1 LINKÖPING INSTITUTE OF TECHNOLOGY Department of Mangement and Engineering TPMM06 Analysing and Improving Manufacturing Operations Helene Lidestam March 2015 Analysing and Improving Manufacturing Operations using Production and Inventory Control SIMulator (PICSIM) A written report, together with the self evaluation form, should be handed in to Helene Lidestam (helene.lidestam@liu.se) no later than 1 st of June at 5.00 pm. Do not forget to include group name, names and personal codes of the participants in the group. The used program for this project, PICSIM, cannot be run on an Apple computer. Objective This project will deal with simulating production and inventory control techniques. The simulator allows for simulating MRP (material requirements planning), re-order point systems and cyclic planning. The goal of the simulation project is to optimise the manufacturing planning approaches and make recommendations based on analysis of the impact of different factors on the performance of manufacturing operations. Further more, when using a planning and control system, the user must choose lot sizes, lead times and safety mechanisms with consideration given to the manufacturing environment of the firm. This choice is in practice quite difficult, with respect to interactions among items and constraining capacity. For analysing and improving manufacturing operations, a thorough understanding of the relationships bwteen these control parameters and the system performance is of the utmost importance. This project is suited for students with an interest in manufacturing planning and control. The objectives of this project are: to give a deeper understanding for decision making problems of this kind, to illustrate how alternate planning and control systems can be analyzed through simulation, to give a deeper understanding for the interrelationships among parameters, to analyse manufacturing operations through studying relationships between different variables, to analyse the impact of different factors such as demand variations and load, to study development of manufacturing operations through for example set-up time reduction. Introduction A manufacturing firm is reviewing one of its manufacturing units. The preliminary findings include a combination of poor delivery service (too many shortages) and unnecessarily large inventories (and the corresponding capital tied up in materials). In order to analyze the production situation the firm has modelled its operations in a simulation model. They have simulated the ways that planning and control is carried out today, i.e. in terms of a re-order point (ROP) system using lot sizes according to the economic order quantity (EOQ) formulae.

2 Safety stocks are dimensioned to last for two weeks of expected demand. Lead times are based on the simplistic rule of thumb: one operation per week. The result of this simulation is shown in appendix 1. This result corresponds in all aspects to the experiences of the current production situation. They now want to find improvements in the planning and control procedure, in such a way that shortages are reduced and the capital tied up in inventories is reduced. The project is therefore concerned with the analysis of the current production situation and to suggest better parameter values for the planning and control system for the manufacturing unit. The company is considering the use of MRP and cyclic planning and would like you to evaluate both of these planning and control systems relative the ROP system in use. Also, they want to increase their understanding of interrelationships and would therefore like to get a number of operating characteristics curves. Market and products The firm manufactures and markets three end products, called A1, A2 and A3. The market for these products is stable. It is expected that the same kind of demand pattern will hold for the some period in time into the future. After careful analysis, it has been found that the demand per product per week is normal distributed, with means and standard deviations according to table 1. The demand between products and between weeks is independent. Since the forecast of the demand is the same as the average demand, the standard deviation of demand can be seen as the standard deviation of forecast error. Measurements have shown that the lead time, of all end products and items, have a standard deviation of 1.0 weeks. Item Mean Standard deviation A A A Table 1. Means and standard deviations for weekly demand. Product and production data The firm manufactures all items in the same production unit. The bills of material are shown in figure 1 (one item A4 consists of e.g. two items A8). In total, there are nine items, of which A1-A5 are manufactured inhouse whereas A6-A9 are purchased from outside suppliers. A1 A2 A3 A4 (2) A8 (2) A7 A5 (2) A9 (3) A6 (2) A8 (2) A6 Figure 1. Bills of materials. 2

3 Processing times, setup times and capacity for the five work centers of the production unit are shown in tables 2 and 3. There are 50 working weeks in a year. A1 A2 A3 A4 A5 P P P P P Table 2. Processing times per unit (hours); P=planning group; A=item. Planning group Setup time (hours) P P P P P Capacity (hours/week) Table 3. Setup times and capacities for work centers W1-W5. The production is flow oriented is such a way that operations in planning groups (work centers) with lower numbers always are processed before operations in planning groups having higher numbers. Thus, P1 is always the gateway work center, i.e. the first in an operations sequence. When an end product is demanded but cannot be delivered, a back order is taken and the product is delivered as soon as finished products are available. There is no need for spare parts. The values of the items are given in table 4. Item Value A A2 500 A3 940 A4 370 A5 210 A6 70 A7 390 A8 80 A9 100 Table 4. Item values in SEK (Swedish Crowns) per unit. The delivery lead times for purchased components A6-A9 are three weeks. Historically, suppliers have been very accurate and no variation in lead times has been detected. Simulation of ROP, MRP and cyclic planning The manufacturing, planning and control of the production unit has been modelled in a simulation model. This model is used to study how different parameter values affect the total relevant costs. 3

4 The basic structure for the planning and control simulator is MRP. With this structure ROP can be described, such that order quantities are calculated for each item individually and independently of the other items. Then, the planning logic of the simulator will trigger orders when the re-order point is passed with respect to the inventory levels. Also, cyclic planning can be emulated, by focusing on a constraining resource and synchronizing the order quantities for the item at this resource, using a common cycle approach or a basic period approach. In the beginning of every week a complete MRP regeneration is run. The net requirements are calculated based on demand forecasts (related to average demand) and the inventory situation before any withdrawals from stock. The result of the MRP is of course dependent upon the choice of parameter values. MRP use item lead times for lead time offsetting between different levels in the bills of materials (BOM). The need date for an item at the next lower BOM level is calculated as the need date for the parent item minus the lead time of the parent item. The ordering time for purchase components is the need date minus the item lead time. For example, if the lead time is 5 weeks, the items will arrive two weeks prior to the need date, since the delivery lead time from the supplier is three weeks. Orders that are to be started in a given week are released immediately, provided that all components are available. Orders with an earlier planned start date are initiated first. If two items have the same planned start date they are released in the order of item number, i.e. A1 is released first. The planned start date is obtained as the need date for the item according to MRP minus the planned production time for the item. The parameter planned production time is used for the simulation model to know when to release the first operation for an item. When an order is released, it is placed in the queue of its first work center. The queue principle is the well-known FIFO, i.e. first-in, first-out. As soon as an order is finished in one work center it is immediately moved to the next work center according to its operations sequence. The internal transportation times are negligible. In order to obtain stability in the simulation results, one simulation run is for three years. The first year is used for initiation to obtain a steady state. Only the results for the last two years are registered. The final simulation result in terms of annual costs and production statistics are calculated as an average over these two years. This fact should not be interpreted such that the parameter values must be valid for a two-year period. It is only used as a means to indicate that the parameter values will be valid as long as the demand and production data is valid. Parameters The parameters that can be varied are given in the appendix 2, which is the parameter data entry table. Please note the units of each respective parameter. The lead times which can be specified in terms of days, i.e. in steps of 0.2 weeks (since there are 5 working days per week). Ordering quantity fro each item, in terms of unit. Safety stock level for each item, in terms of unit. The choice of parameter values should thus be seen as a control mechanisms in order to obtain the planning and control of manufacturing that is desirable. 4

5 A large part of the production costs are fixed and independent upon the choice of planning and control parameters. However, to determine the order quantity, setup/ordering cost and inventory holding cost could be considered. In total, the ordering costs for manufacturing (setup costs) of items A1-A5 is 200 SEK plus 400 SEK per hour of capacity for setups and for purchasing of items A6-A9 is 400 SEK per order. By calculation of the holding cost, the company uses the calculated holding cost rate (20%) multiplied by the value of each item. With those costs, the company now has the following control parameters regarding the ordering quantity: Item Setup/ordering cost Economic order quantity A A A A A A A A A Table 5. Ordering costs and ordering quantities. Perfomance measures There are two performance measures. The first one is the service level of the finished goods and the second one is the total inventory holding cost including raw materials, work-inprocess and the finished goods. The object of this simulation study is to find a good balance between these two performance measures. Your final results should be better than: Inventory holding costs maximun and Service level (total) 95 % minimun. Running the simulator The steps for running PICSIM are the following: 1. Copy all files from floppy disk into your hard disk under the same directory. 2. Start the Microsoft Excel. 3. Click File and then Open in the Microsoft Excel main menu. 4. Open the file Picsim2015-ENG.xls and enable the macros. 5. Go to sheet1, modify parameters and click the Create Input File button. 6. Click Run Picsim2000 button. Or alternatively you may run piscim2000.exe either in Dos environment or by double clicking the icon of this program. 7. Turn to sheet2. Click Simulation Results button. 8. To make more than one run, repeat steps 5-7. Sheet1: Input information for current run. Sheet2: Results for current run. Sheet3: Results for all previous runs. When you open the Picsim2015-ENG.xls, it is recommended that you open it from the Microsoft Excel. After Step 5, you should automatically create a Pi.dat file under the same 5

6 directory as Picsim.xls. If you open the Picsim.xls through a short cut, e.g. clicking the file icon, you may not be able to create the input file in a proper directory. The result of a simulation run is illustrated in appendix 1. Appendix 1 depicts the current situation and the choice of parameter values (see data input). Also, some production statistics are given, that can be used for decision support for new decisions. Appendix 2 shows the input information file with the numbers for the current planning and control approach by the company. The bottom section includes the planning and control parameters that you can use to control the system, i.e. lead time, ordering quantity and safety stock. Compare your results with the initial condition of the company and discuss similarities and differences. Discuss the improvements that you have achieved. Project task The project can be divided in two tasks, task A and task B. For task A, there are 10 simulation runs, which will be ed to Lujie Chen, lujie.chen@liu.se. Lujie will carry out those simulations. The detailed schedule for the simulations can be found in the course presentation. There will be 18 scheduled time slots in total where of you should use 10. Each group s simulation results and get them back according to the schedule. Task B is conducted by each group and simulation package will be distributed after task A is finished. The project tasks are: Task A Give a suggestion for optimal planning and control for the company. The evaluation is based on a good tradeoff between the service levels and the total inventory holding costs. These control parameters can be determined by either ROP, MRP or cyclic planning systems. Give suggestions for better planning, as recommended planning ways and values of the control parameters. The proposal includes the choice of planning method, ie reorder point systems, MRP or cyclic planning. Motivate recommended values. Note that, inorder to dismiss a planning system, strong theoretical or empirical evidence is needed as motivation. Only control parameters may be changed in this task. The group will receive 10 simulation runs for this. These simulations are carried out by the course management based on group input template (10 per group; see Appendix 2). In Appendix 2 the company's current parameter values. Compare your proposal with the company's position and discuss the differences and similarities. Describe, compare and interpret the improvements you have achieved. Task B Each group will get a copy of the simulation software and be able to plan and execute your own simulation experiments. In this task the group can start from the recommended solution of task A, but you can also choose to use another, more stable solution, as a reference case (base case). Task B1 Study how a setup reduction affects delivery service, capital, parameters, etc. Refer to the direct effect of set-up time reduction as such versus the indirect effect of a subsequent adjustment of the planning parameters such as order quantity, lead time and safety stock. 6

7 Task B2 Study how different parameters are interrelated, such as cost, lead time, customer service, resource utilization (load), inventory turnover rates, demand variability etc. You can study how an input vairable affects an output variable; such as demand variability relative actual lead times. You can also study how a control parameter affects an output variable; such as order quantity relative customer service. You can further study how two output variables are interrelated; for example is there a relationship between actual lead times and customer service. In the third type of relationships you typically use a scatter diagram to study the relationship in principle, looking at the shape of the relationship and estimate regression lines or curves. Example of an Operating Characteristic Curve Avoid simulating trivial relationships, i.e. where one variable can be calculated from the oteher mathematically. Please use the insights you have from the Statistical Analysis course for the design of experiments and the calculation of statistical significance of the results. Seminars, presentation and the report In Phase I, three seminars are arranged for introducing the project, discussing the progress in the simulation study. In phase II, one seminar is arranged for discussing the study tasks and simulation results in Phase II. Finally each group shall present the simulation method and results in the final seminars (seminar 5). Afterwards, a complete report should be handed to Helene Lidestam (helene.lidestam@liu.se) not later than June 1 st, at 5.00 pm. The report must be written using the report template found on the course webpage. The report content should follow this structure. Report content ü Cover page including the group number and the group members names and info ü Table of content ü Introduction - Purpose - Method (as how you worked) - Delimitations ü Review of task A - Explain how you did each simulation run, which formulas you used and motivate! - Conclusion of task A 7

8 ü Task B1 - Direct effects of set-up time reduction - Indirect effects of set-up time reduction - Design of experiments - Conclusion of task B1 ü Task B2 - Interrelation between different parameters - Conclusion of task B2 ü Final conclusion of the project and managerial insights ü References Observe: You can add additional sections/subsections but all the reports should at least have the ones presented here! Note: ü Use of basic statistics is expected to highlight results (e.g. tests, regression analysis etc.) ü Uses references where appropriate ü Relate findings to covered literature ü Set up tests to verify covered literature ü For top grades, please follow the grading criteria. Format: ü Maximum 20 pages (incl. cover page, attachements, etc.) ü Font type: Calibri and Font size: 11 ü Use of vivid colors and clear legends for the charts/figures ü All tables and figures should be numbered and titled The report is used for grading the project part of the course, see grading criteria in the next section. Together with the report, a self evaluation of the report is handed in. The self evaluation contains which grade you strive for, and, connected to the criteria, a motivation on each critera for the desired grade. Use the self evaluation template for the self evaluation. Grading criteria Grade 3 requires the following: - Active participation in the project group. - Presence at the presentation (seminar 5). - For part A: o Maximum of 10 simulation runs with at least 1 result is better or as good as the requirements for the inventory holding cost and service level. o Simulation results for at least three of the planning methods that show why or why not Reorder point system, MRP, Cyclic planning and Cyclic planning with base period solution is an appropriate planning method in this project. - For Part B1 o A motivated and implemented set-up time reduction on a resource. o Discussion and analysis about the direct effects of the set-up time reduction. o Discussion and analysis about the indirect effects of the set-up time reduction. 8

9 o An improved planning situation after the set-up time reduction by a freely chosen planning method. - For part B2 o At least 5 operating characteristic curves, constructed from the simulation model, over non-trivial relations between different parameters, containing confidence intervals. o Discussion and reasoning about these five operating characteristic curves. Grade 4 requires the following (in addition to the requirements for grade 3): - A report submitted on time. - For part A: o Theoretical motivation for at least three of the planning methods that show why or why not Reorder point system, MRP, Cyclic planning and Cyclic planning with base period solution is an appropriate planning method in this project. o Motivation for choice of safety stock and/or safety lead time. - For part B1: o An improved planning situation after the set-up time reduction produced by a freely chosen planning method and by the use of experimental design, DOE. - For part B2: o Discussion and reasoning about these five operating characteristic curves clearly linked to course literature. o Motivation for choice of number of replications and random number seeds. Grade 5 requires the following (in addition to the requirements for grade 4): - For part A: o Theoretical motivation and simulation results that show why or why not Reorder point system, MRP, Cyclic planning and Cyclic planning with base period solution is an appropriate planning method in this project. o Additional planning methods are examined, with more simulations than the first 10, in order to further improve the results. - For part B1: o Discussion on advantages and disadvantages of using a theoretical planning method compared to experimental design, DOE, for improving operations. - For part B2: o Discussion and reasoning about these five operating characteristic curves clearly linked to other literature found by the project group. References 1. Anupindi, Chopra, Deshmukh, Van Mieghem & Zemel (2006), Managing Business Process Flows, Pearson Education. 2. Browne J, Harhen J and Shivnan J (1996), Production Management Systems, Addison- Wesley, Harlow, England. 3. Kivenko K (1981), Managing Work-in-Process Inventory, Marcel Dekker Inc, New York. 4. Vollmann TE, Berry WL and Whybark DC (1997), Manufacturing Planning and Control Systems, (4 th edition), Irwin, Homewood, Ill. 9

10 Appendix 1: Simulation Result for the Case Company. Simulation Results Simulation Results Group No. 1 Run No. 1 Input data Product/Item A1 A2 A3 A4 A5 A6 A7 A8 A9 Lead time Order quantity Safety stock Costs Inventory of raw materials Work in process Semi-finished and finished goods inventory Total Service levels (%) Product Product Product Overall 50.6 Statistics Stockouts of finished products Average inventory level A1-A Average actual lead time A1-A5 (weeks) Average queueing time P1-P5 (hours) Average load P1-P5 (%) Inventory turnover rates Raw material inventory Work in process 9.82 Semi-finished and finished goods inventory Total 9.62 Appendix 2: Planning Input Data Sheet for the Simulations. Input data to simulation model PICSIM TPMM06 Group no. Run no. A1 A2 A3 A4 A5 A6 A7 A8 A9 Lead time (weeks)* Order quantity (units) Safety stock (units) Please observe that the lead time is the item lead time, i.e. for A1 it is the lead time required to manufacture A1 based on that A4 and A8 are available. This can be set in steps of 0.2 weeks, i.e. in steps of full days. 10

By: ATEEKH UR REHMAN 12-1

By: ATEEKH UR REHMAN 12-1 12 Inventory Management By: ATEEKH UR REHMAN 12-1 Inventory Management The objective of inventory management is to strike a balance between inventory investment and customer service 12-2 Importance of

More information

Glossary of Inventory Management Terms

Glossary of Inventory Management Terms Glossary of Inventory Management Terms ABC analysis also called Pareto analysis or the rule of 80/20, is a way of categorizing inventory items into different types depending on value and use Aggregate

More information

Chapter 6. Inventory Control Models

Chapter 6. Inventory Control Models Chapter 6 Inventory Control Models Learning Objectives After completing this chapter, students will be able to: 1. Understand the importance of inventory control and ABC analysis. 2. Use the economic order

More information

TOOLS OF MONTE CARLO SIMULATION IN INVENTORY MANAGEMENT PROBLEMS

TOOLS OF MONTE CARLO SIMULATION IN INVENTORY MANAGEMENT PROBLEMS TOOLS OF MONTE CARLO SIMULATION IN INVENTORY MANAGEMENT PROBLEMS Jacek Zabawa and Bożena Mielczarek Institute of Industrial Engineering and Management Wrocław University of Technology 50-370, Wrocław,

More information

Material Requirements Planning (MRP)

Material Requirements Planning (MRP) Material Requirements Planning (MRP) Unlike many other approaches and techniques, material requirements planning works which is its best recommendation. Joseph Orlicky, 1974 1 History Begun around 1960

More information

Functional Area Systems Production / Operation Systems

Functional Area Systems Production / Operation Systems ACS-1803 Introduction to Information Systems Instructor: Kerry Augustine Functional Area Systems Production / Operation Systems Lecture Outline 5, Part 2 ACS-1803 Introduction to Information Systems Examples:

More information

26/10/2015. Functional Area Systems Production / Operation Systems. Examples: Functional Area Info Systems. Functional Area Information Systems

26/10/2015. Functional Area Systems Production / Operation Systems. Examples: Functional Area Info Systems. Functional Area Information Systems ACS-1803 Introduction to Information Systems Instructor: Kerry Augustine Functional Area Systems Production / Operation Systems Lecture Outline 5, Part 2 ACS-1803 Introduction to Information Systems Examples:

More information

Operations Management. 3.3 Justify the need for Operational Planning and Control in a selected Production Process

Operations Management. 3.3 Justify the need for Operational Planning and Control in a selected Production Process Operations Management 3.3 Justify the need for Operational Planning and Control in a selected Production Process Key Topics LO3 Understand how to organise a typical production process 3.3 justify the need

More information

Modeling Stochastic Inventory Policy with Simulation

Modeling Stochastic Inventory Policy with Simulation Modeling Stochastic Inventory Policy with Simulation 1 Modeling Stochastic Inventory Policy with Simulation János BENKŐ Department of Material Handling and Logistics, Institute of Engineering Management

More information

Inventory Decision-Making

Inventory Decision-Making Management Accounting 195 Inventory Decision-Making To be successful, most businesses other than service businesses are required to carry inventory. In these businesses, good management of inventory is

More information

Course Supply Chain Management: Inventory Management. Inventories cost money: Reasons for inventory. Types of inventory

Course Supply Chain Management: Inventory Management. Inventories cost money: Reasons for inventory. Types of inventory Inventories cost money: Inventories are to be avoided at all cost? Course Supply Chain Management: Or Inventory Management Inventories can be useful? Chapter 10 Marjan van den Akker What are reasons for

More information

Chapter 9. Inventory management

Chapter 9. Inventory management Chapter 9 Inventory management Slack et al s model of operations management Direct Design Operations Management Deliver Develop Supply network management Capacity management Inventory management Planning

More information

PRINCIPLES OF INVENTORY AND MATERIALS MANAGEMENT

PRINCIPLES OF INVENTORY AND MATERIALS MANAGEMENT PRINCIPLES OF INVENTORY AND MATERIALS MANAGEMENT Fourth Edition Richard J. Tersine The University of Oklahoma TEGHNISCHE HOCHSCHULE DARMSTADT Fochbereich 1 Gesonr> 11-. ib I iothek Betiier >wi rtschottsiehre

More information

Microsoft Dynamics GP. Manufacturing Planning Functions

Microsoft Dynamics GP. Manufacturing Planning Functions Microsoft Dynamics GP Manufacturing Planning Functions Copyright Copyright 2007 Microsoft Corporation. All rights reserved. Complying with all applicable copyright laws is the responsibility of the user.

More information

Job Manager for Tool and Die Shops

Job Manager for Tool and Die Shops Job Manager for Tool and Die Shops What makes Tool and Die Shops unique? First, most orders are for a unique Tool or Die. No two Jobs are alike. The Job is a one of a kind job, not a mass production type

More information

EXCEL Tutorial: How to use EXCEL for Graphs and Calculations.

EXCEL Tutorial: How to use EXCEL for Graphs and Calculations. EXCEL Tutorial: How to use EXCEL for Graphs and Calculations. Excel is powerful tool and can make your life easier if you are proficient in using it. You will need to use Excel to complete most of your

More information

INVENTORY MANAGEMENT. 1. Raw Materials (including component parts) 2. Work-In-Process 3. Maintenance/Repair/Operating Supply (MRO) 4.

INVENTORY MANAGEMENT. 1. Raw Materials (including component parts) 2. Work-In-Process 3. Maintenance/Repair/Operating Supply (MRO) 4. INVENTORY MANAGEMENT Inventory is a stock of materials and products used to facilitate production or to satisfy customer demand. Types of inventory include: 1. Raw Materials (including component parts)

More information

Understanding Stock and Inventory Control

Understanding Stock and Inventory Control Understanding Stock and Inventory Control Stock control, otherwise known as inventory control, is used to show how much stock you have at any one time, and how you keep track of it. It applies to every

More information

Agenda. TPPE37 Manufacturing Control. A typical production process. The Planning Hierarchy. Primary material flow

Agenda. TPPE37 Manufacturing Control. A typical production process. The Planning Hierarchy. Primary material flow TPPE37 Manufacturing Control Agenda Lecture 2 Inventory Management 1. Inventory System Defined 2. Inventory Costs 3. Inventory classification 4. Economic order quantity model 5. Newsboy problem 6. Reorder

More information

1 Material Requirements Planning (MRP)

1 Material Requirements Planning (MRP) IEOR 4000: Production Management page 1 Professor Guillermo Gallego 1 Material Requirements Planning (MRP) Material Requirements Planning (MRP) is a computer-based production planning and inventory control

More information

Inventory: Independent Demand Systems

Inventory: Independent Demand Systems Inventory: Independent Demand Systems Inventory is used in most manufacturing, service, wholesale, and retail activities and because it can enhance profitability and competitiveness. It is widely discussed

More information

Inventory Management. Topics on inventory management

Inventory Management. Topics on inventory management Inventory Management ISyE 3104 Fall 2013 Topics on inventory management Objective An introduction to the fundamental concepts, tradeoffs and methods in inventory management Topics Deterministic inventory

More information

Managing Working Capital. Managing Working Capital

Managing Working Capital. Managing Working Capital Managing Working Capital Working Capital is the name given to funds invested in the short-term assets of the business. While all assets should work to produce a return on investment, it is often easier

More information

Chalmers Publication Library

Chalmers Publication Library Chalmers Publication Library Inventory management practices and their implications on perceived planning performance This document has been downloaded from Chalmers Publication Library (CPL). It is the

More information

Inventory Control Models

Inventory Control Models Chapter 12 Inventory Control Models Learning Objectives After completing this chapter, students will be able to: 1. Understand the importance of inventory control. 2. Use inventory control models to determine

More information

A Cross-Functional View of Inventory Management, Why Collaboration among Marketing, Finance/Accounting and Operations Management is Necessary

A Cross-Functional View of Inventory Management, Why Collaboration among Marketing, Finance/Accounting and Operations Management is Necessary A Cross-Functional View of Inventory Management, Why Collaboration among Marketing, Finance/Accounting and Operations Management is Necessary Richard E. Crandall, Appalachian State University, John A.

More information

Job Manager for Metal Fabrication

Job Manager for Metal Fabrication Job Manager for Metal Fabrication What makes Metal Fabrication unique? First, most metal shops are building to unique specifications. The Jobs are service type jobs, not production type jobs. Mass Production

More information

INVENTORY MANAGEMENT

INVENTORY MANAGEMENT 7 INVENTORY MANAGEMENT MGT2405, University of Toronto, Denny Hong-Mo Yeh Inventory management is the branch of business management that covers the planning and control of the inventory. In the previous

More information

APPENDIX B. The Risk Pool Game B.1 INTRODUCTION

APPENDIX B. The Risk Pool Game B.1 INTRODUCTION APPENDIX B The Risk Pool Game B.1 INTRODUCTION One of the most important concepts in supply chain management is risk pooling. Recall that risk pooling involves the use of centralized inventory to take

More information

The aim behind the calculations of EOQ and ROL is to weigh up these, and other advantages and disadvantages and to find a suitable compromise level.

The aim behind the calculations of EOQ and ROL is to weigh up these, and other advantages and disadvantages and to find a suitable compromise level. Stock control by Tony Mock 12 Feb 2004 Stock control features in the syllabuses of several ACCA examination papers, including CAT Papers 4 and 10, and Professional Scheme Papers 1.2 and 2.4. The areas

More information

Supply Chain Inventory Management Chapter 9. Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall 09-01

Supply Chain Inventory Management Chapter 9. Copyright 2013 Pearson Education, Inc. publishing as Prentice Hall 09-01 Supply Chain Inventory Management Chapter 9 09-01 What is a Inventory Management? Inventory Management The planning and controlling of inventories in order to meet the competitive priorities of the organization.

More information

Microsoft Dynamics GP. Inventory Control

Microsoft Dynamics GP. Inventory Control Microsoft Dynamics GP Inventory Control Copyright Copyright 2010 Microsoft. All rights reserved. Limitation of liability This document is provided as-is. Information and views expressed in this document,

More information

Understand How and Where Computers are used in Manufacturing

Understand How and Where Computers are used in Manufacturing H. RESOURCE MANAGEMENT AND MANUFACTURING COMPUTING H1 Understand How and Where Computers are used in Manufacturing H1.1 List possible computer applications in manufacturing processes. Performance Objective:

More information

INTERACTIVE METHODS USED IN GRADUATE PROGRAMS

INTERACTIVE METHODS USED IN GRADUATE PROGRAMS INTERACTIVE METHODS USED IN GRADUATE PROGRAMS Virgil CHICHERNEA 1 PhD, University Professor, Management Information Systems Department, Romanian American University, B-dul Expozitiei no. 1B, Sector 1,

More information

Abstract: Why inventory exists. Types of inventory. This is sequel to OM 601 assignment.

Abstract: Why inventory exists. Types of inventory. This is sequel to OM 601 assignment. Abstract: This is sequel to OM 601 assignment. The reason for this assignment is to improve overall competitiveness of Hefley Finland by focusing on inventory management. In this assignment I first clarify

More information

INVENTORY MANAGEMENT WITH INDEPENDENT DEMAND Cases

INVENTORY MANAGEMENT WITH INDEPENDENT DEMAND Cases INVENTORY MANAGEMENT WITH INDEPENDENT DEMAND Cases CASE 1. ABC ANALISYS AND INVENTORY MANAGEMENT SYSTEM Ref. Annual Demand in Euro Cumulated in Euro Demand % total demand Class 1 3.700.000 3.700.000 53

More information

Materials Management and Inventory Systems

Materials Management and Inventory Systems Materials Management and Inventory Systems Richard J.Tersine Old Dominion University 'C & North-Holland PUBLISHING COMPANY NEW YORK AMSTERDAM Contents Preface Chapter 1 INTRODUCTION 1 Inventory 4 Types

More information

Inventory Theory 935

Inventory Theory 935 19 Inventory Theory Sorry, we re out of that item. How often have you heard that during shopping trips? In many of these cases, what you have encountered are stores that aren t doing a very good job of

More information

Functional Area Systems Lecture 5

Functional Area Systems Lecture 5 ACS-1803 Introduction to Information Systems Instructor: David Tenjo Functional Area Systems Lecture 5 1 1. ACCOUNTING TRANSACTION SYSTEMS 2 1 Business Transaction Cycles 3 Business Transaction Cycles

More information

EVERYTHING YOU NEED TO KNOW ABOUT INVENTORY

EVERYTHING YOU NEED TO KNOW ABOUT INVENTORY EVERYTHING YOU NEED TO KNOW ABOUT INVENTORY Introduction Inventory is considered the necessary evil of the supply chain. In fact, there has been a whole movement; lean manufacturing that has tried to reduce

More information

Understanding Financial Management: A Practical Guide Guideline Answers to the Concept Check Questions

Understanding Financial Management: A Practical Guide Guideline Answers to the Concept Check Questions Understanding Financial Management: A Practical Guide Guideline Answers to the Concept Check Questions Chapter 6 Working Capital Management Concept Check 6.1 1. What is the meaning of the terms working

More information

講 師 : 周 世 玉 Shihyu Chou

講 師 : 周 世 玉 Shihyu Chou 講 師 : 周 世 玉 Shihyu Chou Logistics involves the following activities: sourcing and purchasing inputs, managing inventory, maintaining warehouses, and arranging transportation and delivery. There are three

More information

Introduction. Continue to Step 1: Creating a Process Simulator Model. Goal: 40 units/week of new component. Process Simulator Tutorial

Introduction. Continue to Step 1: Creating a Process Simulator Model. Goal: 40 units/week of new component. Process Simulator Tutorial Introduction This tutorial places you in the position of a process manager for a specialty electronics manufacturing firm that makes small lots of prototype boards for medical device manufacturers. Your

More information

Material Requirements Planning (MRP)

Material Requirements Planning (MRP) The Priority Enterprise Management System Material Requirements Planning (MRP) Contents MRP - Introduction...2 Calculating Demand for Top-Level Parts...2 Calculating Demand for Sub-assemblies and Raw Materials...3

More information

Manufacturing Efficiency Guide

Manufacturing Efficiency Guide Note: To change the product logo for your ow n print manual or PDF, click "Tools > Manual Designer" and modify the print manual template. Contents 3 Table of Contents 1 Introduction 5 2 What Is Manufacturing

More information

Bill of Manufacturing Guide

Bill of Manufacturing Guide Note: To change the product logo for your ow n print manual or PDF, click "Tools > Manual Designer" and modify the print manual template. Contents 3 Table of Contents 1 Introduction 4 2 Why You Need a

More information

Basics of Supply Chain Management (BSCM) Curriculum

Basics of Supply Chain Management (BSCM) Curriculum Basics of Supply Chain Management (BSCM) Curriculum Version 4.0 Session 1 to Supply Chain Management to Manufacturing Role of Manufacturing Global Citizenship Manufacturing Business Model Business Environment

More information

Economic Ordering Quantities: A Practical Cost Reduction Strategy for Inventory Management

Economic Ordering Quantities: A Practical Cost Reduction Strategy for Inventory Management Economic Ordering Quantities: A Practical Cost Reduction Strategy for Inventory Management By Todd Duell Abstract Inventory management is an important concern for all managers in all types of businesses.

More information

THE INTEGRATION OF SUPPLY CHAIN MANAGEMENT AND SIMULATION SYSTEM WITH APPLICATION TO RETAILING MODEL. Pei-Chann Chang, Chen-Hao Liu and Chih-Yuan Wang

THE INTEGRATION OF SUPPLY CHAIN MANAGEMENT AND SIMULATION SYSTEM WITH APPLICATION TO RETAILING MODEL. Pei-Chann Chang, Chen-Hao Liu and Chih-Yuan Wang THE INTEGRATION OF SUPPLY CHAIN MANAGEMENT AND SIMULATION SYSTEM WITH APPLICATION TO RETAILING MODEL Pei-Chann Chang, Chen-Hao Liu and Chih-Yuan Wang Institute of Industrial Engineering and Management,

More information

Inventory Management and Risk Pooling. Xiaohong Pang Automation Department Shanghai Jiaotong University

Inventory Management and Risk Pooling. Xiaohong Pang Automation Department Shanghai Jiaotong University Inventory Management and Risk Pooling Xiaohong Pang Automation Department Shanghai Jiaotong University Key Insights from this Model The optimal order quantity is not necessarily equal to average forecast

More information

Short-Term Financial Decisions

Short-Term Financial Decisions Part 5 Short-Term Financial Decisions Chapter 13 Working Capital and Current Assets Management Chapter 14 Current Liabilities Management 492 Chapter 13 Working Capital and Current Assets Management LG1

More information

Modeling and Optimization of an Industrial Inventory Management System

Modeling and Optimization of an Industrial Inventory Management System Modeling and Optimization of an Industrial Inventory Management System Design Team Katia Lisboa, Jaime Bonifasi, Cristina Cromeyer, Frederick Stewart Design Advisor Prof. Abe Zeid Sponsor Barry Controls

More information

How To Run Statistical Tests in Excel

How To Run Statistical Tests in Excel How To Run Statistical Tests in Excel Microsoft Excel is your best tool for storing and manipulating data, calculating basic descriptive statistics such as means and standard deviations, and conducting

More information

Best Practices in Inventory Management Systems. Best Practices in Inventory Management Systems

Best Practices in Inventory Management Systems. Best Practices in Inventory Management Systems Best Practices in Inventory Management Systems 1 Disclaimer The information contained within this whitepaper is the opinion of the author and in no way represents the opinion of The Rand Group, LLC. The

More information

Chapter 14 Inventory Management

Chapter 14 Inventory Management Chapter 14 Inventory Management Overview Nature of Inventories Opposing Views of Inventories Fixed Order Quantity Systems Fixed Order Period Systems Other Inventory Models Some Realities of Inventory Planning

More information

How to Configure and Use MRP

How to Configure and Use MRP SAP Business One How-To Guide PUBLIC How to Configure and Use MRP Applicable Release: SAP Business One 8.8 All Countries English October 2009 Table of Contents Purpose... 3 The MRP Process in SAP Business

More information

GESTION DE LA PRODUCTION ET DES OPERATIONS PICASSO EXERCICE INTEGRE

GESTION DE LA PRODUCTION ET DES OPERATIONS PICASSO EXERCICE INTEGRE ECAP 21 / PROD2100 GESTION DE LA PRODUCTION ET DES OPERATIONS PICASSO EXERCICE INTEGRE 2004-2005 Prof : Pierre Semal : semal@poms.ucl.ac.be Assistants : Eléonore de le Court : delecourt@poms.ucl.ac.be

More information

MASTER PRODUCTION SCHEDULE

MASTER PRODUCTION SCHEDULE 6 MASTER PRODUCTION SCHEDULE MGT2405, University of Toronto, Denny Hong-Mo Yeh So far, in discussing material requirement planning (MRP), we have assumed that master production schedule (MPS) is ready

More information

APS1028 Operations and Production Management - Fall 2014 (Monday Noon-2 PM starting 8 th September 2014: BA B025 (the basement classroom)

APS1028 Operations and Production Management - Fall 2014 (Monday Noon-2 PM starting 8 th September 2014: BA B025 (the basement classroom) - Fall 2014 (Monday Noon-2 PM starting 8 th September 2014: BA B025 (the basement classroom) Course Outline Operations Management is the systematic approach and control of the processes that transform

More information

VISUAL management techniques for optimum INVENTORY form, fit and function

VISUAL management techniques for optimum INVENTORY form, fit and function You won t GET LEAN... until you GET VISUAL! VISUAL management techniques for optimum INVENTORY form, fit and function Raw materials, work-in-process, finished goods, location and product flow Kanban Min/max

More information

1. Go to your programs menu and click on Microsoft Excel.

1. Go to your programs menu and click on Microsoft Excel. Elementary Statistics Computer Assignment 1 Using Microsoft EXCEL 2003, follow the steps below. For Microsoft EXCEL 2007 instructions, go to the next page. For Microsoft 2010 and 2007 instructions with

More information

MANAGE. Warehouse Management Systems. Microsoft Dynamics NAV 5.0. Technical Whitepaper

MANAGE. Warehouse Management Systems. Microsoft Dynamics NAV 5.0. Technical Whitepaper MANAGE Microsoft Dynamics NAV 5.0 Warehouse Management Systems Technical Whitepaper This Paper will give you an overview of the Warehouse Management Systems granule in Microsoft Dynamics NAV. It is written

More information

Universidad del Turabo MANA 705 DL Workshop Eight W8_8_3 Aggregate Planning, Material Requirement Planning, and Capacity Planning

Universidad del Turabo MANA 705 DL Workshop Eight W8_8_3 Aggregate Planning, Material Requirement Planning, and Capacity Planning Aggregate, Material Requirement, and Capacity Topic: Aggregate, Material Requirement, and Capacity Slide 1 Welcome to Workshop Eight presentation: Aggregate planning, material requirement planning, and

More information

Ud Understanding di inventory issues

Ud Understanding di inventory issues Lecture 10: Inventory Management Ud Understanding di inventory issues Definition of inventory Types of inventory Functions of inventory Costs of holding inventory Introduction to inventory management Economic

More information

EXPERIMENT NUMBER 5 BASIC OSCILLOSCOPE OPERATIONS

EXPERIMENT NUMBER 5 BASIC OSCILLOSCOPE OPERATIONS 1 EXPERIMENT NUMBER 5 BASIC OSCILLOSCOPE OPERATIONS The oscilloscope is the most versatile and most important tool in this lab and is probably the best tool an electrical engineer uses. This outline guides

More information

MULTIPLE LINEAR REGRESSION ANALYSIS USING MICROSOFT EXCEL. by Michael L. Orlov Chemistry Department, Oregon State University (1996)

MULTIPLE LINEAR REGRESSION ANALYSIS USING MICROSOFT EXCEL. by Michael L. Orlov Chemistry Department, Oregon State University (1996) MULTIPLE LINEAR REGRESSION ANALYSIS USING MICROSOFT EXCEL by Michael L. Orlov Chemistry Department, Oregon State University (1996) INTRODUCTION In modern science, regression analysis is a necessary part

More information

CORE COURSE EXEMPTION PROCESS

CORE COURSE EXEMPTION PROCESS CORE COURSE EXEMPTION PROCESS The core curriculum at Fuqua provides a foundation for graduate business education. Faculty members expect each student to gain this basic core of knowledge; however, many

More information

Scatter Plots with Error Bars

Scatter Plots with Error Bars Chapter 165 Scatter Plots with Error Bars Introduction The procedure extends the capability of the basic scatter plot by allowing you to plot the variability in Y and X corresponding to each point. Each

More information

Chapter 7. Production, Capacity and Material Planning

Chapter 7. Production, Capacity and Material Planning Chapter 7 Production, Capacity and Material Planning Production, Capacity and Material Planning Production plan quantities of final product, subassemblies, parts needed at distinct points in time To generate

More information

Microsoft Axapta Inventory Closing White Paper

Microsoft Axapta Inventory Closing White Paper Microsoft Axapta Inventory Closing White Paper Microsoft Axapta 3.0 and Service Packs Version: Second edition Published: May, 2005 CONFIDENTIAL DRAFT INTERNAL USE ONLY Contents Introduction...1 Inventory

More information

Document Summary: HowTo Manufacturing Light v3.odt

Document Summary: HowTo Manufacturing Light v3.odt Manufacturing Light DOCUMENT SUMMARY SHEET Document Type: How To Document Title: Manufacturing Light Document Summary: File Name: HowTo Manufacturing Light v3.odt Created on: Friday, 18 November 2011 Created

More information

Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi

Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi Lecture - 38 Basic Inventory Principles In today s lecture we are going to

More information

STC: Descriptive Statistics in Excel 2013. Running Descriptive and Correlational Analysis in Excel 2013

STC: Descriptive Statistics in Excel 2013. Running Descriptive and Correlational Analysis in Excel 2013 Running Descriptive and Correlational Analysis in Excel 2013 Tips for coding a survey Use short phrases for your data table headers to keep your worksheet neat, you can always edit the labels in tables

More information

Principles of Inventory and Materials Management

Principles of Inventory and Materials Management Principles of Inventory and Materials Management Second Edition Richard J. Tersine The University of Oklahoma m North Holland New York Amsterdam Oxford TECHNISCHE HOCHSCHULE DARMSTADT Fochbereich 1 Gesamthiblio-thek

More information

A System Dynamics Approach to Reduce Total Inventory Cost in an Airline Fueling System

A System Dynamics Approach to Reduce Total Inventory Cost in an Airline Fueling System , June 30 - July 2, 2010, London, U.K. A System Dynamics Approach to Reduce Total Inventory Cost in an Airline Fueling System A. Al-Refaie, M. Al-Tahat, and I. Jalham Abstract An airline fueling system

More information

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras Lecture - 36 Location Problems In this lecture, we continue the discussion

More information

011-0385 ARQUIMEDES: A TOOL FOR TEACHING PPC IN AN OPERATIONS MANAGEMENT COURSE

011-0385 ARQUIMEDES: A TOOL FOR TEACHING PPC IN AN OPERATIONS MANAGEMENT COURSE 011-0385 ARQUIMEDES: A TOOL FOR TEACHING PPC IN AN OPERATIONS MANAGEMENT COURSE Carlos Alberto Castro Z.*, Guillermo León Carmona G.*María Cristina Bravo G* * Departamento de Ingeniería de Producción,

More information

USING FORECASTING TOOLS

USING FORECASTING TOOLS USING FORECASTING TOOLS IFS Inventory Planning and Replenishment IFS CUSTOMER SUMMIT 2011, CHICAGO GREG ROMANELLO SENIOR IMPLEMENTATION MANAGER greg.romanello@ifsworld.com IFS Customer Summit 2011, Chicago

More information

SIMULATION-BASED ANALYSIS OF THE BULLWHIP EFFECT UNDER DIFFERENT INFORMATION SHARING STRATEGIES

SIMULATION-BASED ANALYSIS OF THE BULLWHIP EFFECT UNDER DIFFERENT INFORMATION SHARING STRATEGIES SIMULATION-BASED ANALYSIS OF THE BULLWHIP EFFECT UNDER DIFFERENT INFORMATION SHARING STRATEGIES Yuri A. Merkuryev and Julija J. Petuhova Rik Van Landeghem and Steven Vansteenkiste Department of Modelling

More information

Microsoft Dynamics GP. Engineering Data Management Integration Administrator s Guide

Microsoft Dynamics GP. Engineering Data Management Integration Administrator s Guide Microsoft Dynamics GP Engineering Data Management Integration Administrator s Guide Copyright Copyright 2007 Microsoft Corporation. All rights reserved. Complying with all applicable copyright laws is

More information

MATERIALS MANAGEMENT. Module 9 July 22, 2014

MATERIALS MANAGEMENT. Module 9 July 22, 2014 MATERIALS MANAGEMENT Module 9 July 22, 2014 Inventories and their Management Inventories =? New Car Inventory Sitting in Parking Lots Types of Inventory 1. Materials A. Raw material B. WIP C. Finished

More information

A simulation study on supply chain performance with uncertainty using contract. Creative Commons: Attribution 3.0 Hong Kong License

A simulation study on supply chain performance with uncertainty using contract. Creative Commons: Attribution 3.0 Hong Kong License Title A simulation study on supply chain performance with uncertainty using contract Author(s) Chan, FTS; Chan, HK Citation IEEE International Symposium on Intelligent Control Proceedings, the 13th Mediterrean

More information

Lecture No. 12: Delivery Improvement and Inventory System. Takahiro Fujimoto

Lecture No. 12: Delivery Improvement and Inventory System. Takahiro Fujimoto Business Administration Lecture No. 12: Delivery Improvement and Inventory System 1.Reduction of Production Period 2.Variety and Function of Inventory 3.Fixed-Quantity Order and Fixed-Period Order 4.Kanban

More information

Figure 1. An embedded chart on a worksheet.

Figure 1. An embedded chart on a worksheet. 8. Excel Charts and Analysis ToolPak Charts, also known as graphs, have been an integral part of spreadsheets since the early days of Lotus 1-2-3. Charting features have improved significantly over the

More information

Operations Management

Operations Management 11-1 Inventory Management 11-2 Inventory Management Operations Management William J. Stevenson CHAPTER 11 Inventory Management 8 th edition McGraw-Hill/Irwin Operations Management, Eighth Edition, by William

More information

Introduction. How Important Is Inventory Control?

Introduction. How Important Is Inventory Control? PUBLICATION 420-148 Lean Inventory Management in the Wood Products Industry: Examples and Applications Henry Quesada-Pineda, Assistant Professor, Wood Science and Forest Products, and Business and Manufacturing

More information

Design of a Computerized Inventory Management System for Supermarkets

Design of a Computerized Inventory Management System for Supermarkets Design of a Computerized Inventory Management System for Supermarkets Abisoye Opeyemi A. 1, Boboye Fatoba 2, Abisoye Blessing O 3 1 M. Sc (Computer Science), Federal University of Technology, Department

More information

Statistical Data analysis With Excel For HSMG.632 students

Statistical Data analysis With Excel For HSMG.632 students 1 Statistical Data analysis With Excel For HSMG.632 students Dialog Boxes Descriptive Statistics with Excel To find a single descriptive value of a data set such as mean, median, mode or the standard deviation,

More information

How to Improve Solidworks Bill of Material Auto Population

How to Improve Solidworks Bill of Material Auto Population How to Improve Solidworks Bill of Material Auto Population Auto Population of Solidworks Bill of Materials: By Ed Thompson V1.0 10/15/2015 Setting up the auto population of bills of material (BOM) requires

More information

Inventory - A current asset whose ending balance should report the cost of a merchandiser's products waiting to be sold.

Inventory - A current asset whose ending balance should report the cost of a merchandiser's products waiting to be sold. Accounting Fundamentals Lesson 6 6.0 Inventory & Cost of Sales Inventory - A current asset whose ending balance should report the cost of a merchandiser's products waiting to be sold. The inventory of

More information

Appendix O MANUFACTURING YOUTH APPRENTICESHIP PRODUCTION OPERATIONS MANAGEMENT PATHWAY PRODUCTION OPERATIONS MANAGEMENT (UNIT 8)

Appendix O MANUFACTURING YOUTH APPRENTICESHIP PRODUCTION OPERATIONS MANAGEMENT PATHWAY PRODUCTION OPERATIONS MANAGEMENT (UNIT 8) Appendix O MANUFACTURING YOUTH APPRENTICESHIP PRODUCTION OPERATIONS MANAGEMENT PATHWAY PRODUCTION OPERATIONS MANAGEMENT (UNIT 8) Pathway: (Unit 8) PAGE 1 OF 17 Unit 8: Pathway 1. Assist to purchase materials

More information

Antti Salonen KPP227 - HT 2015 KPP227

Antti Salonen KPP227 - HT 2015 KPP227 - HT 2015 1 Inventory management Inventory management concerns short-range decisions about supplies, inventories, production levels, staffing patterns, schedules and distribution. The decisions are often

More information

Inventory Management, Just-in-Time, and Backflush Costing

Inventory Management, Just-in-Time, and Backflush Costing Inventory Management, Just-in-Time, and Backflush Costing Inventory Management in Retail Organizations Inventory Management is planning coordinating controlling activities related to the flow of inventory

More information

APICS acknowledges the Basics of Supply Chain Management Committee for its contributions in the development of this resource.

APICS acknowledges the Basics of Supply Chain Management Committee for its contributions in the development of this resource. APICS acknowledges the Basics of Supply Chain Management Committee for its contributions in the development of this resource. Jim Caruso, CPIM, CSCP (chair) Carol Bulfer, CPIM James F. Cox, Ph.D., CFPIM,

More information

Manufacturing Planning and Control for Supp Chain Management

Manufacturing Planning and Control for Supp Chain Management Manufacturing Planning and Control for Supp Chain Management Sixth Edition F. Robert Jacobs Indiana University William L. Berry The Ohio State University (Emeritus) D. Clay Whybark University of North

More information

ISE 421 QUANTATIVE PRODUCTION PLANNING

ISE 421 QUANTATIVE PRODUCTION PLANNING ISE 421 QUANTATIVE PRODUCTION PLANNING LECTURE III MRP, MRPII, ERP, APS Dr. Arslan ÖRNEK 2013 2014 Fall Term PRODUCTION PLANNING & SCHEDULING (PP&S) PP&S is one of the most critical activities in a manufacturing

More information

Competence Certificate in Purchasing & Supply Chain Management

Competence Certificate in Purchasing & Supply Chain Management Competence Certificate in Purchasing & Supply Chain Management Welcome to the Competence Certificate in Purchasing & Supply Chain Management s programme. We hope you find the course interesting and that

More information

Warehouse R x Inventory Management Software. Technical Overview

Warehouse R x Inventory Management Software. Technical Overview Warehouse R x Inventory Management Software Technical Overview January 19, 2009 System Overview Warehouse R X is the latest version of Daifuku America s Warehouse Control System (WCS) software. It provides

More information