1 2012 Technology Project Proposal Instructions This document primarily addresses technology project proposals, but also includes important information regarding new and replacement technology equipment requests. There is a resources and forms section at the end of this document that summarizes available resources and submittal requirements related to each type of technology need. Please read these instructions thoroughly and let your BMO Analyst know if you have any questions. Additional documents and resources related to this process are located on DOT under Global Menu/Budget and Finance/Budget Resources. How Technology Related Services are Delivered Information Technology (IT) consolidation began in 2003 and continues today through Shared Services. Technology related services are provided in three primary ways. 1. Problems Break/fix and trouble-shooting services Catastrophic production problems Loss of production data System functioning in severely reduced capacity Loss or interruption of service 2. Work Orders Requests for future product enhancement or modification Reoccurring operational tasks related to an existing system Requests take 80 hours or less to complete Requests are prioritized and included in Technology Services work plan 3. Projects New technology initiatives that require more than 80 hours to complete Proposed projects are considered for funding during the annual budget development process Approved projects are added to the Technology Services Department s work plan Mid-year project proposals will be considered only in the following situations: 1. Proposal is considered an emergency and cannot wait until the following budget development process 2. There is significant cost savings to be gained as a result of funding the project mid-year To obtain any service from the Technology Services Department, contact the Help Desk by ing TSHelp.Desk@denvergov.org or by calling HELP (4357). Help Desk staff will route the service request to the appropriate group within Technology Services. If you are proposing a project that needs funding, however, you will need to submit the proposal during the technology project proposal process, which is part of the annual budget development process. Project proposals for 2012 funding consideration are due to the Budget Submittal inbox by close of business on 4/15/11. IT Governance and the Role of the Project Sponsor There is significant demand for new technology and limited resources available to implement new technology projects. To best meet demands within a strategic City-wide view, a formal IT
2 governance framework was established to support prioritization and decision making processes for technology projects and investments. The Information Technology Investment Council (ITIC) seeks to fund projects with the greatest benefits. Cross-agency collaboration and exploration of common enterprise-wide solutions are highly encouraged. The City s IT Governance framework consists of: Party Technology Services Department Information Technology Investment Council (ITIC) ITIC Support Committee Information Technology Advisory Committees (ITACs) Budget & Management Office Project Sponsor Role Ongoing planning and customer support IT investment decision making body, comprised of representatives appointed by the Mayor's Cabinet Three member group (Technology Services project Management Office Director, Manager of Business Process Analysis, and the BMO Analyst for Technology Services) responsible for supporting the ITIC Staff members from various departments that provide subject matter expertise for various technology and service area domains Financial management, analytical support, and business process analysis Executive level individual responsible for managing the core service area and business process to be impacted by the proposed project; the sponsor promotes a given project from initial project proposal through project closeout and benefits realization The role of the project sponsor is critical. The project sponsor is involved in the project every step of the way. This includes: Proposing the project Developing the business case for the proposed project Determining measurable success criteria of the project Being engaged during the implementation and delivery of the project Measuring project results Reporting on those results Below is a summary of the Project Lifecycle. The project sponsor is expected to be involved throughout the lifecycle. Project Selection (ITIC & Project Sponsor) Project Delivery (Project Sponsor & TS PMO) Ongoing Operations & Project Evalution (ITIC & Project Sponsor) ITIC Selection Process Initiating Planning Executing Monitoring & Controlling Closing Ongoing/Periodic Post-Implementation Reviews (Possibly First 6 &/or 12 Months post-delivery) Large Technology needs/changes that require ITIC Funding 2
3 What is a Technology Project? A technology project is any initiative designed to deliver a new service, a new functionality, or a significant enhancement to existing capabilities, regardless of potential funding source. The determination of what constitutes the scope and priorities of a project may vary depending on available funding and resources, business requirements, and direction from City leadership. Additionally, the project discovery process, which includes understanding of the scope, impact, and priority of the proposed project, will be impacted by projects already in progress at the time. Examples of technology projects include, but are not limited to: Acquisition of new application or implementation of new technology Development of major enhancement to existing application or technology Effort requiring one or more of the following: - Significant number of hours for staff to complete - Significant overall cost - High visibility or service delivery impact at the organizational level - High degree of complexity or risk - Multiple agency coordination - Significant business process consideration - Major production support or maintenance effort Projects require an executive level sponsor (department/agency director or manager) from the proposing agency, business case development, and measurable success criteria. Projects are approved through the annual budget development and ITIC processes. Approved projects will be assigned a Project Manager from Technology Services and added to the Technology Services work plan. Project sponsors are required to provide the status reports during project implementation and to report on project results post project implementation. How to Propose a Technology Project To propose a technology project, submit a Project Proposal Form (available on the 2011 Budget Process page on DOT), with as much detail as possible. Incomplete proposals may not be fully considered for funding. 1. Projects will be evaluated and prioritized along with all other project proposals 2. Business cases for high priority projects will be presented to the ITIC for funding considerations and decisions 3. Projects approved for implementation will be integrated into the Six-Year Technology Investment Plan and Technology Services work plan Most technology project funding decisions will be made to coincide with the annual budget process. However, special consideration will be given to emergency or other mid-year proposals to take advantage of cost savings opportunities. Technology projects tend to be complex in nature and require extensive scoping, costing, and vetting efforts. Many projects require ongoing resources beyond implementation, so it is important to understand both implementation and ongoing resource needs prior to funding a project. Also, some project proposals may benefit from business analysis. Frequently, projects are not funded for the same year they are proposed, due to the amount of groundwork that needs to be laid to ensure project success. When determining whether or not to submit a technology project proposal, consider the proposal in light of the three existing technology programs below, which will establish a pipeline of projects to bring agencies on-line with these capabilities. 3
4 1. Consolidated Document Management centralized document management repository and collaboration capabilities 2. Foundational Technologies (Business Intelligence and Identity Management) reporting, data warehousing, and information search and retrieval capabilities 3. Customer Experience website capabilities designed to enhance customer interaction through the City s website Project proposals related to the three programs above will be considered pipeline projects, to be prioritized and implemented within a broader technology program, rather than approved as a stand alone project. How Technology Project Proposals are Evaluated and Prioritized Once submitted, project proposals are categorized, scored, and ranked. It is important to complete all sections of the Project Proposal Form. Incomplete proposals may not be well understood or score well. Proposals are initially grouped into the following categories: 1. Not complete needs more information 2. Good request would benefit from business analysis 3. Good request ready for more detailed scoring process 4. Project is mandated by Council Ordinance, Executive Order, State or Federal governments, etc. Proposals that fall into the third and fourth categories above will be scored and ranked according to the following criteria: 1. Strategic Fit - degree to which an agency is matching resources and capabilities with opportunities to improve service delivery to customers; fit within City-wide strategic framework and ITIC funding strategy 2. Cost/Benefit evaluation of the desirability of a given project proposal based upon quantifiable service delivery improvements and any known cost reduction and revenue enhancement details; strength of the business case 3. Sponsorship - executive sponsor (department/agency director or manager) support 4. Readiness - groundwork laid for project implementation; resources available for project implementation 5. Risk Assessment degree to which project proposal is well understood; risks associated with the project and how risks might be addressed Projects are scored and ranked by the ITIC Support Committee. Scores and rankings are presented to the ITIC and ITIC members determine which projects move forward for scoping and cost estimating. Sponsors of those projects that move forward are required to build and present business cases to the ITIC. Following these business case presentations, ITIC members make funding decisions. Funding decisions are made in light of existing project workloads (see Six-Year Technology Plan for listing of current projects), financial resources available to fund new projects, and capacity available within Technology Services to staff projects. A mixture of internal Technology Services staff and external contractors is used to manage and implement approved projects. Project proposals should detail resources needed for project completion, whether internal or external. 4
5 It is hoped that funding decisions will be made between late summer and early fall. However, time requirements of the scoping and cost estimating processes and informational needs of the ITIC may delay this timeline. Project proposal dispositions and results will be communicated to project sponsors at major steps throughout the process. Please see the 2011 ITIC Process Flowchart and the 2011 Technology Project Evaluation and Scoring Criteria for additional information. Post-Implementation Reviews The City invests millions of dollars in technology each year. So, it is important to track the benefits realized from technology investments. One of the key duties of the project sponsor is to report on project results. The purpose of post-implementation reviews is to: 1. Determine whether the project delivered the intended value/impact 2. Utilize metrics to drive ongoing process improvements and make informed decisions 3. Ensure project sponsor accountability to project success 4. Provide lessons learned for future funding decisions and project delivery improvements In order for a post-implementation review to be successful, measureable success criteria must be identified and baseline data gathered prior to project implementation. Six-Year Technology Plan Due to the high implementation costs, effort required to build solid work plans, and ongoing maintenance and support requirements of technology projects it is necessary to have a longterm vision. Projects approved for implementation will be integrated into the Six-Year Technology Investment Plan and Technology Services work plan. Similar to the City s Six-Year Capital Program, the Six-Year Technology Plan addresses the following three expenditure areas: 1. Payments any necessary lease payments associated with technology projects or planned replacement of technology equipment 2. Maintenance any necessary maintenance costs associated with technology projects or planned technology equipment purchases; these costs are initially budgeted in the appropriate technology project or equipment fund, then rolled into the Technology Services operating budget post project implementation or following successful equipment purchase and installation 3. Discretionary any remaining funding available to continue phases of existing technology projects and support new technology projects The Six-Year Technology Plan is just that a plan and is subject to change based upon available funding from year to year. The Plan includes lease payments and non-financeable costs associated with multi-year technology projects and anticipated annual maintenance costs associated with planned equipment replacements. The Plan is updated as new technology projects are approved Technology Project Proposal Timeline The following calendar details the timeline for major activities related to the 2011 Technology Project Proposal Process. 5
6 Date March 3 April 15 April 18 June 6 June 7 June 8 August 29 August 30 September October December February - March Activity Instructions distributed and informational session held Project Proposals due to Budget Submittal Inbox Project categorization, scoring, and ranking Project scores and rankings presented to the ITIC Technology Services prepares scopes and cost estimates Project sponsor prepares detailed business case Project scopes, cost estimates, and funding worksheet presented to the ITIC Funding decisions made by the ITIC Technology Services work plan developed for upcoming year Six-Year Technology Plan finalized Resources and Forms The following resources and forms are to be used when proposing technology projects and requesting technology equipment. Item Resource/Form Due Date Technology Project Proposal Proposal Instructions Proposal Form Six-Year Technology Plan April 15 th Project Scoring Criteria ITIC Process Flowchart Replacement Technology Equipment* Replacement Capital Equipment Form (BRASS) May 23 rd New Technology Equipment* Decision Package Form June 6 th *See bottom of page 6 through the top of page 8 for additional detail. Information Technology Investment Council (ITIC) Support Committee Theresa Wilson BMO Analyst for Technology Services Primary Contact Scotty Martin Manager of Business Process Analysis Terry Tanner Technology Services Project Management Office Director Secondary Contacts The information below addresses how to request new or replacement technology equipment (not related to a technology project) New Technology Equipment Requests for new technology equipment associated with a technology project should be included in the cost estimating and business case development steps for the applicable technology project being proposed. Requests for new technology equipment that is not associated with a technology project should be submitted via a Decision Package Proposal during the annual budget development process. Replacement Technology Equipment There are planned replacement programs for existing technology equipment (desktop/laptop computers, servers, radios, software, and other IT equipment/infrastructure). Details regarding how to submit each type of these requests are provided below. 6
7 Desktop/Laptop Computer Replacement General Fund agencies should not request replacement of desktop/laptop computers and mobile data computers (MDTs/MCTs). These replacements are planned and funded through the TS User Components Fund. Please note that TS replaces only the CPU, keyboard, and mouse (not the monitor) out of this Project Fund. Monitors will only be replaced upon failure. Non-General Fund agencies should include replacement desktop/laptop computers in their budget request. Non-general fund agencies need to work with Technology Services to reach agreement regarding replacements and replacement costs will be included in appropriate non-general fund agencies budgets. Once agreement is reached with Technology Services, replacement requests should be included in agencies Replacement Capital Equipment (BRASS). These requests will be reviewed by Technology Services and BMO and approved equipment will be included in agencies capital equipment budgets. Infrastructure Replacement Scheduled replacement of servers, routers, hardware/software, and tools necessary to maintain the City s network infrastructure will be managed by Technology Services for General Fund agencies. These replacements are planned and funded through the Technology Infrastructure Replacement Fund. General Fund agencies whose IT support is not provided by Technology Services should John Beck in Technology Services regarding needed replacements. Approved replacements for all General Fund agencies, regardless of whether they are supported by Technology Services or not, will be funded through the TS Infrastructure Replacement Fund. Non-General Fund agencies should include replacement servers and other infrastructure items in their budget request. Non-general fund agencies need to work with Technology Services to reach agreement regarding replacements and replacement costs will be included in appropriate non-general fund agencies budgets. Once agreement is reached with Technology Services, replacement requests should be included in agencies Replacement Capital Equipment (BRASS). These requests will be reviewed by Technology Services and BMO and approved equipment will be included in agencies capital equipment budgets. Radio Replacement Replacement of existing 800 MHz radios for General Fund agencies (including Safety agencies) is conducted according to a citywide Radio Technology Advisory Committee (RTAC) Plan, coordinated by Technology Services Electronic Engineering Bureau (EEB). Replacements are funded through the Radio Replacement Fund. General Fund agencies should not request replacement radios. TS will submit a consolidated radio replacement request for General Fund agencies to support a replacement cycle giving priority to the oldest portion of the radio fleet. If special considerations apply, please contact your BMO Analyst. Non-General Fund agencies should include radio replacements in their budget request. Non-general fund agencies need to work with Technology Services Electronic Engineering Bureau (EEB) to reach agreement regarding replacements and replacement costs will be included in appropriate non-general fund agencies budgets. EEB can provide the age and replacement eligibility for existing radios along with minimum specifications and cost estimates for replacement radios. Once agreement is reached with Technology Services, replacement requests should be included in agencies Replacement Capital Equipment (BRASS). These requests will be reviewed by 7
8 Technology Services and BMO and approved equipment will be included in agencies capital equipment budgets. If uncertain whether a request constitutes a technology project or a technology equipment item (new or replacement), please contact your BMO Analyst to discuss. 8
Information Technology Project Oversight Framework
i This Page Intentionally Left Blank i Table of Contents SECTION 1: INTRODUCTION AND OVERVIEW...1 SECTION 2: PROJECT CLASSIFICATION FOR OVERSIGHT...7 SECTION 3: DEPARTMENT PROJECT MANAGEMENT REQUIREMENTS...11
More informationBest Practices in School Budgeting
Best Practices in School Budgeting 5A Put the Strategies into Practice and Evaluate Results SUMMARY Prerequisite Best Practices: None Key Points A district should establish a system to ensure that its
More informationThis page was left intentionally blank.
This page was left intentionally blank. Workforce Planning Model Steps What This Step Accomplishes 1. Define the Scope Determines our focus could be long or short term could be a specific business unit
More informationINFORMATION TECHNOLOGY PROJECT REQUESTS
INFORMATION TECHNOLOGY PROJECT REQUESTS Guidelines & Instructions for Maryland State Agencies Revised Two Step PPR/PIR Approval Process Fiscal Year 2013 Table of Contents Part 1: Overview... 2 1.1 Introduction...
More informationEnterprise Project Management Initiative
Executive Summary Enterprise Project Management Initiative At a time when budgetary challenges became more and more aggressive, the Commonwealth of Kentucky determined in late 2000 it must develop a more
More informationInformation Technology
Information Technology 824 Overview The Department of Information Technology (DoIT) builds, manages and maintains City government information technology infrastructure and systems used by City departments
More informationThe City of Information Technology Improvement Program (CIP), 2014
Information Technology Overview The (DoIT) builds, manages, and maintains City government information technology infrastructure including radio, data, communications, and computer networks. DoIT also manages
More informationDEPARTMENT AGENCY STATEMENT OF OBJECTIVES FOR CLOUD MIGRATION SERVICES: INVENTORY, APPLICATION MAPPING, AND MIGRATION PLANNING MONTH YYYY TEMPLATE
DEPARTMENT AGENCY STATEMENT OF OBJECTIVES FOR CLOUD MIGRATION SERVICES: INVENTORY, APPLICATION MAPPING, AND MIGRATION PLANNING MONTH YYYY TEMPLATE 1 Introduction and Instructions This sample Statement
More informationInformation Technology and Communications
Information Technology and Communications City Council City Manager I INFORMATION TECHNOLOGY AND COMMUNICATIONS I '""""'"'"1:11 commimill!itlerrs: Mission Statement To establish strategies, policies and
More informationITRM Guideline CPM 110-01 Date: January 23, 2006 SECTION 5 PROJECT CLOSEOUT PHASE
PROJECT MANAGEMENT GUIDELINE SECTION 5 PROJECT CLOSEOUT PHASE Table of Contents Introduction... 3 Project Closeout Phase... 3 Activities and Documents in the Closeout Phase... 4 Project Closeout Task...
More informationDepartment of Administration Portfolio Management System 1.3 June 30, 2010
E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2
More informationMigrating and consolidating even the simplest of data
CALIBRE An Employee-Owned Management and Technology Services Company 6354 Walker Lane, Suite 300, Metro Park Alexandria, Virginia 22310-3252 USA p. 703.797.8500 or 1.888.CALIBRE international p. 011.1.888.CALIBRE
More informationProject Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management
Project Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management Approach Project management solutions for the Smart Grid
More informationAudit of the Data Center Consolidation Initiative at NARA. OIG Draft Audit Report No. 12-09. May 10, 2012
Audit of the Data Center Consolidation Initiative at NARA OIG Draft Audit Report No. 12-09 May 10, 2012 Table of Contents Executive Summary... 3 Background... 4 Objectives, Scope, Methodology... 7 Audit
More informationPenn State University IT Assessment. Opportunity Analysis - Advisory Committee March 30, 2011
+ Penn State University IT Assessment Opportunity Analysis - Advisory Committee March 30, 2011 + Opportunity Analysis 2 n Email/Calendar n Storage n Virtualization/Co-location n Support n Networking n
More information5 FAM 670 INFORMATION TECHNOLOGY (IT) PERFORMANCE MEASURES FOR PROJECT MANAGEMENT
5 FAM 670 INFORMATION TECHNOLOGY (IT) PERFORMANCE MEASURES FOR PROJECT MANAGEMENT (CT:IM-92; 08-01-2007) (Office of Origin: IRM/BPC/PRG) 5 FAM 671 WHAT ARE IT PERFORMANCE MEASURES AND WHY ARE THEY REQUIRED?
More informationINVESTMENT PLANNING AND PRIORITY SETTING: Management Approaches to Resource Allocation
INVESTMENT PLANNING AND PRIORITY SETTING: Management Approaches to Resource Allocation Treasury Board Secretariat: Mel Thompson : Catherine Ella, P Eng, PMP Speakers Mel Thompson is the Principal Analyst
More informationDepartment of Information and Technology Management
INFOTEC Overview Department of Information and Technology Management Introduction The Information and Technology Management Department (INFOTEC) is responsible for providing modern, secure, fit for purpose
More informationSound Transit Internal Audit Report - No. 2014-3
Sound Transit Internal Audit Report - No. 2014-3 IT Project Management Report Date: Dec. 26, 2014 Table of Contents Page Background 2 Audit Approach and Methodology 2 Summary of Results 4 Findings & Management
More informationUniversity of Wisconsin Platteville IT Governance Model Final Report Executive Summary
University of Wisconsin Platteville IT Governance Model Final Report Executive Summary February 2013 Project Objectives & Approach Objectives: Build on the efforts of the Technology Oversight Planning
More informationSACM and CMDB Strategy and Roadmap. David Lowe ActionableITSM.com March 20, 2012
SACM and CMDB Strategy and Roadmap David Lowe ActionableITSM.com March 20, 2012 Disclaimer The strategy and roadmap information presented here is generic by nature and based on a highly hypothetical use
More informationPROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:
PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Project Name Project Management Plan Document Information Document Title Version Author Owner Project Management Plan Amendment History
More informationE-Guide. Sponsored By:
E-Guide Network Management Fundamentals Network management is a complex topic. In today's diverse networking infrastructure, the network has to handle more instances of unified communications, video, and
More informationCRM for Real Estate Part 1: Why CRM?
CRM for Real Estate Anne Taylor Contents Introduction... 1 Typical Challenges for Real Estate... 2 How CRM can Help... 3 Conclusion... 6 Introduction Some Real Estate organizations are still asking why
More informationU.S. Nuclear Regulatory Commission
U.S. Nuclear Regulatory Commission 2011 Data Center Consolidation Plan and Progress Report Version 2.0 September 30, 2011 Enclosure Contents 1 Introduction... 2 2 Agency Goals for Data Center Consolidation...
More informationCreating a Project Management Office (PMO)
Creating a Project Management Office (PMO) By Jane Walton Managing Director, Clarity Decisions LLC Table of Contents Executive Summary... 3 Creating a PMO... 4 The Foundation Understand the Cultural Context...
More informationRealizing Hidden Value: Optimizing Utility Field Service Performance by Measuring the Right Things
Energy and Utility Insights Realizing Hidden Value: Optimizing Utility Field Service Performance by Measuring the Right Things Utilities Realizing Hidden Value About the Author Rob Milstead serves as the
More information2014 Guide to IT Governance
2014 Guide to IT Governance What is IT Governance? IT governance provides the conceptual framework, structures, processes, resources and information aligned to university strategies and objectives, enabling
More informationInformation Sharing Lessons Learned from Gateway Reviews: Gate 5 Benefits Realisation Review
Information Sharing Lessons Learned from Gateway Reviews: Gate 5 Benefits Realisation Review October 2013 The purpose of this document is to share lessons learned to support agencies to better identify
More informationIT Unification Phase One State CIO Office (or equivalent) Special Recognition
IT Unification Phase One State CIO Office (or equivalent) Special Recognition Contact: Kathryn Henson, IT Director of Unification and Platform and Product Services, kathryn.henson@omes.ok.gov, 405-522-3013
More informationPROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE
PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE Table of Contents Introduction...3-1 Overview...3-1 The Process and the Project Plan...3-1 Project Objectives and Scope...3-1 Work Breakdown Structure...3-1
More informationCITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF FEBRUARY 17, 2015
EXTRACT FROM COUNCIL MEETING MINUTES OF FEBRUARY 17, 2015 Item 3, Report No. 5, of the Finance, Administration and Audit Committee, which was adopted without amendment by the Council of the City of Vaughan
More informationManaged Print Programs
Managed Print Programs Cost Reduction Resource Efficiency Proper Asset Utilization Business Process Matching Why Print Management? What is Print Management? Print management can mean different things to
More informationSoftware Asset Management on System z
Software Asset Management on System z Mike Zelle Tivoli WW IT Asset Management Marketing SAM in SHARE Project Manager mzelle@us.ibm.com Agenda Why Software Asset Management (SAM) The Discipline of Software
More informationThe Financial Planning Analysis and Reporting System (FPARS) Project: Implementation Status Update
STAFF REPORT ACTION REQUIRED The Financial Planning Analysis and Reporting System (FPARS) Project: Implementation Status Update Date: March 24, 2014 To: From: Wards: Reference Number: Government Management
More informationCentralized da Audit Selection and Audit Case Management
Centralized da Audit Selection and Audit Case Management Presented by: Mike Wulfkuhle Revenue Solutions, Inc. Introduction Mike Wulfkuhle With Revenue Solutions, Inc. (RSI) since 2004 12 Years in Tax and
More informationU.S. Department of the Treasury. Treasury IT Performance Measures Guide
U.S. Department of the Treasury Treasury IT Performance Measures Guide Office of the Chief Information Officer (OCIO) Enterprise Architecture Program June 2007 Revision History June 13, 2007 (Version 1.1)
More informationMigrant Education Program Evaluation Toolkit A Tool for State Migrant Directors. Summer 2012
Migrant Education Program Evaluation Toolkit A Tool for State Migrant Directors Summer 2012 Developed by the U.S. Department of Education Office of Migrant Education through a contract with The SERVE Center
More informationserena.com seven ways ppm will change your application development organization
seven ways ppm will change your application development organization Table of Contents Executive Summary...3 1. Make Demands Less Demanding... 4 Capture 100% of resource demand... 4 Field and route all
More informationIT Project Governance. Chris Cruz, Deputy Agency Information Officer
IT Project Governance Chris Cruz, Deputy Agency Information Officer IT Project Governance Agenda Key Challenges in Today's Organizations Areas of Focus for Project Governance PMO Governance PMO Governance
More informationIT Governance Overview
IT Governance Overview Contents Executive Summary... 3 What is IT Governance?... 4 Strategic Vision and IT Guiding Principles... 4 Campus-Wide IT Strategic Vision... 4 IT Guiding Principles... 4 The Scope
More informationCAPITAL IMPROVEMENT PROGRAM (CIP) MANAGEMENT & TRACKING PROCESS, SYSTEMS, & PEOPLE APPROACH
CAPITAL IMPROVEMENT PROGRAM (CIP) MANAGEMENT & TRACKING PROCESS, SYSTEMS, & PEOPLE APPROACH ABSTRACT Aditya Ramamurthy, PMP, ARCADIS US, Inc. Like most water and sanitary sewer utilities around the nation,
More informationten mistakes to avoid
second quarter 2010 ten mistakes to avoid In Predictive Analytics By Thomas A. Rathburn ten mistakes to avoid In Predictive Analytics By Thomas A. Rathburn Foreword Predictive analytics is the goal-driven
More informationTraining Programs for Enterprise-Wide Change
Training Programs for Enterprise-Wide Change Top Five Requirements for Programs that Deliver Prepared by VisionCor, Inc. 1 Contents Summary... 3 Before We Get Started... 3 Program Principles... 4 Business
More informationStrategic Plan for the Enterprise Portfolio Project Management Office Governors Office of Information Technology... Ron Huston Director
Strategic Plan for the Enterprise Portfolio Project Management Office Governors Office of Information Technology.......... June 2010 Ron Huston Director Message from the State Enterprise Portfolio Project
More informationCapital Improvement Program: Public Input and the Need for a Multi-year Plan
Attachment 1 OFFICE OF THE INDEPENDENT BUDGET ANALYST REPORT Date Issued: September 21, 2012 IBA Report Number: 12-39 Budget and Finance Committee Docket Date: September 26, 2012 Item Number: 8 OVERVIEW
More informationAchieving Business Analysis Excellence
RG Perspective Achieving Business Analysis Excellence Turning Business Analysts into Key Contributors by Building a Center of Excellence Susan Martin March 5, 2013 11 Canal Center Plaza Alexandria, VA
More informationVisual Enterprise Architecture
Business Process Management & Enterprise Architecture Services and Solutions October 2012 VEA: Click About to edit Us Master title style Global Presence Service and Solution Delivery in 22 Countries and
More informationA Practical Guide for Creating an Information Management Strategy and Strategic Information Management Roadmap
A Practical Guide for Creating an Information Management Strategy and Strategic Information Management Roadmap Principal Author Sam McCollum, CRM, MBA Director of End User Consulting Parity Research LLC
More informationTechnology Lifecycle Management. A Model for Enabling Systematic Budgeting and Administration of Government Technology Programs
Technology Lifecycle Management A Model for Enabling Systematic Budgeting and Administration of Government Technology Programs Even as technology improves, government s fundamental IT challenge remains
More informationDefense Travel Management Office. Change Management Plan
Defense Travel Management Office Change Management Plan January 2007 Version 2.0 Table of Contents Table of Contents...2 List of Figures...2 List of Appendices...2 Record of Changes...3 Executive Summary...4
More informationCity Budget Office FY 2016-17
City Budget Office FY 2016-17 OFFICE OF EQUITY & HUMAN RIGHTS Analysis By: Jane Marie Ford All Funds Budget Summary Adopted Request Base Decision Pkgs Request Total Percent FY 2015-16 FY 2016-17 FY 2016-17
More informationBuilding a Strategic Workforce Planning Capability at the U.S. Census Bureau 1
Building a Strategic Workforce Planning Capability at the U.S. Census Bureau 1 Joanne Crane, Sally Obenski, and Jonathan Basirico, U.S. Census Bureau, and Colleen Woodard, Federal Technology Services,
More informationProject Management Office Charter
Old Dominion University Office of Computing and Communication Services Project Management Office Charter Version: 1.0 Last Update: February 18, 2010 Created By: Anthony Fox, PMP OCCS Project Management
More informationINDIANA STATE BUDGET AGENCY. Capital Budget Development Process for FY 2014 and FY 2015
INDIANA STATE BUDGET AGENCY Capital Budget Development Process for FY 2014 and FY 2015 Successful capital planning and budgeting requires long-term planning, looking well beyond the current biennium to
More informationOffice of the CIO. Department Description. Goals and Objectives
Department Description The Office of the Chief Information Officer (OCIO) is comprised of the Communications and Information Technology (IT) divisions. The Communications Division provides all wireless
More informationEnterprise Data Governance
DATA GOVERNANCE Enterprise Data Governance Strategies and Approaches for Implementing a Multi-Domain Data Governance Model Mark Allen Sr. Consultant, Enterprise Data Governance WellPoint, Inc. 1 Introduction:
More informationProject Management/Controls and their impact on Auditing and Accounting Issues. October 31, 2012
Project Management/Controls and their impact on Auditing and Accounting Issues October 31, 2012 Today s presenters Patrick Hagan National Managing Partner State and Local Government patrick.hagan@mcgladrey.com
More informationAchieving Business Analysis Excellence
RG Perspective Achieving Business Analysis Excellence Turning Business Analysts into Key Contributors by Building a Center of Excellence 11 Canal Center Plaza Alexandria, VA 22314 HQ 703-548-7006 Fax 703-684-5189
More informationAutomating IT Capacity Management
Automating IT Capacity Management Ingo Schulz Product Manager IT Intelligence SAS International Agenda Introduction The IT Capacity Planning Methodology IT Capacity Planning leveraging SAS IT Intelligence
More informationPOLICY AND PROCEDURES OFFICE OF STRATEGIC PROGRAMS. CDER Master Data Management. Table of Contents
POLICY AND PROCEDURES OFFICE OF STRATEGIC PROGRAMS CDER Master Data Management Table of Contents PURPOSE...1 BACKGROUND...1 POLICIES...2 RESPONSIBILITIES...2 PROCEDURES...4 REFERENCES...5 DEFINITIONS...5
More informationCA Service Desk On-Demand
PRODUCT BRIEF: CA SERVICE DESK ON DEMAND -Demand Demand is a versatile, ready-to-use IT support solution delivered On Demand to help you build a superior Request, Incident, Change and Problem solving system.
More informationComputing Services Network Project Methodology
Computing Services Network Project Prepared By: Todd Brindley, CSN Project Version # 1.0 Updated on 09/15/2008 Version 1.0 Page 1 MANAGEMENT PLANNING Project : Version Control Version Date Author Change
More informationSENIOR SYSTEMS ANALYST
CITY OF MONTEBELLO 109 DEFINITION Under general administrative direction of the City Administrator, provides advanced professional support to departments with very complex computer systems, programs and
More informationComputer Aided Dispatch System Replacement Funding
OFFICE OF THE INDEPENDENT BUDGET ANALYST REPORT Date Issued: February 8, 2013 IBA Report Number: 13-08 Public Safety & Neighborhood Services Committee Date: February 13, 2013 Item Number: 5 OVERVIEW Computer
More informationWhite Paper Case Study: How Collaboration Platforms Support the ITIL Best Practices Standard
White Paper Case Study: How Collaboration Platforms Support the ITIL Best Practices Standard Abstract: This white paper outlines the ITIL industry best practices methodology and discusses the methods in
More informationIDC MaturityScape Benchmark: Big Data and Analytics in Government. Adelaide O Brien Research Director IDC Government Insights June 20, 2014
IDC MaturityScape Benchmark: Big Data and Analytics in Government Adelaide O Brien Research Director IDC Government Insights June 20, 2014 IDC MaturityScape Benchmark: Big Data and Analytics in Government
More informationMaking the Business Case for IT Asset Management
1 The business case for IT Asset Management Making the Business Case for IT Asset Management Executive Summary IT Asset Management (ITAM) is an important business discipline that provides insight into
More informationPresented By: Leah R. Smith, PMP. Ju ly, 2 011
Presented By: Leah R. Smith, PMP Ju ly, 2 011 Business Intelligence is commonly defined as "the process of analyzing large amounts of corporate data, usually stored in large scale databases (such as a
More informationThe Infrastructure Service Provider (ISP) Cost Model
The Infrastructure Service Provider (ISP) Cost Model Carol Wilson The National-Geospatial Intelligence Agency (NGA) Belinda Nethery TASC, Inc. Kyle Thomas TASC, Inc. June 2011. Background 2 Our Mission:
More informationSENIOR INFORMATION SYSTEMS MANAGER
CITY OF PORTLAND Multiple SENIOR INFORMATION SYSTEMS MANAGER FLSA Status: Union Representation: Exempt Nonrepresented DEFINITION To plan, manage, supervise and coordinate information systems activities
More informationPMO Director. PMO Director
PMO Director It s about you Are you curious about how individual projects further a company s strategy? Can you think at the macro level across broad groups of people and services? Do you have an eye for
More informationTechnology Master Plan 2010-2015 Irvine Valley College
Technology Master Plan 2010-2015 Irvine Valley College Adopted Fall Term 2010 V4.0 Created By: Irvine Valley College Page 1 6/21/2010 Table of Contents Introduction and Overview... 3 Background and Planning
More informationudget and Business Plans for 2015-16
P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 4 Committee of the Whole January 14, 2015 TO: SUBMITTED BY: Mayor Savage and Members of Halifax Regional Council Original Signed John Traves,
More informationDriving State Procurement Decisions Using Business Intelligence 2012 Cronin Award Submission
Driving State Procurement Decisions Using Business Intelligence 2012 Cronin Award Submission 7/3/2012 State of Arizona Jean A. Clark, State Procurement Administrator Executive Summary For years, public
More informationUniversity of Michigan Medical School Data Governance Council Charter
University of Michigan Medical School Data Governance Council Charter 1 Table of Contents 1.0 SIGNATURE PAGE 2.0 REVISION HISTORY 3.0 PURPOSE OF DOCUMENT 4.0 DATA GOVERNANCE PROGRAM FOUNDATIONAL ELEMENTS
More informationWhat you need to know about PMOs
What you need to know about PMOs By Bahar Banyahmad 2009 Overview With PMOs becoming more pervasive in large and medium enterprises, this whitepaper explores different PMO models and functions. It explores
More informationYou may be applying for the first time since these changes were made due to the shift to multi-year grants you may not have needed to apply last year.
Fiscal Year 2016 Overview & Guidelines Introduction In 2016 the Philadelphia Cultural Fund (PCF) celebrates 23 years of grantmaking. Established as a nonprofit corporation by Philadelphia s Mayor and City
More informationFederal Data Center Consolidation Initiative
Federal Data Center Consolidation Initiative 2011 Data Center Consolidation Plan & Progress Report (date) 1 Introduction... 2 2 Agency Goals for Data Center Consolidation... 2 3 Implementing Shared Services/Multi-tenancy...
More informationIDC MaturityScape Benchmark: Big Data and Analytics in Government
IDC MaturityScape Benchmark: Big Data and Analytics in Government Adelaide O Brien Research Director, IDC aobrien@idc.com Presentation to ACT-IAC Emerging Technology SIG July, 2014 IDC MaturityScape Benchmark:
More informationCOMMONWEALTH OF VIRGINIA
COMMONWEALTH OF VIRGINIA Information Technology Resource Management (ITRM) TECHNOLOGY MANAGEMENT PROJECT MANAGEMENT STANDARD Virginia Information Technologies Agency (VITA) Reviews This publication was
More informationWHITE PAPER December, 2008
INTRODUCTION Key to most IT organization s ongoing success is the leadership team s ability to anticipate, plan for, and adapt to change. With ever changing business/mission requirements, customer/user
More informationPHASE 8: IMPLEMENTATION PHASE
PHASE 8: IMPLEMENTATION PHASE The Implementation Phase has one key activity: deploying the new system in its target environment. Supporting actions include training end-users and preparing to turn the
More informationOrganizational Change Management Methodology. Tools and Techniques to aid Project Implementation
Organizational Change Management Methodology Tools and Techniques to aid Project Implementation Today s Objectives Discuss the Organizational Change Management team and explore ways Organizational Change
More informationAttachment 1. PGW IS expects to use the Demand Management and Project Prioritization tools and methodologies to:
Attachment 1 1. Introduction 1.1 Overview Philadelphia Gas Works (PGW) has used Microsoft Project and Project Server to manage Information Services (IS) Projects since 2006. In 2014, PGW upgraded its Project
More informationIT Governance (Worthwhile Exercise?) January 10, 2013 Presented by Chad Murphy, CISA
IT Governance (Worthwhile Exercise?) January 10, 2013 Presented by Chad Murphy, CISA Things we hear! You are making it much too complex. It is an IT problem! We do not know where to start! We do this already!
More informationBASIC EMPLOYABILITY SKILLS TRAINING (B.E.S.T.) PROGRAM
CITY OF ROCHESTER BUREAU OF HUMAN SERVICES BASIC EMPLOYABILITY SKILLS TRAINING (B.E.S.T.) PROGRAM REQUEST FOR PROPOSALS MAY 2003 The City of Rochester s Bureau of Human Services in collaboration with the
More information5 STEP WEB-TO-LEAD CONVERSION
Marketing Expertise - Topic Two: What Contractors Need to Know About Online Lead Conversion 5 STEP WEB-TO-LEAD CONVERSION Learn what every home remodeling contractor should know about online lead generation.
More informationExecutive Dashboards:
Executive Dashboards: An Effective Tool for Managing Enterprise Project Risk In the current health IT environment, for most provider organizations, enterprise-wide EHR implementation projects represent
More informationCAPITAL ASSET MANAGEMENT FRAMEWORK
May 2002 TABLE OF CONTENTS Table of Contents... I-III 1. Introduction... 1 1.1. OVERVIEW OF THE GUIDELINES... 2 1.2. ORGANIZATION... 2 1.3. APPLICATION... 4 1.4. CLARIFICATIONS & AMENDMENTS... 5 2. Governance
More informationTHE ITAM DREAM TEAM: HOW TO BUILD AND MAINTAIN IT
BEYOND TOOLS: BUSINESS INTELLIGENCE MEETS ANALYTICS THE ITAM DREAM TEAM: HOW TO BUILD AND MAINTAIN IT Frank Venezia, Siwel Consulting, Inc. Steffani Lomax, Siwel Consulting, Inc. White Paper - May 2013
More informationManagement. Competency Profiles
i Information Management Records Management Competency Profiles March 24 Produced by Information Management Branch Government and Program Support Services Division Alberta Government Services 3 rd Floor,
More informationHarness the value of information throughout the enterprise. IBM InfoSphere Master Data Management Server. Overview
IBM InfoSphere Master Data Management Server Overview Master data management (MDM) allows organizations to generate business value from their most important information. Managing master data, or key business
More informationProject Management Guidelines
Project Management Guidelines Overview Section 86-1506 (5) directs the NITC to adopt guidelines regarding project planning and management. The goal of project management is to achieve the objectives of
More informationState of Minnesota IT Governance Framework
State of Minnesota IT Governance Framework June 2012 Table of Contents Table of Contents... 2 Introduction... 4 IT Governance Overview... 4 Process for Developing the New Framework... 4 Management of the
More informationIntegrating Physical Protection and Cyber Security Vulnerability Assessments
Integrating Physical Protection and Cyber Security Vulnerability Assessments Presented by Doug MacDonald Information Release # PNNL-SA-99462 Definition Wikipedia defines Vulnerability Assessments as the
More informationINFORMATION TECHNOLOGY PROJECT MANAGEMENT ANALYST I / II / III
Monterey County INFORMATION TECHNOLOGY PROJECT MANAGEMENT ANALYST I / II / III DEFINITION Under direction, plans, organizes, communicates and manages information technology projects to meet customer expectations
More informationAssessing the Appropriate Level of Project, Program, and PMO Structure
PMI Virtual Library 2011 Daniel D. Magruder Assessing the Appropriate Level of Project, Program, and PMO Structure By Daniel D. Magruder, PMP Executive Summary Does your organization have in-flight projects
More informationCertified Information Professional 2016 Update Outline
Certified Information Professional 2016 Update Outline Introduction The 2016 revision to the Certified Information Professional certification helps IT and information professionals demonstrate their ability