1 Community and Built Environment Localities and Safer Communities Business Continuity Management Policy Andrew Fyfe 4 Aug 14 Draft v4.4 TBC Resilience Team BCM Policy draft v Aug 2014
2 Statement of Intent In light of the duty placed on Buckinghamshire County Council under the Civil Contingencies Act 2004, Buckinghamshire County Council recognises and accepts its responsibility to develop and maintain a Business Continuity Management (BCM) programme and plans to safeguard the continuous provision of a high standard of critical public services in the event of anticipated or unexpected disruptive challenges. Rationale / Legislative Background The primary legislation for Business Continuity Management is the Civil Contingencies Act (2004) and associated statutory and non-statutory guidance. Buckinghamshire County Council (and the District Councils) is defined in this Act as a Category One Responder (C1R). The duty is summarised as follows: The Civil Contingencies Act (CCA) 2004 makes it a statutory duty for local authorities to maintain plans to ensure that they can continue to exercise their functions in the event of an emergency so far as is reasonably practicable. The duty relates to all functions, not just their emergency response functions. HM Government, Emergency Preparedness. Chapter 6, Summary The statutory duty also covers all contracted out services or capabilities: The duty also requires the authority to ensure that those organisations delivering services on behalf of the local authority (e.g. contracted-out services), or capabilities which underpin service provision (e.g. information technology and telecommunications) can also deliver to the extent required in the event of an emergency. This is because services remain part of an organisation s functions even if they do not directly provide them. HM Government, Emergency Preparedness. Paragraph 6.5 Furthermore, there is a requirement under the Council s Financial Regulations for Services to have BCPs and there is a requirement under the Annual Governance Statement for Services to confirm they have effective BCPs. Scope The BCM Policy underpins corporate support for the BCM programme, which defines how BCM will be structured, implemented and maintained throughout the authority. The BCM programme will be aligned to the British Standard (2007) for Business Continuity Best Practice: Part 1 (BS ) while moving towards the International Standard, ISO22301, released in Ultimately the BCM programme will satisfy the Council s compliance with the Civil Contingencies Act 2004 and subsequent regulations and statutory guidance. The BCM programme will be a cyclical programme that reflects the current, organisation, structure and legislative responsibilities of the Council. This BCM policy covers all Buckinghamshire County Council functions at all levels as well as those functions that have been subcontracted to external suppliers, where the overall legal BCM Policy draft v Aug 2014
3 responsibility remains with the authority. The Council BCM Policy requires subcontractors to provide evidence to their contracting Service that they have effective Business Continuity Plans (BCPs) that will ensure the continuation of the contracted service in the event of a disruption to the subcontractor or supplier. Buckinghamshire County Council Business Continuity Management Programme Aim and Objectives The aim of the BCM programme is to establish a strategic and operational BCM framework that will ensure that the Council is able to continue to provide its identified mission critical activities in the event of a disruption to normal service delivery and be able to rapidly restore all activities as quickly as possible, in line with UK best practice. The objectives of the BCM programme are: To identify the BCM infrastructure within the Council. To specify the processes and criteria for the BCM process that will identify the Council s Mission Critical Activities. To identify the mechanism for assessing resources and risks and the subsequent identification of suitable Service contingency plans to mitigate the risks. To identify the process for identifying corporate Business Continuity (BC) strategies. To identify the process for Service BC planning. To identify specific training and exercising arrangements. To outline the method of enhancing awareness of BCM in the Council. Relationship with Risk Management Buckinghamshire County Council maintains a corporate Risk Register. Business Continuity Planning is found on the Risk Register as a legal requirement. Contingency planning is a control measure ( treat ) to mitigate the effects of an assessed risk. The BCM arrangements will mitigate the impacts and consequences of hazards as identified in the BCM Programme (under the risk analysis phase). The plan will also cater for those emerging risks identified by outside agencies, including the Civil Contingencies Secretariat and the Police / Security Services. Governance The BCM process is owned by the Chief Executive Officer. Member leadership is provided by the Cabinet Member for Communities and Built Environment. Service Directors are responsible for ensuring that they have an effective BCP. The requirement for each Service to have an effective BCP is written into the Finance Regulations. Service Directors are required to confirm they have a BCP in their Annual Governance Statement. Each current County Council Service (or Business Unit / Delivery Unit that replaces them in the Future Shape) will nominate a lead officer for BCM who will be responsible to the Service Directors for coordinating the preparation of an individual Service BCP. COMT will have oversight of the Business Continuity Management process in its day-to-day role. BCM Policy draft v Aug 2014
4 The Resilience Team will: Prepare a framework corporate BCP that will be incorporated into the County Emergency Plan. Assist Services in the preparation of their individual Service plans as well as assisting with the general coordination between Services. Assist Services with Service-level training and exercises and will prepare corporate exercises in conjunction with the exercise schedule of the Resilience Team. Support Commercial Services to ensure that platinum and gold contracts have appropriate and effective BCM arrangements in place. Support the delivery of BCM training within the context of the Contract Management Framework training. Competences The Resilience Team will have at least one officer with (or working to gain) an appropriate qualification (minimum Diploma) and experience in BCM. Other officers will be trained and experienced in BCM. The officer(s) will have a sound understanding of BCM and should be, or be aspiring to be, Member(s) of the Business Continuity Institute (BCI). Contract Management / Commissioned Services All Service Providers of contracted / commissioned services must be able to demonstrate that they can continue to deliver their contracted / commissioned activity to the expectations of the County Council. To this end, they must all have a BCM system including a BCP which is aligned to / compatible with the BCC BCM programme Continuity / recovery timeframes and levels of continuity / recovery required will be provided to the Service Providers by their County Council contract manager / commissioner. BCM must be included as a requirement in the Tendering / Procurement / Commissioning process. Contract Management of all contracts should be considered as a Critical Activity. They may be subsequently reclassified as Mission Critical. Contract Management of Platinum and Gold contracts should be considered as a Mission Critical Activity. Sub-contracted activities which are a critical interdependency for another Mission Critical Activity should themselves be considered Mission Critical Activities. Platinum and Gold Contract Managers must be suitably trained to assess the BCM arrangements of their Service Providers. Training & Exercising Service BCPs should be exercised at least once every year. Responsibility for arranging this lies with the Service Director. The format of such exercises may vary and advice should be sought from the Resilience Team. Corporate level BC exercises, arranged by the Resilience Team, should take place every other year (alternating with an Emergency Management exercise) unless there has been a significant real event that has tested the BCPs. BCM Policy draft v Aug 2014
5 Reviewing, Monitoring and Maintenance In line with Financial Regulations and the Annual Governance Statement, BCPs must be revised, complete, and current by the end of each Financial Year, with staff appropriately trained and exercised. Contact information must be updated quarterly. All BCPs (Corporate and Service) must be reviewed by their author / owner annually (to comply with the end of Financial Year timeline) or more regularly under the following conditions: Following reorganisation within the Council / Service / Teams. In response to a significant new hazard and risk assessment. In response to lessons learned from an incident or exercise, experienced either directly or indirectly. Policy Approval and Review This policy first came into effect on 23 rd November 2006 and was reviewed on 10 th March 2008 and 31 st August This revised version 4 comes into effect on and should be reviewed following the implementation of the Future Shape. BCM Policy draft v Aug 2014
CHAPTER 1: BUSINESS CONTINUITY MANAGEMENT STRATEGY AND POLICY
Zurich Management Services Limited Registered in England: No 2741053 Registered Office The Zurich Centre, 3000 Parkway Whiteley, Fareham Hampshire, PO15 7JZ CHAPTER 1: BUSINESS CONTINUITY MANAGEMENT STRATEGY
More informationBUSINESS CONTINUITY POLICY
BUSINESS CONTINUITY POLICY Document Type Corporate Policy Unique Identifier CO-038 Document Purpose To provide a structure through which: i. A comprehensive business continuity management system (BCMS)
More informationSouth Norfolk Council Business Continuity Policy
South Norfolk Council Business Continuity Policy 1 Title: Business Continuity Policy Date of Publication: TBC Version: 2 Published by: Emergency Planning Team Review date: April 2014 Document Owner: Document
More informationBusiness Continuity Policy and Business Continuity Management System
Business Continuity Policy and Business Continuity Management System Summary: This policy sets out the structure for ensuring that the PCT has effective Business Continuity Plans in place in order to maintain
More information1.0 Policy Statement / Intentions (FOIA - Open)
Force Policy & Procedure Reference Number Business Continuity Management D269 Policy Version Date 23 July 2015 Review Date 23 July 2016 Policy Ownership Portfolio Holder Links or overlaps with other policies
More informationBUSINESS CONTINUITY MANAGEMENT POLICY
BUSINESS CONTINUITY MANAGEMENT POLICY Version No: 1 Issue Status: awaiting Trust Board approval Date of Ratification: 11th April 2012 Ratified by: Risk Management Committee Policy Author(s): Stuart Coalwood
More informationBusiness Continuity Management Policy
Business Continuity Management Policy Business Continuity Policy Version 1.0 1 Version control Version Date Changes Author 0.1 April 13 1 st draft PH 0.2 June 13 Amendments in line with guidance PH 0.3
More informationPS 170 Business Continuity Management Policy
PS 170 Business Continuity Management Policy July 2013 Version 2 Statement of legislative compliance This document has been drafted to comply with the general and specific duties in the Equality Act 2010;
More informationBusiness Continuity Management Policy
Governance: Business Committee Policy Owner: Chief Superintendent, Corporate Services Department: Corporate Services Policy Number: 002 Version: 3.0 Policy Writer: Business Continuity Co-ordinator Effective
More informationBusiness Continuity (Policy & Procedure)
Business Continuity (Policy & Procedure) Publication Scheme Y/N Can be published on Force Website Department of Origin Force Operations Policy Holder Ch Supt Head of Force Ops Author Business Continuity
More informationBusiness Continuity Policy
Business Continuity Policy 1 NHS England INFORMATION READER BOX Directorate Medical Commissioning Operations Patients and Information Nursing Trans. & Corp. Ops. Commissioning Strategy Finance Publications
More informationBusiness Continuity Management
Business Continuity Management Policy Statement & Strategy July 2009 Basildon District Council Business Continuity Management Policy Statement The Council is committed to ensuring robust and effective
More informationWest Sussex County Council Resilience Policy
West Sussex County Council Resilience Policy INDEX page 2 Policy Statement page 3 Vision Statement,Values and General Principles page 4 Introduction and purpose page 4 Scope of the Policy page 4 The Council
More informationDERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY
DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY VERSION 1.0 ISSUED JULY 2015 CONTENTS Page CONTENTS VERSION CONTROL FOREWORD i ii iii POLICY 1 Scope 1 Aim and Objectives 1 Methods and Standards 1
More informationHEALTH AND SOCIAL CARE BOARD POLICY ON BUSINESS CONTINUITY MANAGEMENT
HEALTH AND SOCIAL CARE BOARD POLICY ON BUSINESS CONTINUITY MANAGEMENT February 2012 1 Role of the Health and Social Care Board The role of the Health and Social Care Board (the Board) is broadly contained
More informationEmergency Management and Business Continuity Policy
www.surreycc.gov.uk Making Surrey a better place Emergency Management and Business Continuity Policy 4 TH EDITION June 2011 Title Emergency Management and Business Continuity Policy Version 4.0 Policy
More informationBUSINESS CONTINUITY MANAGEMENT POLICY
BUSINESS CONTINUITY MANAGEMENT POLICY AUTHORISED BY: DATE: Andy Buck Chief Executive March 2011 Ratifying Committee: NHS Rotherham Board Date Agreed: Issue No: NEXT REVIEW DATE: 2013 1 Lead Director John
More informationBSO Board Director of Human Resources & Corporate Services Business Continuity Policy. 28 February 2012
To: From: Subject: Status: Date of Meeting: BSO Board Director of Human Resources & Corporate Services Business Continuity Policy For Approval 28 February 2012 The Board is asked to agree the attached
More informationNHS Central Manchester Clinical Commissioning Group (CCG) Business Continuity Management (BCM) Policy. Version 1.0
NHS Central Manchester Clinical Commissioning Group (CCG) Business Continuity Management (BCM) Policy Version 1.0 Document Control Title: Status: Version: 1.0 Issue date: May 2014 Document owner: (Name,
More informationDORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy
Not Protectively Marked Item 6 Appendix B DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Management Policy The Dorset & Wiltshire Fire and Rescue Authority () is the combined fire and rescue authority for
More informationBusiness Continuity Management Framework
Business Continuity Management Framework Date of Issue: November 2013 Review Date: November 2014 Written by: Jackie Orchard Risk & Business Continuity Manager Authorised by: Signed off by: DCC Francis
More informationStrategic Alliance. Business Continuity Policy
Version 1.1 April 2016 Contents Contents Version control Foreword Policy Scope Aim and objectives Methods and standards Responsibilities Governance Training and exercises Page i ii 1 2 2 2 Version 1.1
More informationBusiness Continuity Management. Policy Statement and Strategy
Business Continuity Management Policy Statement and Strategy November 2011 Title Business Continuity Management Policy & Strategy Date of Publication: Cabinet Council Published by Borough Council of King
More informationBusiness Continuity Management Framework 2014 2017
Business Continuity Management Framework 2014 2017 Blackpool Council Business Continuity Framework V3.0 Page 1 of 13 CONTENTS 1.0 Forward 03 2.0 Administration 04 3.0 Policy 05 4.0 Business Continuity
More informationCouncil Policy Business Continuity Management
Policy Name: Business Continuity Management Council Policy Business Continuity Management ADOPTED BY COUNCIL: 19 th April 2016 DATE OF NEXT REVIEW: 18 th April 2020 RESPONSIBLE OFFICER: REFERENCES: Chief
More informationNHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY
NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY AUTHOR/ APPROVAL DETAILS Document Author Written By: Human Resources Authorised Signature Authorised By: Helen Shields Date: 20
More informationBusiness Continuity Policy
Page 1 of 16 Business Continuity Policy Issue Date: Aug 2013 Document Number: 00241 Prepared by: Business Management and Continuity Senior Manager Next Review Date: April 2014 Page 2 of 16 NHS England
More informationBy. Mr. Chomnaphas Tangsook Business Director BSI Group ( Thailand) Co., Ltd
BS 25999 Business Continuity Management By. Mr. Chomnaphas Tangsook Business Director BSI Group ( Thailand) Co., Ltd 1 Contents slide BSI British Standards 2006 BS 25999(Business Continuity) 2002 BS 15000
More informationBusiness Continuity Policy
Business Continuity Policy Page 1 of 15 Business Continuity Policy First published: Amendment record Version Date Reviewer Comment 1.0 07/01/2014 Debbie Campbell 2.0 11/07/14 Vicky Ryan Updated to include
More informationWILTSHIRE POLICE FORCE POLICY
Template v4 WILTSHIRE POLICE FORCE POLICY BUSINESS CONTINUITY MANAGEMENT SYSTEMS (BCMS) Effective from: July 2013 Version: 2.0 Next Review Date: July 2015 POLICY STATEMENT Wiltshire Police has a statutory
More informationBusiness Continuity Management
Business Continuity Management Standard Operating Procedure Notice: This document has been made available through the Police Service of Scotland Freedom of Information Publication Scheme. It should not
More informationBusiness Continuity Policy. Version 1.0
Business Continuity Policy Version.0 January 206 Contents Contents Version control Foreword Policy. Scope.2 Aim and objectives.3 Methods and standards.4 Responsibilities.5 Governance.6 Training and exercises
More informationBUSINESS CONTINUITY STRATEGY 2014-2017
BUSINESS CONTINUITY STRATEGY 2014-2017 This strategy covers the period 01 April 2014 31 March 2017 and was approved by the Major Incident Working Group 19.03.2014 Caroline Rushmer Major Incident and Business
More informationBUSINESS CONTINUITY MANAGEMENT FRAMEWORK
BUSINESS CONTINUITY MANAGEMENT FRAMEWORK Document Author: Civil Contingencies Service - Authorised by the CCS Joint Management Board - Version 1.0. Issued December 2012 Page 1 FRAMEWORK STATEMENT Business
More informationTRUST POLICY FOR EMERGENCY PLANNING
TRUST POLICY FOR EMERGENCY PLANNING Reference Number: CL-OP/ 2013/027 Version: 1.4 Status: New Draft Author: Ashley Reed Job Title: Head of Security and EPO Version / Amendment History Version Date Author
More informationNHS Commissioning Board Business Continuity Management Framework (service resilience)
NHS Commissioning Board Business Continuity Management Framework (service resilience) 1 P a g e NHS Commissioning Board Business Continuity Management Framework Date 7 January 2013 Audience NHS Commissioning
More informationAppendix 2 - Leicester City Council s Business Continuity Management Policy Statement and Strategy 2015. Business Continuity Policy Statement 2015
Appendix 2 - Leicester City Council s Business Continuity Management Policy Statement and Strategy 2015 Business Continuity Policy Statement 2015 This Policy sets the direction for Business Continuity
More informationEssex Fire Authority
Internal Audit Report (2.13/.14) FINAL with the Civil Contingencies Act 1 October 2013 Contents Section Page Executive Summary 1 Action Plan 5 Findings and Recommendations 6 Debrief meeting 15 August 2013
More informationBusiness Continuity Management Policy
Business Continuity Management Policy Policy Holder: Authoriser: Caroline Gover, Head of Business Continuity Caroline Thomson, Chief Operating Officer Reviewed on: Feb 08 Reviewed on: Feb 08 Next Review
More informationWEST YORKSHIRE FIRE & RESCUE SERVICE. Business Continuity Management Strategy
WEST YORKSHIRE FIRE & RESCUE SERVICE Business Continuity Management Strategy Date Issued: 12 November 2012 Review Date: 12 November 2015 Version Control Version Number Date Author Comment 0.1 June 2011
More informationHow To Manage A Business Continuity Strategy
Business continuity strategy 2009 2012 Table of contents 1 Why this strategy is needed 3 2 Aim of the strategy 4 3 Our approach to business continuity 4 PROCESS 4 STRUCTURE 5 DOCUMENTATION 6 DISRUPTION
More informationDRAFT BUSINESS CONTINUITY MANAGEMENT POLICY
DRAFT BUSINESS CONTINUITY MANAGEMENT POLICY This document outlines a set of policies and procedures for formalising a Business Continuity programme, and provides guidelines for developing, maintaining
More informationNHS Hardwick Clinical Commissioning Group. Business Continuity Policy
NHS Hardwick Clinical Commissioning Group Business Continuity Policy Version Date: 26 January 2016 Version Number: 2.0 Status: Approved Next Revision Due: January 2017 Gordon Stevens MBCI Corporate Assurance
More informationBusiness Continuity Management Policy
Governance 1 Purpose The purpose of this policy is to communicate Business Continuity Management (BCM) framework, responsibilities and guiding principles for Victoria to effectively prepare for and achieve
More informationNOT PROTECTIVELY MARKED BUSINESS CONTINUITY. Specialist Operations Contingency Planning Business Continuity Manager 17.09.12
POLICY BUSINESS CONTINUITY Policy owners Policy holder Author Head of Services Specialist Operations Contingency Planning Business Continuity Manager Policy No. 132 Approved by Legal Services 17.09.12
More informationBusiness Continuity Management Governance. Frank Higgins Abu Dhabi March 2015
Business Continuity Management Governance Frank Higgins Abu Dhabi March 2015 Different Names Same Concept BCM (Business Continuity Management) BSI 25999 IPOCM (Incident Preparedness & Operational Continuity
More informationPolicy for the Management of Business Continuity
Policy for the Management of Business Continuity VERSION 2.1 Prepared by: Jeremy Cowen 29 January 2014 Page 1 of 7 1.0 Version Control Date Version Amendment Amended by 12 Jan 2011 1.0 Document created
More informationEssex Clinical Commissioning Groups. Business Continuity Management System. Scope and Policy
Essex Clinical Commissioning Groups Essex Clinical Commissioning Groups Business Continuity Management System Scope and Policy Policy Author: Daniel Hale - Head of Emergency Planning Version: 1.0 Date
More informationBUSINESS CONTINUITY POLICY
BUSINESS CONTINUITY POLICY Last Review Date Approving Body n/a Audit Committee Date of Approval 9 th January 2014 Date of Implementation 1 st February 2014 Next Review Date February 2017 Review Responsibility
More informationDORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy
Part Two Part One Not Protectively Marked DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy. The Dorset & Wiltshire Fire and Rescue Authority (DWFRA)
More informationSouth West Lincolnshire NHS Clinical Commissioning Group Business Continuity Policy
South West Lincolnshire NHS Clinical Commissioning Group Business Continuity Policy Reference No: CG 01 Version: Version 1 Approval date 18 December 2013 Date ratified: 18 December 2013 Name of Author
More informationCumbria Constabulary. Business Continuity Planning
Cumbria Constabulary Business Continuity Planning 0 Cumbria Shared Internal Audit Service Images courtesy of Carlisle City Council except: Parks (Chinese Gardens), www.sjstudios.co.uk, Monument (Market
More informationHow To Manage A Disruption Event
BUSINESS CONTINUITY FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Manager Organisational
More informationAppendix 1 - Leicester City Council s Business Continuity Management Strategy and Policy Statement - 2016
Appendix 1 - Leicester City Council s Business Continuity Management Strategy and Policy Statement - 2016 Policy Statement - 2016 This Policy sets the direction for Business Continuity Management at Leicester
More informationBUSINESS CONTINUITY PLAN
MEETING DATE: 10 April 2014 AGENDA ITEM NUMBER: Item 7.6.2 AUTHOR: JOB TITLE: DEPARTMENT: Julie Killingbeck/Catherine Wylie Relationship Manager Commissioning/Director Quality and Assurance NHS North Lincolnshire
More informationProposal for Business Continuity Plan and Management Review 6 August 2008
Proposal for Business Continuity Plan and Management Review 6 August 2008 2008/8/6 Contents About Newton IT / Quality of our services. BCM & BS25999 Overview 2. BCM Development in line with BS25999 3.
More informationLondon Local Authorities Business Continuity Guidance for Suppliers & Contractors
London Local Authorities Business Continuity Guidance for Suppliers & Contractors This document has been produced by the LAP-IG Supply Chain Resilience Sub Group. For further information please contact:
More informationBusiness Continuity Policy
Business Continuity Policy Ref. No. TP/028 Title: Business Continuity Policy Page 1 of 15 DOCUMENT PROFILE and CONTROL. Purpose of the document: Provides an overview of the London Ambulance Service NHS
More informationBusiness Continuity Policy
Business Continuity Policy Summary: This policy sets out the structure for ensuring that the PCT has effective Business Continuity Plans in place in order to maintain its essential business functions during
More informationDEPARTMENT FOR TRANSPORT BUSINESS CONTINUITY MANAGEMENT POLICY
DEPARTMENT FOR TRANSPORT BUSINESS CONTINUITY MANAGEMENT POLICY Introduction 1. This policy is a key part of the Department for Transport s internal control framework and specifically covers the Department
More informationDirector of Asset Management and Repairs
Job details Job title: Director of Asset Management Responsible to: Executive Director of Property Responsible for: Location: Overview of the role The overall purpose of the Director of Asset Management
More informationBusiness continuity management policy
Business continuity management policy health.wa.gov.au Effective: XXX Title: Business continuity management policy 1. Purpose All public sector bodies are required to establish, maintain and review business
More informationVersion Adoption by Council: 2013 Resolution Number: 2013/177 Current Version: V1.0 Administered by: Governance Coordinator
Risk Management Framework Version Adoption by Council: 2013 Resolution Number: 2013/177 Current Version: V1.0 TRIM CON: 12/1132 Administered by: Governance Coordinator Last Review Date: 2013 Next Review
More informationabcdefghijklmnopqrstu
abcdefghijklmnopqrstu Business Continuity A Framework for NHS Scotland Strategic Guidance for NHS Organisations in Scotland 1 Contents 1. Introduction 4 1.1 Business Continuity Overview 5 2. Roles and
More informationBCP and DR. P K Patel AGM, MoF
BCP and DR P K Patel AGM, MoF Key difference between BS 25999 and ISO 22301 ISO 22301 puts a much greater emphasis on setting the objectives, monitoring performance and metrics aligning BC to top management
More informationBusiness Continuity Management
Annex A Business Continuity Management Programme Business Continuity Management Policy 1. Introduction This Business Continuity Management (BCM) Policy defines the scope of the SPCB s ability to maintain
More informationSUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY
SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY 1. Introduction 1.1 The Council recognises the threat to local communities from flooding following severe weather events and as a result
More informationJuly 2003. Introduction Sound Risk Management
Risk Management Practices Business Continuity Management Guidelines Introduction Sound Risk Management...1 Management And Planning To provide financial institutions with the principles for establishing
More informationBusiness Continuity Management Policy and Plan
Business Continuity Management Policy and Plan 1 Page No: Contents 1.0 Introduction 3 2.0 Purpose 3 3.0 Definitions 4 4.0 Roles, Duties & Responsibilities 4 4.1 Legal And Statutory Duties, Responsibilities
More informationI attach the following documents in response:
London Fire Brigade Headquarters 169 Union Street London SE1 0LL T 020 8555 1200 F 020 7960 3602 Minicom 020 7960 3629 www.london-fire.gov.uk Freedom of Information request reference number: FOIA608.1
More informationDacorum Borough Council Final Internal Audit Report. IT Business Continuity and Disaster Recovery
Dacorum Borough Council Final Internal Audit Report IT Business Continuity and Disaster Recovery Distribution list: Chris Gordon Group Manager Performance, Policy and Projects John Worts ICT Team Leader
More informationiso20000templates.com
iso20000templates.com Public IT Limited 2011 IT Service Policy Document Ref. ITSM01001 Version: 1.0 Draft 1 Document Author: Document Owner: V 1.0 Draft 1 Page 1 of 11 Revision History Version Date RFC
More informationBT Conferencing Business Continuity Management. Planning to stay in business
BT Conferencing Business Continuity Management Planning to stay in business Planning for the unexpected In today s connected world, businesses are increasingly dependent on their communications and networked
More informationBusiness Continuity Plan
Business Continuity Plan March 2014 Version: 1.0 Ratified by: Quality Group Date ratified: Name of originator/author: Name of responsible committee/ individual: Julie Killingbeck NHS North Lincolnshire
More informationBusiness Continuity Management Group Policy
THE WAREHOUSE GROUP LIMITED ( the Company ) 1. Purpose of Policy This policy is to communicate The Warehouse Group Limited ( TWG ) governance requirements and arrangements for developing and sustaining
More informationEmergency management in Cardiff. A practical guide
Emergency management in Cardiff A practical guide Emergency management in Cardiff Introduction It is very unlikely that any of us will ever be caught up in an emergency or disaster, but by being informed
More informationHelping you reach your potential...
SKILLS_2_SHARE_PROSPECTUS_2 16/6/10 08:42 Page 2 STRATEGIC AND OPERATIONAL TRAINING AND MANAGEMENT Helping you reach your potential... COURSE PROSPECTUS SKILLS_2_SHARE_PROSPECTUS_2 16/6/10 08:42 Page 3
More informationSection A: Introduction, Definitions and Principles of Infrastructure Resilience
Section A: Introduction, Definitions and Principles of Infrastructure Resilience A1. This section introduces infrastructure resilience, sets out the background and provides definitions. Introduction Purpose
More informationBusiness Continuity Policy
Business Continuity Policy Reference Number: 243 Author & Title: Siân Dyson Resilience Manager Responsible Director: Chief Operating Officer Review Date: 29 May 2018 Ratified by: Francesca Thompson Chief
More informationAudit of Business Continuity Planning
Cumbria Office of the Police & Crime Commissioner Audit of Business Continuity Planning 0 Cumbria Shared Internal Audit Service Images courtesy of Carlisle City Council except: Parks (Chinese Gardens),
More informationHOW THE SCHOOL HAS IMPLEMENTED BUSINESS CONTINUITY MANAGEMENT. Andrew Webb Director of Business Continuity
HOW THE SCHOOL HAS IMPLEMENTED BUSINESS CONTINUITY MANAGEMENT Andrew Webb Director of Business Continuity Life Cycle - 1 Understanding the Organisation Our poor response to a major power outage in February
More informationNORTH HAMPSHIRE CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY MANAGEMENT POLICY AND PLAN (COR/017/V1.00)
NORTH HAMPSHIRE CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY MANAGEMENT POLICY AND PLAN (COR/017/V1.00) Subject and version number of document: Serial Number: Business Continuity Management Policy
More informationGlobal Statement of Business Continuity
Business Continuity Management Version 1.0-2014 Date October 18, 2014 Status Author Business Continuity Management (BCM) Page 1 of 8 Table of Contents 1. Credit Suisse Business Continuity Statement 3 2.
More informationBUSINESS CONTINUITY MANAGEMENT POLICY
This document is uncontrolled once printed. Please check on the CCG s Intranet site for the most up to date version BUSINESS CONTINUITY MANAGEMENT POLICY DOCUMENT CONTROL Type of Document Document Title
More informationLondon Borough of Bromley. Executive & Resources PDS Committee. Disaster Recovery Plans for London Borough of Bromley
Report No. DRR12/041 London Borough of Bromley PART 1 - PUBLIC Decision Maker: Executive & Resources PDS Committee Date: 4 th April 2012 Decision Type: Non-Urgent Non-Executive Non-Key Title: Disaster
More informationHMG Security Policy Framework
HMG Security Policy Framework Security Policy Framework 3 Foreword Sir Jeremy Heywood, Cabinet Secretary Chair of the Official Committee on Security (SO) As Cabinet Secretary, I have a good overview of
More informationBusiness Continuity Guidance for Suppliers & Contractors. Blackburn with Darwen Borough Council
Business Continuity Guidance for Suppliers & Contractors For further information please contact: Rachel Hutchinson Civil Contingencies Manager Blackburn with Darwen Borough Council Contents 1. Introduction...
More informationBUSINESS CONTINUITY MANAGEMENT IN THE PUBLIC SECTOR A ROUGH GUIDE
BUSINESS CONTINUITY MANAGEMENT IN THE PUBLIC SECTOR A ROUGH GUIDE Introduction 1. Recently many organisations both public and private have directed much more time, money and effort towards protecting service
More informationChapter 6 Business continuity management
74 CHAPTER 6 BUSINESS CONTINUITY MANAGEMENT Chapter 6 Business continuity management Summary The Act requires Category 1 responders to maintain plans to ensure that they can continue to exercise their
More informationAnnex 1. Business Continuity Management Policy
Annex 1 Business Continuity Management November 2008 p 2 Thanet District Council Business Continuity Management Contents Foreword...3...4 Definition of Terms...5 Document History...6 This policy is supported
More informationPolicy. VBA Enterprise Risk Management. Governance Unit
Policy VBA Enterprise Risk Management Governance Unit Keywords: Policy; risk; governance. ID: Version no: Status: VBAPOL-0074 2.0 Final Issue date: Date of effect: Next review date: 14/07/2015 14/07/2015
More informationEMERGENCY PREPAREDNESS POLICY
EMERGENCY PREPAREDNESS POLICY CONTROLLED DOCUMENT CATEGORY: CLASSIFICATION: Policy Emergency Planning PURPOSE This document sets out the strategic framework for the management of emergency preparedness
More informationPrinciples for BCM requirements for the Dutch financial sector and its providers.
Principles for BCM requirements for the Dutch financial sector and its providers. Platform Business Continuity Vitale Infrastructuur Financiële sector (BC VIF) Werkgroep BCM requirements 21 September 2011
More informationBusiness Continuity Management and BS 25999 by Steve Chan, Head of Training - HK, BSI Management Systems
Business Continuity Management and BS 25999 by Steve Chan, Head of Training - HK, BSI Management Systems 9 April, 2008 2 Presentation content Drivers for Business Continuity Standards and definitions.
More informationJOB DESCRIPTION. T&T Security and Resilience Manager. Technology and Telecommunications. Bedford, Chelmsford or Norwich
JOB DESCRIPTION PART A: JOB DETAILS JOB TITLE: AFC BAND: T&T Security and Resilience Manager 8a HOURS: 37.5 DIRECTORATE: DEPARTMENT: REPORTING TO: BASE: IM&T Technology and Telecommunications Head of T&T
More informationTraining Management Guidelines
Training Management Guidelines February 2009 Training Management Guidelines - February 2009 These guidelines provide a strategic approach to training and skills development in the construction industry
More informationHarrow Business Consultative Panel. Business Continuity Management. Responsible Officer: Myfanwy Barrett Director of Finance and Business Strategy
Meeting: Harrow Business Consultative Panel Date: 18 th July 2006 Subject: Business Continuity Management Responsible Officer: Myfanwy Barrett Director of Finance and Business Strategy Contact Officer:
More information--- Sunshine Coast Council ~1'/12- ORGANISATIONAL POLICY. Business Continuity Management Policy
Sunshine Coast Council Sunshine Coast Regional Council -------- - --- --- ORGANISATIONAL POLICY Business Continuity Management Policy Corporate Plan Reference: 8. Great Governance 8.2 Effective Business
More informationBusiness Continuity Management
Business Continuity Management Version 1 approved by SMG December 2013 Business Continuity Policy Version 1 1 of 9 Business Continuity Management Summary description: This document provides the rationale
More information19. Planning. 19 PLANNING p1
19. Planning Summary Planning involves the proactive coordination of activities in the medium to long term, with the intention of achieving a unified effort towards a common objective. Planning consists