Government of Nepal Ministry of Physical Planning and Works Earthquake Risk Reduction and Recovery Preparedness Programme for Nepal

Size: px
Start display at page:

Download "Government of Nepal Ministry of Physical Planning and Works Earthquake Risk Reduction and Recovery Preparedness Programme for Nepal"

Transcription

1 Government of Nepal Ministry of Physical Planning and Works Earthquake Risk Reduction and Recovery Preparedness Programme for Nepal (UNDP/ ERRRP-Project: NEP/07/010) Report of the Training Program on Vulnerability Assessment of Buildings / Retrofitting and Recovery Preparedness for Municipal Engineers in Pokhara July 19 22, 2009 In association with Pokhara Sub-Metropolitan City and UNDP/ERRRP-Project Prepared By:ll UNDP/ERRRP Project August 2009

2 Table of Contents ACKNOWLEDGEMENT... i Executive Summary Training Outline Objective and Purpose of the Training Program Time Duration: Participants Course Design Concept List of Resource Persons Training Proceedings Inauguration Session Expectation Tools and Training Aids Course Methodology Class Lectures Execution Arrangements Feedbacks from the participants / Evaluations Valedictory / Closing Session Output of the Training Appendix A: Detail Course Schedule Appendix B: Participants Details Appendix C: Photographs Appendix D: Participant Attendance Sheet Appendix E: Resource Person Attendance Sheet Appendix F: Registration List in Inauguration Ceremony Appendix G: Training Expectation and Evaluation Sheet Appendix H: Presentation Materials Appendix I: Copy of Certificate... 33

3 ACKNOWLEDGEMENT We would like to express my gratitude to all those, whose support enabled us to complete the training program on Vulnerability Assessment of Buildings / Retrofitting and Recovery Preparedness for Municipal Engineers in Pokhara and preparing training report for the same. We are grateful to Mr. Suresh Prakash Acharya, National Programme Director, UNDP/ERRRP Project and Joint Secretary, Ministry of Physical Planning and Works for his presence in opening ceremony of the training program and of course for providing us with suggestions and guidance which have been a valuable conducting training. We would like to take this opportunity to extend sincere thanks to Mr. Masato Ohori, Senior Researcher from Asian Disaster Reduction Center (ADRC), Kobe, Japan, Prof. Dr. Qaisar Ali from Peshawar University, Pakistan, Mr. Hiroshi Imai, Research Specialist, Building Research Institute (BRI), Japan, for their valuable presentations and sharing unsurpassed knowledge of retrofitting technique to the participants We have furthermore to thank Mr. Tilak Poudel, Chief Executive Officer, Pokhara Sub Metropolitan City, Mr. Shyam Jee Bastola, Civil Engineer and focal person of UNDP/ERRRP Project from Pokhara Sub Metropolitan City, Mr. Lekh Bahadur Gurung, Principal of Pokhara Engineering College, municipal members, resource persons, NEA members and participants who has confirmed and supported to go ahead with the training. We would like to thank to municipal technicians and staff for coordinating all necessary activities that facilitated for timely arrangement of the programme We thank UNDP/ERRRP project team for their support on completion of the training programme Chandra Laxmi Hada Project Engineer / Training Coordinator UNDP/ERRRP-Project clhada@errrp.org.np Amrit Man Tuladhar Senior Divisional Engineer Department of Urban Development and Building Construction and National Programme Manager UNDP/ERRRP-Project amritmtuladhar@yahoo.com UNDP/ERRRP Project i

4 Executive Summary Earthquake Risk Reduction and Recovery Preparedness (ERRRP) program was initiated by UNDP/BCPR (Bureau of Crisis Prevention and Recovery) with the support of government of Japan. This being a National Implementation (NIM) project of UNDP, the implementation responsibility of the project is Ministry of Physical Planning & Works, Department of Urban Development & Building Construction (DUDBC). Therefore, UNDP/ERRRP project has been continuously strengthening the Earthquake Risk Reduction Management capacity of its selected municipalities in 5 development regions of Nepal since April The project focuses on capacity building programme through training, sensitize people and giving awareness as well as establishing linkages with partners at different levels for earthquake disaster mitigation to transfer the technology of earthquake resistant construction to reduce the impact of potential earthquakes and respond to disasters more effectively in Nepal. The project includes retrofitting of public buildings to disseminate the knowledge that seismic retrofitting is the modification of existing structures to make them more resistant to seismic activity due to earthquakes and for demonstration to communities. With better understanding of seismic demand on structures and with our recent experiences with large earthquakes, the need of seismic retrofitting is well acknowledged. Retrofitting is not simple as new construction, has to work on existing structure without affecting other elements. Retrofitting may also refer to the process of strengthening older buildings in order to make them earthquake resistant. It is important to keep in mind that there is no such thing as an earthquake-proof structure, although seismic performance can be greatly enhanced through proper initial design or subsequent modifications. So before doing the retrofitting works, the training program related to vulnerability assessment, retrofitting and recovery preparedness is planned to organize in one of the program municipalities (Pokhara) where all the 5 municipal engineers were participated. Accordingly, with the joint effort of ERRRP and Pokhara Sub-Metropolitan City had conducted the four days training program on Vulnerability Assessment of Buildings / Retrofitting and Recovery Preparedness for 35 numbers of municipal engineers from July 19-22, 2009 in Pokhara. The goal is to protect human life, ensuring that the structure will not collapse upon its occupants or passersby, and that the structure can be safely exited during earthquake. The principal aim of the course is to create awareness about seismic hazards on structural system among the participants and provide basic knowledge on retrofitting design and re-strengthening of structural integrities. UNDP/ERRRP Project 1

5 1.0 Training Outline The Pokhara Sub-Metropolitan City and United Nation Development Programme / Earthquake Risk Reduction and Recovery Preparedness Programme for Nepal jointly organized training program on Vulnerability Assessment of Buildings / Retrofitting and Recovery Preparedness for Municipal Engineers at Hotel Pokhara Grande in Pokhara on July 19-22, A total of 35 participants were attended in the program out of which 1 was female. 2.0 Objective and Purpose of the Training Program The principal aim of the course is to create awareness about seismic hazards on structural system among the participants and provide basic knowledge on retrofitting design and re-strengthening of structural integrities. The objectives of the training programme are: To familiarize with Seismic Vulnerable Assessment / Retrofitting of Buildings Find out the buildings vulnerable against earthquake To familiarize with different options of retrofitting design and select most appropriate option for Masonry and RC Frame building To aware on different available construction technologies for seismic retrofitting. To familiarize with the municipal profile, impact of settlement pattern, land use practice and option in high risk areas of municipalities for recovery preparedness To familiarize with existing government and municipal policies on earthquake risk reduction, preparedness and response hence support for implementation of NBC To share the experiences and research from earthquake prone countries like Japan and Pakistan To make involvement during the actual retrofitting works and help to enhance the theoretical knowledge gained during this training. To institutionalize the training and continuing education on earthquake safe construction 3.0 Time Duration: The duration of the training period was 4 days which held completely from July 19-22, 2009 in Pokhara Sub Metropolitan City. UNDP/ERRRP Project 2

6 4.0 Participants The training was attended by 35 engineers who are engaged in design and construction of buildings in the municipalities. All the participants of the training program were technical persons of varying level. Capacity building and training of engineers of municipal members was called by issuing letter to different concerned departments through Hetauda Municipality and UNDP/ERRRP Project. Participants from Lekhnath Municipality, Biratnagar Sub Metropolitan city, Dhangadhi Municipality, Hetauda Municipality, DUDBC Kathmandu, DUDBC / Kaski Divisional Office, DUDBC / Kailali Divisional Office, DUDBC / Surkhet Divisional Office, DUDBC / Morang Divisional Office, BTRTC/DUDBC - Hetauda, Pokhara Sub Metropolitan City, Pokhara Valley Town Development Committee, NEA Pokhara Regional Center and Engineering Colleges, Institute of Engineering, and Consultants / Designers from Pokhara were attended. Out of 35 participants, 1 was female participants and rests 34 were men attended the programme. In covering the gender issues, Bhramin = 14, Kshetris = 12, Janjati = 8, and Madhesi = 2 were attended in the program. A list of participants and their details has been attached in Appendix B. 5.0 Course Design Concept According to the field visit and municipal level meeting in 5 programme municipalities, the participants of meeting felt the necessary of various training and awareness programme on earthquake risk reduction and preparedness. From the discussion with municipal technicians and staffs, the focal persons of UNDP/ERRRP Project filled up the training need assessment form and prioritize trainings accordingly. On the basis of that need assessment and further discussions with focal persons and request from the municipality, we analyzed the need of trainings for engineers and architects on Vulnerability Assessment of Buildings / Retrofitting and Recovery Preparedness. In the past experiences several destructive earthquakes caused extensive damage to lives and property. Learning from the past and recent earthquakes, reinforced concrete as well as masonry structures should be designed according to the requirements of the state of art of earthquake engineering. In general most of the existing structures particularly non-engineered as well as engineered structures merely by suffer severe damages during earthquake. For a seismically UNDP/ERRRP Project 3

7 vulnerable country like Nepal, to mitigate the problems due to pre and post disaster, retrofit and re-strengthening of structural integrity is now quite essential. With this aim and objectives, the training will be provided by the experts from Japan, Pakistan and Nepal. The course has covered in such a way that will increase awareness and enhance the theoretical knowledge on vulnerability assessment, seismic retrofitting and recovery preparedness. The course covered the technique to find out the buildings vulnerable against earthquake, different options of safe construction design and retrofitting technique. The course also covers the municipal earthquake vulnerability profile and recovery preparedness including the plan of program municipalities studied by the consultant. Participants are trained for the effective implementation of retrofitting technique focusing on earthquake resistant design of buildings to promote economic, safe house building aimed at reducing human losses from natural disasters like earthquakes. 6.0 List of Resource Persons The technical and overall coordination was provided by Mr. Amrit Man Tuladhar, Senior Divisional Engineer, DUDBC / National Programme Manager, UNDP/ERRRP Project and Ms. Chandra Laxmi Hada, Project Engineer and Training Coordinator of UNDP/ERRRP Project. The Resource Persons for the training program were: S. No Resource Person / Speaker Designation /Organization 1. Mr. Amrit Man Tuladhar Senior Divisional Engineer, DUDBC / National Programme Manager, UNDP/ERRRP Project 2. Mr. Manohar Raj Rajbhandari Managing Director, MRB & Associates 3. Mr. Deepak Manandhar Civil Engineer, MRB & Associates 4. Mr. Ram Bahadur Shrestha Managing Director, BDA Nepal (P.) Limited 5. Mr. Anish Joshi Managing Director, Genesis Consultancy 6. Dr. Jib Raj Pokharel Professor, Institute of Engineering, NCDM 7. Mr. Ajay Chandra Lal Civil Engineer / Urban Planner, NCDM 8. Mr. Hiroshi Imai Research Specialist, Building Research Institute (BRI), Japan 9. Mr. Masato Ohori Senior Researcher, Asian Disaster Reduction Center (ADRC), Kobe, Japan 10. Dr. Qaisar Ali Professor /Director, Peshawar University, Pakistan UNDP/ERRRP Project 4

8 7.0 Training Proceedings 7.1 Inauguration Session At Inauguration, Mr. Purna Bahadur Gurung, Acting Chief Executive Officer of Pokhara Sub Metropolitan City, Mr. Suresh Prakash Acharya, Joint Secretary, MoPPW and National Program Director of UNDP/ERRRRP Project, Mr. Amrit Man Tuladhar, Senior Division Engineer of DUDBC and National Program Manager of UNDP/ERRRRP Project, Ms. Chandra Laxmi Hada, Project Engineer and Training Coordinator of UNDP/ERRRP Project, Mr. Lekh Bahadur Gurung, Principal of Pokhara Engineering College, Chairman of NEA Pokhara Regional center and Chairman of Society of Engineering Consultants (SECON), Mr. Masato Ohori, Senior Researcher from Asian Disaster Reduction Center (ADRC), Kobe, Japan, Prof. Dr. Qaisar Ali from Peshawar University, Pakistan Mr. Hiroshi Imai, Research Specialist, Building Research Institute (BRI), Japan, Mr. Narayan Silwal, Leutinant Colonel, Mr. Krishna Prasad Nepal, Chief of Irrigation Department, Mr. Shyam Jee Bastola, Civil Engineer- PSMC and Focal Person of UNDP/ERRRP Project, Participants and Media persons were attended. Ms. Chandra Laxmi Hada facilitated the master of ceremony and delivered welcome address to the participants. Speaking at the program Mr. Amrit Man Tuladhar highlighted the training objectives and gave the brief information of ERRRP Project. He mentioned about the important of the retrofitting training and recovery preparedness after earthquake. The training program was started lighting the Panas by chief guest, Mr. Suresh Prakash Acharya. Mr. Lekh Bahadur Gurung said the Nepal National Building Code (NBC) was established in 1994 and was enacted only in But the implementation is limited to a few municipalities only. This is because of the lack of public awareness, lack of institutional mechanism for implementation and insufficient capacity of implementing authorities. Engineers are directly responsible for safety, health and welfare of the people. He insisted to implement NBC as soon as possible. UNDP/ERRRP Project 5

9 Mr. Masato Ohori explained about the reason of his visit in Nepal as a technical assistance. He acknowledged that ADRC invited Prof. Qaisal Ali and Mr. Hiroshi Imai for the pull down test of existing building situated in Bhainsepati, Lalitpur to check vulnerability and weakness. Mr. Narayan Silwal stressed that the basic infrastructures of urban areas are really pathetic. The soil bearing capacity of Pokhara Valley seems weak so through this training significant output is expected from the training. Prof. Dr. Qaisar Ali felt our country Nepal is same like his country Pakistan with same culture and people. He has shared the different buildings retrofitted in Pakistan and Japan and the results of it. Mr. Suresh Prakash Acharya expressed that capacity building of institutions and local bodies are really necessary. He shared that disaster is in 3 phases viz. Pre disaster, during disaster and post disaster. Retrofitting is not simple as new construction and completely new technology that has to work on existing structure without affecting other elements. He has expected from the participants that get idea and enhance knowledge through training and disseminate information whatever learned to others. 7.2 Expectation The participants were requested to fill-in their expectation from the training program in the Training Expectation Sheet before starting the technical session. Upon completion of the fill-in process, the forms were collected and a rapid review of their expectation was made by the resource persons and the training coordinator so that their request could be accommodated in the training course at the time of training itself. Findings on the expectations of the participants are that they were desirous to have knowledge on the following topics as expressed by them in the Training Expectation Sheet : Knowledge on earthquake vulnerability in world and Nepal, Retrofitting technology and techniques Information of preparedness for earthquake disasters Information of vulnerability assessment of buildings to local level UNDP/ERRRP Project 6

10 Share and gain knowledge and experiences from foreign instructors who are specialist in earthquake resistant design buildings Share knowledge gained by the training to others in different field Familiar with the seismic vulnerability assessment of buildings Acquire knowledge regarding vulnerability assessment of buildings / retrofitting of existing building Gain idea about disaster preparedness Share idea from case studies of the experts. Vulnerability assessment in urban as well as rural areas Cost occurs in retrofitting work. Sharing of experiences from experts and how to implement building code of Nepal. After quick review of the expectations from the participants, the resource persons reported to the trainees that most of the topics have already been included in the training course. However, since the course is a basic level one to familiarize with seismic vulnerable assessment / retrofitting of buildings, find out the buildings vulnerable against earthquake, familiarize with different options of retrofitting design and select most appropriate option for Masonry and RC Frame building and aware on different available construction technologies for seismic retrofitting, it would not be possible to accommodate in detail design in such training. 7.3 Tools and Training Aids The photocopy of the handouts / Reading Materials, ERRRP bag, Note Copy, required stationeries and IEC materials were provided before starting the class lectures. The photocopy of the handouts was distributed to participants for reference. 7.4 Course Methodology The format of the teaching was basically power point presentation by the resource person followed by interactive discussion in each session. Lectures / Presentations Case studies UNDP/ERRRP Project 7

11 o Retrofitting Building at Biratnagar, Hetauda, Pokhara, Surkhet, Dhangadhi and some other project o Municipal Earthquake Vulnerability Profile and Recovery Preparedness EQ Vulnerability Profiles of Pokhara, Dhangadhi and Hetauda Question/Answer Sharing of Experiences from Japan, Pakistan and Nepal The lectures were followed as per the training schedule by the resource persons. (Refer Annex A) 7.5 Class Lectures Day 1: July 19, 2009 In the first session of the first day of the workshop, the participants were introduced to Course overview, objective of the training and brief about ERRRP project. Mr. Amrit Man Tuladhar from UNDP/ERRRP project gave the deliberation on Concept of Seismic Strengthening / Retrofitting of Building Seismic Strengthening Why Seismic Retrofitting Retrofit or Reconstruct Why buildings fail in an earthquake? Steps for identification of Deficiency o Site Visit & collection of data o Load path check, Soft storey o Mass irregularities, Short column o RC jacketing of column o Addition of new structural element Seismic Strengthening method o Retrofitting strategies and measures Case studies of Seismic Retrofitting UNDP/ERRRP Project 8

12 Mr. Hiroshi Imai from Building Research Institute (BRI), Japan deliberated on: Safe Construction Design and Retrofitting Techniques (Bridge between Engineering Research and Construction Works) The most of life loss in past earthquake has occurred due to the collapse of buildings in Bhuj, India 2001, Bam, Iran 2003, Kashmir, Pakistan 2004, Yogyakarta, Indonesia 2006 Type of masonry structure Socio-Economic considerations for seismic safety of buildings Building behavior during Earthquake The full scale shaking table test in NIED, JAPAN o 1st experiment: 2007 Pakistan model in Japan o Examples: Demo-Model in Bam, IRAN o Strengthening Method: Example: Construction in Bam, Iran, Nepal and India Prof. Dr. Qaisar Ali from Peshawar University, Pakistan deliberated on Case Studies on Retrofitting of Reinforced Concrete and Masonry Structures Brief Introduction of EEC o Existing facilities at the center Research at EEC o Research on stone masonry, research on timber frame dhajji, research on brick masonry, quasi-static test on masonry walls and training/awareness Basic concept of Retrofitting o Simple repair, retrofitting repair, strengthening vs retrofitting and retrofitting techniques Steps in a Standard Retrofitting exercise o Structural damage assessment, design of retrofitting scheme and execution of work Case Studies o Jinnah Dental Hospital AJK, funded by UNDP o Schools in Iran, funded by Japan o Tohid School Bam, Kerman School Kerman, Jiroft School, Tehran o DHQ Hospital Swabi Pak, funded by GOP and Guest House Batagram Pak, funded by SDC UNDP/ERRRP Project 9

13 Mr. Manohar Raj Bhandari from MRB & Associates consultant presented on: Qualitative Building Assessment of Vulnerable Buildings Methodologies of building assessment Steps in qualitative assessment Major building types Fragility curve Vulnerability factors identification Damage grade and Specification of relative safety Quantitative Assessment of Vulnerable Buildings Qualitative assessment to be performed prior to Quantitative assessment for further evaluation on deficiencies identified in qualitative assess Day 2: July 20, 2009 On the second day of the workshop, the session were started from Mr. Amrit Man Tuladhar from UNDP/ERRRP project gave the deliberation on Seismic Evaluation of Building: International Practice Evaluation procedure studied FEMA 310 procedure NZDC procedure UNIDO procedure EUROCODE 8 procedure Force levels for strength checks Global versus component levels Seismic evaluation procedure Preliminary evaluation Mr. Masato Ohori, Senior Researcher from Asian Disaster Reduction Center, Kobe, Japan presented on Lessons Learned from the Great Hanshin-Awaji Earthquake, Japan And About the Importance of Quality Management at the Construction Site Overview of the Great Hanshin-Awaji Earthquake UNDP/ERRRP Project 10

14 Amount of damage in Hyogo (direct damage) Collapsed Houses o Emergency response Rescue, Removing the debris, Providing Shelters, Early restoration of lifeline The Reconstruction Plan: Hyogo Phoenix Plan About the Importance of Quality Management at the Construction Site Pakistan Earthquake - M 7.6, Sichuan, China, Great Earthquake Transition of Disaster in the World o What is the Disaster Risk? Specific Character of the field Construction Focus Points: Raw Materials o Water, Coarse Aggregate, Fine Aggregate (Sand), Cement, Steel Bar and o Workmanship at Site (Earth work, Excavation for the Foundation, Form work, Concrete work, Workers: Engineers and Inspectors Economic Losses Due to Natural Disasters Disaster Risk Management Circle Benefit of Quality Management Mr. Manohar Raj Bhandari from MRB & Associates presented on: Fundamental Concepts and Philosophy of Earthquake Resistant Design Ordinary loads design vs. earthquake load design Earthquake proof vs. earthquake resistant construction Philosophy of earthquake resistant design Defining earthquake load Earthquake Resistant Elements Basics of Earthquake- Resistant Design of Masonry Houses Configuration Plan Shapes Long Narrow Buildings Large Doors and Windows Openings Close to Corners Openings in Brick Walls UNDP/ERRRP Project 11

15 Retrofitting Options for Masonry Houses Improving the configuration: Stiffness Improving the wall-floor/ roof connection Floor/ Roof Bracing Improving the Wall Integrity, Strength and Ductility Splint and Bandage System for Retrofitting of Unreinforced Masonry Walls Mr. Anish Joshi from Genesis Consultant presented on: Municipal Earthquake Vulnerability Profile and Recovery Preparedness An Overview Earthquake hazard in program municipalities (Hetauda, Pokhara, Dhangadhi) Objectives of Earthquake Vulnerability Profile Overview of Methodology for preparation of Earthquake Vulnerability Profiles Recommendations for Earthquake Preparedness and Response Institutional framework Disaster Preparedness and Response Framework (DPRF) Day 3: July 21, 2009 On the third day of the training, the session were started from Prof Dr. Jiba Raj Pokharel and Ajay Chandra Lal from NCDM presented on Municipal Policies on Earthquake Risk Reduction Response Preparedness Background Policy polices linked with municipal activities Cycles of risk reduction o preparedness o rescue and relief o reconstruction and rehabilitation Municipal Regulatory Policies o Building Bye Laws of Municipalities o Process of Issuing permit for building construction including the form UNDP/ERRRP Project 12

16 Draft Policy on Disaster Management National Strategy for Disaster Management Options and Amendments for better Policies on o Planning Regulation, Building Bylaws, Building Permit Form, Institutional Strengthening and Capacity Building Mr. Manohar Raj Bhandari from MRB & Associates presented on: Retrofitting Options and Design of RC Building Basic Concepts Increasing their seismic capacity o Increasing stiffness, strength and ductility, reducing irregularity Reducing their seismic response o Energy dissipation devices, reducing mass, base isolation Options for Retrofitting of RC Buildings o Jacketing, RC shear Walls and Steel braces Exercise: Retrofitting Design for RCC Building Photographs and Design Drawings of Five Municipalities Biratnagar Sub-Metropolitan City- Ward Office Building (ward no. 3) Pokhara Sub-Metropolitan City - Fire Brigade (ward no. 8) Hetauda Municipality - Store Building, Ward Office Building at Bus park (ward no. 10) Birendranagar Municipality- Shree Krishna Higher Secondary School (ward no. 18) Dhangadi Municipality-Tri Nagar High School Mr. Anish Joshi from Genesis Consultant presented on: Municipal Earthquake Vulnerability Profile and Recovery Preparedness EQ Vulnerability Profiles of Pokhara and Hetauda Geology and EQ scenario of Hetauda Estimated vulnerable buildings and population at risk in Hetauda Available open spaces for evacuation in Hetauda Geology and EQ scenarios of Pokhara Estimated vulnerable buildings and population at risk in Hetauda UNDP/ERRRP Project 13

17 Available open spaces for evacuation in Pokhara Application of GIS for Preparedness and Response Planning Municipal Earthquake Vulnerability Profile and Recovery Preparedness Methodology Overview Earthquake Vulnerability Assessment Methodology Mapping elements at risk-methodology of mapping and enumerating buildings, important infrastructures, road networks and open spaces Seismic hazard assessment geological study, study of earthquake scenarios, peak ground acceleration and Modified Mercalli Intensity analysis and GIS modelling Vulnerability analysis of elements are risk o Photo Feature of enumerated vulnerable buildings and structural cause of vulnerability o Geological and liquefaction scenario of Pokhara and Hetauda o Earthquake hazard scenario of Pokhara and Hetauda o EQ vulnerability scenarios of Pokhara and Hetauda (estimated vulnerable buildings and population at risk) Day 4: July 22, 2009 The fourth day started with the deliberations from Mr. Manohar Raj Bhandari and Deepak Manandhar from MRB & Associates presented on: Construction Process and Technologies for Retrofitting Retrofitting of RC Buildings Retrofitting of Large Masonry House (Brick Masonry) Retrofitting of Masonry House (Brick Masonry) Retrofitting of Masonry House (Stone Masonry) Experience Sharing of Retrofitting Technology Bhaktapur School Free Chhettrapati Clinic, Kathmandu Residential Building, Bhutan UNDP/ERRRP Project 14

18 International Committee of Red Cross Building, Kathmandu Oriental Apartment, Kathmandu UNDP Annex 1 Building, Pulchowk Before the initiation of the closing ceremony, participants were given the feedback form and requested to submit them after filling-in their comments & suggestions. At the end of the day, closing ceremony was held together with certificate distribution to all participants from the chair-person. 8.0 Execution Arrangements Ministry of Home Affairs, Ministry of Physical Planning and Works, Ministry of Local development, UNDP/ERRRP project executed the programme in collaboration with Pokhara Sub Metropolitan City. Additionally the UNDP/ERRRP Project provide support to strengthen the institutional, administrative, technical system for earthquake vulnerability reduction. The Municipality provided support for the successful implementation of the programme. 9.0 Feedbacks from the participants / Evaluations Evaluations sheets for all participants were distributed for the evaluation of whole training programs. The section of training evaluation has seven main headings: topics covered, training schedule, resource persons, exercise during training, training venue, participation from trainees and logistics arrangement. (Refer Annex G) The evaluation analysis has done and shown in chart for clear as per the evaluation sheet filled it up by the participants. Here are some of the feedbacks after filling-in their sheet: UNDP/ERRRP Project 15

19 Municipal Engineers in Pokharaa Sub Metropolitan City Chart 1: Topics Covered Topics Covered 6% 7% 16% 71% Excellent Very Good Good satisfactory After the analysis of evaluation sheet, the chart shows 71% of the participants felt that topics covered during training was very good, 16 % good, 7% excellent and 6 % satisfactory. Chart 2: Training Schedule Training Schedule 3% 23% 26% 48% Excellent Very Good Good Satisfactory The participants found the training schedule was 48% very good, 26% good, 23% excellent and 3% satisfactory. Chart 3: Resource Persons Presentations from Resource Persons 0% 29% 23% Excellent Very Good Good 48% Satisfactory The participants felt that the overall presentations done by the respective resource persons were 48% very good, 29% good and 23% excellent. UNDP/ ERRRP Project 16

20 Municipal Engineers in Pokharaa Sub Metropolitan City Chart 4: Exercise during Training 39% Exercise During Training 3% 16% Excellent Very Good The participants felt that the overall exercise done during training were 42% good, 39% satisfactory, 16% good and 3% 42% Good Satisfactory excellent Chart 5: Participation from Trainees Participation from Trainees 3% 19% 23% 55% Excellent Very Good Good Satisfactory The participants felt that the overall participation from trainees during training felt that 55% very good, 23% excellent, 19% good and 3% satisfactory. Chart 6: Training Venue Training Venue 3% 56% of the participants felt training venue was excellent, 41% very good 41% 56% Excellent Very Good Good and 3% good Satisfactory UNDP/ ERRRP Project 17

21 Municipal Engineers in Pokharaa Sub Metropolitan City Chart 7: Logistics Arrangement Logistics Arrangement 19% 39% 42% Excellent Very Good Good Satisfactory The logistics arrangement provided by the organizers was found to be 42% very good, 39% excellent and 19% good from the participants view. Here are some of the extra comments & suggestions after filling-in their sheet: One of the best training Logistic and technical support during training program was found good. Sharing of experiences from Japan and Pakistan found to be very useful. Participants were really curious on earthquake vulnerability profile and recovery preparedness plan of Pokhara Sub-Metropolitan City, Hetaudaa Municipality and Dhangadhi Municipality Participants were aware on retrofitting design of masonry building and RCC Buildings. Suggested to provide such level of training for policy makers, planner, political parties, NGO s, INGOs etc, Need of continuation of such training in future Training need to be given for B.E final year and I.E final year students who are mainly involved in the construction site supervision works Provide such training jointly organised by Nepal Engineers Association of local centre and main institutions This kind of evaluation system is good practice it makes next training more realistic Expected that such program will be continued in future. Such messages should be disseminated from one person to another Training program was good. Need to add field work in training. This training programme is very much beneficial to DUDBC engineers. This programme helps to retrofit and preserve the existing vulnerable government buildings. UNDP/ ERRRP Project 18

22 It was obviously quite good but time was limited. So the training program should cover a longer time. To disseminate this knowledge to targeted community, such trainings should be organised to village and ward level with suitable course. Training was good. Resource Persons were also excellent. Such types of training should be conducted in every year to make update about latest development. Actually this program is very fruitful for engineers. Such type of training program should be given more engineers in the days to come. Thank you so much for providing opportunity to know about earthquake and retrofitting technique After the overview of those evaluation sheets, the training program was found to be fruitful in many ways for the participants. Despite the wide range of the participants, their active participation, keen interest and finally their satisfaction shows that the training program was successful Valedictory / Closing Session The valedictory session attended by Mr. Tilak Poudel, Chief Executive Officer PSMC, Mr. Amrit Man Tuladhar, Senior Division Engineer of DUDBC and National Program Manager of UNDP/ERRRRP Project, Ms. Chandra Laxmi Hada, Project Engineer and Training Coordinator of UNDP/ERRRP Project, Mr. Lekh Bahadur Gurung, Principal of Pokhara Engineering College, Chairman of NEA Pokhara Regional center and Chairman of Society of Engineering Consultants (SECON), Mr. Masato Ohori, Senior Researcher from Asian Disaster Reduction Center (ADRC), Japan, Mr. Shyam Jee Bastola, Civil Engineer of PSMC and Focal Person of UNDP/ERRRP Project, Mr. Manohar Raj Rajbhandari, Senior Structure Engineer / Expert, MRB & Associates, Mr. Ram Bahadur Shrestha, Civil Engineer / Expert, MRB & Associates, Mr. Anish Joshi, Civil Engineer / Expert, Genesis Consultancy, Municipal Section Chief, ERRRP project members and Participants Mr. Shyam Jee Bastola shared the information about earlier trainings already conducted in Pokhara through ERRRP project. This retrofitting training is completely new to him and need to UNDP/ERRRP Project 19

23 work on existing buildings. He even gave thanks to resource persons for their deliverable presentations. Mr. Baburam Bhandari as a participant expressed that we got an opportunity to be the part of this training and course contents are very beneficial and practical. He even mentioned that resource person s presentations are really influential and sharing experiences from Japan and Pakistan are very useful to them. Mr. Ohm Sharma as a participant said what they learned from short period of training is valuable but not sufficient and likes to continue further courses in coming days. Our society is far behind about the occurrence of earthquake and there is a big question that who is going to help in this retrofitting technology. Mr. Lekh Bahadur Gurung mentioned that he is really glad to hear the 3 subject focused training viz. vulnerability, retrofitting and recovery preparedness. He said that to use this retrofitting technology, we need to learn from the past, see the future and act in present. When there is an action, there is an act. He is very hopeful from the participants that what you learn from the training will act on the field. Mr. Masato Ohori expressed that he has a strong impression from Nepali Participants. They are very intelligent and keen on learning. He shared that this is his first visit in Pokhara and found really beautiful. He found that many buildings seem to be good from outside in Pokhara. He suggested that power is needed to control over the workers so as to make quality building construction for safer communities. Mr. Ram Bahadur Shrestha expressed that policy workers need to focus on tax rebate on earthquake resistant design and construction of buildings. He said that there is a need of bank that provides interest subsidies giving loan for the house owner. He gave thanks to organizers and participants. Ms. Chandra Laxmi Hada shared the ERRRP project includes retrofitting of public buildings to disseminate the knowledge that seismic retrofitting is the modification of existing structures to make them more resistant to seismic activity, ground motion or soil failure due to earthquake and for demonstration to communities. She even stressed that it is important to keep in mind that there is no such thing as an earthquake proof structures, although seismic performance can be greatly UNDP/ERRRP Project 20

24 enhanced through proper initial design or subsequent modifications. Lastly she mentioned that for a seismically vulnerable country like Nepal, to mitigate the problems due to pre and post disaster, retrofit and re-strengthening of structural integrity is now quite essential. She hopes that all the participants will involve during the actual retrofitting works in 5 municipalities and help to enhance the theoretical knowledge gained during this training. The certificate distribution was carried out by Chief Executive Officer of Pokhara Sub Metropolitan City. Mr. Tilak Poudel started with welcoming Mr. Masato Ohori from Japan and wishing safe departure too. He gave thanks to participants for good participation. As Nepal is prone to earthquake, he insisted the earthquake resistant design need to be adopted and engineers are responsible to it. All the human beings existed on earth are capable and he gave the example of Japanese technology. He encourages all the participants that learning is never ending and whatever learned try to implement. This is one of the sophisticated training and we all are responsible for development of nation. Lastly he wished for safe and happy journey and gave thanks to UNDP/ERRRP Project. In closing session, Mr. Purna Bahadur Gurung facilitated the master of ceremony. UNDP/ERRRP Project 21

25 11.0 Output of the Training Upon completion of the training course, 35 participants from different municipalities Were familiarized with general procedures for retrofitting technique as well as restrengthening techniques of Masonry and RC Frame buildings Were trained for listing different options of seismic retrofitting of Masonry and RC Frame house Were aware on different available construction technologies for seismic retrofitting and familiar with different options of retrofitting and can select options for masonry and R.C frame buildings Were trained for earthquake resistant design of buildings, seismic rehabilitation of existing buildings Build capacity to guide and supervise to masons and contractors for seismic retrofitting works of existing unsafe building. Were familiarized with municipal earthquake vulnerability profile and recovery preparedness and overall knowledge on vulnerability assessment. Were familiarized with impact of settlement pattern, land use practice and option in high risk areas of municipalities for recovery preparedness Were familiarized with existing government and municipal policies on earthquake risk reduction, preparedness and response hence support for implementation of NBC UNDP/ERRRP Project 22

26 Appendix A: Detail Course Schedule UNDP/ERRRP Project 23

27 Appendix B: Participants Details UNDP/ERRRP Project 24

28 Appendix C: Photographs Inaugural Session of the Training Class Lectures UNDP/ERRRP Project 25

29 Field Visit to School UNDP/ERRRP Project 26

30 Closing Session UNDP/ERRRP Project 27

31 Appendix D: Participant Attendance Sheet UNDP/ERRRP Project 28

32 Appendix E: Resource Person Attendance Sheet UNDP/ERRRP Project 29

33 Appendix F: Registration List in Inauguration Ceremony UNDP/ERRRP Project 30

34 Appendix G: Training Expectation and Evaluation Sheet UNDP/ERRRP Project 31

35 Appendix H: Presentation Materials UNDP/ERRRP Project 32

36 Appendix I: Copy of Certificate UNDP/ERRRP Project 33

37 For further information please contact: AMRIT MAN TULADHAR Senior Divisional Engineer / National Programme Manager Earthquake Risk Reduction and Recovery Preparedness Programme for Nepal (UNDP/ERRRP-Project:NEP/07/010) Department of Urban Development and Building Construction Babar Mahal, Kathmandu, NEPAL Ph: (977 1) Fax: (977 1) G.P.O. Box No , Kathmandu, NEPAL amritmtuladhar@yahoo.com website: UNDP/ERRRP Project 34

Government of Nepal Ministry of Physical Planning and Works Earthquake Risk Reduction and Recovery Preparedness Programme for Nepal

Government of Nepal Ministry of Physical Planning and Works Earthquake Risk Reduction and Recovery Preparedness Programme for Nepal Government of Nepal Ministry of Physical Planning and Works Earthquake Risk Reduction and Recovery Preparedness Programme for Nepal (UNDP/ ERRRP-Project: NEP/07/010) Report of the Training Program on Earthquake

More information

5-2. Dissemination of Earthquake Risk Reduction and Recovery Preparedness Model Programme

5-2. Dissemination of Earthquake Risk Reduction and Recovery Preparedness Model Programme 5-2. Dissemination of Earthquake Risk Reduction and Recovery Preparedness Model Programme 5-2-1. Background Asian Region is the most disaster prone regions in the world. Many countries in the region are

More information

SEISMIC ANALYSIS AND RETROFITTING OF R.C.C STRUCTURE

SEISMIC ANALYSIS AND RETROFITTING OF R.C.C STRUCTURE International Journal of Advanced Research in Biology Engineering Science and Technology (IJARBEST) Vol., Issue, April 1 SEISMIC ANALYSIS AND RETROFITTING OF R.C.C STRUCTURE M.R.NAVANEETHA KRISHNAN 1,

More information

Advanced Retrofitting Methods and Techniques for RC Building: State of an Art

Advanced Retrofitting Methods and Techniques for RC Building: State of an Art Advanced Retrofitting Methods and Techniques for RC Building: State of an Art Miss. Swati Sanjay Nibhorkar * M. E (Structure) Scholar, Civil Engineering Department, G. H. Raisoni College of Engg and Management,

More information

MINISTRY OF EDUCATION SCHOOL STANDARDS

MINISTRY OF EDUCATION SCHOOL STANDARDS Islamic Republic of Afghanistan MINISTRY OF EDUCATION SCHOOL STANDARDS Policies, Codes and Designs 1 Subjects in Presentation Standards and Designs Policy guidelines: July 2006, Cost-effective Schools

More information

SEISMIC CAPACITY OF EXISTING RC SCHOOL BUILDINGS IN OTA CITY, TOKYO, JAPAN

SEISMIC CAPACITY OF EXISTING RC SCHOOL BUILDINGS IN OTA CITY, TOKYO, JAPAN SEISMIC CAPACITY OF EXISTING RC SCHOOL BUILDINGS IN OTA CITY, TOKYO, JAPAN Toshio OHBA, Shigeru TAKADA, Yoshiaki NAKANO, Hideo KIMURA 4, Yoshimasa OWADA 5 And Tsuneo OKADA 6 SUMMARY The 995 Hyogoken-nambu

More information

Earthquake Resistant Design and Risk Reduction. 2nd Edition

Earthquake Resistant Design and Risk Reduction. 2nd Edition Brochure More information from http://www.researchandmarkets.com/reports/2171210/ Earthquake Resistant Design and Risk Reduction. 2nd Edition Description: Earthquake Resistant Design and Risk Reduction,

More information

OECD RECOMMENDATION CONCERNING GUIDELINES ON EARTHQUAKE SAFETY IN SCHOOLS

OECD RECOMMENDATION CONCERNING GUIDELINES ON EARTHQUAKE SAFETY IN SCHOOLS OECD RECOMMENDATION CONCERNING GUIDELINES ON EARTHQUAKE SAFETY IN SCHOOLS THE COUNCIL Having regard to article 5b) of the Convention establishing the Organisation for Economic Co-operation and Development

More information

Chapter. Earthquake Damage: Types, Process, Categories

Chapter. Earthquake Damage: Types, Process, Categories 3 Chapter Earthquake Damage: Types, Process, Categories Earthquakes leave behind a trail of damage and destruction. People s lives are affected by the loss of loved ones, destruction of property, economic

More information

CHAPTER SEISMIC RISK MITIGATION PRACTICES IN SCHOOL BUILDINGS IN ISTANBUL, TURKEY

CHAPTER SEISMIC RISK MITIGATION PRACTICES IN SCHOOL BUILDINGS IN ISTANBUL, TURKEY CHAPTER 13 SEISMIC RISK MITIGATION PRACTICES IN SCHOOL BUILDINGS IN ISTANBUL, TURKEY Özal Yüzügüllü, Gülay Barbarosoglu and Mustafa Erdik Kandilli Observatory and Earthquake Research Institute Bogaziçi

More information

ENGINEERING-BASED EARTHQUAKE RISK MANAGEMENT

ENGINEERING-BASED EARTHQUAKE RISK MANAGEMENT ENGINEERING-BASED EARTHQUAKE RISK MANAGEMENT MRP Engineering Newsletter February 2012 The world recently experienced several major earthquakes, which caused severe local impacts and major worldwide repercussions.

More information

STUDY OF PROMOTION SYSTEM FOR PP-BAND RETROFITTING OF NON-ENGINEERED MASONRY HOUSES

STUDY OF PROMOTION SYSTEM FOR PP-BAND RETROFITTING OF NON-ENGINEERED MASONRY HOUSES Institute of Industrial Science, University of Tokyo Bulletin of ERS, No. 43 (21) STUDY OF PROMOTION SYSTEM FOR PP-BAND RETROFITTING OF NON-ENGINEERED MASONRY HOUSES Naoki SORIMACHI 1 and Kimiro MEGURO

More information

Post Earthquake Quick Damage Inspection of Buildings in Nepal

Post Earthquake Quick Damage Inspection of Buildings in Nepal Post Earthquake Quick Damage Inspection of Buildings in Nepal Collaborative Research and Development (R&D) Project for Disaster Mitigation in Earthquake Prone Areas in Asia (Sep 27, 2007) Presented By

More information

SEISMIC RETROFITTING OF STRUCTURES

SEISMIC RETROFITTING OF STRUCTURES SEISMIC RETROFITTING OF STRUCTURES RANJITH DISSANAYAKE DEPT. OF CIVIL ENGINEERING, FACULTY OF ENGINEERING, UNIVERSITY OF PERADENIYA, SRI LANKA ABSTRACT Many existing reinforced concrete structures in present

More information

Miss S. S. Nibhorkar 1 1 M. E (Structure) Scholar,

Miss S. S. Nibhorkar 1 1 M. E (Structure) Scholar, Volume, Special Issue, ICSTSD Behaviour of Steel Bracing as a Global Retrofitting Technique Miss S. S. Nibhorkar M. E (Structure) Scholar, Civil Engineering Department, G. H. Raisoni College of Engineering

More information

in the construction. Others identify the options and the design that will result in to lowest

in the construction. Others identify the options and the design that will result in to lowest Retrofitting Going Green by Reducing Reconstruction Green options are discussed when one is planning to construct a new building. Some try to identify the viable option having lowest energy input in the

More information

Prepared For San Francisco Community College District 33 Gough Street San Francisco, California 94103. Prepared By

Prepared For San Francisco Community College District 33 Gough Street San Francisco, California 94103. Prepared By Project Structural Conditions Survey and Seismic Vulnerability Assessment For SFCC Civic Center Campus 750 Eddy Street San Francisco, California 94109 Prepared For San Francisco Community College District

More information

Seismic safety of schools in Kathmandu Valley, Nepal: problems and opportunities

Seismic safety of schools in Kathmandu Valley, Nepal: problems and opportunities Seismic safety of schools in Kathmandu Valley, Nepal: problems and opportunities J.K. Bothara, A.M. Dixit, M. Nakarmi, S.B. Pradanang, & R C. Thapa Dept. of Civil Engineering, University of Canterbury,

More information

PERFORMANCE BASED SEISMIC EVALUATION AND RETROFITTING OF UNSYMMETRICAL MEDIUM RISE BUILDINGS- A CASE STUDY

PERFORMANCE BASED SEISMIC EVALUATION AND RETROFITTING OF UNSYMMETRICAL MEDIUM RISE BUILDINGS- A CASE STUDY Paper No. 682 PERFORMANCE BASED SEISMIC EVALUATION AND RETROFITTING OF UNSYMMETRICAL MEDIUM RISE BUILDINGS- A CASE STUDY Jimmy Chandra, Pennung Warnitchai, Deepak Rayamajhi, Naveed Anwar and Shuaib Ahmad

More information

Seismic Risk Prioritization of RC Public Buildings

Seismic Risk Prioritization of RC Public Buildings Seismic Risk Prioritization of RC Public Buildings In Turkey H. Sucuoğlu & A. Yakut Middle East Technical University, Ankara, Turkey J. Kubin & A. Özmen Prota Inc, Ankara, Turkey SUMMARY Over the past

More information

REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE MAULE EARTHQUAKE

REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE MAULE EARTHQUAKE Proceedings of the International Symposium on Engineering Lessons Learned from the 2011 Great East Japan Earthquake, March 1-4, 2012, Tokyo, Japan REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE

More information

Sustainable Recovery and Reconstruction Framework (SURRF)

Sustainable Recovery and Reconstruction Framework (SURRF) Sustainable Recovery and Reconstruction Framework (SURRF) Presented by Iwan Gunawan, Sr. Disaster Management Adviser, Original Presentation by Saroj Kumar Jha Program Manager Global Facility for Disaster

More information

District Disaster Risk Management Planning

District Disaster Risk Management Planning District Disaster Risk Management Planning GUIDELINES JULY 2007 National Disaster Management Authority 1. Introduction Notifications for establishment of the District Disaster Management Authorities (DDMAs)

More information

EGYPTIAN CODES FOR DESIGN AND CONSTRUCTION OF BUILDINGS

EGYPTIAN CODES FOR DESIGN AND CONSTRUCTION OF BUILDINGS in the Euro-Mediterranean Area EGYPTIAN CODES FOR DESIGN AND CONSTRUCTION OF BUILDINGS By Prof. Amr Ezzat Salama Chairman of Housing, Building National Center Cairo, Egypt Former Minister of High Education

More information

PROPOSAL OF A SYSTEM TO PROMOTE RETROFITTING OF VULNERABLE MASONRY HOUSES IN DEVELOPING COUNTRIES

PROPOSAL OF A SYSTEM TO PROMOTE RETROFITTING OF VULNERABLE MASONRY HOUSES IN DEVELOPING COUNTRIES Institute of Industrial Science, University of Tokyo Bulletin of ERS, No. 41 PROPOSAL OF A SYSTEM TO PROMOTE RETROFITTING OF VULNERABLE MASONRY HOUSES IN DEVELOPING COUNTRIES Satoshi IRITANI 1, Paola MAYORCA

More information

Current Status of Seismic Retrofitting Technology

Current Status of Seismic Retrofitting Technology CONTENTS Current Status of Seismic Retrofitting Technology Damages of Past Earthquakes Seismic Diagnosis Method Building Control Section Urban Building Division Bureau of Urban Development, TMG Seismic

More information

Earthquake damaged building structures demolition (removal) guideline, 2072

Earthquake damaged building structures demolition (removal) guideline, 2072 Earthquake damaged building structures demolition (removal) guideline, 2072 (Debris and Demolition Guidelines, 2015) Preamble: Pursuant to Sub-section (M) of the Natural Calamity (Relief) Act (1982), following

More information

Chincha and Cañete, Peru, Based

Chincha and Cañete, Peru, Based Reconstruction of Ica, Pisco, Chincha and Cañete, Peru, Based on Updated Hazard Maps Julio Kuroiwa Professor emeritus National University of Engineering and UNDP Reconstruction Program/Sustainable Cities.

More information

Islamic Republic of Afghanistan, Post Disaster Need Assessment (PDNA) Training Manual

Islamic Republic of Afghanistan, Post Disaster Need Assessment (PDNA) Training Manual Islamic Republic of Afghanistan, Ministry of Rural Rehabilitation and Development (MRRD) Ministry of Rural Rehabilitation & Development Post Disaster Need Assessment (PDNA) Training Manual Social Protection

More information

DISASTER MANAGEMENT SYSTEM IN NEPAL POLICY ISSUES AND SOLUTIONS

DISASTER MANAGEMENT SYSTEM IN NEPAL POLICY ISSUES AND SOLUTIONS Journal of Risk Analysis and Crisis Response, Vol. 2, No. 3 (November 2012), 166-172 DISASTER MANAGEMENT SYSTEM IN NEPAL POLICY ISSUES AND SOLUTIONS GANGALAL TULADHAR Ph.D. Fellow at the Ehime University,

More information

Mainstreaming Disaster Risk Reduction into National and Sectoral Development Process

Mainstreaming Disaster Risk Reduction into National and Sectoral Development Process Mainstreaming Disaster Risk Reduction into National and Sectoral Development Process Safer Training Health Course Facilities Regional Consultative Committee on Disaster Management (RCC) Training Course

More information

ISTANBUL EARTHQUAKE RISK AND MITIGATION STUDIES

ISTANBUL EARTHQUAKE RISK AND MITIGATION STUDIES ISTANBUL EARTHQUAKE RISK AND MITIGATION STUDIES O. Metin Ilkisik, M. Nilay Ergenc and Murat T. Turk Disaster Coordination Center, Istanbul Metropolitan Municipality, Istanbul, Turkey e-mail: omilkisik@hotmail.com

More information

Structural Audit of Buildings

Structural Audit of Buildings International Journal of Civil Engineering Research. ISSN 2278-3652 Volume 5, Number 4 (2014), pp. 411-416 Research India Publications http://www.ripublication.com/ijcer.htm Structural Audit of Buildings

More information

PRESENTERS: BACHELOR OF ARTS- PSYCHOLOGY

PRESENTERS: BACHELOR OF ARTS- PSYCHOLOGY KIBET J. NELLY PRESENTERS: MAGAI N. DORCAS BACHELOR OF ARTS- PSYCHOLOGY DISASTER? A serious disruption of the functioning of a community or society causing widespread human, material, economic or environmental

More information

Structural Retrofitting For Earthquake Resistance

Structural Retrofitting For Earthquake Resistance Structural Retrofitting For Earthquake Resistance Ruben Boroschek WHO Disaster Mitigation in Health Facilities University of Chile rborosch@ing.uchile.cl www.hospitalseguro.cl The following paper is part

More information

Retrofitting of Existing RCC Buildings by Method of Jacketing

Retrofitting of Existing RCC Buildings by Method of Jacketing Retrofitting of Existing RCC Buildings by Method of Jacketing BHAVAR DADASAHEB O. Assistant Professor, Sandip Institute of Engineering & Managemnt, At Post Mahiravani, Trimbak Road, Nashik. Maharashtra

More information

SEISMIC DESIGN OF HIGHWAY BRIDGES

SEISMIC DESIGN OF HIGHWAY BRIDGES Journal of Japan Association for Earthquake Engineering, Vol.4, No.3 (Special Issue), 2004 SEISMIC DESIGN OF HIGHWAY BRIDGES Kazuhiko KAWASHIMA 1 and Shigeki UNJOH 2 1 Member of JAEE, Professor, Department

More information

Seismic retrofitting on structures in urban areas

Seismic retrofitting on structures in urban areas Disaster Management and Human Health Risk II 161 Seismic retrofitting on structures in urban areas A. K. Desai Applied Mechanics Department, S V National Institute of Technology, Surat, India Abstract

More information

Seismic Retrofit of Existing Buildings: Innovative Alternatives

Seismic Retrofit of Existing Buildings: Innovative Alternatives Seismic Retrofit of Existing Buildings: Innovative Alternatives Moe Cheung and Simon Foo Public Works & Government Services Canada Hull, Quebec, Canada Jacques Granadino Public Works & Government Services

More information

Preliminary Database Good Practices on Recovery (IRP) AND Total Disaster Risk Management (TDRM) Good Practices

Preliminary Database Good Practices on Recovery (IRP) AND Total Disaster Risk Management (TDRM) Good Practices Asian Science and Technology Forum Tsukuba Seminar "International Workshop on Information Platforms for Disaster Reduction" (IPDR Workshop),Tsukuba, Japan, 3-4 October 2007 Preliminary Database Good Practices

More information

How To Write An Interim Report On A Disaster In Australia

How To Write An Interim Report On A Disaster In Australia REPORTING Second Draft Post-Disaster Damage Assessment and Need Analysis PO Box 4, Klong Luang Pathumthani 12120 Thailand www.adpc.ait.ac.th TABLE OF CONTENTS Page 1. Introduction 2 2. Types of Assessment

More information

Date, Time and Place: Presented by: Presented to: 22 August 2013, 0900 hrs, Pier 1 The Embarcadero, San Francisco

Date, Time and Place: Presented by: Presented to: 22 August 2013, 0900 hrs, Pier 1 The Embarcadero, San Francisco Date, Time and Place: 22 August 2013, 0900 hrs, Pier 1 The Embarcadero, San Francisco Presented by: Nick Rogers, Mike Jacka, Kate Williams, Sjoerd van Ballegooy and Rick Wentz, Tonkin & Taylor International

More information

National Academy of Science & Technology Dhangadi Engineering College

National Academy of Science & Technology Dhangadi Engineering College Contact Address of Engineering Colleges Pokhara Engineering College Address :- Phirke, Pokhara Chairperson :- Er.Lekh Bdr. Gurung Principal :- Er.Lekh Bdr. Gurung Mobile No.: 9856021965 Po. Box. No. :-

More information

REVISION OF GUIDELINE FOR POST- EARTHQUAKE DAMAGE EVALUATION OF RC BUILDINGS IN JAPAN

REVISION OF GUIDELINE FOR POST- EARTHQUAKE DAMAGE EVALUATION OF RC BUILDINGS IN JAPAN 10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska REVISION OF GUIDELINE FOR POST- EARTHQUAKE DAMAGE EVALUATION OF RC

More information

DISASTER RESISTANCE EARTHQUAKES AND STRUCTURES

DISASTER RESISTANCE EARTHQUAKES AND STRUCTURES DISASTER RESISTANCE EARTHQUAKES AND STRUCTURES EARTHQUAKES Origin of earthquakes The earth was a single land about two hundred million years ago. This land split progressively over a long period of time

More information

ASSESSMENT AND RETROFITTING OF EXISTING RC BUILDINGS IN VIETNAM IN TERMS OF EARTHQUAKE RESISTANCES

ASSESSMENT AND RETROFITTING OF EXISTING RC BUILDINGS IN VIETNAM IN TERMS OF EARTHQUAKE RESISTANCES GEM-SEA Workshop on Seismic Vulnerability of Buildings Nanyang Technological University, Singapore 1 st July 2013 ASSESSMENT AND RETROFITTING OF EXISTING RC BUILDINGS IN VIETNAM IN TERMS OF EARTHQUAKE

More information

The Role of Government in a Disaster

The Role of Government in a Disaster Chapter 3: During the Disaster The Role of Government in a Disaster Government agencies play a critical role during times of disaster, but the exact role of government is often unclear to disaster victims.

More information

Open Spaces Inventory and Analysis for Planning of Earthquake Emergencies for Safe Evacuation Sites in Kathmandu Valley

Open Spaces Inventory and Analysis for Planning of Earthquake Emergencies for Safe Evacuation Sites in Kathmandu Valley USMCA2015 The 14 th International Symposium on New Technologies for Urban Safety of Mega Cities in Asia Open Spaces Inventory and Analysis for Planning of Earthquake Emergencies for Safe Evacuation Sites

More information

Project Report. Submitted to: GOAC

Project Report. Submitted to: GOAC Project Report Enhancing Emergency Health And Rehabilitation Response Readiness Capacity of Health System in the Event of a High Intensity Earthquake in Kathmandu Valley Submitted to: GOAC Summary Project

More information

POST-EVENT DATA COLLECTION USING MOBILE GIS/GPS AND DEVELOPMENT OF SEISMIC EVALUATION TECHNIQUE FOR DAMAGE

POST-EVENT DATA COLLECTION USING MOBILE GIS/GPS AND DEVELOPMENT OF SEISMIC EVALUATION TECHNIQUE FOR DAMAGE POST-EVENT DATA COLLECTION USING MOBILE GIS/GPS AND DEVELOPMENT OF SEISMIC EVALUATION TECHNIQUE FOR DAMAGE Satoshi IWAI 1 And Hiroyuki KAMEDA 2 SUMMARY This paper presents mobile system for post-event

More information

HYOGO PREFECTURE. Hyogo Prefectural Government

HYOGO PREFECTURE. Hyogo Prefectural Government HYOGO Hyogo s Initiatives for Recovery from the Great Hanshin-Awaji Earthquake1995 22 March, 2010 Tomio Saito Former Vice Governor Hyogo Prefectural Government < Chairman, Hyogo International Association

More information

ESF 14. Long-Term Community Recovery

ESF 14. Long-Term Community Recovery 1. Purpose This annex provides an overview of the general process to be followed in recovering from the economic results of a natural disaster or other major emergency that may impact Coos County. It outlines

More information

How To Preserve An Ancient City

How To Preserve An Ancient City Shared Legacy, Common Responsibility International Workshop for the Recovery of Bam s Cultural Heritage Bam City, Kerman Province, Islamic Republic of Iran 17-20 April 2004 Declaration and Concluding Recommendations

More information

Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE

Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE To satisfy the performance goals of the NEHRP Recommended Seismic Provisions, a number of characteristics are important to the

More information

afer ities The School Earthquake Safety Program in Kathmandu Valley Building safer communities through schools

afer ities The School Earthquake Safety Program in Kathmandu Valley Building safer communities through schools School earthquake safety program Nepal cs afer ities Asian Urban Disaster Mitigation Program 4 C a s e s t u d i e s o n m i t i g a t i n g d i s a s t e r s i n A s i a a n d t h e P a c i f i c The

More information

Protecting Cultural Heritage against Earthquake

Protecting Cultural Heritage against Earthquake Protecting Cultural Heritage against Earthquake Miloš Drdácký Institute of Theoretical and Applied Mechanics of the Academy of Sciences of the Czech Republic European Centre of Excellence Advanced Research

More information

Comparison of the Structural Provisions in the International Existing Building Code 2012 versus the Rhode Island State Rehabilitation Code

Comparison of the Structural Provisions in the International Existing Building Code 2012 versus the Rhode Island State Rehabilitation Code August 3, 2012 Existing Building Code 2012 versus the Rhode Island State By: Structural Engineers Association of Rhode Island, Building Code Committee Introduction At the request of the Building Code Standards

More information

REGIONAL CONSULTATIVE COMMITTEE ON DISASTER MANAGEMENT (RCC)

REGIONAL CONSULTATIVE COMMITTEE ON DISASTER MANAGEMENT (RCC) REGIONAL CONSULTATIVE COMMITTEE ON DISASTER MANAGEMENT (RCC) Regional Consultative Committee on Disaster Management (RCC) RCC MEMBERSHIP The Regional Consultative Committee on Disaster Management (RCC)

More information

Methods for Seismic Retrofitting of Structures

Methods for Seismic Retrofitting of Structures Methods for Seismic Retrofitting of Structures Retrofitting of existing structures with insufficient seismic resistance accounts for a major portion of the total cost of hazard mitigation. Thus, it is

More information

EARTHQUAKE DESIGN OF BUILDINGS

EARTHQUAKE DESIGN OF BUILDINGS GAP.2.0.9 A Publication of Global Asset Protection Services LLC EARTHQUAKE DESIGN OF BUILDINGS INTRODUCTION Buildings in many areas of the world are susceptible to damage from moderate to severe earthquakes.

More information

Implementing National Programs on Community-based Disaster Risk Reduction in high risk communities: Lessons learned, challenges and way ahead

Implementing National Programs on Community-based Disaster Risk Reduction in high risk communities: Lessons learned, challenges and way ahead Implementing National Programs on Community-based Disaster Risk Reduction in high risk communities: Lessons learned, challenges and way ahead An RCC Presentation based on the National Reports on CBDRR

More information

Disaster Recovery Managing and Leveraging Multiple Funding Sources

Disaster Recovery Managing and Leveraging Multiple Funding Sources Disaster Recovery Managing and Leveraging Multiple Funding Sources Jordan Williams, CFM June 3, 2015 Overview Programs FEMA Public Assistance (PA) and Hazard Mitigation Grant Program HUD s Community Development

More information

Learning from Disaster Recovery Ian Davis Visiting Professor, Cranfield, Coventry and Kyoto Universities

Learning from Disaster Recovery Ian Davis Visiting Professor, Cranfield, Coventry and Kyoto Universities Keynote Speech Learning from Disaster Recovery Ian Davis Visiting Professor, Cranfield, Coventry and Kyoto Universities The farther backward you look, the farther forward you are likely to see Winston

More information

The handouts and presentations attached are copyright and trademark protected and provided for individual use only.

The handouts and presentations attached are copyright and trademark protected and provided for individual use only. The handouts and presentations attached are copyright and trademark protected and provided for individual use only. READINESS RESOURCES American Bar Association -- www.abanet.org Disaster Recovery: www.abanet.org/lpm/lpt/articles/slc02051.html

More information

4460.1 REV 1. 4-1. GENERAL. All instructions of this Handbook apply to rehabilitation projects unless modified by this Chapter.

4460.1 REV 1. 4-1. GENERAL. All instructions of this Handbook apply to rehabilitation projects unless modified by this Chapter. 4460.1 REV 1 CHAPTER 4. REHABILITATION 4-1. GENERAL. All instructions of this Handbook apply to rehabilitation projects unless modified by this Chapter. 4-2. DEFINITIONS. A. Substantial Rehabilitation.

More information

FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012

FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012 FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012 Building and Housing has published technical guidance for foundation repairs and reconstruction for residential properties in green zone Foundation Technical

More information

Earthquake hazard mapping for community resilience in Japan

Earthquake hazard mapping for community resilience in Japan Earthquake hazard mapping for community resilience in Japan -the role of the government- Understanding Risk Forum Focus day session Let s shake your community earthquake hazard mapping approach for community

More information

Interlocking Soil-Cement Brick Technology. Habitech Center

Interlocking Soil-Cement Brick Technology. Habitech Center School Design and Implementation of Construction Projects Workshop 2-4 August 2010 Bangkok, Thailand Interlocking Soil-Cement Brick Technology Habitech Center a Research and Development unit for the Housing

More information

DISASTER MANAGEMENT. Goals To instill an understanding of the disaster management process

DISASTER MANAGEMENT. Goals To instill an understanding of the disaster management process DISASTER MANAGEMENT Goals To instill an understanding of the disaster management process Learning outcomes After completing this session, you will be able to Affirm the usefulness of integrating management

More information

Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions

Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions Peyman Amini Motlagh, Ali Pak Abstract Seismic retrofitting of important structures is essential in seismological

More information

DISASTER RESTORATION VISIONS FOR TOMIOKAMACHI AND DECONTAMINATION PROJECT

DISASTER RESTORATION VISIONS FOR TOMIOKAMACHI AND DECONTAMINATION PROJECT DISASTER RESTORATION VISIONS FOR TOMIOKAMACHI AND DECONTAMINATION PROJECT Kazuyoshi Sanbe Chairman of Disaster Restoration Visions Preparation Committee Tomiokamachi, Fukushima Prefecture Preparation Committee

More information

Predicting Seismic Vulnerable Zones using GIS. Outline of the presentation. Objectives. Risk Mapping Overview Factor Maps. Three levels of Zonation

Predicting Seismic Vulnerable Zones using GIS. Outline of the presentation. Objectives. Risk Mapping Overview Factor Maps. Three levels of Zonation Predicting Seismic Vulnerable Zones using GIS by K.S.A. Dinesh Kumar Research Scholar, Anna University & Lecturer in Civil Engineering Dept. National Institute of Technical Teachers Training & Research

More information

GUIDELINES FOR THE IMPLEMENTATION OF EARTHQUAKE RISK MANAGEMENT PROJECTS

GUIDELINES FOR THE IMPLEMENTATION OF EARTHQUAKE RISK MANAGEMENT PROJECTS GUIDELINES FOR THE IMPLEMENTATION OF EARTHQUAKE RISK MANAGEMENT PROJECTS Carlos A. VILLACIS Cynthia N. CARDONA GEOHAZARDS INTERNATIONAL Palo Alto, California ACKNOWLEDGMENTS The methodology for the implementation

More information

Sit Rep from Injury Rehab Sub Cluster: 01/06/2015 HOTLINES

Sit Rep from Injury Rehab Sub Cluster: 01/06/2015 HOTLINES Sit Rep from Injury Rehab Sub Cluster: 01/06/2015 HOTLINES Handicap International: 166001 78482 (NTC) 980 1571100 (NCell) or 01437 2794 (provides advice and signposting to rehabilitation services including

More information

Pre-Disaster Recovery Planning Tokyo

Pre-Disaster Recovery Planning Tokyo Pre-Disaster Recovery Planning Tokyo Population and Dimension West Tama (3 towns and 1 village) 59, 764 residents 375.96 Km2 Tama Cities (26 cities) 4.06 million 783.93 Km2 (Population : June, 2009) (Dimension

More information

Creation of a Highly Disaster-resistant City

Creation of a Highly Disaster-resistant City Creation of a Highly Disaster-resistant City Improvement of Districts with Close-set Wooden Houses In the event of earthquakes, districts with close-set wooden houses are expected to suffer major damage

More information

T H E G R EA T C A L IF O R N IA S H A K E O U T O C TO B E R 21, 201 0

T H E G R EA T C A L IF O R N IA S H A K E O U T O C TO B E R 21, 201 0 T H E G R EA T C A L IF O R N IA S H A K E O U T O C TO B E R 21, 201 0 S H A K E O U T. O R G 7 S T E P S T O E A R T H Q U A K E S A F E T Y S T E P 4. I D E N T I F Y Y O U R B U I L D I N G ' S P O

More information

1-800-927-4357. www.insurance.ca.gov. Earthquake. Insurance. California Department of Insurance

1-800-927-4357. www.insurance.ca.gov. Earthquake. Insurance. California Department of Insurance 1-800-927-4357 www.insurance.ca.gov Earthquake Insurance California Department of Insurance Table of Contents Page 2 Before You Buy Earthquake Insurance 4 Basic Earthquake Insurance 6 What Earthquake Insurance

More information

Cover page. Introduction to the Earthquake Resistance Capacity Assessment and Reinforcement of Taipei Water Department Office Building.

Cover page. Introduction to the Earthquake Resistance Capacity Assessment and Reinforcement of Taipei Water Department Office Building. Cover page Title: Authors: Introduction to the Earthquake Resistance Capacity Assessment and Reinforcement of Taipei Water Department Office Building. Ming-Fuw Wang (Presenter and Contact person) Chief

More information

Implementation of Nepal National Building Code Through Automated Building Permit System

Implementation of Nepal National Building Code Through Automated Building Permit System Implementation of Nepal National Building Code Through Automated Building Permit System By: Naresh Giri Background Electronic - Building Permit System (E-BPS), the automation of a building permit system,

More information

EMERGENCY MANAGEMENT AGAINST THE NATURAL DISASTERS OF TURKEY: MITIGATION, RESPONSE AND RECOVERY ISSUES

EMERGENCY MANAGEMENT AGAINST THE NATURAL DISASTERS OF TURKEY: MITIGATION, RESPONSE AND RECOVERY ISSUES 3 rd Roundtable Meeting on Disaster Management 19 November 2014; JCSE HQ Auditorium EMERGENCY MANAGEMENT AGAINST THE NATURAL DISASTERS OF TURKEY: MITIGATION, RESPONSE AND RECOVERY ISSUES Beyza TASKIN (PhD)

More information

Resolution adopted by the General Assembly. [without reference to a Main Committee (A/64/L.43 and Add.1)]

Resolution adopted by the General Assembly. [without reference to a Main Committee (A/64/L.43 and Add.1)] United Nations A/RES/64/251 General Assembly Distr.: General 30 April 2010 Sixty-fourth session Agenda item 70 (a) Resolution adopted by the General Assembly [without reference to a Main Committee (A/64/L.43

More information

Disaster and Emergency Management Activities in Turkey

Disaster and Emergency Management Activities in Turkey Muhammed SAHIN, Himmet KARAMAN, Turan ERDEN, Turkey Key words: Disaster and Emergency Management, Loss Estimation, TABIS, Earthquake SUMMARY After the two devastating earthquakes in the Marmara Region

More information

Disaster Risk Reduction (DRR)

Disaster Risk Reduction (DRR) Disaster Risk Reduction (DRR) A. Introduction 1. In order to address the impacts of the May 12 Wenchuan Earthquake, the Government of China will implement an effective, comprehensive and sustainable recovery

More information

MONTGOMERY COUNTY, KANSAS EMERGENCY OPERATIONS PLAN. ESF14-Long Term Community Recovery

MONTGOMERY COUNTY, KANSAS EMERGENCY OPERATIONS PLAN. ESF14-Long Term Community Recovery MONTGOMERY COUNTY, KANSAS EMERGENCY OPERATIONS PLAN ESF14-Long Term Community Recovery Planning Team Support Agency Coffeyville Public Works Independence Public Works Montgomery County Public Works 1/15/2009

More information

TABLE OF CONTENTS 10. ANNEX D... 10-2

TABLE OF CONTENTS 10. ANNEX D... 10-2 TABLE OF CONTENTS 10. ANNEX D... 10-2 10.1 PURPOSE...10-2 10.2 SITUATION AND ASSUMPTIONS...10-2 10.2.1 SITUATION...10-2 10.2.2 ASSUMPTIONS...10-2 10.3 GENERAL PROCEDURES AND RESPONSIBILITIES... 10-3 10.3.1

More information

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline

More information

The National standardization and Current status of Eurocodes in Turkey

The National standardization and Current status of Eurocodes in Turkey ADOPTION OF THE EUROCODES IN THE BALKAN REGION 5-6 December 2013, Milan & Ispra, Italy The National standardization and Current status of Eurocodes in Turkey Atila ERENLER (Deputy DG-MoEU) Prof. Dr. Ahmet

More information

What is Seismic Retrofitting?

What is Seismic Retrofitting? What is Seismic Retrofitting? SEISMIC RETROFITTING A Seismic Retrofit provides existing structures with more resistance to seismic activity due to earthquakes. In buildings, this process typically includes

More information

Article 5: Building Regulations

Article 5: Building Regulations Article 5: Building Regulations Division 37: Additional Building Regulations for Archaic Materials and Methods of Construction (Added Additional Building Regulations for Archaic Materials and Methods of

More information

Disaster Risk Assessment:

Disaster Risk Assessment: Disaster Risk Assessment: Disaster Risk Mapping Dr. Jianping Yan Disaster Risk Assessment Specialist Session Outline Essentials on Risk Mapping Map scale, grid size, aggregation unit Requirements for Risk

More information

3. Observed Damage in Railway Viaducts

3. Observed Damage in Railway Viaducts Structural Damage of Tohoku Shinkansen Viaducts by the Off the Pacific Tohoku Earthquake First Report on March 16, 2011 Dr. Yoshikazu Takahashi, Associate Professor Disaster Prevention Research Institute,

More information

Karlstad, Sweden. Local progress report on the implementation of the Hyogo Framework for Action (2013-2014)

Karlstad, Sweden. Local progress report on the implementation of the Hyogo Framework for Action (2013-2014) Karlstad, Sweden Local progress report on the implementation of the Hyogo Framework for Action (2013-2014) Mayor: Ulf Nyqvist Name of focal point: -Anna -Sjödin Organization: -Karlstad Municipality Title/Position:

More information

HOUSE BUILDING DIGEST

HOUSE BUILDING DIGEST HOUSE BUILDING DIGEST (Construction Specifications-Foundations) Creating Enabling Environment for Affordable Housing for All This is an attempt by BMTPC to provide useful but often ignored information

More information

Emergency Management in Turkey Adil Özdemir

Emergency Management in Turkey Adil Özdemir Adil Özdemir Turkey has been exposed to natural disasters throughout history. The main sources of these natural disasters have been earthquakes, floods, erosion and avalanches. Disaster response policies

More information

SEISMIC RETROFITTING OF SCHOOL BUILDINGS, CAPACITY BUILDING OF COMMUNITY, AND DISASTER EDUCATION (SESI)

SEISMIC RETROFITTING OF SCHOOL BUILDINGS, CAPACITY BUILDING OF COMMUNITY, AND DISASTER EDUCATION (SESI) SEISMIC RETROFITTING OF SCHOOL BUILDINGS, CAPACITY BUILDING OF COMMUNITY, AND DISASTER EDUCATION (SESI) of the United Nations Centre for Regional Development (UNCRD) Shoichi ANDO Dr. 1, Bishnu Hari Pandey

More information

Building a Spatial Database for Earthquake Risk Assessment and Management in the Caribbean

Building a Spatial Database for Earthquake Risk Assessment and Management in the Caribbean Building a Spatial Database for Earthquake Risk Assessment and Management in the Caribbean Jacob Opadeyi and Rehanna Jadoo Department of Geomatics Engineering and Land Management, The University of the

More information

Preparing Istanbul for Future Disasters: İstanbul Seismic Risk Mitigation and Preparedness Project (ISMEP) Istanbul Project Coordination Unit

Preparing Istanbul for Future Disasters: İstanbul Seismic Risk Mitigation and Preparedness Project (ISMEP) Istanbul Project Coordination Unit Preparing Istanbul for Future Disasters: İstanbul Seismic Risk Mitigation and Preparedness Project (ISMEP) Istanbul Project Coordination Unit TURKEY is prone to mainly three types Earthquakes; 70% of the

More information

Seismic performance evaluation of an existing school building in Turkey

Seismic performance evaluation of an existing school building in Turkey CHALLENGE JOURNAL OF STRUCTURAL MECHANICS 1 (4) (2015) 161 167 Seismic performance evaluation of an existing school building in Turkey Hüseyin Bilgin * Department of Civil Engineering, Epoka University,

More information

JICA Hyogo International Centre (HIC)

JICA Hyogo International Centre (HIC) (HIC) HISTORY Established( in Suma Ward) : August 1973 Moved to Chuo Ward : October 2001 Opening Ceremony : April 2002 LOCATION HAT Kobe (the east center of Kobe City) FACILITIES Area 3,760m 2 Floor Space

More information