1 Data Quality Objectives and Quality Assurance Project Plans
2 Quality assurance (QA) Integrated system of management procedures and activities to verify that the QC system is operating within acceptable limits and to evaluate the quality of data Roles and responsibilities of staff Training
3 Quality assurance (QA) Data quality objectives, data validation, laboratory audits Statistics to determine number of samples and sites Sample custody
4 Quality control (QC) System of technical procedures and activities developed and implemented to produce measurements of requisite quality Collection and analysis of blank, duplicate, and spiked samples Standard reference materials Equipment inspection
5 Data quality objectives (DQOs) Type, quantity, and quality of data needed to meet project objectives Hypotheses, experiments, and tests Results include data quality criteria and data collection design for QAPP Guidelines for data collection effort to achieve objectives
6 DQOs: 7-Step Process 1. State problem 2. Identify decision (questions to answer and resulting actions) 3. Identify inputs to the decision (info needed and measurement methods) 4. Define the study boundaries (temporal and spatial) 5. Develop a decision rule (statistical parameter of interest; If..then.)
7 DQOs: 7-Step Process 6. Specify limits on decision errors (tolerable limits of making an incorrect decision; hypothesis, probability) 7. Optimize the design a. Types and quantity of samples b. Where, when, conditions for sampling c. Variables to measure d. QA/QC procedures to meet DQOs
8 Michigan Stamp Sands QAPP DQOs for Measurement Accuracy of the Stream Geomorphic Measurements Measurement Instrument Measurement Tolerance Data Quality Objective Elevation Laser level 0.01 ft. Survey closure = ± 0.02 ft. Length Survey tape 0.1 ft. 0.1 ft. for crosschannel transects Sediment grain size (pebble count) Ruler, calipers, and/or sand card Larger than sand = 1 mm; sand = semi-quantitative category on sand card Not applicable Rathbun, Quality Assurance Project Plan for the Central Mine Site Stamp Sand Remediation Project, Version 1; August 8, 2007, Michigan DEQ.
9 Michigan Stamp Sands QAPP Details of the Chemical Analyses Water Samples Parameter Method Reporting Limit Sample Volume (ml) Bottle Type Preserva -tive Hold Time Total 220.2/ µg/l 250 Plastic HNO 3 6 months copper TOC µg/l 250 Plastic H 2 SO 4 28 days Hardness Calculated 5 mg/l 250 Plastic 4 ºC 6 months Rathbun, Quality Assurance Project Plan for the Central Mine Site Stamp Sand Remediation Project, Version 1; August 8, 2007, Michigan DEQ.
10 Michigan Stamp Sands QAPP Summary of the Stream Morphology Measurements Morphology Measurement Pebble counts Locations (see Figure 2.1) Number of pebbles counted at each location Collection area Specifics Reaches at A, B, D, E, F, & Buffalo Creek 100 Wetted channel only; along 10 transects in each reach, stratified by prominent habitat type (riffle, run, pool) Pertinent metrics D 50 and D 84 Bank Erosion Hazard Index (BEHI) Locations (see Figure 2.1) Pertinent metrics (Rathbun, 2007) At each transect at A, B, D, E, F, & Buffalo Creek Ratio of bank height to bankfull height; root depth; root density; overall surface protection; bank angle
11 IDEM 319 QAPP Manager Betty Ratcliff
12 QAPP A detailed document describing project objectives and specific procedures to generate data Required of projects using Section 319 or other federal funds to generate environmental data Project roadmap Provides focus during the planning process Facilitates communication among staff Provides a plan to help to ensure data quality Allows early discovery of data quality problems Begins preparation of final project report IDEM, Guidelines for preparing quality assurance project plans (QAPPs) for section 319 projects.
13 QAPP Presents policies, organization, and objectives of the data collection effort and explains how particular QA and QC activities will be implemented to achieve the DQOs of the project Covers each monitoring or measurement activity associated with a project Clear objectives Data needs
14 Quality Assurance Project Plan Answers questions: Who, What, When, Where, How, & Describe each. Documentation is the most important part of Quality Assurance Project Plan. Template, outline and document sites on NPS website. tml I can provide examples.
15 Indiana QAPP Outline 1. Study Description a. Study goals b. Sampling design 2. Study Organization and Responsibility 3. Data Quality Objectives a. Precision (agreement among measurements) b. Accuracy (closeness to true value) c. Completeness (% of planned data collected) d. Representativeness (data reflect conditions monitored) e. Comparability (ability to compare project & other data) IDEM, Guidelines for preparing quality assurance project plans (QAPPs) for section 319 projects.
16 Indiana QAPP Outline 4. Sampling Procedures a. Map with sampling locations b. Sampling equipment c. Sample types d. Preservation and handling 5. Custody Procedures 6. Calibration Procedures and Frequency IDEM, Guidelines for preparing quality assurance project plans (QAPPs) for section 319 projects.
17 Indiana QAPP Outline 7. Analytical Procedures a. Field and lab analytical methods b. Sub-sampling and sample preparation c. Performance range/detection limits for methods 8. Quality Control Procedures 9. Data Reduction, Review, and Reporting 10. Performance and Systems Audits IDEM, Guidelines for preparing quality assurance project plans (QAPPs) for section 319 projects.
18 Indiana QAPP Outline 11. Preventative Maintenance 12. Data Quality Assessment a. Procedures for determining if precision, accuracy, and completeness are met 13. Corrective Action a. Procedures to correct any problems with accuracy and precision 14. Quality Assurance Reports IDEM, Guidelines for preparing quality assurance project plans (QAPPs) for section 319 projects.
19 Schedule Submit plan 60 days before sampling. is the fastest way. Send final hard copy with signatures. I will return completed signature sheet plus approval letter to you. Amendment to QAPP is easy. note to me and include: changes, reason, & consequences to sampling objectives.
20 What I Look For Now Address all topics listed in QAPP template. Submit data in ACCESS format. Identify sampling goals and objectives. List methods, detection limits, spatial, & temporal parameters. Address Out-Of-Control results with decision statements. (RPD, STDEV, Flags) Discuss how are you going to evaluate the results to meet sampling goals. *
21 References IDEM, Guidelines for preparing quality assurance project plans (QAPPs) for section 319 projects. Rathbun, Quality Assurance Project Rathbun, Quality Assurance Project Plan for the Central Mine Site Stamp Sand Remediation Project, Version 1; August 8, 2007, Michigan DEQ.
Data Quality. Tips for getting it, keeping it, proving it! Central Coast Ambient Monitoring Program
Data Quality Tips for getting it, keeping it, proving it! Central Coast Ambient Monitoring Program Why do we care? Program goals are key what do you want to do with the data? Data utility increases directly
More information1 Quality Assurance and Quality Control Project Plan
1 Quality Assurance and Quality Control Project Plan The purpose of this section is to describe the quality assurance/quality control program that will be used during the system specific field testing
More informationDeveloping Quality Assurance Project Plans using Data Quality Objectives and other planning tools. Developing QAPPs 5/10/2012 1
Developing Quality Assurance Project Plans using Data Quality Objectives and other planning tools 1 Introductions 2 Agenda I. Developing a QAPP II. Systematic Planning using Data Quality Objectives III.
More information4 QUALITY ASSURANCE 4.1 INTRODUCTION
4 QUALITY ASSURANCE 4.1 INTRODUCTION BNL has an established Quality Assurance/Quality Control (QA/QC) Program to ensure that the accuracy, precision, and reliability of environmental monitoring data are
More informationMDEP/RCRA Quality Assurance Plan Revision 6 Date: November 21, 2012 Page 0 of 19
Page 0 of 19 Page 1 of 19 TABLE OF CONTENTS Title Page 1.0 Introduction 3 1.1 Project Description 3 1.2 QAP Implementation 4 2.0 Quality Assurance Statement 4 3.0 MDEP/RCRA Program Organization 5 3.1 Organizational
More informationGreat Lakes National Program Office and Office of Water Quality Management Training Modules
GLOSSARY Assessment - the evaluation process used to measure the performance or effectiveness of a system and its elements. As used here, assessment is an all-inclusive term used to denote any of the following:
More informationQUALITY ASSURANCE PROJECT PLAN FOR BROWNFIELDS/VOLUNTARY CLEANUP PROGRAM SITES
QUALITY ASSURANCE PROJECT PLAN FOR BROWNFIELDS/VOLUNTARY CLEANUP PROGRAM SITES Prepared by the Missouri Department of Natural Resources Division of Environmental Quality Hazardous Waste Program Brownfields/Voluntary
More informationAPPENDIX 7-B SUGGESTED OUTLINE OF A QUALITY ASSURANCE PROJECT PLAN
APPENDIX 7-B SUGGESTED OUTLINE OF A QUALITY ASSURANCE PROJECT PLAN This outline is recommended for use by UST consultants/contractors in preparing a generic Quality Assurance Project Plan (QAPP) for use
More informationTechnical Guidance Manual for the Implementation of the Hawai`i State Contingency Plan. Interim Final SECTION 10
Technical Guidance Manual for the Implementation of the Hawai`i State Contingency Plan SECTION 10 DATA QUALITY ASSURANCE AND QUALITY CONTROL (QA/QC) Hawai`i HEER TGM 10-1 December 31, 2008 CONTENTS Acronyms
More informationQuality Assurance/Quality Control in Acid Deposition Monitoring
Quality Assurance/Quality Control in Acid Deposition Monitoring Acid Deposition and Oxidant Research Center (Network Center of EANET) Introduction Wet deposition data are used for -assessments of spatial
More informationAPPENDIX N. Data Validation Using Data Descriptors
APPENDIX N Data Validation Using Data Descriptors Data validation is often defined by six data descriptors: 1) reports to decision maker 2) documentation 3) data sources 4) analytical method and detection
More informationEvaluating Laboratory Data. Tom Frick Environmental Assessment Section Bureau of Laboratories
Evaluating Laboratory Data Tom Frick Environmental Assessment Section Bureau of Laboratories Overview of Presentation Lab operations review QA requirements MDLs/ PQLs Why do we sample? Protect physical,
More informationMethods of Data Collection and Field Planning
Quality Assurance and Quality Control Tools for Monitoring Projects Beverly H. van Buuren,, SWAMP QA Officer Amara Vandervort, SWAMP QA Coordinator Megan Kilner, SWAMP QA Specialist The Quality Assurance
More informationGUIDELINES FOR USE BY CLASS A LICENSEES IN MEETING SNP REQUIREMENTS JULY 1996
QUALITY ASSURANCE (QA) AND QUALITY CONTROL (QC) GUIDELINES FOR USE BY CLASS A LICENSEES IN MEETING SNP REQUIREMENTS AND FOR SUBMISSION OF A QA/QC PLAN JULY 1996 DEPARTMENT OF INDIAN AND NORTHERN AFFAIRS
More informationSample Management SOP 2v8 Page 1 STANDARD OPERATING PROCEDURE NO. 2 SAMPLE MANAGEMENT REVISION LOG. Revision Number Description Date
Sample Management SOP 2v8 Page 1 STANDARD OPERATING PROCEDURE NO. 2 SAMPLE MANAGEMENT REVISION LOG Revision Number Description Date 2.0 Original SOP 2.1 Revisions by McLemore after field testing 1/3/04
More informationQUALITY ASSURANCE and QUALITY CONTROL DATA STANDARD
QUALITY ASSURANCE and QUALITY CONTROL DATA STANDARD Standard No.: EX000012.1 January 6, 2006 This standard has been produced through the Environmental Data Standards Council (EDSC). The Environmental Data
More information4 PROJECT PLAN DOCUMENTS
1 4 PROJECT PLAN DOCUMENTS 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 4.1 Introduction The project plan documents are a blueprint for how a particular project
More informationDRY CLEANING PROGRAM QUALITY ASSURANCE MANAGEMENT PLAN
DIVISION OF ENVIRONMENT QUALITY MANAGEMENT PLAN PART III: DRY CLEANING PROGRAM QUALITY ASSURANCE MANAGEMENT PLAN Revision 3 January 8, 2013 Kansas Department of Health and Environment Division of Environment
More informationQUALITY ASSURANCE / QUALITY CONTROL POLICY BREG SOIL AND WATER QUALITY LABORATORY UNIVERSITY OF DELAWARE
QUALITY ASSURANCE / QUALITY CONTROL POLICY BREG SOIL AND WATER QUALITY LABORATORY UNIVERSITY OF DELAWARE Department of Bioresources Engineering Rm 111 Worrilow Hall 531 S. College Ave. Newark, DE 19716-2140
More informationMinnesota Pollution Control Agency. Quality Assurance Project Plan Guidance
www.pca.state.mn.us Minnesota Pollution Control Agency Quality Assurance Project Plan Guidance Overview The following guidance is for use in building Quality Assurance Project Plans (QAPPs) for the Minnesota
More informationStreet Address (number and street): City: County: ZIP Code: B. CURRENT SITE PRIORITY INFORMATION Was free product present this quarter?
QUARTERLY MONITORING REPORT (QMR) COVER SHEET AND REPORT FORMAT State Form 56087 (6-16) 329 IAC 9-5 Indiana Department of Environmental Management Office of Land Quality Leaking Underground Storage Tank
More information3.3 Data Collection Systems Design... 22 3.4 Planning Documents... 23 3.4.1 Work Plan... 23 3.4.2 Field Sampling Plan (FSP)... 24 3.4.
TABLE OF CONTENTS 1 INTRODUCTION... 1 1.1 Commitment to Quality... 1 1.2 QA Program Principles... 1 1.2.1 Client Satisfaction... 1 1.2.2 Employee Participation... 2 1.2.3 Problem Prevention... 2 1.2.4
More informationITS REWORK DATA VERIFICATION REPORT for samples collected from CAMP STANLEY STORAGE ACTIVITY BOERNE, TEXAS
INTRODUCTION ITS REWORK DATA VERIFICATION REPORT for samples collected from CAMP STANLEY STORAGE ACTIVITY BOERNE, TEXAS Data Verifiers: Michelle Wolfe & Tammy Chang Parsons The following data validation
More informationBuilding Credibility: Quality Assurance & Quality Control for Volunteer Monitoring Programs
Building Credibility: Quality Assurance & Quality Control for Volunteer Monitoring Programs Elizabeth Herron URI Watershed Watch/ National Facilitation of CSREES Volunteer Monitoring Ingrid Harrald Cook
More informationDivision of Environmental Response and Revitalization
Division of Environmental Response and Revitalization Guidelines and Specifications for Preparing Quality Assurance Project Plans (QAPPs) September 1, 1998 - Final Purpose This document (1) presents guidelines
More informationDIVISION OF ENVIRONMENT QUALITY MANAGEMENT PLAN PART III: SUPERFUND (MACA) PROGRAM QUALITY ASSURANCE MANAGEMENT PLAN
DIVISION OF ENVIRONMENT QUALITY MANAGEMENT PLAN PART III: SUPERFUND (MACA) PROGRAM QUALITY ASSURANCE MANAGEMENT PLAN Revision 3 February 21, 2012 Kansas Department of Health and Environment Division of
More informationEcology Quality Assurance Glossary
Ecology Quality Assurance Glossary Edited by William Kammin, Ecology Quality Assurance Officer Accreditation - A certification process for laboratories, designed to evaluate and document a lab s ability
More informationRouge River National Wet Weather Demonstration Project. TECHNICAL MEMORANDUM Data Screening, Validation, Reduction, and Reporting RPO-WM03A-TM05.
Rouge River National Wet Weather Demonstration Project Wayne County, Michigan TECHNICAL MEMORANDUM Data Screening, Validation, Reduction, and Reporting RPO-WM03A-TM05.02 February 1996 Rouge River National
More informationCOPY. Revision History
Revision History COPY The top row of this table shows the most recent changes to this controlled document. For previous revision history information, archived versions of this document are maintained by
More informationANALYTICAL SUMMARY REPORT
ANALYTICAL SUMMARY REPORT OST-003 August 06, 2015 PO Box 2003 Rapid City, SD 57709 Work Order: Project Name: G15070702 Energy Laboratories Inc. Gillette WY received the following 2 samples for on 7/31/2015
More informationMedical Cannabis Laboratory Approval Program
Medical Cannabis Laboratory Approval Program Application Process and Required Documentation After the publication of the Medical Cannabis Laboratory Application, currently expected by February 16, 2015,
More informationLAB ID and/or LABORATORY NAME: ASSESSOR NAME: CONTINUOUS RADON MONITOR (CRM) by Proportional Counting. Method Number: ELAP method code 7037
LAB ID and/or LABORATORY NAME: ASSESSOR NAME: DATE: CONTINUOUS RADON MONITOR (CRM) by Proportional Counting Method Number: ELAP method code 7037 SOP Number: Revision Number: SOP Date: Personnel / Data
More informationLevels of QA, Certifications, Credentials, Defending Your Data
Levels of QA, Certifications, Credentials, Defending Your Data GCSA Employee Training Tulsa Technology Center, Broken Arrow April 16, 2014 Richard Smith, INCOG Phase 2 Data Streaming DATA IN-FLOWS DATA
More informationGuidelines for Quality Assurance and Quality Control in Surface Water Quality Programs in Alberta
Guidelines for Quality Assurance and Quality Control in Surface Water Quality Programs in Guidelines for Quality Assurance and Quality Control in Surface Water Quality Programs in Prepared by: Patricia
More informationStream Monitoring at Tumacácori NHP
Stream Monitoring at Tumacácori NHP Santa Cruz River Researcher s Day Tucson Community Service Center March 27 2009 Presented by E.L.Gwilliam Overview why, what, where, when and how Stream Protocol Importance
More informationExperiment 1: Measurement and Density
Experiment 1: Measurement and Density Chemistry 140 Learning Objectives Become familiar with laboratory equipment and glassware Begin to see the link between measurement and chemical knowledge Begin to
More informationMIDLAND AREA SOIL SAMPLING MIDLAND, MICHIGAN
QUALITY ASSURANCE PROJECT PLAN MIDLAND AREA SOIL SAMPLING MIDLAND, MICHIGAN Revised May 2013 URS Corporation 9400 Amberglen Boulevard Austin, Texas 78729 (512) 454-4797 TABLE OF CONTENTS Section 1 Objectives
More informationEPA GUIDANCE FOR QUALITY ASSURANCE PROJECT PLANS EPA QA/G-5
United States Office of Research and EPA/600/R-98/018 Environmental Protection Development February 1998 Agency Washington, D.C. 20460 EPA GUIDANCE FOR QUALITY ASSURANCE PROJECT PLANS FOREWORD The U.S.
More informationUS EPA - Region III BROWNFIELDS. Quality Assurance Project Plan. Template
U.S. Environmental Protection Agency (EPA) Region III 1650 Arch Street Philadelphia, PA 19107 US EPA - Region III BROWNFIELDS Quality Assurance Project Plan Template Interim Final March 2001 DISLAIMER
More informationUS EPA REGION III QUALITY MANAGEMENT PLAN REVIEW CHECKLIST
US EPA REGION III Organization: EPA Organization: EPA Program: Contact: EPA Contact: EPA Contract/Grant/IAG Number: Phone Number: Phone Number: Reviewer: Date Reviewed: Reviewer Organization: Check New
More informationContent Sheet 7-1: Overview of Quality Control for Quantitative Tests
Content Sheet 7-1: Overview of Quality Control for Quantitative Tests Role in quality management system Quality Control (QC) is a component of process control, and is a major element of the quality management
More informationTEST PLAN APPLICATION TEMPLATE for Field Verification of Advanced Onsite Pretreatment Units for Nitrogen Reduction Chesapeake Bay Watershed States
TEST PLAN APPLICATION TEMPLATE for Field Verification of Advanced Onsite Pretreatment Units for Nitrogen Reduction Chesapeake Bay Watershed States This document is a template to be used by applicants seeking
More informationRounding and Significant Figures
National Renewable Energy Laboratory Innovation for Our Energy Future A national laboratory of the U.S. Department of Energy Office of Energy Efficiency & Renewable Energy Rounding and Significant Figures
More information6.b Quality Management Plan
6.b Quality Management Plan 6.b.1. Summary: The researchers participating in this Center are strongly committed to good science and aggressive quality management (QM) practices. Our commitment is documented
More informationAddendum. Use Attainability Analysis for Site Specific Selenium Criteria: Alkali Creek. February 23, 2009
Addendum Use Attainability Analysis for Site Specific Selenium Criteria: Alkali Creek February 23, 2009 Prepared by MWH Americas, Inc. Prepared for EnCana Oil and Gas (USA) Inc. Page 2 Responses to Comments
More informationATTACHMENT 8: Quality Assurance Hydrogeologic Characterization of the Eastern Turlock Subbasin
ATTACHMENT 8: Quality Assurance Hydrogeologic Characterization of the Eastern Turlock Subbasin Quality assurance and quality control (QA/QC) policies and procedures will ensure that the technical services
More informationASSURING THE QUALITY OF TEST RESULTS
Page 1 of 12 Sections Included in this Document and Change History 1. Purpose 2. Scope 3. Responsibilities 4. Background 5. References 6. Procedure/(6. B changed Division of Field Science and DFS to Office
More informationWater Quality Monitoring and Analysis of the Bennett Spring Watershed and Recharge Area
Quality Assurance Project Plan for Water Quality Monitoring and Analysis of the Bennett Spring Watershed and Recharge Area The Ozarks Environmental and Water Resources Institute (OEWRI) Missouri State
More informationPERFORMANCE EVALUATION AUDIT CHECKLIST EXAMPLE. EIIP Volume VI
Final 7/96 APPENDIX E - PERFORMANCE EVALUATION AUDIT APPENDIX E PERFORMANCE EVALUATION AUDIT CHECKLIST EXAMPLE APPENDIX E - PERFORMANCE EVALUATION AUDIT Final 7/96 This page is intentionally left blank.
More informationCanadian Environmental Technology Verification Program Applicant Information Package CONTENTS
Canadian Environmental Technology Verification Program CONTENTS Contents... 1 Overview... 2 Performance Verification... 2 Application Information... 2 How much does verification cost?... 2 What is the
More informationDATA QUALITY OBJECTIVES
The Wastewater Treatment Plant Operators Guide to Biosolids Sampling Plans CHAPTER 5 DATA QUALITY OBJECTIVES Goals of the Sampling Plan ESSENTIAL ELEMENTS OF A SAMPLING PLAN Description of the Facility
More informationApprovals [Signature On File]
Page 1 of 7 Minimum Reporting Requirements for Analytical Data (Chemistry) for the Water Quality Planning Bureau Approvals SOP WQPBDMS-010 Prepared by: Chris Shirley, QA Officer, WQPB Michael Pipp, Environmental
More informationAPPENDIX 4 Water Quality Monitoring Program Plan
APPENDIX 4 Water Quality Monitoring Program Plan As required by SWRCB Order No. WQ 2013-0058-EXEC, this plan shall be implemented by the BCPUD immediately upon discovery of any Category 1 SSO of 50,000
More informationCentral Valley Regional Data Center
Central Valley Regional Data Center CEDEN July 13, 2015 www.mlj-llc.com TABLE OF CONTENTS i. Introduction... 4 1. Water and Sediment Quality (Chemistry and Bacteria) Data... 6 1.1 Chemistry Results Worksheet...
More informationDIVISION OF ENVIRONMENT QUALITY MANAGEMENT PLAN VOLUNTARY CLEANUP AND PROPERTY REDEVELOPMENT PROGRAM QUALITY ASSURANCE MANAGEMENT PLAN
DIVISION OF ENVIRONMENT QUALITY MANAGEMENT PLAN PART III: VOLUNTARY CLEANUP AND PROPERTY REDEVELOPMENT PROGRAM QUALITY ASSURANCE MANAGEMENT PLAN January 29, 2015 Kansas Department of Health and Environment
More informationFinal Plan. Revision No. 1.0 Effective September 5, 2014
UTAH DIVISION OF WATER QUALITY QUALITY ASSURANCE PROGRAM PLAN FOR ENVIRONMENTAL DATA OPERATIONS Final Plan Revision No. 1.0 Effective September 5, 2014 Utah Division of Water Quality Utah Department of
More informationTASK 2: QUALITY ASSURANCE
TASK 2: QUALITY ASSURANCE Contents Introduction 2-3 Contract Provisions 2-3 Approval to Conduct Work 2-4 QAPP Extensions 2-4 Quality Assurance Project Plans 2-4 Biennial Submittal of Basin-Wide QAPPs 2-4
More informationRevision Log. Section 2.0, added Standard Scope Statement, applicable to M&O and LW only
ENVIRONMENTAL REQUIREMENTS AND PROGRAM DOCUMENTS ENVIRONMENTAL MONITORING PROGRAM QUALITY ASSURANCE PROJECT PLAN Effective Date: 06/05/13 Type-Class.: Admin-Info Page: 1 of 16 Pages Affected All All All
More informationThe volume of a penny will be calculated from its mass and density.
Measurement and Density In science a key concern is the quantities involved in chemical processes. These amounts can be directly measured or calculated from other measurements. A measurement consists of
More informationAPPENDIX C. DATA VALIDATION REPORT
APPENDIX C. DATA VALIDATION REPORT T-117 Upland Investigation Upland Investigation Data Report Appendices PROJECT NARRATIVE Basis for the Data Validation This report summarizes the results of the validation
More informationNYE COUNTY NUCLEAR WASTE REPOSITORY PROJECT OFFICE QUALITY ADMINISTRATIVE PROCEDURE SUPERSEDES: CONCURRENCE
NYE COUNTY NUCLEAR WASTE REPOSITORY PROJECT OFFICE QUALITY ADMINISTRATIVE PROCEDURE TITLE: Records Management REVISION: 4 DATE: Page 1 of 11 PROCEDURE NUMBER: QAP-17.1 SUPERSEDES: Revision 3, 11-15-07
More informationQuality Assurance Program Plan
Quality Assurance Program Plan Prepared by: Environment, Health and Safety Division Environmental Services Group Environmental Restoration Program September 2009 Revision 5 Ernest Orlando Lawrence Berkeley
More informationPERFORMANCE-BASED EVALUATION OF LABORATORY QUALITY SYSTEMS An Objective Tool to Identify QA Program Elements that Actually Impact Data Quality
PERFORMANCE-BASED EVALUATION OF LABORATORY QUALITY SYSTEMS An Objective Tool to Identify QA Program Elements that Actually Impact Data Quality ABSTRACT Sevdâ K Aleckson, Western Region Quality Assurance
More informationTARP Section 2.2 Stormwater BMP Screening for Validation
Requirements for Final Certification of Manufactured Treatment Devices for Total Suspended Solids Removal Based on Field Testing Amendments to TARP Protocol DRAFT April 28, 2009 The New Jersey Stormwater
More informationStrategic Environmental Compliance and Performance Review. Industry monitoring. Department of Environment, Climate Change and Water NSW
Strategic Environmental Compliance and Performance Review Industry monitoring Department of Environment, Climate Change and Water NSW Strategic Environmental Compliance and Performance Review Industry
More informationMeasurement of Length, Mass, Volume and Density
Measurement of Length, Mass, Volume and Density Experimental Objective The objective of this experiment is to acquaint you with basic scientific conventions for measuring physical quantities. You will
More informationBRC Food Safety Management System Implementation Workbook
We have written this workbook to assist in the implementation of your BRC food safety management system. The workbook is divided into 8 steps that are designed to assist you in implementing your food safety
More informationPrattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
More informationRadioanalytical Data Validation Issues and Solutions
Radioanalytical Data Validation Issues and Solutions Presented by: Terry McKibbin and Kevin Harmon Validata Chemical Services, Inc. Purpose of Data Validation The Presentation is Based on this Goal for
More informationLATEST ENHANCEMENTS TO THE RIVERMorph STREAM RESTORATION SOFTWARE
LATEST ENHANCEMENTS TO THE RIVERMorph STREAM RESTORATION SOFTWARE J. George Athanasakes, PE RIVERMorph, LLC 1901 Nelson Miller Parkway Louisville, KY 40223-2177 233 BIOGRAPHICAL SKETCH J. George Athanasakes,
More informationNOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT.
September 1, 2003 CONCRETE MANUAL 5-694.300 MIX DESIGN 5-694.300 NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT. 5-694.301
More informationAn Introduction to. Metrics. used during. Software Development
An Introduction to Metrics used during Software Development Life Cycle www.softwaretestinggenius.com Page 1 of 10 Define the Metric Objectives You can t control what you can t measure. This is a quote
More informationCHAPTER ONE TABLE OF CONTENTS 1.0 INTRODUCTION... 1
CHAPTER ONE TABLE OF CONTENTS Section Page 1.0 INTRODUCTION... 1 2.0 QA PROJECT PLAN... 1 2.1 DATA QUALITY OBJECTIVES... 2 2.2 PROJECT OBJECTIVES... 2 2.3 SAMPLE COLLECTION... 3 2.4 ANALYSIS AND TESTING...
More informationMystic River Watershed Association Water Quality Monitoring: Malden River May 28 th 2002
Mystic River Watershed Association Water Quality Monitoring: Malden River May 28 th 2002 Introduction The Mystic River Watershed Association, through its Mystic Monitoring Network (MMN) program, has been
More informationLaboratory Quality Assurance Manual
Laboratory Quality Assurance Manual (Revision 8) Effective Date: 03/22/2013 Approved By: Randall Warden President (260) 483-4759 03/22/2013 Date Greg Neyman Vice-President (260) 483-4759 03/22/2013 Date
More informationSection 5 Floodplain Management Tools
5.1 Floodprone Areas One of the major elements of the Master Plan is the updated 100-year floodplain and floodway boundary maps. This information provided the most up-to-date tools to protect homes and
More informationWorking Copy - 1,- / t&,1 r. Responsibilities of the Laboratory Quality Assurance Officer. EffectiveDate: 7/ltl/ l'rritials: tuwt
QAM.Q-1 13 Approval: Responsibilities of the Laboratory Quality Assurance Officer Laboratory Manager/ Quality Assurance Officer Concurrefirco - -/^/ - 1,- Rev. 4 EffectiveDate: 7/ltl/ Date,i / t&,1 r Renewat
More informationFINAL Quality Assurance Project Plan Municipal Separate Storm Sewer System Discharge Sampling City of Coeur d Alene, Idaho NPDES Permit No.
FINAL Quality Assurance Project Plan Municipal Separate Storm Sewer System Discharge Sampling City of Coeur d Alene, Idaho NPDES Permit No. IDS-028215 Prepared for City of Coeur d Alene, Idaho February
More informationAnalytical Data Package Reports
Analytical Data Package Reports TriMatrix offers a variety of analytical data packages formatted to meet the reporting needs and varying data quality objectives of its clients. The data packages offered
More informationPERFORMANCE REPORT. Quality Assurance Program - January to June 2011
PERFORMANCE REPORT Quality Assurance Program - January to June 2011 The following discussion is prepared in accordance with the requirements for a Semiannual Performance Report on the Quality Assurance
More informationScope and application: For testing residual corrosion inhibitors (oxygen scavengers) in boiler feed water or condensate
Oxygen Scavengers DOC316.53.01105 Iron Reduction Method Method 8140 3 to 450 µg/l DEHA; 5 to 600 µg/l carbohydrazide; 9 to 1000 µg/l hydroquinone; 13 to 1500 µg/l iso-ascorbic acid (ISA); 15 to 1000 µg/l
More informationDATA QUALITY ASSESSMENT AND DATA USABILITY EVALUATION TECHNICAL GUIDANCE
New Jersey Department of Environmental Protection Site Remediation Program DATA QUALITY ASSESSMENT AND DATA USABILITY EVALUATION TECHNICAL GUIDANCE Version 1.0 April 2014 Preamble The results of analyses
More informationThird Party Data Validation: What you need to know and do!
Third Party Data Validation: What you need to know and do! Anand Mudambi & Pamela Wehrmann 2012 DoD EMDQ Workshop San Diego, CA Course Objectives/Outline The course will provide an overview of third party
More informationGuidance for Geospatial Data Quality Assurance Project Plans
United States Environmental Protection Agency Guidance for Geospatial Data Quality Assurance Project Plans EPA QA/G-5G Office of Environmental Information Washington, DC 20460 EPA/240/R-03/003 Quality
More informationDraft. Quality Assurance Project Plan. Haul Road Fugitive Dust Study. Red Dog Mine, Alaska. Prepared for. Teck Cominco Alaska Inc.
Draft Quality Assurance Project Plan Haul Road Fugitive Dust Study Red Dog Mine, Alaska Prepared for Teck Cominco Alaska Inc. Anchorage, Alaska Draft Quality Assurance Project Plan Haul Road Fugitive Dust
More informationColor, True and Apparent
Color, True and Apparent DOC316.53.01037 Platinum-Cobalt Standard Method 1, 2, 3 Method 8025 15 to 500 color units Scope and application: For water, wastewater and seawater; equivalent to NCASI method
More information1 For more information T: +1.847.664.1499 / E: DAP@ul.com / W: ul.com/dap
DATA ACCEPTANCE PROGRAM UL Client Test Data Program Investigations of products by UL typically involve the testing of product samples. While UL maintains extensive facilities for these purposes, customers
More informationSuspended Solids: Unequal Results from Equal Methods
Suspended Solids: Unequal Results from Equal Methods By John Stone As of November 2003, 40 CFR, Part 136 lists five approved methods for determining Total Suspended Solids (Residue). Major differences
More informationLaboratory Information Management System (LIMS) in EMRL
Laboratory Information Management System (LIMS) in EMRL History of LIMS at EMRL November of 2003, EMRL purchased a commercial LIMS system to replace an LLNL built system Use for multiple groups Keep current
More informationColor, True and Apparent
Color, True and Apparent DOC316.53.01037 Platinum-Cobalt Standard Method 1, 2, 3 Method 8025 15 to 500 color units 5 to 500 color units (low range technique) Scope and application: For water, wastewater
More informationGeneric CMMS Quality Assurance Plan
Generic CMMS Quality Assurance Plan Scope In accordance with the Quality Policy, the Quality System of CMMS is based upon the requirements and structure of ISO (the International Organization for Standardization)
More informationTipping Bucket Rain Gauge Models 6011-A 6011-B
Tipping Bucket Rain Gauge Models 6011-A 6011-B User s Manual 1165 National Drive Sacramento, CA 95834 800.824.5873 Table of Contents General Information... 1 Introduction... 1 Installation General... 2
More informationValidating Emissions Testing Laboratories: A Standard for Assessing Laboratories that Conduct Chemical Emissions Testing
Validating Emissions Testing Laboratories: A Standard for Assessing Laboratories that Conduct Chemical Emissions Testing 2006-2010 GG Publications, Inc LABORATORY PROFICIENCY Critical product purchasing
More informationMOBILE HOME LAW. Revised November 2001
MOBILE HOME LAW Revised November 2001 TABLE OF CONTENTS: SECTION 1: SECTION 2: SECTION 3: SECTION 4: SECTION 5: SECTION 6: SECTION 7: SECTION 8: SECTION 9: SECTION 10: SECTION 11: SECTION 12: INTENT DEFINITIONS
More informationGrammage of paper and paperboard (weight per unit area) (Revision of T 410 om-08) (underscores and strikeouts indicate changes from Draft 1)
NOTICE: This is a DRAFT of a TAPPI Standard in ballot. Although available for public viewing, it is still under TAPPI s copyright and may not be reproduced or distributed without permission of TAPPI. This
More informationHighway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting
Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting MnDOT Contract No. 1003249 General Project Overview This work is located along Trunk Highway (TH) 23, for State Project (SP) 7305-124.
More informationProcedure: Quality Assurance Policy Version 5 Quality Assessment Policy Version 3
Procedure: Quality Assurance Policy Version 5 Quality Assessment Policy Version 3 Prepared by Date Adopted Supersedes Procedure # Estelle Piwowar-Manning Quality Assessment vers 2 Sarah Dawson Paul Richardson
More informationQuality Assurance (QA) & Quality Control (QC)
Quality Assurance (QA) & Quality Control (QC) In the laboratory Georges Ruta Water Quality Scientist City West Water 1 City West Water Water Supply & Sewerage Authority Melbourne Pop. >800,000 Area 580
More informationAnalytical Test Method Validation Report Template
Analytical Test Method Validation Report Template 1. Purpose The purpose of this Validation Summary Report is to summarize the finding of the validation of test method Determination of, following Validation
More informationAPPENDIX L DATA VALIDATION REPORT
APPENDIX L DATA VALIDATION REPORT FIELD AND DATA REPORT DOWNTOWN PORTLAND SEDIMENT CHARACTERIZATION PHASE II WILLAMETTE RIVER PORTLAND, OREGON JUNE 2010 Data Validation Report Downtown Portland Sediment
More information