MITIGATION MONITORING AND REPORTING PROGRAM FOR THE BUENA OUTFALL FORCE MAIN PHASE III PROJECT. September 2014

Size: px
Start display at page:

Download "MITIGATION MONITORING AND REPORTING PROGRAM FOR THE BUENA OUTFALL FORCE MAIN PHASE III PROJECT. September 2014"

Transcription

1 MITIGATION ING AND REPORTING PROGRAM FOR THE BUENA OUTFALL FORCE MAIN PHASE III PROJECT September 2014 PROJECT NAME: Buena Outfall Force Main Phase III Project (CIP 8131) DESCRIPTION: The is proposing to construct a new Buena Outfall that begins at an existing force main just east of manhole #55A. The proposed project will replace and re-route the existing Buena Outfall. The Buena Outfall starts as a pressurized force main then continues across El Camino Real, parallel to the existing Buena Outfall sewer, approximately 650 feet southwest to the north side of Palomar Airport Road. The force main then proceeds within the westbound lanes of Palomar Airport Road towards the intersection of Yarrow Drive and Palomar Airport Road. The alignment continues west for approximately 2,600 feet to a high point before the intersection of Yarrow and Palomar Airport Road. A proposed manhole will be placed where the force main will end and discharge into the proposed gravity sewer and continue approximately another 5,500 feet in the westbound lanes of Palomar Airport Road. At approximately Palomar Oaks Way, the pipeline would transitions to force main and continues to the intersection of Palomar Airport Road and Paseo Del Norte. The pipeline will then transition back to a gravity sewer main and turn south and proceed within the southbound lanes of Paseo Del Norte a distance of approximately 1,200 feet and tie into the existing 48-inch and 30-inch trunks sewers, which flow, to the Encina Water Pollution Control Facility located west of Interstate 5. LOCATION: The project alignment begins at the northeast corner of the intersection of Palomar Airport Road and El Camino Real, traverses within the westbound lanes of Palomar Airport Road and terminates within Paseo Del Norte, approximately 1,200 feet south of Palomar Airport Road, in the City of Carlsbad, northwestern San Diego County. The following Mitigation Measures are to be implemented before, during or after in accordance with the project conditions of approval, thereby reducing all identified potentially significant impacts to a less than significant level. Buena Sanitation September 2014

2 AQ-1 All equipment will be maintained at appropriate mechanical and electronic tuning levels per the manufacturer's specifications. Diesel equipment, including dump trucks waiting to deliver or receive soil, gravel, aggregate or other bulk materials, standing idle for more than five minutes shall be turned off in accordance with the Regulation for In-Use Off-Road Vehicles (California Code of Regulations Title 13, Article 4.8, Chapter 9, Section 2449(d)(3)), which took effect June 15, 2008: (A) Idling Limit No Vehicles or engines subject to this regulation may idle for more than five consecutive minutes. Idling of a vehicle that is owned by a rental company is the responsibility of the renter or lessee, and the rental agreement should so indicate. The idling limit does not apply to: 1. Idling when queuing, 2. Idling to verify that the vehicle is in safe operating condition, 3. Idling for testing, servicing, repairing or diagnostic purposes, 4. Idling necessary to accomplish work for which the vehicle was designed (such as operating a crane), During 5. Idling required to bring the machine system to operating temperature, and 6. Idling necessary to ensure safe operation of the vehicle (B) Written Idling Policy As of March 1, 2009, medium and large fleets must also have a written idling policy that is made available to operators of the vehicles and informs them that idling is limited to five consecutive minutes or less. (C) Waiver A fleet owner may apply to the Executive Officer for a waiver to allow additional idling in excess of five consecutive minutes. The Executive Officer shall grant such a request upon finding that the fleet owner has provided sufficient justification that such idling is necessary. AQ 2 Project shall implement the following measure in order to minimize -related emissions due to dust: Limit traffic speeds on unpaved roads to 15 mph. During Buena Sanitation September 2014

3 BIO 1 In order to avoid impacts to adjacent open space habitats during, open space interfaces will require temporary orange fencing which clearly delineates the edge of the approved limits of grading and clearing and environmentally sensitive areas beyond. This fencing shall be installed in all areas adjacent to protected open spaces, and shall be installed prior to, and maintained for the duration of activity. Fencing shall be installed in a manner that does not impact habitats to be avoided. At least seven days prior to initiating project impacts, the final plans and photographs for initial clearing and grubbing of habitat and project shall be submitted to the for review and approval. These final plans shall include photographs that show the fenced limits of impact and all areas to be impacted or avoided. If work occurs beyond the fenced or demarcated limits of impact, all work in the area shall cease until the problem has been remedied and mitigation identified, to the satisfaction of a qualified biological monitor. Temporary orange fencing shall be removed upon completion of of the project. BIO 2 The shall install temporary silt barriers along the limits of project impacts (including staging areas and access routes) adjacent to open space habitats to prevent additional habitat impacts and prevent the spread of silt from the zone into adjacent habitats to be avoided. Silt fencing shall be installed in a manner that does not impact habitats to be avoided. BIO 3 In order to adequately protect the adjacent open spaces, the shall ensure that the following mitigation measures are implemented during project by incorporating them into the design/contractor specifications of the project: Employees shall strictly limit their activities, vehicles, equipment and materials to the fenced project footprint; Pets of project personnel shall not be allowed on the project site; Disposal or temporary placement of excess fill, brush or other debris shall not be allowed in waters of the United States or their banks; All equipment maintenance, staging, and dispensing of fuel, oil, coolant, or any other such activities shall occur in designated areas within the fenced project impact limits and in such a manner as to prevent any runoff from entering offsite open spaces, and shall be shown on the plans. Fueling of equipment shall take place within existing paved areas. Contractor equipment shall be checked for leaks prior to operation and repaired as necessary. "No-fueling zones" shall be designated on plans; and Night lighting, if any, of staging areas shall be of the lowest illumination necessary for human safety, selectively placed, shielded, and directed away from adjacent natural habitats. Buena Sanitation September 2014

4 BIO 4 The hydroseed mix or landscape mix in areas adjacent to open spaces shall not include any invasive exotic seeds or plants identified on List A and List B of the California Exotic Plant Council s List of Exotic Plants of Greatest Ecological Concern in California, as of October 1999, and updated if applicable. Implementation of this measure shall be verified by the during review of the Erosion Control Plans. Following completion of active phases BIO 5 In the event that the preferred option of utilizing trenchless methods (e.g., jack and bore, directional drilling) for pipeline installation between STA and STA at the intersection of Palomar Airport Road and El Camino Real cannot be implemented, and activities requiring the direct removal, trimming and/or pruning of the eucalyptus and pine trees located along the pipeline alignment at this location are determined necessary for installation, the shall require that the activities are performed outside of the general breeding season for migratory birds and raptors, which is defined as occurring between January 15 and September 15. If activities requiring the direct removal, trimming and/or pruning of the trees must occur during the general bird breeding season, the shall retain a qualified biologist to perform a pre- survey of the trees to confirm the absence of active nests belonging to migratory birds and raptors afforded protection under the Migratory Bird Treaty Act and California Fish and Game Code. The pre survey shall be performed no more than three days prior to the commencement of removal, trimming, and/or pruning of the eucalyptus and pine trees. If the qualified biologist determines that no active migratory bird or raptor nests occur, the activities shall be allowed to proceed without any further requirements. If the qualified biologist determines that an active migratory bird or raptor nest is present, no impacts shall occur until the young have fledged the nest and the nest is confirmed to no longer be active, as determined by the qualified biologist. Implementation of this measure to ensure compliance with the Migratory Bird Treaty Act and California Fish and Game Code shall be verified by the. in affected area CR 1 the start of any grading/trenching/ground-disturbing work on the Project, the shall enter into a pre-excavation agreement with the San Luis Rey Band of Luiseño Mission Indians (San Luis Rey Band), the local Luiseño Native American tribe. The purpose of this agreement shall be to formalize protocols and procedures between the and the San Luis Rey Band for the protection and treatment of, including but not limited to, Native American human remains, funerary objects, cultural and religious landscapes, ceremonial items, traditional gathering areas and cultural items, located and/or discovered through a monitoring program in conjunction with the of the proposed project, including additional archaeological surveys and/or studies, excavations, geotechnical investigations, grading, and all other ground disturbing activities. Buena Sanitation September 2014

5 CR 2 the start of any grading/trenching/ground-disturbing work on the Project, the shall provide written and signed verification to the Manager stating that a Luiseño Native American Monitor and a Qualified Archaeologist have been retained at the s expense to implement the monitoring program, as described in the pre-excavation agreement. CR 3 The Qualified Archaeologist shall maintain ongoing consultation with the Luiseño Native American Monitor during ground disturbing activities. The requirement for the monitoring program shall be noted on all applicable documents, including demolition plans, grading plans, etc. The shall notify the Manager in writing of the start and end of all ground disturbing activities subject to monitoring. Ongoing during CR 4 The Luiseño Native American Monitor and Qualified Archaeologist shall attend all applicable pre meetings with the General Contractor and/or associated Subcontractors to present the monitoring program. The Luiseño Native American Monitor and Qualified Archaeologist shall be present on-site during grubbing, excavating, trenching and/or any other ground disturbing activities, to identify evidence of potential archaeological resources. This includes excavation/trenching beneath existing artificial fills. If fill materials are used they shall be absent of any and all cultural resources. The Luiseño Native American Monitor and Qualified Archaeologist shall have the authority to halt monitoring activities in areas where excavation is in formational soils and there is potential for cultural material to be encountered. Ongoing during Buena Sanitation September 2014

6 CR 5 The Qualified Archaeologist or the Luiseño Native American Monitor may halt ground disturbing activities if unknown archaeological artifact deposits or cultural features are discovered. Ground disturbing activities shall be directed away from these deposits to allow a determination of potential importance. Isolates and clearly non-significant deposits will be minimally documented in the field, and before grading, excavation or trenching proceeds these items shall be given to the San Luis Rey Band so that they may be repatriated at a later date. If a determination is made that the unearthed artifact deposits or cultural features are considered potentially significant, the San Luis Rey Band shall be notified and consulted with in regards to the respectful and dignified treatment of those resources. The avoidance and protection of the significant cultural resource and/or unique archaeological resource is the preferable mitigation. If however, a data recovery plan is authorized by the as the Lead Agency under CEQA, the San Luis Rey Band shall be notified and consulted regarding the drafting and finalization of any such recovery plan. For significant artifact deposits or cultural features that are part of a data recovery plan, an adequate artifact sample to address research avenues previously identified for sites in the area will be collected using professional archaeological collection methods. If the Qualified Archaeologist collects such resources, the Luiseño Native American monitor must be present during any testing or cataloging of those resources. Moreover, if the Qualified Archaeologist does not collect the cultural resources that are unearthed during the ground disturbing activities, the Luiseño Native American Monitor may, at their discretion, collect said resources and provide them to the San Luis Rey Band for respectful and dignified treatment in accordance with the Tribe s cultural and spiritual traditions. Ongoing during CR-6 Following completion of the, a monitoring report and/or evaluation report, if appropriate, which describes the results, analysis and conclusions of the archaeological monitoring program (e.g., data recovery plan) shall be submitted by the Qualified Archaeologist, along with the Luiseño Native American monitor s notes and comments, to the Director of Community Development for approval. Post Buena Sanitation September 2014

7 CR-7 As specified by California Health and Safety Code Section , if human remains are found on the project site during ground disturbing activities or during archaeological work, the person responsible for the excavation, or his or her authorized representative, shall immediately notify the San Diego County Coroner s office by telephone. No further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent remains shall occur until the Coroner has made the necessary findings as to origin and disposition pursuant to Public Resources Code If such a discovery occurs, a temporary exclusion zone shall be established surrounding the area of the discovery so that the area would be protected, and consultation and treatment could occur as prescribed by law. By law, the Coroner will determine within two working days of being notified if the remains are subject to his or her authority. If the Coroner recognizes the remains to be Native American, he or she shall contact the Native American Heritage Commission (NAHC) within 24 hours. The NAHC will make a determination as to the Most Likely Descendent. If Native American remains are discovered, the remains shall be kept in situ, or in a secure location in close proximity to where they were found, and the analysis of the remains shall only occur on-site in the presence of a Luiseño Native American Monitor. HM 1 The shall ensure that all trash, debris, and waste materials are disposed of off-site, in accordance with current local, state, and federal disposal regulations, including any containers which may contain paint. Any hazardous materials which may be potentially encountered during will be evaluated prior to removal and disposal consistent with the HASP and throughout daily operations. Any buried trash/debris shall be evaluated by a Qualified Environmental Professional (as defined by 40 Code of Federal Regulation Section ) prior to removal. Ongoing during HWQ-1 Mitigation measures listed below shall be implemented in order to reduce impacts to jurisdictional waters., the shall obtain all necessary permits to comply with the federal Clean Water Act, state discharge permitting requirements, and local grading ordinances. Copies of each permit shall be maintained at the project site for the duration of. Biological Resources mitigation measures BIO-2 and BIO-3 provide mitigation for projects affecting downstream waters and potential wetlands. Buena Sanitation September 2014

8 N-1 The or its contractors shall develop a Nighttime Noise Mitigation Plan to be implemented within 300 feet of the hotels along the proposed pipeline route. The plan shall be developed in coordination with the hotel management staff. The plan shall include, but not be limited to: The contractor shall appoint a liaison that shall be responsible for coordinating any/all complaints about with staff and the City of Carlsbad, responding to any local complaints about noise, and notifying the hotels regarding dates and the anticipated length of. Installation of temporary noise barriers, when necessary and where feasible, to block the line of sight between major noise generating activities and nearby hotel rooms. Require during daytime hours for the Motel 6 on the western end of the route, and any other receptors identified that have high sensitivity to nighttime noise. Require contractors to modify nighttime activities, as feasible, when they receive complaints from the nearest adjacent receptors. This could include developing schedules so that the loudest activities would occur in the first couple of hours of each shift if nighttime is utilized. Buena Sanitation September 2014

Amanda Estates Development Project IS/MND Page 1

Amanda Estates Development Project IS/MND Page 1 Mitigation Monitoring and Reporting Program for the Amanda Estates Development Project Initial Study / Mitigated Negative Declaration City No: PHG 13-0034 / SUB 13-0007 The adopts this Mitigation Monitoring

More information

Attachment 1: Exhibit A 801 GRAYSON STREET/800 DWIGHT WAY

Attachment 1: Exhibit A 801 GRAYSON STREET/800 DWIGHT WAY Page 1 of 11 Attachment 1: Exhibit A 801 GRAYSON STREET/800 DWIGHT WAY MITIGATION MONITORING AND REPORTING PROGRAM This Mitigation and Program (MMRP) was formulated based on the findings of the Initial

More information

PLAN AND PROCEDURES FOR THE UNANTICIPATED DISCOVERY OF CULTURAL RESOURCES AND HUMAN SKELETAL REMAINS PROJECT, COUNTY WASHINGTON

PLAN AND PROCEDURES FOR THE UNANTICIPATED DISCOVERY OF CULTURAL RESOURCES AND HUMAN SKELETAL REMAINS PROJECT, COUNTY WASHINGTON PLAN AND PROCEDURES FOR THE UNANTICIPATED DISCOVERY OF CULTURAL RESOURCES AND HUMAN SKELETAL REMAINS PROJECT, COUNTY WASHINGTON 1. INTRODUCTION The Washington State Department of Transportation (WSDOT)

More information

Appendix D CONSTRUCTION MANAGEMENT PLAN

Appendix D CONSTRUCTION MANAGEMENT PLAN Appendix D CONSTRUCTION MANAGEMENT PLAN Contents Introduction... 2 Construction Work in Environmental Zones... 3 Construction Schedule... 6 Construction Work Hours... 7 Site Management... 7 Pre-construction

More information

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA

SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA A. LAND USE ELEMENT INTERPRETIVE GUIDELINES B. COMMUNITY BENEFITS C. COUNTY ACTION ITEMS Adopted by the Board of Supervisors November 9, 1999 A. Santa

More information

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter

More information

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633 ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER

More information

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local

More information

SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING

SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING 1 TABLE OF CONTENTS 1.0 Introduction and Purpose 3 2.0 Description of Work 3 3.0 Site Supervisor/Foremen Responsibilities 4 4.0 Equipment

More information

CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL

CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL This manual applies to all development projects within Pitkin County. A Construction Management Plan (CMP) shall be submitted for all projects in Pitkin

More information

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Purpose The purpose of this document is to provide guidance and recommendations for minimizing potential impacts to

More information

FILING REQUIREMENTS EXCERPTS FROM THE ZONING ORDINANCE SOLAR ENERGY SYSTEMS

FILING REQUIREMENTS EXCERPTS FROM THE ZONING ORDINANCE SOLAR ENERGY SYSTEMS County of San Diego, Planning & Development Services APPLICANT S GUIDE FOR A SOLAR ENERGY SYSTEM ZONING DIVISION These guidelines provide information on how to apply for a Solar Energy System. Review the

More information

PROPOSED CHEVRON EL SEGUNDO REFINERY CALIFORNIA AIR RESOURCES BOARD (CARB) PHASE 3 CLEAN FUELS PROJECT

PROPOSED CHEVRON EL SEGUNDO REFINERY CALIFORNIA AIR RESOURCES BOARD (CARB) PHASE 3 CLEAN FUELS PROJECT PROPOSED CHEVRON EL SEGUNDO REFINERY CALIFORNIA AIR RESOURCES BOARD (CARB) PHASE 3 CLEAN FUELS PROJECT ATTACHMENT 1 - STATEMENT OF FINDINGS, STATEMENT OF OVERRIDING CONSIDERATIONS, AND MITIGATION MONITORING

More information

Activity Yes No N/A Notes

Activity Yes No N/A Notes CE 2020 (Rev. 12/11) Page 1 of 5 PROJECT NAME AND SITE ADDRESS: CONTRACT NUMBER: ORACLE NUMBER: WDID NUMBER: CONTRACTOR NAME AND ADDRESS: PROJECT SITE RISK LEVEL: Risk Level 1 Risk Level 2 Risk Level 3

More information

SECTION 02221 SELECTIVE DEMOLITION

SECTION 02221 SELECTIVE DEMOLITION SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on

More information

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

EXHIBIT C: MITIGATION MONITORING AND REPORTING PROGRAM (includes text of improvement measures as well)

EXHIBIT C: MITIGATION MONITORING AND REPORTING PROGRAM (includes text of improvement measures as well) EXHIBIT C: MITIGATION (includes text of improvement measures as well) Adopted Mitigation Measures / Action MITIGATION MEASURES HISTORIC ARCHITECTURAL RESOURCES Mitigation Measure M-CP-1a: Clubhouse and

More information

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting

More information

DIESEL EMISSION CONTROLS IN CONSTRUCTION PROJECTS MODEL CONTRACT SPECIFICATION December 2010

DIESEL EMISSION CONTROLS IN CONSTRUCTION PROJECTS MODEL CONTRACT SPECIFICATION December 2010 DIESEL EMISSION CONTROLS IN CONSTRUCTION PROJECTS MODEL CONTRACT SPECIFICATION December 2010 Introduction The model contract specification outlined below offers guidance to private institutions and public

More information

MISSION TRAILS PROJECT WORKING GROUP MEETING SUMMARY

MISSION TRAILS PROJECT WORKING GROUP MEETING SUMMARY MISSION TRAILS PROJECT WORKING GROUP MEETING SUMMARY DATE: May 19, 2005 ORGANIZATION: MEETING LOCATION: PRESENTERS: STAFF RESOURCES: PRESENTATION SUMMARY: TIME: 6 p.m. to 8:30 p.m. Mission Trails Project

More information

Chapter 4.0 - Impacts of the Proposed Project

Chapter 4.0 - Impacts of the Proposed Project Chapter 4.0 - Impacts of the Proposed Project 4.0 Impacts of the Proposed Project This section presents the baseline conditions and the analysis of the potential for the proposed Ridgecrest Sanitary Landfill

More information

PLANNED DEVELOPMENT PERMIT

PLANNED DEVELOPMENT PERMIT FILE NO. LOCATION OF PROPERTY ZONING DISTRICT ZONING FILE NUMBER GENERAL PLAN DESIGNATION PROPOSED USE PLANNED DEVELOPMENT PERMIT PDA05-095-01 Southwest corner of Silver Creek Valley Road and Silver Creek

More information

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN

ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN Best Management Practices (BMPs) will be implemented during construction of the Allegany Wind Power Project to prevent and contain spills.

More information

Storm Water Management Requirements for Construction Projects Less than One Acre

Storm Water Management Requirements for Construction Projects Less than One Acre Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to

More information

SAN DIEGO GAS & ELECTRIC COMPANY SOUTH BAY SUBSTATION RELOCATION PROJECT TRAFFIC MANAGEMENT PLAN SEPTEMBER 2014

SAN DIEGO GAS & ELECTRIC COMPANY SOUTH BAY SUBSTATION RELOCATION PROJECT TRAFFIC MANAGEMENT PLAN SEPTEMBER 2014 SAN DIEGO GAS & ELECTRIC COMPANY SOUTH BAY SUBSTATION RELOCATION PROJECT TRAFFIC MANAGEMENT PLAN SEPTEMBER 2014 Traffic Management Plan TABLE OF CONTENTS 1 INTRODUCTION... 1 2 OBJECTIVES... 1 3 APPLICABLE

More information

SECTION 7 UNDERDRAIN SERVICE

SECTION 7 UNDERDRAIN SERVICE SECTION 7 UNDERDRAIN SERVICE ARTICLE I USE OF THE PUBLIC UNDERDRAIN SYSTEM 7.100 The purpose of the District s underdrain system is to provide a method for conveying ground water from around building foundations

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

5. Environmental Analysis

5. Environmental Analysis 5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the

More information

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities This document summarizes and provides explanation for the purpose and intent of major recommended

More information

Spill Prevention, Control & Cleanup SC-11

Spill Prevention, Control & Cleanup SC-11 Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Spills and leaks, if not properly controlled, can adversely impact the storm drain system and receiving waters. Due to

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

This guidance was prepared to parallel the Low Hazard Exemption process guidance prepared by the Waste and Materials Management Program.

This guidance was prepared to parallel the Low Hazard Exemption process guidance prepared by the Waste and Materials Management Program. RR-999 Management of Contaminated Soils and Other Waste Materials Under s. NR 718 Wis. Adm. Code Wisconsin Department of Natural Resources (November, 2014) The attached document, Management of Contaminated

More information

Answers to Commonly Asked Questions

Answers to Commonly Asked Questions County of San Diego, Planning & Development Services FIRESTORM POLICY AND GUIDANCE DOCUMENT BUILDING DIVISION Answers to Commonly Asked Questions The County of San Diego understands the confusion and frustration

More information

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum.

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum. MEMORANDUM File: Sanikiluaq Improvement of the Existing Wastewater Treatment Facility To: Government of Nunavut Department of Community and Government Services Attention: Mr. Grigor Hope,, Project Officer

More information

BEAR DEN PHASE 2 PROJECT. Plan of Development. APPENDIX I Plan for Unanticipated Discovery of Cultural Resources or Human Remains During Construction

BEAR DEN PHASE 2 PROJECT. Plan of Development. APPENDIX I Plan for Unanticipated Discovery of Cultural Resources or Human Remains During Construction BEAR DEN PHASE 2 PROJECT Plan of Development APPENDIX I Plan for Unanticipated Discovery of Cultural Resources or Human Remains During Construction BEAR DEN PHASE 2 PROJECT Plan of Development Plan for

More information

Dewatering - Time and Cost Relief by way of Trenchless Construction

Dewatering - Time and Cost Relief by way of Trenchless Construction North American Society for Trenchless Technology (NASTT) NASTT s 2015 No-Dig Show Denver, Colorado March 15-19, 2015 TA-T3-04 Dewatering - Time and Cost Relief by way of Trenchless Construction Jenn Stillman,

More information

It was my assignment to physically inspect the 8 trees on site near the proposed construction,

It was my assignment to physically inspect the 8 trees on site near the proposed construction, July 11, 2013 Tariton Properties 2555 Park Blvd Palo Alto, CA 94306 Re: Tree Survey To Whom It May Concern: Assignment It was my assignment to physically inspect the 8 trees on site near the proposed construction,

More information

SE-10 STORM DRAIN INLET PROTECTION. Objectives

SE-10 STORM DRAIN INLET PROTECTION. Objectives STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -

More information

Package Treatment Plant Policy and Procedure

Package Treatment Plant Policy and Procedure Package Treatment Plant Policy and Procedure PURPOSE There has been increased interest in the use of package treatment plants for new development proposals in the County. Current review procedures are

More information

Woodlands Management Plan. (Draft June 2011) A. Definition of Woodlands Areas vs. Landscaped Areas of Parkfairfax

Woodlands Management Plan. (Draft June 2011) A. Definition of Woodlands Areas vs. Landscaped Areas of Parkfairfax Woodlands Management Plan (Draft June 2011) I. Background A. Definition of Woodlands Areas vs. Landscaped Areas of Parkfairfax The woodlands are defined as those wooded areas of Parkfairfax which are left

More information

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:

REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for: EG-30NY ENVIRONMENTAL GUIDANCE PAGE 1 of 9 DATE 10/1/10 EP 3 Natural Resource Protection 1.0 SCOPE AND RESPONSIBILITIES National Grid s New York service territory encompasses thousands of wetlands, lakes,

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY

DEPARTMENT OF ENVIRONMENTAL QUALITY PROJECT IDENTIFICATION DEPARTMENT OF ENVIRONMENTAL QUALITY City of Burton Sanitary Sewer Collection System Improvements State Revolving Fund (SRF) Environmental Assessment April 2015 Applicant: Authorized

More information

Draft Environmental Impact Statement. PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act

Draft Environmental Impact Statement. PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act CENTERSTATE NY INLAND PORT DRAFT SCOPING DOCUMENT FOR THE Draft Environmental Impact Statement PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act SEPTEMBER 30, 2015 INTRODUCTION

More information

STANDARD ELEMENTS OF A CONSTRUCTION MANAGEMENT PLAN

STANDARD ELEMENTS OF A CONSTRUCTION MANAGEMENT PLAN STANDARD ELEMENTS OF A CONSTRUCTION MANAGEMENT PLAN JULY 2015 Standard Elements of a Construction Management Plan (CMP) This guidance tool was developed through partnership between the Department of Planning

More information

Definition of Tower from the Bradley County Zoning Resolution

Definition of Tower from the Bradley County Zoning Resolution Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION

SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION 104-1 Description. Provide erosion control measures on the project and in areas outside the right-of-way where work is accomplished

More information

Twenty-four contracting services environmental claim scenarios you may not have thought about.

Twenty-four contracting services environmental claim scenarios you may not have thought about. Environmental DIVISION Twenty-four contracting services environmental claim scenarios you may not have thought about. Contracting Services Environmental Liability Policy Great American Insurance Group

More information

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan Transportation Authority (Metro) 2009 Transportation Improvement Program Call for Projects APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan

More information

Temporary Batch Plants

Temporary Batch Plants Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

How To Plan A Buffer Zone

How To Plan A Buffer Zone Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other

More information

CPMC CATHEDRAL HILL HOSPITAL CONSTRUCTION MANAGEMENT PLAN

CPMC CATHEDRAL HILL HOSPITAL CONSTRUCTION MANAGEMENT PLAN Updated: 09/11/2013 HERREROBOLDT (General Contractor) Municon Consultants (Vibration, noise, and geotechnical monitoring) Archeo-Tec (Archeological and paleontological) Treadwell & Rollo (Geotechnical

More information

Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1

Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 The Montgomery County Dept. of Environmental Protection, in cooperation with the Dept. of Permitting Services and the Washington

More information

Frequently Asked Transmission Pipeline Questions

Frequently Asked Transmission Pipeline Questions Frequently Asked Transmission Pipeline Questions Who is PennEast, LLC? PennEast was formed by the partnership of AGL Resources, NJR Pipeline Company, South Jersey Industries and UGI Energy Services (UGIES).

More information

CHAPTER 4 ALTERNATIVES COMPARISON

CHAPTER 4 ALTERNATIVES COMPARISON CHAPTER 4 ALTERNATIVES COMPARISON 4.1 INTRODUCTION This chapter provides a comparison of the and its alternatives as described in EIS/EIR Section 1.8.3 (s Evaluated in this EIS/EIR) and analyzed in Sections

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS AND APPROVAL OF THE DESIGN OF THE GENOME LAUNCH FACILITY PROJECT, DAVIS CAMPUS

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS AND APPROVAL OF THE DESIGN OF THE GENOME LAUNCH FACILITY PROJECT, DAVIS CAMPUS CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS AND APPROVAL OF THE DESIGN OF THE GENOME LAUNCH FACILITY PROJECT, DAVIS CAMPUS I. ADOPTION OF THE MITIGATED NEGATIVE DECLARATION Pursuant to Title 14, California

More information

8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP

8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP 8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP 8.1 INTRODUCTION Mitigation measures, monitoring and other follow-up actions identified in Chapter 7 (Environmental Effects Assessment and Mitigation)

More information

Q 4/17/13: Thank you for your quick response to our email dated April 10, 2013. In looking over your comments, we have a few clarifying remarks.

Q 4/17/13: Thank you for your quick response to our email dated April 10, 2013. In looking over your comments, we have a few clarifying remarks. Q & A Q 4/10/13: In anticipation of the DEM action plan implementation in the next few days, Citizens Advocating for a Safe Environment (CASE) would like to bring a few concerns to your attention. Some

More information

Construction Guidelines for Tree Protection. d. DISTRICT DEPARTMENT OF TRANSPORTATION URBAN FORESTRY ADMINISTRATION

Construction Guidelines for Tree Protection. d. DISTRICT DEPARTMENT OF TRANSPORTATION URBAN FORESTRY ADMINISTRATION Construction Guidelines for Tree Protection d. DISTRICT DEPARTMENT OF TRANSPORTATION URBAN FORESTRY ADMINISTRATION City of Trees Our time in history Since 1872, when Governor Alexander Shepherd planted

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

City of San Diego Urban Runoff Management Program. Appendix XI. Minimum BMPs for Mobile Businesses

City of San Diego Urban Runoff Management Program. Appendix XI. Minimum BMPs for Mobile Businesses City of San Diego Urban Runoff Management Program This Page Left Intentionally Blank. Minimum Best Management Practices (BMPs) for Mobile Businesses No. BMP Title Description and Examples Justification

More information

Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702

Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702 Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702 November 2011 TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 RESPONSIBILITY

More information

Appendix C. Municipal Planning and Site Restoration Considerations

Appendix C. Municipal Planning and Site Restoration Considerations Appendix C Municipal Planning and Site Restoration Considerations 67 68 Appendix C - Municipal Planning and Site Restoration Considerations This appendix contains best practice standards for site planning

More information

Waste Handling & Disposal

Waste Handling & Disposal Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended

More information

Concrete Waste Management

Concrete Waste Management Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category

More information

SUMMARY. for the. SCH No. 2006101028. Prepared for. University of California, San Diego 9500 Gilman Drive, MC 0074 La Jolla, California 92093

SUMMARY. for the. SCH No. 2006101028. Prepared for. University of California, San Diego 9500 Gilman Drive, MC 0074 La Jolla, California 92093 SUMMARY for the UNIVERSITY OF CALIFORNIA, SAN DIEGO UNIVERSITY HOUSE MEETING CENTER AND CHANCELLOR RESIDENCE FINAL ENVIRONMENTAL IMPACT REPORT SCH No. 2006101028 Prepared for University of California,

More information

Jewish Home Lifecare, Manhattan Replacement Nursing Facility Project. DEIS Public Hearing May 7 and May 8, 2014

Jewish Home Lifecare, Manhattan Replacement Nursing Facility Project. DEIS Public Hearing May 7 and May 8, 2014 Jewish Home Lifecare, Manhattan Replacement Nursing Facility Project DEIS Public Hearing May 7 and May 8, 2014 Project Program Illustrative Site Plan and Stack Diagram SEQR Assessment SEQR DEIS follows

More information

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile

Chapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality

More information

United States Depmiment of the Interior Bureau of Reclamation Western Colorado Area Office Grand Junction, Colorado

United States Depmiment of the Interior Bureau of Reclamation Western Colorado Area Office Grand Junction, Colorado WCAO-GJ-FONSI -14-01 United States Depmiment of the Interior Bureau of Reclamation Western Colorado Area Office Grand Junction, Colorado FINDING OF NO SIGNIFICANT IMPACT SPURLIN MESA LATERAL OF THE CRAWFORD

More information

Wellington Inner City Improvements National War Memorial Park (Pukeahu) Certification Review

Wellington Inner City Improvements National War Memorial Park (Pukeahu) Certification Review Wellington Inner City Improvements National War Memorial Park (Pukeahu) Air Quality (Dust) Certification Review 22 November 2012 [CAQMP1 TR] Prepared in association with: Document produced by: Apecx PO

More information

Underground Commercial Electric Service

Underground Commercial Electric Service Underground Commercial Electric Service SCANA Corporation 2013 Revised: June 2013 Table of Contents SECTION PAGE I. Specification and Requirements 2 A. General B. Definition of Terms C. Company and Developer

More information

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section 24.0. Summary of Commitments

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section 24.0. Summary of Commitments KITSAULT MINE PROJT ENVIRONMENTAL ASSESSMENT Section 24.0 Summary of s VE51988 KITSAULT MINE PROJT ENVIRONMENTAL ASSESSMENT SUMMARY OF COMMITMENTS TABLE OF CONTENTS TABLE OF CONTENTS... 24-I 24.0 SUMMARY

More information

PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan

PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON. Construction Management Plan PROPOSED RESIDENTIAL DEVELOPMENT LAND OFF MACCLESFIELD OLD ROAD, BUXTON Construction Management Plan May 2013 CONTENTS Page No: 1.0 INTRODUCTION 1 2.0 PROJECT ORGANISATION AND RESPONSIBILITIES 2 2.1 Client

More information

DRAFT Public Outreach Document for What s an SSMP?

DRAFT Public Outreach Document for What s an SSMP? DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials

More information

Appendix I: BMP Inspection Form CASQA SWPPP Template 91 January2011 BMP INSPECTION REPORT Date and Time of Inspection: Date Report Written: Inspection Type: (Circle one) Weekly Complete Parts I,II,III

More information

ENVIRONMENTAL REVIEW SCREENING QUESTIONS

ENVIRONMENTAL REVIEW SCREENING QUESTIONS ENVIRONMENTAL REVIEW SCREENING QUESTIONS All applications to WHEDA are required to meet the Department of Housing and Urban Development s environmental compliance standards listed in 24 CFR Part 58. Your

More information

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

ADDENDUM TO THE DRAFT ECONOMIC IMPACT ANALYSIS OF CRITICAL HABITAT DESIGNATION FOR THE OTAY TARPLANT

ADDENDUM TO THE DRAFT ECONOMIC IMPACT ANALYSIS OF CRITICAL HABITAT DESIGNATION FOR THE OTAY TARPLANT ADDENDUM TO THE DRAFT ECONOMIC IMPACT ANALYSIS OF CRITICAL HABITAT DESIGNATION FOR THE OTAY TARPLANT November 2002 IEc INDUSTRIAL ECONOMICS, INCORPORATED Prepared for: Division of Economics U.S. Fish and

More information

Table of Contents ESF-3-1 034-00-13

Table of Contents ESF-3-1 034-00-13 Table of Contents Primary Coordinating Agency... 2 Local Supporting Agencies... 2 State, Regional, and Federal Agencies and Organizations... 3 Purpose... 3 Situations and Assumptions... 4 Direction and

More information

Low Impact Development Checklist

Low Impact Development Checklist New Jersey Stormwater Best Management Practices Manual February 2004 A P P E N D I X A Low Impact Development Checklist A checklist for identifying nonstructural stormwater management strategies incorporated

More information

NEW HAMPSHIRE PIPELINE INSTALLATION

NEW HAMPSHIRE PIPELINE INSTALLATION NORTHEAST ENERGY DIRECT NEW HAMPSHIRE PIPELINE INSTALLATION Benefits to New Hampshire January 2015 Overview of Proposed New Hampshire Facilities The proposed Northeast Energy Direct Pipeline (NED) routed

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION. Vallecitos Water District Rock Springs Sewer Replacement Project

NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION. Vallecitos Water District Rock Springs Sewer Replacement Project NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION Vallecitos Water District Rock Springs Sewer Replacement Project Vallecitos Water District has prepared a Draft Mitigated Negative Declaration

More information

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.

More information

Right-of Way Use Permit Application

Right-of Way Use Permit Application Right-of Way Use Permit Application 400 SW 152 nd Street, Suite 300 Burien, WA 98166 Phone: (206) 439-3161 Inspection: Line 206-439-3162 Email address: rowpermits@burienwa.gov For City Use Only Reviewed

More information

U.S. DEPARTMENT OF THE INTERIOR BUREAU OF INDIAN AFFAIRS RECORD OF DECISION COYOTE BUSINESS PARK

U.S. DEPARTMENT OF THE INTERIOR BUREAU OF INDIAN AFFAIRS RECORD OF DECISION COYOTE BUSINESS PARK U.S. DEPARTMENT OF THE INTERIOR BUREAU OF INDIAN AFFAIRS February 2007 RECORD OF DECISION COYOTE BUSINESS PARK Agency: Action: Summary: Bureau of Indian Affairs Northwest Region Record of Decision Bureau

More information

Floodplain Development Land Use Review

Floodplain Development Land Use Review COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review

More information

FIBER-OPTIC CABLE PLAN CHECK

FIBER-OPTIC CABLE PLAN CHECK Engineering Division 201 North Broadway, Escondido, CA 92025 (760) 839-4651, FAX (760) 839-4597 FIBER-OPTIC CABLE PLAN CHECK To: Date: Project: Project No. Address: Check No. Attn: Via: The attached plans

More information

How To Preserve Trees

How To Preserve Trees San Diego County Water Authority Vic Bianes, PE - Engineering Manager Tad Brierton, SR/WA - Right of Way Supervisor APWA National Congress 2013 Chicago, IL 2 1 Background - San Diego County Water Authority

More information

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at

More information

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills. WQ-10 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design Standards Fuel Storage on Construction Sites According to the EPA, the majority of water pollution in

More information

IV. Environmental Impact Analysis I.2. Cultural Resources Archaeological Resources

IV. Environmental Impact Analysis I.2. Cultural Resources Archaeological Resources IV. Environmental Impact Analysis I.2. Cultural Resources Archaeological Resources 1. Introduction The following section addresses the potential for the Proposed Project to affect archaeological resources

More information