1 Page: 1/42 Appendix 3 to /05/NL/GM E X O M A R S Phase B1 Product Assurance & Safety Requirements EXM-MS-RS-ESA Prepared by: ExoMars PA Team ESTEC Noordwijk The Netherlands

2 Page: 2/42 DOCUMENT CHANGE LOG Issue/ Date Modified pages Observations Revision Issue for Phase B1 Contract Signature Issue for Phase B1 Redirection Change Request

3 Page: 3/42 Table of Contents 1 INTRODUCTION Scope Applicability Applicable Documents PRODUCT ASSURANCE General PA Right of Access ESA Participation PA Plan (Addition to ECSS-Q-00A para 3.2) PA Progress Reporting (Addition to ECSS-Q-00A para 3.5.3) PA Database (Addition to ECSS-Q-00) QUALITY ASSURANCE Quality Assurance Plan (Addition to ECSS-Q-20B para 4.3) Audits (Addition to ECSS-Q-20B para 4.6) Critical Items Control (Addition to ECSS-Q-20B para 4.8) Non-Conformance Control System (Addition to ECSS-Q-20 para 5.6) Waivers (Addition to ECSS-Q-20B para 5.6.9) Cleanliness and Contamination Control (Addition to ECSS-Q-20B para 8.8) Acceptance Data Package (ADP) (Addition to ECSS-Q-20B para 10.1) DEPENDABILITY ASSURANCE Failure Tolerance SAFETY Objective Safety Approach Software RISK ASSESSMENT (TECHNICAL) General Requirements Risk Factors Consequences EEE COMPONENTS General Parts Selection Components Selection Parts Quality Level Planetary Protection Provisions Radiation Hardness... 14

4 Page: 4/42 8 MATERIALS, PROCESSES AND MECHANICAL PARTS (MPM) General Environmental Interaction Sterilization SOFWARE PRODUCT ASSURANCE OFF-THE-SHELF (OTS) EQUIPMENT ANNEX Applicable ECSS Standards: Tailoring Tables ECSS-Q-20B (08 March 2002) Tailoring for ExoMars Phase B ECSS-Q-30B (08 March 2002) Tailoring for ExoMars Phase B ECSS-Q-40B (17 May 2002) Tailoring for ExoMars Phase B ECSS-Q-60A (19 April 1996) Tailoring for ExoMars Phase B ECSS-Q-70A (19 April 1996) Tailoring for ExoMars Phase B ECSS-Q-70-01A (11 December 2002) Tailoring for ExoMars Phase B ECSS-Q-80B (10 October 2003) Tailoring for ExoMars Phase B1...34

5 Page: 5/42 1 INTRODUCTION 1.1 Scope This document defines the Product Assurance & Safety Requirements applicable to the ExoMars Mission. This document is a complement to the Mission & System Requirements and to the Management Requirements. 1.2 Applicability The requirements defined here are applicable to the phase B1 of the project. 1.3 Applicable Documents The following documents shall be applicable with modifications, if any, defined in the text of this document. All ECSS Standards refer to the current issue. They are available from the ESA Publications Division and also online on the Internet at: 3. ECSS-P-001A Glossary of Terms 4. ECSS-Q-00A Policy and principles 5. ECSS-Q-20B Quality Assurance 6. ECSS-Q-30B Dependability. 7. ECSS-Q-30-02A Failure Modes, Effects and Criticality Analysis. 8. ECSS-Q-40B Safety 9. ECSS-Q-60A EEE Components 10. ECSS-Q-70B Materials, Mechanical Parts and Processes 11. ECSS-Q-70-01A Contamination and Cleanliness control 12. ECSS-Q-80B Software Product Assurance 13. Planetary Protection Policies & Requirements EXM-MS-RS-ESA-00005, Issue 2

6 Page: 6/42 2 PRODUCT ASSURANCE The spacecraft design and operation regime shall be developed in compliance with these requirements, which are applicable to the prime contractor, sub-contractors and suppliers. It is the responsibility of the contractor to allocate these requirements to sub-contractors and suppliers and to ensure their implementation. 2.1 General The prime objective of the Contractors PA programme shall be to ensure that the EXOMARS mission will accomplish the intended objectives successfully. This shall be achieved in the most cost effective way. The contractor shall implement a PA programme in accordance with ECSS-Q-00 for the duration of the project. In particular the outputs from the PA and Safety programme shall be linked to a Risk Management programme. 2.2 PA Right of Access ESA shall have the right of access to all technical and programmatic documentation, all areas and operations within the contractor s or supplier s facilities, in which work is performed or items are stored, which relate to the project even if the information is considered proprietary. ESA will undertake not to disclose such information to a third party. 2.3 ESA Participation ESA shall have the right to perform or participate in audits, surveys, source inspection, test reviews, mandatory inspections, Delivery Review Boards, Non conformance Review Boards etc at the contractor or supplier facility. ESA participation shall not in any way replace or relieve the supplier of his responsibility. 2.4 PA Plan (Addition to ECSS-Q-00A para 3.2) The PA Plan shall be supported by a compliance matrix against the ECSS requirements and the ExoMars Mission specific modifications cited in this document, including an organisation chart showing responsibilities and reporting. The contractor shall provide a justification and an equivalent alternative approach for any non-compliance. Output PA-01: PA plan and related compliance matrix 2.5 PA Progress Reporting (Addition to ECSS-Q-00A para 3.5.3) PA progress reporting shall be part of the overall project progress reporting and shall include: status of the PA activities since the last progress report risk management non conformance and waiver status

7 Page: 7/ PA Database (Addition to ECSS-Q-00) All PA-related data and analyses (e.g., waivers, PA analyses, PA planning, alerts, etc) shall be stored in an electronic database. This shall allow to import and export data from and to sub-contractors and the Customer. The database format and content shall be agreed with the Customer.

8 Page: 8/42 3 QUALITY ASSURANCE The contractor shall implement a QA program in accordance with ECSS-Q-20 with the limitations or modifications given below. 3.1 Quality Assurance Plan (Addition to ECSS-Q-20B para 4.3) This may be a part of the PA plan required by clause 2.4 of these requirements. 3.2 Audits (Addition to ECSS-Q-20B para 4.6) The Contractor shall establish an Audit plan covering external and in-house audits linked to the Risk Management programme. Thus new processes will be audited. Critical items will be audited on a case by case basis pending the risk management. Auditing may be required by the customer. Thus the audit planning will also evolve with the risk monitoring. Output PA-02: Audit planning 3.3 Critical Items Control (Addition to ECSS-Q-20B para 4.8) The contractor shall implement the requirements of ECSS-Q-20 for the control of critical items. The contractor shall identify those items which are a risk to the programme, e.g. newly developed hardware, unqualified processes, unqualified materials, critical items from the dependability and safety analyses, special software, special GSE. These risk items shall be tracked and controlled via the project risk management programme, which will be reported on a monthly basis except where failures occur these will be reported within 2 working days. Output PA-03: Critical Items Control Plan and Critical Items list 3.4 Non-Conformance Control System (Addition to ECSS-Q-20 para 5.6) The Contractor shall establish and maintain an electronic non-conformance control system, covering both the spacecraft and the science instruments, which gives the customer full visibility of NCRs and their disposition. The Customer shall concur in the disposition of any NCR affecting system requirements, a science instrument and all system level NCRs. All major non-conformances shall be notified to the Customer within 2 working days. Any non-conformance affecting the planetary protection requirements shall be classified and reported with the highest criticality. Output PA-04: Non-conformances reports and status list 3.5 Waivers (Addition to ECSS-Q-20B para 5.6.9) Waiver submittal shall be done by electronic mean as reference and also in paper.

9 Page: 9/42 Output PA-05: Requests for waivers and status list 3.6 Cleanliness and Contamination Control (Addition to ECSS-Q-20B para 8.8) In addition to the requirements given in the ECSS-Q-20B, the ECSS-Q-70-01A shall be applicable taking into account the tailoring per the attached spreadsheet in annex. All MAIT (manufacture, assembly, integration and testing) activities shall be performed in class clean room or higher. The requirements of AD 13 shall apply. Output PA-06: Preliminary Cleanliness and Contamination control plan 3.7 Acceptance Data Package (ADP) (Addition to ECSS-Q-20B para 10.1) The Contractor shall deliver an ADP containing the deliverable outputs mentioned in the present document.

10 Page: 10/42 4 DEPENDABILITY ASSURANCE The Dependability programme shall follow the requirements of ECSS-Q-30B, however Maintainability analyses are not required. Output PA-07: The following analyses are required: (Limitation to ECSS-Q-30B para & 8.2.4) Failure Modes, Effects and Criticality Analysis (including common-mode and common cause analyses) Contingency Analysis. The major output of the programme shall be the identification of those items which contribute to project risk. The Risk Management program shall also track these items. 4.1 Failure Tolerance In accordance with both ECSS-Q-30B dependability and ECSS-Q-40B Safety the design of the system shall meet the failure tolerance requirements as per ECSS-Q-40B para Failure tolerance need not be applied to: primary structures, load-carrying structures, structural fasteners, load-carrying elements of mechanisms, and pressure vessels. In these cases, the requirements of design for minimum risk shall be applied. See also para of ECSS-Q-40B safety.

11 Page: 11/42 5 SAFETY 5.1 Objective The requirement of the safety program is to identify hazards and to implement a means of reducing and controlling the hazards so as to minimize the consequences to personnel, flight hardware, launch vehicle and facilities. 5.2 Safety Approach The Contractor shall establish a safety program and assign a contact person within the project team. The ECSS-Q-40B is made applicable, besides, the safety assurance program shall assure compliance to the launch authority safety requirements and applicable national and international safety standards and regulations (i.e. during handling and transportation). Safety critical items shall be monitored and tracked as part of the project risk management approach. For this purpose a safety critical item is defined as an item which does not comply with the applicable safety requirements. The Contractor shall demonstrate that results of the safety analysis confirm that the design is in agreement with the launch authority. Output PA-08: Hazard analysis and Safety critical functions at system level 5.3 Software Software shall not be used as a hazard control.

12 Page: 12/42 6 RISK ASSESSMENT (TECHNICAL) 6.1 General Requirements Loss of mission definition: The ExoMars Mission is considered to be lost when either the lander does not reach the Mars' surface or in case that after landing the scientific measurements cannot be performed. Launch and Ground Station risk shall also be assessed Instruments risk shall also be assessed. The scope of the Risk Analysis is to identify the Risk Scenarios that can potentially jeopardise the ExoMars Mission, to identify the Risk Causes and consequently the Risk Control to eliminate, or minimise and control the risks. The main parameters normally used to evaluate the risk scenario level of criticality are relevant to the capability of satisfying the required performances in terms of mission success, and the constraints on safety, cost and schedule. The supplier shall, using the identified Risk Factors as a basis for the analysis, develop a Risk Scenario Tree in order to identify the specific Risk scenarios inherent to the ExoMars mission Risk Factors The following risk factors shall be considered as a minimum: Related to Environment knowledge Thermal Environment Radiation Meteoroid Environment Contamination Condensation of moisture or contaminants on cold surfaces during test and transportation EMC Requirements definition Performances Lifetime Mission Profile (Ops) Reliability Related to Technologies + Design Materials EEE Components AOCS Propulsion Power Communication Separation Landing Structure Realisation AIV

13 Page: 13/ Consequences The following consequences shall be considered as a minimum: Performance Safety Interplanetary Protection The consequence severity level is defined according to the worst case potential effect. For what concerns safety, the severity is defined in ECSS-Q-40B Safety. For what concerns performance the ECSS-Q-30B dependability apply. For what concerns cost and schedule is defined according to the risk of overcoming an established target or a requirement according to ECSS-M-00-03A. The Risk register format and content shall be agreed with the Customer. Output PA-09: Technical risk assessment as per ECSS-M chap. 7

14 Page: 14/42 7 EEE COMPONENTS 7.1 General The purpose of this chapter is to describe the EEE-Parts requirements for the phase B1 of ExoMars Mission. These requirements define parts selection, procurement, use and quality assurance. The contractor shall comply with all the general and detail requirements of ECSS-Q-60A with any amendment specified herein (as per Table in Annex). 7.2 Parts Selection Components Selection The contractor shall be considered fully responsible of parts selection: it shall select parts which meet operating, stability, environmental, radiation, material, safety, quality and reliability requirements defined for the ExoMars mission. No Preferred Parts List (PPL) is dedicated to the project. EEE Components shall preferably be selected from the European PPL (part 1) available at Alternatively, NASA Parts Selection List (Level 1) in shall be used as a baseline for selection Parts Quality Level All EEE Components shall be selected in accordance with the standards outlined below: Integrated circuits Hybrids Diodes, transistors, optos ESCC level B, or MIL-PRF class V ESA PSS level B, or MIL-PRF class K ESCC level B, or MIL-PRF JANS Passives, other components ESCC level B or C, or MIL Spec, failure rate R or S Crystals, Relays ESCC level B Strategic components: The mid/long term availability of any identified components shall be assessed Planetary Protection Provisions The selection of components shall take into account AD 13. The compatibility with its requirements (i.e. sterilization, bake out temperatures) shall be assessed Radiation Hardness When selecting the components, the Contractor shall pay due attention to the radiation hardness. At Prime level, this activity shall be based on the environment specification.

15 Page: 15/42 Output PA-10: Preliminary Assessment of Parts Selection. This document shall identify main building blocks (at the supplier s criteria) implicitly considered in the technical baseline. For each identified component, the possible options for parts screening shall be identified. Any identified components shall be assessed w.r.t. all requirements specified in this paragraph: possible screening options, RHA, obsolescence issues (if any) and compatibility with Planetary Protection Specification. Output PA-11: Radiation Hardness Assurance Plan. This document shall specify the necessary requirements and provisions to be put in place for the implementation of a RHA program in the next phase of the project.

16 Page: 16/42 8 MATERIALS, PROCESSES AND MECHANICAL PARTS (MPM) 8.1 General The requirements of ECSS-Q-70A shall be followed except where modified in the spreadsheet attached in annex or in the paragraphs below. 8.2 Environmental Interaction When considering the materials environment it should be noted that atomic oxygen might be present during the earth escape orbit and the Mars insertion/operation orbit. The amount of atomic oxygen shall be predicted and its effect on materials shall be estimated. Particularly sensitive materials shall be avoided. The survivability of materials in the Martian environment (atmosphere, sand, etc.) for orbit /landing and operation shall be demonstrated if applicable 8.3 Sterilization In case of sterilization, relevant hardware shall be compatible with appropriate sterilization techniques or processes as defined in AD 13. Such Processes shall be considered as a special process in future MPM lists. Time efforts for the validation for such sterilization techniques shall be considered for the mission schedule.

17 Page: 17/42 9 SOFWARE PRODUCT ASSURANCE An effective Software Product Assurance (SPA) programme shall be implemented with the objective to provide adequate confidence that the software performs properly and safely and meets the specified quality requirements. The SPA requirements are applicable for flight software and ground support software. The Contractor shall develop software in accordance with the requirements of ECSS-E-40B and ECSS- Q-80B. A Software Product Assurance programme shall be implemented by the Contractor to fulfil the requirements of ECSS Q-80, as tailored in annex The supplier shall provide with the Software Product Assurance Plan a compliance matrix documenting conformance to the software product assurance requirements (ref. ECSS Q-80, sub clause ). For each applicable requirement listed in annex, a reference shall be provided to the section(s) of the relevant document(s) where that requirement is implemented. N.B.: The ECSSQ-80 requirements made not applicable in the annex, due to the scope of the contract phase B1 -, will be evaluated and opportunely made applicable for the next phases of software development. Output PA-12: Software PA plan and related compliance matrix

18 Page: 18/42 10 OFF-THE-SHELF (OTS) EQUIPMENT 1 OTS equipment is defined as equipment that has been developed and manufactured to sound industrial practices and that has been qualified for its originally intended use. OTS equipment for use in the EXOMARS programme shall have a demonstrated compliant heritage and usage. OTS equipment shall be able to withstand the environmental conditions applicable to the ExoMars Mission during all mission phases. Depending on the intended use, the following classes of OTS equipment can be identified: Equipment developed, built and qualified for other space projects under PA requirements equivalent to the ones of this document (equipment S ). S equipment may be used for flight applications. Equipment developed and built for commercial, aviation or military applications (equipment CAM ). CAM equipment may be used for non-flight applications. The use of OTS equipment shall not lead to the violation of any applicable safety requirement. System-level reliability and safety analyses (e.g., the FMEA) shall consider also OTS equipment failures. Candidate OTS equipment shall be reviewed by an Equipment Suitability Board chaired by a customer representative and including the PA function. It shall ensure that the proposed OTS meet the environmental and PA requirements. Following the review, the board shall issue an assessment and justification report Output PA-13: Preliminary list of OTS and related justification reports 1 Commercial OTS software is covered by Chapter 9 of this document.

19 Page: 19/42 11 ANNEX 11.1 Applicable ECSS Standards: Tailoring Tables ECSS-Q-20B (08 March 2002) Tailoring for ExoMars Phase B1 Tailoring: Y = tailor in; N = tailor out; M = modified; NA = not applicable, due to the scope of the contract; these requirements will be considered for their applicability in the next phases of project development. Clause Description Tailori Comments ng 4 Quality Assurance management 4.1 QA programme Y 4.2 Organization Y 4.3 QA programme plan Y 4.4 QA status reporting Y 4.5 Personnel training and certification NA 4.6 QA programme audits M 4.7 QA role in configuration management Y For only 4.8 Critical Items control Y 5 Quality Assurance general requirements 5.1 Documentation and data control Y 5.2 Quality records NA 5.3 Stamp control NA 5.4 Traceability NA 5.5 Metrology and calibration NA 5.6 Non Conformance control system M 5.7 Alert system NA 5.8 Handling, storage and preservation NA 5.9 Statistical quality control and analysis NA 6 QA requirements for design and verification 6.1 General Y 6.2 Planning Y 6.3 Organizational and technical interfaces Y 6.4 Design rules Y 6.5 Standards and procedures Y 6.6 Verification Y 6.7 Design changes Y 7 QA requirements for procurement NA 8 QA requirements for manufacturing, NA assembly and integration 9 Testing NA 10 QA requirements for acceptance and M delivery 11 Operations NA

20 Page: 20/ ECSS-Q-30B (08 March 2002) Tailoring for ExoMars Phase B1 Tailoring: Y = tailor in; N = tailor out; M = modified; NA = not applicable, due to the scope of the contract; these requirements will be considered for their applicability in the next phases of project development. 5 Dependability programme management Organization Y 5.2 Dependability programme planning Y Y 5.3 Dependability critical items Y Y 5.4 Design reviews Y Y Y Y 5.5 Audits Y 5.6 Use of previously designed, fabricated, qualified or -- flown items Y Y 5.7 Subcontractor control Y 5.8 Progress reporting Y 5.9 Documentation Y Y 6 Dependability risk reduction and control General Y 6.2 Identification and classification of undesirable events Y Y Y 6.3 Assessment of failure scenarios Y Y Y 6.4 Criticality classification of functions and products Y 6.5 Actions and recommendations for risk reduction Y 6.6 Risk decisions Y Y Y 6.7 Verification of risk reduction Y 6.8 Documentation Y 7 Dependability engineering Integration of dependability in the project Y

21 Page: 21/ Y Y Y 7.2 Dependability requirements in technical specification Y 7.3 Dependability design criteria Consequence category and severity Y Failure Tolerance Y Design approach Y 7.4 Involvement in test definition Y Y 7.5 Involvement in operational aspects Y Y Y 7.6 Dependability recommendations Y Y Y 8 Dependability Analysis Dependability Analysis and the project life cycle Y Y Y Y 8.2 Dependability analytical methods General Y Reliability analyses Y Maintainability analyses N Availability analyses Y 8.3 Classification of design characteristics in production N documents 8.4 Critical items list A A A A 9 Dependability testing, demonstration and data -- collection 9.1 Dependability testing and demonstration N N N 9.2 Dependability data collection and dependability growth N

22 Page: 22/ ECSS-Q-40B (17 May 2002) Tailoring for ExoMars Phase B1 Tailoring: Y = tailor in; N = tailor out; M = modified; NA = not applicable, due to the scope of the contract; these requirements will be considered for their applicability in the next phases of project development. 4 Safety programme Scope Y 4.2 Safety organization General Y Safety representative Y Reporting lines Y Safety integration Y Coordination with others Y 4.3 Safety representative access and -- authority Access Y Delegated authority to reject-stop work Y Delegated authority to interrupt Y operations Launch sequence NA Safety audits Y Safety audit schedule and access Y Conformance Y Approval of reports Y Review Y Representation on boards Y 4.4 Safety risk management Risks Y Hazard assessment Y Preferred measures Y 4.5 Project phases and safety review cycle Progress meetings Y Project reviews General Y Mission definition review Y Preliminary requirements review Y System requirements review Y Preliminary design review NA Critical design review NA Qualification review NA Acceptance review NA Flight readiness review NA Operational readiness review NA Launch commitment meeting NA In-orbit test review NA End-of-life assessment NA

23 Page: 23/ Safety programme review Y Safety data package Y 4.6 Safety programme plan Implementation Y Safety activities Y Definition Y Description Y Safety and project engineering activities Y Supplier and sub-supplier premises Y Conformance Y 4.7 Safety certification NA 4.8 Safety training Overall training NA Participation NA Basic technical training NA Product specific training NA Records NA Identification Y 4.9 Accident incident reporting and NA investigation 4.10 Safety documentation General Y Customer access Y Supplier review Y Documentation Y Safety data package Y Safety deviations and waivers Request for deviation Y Description, analysis and rationale Y Identification and review Y Assessment of deviation Y Review and disposition Y Certification authority approval Y Verification tracking log Y Lessons-learnt file NA 5 Safety engineering Safety engineering policy General Y Elements Y Lessons-learnt Y 5.2 Safety design principles Human life consideration Y Design selection Y Hazard reduction precedence Y Environmental compatibility M Must comply also with Interplanetary protection rules.

24 Page: 24/ Safe without services M Must comply also with Interplanetary protection rules Fail-safe design M Must comply also with Interplanetary protection rules Hazard detection signalling and safing NA Debris, fallout and impact prevention M Must comply also with Interplanetary protection rules Access NA 5.3 Safety risk reduction and control Severity Y Failure tolerance requirements Basic requirements Y Software Y Payload interface Y Redundancy separation Y Failure propagation Y Design for minimum risk General Y Fracture control Y Safety factors Y Materials Y Probabilistic safety targets M Safety target for the civil population tbd 5.4 Identification and control of safety critical -- functions Identification Y Inadvertent operation Y Provisions Y Safe shutdown and failure tolerance Y requirements Electronic, electrical, electromechanical Y 6 Safety analysis requirements and -- techniques 6.1 General Y 6.2 Assessment and allocation of -- requirements Safety requirements Y Additional safety requirements Y Define safety requirements functions Y Define safety requirements subsystems Y Justification Y Functional and subsystem specification Y 6.3 Safety analysis General Y Mission analysis Y Feasibility Y Preliminary definition Y

25 Page: 25/ Detailed definition, production and NA qualification Utilization NA Disposal NA 6.4 Specific safety analysis General NA Hazard analysis M Must comply also with Interplanetary protection rules Safety risk assessment Y Safety analysis for hardware software -- systems Safety-critical function Y Requirements definition phase Y Architectural and detailed design phase NA Software code NA 6.5 Supporting assessment and analysis General NA Warning times analysis NA Caution and warning analysis NA Common-cause and common-mode -- failure analysis Multiple failures Y Identification of requirements and scope NA Identification of common-cause failures Y Analysis of common-mode failures Y Integration of results Y Fault tree analysis NA Human dependability analysis NA Failure modes, effects and criticality Y analysis Sneak analysis Applicability NA Use of results NA Zonal analysis Definition NA Redundancy and objectives NA Energy trace analysis NA 7 Safety verification General Y 7.2 Tracking of hazards Hazard reporting system Y Status Y Safety progress meeting Y Review and disposition Y Documentation Y Mandatory inspection points NA 7.3 Safety verification methods --

26 Page: 26/ Verification engineering and planning Y Methods and reports NA Verification requirements NA Analysis NA Inspections NA Tests NA Verification and approval NA 7.4 Qualification of safety-critical functions Validation NA Qualification NA Failure tests NA Verification of design or operational NA characteristics Safety verification testing NA 7.5 Hazard close out Safety assurance verification NA Safety approval authority NA 7.6 Residual risk reduction NA 8 Operational safety Basic requirements Y 8.2 Flight operations and mission control Launcher operations Y Contamination M Must comply also with Interplanetary protection rules Flight rules NA Hazardous commanding control NA Mission operation change control NA Safety surveillance and anomaly control NA Hazardous debris, fallout and impact Y control 8.3 Ground operations Applicability NA Initiation NA Review and inspection NA Hazardous operations NA Launch and landing site Y Ground support equipment Y 11.4 ECSS-Q-60A (19 April 1996) Tailoring for ExoMars Phase B1 Tailoring: Y = tailor in; N = tailor out; M = modified; NA = not applicable, due to the scope of the contract; these requirements will be considered for their applicability in the next phases of project development. 1 General Y

27 Page: 27/42 2 Components Programme Management N/A 3 Component Engineering M See below 3.1 General Y 3.2 Component Selection M See below General rules Y Components requiring specific N/A Components approval not foreseen in authorisation this phase Type reduction and Standardization N/A Radiation Sensitive Components M Re-written just to require the deliverable documentation specified by the project Material Requirements for EEE Y components Derating M PSS called as applicable while ECSS- Q mentioned as reference only Availability of EEE Components Y Component Selection Criteria M EPPL and NPSL considered in equivalence. Preference given to EPPL part 1 and NSPL Level 1. Nonexhaustive table of required screening levels included 3.3 Component Approval N/A 3.4 Procurement Requirements N/A 3.5 Specific components N/A 4 Component Quality Assurance N/A 5 Non conformances or Failures N/A 6 Alerts N/A 7 Documentation M OUTPUTs of this phase defined Annex PAD format N/A A Annex B Level 3 standards N/A 11.5 ECSS-Q-70A (19 April 1996) Tailoring for ExoMars Phase B1 Tailoring: Y = tailor in; N = tailor out; M = modified; NA = not applicable, due to the scope of the contract; these requirements will be considered for their applicability in the next phases of project development. 0 Foreword 1 General Y 1.1 Scope Y 1.2 Objectives Y 1.3 Applicability Y 1.4 Normative Documents Y 1.5 Informative Documents Y 1.6 Definitions and Abbreviations Y Definitions Y Abbreviations. Y

28 Page: 28/42 2 General Requirements 2.1 Materials, Parts and Processes Y Programme Management Product Assurance Plan Y Materials, Parts and Processes Manager Y Materials, Parts and Processes Board N Materials, Parts and Processes Reviews N 2.2 Management and consolidation of the Materials, Parts and Processes N N N 2.3 Technical Constraints Y Y M in addition, resistance to sterilisation techniques Y 2.4 Cleanliness, Contamination Control N Not relevant to phase B N Not relevant to phase B M Shall in addition, make reference to planetary protection requirements 2.5 Safety Hazardous Materials and Parts Y 2.6 Mechanical GSE/Electrical GSE N Hardware 3 Materials Control 3.1 Selection of Materials Y Technical Criteria Y Identification of Needs Y Declared Material List (DML) Content Criticality Analysis Y Evaluation and Validation Phases Y Evaluation phase Y Validation phase Y Deviation request Y 3.2 Procurement of Materials M Procurement Specifications Incoming Inspection Procedure N 3.3 Use of Materials Validation status of Materials Y Traceability of Materials Y M Packaging, Storage, Removal from Storage Limited-Life Materials before N Implementation M No delivery required but future lists shall be prepared electronically in a readable, exchangeable and sortable format Only for critical items or new/novel materials & processes Shall be considered in view of planetary protection (hardware sterilisation etc.)

29 Page: 29/42 Limited-Life Materials after N Implementation Materials Non conformances and Alerts N Health and Safety Y 4 Mechanical Parts Control 4.1 Selection of Mechanical Parts Y Technical Criteria Y Identification of Needs Y M Declared Mechanical Part List (DMPL) Content Criticality Analysis Y Evaluation and Qualification Phases Y Evaluation phase Y Qualification phase Y Deviation request Y 4.2 Procurement of Mechanical Parts M Procurement Specification Source Inspection N Incoming Inspection Procedure N 4.3 Use of Mechanical Parts Qualification Status of Parts Y Traceability of Parts Y M Packaging, Storage, Removal from Storage Limited Life Parts or Parts Subject to N Wearout Parts Non conformance and Alerts N 5 Process Control 5.1 Selection of Processes Y Technical Criteria Y Identification of Needs Y M Declared Processes List Content Criticality Analysis Y Evaluation and Validation Phase Y Evaluation phase Y Validation phase Y Deviation request Y 5.2 Use of a Process Validation Status of a Process Y Revalidation of a Process N Implementation of a Process N M Special Processes Traceability of Processes Y No delivery required in phase B, but future lists shall be prepared electronically in a readable, exchangeable and sortable format Only for critical items or new/novel materials & processes Shall be considered in view of planetary protection (hardware sterilisation etc.) No delivery required in phase B, but future lists shall be prepared electronically in a readable, exchangeable and sortable format Shall be considered in view of planetary protection (hardware sterilisation etc.)

30 Page: 30/ Process Non conformances and N Alerts Mandatory Inspection Points (MIP) N M Shall be considered in view of Packaging/Storage/Removal from planetary protection (hardware Storage sterilisation etc.) 6 Annex A (informative): Relationship Between Materials, Parts and Processes Activities and Programme Phases 6.1 A.1 Conceptual Phase (Phase A) 6.2 A.2 Project Definition Phase (Phase B) A.3 Detailed Design, Development, Manufacturing, Integration and Test 6.3 Phase (Phase C/D) 6.4 A.4 Operational Phase (Phase E) 11.6 ECSS-Q-70-01A (11 December 2002) Tailoring for ExoMars Phase B1 Tailoring: Y = tailor in; N = tailor out; M = modified; NA = not applicable, due to the scope of the contract; these requirements will be considered for their applicability in the next phases of project development. 0 Foreword 1 Contents 2 Introduction 1 Scope Y 2 Normative references Y 3 Terms, definitions and abbreviated terms Y 3.1 Terms and definitions Y airborne particle Y airborne particle cleanliness class Y bakeout Y bio-contamination Y clean area Y cleaning Y cleanliness (contamination) control Y cleanliness level Y cleanliness verification Y cleanroom Y clean work station Y clean zone Y contaminant Y contaminate, to Y contamination budget Y contamination potential Y controlled area Y fibre Y FTIR spectrometer Y HEPA particle filter Y

31 Page: 31/ induced contaminant environment Y molecular contamination Y monitoring Y non-volatile residue (NVR) Y obscuration factor (OF) Y offgassing Y outgassed quantity Y outgassing Y particle Y particle fallout Y particle size Y particulate Y particulate contamination (PAC) Y plume Y purging Y quartz crystal microbalance (QCM) Y ram direction Y sensitive item Y ULPA particle filter Y venting Y visibly clean Y wake direction Y witness sample Y 3.2 Abbreviated terms Y 4 General cleanliness and contamination Y control aspects 4.1 General Y 4.2 Contamination attributes Y Main effects of contamination on space Y systems Typical contaminants and their sources on M in view of planetary protection ground requirements taking also into account bio-contamination etc Particulate contaminants Y Molecular contaminants Y Gases and vapours Y Liquids Y Other contaminants Y Typical contaminants during operations Y and their sources Launch Y Mission (external) Y General Y Natural environment Y Induced environment Y Mission (inhabited space cabins) Y

32 Page: 32/ General Y Sources of contamination - natural Y 2 environment Sources of contamination - induced Y 3 environment (internal) Effects of contaminants and failure modes Y due to contaminants in space Particle transport in space Y Molecular contaminants transport in space Y 4.3 Cleanliness levels Y General Y Particulate levels on surfaces Y General Y Expression of levels for particles on Y surfaces Standard method 1 (MIL-STD-1246C) Y Standard method 2 (Obscuration factor) Y Correlation for particles on surfaces Y Particle levels in environments Y Molecular levels on surfaces Y Sources of molecular levels on surfaces Y Acceptance levels for molecular Y contamination on surfaces Molecular levels in environments Y 4.4 Cleanliness monitoring Y Particulate contamination monitoring Y Molecular contamination monitoring Y Contamination monitoring in vacuum Y facility Contamination monitoring during launch Y Contamination monitoring in space Y 4.5 Cleaning Y Removal of particulate contamination Y Removal of molecular contamination Y 4.6 Modelling Y 5 Cleanliness and contamination control programme M In view of planetary protection requirements this shall also take into account bio-contamination (Sterilsation, bio-burden control, monitoring etc). 6 Contamination control during the product Y life cycle 6.1 General design provisions Y 6.2 Manufacturing, integration and test N Manufacturing N Assembly and integration N Testing N Vacuum facilities N 6.3 Budgets, prediction and modelling

33 Page: 33/ General Y On-ground contamination budget N In-orbit molecular contamination budget N Launch contamination budget N 6.4 Cleanliness verification General M In view of planetary protection requirements taking also into Cleaning procedures N General N Cleaning aids N Cleaning solvents N Bakeout N Purging N 6.5 Packing, containerization, transportation and storage M account bio-contamination (Sterilsation, bio-burden control, monitoring etc). Shall be considered in view of planetary protection (hardware sterilisation etc.) 6.6 Launch N General N Specific provisions N Launcher level N System (payload) level N 6.7 Mission (external) Molecular outgassing from materials M No output required but to be considered for preliminary design Design aspects M No output required but to be considered for preliminary design Mission (inhabited space cabins) N 6.8 Mission (internal) System level M No output required but to be considered for preliminary design Lower levels N Monitoring N 7 Annex A (normative): Document requirements list 8 Annex B (informative): Space system cleanliness control flow chart 9 Annex C (informative): Molecular contaminant content of some wipe materials 10 Annex D (informative) Compatibility of various solvents with listed materials 11 Annex E (informative): Non-volatile residue of commercially available solvents, measured by infrared techniques 12 Annex F (informative): Clean-room requirements 12.1 F-- F--F.1 Particle levels and clean-room classification Y N N N N N N

34 Page: 34/ F.2 Interpretation for particles in N environments 12.3 F.3 Monitoring of clean-room air N 12.4 F.4 Indicative correlation between particles N in air and particle fallout 12.5 F.5 Molecular levels N 12.6 F.6 Measurement of molecules in N environments 12.7 F. 7 D e s i g n N 12.8 F.8 Environmental control N 12.9 F.9 Maintenance and cleaning N F.10 Access control N F.11 General requirements for a cleanroom N 13 Annex G (normative): Cleanliness M Shall in addition encompass the requirement specification Document planetary protection requirements requirements definition (DRD) 13.1 G.1 Introduction Y 13.2 G.2 Scope and applicability Y 13.3 G.3 Terms, definitions and abbreviated Y terms 13.4 G.4 Description and purpose Y 13.5 G.5 Application and interrelationship Y 13.6 G.6 CRS preliminary elements Y 13.7 G.7 CRS contents Y 14 Annex H (normative): Cleanliness and contamination control plan Document requirements definition (DRD) 14.1 H.1 Introduction Y 14.2 H.2 Scope and applicability Y 14.3 H.3 Terms, definitions and abbreviated Y terms 14.4 H.4 Description and purpose Y 14.5 H.5 Application and interrelationship Y 14.6 H.6 C&CCP Preliminary elements Y 14.7 H.7 C&CCP contents Y 15 Bibliography 16 ECSS Document Improvement Proposal M Shall in addition encompass the planetary protection requirements 11.7 ECSS-Q-80B (10 October 2003) Tailoring for ExoMars Phase B1 Tailoring: Y = tailor in; N = tailor out; M = modified; NA = not applicable, due to the scope of the contract; these requirements will be considered for their applicability in the next phases of project development. 5 Software product assurance programme implementation 5.1 Introduction 5.2 Organization and responsibility

35 Page: 35/ Organization Y Responsibility and authority Y Resources Y Software product assurance manager Y Y Training M Expected Output not required M Expected Output not required Y Y 5.3 Contractual aspects Y 5.4 Software product assurance programme management Software product assurance planning and control M A separate software PA plan is not required. The contractor shall include the software PA planning in the overall PA Plan Y Y Y NA Y Software product assurance reporting M Separate software PA reporting is not required. The contractor shall include the software PA reporting in the PA reporting for the project Y NA NA Audits Y Alerts Y Nonconformances Y Y Y Software problems NA

36 Page: 36/ NA NA 5.5 Risk management and critical item control Risk management Y Critical item control Y 5.6 Supplier selection and control Supplier selection Y Supplier requirements Y Y Supplier monitoring Y Y NA NA Criticality classification Y 5.7 Procurement Requirements Y Selection Y Approval Y Procurement details Y Identification Y Inspection NA Exportability Y 5.8 Tools and supporting environment Development computer selection Y Choice description Y Methods and tools Y Y M The suitability of the software development environment shall be justified in the PAF Y Y Tool selection NA NA 5.9 Assessment and improvement process Assessment process Y Assessment procedure Y Assessment records Y Assessment data Y Quality data Y Applicable to the methods and tools used in the activities performed within the scope of the contract (e.g. requirements analysis).

37 Page: 37/ Process improvement Y Process or project documentation Y 6 Software process assurance 6.1 Software development life cycle Life cycle definition Y Life cycle definition review Y Life cycle resources Y Quality objectives Y Phase outputs Y Special characteristics Y Milestones Y Role of customer Y Validation process schedule Y 6.2 Requirements applicable to all software engineering processes Documentation of processes Y Y Y Y Y NA NA NA NA NA Software dependability and safety analysis Y Y NA NA NA NA NA Handling of critical software NA NA NA NA NA NA NA NA NA Software configuration management Y Y

38 Page: 38/ NA NA NA NA Y Y Y NA Y Y Process metrics Y Y Y NA NA NA Verification Y Y Y Y NA NA NA Y Y Y Y Y M Reuse of existing software Y Y Y Y Y Y Y Y Y Y Y Independent software verification shall be performed for safety and mission critical software.

39 Page: 39/ Requirements applicable to individual software engineering processes or activities Software requirements analysis Y Y Y Y Y Software architectural design and design of software NA NA NA NA NA NA NA NA Y Coding NA NA NA NA NA NA NA NA NA NA Testing and validation NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA

40 Page: 40/ NA NA NA NA NA NA NA NA NA NA NA NA M Independent software validation shall be performed for safety and mission critical software NA NA NA Software delivery and acceptance NA NA NA NA NA NA NA NA NA Operations NA NA NA Maintenance NA NA NA NA NA NA NA 7 Software product quality assurance 7.1 Product quality objectives and metrication Assurance activities for product quality Y requirements Deriving of requirements Y Quality models

41 Page: 41/ NA NA NA Product metrics NA NA Measurement NA Measurement results NA Basic metrics NA Metrication process NA Metrics analysis NA Numerical accuracy NA Analysis of software behaviour NA Metrics trend NA Improvement actions NA 7.2 Product quality requirements Technical specification Y Y Y Y Design and related documentation NA NA NA Software intended for reuse Y Y Y Y Y NA Y 7.3 Supporting documentation Test and validation documentation NA NA NA NA NA NA Reports and analysis Y 7.4 Standard hardware for operational system Procurement Y Constraints Y Selection Y Maintenance Y

42 Page: 42/ Documentation Y 7.5 Firmware Device programming NA Marking NA Calibration NA

Criteria for Flight Project Critical Milestone Reviews

Criteria for Flight Project Critical Milestone Reviews Criteria for Flight Project Critical Milestone Reviews GSFC-STD-1001 Baseline Release February 2005 Approved By: Original signed by Date: 2/19/05 Richard M. Day Director, Independent Technical Authority

More information

Space Project Management

Space Project Management EUROPEAN COOPERATION FOR SPACE STANDARDIZATION Space Project Management Configuration Management Secretariat ESA ESTEC Requirements & Standards Division Noordwijk, The Netherlands Published by: Price:

More information

Space project management

Space project management ECSS-M-ST-80C Space project management Risk management ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands Foreword This Standard is one of the series of ECSS Standards

More information

Space engineering. System engineering. ECSS-E-10 C Draft 1

Space engineering. System engineering. ECSS-E-10 C Draft 1 Space engineering System engineering This ECSS document is a draft standard distributed for Public Review. It is therefore subject to change without any notice and may not be referred to as an ECSS Standard

More information

Space product assurance

Space product assurance Space product assurance Software dependability and safety ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands Foreword This Handbook is one document of the series of

More information

Space product assurance

Space product assurance ECSS-Q-ST-80C Space product assurance Software product assurance ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands Foreword This Standard is one of the series of ECSS

More information

Space product assurance

Space product assurance ECSS-Q-ST-70-01C Space product assurance Cleanliness and contamination control ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands Foreword This Standard is one of the

More information

DOCUMENT REQUIREMENTS DESCRIPTIONS

DOCUMENT REQUIREMENTS DESCRIPTIONS DOCUMENT REQUIREMENTS DESCRIPTIONS Document number... SKA-TEL.SE-SKO-DRD-001 Revision... 1 Author... Jason Spyromilio Date... 2013-03-10 Status... Released Name Designation Affiliation Date Signature Owned

More information

Goddard Procedures and Guidelines

Goddard Procedures and Guidelines Goddard Procedures and Guidelines DIRECTIVE NO. APPROVED BY Signature: Original signed by NAME: A. V. Diaz TITLE: Director Responsible Office: Title: Code 300 / Office of Systems Safety and Mission Assurance,

More information

Space engineering ECSS. System engineering Part 1: Requirements and process. ECSS-E-10 Part 1B EUROPEAN COOPERATION FOR SPACE STANDARDIZATION

Space engineering ECSS. System engineering Part 1: Requirements and process. ECSS-E-10 Part 1B EUROPEAN COOPERATION FOR SPACE STANDARDIZATION -E-10 Part 1B EUROPEAN COOPERATION FOR SPACE STANDARDIZATION Space engineering System engineering Part 1: Requirements and process Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The

More information

SOFTWARE VERIFICATION RESEARCH CENTRE SCHOOL OF INFORMATION TECHNOLOGY THE UNIVERSITY OF QUEENSLAND. Queensland 4072 Australia TECHNICAL REPORT

SOFTWARE VERIFICATION RESEARCH CENTRE SCHOOL OF INFORMATION TECHNOLOGY THE UNIVERSITY OF QUEENSLAND. Queensland 4072 Australia TECHNICAL REPORT SOFTWARE VERIFICATION RESEARCH CENTRE SCHOOL OF INFORMATION TECHNOLOGY THE UNIVERSITY OF QUEENSLAND Queensland 4072 Australia TECHNICAL REPORT No. 99-30 A Survey of International Safety Standards Axel

More information

SOFTWARE DEVELOPMENT STANDARD FOR SPACECRAFT

SOFTWARE DEVELOPMENT STANDARD FOR SPACECRAFT SOFTWARE DEVELOPMENT STANDARD FOR SPACECRAFT Mar 31, 2014 Japan Aerospace Exploration Agency This is an English translation of JERG-2-610. Whenever there is anything ambiguous in this document, the original

More information

Space Project Management

Space Project Management EUROPEAN COOPERATION FOR SPACE STANDARDIZATION Space Project Management Project Phasing and Planning Secretariat ESA ESTEC Requirements & Standards Division Noordwijk, The Netherlands Published by: Price:

More information

Software Quality Subcontractor Survey Questionnaire INSTRUCTIONS FOR PURCHASE ORDER ATTACHMENT Q-201

Software Quality Subcontractor Survey Questionnaire INSTRUCTIONS FOR PURCHASE ORDER ATTACHMENT Q-201 PURCHASE ORDER ATTACHMENT Q-201A Software Quality Subcontractor Survey Questionnaire INSTRUCTIONS FOR PURCHASE ORDER ATTACHMENT Q-201 1. A qualified employee shall be selected by the Software Quality Manager

More information

LISA Pathfinder SUMMARY

LISA Pathfinder SUMMARY Page 2 of 36 SUMMARY This document defines the Independent Software Verification and Validation requirements for the Implementation Phase of the LISA Pathfinder project. Page 3 of 36 TABLE OF CONTENTS

More information

Chapter 4: Contractor Quality Control

Chapter 4: Contractor Quality Control Chapter 4: Contractor Quality Control Seattle District, NWS Last updated: 05FEB14 Chapter 4 Contractor Quality Control 1. GENERAL. Contractor is responsible for quality control and shall establish and

More information

Quality Management System Manual

Quality Management System Manual Quality Management System Manual Assurance ISO / AS Manual Quality Management System EXCEEDING ALL EXPECTATIONS Since our inception in 1965, Swiss-Tech has supplied the medical, aerospace, hydraulic, electronic

More information

Superseded by T MU AM 04001 PL v2.0

Superseded by T MU AM 04001 PL v2.0 Plan T MU AM 04001 PL TfNSW Configuration Management Plan Important Warning This document is one of a set of standards developed solely and specifically for use on the rail network owned or managed by

More information

8. Master Test Plan (MTP)

8. Master Test Plan (MTP) 8. Master Test Plan (MTP) The purpose of the Master Test Plan (MTP) is to provide an overall test planning and test management document for multiple levels of test (either within one project or across

More information

COMMISSION DIRECTIVE 2003/94/EC

COMMISSION DIRECTIVE 2003/94/EC L 262/22 COMMISSION DIRECTIVE 2003/94/EC of 8 October 2003 laying down the principles and guidelines of good manufacturing practice in respect of medicinal products for human use and investigational medicinal

More information

AS9100 Quality Manual

AS9100 Quality Manual Origination Date: August 14, 2009 Document Identifier: Quality Manual Revision Date: 8/5/2015 Revision Level: Q AS 9100 UNCONTROLLED IF PRINTED Page 1 of 17 1 Scope Advanced Companies (Advanced) has established

More information

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev

More information

A Brazilian Software Industry Experience in Using ECSS for Space Application Software Development

A Brazilian Software Industry Experience in Using ECSS for Space Application Software Development A Brazilian Industry Experience in Using ECSS for Space Application Development Fátima MattielloFrancisco a,1, Valdivino Santiago a, Ana Maria Ambrósio a, Leise Jogaib b and Ricardo Costa b a National

More information

Space Project Management

Space Project Management EUROPEAN COOPERATION FOR SPACE STANDARDIZATION Space Project Management Information/Documentation Management Secretariat ESA ESTEC Requirements & Standards Division Noordwijk, The Netherlands Published

More information

SOFTWARE ASSURANCE STANDARD

SOFTWARE ASSURANCE STANDARD NOT MEASUREMENT SENSITIVE National Aeronautics and NASA-STD-8739.8 w/change 1 Space Administration July 28, 2004 SOFTWARE ASSURANCE STANDARD NASA TECHNICAL STANDARD REPLACES NASA-STD-2201-93 DATED NOVEMBER

More information

CONFIGURATION MANAGEMENT REQUIREMENTS EXM-MS-RS-ESA-00008

CONFIGURATION MANAGEMENT REQUIREMENTS EXM-MS-RS-ESA-00008 Page: 1/22 ExoMars CONFIGURATION MANAGEMENT REQUIREMENTS EXM-MS-RS-ESA-00008 Issue 1, Rev. 0 Date and Signature Prepared Agreed HME-CLS P. Provasi 29 June 2007 Approved HME-ME D. McCoy 29 June 2007 Page:

More information

Quality Assurance QUALITY ASSURANCE PLAN

Quality Assurance QUALITY ASSURANCE PLAN Revision 2 Page 1 of 40 QUALITY ASSURANCE PLAN PLAN APPROVALS: Jeff Shouse Signature on File DIRECTOR OF QUALITY ASSURANCE DIRECTOR OF QUALITY ASSURANCE (signature) DATE Rodney Baltzer Signature on File

More information

DATA REQUIREMENTS DESCRIPTION (DRD)

DATA REQUIREMENTS DESCRIPTION (DRD) DATA REQUIREMENTS DESCRIPTION (DRD) 1. DPD NO.: XXX ISSUE: Draft 2. DRD NO.: STD/EDAL 3. DATA TYPE: 3 4. DATE REVISED: 5. PAGE: 1/3 6. TITLE: Engineering Drawings and Associated Lists 7. DESCRIPTION/USE:

More information

Quality Management System Manual ISO9001:2008

Quality Management System Manual ISO9001:2008 Quality Management System Manual ISO9001:2008 Controlled Copy Rev. 3 Page 1 of 21 7/1/13 Table of Contents Company Profile...5 Past...5 Present...5 Mission...5 Vision...5 Locations...6 1 Scope...6 1.1

More information

SOFTWARE CONFIGURATION MANAGEMENT GUIDEBOOK

SOFTWARE CONFIGURATION MANAGEMENT GUIDEBOOK Office of Safety and Mission Assurance NASA-GB-9503 SOFTWARE CONFIGURATION MANAGEMENT GUIDEBOOK AUGUST 1995 National Aeronautics and Space Administration Washington, D.C. 20546 PREFACE The growth in cost

More information

DNV GL Assessment Checklist ISO 9001:2015

DNV GL Assessment Checklist ISO 9001:2015 DNV GL Assessment Checklist ISO 9001:2015 Rev 0 - December 2015 4 Context of the Organization No. Question Proc. Ref. Comments 4.1 Understanding the Organization and its context 1 Has the organization

More information

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name

More information

TfNSW Standard Requirements TSR T Technical Management

TfNSW Standard Requirements TSR T Technical Management Template Applicable to: Transport Projects Quality Management System Status: Division: Approved Transport Projects Version: 5.0 Desksite No.: 3455797_1 Date of issue: 1 July 2014 Effective date: 1 July

More information

DIRECTIVE 2014/32/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

DIRECTIVE 2014/32/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL 29.3.2014 Official Journal of the European Union L 96/149 DIRECTIVE 2014/32/EU OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 26 February 2014 on the harmonisation of the laws of the Member States relating

More information

MHRA GMP Data Integrity Definitions and Guidance for Industry January 2015

MHRA GMP Data Integrity Definitions and Guidance for Industry January 2015 MHRA GMP Data Integrity Definitions and Guidance for Industry Introduction: Data integrity is fundamental in a pharmaceutical quality system which ensures that medicines are of the required quality. This

More information

Space Environment Technologies (SET) QUALITY ASSURANCE PROGRAM. Command Media. Approved by: Approved by: Approved by:

Space Environment Technologies (SET) QUALITY ASSURANCE PROGRAM. Command Media. Approved by: Approved by: Approved by: Space Environment Technologies (SET) QUALITY ASSURANCE PROGRAM Command Approved by: Approved by: Approved by: S. Dave Bouwer Rian Shelley W. Kent Tobiska SECTION 1 - QUALITY POLICY & ADMINISTRATION Scope

More information

Generic CMMS Quality Assurance Plan

Generic CMMS Quality Assurance Plan Generic CMMS Quality Assurance Plan Scope In accordance with the Quality Policy, the Quality System of CMMS is based upon the requirements and structure of ISO (the International Organization for Standardization)

More information

Mission Operation Ground. Assurance @ ESA. Mario Merri GSAW, Los Angeles, USA 2 Mar 2011 ESA UNCLASSIFIED

Mission Operation Ground. Assurance @ ESA. Mario Merri GSAW, Los Angeles, USA 2 Mar 2011 ESA UNCLASSIFIED Mission Operation Ground Software Systems Product Assurance @ ESA Mario Merri GSAW, Los Angeles, USA 2 Mar 2011 The European Cooperation for Space Standardisation (ECSS) Established: in 1993 Goal: coherent,

More information

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production

More information

074-8432-552 Page 1 of 7 Effective Date: 12/18/03 Software Supplier Process Requirements

074-8432-552 Page 1 of 7 Effective Date: 12/18/03 Software Supplier Process Requirements Page 1 of 7 Software Supplier Process Requirements 1.0 QUALITY SYSTEM FRAMEWORK 1.1 QUALITY POLICY The Seller shall document and implement a quality program in the form of Quality manual or detailed Quality

More information

ISO 9001:2015 Overview of the Revised International Standard

ISO 9001:2015 Overview of the Revised International Standard ISO 9001:2015 Overview of the Revised International Standard Introduction This document provides: a summary of the new ISO 9001:2015 structure. an overview of the new and revised ISO 9001:2015 requirements

More information

ECSS-E-ST-40C 6 March 2009. Space engineering. Software. ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands

ECSS-E-ST-40C 6 March 2009. Space engineering. Software. ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands ECSS-E-ST-40C Space engineering Software ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands Foreword This Standard is one of the series of ECSS Standards intended to

More information

Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8

Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 5. MANAGEMENT RESPONSIBILITY...8-9 6. RESOURCE MANAGEMENT... 10 7. PRODUCT

More information

AEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE

AEROSPACE STANDARD. Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE AEROSPACE STANDARD AS9100C Issued 1999-11 Revised 2009-01 Superseding AS9100B Quality Management Systems - Requirements for Aviation, Space and Defense Organizations RATIONALE This standard has been revised

More information

ISO 9001:2015 Internal Audit Checklist

ISO 9001:2015 Internal Audit Checklist Page 1 of 14 Client: Date: Client ID: Auditor Audit Report Key - SAT: Satisfactory; OBS: Observation; NC: Nonconformance; N/A: Not Applicable at this time Clause Requirement Comply Auditor Notes / Evidence

More information

Comparison ISO/TS 16949 (1999) to VDA 6.1 (1998)

Comparison ISO/TS 16949 (1999) to VDA 6.1 (1998) 1 APPLICABILITY VDA 6.1: Section: 3.1; 7 new: In addition to the applicability for supplier sites for production, services and their subcontractors for: products and production materials, or services like

More information

Space project management

Space project management ECSS-M-ST-40C Rev. 1 Space project management Configuration and information management ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands Foreword This Standard is

More information

UNCONTROLLED COPY FOR REFERENCE ONLY

UNCONTROLLED COPY FOR REFERENCE ONLY CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President

More information

IAEA-TECDOC-1328 Solutions for cost effective assessment of software based instrumentation and control systems in nuclear power plants

IAEA-TECDOC-1328 Solutions for cost effective assessment of software based instrumentation and control systems in nuclear power plants IAEA-TECDOC-1328 Solutions for cost effective assessment of software based instrumentation and control systems in nuclear power plants Report prepared within the framework of the Technical Working Group

More information

New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification

New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification Revision A New Program Quality Requirements for Suppliers Rev.

More information

ESA s Data Management System for the Russian Segment of the International Space Station

ESA s Data Management System for the Russian Segment of the International Space Station iss data management system ESA s Data Management System for the Russian Segment of the International Space Station J. Graf, C. Reimers & A. Errington ESA Directorate of Manned Spaceflight and Microgravity,

More information

NATO GUIDANCE ON THE USE OF THE AQAP 2000 SERIES

NATO GUIDANCE ON THE USE OF THE AQAP 2000 SERIES NATO GUIDANCE ON THE USE OF THE AQAP 2000 SERIES (June 2003) I ORIGINAL Page blank II ORIGINAL NORTH ATLANTIC TREATY ORGANIZATION NATO STANDARDISATION AGENCY (NSA) NATO LETTER OF PROMULGATION June 2003

More information

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards

INTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards INTEGRATED MANAGEMENT SYSTEM MANUAL IMS Based on ISO 9001:2008 and ISO 14001:2004 Standards Approved by Robert Melani Issue Date 30 December 2009 Issued To Management Representative Controlled Y N Copy

More information

REFERENTIEL- SODERN. Autre référence / Other reference :

REFERENTIEL- SODERN. Autre référence / Other reference : Classification: NC Page : 1/8 Autre référence / Other reference : Type: Sector procedureprocédure sectorielle. Description: Exigences qualité pour les fournisseurs de Sodern version anglaise / Quality

More information

Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL

Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL Karas Engineering AS9100 QUALITY MANAGEMENT SYSTEM MANUAL Revision D October 27, 2015 Statement of Commitment and Authority Commitment This Quality Management System Manual (QMSM) delineates the processes,

More information

STANDARD REVIEW PLAN

STANDARD REVIEW PLAN NUREG-0800 U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN BRANCH TECHNICAL POSITION 7-14 GUIDANCE ON SOFTWARE REVIEWS FOR DIGITAL COMPUTER-BASED INSTRUMENTATION AND CONTROL SYSTEMS REVIEW RESPONSIBILITIES

More information

Quality Management System Manual

Quality Management System Manual Effective Date: 03/08/2011 Page: 1 of 17 Quality Management System Manual Thomas C. West Eric Weagle Stephen Oliver President ISO Management General Manager Representative Effective Date: 03/08/2011 Page:

More information

The Prophotonix (UK) Ltd Quality manual

The Prophotonix (UK) Ltd Quality manual The Prophotonix (UK) Ltd Quality manual Date: March 2014 Revision: D Sparrow lane, Hatfield Broad Oak, Herts, UK, CM22 7BA Tel: +44 (0)1279 717170 Fax: +44 (0)1279 717171 e-mail: info@prophotonix.com Page

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

CONFIGURATION/DOCUMENT MANAGEMENT

CONFIGURATION/DOCUMENT MANAGEMENT Air Force Research Laboratory Space Vehicles Directorate Revision February 2007 CONFIGURATION/DOCUMENT MANAGEMENT AND QUALITY ASSURANCE PLAN UNIVERSITY NANOSAT-5 PROGRAM University Nanosat Program Office

More information

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company Ref: Quality Manual.ind Issue: June 2009 INDEX 1 Amendment Status 2 Controlled Distribution

More information

UNCONTROLLED IF PRINTED IN-SERVICE MANAGEMENT OF SOFTWARE FOR AIRBORNE AND RELATED SYSTEMS

UNCONTROLLED IF PRINTED IN-SERVICE MANAGEMENT OF SOFTWARE FOR AIRBORNE AND RELATED SYSTEMS UNCONTROLLED IF PRINTED AAP 7001.054 Sect 2 Chap 17 SECTION 2 CHAPTER 17 IN-SERVICE MANAGEMENT OF SOFTWARE FOR AIRBORNE AND RELATED SYSTEMS INTRODUCTION 1. The in-service maintenance and development of

More information

Space engineering ECSS. Software - Part 1: Principles and requirements. ECSS-E-40 Part 1B EUROPEAN COOPERATION FOR SPACE STANDARDIZATION

Space engineering ECSS. Software - Part 1: Principles and requirements. ECSS-E-40 Part 1B EUROPEAN COOPERATION FOR SPACE STANDARDIZATION -E-40 Part 1B EUROPEAN COOPERATION FOR SPACE STANDARDIZATION Space engineering Software - Part 1: Principles and requirements Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands

More information

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization

Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization 4.1 Understanding the organization and its context

More information

Software Classification Methodology and Standardisation

Software Classification Methodology and Standardisation Software Classification Methodology and Standardisation 07 March 2003 1/10 Table of Contents 1. INTRODUCTION a Galileo system overview Ε b Master schedule Ε 2. GALILEO SAFETY CASE APPROACH Ε 3. SYSTEM

More information

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN. Organization responsible for the review of instrumentation and controls

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN. Organization responsible for the review of instrumentation and controls U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN NUREG-0800 BRANCH TECHNICAL POSITION 7-14 GUIDANCE ON SOFTWARE REVIEWS FOR DIGITAL COMPUTER-BASED INSTRUMENTATION AND CONTROL SYSTEMS REVIEW RESPONSIBILITIES

More information

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division Quality Assurance Requirements For Pratt & Whitney/Space Propulsion, FORM 06.13.02.02 (REV. 6) Page 1 of 14 Table of Contents SECTION I QUALITY SYSTEMS REQUIREMENTS... 5 1. QUALITY ASSURANCE PROGRAM...

More information

Space product assurance

Space product assurance ECSS-Q-ST-60-02C Space product assurance ASIC and FPGA development ECSS Secretariat ESA-ESTEC Requirements & Standards Division Noordwijk, The Netherlands Foreword This Standard is one of the series of

More information

QUALITY MANUAL REVISION RECORD

QUALITY MANUAL REVISION RECORD Page 2 of 31 REVISION RECORD Date Rev Description Jun 18, 2007 N/C Original Issue Sep 16, 2009 A Update to ISO 9001:2008 Standard. Feb 04, 2010 B Revised exclusions, removed (Except 7.3.7 from the exclusion

More information

Quality Agreement Template

Quality Agreement Template Quality Agreement Template Prepared by Dan O Leary Ombu Enterprises, LLC 3 Forest Ave. Swanzey, NH 03446 603-209-0600 This document is intended to form the basis for a Supplier Agreement. The document

More information

Proton Launch System Mission Planner s Guide APPENDIX B. Quality Management System

Proton Launch System Mission Planner s Guide APPENDIX B. Quality Management System Proton Launch System Mission Planner s Guide APPENDIX B Quality Management System B. QUALITY MANAGEMENT SYSTEM B.1 Proton Quality Assurance Plan B.1.1 KhSC Quality Management Overview ILS Proton launch

More information

ISO 9001:2008 Quality Management System Requirements (Third Revision)

ISO 9001:2008 Quality Management System Requirements (Third Revision) ISO 9001:2008 Quality Management System Requirements (Third Revision) Contents Page 1 Scope 1 1.1 General. 1 1.2 Application.. 1 2 Normative references.. 1 3 Terms and definitions. 1 4 Quality management

More information

Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables

Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables (1987) Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables 1. General 1.1 Introduction 1.1.1 The present guidelines are to serve as a supplement to the IACS

More information

Quality Assurance Manual for Low Level Radioactive. Waste Disposal Facility

Quality Assurance Manual for Low Level Radioactive. Waste Disposal Facility WM 07 Conference, February 25 March 1 2007, Tucson, AZ Quality Assurance Manual for Low Level Radioactive Waste Disposal Facility Yasser T. Mohamed Hot Laboratories and Waste Management Center, Egyptian

More information

<name of project> Software Project Management Plan

<name of project> Software Project Management Plan The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor

More information

GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL

GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL Issue Number: 1 Issue Date: 12/9/14 1 of 19 Contents Revision Summary... 4 1.0 Introduction... 5 2.0 Supplier Quality System Requirements... 6 3.0

More information

Jonathan Wilson. Sector Manager (Health & Safety)

Jonathan Wilson. Sector Manager (Health & Safety) Jonathan Wilson Sector Manager (Health & Safety) OHSAS 18001:2007 Making Life Easier For Health & Safety Managers Workshop Agenda 1. Introduction 2. Why Manage Health & Safety 3. OHSAS 18001 and OHSMS

More information

Subject: Establishment of a Safety Management System (SMS)

Subject: Establishment of a Safety Management System (SMS) GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPPOSITE SAFDARJUNG AIRPORT, NEW DELHI 11 0 003 CIVIL AVIATION REQUIREMENTS SERIES 'C' PART I 20 TH JULY 2010 EFFECTIVE:

More information

Implementation of ANSI/AAMI/IEC 62304 Medical Device Software Lifecycle Processes.

Implementation of ANSI/AAMI/IEC 62304 Medical Device Software Lifecycle Processes. Implementation of ANSI/AAMI/IEC 62304 Medical Device Software Lifecycle Processes.. www.pharmout.net Page 1 of 15 Version-02 1. Scope 1.1. Purpose This paper reviews the implementation of the ANSI/AAMI/IEC

More information

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL. EudraLex The Rules Governing Medicinal Products in the European Union.

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL. EudraLex The Rules Governing Medicinal Products in the European Union. EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL Consumer goods Pharmaceuticals Brussels, 03 February 2010 ENTR/F/2/AM/an D(2010) 3374 EudraLex The Rules Governing Medicinal Products in

More information

GLOBAL AEROSPACE PROCEDURE

GLOBAL AEROSPACE PROCEDURE 1 of 13 1. PURPOSE: This procedure establishes the minimum PPG Aerospace requirements for a Supplier's Quality Plan. These requirements pertain to the documentation and inspection/testing necessary to

More information

ESRS guidelines for software safety reviews

ESRS guidelines for software safety reviews IAEA Services Series No. 6 ESRS guidelines for software safety reviews Reference document for the organization and conduct of Engineering Safety Review Services (ESRS) on software important to safety in

More information

MHRA GMP Data Integrity Definitions and Guidance for Industry March 2015

MHRA GMP Data Integrity Definitions and Guidance for Industry March 2015 MHRA GMP Data Integrity Definitions and Guidance for Industry Introduction: Data integrity is fundamental in a pharmaceutical quality system which ensures that medicines are of the required quality. This

More information

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL 130 Wisbech Road Outwell Wisbech Cambridgeshire PE14 8PF Tel: (01945) 772578 Fax: (01945) 773135 Copyright 2003. This Manual and the information contained herein are the property Bloom & Wake (Electrical

More information

QUALITY MANUAL ISO 9001. Quality Management System

QUALITY MANUAL ISO 9001. Quality Management System Page 1 of 20 QUALITY MANUAL ISO 9001 Quality Management System Printed copies are not controlled unless marked "CONTROLLED". Upon receipt of this document, discard all previous copies. Page 2 of 20 Approval

More information

National Information Assurance Certification and Accreditation Process (NIACAP)

National Information Assurance Certification and Accreditation Process (NIACAP) NSTISSI No. 1000 April 2000 National Information Assurance Certification and Accreditation Process (NIACAP) THIS DOCUMENT PROVIDES MINIMUM STANDARDS. FURTHER INFORMATION MAY BE REQUIRED BY YOUR DEPARTMENT

More information

QUALITY MANUAL ISO 9001:2015

QUALITY MANUAL ISO 9001:2015 Page 1 of 22 QUALITY MANUAL ISO 9001:2015 Quality Management System Page 1 of 22 Page 2 of 22 Sean Duclos Owner Revision History Date Change Notice Change Description 11/02/2015 1001 Original Release to

More information

AS9100:2016 Transition Guide

AS9100:2016 Transition Guide AS9100:2016 Transition Guide Updated August 24, 2016 AS9100 Series Overview AS9100 Aerospace Management Systems is a widely adopted and standardized quality management system for the aerospace industry.

More information

ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008

ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008 ISO 9001: 2008 Boosting quality to differentiate yourself from the competition xxxx November 2008 ISO 9001 - Periodic Review ISO 9001:2008 Periodic Review ISO 9001, like all standards is subject to periodic

More information

ELECTROTECHNIQUE IEC INTERNATIONALE 61508-3 INTERNATIONAL ELECTROTECHNICAL

ELECTROTECHNIQUE IEC INTERNATIONALE 61508-3 INTERNATIONAL ELECTROTECHNICAL 61508-3 ª IEC: 1997 1 Version 12.0 05/12/97 COMMISSION CEI ELECTROTECHNIQUE IEC INTERNATIONALE 61508-3 INTERNATIONAL ELECTROTECHNICAL COMMISSION Functional safety of electrical/electronic/ programmable

More information

Q2A First Article Inspection (FAI) AS9102 * Revised ** Added

Q2A First Article Inspection (FAI) AS9102 * Revised ** Added Page 1 of 5 Q2A First Article Inspection (FAI) AS9102 * Revised ** Added NOTE: A hard copy of this document may not be the document currently in effect. The current version is always the version on the

More information

TG 47-01. TRANSITIONAL GUIDELINES FOR ISO/IEC 17021-1:2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES

TG 47-01. TRANSITIONAL GUIDELINES FOR ISO/IEC 17021-1:2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES TRANSITIONAL GUIDELINES FOR ISO/IEC 17021-1:2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES Approved By: Senior Manager: Mpho Phaloane Created By: Field Manager: John Ndalamo Date of Approval:

More information

NOT PROTECTIVELY MARKED

NOT PROTECTIVELY MARKED Title of document ONR GUIDE Supply Chain Management Arrangements for the Procurement of Nuclear Safety Related Items or Services Document Type: Unique Document ID and Revision No: Nuclear Safety Technical

More information

Cartel Electronics. AS 9100 Quality Systems Manual

Cartel Electronics. AS 9100 Quality Systems Manual Cartel Electronics AS 9100 Quality Systems Manual 1900 C Petra Lane Placentia, California 92870 Introduction Cartel Electronics, as a global supplier to the aviation, space, and space industries, has developed

More information

REGULATIONS OF THE EUROPEAN SPACE AGENCY

REGULATIONS OF THE EUROPEAN SPACE AGENCY ESA UNCLASSIFIED Releasable to the public ESA/REG/002 Paris, 30 July 2010 (Original: English) REGULATIONS OF THE EUROPEAN SPACE AGENCY General Clauses and Conditions for ESA Contracts The attached General

More information

DATA REQUIREMENTS DESCRIPTION (DRD)

DATA REQUIREMENTS DESCRIPTION (DRD) DATA REQUIREMENTS DESCRIPTION (DRD) 1. DPD NO.: XXX ISSUE: Draft 2. DRD NO.: STD/AD 3. DATA TYPE: 2/3 4. DATE REVISED: 5. PAGE: 1/4 6. TITLE: Functional and Physical Configuration Audit (FCA/PCA) Documentation

More information

SOFTWARE DEVELOPMENT AND DOCUMENTATION

SOFTWARE DEVELOPMENT AND DOCUMENTATION DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE MIL-STD-498 5 December 1994 (PDF version) Superseding DOD-STD-2167A 29 February 1988 DOD-STD-7935A

More information

SQ 901 Version D. Railway Application Quality Specification REQUIREMENTS FOR THE QUALITY MANAGEMENT SYSTEM AND QUALITY PLAN

SQ 901 Version D. Railway Application Quality Specification REQUIREMENTS FOR THE QUALITY MANAGEMENT SYSTEM AND QUALITY PLAN SQ 901 Version D Railway Application Quality Specification OBTAINING QUALITY OF PRODUCTS PURCHASED BY SNCF REQUIREMENTS FOR THE QUALITY MANAGEMENT SYSTEM AND QUALITY PLAN Issue date March 2004 This English