For personal use only

Size: px
Start display at page:

Download "For personal use only"

Transcription

1 ASX ANNOUNCEMENT ASX:AWV Anova Metals Limited ABN Directors Jon Parker Chairman & NED Tim Dobson Managing Director Bill Fry NED Mal James NED Management Tim Dobson Managing Director Geoff Collis GM Exploration Leni Stanley Co. Secretary For further information contact: Tim Dobson Managing Director Tel: Big Springs: maiden JORC Resource defined KEY POINTS Inferred Resource of 968,000 ounces gold defined: 14.8 million tonnes at 2.0 g/t High grade core of 388,000 ounces gold at 4.2g/t Open pit and underground mining options exist Limited work required to upgrade JORC classification 12 April 2013 Anova Metals Limited (ASX:AWV) ( Anova or the Company ) advises that a maiden JORC Mineral Resource estimate for its Big Springs gold deposit has been completed with a contained 968,000 ounces of gold. Big Springs is a Carlin-style gold deposit located in north eastern Nevada, USA (Figure 1). The Inferred Mineral Resource estimate has been completed in accordance with the JORC Code and comprises a total resource of 14.8 million tonnes at 2.0 g/t gold. Increasing the cut-off grade to 2.5 g/t gold results in a high grade core to the deposit of 2.9 million tonnes of 4.2 g/t gold for 388,000 ounces. Anova s geological model was developed in-house and the resource estimate was prepared by specialist consultants Trepanier Pty Ltd as described within this announcement (Appendix 1). The Mineral Resource estimate will be the basis for a gold production scoping study to commence shortly. This maiden JORC Mineral Resource estimate confirms the size and quality of our 100% owned Big Springs gold project, said Tim Dobson, Managing Director. It paves the way for the assessment of both open cut and underground mining options from surface in line with our intention to bring this low risk project into gold production as soon as practicable. anovametals.com.au Level 1, 101 Edward Street, Brisbane QLD 4000 Telephone: Facsimile:

2 Figure 1: Big Springs project location in Nevada, USA Big Springs JORC (2012 edition) Mineral Resource estimate Description of geology & mineralisation The Big Springs disseminated, sediment-hosted gold deposits have been classified by respected scientific authors as typical Carlin-style deposits. Gold is hosted predominantly within the Overlap Assemblage, which is Mississippian to Permian in age (300 to 360Ma), with structure and host stratigraphy being the primary controls on gold mineralisation. Mineralisation is typically hosted within black, highly carbonaceous siltstone and calcareous sandy siltstone. These units are typically located between the Argillic thrust in the footwall and the Schoonover thrust in the hangingwall. Individual high grade ore shoots at North Sammy generally plunge moderately to the NNW and are controlled by intersections of E-W-striking faults with the NE-SW-striking Argillic thrust. The South Sammy Creek deposit is more complex with a series of controlling structures, in particular the Briens fault along the western margin. On the eastern side of the Briens fault the thick, tabular South Sammy ore deposit forms a largely continuous zone that is semi-concordant with the permeable and brittle host rocks of the Overlap Assemblage. Data used in estimation process All historic hardcopy and digital data was obtained from the project vendors and assimilated into Anova databases. Useful information dates back to the mid-1970s when serious exploration was first carried out in the Independence Mountains. Considerable hardcopy data pertaining to the Big Springs mining era have been catalogued, digitised and returned to Australia for assessment. This data has been used to inform the resource estimation process. 2

3 Historically, two main phases of drilling have occurred at Big Springs. Independence Mining, a subsidiary of Freeport-McMoRan, conducted an extensive drilling campaign between 1982 and 1993 which ultimately resulted in the production of 386,000 ounces of gold from a series of small open pits. Gateway Gold Corp, a TSX listed exploration company, later acquired the property and conducted drilling between 2003 and 2008 predominantly aimed at verifying and extending the mineralisation discovered and exploited by Freeport. A total of 2,410 drill holes representing 289,000 metres of drilling were used for the interpretation. Mineralised domain definition The Big Springs gold resource has been divided into three primary zones (North Sammy, South Sammy and Beadles Creek) and four subsidiary zones (North Sammy Contact, Briens Fault, Mac Ridge and Dorsey Creek) as shown in Figure 2. Mineralised shoots with well-defined structural and lithological control, such as North Sammy and Beadles Creek, were individually modelled using 3D wireframes. Deposits with more diffuse and poddy forms, such as South Sammy, were estimated using indicator models. Application of lower cut-off grades A 1.0 g/t gold cut-off appears to be a natural grade boundary for the well-defined structurally controlled shoots while a nominal 0.8 g/t gold cut-off was used for the more diffuse zones with open pit potential. Samples were composited to 1.52 metre lengths. Statistical analysis showed the populations in each domain to generally have acceptable levels of variation, however each estimation domain contained outlier values that required top-cut values to be applied. Block model A block model was created using Surpac software incorporating 3.05 x 3.05 x 1.52 metre blocks, constrained by wireframes as described above. Directional variograms and Ordinary Kriging were used to estimate grades in all domains, with estimation searches governed by individual variograms for each domain. Historic bulk density measurements from the property could not be verified and hence a nominal 2.60 g/cm 3 was selected based on published data available for similar rock types. JORC classification The mineralised domains have demonstrated sufficient continuity in both geological and grade continuity to support the definition of Mineral Resource and Reserves, and the classifications applied under the JORC Code (2012 edition). Consideration was given to classifying sections of the deposit in the Indicated category, however the unverified bulk density data ultimately resulted in the entire mineral resource being classified as Inferred. No assumptions have been made as to mining methods other than both open pit and underground operations will be considered. No assumptions have been made as to metallurgical recoveries, environmental matters or infrastructure. 3

4 Mineral Resource estimate Deposit Cut-off (g/t Au) Tonnes (Mt) Grade (g/t Au) Contained gold ( 000 ounces) North Sammy North Sammy Contact South Sammy Beadle Creek Mac Ridge Dorsey Creek Briens Fault Note: Appropriate rounding applied Total Table 1: Big Springs Inferred Mineral Resource estimate (2012 JORC Code guidelines) Figure 2: Plan projection of the Big Springs resource domains 4

5 Effect of varying cut-off grade The Mineral Resource has been reported for a range of cut-off grades (Table 2) in order to produce a grade vs. tonnage relationship (Figure 3). It can be seen, using a 2.5 g/t cut-off grade, that a higher grade portion of the Resource exists with 40% of the overall contained gold (388,000 ounces) contained within a 2.9 million tonne, 4.2 g/t resource. Cut-off (g/t Au) Tonnes (Mt) Grade (g/t Au) Contained gold ( 000 ounces) Note: Appropriate rounding applied Table 2: Big Springs Inferred Mineral Resource estimate at various cut-off grades Figure 3: Big Springs grade-tonnage relationship at various cut-off grades 1 Weighted average of domains estimated with 1.0 g/t and 0.8 g/t cut-off grades. 5

6 Future work Anova is currently preparing and permitting a limited drilling program at Big Springs to confirm a number of technical aspects of the deposits with a view to re-classifying the Mineral Resource, supporting operational permitting requirements, and informing subsequent mining studies. Both open cut and underground mining studies will be undertaken on the block model to determine the optimal production scenario for the project. The size, shape and depth (commencing at surface) of the Big Springs deposits indicate that a combination of the two methods will be appropriate. Big Springs project purchase terms triggered In line with the Big Springs project purchase terms previously announced to the market (ASX Announcement 28 November 2012), the JORC Mineral Resource estimation triggers the conversion of 17 million Performance Shares held by the project vendors to Anova Ordinary Shares, and a further cash payment, subject to review and approval of the JORC Mineral Resource estimate by the vendors. Competent Person Statement The information in this report that relates to Exploration Results is based on information compiled by Mr. Geoff Collis, who is an employee of the Company. Mr Collis is a member of the Australasian Institute of Mining and Metallurgy and has sufficient experience of relevance to the styles of mineralisation and types of deposits under consideration, and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Collis consents to the inclusion in this report of the matters based on information in the form and context in which it appears. The information in this report that relates to Mineral Resources is based on information compiled by Mr Lauritz Barnes, Principal Consultant Geologist Trepanier Pty Ltd and Mr Geoff Collis, General Manager Exploration, an employee of the Company. Mr Barnes and Mr Collis are both shareholders of Anova Metals. Mr Barnes and Mr Collis are members of the Australasian Institute of Mining and Metallurgy and have sufficient experience of relevance to the styles of mineralisation and types of deposits under consideration, and to the activities undertaken to qualify as Competent Persons as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Barnes and Mr Collis consent to the inclusion in this report of the matters based on their information in the form and context in which they appear. 6

7 Appendix 1: JORC Code (2012) supporting tables. The following section is provided to ensure compliance with the JORC (2012) requirements for the reporting of the Mineral Resource estimates for the Big Springs gold deposit in Nevada. Section 1: Sampling Techniques and Data ( in this section apply to all succeeding sections.) Sampling techniques Samples were routinely collected at 5 foot (1.52m) intervals from Reverse Circulation (RC) and diamond drill holes (DDH). Freeport drilled 2098 holes between 1982 and 1993 primarily on a nominal 50ft by 50ft (15.2m) spacing, increasing to about 100ft (30.5m) by 50ft in places. Gateway Gold Corp ( Gateway ) drilled 312 holes between 2003 and 2008 as infill to these grids. Gold occurs as very fine inclusions within finely disseminated sulphide mineralisation resulting in a moderate nugget effect. The sampling intervals are considered sufficiently small to yield statistically valid results given the nature of mineralisation encountered. Based on statistical analysis of field duplicates, there is no evidence to suggest samples are not representative. Sampling procedures followed by all historic operators were in line with industry standards at the time (personal communication with senior staff and drilling companies in charge of previous work). All RC samples were split at the rig using either a riffle or cone splitter to produce between 3 and 5kg of sample for shipment to the laboratory. Diamond core was HQ size, and cut in half over mineralized intervals, using either a core-splitter or core-saw. All samples were analysed. Drilling techniques Data from 2410 drill holes (289,000 metres) were used for the interpretation. Freeport drilled both RC and diamond core however the exact proportion of each has yet to be verified from the hardcopy logs. Gateway drilled 312 holes of which 141 were RC and 171 were HQ diamond core. The majority of the Freeport holes were drilled vertically while the more recent Gateway holes were inclined as in-fill or extension to the deposits. Drill sample recovery Core recovery data are available for 160 of the Gateway holes. Nearly 90% of these data have recoveries above 80%. Core recovery is described as good to excellent by previous workers. For the historic component of the database, it has not been possible to check sample recoveries and sampling methods. However, for Gateway drill holes, recovery data has been recorded, and field duplicates submitted and analysed. It was not possible, given the historical nature of the bulk of the database to make these types of assessments. It is planned that future drilling will target these issues. Logging Detailed lithological logs exist for most of the holes in the database. Where these only exist in hard copy, they have been scanned and stored digitally. It is planned that the additional information from these logs that is not currently in the digital database (minerals, geotechnical, structural data) will be collated and included for future resource estimation work. Logging of diamond core and RC samples recorded lithology, mineralogy, mineralisation, structure (DDH only), weathering and colour. Core photographs also exist for some of the Gateway holes. Lithological data exists for 2149 of the 2410 holes in the database (90%). These drill holes were logged in full. 7

8 Sub-sampling techniques and sample preparation Quality of assay data and laboratory tests Verification of sampling and assaying Location of data points Diamond core was cut in half on site using a mechanical splitter or a diamond saw. Some quarter core has been sampled to perform check assaying by previous workers. RC samples were generally wet and split at the rig using a rotary device which was standard industry practice in Nevada at the time. Large samples weighing between 3 and 5kg each were dried, crushed and pulverized using industry best practice at that time. Field QC procedures for Gateway drill holes involve the use of certified reference material assay standards and blanks; as well as rig, reject and assay duplicates. For all Gateway drill holes, in the case of RC samples, rig duplicates were collected at regular intervals. Diamond core was duplicated every 60 to 70 core samples by submitting the remaining half core for analysis. Personal communication with senior staff supervising the Freeport drilling indicates that industry best practice was employed at the time. The sample sizes are considered appropriate for the style of mineralization, which is fine grained disseminated gold with minimal nugget effect. Historical assaying was undertaken by one of the following; Monitor Geochemical Laboratory, American Assay Laboratories, Chemex Laboratory or Cone Geochemical. Most of the samples were assayed for Au by Atomic Absorption Spectroscopy after roasting and acid digestion. Selected samples were analysed by Fire Assay, or by cyanide leach on either roasted or un-roasted pulps. These techniques are designed to report total gold. Gateway samples were submitted to ALS Chemex for Au by Fire Assay/atomic absorption (FA/AA). All samples in excess of 5g/t Au were re-assayed by Fire Assay with gravimetric finish (FA/Grav). In addition all samples were analysed for a suite of 34 elements with either an aqua regia or 4 acid digest and ICP/AES finish. No geophysical tools were used to determine any element concentrations in this resource estimate. Hard copy logs of historical drilling show that umpire laboratory checks were undertaken to check the Monitor Geochemical Laboratory results. The Gateway drilling contains QC samples including field duplicates, coarse crush laboratory duplicates and laboratory pulp splits, certified reference materials and blanks. Previous workers have verified historical assay data by re-assaying of Freeport diamond holes. Independent consultant reports have been viewed that verify significant intersections in diamond core. Twinned holes have been drilled along with drill holes fanned about a central collar. Visual inspections have been completed with original and twin holes showing comparable results but no detailed statistical analysis has been undertaken as yet. Primary data was sourced from an existing digital database and compiled into an industry standard drillhole database management software (DataShed ). Records have been made of all updates that have been made in cases of erroneous data. The database is in the process of being enhanced with additional data sourced from both digital and hard copy logs. Data verification has been ongoing with historical assays and surveys being checked back against hard copy logs. All Gateway assays were sourced directly from original electronic laboratory files. No adjustments or calibrations were made to any assay data used in this estimate. Collar surveys have been used from the supplied database. Where discrepancies occurred, these coordinates were edited only after checking against hard copy logs. This process will continue as part of the database enrichment. Downhole survey records have been checked against digital and hardcopy survey logs and where necessary additional surveys have been added to the database. All edits have been documented. All holes have been checked spatially in 3D and all obvious errors addressed. The grid system uses the NAD 27 Datum, and the Nevada East State Plain projection in feet. The topographic surface was sourced from digitized scanned pit maps from mine closure. Comparisons against current surface imagery were made and appear very accurate. GPS readings were also made during site visits as an approximate check. 8

9 Data spacing and distribution Orientation of data in relation to geological structure The nominal drillhole spacing is approximately 50ft by 50ft (15m), but this can increase in places. Gateway holes have been drilled as infill to these grids as confirmation of mineralisation. The mineralized domains have demonstrated sufficient continuity in both geological and grade continuity to support the definition of Mineral Resource and Reserves, and the classification applied under the 2012 JORC code. No sample compositing has been applied out of 2412 holes were drilled vertically (88%). The remainder were drilled at angles of between 85 0 and 30 0 and azimuths of between 0 0 and The orientation of the mineralisation is variable and no bias has been detected. No orientation based sampling has been identified to date. Sample security Gateway samples are stored at the Doheny Ranch located east of the Big Springs property. All samples were sorted here before being sent by a dedicated truck to ALS Chemex in Elko. After analysis, all samples were returned and archived and coarse sample rejects discarded. Core is stored in wooden boxes and racked for reference, as are chip trays. There is no information regarding security of samples for work previous to Gateway s tenure at the project. Audits or reviews Gateway completed checks of historic assays with favourable comparisons. Anova has checked 5% of the collar and assay data in the supplied digital database against hard copy logs and found no material discrepancies. Section 3: Estimation and Reporting of Mineral Resources ( listed in Section 1, also apply to this section.) Database integrity Data have been compiled into a relational SQL database, the setup of this database precludes the loading of data which do not meet the required validation protocols. The data are managed by DataShed Management Software, which also has inbuilt validation checks. Data have also been checked against original hard copies for 5% of the data, and where possible, loaded from original data sources. Site visits Geoff Collis and Lauritz Barnes, who are the Competent Persons, both visited the Big Springs site on 7 November During the visit historical pits were inspected, geological units within pits compared to mapped geology, grab samples were taken, photos were taken, diamond core was viewed, GPS checks were carried out on selected drillhole collar sites. ALS Global s minerals laboratory in Elko, Nevada was visited and inspected (where the majority of Gateway s samples were prepared and analysed between 2003 and 2008). Anova s check grab samples were submitted for analysis with this laboratory. Geological interpretation The historical digital database used for the interpretation included logged intervals for the key stratigraphic zones. Detailed geological logs were available in hardcopy and reviewed where necessary. Litho-geochemistry for the Gateway holes assisted to confirm the validity of the historic stratigraphic interpretation with good confidence. Drill density (50ft by 50ft) for the majority of the Big Springs area allows for confident interpretation of the geology and mineralized domains. More recent infill/verification drilling by Gateway confirms positions of key mineralized zones. Geological and structural controls support modeled mineralized zones. Continuity of mineralization is affected by proximity to structural conduits (allowing flow of mineralized fluids), stratigraphic position, lithochemistry of key stratigraphic units and porosity of host lithologies. All remaining mineralisation is considered to be transitional to fresh material as the vast majority of oxide ore has been mined previously. 9

10 Dimensions The Mineral Resource areas vary however mineralized zones modeled have dimensions of up to 4,000ft (north) by 1,000ft (east) and 1,000ft (elevation) for North Sammy, South Sammy and Beadle Creek. The other zones are smaller than these. Estimation and modelling techniques Grade estimation using Ordinary Kriging (OK) was completed using Gemcom Surpac software for gold only. Drill spacing typically ranges from 50ft (15.2m) to 100ft (30.5m). Drillhole samples were flagged with wireframed domain codes. Sample data was composited for gold to 5ft using a best fit method. The very minor number of residuals were considered immaterial and were excluded. Influences of extreme sample distribution outliers were reduced by top-cutting on a domain basis. Top-cuts were decided by using a combination of methods including grade histograms, log probability plots and statistical tools. Directional variograms were modeled by domain using traditional variograms and correlograms. Nugget values are moderate and grade ranges generally short (approximately 50-60m). Domains with limited samples used variography of geologically similar domains. Previous open pit mining activity produced approximately 380,000 oz of gold. Historical pit shapes and mined zones match mineralized zones (modeled using drilling data) well. No underground mining has been conducted at Big Springs. A published 2006 NI resource is available on SEDAR. No by-products have historically been produced, or are expected to be produced, from Big Springs. No other elements are estimated to date due to the limited availability of multi-element assays this exists for the more recent Gateway drilling only. Block model was constructed with parent blocks of 10ft (E) by 10ft (N) by 5ft (RL) and sub-blocked to 5ft (E) by 5ft (N) by 2.5ft (RL). All estimation was completed to the parent cell size. Discretisation was set to 5 by 5 by 2 for all domains. Three estimation passes were used. The first pass had a limit of 125ft (38.1m), the second pass 250ft (76.2m) and the third pass searching a large distance to fill and blocks within the wireframed zones. Reporting was limited to Passes 1 and 2. Each pass used a maximum of 24 samples, a minimum of 8 samples and maximum per hole of 5 samples. Search ellipse sizes were based primarily on a combination of the variography and the trends of the wireframed mineralized zones. Hard boundaries were applied between all estimation domains. Validation of the block model included a volumetric comparison of the resource wireframes to the block model volumes. Validation of the grade estimate included comparison of block model grades to the declustered input composite grades plus swath plot comparison by easting, northing and elevation. Visual comparisons of input composite grades vs. block model grades were also completed. Moisture Tonnes have been estimated on a dry basis. Cut-off parameters Mining factors or assumptions Metallurgical factors or assumptions Zones more likely to be mined by underground methods (primarily at North Sammy and Beadle Creek) have been wireframed to a 1.0g/t gold cut-off. For these shoots, this cutoff also tends to be very close to a natural cut-off. All other zones have been reported inside the mineralisation wireframes constructed at an approximately 0.8g/t gold cutoff, either by wireframing or indicator modeling methods. The only assumptions made as to mining methods are that both open pit and underground operations will be considered. Factors such as a successful previous mining history, open pits still with stable walls after 20 years since the mine closure, successful historical processing of both oxide and sulphide ore plus numerous nearby mining operations on similar styles of mineralization and processing facilities indicate that the assumption for potential successful mining of Big Springs is reasonable. A combination of a historical period of processing both oxide and sulphide ore from Big Springs plus more recent limited metallurgical testwork by Gateway indicate that the assumption for potential successful processing of Big Springs ore is reasonable. 10

11 Environmental factors or assumptions No assumptions have been made and these will form part of any future studies. Preliminary discussions have been held with the relevant permitting agencies and the regulatory process determined. Bulk density Bulk density has previously been estimated from measurements carried out by Gateway drilling on 98 core samples using weight in air and weight in water. Samples were tested from different rock types, as well as within mineralized zones (Gateway reported 61 to be from within mineralized intervals). Sample masses varied from 150 to 1200 grams (averaging 450 grams). It was found that there was low variability in density values between the categories and the previous NI resource was reported using a bulk density of Concern that the method used by Gateway (weight in air and weight in water) does not adequately account for potential porosity has resulted in a more conservative bulk density of 2.60 being used for this resource. The number is based on a review of bulk densities for similar rock types and allowing for decrease from the previously used bulk density due to porosity. Classification The Mineral Resource has been classified on the basis of confidence in the geological model, continuity of mineralized zones, drilling density, confidence in the underlying database and the available bulk density information. All factors considered with the exception of bulk density, Indicated classification would be highly likely for a significant portion of the resource. However, the unverified bulk density resulted in the CP s classifying the entire resource as Inferred. Audits or reviews No independent third party review has been conducted. Discussion of relative accuracy/ confidence The relative accuracy of the Mineral Resource estimate is reflected in the reporting of the Mineral Resource as per the guidelines of the 2012 JORC Code. The statement relates to global estimates of tonnes and grade. Available hardcopy production data has briefly been reviewed. Further analysis of the information will be completed during the next phase of resource work. 11

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District ASX Release 12 October 2012 Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District Total mineral resource at Duck Creek Project area of 960,000t @ 1.47% Cu (0.2%

More information

KYLYLAHTI RESOURCE INCREASED

KYLYLAHTI RESOURCE INCREASED 26 March 2014 ASX: AOH, FSE: A2O KYLYLAHTI RESOURCE INCREASED Copper in Resources exceeds pre-mining estimates 2 years after first production commenced Contained copper up 17% from June 2013 after mine

More information

HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE

HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE 22 August 2013 ASX: AOH, FSE: A2O HIGH GRADE DRILL RESULTS CONTINUE AT THE KYLYLAHTI MINE Upper part of Wombat zone returns excellent drilling intersections: - 29.0m at 4.7% copper - 37.6m at 3.2% copper

More information

HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT

HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT July 7 th, 2015 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 HIGH GRADE GOLD DRILL RESULTS MT EGERTON PROJECT RC Drilling has returned shallow high grades at the Gaffney

More information

AIM: KEFI 6 March 2014. KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE

AIM: KEFI 6 March 2014. KEFI Minerals Plc. ( KEFI or the Company ) SAUDI ARABIAN EXPLORATION AND DEVELOPMENT UPDATE KEFI Minerals Plc Doğu Akdeniz Mineralleri San. Tic. Ltd. Şti. Cemal Gürsel Cad. Yalı Apt. No:304 K:4 D:9 Karşıyaka İZMİR Tel: +90 232 381 9431 Fax: +90 232 381 9071 Email: info@kefi-minerals.com AIM:

More information

NEW DRILLING RESULTS FROM THE CLONCURRY PROJECT

NEW DRILLING RESULTS FROM THE CLONCURRY PROJECT 8 October 2015 ASX: AOH, FSE: A2O NEW DRILLING RESULTS FROM THE CLONCURRY PROJECT Excellent results from previously un-assayed drill core. Best intersection of 29.1 metres at 1.41% copper, 0.11g/t gold.

More information

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015 ASX RELEASE ASX:AWV 30 October 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015 HIGHLIGHTS Pit optimisation and final mine design completed Metallurgical test work completed Engineering

More information

For Immediate Release Date: February 3, 2016 #01-2016. Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva

For Immediate Release Date: February 3, 2016 #01-2016. Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva For Immediate Release TSX:ORV Date: February 3, 2016 #01-2016 Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva New Villar Zone discovered within 50m of existing reserves

More information

For personal use only

For personal use only Investigator Resources Limited Date: 7 th February 2012 up to 2.25% Ag at the new Paris prospect in South Australia First assays received for new drilling on Paris Line 7 with all three holes assayed returning

More information

ALCYONE REPORTS JORC SILVER RESOURCES

ALCYONE REPORTS JORC SILVER RESOURCES ASX ANNOUNCEMENT & MEDIA RELEASE 29 March 2010 ALCYONE REPORTS JORC SILVER RESOURCES +15Moz RESOURCE INVENTORY UNDERPINS PROGRAM TARGETING RESUMPTION OF SILVER PRODUCTION AT TEXAS PROJECT LATER THIS YEAR

More information

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value De Grey Mining Ltd ASX RELEASE 5 July 2016 ASX Code DEG ABN 65 094 206 292 Wingina Deeps Drilling Commenced (Turner River Project) Highlights Diamond drilling programme of approximately 1,500m has COMPANY

More information

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES Suite 250, 1075 West Georgia Street Vancouver, BC, Canada V6E 3C9 Tel: 1.778.373.0102 Fax: 1.604.434.1487 NEWS RELEASE NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. WIRE SERVICES

More information

Expansion drilling at Mt Marion Lithium Project yields positive results

Expansion drilling at Mt Marion Lithium Project yields positive results 29 January 2016 Level 1, 672 Murray Street West Perth WA 6005 Locked Bag 8 West Perth WA 6872 t. +61 8 9322 1182 f. +61 8 9321 0556 info@neometals.com.au neometals.com.au Neometals Ltd ABN 89 099 116 631

More information

New Cascade drill results and Ulanzi drill update

New Cascade drill results and Ulanzi drill update New Cascade drill results and Ulanzi drill update 1 October 2015 Highlights Assays from the next two Cascade drill holes continue returning excellent intervals: o 98m@ 8.92% TGC including 40m@ 10.18% from

More information

COPPER DISCOVERY GROWS AT TURKEY CREEK

COPPER DISCOVERY GROWS AT TURKEY CREEK 28 October 2014 ASX: AOH, FSE: A2O COPPER DISCOVERY GROWS AT TURKEY CREEK HIGHLIGHTS RC drilling highlights prospectivity of Cloncurry Copper Project Infill and Extension RC drilling about to recommence

More information

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015 ASX RELEASE ASX:AWV 29 January 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 31 DECEMBER 2015 HIGHLIGHTS Review of updated pit optimisation undertaken Metallurgical testwork report received confirming

More information

ST GEORGE ACQUIRES NICKEL SULPHIDE PROJECTS

ST GEORGE ACQUIRES NICKEL SULPHIDE PROJECTS ASX / MEDIA RELEASE 18 September 2015 HIGHLIGHTS: ST GEORGE ACQUIRES NICKEL SULPHIDE PROJECTS St George acquires 100% of the Hawaii and Mt Alexander North nickel sulphide exploration projects from BHP

More information

NORTH PORTIA RESOURCE SUPPORTED BY NEW DRILLING RESULTS

NORTH PORTIA RESOURCE SUPPORTED BY NEW DRILLING RESULTS Havilah Resources Limited plans to sequentially develop its portfolio of gold, copper, iron, cobalt, tin and other mineral resources in South Australia. Our vision is to become a new mining force, delivering

More information

Exploration Update - Corunna

Exploration Update - Corunna ASX RELEASE 27 th August 2015 ASX: MGV Exploration Update - Corunna Anomalous lead, zinc and silver identified in aircore drilling at the Corunna project in South Australia Anomalous silver-lead-zinc zone

More information

ASX ANNOUNCEMENT Date: 3 February 2016 Number: 449/030216

ASX ANNOUNCEMENT Date: 3 February 2016 Number: 449/030216 ASX ANNOUNCEMENT Date: 3 February 2016 Number: 449/030216 VERY HIGH GRADE PGM-COPPER-NICKEL IN MASSIVE NICKEL COPPER SULPHIDE AT PLATINUM SPRINGS, N.S.W. 0.6 metres at 11.5 g/t platinum, 25.6 g/t palladium,

More information

DALGARANGA MINERAL RESOURCE GROWS TO OVER ONE MILLION OUNCES

DALGARANGA MINERAL RESOURCE GROWS TO OVER ONE MILLION OUNCES November 4th, 2015 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 DALGARANGA MINERAL RESOURCE GROWS TO OVER ONE MILLION OUNCES Total Dalgaranga Mineral Resource increased

More information

MORE STRONG NICKEL HITS FOR MINCOR AS KAMBALDA DISCOVERIES GROW

MORE STRONG NICKEL HITS FOR MINCOR AS KAMBALDA DISCOVERIES GROW MEDIA RELEASE Thursday, 11 December 2014 MORE STRONG NICKEL HITS FOR MINCOR AS KAMBALDA DISCOVERIES GROW High-grade intersections at Cassini and Burnett Drilling ramps up Strong new intersections returned

More information

KEY POINTS. Resource additions come at a discovery cost of <$10/oz ASX ANNOUNCEMENT 28 FEBRUARY 2013. Australian Securities Exchange Code: NST

KEY POINTS. Resource additions come at a discovery cost of <$10/oz ASX ANNOUNCEMENT 28 FEBRUARY 2013. Australian Securities Exchange Code: NST ASHBURTON RESOURCE SOARS 66% TO 1.7MOZ Inventory includes 647,000oz of oxide ore, putting Northern Star on track to develop its second low-cost operation KEY POINTS ASX ANNOUNCEMENT 28 FEBRUARY 2013 Australian

More information

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW NEWS RELEASE February 11, 2008 Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW INTERNATIONAL MINERALS ANNOUNCES 6.2 MILLION OUNCES OF MEASURED AND INDICATED GOLD RESOURCES AND RESULTS

More information

FINAL FURTHER HIGH GRADE COPPER RESULTS IN SURFACE FLOAT SAMPLES AT NAKRU

FINAL FURTHER HIGH GRADE COPPER RESULTS IN SURFACE FLOAT SAMPLES AT NAKRU 5 June 2015 ASX Code: COY FINAL FURTHER HIGH GRADE COPPER RESULTS IN SURFACE FLOAT SAMPLES AT NAKRU Mineral explorer Coppermoly Limited (Coppermoly and the Company) is pleased to announce final assay results

More information

Lalor Project Base Metal Zones and Gold Mineralization January 2009

Lalor Project Base Metal Zones and Gold Mineralization January 2009 Lalor Project Base Metal Zones and Gold Mineralization January 2009 1 Forward-Looking Statements All monetary amounts in Canadian dollars unless otherwise stated.. This presentation contains forward-looking

More information

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY

TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY 10 August 2015 ASX: AOH, FSE: A2O TURKEY CREEK PIT OPTIMISATION STUDY ADDS 2 YEARS MINE LIFE TO THE LITTLE EVA PROJECT AT CLONCURRY Estimated oxide and sulphide resources within the optimum pit is 17.3

More information

Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000

Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000 6 November 2006 Australian Stock Exchange Limited Company Announcements NO. OF PAGES : (5) Level 10, 20 Bond Street SYDNEY NSW 2000 TROPICANA JV (IGO 30%) PROJECT UPDATE KEY POINTS: New significant drill

More information

For personal use only

For personal use only Korab Resources Limited Gold Operations Update November 2012 Andrej K. Karpinski Executive Chairman Korab Projects BOBRIKOVO MELROSE 1 Korab Gold Projects Other Korab Projects Robust Undervalued Gold Portfolio

More information

JACQUES GOLD PROSPECT RETURNS 37.7g/t. Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37.

JACQUES GOLD PROSPECT RETURNS 37.7g/t. Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37. ASX Announcement 15 January 2013 JACQUES GOLD PROSPECT RETURNS 37.7g/t Re-assay of 1m samples from initial drilling program at Jacques returns gold grades of up to 37.7g/t Second phase drilling program

More information

ASX Announcement (ASX: HMX)

ASX Announcement (ASX: HMX) ASX Announcement (ASX: HMX) 18 th March 2015 Drilling at Hammertime and Overlander to commence 3D-IP enhances gravity and magnetic target at Overlander North IOCG Hammer Metals Limited (ASX: HMX) ( Hammer

More information

For personal use only

For personal use only ASX Release 27 September 2012 OPTION TO ACQUIRE 560,000oz PEAK HILL GOLD PROJECT RESOURCE AND INVESTMENT NL (ASX: RNI) (RNI or the Company) has reached agreement with Montezuma Mining Company Limited for

More information

SILVERCORP INTERCEPTS HIGH GRADE SILVER LEAD ZINC MINERALIZATION AT THE TLP MINE, YING MINING DISTRICT, HENAN PROVINCE, CHINA

SILVERCORP INTERCEPTS HIGH GRADE SILVER LEAD ZINC MINERALIZATION AT THE TLP MINE, YING MINING DISTRICT, HENAN PROVINCE, CHINA NEWS RELEASE Trading Symbol: TSX: SVM NYSE: SVM SILVERCORP INTERCEPTS HIGH GRADE SILVER LEAD ZINC MINERALIZATION AT THE TLP MINE, YING MINING DISTRICT, HENAN PROVINCE, CHINA VANCOUVER, BRITISH COLUMBIA,

More information

Update on Heap Leach potential of the Murchison gold project

Update on Heap Leach potential of the Murchison gold project 3 July 2012 Australian-based Kentor Gold Limited (ASX: KGL) is entering the ranks of operating gold mining companies in 2012. The Company is progressing a pipeline of advanced projects in Australia and

More information

West African hits 19m at 1.8g/t Au from 9m extending shallow oxide gold at M3 Eastern Zone

West African hits 19m at 1.8g/t Au from 9m extending shallow oxide gold at M3 Eastern Zone Press Release 13th January 2016 West African hits 19m at 1.8g/t Au from 9m extending shallow oxide gold at M3 Eastern Zone Gold developer West African Resources Limited (ASX, TSXV: WAF) is pleased to report

More information

News Release. Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTCQX)

News Release. Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTCQX) News Release July 3 rd, 2012 Trading Symbols: GTP (TSX-V) P01 (FRANKFURT) COLTF (OTCQX) Initial NI 43-101 Resource Estimate for the Chaminé and Casas Novas deposits within its 100% Boa Fé Gold Project,

More information

MULTIPLE NEW GOLD ZONES DISCOVERED IN REGIONAL EXPLORATION DRILLING AT DALGARANGA

MULTIPLE NEW GOLD ZONES DISCOVERED IN REGIONAL EXPLORATION DRILLING AT DALGARANGA February 8 th, 2016 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 MULTIPLE NEW GOLD ZONES DISCOVERED IN REGIONAL EXPLORATION DRILLING AT DALGARANGA Significant new gold

More information

Reservoir Minerals Reports Further High Grade Copper-Gold Drill Intercepts from the Upper Zone of the Cukaru Peki Deposit, Serbia

Reservoir Minerals Reports Further High Grade Copper-Gold Drill Intercepts from the Upper Zone of the Cukaru Peki Deposit, Serbia CORPORATE OFFICE: 501 543 Granville Street Vancouver, BC, V6C 1X8 Canada Phone: +1 604 669 4854 Fax: +1 604 688 1157 TSX-V RMC www.reservoirminerals.com info@reservoirminerals.com News Release April 13,

More information

ULYSSES MINERAL RESOURCE UPGRADE

ULYSSES MINERAL RESOURCE UPGRADE ASX Announcement 1 February 2016 ULYSSES MINERAL RESOURCE UPGRADE Ulysses total Mineral Resource increases by 10% to: 2.13 Mt @ 2.2 g/t gold for 151,500 ounces of gold Over 80% of the Mineral Resource

More information

ST GEORGE COMMENCES MAJOR NICKEL SULPHIDE DRILLING CAMPAIGN. High impact drilling campaign has commenced at the East Laverton Project

ST GEORGE COMMENCES MAJOR NICKEL SULPHIDE DRILLING CAMPAIGN. High impact drilling campaign has commenced at the East Laverton Project ASX / MEDIA RELEASE 6 October 2015 ST GEORGE COMMENCES MAJOR NICKEL SULPHIDE DRILLING CAMPAIGN HIGHLIGHTS: High impact drilling campaign has commenced at the East Laverton Project Testing priority nickel

More information

KYLYLAHTI MINE INCREASES RESERVES AND MINE LIFE

KYLYLAHTI MINE INCREASES RESERVES AND MINE LIFE 29 August 2013 ASX: AOH, FSE: A2O KYLYLAHTI MINE INCREASES RESERVES AND MINE LIFE Ore Reserve tonnes increased 16% Ore Reserve contained copper increased 10% Mine life increased to over 7.5 years Copper

More information

Akjoujt South Project: Drilling Update and Ground Magnetic Anomalies Identified

Akjoujt South Project: Drilling Update and Ground Magnetic Anomalies Identified ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE Akjoujt South Project: Drilling Update and Ground Magnetic Anomalies Identified The Board of OreCorp Limited (OreCorp or the Company) is pleased to provide

More information

Galahad Gold plc (Galahad)

Galahad Gold plc (Galahad) 23 January 2007 Galahad Gold plc (Galahad) 2006 Drilling Expands Northern Dynasty's Pebble East Deposit Pebble East Deposit Now Over 7000 Ft By 4000 Ft With Grades Exceeding 1% Cueq Galahad sets out below

More information

Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia

Quarterly Report Highlights. Ulysses Gold Project, Western Australia. Viking Gold Project, Western Australia ASX Announcement Quarterly Activities Report For the Quarter Ended 31 December 2015 29 January 2016 Genesis Minerals Limited ASX Code: GMD Issued Capital 446 million shares 27.2 million options Current

More information

Significant Nickel Sulphides at Killaloe JV Project

Significant Nickel Sulphides at Killaloe JV Project Decem000000000000000000000000000000000000000 000ber 2012 LIMITED ABN 48 106 732 487 ASX Announcement 16 June 2014 Significant Nickel s at Killaloe JV Project Highlights 14.65m of komatiite hosted nickel

More information

Positioned for Production: Exploring for Growth

Positioned for Production: Exploring for Growth ASX Code: AYN Positioned for Production: Exploring for Growth Andrew King, Managing Director May 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors

More information

ASX RELEASE. Mineral Resource Estimate increases 160% to 60.5Mt

ASX RELEASE. Mineral Resource Estimate increases 160% to 60.5Mt 5 July 2016 ASX RELEASE Mineral Resource Estimate increases 160% to 60.5Mt Mineral Resources Limited (ASX: MIN) ( MRL ), Neometals Ltd (ASX: NMT) ( Neometals ) and Ganfeng Lithium Co., Ltd (SZSE: 002460)

More information

MINERAL RESOURCES LIMITED MT MARION EXPLORATION 18 May 2016

MINERAL RESOURCES LIMITED MT MARION EXPLORATION 18 May 2016 MINERAL RESOURCES LIMITED MT MARION EXPLORATION 18 May 2016 DEEP DRILLING AT MT MARION INSECTS SIGNIFICANT BROAD ZONE OF PEGMATITE Neometals Ltd (ASX: NMT) ( Neometals ), Mineral Resources Limited (ASX:

More information

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016

Mining Indaba Presentation. Capetown, South Africa 8 th 10 th February 2016 Mining Indaba Presentation Capetown, South Africa 8 th 10 th February 2016 www.birimiangold.com 1 Disclaimer This presentation has been prepared by Birimian Gold Limited (BGS) for general information purposes

More information

SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA

SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA NEWS RELEASE Trading Symbol: TSX: SVM NYSE: SVM SILVERCORP INTERCEPTS 18.8 METRES TRUE WIDTH GRADING 368 G/T SILVER AND 1.78 PERCENT LEAD AT THE LM MINE WEST, YING MINING DISTRICT, CHINA VANCOUVER, British

More information

RIDDARHYTTAN RESOURCES PRESS RELEASE August 11, 2003

RIDDARHYTTAN RESOURCES PRESS RELEASE August 11, 2003 1 RIDDARHYTTAN RESOURCES PRESS RELEASE August 11, 2003 New drill holes in the Suurikuusikko area, Finland, have further intersected high gold grades over considerable widths, increasing the depth extent

More information

TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION

TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION B-1 APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION 1.0 INTRODUCTION The disclosure of the results of exploration and development activity on mineral

More information

West African hits 19m at 1.9g/t Au from 40m, including 3m at 5.7 g/t Au at M1 from shallow RC drilling

West African hits 19m at 1.9g/t Au from 40m, including 3m at 5.7 g/t Au at M1 from shallow RC drilling Press Release 2nd February 2016 West African hits 19m at 1.9g/t Au from 40m, including 3m at 5.7 g/t Au at M1 from shallow RC drilling Gold developer West African Resources Limited (ASX, TSXV: WAF) is

More information

For personal use only

For personal use only ASX Announcement 8 June 2015 Revised PFS Delivers Major Boost for Underground Development at Syama 01 Resolute Mining Limited (ASX:RSG, Resolute or the Company ) is pleased to provide results from an independent

More information

ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT

ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT ASX ANNOUNCEMENT & MEDIA RELEASE 25 November 2010 ALCYONE TO RAISE $5M TO UNDERPIN TRANSITION TO SILVER PRODUCTION AT TEXAS PROJECT ENTITLEMENT OFFER TO FUND FURTHER EXPLORATION, ACQUISITION OF LONG-LEAD

More information

For personal use only

For personal use only 22 October 2015 GEOPACIFIC RESOURCES LIMITED ACN 003 208 393 ASX Code: GPR info@geopacific.com.au www.geopacific.com.au AUSTRALIAN OFFICE Level 1, 278 Stirling Highway Claremont, WA 6010. PO Box 439, Claremont,

More information

GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER

GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER Dacian Gold Ltd ( Dacian or the Company ) (ASX:DCN) is pleased to announce that it has completed a major geological review and reinterpretation

More information

POTENTIAL NEW SYENITE CORRIDORS IDENTIFIED FOLLOWING DETAILED MAGNETIC SURVEY AT JUPITER

POTENTIAL NEW SYENITE CORRIDORS IDENTIFIED FOLLOWING DETAILED MAGNETIC SURVEY AT JUPITER 4 NOVEMBER 2015 POTENTIAL NEW SYENITE CORRIDORS IDENTIFIED FOLLOWING DETAILED MAGNETIC SURVEY AT JUPITER Dacian Gold Ltd ( Dacian or the Company ) (ASX:DCN) is pleased to announce an update on the exploration

More information

ENCOURAGING PRELIMINARY METALLURGICAL TESTWORK FOR OXIDE HEAP LEACHING AT THE SOUTH HOUNDÉ PROJECT

ENCOURAGING PRELIMINARY METALLURGICAL TESTWORK FOR OXIDE HEAP LEACHING AT THE SOUTH HOUNDÉ PROJECT NEWS RELEASE JANUARY 30, 2014 ENCOURAGING PRELIMINARY METALLURGICAL TESTWORK FOR OXIDE HEAP LEACHING AT THE SOUTH HOUNDÉ PROJECT VANCOUVER, CANADA. Sarama Resources Ltd. ( Sarama or the Company ) is pleased

More information

MAIDEN RESERVES EXCEED EXPECTATIONS FOR ANTAS COPPER

MAIDEN RESERVES EXCEED EXPECTATIONS FOR ANTAS COPPER ASX Release 17 September 2014 MAIDEN RESERVES EXCEED EXPECTATIONS FOR ANTAS COPPER Level 3, 680 Murray Street West Perth. WA 6005 PO Box 1726 West Perth. WA 6872 Tel: +61 8 9324 1865 Fax: +61 8 9200 1850

More information

Attractive gold assays from Chameleon Deposit, Kalgoorlie

Attractive gold assays from Chameleon Deposit, Kalgoorlie MINOTAUR EXPLORATION LIMITED ACN 108 483 601 ASX: MEP 4 July 2016 MINOTAUR EXPLORATION ASX Release Attractive gold assays from Chameleon Deposit, Kalgoorlie Highlights Positive results returned from infill

More information

MASSIVE NICKEL SULPHIDE TARGET AT WINDSOR

MASSIVE NICKEL SULPHIDE TARGET AT WINDSOR ASX / MEDIA RELEASE 18 December 2015 HIGHLIGHTS: MASSIVE NICKEL SULPHIDE TARGET AT WINDSOR Drill hole WINDD004 targeting the very strong electromagnetic (EM) plate WINRC016_v1 (210,469 Siemens) has been

More information

HIGH GRADE TUNGSTEN-TIN LODES IDENTIFIED AT REDMOOR

HIGH GRADE TUNGSTEN-TIN LODES IDENTIFIED AT REDMOOR HIGH GRADE TUNGSTEN-TIN LODES IDENTIFIED AT REDMOOR ASX Release 26 November 2015 This is a re-release of the 25 November 2015 announcement with a revised Competent Persons Statement on The last page. All

More information

Leapfrog : new software for faster and better 3D geological modelling

Leapfrog : new software for faster and better 3D geological modelling Leapfrog : new software for faster and better 3D geological modelling Paul Hodkiewicz, Principal Consultant (Geology), SRK Consulting, 10 Richardson Street, West Perth WA 6005, Australia, phodkiewicz@srk.com.au

More information

Cannon Big Pit Given the Green Light

Cannon Big Pit Given the Green Light ASX Release Tuesday 3 November 2015 Cannon Big Pit Given the Green Light Southern Gold maintains 50% profit share on Cannon Metals X estimate open pit recovered gold +270% to ~50koz Significant cash flow

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 6 May 2013 SIRIUS RESOURCES NL ASX: SIR ABN: 46 009 150 083 Street address: LA NICKE BOLLINGER UPDATE Sirius Resources NL (ASX:SIR) ( Sirius or the Company ) advises that ongoing drilling

More information

MAJOR RESOURCE & RESERVE UPGRADE GIVES PAULSENS +5-YEAR MINE LIFE

MAJOR RESOURCE & RESERVE UPGRADE GIVES PAULSENS +5-YEAR MINE LIFE We now have dividend yield, strong cashflow, ample mine life, low costs, production growth and significant exploration upside. - MD Bill Beament MAJOR RESOURCE & RESERVE UPGRADE GIVES PAULSENS +5-YEAR

More information

DRILLING COMMENCES AT REMBRANDT GOLD PROJECT

DRILLING COMMENCES AT REMBRANDT GOLD PROJECT ASX Release 8 th October 2015 DRILLING COMMENCES AT REMBRANDT GOLD PROJECT HIGHLIGHTS Terrain has commenced drilling at the Rembrandt Gold Project and is targeting high grade near surface gold at the Monet

More information

For personal use only

For personal use only 20 November 2014 01 Exceptional High Grade Intercepts from Bibiani Gold Project Highlights Significant high grade gold mineralisation intersected in surface and underground diamond drill program including;

More information

Funds from the placement will be used for working capital requirements, including the completion of the Productora Pre-feasibility Study (PFS).

Funds from the placement will be used for working capital requirements, including the completion of the Productora Pre-feasibility Study (PFS). ASX ANNOUNCEMENT Monday 1 st February 2016 Hot Chili to Raise A$1.6m via Placement to Strategic Shareholders Hot Chili Limited (ASX Code: HCH) is pleased to announce that it has received commitments from

More information

Highlights of selected high-grade mineralized zones exposed in drift tunnels include:

Highlights of selected high-grade mineralized zones exposed in drift tunnels include: NEWS RELEASE Trading Symbol: TSX: SVM SILVERCORP REPORTS NEWLY EXPOSED MINERALIZATION AT THE TLP MINE FROM ITS 2015 EXPLORATION TUNNELING PROGRAM - 1,414 METERS IN TOTAL LENGTH AND 0.70 METERS IN AVERAGE

More information

ANNUAL GENERAL MEETING 2015. 30 November 2015

ANNUAL GENERAL MEETING 2015. 30 November 2015 ANNUAL GENERAL MEETING 2015 30 November 2015 Disclaimer Competent Person Statement This presentation may contain some references to forecasts, estimates, assumptions and other forward-looking statements.

More information

BOADICEA RESOURCES. Additional Conductors Identified at Symons Hill in the Fraser Range from VTEM max Survey.

BOADICEA RESOURCES. Additional Conductors Identified at Symons Hill in the Fraser Range from VTEM max Survey. ASX Announcement- 17th June 2014 ASX Code: BOA BOADICEA RESOURCES Additional Conductors Identified at Symons Hill in the Fraser Range from VTEM max Survey. Highlights The final interpretation of the 2013

More information

DRILLING COMMENCES AT STRONG WINDSOR DHEM TARGET

DRILLING COMMENCES AT STRONG WINDSOR DHEM TARGET ASX / MEDIA RELEASE 14 December 2015 HIGHLIGHTS: DRILLING COMMENCES AT STRONG WINDSOR DHEM TARGET Diamond drilling of electromagnetic (EM) plate WINRC016_v1 (210,469 Siemens) has commenced New off hole

More information

For personal use only

For personal use only 29 January 2016 ASX Announcement December 2015 Quarterly Activities Report Summary New Satimola Limited Sale and Purchase Agreement Signed Financing to Acquire Satimola Limited Secured Revised Consulting

More information

Cannon Mine on Track

Cannon Mine on Track ASX Release Thursday 1 October 2015 Cannon Mine on Track Pit development running to schedule Good progress on big pit negotiations with Metals X Stage 1 Open Pit Now At the 347.5m Bench ASX Code: SAU Issued

More information

SILVERCORP REPORTS RESULTS FROM ITS 2012 EXPLORATION PROGRAM AT THE SGX MINE, YING MINING DISTRICT, CHINA

SILVERCORP REPORTS RESULTS FROM ITS 2012 EXPLORATION PROGRAM AT THE SGX MINE, YING MINING DISTRICT, CHINA NEWS RELEASE Trading Symbol: TSX: SVM NYSE: SVM SILVERCORP REPORTS RESULTS FROM ITS 2012 EXPLORATION PROGRAM AT THE SGX MINE, YING MINING DISTRICT, CHINA VANCOUVER, British Columbia June 4, 2013 Silvercorp

More information

For personal use only

For personal use only ASX Announcement 16 November 2015 Maiden 117,000oz, 16.9g/t, Gold Resource for Bonnie Vale Deposit Focus Minerals Ltd. (ASX: FML) is pleased to announce that an inaugural JORC 2012 reportable Mineral Resource

More information

For personal use only

For personal use only January, 202 Silver Swan Group Limited December 20 Quarterly Activities Report HIGHLIGHTS STAKEWELL Gold Project: Drilling intersected high and low grade gold mineralisation at Kohinoor, including surface

More information

HIGH IMPACT EXPLORATION CONTINUES AT EAST LAVERTON

HIGH IMPACT EXPLORATION CONTINUES AT EAST LAVERTON ASX / MEDIA RELEASE 23 November 2015 HIGHLIGHTS: HIGH IMPACT EXPLORATION CONTINUES AT EAST LAVERTON Two new bedrock conductors identified by downhole electromagnetic (DHEM) surveys at Windsor Drilling

More information

DRILLING INTERSECTS WIDE ZONES OF GOLD MINERALISATION AT DUSK TIL DAWN

DRILLING INTERSECTS WIDE ZONES OF GOLD MINERALISATION AT DUSK TIL DAWN ASX Announcement 21 st October 2015 DRILLING INTERSECTS WIDE ZONES OF GOLD MINERALISATION AT DUSK TIL DAWN Intersections of significant thick zones of gold mineralisation confirm a new greenfields gold

More information

West African hits 25m at 2.5g/t Au including 17m at 3.35g/t Au ending in mineralisation

West African hits 25m at 2.5g/t Au including 17m at 3.35g/t Au ending in mineralisation Press Release 10 th November 2015 West African hits 25m at 2.5g/t Au including 17m at 3.35g/t Au ending in mineralisation Gold developer West African Resources Limited (ASX, TSXV: WAF) is pleased to report

More information

CHALICE GOLD MINES AND SUB SAHARA RESOURCES ANNOUNCE PROPOSED MERGER TO CONSOLIDATE AND FUND ERITREAN GOLD PROJECT

CHALICE GOLD MINES AND SUB SAHARA RESOURCES ANNOUNCE PROPOSED MERGER TO CONSOLIDATE AND FUND ERITREAN GOLD PROJECT 3 APRIL 2009 CHALICE GOLD MINES AND SUB SAHARA RESOURCES ANNOUNCE PROPOSED MERGER TO CONSOLIDATE AND FUND ERITREAN GOLD PROJECT Key Points Chalice Gold Mines and Sub Sahara Resources agree to merge by

More information

MESA DE PLATA RESOURCE DRILLING UPDATE

MESA DE PLATA RESOURCE DRILLING UPDATE ASX: AZS 23 December 2015 MESA DE PLATA RESOURCE DRILLING UPDATE HIGHLIGHTS Reverse Circulation (RC) resource drill-out nearing completion with 47 of 55 planned holes completed, and assays received for

More information

Cummins Range Rare Earths Project

Cummins Range Rare Earths Project Cummins Range Rare Earths Project December 2011 DISCLAIMER The information contained in this presentation is not financial product advice. The presentation is for information purposes and is of a general

More information

For personal use only

For personal use only Investor Presentation August 2012 Disclaimer/Competent Person s Disclaimer: This presentation has been prepared by Buxton Resources ( Buxton ). The information contained in this presentation is a professional

More information

BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb - 2014 - TORONTO

BUILDING A COPPER COMPANY IN BRAZIL. PDAC Feb - 2014 - TORONTO BUILDING A COPPER COMPANY IN BRAZIL PDAC Feb - 2014 - TORONTO CORPORATE & GOALS Shares on Issue 1.355B Significant Shareholders Share Price ~Au$0.07* Glencore 15% Market Cap ~Au$95m* BlackRock 5% Cash

More information

SUBSTANTIAL GRAPHITIC MINERALISATION CONFIRMED AT ANCUABE

SUBSTANTIAL GRAPHITIC MINERALISATION CONFIRMED AT ANCUABE ASX ANNOUNCEMENT 18 September 2015 resource. Triton Minerals Ltd ASX: TON ABN: 99 126 042 215 SUBSTANTIAL GRAPHITIC MINERALISATION CONFIRMED AT ANCUABE HIGHLIGHTS Street address: Ground Floor Unit 1 256

More information

Further Basement Gold Results Confirm Yamarna Gold Potential

Further Basement Gold Results Confirm Yamarna Gold Potential ABOUT MONTEZUMA MINING Listed in 2006, Montezuma Mining Company Ltd (ASX: MZM) is a diversified explorer primarily focused on manganese, copper and gold. The Company s primary objective is to achieve returns

More information

Assays Confirm Extensive Zinc Gossan at Millennium

Assays Confirm Extensive Zinc Gossan at Millennium Level 7, 600 Murray Street West Perth WA 6005 PO Box 273 West Perth WA 6872 P 08 9486 9455 F 08 6210 1578 www.enrl.com.au 9 July 2015 ASX : ENR Company Announcements Office Australian Securities Exchange

More information

CINOVEC LITHIUM PROJECT DRILLING UPDATE

CINOVEC LITHIUM PROJECT DRILLING UPDATE European Metals Holdings Limited ARBN 154 618 989 Suite 12, Level 1 11 Ventnor Avenue West Perth WA 6005 PO Box 52 West Perth WA 6872 Phone + 61 8 6141 3500 Fax + 61 6141 3599 Website: www.europeanmet.com

More information

RTG ANNOUNCES UPDATE TO MINERAL RESOURCE OF MABILO

RTG ANNOUNCES UPDATE TO MINERAL RESOURCE OF MABILO Level 2, 338 Barker Road Subiaco WA 6008 Phone: +61 8 6489 2900 www.rtgmining.com ABN: 70 164 362 850 RTG ANNOUNCES UPDATE TO MINERAL RESOURCE OF MABILO 52% INCREASE IN INDICATED CATEGORY OF MINERAL RESOURCE

More information

Achtung, Folientest, nicht für den Produktiveinsatz geeignet. Blötberget Iron Ore Project From Resource and Mining History to Present

Achtung, Folientest, nicht für den Produktiveinsatz geeignet. Blötberget Iron Ore Project From Resource and Mining History to Present From Resource and Mining History to Present 30.11.2015 Folie 1 DMT-Präsentation Project Location From Berlin 1100 km by road (13 hours) 1.5 hours by plane to Stockholm plus 2.5 hours by car Introduction

More information

Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves

Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves 2001 Edition (as referred to in the Joint Ore Reserves Committee Code ( The JORC Code ) 1999 edition) Prepared

More information

New Lithium Project includes largest tin tantalum mine in NT HIGHLIGHTS. Core has extended its lithium focus in the prospective Bynoe pegmatite field

New Lithium Project includes largest tin tantalum mine in NT HIGHLIGHTS. Core has extended its lithium focus in the prospective Bynoe pegmatite field ASX ANNOUNCEMENT ASX : CXO 8 th February 2016 New Lithium Project includes largest tin tantalum mine in NT HIGHLIGHTS Core has extended its lithium focus in the prospective Bynoe pegmatite field NT into

More information

For personal use only

For personal use only DECEMBER 2011 Issued 31 January 2012 HIGHLIGHTS INDIAN IRON ORE MINING PROJECT Significant on-site work completed and installation of phase one processing infrastructure underway at Kurnool iron beneficiation

More information

IP survey expands gold prospectivity at Dixon, Doolgunna Marymia Project

IP survey expands gold prospectivity at Dixon, Doolgunna Marymia Project 27 January 2016 IP survey expands gold prospectivity at Dixon, Doolgunna Marymia Project 200 metre long chargeability zone detected at the Dixon gold prospect o Sulphidic quartz veining the likely source

More information

December 2015 Quarterly Activities Report

December 2015 Quarterly Activities Report December 2015 Quarterly Activities Report Musgrave Minerals Ltd is an Australian focused gold and base metal exploration company. Musgrave plans to grow through the discovery and development of gold and

More information

Savannah North Scoping Study Looking into the future 3 February 2016

Savannah North Scoping Study Looking into the future 3 February 2016 Savannah North Scoping Study Looking into the future 3 February 2016 ASX: PAN Disclaimer Cautionary Statements This presentation includes information extracted from Panoramic Resources Limited ASX announcement

More information

DIAMOND DRILLING UNDERWAY AT MESA DE PLATA

DIAMOND DRILLING UNDERWAY AT MESA DE PLATA ASX: AZS 6 October 2015 DIAMOND DRILLING UNDERWAY AT MESA DE PLATA Key Points: Mesa De Plata: Diamond drilling underway to test high-grade silver discovery La Morita: Assay results identify wide zones

More information