EXECUTIVE SUMMARY INTRODUCTION. Intended Use of the EIR/EIS

Size: px
Start display at page:

Download "EXECUTIVE SUMMARY INTRODUCTION. Intended Use of the EIR/EIS"

Transcription

1 1 EXECUTIVE SUMMARY INTRODUCTION Intended Use of the EIR/EIS The San Dieguito River Valley Regional Open Space Park Joint Powers Authority (JPA) and the U.S. Department of the Interior, Fish and Wildlife Service (USFWS) have determined that the San Dieguito Wetland Restoration Project is subject to both the California Environmental Quality Act (CEQA), the National Environmental Policy Act (NEPA), and the adopted local CEQA guidelines for the JPA, the City of Del Mar, and the City of San Diego. The need for numerous state and local permits makes the project subject to CEQA, while compliance with NEPA is required where there is federal involvement in a project. In this case, NEPA would apply to the future issuance of a 404 Permit from the U.S. Army Corps of Engineers, as well as to the future granting of federal funds for various aspects of project implementation. To address the requirements of both CEQA and NEPA, the JPA and USFWS have prepared this joint Environmental Impact Report/Environmental Impact Statement (EIR/EIS) for the San Dieguito Wetland Restoration Project. Because NEPA and CEQA are somewhat different with regard to procedural and content requirements, the document has been prepared to comply with whichever requirements are more stringent. The JPA is the lead agency for compliance with CEQA, while USFWS is the lead federal agency for compliance with NEPA. In accordance with both CEQA and NEPA, the lead agencies have the responsibility for the scope, content, and legal adequacy of the document. Therefore, all aspects of the EIR/EIS scope and process are being coordinated between the two agencies. This joint EIR/EIS is an informational document intended to inform both the decision makers and the public of the potentially environmental effects associated with the design, construction, and long-term maintenance of a coastal wetland restoration project at the San Dieguito Lagoon. The EIR/EIS also addresses potential impacts associated with the implementation of a park master plan for the lagoon area that is proposed by the JPA. Approval of this park master plan will establish the planning framework for the overall restoration and interpretation of the westernmost portion of the San Dieguito River Valley. In addition to tidal wetland restoration, the plan addresses upland and non-tidal wetland restoration, public access and trails, interpretation features including a visitor center, and the potential future uses of designated disposal sites intended to receive excavated/dredged materials generated from proposed tidal restoration activities. The proposal to restore the coastal wetlands and upland areas surrounding the San Dieguito Lagoon, as well as the public access and interpretation components of the project, are part of the vision for the larger San Dieguito River Valley Regional Open Space Park. This open space park planning effort extends from Volcan Mountain near Julian westward along the San Dieguito River drainage to the ocean at Del Mar. The proposals for coastal wetland and upland restoration near the lagoon, the Coast to Crest Trail, and other trail and interpretive concepts were adopted as part of the San Dieguito River Park Concept Plan (San Dieguito River Park JPA 1994a), by the JPA in In association with the processing of the Park Concept Plan, the JPA also prepared and certified the San Dieguito River Park Concept Plan Program EIR (San Dieguito River Park JPA 1994b). This Program EIR is incorporated by reference into the current EIR/EIS. San Dieguito EIR/EIS ES-1

2 Executive Summary Project Location The San Dieguito Wetlands Restoration planning area encompasses approximately 440 acres at the western end of the San Dieguito River Valley and generally includes the public lands located between El Camino Real on the east, the Pacific Ocean on the west, Via de la Valle on the north, and the northern edge of the Carmel Valley planning area on the south. The project site, which is situated entirely within the coastal zone, is located within incorporated boundaries of the cities of Del Mar and San Diego in San Diego County, California. Project Background The San Dieguito Lagoon was once the largest of the six San Diego coastal lagoons. Restoration of the San Dieguito coastal wetlands has been a stated goal of the Cities of Del Mar and San Diego, local citizens, and the organizers of the San Dieguito River Park JPA for over two decades. In the late 1970s, the City of Del Mar and the State Coastal Conservancy prepared a plan for revitalizing and managing what remained of the lagoon and surrounding areas west of Interstate 5 (I-5) near the mouth of the river. As a result of that effort the City of Del Mar adopted the San Dieguito Lagoon Resource Enhancement Program in 1979 as part of its General Plan. In 1983, a portion of the enhancement program was implemented using a grant from the Coastal Conservancy. This restoration program involved dredging a new tidal basin on 70 acres of land acquired by the California Department of Fish and Game as an Ecological Reserve and located in the southern corner of the historic wetlands just west of I-5. The river mouth was also opened, thus restoring tidal influence, at least temporarily, to the entire coastal wetland. Since this initial restoration effort was completed, the restoration goal has been expanded to address both the west and east sides of I-5, with the stated goal of restoring what remains of the historically San Dieguito Lagoon system. In the early 1990s, efforts began to direct coastal wetland mitigation proposals to San Dieguito. One possible mitigation project was identified when the California Coastal Commission (CCC) in July 1991 adopted new permit conditions for the San Onofre Nuclear Generating Station (SONGS) Units 2 and 3. These conditions required Southern California Edison (SCE) to create or substantially restore 150 acres of tidal wetland as mitigation for impacts to the marine environment caused by the construction and operation of SONGS Units 2 and 3. The CCC identified eight wetlands, including San Dieguito, in Southern California that could be evaluated for suitability as the required mitigation site. By June 1992, the CCC had approved San Dieguito as the site for the required mitigation. The San Dieguito Wetland Restoration Project addressed by this EIR/EIS includes the proposal to restore wetlands as mitigation for impacts caused by SONGS Units 2 and 3. This aspect of the restoration project would be implemented by SCE, as the managing owner of SONGS. SCE has identified a preferred alternative, the Mixed, for implementing the requirements of the CCC. This alternative is one of six (including the No Action Alternative) that is analyzed in this EIR/EIS. The proposed tidal wetland restoration component of this project, in addition to addressing CCC permit conditions, also includes tidal wetland restoration acreage to fulfill the conditions of a compromised settlement between SCE and Earth Island Institute, Inc. The restoration plan recommended for approval and/or permitting by the lead agencies will be analyzed by the CCC to determine the amount of wetland credits being provided to address the CCC permit conditions. To make this determination, the CCC will consider the standards and criteria set forth by the CCC staff for defining created or substantially restored tidally influenced ES-2 San Dieguito EIR/EIS

3 Executive Summary salt marsh. As stated previously, the permit conditions require SCE to submit a plan that includes a total of 150 acres of credit, including the creation and/or substantial restoration of 115 acres of tidal wetland. The SONGS permit states that up to 35 acres of enhancement credit will be given for permanent, continuous tidal maintenance if the final restoration plan provides for enhancement of at least 126 acres through tidal maintenance. The 35 acres of enhancement credit is based upon the determination that 126 acres of existing wetlands at San Dieguito will be enhanced by 28 percent if the tidal flows are maintained continuously. If less than 126 acres are enhanced, then the amount of enhancement credit awarded will be equal to 28 percent of the total number of existing tidal wetland acres that are enhanced by tidal maintenance. In order to calculate acreage credits pursuant to the SONGS coastal development permit, the CCC staff provisionally has defined the upper boundary for created or restored high tidal salt marsh as +4.5 feet National Geodetic Vertical Datum of 1929 (NGVD). This elevation was determined by CCC scientific staff based on data collected at several existing wetland sites. The tidal hydraulics of the restored system under alternative restoration designs have been modeled in a series of studies by Jenkins and Wasyl (1998, 1999a-d). The resulting hydroperiod functions that relate tidal inundation/exposure frequencies to elevations on the shore lead to a predicted upper boundary of high salt marsh that is in the range of +4.7 feet to +4.9 feet NGVD, but differs slightly between alternatives. This EIR/EIS recognizes that in nature there is not generally a sharp demarcation between tidally influenced wetlands and adjacent non-tidal wetlands or uplands, but rather a transition zone of diminishing tidal influence with increasing elevation. In addition, there is not necessarily universal agreement among specialists concerning the upper boundary of salt marsh that is substantially free of upland species. Accordingly, in evaluating the creation of wetlands by the different restoration alternatives, the EIR/EIS treats +4.5 feet NGVD as the upper limit of high tidal salt marsh, but recognizes as transitional wetland habitat the area between +4.5 feet NGVD and the upper limit predicted by the hydroperiod function. This approach provides the information needed by the public, the agencies, and the decision makers, including the CCC, to make informed decisions about the project. It is not the purpose or intent of this EIR/EIS to evaluate either the adequacy of the CCC permit conditions as mitigation for impacts from SONGS Units 2 and 3, or the effectiveness of the proposed mitigation plan in meeting the minimum standards and objectives set forth for wetland mitigation in the CCC Permit for SONGS Units 2 and 3. The determination as to whether or not the SCE restoration plan meets the approved permit condition is the sole responsibility of the CCC. The proposal to restore coastal wetlands is one element, albeit the predominant element, of a larger restoration and public access plan for all of the public open space lands within the San Dieguito River Valley that lie between El Camino Real on the east and the Pacific Ocean on the west. Various adopted planning documents, including the San Dieguito River Park Concept Plan and the City of Del Mar San Dieguito Lagoon Enhancement Program, include goals for restoring both coastal wetlands and adjoining upland and freshwater wetland habitats and providing for compatible public access and resource interpretation. All of these components have been incorporated into the various wetland restoration alternatives, as well as the accompanying draft park master plan for this area. San Dieguito EIR/EIS ES-3

4 Executive Summary Purpose of and Need for the Project Historically, the San Dieguito Lagoon and its adjoining coastal wetlands occupied much of the western San Dieguito River Valley and included a mosaic of vegetated salt and brackish marsh, with associated tidal embayments, sloughs, and mudflats. The San Dieguito wetlands have experienced extensive filling and alteration, beginning as early as the late 1800s. Today, less than half of the historic wetlands remain intact. During the same period that the lagoon and marshland were being filled, the surrounding area was also being developed for a variety of commercial and residential uses. Consequently, the historical context of the tidal marsh ecosystem components and the regular influence of the ocean tidal waters have been seriously diminished. The portion of the historical marsh system that still exists at the San Dieguito Lagoon continues to be viewed as, despite the degradation that has occurred over the years to its wetland and aquatic functions. The primary purpose of the proposed project is to restore the habitats that historically occurred within this coastal area, taking into consideration the constraints now imposed by existing adjacent land uses. In light of permanent losses of adjacent wetlands and aquatic areas in addition to permanent hydrologic modifications, and urbanization surrounding San Dieguito over the last century, complete restoration of wetland and aquatic functions to historical levels is probably not possible. However, there is opportunity for the creation and/or substantial restoration of large portions of the area that historically supported coastal wetlands. In addition, recent public acquisitions of the western river valley s floodplain areas and surrounding uplands provides many opportunities for restoration of native grasslands, coastal sage scrub, and other upland habitats, as well as freshwater habitats including freshwater marsh and southern willow scrub. Finally, the project offers opportunities for public access and interpretation/education. Scope of the EIR/EIS This EIR/EIS contains the full range of topics required under both CEQA and NEPA, including a table of contents, summary, purpose and need for the proposed action, description of alternatives, environmental setting, environmental impact analysis for short- and long-term, direct and indirect impacts, as well as cumulative impacts, mitigation measures and monitoring, growth inducing impacts, and irreversible changes associated with the project. The document presents a range of alternatives, which are all evaluated at the same level of detail in the environmental consequences section, as required under NEPA. A number of technical studies were conducted in association with the development of project alternatives and the preparation of this document. These studies are summarized in the body of the EIR/EIS and are provided as appendices, as deemed appropriate. Required Permits and Approvals (Federal, State, and Local) The following actions and approvals are anticipated to be required: San Dieguito River Park JPA Approval by the JPA Board of Directors of a final restoration plan and associated Park Master Plan and certification of the Final EIR/EIS. City of Del Mar Permit for grading and possible Amendment to the City of Del Mar s General Plan and LCP and Coastal Development Permit. ES-4 San Dieguito EIR/EIS

5 Executive Summary City of San Diego Land Development and Sensitive Lands Permit, possible Coastal Development Permit, Conditional Use Permit for the nature center, right-of-entry and possible encroachment permit for various trail segments. U.S. Army Corps of Engineers Individual 404 and Section 10 Permits. U.S. Fish and Wildlife Service Section 7 Consultation. California Department of Fish and Game Streambed Alteration Agreement and possible Encroachment Permit. Caltrans, District 11 Encroachment Permit. North County Transit District Possible Encroachment Permit. Regional Water Quality Control Board 401 Certification and/or Discharge Permit. San Diego County Air Pollution Control District Permit to Operate for Dredge. 22nd District Agricultural Association Approval to utilize portions of the District property for the project. California State Lands Commission Possible Lease of State Lands. California Coastal Commission Approval of the Final Restoration Plan and Coastal Development Permit(s). California Public Utilities Commission Approval of the relocation of San Diego Gas & Electric Company s 69 kv electric transmission line Circuit TL 667 and 12 kv distribution underbuilds. Project Description The San Dieguito Wetland Restoration Project includes restoration and enhancement of tidal wetlands, the development of native upland habitat on the public properties surrounding the proposed wetlands, and the enhancement and expansion of several freshwater and seasonal coastal wetland areas. Another important element of the project is the implementation of a public access and interpretive plan for the project area that includes proposals for a regional trail, nature trails, a nature/interpretive center, trail staging areas, and an interpretive program. In accordance with the adopted San Dieguito River Park Concept Plan, a Park Master Plan for this portion of the San Dieguito River Valley has also been drafted to address all of these project components. A major component of this planning effort is a tidal restoration proposal to (1) restore the aquatic functions of the lagoon through permanent inlet maintenance and expansion of the lagoon s tidal prism, and (2) create subtidal and intertidal habitats on both the east and west sides of I-5. Tidal restoration would involve modifications to the existing drainage pattern, excavation of the tidal inlet to promote continual tidal exchange, excavation/dredging of sediments on up to 247 acres to create/restore coastal wetlands, construction of three berms (two for the Reduced Berm Alternative) along the river to maintain existing flood flows and direct sediment transport to the San Dieguito EIR/EIS ES-5

6 Executive Summary ocean, and identification of appropriate disposal sites for excavated/dredge material generated from the project. Five nesting sites, which would provide 13.7 acres of flat nesting area for the California least tern, western snowy plover, and other shorebirds, are also proposed in the restoration plan. The draft EIR/EIS analyzes six project alternatives including the Mixed Habitat, Maximum Tidal Basin, Maximum Intertidal, Hybrid, Reduced Berm, and No Action alternatives. All but the Reduced Berm and No Action alternatives have the same restoration footprint. Each of five action alternatives proposes a different mix of tidally-influenced habitat types and require a different grading plan, with those alternatives that would create larger areas of subtidal and low salt marsh requiring more excavation than those alternatives that would create intertidal mudflats and high marsh. Excavation generated from these alternatives would range from 1.2 million to 3 million cubic yards. PROJECT IMPACTS The environmental impacts of the five project alternatives (with the exception of the No Action Alternative) are summarized in tables ES-2 through ES-5 by resource, along with proposed mitigation measures and level of significance after mitigation. Potentially environmental impacts have been identified in the areas of land use, landform alteration/visual quality, hydrology/water quality, traffic circulation, noise, air quality, geology and soils, public utilities, biological resources, public health and safety, and natural resources. The project includes measures to mitigate some potential impacts, while other mitigation will be made conditions of subsequent permits. Cumulative impacts are not addressed in these tables but are described in Chapter 6 of this EIR/EIS. The project has beneficial impacts, as well, including: Helping to restore aquatic functions by opening the tidal channel and maintaining tidal exchange between the ocean and lagoon/wetlands, thereby improving water quality and health of wetland habitat. Restoring habitat and improving existing habitat values, thereby benefiting threatened and endangered species (least tern, snowy plover, and Belding s savannah sparrow). Increasing acreage of all tidal habitats with beneficial impacts on associated species. Improving functions and values of existing tidal habitats with beneficial impacts on associated species. Enhancing functions and values of seasonal wetlands with beneficial impacts on associated species. Restoring native uplands with beneficial impacts on associated species. Enhancing fresh and brackish water marsh, riparian woodland and scrub habitats. ES-6 San Dieguito EIR/EIS

7 Executive Summary Creation of nest sites would benefit least tern and snowy plover and other waterbirds that may use these sites and would contribute to the restoration of ecosystem functions and values. Preserving the site in open space and restoring a number of filled and otherwise degraded areas with native vegetation, thereby improving the overall aesthetic qualities of the site. Providing additional recreational opportunities in areas currently closed to public use through the design and implementation of a regional trail, nature trails, a nature/interpretive center, trail staging areas, and an interpretive program. RECOMMENDATIONS In accordance with Section (e)(2) of the CEQA Guidelines, the lead agencies have reviewed the alternatives presented in this document in order to determine the environmentally superior alternative. In making this selection, the agencies are required to consider the short- and long-term environmental impacts and benefits of each alternative. The very nature of the proposal, the restoration of native wetland and upland habitats, makes this a difficult task. As developed, each of the restoration alternatives would provide important but somewhat different benefits to the environment. Therefore, for the purpose of selecting the environmentally superior alternative, the lead agencies did not attempt to rank these benefits; rather, all of the restoration alternatives were viewed as having similar environmental benefits. The alternatives were then ranked in terms of their overall impacts on the environment. Based on this analysis, the Maximum Intertidal Alternative is considered the environmentally superior alternative. Implementation of this alternative would require the least amount of excavation of the four major restoration alternatives (Mixed Habitat, Maximum Tidal Basin, Maximum Intertidal, and Hybrid). Reduced grading would result in reduced impacts to air quality, traffic, landform, water quality, and noise. The Reduced Berm Alternative would require ly less initial grading. However, this alternative was not selected as the environmentally superior alternative because of its greater longterm environmental impacts. These impacts result from the need for more frequent maintenance at the river mouth and in the river channel due to the reduced tidal prism provided by this alternative. Such increases in maintenance would result in greater disruption at the river mouth and on the beach over the life of the project, resulting in more frequent short-term impacts to recreation, visual quality, and noise. Neither CEQA nor NEPA require that the environmentally superior alternative be the same as the agency preferred alternative, therefore, it should not be automatically assumed that the environmentally superior alternative will also be considered the agencies preferred alternative. In fact, the lead agencies have not yet selected their preferred alternative. This will be done after taking into consideration the public comments received for the draft EIR/EIS. The Final EIR/EIS, which will be made available for public review in accordance with NEPA, will identify the lead agencies preferred alternative. San Dieguito EIR/EIS ES-7

8 Table ES-1. Summary of Significant Impacts of the Mixed Resource Significant Impact Measure Land Use Use of SA3 and the access road leading to this construction staging area could be incompatible with residences along Racetrack View Drive. Excavation/construction west of I-5, inlet dredging, and maintenance dredging would produce temporary noise and night lighting impacts on residential areas along Sandy Lane. Additionally, periodic disruption of beach use would occur during maintenance dredging. Hours of operation at SA3 shall be limited to 7 A.M. to 7 P.M. and nighttime lighting shall be shielded and limited to that needed for security and nighttime maintenance, should this activity be permitted by the appropriate land use authorities. The construction contractor shall be responsible for implementing this mitigation, with oversight by SCE or JPA. Use of the proposed new haul road for construction access to SA3 shall be limited to mobilization, demobilization, and occasional truck traffic for equipment maintenance and exchange and hours of operation limited to 7 A.M. to 7 P.M. Use of the haul road for daily access by construction workers going to and from the work site shall be prevented. The construction contractor shall be responsible for implementing this mitigation, with oversight by SCE or JPA. A public outreach/public comment program shall be developed by the applicant and approved by the appropriate affected agencies (City of Del Mar, City of San Diego, CCC, JPA).

9 Table ES-1. Summary of Significant Impacts of the Mixed Resource Significant Impact Measure Land Use Crossing the river mouth on foot would become relatively more difficult most of the time and prevented at some periods, particularly during high tides. If either DS37 or DS38 were used as disposal sites during peak times, such as the fair or racing season, disposal activities could conflict with activities at these sites. The Coast to Crest Trail could conflict with use of the 22 nd District Agricultural Association's seasonal parking lot and Surf and Turf golf driving range. Prior to the approval of discretionary permits required for the project from the City of Del Mar, the applicant shall prepare, to the satisfaction of the City of Del Mar, a design for a pedestrian access way along the south side of the inlet channel that would accommodate access to Camino Del Mar. In addition, the applicant shall also agree to fund and construct said pathway prior to opening the inlet channel. If based on additional design work, the City of Del Mar determines that the pathway is in fact technically infeasible, an alternative access way to Camino Del Mar shall be considered. Disposal sites D37 and D38 shall not be used during peak times such as the Del Mar fair or racing season. A 5- to 6-foot-high fence with 1-inch or smaller mesh shall be provided between the driving range and the trail. A lodgepole or post and cable fence shall be provided between the trail and the District s parking areas. The final trail design and alignment shall be coordinated with the District in order to minimize potential conflicts. if technically feasible to construct the pathway in a timely manner.

10 Table ES-1. Summary of Significant Impacts of the Mixed Resource Significant Impact Measure Land Use The preferred alignment for the Coast to Crest Trail east of the Via de la Valle property is to travel along the north side of the San Dieguito River near the southern end of the Horsepark property. This alignment could result in potentially land use conflicts between the existing equestrian operation and public trail uses. Land use compatibility impacts to residential areas located to the north of the site across Via de la Valle could occur if public address systems are used and/or if night lighting is visible. Use of a tram on the proposed trail system during the Del Mar fair could cause conflicts with bicyclists, hikers, equestrians, and other users. The tram could cause safety impacts, as well as a diminishment of the overall recreational experience. Prior to construction of the Coast to Crest Trail, the JPA shall coordinate the trail alignment with the District to ensure that use conflicts have been minimized. Measures such as the installation of fences, gates, and possibly vegetative screening shall be considered and District staff shall be consulted to determine the best alignment for the trail through the Horsepark facility. Implement mitigation measures described for noise and visual resources below. No feasible mitigation measures have been identified. Significant

11 Table ES-1. Summary of Significant Impacts of the Mixed Resource Significant Impact Measure Hydrology/ Water Quality Construction could result in: Spills or leaks of oils or fluids onto ground and into aquifer or wetlands; Potential for increased channel and river bottom scour; Short-term impacts to water quality (e.g., increased turbidity) during dredging, berm and nesting site construction, and upland disposal. The contractor shall attend a pre-construction meeting to review all required environmental mitigation measures prior to the commencement of any construction activity. Prior to the utilization of any construction staging areas, temporary berms/cofferdams shall be constructed around the staging areas to prevent the transport of spilled materials into adjacent waterways. The contractor shall take all appropriate precautions to avoid spillage or leakage of hazardous materials, such as petroleum products, all fueling and maintenance of construction vehicles shall occur either off-site or be limited to the designated staging areas. The contractor shall be responsible for removing and properly disposing of any hazardous materials that are brought onto the construction site as a result of construction activity and/or removing and properly disposing of any soils that become contaminated during the construction process through spillage or leakage. All such contaminated areas shall be cleaned up prior to preparing the construction site and temporary construction staging areas for revegetation. The contractor shall prepare, submit to the JPA and any other designated agencies for review and approval, and follow the recommendations of a spill prevention and contingency plan.

12 Table ES-1. Summary of Significant Impacts of the Mixed Resource Significant Impact Measure Hydrology/ Water Quality The contractor shall construct additional temporary berms around fuel storage areas that shall be maintained for the full time during which construction is occurring and construction equipment is present on the site, and all fuel storage areas shall be confined to designated construction staging areas. The contractor shall construct berms or erect silt curtains around areas being excavated/graded to reduce soil losses to waterways. The contractor shall control fugitive dust emissions through watering or other accepted standard methods of control. Water quality monitoring shall be implemented for the following: Monitor the dewatering effluent to demonstrate that the effluent quality has achieved the appropriate receiving water criteria. Construction may be halted if effluent levels are not within established criteria. Conduct water quality monitoring during dredging/construction activities; if monitoring results indicate excessive impacts (e.g., depressed dissolved oxygen concentrations), modifications to construction or sediment disposal methods to lessen the magnitude of the impacts shall be developed and implemented in consultation with the appropriate permitting agencies. All designated fill slopes shall be hydroseeded and landscaped within 30 days of completion of grading activities. Incorporate various engineered erosion control measures into the project design.

13 Table ES-1. Summary of Significant Impacts of the Mixed Resource Significant Impact Measure Hydrology/ Water Quality Public use of the proposed trails may result in greater amounts of trash, debris, and wastes from domestic animals (e.g., horses). Runoff containing these materials could adversely impact surface water quality. The use of area U18 for multiple uses, including equestrian uses and seasonal parking, could result in greater amounts of trash, debris, and wastes from domestic animals (e.g., horses) than under existing conditions. Runoff containing these materials could adversely impact surface water quality. Temporary sedimentation and desilting basins, to be located between graded areas and adjoining wetlands shall be constructed and maintained until the potential for erosion of graded areas has been minimized through the successful establishment of erosion control landscaping.. Expand the JPA's current trail maintenance program to cover the trails located within the current project area. This maintenance program shall include the requirement to perform regular trail maintenance, including manure and trash removal from and around the trail. Trail tread maintenance intended to avoid erosion problems on natural soil surfaced trails shall occur on as-needed basis. The maintenance program shall include a monitoring component that will determine when and how often trail cleanup should occur. This could result in more frequent maintenance, but under no circumstances shall trail cleanup occur less than once ever two weeks. If seasonal tram use is permitted on the Coast to Crest, then trail cleanup should occur daily during the period in which trams are using the trail. Implement a routine maintenance program for the area that would include regular trash and debris cleanup, routine removal of manure from the site, protection of slope vegetation to ensure adequate erosion control on adjoining slopes, routine dust control, and proper drainage of the site that is directed away from the adjoining wetlands.

14 Table ES-1. Summary of Significant Impacts of the Mixed Resource Significant Impact Measure Geology/ Soils Biological Resources Grading of construction staging areas, access areas, disposal sites, and public access areas could result in erosion and associated short-term water quality impacts. Erosion of graded slopes at disposal sites could result in potential long-term water quality impacts. Seismically induced ground shaking could result in liquefaction, differential settlement, and lateral spreading, including potential slope failure of berms, nesting sites, freeway embankments, and disposal sites. Overexcavation of area W1 could result in potential slope instability of the adjacent freeway embankment. Post-construction shrinkage of soil could result in differential settlement and distress of structure foundations. Natural corrosivity of on-site soils could result in corrosion of future ferrous metal structures. Precise elevation controls are necessary to ensure that habitats are graded to design specifications and provide the intended functions and values. If least terns, snowy plovers, or other water birds were to nest on NS15 in the future, use of the access road and staging area SA3 could affect their reproductive success and risk injury to the birds. Implement standard short-term erosion control features during grading and construction of permanent erosion control features on slopes of disposal sites. Site-specific geotechnical investigations shall be completed in areas proposed to receive fills, including berm areas, nesting sites, public access areas, and disposal sites. A geotechnical investigation shall be completed to determine appropriate slope stability measures. Dewatering of soils shall be completed prior to sediment placement to allow pre-construction shrinkage of soils. Heavy-gauge, corrosion protected, steel drainage pipes/culverts or plastic pipe shall be utilized in the berms. Survey benchmarks shall be established prior to construction and surveyed during construction to ensure that elevations are achieved within a tolerance of +/ ft. All construction activities within 100 feet (or as otherwise determined by the USFWS) of any California least tern or western snowy plover breeding habitat shall not resume or begin until a qualified, USFWS approved biologist determines that breeding is not taking place.

15 Table ES-1. Summary of Significant Impacts of the Mixed Resource Significant Impact Measure Biological Resources Potential impacts of staging areas and haul routes include the removal of existing vegetation, disruption of wildlife use including possible nesting on NS15 alteration of soil and drainage characteristics, and construction-related spills. Although the project commits to restoration of these areas, plans to accomplish this are only generally developed. Final details should be addressed during permitting for the project. Impacts are considered potentially but mitigable by confining ground disturbance, parking, and maintenance/ refueling activities to areas that are of lowest value to wildlife and can most easily be restored following construction, and by avoiding the use of areas where sensitive bird species are nesting. The water control structure for haul route to DS38 would temporarily disrupt tidal flows and constrict the area of passage for aquatic organisms. Frequent use of the structure by trucks hauling sediment to DS38 would also disturb fish and wildlife in the vicinity. If California least terns or western snowy plovers are breeding, all construction activities within 100 feet (or as otherwise determined by the USFWS) of the active breeding sites shall be postponed until breeding activities have finished (approximately September 15 or as otherwise determined by surveys and the USFWS). Proposed construction staging areas and haul routes shall be located within the footprint of marsh restoration and the overlap of existing wetlands minimized wherever possible. To achieve this, the following modifications to proposed staging areas and haul routes shall be incorporated into the final grading plans: The haul route that passes east-west under I-5 shall be located as far to the south as possible to avoid the population of Coulter's goldfields on the west side of the bridge and the existing tidal channel east of the bridge. The haul route and water control structure on the southwest side of I- 5 shall be placed in ruderal habitat on the berm west of the bridge. Staging Area SA3 shall be reconfigured as close as possible to the toe of the I-5 embankment to avoid existing seasonal wetlands. Staging Area SA4 shall be relocated into the W4 wetland restoration footprint and adjacent ruderal habitat, avoiding areas of seasonal wetlands to the west.

16 Table ES-1. Summary of Significant Impacts of the Mixed Resource Significant Impact Measure Biological Resources Prior to construction, the boundaries of staging areas and haul routes shall be flagged by a qualified biologist. In addition, a biological monitor shall be present during the pre-construction meeting and during initial grading of these areas to ensure that no construction activity occurs outside of the designated construction boundaries. All sensitive biological areas within the project site but outside the restoration footprint shall be delineated on construction plans and flagged in the field in order to avoid any impacts to special status plants or habitats. Prior to any construction-related disturbances, all construction personnel shall attend an environmental training session that shall discuss the sensitive resources in the project area and the mitigation measures designed to protect them. All haul roads and construction staging areas (with the exception of SA3) shall be restored to predisturbance construction conditions following completion of construction. Prior to use of SA3 during the March through September period, a qualified biologist shall confirm the absence of nesting by least terns, snowy plovers, or other sensitive bird species, within 500 feet of the staging area and associated haul route.

17 Table ES-1. Summary of Significant Impacts of the Mixed Resource Significant Impact Measure Biological Resources Beach disposal could adversely impact grunion spawning or the survival of eggs and larvae from previous spawns. Destruction of jurisdictional wetlands that are converted to uplands through use of disposal site DS38. No excavation shall occur at the river mouth (SA1) until a fenced access way has been installed to direct beach users around the construction and down to the beach. This fencing would ensure that vegetated foredunes and coastal bluff scrub would not be impacted by beach users looking for an alternate route to the beach. All vehicles and construction equipment shall be parked, and equipment refueling and maintenance shall take place only in designated areas where potential spills of fuel, lubricants, or coolants can be contained and cleaned up without impacts on adjacent wetland and aquatic habitats. The proposed bridge and temporary water control structure needed to accommodate the haul road proposed to cross I-5 shall incorporate gates or culverts that can be opened and closed temporarily, enabling tidal and river flows to pass through the structure during periods when water control is not needed but the bridge must be left in place for use as a haul route. Beach disposal shall not occur during the high tide spawning and hatching periods of the California grunion, as predicted by the CDFG. Based on USACE final determination of jurisdictional area at DS38, compensatory acreage of wetlands would have to be provided at a 4:1 ratio for any unavoidable losses of jurisdictional habitat. acreage does not appear to be available, making use of this site potentially infeasible. Significant unless sufficient mitigation acreage were provided

18 Table ES-1. Summary of Significant Impacts of the Mixed Resource Significant Impact Measure Biological Resources A portion of the trail alignment (up to 2 acres) would require the conversion of wetlands to non-wetland trail use. The JPA shall work with the USACE to determine the exact acreage of wetland habitat that would be impacted by the construction of the Coast to Crest Trail. Impacts to freshwater marsh (up to 0.28 acre) shall be mitigated at a 1:1 ratio; impacts to seasonal salt marsh (up to 1.18 acres) shall be mitigated at a 4:1 ratio; and impacts to tidal wetlands (up to 0.5 acre) shall be mitigated at a 4:1 ratio. To mitigate for these impacts, creation of up to 0.28 acres of freshwater marsh, up to 4.7 acres of seasonal salt marsh, and up to 2 acres of tidal wetlands are proposed. These mitigation areas are shown on figures , , , and as areas M32, M33, M34 and M37. Area M32 represents the creation of up to 2.31 acres of high salt marsh, M33 represents the creation of up to 1.15 acres of seasonal salt marsh, M34 represents the creation of up to 0.30 acres of freshwater marsh, and M37 represents the creation of up to 4.75 acres of salt marsh transition habitat. An additional 0.12 acre of wetland mitigation would be required if the Coast to Crest Trail were to accommodate the tram. The exact amount of mitigation acreage for the Coast to Crest shall be determined during the permit application process.

19 Table ES-1. Summary of Significant Impacts of the Mixed Resource Significant Impact Measure Biological Resources If inlet maintenance ceases, populations of tidal marsh plants, invertebrates, fish, and wildlife that become established in the restored, fully tidal system could be adversely affected by inlet closure and the resulting deterioration of water quality. Areas near the river mouth would be disturbed during wetland construction and subjected intermittently to disturbance in conjunction with inlet maintenance. Disturbance would include both the direct effects of equipment operation and the indirect effects of redirected foot traffic. A increase in the turbidity of the water associated with construction may temporarily reduce foraging success of terns using the lagoon area during the construction period. The disruption of least tern foraging or breeding activities would be a impact that could be mitigated by the avoidance of construction activities within 500 feet of nesting birds, and the installation of sediment fencing around work areas and other erosion control measures (described under the water quality mitigation section) to control erosion and limit turbidity. Prior to the approval of the San Dieguito Wetland Restoration project by the JPA, the JPA shall enter into an agreement with SCE that would provide the legal and financial guarantees necessary to ensure that the inlet will be maintained in an open condition in perpetuity and the restored wetland will continue to attain the biological benefits described in section 4.4. Impacts on these sensitive habitats are potentially but mitigable by confining activities to areas of lowest biological value and providing public access along pre-existing trails where native vegetation would not be impacted. See Hydrology/Water Quality above.

20 Table ES-1. Summary of Significant Impacts of the Mixed Resource Significant Impact Measure Biological Resources If breeding on the site occurred during construction, least Bell's vireo could be adversely affected. Possible disturbance of Belding's savannah sparrow during nesting season. Least Bell s vireo presence/absence surveys shall be conducted in the spring by a qualified, USFWS approved biologist. Surveys shall take place in the riparian habitat in the southeastern part of the property prior to the commencement of any activities within 500 feet of that area. If this species is present during its breeding season, grading and other intense activity associated with habitat restoration within 200 feet, or as otherwise determined by the USFWS, of the breeding habitat shall be scheduled to occur outside the least Bell s vireo breeding season (approximately March 15 through September). Belding s savannah sparrow presence/absence surveys shall be conducted in the spring by a qualified, USFWS approved biologist in all suitable habitat within the project area. Construction staging, excavation, dredging, disposal sites use, and berm creation shall be scheduled to occur outside the breeding season for Belding s savannah sparrow (March 1 to August 1) for all activities that would occur in or within 100 feet of habitat known to support Belding s savannah sparrow breeding. Obtain CDFG incidental take permit as required.

21 Table ES-1. Summary of Significant Impacts of the Mixed Resource Significant Impact Measure Biological Resources Predation on least tern or snowy plover nests could be increased, or nesting could be discouraged, by fences, structures, bushes, or public access that is too close to the nest sites. California least tern and western snowy plover breeding habitat created onsite shall include the following characteristics: The nesting sites shall be monitored to address fencing and potential predation issues. If least terns begin using the nesting sites, the nesting attempts shall be monitored to determine if predation is a problem, and if so, whether it is mammalian or avian in origin, and appropriate measures shall be taken to eliminate any future predation. Large shrubs or man-made structures that could be used as perches by predators shall not be allowed on the berms near the nest sites. Fencing shall not be installed initially around the nesting sites west of the highway, and shall be based on monitoring studies on the incidence of predators following construction. The nesting sites shall be monitored to address fencing and potential predation issues. If least terns begin using the nesting sites, the nesting attempts shall be monitored to determine if predation is a problem, and if so, whether it is mammalian or avian in origin.

22 Table ES-1. Summary of Significant Impacts of the Mixed Resource Significant Impact Measure Biological Resources If the use of fencing is unavoidable (to exclude mammalian predators), the following measures shall be required as part of the fence installation: fencing shall be installed at the base of elevated breeding habitat or if there is no elevation difference, at a distance to eliminate vantage sites for avian predators; materials that are mechanical deterrents to perching shall be installed on top of the fence. If these measures do not solve the problem, additional measures shall be used, such as protection of individual nests, and trapping and relocation of problem predator birds. Public access points (trails or lookouts) shall not be constructed within 100 feet of any tern nest site. Trails or access points shall be temporarily closed if terns nest within that distance. Possible elimination of local populations of non-listed sensitive plant species (southern tarplant, Coulter's goldfields, Del Mar sand aster, woolly seablite) if restoration activities cannot avoid sites supporting them. Non-listed, sensitive plant species shall be avoided to the maximum extent possible. Where impacts cannot be avoided, seed shall be salvaged from impacted plants and an attempt shall be made to reestablish populations in suitable habitat. Restoration efforts onsite shall use seed collected from the site, where feasible.

23 Table ES-1. Summary of Significant Impacts of the Mixed Resource Significant Impact Measure Biological Resources A habitat restoration and monitoring plan, including success criteria that recognize the experimental nature of such transplantation, shall be prepared for any reestablishment effort. This plan shall include the following details for sensitive plant species: Restoration efforts shall plan to establish the Southern tarplant populations on spoil disposal areas, as this species appears tolerant of saline compacted soils. The species shall be included in the proposed seed and plant mix for use in freshwater marsh transitional vegetation. In order to obtain viable seed, the plants shall not be impacted until the seed has been allowed to mature. Restoration efforts shall plan to establish the Coulter s Goldfields populations in areas of salt marsh playas and fringing areas that receive seasonal rainwater flushing that reduces soil salinity. The species shall be included in the proposed seed and plant mix for use in upland restoration of the site. In order to obtain viable seed, the plants shall not be impacted until the seed has been allowed to mature. Impacts to the red sand-verbena colony onsite would be considered locally and therefore, the area occupied by the red sandverbena shall be fenced to prevent inadvertent impacts to these plants and their habitat.

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633 ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER

More information

RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS

RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS by Hany Elwany, Ph.D. Scripps Institution of Oceanography Headwaters to Oceans Conference 25 October 2003 CE Ref #03-22 San Diego County Lagoons

More information

AN INITIATIVE TO IMPROVE

AN INITIATIVE TO IMPROVE L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN

More information

CHAPTER 4 ALTERNATIVES COMPARISON

CHAPTER 4 ALTERNATIVES COMPARISON CHAPTER 4 ALTERNATIVES COMPARISON 4.1 INTRODUCTION This chapter provides a comparison of the and its alternatives as described in EIS/EIR Section 1.8.3 (s Evaluated in this EIS/EIR) and analyzed in Sections

More information

4.2 Buena Vista Creek Watershed

4.2 Buena Vista Creek Watershed Buena Vista Creek Watershed 4.2 Buena Vista Creek Watershed Watershed Overview The Buena Vista Creek Watershed is the fourth-largest system within the Carlsbad Hydrologic Unit. The watershed extends approximately

More information

Section 401 Water Quality Certification

Section 401 Water Quality Certification Section 401 Water Quality Certification Department of Health Environmental Management Division Clean Water Branch Voice: (808) 586-4309 Fax: (808) 586-4352 http://www.hawaii.gov/health/environmental/water/cleanwater/index.html

More information

SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA

SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA A. LAND USE ELEMENT INTERPRETIVE GUIDELINES B. COMMUNITY BENEFITS C. COUNTY ACTION ITEMS Adopted by the Board of Supervisors November 9, 1999 A. Santa

More information

Multiple Species Conservation Program County of San Diego. A Case Study in Environmental Planning & The Economic Value of Open Space

Multiple Species Conservation Program County of San Diego. A Case Study in Environmental Planning & The Economic Value of Open Space Multiple Species Conservation Program County of San Diego A Case Study in Environmental Planning & The Economic Value of Open Space Amy M. Fox Land Use Law Case Study Autumn Semester, 1999 Multiple Species

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

Floodplain Development Land Use Review

Floodplain Development Land Use Review COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter

More information

San Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline

San Francisco Bay Area Wetlands Restoration Program Design Review Group. Project Summary Outline San Francisco Bay Area Wetlands Restoration Program Design Review Group Project Summary Outline The project proponent desiring to have a project considered by the Design Review Group (DRG) shall provide

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

a. For all activities that would result in the discharge of fill material into any vernal pool;

a. For all activities that would result in the discharge of fill material into any vernal pool; Final Sacramento District Nationwide Permit Regional Conditions for Nevada and the Lake Tahoe Basin in California (Effective March 19, 2012 until March 18, 2017) 1.* When pre-construction notification

More information

Remaining Wetland Acreage 1,500,000 915,960 584,040-39%

Remaining Wetland Acreage 1,500,000 915,960 584,040-39% NEW JERSEY Original Wetland Acreage Remaining Wetland Acreage Acreage Lost % Lost 1,500,000 915,960 584,040-39% New Jersey Wetlands: Nearly 99 percent of New Jersey s wetlands are palustrine or estuarine.

More information

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at

More information

PUBLIC NOTICE Application for Permit

PUBLIC NOTICE Application for Permit PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested

More information

COASTAL DEVELOPMENT PERMIT

COASTAL DEVELOPMENT PERMIT COASTAL DEVELOPMENT PERMIT ZONE CODE SECTIONS 12.20.2 prior to LCP certification. The MASTER LAND USE APPLICATION INSTRUCTION SHEET 500' RADIUS should also be followed, except that a 100-foot radius map

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS AND APPROVAL OF THE DESIGN OF THE GENOME LAUNCH FACILITY PROJECT, DAVIS CAMPUS

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS AND APPROVAL OF THE DESIGN OF THE GENOME LAUNCH FACILITY PROJECT, DAVIS CAMPUS CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS AND APPROVAL OF THE DESIGN OF THE GENOME LAUNCH FACILITY PROJECT, DAVIS CAMPUS I. ADOPTION OF THE MITIGATED NEGATIVE DECLARATION Pursuant to Title 14, California

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific

More information

Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants

Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants OMB Approval No.: 0648-0538 Environmental Compliance Questionnaire for National Oceanic and Atmospheric Administration Federal Financial Assistance Applicants Instructions The National Environmental Policy

More information

How To Plan A Buffer Zone

How To Plan A Buffer Zone Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other

More information

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for: EG-30NY ENVIRONMENTAL GUIDANCE PAGE 1 of 9 DATE 10/1/10 EP 3 Natural Resource Protection 1.0 SCOPE AND RESPONSIBILITIES National Grid s New York service territory encompasses thousands of wetlands, lakes,

More information

STAFF REPORT: CONSENT CALENDAR. Vasanth Venugopal. 367 Via Lido Soud, City of Newport Beach (County of Orange)

STAFF REPORT: CONSENT CALENDAR. Vasanth Venugopal. 367 Via Lido Soud, City of Newport Beach (County of Orange) STATE OF CALIFORNIA - NATURAL RESOURCES AGENCY CALIFORNIA COASTAL COMMISSION South Coast Area Office 200 Oceangate, Suite 1000 Long Beach, CA 90802-4302 (562) 590-5071 EDMUND G. BROWN, Jr., Governor F

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION

SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION 104-1 Description. Provide erosion control measures on the project and in areas outside the right-of-way where work is accomplished

More information

Eldorado-Ivanpah Transmission Project WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE

Eldorado-Ivanpah Transmission Project WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE WELCOME To Southern California Edison Company s Eldorado-Ivanpah Transmission Project OPEN HOUSE 1 1 Welcome to The Eldorado-Ivanpah Transmission Project Open House How is the open house organized? This

More information

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects City of Los Angeles Department of Public Works Bureau of Engineering Machado Lake Ecosystem Rehabilitation Project & Wilmington Drain Multi-Use Project Community Workshop 5 February 24, 2009 In association

More information

Gold Ray Dam Interagency Technical Team Meeting

Gold Ray Dam Interagency Technical Team Meeting Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,

More information

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers

More information

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements

More information

720 Contour Grading. General. References. Resources. Definitions

720 Contour Grading. General. References. Resources. Definitions 720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable

More information

ADDENDUM TO THE DRAFT ECONOMIC IMPACT ANALYSIS OF CRITICAL HABITAT DESIGNATION FOR THE OTAY TARPLANT

ADDENDUM TO THE DRAFT ECONOMIC IMPACT ANALYSIS OF CRITICAL HABITAT DESIGNATION FOR THE OTAY TARPLANT ADDENDUM TO THE DRAFT ECONOMIC IMPACT ANALYSIS OF CRITICAL HABITAT DESIGNATION FOR THE OTAY TARPLANT November 2002 IEc INDUSTRIAL ECONOMICS, INCORPORATED Prepared for: Division of Economics U.S. Fish and

More information

The project site lies within an AE Zone and portions lie within the regulated floodway. Development of this site is subject to TCLUO, Section 3.060.

The project site lies within an AE Zone and portions lie within the regulated floodway. Development of this site is subject to TCLUO, Section 3.060. Introduction This application is for the Southern Flow Corridor-Landowner Preferred Alternative, a flood mitigation and tidal wetland restoration project. The Port of Tillamook Bay is the applicant in

More information

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY In the Matter of the Application of ) NO. SSDP 000748 ) Kevin Robinson ) FINDINGS, CONCLUSIONS ) AND DECISION For a Shoreline Substantial Development ) Permit

More information

COMMUNITY CERTIFICATIONS

COMMUNITY CERTIFICATIONS National Flood Insurance Program Community Rating System COMMUNITY CERTIFICATIONS Public reporting burden for this form is estimated to average 4 hours for annual recertification, per response. The burden

More information

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower

More information

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold CHAPTER 11 GLOSSARY OF TERMS Active Channel The channel that contains the discharge Leopold where channel maintenance is most effective, sediment are actively transported and deposited, and that are capable

More information

Appendix C. Municipal Planning and Site Restoration Considerations

Appendix C. Municipal Planning and Site Restoration Considerations Appendix C Municipal Planning and Site Restoration Considerations 67 68 Appendix C - Municipal Planning and Site Restoration Considerations This appendix contains best practice standards for site planning

More information

STATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S

STATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S STATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S. DEPARTMENT OF THE INTERIOR BEFORE THE HOUSE APPROPRIATIONS SUBCOMMITTEE ON INTERIOR, ENVIRONMENT AND RELATED AGENCIES

More information

Draft Program Environmental Impact Report

Draft Program Environmental Impact Report Draft Program Environmental Impact Report El Dorado 50 and 89 Water Quality Improvement Projects El Dorado County, California On US Highway 50 between Old Meyers Road and Nevada State Line and SR 89 between

More information

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects. American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4

More information

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Purpose The purpose of this document is to provide guidance and recommendations for minimizing potential impacts to

More information

Beseck Switching Station Inspection

Beseck Switching Station Inspection Page 1 of 5 Docket No. 272 Development and Management Plan Inspection The Connecticut Light and Power Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV

More information

Regulatory Features of All Coastal and Inland Ecological Restoration Limited Projects

Regulatory Features of All Coastal and Inland Ecological Restoration Limited Projects Eligibility Checklist This Ecological Restoration Limited Project Eligibility Checklist guides the applicant in determining if their project is eligible to file as an Inland or Coastal Ecological Restoration

More information

Design And Construction Of The South San Diego Bay Western Salt Pond Restoration Project. 2012 Headwaters To Ocean Conference

Design And Construction Of The South San Diego Bay Western Salt Pond Restoration Project. 2012 Headwaters To Ocean Conference Design And Construction Of The South San Diego Bay Western Salt Pond Restoration Project 2012 Headwaters To Ocean Conference David Cannon, M.C.E., P.E. President/Principal Engineer Everest International

More information

33 CFR PART 332 COMPENSATORY MITIGATION FOR LOSSES OF AQUATIC RESOURCES. Authority: 33 U.S.C. 401 et seq. ; 33 U.S.C. 1344; and Pub. L. 108 136.

33 CFR PART 332 COMPENSATORY MITIGATION FOR LOSSES OF AQUATIC RESOURCES. Authority: 33 U.S.C. 401 et seq. ; 33 U.S.C. 1344; and Pub. L. 108 136. 33 CFR PART 332 COMPENSATORY MITIGATION FOR LOSSES OF AQUATIC RESOURCES Authority: 33 U.S.C. 401 et seq. ; 33 U.S.C. 1344; and Pub. L. 108 136. Source: 73 FR 19670, Apr. 10, 2008, unless otherwise noted.

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)

More information

3.1.8 Utilities and Service Systems

3.1.8 Utilities and Service Systems 3.1.8 Utilities and Service Systems This section discusses potential impacts to utilities and service systems, including water, wastewater, and solid waste hauling and disposal, resulting from the implementation

More information

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the

More information

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local

More information

Restoring Ecosystems. Ecosystem Restoration Services

Restoring Ecosystems. Ecosystem Restoration Services Restoring Ecosystems Ecosystem Restoration Services 2 Ecosystem Restoration Services AECOM s integrated approach sciencebased planning, with innovative design and execution delivers sustainable and cost-effective

More information

Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan

Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan Throughout the Plan 1. There is a fundamental need for the revised plan to address how

More information

Northern Nevada Water Planning Commission

Northern Nevada Water Planning Commission 12-07-11: NNWPC Agenda Item 6 Northern Nevada Water Planning Commission DATE: November 29, 2011 STAFF REPORT TO: FROM: SUBJECT: Chairman and Members, Northern Nevada Water Planning Commission Jim Smitherman,

More information

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. 19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN COHASSET HARBOR COHASSET AND SCITUATE, MASSACHUSETTS

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN COHASSET HARBOR COHASSET AND SCITUATE, MASSACHUSETTS .-ro:'j - I US Army Corps of Engineers r& New England District 696 Virginia Road Concord, MA 01742-2751 Public Notice In Reply Refer to: Mr. Craig Martin nae-pn-nav@usace.army.mil Programs/Project Management

More information

3. The submittal shall include a proposed scope of work to confirm the provided project description;

3. The submittal shall include a proposed scope of work to confirm the provided project description; QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding

More information

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County Mission Creek Flood Control & Restoration Project City of Fremont, Alameda County Agenda Background Why are proposed improvements necessary? Proposed project components Challenges Construction schedule/phasing

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

30-DAY PUBLIC NOTICE CHELSEA RIVER, EAST BOSTON MASSACHUSETTS EMERGENCY STREAMBANK PROTECTION PROJECT

30-DAY PUBLIC NOTICE CHELSEA RIVER, EAST BOSTON MASSACHUSETTS EMERGENCY STREAMBANK PROTECTION PROJECT PUBLIC NOTICE Engineering/Planning 696 Virginia Road Concord, MA 01742 Date: 10 November, 2015 Comment Period Ends: 10 December, 2015 In Reply, Refer To: Robert Russo Or by e-mail: Robert.S.Russo@usace.army.mil

More information

Prepared By: Tom Parker Geum Environmental Consulting, Inc.

Prepared By: Tom Parker Geum Environmental Consulting, Inc. Prepared By: Tom Parker Geum Environmental Consulting, Inc. Topics covered: Definition of riparian and floodplain restoration Floodplain attributes as a basis for developing criteria for restoration designs

More information

Storm Water Management Requirements for Construction Projects Less than One Acre

Storm Water Management Requirements for Construction Projects Less than One Acre Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to

More information

Chapter 4.0 - Impacts of the Proposed Project

Chapter 4.0 - Impacts of the Proposed Project Chapter 4.0 - Impacts of the Proposed Project 4.0 Impacts of the Proposed Project This section presents the baseline conditions and the analysis of the potential for the proposed Ridgecrest Sanitary Landfill

More information

9.0 PUBLIC HEALTH (MOSQUITO ABATEMENT)

9.0 PUBLIC HEALTH (MOSQUITO ABATEMENT) 9.0 PUBLIC HEALTH (MOSQUITO ABATEMENT) This chapter analyzes the public health effects of the project, particularly with regard to mosquito abatement. The chapter discusses historical and existing efforts

More information

How To Amend A Stormwater Ordinance

How To Amend A Stormwater Ordinance Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental

More information

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

Package Treatment Plant Policy and Procedure

Package Treatment Plant Policy and Procedure Package Treatment Plant Policy and Procedure PURPOSE There has been increased interest in the use of package treatment plants for new development proposals in the County. Current review procedures are

More information

Carlton Fields Memorandum

Carlton Fields Memorandum Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed

More information

MITIGATION MONITORING AND REPORTING PROGRAM FOR THE BUENA OUTFALL FORCE MAIN PHASE III PROJECT. September 2014

MITIGATION MONITORING AND REPORTING PROGRAM FOR THE BUENA OUTFALL FORCE MAIN PHASE III PROJECT. September 2014 MITIGATION ING AND REPORTING PROGRAM FOR THE BUENA OUTFALL FORCE MAIN PHASE III PROJECT September 2014 PROJECT NAME: Buena Outfall Force Main Phase III Project (CIP 8131) DESCRIPTION: The is proposing

More information

United States Depmiment of the Interior Bureau of Reclamation Western Colorado Area Office Grand Junction, Colorado

United States Depmiment of the Interior Bureau of Reclamation Western Colorado Area Office Grand Junction, Colorado WCAO-GJ-FONSI -14-01 United States Depmiment of the Interior Bureau of Reclamation Western Colorado Area Office Grand Junction, Colorado FINDING OF NO SIGNIFICANT IMPACT SPURLIN MESA LATERAL OF THE CRAWFORD

More information

Receiving Water Body:

Receiving Water Body: 62-330 ENVIRONMENTAL RESOURCE PERMIT INDIVIDUAL - TECHNICAL STAFF REPORT 04-Nov-2015 APPLICATION #: IND-059-16968-1 Applicant: Eddie Dixon Holmes District School Board 701 E Pennsylvania Ave Bonifay, FL

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

Most informed people realize that cumulative impacts have had

Most informed people realize that cumulative impacts have had Welcome to the First Issue of Rivers & Coast! The goal of the new Rivers & Coast newsletter is to keep readers well informed of current scientific understanding behind key environmental issues related

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment

DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment Water Protection Bureau Name of Project: Applicant: Ueland Land Development LLC Type of Project: Proposed discharge of treated domestic wastewater

More information

Coastal Management Definitions

Coastal Management Definitions Coastal Management Definitions Administrator the administrator of the Office of Coastal Management of the Department of Natural Resources. Advanced Mitigation Project a project implemented to create, restore,

More information

PREVENTION. City of Orem FLOOD DAMAGE PREVENTION 10-1-1

PREVENTION. City of Orem FLOOD DAMAGE PREVENTION 10-1-1 City of Orem FLOOD DAMAGE PREVENTION 10-1-1 CHAPTER 10. Article 10-1. Article 10-2. Article 10-3. Article 10-4. Article 10-5. FLOOD DAMAGE PREVENTION Purposes Definitions General Provisions Administration

More information

Storm Drain Inlet Protection - IP

Storm Drain Inlet Protection - IP Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior

More information

Michigan Wetlands. Department of Environmental Quality

Michigan Wetlands. Department of Environmental Quality Department of Environmental Quality Wetlands are a significant component of Michigan s landscape, covering roughly 5.5 million acres, or 15 percent of the land area of the state. This represents about

More information

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1 COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION PLANNING DIVISION CITY OF SUNNYVALE P.O. BOX 3707 SUNNYVALE, CA 94088-3707 NOTICE OF PREPARATION TO: Responsible, Trustee, and Other Interested Public Agencies FROM: Sunnyvale Community Development 456

More information

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project

More information

SR 89/Fanny Bridge Community Revitalization Project. Draft Environmental Impact Report/ Environmental Impact Statement/ Environmental Assessment

SR 89/Fanny Bridge Community Revitalization Project. Draft Environmental Impact Report/ Environmental Impact Statement/ Environmental Assessment SR 89/Fanny Bridge Community Revitalization Project Draft Environmental Impact Report/ Environmental Impact Statement/ Environmental Assessment 2015 Meeting Purpose Provide a summary description of alternatives

More information

ORDINANCE NO. 2013 -

ORDINANCE NO. 2013 - ORDINANCE NO. 2013 - AN ORDINANCE OF BREVARD COUNTY, FLORIDA AMENDING CHAPTER 62, LAND DEVELOPMENT REGULATIONS SECTION 62-2891, LOT DRAINAGE, AND CHAPTER 22 BUILDINGS AND BUILDING REGULATIONS, SECTION

More information

Sec. 22a-1a page 1 (4-97)

Sec. 22a-1a page 1 (4-97) Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination

More information

STANDARDS FOR RANGELAND HEALTH ASSESSMENT FOR SAGEHEN ALLOTMENT #0208

STANDARDS FOR RANGELAND HEALTH ASSESSMENT FOR SAGEHEN ALLOTMENT #0208 STANDARDS FOR RANGELAND HEALTH ASSESSMENT FOR SAGEHEN ALLOTMENT #0208 RANGELAND HEALTH STANDARDS - ASSESSMENT SAGEHEN ALLOTMENT #0208 STANDARD 1 - UPLAND WATERSHED This standard is being met on the allotment.

More information

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 APPLICANT Skyline Restoration Inc. CGI Northeast, Inc. Spring Scaffolding LLC Metropolitan Northeast LLC 11-20 37 th Avenue Long Island City, NY 11101

More information

CEQA PRACTICUM: SUPPLEMENTAL ENVIRONMENTAL REVIEW

CEQA PRACTICUM: SUPPLEMENTAL ENVIRONMENTAL REVIEW NAEP/AEP Conference Los Angeles CEQA PRACTICUM: SUPPLEMENTAL ENVIRONMENTAL REVIEW P RESENTED B Y : C URTIS E. ALLING, AICP G ARY D. JAKOBS, AICP A SCENT E NVIRONMENTAL, INC. A PRIL 2013 AEP CONFERENCE

More information

Bolinas Lagoon Ecosystem Restoration Feasibility Project Marin County Open Space District

Bolinas Lagoon Ecosystem Restoration Feasibility Project Marin County Open Space District Bolinas Lagoon Ecosystem Restoration Feasibility Project Marin County Open Space District With Funding from the California State Coastal Conservancy & the U.S. Army Corps of Engineers July 2006 Bolinas

More information

~~~~A~~O~F~~~UF~OR~N~~~-~~~E~RE~SO~U~~~ES~A~GE~Na~============================================~A~RN=O~~~SC~H~WA~~=E=NE=GG=E~~~=~~

~~~~A~~O~F~~~UF~OR~N~~~-~~~E~RE~SO~U~~~ES~A~GE~Na~============================================~A~RN=O~~~SC~H~WA~~=E=NE=GG=E~~~=~~ ~~~~A~~O~F~~~UF~OR~N~~~-~~~E~RE~SO~U~~~ES~A~GE~Na~============================================~A~RN=O~~~SC~H~WA~~=E=NE=GG=E~~~=~~ CALIFORNIA COASTAL COMMISSION SAN DIEGO AREA "7575 METROPOUTAN DRIVE, SUITE

More information

Arkansas River Corridor Vision & Master Plan

Arkansas River Corridor Vision & Master Plan A r k a n s a s R I v e r C o r r I d o r P l a n Arkansas River Corridor Vision & Master Plan July 2005 Indian Nations Council of Governments A r k a n s a s R I v e r C o r r I d o r P l a n Partnership

More information

Temporary Batch Plants

Temporary Batch Plants Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category

More information

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12

Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12 CIVL 1112 - Part 1 1/12 The water cycle, also known as the hydrologic cycle, describes the continuous movement of water on, above and below the surface of the Earth. The water cycle, also known as the

More information