Sensitivity of an Environmental Risk Ranking System

Size: px
Start display at page:

Download "Sensitivity of an Environmental Risk Ranking System"

Transcription

1 Sensitivity of an Environmental Risk Ranking System SUMMARY Robert B. Hutchison and Howard H. Witt ANSTO Safety and Reliability CERES is a simple PC tool to rank environmental risks and to assess the cost-benefit of proposals. It is based on a methodology which effectively combines environmental science, engineering and site operations expertise. The operations at each site are examined to generate a list of postulated incidents and associated estimates of the incident likelihood and the quantity of material released from the site. For each material-site combination, transfer effectiveness estimates are assigned based on the pathway to the receptors. Incident risks are ranked using these estimates along with ratings for the impact of each hazardous material; and ratings for the ecological sensitivity of each site. Initial estimates are based on subjective assessments which are refined by additional data when available. Estimation effort needs to be directed to refining those estimates which have the greatest impact on the results. The ranking method is described and approaches to determine the sensitivity of the results to individual estimates are examined. INTRODUCTION Many organisations have a number of sites with various surrounding land types and use a wide variety of environmentally hazardous materials. With an intention to reduce the environmental risk of possible accidental releases from their operations, the organisation needs to be able to assess which site and which particular improvement options should be addressed first. Management has a duty to spend the environmental improvement budget in an efficient and cost effective fashion. Naturally, sufficient funds need to be provided to comply with legal requirements but many organisations desire to further reduce environmental risks. Once the scenarios for environmental damage have been ranked, it is appropriate to assess how precise or vague are the rankings. Even within the bounds determined by the choice of value judgements, the particular scores assigned to each scenario will have a degree of uncertainty. Knowledge of the size of this uncertainty will enable the decision makers to understand the difference between scores of different scenarios. In addition, knowledge of the source of the uncertainty will enable effort to be spent in the area which will reduce the overall uncertainty of the results. The model described herein has been effectively utilised in a number of Australian organisations to rank their exposure to environmental risk from operations at a number of sites (Hutchison, et al. 1996). It is the intent of this study to investigate uncertainties in the model so that the best possible results are obtained with the minimum amount of effort spent on determining factors that do not significantly affect the result. MODEL DESCRIPTION The overall method is shown in Figure 1 which sets out the development of the various estimates. The differing expertise of personnel within the organisation is utilised in estimation of different factors incorporated into the technique. The expertise of environmental specialists is used to produce hazard ratings for the different chemicals used on the sites and site sensitivity ratings, while site based personnel s knowledge is used in the estimation of accident scenario size and frequency. Incident records are linked to the material and site data files. Incident consequence scores are computed using the material and site ratings from these files and incident specific data. The incident consequence score and an estimate of the incident frequency are combined to give the incident risk score.

2 Codes are defined later in the paper Figure 1 Model for estimating environmental risk The model presented here is congruent with AS/NZS 4360 (Hutchison, Perera & Witt 1996) and uses a technical panel to produce the scores used for ranking the accident scenarios. The reasoning for assessments and the data used in the assessment is documented to allow for revision and checking. There are three consequence scores that are developed, one for human health effects (CSh), one for the local environment (CSe) and one for the global environment (global warming and ozone depletion - CSg). We have chosen to explicitly assign the weightings for each of these consequence scores and have combined these scores by addition. The explicit assignment of weightings enables the degree of anthropogenic orientation to be documented. The addition of consequence scores results in a single total consequence score (CS) which is used for consequence ranking of the scenarios. Equations Used The quantity released is an estimate of the amount of material released from the site per incident, taking into account the effectiveness of the mitigation systems. Quantity released (QR) = Quantity spilt x fraction not contained by mitigation systems The algorithms for the consequence scores (CS) are: Human: CSh Ecological: CSe Global: CSg = QR x HRh x SSh x TRh = QR x HRe x SSe x TRe = QR x HRg where HR = material hazard rating; SS = site sensitivity rating; TR = transfer route score. The total incident consequence score is the sum of the consequence scores for each of the three types of effects. This total score, multiplied by the estimated incident frequency (F) yields the incident risk score (RS) which is used to rank the environmental risk of the incidents. CS RS = CSh + CSe + CSg = CS x F A fictitious example could be a site using aromatic solvents stored in a bunded tank located next to a stream leading to wetlands. Details of the calculations are given in Table 1. Table 1: Sample calculations for fictitious environmental risk

3 Quantity spilled from tank Effectiveness of bund in containing spill Quantity Released Likelihood of spill L 90% 1 000L 0.01 p.a. human local environment global environment Aromatic Solvents hazard ratings Site environs sensitivity N.A. Transfer routes efficiency N.A. Consequence Scores Total Consequence Score Risk Score Technique Application The technique developed builds on lists of hazardous substances and operating practices at each site in the organisation. This could be generated during environmental audits, other site visit reports or by site staff. Using an experienced analyst, the site knowledge of local staff and various identification techniques such as a Rapid Ranking Study or brainstorming, a list of potential incidents is generated. An incident record is created for each postulated release at each location in which a hazardous material is stored or used. The likely quantity to be released is calculated from estimates of the quantity spilt and estimates of the effectiveness of mitigation systems. If historical data are not available, the frequency (or likelihood) of the event is based on industry experience or generic failure data. This work is best done by a team, or drafted by one individual and reviewed by a multidiciplinary team. The approach can be similar to the Rapid Ranking approach advocated by Tweeddale, Cameron & Sylvester (1992), with the team comprising a vertical slice of the organisation, including persons with shop floor knowledge of operating practice. In large operations the team membership would change as different activities are covered. Expertise of environmental scientists and engineers is utilised to derive hazard and site sensitivity ratings. The hazard rating for effects on humans (HRh) is derived by summing weighted scores for the toxicity, fire risk, aesthetic impact and public perception. The environmental hazard rating (HRe) for the chemicals is derived from similar consideration of the toxicity to flora and fauna, biodegradability and the propensity to affect habitats through fire, visual impact, degradation of the soil, etc. As ecotoxicity develops the methods for estimating the environmental hazard score may become less dependent on judgements by environmental experts. The global hazard rating (HRg) is similarly derived from the materials ozone depletion capacity, greenhouse contribution and bioaccumulation. Bioaccumulation is included in the global hazard rating as it will affect flora and fauna for a long time and is very likely to extend for a considerable distance around the site. SENSITIVITY ANALYSIS Elliott and Horowitz (1994) advise that ranges of risk, rather than single-value conservative risk estimates should be communicated to legitimise risk analysis whereas Garetz (1993) advocates the use of single point estimates in order to simplify the analysis and reduce the disputation on what the results mean. In this system we have chosen to use best estimate single point scores to simplify the results. Additional analysis of the results is suggested to determine the factors that have the most uncertainty. This would be the starting point for any additional refinement of the scores. In a risk score calculated by the product of many factors, it is intuitively obvious, that the only parameters that contribute significantly to the uncertainty of the final risk are those with the largest errors (Seiler and Alvarez 1996). Seiler and Alvarez also point out that the most uncertain parameters are the ones which have the most uncertain probability distribution and standard errors. This leads to the necessity of spending effort attempting to refine the estimates of those parameters that are intrinsically difficult to quantify, whereas refining estimates of more easily assessed parameters does not improve the overall result. This system calculates the risk score from multiplication of the primary factors, QS, (1-ME), F and CS. Thus for the best accuracy with the least effort, each of the values assigned to these factors should have the same level of confidence. In other words, the standard errors of the distributions of real scores

4 about the estimated values should be similar for each of the factors. This will enable the final risk score, RS, to have the lowest spread of values about the calculated value based on the estimated factors. Through analysis of information used in implementations of this system, estimates of the precision of the parameters can be made. Three different techniques are utilised. The first technique uses the discrimination between parameter values for different model scenarios. Where only three different parameter values are entered for 200 scenarios, it can be concluded that the degree of uncertainty for this parameter is large. The second technique uses the precision of the parameter estimates. This would ascribe a higher level of precision to a parameter given a score of 2.34 than a parameter given a score of 6. The third technique requires judgement of experienced risk analysts to estimate the likely error in the different parameters. This third technique permits assessment of uncertainties due to both lack of knowledge and lack of precision in the parameter value estimates. In all analyses of this nature, the possibility of correlations between input data must be incorporated in the results. In this model a significant degree of correlation is likely to be present between the Hazard Ratings for humans, the local environment and the global environment. ie if the hazard to people is underestimated it is likely that the hazard to the environment would also be underestimated. It is important to note that these correlations only exist in the calculations determining the consequence score. RESULTS One large implementation of this system was analysed as part of this study. The table of estimated accuracy of parameter values (Table 2) shows that the confidence which could be read into the parameter values entered by either discrimination or numerical precision was much higher than the confidence in the values given by risk analysts. Table 2: Estimated precision of parameter values used in an implementation of the environmental risk ranking system. The values are the factors by which the estimated values are multiplied or divided to be confident that the real value will lie within that range. Parameter Value Discrimination Value Precision Estimated by Risk Analysts Quantity Spilt (QS) Mitigating Effectiveness (1-ME) Likelihood (F) Hazard Rating Human Hazard Rating Environment Hazard Rating Global Transfer Route Human Transfer Route Environment Site Sensitivity Human Site Sensitivity Environment Consequence Score 5 The likelihood of scenarios is seen to have the highest uncertainty with a factor of 10 being the estimated range of values about the estimated value. This suggests that significant effort be applied to improve the values used in this area. However, the final scenario scores are likely to be biased in the same direction, with all consequences underestimated or overestimated, etc. This systematic error would result in little error to the ranking of the risks. As the ranking of the risks is the most important aspect of the system, the accuracy of the scores is of less importance than the ranking of scenarios. However, this does not lessen the importance of being diligent in assigning best estimates to all the scores as rankings are also possible based on the consequence score, the frequency or the quantity of material lost to the environment. It can be argued that even though the real results have the uncertainty ranges shown, the ranking of the results does not change due to similar assumptions and processes being involved in the determination of both values. Alternatively, if different people have been involved in the determination of the values, completely different assumptions may have been used and the uncertainty ranges may reflect the uncertainty in the relative values as well as the real values. It is important to have at least

5 one person who is involved in all the assessments so that views of different personnel can be moderated to reduce the variability. Figure 2: Discrimination of parameter values The choices made by the team in assigning scores to the various factors in one implementation shows the confidence that they have in the values or the confidence they have in the relative rankings between scenarios. The transfer route human values have all been chosen to be either 1%, 10%, 20%, 40% or 60% (see Figure 2). This suggests that the team either had very little information to base their decisions on or could only perceive five distinct classes of values due to the inherent variability of this factor. This could be due to difficulty in reconciling the different factors which comprise the transfer routes to local human populations. Care must be taken to ensure that the users are aware of the limitations of the system. Even though the use of a single team to produce the estimates will result in rankings that have validity, the uncertainty in the numerical results remain. Application of the results of the ranking system must be made in awareness of the basis for ranking and the explicit value judgements which are incorporated. In the method given here, only the consequence score is broken down into other non-multiplicative factors. The consequence score is the sum of three factors of consequence scores for each of human, environmental and global effects. The basis for this breakdown in factors is to enable the value judgements and the assumptions to be documented and explicitly considered. This is particularly relevant as the consequence score is the one factor in this system which is quite different to the factors currently used in risk assessments and ranking methods for risks to people and property. The 200 scenarios were represented by four scenarios equally spread by risk score. Figure 3 shows the possible variation in risk scores using the estimated precision factors of the risk analysts given in Table 2. This shows that even with the very low precision estimates of the scores and assuming complete independence of the scores for the scenarios, the scenarios can be separated into four categories with high levels of confidence. As the estimates of the scenario values are not likely to be independent but will vary in line with each other, the separation into separate classes of risk score is likely to be even greater.

6 Figure 3: Sensitivity of scenario risk scores assuming independence of factor scoring CONCLUSIONS The use of a consequence score broken down into separate factors has enabled value judgements, assumptions and lack of knowledge to be faced explicitly. Despite the difficulties which the value judgements and lack of knowledge pose, a numerical score has been able to be assigned and the documentation of reasoning allows the score to be defended. Even incorporating high levels of uncertainty and assuming independence of scores, the risk scores can be separated into separate groups. Although the scores may not be significantly different from one score to the next one, they are different from one group to the next. This work shows that it is possible to analyse the results from a preliminary environmental risk ranking study to enable efforts to refine the results to be directed to those areas of the analysis which are less precise. The approach used for this environmental risk ranking system has been demonstrated through use to be efficient and effective. Decisions on the allocation of available funds for environmental risk reduction can be made on a systematic scientific/engineering basis. It also enables operators to improve their understanding of the environmental issues associated with the operations. REFERENCES AS/NZS. Australian and New Zealand Standard 4360:1995. Risk Management. Elliott E D and Horowitz A B Risk-based environmental priorities: What priority? Water Resources Regulations. p Garetz W V Current concerns regarding the implementation of risk-based management: How real are they? Comparative Environmental Risk Assessment. Ed. Cothern C R. Hutchison R B, Perera J, Witt H H, Brodie M H, Ross K J and Elliot G I Application of an environmental risk ranking system. paper in preparation. Hutchison R B, Perera J, Witt H H Preliminary Environmental Risk Ranking. First Annual Risk Engineering Seminar, 11 April The Munro Centre for Civil and Environmental Engineering, The University of New South Wales. Seiler F A and Alvarez J L On the selection of distributions for stochastic variables. Risk Analysis. Vol. 16 no. 1 pp5-18. Tweeddale H M, Cameron R F & Sylvester S Some Experiences in Hazard Identification and Risk Shortlisting. J. of Loss Prev. Process Ind. vol. 5(5) p279-88

ENVIRONMENTAL ASPECTS REGISTER (ISO 14001)

ENVIRONMENTAL ASPECTS REGISTER (ISO 14001) ENVIRONMENTAL ASPECTS REGISTER (ISO 14001) 1. Scope The scope of this Environmental Aspects Register covers the following operational areas: Aberdeen Region (A); Cumbernauld Region (C); Warrington Region

More information

QUANTITATIVE RISK ASSESSMENT FOR ACCIDENTS AT WORK IN THE CHEMICAL INDUSTRY AND THE SEVESO II DIRECTIVE

QUANTITATIVE RISK ASSESSMENT FOR ACCIDENTS AT WORK IN THE CHEMICAL INDUSTRY AND THE SEVESO II DIRECTIVE QUANTITATIVE RISK ASSESSMENT FOR ACCIDENTS AT WORK IN THE CHEMICAL INDUSTRY AND THE SEVESO II DIRECTIVE I. A. PAPAZOGLOU System Reliability and Industrial Safety Laboratory National Center for Scientific

More information

Identifying Environmental Aspects

Identifying Environmental Aspects Identifying Environmental Aspects How an organization interfaces with the environment Environmental Aspect: Element of an organization s activities, products, or services that can interact with the environment.

More information

APPENDIX 4. Risk Tables

APPENDIX 4. Risk Tables APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The

More information

Risk Management Procedure For The Derivation and Use Of Soil Exposure Point Concentrations For Unrestricted Use Determinations

Risk Management Procedure For The Derivation and Use Of Soil Exposure Point Concentrations For Unrestricted Use Determinations Risk Management Procedure For The Derivation and Use Of Soil Exposure Point Concentrations For Unrestricted Use Determinations Hazardous Materials and Waste Management Division (303) 692-3300 First Edition

More information

Version Adoption by Council: 2013 Resolution Number: 2013/177 Current Version: V1.0 Administered by: Governance Coordinator

Version Adoption by Council: 2013 Resolution Number: 2013/177 Current Version: V1.0 Administered by: Governance Coordinator Risk Management Framework Version Adoption by Council: 2013 Resolution Number: 2013/177 Current Version: V1.0 TRIM CON: 12/1132 Administered by: Governance Coordinator Last Review Date: 2013 Next Review

More information

Bridgend County Borough Council. Corporate Risk Management Policy

Bridgend County Borough Council. Corporate Risk Management Policy Bridgend County Borough Council Corporate Risk Management Policy December 2014 Index Section Page No Introduction 3 Definition of risk 3 Aims and objectives 4 Strategy 4 Accountabilities and roles 5 Risk

More information

Phase A Aleutian Islands Risk Assessment. Options and Recommended Risk Matrix Approach. April 27, 2010

Phase A Aleutian Islands Risk Assessment. Options and Recommended Risk Matrix Approach. April 27, 2010 Phase A Aleutian Islands Risk Assessment Options and Recommended Risk Matrix Approach April 27, 2010 Agenda for Risk Matrix Discussion Introductions Where we are in AIRA Phase A Risk Matrix Background

More information

BEYOND AMA PUTTING OPERATIONAL RISK MODELS TO GOOD USE POINT OF VIEW

BEYOND AMA PUTTING OPERATIONAL RISK MODELS TO GOOD USE POINT OF VIEW POINT OF VIEW BEYOND AMA PUTTING OPERATIONAL RISK MODELS TO GOOD USE AUTHORS Ramy Farha, Principal Tom Ivell, Partner Thomas Jaeggi, Principal Evan Sekeris, Partner A long history of incidents, ranging

More information

ENGINEERING COUNCIL. Guidance on Risk for the Engineering Profession. www.engc.org.uk/risk

ENGINEERING COUNCIL. Guidance on Risk for the Engineering Profession. www.engc.org.uk/risk ENGINEERING COUNCIL Guidance on Risk for the Engineering Profession www.engc.org.uk/risk This guidance describes the role of professional engineers and technicians in dealing with risk, and their responsibilities

More information

Asset Management Plan Overview

Asset Management Plan Overview Council Strategy Asset Management Plan Overview City of Albany 2013 File Ref: CM.STD.6 Synergy Ref: NMP1331749 102 North Road, Yakamia WA 6330 Version: 25/06/2013 PO Box 484, ALBANY WA 6331 Tel: (08) 9841

More information

Effective Techniques for Risk Measurement. Agenda

Effective Techniques for Risk Measurement. Agenda Effective Techniques for Risk Measurement Steven Ross Executive Principal Risk Masters, Inc. Agenda The Failure of Current Techniques A Fresh Approach to Risk Measurement The Theory Behind the Techniques

More information

Discipline: Technical Services Category: Procedure. Risk Management RM-01 2013. Applicability. ARTC Network Wide. Interstate Network.

Discipline: Technical Services Category: Procedure. Risk Management RM-01 2013. Applicability. ARTC Network Wide. Interstate Network. Discipline: Technical Services Category: Procedure Risk Management RM-01 2013 Applicability ARTC Network Wide Interstate Network Hunter Valley Document Status Version Prepared by Reviewed by Endorsed Approved

More information

Alternate Concentration Limits/Groundwater Cleanup Levels. Title slide

Alternate Concentration Limits/Groundwater Cleanup Levels. Title slide Alternate Concentration Limits/Groundwater Cleanup Levels Title slide 1 Alternate Concentration Limits (ACL) Terms and Definitions 40 CFR 264 Subpart F Definitions Regulated Unit Ground Water Protection

More information

Life Cycle Cost Analysis (LCCA)

Life Cycle Cost Analysis (LCCA) v01-19-11 Life Cycle Cost Analysis (LCCA) Introduction The SHRP2 R-23 Guidelines provide a number of possible alternative designs using either rigid of flexible pavements. There is usually not a single

More information

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

CHAPTER 24: ENVIRONMENTAL MANAGEMENT Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION EUROPEAN COMMISSION Brussels, XXX [ ] (2013) XXX draft Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION Providing minimum principles for the exploration and production of hydrocarbons (especially

More information

Managing construction procurement risks

Managing construction procurement risks CONSTRUCTION PROCUREMENT BEST PRACTICE GUIDELINE #A5 Construction Industry Development Board Pretoria - Head Office Tel: 012 482 7200 Fraudline: 0800 11 24 32 Call Centre: 0860 103 353 E-mail: cidb@cidb.org.za

More information

THE ROAD SAFETY RISK MANAGER GAME, SET, MATCH FOR MANAGING YOUR ROAD SAFETY INTERVENTIONS

THE ROAD SAFETY RISK MANAGER GAME, SET, MATCH FOR MANAGING YOUR ROAD SAFETY INTERVENTIONS THE ROAD SAFETY RISK MANAGER GAME, SET, MATCH FOR MANAGING YOUR ROAD SAFETY INTERVENTIONS Rob McInerney robm@arrb.com.au Business Manager, ARRB Transport Research Victoria Australia Abstract Local government

More information

A Geospatial Solution for Minimizing Risk. Pipeline Hazard Categorization

A Geospatial Solution for Minimizing Risk. Pipeline Hazard Categorization A Geospatial Solution for Minimizing Risk Pipeline Hazard Categorization 1 Agenda 1. At stake: corporate value and reputation 2. Contributing Pipeline Segments: a building block for risk prioritization

More information

Risk-Based Decision Making for Site Cleanup

Risk-Based Decision Making for Site Cleanup July 2013 Risk-Based Decision Making for Site Cleanup The Oklahoma Department of Environmental Quality (DEQ) has adopted a risk based decision making process to provide a framework for determining cleanup

More information

RISK MANAGEMENT GUIDANCE FOR GOVERNMENT DEPARTMENTS AND OFFICES

RISK MANAGEMENT GUIDANCE FOR GOVERNMENT DEPARTMENTS AND OFFICES RISK MANAGEMENT GUIDANCE FOR GOVERNMENT DEPARTMENTS AND OFFICES GOVERNMENT ACCOUNTING SECTION DEPARTMENT OF FINANCE MARCH 2004 Risk Management Guidance CONTENTS Pages List of guidelines on risk management

More information

The Lowitja Institute Risk Management Plan

The Lowitja Institute Risk Management Plan The Lowitja Institute Risk Management Plan 1. PURPOSE This Plan provides instructions to management and staff for the implementation of consistent risk management practices throughout the Lowitja Institute

More information

The Locomotive. Risk-Informed Fire Protection

The Locomotive. Risk-Informed Fire Protection Risk-Informed Fire Protection By Thomas F. Barry, P.E., and Theresa Stone, HSB Professional Loss Control, The Hartford Steam Boiler Fire Safety And Tight Budgets Fire safety specialists are meeting the

More information

LCA approaches for quantifying the environmental impact of plastics in the marine environment

LCA approaches for quantifying the environmental impact of plastics in the marine environment LCA approaches for quantifying the environmental impact of plastics in the marine environment Summary Graduation Project Report by Otto Faasse from Avans University of Applied Science, Breda IVAM UvA BV

More information

RISK MANAGEMENT OVERVIEW - APM Project Pathway (Draft) RISK MANAGEMENT JUST A PART OF PROJECT MANAGEMENT

RISK MANAGEMENT OVERVIEW - APM Project Pathway (Draft) RISK MANAGEMENT JUST A PART OF PROJECT MANAGEMENT RISK MANAGEMENT OVERVIEW - APM Project Pathway (Draft) Risk should be defined as An uncertain event that, should it occur, would have an effect (positive or negative) on the project or business objectives.

More information

APPENDIX H7: POOL SPREAD AREAS FOR INSTANTANEOUS TANK FAILURE

APPENDIX H7: POOL SPREAD AREAS FOR INSTANTANEOUS TANK FAILURE APPENDIX H7: POOL SPREAD AREAS FOR INSTANTANEOUS TANK FAILURE H7.1 Introduction H7.1.1.1 The extent of flow of liquid from a instantaneous tank failure has been assessed based on the physical modelling

More information

Aachen Summer Simulation Seminar 2014

Aachen Summer Simulation Seminar 2014 Aachen Summer Simulation Seminar 2014 Lecture 07 Input Modelling + Experimentation + Output Analysis Peer-Olaf Siebers pos@cs.nott.ac.uk Motivation 1. Input modelling Improve the understanding about how

More information

Oil spill contingency planning

Oil spill contingency planning Oil spill contingency planning N-04700-GN0940 Rev 2, July 2012 Core concepts The Regulations specify that the EP must contain an oil spill contingency plan (OSCP) which includes appropriate oil spill response

More information

Usefulness of expected values in liability valuation: the role of portfolio size

Usefulness of expected values in liability valuation: the role of portfolio size Abstract Usefulness of expected values in liability valuation: the role of portfolio size Gary Colbert University of Colorado Denver Dennis Murray University of Colorado Denver Robert Nieschwietz Seattle

More information

How To Monitor Safety Management System Performance

How To Monitor Safety Management System Performance Guidance Note Performance standards and indicators Advice for operators of major hazard facilities on developing meaningful and useful performance standards and indicators for the Safety Management System

More information

EMERGENCY MANAGEMENT PLANS AND DEFICIENT DAMS (INTERNATIONAL BEST PRACTICE OR A HOME- GROWN APPROACH?)

EMERGENCY MANAGEMENT PLANS AND DEFICIENT DAMS (INTERNATIONAL BEST PRACTICE OR A HOME- GROWN APPROACH?) EMERGENCY MANAGEMENT PLANS AND DEFICIENT DAMS (INTERNATIONAL BEST PRACTICE OR A HOME- GROWN APPROACH?) INTRODUCTION One inescapable implication of ownership of a large dam is the obligation imposed towards

More information

1.1 Objective 4. 1.2 Competencies and resources required 4. 1.3 Scope 4. 1.4 Related documents 5. 3.1 Defining the objectives and scope of projects 7

1.1 Objective 4. 1.2 Competencies and resources required 4. 1.3 Scope 4. 1.4 Related documents 5. 3.1 Defining the objectives and scope of projects 7 Contents 1.0 Introduction 3 1.1 Objective 4 1.2 Competencies and resources required 4 1.3 Scope 4 1.4 Related documents 5 2.0 Project evaluation 5 3.0 Project feasibility 7 3.1 Defining the objectives

More information

REDUCING UNCERTAINTY IN SOLAR ENERGY ESTIMATES

REDUCING UNCERTAINTY IN SOLAR ENERGY ESTIMATES REDUCING UNCERTAINTY IN SOLAR ENERGY ESTIMATES Mitigating Energy Risk through On-Site Monitoring Marie Schnitzer, Vice President of Consulting Services Christopher Thuman, Senior Meteorologist Peter Johnson,

More information

Capital Adequacy: Advanced Measurement Approaches to Operational Risk

Capital Adequacy: Advanced Measurement Approaches to Operational Risk Prudential Standard APS 115 Capital Adequacy: Advanced Measurement Approaches to Operational Risk Objective and key requirements of this Prudential Standard This Prudential Standard sets out the requirements

More information

OPERATIONAL RISK MANAGEMENT B130786 STUDENT HANDOUT

OPERATIONAL RISK MANAGEMENT B130786 STUDENT HANDOUT UNITED STATES MARINE CORPS THE BASIC SCHOOL MARINE CORPS TRAINING COMMAND CAMP BARRETT, VIRGINIA 22134-5019 OPERATIONAL RISK MANAGEMENT B130786 STUDENT HANDOUT Basic Officer Course (ORM) Introduction Importance

More information

BT s supply chain carbon emissions a report on the approach and methodology

BT s supply chain carbon emissions a report on the approach and methodology BT s supply chain carbon emissions a report on the approach and methodology April 2015 1 BT s supply chain emissions metrics approach and methodology 1 Are supply chain emissions really the essential,

More information

Risk assessment. made simple

Risk assessment. made simple Risk assessment made simple July 2015 1 Sayer Vincent LLP Chartered accountants and statutory auditors Invicta House 108 114 Golden Lane London EC1Y 0TL Offices in London, Bristol and Birmingham 020 7841

More information

Risk Management and Internal Audit Specialized Training Course Audit Risk Assessment Methodology

Risk Management and Internal Audit Specialized Training Course Audit Risk Assessment Methodology Risk Management and Internal Audit Specialized Training Course Audit Risk Assessment Methodology May 20, 2015 Internal FR 2 Risk and Risk Assessment Defined Risk Institute of Internal Auditors (IIA) The

More information

Risk Management Within an Organisation

Risk Management Within an Organisation COUNTY DURHAM AND DARLINGTON FIRE AND RESCUE SERVICE Administration and General Order No. AD/1/TBC CORPORATE RISK MANGEMENT POLICY 1. INTRODUCTION 1.1 County Durham and Darlington Combined Fire Authority

More information

1. This Prudential Standard is made under paragraph 230A(1)(a) of the Life Insurance Act 1995 (the Act).

1. This Prudential Standard is made under paragraph 230A(1)(a) of the Life Insurance Act 1995 (the Act). Prudential Standard LPS 110 Capital Adequacy Objective and key requirements of this Prudential Standard This Prudential Standard requires a life company to maintain adequate capital against the risks associated

More information

Specialists in Strategic, Enterprise and Project Risk Management. PROJECT RISK MANAGEMENT METHODS Dr Stephen Grey, Associate Director

Specialists in Strategic, Enterprise and Project Risk Management. PROJECT RISK MANAGEMENT METHODS Dr Stephen Grey, Associate Director BROADLEAF CAPITAL INTERNATIONAL PTY LTD ACN 054 021 117 23 Bettowynd Road Tel: +61 2 9488 8477 Pymble Mobile: +61 419 433 184 NSW 2073 Fax: + 61 2 9488 9685 Australia www.broadleaf.com.au Cooper@Broadleaf.com.au

More information

Spills and leaks Associated with Shale Gas Development (Updated April 27 th, 2012)

Spills and leaks Associated with Shale Gas Development (Updated April 27 th, 2012) NEW YORK STATE WATER RESOURCES INSTITUTE Department of Earth and Atmospheric Sciences 1123 Bradfield Hall, Cornell University Tel: (607) 255-3034 Ithaca, NY 14853-1901 Fax: (607) 255-2016 http://wri.eas.cornell.edu

More information

ENTERPRISE RISK MANAGEMENT FRAMEWORK

ENTERPRISE RISK MANAGEMENT FRAMEWORK ROCKHAMPTON REGIONAL COUNCIL ENTERPRISE RISK MANAGEMENT FRAMEWORK 2013 Adopted 25 June 2013 Reviewed: October 2015 TABLE OF CONTENTS 1. Introduction... 3 1.1 Council s Mission... 3 1.2 Council s Values...

More information

2. determining that land is not contaminated land and is suitable for any use, and hence can be removed from the CLR or EMR, as relevant.

2. determining that land is not contaminated land and is suitable for any use, and hence can be removed from the CLR or EMR, as relevant. 1. Purpose The Environmental Protection Act 1994 (EP Act) enables listing of land on the environmental management register (EMR) if either a notifiable activity has been or is being conducted, or the land

More information

K A Lewis, M J Newbold, J A Skinner and K S Bardon

K A Lewis, M J Newbold, J A Skinner and K S Bardon A DECISION SUPPORT SYSTEM FOR ENVIRONMENTAL MANAGEMENT OF AGRICULTURE' K A Lewis, M J Newbold, J A Skinner and K S Bardon Division of Environmental Sciences, University of Hertfordshire ABSTRACT The University

More information

Project Evaluation Guidelines

Project Evaluation Guidelines Project Evaluation Guidelines Queensland Treasury February 1997 For further information, please contact: Budget Division Queensland Treasury Executive Building 100 George Street Brisbane Qld 4000 or telephone

More information

AFTRS Health and Safety Risk Management Policy

AFTRS Health and Safety Risk Management Policy AFTRS Health and Safety Risk Management Policy Responsible Officer Contact Officer Authorisation Director, Corporate and Student Services Head of Human Resources Chief Executive Officer Effective Date

More information

HYDROCARBON SPILLS PROCEDURE SIG-ENV-PR003

HYDROCARBON SPILLS PROCEDURE SIG-ENV-PR003 Page: 1 of 6 PROCEDURE SIG-ENV-PR003 Revision Approved Date Description 1 AV 01/04/99 New EP 2 AV 07/06/00 Revision of EP 3 AV 04/04/03 Revision of EP 4 Stuart Roseby DRAFT 5 Stuart Roseby 25/07/2005 Approved

More information

On-Site Risk Management Audit Checklist for Program Level 3 Process

On-Site Risk Management Audit Checklist for Program Level 3 Process On-Site Risk Management Audit Checklist for Program Level 3 Process Auditor name: Date: I. Facility Information: Facility name: Facility location: County: Contact name: RMP Facility I.D. Phone Number:

More information

Management of Environmental Risks and Emergencies. Compliance Audit Program

Management of Environmental Risks and Emergencies. Compliance Audit Program Management of Environmental Risks and Emergencies Compliance Audit Program 2012 State of NSW and Environment Protection Authority The State of NSW and the Environment Protection Authority (EPA) are pleased

More information

COMPLIANCE & RISK MANAGEMENT THE FOUNDATION

COMPLIANCE & RISK MANAGEMENT THE FOUNDATION Working together to achieve maximum results COMPLIANCE & RISK MANAGEMENT THE FOUNDATION Presented By: Mr Graham Caddies (CPRM, FRMIA, FSIA, FAIM, Grad MAICD) Advance Profitplan 173 Ross River Road Mundingburra

More information

Risk Management Policy and Framework

Risk Management Policy and Framework Risk Management Policy and Framework December 2014 phone 1300 360 605 08 89589500 email info@centraldesert.nt.gov.au location 1Bagot Street Alice Springs NT 0870 post PO Box 2257 Alice Springs NT 0871

More information

Dangerous Goods Safety Guidance Note. Dangerous goods emergency plans for small businesses

Dangerous Goods Safety Guidance Note. Dangerous goods emergency plans for small businesses Dangerous Goods Safety Guidance Note Dangerous goods emergency plans for small businesses January 2014 Level 1, 303 Sevenoaks Street (cnr Grose Ave), Cannington WA 6107 Postal address: Mineral House, 100

More information

Improving proposal evaluation process with the help of vendor performance feedback and stochastic optimal control

Improving proposal evaluation process with the help of vendor performance feedback and stochastic optimal control Improving proposal evaluation process with the help of vendor performance feedback and stochastic optimal control Sam Adhikari ABSTRACT Proposal evaluation process involves determining the best value in

More information

St Patrick s Catholic School

St Patrick s Catholic School St Patrick s Catholic School Risk Management Policy Date 2012 Version No 1 Responsible Person Rodney Linhart Approved By Rodney Linhart Review Date 2016 Related Documents 2a WHS Hazard and Risk Register,

More information

Risk Management approach for Cultural Heritage Projects Based on Project Management Body of Knowledge

Risk Management approach for Cultural Heritage Projects Based on Project Management Body of Knowledge 1 Extreme Heritage, 2007 Australia, 19-21 July 2007, James Cook University, Cairns, Australia Theme 6: Heritage disasters and risk preparedness approach for Cultural Heritage Projects Based on Project

More information

Social cost-benefit analysis of the soil remediation operation in the Netherlands

Social cost-benefit analysis of the soil remediation operation in the Netherlands Social cost-benefit analysis of the soil remediation operation in the Netherlands A.P. van Wezel et al, 2007. The Netherlands Environmental Assessment Agency, MNP report 500122002/2007 (Dutch). Summary

More information

CONTENTS 1. INTRODUCTION 1 2. EQUALITY 1. - Part-time posts 1 - Equality proofing JESP scores 1 3. CABINET OFFICE ROLE 1 4. TRADE UNION ROLE 2

CONTENTS 1. INTRODUCTION 1 2. EQUALITY 1. - Part-time posts 1 - Equality proofing JESP scores 1 3. CABINET OFFICE ROLE 1 4. TRADE UNION ROLE 2 JESP Job Evaluation for Senior Posts Good Practice Guide March 2008 CONTENTS Page 1. INTRODUCTION 1 2. EQUALITY 1 - Part-time posts 1 - Equality proofing JESP scores 1 3. CABINET OFFICE ROLE 1 4. TRADE

More information

An approach for evaluating methods for risk and vulnerability assessments

An approach for evaluating methods for risk and vulnerability assessments Risk, Reliability and Societal Safety Aven & Vinnem (eds) 2007 Taylor & Francis Group, London, ISBN 978-0-415-44786-7 An approach for evaluating methods for risk and vulnerability assessments E. Ford IRIS,

More information

Checklist for Operational Risk Management

Checklist for Operational Risk Management Checklist for Operational Risk Management I. Development and Establishment of Comprehensive Operational Risk Management System by Management Checkpoints - Operational risk is the risk of loss resulting

More information

How To Calculate Cost Of Motor Vehicle Accidents In Australia

How To Calculate Cost Of Motor Vehicle Accidents In Australia Title: Estimating the Cost of Work Motor Vehicle Incidents in Australia Names and Affiliations of Authors: Jeremy Davey, Dip Teach, BEd, MEd, PhD, is the Deputy Director at the Centre for Accident Research

More information

This is a summarised version of 3i s full policy. Responsible Investment policy APRIL 2014

This is a summarised version of 3i s full policy. Responsible Investment policy APRIL 2014 This is a summarised version of 3i s full policy Responsible Investment policy APRIL 2014 Our policy 3i will use its influence as an investor to promote a commitment in our investee companies to: Comply,

More information

NATIONAL COMPETENCY STANDARDS FOR QUANTITY SURVEYORS - CONSTRUCTION ECONOMISTS

NATIONAL COMPETENCY STANDARDS FOR QUANTITY SURVEYORS - CONSTRUCTION ECONOMISTS NATIONAL COMPETENCY STANDARDS FOR QUANTITY SURVEYORS - CONSTRUCTION ECONOMISTS THE AUSTRALIAN INSTITUTE OF QUANTITY SURVEYORS THE AUSTRALIAN INSTITUTE OF QUANTITY SURVEYORS NATIONAL COMPETENCY STANDARDS

More information

Sensitivity Analysis of Safety Measures for Railway Tunnel Fire Accident

Sensitivity Analysis of Safety Measures for Railway Tunnel Fire Accident Sensitivity Analysis of Safety Measures for Railway Tunnel Fire Accident Sanglog Kwak, Jongbae Wang, Yunok Cho Korea Railroad Research Institute, Uiwnag City, Kyonggi-do, Korea Abstract: After the subway

More information

APPENDIX N. Data Validation Using Data Descriptors

APPENDIX N. Data Validation Using Data Descriptors APPENDIX N Data Validation Using Data Descriptors Data validation is often defined by six data descriptors: 1) reports to decision maker 2) documentation 3) data sources 4) analytical method and detection

More information

Information Governance Strategy

Information Governance Strategy Information Governance Strategy Document Status Draft Version: V2.1 DOCUMENT CHANGE HISTORY Initiated by Date Author Information Governance Requirements September 2007 Information Governance Group Version

More information

Power plant safety: a wise business move

Power plant safety: a wise business move Power plant safety: a wise business move Power plant safety: a wise business move Going to work in a controlled and safe environment is not an unreasonable expectation for any worker. In many occupations,

More information

Glossary 2. About this chapter 6. 6.1 About risk management 7

Glossary 2. About this chapter 6. 6.1 About risk management 7 Contents Glossary 2 Chapter 6 Risk Management About this chapter 6 6.1 About risk management 7 6.1.1 What is risk? 7 6.1.2 What is risk management? 7 6.1.3 The Australian Standard AS/NZS 4360:2004 7 6.1.4

More information

LAC 67-2 rev3 - Annex B

LAC 67-2 rev3 - Annex B LAC 67-2 rev3 - Annex B Risk Rating System 1. This guidance provides a simple four Category (A high risk; B1 and B2 - medium risk and C low risk) premises risk rating system based on a business s health

More information

Risk Management at Chevron

Risk Management at Chevron Risk Management at Chevron Jean Bruney AIChE/SACHE Workshop Context for HES Risk Management Corporation Sets policies & expectations Centers of Expertise Establish processes & verify Oversight Level Global

More information

Six steps to Occupational Health and Safety

Six steps to Occupational Health and Safety Six steps to Occupational Health and Safety This booklet gives basic guidelines for workplace health and safety systems to help industry in NSW comply with the "duty of care" principle outlined in the

More information

FRC Risk Reporting Requirements Working Party Case Study (Pharmaceutical Industry)

FRC Risk Reporting Requirements Working Party Case Study (Pharmaceutical Industry) FRC Risk Reporting Requirements Working Party Case Study (Pharmaceutical Industry) 1 Contents Executive Summary... 3 Background and Scope... 3 Company Background and Highlights... 3 Sample Risk Register...

More information

Methodology. Discounting. MVM Methods

Methodology. Discounting. MVM Methods Methodology In this section, we describe the approaches taken to calculate the fair value of the insurance loss reserves for the companies, lines, and valuation dates in our study. We also describe a variety

More information

Corporate Risk Management Policy

Corporate Risk Management Policy Corporate Risk Management Policy Managing the Risk and Realising the Opportunity www.reading.gov.uk Risk Management is Good Management Page 1 of 19 Contents 1. Our Risk Management Vision 3 2. Introduction

More information

HUGO BOSS ENVIRONMENTAL COMMITMENT. Our claim. Our approach

HUGO BOSS ENVIRONMENTAL COMMITMENT. Our claim. Our approach HUGO BOSS ENVIRONMENTAL COMMITMENT HUGO BOSS assumes responsibility for future generations. This entails that we also pursue our high standards for quality and performance in environmental protection.

More information

Comments on and improvements for the following proposed Chemical Management System Guide are welcome. Please e-mail them to Billy.Lee@eh.doe.gov.

Comments on and improvements for the following proposed Chemical Management System Guide are welcome. Please e-mail them to Billy.Lee@eh.doe.gov. Comments on and improvements for the following proposed Chemical Management System Guide are welcome. Please e-mail them to Billy.Lee@eh.doe.gov. 1.0 Introduction --------- DRAFT 9-28-98 ----------- CHEMICAL

More information

ACH 1.1 : A Tool for Analyzing Competing Hypotheses Technical Description for Version 1.1

ACH 1.1 : A Tool for Analyzing Competing Hypotheses Technical Description for Version 1.1 ACH 1.1 : A Tool for Analyzing Competing Hypotheses Technical Description for Version 1.1 By PARC AI 3 Team with Richards Heuer Lance Good, Jeff Shrager, Mark Stefik, Peter Pirolli, & Stuart Card ACH 1.1

More information

GENERAL SPECIFICATION

GENERAL SPECIFICATION R64 - PAVEMENT MARKING August 1996 GENERAL SPECIFICATION G10 CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN Date JUNE 2012 Department 1 DOT Spec R64 of Infrastructure, Energy and Resources Index DEPARTMENT

More information

HEALTH & SAFETY EXECUTIVE NUCLEAR DIRECTORATE ASSESSMENT REPORT. New Reactor Build. EDF/AREVA EPR Step 2 PSA Assessment

HEALTH & SAFETY EXECUTIVE NUCLEAR DIRECTORATE ASSESSMENT REPORT. New Reactor Build. EDF/AREVA EPR Step 2 PSA Assessment HEALTH & SAFETY EXECUTIVE NUCLEAR DIRECTORATE ASSESSMENT REPORT New Reactor Build EDF/AREVA EPR Step 2 PSA Assessment HM Nuclear Installations Inspectorate Redgrave Court Merton Road Bootle Merseyside

More information

Risk Assessment Tool and Guidance (Including guidance on application)

Risk Assessment Tool and Guidance (Including guidance on application) Risk Assessment Tool and Guidance (Including guidance on application) Document reference number Revision number OQR012 Document developed by 5 Document approved by Revision date October 2011 Responsibility

More information

Explode Six Direct Marketing Myths

Explode Six Direct Marketing Myths White Paper Explode Six Direct Marketing Myths Maximize Campaign Effectiveness with Analytic Technology Table of contents Introduction: Achieve high-precision marketing with analytics... 2 Myth #1: Simple

More information

Hazard Identification, Risk Assessment and Management Procedure. Documentation Control

Hazard Identification, Risk Assessment and Management Procedure. Documentation Control Hazard Identification, Risk Assessment and Management Procedure Reference: Date approved: Approving Body: Implementation Date: Version: 3 Documentation Control GG/CM/007 Trust Board Supersedes: Version

More information

Data quality in Accounting Information Systems

Data quality in Accounting Information Systems Data quality in Accounting Information Systems Comparing Several Data Mining Techniques Erjon Zoto Department of Statistics and Applied Informatics Faculty of Economy, University of Tirana Tirana, Albania

More information

Business Continuity Business Continuity Management Policy

Business Continuity Business Continuity Management Policy Business Continuity Business Continuity Management Policy : Date of Issue: 28 January 2009 Version no: 1.1 Review Date: January 2010 Document Owner: Patricia Hughes Document Authoriser: Tony Curtis 1 Version

More information

An evaluation of the fire safety emergency cover toolkit

An evaluation of the fire safety emergency cover toolkit icccbe 2010 Nottingham University Press Proceedings of the International Conference on Computing in Civil and Building Engineering W Tizani (Editor) An evaluation of the fire safety emergency cover toolkit

More information

EBRD s Environmental & Social (E&S) Risk Management Procedures for Mortgage Lending

EBRD s Environmental & Social (E&S) Risk Management Procedures for Mortgage Lending EBRD s Environmental & Social (E&S) Risk Management Procedures for Mortgage Lending Any EBRD partner Financial Intermediary (FI) must have clearly defined environmental and social management systems in

More information

American Statistical Association

American Statistical Association American Statistical Association Promoting the Practice and Profession of Statistics ASA Statement on Using Value-Added Models for Educational Assessment April 8, 2014 Executive Summary Many states and

More information

This is a free 9 page sample. Access the full version online. AS/NZS ISO 31000:2009 Risk management Principles and guidelines

This is a free 9 page sample. Access the full version online. AS/NZS ISO 31000:2009 Risk management Principles and guidelines AS/NZS ISO 31000:2009 Risk management Principles and guidelines AS/NZS ISO 31000:2009 This Joint Australian/New Zealand Standard was prepared by Joint Technical Committee OB-007, Risk Management. It was

More information

Linking Risk Management to Business Strategy, Processes, Operations and Reporting

Linking Risk Management to Business Strategy, Processes, Operations and Reporting Linking Risk Management to Business Strategy, Processes, Operations and Reporting Financial Management Institute of Canada February 17 th, 2010 KPMG LLP Agenda 1. Leading Practice Risk Management Principles

More information

Xavier Catholic College Risk Management - Policy & Procedure

Xavier Catholic College Risk Management - Policy & Procedure Xavier Catholic College Risk Management Policy 18 March 2013 Sourced from CSOHS Online. Source CSO Broken Bay 2012 Page 1 Risk Management Policy (Draft) PURPOSE Risk management is the culture, processes

More information

Hazard Analysis and Critical Control Points (HACCP) 1 Overview

Hazard Analysis and Critical Control Points (HACCP) 1 Overview Manufacturing Technology Committee Risk Management Working Group Risk Management Training Guides Hazard Analysis and Critical Control Points (HACCP) 1 Overview Hazard Analysis and Critical Control Point

More information

Basic Fundamentals Of Safety Instrumented Systems

Basic Fundamentals Of Safety Instrumented Systems September 2005 DVC6000 SIS Training Course 1 Basic Fundamentals Of Safety Instrumented Systems Overview Definitions of basic terms Basics of safety and layers of protection Basics of Safety Instrumented

More information

Conference Proceedings

Conference Proceedings Evaluating Risk The HIRA Approach Presented by Wilderness Matt Risk Cruchet Management Direct Bearing Incorporated Oct 27-29, 2006 Conference Workshop Presentation Killington Vermont, USA Risk-based Management

More information

Guidance on Process Safety Performance Indicators

Guidance on Process Safety Performance Indicators Guidance on Process Safety Performance Indicators Table of contents 01 INTRODUCTION 02 OBJECTIVE 02 SCOPE 03 CRITERIA 06 DATA REPORTING 08 PROCESS SAFETY PERFORMANCE 08 CONCLUSIONS 09 DEFINITIONS 09 REFERENCES

More information

Sec. 22a-1a page 1 (4-97)

Sec. 22a-1a page 1 (4-97) Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination

More information

A guide for members APES 325 Risk Management for Firms

A guide for members APES 325 Risk Management for Firms A guide for members APES 325 Risk Management for Firms An explanation and introduction to APES 325 Risk Management for Firms Overview of the scope and application of a risk management framework. APES 325

More information

Risk Management Policy Adopted by:

Risk Management Policy Adopted by: Risk Management Policy Adopted by: Infigen Energy Limited Infigen Energy (Bermuda) Limited Infigen Energy RE Limited in its capacity as Responsible Entity of Infigen Energy Trust Adopted: 17 December 2009

More information

NASA Stennis Space Center Environmental Resources Document

NASA Stennis Space Center Environmental Resources Document 16.0 Major Environmental Considerations for Proposed Actions All construction, rocket testing, and operations that may potentially impact environmental media, such as air, water, land, aquatic and biotic

More information