1 Air Force Research Laboratory Space Vehicles Directorate Revision February 2007 CONFIGURATION/DOCUMENT MANAGEMENT AND QUALITY ASSURANCE PLAN UNIVERSITY NANOSAT-5 PROGRAM University Nanosat Program Office 3550 Aberdeen Ave. SE Building 472 Kirtland AFB, NM The publication of this material does not constitute approval by the government of the findings or conclusion herein. Wide distribution or announcement of this material shall not be made without the specific written approval of the sponsoring government activity. Distribution limited to US Government agencies and their contractors.

2 SIGNATURE PAGE Prepared by: Jared Clements, Jackson & Tull () University Nanosat Program Systems Engineer Date Approval: Scott Franke, University Nanosat Program Manager (AFRL) Date Approval: Dr. Kent L. Miller University Nanosat Program Manager (AFOSR) Date Approval: Jayesh Hirani University Nanosat Program Manager (AIAA) Date Page i

3 REVISIONS Revision Description Date Approval - Initial Release. This document is based on the Configuration/Document Management and Quality Assurance Plan from UN3 and UN4, AFRL documents UN-0002 (dated 10/03) and UN (9/05), so readers will note many similarities to those documents. This document supersedes UN and UN /2007 2/2007 Page ii

4 TABLE OF CONTENTS 1. INTRODUCTION PURPOSE SCOPE OF CONFIGURATION MANAGEMENT AND QUALITY ASSURANCE ACTIVITIES APPLICABLE DOCUMENTS CONFIGURATION/DOCUMENT MANAGEMENT PROGRAM DOCUMENTATION Requirements Engineering Definition As Built Data Qualification Data Documentation Summary REVIEW & APPROVAL OF PROGRAM DOCUMENTATION University Review and Approval AFRL/DoD Review and Approval Document Numbering CHANGE MANAGEMENT Waivers and Deviations for Program Requirements Engineering Changes Manufacturing Deviations SPECIAL DOCUMENTATION REQUIREMENTS: NON-FRACTURE CRITICAL HARDWARE QUALITY ASSURANCE SUPPLIER INTEGRITY Fasteners Other Hardware CONTROL OF HARDWARE Cleanliness Access Ground Safety Transport INSPECTIONS Two-Person Build & Verify Mandatory Inspection Points TRAINING REQUIREMENTS...19 APPENDIX A. PROGRAM DOCUMENTATION, UN APPENDIX B. APPENDIX C. CERTIFICATES OF COMPLIANCE...23 CONFIGURATION MANAGEMENT FORMS...26 Page iii

5 LIST OF FIGURES Figure 2-2: Request for Deviation/Waiver Process...13 Figure 2-3: Engineering Change Process...14 Figure 2-4: Manufacturing Deviation Review Process...15 Figure A-1: Nanosat-5 Document Tree...22 LIST OF TABLES Table 2-2: University Documentation Review and Approval...11 Table 2-3: As-Built/As-Tested Documentation Requirements for Parts...16 LIST OF EXHIBITS Exhibit B-1: Certificate of Compliance Example Exhibit B-2: Certificate of Compliance Example Exhibit B-3: Certificate of Compliance Example Exhibit C-1. Request for Deviation / Waiver Form...27 Exhibit C-2: Request for Deviation / Waiver (Continuation Sheet)...28 Exhibit C-3: Assembly/Test Certification Log...29 Exhibit C-4: Assembly/Test Certification Log (Continuation Sheet)...30 Exhibit C-5: Manufacturing Deviation Notice...31 Exhibit C-6: Manufacturing Deviation Notice (Continuation Sheet)...32 Exhibit C-7: Engineering Change Request Form...33 Exhibit C-8: Engineering Change Request (Parts List Sheet)...34 Exhibit C-9: Engineering Change Request (Continuation Sheet)...35 Exhibit C10: Problem Failure Report...36 Exhibit C11: Problem Failure Report (Continuation Sheet)...37 Page iv

6 1. INTRODUCTION 1.1 Purpose Configuration management is a system of processes used to establish control over program hardware, software and all supporting documentation, including drawings, specifications, qualification data, etc. Such processes are to be used by universities and the University Nanosat Program Office in managing all University Nanosat Program documentation and hardware. This Configuration/Document Management and Quality Assurance Plan defines the concepts, requirements, and processes for implementing Configuration Management (CM) and Quality Assurance (QA) on the University Nanosat Program (UNP). This document also defines the roles and responsibilities for all participants, including the universities, Nanosat Separation System (NSS) supplier, and AFRL. Universities will note that the Nanosat-5 User s Guide (AFRL Doc. UN5-0001) lays out documentation submittal requirements in addition to those listed in this document, primarily consisting of engineering definition documents like requirements flowdown, requirements verification, and design budgets & analyses. Where applicable, those design review deliverables must also adhere to the requirements laid out in this document. 1.2 Scope of Configuration Management and Quality Assurance Activities Methods of CM used on the University Nanosat Program exist primarily for two reasons: (1) to ensure adequate technical review of all program data, and (2) to ensure complete documentation of the as-built configuration. Methods of QA are used to ensure that flight hardware is built and tested according to approved drawings, specifications, and procedures. Implementation of structured CM and QA processes are particularly important for university-built hardware, since university organizations do not have the benefit of established, in-house CM and QA programs. Therefore, this document has been developed specifically to convey CM and QA requirements to the universities. The Flight Competition winner will be selected based in part on whether adequate CM and QA measures have been applied to the protoflight hardware and associated data. Once the Flight Competition winner has been selected, two organizations AFRL and SMC/STP will verify that university-built hardware is safe to fly. Review and approval requirements are summarized in Section Applicable Documents 1 UN5-0001, Nanosat-5 User s Guide University Nanosat Program Website: UN-SPEC Rev A, Stress Analysis Case Study. Planetary Systems Corporation Document , Rev. A, Motorized Lightband Specification NSTS B, Safety Policy and Requirements for Payloads Using the STS NSTS/ISS 13830, Payload Safety Review and Data Submittal Requirements 1 These documents may be found on the University Nanosat Program website, Updates to the NASA PSRP website or NASA/DoD documents shall supercede those NASA/DoD-controlled documents listed in this section. Page 1

7 KHB C, Space Shuttle Payload Ground Safety Handbook NASA-STD-5003, Fracture Control Requirements for Payloads Using the Space Shuttle UN-SPEC-12311, Rev. A Stress Analysis Case Study JSC Rev. D, JSC Fastener Integrity Testing Program Outgassing Data for Selecting Spacecraft Materials System: FED-STD-209E, Airborne Particulate Cleanliness Classes in Cleanrooms and Clean Zones, Sept (Superceded by ISO /-2). MIL-STD-1246C, Product Cleanliness Levels and Contamination Control Program, Apr (Cancelled). KSC-C-123H, Specification for Surface Cleanliness of Fluid Systems, Sept AIAA Paper , Venting of Space Shuttle Payloads, JSC 26943, Guidelines for the Preparation of Payload Flight Safety Data Packages and Hazard Reports for Payloads using the Space Shuttle, Feb NASA-STD-5001, Structural Design and Test Factors. NASA-STD-5003, Fracture Control Requirements for Payloads using the Space Shuttle. JSC 23642, Rev. D, JSC Fastener Integrity Testing Program. NSTS/ISS 13830, Rev. C, Payload Safety Review and Data Submittal Requirements. NSTS B, Safety Policy and Requirements for Payloads using the Space Transportation System, Jan KHB C, Space Shuttle Payload Ground Safety Handbook, Aug NSTS 14046, Rev E, Payload Verification Requirements, Mar NSTS/ISS 18798, Rev. B, Interpretation of NSTS/ISS Payload Safety Requirements. TM , Selection of Wires and Circuit Protection Devices for NSTS Orbiter Vehicle Payload Electrical Circuits. JSC Payload Safety Home Page: NASA Fastener Inventory: NASA Parts Selection List (NPSL): Page 2

8 2. CONFIGURATION/DOCUMENT MANAGEMENT 2.1 Program Documentation This section provides a summary of required documentation for the University Nanosat Program. There are four types of documentation addressing the following areas: 1) requirements, 2) engineering definition, 3) asbuilt configuration, and 4) hardware qualification Requirements For Nanosat-5, NASA is the primary source for requirements data related to payload safety. Most of the NASA requirements already exist to support Shuttle payloads and do not require further development to support the University Nanosat Program. Since Shuttle safety requirements are, in general, more stringent than those for expendable launch vehicles (LV s), the Program Office has elected to apply them to the Program in an effort to maximize the flexibility of finding a launch for the Flight Competition winner. The Nanosat team must adhere to these requirements and inform AFRL in cases where such requirements cannot be met, through an established change process (see Section 2.3). AFRL has also developed requirements to ensure that hardware produced by universities can be integrated into a system that in turn meets the NASA and DoD requirements. The primary AFRL requirements document is UN5-0001, Nanosat-5 User s Guide. Other requirements include AFRL Document UN-SPEC , Rev. A, Stress Analysis Case Study, this Configuration/Document Management and Quality Assurance Plan, and all ancillary requirements documents listed as applicable to the UNP by UN5-0001, UN- SPEC-12311, and this document. Any deviations from program requirements must be handled according to procedures defined in Section Engineering Definition Drawings and Specifications All universities are required to submit sets of drawings to AFRL in support of the Design Reviews as stated in the Nanosat-5 User s Guide. It is necessary to provide sufficient detail such that the design can be thoroughly critiqued. Design drawings must include all systems and subsystems (electrical, structural, mechanical, flight experiment) and should illustrate hardware at both the component and assembly level. Special review emphasis will be given to structural details and assemblies, mechanisms, electrical systems (including batteries), key interfaces, and propulsion systems. The drawing tree in Figure A-1 provides a sampling of required drawings and areas of responsibility. Review and approval requirements for drawings are outlined in Section For each drawing the following information must be included in the drawing itself or in the cover sheets: Document number and revision level Part physical characteristics (e.g., geometry, orientation, material content, surface treatment, etc.) Complete parts and materials list (including part count, i.e. # of fasteners) and material type. This includes materials that are not necessarily part numbered, such as staking agents for non-load bearing items. Assembly processes (in particular, safety critical processes) Indication of whether the part is fracture critical Page 3

9 Parts and materials list include this along with drawings Miscellaneous Design Data Design data for battery cells, approved cleaning solvents, matching procedures for battery cells, manufacturers specifications for pressure components, etc. All universities must submit a complete set of approved drawings to AFRL thirty days prior to the Flight Competition Review in January 2009 as stated in the Nanosat-5 User s Guide. Design drawings shall document the as-built protoflight Nanosat. Drawing contents shall be the same as for PQR; however, drawings shall be complete and final with comments from previous reviews having been incorporated. (Universities shall provide a means for tracking review comments, such as an action items form/spreadsheet.) Once drawings have been submitted to AFRL for the Flight Competition Review, changes to the drawings must be communicated through a formal change process (see Section 2.3.2). *Winner of the Flight Competition: The winner of the Flight Competition will be required to provide engineering definition data for all launch vehicle ground and flight safety reviews, in accordance with NSTS/ISS 13830, Payload Safety Review and Data Submittal Requirements As Built Data All University Nanosat participants are responsible for producing as-built documentation verifying proper assembly and inspection of protoflight Nanosat hardware. As-built data required by AFRL includes assembly, handling, and inspection procedures, assembly certification logs, and certificates of compliance (C of C s) as described below: Assembly / Handling / Inspection Procedures All universities must develop assembly, handling, and inspection procedures to be applied to the protoflight Nanosat. These procedures are meant to ensure that the Nanosat supplied to AFRL is built according to approved drawings and specifications (materials, processes, etc). Hardware assembly and inspection are to be performed in accordance with approved procedures (see Section for review and approval requirements). Each procedure must contain the following: Clear references to approved drawings and specifications. Identify where the procedure is to be conducted and who is the designated QA authority for the procedure. Identify Mandatory Inspection Points (MIP s) where applicable (see Section 3.3.2) Assembly Certification Logs All universities must provide proof that the protoflight hardware supplied to AFRL is built according to approved drawings and specifications (materials, processes, etc). For each part manufactured or assembled internally, universities shall maintain certification logs documenting fabrication, QA inspections, and subsystem/system level assemblies. In cases where hardware does not comply with applicable drawings and specifications, an approved Manufacturing Deviation Notice must be supplied (see Section 2.3.3). A certification log template is provided in Exhibit C-3. 2 From NSTS B - When procedures and/or processes are critical steps in controlling a hazard and the procedure and/or process results will not be independently verified by subsequent test or inspection, it will be necessary to insure the procedure/process is independently verified in real-time. Critical procedure/process steps must be identified as MIP's requiring independent observation. Page 4

10 Each certification log shall include the following: Part information, including date of manufacture, part number, revision level, part description, lot number and date codes, and serial number. Material content of the part, especially for non-metallic parts (composites, etc.). For material content, it is sufficient to refer to the master parts list if the parts list contains such information. References to drawings and procedure numbers as applicable. All document numbers shall include revision level. Also, include references to the use of trained individuals and related training procedures as applicable. Two sets of handwritten initials, one each from two individuals who participated in the manufacture and/or inspection of the part and who can confirm that it complies with all applicable engineering data. Initials shall be dated in handwriting. Calibration data for measurement equipment (measuring C.G. locations, fastener torques, etc.), along with the manufacturer, part number, serial number, and description of the equipment. Expiration dates of perishable materials (carbon pre-preg, adhesives, potting compounds, etc.) References to mix records for adhesives or compounds that consist of two or more components. Mix records shall contain the following information: component ratios, cure times, personnel involved in the creation of the adhesive or compound. Note: mix records shall be handled and stored in the same manner as flight hardware. References to samples or test coupons used to verify the structural integrity of the flight hardware. Record of installation and removal of key components (e.g., locking inserts-number of installs and removals) Identification of procedures and chemical agents used to clean flight hardware. Note: this information shall be provided to AFRL to ensure compatibility with LV hardware. Identification of procedures and materials used to service and maintain the flight hardware. Note: this information shall be provided to the AFRL to support ground operations at the launch range Certificates of Compliance All universities shall provide Certificates of Compliance (C of C s) for each item (whether purchased or donated) used on the protoflight Nanosat. C of C s are used to establish hardware compliance with drawings and specifications for parts or components procured from third-party organizations. For each C of C, the following information (in English) shall be included: Part number, revision level, and part description. Note: raw materials, such as plate aluminum prior to machining, are considered parts and must be accompanied with a material certification. Statement to the effect the parts supplied to the University/AFRL are in compliance with all applicable engineering documents, Listing of applicable engineering documents, including standards and specifications (ASTM, MIL, NAS, etc.) Signature from the supplier s representative. Applicable dates There are no pre-defined exceptions to the requirement for the Nanosat participants to have C of C s for all procured hardware. However, in past programs, it has been acceptable to use board-mounted electrical components without C of C s, provided that all electronic boards are conformal coated to prevent outgassing of components. In cases where it is not possible to have a C of C, the university team must work closely with AFRL to ensure that materials, method of construction, or operation of the component do not pose a safety Page 5

11 hazard. In such cases, the university team responsible for the part in question shall provide a clear context for the use of the part, including the following: Full description of the part (dimensions, materials, treatment, method of installation) Fracture control classification Environmental simulation and test aimed at reducing risk of contamination or structural failure Availability of this information will be used to determine whether a part is acceptable. Examples of C of C s are provided in Appendix B Qualification Data All universities are responsible for producing documentation verifying that flight hardware and GSE meets all NASA safety requirements as defined in NASA Documents NSTS B, Safety Policy and Requirements for Payloads Using the STS and KHB C, Space Shuttle Payload Ground Safety Handbook. Qualification data includes analysis and test data as described in Sections to Analysis Documentation All universities shall provide a complete structural analysis in support of the Flight Competition Review. Guidelines for developing stress analyses may be found in AFRL Document UN-SPEC-12311, Rev. A, Stress Analysis Case Study. The structural analysis must be maintained to reflect changes to the flight hardware (e.g., increases in mass, changes in CG, material changes, etc.). This structural analysis will be included in the ground/flight safety data packages for the LV safety panel. In addition to the structural analysis, all universities shall conduct a thermal analysis of the individual satellite in its operational configuration (i.e., free flight configuration). The thermal analysis must take into consideration the guidelines and suggestions provided by AFRL in the Nanosat Thermal Management expert area telecon, and UN Per UN5-0001, universities shall also provide results from pressure profile (venting) and electromagnetic compatibility analyses for their integrated protoflight Nanosat. *Winner of the Flight Competition. The winner of the Flight Competition shall submit structural, thermal properties, pressure profile and EMC analysis data/results to AFRL to support integrated analyses, per UN Updates to these analyses due to design changes required by AFRL post-fcr shall be the responsibility of the university Test Documentation Universities shall be the responsible authority for developing and executing functional tests that demonstrate the proper operation of satellite subsystems and experiments. Proper operation means that the Nanosat systems are capable of meeting all LV, NASA, STP, and AFRL requirements, including those in the Nanosat- 5 User s Guide, all associated safety requirements, and any additional requirements imposed by the launch provider at any time pre- or post-fcr. Functional tests must also demonstrate that Nanosat systems are capable of executing proposed mission goals presented at the design review meetings. To demonstrate that such testing has taken place, all universities are required to submit test plans, test reports and manufacturers test data to support the design review process. Testing is to be performed according to documented procedures that have been subjected to appropriate university/team approval. Test documentation review and approval requirements at the university level are defined in Section Page 6

12 Test plans are the tools that translate test concepts and statistical/analytical test designs into concrete test objectives, procedures, resources, schedules, and responsibilities. Test plans also describe the equipment configuration(s) and any known test limitations. Types of information typically included in a test plan are: Test purpose and objectives Applicable military, NASA, or commercial test specifications and/or standards Concept of test operations Method(s) of accomplishment Test schedules Test organization and management Personnel responsibilities Test configuration and instrumentation Data collection and distribution requirements Test reporting requirements Pass/fail/retest criteria Test reports are created after a test has been completed and should include the following: Test purpose and objectives Test issues, problems, and methods of resolution, including references to completed Problem Failure Reports as required (see Exhibits C-10 and C-11) Method(s) of accomplishing the test purpose and objectives, including references to completed test procedures and test certification logs as required (see Exhibits C-3 and C-4). Summary of results (pass/fail) keyed to test objectives Discussion, conclusions, recommendations The following topics are often addressed in appendices to test reports: Detailed test description Test organization and control Test environment Test instrumentation Test data collection and management Test data Data analysis Modeling/simulation results In certain cases, AFRL will require that manufacturers test data be provided to verify the integrity of key hardware. Areas of particular concern: Mechanisms that have been purchased from or donated by a third party, Battery cells, Pressurized or sealed components, Pre-fabricated composite panels, Any component or item containing stored energy or whose manufacture is process intensive. Page 7

13 Formal Safety Documentation AFRL will prepare formal safety documentation for the NASA Phase 0/1 safety reviews on behalf of all participating universities, should the program office pursue the Space Shuttle as a launch option. The winner of the Flight Competition will have additional responsibilities as outlined below: *Winner of the Flight Competition. In addition to the qualification data listed in Sections and , the winner of the Flight Competition is expected to support the development of formal LV safety documentation for the ground and flight safety reviews. The development of safety documentation is a multistage process: 1) the development of safety inputs at the university, 2) AFRL integration of the university inputs into integrated documents, and 3) review by SMC/STP, NASA PSRP and/or other LV provider. The Flight Competition winner shall provide safety inputs for each phase of the safety process. Inputs are generally required for six types of safety documents addressing the following areas: Flight Safety / Hazard Identification, Control, and Verification Ground Safety Structural Verification Fracture Control Mechanical Systems Verification Materials List Guidelines for developing inputs to these documents may be found in NASA Document NSTS/ISS 13830, Payload Safety Review and Data Submittal Requirements (note: this document can be found on the University Nanosat Website at Documentation Summary As stated in the preceding paragraphs, the documentation requirements for the winner of the Flight Competition will be greater than for the other universities. Table 2-1 shows a comparison of requirements for the Flight Competition winner vs. the remaining participants. Table 2-1: Additional Documentation Requirements for the Flight Competition Winner Documentation Type Drawings and specifications Assembly/Handling/Inspection Procedures Assembly Certification Logs Certificates of Compliance All Participants Submit a complete drawing package to AFRL (UNP Program Office) to support CDR. Submit documentation to support protoflight Nanosat development Submit documentation to support protoflight Nanosat development Submit documentation to support protoflight Nanosat development Flight Competition Winner (additional effort required) Provide Engineering data in accordance with NSTS/ISS13830 for phased safety reviews, or other LV safety process. *See Note below. Submit updated documentation to reflect Flight Unit configuration changes Submit updated documentation to reflect Flight Unit configuration changes Submit updated documentation to reflect Flight Unit configuration changes Page 8

14 Documentation Type Analysis Documentation Structural Thermal Pressure profile (venting) EMC Test Documentation Test Plans Test Reports Manufacturer s Test Data Test Procedures Problem Failure Reports Test Certification Logs Formal Safety Documentation: inputs for launch vehicle Safety Reviews All Participants Complete structural analysis by PQR in accordance with UN-SPEC , Rev. A, Stress Analysis Case Study, and Sections 8.1 and 8.4 of UN Complete thermal analysis by PQR in accordance with the Thermal Management expert area telecon and Section 8.4 of UN Complete venting analysis by PQR in accordance with AIAA Paper and Section 8.5 of UN Complete EMC analysis by PQR in accordance with Section 8.6 of UN Submit documentation to support protoflight Nanosat development Not Required Flight Competition Winner (additional effort required) Submit structural, thermal, venting and EMC properties data and analysis results to AFRL to support the development of integrated models Submit documentation to support Flight Unit development, and support environmental testing/documentation of the flight Nanosat at AFRL. Provide inputs to support development of NASA Phase 2 and 3 safety documentation per NSTS/ISS 13830, or other safety documentation in support of a DoD expendable launch vehicle safety review process. *See Note below. *Note: there is significant effort involved in developing documentation that satisfies the requirements of NSTS/ISS All universities are encouraged to read NSTS/ISS 13830, so that these requirements are clearly understood. NSTS/ISS can be found on the UNP website at Review & Approval of Program Documentation University Review and Approval Universities must provide requirements data, engineering definition, as-built, and qualification data as defined in Sections through These data shall be subjected to a disciplined internal review and approval process. In most cases, documents submitted by the universities to AFRL or other entity must be reviewed by at least two qualified individuals at the university as defined in Table 2-2. This table also indicates which signature sheets or forms are to be used for various types of documentation. Each form should clearly show who has reviewed and approved the document and in what capacity. Completed signature sheets must be kept on file at the university and provided to AFRL in support of the Flight Competition AFRL/DoD Review and Approval Documentation submitted in support of the Flight Competition will be reviewed by AFRL and/or other government personnel as part of the Flight Competition, but only the winning team will have formal government review and concurrence in preparation for LV safety reviews and prior to acceptance of delivery Page 9

15 to AFRL for integrated environmental testing (see Figure 2-1). In cases where review and approval requirements are in conflict with hazard report requirements, the hazard report requirements shall supersede the requirements outlined in this document Document Numbering The Nanosat participants shall implement a document numbering scheme that permits unique identification of all project documentation. The document numbering scheme must also allow for the unique identification of document revisions. Nanosat participants may implement their own system of document numbering; however, when delivering engineering documents, participants shall clearly state the safety requirement(s) that submittals are intended to fulfill. Complete documentation to be released University internall review per Section 2.2. All universities to provide internal review and approval of protoflight Nanosat data prior to Flight Competition Review Document approved Y N Update design baseline Flight Competition Review Winner submits LV safety inputs NS-4 Flight Competition Review & selection of FCR winner Formal AFRL review of winner documentation, including safety inputs Following the Flight Competition Review, design changes shall be subject to the change process defined in Section 2.3. Following the Flight Competition Review, the flight competition winner will continue to provide data to support the development of formal safety data packages Documentation approved Y Develop integrated safety data packages & support docs N Incorporate changes as required RESPONSIBILITY LEGEND Phase 2 / 3 or LV Safety Review University Safety review process DoD Figure 2-1: Document Review Process Page 10

16 Type Program Requirements Subtype Table 2-2: University Documentation Review and Approval Review & Signature Req s (See Roles, Note 3) Signature Provisions Sample Form Nanosatellite Requirements Flow-Down PREP 1, REA(s), SY, PM Signature Sheet Include in document (Ref. Page i of this document for an example of signature sheet.) Component Specifications PREP 1, REA(s), SY, PM Signature Sheet Include in document Deviations, Waivers PREP 1, REA(s), SY, PM Request for Deviation / Waiver (RFD/W) Exhibits C-1, C-2 Engineering Drawings and Specifications PREP 1, REA(s), SY Signature Sheet Include in document Definition Engineering Changes PREP 1, REA(s), SY Engineering Change Request (ECR) Exhibits C-7, C-8, C-9 As Built Assembly Activity FAB, QA Certification Log Exhibits C-3, C-4 Configuration Manufacturing Deviation FAB, REA(s), QA, SY Manufacturing Deviation Notice (MDN) Exhibits C-5, C-6 Analysis (e.g., structural, thermal) PREP 1, REA(s), SY Signature Sheet Include in document Test Plans/Procedures/Reports/ PREP 1, IT, QA, SY, PM 2 Signature Sheet Include in document Qualification Data Test Activity PREP 1, IT, QA Certification Log Exhibits C-3, C-4 Problem/Failure PREP 1, IT, QA, REA(s), SY, PM Problem Failure Report Exhibits C-10, C-11 FSDP, GSDP, SVP, FCP, MSVP or PREP 1 Include in document, REA(s), SY, PM Signature Sheet other LV safety review document inputs 1. Depending on the organization, functional positions may overlap. For example, the preparer of an electrical component specification may be the project s electrical REA; the originator of the program s structural analysis may be the project s structural REA; and the originator of the system test plan may be the student test engineer (IT). 2. PM signature for final report only 3. Roles: PREP Any qualified individual who serves as the preparer of technical data or who initiates an engineering action. The preparer is responsible for obtaining supplementary engineering review and maintains overall responsibility if supplementary review is not sought. REA - Responsible Engineering Authority: Any qualified individual that reviews and approves the program s technical data, especially when the review is conducted with respect to a particular discipline. There may be more than one applicable REA per document. FAB Fabricator/Assembler The individual(s) responsible for fabricating or assembling the part in question. IT Integration and Test The individual(s) responsible for planning, executing, and documenting integration and testing of payload elements. SY - Systems Engineer The individual(s) responsible for defining system requirements and for ensuring the overall satisfaction of these requirements. Also responsible for identifying and resolving conflicts and discrepancies of an engineering nature. QA - Quality Assurance (QA) The individual(s) responsible for ensuring that parts are manufactured according to engineering specification. For the University Nanosat Program, QA may be performed by any individual that is independent of the Fabricator/Assembler and that has either witnessed the proper assembly of the part or can confirm that the part complies with all applicable engineering specifications. CM - Configuration Manager The individual(s) responsible for ensuring the accuracy of as-built documentation and for archiving all documentation related to the history of a part. PM - Program Manager The individual responsible for resource management and for overall program success Page 11

17 2.3 Change Management All universities are encouraged to implement a formal change management process to minimize the potential for design errors and requirements violations. The use of a formal change management process as described in Sections through is required only for the winner of the Flight Competition Waivers and Deviations for Program Requirements University Nanosat Hardware is subject to requirements specified in AFRL Document UN5-0001, Nanosat-5 Users Guide, PSC Document , Rev. A, Motorized Lightband Specification, and all applicable program requirements referenced in this or any other program requirements documentation, including the UNP website. If the hardware fails to meet these requirements, then the university must request a deviation or waiver to these requirements via a Request for Deviation/Waiver (RFD/W) Form (see Exhibit C-1). The process for completing an RFD/W Form is shown in Figure 2-2. The Preparer/REA must state the reason for the RFD/W along with a reference to the specific requirement. The Preparer/REA should also note whether the requirement is a UNP, NASA, LV or other requirement (Class I vs. Class II). AFRL would then review the RFD/W indicating its approval or disapproval. Note: The UNP Program Office fully expects the universities to meet all program and technical requirements. The use of the RFD/W is considered a last resort after all other methods of resolution have been exhausted. Page 12

18 Alternatives to bring H/W into compliance N Write / submit RFD/W Assign RFD/W tracking number Determine whether Class I or Class II Review RFD/W. Establish disposition Approved RFD/W? N Y Notify university and file RFD/W RESPONSIBILITY LEGEND Notify university and file RFD/W Implement proposed design/repair or remanufacture University DoD Pursue alternate design/repair or remanufacture Note: Class I deviation from a NASA or LV requirement Class II deviation from a UNP requirement Figure 2-2: Request for Deviation/Waiver Process Engineering Changes All universities should maintain a formalized process for communicating and implementing engineering changes within their respective teams. Following the Flight Competition Review, engineering changes shall be reviewed and approved by AFRL through the use of an Engineering Change Request (ECR). The ECR serves as both a proposal for change as well as approval for the change. Examples of various ECR forms are shown in Exhibits C-7 C-9. These examples include an ECR signature sheet, continuation sheet, and parts list sheet. The process for proposing and incorporating changes is shown in Figure 2-3. Review and approval requirements for the ECR are defined in Section SMC and/or NASA review may be necessary in the event that an engineering or manufacturing action causes a LV or NASA requirement to be violated. A common example is an engineering change that affects a LV or Page 13

19 NASA requirement (see Section 2.3). Such a change is known as a Class I change. In such instances, the AFRL will seek approval from the LV provider or NASA on behalf of the university team. Changes that do not affect LV or NASA requirements are known as Class II changes. Class II changes may be reviewed and approved by AFRL. Changes of any sort that occur after the LV or NASA Phase 3 Safety Review must be coordinated with the DoD and/or NASA. Write / submit ECR Assign ECR tracking number Determine whether Class I or Class II Review ECR. Establish disposition Approved ECR? N Y Notify university and update ECR status RESPONSIBILITY LEGEND Notify university and update ECR status Implement change / update baseline design University Study design alternatives DoD Note: Class I change impacts a LV or NASA requirement Class II change impacts a program requirement Figure 2-3: Engineering Change Process Manufacturing Deviations If a manufactured part does not adhere to engineering specifications, the responsible party shall submit a Manufacturing Deviation Notice (MDN) to AFRL (Exhibits C-5 and C-6). This notice shall provide a complete description of the deviation and the proposed repair. In addition, the MDN shall describe the disposition by the REA with respect to the repaired part. Processing of an MDN is outlined in Figure 2-4. If AFRL s review reveals that the deviation violates a standing requirement, and there is the possibility of waiving the requirement, then the part manufacturer shall submit a Request for Deviation/Waiver (RFD/W) to AFRL. Review and approval requirements for the MDN are defined in Section Page 14

20 Write / submit MDN Assign MDN tracking number MDN impact to baseline? N Y RFD/W required? N Y Review RFD/W. Establish disposition Approved RFD/W Y Approve MDN and notify university N Notify university and file MDN Update baseline design RESPONSIBILITY LEGEND University Modify design, repair, or remanufacture DoD Figure 2-4: Manufacturing Deviation Review Process 2.4 Special Documentation Requirements: Non-Fracture Critical Hardware The amount of documentation required to verify hardware acceptability varies with the potential hazard associated with the hardware in question. For fracture critical hardware (i.e. hardware whose fracture or failure will result in a catastrophic failure as defined in NSTS B), a significant amount of as-built and qualification documentation is required to verify part acceptability per NASA-STD This includes a detailed accounting of the stages of assembly and testing. By contrast, non-fracture critical hardware (particularly contained hardware) is not subject to the same level of analysis and testing. The documentation requirements for such hardware are therefore less than for fracture critical hardware. Table 2-3 provides a summary of as-built and qualification data used to support the following end goals: Proof of proper handling and the use of approved materials Proof of quality of assembly Proof of all required tests This table shows examples of the level of documentation required for non-fracture critical, contained hardware versus other hardware. Page 15

21 End Goal of CM / QA Document proper handling and the use of approved materials Table 2-3: As-Built/As-Tested Documentation Requirements for Parts Methodology to Support End Goal of CM / QA Non-Fracture Critical, Contained 3 Fracture Critical & Non-Fracture Critical (other than Contained) Complete drawings and parts lists Certification Logs documenting the use of approved materials Miscellaneous logs for handling of flight H/W: Receipt and storage of flight hardware Recording the movement of flight hardware between integration and test facilities Document quality of assembly Certification Logs documenting the quality of assembly of flight hardware: Conformance with drawings and parts lists Proper execution of assembly procedures (pre-approved if necessary, and involving the use of trained personnel where appropriate) Complete drawings and parts lists Certification Logs documenting the use of approved materials Miscellaneous logs for handling of flight H/W: Receipt and storage of flight hardware Recording the movement of flight hardware between integration and test facilities CofC s for all parts not manufactured by Nanosat team Certification Logs documenting quality of assembly of flight hardware: Conformance with drawings and parts lists Proper execution of assembly procedures (pre-approved if necessary, and involving the use of trained personnel where appropriate) Contamination control and part cleaning Use of protection against electrostatic discharge (ESD) Lot numbers and serial numbers of installed parts. Calibration of measuring equipment (measuring C.G. locations, fastener torques) Expiration dates of perishable materials (carbon pre-preg, adhesives, potting compounds, etc.) Record of disassembly (for example, locking inserts-number of installs and removals) Written procedures for fabrication and inspection of flight hardware, including identification of Mandatory Inspection Points (MIPs). Written documentation of inspection results Document all required tests N/A Written procedures for testing and inspection of flight hardware Certification Logs verifying that hardware is tested as required Documentation of inspection results 3 Important note: There are very few parts that can be classified as non-fracture critical and contained. Classification of non-fracture critical, contained parts is subject to review and approval by the UNP Program Office as part of the Flight Competition. Page 16

22 3. QUALITY ASSURANCE 3.1 Supplier Integrity Fasteners There are special requirements for ensuring the integrity of fasteners supplied by outside sources. These requirements are defined in JSC JSC Fastener Integrity Testing Program (see After delivery to the user, the responsibility for configuration control rests with the organization in possession as stated in Section Other Hardware Hardware purchased from outside suppliers is subject to the documentation requirements stated in Section Certificates of compliance are required for all purchased hardware to ensure that the hardware meets all applicable specifications. Section lists minimum information requirements for C of C s. 3.2 Control of Hardware The responsibility for control of hardware depends on the phase of development and the corresponding location of the hardware. Generally speaking, the responsibility rests with the organization currently in possession of the hardware unless otherwise specified by contract. The responsible organization should take all necessary steps to control the environment in which materiel is stored, assembled, integrated, and tested with respect to the following: Cleanliness Per UN5-0001, Nanosat participants are responsible for ensuring the cleanliness of hardware under their control: Use of clean assembly facilities, such as rooms, tents, and tables where applicable Use of protective clothing to prevent contaminants from being deposited on flight hardware Cleaning of parts prior to installation Use of vacuum sealed plastic during shipping Bakeout of all applicable parts to minimize outgassing Use of procedures to prevent damage due to ESD. Universities should establish a training program for students needing access to clean facilities Access In cases where controlled access is required the responsible authority shall implement the necessary physical security to prevent unauthorized access. A sign-in/sign-out and escort system shall be implemented and a training program established to ensure that access is provided only to personnel who are skilled in the proper handling of the hardware. Parts destined for use on flight hardware shall be stored in locked cabinets to prevent unauthorized access. Handling of flight parts shall be traceable through handling certification logs ( travelers ). Page 17

23 3.2.3 Ground Safety It is of utmost importance for all individuals with access to the hardware to be cognizant of safe handling procedures. All Nanosat participants shall adhere to safety guidelines established by their respective organizations. For ground activities conducted at the NASA-KSC, Nanosat participants shall adhere to the safety requirements defined in NASA document KHB C, Space Shuttle Payload Ground Safety Handbook. For ground activities conducted at the Eastern or Western Launch Ranges (CCAFS or VAFB), Nanosat participants shall adhere to the safety requirements defined in AFSPC MAN Though ensuring ground safety is ultimately the responsibility of the university, AFRL will provide guidance to the Flight Nanosat team on satisfaction of ground safety requirements Transport The university shall provide packing and shipping container(s) that will protect against damage during transport to the integration site. The development and approval of handling procedures for some hardware is a safety requirement (e.g., handling procedures for composite panels). Any special procedures or notable events that occur during transport shall be recorded in the appropriate certification log. Examples include, but are not limited to: Special handing procedures (lifting, application and removal of protective materials, gas purges, etc.) Excessive shock levels recorded during transport. 3.3 Inspections Two-Person Build & Verify Nanosat participants shall clearly document all stages of flight hardware development as defined in Section Universities shall use a two-person build and verify approach to ensure that university-built hardware is assembled and tested according to approved procedures, drawings, and specifications. For each significant step in the assembly procedures, two sets of handwritten initials shall be included: one each from two individuals who participated in the manufacture and/or inspection of the part or subassembly and who can confirm that it complies with all applicable engineering data. Universities shall thoroughly document all assembly/build processes via photographic record. The Nanosat Separation System supplier and AFRL shall adhere to existing internal processes for verification of their respective hardware Mandatory Inspection Points Mandatory Inspection Points (MIP s) are critical steps during assembly and I&T that have a direct bearing on the control of a hazard but will not be independently verified by subsequent test or inspection and must therefore be independently verified in real-time. It follows that MIP s generally involve 1) hardware that carries an inherent potential for catastrophic failure 2) hardware that is difficult to inspect after final assembly, and/or 3) hardware whose assembly is process sensitive. The university and AFRL shall jointly be responsible for the identification of MIP s through the design process. The university and AFRL shall be responsible for tracking and ensuring that the MIP s are adequately inspected. AFRL must review and approve MIP s identified by the universities or the separation system supplier. AFRL will also be the primary agency responsible for independent inspection of MIP s. SMC/STP, NASA, and/or Page 18

24 other LV provider may also participate in the inspection process. Successful completion of MIP s shall be noted in the assembly/test certification logs. To facilitate planning, the university and the separation system supplier(s) must provide AFRL with a schedule of MIP s four weeks prior to execution of the first MIP. 3.4 Training Requirements All aspects of Nanosat design, assembly and/or I&T must be conducted using qualified personnel. Personnel at AFRL and the separation system supplier must have an engineering degree and a history of related experience. Individuals involved in assembly and I&T must have a history of related experience. University students may be involved in some aspects of the satellite integration and test activities at AFRL and the launch site. Where this is the case, students must be familiar with the hardware design as well as with the assembly, test, and inspection procedures used to integrate and test the hardware. Individuals responsible for the integration and test of university-built hardware must be identified in advance, and their initials must appear on the appropriate certification logs. For certain critical procedures, such as the installation of the Lightband System, students must be formally trained and certified by the Planetary Systems Corporation. Page 19

25 ACRONYMS AIAA AFOSR AFRL CCAFS CDR C of C CG CVCM CM DoD ECR EGSE EMC EMI EN ESD FCP FCR FS GSE I&T ICD ITAR JSC KAFB KSC LV MDN MGSE MIP MS MSVP Nanosat NASA NS-5 NSS NSTS American Institute of Aeronautics and Astronautics Air Force Office of Scientific Research Air Force Research Laboratory Cape Canaveral Air Force Station Critical Design Review Certificate of Compliance Center of Gravity Collectable Volatile Condensable Material Configuration Management Department of Defense Engineering Change Request Electrical Ground Support Equipment Electromagnetic Compatibility Electromagnetic Interference Engineering Notice Electro-Static Discharge Fracture Control Plan Flight Competition Review Factor of Safety Ground Support Equipment Integration and Test Interface Control Document International Traffic in Arms Regulations Johnson Space Center Kirtland Air Force Base Kennedy Space Center Launch Vehicle Manufacturing Deviation Notice Mechanical Ground Support Equipment Mandatory Inspection Point Margin of Safety Mechanical Systems Verification Plan Nanosatellite National Aeronautics and Space Administration Nanosat-5 Nanosat Separation System National Space Transportation System Page 20

Bogue Machine Company, Inc. Business Instruction

Bogue Machine Company, Inc. Business Instruction Bogue Machine Company, Inc. Business Instruction Document Title: Supplier Quality Control Requirements Document Number: Revision: Document Owner: Mark Bogue Backup Owner: Craig Bogue Parent Document: PURP-004,

More information

Q2A First Article Inspection (FAI) AS9102 * Revised ** Added

Q2A First Article Inspection (FAI) AS9102 * Revised ** Added Page 1 of 5 Q2A First Article Inspection (FAI) AS9102 * Revised ** Added NOTE: A hard copy of this document may not be the document currently in effect. The current version is always the version on the

More information

Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E

Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E 9060 WINNETKA AVENUE NORTHRIDGE, CA 91324 USA Supplier Quality Assurance Provisions Manual SQAP-001 Revision E Page 1 of 14 Table of Contents 1 General Requirements... 4 1.1 Supplier Control... 4 1.2 Supplier

More information

Criteria for Flight Project Critical Milestone Reviews

Criteria for Flight Project Critical Milestone Reviews Criteria for Flight Project Critical Milestone Reviews GSFC-STD-1001 Baseline Release February 2005 Approved By: Original signed by Date: 2/19/05 Richard M. Day Director, Independent Technical Authority

More information

Supplier Quality Assurance

Supplier Quality Assurance Supplier Quality Assurance Preface We strive to continually improve our process performance by meeting quality objectives. It is imperative that our suppliers operate under the zero defects and 100% on

More information

Self-Audit Checklist

Self-Audit Checklist Page 1 Company Name: Date of audit: Date of last audit performed: Name of person performing self-audit: Signature: Name of person responsible for quality system: Signature: Number of non-compliances: Page

More information

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division Quality Assurance Requirements For Pratt & Whitney/Space Propulsion, FORM 06.13.02.02 (REV. 6) Page 1 of 14 Table of Contents SECTION I QUALITY SYSTEMS REQUIREMENTS... 5 1. QUALITY ASSURANCE PROGRAM...

More information

INTRODUCTION: PURPOSE:

INTRODUCTION: PURPOSE: UMBRA CUSCINETTI, INC. 2916 100 th Street SW Everett, WA 98204-1340 USA 425-743-2577 FAX: 425-347-0682 Printed versions may not be the latest. Suppliers shall utilize the latest version which can be found

More information

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan) ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan) Part 1: Project-Specific Quality Plan Part 2: Company Quality Manual Part 3: Submittal Forms Part 4:

More information

Supplier Quality Requirements and Clauses

Supplier Quality Requirements and Clauses Supplier Quality Requirements and Clauses Supplier Quality Requirements General The following Quality Notes (QN01 through QN19) apply to and form a part of all Purchase Orders issued by Advanced Conversion

More information

E X O M A R S. Phase B1 Product Assurance & Safety Requirements EXM-MS-RS-ESA-00002. ESTEC Noordwijk The Netherlands. Prepared by: ExoMars PA Team

E X O M A R S. Phase B1 Product Assurance & Safety Requirements EXM-MS-RS-ESA-00002. ESTEC Noordwijk The Netherlands. Prepared by: ExoMars PA Team Page: 1/42 Appendix 3 to /05/NL/GM E X O M A R S Phase B1 Product Assurance & Safety Requirements EXM-MS-RS-ESA-00002 Prepared by: ExoMars PA Team ESTEC Noordwijk The Netherlands Page: 2/42 DOCUMENT CHANGE

More information

INSPECTION IN-PROCESS AND FINAL QUALITY ASSURANCE

INSPECTION IN-PROCESS AND FINAL QUALITY ASSURANCE INSPECTION IN-PROCESS AND FINAL QUALITY ASSURANCE 1.0 SCOPE: The purpose of this procedure is to document mandatory to ensure compliance to Project Requirements. inspection points and 2.0 REFERENCE DOCUMENTS:

More information

Q2A First Article Inspection (FAI) AS9102

Q2A First Article Inspection (FAI) AS9102 Page 1 of 7 Q2A First Article Inspection (FAI) AS9102 A hard copy of this document may not be the document currently in effect. The current version is always the version on the Lockheed Martin network.

More information

Nanosat 4 Competition

Nanosat 4 Competition Nanosat 4 Competition NMSUSat2 Team New Mexico State University College of Engineering Presented by Jeremy Bruggemann Topics Competition Overview Mission Overview Design Concept Tests and Analyses Hardware

More information

GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059

GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059 QUALITY MANUAL GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059 Distribution: Position Location Copy # President / CEO Office 1 Operations Manager Office 2 Quality Assurance Office

More information

Purchase Order Clauses and Conditions

Purchase Order Clauses and Conditions Purchase Order Clauses and Conditions All purchase orders for materials, special processes, machining and fabrication services and end items are subject to the following requirements: General Requirements:

More information

System Engineering Plan

System Engineering Plan Project Documentation Document SPEC-0064 Revision A System Engineering Plan Rob Hubbard, Jeremy Wagner, Larry Daggert, Larry Stepp, Christoph Keller Systems Engineering / Project Management 5 October 2006

More information

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev

More information

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production

More information

Appendix B: Work Breakdown Structure (WBS)

Appendix B: Work Breakdown Structure (WBS) : Work Breakdown Structure (WBS) B.1. Introduction The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. In accordance with

More information

Acceptability of Printed Circuit Board Assemblies

Acceptability of Printed Circuit Board Assemblies Section No.: 12I.2.3, Sheet 1 of 9 Rev Level: 16 Additional Distribution: PCB Assembly Subcontractors 1.0 Purpose 2.0 Scope Acceptability of Printed Circuit Board Assemblies 1.1 The purpose of this standard

More information

PERFORMANCE SPECIFICATION PRINTED CIRCUIT BOARD/PRINTED WIRING BOARD, GENERAL SPECIFICATION FOR

PERFORMANCE SPECIFICATION PRINTED CIRCUIT BOARD/PRINTED WIRING BOARD, GENERAL SPECIFICATION FOR The document and process conversion measures necessary to comply with this revision shall be completed by NOT MEASUREMENT SENSITIVE 17 August 2012. MIL PRF 31032B 16 May 2012 SUPERSEDING MIL PRF 31032B

More information

Helical Products Co., Inc.

Helical Products Co., Inc. Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance

More information

www.itilhelp.com ISO 9000 Quality Standard Background Information Quality Systems Implementation

www.itilhelp.com ISO 9000 Quality Standard Background Information Quality Systems Implementation ISO 9000 Quality Standard Background Information www.itilhelp.com There is a worldwide trend towards more stringent customer expectations with regard to quality. Accompanying this trend has been a growing

More information

L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance

L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance Q10 QUALITY SYSTEM REQUIREMENTS Q10A Q10B ISO 9001:2008 Seller s quality system shall be in compliance with the requirements of ISO 9001, Model for in Design, Development, Production, Installation and

More information

UNCONTROLLED COPY FOR REFERENCE ONLY

UNCONTROLLED COPY FOR REFERENCE ONLY CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President

More information

DEPARTMENT OF DEFENSE HANDBOOK PARTS MANAGEMENT. This handbook is for guidance only. Do not cite this document as a requirement.

DEPARTMENT OF DEFENSE HANDBOOK PARTS MANAGEMENT. This handbook is for guidance only. Do not cite this document as a requirement. NOT MEASUREMENT SENSITIVE MIL-HDBK-512 04 October 2000 DEPARTMENT OF DEFENSE HANDBOOK PARTS MANAGEMENT This handbook is for guidance only. Do not cite this document as a requirement. AMSC N/A DISTRIBUTION

More information

Quality Assurance Provisions

Quality Assurance Provisions Page 1 of 5 1. Purpose and Scope. The purpose of this document is to define the Quality Assurance Provisions FLIR Systems Inc. requires for inventory material received from Suppliers. This document applies

More information

2.1.1. Distributors In addition to the requirements noted herein, Distributors shall have a Quality System

2.1.1. Distributors In addition to the requirements noted herein, Distributors shall have a Quality System 1. Purpose This document defines requirements for suppliers providing aerospace and defense materials, products and services to Electromech Technologies. Supplier acceptance of a purchase order from Electromech

More information

PPI/TZ Standard Quality Requirements for Suppliers -SQRS-

PPI/TZ Standard Quality Requirements for Suppliers -SQRS- PPI/TZ Standard Quality Requirements for Suppliers -SQRS- AS9100, ISO 13485 and ISO 9001 Revision: November 16, 2015 For questions concerning Standard Quality Requirements for Supplier (SQRS), please contact

More information

New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification

New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification New Program Quality Requirements for Suppliers (NPQR) For Limited Manufacturing of Components and/or Processes for Engineering Certification Revision A New Program Quality Requirements for Suppliers Rev.

More information

Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements

Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements Cessna - Interiors Manufacturing Facility (IMF) Supplier Quality System Requirements Wichita KS Effective: 3-11-15 Rev. IR Page 1 of 6 1.0 Introduction This document establishes Cessna Interiors Manufacturing

More information

NSSC Enterprise Service Desk Configuration Management Database (CMDB) Configuration Management Service Delivery Guide

NSSC Enterprise Service Desk Configuration Management Database (CMDB) Configuration Management Service Delivery Guide National Aeronautics and Space Administration NASA Shared Services Center Stennis Space Center, MS 39529-6000 www.nssc.nasa.gov NASA Shared Services Center Version 1.0 NSSC Enterprise Service Desk Configuration

More information

Configuration Management ISO 10007

Configuration Management ISO 10007 Configuration Management ISO 10007 Introduction Configuration Management Overview: What is Configuration Management? Collection of tools, techniques and experience designed to reduce costs and improve

More information

PI Team Masters Forum - 2. The Successful Team Composition Engineering of Systems

PI Team Masters Forum - 2. The Successful Team Composition Engineering of Systems National Aeronautics and Space Administration PI Team Masters Forum - 2 The Successful Team Composition Engineering of Systems Orlando Figueroa Deputy Center Director for Science and Technology NASA/Goddard

More information

Mechanical Installation

Mechanical Installation Page -1-1. INTRODUCTION AND PURPOSE 1.1. This specification covers the installation, testing and precommissioning of mechanical equipment. Work is to be performed in conjunction with the manufacturer s

More information

Software Quality Subcontractor Survey Questionnaire INSTRUCTIONS FOR PURCHASE ORDER ATTACHMENT Q-201

Software Quality Subcontractor Survey Questionnaire INSTRUCTIONS FOR PURCHASE ORDER ATTACHMENT Q-201 PURCHASE ORDER ATTACHMENT Q-201A Software Quality Subcontractor Survey Questionnaire INSTRUCTIONS FOR PURCHASE ORDER ATTACHMENT Q-201 1. A qualified employee shall be selected by the Software Quality Manager

More information

Linac Coherent Light Source (LCLS)

Linac Coherent Light Source (LCLS) Linac Coherent Light Source (LCLS) An X Ray Free Electron Laser LLNL Quality Implementation Plan PMD 003 r0 May 2004 Prepared for the US Department of Energy under contract numbers: SLAC DE AC03 76SF00515

More information

First Article Inspection (FAI) Training

First Article Inspection (FAI) Training First Article Inspection (FAI) Training What is the purpose an FAI? The purpose of the First Article Inspection is to provide objective evidence that all engineering design and specification requirements

More information

Space Flight Project Work Breakdown Structure

Space Flight Project Work Breakdown Structure APPENDIX G. (WBS) Space Flight Project Work Breakdown Structure G.1 Introduction G.1.1 The Project Work Breakdown Structure (WBS) is a key element of project management. The purpose of a WBS is to divide

More information

SOFTWARE CONFIGURATION MANAGEMENT GUIDEBOOK

SOFTWARE CONFIGURATION MANAGEMENT GUIDEBOOK Office of Safety and Mission Assurance NASA-GB-9503 SOFTWARE CONFIGURATION MANAGEMENT GUIDEBOOK AUGUST 1995 National Aeronautics and Space Administration Washington, D.C. 20546 PREFACE The growth in cost

More information

Supplier Quality Requirements F16 Program

Supplier Quality Requirements F16 Program ISRAEL AEROSPACE INDUSTRIES LTD. MILITARY AIRCRAFT GROUP, LAHAV DIVISION DOCUMENT IDENTIFIER : WF16Z/150901 Supplier Quality Requirements F16 Program RESTRICTION ON USE, DUPLICATION, OR DISCLOSURE OF PROPRIETARY

More information

Goddard Procedures and Guidelines

Goddard Procedures and Guidelines Goddard Procedures and Guidelines DIRECTIVE NO. APPROVED BY Signature: Original signed by NAME: A. V. Diaz TITLE: Director Responsible Office: Title: Code 300 / Office of Systems Safety and Mission Assurance,

More information

Quality Management System General

Quality Management System General Audit Date: Quality Management System General Requirement: 4.1 and 4.2.2-QMS General Verify Scope Comments/Evidence/Findings: Verify the Exclusions is applicable and justified How are the processes in

More information

SUPPLIER FIRST ARTICLE INSPECTION INSTRUCTIONS AND FORMS

SUPPLIER FIRST ARTICLE INSPECTION INSTRUCTIONS AND FORMS SUPPLIER FIRST ARTICLE INSPECTION INSTRUCTIONS AND FORMS 1-4.10-FM-35, Rev. A Page 1 of 5 Page 2 of 5 SUPPLIER FIRST ARTICLE INSPECTION INSTRUCTIONS AND FORMS Document Name: Supplier First Article Inspection

More information

KOLLMORGEN. Title: Standard Operating Procedure Counterfeit Parts

KOLLMORGEN. Title: Standard Operating Procedure Counterfeit Parts Approved By: Elliott Major Date: 11-19-09 Page 1 of 9 Rev ECO Date Approve Rev ECO Date Approve A R01_13541 07-23-10 DWL B R01_14787 12-15-11 DWL C R01_14910 03-07-12 DWL D R01_14964 04-16-12 DWL 1.0 Purpose

More information

Quality Management System Manual

Quality Management System Manual Quality Management System Manual Assurance ISO / AS Manual Quality Management System EXCEEDING ALL EXPECTATIONS Since our inception in 1965, Swiss-Tech has supplied the medical, aerospace, hydraulic, electronic

More information

Quality Agreement Template

Quality Agreement Template Quality Agreement Template Prepared by Dan O Leary Ombu Enterprises, LLC 3 Forest Ave. Swanzey, NH 03446 603-209-0600 This document is intended to form the basis for a Supplier Agreement. The document

More information

Copyright 2006 Quality Excellence for Suppliers of Telecommunications Forum

Copyright 2006 Quality Excellence for Suppliers of Telecommunications Forum Release 4.0 4.2.3 4.2.3.C.1 Control of Customer- Supplied Documents and Data The organization shall establish and maintain a documented procedure(s) to control all customer-supplied documents and data

More information

Quality Supplier Requirements for Beckwith Electric Co., Inc.

Quality Supplier Requirements for Beckwith Electric Co., Inc. Quality Supplier Requirements for Beckwith Electric Co., Inc. This Page Left Intentionally Blank To Our Valued Suppliers: One of the primary goals of Beckwith Electric is to provide the highest Quality

More information

Supplier Requirements Manual M M 0 3

Supplier Requirements Manual M M 0 3 Supplier Requirements Manual M M 0 3 Conformance to this manual is a requirement for all of Merrill Technologies Group and Ranger s suppliers & subcontractors, unless otherwise specified on purchase orders.

More information

MIL-STD-2073-1 Standard Practice for Military Packaging

MIL-STD-2073-1 Standard Practice for Military Packaging MIL-STD-2073-1 Standard Practice for Military Packaging Presented By: Richard Mast Date 19 July 2011 Revision 5, 7 Jun 2010 Agenda Review the organization and content of the MIL-STD-2073-1 1. Scope Purpose

More information

ALL PRODUCTS MFG & SUPPLY

ALL PRODUCTS MFG & SUPPLY ALL PRODUCTS MFG & SUPPLY 618 ANDERSON DRIVE ROMEOVILLE, IL 60446 PHONE: 877-255-8700 FAX: 877-255-8701 WWW. APGASKET.COM QUALITY MANAGEMENT SYSTEM MANUAL DATE: 11/20/12 REVISION 9.1 UNCONTROLLED COPY

More information

AS9100 Quality Manual

AS9100 Quality Manual Origination Date: August 14, 2009 Document Identifier: Quality Manual Revision Date: 8/5/2015 Revision Level: Q AS 9100 UNCONTROLLED IF PRINTED Page 1 of 17 1 Scope Advanced Companies (Advanced) has established

More information

PERFORMANCE EXCELLENCE Procurement Standards

PERFORMANCE EXCELLENCE Procurement Standards PERFORMANCE EXCELLENCE Procurement Standards AEROSPACE PRODUCTS Agile Revision: D Sparton Quality Policy: It is the goal of Sparton Corporation and it subsidiaries ( Sparton ) to deliver value through

More information

Gulfstream Production Certificate Operations

Gulfstream Production Certificate Operations SUPPLIER QUALITY ASSURANCE SYSTEM REQUIREMENTS SQAR 0001 REV D Supplier s Quality System David H. Trucksis Donald A. Strickland R. Christiansen PREPARED BY: REVIEWED BY: APPROVED BY: Robert W. Mullen Jr.

More information

Quality Assurance QUALITY ASSURANCE PLAN

Quality Assurance QUALITY ASSURANCE PLAN Revision 2 Page 1 of 40 QUALITY ASSURANCE PLAN PLAN APPROVALS: Jeff Shouse Signature on File DIRECTOR OF QUALITY ASSURANCE DIRECTOR OF QUALITY ASSURANCE (signature) DATE Rodney Baltzer Signature on File

More information

Quality Management System Manual

Quality Management System Manual Effective Date: 03/08/2011 Page: 1 of 17 Quality Management System Manual Thomas C. West Eric Weagle Stephen Oliver President ISO Management General Manager Representative Effective Date: 03/08/2011 Page:

More information

SUPPLIER QUALITY PROGRAM, V (U)

SUPPLIER QUALITY PROGRAM, V (U) FEDERAL MANUFACTURING & TECHNOLOGIES PQR 1060 PAGE 1 OF 17 SUPPLIER QUALITY PROGRAM, V (U) CHANGE HISTORY ISSUE DESCRIPTION OF CHANGE AUTHOR DATE E CORRECTED CHANGE HISTORY S. L. HALTER 10/18/2000 F UPDATED

More information

DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION. Contract Technical Review

DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION. Contract Technical Review DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION Contract Technical Review Quality Assurance Directorate DCMA-INST 325 OPR: DCMA-QA Administrative Changes, April 28, 2015 NOTE: The

More information

Challenge Rules. Rev. 2.0. Overview

Challenge Rules. Rev. 2.0. Overview Challenge Rules Overview The objective of the Nano-Satellite Launch Challenge is to bring forth innovations in propulsion and other technologies, as well as operations and management relevant to safe,

More information

074-8432-552 Page 1 of 7 Effective Date: 12/18/03 Software Supplier Process Requirements

074-8432-552 Page 1 of 7 Effective Date: 12/18/03 Software Supplier Process Requirements Page 1 of 7 Software Supplier Process Requirements 1.0 QUALITY SYSTEM FRAMEWORK 1.1 QUALITY POLICY The Seller shall document and implement a quality program in the form of Quality manual or detailed Quality

More information

ACCEPTANCE CRITERIA FOR QUALITY DOCUMENTATION (AC10) June 2014

ACCEPTANCE CRITERIA FOR QUALITY DOCUMENTATION (AC10) June 2014 ACCEPTANCE CRITERIA FOR QUALITY DOCUMENTATION (AC10) 1.0 INTRODUCTION June 2014 1.1 Purpose: The purpose of this acceptance criteria is to establish requirements for information that is provided to ICC-ES

More information

MIL-STD 2073: STANDARD PRACTICE FOR MILITARY PACKAGING

MIL-STD 2073: STANDARD PRACTICE FOR MILITARY PACKAGING MIL-STD 2073: STANDARD PRACTICE FOR MILITARY PACKAGING DOCUMENT OVERVIEW MIL-STD 2073-1D [military or mil standard, sometimes referred to as a MilSpec or military specification] details military packaging

More information

Requirements Management John Hrastar

Requirements Management John Hrastar Requirements Management John Hrastar NASA Project Management Conference March 30-31, 2004 University of Maryland Conference Center Introduction Three aspects of requirements management Requirements in

More information

SQF SYSTEMS PRACTICE TEST / OCTOBER, 2012 American Food Safety Services Division, Technical and Business Services, LLC

SQF SYSTEMS PRACTICE TEST / OCTOBER, 2012 American Food Safety Services Division, Technical and Business Services, LLC Introduction This document includes instructions for use and the answer key for the Implementing SQF Systems Practice Test. This Implementing SQF Systems Practice Test provides practice examination for

More information

Aviation Suppliers Association Quality System Standard. ASA-100 Revision 4.0

Aviation Suppliers Association Quality System Standard. ASA-100 Revision 4.0 Page 1 Aviation Suppliers Association Quality System Standard ASA-100 Revision 4.0 Original Issue: March 1994 Revision 4.0 Release Date: August 1, 2015 Effective Date: August 24, 2015 Copyright 1994-2015

More information

QUALITY CONTROL MANUAL

QUALITY CONTROL MANUAL QUALITY CONTROL MANUAL TABLE OF CONTENTS PREFACE I II III IV Title Page Table of Contents Information Page Revision Log SECTION DESCRIPTION 1.0 Introduction 2.0 Organization 3.0 Organization Chart 4.0

More information

QUALITY ASSURANCE PROVISIONS OF PURCHASE ORDER

QUALITY ASSURANCE PROVISIONS OF PURCHASE ORDER QUALITY ASSURANCE PROVISIONS OF PURCHASE ORDER Lockheed Martin and LMC hereinafter shall mean Lockheed Martin Maritime Systems & Sensors, Maritime Security & Ship Systems (MS&SS), a Lockheed Martin Company.

More information

Lockheed Martin Tactical Aircraft Systems (LMTAS) Fort Worth, Texas CONFIGURATION MANAGEMENT REQUIREMENTS FOR SUPPLIERS AND SUBCONTRACTORS.

Lockheed Martin Tactical Aircraft Systems (LMTAS) Fort Worth, Texas CONFIGURATION MANAGEMENT REQUIREMENTS FOR SUPPLIERS AND SUBCONTRACTORS. Lockheed Martin Tactical Aircraft Systems (LMTAS) Fort Worth, Texas CONFIGURATION MANAGEMENT REQUIREMENTS FOR SUPPLIERS AND SUBCONTRACTORS Approved: //signed// J. K. Goodman, Manager Configuration Management

More information

GE Power Electronics Business Total Quality Management for Suppliers

GE Power Electronics Business Total Quality Management for Suppliers GE Power Electronics Business Total Quality Author: Reviewers: Contributors: Alessandro A. Cervone Technical Manager Component & Reliability Engineering Alicia Scott Title Erika Nannis Title Robert Roessler

More information

Aviation Suppliers Association Quality System Standard. ASA-100 Revision 3.5

Aviation Suppliers Association Quality System Standard. ASA-100 Revision 3.5 Page 1 Aviation Suppliers Association Quality System Standard ASA-100 Revision 3.5 Original Issue: March 1994 Revision 3.5 Release Date: September 1, 2008 Effective Date: November 1, 2008 Copyright 1994-2008

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

Product Order Quality Requirements Meggitt (Orange County), Inc.

Product Order Quality Requirements Meggitt (Orange County), Inc. Product Order Quality Requirements Meggitt (Orange County), Inc. Reference QP8-051, Purchase Order Quality Requirements QP8-055, Review/Control Supplier Documentation PP-401, Quality Assurance Codes 50-2-351,

More information

How To Ensure Quality Assurance

How To Ensure Quality Assurance 1001 Robb Hill Road Oakdale, PA 15071-3200 412/923-2670 PROCUREMENT SPECIFICATION: SUPPLIER QUALITY MANAGEMENT SYSTEM REQUIREMENTS Specification Number: ATI-QA-703, Rev 4 Date: 11/12/13 Page: 1 of 7 Written

More information

The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ

The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ The Fulfillment of AS 9100 Rev C Requirements by EnterpriseIQ Manufacturers have worked to meet the stringent requirements of AS9100 for decades; the recent introduction of Revision C has further expanded

More information

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE Community Development Permit Services SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE PROJECT NAME PROJECT ADDRESS PERMIT NUMBER CITY RECEIVED STAMP AND INITIALS Instructions: BEFORE

More information

Your Software Quality is Our Business. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc.

Your Software Quality is Our Business. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc. INDEPENDENT VERIFICATION AND VALIDATION (IV&V) WHITE PAPER Prepared by Adnet, Inc. February 2013 1 Executive Summary Adnet is pleased to provide this white paper, describing our approach to performing

More information

REV G D6-51991 Boeing Partner Network REFERENCE ONLY Copy 1 of 15

REV G D6-51991 Boeing Partner Network REFERENCE ONLY Copy 1 of 15 REV G D6-51991 Boeing Partner Network REFERENCE ONLY Copy 1 of 15 TABLE OF CONTENTS Section Page Table of Contents 2 Abstract 3 Maintenance 3 References 3 Purpose 4 Scope 4 Definitions 4 1.0 Digital Product

More information

Analytical Products and Solutions. Complete service and maintenance solutions for your analytical equipment. usa.siemens.com/analyticalproducts

Analytical Products and Solutions. Complete service and maintenance solutions for your analytical equipment. usa.siemens.com/analyticalproducts Analytical Products and Solutions Complete service and maintenance solutions for your analytical equipment usa.siemens.com/analyticalproducts Support Services for Today, Tomorrow and Years to Come Providing

More information

<name of project> Software Project Management Plan

<name of project> Software Project Management Plan The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor

More information

NODIS Library Program Formulation(7000s) Search

NODIS Library Program Formulation(7000s) Search NODIS Library Program Formulation(7000s) Search NASA Procedural Requirements This Document Is Uncontrolled When Printed. Check the NASA Online Directives Information System (NODIS) Library to verify that

More information

DATA REQUIREMENTS DESCRIPTION (DRD)

DATA REQUIREMENTS DESCRIPTION (DRD) DATA REQUIREMENTS DESCRIPTION (DRD) 1. DPD NO.: XXX ISSUE: Draft 2. DRD NO.: STD/EDAL 3. DATA TYPE: 3 4. DATE REVISED: 5. PAGE: 1/3 6. TITLE: Engineering Drawings and Associated Lists 7. DESCRIPTION/USE:

More information

SOFTWARE ASSURANCE STANDARD

SOFTWARE ASSURANCE STANDARD NOT MEASUREMENT SENSITIVE National Aeronautics and NASA-STD-8739.8 w/change 1 Space Administration July 28, 2004 SOFTWARE ASSURANCE STANDARD NASA TECHNICAL STANDARD REPLACES NASA-STD-2201-93 DATED NOVEMBER

More information

Uncontrolled Document

Uncontrolled Document SOUTHWEST RESEARCH INSTITUTE QUALITY SYSTEM MANUAL July 2015 Revision 5 Quality System Manual Page iii TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 SCOPE... 1 3.0 TERMS AND DEFINITIONS... 2 4.0 QUALITY MANAGEMENT

More information

Quality Management System Manual

Quality Management System Manual Quality Management System Manual This manual has been reviewed and approved for use by: Jack Zazulak President, Aurora Machine Limited March 07, 2011 Date - Copyright Notice - This document is the exclusive

More information

DEPARTMENT OF DEFENSE COMMERCIAL AIR TRANSPORTATION QUALITY AND SAFETY REQUIREMENTS INTRODUCTION

DEPARTMENT OF DEFENSE COMMERCIAL AIR TRANSPORTATION QUALITY AND SAFETY REQUIREMENTS INTRODUCTION DEPARTMENT OF DEFENSE COMMERCIAL AIR TRANSPORTATION QUALITY AND SAFETY REQUIREMENTS INTRODUCTION The Department of Defense (DOD), as a customer of airlift services, expects an air carrier or operator soliciting

More information

STATEMENT OF WORK FOR DESIGN, FABRICATION, INTEGRATION AND TESTING OF THE TELESCOPE STRUCTURE SYSTEM TMT.STR.MGT.12.001.REL01

STATEMENT OF WORK FOR DESIGN, FABRICATION, INTEGRATION AND TESTING OF THE TELESCOPE STRUCTURE SYSTEM TMT.STR.MGT.12.001.REL01 STATEMENT OF WORK FOR DESIGN, FABRICATION, INTEGRATION AND TESTING OF THE TELESCOPE STRUCTURE SYSTEM TMT.STR.MGT.12.001.REL01 27 July, 2012 TMT.STR.TEC.12.001.DRF01 Page 2 of 13 Table of Contents 1. INTRODUCTION

More information

MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS

MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS CONTENTS 1. CONTROL PLANS 2. PROCESS APPROACH 3. PERFORMANCE 4. INTERNAL AUDITING 5. CONTROL OF NON-CONFORMING PRODUCT 6.

More information

OPERATIONAL STANDARD

OPERATIONAL STANDARD 1 of 11 1. Introduction The International Safe Transit Association (ISTA), a non-profit association whose objective is to prevent product damage and excess packaging usage within the distribution environment.

More information

Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8

Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 Table of Contents 1. SCOPE... 3 2. APPLICABLE DOCUMENTS... 4 3. TERMS AND DEFINITIONS... 4 4. QUALITY MANAGEMENT SYSTEM...4-8 5. MANAGEMENT RESPONSIBILITY...8-9 6. RESOURCE MANAGEMENT... 10 7. PRODUCT

More information

Security Control Standard

Security Control Standard Security Standard The security and risk management baseline for the lottery sector worldwide Updated by the WLA Security and Risk Management Committee V1.0, November 2006 The WLA Security Standard is the

More information

1) CERTIFICATE OF COMPLIANCE/CONFORMANCE

1) CERTIFICATE OF COMPLIANCE/CONFORMANCE Standard Supplier Quality Requirements This document defines restrictions and quality system requirements applicable when goods and services are procured to SMART ELECTRONICS part numbers or Military,

More information

www.axon-cable.com Power distribution systems

www.axon-cable.com Power distribution systems www.axon-cable.com Power distribution systems Power distribution systems As vital components for electrical power distribution in telecommunication satellites and landbased weapon systems, the bus and

More information

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 PART 1 - GENERAL 1.01 WORK INCLUDED FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 A. Provide a complete fully addressable, power limited, fire detection and evacuation system. The system shall be connected

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE COMMANDER AIR FORCE RESEARCH LABORATORY (AFRL) AIR FORCE RESEARCH LABORATORY INSTRUCTION 61-104 16 OCTOBER 2013 Scientific/Research and Development SCIENCE AND TECHNOLOGY (S&T) SYSTEMS

More information

QUALITY MANUAL REVISION RECORD

QUALITY MANUAL REVISION RECORD Page 2 of 31 REVISION RECORD Date Rev Description Jun 18, 2007 N/C Original Issue Sep 16, 2009 A Update to ISO 9001:2008 Standard. Feb 04, 2010 B Revised exclusions, removed (Except 7.3.7 from the exclusion

More information

AEROSPACE QUALITY MANAGEMENT SYSTEM - 9100

AEROSPACE QUALITY MANAGEMENT SYSTEM - 9100 AEROSPACE QUALITY MANAGEMENT SYSTEM - 9100 Dale K. Gordon Rolls-Royce Royce North America Past Chairman Americas Aerospace Quality Group April 11th, 2003 Edinburgh General Assembly 1 of 24 Aerospace Quality

More information