1 NORTHEAST ENERGY DIRECT PROJECT DOCKET NO. PF DRAFT ENVIRONMENTAL REPORT RESOURCE REPORT 1 GENERAL PROJECT DESCRIPTION PUBLIC Submitted by: Tennessee Gas Pipeline Company, L.L.C Louisiana Street Houston, Texas 77002

2 This page intentionally left blank

3 1-i RESOURCE REPORT 1 GENERAL PROJECT DESCRIPTION SUMMARY OF FILING INFORMATION INFORMATION FOUND IN Provide a detailed description and location map of the Project facilities ( (c)(1)). Describe any non-jurisdictional facilities that would be built in association with the Project ( (c)(2)). Provide current original U.S. Geological Survey 7.5-minute series topographic maps with mileposts showing the Project facilities ( (c)(3)). Provide aerial images or photographs or alignment sheets based on these sources with mileposts showing the Project facilities ( (c)(3)). Provide plot/site plans of compressor stations showing the location of the nearest noise-sensitive areas within 1 mile ( (c)(3,4)). Describe construction and restoration methods ( (c)(6)). Section 1.1 Attachment 1a Section 1.7 Attachment 1a Volume II, Appendix F Volume IV, Appendix AAA and Resource Report 9, Attachment 9a Section 1.3 Identify the permits required for construction across surface waters ( (c)(9)). Provide the names and addresses of all affected landowners and certify that all affected landowners will be notified as required in Section 157.6(d) ( (c)(10)). Section 1.6 Section 1.8 Volume III, Appendix AA

4 This page intentionally left blank

5 1-ii TABLE OF CONTENTS 1.0 GENERAL PROJECT DESCRIPTION PROPOSED FACILITIES Purpose and Need Location and Description of Facilities Pipeline Facilities Aboveground and Appurtenant Facilities Location Maps, Detailed Site Maps, and Plot/Site Maps LAND REQUIREMENTS Pipeline Facilities Aboveground and Appurtenant Facilities Access Roads Contractor Yards Additional Temporary Workspace Areas of No Access Non-Surveyed Areas CONSTRUCTION PROCEDURES Pipeline Construction Marking the Corridor Erosion and Sediment Control Clearing, Grading, and Fencing Trenching Pipe Stringing Pipe Bending Pipe Assembly and Welding X-Ray and Weld Repair Coating Field Welds, Inspection and Repair Pipe Preparation and Lowering-In Tie-Ins Backfilling and Grade Restoration Clean-up and Restoration Hydrostatic Testing and Tie-Ins

6 Environmental Report 1-iii Alternating Current Mitigation and Cathodic Protection Specialized Construction Procedures Rugged Topography Residential Areas Agricultural Lands Road and Railroad Crossings Trenchless Construction Methods Rock Removal Wetland Crossing Construction Waterbody Crossing Construction Project Specific Alternative Measures or Modifications to Commission s Plan and Procedures Compressor Stations, Meter Stations, and Appurtenant Facilities Clearing and Grading Foundations Building Design and Construction High Pressure Piping Pressure Testing Infrastructure Facilities Control Checkout and Startup Final Grading and Landscaping Erosion Control Procedures Timeframe for Construction Supervision and Inspection OPERATION AND MAINTENANCE PROCEDURES General Procedures Vegetation Maintenance Cathodic Protection and Alternating Current Mitigation Areas Periodic Pipeline and ROW Patrols Procedures Specific to Aboveground Facilities FUTURE PLANS AND ABANDONMENT PERMITS AND APPROVALS NON-JURISDICTIONAL FACILITIES

7 1-iv 1.8 LANDOWNER/AGENCY CONSULTATION Landowner Consultation/Public Participation Agency Consultation Threatened and Endangered Species Consultations Interagency and Other Review/Resource Agency Meetings SUMMARY OF CUMULATIVE IMPACTS Introduction Cumulative Impacts Analysis Spatial and Temporal Scale Past, Present, Proposed or Future Projects Evaluated for Potential Cumulative Impacts

8 TABLE OF CONTENTS (Continued) LIST OF TABLES Environmental Report 1-v Table Summary of NED Project Facilities Table Proposed Pipeline Facilities for the Project Table Areas of Pipeline Looping and Co-Location for the Pipeline Facilities Table Proposed Compressor Stations for the Project Table Proposed Meter Stations for the Project Table Proposed Appurtenant Facilities for the Project Table Summary of Land Requirements for the Project Table Proposed Construction ROW Widths for the Project Pipeline Facilities Table Typical Right-of-Way Configurations for the Project Pipeline Table Land Requirements for the Project Pipeline Facilities Table Land Requirements for the Project Aboveground and Appurtenant Facilities Table Areas of No Access for the Project by State Table Non-Surveyed Areas of the Project Table Tennessee s Minimum Specifications for Depth of Cover Table Horizontal Directional Drill Crossings for the Project Table Cathodic Protection Areas Along the Project Table Maximum Interval Between Patrols Table 1.6-1Permits, Licenses, Approvals, and Certificates Required for Construction, Operation, and Maintenance of the Project Table Libraries Within the Project Area Table Newspapers Within the Project Area Table Agency Meetings Conducted for the Project (As of July 24, 2015) Table Spatial/Geographic Criteria for Cumulative Impacts Table List of Projects Potentially Contributing to Cumulative Impacts... 1b-1

9 ATTACHMENT 1a FIGURES TABLE OF CONTENTS (Continued) LIST OF ATTACHMENTS Environmental Report 1-vi Figure Figure Figure Figure Project Location Map Projects Within the HUC 8 Watershed CIAA Projects Within CIAA Project Within Specified Buffer CIAA ATTACHMENT 1b TABLES Table List of Projects Potentially Contributing to Cumulative Impacts ATTACHMENT 1c LIST OF SOURCES DESCRIBING THE NEED FOR ADDITIONAL PIPELINE INFRASTRUCTURE IN THE NORTHEAST U.S. ATTACHMENT 1d LIST OF SOURCES FOR PROJECTS POTENTIALLY CONTRIBUTING TO CUM ULATIVE IM PACTS

10 This page intentionally left blank

11 GENERAL PROJECT DESCRIPTION Tennessee Gas Pipeline Company, L.L.C. ( Tennessee or TGP ) is filing an application seeking the issuance of a certificate of public convenience and necessity from the Federal Energy Regulatory Commission ( Commission or FERC ) for the construction and operation of the proposed Northeast Energy Direct Project ( NED Project or Project ). Tennessee proposes to expand and modify its existing pipeline system in Pennsylvania, New York, Massachusetts, New Hampshire, and Connecticut. The NED Project is being developed to meet the increased demand in the Northeast United States ( U.S. ) for transportation capacity of natural gas. The NED Project will provide new firm natural gas transportation capacity to meet the growing energy needs in the Northeast U.S., particularly in New England. The Supply Path Component, as defined below, will transport up to 1.0 billion cubic feet per day ( Bcf/d ) of natural gas, and the Market Path Component, as defined below, will transport up to 1.3 Bcf/d of natural gas. 1 For the purposes of the ER, the Project volume will be referred to as up to 1.3Bcf/d. The proposed Project involves the following facilities: Approximately 39 miles of pipeline looping on Tennessee s 300 Line in Pennsylvania; Approximately 132 miles of new pipeline, of which 99 miles are proposed to be generally co-located with the certificated Constitution Pipeline Project ( Constitution ) 2 in Pennsylvania and New York (extending from Tennessee s existing 300 Line near Auburn, Pennsylvania to Wright, New York); Approximately 53 miles of pipeline generally co-located with Tennessee s existing 200 Line and an existing utility corridor in New York; Approximately 64 miles of pipeline generally co-located with an existing utility corridor in Massachusetts; Approximately 71 miles of pipeline generally co-located with an existing utility corridor in New Hampshire (extending southeast to Dracut, Massachusetts); Approximately 59 miles of various laterals and pipeline looping segments in Massachusetts, New Hampshire, and Connecticut to serve local markets; Construction of nine new compressor stations and 13 new meter stations, and modifications to an existing compressor station and 12 existing meter stations throughout the Project area; and Construction of appurtenant facilities, including mainline valves ( MLVs ), cathodic protection, and pig launcher/receivers through the Project area. 1 The reason for the difference in the capacity volumes of the two Project components is that Tennessee is assuming a certain amount of volumes to flow on the Market Path component facilities from sources other than the Supply Path component. 2 On December 2, 2014, the Commission issued an Order Issuing Certificates and Approving Abandonment, Constitution Pipeline Company, LLC, 149 FERC 61,199 (2014), for the Constitution Pipeline Project, which adopted the recommendations from the Constitution Final Environmental Impact Statement: Constitution Pipeline and Wright Interconnect Projects, FERC Environmental Impact Statement ( EIS ) No. 0249F, Docket Numbers CP , CP , and PF ( Constitution Final EIS [ FEIS ] ) issued October 24, Information contained within this related to the Constitution Pipeline Project was based on the routing included in the FEIS, as approved by the certificate order.

12 Environmental Report 1-2 To the extent that it is practicable, feasible, and in compliance with existing law, Tennessee proposes to locate proposed pipeline facilities (either pipeline looping segments or co-located pipeline facilities) generally within or adjacent to its existing right-of-way ( ROW ) associated with its existing 300 Line in Pennsylvania and Connecticut; its existing 200 Line in New York and Massachusetts; and existing utility (pipeline and powerline) corridors in Pennsylvania, New York, Massachusetts, and New Hampshire. Table provides a summary of the NED Project facilities. Pipeline loops are those pipeline segments which are laid parallel to another pipeline and used as a way to increase capacity along what is possible on one line. These lines are connected to move a larger flow of gas through a single pipeline segment. Co-located pipelines are those that are laid parallel to another existing pipeline or linear utility. The current route of Tennessee s proposed NED Project, in large part, is located parallel and adjacent to, and, in many cases, overlaps existing utility easements (either pipeline or powerlines). This paralleling/overlapping of easements is commonly referred to as co-location. Refinement to the routing, including locations of permanent easement and temporary construction workspaces, will occur as the NED Project is developed through the pre-filing and certificate processes, which will incorporate information gained from field surveys, and landowner and stakeholder input, including input from power companies that have existing easements in areas where Tennessee is proposing to co-locate the Project pipelines. For areas of the NED Project pipeline alignment that are proposed to be co-located with existing powerline easements, Tennessee is proposing that the centerline of the pipeline will be installed generally five (5) feet outside the existing power line easement boundary. This proposed alignment is reflected in the proposed impacts of the Project discussed in the ER and in the attached powerline co-location configurations, ROW-Config_05 and 06, included in Volume II, Appendix G. For all areas of co-location with powerline easements, Tennessee is proposing that the permanent easement be centered generally on the proposed pipeline and that 20 feet of the proposed 50 foot permanent easement overlap the existing powerline easement. Further, Tennessee is proposing that the temporary construction workspace for the Project for these areas of co-location would overlap the existing powerline easement between 30 to 60 feet. The amount of overlap of temporary construction easements and the existing powerline easements will depend ultimately on the location of the closest powerline towers and facilities, which will dictate the amount of available space on the powerline easement. This proposed overlap of permanent easement and temporary construction workspace with existing powerline easements will reduce environmental and landowner impacts by a commensurate width outside the powerline easement. Tennessee notes that the proposed routing of the centerline of the pipeline generally five feet outside the existing powerline easement boundaries is based on available public information. Tennessee has engaged in discussions with the power companies regarding co-location and the proposed overlapping of NED Project permanent easements and temporary construction workspaces with that of existing powerline easements and these discussions are ongoing. Tennessee may adjust the proposed centerline location of the pipeline and overlapping areas in the final ER for the Project to reflect these discussions, including appropriate mitigation for safety and operational considerations, as well as landowner and agency concerns, avoidance of sensitive environmental resources, and construction considerations. These adjustments may result in the centerline of the pipeline to be located within an existing powerline easement, less than five feet from the existing power line boundary, or further than five feet from the existing powerline boundary.

13 1-3 Tennessee is requesting issuance of a certificate order for the Project in November 2016 and proposes to commence construction activities in January 2017, in anticipation of placing the Project facilities inservice by November 2018 (with the exception of the proposed pipeline looping segment in Connecticut, which would be placed in-service by November 2019), consistent with the terms and conditions of the precedent agreements executed with Project Shippers. Tennessee s existing pipeline infrastructure consists of approximately 11,900 miles of pipeline designated as the 100, 200, 300, 400, 500, and 800 Lines, based on the region they serve. The proposed NED Project focuses on the existing 200 and 300 Lines. The 200 Line consists of multiple pipelines varying from 24 inches to 36 inches in diameter beginning on the suction side of Compressor Station 200 in Greenup, Kentucky, and extending east through Ohio, Pennsylvania, New York, and Massachusetts. The 300 Line system consists of two pipelines (24 inches and 30 inches in diameter) beginning on the discharge side of Compressor Station 219 in Mercer, Pennsylvania, traveling east through Pennsylvania, New Jersey, New York, Connecticut, and terminating as a 16-inch-diameter pipeline at Compressor Station 261 in Hampden, Massachusetts.

14 Facility Name Facility Type New / Modified Table Summary of NED Project Facilities Environmental Report 1-4 Associated Pipeline 1 Segment 2 MP 3 Length (miles) 4 Pe nnsylvania Loop Pipeline New N/A Bradford A N/A Loop Pipeline New N/A Bradford B N/A 4.83 Loop Pipeline New N/A Susquehanna B N/A 5.18 Pennsylvania to Wright Pipeline Segment Pipeline New N/A Susquehanna C N/A Station 319 Modification Supply Path Head Station Pennsylvania to Wright Pipeline Segment Pennsylvania to Wright Pipeline Segment Pennsylvania to Wright Pipeline Segment Pennsylvania to Wright Pipeline Segment Pennsylvania to Wright Pipeline Segment Compressor Station Compressor Station Modified Loop Bradford B 0.00 N/A New Pennsylvania to Wright Pipeline Segment New York Susquehanna C N/A Pennsylvania Subtotal Pipeline New N/A Broome D N/A Pipeline New N/A Chenango D N/A 2.45 Pipeline New N/A Delaware D N/A Pipeline New N/A Delaware E N/A Pipeline New N/A Schoharie E N/A 30.90

15 1-5 Facility Name Wright to Dracut Pipeline Segment Wright to Dracut Pipeline Segment Wright to Dracut Pipeline Segment Supply Path Mid Station Supply Path Tail Station Market Path Head Station IGT-Constitution Bi-Directional Meter NED Check NED/200 Line Bi- Directional OPP & Check Market Path Mid Station 1 Wright to Dracut Pipeline Segment Facility Type New / Modified Table Summary of NED Project Facilities Associated Pipeline 1 Segment 2 MP 3 Length (miles) 4 Pipeline New N/A Schoharie F N/A 3.89 Pipeline New N/A Albany F N/A Pipeline New N/A Rensselaer F N/A Compressor Station Compressor Station Compressor Station Meter Station Meter Station Meter Station Compressor Station New New New New New New New Pennsylvania to Wright Pipeline Segment Pennsylvania to Wright Pipeline Segment Wright to Dracut Pipeline Segment Wright to Dracut Pipeline Segment Wright to Dracut Pipeline Segment Wright to Dracut Pipeline Segment Wright to Dracut Pipeline Segment Massachusetts Delaware D N/A Schoharie E N/A Schoharie F 0.00 N/A Schoharie F 0.03 N/A Schoharie F 0.12 N/A Schoharie F 0.14 N/A Rensselaer F N/A New York Subtotal Pipeline New N/A Berkshire G N/A 21.43

16 Facility Name Wright to Dracut Pipeline Segment Wright to Dracut Pipeline Segment Wright to Dracut Pipeline Segment Wright to Dracut Pipeline Segment Facility Type New / Modified Table Summary of NED Project Facilities Environmental Report 1-6 Associated Pipeline 1 Segment 2 MP 3 Length (miles) 4 Pipeline New N/A Hampshire G N/A 5.56 Pipeline New N/A Franklin G N/A 5.71 Pipeline New N/A Franklin H N/A Pipeline New N/A Middlesex K N/A 2.82 Maritimes Delivery Line Pipeline New N/A Middlesex L N/A 1.20 Concord Delivery Line Pipeline New N/A Middlesex M N/A 0.51 Lynnfield Lateral Pipeline New N/A Middlesex N N/A Lynnfield Lateral Pipeline New N/A Essex N N/A 4.76 Peabody Lateral Pipeline New N/A Essex O N/A 5.33 Haverhill Lateral Pipeline New N/A Middlesex P N/A 1.67 Haverhill Lateral Pipeline New N/A Essex P N/A 4.00 Fitchburg Lateral Extension Pipeline New N/A Middlesex Q N/A 5.29 Fitchburg Lateral Extension Pipeline New N/A Worcester Q N/A 3.71 North Adams Check Market Path Mid Station 2 West Greenfield Meter Station Compressor Station Meter Station New New New Wright to Dracut Pipeline Segment Wright to Dracut Pipeline Segment Wright to Dracut Pipeline Segment Berkshire G 7.32 N/A Berkshire G N/A Franklin H 9.27 N/A

17 1-7 Facility Name Market Path Mid Station 3 Market Path Tail Station Maritimes Check Check Haverhill Check Fitchburg Lateral Check Longmeadow 5 Everett 5 Facility Type Compressor Station Compressor Station Meter Station Meter Station Meter Station Meter Station Meter Station Meter Station Meter Station North Adams Custody (20103) 5 Meter Station Lawrence (20121) 5 Southbridge (20108) 5 Meter Station Meter Station New / Modified New New Table Summary of NED Project Facilities Associated Pipeline 1 Segment 2 MP 3 Length (miles) 4 Wright to Dracut Pipeline Segment Wright to Dracut Pipeline Segment Franklin H N/A Middlesex K 2.82 N/A New Maritimes Delivery Line Middlesex L 1.20 N/A New Concord Delivery Line Middlesex M 0.06 N/A New Lynnfield Lateral Essex N N/A New Haverhill Lateral Middlesex P 0.10 N/A New Fitchburg Lateral Extension New Existing TGP Line Hampden N/A New Modified Modified Modified Existing TGP Line 270C Existing TGP Line 256A-100 Existing TGP Line 270B- 400 Existing TGP Line 264A-100 Worcester Q N/A Middlesex Berkshire Essex Worcester N/A N/A N/A N/A Proposed Facility Proposed Facility Existing Facility Existing Facility Existing Facility N/A N/A N/A N/A N/A

18 1-8 Facility Name Spencer (20191) 5 Leominster (20111) 5 Lunenberg (20949) 5 Lexington (20192) 5 Burlington (20341) 5 Arlington (20115) 5 Reading (20136) 5 Essex (20323) 5 Wright to Dracut Pipeline Segment Wright to Dracut Pipeline Segment Wright to Dracut Pipeline Segment Facility Type Meter Station Meter Station Meter Station Meter Station Meter Station Meter Station Meter Station Meter Station New / Modified Modified Modified Modified Table Summary of NED Project Facilities Associated Pipeline 1 Segment 2 MP 3 Length (miles) 4 Existing TGP Line 264B- 100 Existing TGP Line 268A-300 Existing TGP Line 268A-100 Worcester Worcester Worcester N/A N/A N/A Modified Existing TGP Line Middlesex N/A Modified Modified Modified Modified Existing TGP Line 270A-100 Existing TGP Line 270A-100 Existing TGP Line 270C- 200 Existing TGP Line 270C- 500 New Hampshire Middlesex Middlesex Middlesex Essex N/A N/A N/A N/A Existing Facility Existing Facility Existing Facility Existing Facility Existing Facility Existing Facility Existing Facility Existing Facility N/A N/A N/A N/A N/A N/A N/A N/A Massachusetts Subtotal Pipeline New N/A Cheshire I N/A Pipeline New N/A Hillsborough I N/A 0.10 Pipeline New N/A Hillsborough J N/A 36.75

19 Facility Name Wright to Dracut Pipeline Segment Facility Type New / Modified Table Summary of NED Project Facilities Environmental Report 1-9 Associated Pipeline 1 Segment 2 MP 3 Length (miles) 4 Pipeline New N/A Rockingham J N/A 4.77 Haverhill Lateral Pipeline New N/A Rockingham P N/A 2.02 Fitchburg Lateral Extension Pipeline New N/A Hillsborough Q N/A Market Path Mid Station 4 West Nashua Compressor Station Meter Station New New Wright to Dracut Pipeline Segment Wright to Dracut Pipeline Segment Connecticut Hillsborough J 5.50 N/A Hillsborough J N/A New Hampshire Subtotal Line CT Loop Pipeline New N/A Hartford S N/A Easton (20853) 5 Meter Station Modified Existing TGP Line Fairfield N/A Existing Facility N/A Connecticut Subtotal Project Total N/A-Not Applicable for proposed pipelines. This column indicates the associated pipeline segment for each aboveground facility (compressor stations and meter stations). Each segment is associated with its own set of mileposts starting at MP N/A- Not Applicable for proposed pipeline facilities. Mileposts are provided for the existing and new compressor stations and the existing and new meter stations located along new proposed pipeline segments only. Mileposts are not provided for meter stations located along TGP s existing system. N/A- Not Applicable for aboveground facilities (compressor stations and meter stations). Pipeline length applies only to the proposed pipeline facilities as reflected on the alignment sheets. Mileposts for these facilities are not provided because these facilities are located along other pipeline segments of Tennessee's existing system that are not proposed to be modified as part of this Project.

20 PROPOSED FACILITIES Purpose and Need Tennessee proposes to construct, install, and operate the Project facilities to meet the growing demand for natural gas transportation capacity in the Northeast and, more specifically, New England. The Project, as described further herein, is a major new pipeline project that consists of: (1) approximately 171 miles of new and co-located pipeline and two pipeline looping segments on Tennessee s existing 300 Line in Pennsylvania, and compression facilities designed to receive gas from Tennessee s 300 Line, Iroquois Gas Transmission System, LP, and/or the Constitution Pipeline Project for deliveries to Tennessee s existing 200 Line system and/or Market Path Component of the NED Project, as defined below, near Wright, New York (may be referred to as the Supply Path Component of the NED Project); and (2) approximately 188 miles of new and co-located pipeline facilities extending from Wright, New York, to an interconnect with the Joint Facilities of Maritimes & Northeast Pipeline System and Portland Natural Gas Transmission System ( PNGTS ) ( Joint Facilities ) at Dracut, Massachusetts and Tennessee s existing 200 Line near Dracut, Massachusetts (may be referred to as the Market Path Component of the NED Project). In addition, the Project includes: (1) the construction of nine new compressor stations, and modifications at an existing compressor station throughout the Project area; (2) construction of 13 new meter stations and modifications to 12 existing meter station throughout the Project area; and (3) approximately 59 miles of market delivery laterals and pipeline looping segments located in Pennsylvania, New York, Massachusetts, New Hampshire, and Connecticut. Upon completion, the Project will provide up to 1.3 Bcf/d of additional natural gas transportation capacity to meet the growing energy needs in the Northeast U.S., particularly in New England. This includes needs of local distribution companies ( LDCs ), gas-fired power generators, electric distribution companies, industrial plants, natural gas producers, and other New England consumers. Tennessee has executed precedent agreements, for approximately 500,000 dekatherms per day ( Dth/d ) of long-term firm transportation capacity on the Market Path Component of the proposed NED Project, with The Berkshire Gas Company, Columbia Gas of Massachusetts, Connecticut Natural Gas Corporation, Liberty Utilities Corporation (EnergyNorth Natural Gas Incorporated), National Grid, Southern Connecticut Gas Corporation, City of Westfield Gas and Electric Light Department, and other shippers that will be identified in the certificate application for the Project, which demonstrates the market need for the Project capacity. Negotiations continue with additional Project Shippers for both the Supply Path and Market Path Components of the Project. This Project and its in-service date of November 2018 (with the exception of the proposed pipeline looping segment in Connecticut, to be placed in-service by November 2019) are supported by the precedent agreements entered into by the Project Shippers. Multiple studies have concluded that additional pipeline infrastructure is needed in the region to serve increasing demand from LDCs and the power sector, as listed in Attachment 1c. As a result of the fact that current natural gas transportation infrastructure is inadequate to meet the growing demand in the New England region, gas prices in New England are the highest in the U.S 3. Limited natural gas transportation infrastructure also has led to extremely high electricity prices in the Northeast U.S., and threatens the 3 See ISO New England, 2013 Wholesale Electricity Prices in New England Rose on Higher Natural Gas Prices: Pipeline Constraints and Higher Demand Pushed Up Prices for Both Natural Gas and Power at 1 (March 18, 2014), available at

21 1-11 reliability of the region s electric grid. 4 National Grid received approval to increase its customers electric rates by an average of 37 percent for winter due to continued constraints on the natural gas pipelines serving the region, which decrease natural gas availability at times of peak demand, causing some generators to buy gas on the spot market at higher prices, switch over to alternate fuels, or not run at all. 5 A January 21, 2015 presentation by Gordon van Welie, President and Chief Executive Officer of ISO-New England, discussed that the New England region is challenged by a lack of natural gas pipeline infrastructure, and is losing non-gas power plants, resulting in serious threats to power system reliability. The presentation further noted that electricity prices are on an upward trajectory until the needed energy infrastructure is added. 6 Additional natural gas infrastructure may benefit the region in the form of lower energy costs and enhanced reliability to both the gas transmission system and the power grid, while also reducing the region s reliance on coal and oil-fired power plants with the added benefit of reducing greenhouse gas ( GHG ) emissions. A recent study by the Interstate Natural Gas Association of America ( INGAA ) Foundation and ICF International predicted that 6.0 Bcf/d of new natural gas pipeline capacity will be needed in the Northeast U.S. by 2020, and 10.1 Bcf/d of capacity will be needed by Another recent study by the Competitive Energy Services ( CES ) estimated that to provide the ISO-NE with natural gas to meet the needs of electric generators in the winter at competitive prices, New England needs an additional 2.4 Bcf/d of pipeline capacity, resulting in an annual economic value of $2.988 billion per year to the region s electricity consumers alone 8. The New England region as a whole will benefit from the Project, as it will enable New England to sustain its electric grid and lower energy costs to compete on a more level economic playing field with other regions of the Nation with access to low-cost gas. As part of Tennessee s fully integrated natural gas pipeline transportation system, the Project will provide incremental access to diverse and economic supplies of natural gas to customers in the New England region. As demand for natural gas in New England increases, Tennessee s LDC Project Shippers have expressed the need for additional firm transportation capacity to serve their growing residential, commercial, industrial, and power generation markets Id. at 2. See also Massachusetts Office of The Attorney General, Overview of Electricity & Natural Gas Rates, available at National Grid, National Grid Files for Winter Rates in Massachusetts (September 24, 2014), available at Massachusetts DPU Docket No , National Grid petition approved on 11/7/14. van Welie, Gordon State of the Grid: Managing a System in Transition. ISO-New England Inc., ISO on Background Informational Briefing, January 21, 2015, available at The Interstate Natural Gas Association of America INGAA Foundation, North American Midstream Infrastructure through 2035: Capitalizing on Our Energy Abundance (March 18, 2014). Available at Silkman, Richard and Mark Isaacson Assessing Natural Gas Supply Options for New England and their Impacts on Natural Gas and Electricity Prices (February 12, 2014). Prepared for the Industrial Energy Consumer Group. Available at:

22 Environmental Report 1-12 Construction of the Project will help alleviate the natural gas pipeline capacity constraints in New England by increasing capacity in high-demand markets in New England. The Project will serve the emergent need for significant natural gas transportation capacity into New England by delivering sufficient incremental supplies that will, based upon basic market forces of supply and demand, put considerable downward pressure on energy commodity prices, which currently are among the highest in the U.S. The expanded natural gas pipeline transportation infrastructure will ensure greater reliability and fuel certainty in the electric generation sector. The proposed interconnection with the Joint Facilities, together with the anticipated reversal of the primary flow direction of the Joint Facilities and Maritimes & Northeast Pipeline, will potentially enable the Project to access more markets in the region, including those in New Hampshire and Maine, the Atlantic Canada region, as well as markets on Algonquin Gas Transmission s ( AGT ) pipeline system through its HubLine Pipeline. Additionally, the Project significantly increases capacity via a backhaul on Tennessee s existing 200 Line system and will increase deliverability at an important supply feed to the AGT pipeline system via an existing Tennessee-AGT interconnect at Mendon, Massachusetts. Backhaul refers to transporting gas in the opposite direction from historical operation. The existing Tennessee system generally flows from west to east in New England. Bringing gas into the eastern end of the existing system via the Project will allow Tennessee to use the existing pipes to instead transport gas from east to west first via displacement, and then if volumes become large enough via physical east to west flow. A significant portion of the Market Path Component facilities are proposed to be co-located with existing utility corridors (i.e., generally located parallel and adjacent to, and, in certain cases, overlaps existing utility easements (pipeline or powerline) rather than with Tennessee s existing ROW through the Commonwealth of Massachusetts. Tennessee s existing system is located in densely populated and developed parts of Connecticut and Massachusetts. When Tennessee evaluated the market need in New England, and the scope of facilities that would be required to provide the infrastructure that New England needs to reduce its high energy costs and enhance electric reliability, Tennessee conducted extensive evaluation of options to: (1) construct the pipeline along its existing 200 Line pipeline corridor in southern Massachusetts; (2) construct a new pipeline along a route across northern Massachusetts, utilizing existing utility corridors where feasible; or (3) construct a new pipeline along a route across eastern New York, western Massachusetts and southern New Hampshire, utilizing existing utility corridors where feasible. An evaluation of the alternatives that Tennessee has and continues to consider and evaluate are set forth in 0 of this ER. Based on an evaluation that includes environmental and landowner impacts, quickest time-to-market gas delivery, constructability, and other factors, Tennessee has selected the New York, Massachusetts, and New Hampshire route which predominantly follows the existing utility corridors for the Market Path Component of the Project. The Project will provide the transformative solution that New England needs to reduce energy costs, enhance electric reliability, and stimulate economic growth in the New England region. It will provide New England with direct access to low-cost gas supplies on the large scale necessary to significantly lower energy costs to the region s homes and businesses. Tennessee s proposed route for the Project will disturb significantly fewer stakeholders and result in lower costs to consumers than it would have if Tennessee were to expand only along its existing 200 Line system corridor. Additionally, the New York, Massachusetts, and New Hampshire route, which predominantly follows existing utility corridors for its Project, will provide economic service to several geographic areas in northern Massachusetts and southern New Hampshire that are not currently served by an interstate pipeline. In summary, the purpose of the Project, to create new natural gas transportation capacity to meet the growing demand for natural gas transportation capacity in the Northeast U.S., particularly New England,

23 1-13 is clear. The new capacity created by the Project will help reduce natural gas costs for homes and businesses in the region, lower electricity prices, increase the reliability of the electric grid, and stimulate economic growth. The Project will also have ancillary environmental benefits by reducing the region s reliance on GHG-emitting coal and oil-fired power plants. The Public Convenience and Necessity section of the certificate application for the Project will include further discussion of the purpose and need for the Project. The certificate application for the Project, including a final version of this, is anticipated to be submitted to the Commission in October Location and Description of Facilities The proposed Project includes two main components: (1) the Supply Path Component of the Project which is comprised of the proposed Project facilities from Troy, Pennsylvania, to Wright, New York; and (2) the Market Path Component of the Project, which is comprised of the proposed Project facilities from Wright, New York, to Dracut, Massachusetts. A summary of the proposed facilities for the Project is provided in Table Additionally, a summary of the individual pipeline facilities and milepost ( MP ) designations within each township or town, county, and state for each pipeline facility is provided in Table The Project facilities are described geographically in a general west-to-east direction and by category. Milepost notations are used throughout this filing to identify resources and facilities along the proposed routes for the pipeline looping segments, co-located pipeline segments, and new pipeline segments and are included on the aerial alignment sheets included as Volume II, Appendix F. For design and reference purposes, the Project facilities have been broken into Segments A through S. Each Segment A through S is associated with its own set of MPs beginning at Mileposts begin at 0.00 at the start of each segment break. Therefore, geographical locations of facilities or environmental features reference both a segment letter and a MP. The Project facilities and geographic locations are summarized in Table Attachment 1a, Figure provides an overview map of the proposed Project facilities, including the approximate locations of the proposed compressor stations identified in Table U.S. Geologica l Survey ( USGS ) topographic quad excerpt mapping of the proposed pipeline facilities (pipeline looping segments, co-located pipeline segments, and new pipeline segments) and specific locations for the aboveground and appurtenant facilities (new and modified compressor stations, new and modified meter stations, MLVs, and pig launcher/receivers) are included in Volume II, Appendix E. Tennessee is also submitting detailed aerial alignment sheets (Volume II, Appendix F) for the properties along the proposed route for the NED Project, with the proposed pipeline facilities and all major existing and proposed aboveground facilities superimposed over the images, in conformance with 18 Code of Federal Regulations ( CFR ), Section (c)(3) of the Commission s regulations. 9 Where applicable, aerial alignment sheets include two sources of aerial imagery: publicly-available aerial imagery and a 1,600-ft aerial corridor was flown along the proposed pipeline route as the alignment was routed at the time of the flight in May Since the flight, there have been route deviations and therefore, not all alignment sheets have imagery from the May 2014 flight. Tennessee initiated flights of the entirety of the currently proposed pipeline route in March This new aerial imagery will be included in the alignment sheet mapping to be included in the final ER.

24 1-14 Table Proposed Pipeline Facilities for the Project Pipeline Name Diameter Milepost Township/Town Segment 1 Length (inches) Begin End (miles) Pennsylvania Loop Bradford Troy A Loop Bradford Granville A Loop Bradford West Burlington A Loop Bradford Burlington A Loop Bradford Towanda A Loop Bradford Monroe A Loop Bradford Asylum A Loop Bradford Wyalusing A Loop Bradford Wyalusing B Loop Bradford Tuscarora B Loop Susquehanna Auburn B Pennsylvania to Wright Pipeline Segment 30 Susquehanna Auburn C Pennsylvania to Wright Pipeline Segment 30 Susquehanna Dimock C Pennsylvania to Wright Pipeline Segment 30 Susquehanna Bridgewater C Pennsylvania to Wright Pipeline Segment 30 Susquehanna Brooklyn C Pennsylvania to Wright Pipeline Segment 30 Susquehanna Harford C Pennsylvania to Wright Pipeline Segment 30 Susquehanna New Milford C Pennsylvania to Wright Pipeline Segment 30 Susquehanna Jackson C Pennsylvania to Wright Pipeline Segment 30 Susquehanna Oakland C Pennsylvania to Wright Pipeline Segment 30 Susquehanna Harmony C Pennsylvania Subtotal 76.01

25 1-15 Table Proposed Pipeline Facilities for the Project Pipeline Name Diameter Milepost Township/Town Segment 1 Length (inches) Begin End (miles) New York Pennsylvania to Wright Pipeline Segment 30 Broome Sanford D Pennsylvania to Wright Pipeline Segment 30 Chenango Afton D Pennsylvania to Wright Pipeline Segment 30 Delaware Masonville D Pennsylvania to Wright Pipeline Segment 30 Delaware Sidney D Pennsylvania to Wright Pipeline Segment 30 Delaware Franklin D Pennsylvania to Wright Pipeline Segment 30 Delaware Franklin E Pennsylvania to Wright Pipeline Segment 30 Delaware Davenport E Pennsylvania to Wright Pipeline Segment 30 Delaware Harpersfield E Pennsylvania to Wright Pipeline Segment 30 Schoharie Summit E Pennsylvania to Wright Pipeline Segment 30 Schoharie Jefferson E Pennsylvania to Wright Pipeline Segment 30 Schoharie Summit E Pennsylvania to Wright Pipeline Segment 30 Schoharie Jefferson E Pennsylvania to Wright Pipeline Segment 30 Schoharie Summit E Pennsylvania to Wright Pipeline Segment 30 Schoharie Jefferson E Pennsylvania to Wright Pipeline Segment 30 Schoharie Summit E Pennsylvania to Wright Pipeline Segment 30 Schoharie Richmondville E Pennsylvania to Wright Pipeline Segment 30 Schoharie Cobleskill E Pennsylvania to Wright Pipeline Segment 30 Schoharie Middleburgh E Pennsylvania to Wright Pipeline Segment 30 Schoharie Schoharie E Pennsylvania to Wright Pipeline Segment 30 Schoharie Wright E Wright to Dracut Pipeline Segment 30 Schoharie Wright F

26 1-16 Table Proposed Pipeline Facilities for the Project Pipeline Name Diameter Milepost Township/Town Segment 1 Length (inches) Begin End (miles) Wright to Dracut Pipeline Segment 30 Albany Knox F Wright to Dracut Pipeline Segment 30 Albany Berne F Wright to Dracut Pipeline Segment 30 Albany New Scotland F Wright to Dracut Pipeline Segment 30 Albany Bethlehem F Wright to Dracut Pipeline Segment 30 Rensselaer Schodack F Wright to Dracut Pipeline Segment 30 Rensselaer Nassau F Wright to Dracut Pipeline Segment 30 Rensselaer Stephentown F New York Subtotal Massachusetts Wright to Dracut Pipeline Segment 30 Berkshire Hancock G Wright to Dracut Pipeline Segment 30 Berkshire Lanesborough G Wright to Dracut Pipeline Segment 30 Berkshire Cheshire G Wright to Dracut Pipeline Segment 30 Berkshire Dalton G Wright to Dracut Pipeline Segment 30 Berkshire Hinsdale G Wright to Dracut Pipeline Segment 30 Berkshire Peru G Wright to Dracut Pipeline Segment 30 Berkshire Windsor G Wright to Dracut Pipeline Segment 30 Hampshire Plainfield G Wright to Dracut Pipeline Segment 30 Franklin Ashfield G Wright to Dracut Pipeline Segment 30 Franklin Ashfield H Wright to Dracut Pipeline Segment 30 Franklin Conway H Wright to Dracut Pipeline Segment 30 Franklin Shelburne H Wright to Dracut Pipeline Segment 30 Franklin Deerfield H

27 1-17 Table Proposed Pipeline Facilities for the Project Diameter Milepost Pipeline Name Township/Town Segment 1 Length (inches) Begin End (miles) Wright to Dracut Pipeline Segment 30 Franklin Montague H Wright to Dracut Pipeline Segment 30 Franklin Erving H Wright to Dracut Pipeline Segment 30 Franklin Northfield H Wright to Dracut Pipeline Segment 30 Franklin Erving H Wright to Dracut Pipeline Segment 30 Franklin Northfield H Wright to Dracut Pipeline Segment 30 Franklin Warwick H Wright to Dracut Pipeline Segment 30 Middlesex Dracut K Maritimes Delivery Line 30 Middlesex Dracut L Concord Delivery Line 24 Middlesex Dracut M Lynnfield Lateral 24 Middlesex Dracut N Lynnfield Lateral 24 Essex Andover N Lynnfield Lateral 24 Middlesex Tewksbury N Lynnfield Lateral 24 Essex Andover N Lynnfield Lateral 24 Middlesex Tewksbury N Lynnfield Lateral 24 Essex Andover N Lynnfield Lateral 24 Middlesex Tewksbury N Lynnfield Lateral 24 Essex Andover N Lynnfield Lateral 24 Middlesex Tewksbury N Lynnfield Lateral 24 Essex Andover N Lynnfield Lateral 24 Middlesex Wilmington N Lynnfield Lateral 24 Middlesex North Reading N Lynnfield Lateral 24 Middlesex Reading N

28 1-18 Table Proposed Pipeline Facilities for the Project Pipeline Name Diameter Milepost Township/Town Segment 1 Length (inches) Begin End (miles) Lynnfield Lateral 24 Essex Lynnfield N Peabody Lateral 24 Essex Lynnfield O Peabody Lateral 24 Essex Middleton O Peabody Lateral 24 Essex Peabody O Peabody Lateral 24 Essex Danvers O Haverhill Lateral 20 Middlesex Dracut P Haverhill Lateral 20 Essex Methuen P Haverhill Lateral 20 Essex Methuen P Fitchburg Lateral Extension 12 Middlesex Townsend Q Fitchburg Lateral Extension 12 Worcester Lunenburg Q Massachusetts Subtotal New Hampshire Wright to Dracut Pipeline Segment 30 Cheshire Winchester I Wright to Dracut Pipeline Segment 30 Cheshire Richmond I Wright to Dracut Pipeline Segment 30 Cheshire Troy I Wright to Dracut Pipeline Segment 30 Cheshire Fitzwilliam I Wright to Dracut Pipeline Segment 30 Cheshire Troy I Wright to Dracut Pipeline Segment 30 Cheshire Fitzwilliam I Wright to Dracut Pipeline Segment 30 Cheshire Troy I Wright to Dracut Pipeline Segment 30 Cheshire Fitzwilliam I Wright to Dracut Pipeline Segment 30 Cheshire Rindge I Wright to Dracut Pipeline Segment 30 Hillsborough New Ipswich I

29 1-19 Table Proposed Pipeline Facilities for the Project Diameter Milepost Pipeline Name Township/Town Segment 1 Length (inches) Begin End (miles) Wright to Dracut Pipeline Segment 30 Hillsborough New Ipswich J Wright to Dracut Pipeline Segment 30 Hillsborough Greenville J Wright to Dracut Pipeline Segment 30 Hillsborough Mason J Wright to Dracut Pipeline Segment 30 Hillsborough Milford J Wright to Dracut Pipeline Segment 30 Hillsborough Brookline J Wright to Dracut Pipeline Segment 30 Hillsborough Milford J Wright to Dracut Pipeline Segment 30 Hillsborough Amherst J Wright to Dracut Pipeline Segment 30 Hillsborough Merrimack J Wright to Dracut Pipeline Segment 30 Hillsborough Litchfield J Wright to Dracut Pipeline Segment 30 Rockingham Londonderry J Wright to Dracut Pipeline Segment 30 Hillsborough Hudson J Wright to Dracut Pipeline Segment 30 Rockingham Windham J Wright to Dracut Pipeline Segment 30 Hillsborough Pelham J Haverhill Lateral 20 Rockingham Salem P Fitchburg Lateral Extension 12 Hillsborough Mason Q New Hampshire Subtotal Connecticut 300 Line CT Loop 24 Hartford Farmington S Line CT Loop 24 Hartford West Hartford S Line CT Loop 24 Hartford Farmington S Line CT Loop 24 Hartford West Hartford S Line CT Loop 24 Hartford Farmington S

30 1-20 Table Proposed Pipeline Facilities for the Project Pipeline Name Diameter Milepost Township/Town Segment 1 Length (inches) Begin End (miles) 300 Line CT Loop 24 Hartford West Hartford S Line CT Loop 24 Hartford Bloomfield S Line CT Loop 24 Hartford Windsor S Line CT Loop 24 Hartford East Granby S Connecticut Subtotal Project Total Each segment is associated with its own set of MPs beginning at MP 0.00.

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of 7-24-15)

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of 7-24-15) PIPELINE SYSTEMS (as of 7-24-15) The Northeast Gas Association (NGA) has prepared this summary based on publicly-available information. NGA will strive to keep the information as updated as possible and

More information

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of 9-25-14)

PLANNED ENHANCEMENTS, NORTHEAST NATURAL GAS PIPELINE SYSTEMS (as of 9-25-14) PIPELINE SYSTEMS (as of 9-25-14) The Northeast Gas Association (NGA) has prepared this summary based on publicly-available information. NGA will strive to keep the information as updated as possible and

More information

Regional Gas Market Update

Regional Gas Market Update April 22, 2015 Milford, MA Regional Gas Market Update Presentation to: ISO-NE Planning Advisory Committee Tom Kiley Northeast Gas Association Objective NGA S ANTITRUST COMPLIANCE PROCEDURES Adopted by

More information

Northeast Energy Direct Project. A Transformative Energy Solution for New England

Northeast Energy Direct Project. A Transformative Energy Solution for New England Northeast Energy Direct Project A Transformative Energy Solution for New England Sital Mody Vice President, Marketing and Business Development NESCOE December 8 th, 2014 1 Forward-Looking/Non-GAAP Financial

More information

Tennessee Gas Pipeline Co, L.L.C. Northeast Energy Direct Project. New York

Tennessee Gas Pipeline Co, L.L.C. Northeast Energy Direct Project. New York Tennessee Gas Pipeline Co, L.L.C. Northeast Energy Direct Project New York Kinder Morgan Assets 2 U.S. Shale Plays Tennessee Gas Pipeline System Overview 13,900 miles of pipeline 79 Bcf of storage capacity

More information

Northeast Energy Direct (NED) Project Frequently Asked Questions

Northeast Energy Direct (NED) Project Frequently Asked Questions Northeast Energy Direct (NED) Project Frequently Asked Questions The Need for the Pipeline Why do we need a new pipeline? Tennessee Gas Pipeline Company, L.L.C. (Tennessee), a Kinder Morgan company, has

More information

NEW HAMPSHIRE PIPELINE INSTALLATION

NEW HAMPSHIRE PIPELINE INSTALLATION NORTHEAST ENERGY DIRECT NEW HAMPSHIRE PIPELINE INSTALLATION Benefits to New Hampshire January 2015 Overview of Proposed New Hampshire Facilities The proposed Northeast Energy Direct Pipeline (NED) routed

More information

S Y S T E M M O D E R N I Z A T I O N

S Y S T E M M O D E R N I Z A T I O N S Y S T E M M O D E R N I Z A T I O N T H E L I N E M B E X T E N S I O N P R O J E C T B A L T I M O R E A N D H A R F O R D C O U N T I E S, M A R Y L A N D Project Overview Columbia Gas Transmission

More information

Frequently Asked Transmission Pipeline Questions

Frequently Asked Transmission Pipeline Questions Frequently Asked Transmission Pipeline Questions Who is PennEast, LLC? PennEast was formed by the partnership of AGL Resources, NJR Pipeline Company, South Jersey Industries and UGI Energy Services (UGIES).

More information

Tennessee Gas Pipeline Co, L.L.C. Northeast Energy Direct (NED) Project Project Update

Tennessee Gas Pipeline Co, L.L.C. Northeast Energy Direct (NED) Project Project Update Tennessee Gas Pipeline Co, L.L.C. Northeast Energy Direct (NED) Project Project Update Northeast Energy and Commerce Association (NECA) September 18, 2014 Curtis Cole Forward-Looking Statements / Non-GAAP

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION PennEast Pipeline Company, LLC Docket No. PF15-1-000 NOTICE OF INTENT TO PREPARE AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PLANNED PENNEAST

More information

Natural Gas Summit 11/14/12

Natural Gas Summit 11/14/12 Natural Gas Summit 11/14/12 1 Natural Gas Summit 11/14/12 Maureen Ball Joined Central New York Oil and Gas (Inergy) in 1999. Participated in the development and construction of various storage, compression,

More information

Access Northeast Project New England Energy Reliability Solution

Access Northeast Project New England Energy Reliability Solution Access Northeast Project New England Energy Reliability Solution Open Season Notice for Firm Service February 18, 2015 May 1, 2015 Access Northeast Project New England Energy Reliability Solution Eversource

More information

High Prices Show Stresses in New England Natural Gas Delivery System

High Prices Show Stresses in New England Natural Gas Delivery System February 7, 2014 High Prices Show Stresses in New England Natural Gas Delivery System Abstract. Since 2012, limited supply from the Canaport and Everett liquefied natural gas (LNG) terminals coupled with

More information

OVERVIEW ABOUT WBI ENERGY

OVERVIEW ABOUT WBI ENERGY OVERVIEW The proposed Demicks Lake Pipeline Project involves approximately 22 miles of 24-inch diameter natural gas pipeline between a natural gas processing plant proposed by ONEOK Rockies Midstream (ONEOK)

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Elba Liquefaction Company, L.L.C. Southern LNG Company, L.L.C. Elba Express Company, L.L.C. Docket No. PF13-3-000 NOTICE OF INTENT TO PREPARE

More information

Tennessee Gas Pipeline Company, L.L.C. Northeast Energy Direct Project. Docket No. CP16- -000. Exhibit Z-4

Tennessee Gas Pipeline Company, L.L.C. Northeast Energy Direct Project. Docket No. CP16- -000. Exhibit Z-4 Tennessee Gas Pipeline Company, L.L.C. Northeast Energy Direct Project Docket No. CP16- -000 Exhibit Z-4 This page intentionally left blank Northeast Energy Direct Project Exhibit Z-4 EXHIBIT Z-4 List

More information

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

TENNESSEE GAS PIPELINE COMPANY, L.L.C. TENNESSEE GAS PIPELINE COMPANY, L.L.C. SILT FENCE DESIGN CRITERIA AND METHODOLOGY FOR THE ACCESS ROADWAYS CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,

More information

Tennessee Gas Pipeline Co, L.L.C. Northeast Energy Direct (NED) Project Project Update

Tennessee Gas Pipeline Co, L.L.C. Northeast Energy Direct (NED) Project Project Update Tennessee Gas Pipeline Co, L.L.C. Northeast Energy Direct (NED) Project Project Update Platts 9 th Annual Pipeline Development and Expansion September 22, 2014 Curtis Cole Forward-Looking Statements /

More information

TENNESSEE GAS PIPELINE COMPANY 300 LINE PROJECT Vernon, West Milford Townships and Ringwood Borough, New Jersey

TENNESSEE GAS PIPELINE COMPANY 300 LINE PROJECT Vernon, West Milford Townships and Ringwood Borough, New Jersey Prepared for: Houston, TX COMPREHENSIVE MITIGATION PLAN HIGHLANDS REGION TENNESSEE GAS PIPELINE COMPANY 300 LINE PROJECT Vernon, West Milford Townships and Ringwood Borough, New Jersey AECOM, Inc. September

More information

154 FERC 61,191 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ISSUING CERTIFICATE. (Issued March 11, 2016)

154 FERC 61,191 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ISSUING CERTIFICATE. (Issued March 11, 2016) 154 FERC 61,191 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable. Tennessee Gas Pipeline

More information

Comanche Trail Pipeline Project. September 2015

Comanche Trail Pipeline Project. September 2015 Comanche Trail Pipeline Project September 2015 2 Comanche Trail Pipeline Project The Comanche Trail Pipeline is a Texas intrastate pipeline (1) designed to transport 1.1 billion cubic feet per day of clean-burning

More information

154 FERC 61,032 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ISSUING CERTIFICATE. (Issued January 21, 2016)

154 FERC 61,032 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ISSUING CERTIFICATE. (Issued January 21, 2016) 154 FERC 61,032 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable. Texas Gas Transmission,

More information

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

TENNESSEE GAS PIPELINE COMPANY, L.L.C. TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,

More information

BLANKET CERTIFICATE PROGRAM NOTICE TO LANDOWNERS

BLANKET CERTIFICATE PROGRAM NOTICE TO LANDOWNERS BLANKET CERTIFICATE PROGRAM NOTICE TO LANDOWNERS FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA June 2007 (updated May 5, 2010) The Role of the Federal Energy Regulatory Commission The Federal

More information

TEAM 2014 Project Texas Eastern Transmission, LP

TEAM 2014 Project Texas Eastern Transmission, LP TEAM 2014 Project Texas Eastern Transmission, LP FERC Section 7(b) and 7(c) Application and Public Exhibits, Except F-1 FERC Docket No. CP13- -000 Volume I PUBLIC February 2013 5400 Westheimer Court Houston,

More information

What Do I Need to Know?

What Do I Need to Know? An Interstate Natural Gas Facility on My Land? What Do I Need to Know? Prepared by the Federal Energy Regulatory Commission Federal Energy Regulatory Commission Washington, DC www.ferc.gov An Interstate

More information

APPENDIX K NATURAL GAS PIPELINE STORAGE PERMITTING PROCESSES

APPENDIX K NATURAL GAS PIPELINE STORAGE PERMITTING PROCESSES APPENDIX K NATURAL GAS PIPELINE & STORAGE PERMITTING PROCESSES Natural Gas Pipeline & Storage Permitting Processes NiSource follows the Federal Energy Regulatory Commission (FERC) planning and permitting

More information

Frequently Asked Questions About PennEast Pipeline Project

Frequently Asked Questions About PennEast Pipeline Project Frequently Asked Questions About PennEast Pipeline Project Who is PennEast Pipeline Company, LLC? AGL Resources, NJR Pipeline Company, South Jersey Industries, PSEG Power LLC and UGI Energy Services (UGIES)

More information

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements

More information

Regional Market Update

Regional Market Update March 20, 2015 Groton, CT Regional Market Update Presentation to: NGA Sales & Marketing Conference Tom Kiley Northeast Gas Association Continued on NGA web site http://www.northeastgas.org/about-nga/antitrust-guidelines

More information

Minnesota Public Utilities Commission Staff Briefing Papers

Minnesota Public Utilities Commission Staff Briefing Papers Minnesota Public Utilities Commission Staff Briefing Papers Meeting Date: April 17, 2014...Agenda Item *3 Company: Docket No. Minnesota Power E015/GP-13-978 In the Matter of the Application of Minnesota

More information

Franklin Regional Council of Governments Northeast Energy Direct Project Questions & Answers

Franklin Regional Council of Governments Northeast Energy Direct Project Questions & Answers Franklin Regional Council of Governments Northeast Energy Direct Project Questions & Answers Permitting and the Proposed Route 1.) Will the proposed pipeline project be subject to the Massachusetts Environmental

More information

People Are Asking Us About the Rover Pipeline Project

People Are Asking Us About the Rover Pipeline Project People Are Asking Us About the Rover Pipeline Project Thank you for your interest in the Rover Pipeline Project. We are committed to addressing questions from the community, landowners and other interested

More information

Lake Charles Expansion Project

Lake Charles Expansion Project Lake Charles Expansion Project Resource Report 11 Reliability and Safety Docket No. CP14- - Public Kinder Morgan Louisiana Pipeline LLC 1001 Louisiana Street, Suite 1000 Houston, Texas 77002 June 2014

More information

MILLENNIUM PIPELINE NEW YORK S ENERGY BACKBONE Existing Benefits and Expansion Opportunities

MILLENNIUM PIPELINE NEW YORK S ENERGY BACKBONE Existing Benefits and Expansion Opportunities MILLENNIUM PIPELINE NEW YORK S ENERGY BACKBONE Existing Benefits and Expansion Opportunities New York is the fourth largest natural gas consuming state in the nation... Overview New York State is highly

More information

Building Interstate Natural Gas Transmission Pipelines: A Primer

Building Interstate Natural Gas Transmission Pipelines: A Primer Building Interstate Natural Gas Transmission Pipelines: A Primer INGAA FOUNDATION REPORT 2013.01 January 2013 The INGAA Foundation Inc. 20 F Street NW Suite 450 Washington, DC 20001 INGAA Foundation Ad-Hoc

More information

146 FERC 61,195 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

146 FERC 61,195 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 146 FERC 61,195 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Cheryl A. LaFleur, Acting Chairman; Philip D. Moeller, John R. Norris, and Tony Clark. Houston Pipe Line

More information

Tennessee Gas Pipeline Co, LLC

Tennessee Gas Pipeline Co, LLC Co, LLC Northeast Gas Association Regional Market Trends Forum April 30, 2013 Preston Troutman Director, Business Development Kinder Morgan: Unparalleled Asset Footprint 3 rd largest energy company North

More information

OSU Extension FACT SHEET

OSU Extension FACT SHEET OHIO STATE UNIVERSITY EXTENSION! OSU Extension FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Shale Oil and Gas Development Fact Sheet Series A Landowner s Guide to Understanding

More information

Discussion Paper. New England migration trends by David Agrawal. New England Public Policy Center Discussion Paper 06-1 October 2006

Discussion Paper. New England migration trends by David Agrawal. New England Public Policy Center Discussion Paper 06-1 October 2006 New England Public Policy Center Discussion Paper 06-1 October 2006 Discussion Paper New England migration trends by David Agrawal Revised October 30, 2006 federal reserve bank of boston TM New England

More information

Sabal Trail Transmission, LLC

Sabal Trail Transmission, LLC FGU 2014 ANNUAL MEETING JUNE 25, 2014 Sabal Trail Transmission, LLC Connecting diverse natural gas supplies to southeast markets Josh Browning Changing Natural Gas Flows Value of capacity increases with

More information

Williams is in the preliminary

Williams is in the preliminary Hillabee Expansion Project www.williams.com/hillabee Winter 2013 2014 Public Feedback Sought for Proposed Williams Pipeline Expansion Williams is in the preliminary stages of developing a multiphased pipeline

More information

Slides prepared by the Northeast Gas Association

Slides prepared by the Northeast Gas Association Natural gas represents 27% of total energy consumption in the U.S. There are 70 million natural gas customers in the country. Gas is the leading home fuel in the country, and also is a leading fuel of

More information

Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations with Companies Seeking Easements

Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations with Companies Seeking Easements Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations As a property owner, you should make a decision about granting an easement based on the same level of information available

More information

GUIDANCE MANUAL FOR ENVIRONMENTAL REPORT PREPARATION

GUIDANCE MANUAL FOR ENVIRONMENTAL REPORT PREPARATION FEDERAL ENERGY REGULATORY COMMISSION Office of Energy Projects GUIDANCE MANUAL FOR ENVIRONMENTAL REPORT PREPARATION AUGUST 2002 GUIDANCE MANUAL FOR ENVIRONMENTAL REPORT PREPARATION TABLE OF CONTENTS PAGE

More information

Millennium Pipeline Company, LLC Response to New York State Energy Highway RFI

Millennium Pipeline Company, LLC Response to New York State Energy Highway RFI Millennium Pipeline Company, LLC Response to New York State Energy Highway RFI www.millenniumpipeline.com One Blue Hill Plaza, 7th Floor Post Office Box 1565 Pearl River, N Y 10965 845.620.1300 Voice 845.620.1320

More information

THE COMMONWEALTH OF MASSACHUSETTS OFFICE OF THE ATTORNEY GENERAL ONE ASHBURTON PLACE BOSTON, MASSACHUSETTS 02108

THE COMMONWEALTH OF MASSACHUSETTS OFFICE OF THE ATTORNEY GENERAL ONE ASHBURTON PLACE BOSTON, MASSACHUSETTS 02108 MAURA HEALEY ATTORNEY GENERAL THE COMMONWEALTH OF MASSACHUSETTS OFFICE OF THE ATTORNEY GENERAL ONE ASHBURTON PLACE BOSTON, MASSACHUSETTS 02108 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission

More information

APT Petroleum Pipelines Limited. Queensland Floods

APT Petroleum Pipelines Limited. Queensland Floods APT Petroleum Pipelines Limited Queensland Floods Attachment 8.1 Attachment 8.1 Queensland Floods.doc Contents 1 Flood Impact 2010-2011 1 1.1 December 2010 Floods 1 1.2 January 2011 Floods 1 1.3 Impact

More information

Negotiating Pipeline Easements

Negotiating Pipeline Easements FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Introduction Shale Oil and Gas Development Fact Sheet Series Negotiating Pipeline Easements Peggy Kirk Hall Director, OSU

More information

What Do I Need to Know?

What Do I Need to Know? An Interstate Natural Gas Facility on My Land? What Do I Need to Know? Prepared by the Federal Energy Regulatory Commission Cover Photos: (left to right): Pipe stringing, Lowering the pipe into the trench,

More information

Arlington Storage Company, LLC, Docket No. CP13-83-000 Submission of Implementation Plan and Request for Clearance to Commence Construction

Arlington Storage Company, LLC, Docket No. CP13-83-000 Submission of Implementation Plan and Request for Clearance to Commence Construction August 12, 2014 VIA ELECTRONIC FILING Ms. Kimberly Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re:, Docket No. Submission of Implementation Plan and Request

More information

149 FERC 61,198 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ISSUING CERTIFICATE. (Issued December 2, 2014)

149 FERC 61,198 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ISSUING CERTIFICATE. (Issued December 2, 2014) 149 FERC 61,198 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Cheryl A. LaFleur, Chairman; Philip D. Moeller, Tony Clark, and Norman C. Bay. Texas Eastern Transmission,

More information

Assessing Natural Gas Supply

Assessing Natural Gas Supply Competitive Energy Services, LLC [Insert date] Competitive Energy Services Assessing Natural Gas Supply February 7, 2014 Assessing Natural Gas Supply Options for New England and their Impacts on Natural

More information

Outlook for the North American and Ontario Gas Markets

Outlook for the North American and Ontario Gas Markets Outlook for the North American and Ontario Gas Markets Union Gas Customer Meeting London, Ontario June 5, 2014 Presented by: Frank Brock Senior Energy Market Specialist ICF International Frank.Brock@ICFI.COM

More information

Regulation of Natural Gas Pipelines. June 23, 2008

Regulation of Natural Gas Pipelines. June 23, 2008 Regulation of Natural Gas Pipelines June 23, 2008 Federal and State Regulations Federal: 49 United States Code 60101. et. seq. Title 49 Code of Federal Regulations The Office of Pipeline Safety (OPS),

More information

Natural Gas Pipelines

Natural Gas Pipelines Natural Gas Pipelines Excerpt from Report 2 of the Pennsylvania Energy Impacts Assessment December 16, 2011 Authors: Nels Johnson, Tamara Gagnolet, Rachel Ralls, and Jessica Stevens The Nature Conservancy

More information

Re: Comments on Constitution Pipeline DEIS Application Docket No. CP13-499

Re: Comments on Constitution Pipeline DEIS Application Docket No. CP13-499 JAMES BRYAN BACON, ESQ., P.C. Attorney and Counselor at Law P.O. Box 575 New Paltz, New York 12561 (845) 419-2338 April 7, 2014 Kimberly D. Bose, Secretary Nathaniel J. Davis, Sr., Deputy Secretary Federal

More information

NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION. Vallecitos Water District Rock Springs Sewer Replacement Project

NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION. Vallecitos Water District Rock Springs Sewer Replacement Project NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION Vallecitos Water District Rock Springs Sewer Replacement Project Vallecitos Water District has prepared a Draft Mitigated Negative Declaration

More information

SABAL TRAIL PROJECT. Volume 1-ALL DISTRICTS

SABAL TRAIL PROJECT. Volume 1-ALL DISTRICTS SABAL TRAIL PROJECT United States Army Corps of Engineers Mobile, Savannah, and Jacksonville Districts SAM-2014-00655, SAS-2013-00942, SAJ-2013-03030 Section 404 Clean Water Act and Section 10 Rivers and

More information

Liberty Utilitiec. Samson. Local Plant, Domestic Supply. 4~NORTHSTAR ~i~~~industriesllc ENERGY. ~LH~PJi~C~ La~ Exhibit F~LE

Liberty Utilitiec. Samson. Local Plant, Domestic Supply. 4~NORTHSTAR ~i~~~industriesllc ENERGY. ~LH~PJi~C~ La~ Exhibit F~LE Liberty Utilitiec ENERGY 4~NORTHSTAR ~i~~~industriesllc ~LH~PJi~C~ La~ Exhibit F~LE Local Plant, Domestic Supply NECA Fuel Conference Sept 18, 2014 Who we are Liberty tjtiiiti~ ~ W?\TER~ ~Z?~S ELECtREC

More information

128 FERC 61,198 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER GRANTING ABANDONMENT AUTHORITY AND ISSUING CERTIFICATES

128 FERC 61,198 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER GRANTING ABANDONMENT AUTHORITY AND ISSUING CERTIFICATES 128 FERC 61,198 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Suedeen G. Kelly, Marc Spitzer, and Philip D. Moeller. Southern Natural Gas

More information

SOUTHERN NATURAL GAS COMPANY, L.L.C. PRELIMINARY DRAFT RESOURCE REPORTS 1 AND 10 NORTH MAIN LINE RELOCATION PROJECT

SOUTHERN NATURAL GAS COMPANY, L.L.C. PRELIMINARY DRAFT RESOURCE REPORTS 1 AND 10 NORTH MAIN LINE RELOCATION PROJECT SOUTHERN NATURAL GAS COMPANY, L.L.C. PRELIMINARY DRAFT RESOURCE REPORTS 1 AND 10 NORTH MAIN LINE RELOCATION PROJECT FERC DOCKET NO. PF14-12 VOLUME I PUBLIC Prepared for: Southern Natural Gas Company, L.L.C.

More information

Appendix U. Environmental Compliance Monitoring Plan

Appendix U. Environmental Compliance Monitoring Plan RUBY PIPELINE PROJECT PLAN OF DEVELOPMENT Appendix U. Environmental Compliance Monitoring Plan U-1 June 2010 Environmental Compliance Monitoring Plan Ruby Pipeline Project May 2010 Table of Contents

More information

Assessment of the Adequacy of Natural Gas Pipeline Capacity in the Northeast United States

Assessment of the Adequacy of Natural Gas Pipeline Capacity in the Northeast United States Assessment of the Adequacy of Natural Gas Pipeline in the Northeast United States U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Energy Infrastructure Modeling and Analysis

More information

What Do I Need to Know?

What Do I Need to Know? An Interstate Natural Gas Facility on My Land? What Do I Need to Know? Federal Energy Regulatory Commission Washington, DC www.ferc.gov An Interstate Natural Gas Facility on My Land? What do I Need to

More information

Short Term Energy Outlook Supplement: Constraints in New England likely to affect regional energy prices this winter

Short Term Energy Outlook Supplement: Constraints in New England likely to affect regional energy prices this winter January 18, 2013 Short Term Energy Outlook Supplement: Constraints in New England likely to affect regional energy prices this winter Since November, New England has had the highest average spot natural

More information

The Economic Impact of Dominion Capital Expenditure Projects

The Economic Impact of Dominion Capital Expenditure Projects The Economic Impact of Dominion Capital Expenditure Projects Prepared for Dominion Virginia Power October 22, 2015 1309 E Cary Street, Richmond, VA 23219 1025 Huron Road East, Cleveland, OH 44115 chmuraecon.com

More information

Northern Middlesex Council of Governments

Northern Middlesex Council of Governments Northern Middlesex Council of Governments The Federal Energy Commission (FERC) is the agency charged with evaluating whether the proposed route should be approved Cooperating agencies generally include

More information

Version Part Section Description 0.0.0 II 13.27 Summary of Negotiated Rate Agreement

Version Part Section Description 0.0.0 II 13.27 Summary of Negotiated Rate Agreement Transcontinental Gas Pipe Line Company, LLC 2800 Post Oak Boulevard (77056) P.O. Box 1396 Houston, Texas 77251-1396 (713) 215-2000 Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

DEPARTMENT OF ENVIRONMENTAL QUALITY

DEPARTMENT OF ENVIRONMENTAL QUALITY PROJECT IDENTIFICATION DEPARTMENT OF ENVIRONMENTAL QUALITY City of Burton Sanitary Sewer Collection System Improvements State Revolving Fund (SRF) Environmental Assessment April 2015 Applicant: Authorized

More information

The Pipelines Regulations, 2000

The Pipelines Regulations, 2000 PIPELINES, 2000 P-12.1 REG 1 1 The Pipelines Regulations, 2000 being Chapter P-12.1 Reg 1 (effective April 1, 2000) as amended by the Statutes of Saskatchewan, 2014, c.21. NOTE: This consolidation is not

More information

New ISO-NE Return on Equity Rate Could Impact Future Transmission Decisions

New ISO-NE Return on Equity Rate Could Impact Future Transmission Decisions RESEARCH North America Power and Utilities Energy Efficiency New ISO-NE Return on Equity Rate Could Impact Future Transmission Decisions Continued Transmission Investments Key to Electric Grid Reliability

More information

Final Abandonment Costs For PNGTS Transmission Plant

Final Abandonment Costs For PNGTS Transmission Plant Exhibit No. PNG- Page of UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Portland Natural Gas Transmission System Docket No. RP- Prepared Direct Testimony of James S. Taylor Q.

More information

SECTION 3 SANITARY SEWER DESIGN

SECTION 3 SANITARY SEWER DESIGN SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary

More information

THE LOCAL ROLE IN PERMITTING INTERSTATE NATURAL GAS PIPELINES MASSACHUSETTS ASSOCIATION OF CONSERVATION COMMISSIONS

THE LOCAL ROLE IN PERMITTING INTERSTATE NATURAL GAS PIPELINES MASSACHUSETTS ASSOCIATION OF CONSERVATION COMMISSIONS THE LOCAL ROLE IN PERMITTING INTERSTATE NATURAL GAS PIPELINES PRESENTATION AT CITIZEN PLANNER TRAINING COLLABORATIVE CONFERENC E BY EUGENE B. BENSON, EXECUTIVE DIRECTOR, MACC MARCH 21, 2015 Massachusetts

More information

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm: Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section

More information

145 FERC 61,112 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

145 FERC 61,112 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 145 FERC 61,112 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris, Cheryl A. LaFleur, and Tony Clark. NET

More information

Understanding Natural Gas Pipeline Infrastructure and Impacts DAVE MESSERSMITH MARCELLUS EDUCATION TEAM

Understanding Natural Gas Pipeline Infrastructure and Impacts DAVE MESSERSMITH MARCELLUS EDUCATION TEAM Understanding Natural Gas Pipeline Infrastructure and Impacts DAVE MESSERSMITH MARCELLUS EDUCATION TEAM Pipeline Infrastructure & Impacts Pipeline Background Pipeline Construction Pipeline-Related Infrastructure

More information

FEDERAL GOVERNMENT OVERSIGHT OF PIPELINE SAFETY

FEDERAL GOVERNMENT OVERSIGHT OF PIPELINE SAFETY Operational Safety INTRODUCTION The Millennium Pipeline Company (Millennium) is proud of the key role it plays in New York s energy infrastructure. The Millennium Pipeline is a vital link in a system that

More information

A Look at Western Natural Gas Infrastructure During the Recent El Paso Pipeline Disruption

A Look at Western Natural Gas Infrastructure During the Recent El Paso Pipeline Disruption A Look at Western Natural Gas Infrastructure During the Recent El Paso Pipeline Disruption This analysis examines the impact of the August 2000 El Paso Natural Gas Pipeline system disruption upon the ability

More information

Supply Options for the U.S. Northeast

Supply Options for the U.S. Northeast Supply Options for the U.S. Northeast NECA Annual Conference on Fuels Tim Stringer Manager, Commercial East Agenda 2009 Supply/Demand Outlook TransCanada Key Initiatives Connecting new supply Northern

More information

CHICAGO MARKET EXPANSION PROJECT PHASE 2 NOTICE OF NON-BINDING SOLICITATION OF INTEREST CMEP PHASE 1 UPDATE

CHICAGO MARKET EXPANSION PROJECT PHASE 2 NOTICE OF NON-BINDING SOLICITATION OF INTEREST CMEP PHASE 1 UPDATE CMEP PHASE 1 UPDATE Natural Gas Pipeline Company of America LLC (NGPL) is pleased to announce its acceptance of the FERC Certificate Order issued March 17, 2016 in Docket No. CP15-505-000, as filed June

More information

Energy Ventures Analysis 1901 N. Moore St. Arlington, VA 22209 (703) 276 8900

Energy Ventures Analysis 1901 N. Moore St. Arlington, VA 22209 (703) 276 8900 T H E I M P A C T O F E A R L Y C O A L R E T I R E M E N T S O N K E Y P O W E R M A R K E T S ISO = 46.6% Prepared for: National Mining Association Washington, DC Northwest = 41.3% MISO = 36.8% NYISO

More information

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

To: All Oil and Gas Companies under the Jurisdiction of the National Energy Board (Board) and Interested Persons

To: All Oil and Gas Companies under the Jurisdiction of the National Energy Board (Board) and Interested Persons File OF-Fac-NOMA 01 01 17 July 2015 To: All Oil and Gas Companies under the Jurisdiction of the National Energy Board (Board) and Interested Persons Operations and Maintenance Activities on Pipelines under

More information

Committee on Natural Resources Rob Bishop, Chairman Markup Memorandum

Committee on Natural Resources Rob Bishop, Chairman Markup Memorandum Committee on Natural Resources Rob Bishop, Chairman Markup Memorandum January 29, 2016 To: From: Markup: All Natural Resources Committee Members Majority Committee Staff, Terry Camp Subcommittee on Federal

More information

Pipeline Basics Prince Rupert

Pipeline Basics Prince Rupert Pipeline Basics Prince Rupert Gas Transmission Project What is natural gas? Natural gas is the cleanest burning of the fossil fuels, often found in underground rock formations deep below the earth s surface.

More information

2.0 DESCRIPTION OF THE PROPOSED ACTION

2.0 DESCRIPTION OF THE PROPOSED ACTION 2.0 DESCRIPTION OF THE PROPOSED ACTION 2.1 PROPOSED FACILITIES The Ruby Pipeline Project would involve the construction and operation of a buried natural gas pipeline and related aboveground facilities.

More information

CHAPTER 8 CIVIL DESIGN

CHAPTER 8 CIVIL DESIGN CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical

More information

New Hampshire Satellite 50/8777 77. New Hampshire Cable. Cable Provider

New Hampshire Satellite 50/8777 77. New Hampshire Cable. Cable Provider Satellite 50/8777 77 50/950 New Hampshire New Hampshire HD D2 Classics D3 Acworth 03601 No Alexandria/Bristol 03222 Metrocast Laconia 17 717 x x Allenstown 03275 Comcast Concord 18 811 288 289 Alstead

More information

Part of Your Community Important Safety Information. TransCanada - Bison Pipeline

Part of Your Community Important Safety Information. TransCanada - Bison Pipeline Part of Your Community Important Safety Information TransCanada - Bison Pipeline Public Safety Information Pipeline Safety is Everybody s Business This brochure contains important safety information about

More information

Natural Gas and Electricity Coordination Experiences and Challenges

Natural Gas and Electricity Coordination Experiences and Challenges 1 Natural Gas and Electricity Coordination Experiences and Challenges Challenges Facing the New England Power System Gordon van Welie, President and CEO, ISO New England 2015 IEEE Power & Energy Society

More information

ROVER PIPELINE LLC. Rover Pipeline Project. RESOURCE REPORT 5 Socioeconomics. FERC Docket No. CP15- -000

ROVER PIPELINE LLC. Rover Pipeline Project. RESOURCE REPORT 5 Socioeconomics. FERC Docket No. CP15- -000 ROVER PIPELINE LLC Rover Pipeline Project RESOURCE REPORT 5 Socioeconomics FERC Docket No. CP15- -000 February 2015 Section TABLE OF CONTENTS ROVER PIPELINE PROJECT 5.0 SOCIOECONOMICS... 5-1 5.1 EXISTING

More information

Winter 2013-14 Energy Market Assessment Report to the Commission

Winter 2013-14 Energy Market Assessment Report to the Commission Winter 2013-14 Energy Market Assessment Report to the Commission Docket No. AD06-3-000 October 2013 Disclaimer: The matters presented in this staff report do not necessarily represent the views of the

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ALGONQUIN GAS TRANSMISSION, LLC ) Docket No. CP14-96-000

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ALGONQUIN GAS TRANSMISSION, LLC ) Docket No. CP14-96-000 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ALGONQUIN GAS TRANSMISSION, LLC ) Docket No. CP14-96-000 LOCAL OFFICIALS EMERGENCY MOTION FOR STAY OF CONSTRUCTION OF THE WEST ROXBURY

More information

Massachusetts Low Gas Demand Analysis: Final Report

Massachusetts Low Gas Demand Analysis: Final Report Massachusetts Low Gas Demand Analysis: Final Report RFR-ENE-2015-012 Prepared for the Massachusetts Department of Energy Resources January 7, 2015 AUTHORS Elizabeth A. Stanton, PhD Patrick Knight Joseph

More information

The Natural Gas-Electric Interface: Summary of Four Natural Gas-Electric Interdependency Assessments WIEB Staff November 30, 2012

The Natural Gas-Electric Interface: Summary of Four Natural Gas-Electric Interdependency Assessments WIEB Staff November 30, 2012 Introduction. The Natural Gas-Electric Interface: Summary of Four Natural Gas-Electric Interdependency Assessments WIEB Staff November 30, 2012 The increased reliance on natural gas as the primary fuel

More information

NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION IR 15-124. Report on Investigation into Potential Approaches to. Mitigate Wholesale Electricity Prices

NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION IR 15-124. Report on Investigation into Potential Approaches to. Mitigate Wholesale Electricity Prices NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION IR 15-124 Report on Investigation into Potential Approaches to Mitigate Wholesale Electricity Prices Prepared by: The Staff of the New Hampshire Public Utilities