1 Planning and Disaster Recovery The Vermont Experience Northern New England Chapter of the American Planning Association October 4, 2012 Annual Meeting Joe Segale, P.E./PTP Vermont Agency of Transportation Policy and Planning Manager 1
2 Presentation 2011: A Wake-up Call Planners Role in Disaster Response & Recovery Planning for Resilience Summary 2
3 2011: A Wake-up Call At Burlington International Airport, it was the wettest year on record with 50.92" of precipitation. Burlington also had its 3rd snowiest winter on record with 128.4". March 6-7, 2011 Winter Storm April 13 - June 19, 2011 Lake Champlain Record Flooding May 26-27, 2011 Flash Flooding and Severe Weather August 28, 2011 Tropical Storm Irene 3
4 IRENE 13 isolated towns 2,000 Road Segments 300 Bridges Rail line and telecommunications 800 Homes and Businesses 4
5 ROUTE OUTE 107 S 107 STOCKBRIDGE 5
6 Jct. of VT 100 and VT 73 Pre and Post- Irene 6
7 COVERED BRIDGE DAMAGE Quechee Rockingham Bartonsville Bridge 7
8 VT RAILR BRIDGE 114 CHESTER 8
9 HAZMAT AZMAT & D & DESTRUCTION 9
10 Response Non-traditional role for planners but all hands-on-deck Planners offered: Local knowledge and local contacts Communication skills Dt Data source and GIS skills 10
11 ICS ~ (INCIDENT COMMAND SYSTEM) The ICCs are operated by a Unified Command (UC) in Montpelier. The UC role was to set priorities, provide overall management through directives, and take the lead on communication and public information. The UC was given direction by the Secretary s Office. Director of Operations & Director of Program Development Dummerston Northern Regions Rutland 11
12 Safety Officer Incident Commander Information Officer Liaisons Operations Planning Logistics Administration District Garages Utilities Communications Time Resident Engineers Inspectors Supplies/ Equipment Procurement Contracts Private Contractors RPCs Facilities Compensation Claims Bills Staging Areas Environmental Hazmat Food Basic Needs Records National Guard Town Crews ICC Commanders Dummerston: Joe Flynn Rutland: Gil Newbury Northern: George McCool 12
13 Recovery: Operational Lessons Learned 13
14 Recovery: Policy Lessons Learned January
15 PLANNING FOR RESILIENCE Wetter Trends The wettest days are wetter 15
16 Since 1927 Vermont has experienced a large-scale disastrous floods once every 14 years. From , Vermont has ssuffered edapproximately ey 25 disastrous floods of regional-scale as depicted on this map. Data Source: VT DEC Rivers Program
17 Resilience Planning Initiatives Long Term Flood Recovery and Statewide Resiliency Planning Project Vermont Economic Resiliency Initiative Focus on Floods-VT Transportation System Resilience Plan Resilient Vermont Project Agency of Commerce and Community Development Agency of Natural Resources Agency of Transportation Recovery Office 17
18 Resilience Planning Vulnerability Assessment Watershed Based Risk Assessment Adaptation Strategies Implementation Actions
19 Risk Assessment Example
20 Planning s Role Phase Response Recovery Adapt & Rebuild Roles Place in Incident Command System Local Knowledge Multi-jurisdictional environment Information Communication Assessment and lessons learned Strategic Direction Priorities Applying lessons learned Innovate & Collaborate Systemic Approach 20
21 APPENDIX 21
22 Resources VTrans Employees: To date approximately 700 have been assigned to IRENE recovery tasks Hundreds of National Guard Troops: Vermont 200 people, numerous equipment Maine 220 people, p numerous equipment, Command & Control function for out-of-state troops Illinois troops, 8 aircraft, 23 vehicles Ohio 93 people, 29 pieces of equipment New Hampshire 8 people, 2 aircraft South Carolina 51 people, 23 pieces of equipment West Virginia i i 30 people, 10 pieces of equipment Virginia 16 people, 6 pieces of equipment DOT Partners Maine 150 people, 145 pieces of equipment New Hampshire 75 people, 60 pieces of equipment Over 200 Private Contractors and Consultants Approximately 1800 people from the private sector, primarily from Vermont Medical Assistance from LA, ME, AR, MO, NH, ID and FL EOC, RPCs, Red Cross Church groups, Fraternal Organizations, and many individuals 22
23 In The First 30 days Summary of State Highway Roads and Bridges August 28, 2011 State Road Segments Closed = 146 ~ 531 miles Bridges Closed = 34 September 28, 2011 State Road Segments Closed = 6 ~ 13 miles Bridges Closed = 6 ***************************************************** December 31, 2011 State Road Segments Closed = 0 Bridges Closed = 0 23
24 Municipalities Local Highway Asset Damage September 30, 2011 Road Segments Damaged = 2,260 Road Segments Closed = 175 Bridges Damaged = 289 Bridges Closed = 90 Culverts Damaged = 963 Culverts Closed = 335 December 7, 2011 Road Segments Closed = 89 Bridges Closed = 52 Source Chittenden County Regional Planning Commission 24
National Infrastructure Coordinating Center Hurricane Sandy State Access Control Procedures
Monday, 29 October, 2012 (1200 EDT) Access Control Procedures Summary The following information was gathered on access control procedures and they are summarized below. When supporting documents are received,
FINAL MOBILE HOME REMOVAL PROJECT REPORT: A SUMMARY OF ACVITIES, OUTCOMES, CHALLENGES AND LESSONS LEARNED
FINAL MOBILE HOME REMOVAL PROJECT REPORT: A SUMMARY OF ACVITIES, OUTCOMES, CHALLENGES AND LESSONS LEARNED Prepared by: The Sarah Woodward Prepared for: The Vermont Community Foundation Christopher Kaufman
PSE&G Flood Lessons Learned
PSE&G Flood Lessons Learned 2012 Mutual Aid Summit Paul Pirro Manager - Technical Services Public Service Electric & Gas Co. 10/23/12 TROPICAL STORM FLOYD - 1999 1999 STORM DAMAGE 17,834 Customers had
Emergency Operations Plan ANNEX K - UTILITIES RESTORATION ESF #3, #12 I. MNWALK REQUIREMENTS. Item #: 1, 4, 46, 53, 54
ANNEX K - UTILITIES RESTORATION ESF #3, #12 I. MNWALK REQUIREMENTS Item #: 1, 4, 46, 53, 54 II. PURPOSE The purpose of this annex is to describe the organization, operational concepts and responsibilities
TABLE OF CONTENTS 10. ANNEX D... 10-2
TABLE OF CONTENTS 10. ANNEX D... 10-2 10.1 PURPOSE...10-2 10.2 SITUATION AND ASSUMPTIONS...10-2 10.2.1 SITUATION...10-2 10.2.2 ASSUMPTIONS...10-2 10.3 GENERAL PROCEDURES AND RESPONSIBILITIES... 10-3 10.3.1
Vermont Disaster Relief Fund
1 Vermont Disaster Relief Fund Recovery is the time following a disaster after immediate response and relief efforts have been completed. Response agencies such as The American Red Cross and The Salvation
National Capital Region: Urban Area Security Initiatives Grants Subgrants as of 01/31/14
National Capital Region: Urban Area Initiatives Grants Subgrants as of 01/31/14 Year Subgrantee Subgrant Name Award All Hazards Consortium HSEMA Performance and Professional Development Initiative (DC
Coordination between Electric and Water Utilities
Coordination between Electric and Water Utilities Anthony Hurley VP of Operations, Jersey Central Power & Light Water and Energy Webinar hosted by the U.S. Environmental Protection Agency April 4th, 2014
Long Term Recovery and GIS Authors: Jason Krejci, Patricia Howell
Long Term Recovery and GIS Authors: Jason Krejci, Patricia Howell Abstract Long Term Recovery is a community partnership that was formed in January 2005 between not-for-profit, Red Cross, United Way and
Chapter 6. Emergency Services
Chapter 6. Emergency Services Most communities appoint an emergency manager or emergency services coordinator. This person is usually part time, although many communities make it an extra duty for a full-time
ALBUQUERQUE EMERGENCY OPERATIONS PLAN ANNEX 8 DAMAGE ASSESSMENT AND REPORTING
ALBUQUERQUE EMERGENCY OPERATIONS PLAN ANNEX 8 DAMAGE ASSESSMENT AND REPORTING PRIMARY RESPONSIBILITY Albuquerque City and Bernalillo County Government SECONDARY RESPONSIBILITY Department of Public Safety,
DAMAGE ASSESSMENT ANNEX E
DAMAGE ASSESSMENT ANNEX E E1. Purpose, Situation, and Assumptions E1.1 Purpose The purpose of this Damage Assessment Functional Annex is to guide and coordinate agencies and organizations in conducting
EMERGENCY MANAGEMENT PLANNING CRITERIA FOR AMBULATORY SURGICAL CENTERS
EMERGENCY MANAGEMENT PLANNING CRITERIA FOR AMBULATORY SURGICAL CENTERS The following criteria are to be used when developing Comprehensive Emergency Management Plans (CEMP) for all ambulatory surgical
Emergency Management is responsible for coordinating the City of Houston s preparation for and response to emergency situations.
CITY OF HOUSTON Office of Emergency Management October 2004 Emergency Management is responsible for coordinating the City of Houston s preparation for and response to emergency situations. Houston is exposed
The Vermont Legislative Research Shop
The Vermont Legislative Research Shop State Responses to Terrorism Every state has responded in some way to the events of September 11 th. Most states have named a Director of Homeland or a liaison to
Typed Resource Definitions
US Department of Homeland Security Typed Resource Definitions Incident Management Resources FEMA 508-2 July 2005 US Department of Homeland Security Background Resource Typing Web Site The National Mutual
State of Vermont Building and General Services. Continuity of Operations Plan Flood Evacuation
State of Vermont Building and General Services Continuity of Operations Plan Flood Evacuation Decision to evacuate state employees made by Governor upon recommendation of Secretary of Administration. Evacuation
Hancock Receives Tax Credits Via Village Designation. TRORC awarded CDBG Disaster Recovery Planning Grant
August 2014 Hancock Receives Tax Credits Via Village Designation To receive this newsletter by e-mail instead of hardcopy, please write to: [email protected] In This Issue News Announcements Upcoming Events
Georgia Emergency Operations Plan. Emergency Support Function # 5 Annex Emergency Management
Emergency Support Function # 5 Annex Emergency Management 2015 Emergency Support Function #5 E S F C o o r d i nator and Support Ag e n c i e s ESF C oordi na t or Georgia Emergency Management Agency/Homeland
HURRICANE DISASTER PREPARATION CHECKLIST AND BUSINESS CONTINUITY PLAN
HURRICANE DISASTER PREPARATION CHECKLIST AND BUSINESS CONTINUITY PLAN G. Thomas Harper, Esq., Editor Florida Employment Law Letter HARPER GERLACH, PL 4110 Southpoint Boulevard Suite 228 Jacksonville, Florida
Emergency Support Function 12 Energy
Emergency Support Function 12 Energy ESF 12 Primary Agency Support Agencies Illinois Commerce Commission (ICC) Illinois Department of Central Management Services (CMS) Illinois Department of Corrections
FEDERAL EMERGENCY MANAGEMENT AGENCY (FEMA) INDEPENDENT STUDY COURSE INTRO TO INCIDENT COMMAND SYSTEM FOR FEDERAL WORKERS (IS-100.
This Study Guide has been created to provide an overview of the course content presented in the Federal Emergency Management Agency (FEMA) Independent Study Course titled IS-100.FWA Intro to Incident Command
Hail-related claims under comprehensive coverage
Bulletin Vol. 29, No. 3 : April 2012 Hail-related claims under comprehensive coverage Claims for hail damage more than doubled in 2011 compared with the previous three years. Hail claims are primarily
DIVISION OF EMERGENCY MANAGEMENT
DIVISION OF EMERGENCY MANAGEMENT PROGRAM DESCRIPTION The Florida Division of Emergency Management (DEM) is responsible for maintaining a comprehensive statewide program of emergency management. In addition,
Delaware s Transportation Management Program
Delaware s Transportation Management Program Operations Incident and Event Management Homeland Security Delaware Department of Transportation Transportation Management Center DelTrac is the Delaware Department
Guidelines for Coordinating Flood Emergency Operations
Guidelines for Coordinating Flood Emergency Operations Completed in compliance with the Flood Emergency Action Team (FEAT): Initiative Number 1 Governor s Executive Order W-156-97 Approved by the Standardized
How To Handle A Train Accident In Whitefish
Drawing by Marty Two Bulls BAKKEN OIL SURE HAS US LOOKING AT OUR DISASTER PLANNING We can t say, Not in our backyard! We can t say rail accidents don t happen here in Whitefish area. Derailment in Olney
Maricopa County Emergency Management
Maricopa County Emergency Management Mission Provide community-wide education, planning, coordination, and continuity of government for the people of Maricopa County in order to protect lives, property
United States Biathlon Association & Biathlon Canada Present 2014 North American Biathlon Championships
United States Biathlon Association & Biathlon Canada Present 2014 North American Biathlon Championships January 23 rd 26 th, 2014 Ethan Allen Firing Range Jericho, Vermont Hosted by Vermont National Guard
Emergency Management Certification and Training (EMC & T) Refresher Terry Hastings, DHSES Senior Policy Advisor
Emergency Management Certification and Training (EMC & T) Refresher Terry Hastings, DHSES Senior Policy Advisor 2015 NYSEMA Conference 2 Please sign in to ensure that you receive credit for the refresher
*****IMPORTANT SUBMITTAL INFORMATION*****
The following minimum criteria are to be used when developing Comprehensive Emergency Management Plans (CEMP) for all Nursing Homes. The criteria serve as the required plan format for the CEMP, and will
E Functional Annex Damage Assessment
E Functional Annex Damage Assessment Approved (September 14, 2004) This page left blank intentionally Table of Contents 1 Purpose... 3 2 Situation and Assumptions... 3 2.1 Situation... 3 2.2 Assumptions...
North Carolina Emergency Management. Preparedness, Response & Long-Term Recovery
North Carolina Emergency Management Preparedness, Response & Long-Term Recovery Status of Recovery from Hurricane Irene Individual Assistance 35 counties declared 29,936 people registered $21,182,252 disbursed
Emergency Support Function 14 Long-Term Community Recovery and Mitigation
ESF Coordinator: Grant County Emergency Management Primary Agencies: Grant County Emergency Management Grant County Assessor s Office Grant County Public Works Grant County Building Department Support
AMBULATORY SURGICAL CENTERS (Based upon AHCA Form # 3130-2003 JUL 94)
(Based upon AHCA Form # 3130-2003 JUL 94) The document below is the cross-reference used by Palm Beach County Division of Emergency Management for the annual review and re-certification of your CEMP. Review
ESF 14. Long-Term Community Recovery
1. Purpose This annex provides an overview of the general process to be followed in recovering from the economic results of a natural disaster or other major emergency that may impact Coos County. It outlines
AMBULATORY SURGICAL CENTERS
AMBULATORY SURGICAL CENTERS STATUTE RULE CRITERIA Current until changed by State Legislature or AHCA Hospitals and Ambulatory Surgical Centers Statutory Reference 3 395.1055 (1)(c), Florida Statutes Rules
Table of Contents ESF-3-1 034-00-13
Table of Contents Primary Coordinating Agency... 2 Local Supporting Agencies... 2 State, Regional, and Federal Agencies and Organizations... 3 Purpose... 3 Situations and Assumptions... 4 Direction and
National Capital Region: Urban Area Security Initiatives Subgrants as of 02/01/12
National Capital Region: Urban Area Initiatives Subgrants as of 02/01/12 Year Subgrantee Subgrant Name Award American Red Cross of the National Capital Area Mass Care (Maintenance) 146,258 American Red
Franklin County Emergency Management Department (FCEMD) All County Emergency Response Team (CERT) Agencies. Table of Contents
Concept of Operations Lead Agency Support Agency Standard Operating Procedures Emergency Operations Center (EOC) Franklin County Emergency Management Department (FCEMD) All County Emergency Response Team
ESF-9 LAW ENFORCEMENT
ESF-9 LAW ENFORCEMENT CONTENTS PAGE I. PURPOSE ESF 9.1 II. SITUATIONS AND ASSUMPTIONS ESF 9.1 A. Situations ESF 9.1 B. Assumptions ESF 9.1 III. CONCEPT OF OPERATIONS ESF 9.2 A. General ESF 9.2 B. Operational
NYSEG and RG&E Emergency Response Power Restoration Practices, Priorities and Interactions
NYSEG and RG&E Emergency Response Power Restoration Practices, Priorities and Interactions NYSEMA 2015 Winter Conference Trish Nilsen Emergency Preparedness Agenda About Iberdrola USA, NYSEG and RG&E Emergency
EMERGENCY MANAGEMENT PLANNING CRITERIA FOR ADULT DAY CARE FACILITIES
The following criteria are to be used for the development of Comprehensive Emergency Management Plans (CEMP) for Adult Day Care (ADC). The criteria will serve as a recommended plan format for the CEMP,
Emergency Management Planning Criteria For Residential Treatment Facilities
Emergency Management Planning Criteria For Residential Treatment Facilities The following minimum criteria are to be used for Comprehensive Emergency Management Plans (CEMP) for Therapeutic Group Homes
Emergency Operations Plan ANNEX R - DONATIONS MANAGEMENT ESF #14 I. MNWALK REQUIREMENTS. Item #: 1, 4, 83, 93, 94, 95, 97
ANNEX R - DONATIONS MANAGEMENT ESF #14 I. MNWALK REQUIREMENTS Item #: 1, 4, 83, 93, 94, 95, 97 II. PURPOSE The purpose of this annex is to explain the responsibilities for coordinating volunteers, donated
TOWN OF NEW HAVEN ROAD PLAN
1 TOWN OF NEW HAVEN ROAD PLAN BACKGROUND The Town of New Haven, Vermont consists of 42 square miles of land and a population of approximately 1400 people. At the start of the 21 st century, it is served
Emergency Management Planning Criteria for Assisted Living Facilities (State Criteria Form)
Emergency Management Planning Criteria for Assisted Living Facilities (State Criteria Form) FACILITY INFORMATION: FACILITY NAME: FIELD (ALF Company) ST. LIC. NO.: FIELD (Lic. #) FAC. TYPE: ALF STATE RULE:
Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets
SUPPORTING INFORMATION ASSOCIATED WITH THE ALLOCATION PRIORITIES FOR CLEAN WATER FUND BOARD Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets 1 Agriculture AAFM On-Farm Implementation
SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY
SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY 1. Introduction 1.1 The Council recognises the threat to local communities from flooding following severe weather events and as a result
CEMP Criteria for Residential Treatment Facilities
CEMP Criteria for Residential Treatment Facilities Lee County Emergency Management The following minimum criteria are to be used when Comprehensive Emergency Management Plans (CEMP) for all Residential
Challenges. Estimated Damages from 100-Year Flood
Suffield Suffield is a rural community located along the Massachusetts border. It encompasses about 42.2 square miles and has a population of about 15,735. Suffield s terrain rises from an elevation of
MADISON COUNTY EMERGENCY MANAGEMENT. After Action Review of the Sheridan Quake and the Ennis 4 th of July Exercise
MADISON COUNTY EMERGENCY MANAGEMENT After Action Review of the Sheridan Quake and the Ennis 4 th of July Exercise Directed by: Chris Mumme, Director of Emergency Management Attendees: Jill Steeley, Madison
The purpose of ESF #9 is to identify search, rescue, and recovery roles and responsibilities within the City of Tucson during a disaster.
Emergency Support Function #9 Search & Rescue ESF Coordinator: Tucson Fire Metropolitan Medical Response System (MMRS) Tucson Police Support Agencies: Planning & Development Services Dept. Building Inspectors
ESF 01 - Transportation Annex, 2015
ESF 01 - Transportation Annex, 2015 Table of contents I. Introduction... 3 A. Purpose... 3 B. Scope of Operations... 3 II. Situation and Assumptions... 3 A. Situation... 3 B. Assumptions... 4 III. Concept
H Functional Annex Emergency Medical Services Resource Management
H Functional Annex Emergency Medical Services Resource Management Approved (April 20, 2007) This page left blank intentionally Table of Contents 1 Purpose... 3 2 Situation and Assumptions... 3 2.1 Situation...
Emergency Management Planning Criteria for Nursing Home Facilities (Criteria)
Emergency Management Planning Criteria for Nursing Home Facilities (Criteria) The following minimum criteria are to be used when developing Comprehensive Emergency Management Plans (CEMP) for all Nursing
Emergency Management Planning Criteria for Ambulatory Surgical Centers (State Criteria Form)
Emergency Management Planning Criteria for Ambulatory Surgical Centers (State Criteria Form) FACILITY INFORMATION: FACILITY NAME: FIELD (Company) FAC. TYPE: ASC STATE RULE: 59A-5, F.A.C CONTACT PERSON:
B E F O R E T H E E M E R G E N C Y
B E F O R E T H E E M E R G E N C Y RESPONSIBILITY / LIABILITY for Homeland Security / Emergency Management Duty of Care - Counties and Cities ARE responsible for the safety of their citizens. Following
NURSING HOME STATUE RULE CRITERIA
NURSING HOME STATUE RULE CRITERIA Page 1 of 11 Nursing Homes Statutory Reference 8 400.23 (2)(g), Florida Statutes Rules; criteria; Nursing Home Advisory Committee; evaluation and rating system; fee for
EMERGENCY SUPPORT FUNCTION (ESF) 14 LONG TERM RECOVERY AND MITIGATION
EMERGENCY SUPPORT FUNCTION (ESF) 14 LONG TERM RECOVERY AND MITIGATION Primary Agency: Chatham Emergency Management Agency Support Agencies: American Red Cross Chatham County Building Safety & Regulatory
Long-Term Community Recovery & Mitigation
Emergency Support Function 14 Long-Term Community Recovery & Mitigation ESF Coordinator Grays Harbor County Division of Emergency Management Primary Agencies Grays Harbor County Division of Emergency Management
El Nino in the OC. Orange County Sheriff s Department Emergency Management Division
El Nino in the OC Orange County Sheriff s Department Emergency Management Division The mission of the Orange County Sheriff s Department s Emergency Management Division is to promote, facilitate, and support
EMERGENCY MANAGEMENT PLANNING CRITERIA FOR HOSPITALS
EMERGENCY MANAGEMENT PLANNING CRITERIA FOR HOSPITALS The following minimum criteria are to be used when developing Comprehensive Emergency Management Plans (CEMP) for all hospitals. These criteria will
EMERGENCY MANAGEMENT PLANNING & COMPLIANCE REVIEW CRITERIA FOR NURSING HOMES [FL RULE CHAPTER 59A-4.126 F.A.C]
EMERGENCY MANAGEMENT PLANNING & COMPLIANCE REVIEW CRITERIA FOR NURSING HOMES [FL RULE CHAPTER 59A-4.126 F.A.C] Notice: Facilities must submit their plans with the appropriate page numbers shown in the
MAYORS GUIDE TO EMERGENCY MANAGEMENT. By Brett Kriger & Nikki Blazier
MAYORS GUIDE TO EMERGENCY MANAGEMENT By Brett Kriger & Nikki Blazier OVERVIEW Disaster Facts State of Emergency Declaration & Powers Use of Mutual Aid Agreements Importance of Documentation Emergency Contract
New Hampshire Recovery Plan
ANNEXES LEAD AGENCY: RECOVERY SUPPORT FUNCTION (RSF) 1 COMMUNITY PLANNING AND CAPACITY BUILDING N.H. Homeland Security and Emergency Management (HSEM) SUPPORT AGENCIES: N.H. Attorney General s Office (AG)
For Official Use Only. Springfield-Greene County, Missouri Multi-Year Training and Exercise Plan 2016-2018 (TEP) July 27, 2015. For Official Use Only
For Official Use Only Springfield-Greene County, Missouri Multi-Year Training and Exercise Plan 2016-2018 (TEP) July 27, 2015 For Official Use Only SPRINGFIELD-GREENE COUNTY Point of Contact Erin Pope
Town of Washington, New Hampshire Master Plan 2015
Washington is vulnerable to a variety of natural and human- made hazards. The hazards affecting the Town of Washington are dam failure, flooding, hurricane, tornado, thunderstorm (including lightning and
Emergency Support Function 14. Recovery
Emergency Support Function 14 Recovery ESF COORDINATOR: PRIMARY AGENCY: SUPPORT AGENCIES: Iowa County Emergency Management Agency Iowa County Emergency Management Agency Chief Elected Officials County
HOSPITALS STATUTE RULE CRITERIA. Current until changed by State Legislature or AHCA
HOSPITALS STATUTE RULE CRITERIA Current until changed by State Legislature or AHCA Hospitals and Ambulatory Surgical Centers Statutory Reference' 395.1055 (1)(c), Florida Statutes Rules and Enforcement.
NCCI Filing Memorandum Item B-1420
NCCI Filing Memorandum Item B-1420 NATIONAL COUNCIL ON COMPENSATION INSURANCE, INC. (Applies in: AK, AL, AR, AZ, CO, CT, DC, FL, GA, HI, IA, ID, IL, IN, KS, KY, LA, MD, ME, MO, MS, MT, NC, NE, NH, NM,
ANNEX M TO THE FAIRFIELD COUNTY EMERGENCY OPERATIONS PLAN
ANNEX M TO THE FAIRFIELD COUNTY EMERGENCY OPERATIONS PLAN ENGINEERING AND PUBLIC WORKS I. AUTHORITIES AND REFERENCES A. Purpose To provide for the coordination and use of Department of Public Works personnel
London Borough of Merton Local Flood Risk Management Strategy
Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood
GIS Data Discovery Workshop
Florida Division of Emergency Management 1 GIS Data Discovery Workshop Richard Butgereit GIS Administrator 850-413-9907 [email protected] floridadisaster.org/gis Critical Facilities Inventory
Emergency Management Planning Criteria for Hospital Facilities (State Criteria Form)
Emergency Management Planning Criteria for Hospital Facilities (State Criteria Form) FACILITY INFORMATION: FACILITY NAME: FIELD (Company) ST. LIC. NO.: FIELD (Lic. #) FAC. TYPE: Hospital STATE RULE: 59A-3.078
ESF 3 - Public Works and Engineering
ESF Annexes ESF 3 - Public Works and Engineering Coordinating Agency: Cowley County Engineering Department Primary Agency: Cowley County Emergency Management Arkansas City (City of) Winfield (City of)