running to schedule Good progress on big pit negotiations with Metals X Stage 1 Open Pit Now At the 347.5m Bench ASX Code: SAU Issued

More information

For personal use only

For personal use only 22 October 2015 GEOPACIFIC RESOURCES LIMITED ACN 003 208 393 ASX Code: GPR info@geopacific.com.au www.geopacific.com.au AUSTRALIAN OFFICE Level 1, 278 Stirling Highway Claremont, WA 6010. PO Box 439, Claremont,

More information

West African hits 19m at 1.8g/t Au from 9m extending shallow oxide gold at M3 Eastern Zone

West African hits 19m at 1.8g/t Au from 9m extending shallow oxide gold at M3 Eastern Zone Press Release 13th January 2016 West African hits 19m at 1.8g/t Au from 9m extending shallow oxide gold at M3 Eastern Zone Gold developer West African Resources Limited (ASX, TSXV: WAF) is pleased to report

More information

MULTIPLE NEW GOLD ZONES DISCOVERED IN REGIONAL EXPLORATION DRILLING AT DALGARANGA

MULTIPLE NEW GOLD ZONES DISCOVERED IN REGIONAL EXPLORATION DRILLING AT DALGARANGA February 8 th, 2016 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 MULTIPLE NEW GOLD ZONES DISCOVERED IN REGIONAL EXPLORATION DRILLING AT DALGARANGA Significant new gold

More information

Exploration Update Cue Project

Exploration Update Cue Project ASX RELEASE 24 June 2016 ASX: MGV Exploration Update Cue Project Sulphide mineralisation intersected at Mt Eelya and Hollandaire West DHEM surveys have identified off hole basement conductors at Mt Eelya,

More information

Assays Confirm Extensive Zinc Gossan at Millennium

Assays Confirm Extensive Zinc Gossan at Millennium Level 7, 600 Murray Street West Perth WA 6005 PO Box 273 West Perth WA 6872 P 08 9486 9455 F 08 6210 1578 www.enrl.com.au 9 July 2015 ASX : ENR Company Announcements Office Australian Securities Exchange

More information

HIGH GRADE TUNGSTEN-TIN LODES IDENTIFIED AT REDMOOR

HIGH GRADE TUNGSTEN-TIN LODES IDENTIFIED AT REDMOOR HIGH GRADE TUNGSTEN-TIN LODES IDENTIFIED AT REDMOOR ASX Release 26 November 2015 This is a re-release of the 25 November 2015 announcement with a revised Competent Persons Statement on The last page. All

More information

Heron Resources Limited ASX/TSX Release. Woodlawn Phase II drilling program completed High grade intersections continue

Heron Resources Limited ASX/TSX Release. Woodlawn Phase II drilling program completed High grade intersections continue 25 November 2015 Level 1, 37 Ord Street, West Perth WA 6005 heron@heronresources.com.au +61 8 6500 9200 ABN: 30 068 263 098 Woodlawn Phase II drilling program completed High grade intersections continue

More information

SUBSTANTIAL GRAPHITIC MINERALISATION CONFIRMED AT ANCUABE

SUBSTANTIAL GRAPHITIC MINERALISATION CONFIRMED AT ANCUABE ASX ANNOUNCEMENT 18 September 2015 resource. Triton Minerals Ltd ASX: TON ABN: 99 126 042 215 SUBSTANTIAL GRAPHITIC MINERALISATION CONFIRMED AT ANCUABE HIGHLIGHTS Street address: Ground Floor Unit 1 256

More information

Tsunsten and Tin Imprints in South East Asia

Tsunsten and Tin Imprints in South East Asia ASX/ Media Announcement 13 October 2014 Vital Metals Limited ASX Code: VML ACN: 112 032 596 VITAL METALS DELIVERS NEW TUNGSTEN PROSPECT BUILDS EXPLORATION PIPELINE TO SUPPORT DEVELOPMENT OF WATERSHED PROJECT

More information

HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE

HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE 22 August 2013 ASX: AOH, FSE: A2O HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE Upper part of Wombat zone returns excellent drilling intersections: - 29.0m at 4.7% copper - 37.6m at 3.2% copper

More information

POTENTIAL NEW SYENITE CORRIDORS IDENTIFIED FOLLOWING DETAILED MAGNETIC SURVEY AT JUPITER

POTENTIAL NEW SYENITE CORRIDORS IDENTIFIED FOLLOWING DETAILED MAGNETIC SURVEY AT JUPITER 4 NOVEMBER 2015 POTENTIAL NEW SYENITE CORRIDORS IDENTIFIED FOLLOWING DETAILED MAGNETIC SURVEY AT JUPITER Dacian Gold Ltd ( Dacian or the Company ) (ASX:DCN) is pleased to announce an update on the exploration

More information

NEW SILVER ZONE FOUND NORTH OF MESA DE PLATA

NEW SILVER ZONE FOUND NORTH OF MESA DE PLATA ASX: AZS 10 FEBRUARY 2016 NEW SILVER ZONE FOUND NORTH OF MESA DE PLATA HIGHLIGHTS A new zone of high grade silver mineralisation over an area of 350m x 150m has been identified north of Mesa de Plata The

More information

West African hits 19m at 1.9g/t Au from 40m, including 3m at 5.7 g/t Au at M1 from shallow RC drilling

West African hits 19m at 1.9g/t Au from 40m, including 3m at 5.7 g/t Au at M1 from shallow RC drilling Press Release 2nd February 2016 West African hits 19m at 1.9g/t Au from 40m, including 3m at 5.7 g/t Au at M1 from shallow RC drilling Gold developer West African Resources Limited (ASX, TSXV: WAF) is

More information

ST GEORGE COMMENCES MAJOR NICKEL SULPHIDE DRILLING CAMPAIGN. High impact drilling campaign has commenced at the East Laverton Project

ST GEORGE COMMENCES MAJOR NICKEL SULPHIDE DRILLING CAMPAIGN. High impact drilling campaign has commenced at the East Laverton Project ASX / MEDIA RELEASE 6 October 2015 ST GEORGE COMMENCES MAJOR NICKEL SULPHIDE DRILLING CAMPAIGN HIGHLIGHTS: High impact drilling campaign has commenced at the East Laverton Project Testing priority nickel

More information

NEW DRILLING RESULTS FROM THE CLONCURRY PROJECT

NEW DRILLING RESULTS FROM THE CLONCURRY PROJECT 8 October 2015 ASX: AOH, FSE: A2O NEW DRILLING RESULTS FROM THE CLONCURRY PROJECT Excellent results from previously un-assayed drill core. Best intersection of 29.1 metres at 1.41% copper, 0.11g/t gold.

More information

HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT

HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT July 7 th, 2015 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT RC Drilling has returned shallow high grades at the Gaffney

More information

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District ASX Release 12 October 2012 Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District Total mineral resource at Duck Creek Project area of 960,000t @ 1.47% Cu (0.2%

More information

NICKEL COPPER SULPHIDE DISCOVERY CONFIRMED AT STRICKLANDS PROSPECT

NICKEL COPPER SULPHIDE DISCOVERY CONFIRMED AT STRICKLANDS PROSPECT ASX / MEDIA RELEASE 29 June 2016 NICKEL COPPER SULPHIDE DISCOVERY CONFIRMED AT STRICKLANDS PROSPECT HIGHLIGHTS: Assays for the first ever drilling at the Stricklands Prospect confirm nickel copper sulphide

More information

VERY FAVOURABLE CYANIDE LEACH RESULTS FROM NAMDINI

VERY FAVOURABLE CYANIDE LEACH RESULTS FROM NAMDINI ASX ANNOUNCEMENT AND MEDIA RELEASE 07 July 2015 VERY FAVOURABLE CYANIDE LEACH RESULTS FROM NAMDINI HIGHLIGHTS Cyanide leaching of oxide samples recovered: 99% gold from high grade oxide samples 91% gold

More information

West African hits 25m at 2.5g/t Au including 17m at 3.35g/t Au ending in mineralisation

West African hits 25m at 2.5g/t Au including 17m at 3.35g/t Au ending in mineralisation Press Release 10 th November 2015 West African hits 25m at 2.5g/t Au including 17m at 3.35g/t Au ending in mineralisation Gold developer West African Resources Limited (ASX, TSXV: WAF) is pleased to report

More information

Porphyry Copper Potential Confirmed By Field Reconnaissance in Peru

Porphyry Copper Potential Confirmed By Field Reconnaissance in Peru 4 December 2013 Porphyry Copper Potential Confirmed By Field Reconnaissance in Peru Highlights Experienced Consultant Geologist with South American Copper-Gold experience engaged Field reconnaissance by

More information

DIAMOND DRILLING UNDERWAY AT MESA DE PLATA

DIAMOND DRILLING UNDERWAY AT MESA DE PLATA ASX: AZS 6 October 2015 DIAMOND DRILLING UNDERWAY AT MESA DE PLATA Key Points: Mesa De Plata: Diamond drilling underway to test high-grade silver discovery La Morita: Assay results identify wide zones

More information

December 2015 Quarterly Activities Report

December 2015 Quarterly Activities Report December 2015 Quarterly Activities Report Musgrave Minerals Ltd is an Australian focused gold and base metal exploration company. Musgrave plans to grow through the discovery and development of gold and

More information

JACQUES GOLD PROSPECT RETURNS 37.7g/t. Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37.

JACQUES GOLD PROSPECT RETURNS 37.7g/t. Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37. ASX Announcement 15 January 2013 JACQUES GOLD PROSPECT RETURNS 37.7g/t Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37.7g/t Second phase drilling program

More information

For personal use only

For personal use only January, 202 Silver Swan Group Limited December 20 Quarterly Activities Report HIGHLIGHTS STAKEWELL Gold Project: Drilling intersected high and low grade gold mineralisation at Kohinoor, including surface

More information

For personal use only

For personal use only Decem000000000000000000000000000000000000000 000ber 2012 LIMITED ABN 48 106 732 487 ASX Announcement 8 th April 2015 HIGHLIGHTS Siam Copper Project (Thailand) Exploration Tenements Granted In a historic

More information

Akjoujt South Project: Drilling Update and Ground Magnetic Anomalies Identified

Akjoujt South Project: Drilling Update and Ground Magnetic Anomalies Identified ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE Akjoujt South Project: Drilling Update and Ground Magnetic Anomalies Identified The Board of OreCorp Limited (OreCorp or the Company) is pleased to provide

More information

DALGARANGA MINERAL RESOURCE GROWS TO OVER ONE MILLION OUNCES

DALGARANGA MINERAL RESOURCE GROWS TO OVER ONE MILLION OUNCES November 4th, 2015 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA MINERAL RESOURCE GROWS TO OVER ONE MILLION OUNCES Total Dalgaranga Mineral Resource increased

More information

HIGH IMPACT EXPLORATION CONTINUES AT EAST LAVERTON

HIGH IMPACT EXPLORATION CONTINUES AT EAST LAVERTON ASX / MEDIA RELEASE 23 November 2015 HIGHLIGHTS: HIGH IMPACT EXPLORATION CONTINUES AT EAST LAVERTON Two new bedrock conductors identified by downhole electromagnetic (DHEM) surveys at Windsor Drilling

More information

MASSIVE NICKEL SULPHIDE TARGET AT WINDSOR

MASSIVE NICKEL SULPHIDE TARGET AT WINDSOR ASX / MEDIA RELEASE 18 December 2015 HIGHLIGHTS: MASSIVE NICKEL SULPHIDE TARGET AT WINDSOR Drill hole WINDD004 targeting the very strong electromagnetic (EM) plate WINRC016_v1 (210,469 Siemens) has been

More information

ALCYONE REPORTS JORC SILVER RESOURCES

ALCYONE REPORTS JORC SILVER RESOURCES ASX ANNOUNCEMENT & MEDIA RELEASE 29 March 2010 ALCYONE REPORTS JORC SILVER RESOURCES +15Moz RESOURCE INVENTORY UNDERPINS PROGRAM TARGETING RESUMPTION OF SILVER PRODUCTION AT TEXAS PROJECT LATER THIS YEAR

More information

DRILLING COMMENCES AT STRONG WINDSOR DHEM TARGET

DRILLING COMMENCES AT STRONG WINDSOR DHEM TARGET ASX / MEDIA RELEASE 14 December 2015 HIGHLIGHTS: DRILLING COMMENCES AT STRONG WINDSOR DHEM TARGET Diamond drilling of electromagnetic (EM) plate WINRC016_v1 (210,469 Siemens) has commenced New off hole

More information

MESA DE PLATA RESOURCE DRILLING UPDATE

MESA DE PLATA RESOURCE DRILLING UPDATE ASX: AZS 23 December 2015 MESA DE PLATA RESOURCE DRILLING UPDATE HIGHLIGHTS Reverse Circulation (RC) resource drill-out nearing completion with 47 of 55 planned holes completed, and assays received for

More information

COPPER DISCOVERY GROWS AT TURKEY CREEK

COPPER DISCOVERY GROWS AT TURKEY CREEK 28 October 2014 ASX: AOH, FSE: A2O COPPER DISCOVERY GROWS AT TURKEY CREEK HIGHLIGHTS RC drilling highlights prospectivity of Cloncurry Copper Project Infill and Extension RC drilling about to recommence

More information

December 2014 QUARTERLY ACTIVITIES REPORT

December 2014 QUARTERLY ACTIVITIES REPORT December 2014 QUARTERLY ACTIVITIES REPORT 20 Howard Street Perth WA 6000 PO Box Z5207 St Georges Terrace WA 6831 Tel: +61 (0)43 8885 055 Email: info@orrexresources.com ASX: ORX ACN: 107 371 497 www.orrexresources.com

More information

QUARTERLY REPORT Ending December 31, 2014

QUARTERLY REPORT Ending December 31, 2014 QUARTERLY REPORT Ending December 31, 2014 Key Highlights Ready for development at Nicolsons Mine, Halls Creek The December 2014 quarter was a defining period for the Halls Creek project and the company.

More information

KYLYLAHTI RESOURCE INCREASED

KYLYLAHTI RESOURCE INCREASED 26 March 2014 ASX: AOH, FSE: A2O KYLYLAHTI RESOURCE INCREASED Copper in Resources exceeds pre-mining estimates 2 years after first production commenced Contained copper up 17% from June 2013 after mine

More information

Positioned for Production: Exploring for Growth

Positioned for Production: Exploring for Growth ASX Code: AYN Positioned for Production: Exploring for Growth Andrew King, Managing Director May 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors

More information

LIVE-FEED PLANNED FIRST QUARTER 2016

LIVE-FEED PLANNED FIRST QUARTER 2016 ACN. 000 317 251 MARKET RELEASE 3 rd February 2016 ROCKLANDS COPPER PROJECT (CDU 100%) ROCKLANDS 90% COMPLETE LIVE-FEED PLANNED FIRST QUARTER 2016 Cloncurry mining Company CuDeco Limited (ACN 000 317 251)

More information

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES Suite 250, 1075 West Georgia Street Vancouver, BC, Canada V6E 3C9 Tel: 1.778.373.0102 Fax: 1.604.434.1487 NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

More information

Figure 2: Shearers and Otways deposits showing historical intercepts and high priority targets

Figure 2: Shearers and Otways deposits showing historical intercepts and high priority targets 23 rd November 2015 High-grade results demonstrate strong potential to grow Mineral Resources and mine life at Nullagine Gold Project Assays of up to 20 g/t received from first of three near-mine targets

More information

ULYSSES MINERAL RESOURCE UPGRADE

ULYSSES MINERAL RESOURCE UPGRADE ASX Announcement 1 February 2016 ULYSSES MINERAL RESOURCE UPGRADE Ulysses total Mineral Resource increases by 10% to: 2.13 Mt @ 2.2 g/t gold for 151,500 ounces of gold Over 80% of the Mineral Resource

More information

Chapter 5. Rules and Policies

Chapter 5. Rules and Policies Chapter 5 Rules and Policies 5.1.1 NI 43-101 Standards of Disclosure for Mineral Projects, Form 43-101F1 Technical Report and Related Consequential Amendments NATIONAL INSTRUMENT 43-101 STANDARDS OF DISCLOSURE

More information

Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000

Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000 6 November 2006 Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000 TROPICANA JV (IGO 30%) PROJECT UPDATE KEY POINTS: New significant drill

More information

ASX RELEASE. Mineral Resource Estimate increases 160% to 60.5Mt

ASX RELEASE. Mineral Resource Estimate increases 160% to 60.5Mt 5 July 2016 ASX RELEASE Mineral Resource Estimate increases 160% to 60.5Mt Mineral Resources Limited (ASX: MIN) ( MRL ), Neometals Ltd (ASX: NMT) ( Neometals ) and Ganfeng Lithium Co., Ltd (SZSE: 002460)

More information

SILVERCORP INTERCEPTS HIGH GRADE SILVER LEAD ZINC MINERALIZATION AT THE TLP MINE, YING MINING DISTRICT, HENAN PROVINCE, CHINA

SILVERCORP INTERCEPTS HIGH GRADE SILVER LEAD ZINC MINERALIZATION AT THE TLP MINE, YING MINING DISTRICT, HENAN PROVINCE, CHINA NEWS RELEASE Trading Symbol: TSX: SVM NYSE: SVM SILVERCORP INTERCEPTS HIGH GRADE SILVER LEAD ZINC MINERALIZATION AT THE TLP MINE, YING MINING DISTRICT, HENAN PROVINCE, CHINA VANCOUVER, BRITISH COLUMBIA,

More information

For personal use only. MRV Metals Launch February 2016

For personal use only. MRV Metals Launch February 2016 MRV Metals Launch February 2016 Important Information This document has been prepared by Moreton Resources Limited ( Moreton or Company ) for the purpose of providing a company and technical overview to

More information

How To Sell A Mine In Australia

How To Sell A Mine In Australia ASX ANNOUNCEMENT 13 November 2015 Triton Minerals Ltd ASX: TON ABN: 99 126 042 215 Street address: Ground Floor, Unit 1 256 Stirling Highway Claremont Western Australia 6010 Postal address: PO Box 1518

More information

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value De Grey Mining Ltd ASX RELEASE 5 July 2016 ASX Code DEG ABN 65 094 206 292 Wingina Deeps Drilling Commenced (Turner River Project) Highlights Diamond drilling programme of approximately 1,500m has COMPANY

More information

For personal use only

For personal use only 20 November 2014 01 Exceptional High Grade Intercepts from Bibiani Gold Project Highlights Significant high grade gold mineralisation intersected in surface and underground diamond drill program including;

More information

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015 ASX RELEASE ASX:AWV 30 October 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015 HIGHLIGHTS Pit optimisation and final mine design completed Metallurgical test work completed Engineering

More information

CINOVEC LITHIUM PROJECT DRILLING UPDATE

CINOVEC LITHIUM PROJECT DRILLING UPDATE European Metals Holdings Limited ARBN 154 618 989 Suite 12, Level 1 11 Ventnor Avenue West Perth WA 6005 PO Box 52 West Perth WA 6872 Phone + 61 8 6141 3500 Fax + 61 6141 3599 Website: www.europeanmet.com

More information

Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia

Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia ASX Announcement Quarterly Activities Report For the Quarter Ended 31 December 2015 29 January 2016 Genesis Minerals Limited ASX Code: GMD Issued Capital 446 million shares 27.2 million options Current

More information

SILVERCORP REPORTS RESULTS FROM ITS 2012 EXPLORATION PROGRAM AT THE SGX MINE, YING MINING DISTRICT, CHINA

SILVERCORP REPORTS RESULTS FROM ITS 2012 EXPLORATION PROGRAM AT THE SGX MINE, YING MINING DISTRICT, CHINA NEWS RELEASE Trading Symbol: TSX: SVM NYSE: SVM SILVERCORP REPORTS RESULTS FROM ITS 2012 EXPLORATION PROGRAM AT THE SGX MINE, YING MINING DISTRICT, CHINA VANCOUVER, British Columbia June 4, 2013 Silvercorp

More information

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016 Mining Indaba Presentation Capetown, South Africa 8 th 10 th February 2016 www.birimiangold.com 1 Disclaimer This presentation has been prepared by Birimian Gold Limited (BGS) for general information purposes

More information

How To Make Money From Mining

How To Make Money From Mining Quarterly Report For the three months ending March 2014 Vital Metals Limited ASX Code: VML ACN: 112 032 596 64 Churchill Avenue, Subiaco, WA 6008 Tel: +61 8 9388 7742 Fax: +61 8 9388 0804 Email: au vital@vitalmetals.com.

More information

Discovery at Manwe. Infill and Extension Drilling Commenced. Duri Aircore Programme Completed Results Awaited

Discovery at Manwe. Infill and Extension Drilling Commenced. Duri Aircore Programme Completed Results Awaited Discovery at Manwe ASX & Media Release ASX Code AZM 19th January 2016 First Pass RC Drilling Returns 14m @ 4.92g/t Au from 48m incl 6m at 6.30g/t Au from 54m and 32m @ 2.10g/t Au from surface incl 6m @

More information

Significant High Grade Nickel Intersection at Emily Ann North

Significant High Grade Nickel Intersection at Emily Ann North 25 th January 2016 Highlights Significant High Grade Nickel Intersection at Emily Ann North Significant nickel sulphide mineralisation has been intersected in the second drill hole of the Emily Ann Extension

More information

Laboratory results confirm high-grade graphite intersected at Balama Central Project

Laboratory results confirm high-grade graphite intersected at Balama Central Project ASX Announcement Metals of Africa Ltd 27 January 2016 Contact Details Cherie Leeden Managing Director Metals of Africa Limited E: cherie@metalsofafrica.com.au James Moses Media and Investor Relations Mandate

More information

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2015

ACTIVITIES REPORT FOR THE QUARTER ENDED 31 DECEMBER 2015 Second Floor, 9 Havelock Street West Perth WA 6005 Postal Address: PO Box 689, West Perth WA 6872 ABN 60 060 628 524 Telephone: (618) 9481 8444 Facsimile: (618) 9481 8445 Email: info@hamptonhill.com.au

More information

QUARTERLY ACTIVITIES REPORT & APPENDIX 5B, 3 MONTHS TO SEPTEMBER 2011

QUARTERLY ACTIVITIES REPORT & APPENDIX 5B, 3 MONTHS TO SEPTEMBER 2011 Level 6 122 Walker St North Sydney NSW 2060, Australia T +61 (0)2 9460 1856 F +61 (0)2 9460 1857 31 October 2011 ASX ANNOUNCEMENT QUARTERLY ACTIVITIES REPORT & APPENDIX 5B, 3 MONTHS TO SEPTEMBER 2011 HIGHLIGHTS

More information

SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA

SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA NEWS RELEASE Trading Symbol: TSX: SVM NYSE: SVM SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA VANCOUVER, British

More information

AIM: KEFI 6 March 2014. KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE

AIM: KEFI 6 March 2014. KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE KEFI Minerals Plc Doğu Akdeniz Mineralleri San. Tic. Ltd. Şti. Cemal Gürsel Cad. Yalı Apt. No:304 K:4 D:9 Karşıyaka İZMİR Tel: +90 232 381 9431 Fax: +90 232 381 9071 Email: info@kefi-minerals.com AIM:

More information

Strategic Minerals Corporation NL, 100% Woolgar Gold Project, Queensland Final results from 2014 phase 2 drill program

Strategic Minerals Corporation NL, 100% Woolgar Gold Project, Queensland Final results from 2014 phase 2 drill program 18 NOVEMBER 2014 ASX ANNOUNCEMENT ACN 008 901 380 ABN 35 008 901 380 58 Jersey Street Jolimont, Western Australia 6014 P.O. Box 66 Floreat Forum WA 6014 Email: wally@stratmin.com.au Website: www.stratmin.com.au

More information

Ivanhoe Mines announces an accelerated infill drilling program at the Kamoa copper project s Kakula Discovery in the D.R. Congo

Ivanhoe Mines announces an accelerated infill drilling program at the Kamoa copper project s Kakula Discovery in the D.R. Congo April 6, 2016 Ivanhoe Mines announces an accelerated infill drilling program at the Kamoa copper project s Kakula Discovery in the D.R. Congo SANTIAGO, CHILE Robert Friedland, Executive Chairman of Ivanhoe

More information

MAIDEN RESERVES EXCEED EXPECTATIONS FOR ANTAS COPPER

MAIDEN RESERVES EXCEED EXPECTATIONS FOR ANTAS COPPER ASX Release 17 September 2014 MAIDEN RESERVES EXCEED EXPECTATIONS FOR ANTAS COPPER Level 3, 680 Murray Street West Perth. WA 6005 PO Box 1726 West Perth. WA 6872 Tel: +61 8 9324 1865 Fax: +61 8 9200 1850

More information

RNI TO DRILL NEW BRYAH BASIN COPPER-GOLD TARGETS

RNI TO DRILL NEW BRYAH BASIN COPPER-GOLD TARGETS ASX Announcement 6 October 2015 RNI TO DRILL NEW BRYAH BASIN COPPER-GOLD TARGETS HIGHLIGHTS RNI has generated an expanded pipeline of priority copper-gold drilling targets from ongoing exploration work

More information

For personal use only

For personal use only ASX Release 27 September 2012 OPTION TO ACQUIRE 560,000oz PEAK HILL GOLD PROJECT RESOURCE AND INVESTMENT NL (ASX: RNI) (RNI or the Company) has reached agreement with Montezuma Mining Company Limited for

More information

QUARTERLY REPORT HIGHLIGHTS. Three Months Ending: 30 September 2012 BUTCHERBIRD MANGANESE:

QUARTERLY REPORT HIGHLIGHTS. Three Months Ending: 30 September 2012 BUTCHERBIRD MANGANESE: QUARTERLY REPORT Three Months Ending: 30 September 2012 ASX CODE: MZM ISSUED SHARES: 67.66M 52 WEEK HIGH: $0.80 52 WEEK LOW: $0.16 CASH ON HAND: $6.13M CONTACT: JUSTIN BROWN Managing Director +61 8 6315

More information

Continued high grade drilling success at Nicolsons

Continued high grade drilling success at Nicolsons ASX Announcement 28 June 2016 Continued high grade drilling success at Nicolsons Pantoro Limited (ASX:PNR) (Pantoro) is pleased to advise that it has received further high grade drilling results from the

More information

Table 1: June 2016 Mineral Resource estimates for Big Hill

Table 1: June 2016 Mineral Resource estimates for Big Hill ASX Announcement Big Hill June 2016 Mineral Resource Update Emerging Australian tungsten developer, Tungsten Mining NL (ASX: TGN) ( Tungsten Mining or the Company ) is pleased to report the updated Mineral

More information

NEXT GENERATION OF MINERAL SANDS DISCOVERIES AT ENEABBA

NEXT GENERATION OF MINERAL SANDS DISCOVERIES AT ENEABBA ASX and Media Release 23 July, 2015 NEXT GENERATION OF MINERAL SANDS DISCOVERIES AT ENEABBA KEY POINTS Four new near-surface, dunal HMS discoveries from initial aircore drilling program High value mineral

More information