Appendix F Section 106 Memorandum of Agreement

Size: px
Start display at page:

Download "Appendix F Section 106 Memorandum of Agreement"

Transcription

1 Appendix F Section 106 Memorandum of Agreement Draft Supplemental Environmental Impact Statement December 2013 Page F-1

2

3 MEMORANDUM OF AGREEMENT among The U.S. Army Corps of Engineers, Seattle District The Washington State Department of Archaeology & Historic Preservation, The Advisory Council on Historic Preservation and The City of Seattle Regarding Treatment of Adverse Effects Associated with the Elliott Bay Seawall Project, Seattle, King County, Washington 1. WHEREAS, U.S. Army Corps of Engineers, Seattle District Regulatory Branch (Corps) received a Department of the Army (DA) permit application (DA Permit No. NWS WRD) from the City of Seattle Department of Transportation (SDOT) associated with replacement of the Elliott Bay Seawall located at the shoreline of Elliott Bay, Puget Sound, in downtown Seattle, King County Washington (the Project); and 2. WHEREAS, the Corps' issuance of such a permit for the Project is subject to review under Section 106 of the National Historic Preservation Act, 16 U.S.C. (NHPA), and its implementing regulations (36 CFR Part 800 and 33 CFR 325, Appendix C); and 3. WHEREAS, the area of potential effects (APE) of the 7,166 foot long seawall is generally contained with the boundaries of Broad Street to the north, one to two blocks from the existing seawall to the east, by the waterward end of the existing piers and the limit of proposed ecosystem restoration in Elliott Bay to the west, and South Main street to the south (see Appendix A); and 4. WHEREAS, the Project includes work on land owned by the Washington State Department of Natural Resources (WDNR) and the Washington State Department of Transportation (WSDOT); and 5. WHEREAS, a report has been prepared identifying known and potential historic properties, titled Cultural Resources Assessment, Elliott Bay Seawall Program and dated January 2013, and is included as if attached and incorporated by this reference; and 6. WHEREAS, the Corps has determined that historic properties eligible for listing in the National Register of Historic Places (NRHP) are located within Project s APE, and the Page 1 of 27

4 Washington State Department of Archaeology & Historic Preservation (DAHP) also known as the Washington State Historic Preservation Officer (SHPO) has agreed; and 7. WHEREAS, those properties are: (1) the Elliott Bay Seawall; (2) the Washington Street Boat Landing Pergola; (3) portions of the Pioneer Square-Skid Road National Historic District and Pike Place Public Market Historic District; (4) the Alaskan Way Viaduct/Battery Street Tunnel and the Great Northern Railway Tunnel; (5) Historic Piers and their associated buildings; (6) Submerged archaeological site 45KI1011; and (7) 17 historic buildings (see Appendix B); and 8. WHEREAS, the Corps notified the Muckleshoot Indian Tribe (Muckleshoot), the Sauk- Suiattle Indian Tribe (Sauk-Suiattle), the Snoqualmie Indian Tribe (Snoqualmie), the Stillaguamish Tribe (Stillaguamish), the Suquamish Tribe (Suquamish), the Tulalip Tribes, and the Yakama Nation of the Project and asked each of these Federally recognized tribes whether they would like to participate in this process, and 9. WHEREAS, Sauk-Suiattle has asked to be kept informed about the project; and 10. WHEREAS, Muckleshoot, Stillaguamish, Snoqualmie and Suquamish ( Consulting Tribes ) have asked to participate as consulting parties in the Section 106 process, and the tribes have stated that there is a potential for buried NRHP-eligible archaeological sites in the APE, and that due to the nature of construction, potential sites may not be identified or exposed during construction but if present may be affected by construction; and 11. WHEREAS, the Corps notified the Alliance for Pioneer Square (APS), the Seattle Historic Waterfront Association (SHWA), the Duwamish Tribe, the Washington Trust for Historic Preservation (WTHP), the King County Historic Preservation Program, the Seattle Department of Neighborhoods (SDN), Washington State Ferries (WSF) and Historic Seattle about the undertaking and has taken into consideration their comments on identification, eligibility, assessment of effect, and resolution of adverse effect; and 12. WHEREAS, SHWA, WTHP, SDN, WSF requested consulting party status as interested public entities; and 13. WHEREAS in accordance with 36 CFR Section 800.6(a)(1), Corps has notified the Advisory Council on Historic Preservation (Council) of its adverse effect determination and the Council has chosen to participate in the consultation pursuant to 36 CFR Section 800.6(a)(1)(iii); and 14. WHEREAS, SHWA has entered into a settlement with SDOT on July 3, 2013 titled Agreement Regarding Seawall Project Pier Access, included as if attached and incorporated by this reference, and this agreement has addressed SHWA's concerns regarding potential economic effects to historic properties associated with the undertaking; and 15. WHEREAS, APS and SDOT are negotiating an agreement to conclude within 30 days of execution of this MOA, which will be included as if attached and incorporated by this reference, that SDOT will allocate at least $305,000 to minimize economic effects of the Project on the Pioneer Square Historic District, and in addition to explore the feasibility of an interpretive Page 2 of 27

5 marking of the original Seattle shoreline using the 1% for Art Program, and this agreement will address APS's concerns regarding potential economic effects to historic properties associated with the undertaking; and 16. WHEREAS, SDOT is committed to avoiding, minimizing, and mitigating the economic effect of the Project on businesses in the APE, as demonstrated in Chapter 8 of the Elliott Bay Seawall Project, Final Environmental Impact Statement, dated March 14, 2013, included as if attached and incorporated by this reference; and 17. WHEREAS, construction will result in an adverse effect to the Elliott Bay Seawall and the Washington Boat Street Landing, and possibly to buried archaeological deposits; and 18. WHEREAS, pursuant to 36 CFR Part 800.6(c)(2), and because of their role as the applicant for the DA permit, the Corps has invited SDOT to sign this Memorandum of Agreement (MOA) as a signatory; and 19. WHEREAS, pursuant to 36 CFR Part 800.6(c)(3), and based on their stated interest, the Corps has invited Muckleshoot, Stillaguamish, Snoqualmie, Suquamish, WSDOT, WDNR, WSF, SDN, APS, SHWA, and WTHP to sign this MOA as concurring parties; and NOW, THEREFORE, the Corps, DAHP, Council and SDOT (collectively the Parties and individually the Party ) agree that should the Undertaking move forward to construction, that the following Corps-enforced stipulations resolve adverse effects to historic properties associated with the Undertaking, and that these stipulations shall govern the Project and all of its parts unless this MOA expires or is terminated. STIPULATIONS The Corps shall ensure that the following stipulations are implemented: 1. Elliott Bay Seawall. Construction will have an adverse effect on the Elliott Bay Seawall. To resolve this adverse effect, SDOT will implement the following measures: a. Railing. i. SDOT shall salvage a portion of the existing railing for use in future projects, or in museums for curation/display. SDOT will work with the Corps, DAHP, and interested parties to determine an appropriate disposition of the salvaged railing. Final disposition will require approval by the Corps and DAHP. ii. Consulting parties have expressed a strong preference that the permanent railing reflects the general character of the original. The replacement railings shall also meet code and life-safety requirements. SDOT shall consult with DAHP, the Corps and other interested consulting parties on the railing replacement and/or reuse in the following manner: Page 3 of 27

6 a) Within 60 days of MOA execution, SDOT shall meet with the Corps, DAHP and other interested consulting parties to gain input on key design elements to be considered for the permanent railing. At this initial meeting, a schedule for future coordination meetings will be defined, with a minimum of two meetings between the initial meeting, and the 60 percent railing design drawings milestone. SDOT shall take consulting party comments into consideration when developing the new railing. b) SDOT shall provide updated railing design information to the Corps, DAHP, and other interested consulting parties through 60 percent design. c) Upon completion of 60 percent design drawings, SDOT will meet with Corps, DAHP, and other interested consulting parties. Should the Parties determine that the railing does not reflect the general character of the original, to serve as mitigation for the loss of this railing SDOT shall allocate $100,000 to establish a fund that will be used for façade improvements or other relatively minor repairs/rehab needs for identified historic resources within the APE as mapped in Appendix A. Assistance with seismic retrofitting design and planning would also be eligible. Any funds granted must be used on projects that meet the Secretary of the Interior's Standards for Rehabilitation. The Alliance for Pioneer Square or a similarly capable organization will be responsible for administering the program, distributing funds based on a competitive grant process. In addition to the $100,000, up to an additional ten percent of funds ($10,000) will be made available to cover administrative costs associated with managing the grant program. The Corps and DAHP will review and approve any SDOT agreement with a potential granting agency prior to its implementation. To maximize benefit of the funds, the grant program should be designed to use matching public and private dollar awards. iii. SDOT shall coordinate with the Corps, DAHP, and the Pioneer Square Preservation Board to gain approval for installation of a permanent railing within the district boundaries that meets the architectural standards of that historic district. b. Historic EBSW Construction Methodology and Fill. SDOT shall prepare a "deconstruction" record as the project progresses to document construction methods, fill materials, and overall variations in the design history of the original seawall. This record shall include cross section drawings of types and variations of construction, and video. The record shall be filed with the Washington State archives and Seattle Municipal archives. When planning documentation of Seawall during deconstruction, use of high probability areas for archaeological resources should be chosen wherever possible, and archaeological monitoring should accompany controlled deconstruction. Overall archaeological monitoring is detailed in Stipulation 5. c. Documentation. SDOT shall prepare documentation of the seawall and railings, to include black and white large photography, compilation of historic drawings, maps, photos, narrative and descriptive history of the seawall per DAHP Level II Documentation standards. SDOT shall file this documentation with DAHP, Washington Page 4 of 27

7 State archives, and Seattle Municipal archives. d. Public Outreach. SDOT shall work with the consulting parties through meetings and conference calls to develop and implement a Public Outreach Plan. The City shall implement the plan in full, following timelines detailed in the plan. The plan will be developed according to the following process: i. Within 60 days of MOA execution, SDOT will organize meetings and conference calls with DAHP and the Consulting Tribes to develop a draft plan. SDOT will provide DAHP, the Corps, and other interested consulting parties with a copy of the draft Public Outreach Plan and meet with this group to review any additional comments. Comments received on the draft Public Outreach Plan will be incorporated. Any comments unable to be incorporated will be subject to additional negotiation. SDOT shall distribute the final plan to Corps, DAHP and other interested consulting parties. ii. In the event of a disagreement concerning development and implementation of the plan the dispute will be mediated with the Corps and the Council (per Stipulation 9.a.). iii. Costs for implementation for the plan are separate from the monetary commitments listed in Part 3.b. of this Agreement. iv. As part of the Public Outreach Plan SDOT will do the following: a) Install imaginative educational panels during the seawall reconstruction to inform the community and visitors about the project and the area's history (including native history; see Stipulation 3). Imaginative and educational panels shall be created in consultation with the Consulting Tribes. b) Support and coordinate a permanent interpretive installation at the site (i.e., in the wall or walkways) as part of the Public Outreach Plan and associated waterfront arts and interpretive planning. c) Make available an electronic presentation of the educational panels with seawall history and reconstruction online. d) Commission a new on-line essay regarding the EBSW on HistoryLink ( or a suitable alternative that has been approved by the Consulting Parties. e) Develop a schedule for implementation of each of the components of the plan. e. Seawall Appurtenances. SDOT shall inventory and record historic and/or artistic appurtenances (e.g. plaques, markers, brass medallions) from the existing railing and provide a copy of the documentation via to the consulting parties at least 5 business days prior to salvage. If there is no concern raised by any consulting party within this 5-day period, SDOT shall salvage the historic appurtenances as listed in the Page 5 of 27

8 documentation prior to project construction. During construction, all inventoried and salvaged items shall be stored by SDOT in a secure location. The storage location shall protect the appurtenances from decay. SDOT shall prepare a Seawall Appurtenances Plan to determine how these items will be permanently treated and provide the plan to the Corps and DAHP within 120 days of execution of this MOA. The plan will be prepared according to the following process: i. Within 60 days of MOA execution, SDOT shall meet with the Corps, DAHP and other interested consulting parties to review options for permanent treatment/use of the appurtenances. Key factors to be considered shall include: historic significance, opportunities of reuse in the central waterfront, costs for storage and potential refurbishment/maintenance, and methods for re-assigning ownership of the appurtenances should that be necessary. The possible reuse of these appurtenances shall be limited to reuse in the central waterfront, curation in an existing facility (temporary or permanent), or re-assignment of ownership. ii. Based upon the outcomes of this discussion, SDOT shall assemble a range of alternatives for permanent treatment of the appurtenances, and distribute for review and comment by the Corps and DAHP and other interested parties. iii. With the feedback on the range of alternatives, SDOT shall prepare a final Appurtenances Plan identifying the final treatment of the individual appurtenances, with applicable implementation mechanisms. DAHP and the Corps must approve the final plan, and SDOT shall implement the Seawall Appurtenances Plan. 2. Washington Street Boat Landing. The proposed habitat beach will degrade the historic setting, feeling, and association of the Boat Landing and introduce a non-historic configuration adjacent to and in front of the historic property. This will adversely affect the Boat Landing s connection with the water. SDOT will work with the consulting parties to preserve the Boat Landing s potential as an access point to watercraft. SDOT shall: a. Plantings. SDOT shall install plants in such a way as to preserve viewsheds in and around the boathouse. Vegetation shall not be placed directly adjacent to the structure. SDOT will consult with the Corp and DAHP on the plantings. The Corps and DAHP must approve the plant placement and type prior to planting, with the understanding that the plants must work within the parameters of habitat goals. b. Unintended Use and Nearshore Habitat. Vegetation may create a shield for undesirable activities, which in turn may encourage activities in and around the boathouse that could damage its historic fabric, such as vandalism. To minimize effects to the WSBL, only plantings essential for habitat goals shall be planted, and sightlines will be designed such that hiding spots for undesirable activities are not inadvertently created. c. Habitat Beach. The habitat beach is inconsistent with the historic nature of the WSBL. Page 6 of 27

9 Plans for the Habitat Beach shall be made available to the Corps, DAHP, and other interested parties for review and comment. SDOT shall reduce the protuberance and visual impact of the rock arms along the south side of the habitat beach to the extent that it will still retain its intended habitat function and stability. The design of the habitat beach shall ensure the navigability of the waterway to allow watercraft to reach the WSBL. d. Public Outreach. As mitigation for the adverse effect to the WSBL, SDOT will provide additional interpretive features/signage to explain the historic function and relationship of the WSBL to the waterfront and Pioneer Square, the geomorphology of the shoreline, and indigenous use of the immediate area prior to industrial development of Seattle. The interpretative features shall be developed with the Corps, DAHP, Pioneer Square Preservation Board, and other interested parties. The final product must meet PSPB approval. e. Pergola Restoration. As mitigation for the changes to the visual setting associated with the habitat beach, SDOT shall restore the pergola and re-install it in its original footprint and orientation, which will preserve the existing sightline from Washington Street toward Elliott Bay. Restoration will take place off-site, following the City of Seattle, Pioneer Square Preservation Board's certificate of approval (COA) dated June 13, 2013, included as if attached and incorporated by this reference. The restoration shall meet the Secretary of the Interior s Standards for Restoration. The existing conditions and removal and restoration process will be documented with photography and video. SDOT will repair any unintended damage to the structure during the removal, restoration, and replacement process in accordance with the Secretary of the Interior s Standards and in such a manner acceptable to the Corps, DAHP, and the Pioneer Square Preservation Board. Any new proposal or deviation from the approved COA affecting the Washington Street Boat Landing during the project implementation must be reviewed and approved by the Corps, DAHP and the Pioneer Square Preservation Board. SDOT shall provide periodic updates/briefings to the Pioneer Square Preservation Board and DAHP during restoration. f. Additional Mitigation. The current habitat beach is inconsistent with the historic setting of the WSBL, and even with the proposed minimization of plantings and reduced footprint the beach will encroach on the WSBL and the undertaking will have an adverse effect to the setting of the WSBL. In addition to the above, SDOT will contribute up to $30,000 for design and fabrication of two (2) Trail to Treasure wayside kiosks as delineated in the Trail to Treasure Master Plan, which is currently administered by the APS. Funding will be provided to APS. 3. Tribal Outreach. Tribes have stated that there is a potential for buried NRHP-eligible archaeological sites in the APE, and that due to the nature of construction the sites may not be identified or exposed during construction but if present may be adversely affected by construction. In recognition of native traditional occupation and continuing use of the area, SDOT shall work with the Consulting Tribes to develop interpretive and educational Page 7 of 27

10 components to be incorporated in the project to inform the public about Indian use of the Elliott Bay shoreline in the pre-contact and early historic periods, and to the present day. Within 30 days of execution of the MOA, SDOT will schedule meetings with the Consulting Tribes and work with them to develop a Tribal Outreach Plan for developing the educational and interpretative components cohesively into the project. Prior to implementation, the plan will be subject to review by Consulting Tribes. The Tribal Outreach Plan will include the following: a. Salmon Homecoming. Salmon Homecoming is an opportunity for public education as a traditional cultural event hosted and celebrated by native people for many centuries on the Bay. SDOT will provide the Salmon Homecoming Alliance with $25,000 in annual support for each year of the Phase I (i.e., Central Seawall) construction as defined in DA Permit No. NWS WRD is active during the month of September (currently estimated to take three years). SDOT will meet with the consulting Tribes within 60 days of the execution of this MOA to discuss continued access to city property for future Salmon Homecomings. b. Interpretation and Education. SDOT will allocate funding for this component not to exceed $25,000 for implementation of the interpretative and educational components under this Section for tribal outreach associated with the Seawall project. c. Consultation. SDOT will ensure that timely consultation and participation opportunities will be given to the Consulting Tribes regarding native history and culture during the planning and development of public art installations, education and interpretative planning, and funding related to the Seawall project. SDOT will coordinate with all Consulting Tribes to integrate tribal concerns with these plans. 4. Historic Building Damage. Construction has the potential to damage historic buildings in the APE. The purpose of this stipulation is to provide details on how damage will be avoided, minimized, and mitigated. Prior to construction, SDOT shall survey the existing conditions of historic buildings in the APE (as listed in Appendix B) as outlined in section 4.c. a. SDOT shall repair any damage caused by construction activities associated with the Project to historic properties within the APE (as listed in Appendix B) as outlined in the steps below. All repairs shall follow the Secretary of the Interior's Standards for Rehabilitation and shall be done under a COA from SDN if required. i. Upon suspected damage caused by construction, SDOT will immediately stop work causing the damage and notify the affected property owner(s), Corps, DAHP, and SDN of the damage. ii. SDOT will determine if the damage results in an emergency situation; if the damage does cause an emergency, repairs will be made in such a manner and to the extent necessary to alleviate the emergency in consultation with the affected property Page 8 of 27

11 owner(s) and, to the extent possible, the Corps, DAHP, and SDN. Once stabilized, SDOT will continue following the procedures below. iii. SDOT will develop a design for repair, in accordance with the Secretary of the Interior s Standards for Rehabilitation, in consultation with these agencies and the affected property owner(s). iv. SDOT will complete the repairs, and send confirmation to the affected property owner(s), the Corps, DAHP, and, if applicable, SDN, SHWA, or APS. b. To avoid and minimize the potential for Project construction to result in neglected historic properties within the APE, SDOT will implement a public outreach strategy that includes informational campaigns to encourage people to visit the waterfront and Pioneer Square during construction. In the event that any business housed within a historic structure within the APE (as listed in Appendix B) goes out of business during construction of the seawall as a direct result of the proposed work, SDOT shall be responsible for maintenance as necessary to maintain those characteristics of the property that make it eligible for listing in the NRHP, until a new tenant can be found. i. Within one week upon taking responsibility for the property, SDOT shall survey the property to note existing conditions, including any damage. SDOT will contact the Corps, DAHP, SDN, and, if applicable, APS or SWHA, to notify them of any damage requiring repair. ii. SDOT shall develop a design for repair, in accordance with the Secretary of the Interior s Standards for Rehabilitation, in consultation with these agencies and the affected property owner(s). iii. SDOT shall complete the repairs, and send confirmation to the affected property owner(s), the Corps, DAHP, and, if applicable, SDN or SHWA. iv. SDOT will not be responsible for any repairs or maintenance that do not pertain to the characteristics that make the property eligibility for listing in the NRHP, such as water, heating, property tax, and electricity, but would include such things as repairs to broken windows and doors, repairs to failing piles or piers, and repairs due to vandalism. Damage caused by natural causes (e.g., tsunami, earthquake, etc.) is excluded. c. Prior to construction that has the potential to cause vibration damage, SDOT shall develop a Vibration Monitoring and Management Plan, which will include a preconstruction survey of the existing site conditions, utilities, and buildings to establish baseline conditions and will consist of photographs of existing cracks and any other architectural or structural problems or deficiencies. Buildings to be surveyed will include those from Appendix B that have the potential to be damaged during construction. This plan will be provided to the Corps, DAHP, and, as applicable, SDN or SHWA for review and comment. If it is determined that EBSW construction caused damage to any historic building, SDOT will respond as outlined in 4.a. above. Page 9 of 27

12 5. Archaeological Monitoring and Curation. SDOT shall prepare an Archaeological Monitoring and Curation Plan prepared by an archaeologist meeting the Secretary of Interior Standards for a Professional Archaeologist. In consultation with DAHP and the Consulting Tribes SDOT shall identify parameters for archaeological monitoring. SDOT shall complete the monitoring plan for submission to the Corps no later than 7 days after this MOA is executed. The plan shall provide for tribal access for any consulting tribe during any ground disturbance, data recovery excavations, during construction of the Project, and during post construction monitoring. The plan will include information on curation of artifacts found during the project. The Archaeological Monitoring and Curation Plan and the Inadvertent Discovery Plan can be combined into one plan, and the curation portion of the plan can be developed as a stand-alone plan. The City will implement the Archaeological Monitoring and Curation Plan in full, following timelines detailed in the plan. After execution of this MOA, but prior to approval of the monitoring plan, SDOT may notify the Corps, DAHP, and Consulting Tribes by and phone about grounddisturbing work that they believe would have no potential to cause effects to historic properties, or that cannot be archaeologically monitored (e.g., jet grouting). If the Corps and DAHP, taking into consideration tribal comments, agree, then the proposed work may proceed following the terms of the IDP (Stipulation 6). 6. Inadvertent Discovery Plan. Construction has the potential to uncover previously unknown cultural material, including human remains. The purpose of this plan is to provide information on treatment of finds made during work not professionally monitored by an archaeologist (Stipulation 5). If human remains are discovered at any time during any data recovery or during construction work, work will cease immediately in the discovery vicinity, the location will be secured and law enforcement will be contacted. The treatment of human remains will comply with RCW SDOT shall prepare a plan detailing treatment of Inadvertent Discoveries for submission to the Corps no later than 7 days after this MOA is executed. Prior to implementation, the plan will be subject to review and comment by the consulting parties, and approval by the Parties. The City will implement the Inadvertent Discovery Plan in full, following timelines detailed in the plan. 7. Reporting. For any report or plan produced under this MOA, SDOT shall all consulting parties a draft version of the electronic copy to review. SDOT will revise the draft electronic copy in consideration of the comments. After final approval by the Parties, SDOT will provide consulting parties to this MOA two hard copies and one electronic copy of any plan or final report SDOT prepares as required under this MOA. SDOT will a yearly status update to the consulting parties detailing the current status of any incomplete Stipulation. Page 10 of 27

13 8. Plan Review. Consulting Party review of plans will be as follows: a. Plans required for construction. For plans that are required for initial project construction, the consulting party review and comment window will be one week. This includes the Vibration Monitoring and Management Plan, the Archaeological Monitoring and Curation Plan, and the Inadvertent Discovery Plan. b. Plans not required for construction. For plans are not required for initial project construction, the consulting party review and comment time will be 30 days. This includes the Public Outreach Plan, the Seawall Appurtenances Plan, the Tribal Outreach Plan, the Curation Plan (if created separately from the Archaeological Monitoring Plan) and the plans for the habitat beach. 9. Administrative Stipulations a. Dispute Resolution Should any consulting party to this agreement object at any time to any actions proposed or the manner in which the terms of this MOA are implemented, the Corps shall consult with the objecting party(ies) to resolve the objection. If Corps determines, within 30 days, that such objection(s) cannot be resolved, Corps will: i. Forward all documentation relevant to the dispute to the Council in accordance with 36 CFR Part 800.2(b)(2). Upon receipt of adequate documentation, the Council shall review and advise the Corps on the resolution of the objection within 30 days. Any comment provided by the Council, and all comments from the parties to the MOA, will be taken into account by the Corps in reaching a final decision regarding the dispute. ii. If the Council does not provide comments regarding the dispute within 30 days after receipt of adequate documentation, the Corps may render a decision regarding the dispute. In reaching its decision, the Corps will take into account all comments regarding the dispute from the consulting parties to the MOA. iii. The Corps responsibility to carry out all other actions subject to the terms of this MOA that are not the subject of the dispute remain unchanged. The Corps will notify all consulting parties of its decision in writing before implementing that portion of the Undertaking subject to dispute under this stipulation. The Corps decision will be final. b. Amendments and Noncompliance Page 11 of 27

14 If any Party to this MOA determines that its terms will not or cannot be carried out or that an amendment to its terms must be made, that Party shall immediately consult with the other Parties to develop an amendment to this MOA pursuant to 36 CFR Part 800.6(c)(7) and Part 800.6(c)(8). The amendment will be effective on the date a copy signed by all of the original signatories is filed with the Council. If the Parties cannot agree to appropriate terms to amend the MOA, any Party may terminate the agreement in accordance with Stipulation 9.f., below. c. Plan Enforceability Any plan developed as a requirement of this MOA is subject to the laws that enforce this MOA. d. Primary Contact Information The contact information for each signatory to this MOA may be updated which shall not be considered an amendment to this MOA. An electronic message ( ) exchanged among the contacts, indicating the updated information, shall be sufficient provided the signature authority for each Party is included in such communication e. Duration If the terms of this agreement have not been implemented within ten years of execution of the MOA, this agreement shall be considered null and void, unless the signatories agree in writing to an extension for carrying out its terms. If this agreement is considered null and void, the Corps shall so notify the parties to this agreement, and if SDOT chooses to continue with the undertaking, shall re-initiate review of the undertaking in accordance with 36 CFR Part 800. f. Termination If an MOA is not amended following the consultation set out in Stipulation 9.b. it may be terminated by any signatory or invited signatory. Within 30 days following termination, the Corps shall notify the signatories if it will initiate consultation to execute an MOA with the signatories under 36 CFR 800.6(c)(1) or request the comments of the Council under 36 CFR 800.7(a) and proceed accordingly. Execution of this Memorandum of Agreement by the Corps, DAHP, Council and SDOT, and the submission of documentation and filing of this Memorandum of Agreement with the Council pursuant to 36 CFR Section 800.6(b)(1)(iv) prior to the Corps approval of this undertaking, and implementation of its terms evidence that the Corps has taken into account the effects of this undertaking on historic properties and afforded the Council an opportunity to comment. Page 12 of 27

15 SIGNATORY PARTY: U.S. ARMY CORPS OF ENGINEERS, SEATTLE DISTRICT Bruce A. Estok Colonel, Corps of Engineers District Commander Date: Contact Information: Chris Jenkins, Regulatory Cultural Resources Program Manager US Army Corps of Engineers, Seattle District P.O. Box 3755 Seattle WA Voice: (206) Note: Signatures continued on next page. Page 13 of 27

16 SIGNATORY PARTY: THE WASHINGTON STATE DEPARMENT OF ARCHAEOLOGY & HISTORIC PRESERVATION By: Date: Title: Allyson Brooks, Ph. D. State Historic Preservation Officer Contact Information: Greg Griffith Deputy State Historic Preservation Officer Department of Archaeology and Historic Preservation 1062 S. Capitol Way, Suite 106 Olympia, WA Voice: (360) Note: Signatures continued on next page. Page 14 of 27

17 SIGNATORY PARTY: THE ADVISORY COUNCIL ON HISTORIC PRESERVATION By: Date: Title: John M. Fowler Executive Director Contact Information: John T. Eddins, PhD Advisory Council on Historic Preservation Old Post Office Building 1100 Pennsylvania Avenue, NW, Suite 803 Washington, DC Voice: (202) Note: Signatures continued on next page. Page 15 of 27

18 SIGNATORY PARTY: THE CITY OF SEATTLE By: Date: Title: Peter E. Hahn, Director Seattle Department of Transportation Contact Information: Mark Mazzola Manager, Environmental Services Seattle Department of Transportation Capital Projects & Roadway Structures Division 700 Fifth Avenue, Suite 3900 PO Box Seattle, WA Voice: (206) Note: Signatures continued on next page. Page 16 of 27

19 CONCURRING PARTY: MUCKLESHOOT INDIAN TRIBE By: Date: Title: Virginia Cross Tribal Council Chairperson Contact Information: Laura R. Murphy Archaeologist Muckleshoot Indian Tribe nd Ave. SE Auburn, WA Phone: (253) Note: Signatures continued on next page. Page 17 of 27

20 CONCURRING PARTY: STILLAGUAMISH TRIBE By: Date: Title: Shawn Yanity Chair, Stillaguamish Tribe of Indians Contact Information: Kerry Lyste, Cultural Resources Stillaguamish Tribe of Indians Post Office Box 277 Arlington, Washington Voice: (360) x226 Note: Signatures continued on next page. Page 18 of 27

21 CONCURRING PARTY: SNOQUALMIE INDIAN TRIBE By: Date: Title: Carolyn LubenauChair, Snoqualmie Tribe Contact Information: Steven Mullen-Moses Director Archaeology & Historic Preservation Snoqualmie Tribe Desk: x1106 Cell: Note: Signatures continued on next page. Page 19 of 27

22 CONCURRING PARTY: SUQUAMISH TRIBE By: Date: Title: Leonard Forsman Chair, Suquamish Tribe Contact Information: Dennis Lewarch, THPO The Suquamish Tribe PO Box 498 Suquamish, WA Voice: (360) Note: Signatures continued on next page. Page 20 of 27

23 CONCURRING PARTY: WASHINGTON STATE DEPARTMENT OF TRANSPORTATION By: Date: Title: Contact Information: Kevin M. Bartoy, RPA Cultural Resources Lead WSDOT Northwest Region Dayton Avenue North Shoreline, WA Voice: (206) Cell: (206) Note: Signatures continued on next page. Page 21 of 27

24 CONCURRING PARTY: WASHINGTON DEPARTMENT OF NATURAL RESOURCES By: Date: Title: Contact Information: Maurice Major, Cultural Resource Specialist HCP and Scientific Consultation Section Washington Department of Natural Resources 1111 Washington Street SE PO Box Olympia, WA Voice: (360) Cell: (360) Page 22 of 27

25 CONCURRING PARTY: WASHINGTON STATE FERRIES By: Date: Title: David Moseley, Director Washington State Ferries Contact Information: Genevieve Rucki, P.E. Washington State Ferries rd Avenue, Suite 500 Seattle, WA Voice: (206) Note: Signatures continued on next page. Page 23 of 27

26 CONCURRING PARTY: SEATTLE DEPARTMENT OF NEIGHBORHOODS By: Date: Title: Karen Gordon Historic Preservation Officer Contact Information: Karen Gordon, Historic Preservation Officer Seattle Department of Neighborhoods 700 5th Avenue, Suite 1700 Post Office Box Seattle, WA Voice: (206) Note: Signatures continued on next page. Page 24 of 27

27 CONCURRING PARTY: ALLIANCE FOR PIONEER SQUARE By: Date: Title: Leslie G. Smith Executive Director Contact Information: Leslie G. Smith Executive Director The Alliance for Pioneer Square 310 1st Avenue South, Suite 238 Seattle, WA Voice: (206) x101 Cell: (206) Note: Signatures continued on next page. Page 25 of 27

28 CONCURRING PARTY: SEATTLE HISTORIC WATERFRONT ASSOCIATION By: Date: Title: Elaine L. Spencer Contact Information: Ms. Elaine L. Spencer, Graham & Dunn PC Seattle Historic Waterfront Association 2801 Alaskan Way, Suite 300 Seattle, WA Voice: (206) Note: Signatures continued on next page. Page 26 of 27

29 CONCURRING PARTY: WASHINGTON TRUST FOR HISTORIC PRESERVATION By: Date: Title: Chris Moore Field Director Contact Information: Chris Moore, Field Director Washington Trust for Historic Preservation Stimson-Green Mansion 1204 Minor Avenue Seattle, Washington Voice: (206) Cell: (206) Note: End of signature pages Page 27 of 27

30

31 Elliott Bay Seawall Project Area of Potential Effects July 2012

32 Elliott Bay Seawall Project Area of Potential Effects July 2012

33 ALASKAN WAY S UNION ST POST AL Potential Construction Staging Locations Construction Work Area ALASKAN WY VI SB UNIVERSITY ST Pier 57 SENECA ST 3RD AVE 2ND AVE Pier 56 SENECA ST OFF RP SPRING ST POST AVE 1ST AVE WESTERN AVE Pier 55 MADISON ST Project APE Pier 54 MARION ST Pier 53 COLUMBIA ST ALASKAN E RDWY WAY COLUMBIA ST ON RP POST AVE ALASKAN WAY Pier 52 Pier 50 YESLER WAY S WASHINGTON ST N meters feet Pier 48 S MAIN ST

34 WESTERN AV OFF RP ELLIOTT AV ON RP BLANCHARD ST ELLIOTT AVE LENORA ST VIRGINIA ST 2ND AVE Potential Construction Staging Locations Construction Work Area OLIVE WAY 3RD AVE ALASKAN WAY LENORA ST PED BR POST AL STEWART ST PINE ST PIKE PL ALASKAN WY VI SB 1ST AVE VIRGINIA ST PIKE ST ALASKAN WY VI NB Pier 63 PINE ST ELLIOTT AVE Pier 62 ALASKAN E RDWY WAY PIKE HILL CLIMB Project APE Pier 61 UNION ST WESTERN AVE Pier 59 POST AL ALASKAN E RDWY WAY Pier 57 UNIVERSITY ST Pier 56 SENECA ST N meters feet Pier 55

35 VINE ST BATTERY ST TUNNEL SB Potential Construction Staging Locations Construction Work Area 3RD AVE WALL ST BATTERY ST 2ND AVE WESTERN AVE BELL ST 1ST AVE BLANCHARD ST ELLIOTT AVE ALASKAN WY VI NB ALASKAN WAY Pier 66 LENORA ST ELLIOTT AV ON RP WESTERN AV OFF RP LENORA ST PED BR ALASKAN WY VI SB Project APE ELLIOTT AVE Pier 63 Pier 62 PINE ST N meters feet

36 BAY ST Potential Construction Staging Locations Construction Work Area 2ND AVE ELLIOTT AVE WESTERN AVE BROAD ST 1ST AVE CLAY ST CEDAR ST Pier 70 VINE ST Pier 69 WALL ST Project APE Pier 67 ALASKAN WAY Pier 66 N meters feet

37 Appendix B: Assessment of Effect for NRHP-Eligible Properties in the APE. SWCA ID/ DAHP No. H1/ H2/ H3/ H4/ 45KI129 Address Current Name (Historic Name) Pioneer Square-Skid Road National Historic District Pike Place Public Market Historic District Alaskan Way Elliott Bay/Alaskan Way Seawall Alaskan Way/ Battery Street S. Main Street to Bell Street Foot of S. Washington Street Alaskan Way Viaduct and Battery Street Tunnel Burlington Northern Railroad Tunnel (Great Northern Railway Tunnel) Washington Street Boat Landing Pergola H5 1 Yesler Way One Yesler Building (Bedford Hotel) H6 H7 H11 H12 H13 H14 H Western Avenue 61 Columbia Street 925 Alaskan Way 911 Western Avenue 1001 Alaskan Way 1101 Alaskan Way 1201 Alaskan Way H Western Avenue H17 H18 H26 51 University Street 1301 Alaskan Way 1507 Western Avenue Western Building Polson Building Fire Station No. 5 Maritime Building Pier 54 ( Northern Pacific Railroad 3/Galbraith Dock) Pier 55 (Northern Pacific Railroad 4/Arlington Dock) Pier 56 (Frank Waterhouse Dock) (Olympic Warehouse) Pacific Net and Twine (Pacific Marine Supply) Pier 57 (John P. Agen s Dock/ Milwaukee Dock) Fix Building NRHP Status 1 Listed NRHP District Listed NRHP District Eligible NRHP (2009) Eligible NRHP (2001) Eligible NRHP (2009) Listed NRHP (1973) Listed NRHP (Contributing PSHD) Listed NRHP (Contributing PSHD) Listed NRHP (Contributing PSHD) Eligible NRHP (2009) Eligible NRHP (2009) Eligible NRHP (2009) Eligible NRHP (2009) Eligible NRHP (2009) Listed NRHP (1998) Eligible NRHP (2009) Eligible NRHP (2009) Eligible (2009) Corps Assessment of Effect No Adverse effect No Adverse effect Adverse Effect Adverse Effect

38 SWCA ID/ DAHP No. Address Current Name (Historic Name) NRHP Status 1 H27 Pike Place Main Arcade Pike Place Market Listed NRHP (contributing PPMHD 2011) H Elliott Avenue H35 77 Yesler Way Pioneer Square Hotel (Yesler Hotel) H Alaskan Way S. H37 68 S. Washington Street H38 77 S. Washington street H39 81 S. Washington Street H41 H42 H Alaskan Way S. 76 S. Main Street 80 S. Main Street Corps Assessment of Effect Old Spaghetti Factory Eligible NRHP Prudential Building 2 Washington Park Building (Lowman & Hanford) Lutheran Compass Center (Pacific Coast Company) St. Charles Hotel OK Hotel Boston Hotel Listed NRHP (Contributing PSHD) Listed NRHP (Contributing PSHD) Listed NRHP (Contributing PSHD) Listed NRHP (Contributing PSHD) Listed NRHP (Contributing PSHD) Listed NRHP (Contributing PSHD) Listed NRHP (Contributing PSHD) Argens Lock & Safe Company Listed NRHP 45KI1011 Pier 54 Submerged Debris Scatter Eligible (A and D) No Effect (avoidance) 1 NRHP = National Register of Historic Places; PPMHD = Pike Place Market Historic District; PSHD = Pioneer Square-Skid Road National Historic District

MEMORANDUM OF AGREEMENT AMONG THE U.S. GENERAL SERVICES ADMINISTRATION THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE AND THE

MEMORANDUM OF AGREEMENT AMONG THE U.S. GENERAL SERVICES ADMINISTRATION THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE AND THE MEMORANDUM OF AGREEMENT AMONG THE U.S. GENERAL SERVICES ADMINISTRATION THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE AND THE ADVISORY COUNCIL ON HISTORIC PRESERVATION REGARDING THE CONSTRUCTION OF A

More information

WHEREAS, the underground garage is being jointly funded by the DCC and the USCAAF; and

WHEREAS, the underground garage is being jointly funded by the DCC and the USCAAF; and GSA National Capital Region MEMORANDUM OF AGREEMENT AMONG THE UNITED STATES GENERAL SERVICES ADMINISTRATION, THE DISTRICT OF COLUMBIA COURTS, THE UNITED STATES COURT OF APPEALS FOR THE ARMED FORCES, THE

More information

Advisory Council On Historic Preservation

Advisory Council On Historic Preservation Advisory Council On Historic Preservation The Old Post Office Building 1100 Pennsylvania Avenue, NW, #809 Washington, DC 20004 MEMORANDUM OF AGREEMENT AMONG THE U.S. DEPARTMENT OF HOUSING AND URBAN Al'ID

More information

Appendix F. Programmatic Agreement

Appendix F. Programmatic Agreement Appendix F Programmatic Agreement DRAFT PROGRAMMATIC AGREEMENT AMONG THE U. S. ARMY CORPS OF ENGINEERS, NEW YORK DISTRICT, THE NATIONAL PARK SERVICE, AND THE NEW YORK STATE HISTORIC PRESERVATION OFFICE

More information

United States Department of the Interior

United States Department of the Interior United States Department of the Interior IN REPLY REFER TO: NATIONAL PARK SERVICE 1849 C Street, N.W. Washington, D.C. 20240 H36(2256) PROGRAMMATIC AGREEMENT AMONG. THE NATIONAL PARK SERVICE, AND CONNECTICUT

More information

FERC No. 2157 Updated 1/2011 Page 2

FERC No. 2157 Updated 1/2011 Page 2 for the This (UDP) details the procedures for the unanticipated discovery of human remains or archaeological resources within the Area of Potential Effects for the (FERC No. 2157). The Snohomish County

More information

FHWA Section 106 Programmatic Agreement

FHWA Section 106 Programmatic Agreement FIRST AMENDED PROGRAMMATIC AGREEMENT AMONG THE FEDERAL HIGHWAY ADMINISTRATION, THE ADVISORY COUNCIL ON HISTORIC PRESERVATION, THE CALIFORNIA STATE HISTORIC PRESERVATION OFFICER, AND THE CALIFORNIA DEPARTMENT

More information

Plug CRM Gaps in the U.S.

Plug CRM Gaps in the U.S. Preventing Archaeological Disasters and Facilitating Cultural Resource Protection: One Nonprofit s Attempt to Plug CRM Gaps in the U.S. Tonight s Conversation Archaeological Disasters - How I came to be

More information

The National Historic Preservation Act of 1966 as Amended (NHPA)

The National Historic Preservation Act of 1966 as Amended (NHPA) I. THE LAW: THE LEGAL FRAMEWORK FOR HISTORIC PRESERVATION Federal Laws and Regulations Early Legislation The Antiquities Act of 1906 The documentation and treatment of historic resources, archaeological

More information

www POLICY STATEMENT REGARDING TREATMENT OF BURIAL SITES, HUMAN REMAINS AND FUNERARY OBJECTS

www POLICY STATEMENT REGARDING TREATMENT OF BURIAL SITES, HUMAN REMAINS AND FUNERARY OBJECTS www Preserving America s Heritage ADVISORY COUNCIL ON HISTORIC PRESERVATION POLICY STATEMENT REGARDING TREATMENT OF BURIAL SITES, HUMAN REMAINS AND FUNERARY OBJECTS Preamble: This policy offers leadership

More information

IV. Environmental Impact Analysis I.2. Cultural Resources Archaeological Resources

IV. Environmental Impact Analysis I.2. Cultural Resources Archaeological Resources IV. Environmental Impact Analysis I.2. Cultural Resources Archaeological Resources 1. Introduction The following section addresses the potential for the Proposed Project to affect archaeological resources

More information

PLAN AND PROCEDURES FOR THE UNANTICIPATED DISCOVERY OF CULTURAL RESOURCES AND HUMAN SKELETAL REMAINS PROJECT, COUNTY WASHINGTON

PLAN AND PROCEDURES FOR THE UNANTICIPATED DISCOVERY OF CULTURAL RESOURCES AND HUMAN SKELETAL REMAINS PROJECT, COUNTY WASHINGTON PLAN AND PROCEDURES FOR THE UNANTICIPATED DISCOVERY OF CULTURAL RESOURCES AND HUMAN SKELETAL REMAINS PROJECT, COUNTY WASHINGTON 1. INTRODUCTION The Washington State Department of Transportation (WSDOT)

More information

WILSON TRANSFER STATION CONSULTING PARTIES MEETING. Chicago Transit Authority

WILSON TRANSFER STATION CONSULTING PARTIES MEETING. Chicago Transit Authority WILSON TRANSFER STATION CONSULTING PARTIES MEETING Chicago Transit Authority AGENDA I. Welcome II. What is Section 106? III. Consulting Parties Introduction IV. Community Outreach V. Project Purpose and

More information

36 CFR PART 800 -- PROTECTION OF HISTORIC PROPERTIES (incorporating amendments effective August 5, 2004)

36 CFR PART 800 -- PROTECTION OF HISTORIC PROPERTIES (incorporating amendments effective August 5, 2004) 1 36 CFR PART 800 -- PROTECTION OF HISTORIC PROPERTIES (incorporating amendments effective August 5, 2004) Subpart A -- Purposes and Participants Sec. 800.1 Purposes. 800.2 Participants in the Section

More information

FWS Cultural Resource Management Planning

FWS Cultural Resource Management Planning I. What is required? FWS Cultural Resource Management Planning A number of laws, regulations, and Fish and Wildlife Service policies address cultural resource management planning requirements and objectives.

More information

APPENDIX B PROGRAMMATIC AGREEMENT

APPENDIX B PROGRAMMATIC AGREEMENT APPENDIX B PROGRAMMATIC AGREEMENT 28 February 2002 DRAFT PROGRAMMATIC AGREEMENT AMONG THE DEPARTMENT OF THE NAVY AND THE TEXAS STATE HISTORIC PRESERVATION OFFICER CONCERNING THE OPERATIONS AND MAINTENANCE

More information

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain

Effect on structures. Uniform settlement - no concerns. Angular distortion - causes damage due to tensile strain Effect on structures Uniform settlement - no concerns Angular distortion - causes damage due to tensile strain 1/500 - safe limit for no cracking of buildings 1/150 - potential structural damage 36 37

More information

Memorandum of Agreement. Federal Transit Administration, and California State Historic Preservation Officer

Memorandum of Agreement. Federal Transit Administration, and California State Historic Preservation Officer 0 0 Memorandum of Agreement among the Federal Transit Administration, and California State Historic Preservation Officer for the Transbay Terminal/Caltrain Downtown Extension/Redevelopment Project in San

More information

PUBLIC NOTICE Application for Permit

PUBLIC NOTICE Application for Permit PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested

More information

WYOMING STATE PROTOCOL APPENDIX I GLOSSARY

WYOMING STATE PROTOCOL APPENDIX I GLOSSARY WYOMING STATE PROTOCOL APPENDIX I GLOSSARY Advisory Council on Historic Preservation (ACHP) Established by the National Historic Preservation Act (1966), the ACHP is an independent executive agency that

More information

5.0 CRM PROCEDURES AND ADMINISTRATION

5.0 CRM PROCEDURES AND ADMINISTRATION Savannah River Site s Cold War Built Environment Cultural Resource Management Plan 145 5.0 CRM PROCEDURES AND ADMINISTRATION 5.1 COMPLIANCE PROCEDURES NHPA, EXECUTIVE ORDER 11593, 36 CFR PARTS 60, 63,

More information

Phase III: Data Recovery and Mitigation

Phase III: Data Recovery and Mitigation Phase III: Data Recovery and Mitigation Introduction... 51 Developing a Data Recovery Plan... 51 Methods and Techniques for Data Recovery... 53 Reporting the Results of Data Recovery Projects... 55 Interested

More information

Environmental Review Document Distribution Matrix

Environmental Review Document Distribution Matrix Federal Agencies US Enironmental Protection Agency Office of Federal Actiities EIS Filing Section Mail Code 2252-A, Room 7241 1200 Pennsylania Ae NW Washington DC 20460 EIS Reiew Coordinator USEPA Region

More information

Jacksonville Port Authority: Fire and Rescue Marine Fire Station #40, Jacksonville, Florida

Jacksonville Port Authority: Fire and Rescue Marine Fire Station #40, Jacksonville, Florida Draft Tiered Site-Specific Environmental Assessment Jacksonville Port Authority: Fire and Rescue Marine Fire Station #40, Jacksonville, Florida Port Security Grant Program Project # 2008-GB-T8-K019 November

More information

May 11, 2015. Charles Felder District 1, Director California Department of Transportation P.O. Box 3700 Eureka, CA 95502-3700. Dear Mr.

May 11, 2015. Charles Felder District 1, Director California Department of Transportation P.O. Box 3700 Eureka, CA 95502-3700. Dear Mr. May 11, 2015 Charles Felder District 1, Director California Department of Transportation P.O. Box 3700 Eureka, CA 95502-3700 Dear Mr. Felder, The Coyote Valley Band of Pomo Indians hereby objects to the

More information

WHEREAS, MnDOT, as PROJECT sponsor, has been invited by the FHW A to sign this PA in accordance with 36 CFR 800.6(c)(2); and

WHEREAS, MnDOT, as PROJECT sponsor, has been invited by the FHW A to sign this PA in accordance with 36 CFR 800.6(c)(2); and PROGRAMMATIC AGREEMENT PURSUANT TO SECTION 106 OF THE NATIONAL HISTORIC PRESERVATION ACT BETWEEN THE FEDERAL HIGHWAY ADMINISTRATION AND THE MINNESOTA STATE HISTORIC PRESERVATION OFFICE REGARDING THE WINONA

More information

Challenge Cost Share, National Park Service National Trails Intermountain Region, FY 11 ADDITIONAL GUIDANCE

Challenge Cost Share, National Park Service National Trails Intermountain Region, FY 11 ADDITIONAL GUIDANCE Challenge Cost Share, National Park Service National Trails Intermountain Region, FY 11 ADDITIONAL GUIDANCE 1) Preservation, Restoration and Rehabilitation Projects Preservation, restoration, and rehabilitation

More information

MEMORANDUM OF AGREEMENT

MEMORANDUM OF AGREEMENT MEMORANDUM OF AGREEMENT BETWEEN THE CITY AND COUNTY OF SAN FRANCISCO AND THE CALIFORNIA STATE HISTORIC PRESERVATION OFFICER REGARDING THE MIXED USE DEVELOPMENT, 55 LAGUNA STREET, SAN FRANCISCO WHEREAS,

More information

WHEREAS, NJ TRANSIT, in consultation with the NJ SHPO, identified additional interested parties (see Exhibit A), including:

WHEREAS, NJ TRANSIT, in consultation with the NJ SHPO, identified additional interested parties (see Exhibit A), including: PROGRAMMATIC AGREEMENT AMONG THE FEDERAL TRANSIT ADMINISTRATION, NEW JERSEYTRANSIT, AND THE NEW JERSEY STATE HISTORIC PRESERVATION OFFICER, REGARDING THE NEW JERSEYTRANSIT HUDSON-BERGEN LIGHT RAIL ROUTE

More information

Seattle Streetcar Center City Connector Seattle, Washington Small Starts Project Development (Rating Assigned November 2015)

Seattle Streetcar Center City Connector Seattle, Washington Small Starts Project Development (Rating Assigned November 2015) Seattle Streetcar Center City Connector Seattle, Washington Small Starts Project Development (Rating Assigned November 2015) Summary Description Proposed Project: Streetcar 1.3 Miles, 4 Stations otal Capital

More information

Stakeholders Advisory Working Groups (SAWGs) Environmental SAWG Meeting #3 (Cultural Resources)

Stakeholders Advisory Working Groups (SAWGs) Environmental SAWG Meeting #3 (Cultural Resources) Meeting Minutes Environmental SAWG Meeting #3 (Cultural Resources) Tappan Zee Bridge/I-287 Corridor Environmental Review Nyack Tarrytown September 25, 2007 Meeting Title: Meeting Purpose: Location Date:

More information

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included

More information

Notice of Intent to Conduct Scoping and to Prepare a Draft Environmental Impact Statement for

Notice of Intent to Conduct Scoping and to Prepare a Draft Environmental Impact Statement for This document is scheduled to be published in the Federal Register on 10/07/2015 and available online at http://federalregister.gov/a/2015-25509, and on FDsys.gov DEPARTMENT OF COMMERCE National Oceanic

More information

PART I CHAPTER I Purpose of the Manual March 2014

PART I CHAPTER I Purpose of the Manual March 2014 INDIANA DEPARTMENT OF TRANSPORTATION CULTURAL RESOURCES MANUAL PART I CHAPTER I Purpose of the Manual March 2014 Contents 1-1.0-Purpose of the Manual... 3 INDOT Cultural Resources Manual Part 1, Chapter

More information

State of Utah Emergency Operations Plan. APPENDIX #1 TO ESF #11 Cultural Property

State of Utah Emergency Operations Plan. APPENDIX #1 TO ESF #11 Cultural Property State of Utah Emergency Operations Plan APPENDIX #1 TO ESF #11 Cultural Property Lead Agencies: Department of Agriculture and Food/ESF #11 Support Agencies: Lead Support Agency The Cultural Property Team

More information

BEAR DEN PHASE 2 PROJECT. Plan of Development. APPENDIX I Plan for Unanticipated Discovery of Cultural Resources or Human Remains During Construction

BEAR DEN PHASE 2 PROJECT. Plan of Development. APPENDIX I Plan for Unanticipated Discovery of Cultural Resources or Human Remains During Construction BEAR DEN PHASE 2 PROJECT Plan of Development APPENDIX I Plan for Unanticipated Discovery of Cultural Resources or Human Remains During Construction BEAR DEN PHASE 2 PROJECT Plan of Development Plan for

More information

SECTION 106 ARCHAEOLOGY GUIDANCE (available online at www.achp.gov/archguide)

SECTION 106 ARCHAEOLOGY GUIDANCE (available online at www.achp.gov/archguide) SECTION 106 ARCHAEOLOGY GUIDANCE (available online at www.achp.gov/archguide) (current as of 01/01/2009) I. INTRODUCTION A. Purpose of the guidance. The Advisory Council on Historic Preservation s Section

More information

MEMORANDUM OF AGREEMENT (MOA) AMONG THE FEDERAL HIGHWAY ADMINISTRATION, THE ADVISORY COUNCIL ON HISTORIC PRESERVATION,

MEMORANDUM OF AGREEMENT (MOA) AMONG THE FEDERAL HIGHWAY ADMINISTRATION, THE ADVISORY COUNCIL ON HISTORIC PRESERVATION, MEMORANDUM OF AGREEMENT (MOA) AMONG THE FEDERAL HIGHWAY ADMINISTRATION, THE ADVISORY COUNCIL ON HISTORIC PRESERVATION, THE INDIANA STATE HISTORIC PRESERVATION OFFICER, AND THE KENTUCKY STATE HISTORIC PRESERVATION

More information

U. S. Department of Energy. National Nuclear Security Administration Los Alamos Area Office 528 35th Street Los Alamos, NM 87544

U. S. Department of Energy. National Nuclear Security Administration Los Alamos Area Office 528 35th Street Los Alamos, NM 87544 Department of Energy National Nuclear Security Administration Finding of No Significant Impact for the Construction and Operation of a New Office Building and Related Structures within TA-3 at Los Alamos

More information

Appendix C. Inadvertent Discovery Plan (IDP)

Appendix C. Inadvertent Discovery Plan (IDP) Specification Appendix D - Cultural Resources Inadvertent Discovery Plan (Excerpted from Cultural Resources Report dated 1/23/15) Appendix C. Inadvertent Discovery Plan (IDP) Cultural Resources Inventory

More information

21st International Conference of The Coastal Society

21st International Conference of The Coastal Society 21st International Conference of The Coastal Society MARINE STEWARDSHIP AREA OFFERS A MODEL FOR INTEGRATING SCIENCE, MANAGEMENT, STEWARDSHIP AND ECOSYSTEM THINKING IN THE CONSERVATION OF COASTAL RESOURCES

More information

Work Type Definition and Submittal Requirements Work Type Definition: Archeological

Work Type Definition and Submittal Requirements Work Type Definition: Archeological Archaeological Work Historic Archaeological Work The first section, Work Type Definition, provides a detailed explanation of the work type. The second section, Work Type Submittal Requirements, identifies

More information

State and Territory Coastal Management Program Managers

State and Territory Coastal Management Program Managers MEMORANDUM FOR: FROM: SUBJECT: State and Territory Coastal Management Program Managers Jeffrey R. Benoit Director Final Program Change Guidance Attached is the Office of Ocean and Coastal Resource Management

More information

2014 Waterfront Program Work Plan

2014 Waterfront Program Work Plan 2014 Waterfront Program Work Plan Waterfront Program Anticipated 2014 Activities and Milestones As requested in Council Resolution 31399, the following pages outline a high-level work plan for Waterfront

More information

Draft Section 106 Programmatic Agreement

Draft Section 106 Programmatic Agreement Appendix H Draft Section 106 The preliminary Draft Section 106 in this appendix will be refined in consultation with the Maryland Historical Trust and other consulting parties. Purple Line Final Environmental

More information

FOR HOUSINIG AND URBAN DEVELOPMENT-FUNDED PROGRAMS ADMINISTERED BY THE CITY OF MIAMI, FLORIDA

FOR HOUSINIG AND URBAN DEVELOPMENT-FUNDED PROGRAMS ADMINISTERED BY THE CITY OF MIAMI, FLORIDA PROGRJa.MMATIC AGREEMENT -' FOR HOUSINIG AND URBAN DEVELOPMENT-FUNDED PROGRAMS ADMINISTERED BY THE CITY OF MIAMI, FLORIDA WHE:REAS, the City of Miami, Florida (City) now administers or may administer in

More information

Section 401 Water Quality Certification

Section 401 Water Quality Certification Section 401 Water Quality Certification Department of Health Environmental Management Division Clean Water Branch Voice: (808) 586-4309 Fax: (808) 586-4352 http://www.hawaii.gov/health/environmental/water/cleanwater/index.html

More information

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY

BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY In the Matter of the Application of ) NO. SSDP 000748 ) Kevin Robinson ) FINDINGS, CONCLUSIONS ) AND DECISION For a Shoreline Substantial Development ) Permit

More information

POLICY NUMBER: C450B SUPERSEDES: C450A. Policy to Encourage the Designation and Rehabilitation of Municipal Historic Resources in Edmonton

POLICY NUMBER: C450B SUPERSEDES: C450A. Policy to Encourage the Designation and Rehabilitation of Municipal Historic Resources in Edmonton CITY POLICY REFERENCE: City Council 1988 October 25 Historical Resources Act RSA 2000 ADOPTED BY: City Council 2008 October 29 SUPERSEDES: C450A PREPARED BY: Planning and Development DATE: 2008 September

More information

Status Report on Settlement. City Council Briefing December 15, 2014

Status Report on Settlement. City Council Briefing December 15, 2014 Status Report on Settlement City Council Briefing December 15, 2014 1 City Response Timeline November 21: SDOT informed of minor settlement (~0.1 ) December 3: SDOT informed of measurement anomaly in deep

More information

Regulations for the 25% State Commercial Tax Credit Program Prepared by the Division of Historic Preservation

Regulations for the 25% State Commercial Tax Credit Program Prepared by the Division of Historic Preservation Regulations for the 25% State Commercial Tax Credit Program Prepared by the Division of Historic Preservation A. DEFINITIONS These Regulations provide guidelines for the application process and the Administration

More information

SPECIFICATIONS FOR CONDUCTING FIELDWORK AND PREPARING CULTURAL RESOURCE ASSESSMENT REPORTS

SPECIFICATIONS FOR CONDUCTING FIELDWORK AND PREPARING CULTURAL RESOURCE ASSESSMENT REPORTS SPECIFICATIONS FOR CONDUCTING FIELDWORK AND PREPARING CULTURAL RESOURCE ASSESSMENT REPORTS Issued By Kentucky State Historic Preservation Office Kentucky Heritage Council Site Protection Program 300 Washington

More information

30-DAY PUBLIC NOTICE CHELSEA RIVER, EAST BOSTON MASSACHUSETTS EMERGENCY STREAMBANK PROTECTION PROJECT

30-DAY PUBLIC NOTICE CHELSEA RIVER, EAST BOSTON MASSACHUSETTS EMERGENCY STREAMBANK PROTECTION PROJECT PUBLIC NOTICE Engineering/Planning 696 Virginia Road Concord, MA 01742 Date: 10 November, 2015 Comment Period Ends: 10 December, 2015 In Reply, Refer To: Robert Russo Or by e-mail: Robert.S.Russo@usace.army.mil

More information

4.11 Geologic and Soil Resources

4.11 Geologic and Soil Resources 4.11 Geologic and Soil Resources Geology and soils are evaluated as part of an environmental document because conditions in the project area can influence the type and size of a project s structure, the

More information

STATE LEVEL AGREEMENT BETWEEN THE NATURAL RESOURCES CONSERVATION SERVICE (NRCS) AND THE NEW JERSEY OFFICE OF HISTORIC PRESERVATION

STATE LEVEL AGREEMENT BETWEEN THE NATURAL RESOURCES CONSERVATION SERVICE (NRCS) AND THE NEW JERSEY OFFICE OF HISTORIC PRESERVATION STATE LEVEL AGREEMENT BETWEEN THE NATRAL RESORCES CONSERVATION SERVICE (NRCS) AND THE NEW JERSEY OFFICE OF HISTORIC PRESERVATION PRPOSE The NRCS, and New Jersey State Historic Preservation Officer (SHPO)

More information

WHEREAS, the College and CDC are directly involved in the implementation of this Undertaking they shall be concurring parties to the Agreement; and

WHEREAS, the College and CDC are directly involved in the implementation of this Undertaking they shall be concurring parties to the Agreement; and PROGRAMMATIC AGREEMENT BETWEEN THE U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT, THE TOWN OF LA WRENCEVILLE, THE VIRGINIA STATE HISTORIC PRESERVATION OFFICE AND THE ADVISORY COUNCIL ON HISTORIC PRESERVATION

More information

Executive Director s Recommendation Commission Meeting: July 11, 2013

Executive Director s Recommendation Commission Meeting: July 11, 2013 Executive Director s Recommendation Commission Meeting: July 11, 2013 PROJECT Russell Road Widening Phase 2 United States Marine Corps Base Quantico Prince William County, Virginia SUBMITTED BY United

More information

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements

More information

Kiana Lodge 14976 Sandy Hook Rd. NE Poulsbo, WA 98370

Kiana Lodge 14976 Sandy Hook Rd. NE Poulsbo, WA 98370 Cultural Resource Protection Summit May 23 & 24, 2011 Doing More With Less: Strategic Action in an Era of Competing Resources Kiana Lodge 14976 Sandy Hook Rd. NE Poulsbo, WA 98370 Our 2011 Primary Sponsors

More information

FirstNet Historic Preservation Requirements

FirstNet Historic Preservation Requirements FirstNet Historic Preservation Requirements Christopher Eck Federal Preservation Officer December 10, 2014 NEPA NEPA is considered an umbrella law as it provides a framework within which a wide variety

More information

National Park Service, Interior 61.2

National Park Service, Interior 61.2 National Park Service, Interior 61.2 The Keeper shall notify the petitioner and the applicable State Historic Preservation Officer, Federal Preservation Officer, or person or local government where there

More information

TABLE OF CONTENTS CURRICULUM AND LESSON PLANS

TABLE OF CONTENTS CURRICULUM AND LESSON PLANS TABLE OF CONTENTS CURRICULUM AND LESSON PLANS Lesson 9: A Career in Archaeology.......................................96 Interview With An Archaeologist: Leonard Forsman..................... 99 Interview

More information

National Marine Sanctuaries Act

National Marine Sanctuaries Act Please note: This text is from the fourth edition of Federal Historic Preservation Laws, published in 2006 by the National Center for Cultural Resources, National Park Service, Department of the Interior.

More information

COMMUNITY CERTIFICATIONS

COMMUNITY CERTIFICATIONS National Flood Insurance Program Community Rating System COMMUNITY CERTIFICATIONS Public reporting burden for this form is estimated to average 4 hours for annual recertification, per response. The burden

More information

Department of Transportation, Rail Division Records Retention Schedule 2002-0018 Effective Date: June 2003 Table of Contents. Rail Safety...

Department of Transportation, Rail Division Records Retention Schedule 2002-0018 Effective Date: June 2003 Table of Contents. Rail Safety... Department of Transportation, Rail Division Records Retention Schedule 2002-0018 Effective Date: June 2003 Table of Contents Crossing Safety... 4 Rail Planning, Projects, and Operations... 5 Rail Safety...

More information

Federal Emergency Management Agency, DHS 206.431. SOURCE: 55 FR 35537, Aug. 30, 1990, unless otherwise noted.

Federal Emergency Management Agency, DHS 206.431. SOURCE: 55 FR 35537, Aug. 30, 1990, unless otherwise noted. Federal Emergency Management Agency, DHS 206.431 (d) A State may appeal a determination by the Regional Administrator on any action related to Federal assistance for fire suppression. Appeal procedures

More information

Program guidance that details the eligibility, criteria and application process. Ferry Boat Program. Ohio Department of Transportation

Program guidance that details the eligibility, criteria and application process. Ferry Boat Program. Ohio Department of Transportation Program guidance that details the eligibility, criteria and application process. Ferry Boat Program Ohio Department of Transportation TABLE OF CONTENTS Program Overview Program Administration.........2

More information

FCRPS Cultural Resources Sub-Committee (CRSC) Quarterly Meeting December 9-10, 2014

FCRPS Cultural Resources Sub-Committee (CRSC) Quarterly Meeting December 9-10, 2014 FCRPS Cultural Resources Sub-Committee (CRSC) Quarterly Meeting December 9-10, 2014 Time: December 9 th 9:00 a.m. to 5:00 p.m., PST December 10 th 8:00 a.m. to 12:00 p.m., PST Place: Old Federal Building

More information

What is historic preservation?

What is historic preservation? THE WASHINGTON STATE DEPARTMENT OF ARCHAEOLOGY & HISTORIC PRESERVATION Historic Preservation is Economic Development: An Overview of DAHP s Programs and Partnerships Greg Griffith, Deputy State Historic

More information

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers

More information

Council On Historic Preservation

Council On Historic Preservation Advisory Council On Historic Preservation The Old Post Office Building 1100 Pennsylvania Avenue. NW. #809 Washington. OC 20004 PROGRAMMATIC AGREEMENT AMONG THE CITY OF ATLANTA, GEORGIA, THE GEORGIA STATE

More information

Carlton Fields Memorandum

Carlton Fields Memorandum Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed

More information

Managing Superfund Cleanups with National Historic Preservation Act Concerns

Managing Superfund Cleanups with National Historic Preservation Act Concerns Managing Superfund Cleanups with National Historic Preservation Act Concerns Anne Dailey, Remedial Project Manager US EPA (on detail from Region 10) Purpose and Goals Provide a basic overview of NHPA requirements

More information

HERITAGE PROPERTY TAX RELIEF PROGRAM GUIDELINES & APPLICATION Community Services Department Planning Division

HERITAGE PROPERTY TAX RELIEF PROGRAM GUIDELINES & APPLICATION Community Services Department Planning Division PART 1 - PURPOSE HERITAGE PROPERTY TAX RELIEF PROGRAM GUIDELINES & APPLICATION Community Services Department Planning Division 1.1 Heritage property tax relief is a financial tool for municipalities to

More information

Unit 5 - The Discovery of Human Remains: Best Practices

Unit 5 - The Discovery of Human Remains: Best Practices Unit 5 - The Discovery of Human Remains: Best Practices This document is a best practices guideline describing the procedures for the treatment of human skeletal remains discovered outside a licensed cemetery.

More information

TARRANT COUNTY HISTORIC SITE TAX EXEMPTION POLICY

TARRANT COUNTY HISTORIC SITE TAX EXEMPTION POLICY TARRANT COUNTY HISTORIC SITE TAX EXEMPTION POLICY A. General Purpose and Objectives The purpose of this Policy is to encourage the rehabilitation and restoration of certain historic properties within Tarrant

More information

SECTION 9 SUMMARY OF COORDINATION, PUBLIC VIEWS AND COMMENTS

SECTION 9 SUMMARY OF COORDINATION, PUBLIC VIEWS AND COMMENTS SECTION 9 SUMMARY OF COORDINATION, PUBLIC VIEWS AND COMMENTS This page intentionally left blank. 9.0SUMMARY OF COORDINATION, PUBLIC VIEWS AND COMMENTS 9.1 PUBLIC OUTREACH AND PUBLIC INVOLVEMENT Public

More information

Chapter 8 Avoidance, Minimization, and Mitigation

Chapter 8 Avoidance, Minimization, and Mitigation Chapter 8 Avoidance, Minimization, and Mitigation This chapter provides a summary of the mitigation measures that the City will implement to avoid, minimize, rectify, or compensate for impacts identified

More information

U.S. DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT GRANTS PASS FIELD OFFICE 2164 NE Spalding Ave Grants Pass, OR 97526

U.S. DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT GRANTS PASS FIELD OFFICE 2164 NE Spalding Ave Grants Pass, OR 97526 A. Background U.S. DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT GRANTS PASS FIELD OFFICE 2164 NE Spalding Ave Grants Pass, OR 97526 Categorical Exclusion Determination and Decision

More information

CITY OF WEST PALM BEACH HISTORIC PRESERVATION AD VALOREM TAX EXEMPTION APPLICATION

CITY OF WEST PALM BEACH HISTORIC PRESERVATION AD VALOREM TAX EXEMPTION APPLICATION CITY OF WEST PALM BEACH HISTORIC PRESERVATION AD VALOREM TAX EXEMPTION APPLICATION OFFICIAL USE ONLY CASE NUMBER: SUBJECT PROPERTY ADDRESS: DATE RECEIVED: ACCEPTED BY: APPLICATION REQUIREMENTS (please

More information

BLM Wyoming Director 5353 Yellowstone Road State Capitol Cheyenne, WY 82009 Cheyenne, WY 82002

BLM Wyoming Director 5353 Yellowstone Road State Capitol Cheyenne, WY 82009 Cheyenne, WY 82002 Donald A. Simpson Matthew H. Mead BLM Wyoming Director Governor 5353 Yellowstone Road State Capitol Cheyenne, WY 82009 Cheyenne, WY 82002 PROGRAMMATIC AGREEMENT AMONG THE BUREAU OF LAND MANAGEMENT, ADVISORY

More information

National Environmental Policy Act/ Clean Water Act Section 404 (NEPA/404) Merger Process and Agreement for Transportation Projects in Colorado

National Environmental Policy Act/ Clean Water Act Section 404 (NEPA/404) Merger Process and Agreement for Transportation Projects in Colorado Background In a May 12, 2003, letter from Mr. James L. Connaughton, Executive Office of the President, Council on Environmental Quality, to Mr. Norman Y. Minneta, Secretary of Transportation, Mr. Connaughton

More information

DEPARTMENT OF THE ARMY

DEPARTMENT OF THE ARMY REPLY TO ATTENTION OF: DEPARTMENT OF THE ARMY Little Rock District, Corps of Engineers Table Rock Lake Project Office 4600 State Highway 165, Suite A Branson, Missouri 65616-8980 (417) 334-4101 FAX: (417)

More information

For Historically Designated Homes & Buildings

For Historically Designated Homes & Buildings Ninth Street Historic Park Acknowledgements This project was paid for in part by a State Historical Fund grant from the Colorado Historical Society. The contents contained herein do not necessarily reflect

More information

National policy encompasses both preserving

National policy encompasses both preserving Affordable Housing and Historic Preservation Advisory Council on Historic Preservation s Policy Statement Adopted November 9, 2006 National policy encompasses both preserving historic resources and providing

More information

1816, Independence Hall 1850, Washington s Headquarters

1816, Independence Hall 1850, Washington s Headquarters Historic Preservation: An Evolving Relation with Our Past 1816, Independence Hall 1850, Washington s Headquarters 1 Mount Vernon Ladies Association, 1853 Ann Pamela Cunningham United States 100 th Birthday

More information

Gold Ray Dam Interagency Technical Team Meeting

Gold Ray Dam Interagency Technical Team Meeting Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,

More information

Executive Director s Recommendation Commission Meeting: March 5, 2015

Executive Director s Recommendation Commission Meeting: March 5, 2015 Executive Director s Recommendation Commission Meeting: March 5, 2015 PROJECT Curseen-Morris Processing and Distribution Center Parking Lot 900 Brentwood Avenue NE Washington, DC SUBMITTED BY United States

More information

I. Introduction. IT. Roles of the Agencies

I. Introduction. IT. Roles of the Agencies MEMORANDUM OF UNDERSTANDING BETWEEN THE FEDERAL ENERGY REGULATORY COMMISSION AND UNITED STATES DEPARTMENT OF DEFENSE TO ENSURE CONSULTATION AND COORDINATION ON THE EFFECT OF LIQUEFIED NATURAL GAS TERMINALS

More information

Historical Resources Guidelines. San Diego Municipal Code Land Development Code

Historical Resources Guidelines. San Diego Municipal Code Land Development Code San Diego Municipal Code Land Development Code Historical Resources Guidelines Adopted September 28, 1999 Amended June 6, 2000 by Resolution No. R-293254-3 Amended April 30, 2001 by City Manager Document

More information

For Office Use: Filing Date: Case Number: Zoning District:

For Office Use: Filing Date: Case Number: Zoning District: City of Syracuse Zoning Administration Application for Off-Premises Advertising Sign Review by the Planning Commission City Hall Commons * Room 101 * 201 E. Washington Street * Syracuse, NY 13202-1426

More information

FAIR Act Inventory Functions and Service Contract Inventory Product Service Codes Crosswalk Attachment I

FAIR Act Inventory Functions and Service Contract Inventory Product Service Codes Crosswalk Attachment I Product Service Code (PSC) Recommended PSC Definition FAIR Function Codes and Definitions 1 B510 Study/Environmental Assessments - Organized, analytical assessments/evaluations in support of policy development,

More information

Final Recommendations of the Committee on Regional Truck Issues June 27, 2001

Final Recommendations of the Committee on Regional Truck Issues June 27, 2001 Final Recommendations of the Committee on Regional Truck Issues June 27, 2001 STUDY OBJECTIVES 1) Reduce the impacts of truck noise and vibrations on residents in the six MOU communities, especially at

More information

Historic Preservation in Housing and Community Development. Linking Historic Preservation to Community Development Block Grant Objectives

Historic Preservation in Housing and Community Development. Linking Historic Preservation to Community Development Block Grant Objectives U.S. Department of Housing and Urban Development Office of Community Planning and Development Office of Environment and Energy Historic Preservation in Housing and Community Development Linking Historic

More information

E2SHB 2569 - S COMM AMD By Committee on Energy, Environment & Telecommunications

E2SHB 2569 - S COMM AMD By Committee on Energy, Environment & Telecommunications 2569-S2.E AMS EET S4774.1 E2SHB 2569 - S COMM AMD By Committee on Energy, Environment & Telecommunications ADOPTED 03/06/2014 1 Strike everything after the enacting clause and insert the 2 following: 3

More information

LOCATION: In Elliott Bay, Puget Sound at Seattle, King County, Washington.

LOCATION: In Elliott Bay, Puget Sound at Seattle, King County, Washington. US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project September 12, 2013 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Preliminary Permit Application for the Dear Ms. Bose, Please find attached

More information

5 March 12, 2014 Public Hearing

5 March 12, 2014 Public Hearing 5 March 12, 2014 Public Hearing APPLICANT: MOORE FARM, L.L.L.P. PROPERTY OWNER: MOORE FARM L.L.L.P. STAFF PLANNER: Kevin Kemp REQUEST: Change of Zoning (B-1A Limited Community Business to Conditional B-2

More information

PROGRAM COMMENT FOR DEPARTMENT OF DEFENSE REHABILITATION. I. Establishment and Authority: This Program Comment was issued

PROGRAM COMMENT FOR DEPARTMENT OF DEFENSE REHABILITATION. I. Establishment and Authority: This Program Comment was issued PROGRAM COMMENT FOR DEPARTMENT OF DEFENSE REHABILITATION TREATMENT MEASURES I. Establishment and Authority: This Program Comment was issued by the Advisory Council on Historic Preservation (ACHP) on (date

More information