1 Annex A Business Continuity Management Programme Business Continuity Management Policy
2 1. Introduction This Business Continuity Management (BCM) Policy defines the scope of the SPCB s ability to maintain continuity of support for the conduct of Parliamentary business. 2. Business Continuity It is not possible for an organisation to prevent all unexpected incidents, however much effort and budget is directed at risk management. Therefore a generic response capability is required. Business Continuity (BC) provides a framework for creating resilience that will enable the SPCB to continue to fulfill its role under adverse conditions. It provides the capability for an effective response should a serious incident occur. Serious incidents include fires, floods, power cuts, industrial action, epidemics and pandemics. This resilience is delivered through a programme of work known collectively as Business Continuity Management (BCM). BCM increases the resilience of the organisation by: Maintaining a capability for responding to unexpected incidents, minimising the extent of financial and reputational damage by having a rehearsed recovery plan over a pre-agreed timescale. Setting priorities for threat minimisation measures to be implemented by identifying those processes, which if lost, would most rapidly damage the organisation BCM is an element of good corporate governance and the responsibility senior management. 3. Scope of the Parliament s BCM Policy 3.1 Principles The SPCB has a statutory duty to provide the Scottish Parliament with the property, staff and services required for the Parliament s purposes. The SPCB has a duty of care to all persons on its premises. Status: Final Page: 2 of 5
3 3.2 Parliament Building The BCM Policy covers all activities undertaken for the Parliament by: SPCB staff Contracted service providers 3.3 Members Parliamentary Offices The BCM Policy provides for; Support and accommodation for Members within the parliamentary complex Advice and guidance to Members local offices. 3.4 Parameters Time Following an incident which renders the Parliament building wholly or partially unusable the BCM Policy provides for the infrastructure and logistics to enable: an emergency meeting of the Parliament within a maximum of two days of the disruption limited parliamentary business (plenary and committee) within a maximum time period of two weeks of the disruption.. Geographical Incidents can vary in their severity and impact. The BCM Policy therefore includes the flexibility to allow decisions to be made on where to resume parliamentary business, based on a number of previously approved locations both within and outwith Edinburgh. Staff Resources The BCM Policy acknowledges that SPCB staff numbers and those of contracted service providers can fall below operational levels e.g. industrial dispute, epidemic/pandemic or transport disruption. The strategy identifies minimum levels of suitably qualified staff required to meet safety and security requirements and to support Parliamentary business. The possibility that SPCB staff may be prevented from responding to an incident because of a threat to their safety, the occurrence of extreme circumstances or Status: Final Page: 3 of 5
4 because of direction by civil or military authorities is taken into account in the BCM Policy. In these circumstances the Chief Executive and Directors will decide on an appropriate course of action. In all other circumstances the time and geographical parameters will apply. 4. Relationship of Parliament s BCM Policy to Risk Management A separate programme of work to manage risks is in operation at the Parliament. At a strategic level this includes business continuity. Many serious threats are not easy to identify. Their likelihood is impossible to measure and specific control measures are impractical. In addition therefore, it is necessary to have a separate Business Continuity Management structure and function to provide the means of delivering a rehearsed response to unexpected incidents. 5. Responsibility for the Parliament s BCM Programme All SPCB staff have ownership of BCM, but some personnel have specific responsibilities. These are; Chief Executive and Directors Members of Business Continuity Project/Programme Board Business Continuity Manager Heads of Office Business Continuity Coordinators Procurement Contract Managers The detailed responsibilities of these personnel are set out in the Parliament s Strategy for Incident Management. 6. Responsibility for Incident Response The Parliament s response to an incident is managed by the following teams; Strategic - Incident Management Team Tactical - Emergency Response Team, - Incident Communications Team,, - Business Continuity Team The composition, operation and responsibilities of these teams are outlined in the Parliament s Strategy for Incident Management. Status: Final Page: 4 of 5
5 7. Standards Applied 7.1 British Standard The BCM programme conforms to BS : A Code of Practice for Business Continuity and follows the Business Continuity Institute s Good Practice Guide. 7.2 Business Continuity Exercises Comprehensive testing of Parliament s Business Continuity Plans will be carried out on an agreed four year rolling programme. 7.3 Audit An audit of the Parliament s BCM process will be undertaken internally and by an appropriately qualified external body at agreed regular intervals. Status: Final Page: 5 of 5
South Norfolk Council Business Continuity Policy
South Norfolk Council Business Continuity Policy 1 Title: Business Continuity Policy Date of Publication: TBC Version: 2 Published by: Emergency Planning Team Review date: April 2014 Document Owner: Document
More informationBusiness Continuity Management Policy
Business Continuity Management Policy Business Continuity Policy Version 1.0 1 Version control Version Date Changes Author 0.1 April 13 1 st draft PH 0.2 June 13 Amendments in line with guidance PH 0.3
More informationBUSINESS CONTINUITY MANAGEMENT FRAMEWORK
BUSINESS CONTINUITY MANAGEMENT FRAMEWORK Document Author: Civil Contingencies Service - Authorised by the CCS Joint Management Board - Version 1.0. Issued December 2012 Page 1 FRAMEWORK STATEMENT Business
More informationBUSINESS CONTINUITY MANAGEMENT POLICY
BUSINESS CONTINUITY MANAGEMENT POLICY AUTHORISED BY: DATE: Andy Buck Chief Executive March 2011 Ratifying Committee: NHS Rotherham Board Date Agreed: Issue No: NEXT REVIEW DATE: 2013 1 Lead Director John
More informationNHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY
NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY AUTHOR/ APPROVAL DETAILS Document Author Written By: Human Resources Authorised Signature Authorised By: Helen Shields Date: 20
More information1.0 Policy Statement / Intentions (FOIA - Open)
Force Policy & Procedure Reference Number Business Continuity Management D269 Policy Version Date 23 July 2015 Review Date 23 July 2016 Policy Ownership Portfolio Holder Links or overlaps with other policies
More informationBusiness Continuity Business Continuity Management Policy
Business Continuity Business Continuity Management Policy : Date of Issue: 28 January 2009 Version no: 1.1 Review Date: January 2010 Document Owner: Patricia Hughes Document Authoriser: Tony Curtis 1 Version
More informationPAPER-6 PART-1 OF 5 CA A.RAFEQ, FCA
1 Chapter-4: Business Continuity Planning and Disaster Recovery Planning PAPER-6 PART-1 OF 5 CA A.RAFEQ, FCA Learning Objectives 2 To understand the concept of Business Continuity Management To understand
More informationBusiness Continuity Management Framework 2014 2017
Business Continuity Management Framework 2014 2017 Blackpool Council Business Continuity Framework V3.0 Page 1 of 13 CONTENTS 1.0 Forward 03 2.0 Administration 04 3.0 Policy 05 4.0 Business Continuity
More informationDORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy
Not Protectively Marked Item 6 Appendix B DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Management Policy The Dorset & Wiltshire Fire and Rescue Authority () is the combined fire and rescue authority for
More informationNORTH HAMPSHIRE CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY MANAGEMENT POLICY AND PLAN (COR/017/V1.00)
NORTH HAMPSHIRE CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY MANAGEMENT POLICY AND PLAN (COR/017/V1.00) Subject and version number of document: Serial Number: Business Continuity Management Policy
More informationHarrow Business Consultative Panel. Business Continuity Management. Responsible Officer: Myfanwy Barrett Director of Finance and Business Strategy
Meeting: Harrow Business Consultative Panel Date: 18 th July 2006 Subject: Business Continuity Management Responsible Officer: Myfanwy Barrett Director of Finance and Business Strategy Contact Officer:
More informationHEALTH AND SOCIAL CARE BOARD POLICY ON BUSINESS CONTINUITY MANAGEMENT
HEALTH AND SOCIAL CARE BOARD POLICY ON BUSINESS CONTINUITY MANAGEMENT February 2012 1 Role of the Health and Social Care Board The role of the Health and Social Care Board (the Board) is broadly contained
More informationWEST YORKSHIRE FIRE & RESCUE SERVICE. Business Continuity Management Strategy
WEST YORKSHIRE FIRE & RESCUE SERVICE Business Continuity Management Strategy Date Issued: 12 November 2012 Review Date: 12 November 2015 Version Control Version Number Date Author Comment 0.1 June 2011
More informationDesktop Scenario Self Assessment Exercise Page 1
Page 1 Neil Jarvis Head of IT Security & IT Risk DHL Page 2 From reputation to data loss - how important is business continuity? Neil Jarvis Head of IT Security (EMEA) DHL Logistics IT Security Taking
More informationBSO Board Director of Human Resources & Corporate Services Business Continuity Policy. 28 February 2012
To: From: Subject: Status: Date of Meeting: BSO Board Director of Human Resources & Corporate Services Business Continuity Policy For Approval 28 February 2012 The Board is asked to agree the attached
More informationBusiness Continuity Policy and Business Continuity Management System
Business Continuity Policy and Business Continuity Management System Summary: This policy sets out the structure for ensuring that the PCT has effective Business Continuity Plans in place in order to maintain
More informationBusiness Continuity Management Policy
Governance 1 Purpose The purpose of this policy is to communicate Business Continuity Management (BCM) framework, responsibilities and guiding principles for Victoria to effectively prepare for and achieve
More informationBusiness Continuity Management
Business Continuity Management Standard Operating Procedure Notice: This document has been made available through the Police Service of Scotland Freedom of Information Publication Scheme. It should not
More informationBusiness Continuity Management Policy
Governance: Business Committee Policy Owner: Chief Superintendent, Corporate Services Department: Corporate Services Policy Number: 002 Version: 3.0 Policy Writer: Business Continuity Co-ordinator Effective
More informationThe purpose of this report is to provide an update on the progress of the development of business continuity plans in the Trust
Meeting / Committee: Board of Directors Meeting Date: 31 July 2012 This paper is for: (Only 1 column to be marked with as appropriate) Action/Decision Assurance Information Title: Business Continuity Update
More informationCoping with a major business disruption. Some practical advice
Coping with a major business disruption Some practical advice Coping with a major business disruption What is business continuity? Business continuity planning (BCP) is a management process that helps
More informationTRANSPORT FOR LONDON SAFETY, HEALTH AND ENVIRONMENT ASSURANCE COMMITTEE
AGENDA ITEM 9 TRANSPORT FOR LONDON SAFETY, HEALTH AND ENVIRONMENT ASSURANCE COMMITTEE SUBJECT: REVIEW OF TFL RESILIENCE MANAGEMENT POLICY FRAMEWORK DATE: 20 JULY 2010 1 PURPOSE AND DECISION REQUIRED 1.1
More informationCompany Management System. Business Continuity in SIA
Company Management System Business Continuity in SIA Document code: Classification: Company Project/Service Year Document No. Version Public INDEX 1. INTRODUCTION... 3 2. SIA S BUSINESS CONTINUITY MANAGEMENT
More informationBusiness Continuity Management Policy
Business Continuity Management Policy Policy Holder: Authoriser: Caroline Gover, Head of Business Continuity Caroline Thomson, Chief Operating Officer Reviewed on: Feb 08 Reviewed on: Feb 08 Next Review
More informationBusiness Continuity (Policy & Procedure)
Business Continuity (Policy & Procedure) Publication Scheme Y/N Can be published on Force Website Department of Origin Force Operations Policy Holder Ch Supt Head of Force Ops Author Business Continuity
More informationA GUIDE TO BUSINESS CONTINUITY PLANNING
A GUIDE TO BUSINESS CONTINUITY PLANNING Introduction The Civil Contingencies Act 2004 places a duty on Local Authorities to ensure that local businesses and voluntary sector organisations in their area
More informationNHS Central Manchester Clinical Commissioning Group (CCG) Business Continuity Management (BCM) Policy. Version 1.0
NHS Central Manchester Clinical Commissioning Group (CCG) Business Continuity Management (BCM) Policy Version 1.0 Document Control Title: Status: Version: 1.0 Issue date: May 2014 Document owner: (Name,
More informationBusiness Continuity Management Policy and Framework
Management Policy and Framework Version: Produced by: Date Produced: Approved by: Updated: 7 University Manager with the assistance of the Operational Group 11 th March 2010 Steering Group (14 December
More informationHow to Exercise a Business Continuity Plan (BCP)
How to Exercise a Business Continuity Plan (BCP) This document provides a step by step guide to exercising a Business Continuity Plan (BCP). The exercise of a BCP should not be undertaken in isolation,
More informationabcdefghijklmnopqrstu
abcdefghijklmnopqrstu Business Continuity A Framework for NHS Scotland Strategic Guidance for NHS Organisations in Scotland 1 Contents 1. Introduction 4 1.1 Business Continuity Overview 5 2. Roles and
More informationBUSINESS CONTINUITY STRATEGY
BUSINESS CONTINUITY STRATEGY January 2009 CONTENTS Page BACKGROUND 1 OVERVIEW 1 AIM AND OBJECTIVES 1 CORE BUSINESS OF THE COUNCIL 2 ORGANISATION STRUCTURE 2 RISK IDENTIFICATION AND MITIGATION STRATEGIES
More informationNHS HDL (2006)41 abcdefghijklm. = eé~äíü=aéé~êíãéåí= = aáêéåíçê~íé=çñ=mêáã~êó=`~êé=~åç=`çããìåáíó=`~êé
NHS HDL (2006)41 abcdefghijklm = eé~äíü=aéé~êíãéåí= = aáêéåíçê~íé=çñ=mêáã~êó=`~êé=~åç=`çããìåáíó=`~êé Dear Colleague NHSSCOTLAND INFORMATION SECURITY POLICY Summary 1. NHSScotland IT Security Policy was
More informationLondon Borough of Bromley. Executive & Resources PDS Committee. Disaster Recovery Plans for London Borough of Bromley
Report No. DRR12/041 London Borough of Bromley PART 1 - PUBLIC Decision Maker: Executive & Resources PDS Committee Date: 4 th April 2012 Decision Type: Non-Urgent Non-Executive Non-Key Title: Disaster
More informationHow To Manage A Business Continuity Strategy
Business continuity strategy 2009 2012 Table of contents 1 Why this strategy is needed 3 2 Aim of the strategy 4 3 Our approach to business continuity 4 PROCESS 4 STRUCTURE 5 DOCUMENTATION 6 DISRUPTION
More informationEmergency Response and Business Continuity Management Policy
Emergency Response and Business Continuity Management Policy Owner: John Duffy, Registrar & Secretary Last updated: September 2012 Version: 04 Document control Date Version Author Changes To be populated
More informationDEPARTMENT FOR TRANSPORT BUSINESS CONTINUITY MANAGEMENT POLICY
DEPARTMENT FOR TRANSPORT BUSINESS CONTINUITY MANAGEMENT POLICY Introduction 1. This policy is a key part of the Department for Transport s internal control framework and specifically covers the Department
More informationBusiness Continuity Management Policy and Plan
Business Continuity Management Policy and Plan 1 Page No: Contents 1.0 Introduction 3 2.0 Purpose 3 3.0 Definitions 4 4.0 Roles, Duties & Responsibilities 4 4.1 Legal And Statutory Duties, Responsibilities
More informationBusiness Continuity Management (BCM) Policy
Business Continuity Management (BCM) Policy Reference number: Corporate 042 Title: Business Continuity Management (BCM) Policy Version number: Version 2 Policy Approved by: LLR PCT Cluster Board Date of
More informationBy. Mr. Chomnaphas Tangsook Business Director BSI Group ( Thailand) Co., Ltd
BS 25999 Business Continuity Management By. Mr. Chomnaphas Tangsook Business Director BSI Group ( Thailand) Co., Ltd 1 Contents slide BSI British Standards 2006 BS 25999(Business Continuity) 2002 BS 15000
More informationBusiness Continuity Management Group Policy
THE WAREHOUSE GROUP LIMITED ( the Company ) 1. Purpose of Policy This policy is to communicate The Warehouse Group Limited ( TWG ) governance requirements and arrangements for developing and sustaining
More informationBUSINESS CONTINUITY POLICY
BUSINESS CONTINUITY POLICY Last Review Date Approving Body n/a Audit Committee Date of Approval 9 th January 2014 Date of Implementation 1 st February 2014 Next Review Date February 2017 Review Responsibility
More informationHow To Improve The Shared Services Partnership Business Continuity Plan
Audit and Governance Committee 24 September 2015 Business Continuity Plan For Information Portfolio Holder(s) Environmental Protection & Assets Senior Leadership Team Contact: Strategic Director 1. Purpose
More informationBusiness Continuity Management
Business Continuity Management Policy Statement & Strategy July 2009 Basildon District Council Business Continuity Management Policy Statement The Council is committed to ensuring robust and effective
More informationWILTSHIRE POLICE FORCE POLICY
Template v4 WILTSHIRE POLICE FORCE POLICY BUSINESS CONTINUITY MANAGEMENT SYSTEMS (BCMS) Effective from: July 2013 Version: 2.0 Next Review Date: July 2015 POLICY STATEMENT Wiltshire Police has a statutory
More informationTeam Business Continuity Plan Guide
Team Business Continuity Plan Guide Contents Introduction 1.0 Functional Analysis of your Team 2.0 Business Continuity Risk Assessment 3.0 Team Network of Contacts 4.0 Incident Log Sheet 5.0 Record of
More informationSouth West Lincolnshire NHS Clinical Commissioning Group Business Continuity Policy
South West Lincolnshire NHS Clinical Commissioning Group Business Continuity Policy Reference No: CG 01 Version: Version 1 Approval date 18 December 2013 Date ratified: 18 December 2013 Name of Author
More informationAnnex 1. Business Continuity Management Policy
Annex 1 Business Continuity Management November 2008 p 2 Thanet District Council Business Continuity Management Contents Foreword...3...4 Definition of Terms...5 Document History...6 This policy is supported
More informationCouncil Policy Business Continuity Management
Policy Name: Business Continuity Management Council Policy Business Continuity Management ADOPTED BY COUNCIL: 19 th April 2016 DATE OF NEXT REVIEW: 18 th April 2020 RESPONSIBLE OFFICER: REFERENCES: Chief
More informationBUSINESS CONTINUITY MANAGEMENT POLICY
This document is uncontrolled once printed. Please check on the CCG s Intranet site for the most up to date version BUSINESS CONTINUITY MANAGEMENT POLICY DOCUMENT CONTROL Type of Document Document Title
More informationDORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy
Part Two Part One Not Protectively Marked DORSET & WILTSHIRE FIRE AND RESCUE AUTHORITY Performance, Risk and Business Continuity Management Policy. The Dorset & Wiltshire Fire and Rescue Authority (DWFRA)
More informationBusiness Continuity Policy
Business Continuity Policy Page 1 of 15 Business Continuity Policy First published: Amendment record Version Date Reviewer Comment 1.0 07/01/2014 Debbie Campbell 2.0 11/07/14 Vicky Ryan Updated to include
More informationBUSINESS CONTINUITY MANAGEMENT POLICY
BUSINESS CONTINUITY MANAGEMENT POLICY Version No: 1 Issue Status: awaiting Trust Board approval Date of Ratification: 11th April 2012 Ratified by: Risk Management Committee Policy Author(s): Stuart Coalwood
More informationUniversity of Glasgow. Policy for. Business Continuity Management
University of Glasgow Policy for Business Continuity Management 1 Policy Statement The University of Glasgow is committed to delivering the highest possible quality of service to our students, and the
More informationEMERGENCY PREPAREDNESS POLICY
EMERGENCY PREPAREDNESS POLICY CONTROLLED DOCUMENT CATEGORY: CLASSIFICATION: Policy Emergency Planning PURPOSE This document sets out the strategic framework for the management of emergency preparedness
More informationCommunity and Built Environment Localities and Safer Communities Business Continuity Management Policy Andrew Fyfe
Community and Built Environment Localities and Safer Communities Business Continuity Management Policy Andrew Fyfe 4 Aug 14 Draft v4.4 TBC Resilience Team BCM Policy draft v4.4 1 4 Aug 2014 Statement of
More informationPrinciples for BCM requirements for the Dutch financial sector and its providers.
Principles for BCM requirements for the Dutch financial sector and its providers. Platform Business Continuity Vitale Infrastructuur Financiële sector (BC VIF) Werkgroep BCM requirements 21 September 2011
More informationEssex Clinical Commissioning Groups. Business Continuity Management System. Scope and Policy
Essex Clinical Commissioning Groups Essex Clinical Commissioning Groups Business Continuity Management System Scope and Policy Policy Author: Daniel Hale - Head of Emergency Planning Version: 1.0 Date
More informationLFRS Business Continuity Planning
LFRS Business Continuity Planning 1.1 INTRODUCTION The LFRS Business Continuity Plan provides a framework for the activation, allocation and deployment of Lancashire Fire and Rescue Services resources
More informationDepartmental Business Continuity Framework. Part 2 Working Guides
Department for Work and Pensions Departmental Business Continuity Framework Part 2 Working Guides Page 1 of 60 CONTENTS Guide to business impact analysis...3 Guide to business continuity planning...7 Guide
More informationBUSINESS CONTINUITY STRATEGY 2014-2017
BUSINESS CONTINUITY STRATEGY 2014-2017 This strategy covers the period 01 April 2014 31 March 2017 and was approved by the Major Incident Working Group 19.03.2014 Caroline Rushmer Major Incident and Business
More informationBUSINESS CONTINUITY POLICY RM03
BUSINESS CONTINUITY POLICY RM03 Applies to: All NHS LA employees, contractors, secondees and consultants, contractors and/or any other parties who will carry out duties on behalf of the NHS LA Version:
More informationBusiness Continuity Policy
Business Continuity Policy 1 NHS England INFORMATION READER BOX Directorate Medical Commissioning Operations Patients and Information Nursing Trans. & Corp. Ops. Commissioning Strategy Finance Publications
More informationCENTRAL BANK OF KENYA (CBK) PRUDENTIAL GUIDELINE ON BUSINESS CONTINUITY MANAGEMENT (BCM) FOR INSTITUTIONS LICENSED UNDER THE BANKING ACT
CENTRAL BANK OF KENYA (CBK) PRUDENTIAL GUIDELINE ON BUSINESS CONTINUITY MANAGEMENT (BCM) FOR INSTITUTIONS LICENSED UNDER THE BANKING ACT JANUARY 2008 GUIDELINE ON BUSINESS CONTINUITY GUIDELINE CBK/PG/14
More informationCumbria Constabulary. Business Continuity Planning
Cumbria Constabulary Business Continuity Planning 0 Cumbria Shared Internal Audit Service Images courtesy of Carlisle City Council except: Parks (Chinese Gardens), www.sjstudios.co.uk, Monument (Market
More informationTyne and Wear Fire and Rescue Authority
Tyne and Wear Fire and Rescue Authority Business Continuity Planning Policy Index Section Item 1 Policy Statement 2 Introduction 3 Aims 4 Objectives 5 Continuity of Critical Functions 6 Command and Control
More informationAppendix 2 - Leicester City Council s Business Continuity Management Policy Statement and Strategy 2015. Business Continuity Policy Statement 2015
Appendix 2 - Leicester City Council s Business Continuity Management Policy Statement and Strategy 2015 Business Continuity Policy Statement 2015 This Policy sets the direction for Business Continuity
More informationBusiness Continuity Management For Small to Medium-Sized Businesses
Business Continuity Management For Small to Medium-Sized Businesses Produced by NORMIT and Norfolk County Council Resilience Team For an electronic copy of this document visit www.normit.org Telephone
More informationBusiness Continuity. Is your Business Prepared for the worse? What is Business Continuity? Why use a Business Continuity Plan?
Business Continuity Is your Business Prepared for the worse? Major emergencies can develop suddenly without warning. Situations can threaten and disrupt your business and impact upon you and your staff.
More informationEssex Clinical Commissioning Groups. Business Continuity Management System. Business Impact Analysis Process
Essex Clinical Commissioning Groups Essex Clinical Commissioning Groups Business Continuity Management System Business Impact Analysis Process Policy Author: Daniel Hale - Head of Emergency Planning Version:
More informationBusiness Continuity Management - A Guide to the Italian Premier Control System
BELA-BELA LOCAL MUNICIPALITY Chris Hani Drive, Bela- Bela, Limpopo. Private Bag x 1609 BELA-BELA 0480 Tel: 014 736 8000 Fax: 014 736 3288 Website: www.belabela.gov.za OFFICE OF THE MUNICIPAL MANAGER Information
More informationWest Sussex County Council Resilience Policy
West Sussex County Council Resilience Policy INDEX page 2 Policy Statement page 3 Vision Statement,Values and General Principles page 4 Introduction and purpose page 4 Scope of the Policy page 4 The Council
More informationCHAPTER 1: BUSINESS CONTINUITY MANAGEMENT STRATEGY AND POLICY
Zurich Management Services Limited Registered in England: No 2741053 Registered Office The Zurich Centre, 3000 Parkway Whiteley, Fareham Hampshire, PO15 7JZ CHAPTER 1: BUSINESS CONTINUITY MANAGEMENT STRATEGY
More informationEmergency Management and Business Continuity Policy
www.surreycc.gov.uk Making Surrey a better place Emergency Management and Business Continuity Policy 4 TH EDITION June 2011 Title Emergency Management and Business Continuity Policy Version 4.0 Policy
More informationBS 25999 BUSINESS CONTINUITY MANAGEMENT
BS 25999 BUSINESS CONTINUITY MANAGEMENT AUDIT, CERTIFICATION & training services HOW CAN YOU ENSURE BUSINESS CONTINUITY? BS 25999 AUDITS & CERTIFICATION FROM SGS Most organisations will, at some point,
More informationUniversity of Sunderland Business Assurance Information Security Policy
University of Sunderland Business Assurance Information Security Policy Document Classification: Public Policy Reference Central Register Policy Reference Faculty / Service IG 003 Policy Owner Assistant
More informationAppendix 1 - Leicester City Council s Business Continuity Management Strategy and Policy Statement - 2016
Appendix 1 - Leicester City Council s Business Continuity Management Strategy and Policy Statement - 2016 Policy Statement - 2016 This Policy sets the direction for Business Continuity Management at Leicester
More informationINFORMATION TECHNOLOGY SECURITY STANDARDS
INFORMATION TECHNOLOGY SECURITY STANDARDS Version 2.0 December 2013 Table of Contents 1 OVERVIEW 3 2 SCOPE 4 3 STRUCTURE 5 4 ASSET MANAGEMENT 6 5 HUMAN RESOURCES SECURITY 7 6 PHYSICAL AND ENVIRONMENTAL
More informationBusiness Continuity Management and BS 25999 by Steve Chan, Head of Training - HK, BSI Management Systems
Business Continuity Management and BS 25999 by Steve Chan, Head of Training - HK, BSI Management Systems 9 April, 2008 2 Presentation content Drivers for Business Continuity Standards and definitions.
More informationDERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY
DERBYSHIRE COUNTY COUNCIL BUSINESS CONTINUITY POLICY VERSION 1.0 ISSUED JULY 2015 CONTENTS Page CONTENTS VERSION CONTROL FOREWORD i ii iii POLICY 1 Scope 1 Aim and Objectives 1 Methods and Standards 1
More informationUpdate from the Business Continuity Working Group
18 June 2015 Performance and Resources Board 14 To note Update from the Business Continuity Working Group Issue 1 The Business Continuity Working Group oversees the development, maintenance and improvement
More informationEmergency Planning and Business Continuity Policy
Nottingham University Academy of Science and Technology Emergency Planning and Business Continuity Policy Responsible officer: Vice Principal Curriculum & Quality Date approved: 15/07/2014 Review date:
More informationI attach the following documents in response:
London Fire Brigade Headquarters 169 Union Street London SE1 0LL T 020 8555 1200 F 020 7960 3602 Minicom 020 7960 3629 www.london-fire.gov.uk Freedom of Information request reference number: FOIA608.1
More informationwww.td.com.au Business Continuity - IT Disaster Recovery Discussion Paper - - Commercial in Confidence Version V2.0R Wednesday, 5 September 2012
Business Continuity - IT Disaster Recovery Discussion Paper - - Version V2.0R Wednesday, 5 September 2012 Commercial in Confidence Melbourne Sydney 79-81 Coppin St Level 2 Richmond VIC 3121 414 Kent St
More informationBusiness Continuity Planning in IT
Introduction: Business Continuity Planning in IT The more your business relies on its IT systems, the more you need to consider how unexpected disruptions might affect your business. These disruptions
More informationBUSINESS CONTINUITY MANAGEMENT A Guide for Businesses In Northamptonshire
BUSINESS CONTINUITY MANAGEMENT A Guide for Businesses In Northamptonshire 1 What is Business Continuity? Business Continuity is a planning process which provides a framework to ensure the resilience of
More informationUpdate from the Business Continuity Working Group
23 June 2014 Performance and Resources Board 19 To note Update from the Business Continuity Working Group Issue 1 The Business Continuity Working Group oversees the development, maintenance and improvement
More informationGUIDANCE DOCUMENT FOR COMPLETION OF RESIDENTIAL CARE ESTABLISHMENTS BUSINESS CONTINUITY PLAN TEMPLATE WEST MIDLANDS
GUIDANCE DOCUMENT FOR COMPLETION OF RESIDENTIAL CARE ESTABLISHMENTS BUSINESS CONTINUITY PLAN TEMPLATE WEST MIDLANDS 1 st EDITION Page 1 of 18 INTRODUCTION This document is to be used in conjunction with
More informationGlobal Statement of Business Continuity
Business Continuity Management Version 1.0-2014 Date October 18, 2014 Status Author Business Continuity Management (BCM) Page 1 of 8 Table of Contents 1. Credit Suisse Business Continuity Statement 3 2.
More informationStaffordshire County Council. Civil Contingencies Policy
Staffordshire County Council Civil Contingencies Policy Version 1 September 2012 Staffordshire County Council s Civil Contingencies Policy 1.1 Introduction The County Council aims to protect the wellbeing
More informationBUSINESS CONTINUITY MANAGEMENT POLICY
BUSINESS CONTINUITY MANAGEMENT POLICY A GUIDE TO BUSINESS CONTINUITY AND SERVICE RECOVERY PLANNING Version 1.1 Ratified by BHR CCGs Governing Bodies Date ratified September 2013 Name of Director Lead Marie
More informationBusiness Continuity Management. Policy Statement and Strategy
Business Continuity Management Policy Statement and Strategy November 2011 Title Business Continuity Management Policy & Strategy Date of Publication: Cabinet Council Published by Borough Council of King
More informationVersion: 3.0. Effective From: 19/06/2014
Policy No: RM66 Version: 3.0 Name of Policy: Business Continuity Planning Policy Effective From: 19/06/2014 Date Ratified 05/06/2014 Ratified Business Service Development Committee Review Date 01/06/2016
More informationBT Conferencing Business Continuity Management. Planning to stay in business
BT Conferencing Business Continuity Management Planning to stay in business Planning for the unexpected In today s connected world, businesses are increasingly dependent on their communications and networked
More informationKEY STRATEGIC RISKS. Northumberland Sustainable Community Strategy
APPENDIX 1 KEY STRATEGIC RISKS Northumberland Objectives: Northumberland Sustainable Community Strategy Northumberland County Council Objectives: Our Vision: Northumberland will be a thriving county where
More informationEPRR: Toolkit Facilitator Guide
NHS England Business Continuity Management EPRR: Toolkit Facilitator Guide APPENDIX 1 1 [Intentionally Blank] INTRODUCTION The document has been designed to assist you to deliver the outcomes of the workshop
More informationBusiness Continuity Management
Business Continuity Management Version 1 approved by SMG December 2013 Business Continuity Policy Version 1 1 of 9 Business Continuity Management Summary description: This document provides the rationale
More informationNOT PROTECTIVELY MARKED BUSINESS CONTINUITY. Specialist Operations Contingency Planning Business Continuity Manager 17.09.12
POLICY BUSINESS CONTINUITY Policy owners Policy holder Author Head of Services Specialist Operations Contingency Planning Business Continuity Manager Policy No. 132 Approved by Legal Services 17.09.12
More informationLG (2011) Paper 053 28 November 2011 LEADERSHIP GROUP RISK MANAGEMENT ARRANGEMENTS. Executive summary
LG (2011) Paper 053 28 November 2011 LEADERSHIP GROUP RISK MANAGEMENT ARRANGEMENTS Executive summary Issues 1. This paper sets out proposals to implement new strategic risk management arrangements for
More informationBusiness Continuity Management Governance. Frank Higgins Abu Dhabi March 2015
Business Continuity Management Governance Frank Higgins Abu Dhabi March 2015 Different Names Same Concept BCM (Business Continuity Management) BSI 25999 IPOCM (Incident Preparedness & Operational Continuity