1 Investigating the Information Processing Capacities of Organizational Controls: A Computational Modeling Perspective CHRIS P. LONG Olin School of Business Washington University in St. Louis St. Louis, MO (314) long@olin.wustl.edu SIM B. SITKIN Fuqua School of Business Duke University Durham, NC (919) sim.sitkin@duke.edu LAURA B. CARDINAL Kenan-Flagler School of Business McColl Building, CB #3490 The University of North Carolina at Chapel Hill Chapel Hill, NC (919) laura_cardinal@unc.edu RICHARD M. BURTON Fuqua School of Business Duke University Durham, NC (919) rmb2@mail.duke.edu Conditionally Accepted at the International Journal of Management and Business The authors wish to thank Professor Ray Leavitt, his Stanford University colleagues, and the VITE Corporation for the use of Vite Project simulation software 1

2 ABSTRACT This paper investigates issues surrounding the implementation of complex control systems. This study adopts an information processing perspective to explain why effective managers use multiple forms of control and select distinct combinations of multiple controls in different control system environments. We use a computational model to build three forms of control systems (market, bureaucratic, clan) and seven control target combinations (input, process, output, input/process, process/output, input/output, input/process/output). Using this model, we examine how effectively managers operating in different control environments direct various types of organizational tasks using different combinations of control mechanisms. Results of this study demonstrate that effective managers use multiple controls to distribute decision-making responsibilities between themselves and their subordinates. The authors suggest that findings from this study should also direct scholars to incorporate the value of both an information-processing perspective and measurement models in future control research. Furthermore, the study concludes with a discussion of the contribution of computational models to control research. 2

3 INTRODUCTION Traditional organizational research describes control as one of the four fundamental functions of management [the others being organizing, planning, and coordinating] (e.g., Fayol 1949) where organizational controls describe the primary mechanisms that managers use to direct attention, motivate, and encourage organizational members to act in desired ways to meet an organization s objectives (Ouchi 1977, 1979; Eisenhardt 1985; Snell 1992). Despite the scholarly legacy, topical importance, and practical pervasiveness of control phenomena, Oliver recently (1998) observed that the study of organizational control has a long history in administrative science and yet the need to examine the processes and implications of this phenomenon has never been greater. While empirical control research has concentrated primarily on examining managers applications of single forms of control, researchers have begun to extend this work and closely evaluate the development and implementation of complex control systems comprised of multiple forms of control (Cardinal, Sitkin, and Long 2002a, 2002b; Long, Cardinal, and Burton 2002). In this paper we examine an important question regarding complex control systems: how the control system context within which managers operate affects the specific combinations of control mechanisms they choose. In order to facilitate the development of knowledge in this area, we draw upon and integrate two distinct streams of organizational control research: research on organizational control systems (market, bureaucratic, clan) and research on control targets (input, process, output). In addition, we identify recent research and draw on the principles of information processing theory (Galbraith 1977, 1973) to explore relationships between control systems and specific combinations of multiple forms of control. We use a computational model to examine whether managers operating within three 3

4 types of control systems (market, bureaucratic, clan) use different configurations of control mechanisms (input, process, output), in response to their knowledge of transformation processes and the measurability of production outputs. Utilizing refined conceptualizations of control, we find support for both traditional control theories as well as the emerging broader perspective on organizational control that describes how managers can improve organizational performance by leveraging diverse elements of their control systems (Cardinal 2001; Cardinal, et al. 2002a, 2002b ; Long 2002; Long, et al. 2002). We present this research in several sections. In the first section, we introduce various control concepts as we compare traditional control theory with more recent control research. After outlining our hypotheses, we describe our study design and present our results. In the final section of the paper, we both discuss our results and evaluate the benefits of utilizing computational models for the study of organizational control phenomena. THEORY Control Theory While control researchers have developed and utilized a variety of control perspectives (e.g., cybernetic theory, critical theory, studies of power), our theoretical integration and computational analysis draw on two organizational control sub-literatures. Theory developed through this work comprises among the most cited and most influential of all control research. One sub-literature, exemplified by Ouchi (1977), Merchant (1985), Snell (1992), Kirsch (1996), and by both accounting (e.g., Simons 1995) and TQM researchers (e.g., Sutcliffe, Sitkin, and Browning 1997) examines how individual control mechanisms and clusters of mechanisms are applied to organizational production processes. This sub-literature takes a systems management approach to control and specifies how managers apply organizational controls to the inputs, 4

5 throughputs, and outputs of the production processes they manage. The other sub-literature, exemplified by the work of Ouchi (1979, 1980) describes various types of control systems that are distinguished primarily by the fundamental social mechanisms (e.g., rules, norms) they employ to govern sets of intra-organizational transactions. Based on their common theoretical traditions and foci, research on organizational control targets (Ouchi and Maguire 1975; Ouchi 1977) and control systems ( Ouchi 1980; Lebas and Weigenstein 1986) constitute complementary perspectives that seek to identify the most efficient and effective manner by which managers can direct their subordinates (Barney and Hesterly 1996). Below we outline traditional control theory on control targets and control systems. Thereafter, we explain how information processing theory help us understand how control system context affects choices regarding the multiple control mechanisms that managers apply. Control Targets The fundamental unit of analysis in control research is the control mechanism, the specific method by which individual actions are governed. Control target research distinguishes control mechanisms by the portion of the production process they are intended to influence. For example, managers select input targets ( input control ) to direct how material and human resource elements of their production processes are qualified, chosen, and prepared through training and socialization (Arvey 1979; Van Maanen and Schein 1979; Wanous 1980), or by selecting vendors, equipment, or raw materials for use in work activities (Snell 1992, Snell and Youndt 1995). Managers choose process targets (referred to as behavior control or process control ) -- such as process rules and behavioral norms -- when they want to ensure that individuals perform actions in a specific manner (Ouchi and Maguire 1975; Ouchi 1977). Finally, managers focus on output targets ( output control ) -- such as profits, customer 5

6 satisfaction levels, and production volumes and schedules -- to align output quantity/quality with specific production standards (Ouchi 1977, 1979). Control target theorists have used distinctions between input, process, and output targets to describe how managers should focus their control efforts (Donaldson 1990; Ghoshal and Moran 1996). Researchers who examine control targets argue that to efficiently and effectively direct subordinates, managers should select controls in accordance with their knowledge of the transformation process they direct, and the measurability of production outputs (Ouchi 1977; Merchant 1985; Snell 1992; Kirsch 1996). These evaluations lead managers to direct control mechanisms to control targets (Ouchi 1977, 1979) as outlined in Figure 1. Insert Figure 1 About Here Based on the notion that simplicity allows managers to economize effort and promote efficiencies (March and Simon 1958), most research on control targets has focused on how managers use single forms of control. For example, when managers possess a high level of knowledge about the way work should be performed (i.e. the transformation process) in an organization, Ouchi (1977: p. 97) suggests that supervisors can rationally achieve control by watching and guiding the behavior of their subordinates (i.e., by singularly using process control). Ouchi similarly suggests that when managers are able to accurately measure the quantity or quality of products that employees produce (i.e., measurability), they will develop singularly-focused output controls that leverage their ability to measure outputs. When managers both understand how work should be performed and can effectively measure employee outputs, Ouchi does not suggest that both could be used, but rather that managers will select one or the other, thus exercising their option of using either form of control (Ouchi 1977, p. 98). Finally, when managers understand neither how work should be performed, nor how outputs can 6

7 be effectively measured, it has been predicted that they will rely singularly on input controls and focus only on providing the most appropriate human and material resources for a given task (Snell and Youndt 1995). Extending Control Target Theory Beyond the Singular Empirical evidence has provided support for the relationships outlined in Figure 1 (Ouchi 1977; Eisenhardt 1985; Snell 1992). However important questions have been raised about this set of ideas (Barney and Hesterly 1996, p. 128). In particular, critics have claimed that the traditional emphasis in control target research on task measurement and singularly-focused controls presents an overly rational conceptualization of managerial attention and action (Folger, Konovsky, and Croponzano 1992, p. 130) and incorrectly assumes that managers can develop and effectively implement singularly-focused employment contracts based on accurate, reliable measurements of employee task performance (Noorderhaven 1992; Jaworski, Stathakopoulos, and Krishnan 1993; Ghoshal and Moran 1996). In addition to questioning whether the use of singular controls is possible, questions have also been raised about whether the use of singular controls is universally effective in the way depicted in Figure 1. For example, building on Ouchi s observation that the control process is a problem of information flows (Ouchi 1979, p. 833), we draw upon information processing theory to hypothesize that managers are likely to be most effective when they use multiple controls contingent upon the control context. In the next several paragraphs we outline how combining an information processing perspective (e.g., Galbraith 1973, 1977) with current control theory s emphasis on task attributes and measurement allows us to theorize about the use of multiple controls and relationships between configurations of control targets and control systems. 7

8 Information-Processing Theory and Multiple Controls While research on single forms of control has been instrumental in explicating how controls can limit employee opportunism and promote both goal congruence and risk sharing (Barney and Hesterly, 1996), managers who over-emphasize single controls are susceptible to information-processing problems (Galbraith 1973, 1977). Because the effective application of organizational controls involves the exchange of information regarding production inputs, throughputs, and outputs, single controls may work well in routine, stable environments (Galbraith 1973). However, production problems can dramatically increase information exchanges with subordinates and can cause managers who rely on single forms of control to become overloaded with excessive amounts of certain types of performance data. Because these singularly-focused managers are able to exchange information with subordinates at only one segment of the production process (e.g., inputs), these overloads may lead them, in turn, to experience deficiencies in their ability to process information, their capacityto exchange information with subordinates, and their ability to exert effective levels of control (Galbraith 1973). In contrast, managers who rely on multiple controls are able to more easily exchange task information with subordinates over multiple production segments. As a result, they can receive a wider array of production data and maintain a greater range of opportunities to direct production efforts. In addition, because managers who utilize multiple forms of organizational controls reduce their reliance on performance information regarding individual production segments, they avoid processing delays and can exchange information when data is available and exchanges are most appropriate given situational constraints. 8

9 While control theorists have suggested that managers might use multiple forms of control (Ouchi 1979; Bradach and Eccles 1989), control research has only recently begun to empirically examine this topic. For example, Cardinal, et al. (2002a, 2002b) report on a longitudinal case study in which they chart the development of an organization s control system through several stages in which managers actively consider how to combine their use of multiple control mechanisms. They observed that managers use combinations of formal and informal control mechanisms and direct them selectively at input, process, or output control targets (Cardinal, et al. 2002b, p. 32). Complementary findings from a recent computational study by Long, et al. (2002) suggest that when managers focus on multiple control targets (i.e., employee inputs, behaviors, and outputs), they can gain greater production efficiencies compared with managers who focus on single control targets. In explaining their results, they suggest that managers who employ multiple controls are more effective because they can adjust the specific controls they use to avoid portions of the organization s production process where production information cannot be readily acquired or effectively exchanged. Taken together, this research describes an emergent body of control-related work that points to supplementing traditional, single-mechanism control research with multiple-mechanism control studies that more accurately portray how controls are used in organizational practice. Control Mechanism Choices within Various Control Systems. While, findings suggest that managers use multiple controls, little is know about how they make choices about the specific controls they select. Recent control findings, however suggest that the combinations of multiple control mechanisms managers choose are influenced both by the nature of production tasks and the information processing attributes of the control 9

10 systems within which those managers operate. The control system describes an organization-level concept that captures the formal and informal information-based routines that managers use to maintain or alter patterns in organizational activities (Simons 1995, p. 5). The control system is comprised of various organizational design elements that affect managers abilities to direct subordinates in their tasks (Long, et al. 2002, p. 198) and, while describing a distinct concept, a control system is an core element of organization s overall design (e.g., in addition to its structure, culture, hiring and retention mechanisms, etc ) (Lewin and Stephens 1994; Daft 1998). It is important to note, however that, because it describes more than formal reporting relationships, the control system describes a concept distinct from structure (Ouchi, 1977). In addition, the control system concept is also distinct from the concept of control mechanisms which describe individual units of organizational control. Control systems constitute forms of exchange environments in which individual managers make decisions about the individual forms of control mechanisms they apply. Three types of organizational control systems have dominated attention in the control literature: market, bureaucratic, and clan (e.g., Williamson 1975; Ouchi 1977, 1979). These three control systems types are differentiated by the fundamental social mechanisms they use to govern exchanges between actors. In a market control system, managers make decisions based on price considerations (Williamson 1975; Ouchi 1979). Managers within bureaucratic control systems use primarily rules and regulations, hierarchical lines of authority, and job specifications to direct subordinates in their tasks (Weber 1946; Ouchi and Price 1978; Lebas and Weigenstein 1986). Managers within clan control systems place relatively greater emphasis on the development and actualization of common values, traditions, and beliefs (Roth, et al. 1994) and focus on 10

11 socializing members in ways that merge individual and organizational goals. Information Processing and Organizational Control Systems Cardinal et al., (2002a, 2002b) found that, because information exchange patterns differ across market, bureaucratic, and clan control systems, managers operating within each type of control system will tend to use different combinations of control mechanisms to manage tasks. In addition, Long et al., (2002) examined relationships between control systems and control targets using a computational methodology and found that managers were differentially effective depending on the control system in which they applied specific control target combinations. Galbraith (1973, 1977) in his exposition of information processing theory provides some explanation for these observations. He shows that because both control system context and task characteristics affect how organizations process information, they lead managers to make choices regarding multiple control mechanisms. Specifically, he suggests that when levels of task programmability in bureaucratic organizations are low, managers will combine applications of process controls with input and output controls. Managers use input and output controls to effectively measure and monitor tasks, while they use process controls to ensure that they retain their capacity to exchange process-related information with subordinates at key points in the production process. Complementarity of Organizational Controls Building from these findings and from Galbraith s (1973) observations, we argue that in order to promote efficient information processing, managers choose control mechanisms not only based on the nature of the tasks they manage (Ouchi and Maguire 1975; Ouchi 1977), but also to leverage complementarities between specific control targets and the control systems. Managers use complementarities between control systems and control targets to promote the efficient 11

12 exchange of specific types of information with subordinates over segments of a production process. As a general rule, communications about performance measures are most effective in producing extrinsic motivation when they are fast and frequent (Lawler and Rhode 1976, p. 54). Because types of information are more or less influential based, in part, on when that information is exchanged (Jacques 1961), we suggest that managers tend to exchange certain types of information at the points in the production process when managers can most effectively use it to affect subordinate behaviors. By focusing controls on particular control targets, managers operating in particular control systems are able to gather performance information when it is most available and provide performance feedback when it is most relevant. As a result, these managers increase their chance of producing desired behavioral effects among their subordinates. Barney and Ouchi (1986), Eisenhardt (1989), and Long et al. (2002) have all identified control targets that provide managers operating in specific control systems enhanced opportunities to exchange specific types of performance information with their subordinates. Specifically, they have identified complementarities between market control systems and output control targets, bureaucratic control systems and process control targets, and clan control systems and input control targets. Because managers in market control systems make decisions based on price, they can most effectively interact with subordinates after outputs are produced and prices can be accurately assessed (Lebas and Weigenstein 1986). Hence, managers in these control systems will, regardless of task, attempt to direct subordinates by exchanging control-related information during the output phase of the production process. In contrast, managers in bureaucratic control systems rely on rules and can use these mechanisms to explicitly outline the behaviors they want 12

13 performed. Because these rules are best applied at the point where they are utilized, managers in bureaucratic control systems will tend to apply controls to process control targets. Lastly, the traditions and norms that clan system managers use to affect subordinate behaviors are best applied before tasks are commenced. For example, if managers make efforts to select employees that already adhere to the organization s norms and traditions and if they communicate those norms and traditions when subordinates are first socialized in the organization they will increase their chance of effectively indoctrinating those employees (Van Maanen and Schein 1979). As a result, managers in clan control systems will tend to focus their control efforts on input control targets. Building from the discussion above, we argue that managers will select control mechanisms that let them both promote effective task measurement (i.e., Figure 1) and leverage complementarities between specific control systems and control targets. By doing this they are able to both effectively measure and monitor performance and make sure they efficiently exchange performance information with subordinates. HYPOTHESES In order to develop a better understanding of how managers direct subordinates, we present three sets of hypotheses that describe how control system context and task characteristics interact to influence a manager s selection of multiple control mechanisms. The perspective we present here combines traditional control target theory with more recent research on control system/control target configurations (Long et al. 2002; Cardinal et al. 2002a, 2002b). Specifically, we argue that managers will select specific control mechanisms based on the nature of the tasks they manage and on the complementarities between specific control targets and control systems. 13

14 We theorize that complementarities between control systems and control targets and the nature of subordinate tasks lead managers to apply specific combinations of single and multiple controls mechanisms. Managers are hypothesized to focus on single control targets when alignment exists between the measurement requirements for the tasks subordinates perform and the underlying control system structures in which that manager operates. When the nature of the task and the control system structure are not aligned, managers are posited to utilize multiple control mechanisms. In this case, managers will devote some of their control efforts to the measurement of the given task and some control effort to the exchange of production information with subordinates at crucial production points. This perspective is outlined in Proposition 1. In Hypotheses 1a-3d this perspective is translated into testable hypotheses specific to each type of control system. Proposition 1: Within market, bureaucratic, and clan control systems, managers will select control mechanisms based both on the elements of their control system and the measurement requirements of subordinate tasks. Control Mechanism Choice in a Market Control System Managers within market control systems tend to focus on output control targets because, in this environment, it is most efficient for managers to evaluate work after it is completed (Barney and Ouchi 1986). Ouchi (1979) explains the relationship between market control systems and output control targets by arguing that the former arises directly out of managers capacities to measure the outcomes of actors efforts. Lebas and Weigenstein (1986, p. 263) agree and suggest that the most important control system components for a market approach include transfer pricing, lateral relationships and bargaining, and management compensation, all mechanisms that managers use to focus on output control targets. This hypothesized relationship between market control systems and output control targets is specified in Hypotheses 1a-1d. 14

15 Hypothesis 1a: Managers in a market control system will apply input and output controls when their knowledge of the organization s transformation process is low and their ability to measure organizational outcomes is low. Hypothesis 1b: Managers in a market control system will apply process and output controls when their knowledge of the organization s transformation process is high and their ability to measure organizational outcomes is low. Hypothesis 1c: Managers in a market control system will apply output controls when their knowledge of the organization s transformation process is low and their ability to measure organizational outcomes is high. Hypothesis 1d: Managers in a market control system will apply process and output controls when their knowledge of the organization s transformation process is high and their ability to measure organizational outcomes is high. Control Mechanism Choice in a Bureaucratic Control System Bureaucratic control systems contain many of the classic bureaucratic traits described by Weber (1946) and are well suited to situations where managers can more readily observe and determine the value of individual contributions to organizational tasks (Ouchi 1980). As a result, managers within bureaucratic control systems minimize risk by focusing on process control targets that allow them to proscribe behavior and to closely monitor how tasks are performed. Here, managers use rules and regulations, hierarchies, and formal (codified) communications to direct the activities of organizational actors. The relationship between bureaucratic control systems and process control affects relationships is posited in Hypotheses 2a-2d. Hypothesis 2a: Managers in a bureaucratic control system will apply input and process controls when their knowledge of the organization s transformation process is low and their ability to measure organizational outcomes is low. Hypothesis 2b: Managers in a bureaucratic control system will apply process controls when their knowledge of the organization s transformation process is high and their ability to measure organizational outcomes is low. 15

16 Hypothesis 2c: Managers in a bureaucratic control system will apply process and output controls when their knowledge of the organization s transformation process is low and their ability to measure organizational outcomes is high.. Hypothesis 2d: Managers in a bureaucratic control system will apply process and output controls when their knowledge of the organization s transformation process is high and their ability to measure organizational outcomes is high.. Control Mechanism Choice within a Clan Control System According to Ouchi (1980), clan control systems utilize a variety of informal social mechanisms that reduce differences between individual and organizational goals and produce a strong sense of community (p. 136). Here, managers rely on input control mechanisms to select for shared values and norms and to inculcate subordinates with the knowledge necessary to perform organizational tasks. By focusing on instilling employees with a shared set of values, objectives, and beliefs about how to coordinate effort and reach common objectives before task activities begin, managers can create a climate of understanding that can greatly improve task completion efforts. (Pettigrew 1979; Lebas and Weigenstein 1986). The hypothesized relationship between clan control systems and input control targets leads to Hypotheses 3a-3d. Hypothesis 3a: Managers in a clan control system will apply input controls when their knowledge of the organization s transformation process is low and their ability to measure organizational outcomes is low. Hypothesis 3b: Managers in a clan control system will apply input and process controls when their knowledge of the organization s transformation process is high and their ability to measure organizational outcomes is low. Hypothesis 3c: Managers in a clan control system will apply input and output controls when their knowledge of the organization s transformation process is low and their ability to measure organizational outcomes is high.. Hypothesis 3d: Managers in a clan control system will apply input, process, and output controls when their knowledge of the organization s transformation process is high and their ability to measure organizational outcomes is high. 16

17 COMPUTATIONAL METHODS We evaluate Proposition 1 and Hypotheses 1a through 3d using the commercial software version 2.2 of the Vite Project (also VITE ) discrete event computational model. 1 VITE is appropriate for this study because the program is specifically designed to model information exchanges between actors working on production tasks. This program has been validated through case studies (Jin and Levitt, 1996) and as an organizational research tool to evaluate various types of control systems (Long, et al. 2002), communication structures (Carroll and Burton, 2000) and virtual organizations (Wong and Burton 2000). Vite Project Fundamentals We use VITE to create the control systems, control target combinations, and the task conditions used in the study. As Jin and Levitt (1996) outline, a modeler using VITE must identify a sequence of production tasks, create various types of actors, assign actors to tasks, and contstruct an organization within which work is accomplished. Below, we present a detailed description of how we accomplish these objectives to create the computational models used in this study. Actors Vite Project actors work together to complete a multi-task project. Different actors within a VITE organization are distinguished by their organizational roles, the specific skills they possess, their work experience, and the other project workers with whom they communicate. An actor may serve as a project manager, team manager, and front line worker. This organizational position determines the types of decisions s/he makes and the amount of information s/he is required to process. 1 The software used in our research 1 (Vite Project) was developed by Professor Ray Levitt and his associates at the Center for Integrated Facility Engineering at Stanford University and is available through VITE Corporation. 17

18 Project Tasks To obtain the information they require to complete production tasks, Vite Project actors send and receive messages across established communication channels. How quickly a VITE organization completes its production assignment (e.g., 100 units) depends on how effectively information flows through the organization. Each actor in the organization is assigned to complete one or more tasks. If an actor encounters production problems, they will slow production and attempt to resolve these problems by obtaining missing information from the superiors, peers or subordinates with whom they are connected. When actors can efficiently process the information requests they receive, actors communicate smoothly and have their queries promptly handled. When actors cannot efficiently process information requests, they become backlogged, and are delayed in distributing appropriate answers to other actor s queries. When this happens, actors in need of information must wait while others process their information requests. If delays persist in a given organization, information is not effectively distributed, and production slows. Organizational Context In VITE the modeler also creates an organizational structure that significantly affects patterns of intra-organizational information exchange. Communications between actors are determined by superior-subordinate, information exchange relationships that the modeler creates. In addition, the modeler can schedule and invite actors to organizational meetings where they can collectively exchange information on projects. Information flow within a given organization can be further refined using VITE s four organization parameters: centralization, formalization, team experience, and matrix strength. Each of these parameters may be set to a value of low, medium or high. 18

19 Centralization - determines the level of the organizational hierarchy where decisions are made and task problems are handled. High centralization designates project managers as decision-makers. Medium centralization designates team leaders. Low centralization (i.e., decentralization) designates front-line workers as decision-makers. Formalization - determines the frequency with which actors initiate ad hoc communications with other actors. In highly formalized organizations, actors rarely initiate adhoc communications. Instead they exchange information through hierarchical communication channels. In organizations where formalization is low, actors frequently exchange information through ad-hoc channels and gather less information through the formal organizational hierarchy. When formalization is medium, employees exchange information through both hierarchical and ad-hoc communication channels. Team Experience - reflects the total amount of project-related experience that a team possesses. Actors possessing a high level of team experience are familiar each other and the demands of a particular project. Conversely, actors with a low level of team experience are unfamiliar with each other and project demands. Matrix Strength - relates to functionalization. Actors in organizations with low matrix strength focus primarily on their functional duties and communicate less with other organizational actors. Actors in organizations with high matrix strength are more collaborative, focus less on their functional duties, and respond more to ad hoc communications initiated by other actors. Outcome Measures VITE calculates the cost of producing a pre-specified number of production units. We measure the cost of producing 100 production in this study. 19

20 VIRTUAL EXPERIMENT Because the purpose of this study is to examine the most effective control target combination under a various control system/task conditions, we constructed a 2*2*3 study design and conducted twelve independent 7*1 analyses of variance (ANOVAs). We examine seven control target combinations (single input control, single process control, single output control, combined input/process control, combined process/output control, combined input/output control, combined input/process/output control), under four task conditions (low knowledge/low outcome measurability; high knowledge/low outcome measurability; low knowledge/high outcome measurability; high knowledge/high outcomes measurability), and within three types of control systems (market, bureaucratic, clan). Table 1 outlines our experimental design. Insert Table 1 About Here Modeling Actors and Tasks Similar to the approach used by Long et al. (2002) we modeled three simple control systems, consisting of one project manager, two team leaders and two teams each comprised of two workers. We differentiated the project manager, team leaders, and workers by the tasks they performed and their organizational position. While workers performed a generic production task, team leaders applied combinations of input, process, and output controls. Project managers coordinated the work of all actors and shared problem solving responsibilities with team leaders. Modeling Control Targets We used VITE s failure dependency function to model managerial attendance to input, process, and output control targets. When failure dependencies exist between tasks, errors that 20

21 occur in a primary task lead the actors performing that task to work with actor(s) performing, previous, dependent tasks to correct those errors. We modeled various types of organizational control mechanisms by connecting managers monitoring activities to workers production tasks. Specifically, when managers detected errors that occurred in workers production activities, managers collaborated with those workers to correct the errors and solve the identified production problems (i.e., apply controls). Specific control target combinations were determined by the position of that control in the production process and the amount of time managers devoted to their application. Similar to the approach used in Long et al. (2002), managers applied input controls before workers began working on their tasks. Errors detected by workers forced team leaders make adjustments to their input selection and preparation processes. Managers applied process controls to workers while they performed their tasks. Workers errors during tasks forced team leaders to spend time and effort identifying and helping workers remedy process deficiencies. Team leaders applied output controls to tasks after workers completed them. Here again, when team leaders detected problems with workers outputs, they spent time and effort helping those workers solve production problems. While workers devoted all their time each work day (nine hours) to completing a generic production task, managers distributed their time and attention to three control-related tasks. When applying a single form of control (e.g., a single focus on input control) both managers in an organization distributed their time each day to three of the same type of control tasks (e.g., three input control tasks). When applying a combination of two controls (e.g., input/process control), one team leader in an organization devoted 2/3 of their time to one type of control task (e.g., input control), and 1/3 of their time to the other control task (e.g., process control). The 21

22 other team leader allocated their time differently, devoting 1/3 of their time to the first control task (e.g., input control) and 2/3 of their time to the second control task (e.g., process control). Thus, the organization distributed team leaders time and effort equally over two forms of control. When applying a combination of input/process/output control both team leaders in an organization distributed their time equally over three different control tasks (i.e., an input control task, a process control task, and an output control task). Our manipulations of control targets are outlined in Table 2. Insert Table 2 About Here Modeling The Production Process While managers applied various combinations of control targets, actors performed the same production process in each experimental condition. A diagram of the process used in input/process/output conditions is displayed in Figure 2. First (1), managers apply input controls and select resources for workers to use in performing tasks. Second (2a), workers perform tasks using inputs provided by managers. (2b) Insufficient inputs lead workers and managers to jointly correct errors and rework tasks. While subordinates perform tasks, managers exert process controls (3a). (3b) Insufficient behaviors displayed by subordinates during production processes lead managers to help workers correct these deficiencies. Once tasks are complete, managers evaluate work outputs (4a). Insufficient outputs lead managers to help workers correct output deficiencies. Throughout (5), the project manager supervises the process while addressing the questions and requests of team managers. Insert Figure 2 About Here Modeling Control Systems 22

23 We differentiated control systems by manipulating organizational structures, the frequency and attendance of actors (i.e., project manager, team leaders, workers) at organizational meetings, and Vite Project organization parameters. Table 3 provides a summary of control system parameters manipulated in this study. Insert Table 3 About Here Market Control System - Workers within market control systems are often employed on short-term contracts rather than as long-term employees of their organizations (Ouchi 1979). Because market control systems may be more like a portfolio of independent contractors than a monolithic social unit (Roth, Sitkin, and House 1994, p. 145), we chose not to connect team leaders to workers within the hierarchy. Consistent with this, we restricted daily meeting participation to project managers and team leaders, and set team experience to low. To model the relative autonomy that workers in market control systems possess, we set centralization to low. In addition, we set formalization to medium to allow workers and managers to conduct both formal and/or informal communications. Lastly, because workers are generally hired and retained for their individual contributions in market organizations, we focused them primarily on their individual tasks and set matrix strength to low. Bureaucratic Control System Project managers, team leaders, and workers in a bureaucratic control system are all connected within a formal hierarchy. To model how actors in these control systems to exchange information through formal communication channels (Ouchi, 1980), multi-actor meetings were not scheduled. To model the characteristics of a bureaucratic control system (Weber, 1946) in which structure and formal procedure are key coordination and standardization mechanisms, formalization and centralization were set to high and matrix 23

24 strength was set to low (Weber 1946). In addition, we modeled information exchange in mature rule systems by setting team experience to high. Clan Control System All actors in clan control systems were connected within the organizational hierarchy. To model informal communications (Ouchi 1979, 1980), we scheduled daily meetings and required all organizational actors to attend. We set formalization to medium because actors in the clan system extensively use both informal, ad hoc communications (Roth et al. 1994) and meetings to exchange task information with individuals and groups of other employees. Centralization was also set to low and matrix strength to high to model how frontline workers are designated as primary decision-makers (Wilkins and Ouchi 1983). Modeling Organizational Tasks Manager s Knowledge of the Transformation Process - When a managers production knowledge is incomplete, managers do not fully comprehend the transformation process (Snell 1992, p. 295). Within VITE, we model this condition by combining the individual manager s low levels of Application Experience and Skill with high levels of Requirement Complexity and Uncertainty, or the absence of information necessary to complete certain tasks. Application Experience describes an individual actor s capability on a specific set of tasks. It determines how quickly and accurately actors can process project-relevant information. VITE allows modelers to toggle experience setting between low and high. When actors possess a high level of application experience, they understand how a particular task can and should be performed and can quickly process relevant information with few mistakes. Under the condition where a manager s knowledge of the transformation process is relatively complete, that manager s application experience will be set to high. When it is incomplete, that 24

25 manager s application experience will be set to low. Skill Level describes an individual actor s capability on individual tasks and, similar to application experience, determines how rapidly and accurately actors can process project relevant information. In this model, a manager s ability to direct subordinates in their tasks is partially determined by his/her level of generic skill. When managers know less about a transformation process, they are less able to direct subordinates and their skill level is set at low. When managers possess greater knowledge of the transformation process, they can more effectively direct organizational tasks and their skill is set at high. Requirement Complexity is a characteristic of production tasks both managers and subordinates perform. It describes the number and difficulty of functional requirements that need to be satisfied to complete each activity (VITE Handbook 1998, p. 24). Requirement complexity in VITE can be set between low and high. Tasks with higher levels are more difficult to complete. Consequently, under the condition where managers possess low levels knowledge of about transformation processes, the requirement complexity of both their tasks and the tasks subordinates perform are set to high Under the condition where managers possess high levels of knowledge about transformation processes, the requirement complexity of their tasks and the tasks subordinates perform are set to low. Outcome Measurability We define the concept of outcome measurability in this study as the amount to which the output of individual workers in the organization is susceptible to reliable and valid measurement (Govindarajan and Fisher 1990, p. 261). Within VITE, we model this condition by manipulating the solution complexity, task uncertainty and interdependencies of the tasks subordinates perform. 25

26 Solution Complexity is a characteristic of production tasks subordinates perform in this study. It describes the extent to which an activity s requirements affect and are affected by, the requirements of other functionally interdependent activities (VITE Handbook 1998, p. 24). There are three levels of solution complexity in VITE low, medium and high. When tasks are functionally interdependent with other tasks, the contributions of individual workers to the production of a specific output is difficult to measure and solution complexity is set to high. When the measurability of task outcomes is high, the solution complexity of tasks is set to low. Task Uncertainty is also a characteristic of the production tasks subordinates perform in this study. It represents the extent to which information needed to complete an activity is unavailable at the time the activity starts (VITE Handbook 1998, p. 24). Similar to solution complexity, there are three levels of task uncertainty in VITE : low, medium, and high. When outcome measurability is high, individual subordinates rely little on their co-workers for assistance and the level of uncertainty on each activity subordinates perform will be set to low. When it is task uncertainty is low, uncertainty on each activity will be set to high. Subordinate Task Interdependencies are also manipulated in outcome measurability. When subordinates perform highly interdependent tasks, managers cannot as easily determine the individual contributions of individual subordinates to production outcomes. Hence, when outcome measurability is low, the tasks subordinates perform are connected to the tasks other subordinates perform by activity successor and information exchange relationships. Because individual contributions to production outcomes are more easily measurable when task interdependencies are low, subordinate tasks are not connected under conditions of high outcome measurability. 26

27 Table 4 outlines the manipulations for the manager s knowledge of the transformation process and outcome measurability used in this study. Insert Table 4 About Here Procedure We used analysis of variance (ANOVA) procedures to test the efficacy of focusing on specific control combinations (single input, single process, and single output control, combined input/process, combined process/output, combined input/output, combined input/process/output) within each control system (market, bureaucratic, clan). While Vite Project provides several measures of project output, we opted to use overall project cost (in thousands of dollars) as the performance measure for various control target combinations examined in this study. This is consistent with traditional control research that has examined the least expensive method that managers choose to complete organizational tasks (Barney and Hesterly 1996). In this study, we examine how much it costs managers operating within each control system, using various combinations of organizational control mechanisms, to produce 100 production units under four different task conditions. VITE calculated (in thousands of dollars) how much it cost each organization to complete a full production run. To develop statistical measures, the overall production cost of 5 complete production runs were recorded and averaged for each control system/control target/task condition. We then tested Propositions 1 and Hypotheses 1a through 3d by evaluating the cost of producing 100 units using seven control target combinations within each control system and under each task condition.. RESULTS The results for this study are summarized in Tables 5a-5c and Figures 3a-3c. 27

28 Insert Tables 5a-5c About Here Insert Figures 3a-3c About Here Market Control System. Low Knowledge/Low Outcome Measurability A 7*1 ANOVA yielded a significant effect for control combinations F(6, 28) = , p <.001. The organization performed best when managers used single input controls (M = 56.00, sd = 2.52). No significant difference in performance was found when managers used a combination of input and process controls. Significant differences were found between manager s applications of input controls and all other control combinations (p<.001). High Knowledge/Low Outcome Measurability - A 7*1 ANOVA yielded a significant effect for control combinations F(6, 28) = , p <.001. The organization performed best when managers used single input controls (M = 46.00, sd = 1.63). No significant difference in performance was found when managers used input and process controls. Significant differences were found between manager s applications of input controls and all other control combinations (p<.05). Low Knowledge/High Outcome Measurability - A 7*1 ANOVA yielded a significant effect for control combinations F(6, 28) = , p <.001. The organization performed best when managers used single input controls (M = 29.00, sd =.52). Significant differences were found between manager s applications of input controls and all other control combinations (p<.05). High Knowledge/High Outcome Measurability - A 7*1 ANOVA yielded a significant effect for control combinations F(6, 28) = , p <.001. The organization performed best 28

A Qualitative Investigation of the Human Resource Management Practices in Small Businesses

A Qualitative Investigation of the Human Resource Management Practices in Small Businesses Cornell University ILR School DigitalCommons@ILR CAHRS Working Paper Series Center for Advanced Human Resource Studies (CAHRS) 4-1-2004 A Qualitative Investigation of the Human Resource Management Practices

More information

Cover Page. The handle http://hdl.handle.net/1887/33081 holds various files of this Leiden University dissertation.

Cover Page. The handle http://hdl.handle.net/1887/33081 holds various files of this Leiden University dissertation. Cover Page The handle http://hdl.handle.net/1887/33081 holds various files of this Leiden University dissertation. Author: Stettina, Christoph Johann Title: Governance of innovation project management

More information

ROLE OF ORGANIZATIONAL CULTURE ON PROJECT SUCCESS

ROLE OF ORGANIZATIONAL CULTURE ON PROJECT SUCCESS ROLE OF ORGANIZATIONAL CULTURE ON PROJECT SUCCESS Hulya Julie Yazici, Lutgert School of Business, Florida Gulf Coast University, Fort Myers, FL 33965, (239)590-7335, hyazici@fgcu.edu ABSTRACT The purpose

More information

9 TH INTERNATIONAL ASECU CONFERENCE ON SYSTEMIC ECONOMIC CRISIS: CURRENT ISSUES AND PERSPECTIVES

9 TH INTERNATIONAL ASECU CONFERENCE ON SYSTEMIC ECONOMIC CRISIS: CURRENT ISSUES AND PERSPECTIVES Matilda Alexandrova Liliana Ivanova University of National and World Economy,Sofia, Bulgaria CRITICAL SUCCESS FACTORS OF PROJECT MANAGEMENT: EMPIRICAL EVIDENCE FROM PROJECTS SUPPORTED BY EU PROGRAMMES

More information

SMITHSONIAN DIRECTIVE 212, Federal Personnel Handbook, Chapter 430 NON-SENIOR-LEVEL PERFORMANCE APPRAISAL PROGRAM

SMITHSONIAN DIRECTIVE 212, Federal Personnel Handbook, Chapter 430 NON-SENIOR-LEVEL PERFORMANCE APPRAISAL PROGRAM SMITHSONIAN DIRECTIVE 212, Federal Personnel Handbook, Chapter 430 September 30, 2010 NON-SENIOR-LEVEL PERFORMANCE APPRAISAL PROGRAM Purpose 1 Policy 1 Coverage 2 Exclusions 2 Definitions 3 Responsibilities

More information

Total Quality Management for Improving Services of Information Technology Based Organizations: a case study

Total Quality Management for Improving Services of Information Technology Based Organizations: a case study Total Quality Management for Improving Services of Information Technology Based Organizations: a case study Abstract This paper applies TQM theories to facilitate improving IT products/services. A TQMbusiness

More information

Organizational Restructuring Toolkit

Organizational Restructuring Toolkit Organizational Restructuring Toolkit Driving Effective Enterprise Change CEB Applications Leadership Council CEB Infrastructure Leadership Council A Framework for Member Conversations The mission of The

More information

EMBEDDING SUSTAINABILITY SELF-ASSESSMENT

EMBEDDING SUSTAINABILITY SELF-ASSESSMENT EMBEDDING SUSTAINABILITY SELF-ASSESSMENT Embedding Sustainability Self-Assessment This document is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License. You are free to share

More information

Business Continuity Position Description

Business Continuity Position Description Position Description February 9, 2015 Position Description February 9, 2015 Page i Table of Contents General Characteristics... 2 Career Path... 3 Explanation of Proficiency Level Definitions... 8 Summary

More information

A methodology for knowledge based project management (Work in progress)

A methodology for knowledge based project management (Work in progress) A methodology for knowledge based project management (Work in progress) Patrick Onions patrick@knowledgestudio.co.uk 23 January 2007 The characteristics of our late 20th century society demand the development

More information

ITIL V3 and ASL Sound Guidance for Application Management and Application Development

ITIL V3 and ASL Sound Guidance for Application Management and Application Development For IT V3 and Sound Guidance for Application and Application Development Machteld Meijer, Mark Smalley & Sharon Taylor Alignment White Paper January 2008 V3 & : A Comparison Abstract In May 2007, the Office

More information

Requirements Management

Requirements Management REQUIREMENTS By Harold Halbleib Requirements Management Identify, Specify, Track and Control Requirements Using a Standard Process About the author... Harold Halbleib has a degree in Electrical Engineering

More information

A Comparison of System Dynamics (SD) and Discrete Event Simulation (DES) Al Sweetser Overview.

A Comparison of System Dynamics (SD) and Discrete Event Simulation (DES) Al Sweetser Overview. A Comparison of System Dynamics (SD) and Discrete Event Simulation (DES) Al Sweetser Andersen Consultng 1600 K Street, N.W., Washington, DC 20006-2873 (202) 862-8080 (voice), (202) 785-4689 (fax) albert.sweetser@ac.com

More information

The Demise of Cost and Profit Centers

The Demise of Cost and Profit Centers 07-030 The Demise of Cost and Profit Centers Robert S. Kaplan Copyright 2006 by Robert S. Kaplan Working papers are in draft form. This working paper is distributed for purposes of comment and discussion

More information

Chapter-3 Organization Structure &

Chapter-3 Organization Structure & MGMT 4135 Project Management Chapter-3 Organization Structure & Culture 1 Three different project management structures to choose from: 1. Functional organization 2. Projectized or dedicated teams 3. Matrix

More information

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name

More information

Content and Process Theories of Motivation

Content and Process Theories of Motivation 1.4 Content and Process Theories of Motivation F O C U S The major motivation theorists and their relevance to the industry. By Rodger Stotz, CPIM, Maritz Inc., and Bruce Bolger, CPIM, Selling Communications,

More information

Appendix B: Monitoring Tool Matrices

Appendix B: Monitoring Tool Matrices Appendix B: Monitoring Tool Matrices Content: This appendix provides a detailed description of the ISRAP matrix organization and an explanation of each field of the monitoring tool matrices (www.israp.org).

More information

Chapter 6 Appraising and Managing Performance. True/False Questions

Chapter 6 Appraising and Managing Performance. True/False Questions Chapter 6 Appraising and Managing Performance True/False Questions 8-1. Performance management is the method managers use to manage workflow. Ans: F Page 276 LO2 8-2. Through performance management, managers

More information

Business Intelligence and Analytics: Leveraging Information for Value Creation and Competitive Advantage

Business Intelligence and Analytics: Leveraging Information for Value Creation and Competitive Advantage PRACTICES REPORT BEST PRACTICES SURVEY: AGGREGATE FINDINGS REPORT Business Intelligence and Analytics: Leveraging Information for Value Creation and Competitive Advantage April 2007 Table of Contents Program

More information

SCHOOL CITY OF MISHAWAKA TEACHER EVALUATION RUBRIC (SCHOOL SOCIAL WORKERS)

SCHOOL CITY OF MISHAWAKA TEACHER EVALUATION RUBRIC (SCHOOL SOCIAL WORKERS) APPENDIX E DOMAIN A: PURPOSEFUL PLANNING 1. Utilizing Student, School, and Community Data to Plan. The school social worker does not monitor academic achievement. The social worker rarely or never uses

More information

Employability Skills Summary

Employability Skills Summary s Summary Monday, 22 November 2010 10:55 AM Version 1.2 s Summary Page 2 Table of Contents BSB10107 Certificate I in Business... 3 BSB20107 Certificate II in Business... 4 BSB30107 Certificate III in Business...

More information

Using the Organizational Cultural Assessment (OCAI) as a Tool for New Team Development

Using the Organizational Cultural Assessment (OCAI) as a Tool for New Team Development Using the Organizational Cultural Assessment (OCAI) as a Tool for New Team Development Jeff Suderman Regent University The Organizational Cultural Assessment Instrument (OCAI) is a psychometric tool developed

More information

Professional Employer Organizations and Their Role in Small and Medium Enterprises: The Impact of HR Outsourcing

Professional Employer Organizations and Their Role in Small and Medium Enterprises: The Impact of HR Outsourcing 1042-2587-01-262 Copyright 2003 by Baylor University E T& P Professional Employer Organizations and Their Role in Small and Medium Enterprises: The Impact of HR Outsourcing Brian S. Klaas While effective

More information

pm4dev, 2007 management for development series Project Management Organizational Structures PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

pm4dev, 2007 management for development series Project Management Organizational Structures PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS pm4dev, 2007 management for development series Project Management Organizational Structures PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology

More information

Transforming vision into value : A BPM System design Case Study

Transforming vision into value : A BPM System design Case Study B-BPM(1) Transforming vision into value : A BPM System design Case Study Dong LI Professor, Guanghua School of Management, Peking University Abstruct Business Performance Management System is a new trend.

More information

CCPM: TOC Based Project Management Technique

CCPM: TOC Based Project Management Technique CCPM: TOC Based Project Management Technique Prof. P.M. Chawan, Ganesh P. Gaikwad, Prashant S. Gosavi M. Tech, Computer Engineering, VJTI, Mumbai. Abstract In this paper, we are presenting the drawbacks

More information

SUCCESSFUL EXECUTION OF PRODUCT DEVELOPMENT PROJECTS: THE EFFECTS OF PROJECT MANAGEMENT FORMALITY, AUTONOMY AND RESOURCE FLEXIBILITY

SUCCESSFUL EXECUTION OF PRODUCT DEVELOPMENT PROJECTS: THE EFFECTS OF PROJECT MANAGEMENT FORMALITY, AUTONOMY AND RESOURCE FLEXIBILITY SUCCESSFUL EXECUTION OF PRODUCT DEVELOPMENT PROJECTS: THE EFFECTS OF PROJECT MANAGEMENT FORMALITY, AUTONOMY AND RESOURCE FLEXIBILITY MOHAN V. TATIKONDA Kenan-Flagler Business School University of North

More information

BUSINESS PROCESS REENGINEERING ON SME s: EVIDENCE FROM ROMANIAN SME S. Andrei Ionuţ ŞERBAN 1

BUSINESS PROCESS REENGINEERING ON SME s: EVIDENCE FROM ROMANIAN SME S. Andrei Ionuţ ŞERBAN 1 BUSINESS PROCESS REENGINEERING ON SME s: EVIDENCE FROM ROMANIAN SME S Andrei Ionuţ ŞERBAN 1 ABSTRACT In many countries, small and medium enterprises (SMEs) have played an important role in the economic

More information

Performance Factors and Campuswide Standards Guidelines. With Behavioral Indicators

Performance Factors and Campuswide Standards Guidelines. With Behavioral Indicators Performance Factors and Campuswide Standards Guidelines With Behavioral Indicators Rev. 05/06/2014 Contents PERFORMANCE FACTOR GUIDELINES... 1 Position Expertise... 1 Approach to Work... 2 Quality of Work...

More information

Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment

Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Project Management Self-Assessment Contents Introduction 3 User Guidance 4 P3M3 Self-Assessment Questionnaire

More information

Roles of Practitioners and Strategic Planning Practices

Roles of Practitioners and Strategic Planning Practices Roles of Practitioners and Strategic Planning Practices *** Associate Professor Dr. Kanya Sirisagul Department of Advertising and Public Relations Business Administration Faculty Ramkhamhaeng University

More information

FAIRNESS, JUSTICE, SUBJECTIVITY, OBJECTIVITY AND GOAL CONGRUENCE IN MANAGEMENT CONTROL SYSTEMS

FAIRNESS, JUSTICE, SUBJECTIVITY, OBJECTIVITY AND GOAL CONGRUENCE IN MANAGEMENT CONTROL SYSTEMS Working Paper WP-891 January, 2011 FAIRNESS, JUSTICE, SUBJECTIVITY, OBJECTIVITY AND GOAL CONGRUENCE IN MANAGEMENT CONTROL SYSTEMS Natàlia Cugueró Josep Maria Rosanas IESE Business School University of

More information

360-Degree Assessment: An Overview

360-Degree Assessment: An Overview 360-Degree Assessment: An Overview United States Office of Personnel Management Performance Management and Incentive Awards Division This material was developed with the assistance of Human Technology,

More information

An Examination of the Degree of Management Control Used by American and Japanese Multinational Corporations on their Subsidiaries in Thailand

An Examination of the Degree of Management Control Used by American and Japanese Multinational Corporations on their Subsidiaries in Thailand An Examination of the Degree of Management Control Used by American and Japanese Multinational Corporations on their Subsidiaries in Thailand Santidhorn Pooripakdee ABSTRACT As businesses continue to expand

More information

THE LINK BETWEEN ORGANIZATIONAL CULTURE AND PERFORMANCE MANAGEMENT PRACTICES: A CASE OF IT COMPANIES FROM ROMANIA

THE LINK BETWEEN ORGANIZATIONAL CULTURE AND PERFORMANCE MANAGEMENT PRACTICES: A CASE OF IT COMPANIES FROM ROMANIA THE LINK BETWEEN ORGANIZATIONAL CULTURE AND PERFORMANCE MANAGEMENT PRACTICES: A CASE OF IT COMPANIES FROM ROMANIA Dobre Ovidiu-Iliuta The Bucharest University of Economic Studies (Institute of Doctoral

More information

GROUPING OF CRITICAL SUCCESS FACTORS FOR ERP IMPLEMENTATIONS

GROUPING OF CRITICAL SUCCESS FACTORS FOR ERP IMPLEMENTATIONS 316 ABSTRACT GROUPING OF CRITICAL SUCCESS FACTORS FOR ERP IMPLEMENTATIONS T.SUGANTHALAKSHMI*; C MOTHUVELAYUTHAN** *Assistant Professor, School of Management Studies, Anna University of Technology. Coimbatore.

More information

REQUIREMENTS FOR THE MASTER THESIS IN INNOVATION AND TECHNOLOGY MANAGEMENT PROGRAM

REQUIREMENTS FOR THE MASTER THESIS IN INNOVATION AND TECHNOLOGY MANAGEMENT PROGRAM APPROVED BY Protocol No. 18-02-2016 Of 18 February 2016 of the Studies Commission meeting REQUIREMENTS FOR THE MASTER THESIS IN INNOVATION AND TECHNOLOGY MANAGEMENT PROGRAM Vilnius 2016-2017 1 P a g e

More information

Preparing and Refining a Research Proposal: Tips for Inexperienced Scientists

Preparing and Refining a Research Proposal: Tips for Inexperienced Scientists Preparing and Refining a Research Proposal: Tips for Inexperienced Scientists Topics Proposal format Strengthening elements Internal continuity Funding targets Know your donor Grantee ethics Never too

More information

PERFORMANCE APPRAISAL (Non-Exempt)

PERFORMANCE APPRAISAL (Non-Exempt) PERFORMANCE APPRAISAL (Non-Exempt) ****************************************************** Name Department: Job Title Appraisal Period JOB KNOWLEDGE Consider overall knowledge, constructive and creative

More information

Mr. Qiao Jin, Performance Management Department, CMPD Operation Management Center

Mr. Qiao Jin, Performance Management Department, CMPD Operation Management Center Performance management is the core of the management and control system of the Company. Its major functions in enterprise development are manifested in four respects: 1) alignment towards corporate goals,

More information

The Directive Supervision Employee Handbook

The Directive Supervision Employee Handbook The Directive Supervision Employee Handbook Agency Name Patricia Miles Table of Contents Table of Contents... 1 Introduction:... 2 History of the Directive Supervision System:... 2 Defining the Directive

More information

How Firms Learn From the Uses of Different

How Firms Learn From the Uses of Different How Firms Learn From the Uses of Different Types of Management Control Systems Michael T. Lee, Boise State University Sally K. Widener, Rice University We gratefully acknowledge the financial support of

More information

MA in Sociology. Assessment Plan*

MA in Sociology. Assessment Plan* MA in Sociology Assessment Plan* Submitted by The Graduate Assessment Committee: November, 2008 Sharon K. Araji, Chair Submitted to The Dean of the College of Liberal Arts and Sciences UC Denver * The

More information

pm4dev, 2007 management for development series The Project Management Processes PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS

pm4dev, 2007 management for development series The Project Management Processes PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS pm4dev, 2007 management for development series The Project Management Processes PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage

More information

English Summary 1. cognitively-loaded test and a non-cognitive test, the latter often comprised of the five-factor model of

English Summary 1. cognitively-loaded test and a non-cognitive test, the latter often comprised of the five-factor model of English Summary 1 Both cognitive and non-cognitive predictors are important with regard to predicting performance. Testing to select students in higher education or personnel in organizations is often

More information

Effect of Job Autonomy Upon Organizational Commitment of Employees at Different Hierarchical Level

Effect of Job Autonomy Upon Organizational Commitment of Employees at Different Hierarchical Level psyct.psychopen.eu 2193-7281 Research Articles Effect of Job Autonomy Upon Organizational Commitment of Employees at Different Hierarchical Level Shalini Sisodia* a, Ira Das a [a] Department of Psychology,

More information

F. PERFORMANCE APPRAISAL AND DEVELOPMENT SYSTEM

F. PERFORMANCE APPRAISAL AND DEVELOPMENT SYSTEM F. PERFORMANCE APPRAISAL AND DEVELOPMENT SYSTEM GENERAL POLICY It is the policy of Scott County to regularly evaluate the work performance of its employees and provide them with relevant feedback to enable

More information

IMEO International Mass Event Organization based on Recent Experience of Euro 2012

IMEO International Mass Event Organization based on Recent Experience of Euro 2012 IMEO International Mass Event Organization based on Recent Experience of Euro 2012 1. Name of the project: Project Management 2. Leader of the workshop (materials' author): Szymon Włochowicz 1 Objectives

More information

Business to business (B2B) corporations with strong cash. Merger and Acquisition Success: The Sales Force Integration Imperative

Business to business (B2B) corporations with strong cash. Merger and Acquisition Success: The Sales Force Integration Imperative S A L ES & M A R K E TING INSIGHTS Merger and Acquisition Success: The Sales Force Integration Imperative Michael B. Moorman and Ladd Ruddell Business to business (B2B) corporations with strong cash reserves

More information

UNIVERSITY OF ROCHESTER William E. Simon Graduate School of Business Administration. Proposal for a Clinical Faculty Track

UNIVERSITY OF ROCHESTER William E. Simon Graduate School of Business Administration. Proposal for a Clinical Faculty Track Contents: UNIVERSITY OF ROCHESTER William E. Simon Graduate School of Business Administration Proposal for a Clinical Faculty Track 1. Rationale and Objectives of the Proposal 2. The Simon School Mission

More information

Project Human Resource Management. Project Management for IT

Project Human Resource Management. Project Management for IT Project Human Resource Management 1 Learning Objectives Explain the importance of good human resource management on projects, especially on information technology projects Define project human resource

More information

How To Manage A Project

How To Manage A Project Professor A. Jaafari, ME, MSc, PhD, CPEng, FIEA Online Project Diagnostics: A Tool for Management of Project Complexities There is evidence that the current project management models and practices do not

More information

the Journal of Behavioral and Applied Management Winter/Spring 2001 Vol. 2(2) Page 131

the Journal of Behavioral and Applied Management Winter/Spring 2001 Vol. 2(2) Page 131 the Journal of Behavioral and Applied Management Winter/Spring 2001 Vol. 2(2) Page 131 The Use of Organizational Culture and Structure to Guide Strategic Behavior: An Information Processing Perspective

More information

1. Global E Business and Collaboration. Lecture 2 TIM 50 Autumn 2012

1. Global E Business and Collaboration. Lecture 2 TIM 50 Autumn 2012 1. Global E Business and Collaboration Lecture 2 TIM 50 Autumn 2012 Objective of the Learning The Major Feature of Business Systems Performance of Business Organization Levels of Business management The

More information

Performance Evaluation. August 20, 2013

Performance Evaluation. August 20, 2013 Performance Evaluation Discussion Points for University Support Staff August 20, 2013 Performance Evaluations method to assess job performance. A PSU system would include the following: 1. University Support

More information

1.0 FUNDAMENTALS OF ENGINEERING MANAGEMENT

1.0 FUNDAMENTALS OF ENGINEERING MANAGEMENT 1.0 FUNDAMENTALS OF ENGINEERING MANAGEMENT 1.1 INTRODUCTION TO MANAGEMENT In most aspect of our lives we are member of one organization or another a college, a sport team, a musical, religions or theatre

More information

Changing Practice in an Ed.D. Program

Changing Practice in an Ed.D. Program 1 Changing Practice in an Ed.D. Program Beth Kania-Gosche, Lynda Leavitt, and Sherrie Wisdom In the Spring 2010 semester, an anonymous, electronic satisfaction survey was sent to all Ed.D. students (a

More information

Seven Strategies of Assessment for Learning

Seven Strategies of Assessment for Learning Seven Strategies of Assessment for Learning A STUDY GUIDE from ETS Assessment Training Institute Jan Chappuis Educational Testing Service Portland, Oregon Princeton, New Jersey Table of Contents Learning

More information

(Effective as of December 15, 2009) CONTENTS

(Effective as of December 15, 2009) CONTENTS INTERNATIONAL STANDARD ON QUALITY CONTROL 1 QUALITY CONTROL FOR FIRMS THAT PERFORM AUDITS AND REVIEWS OF FINANCIAL STATEMENTS, AND OTHER ASSURANCE AND RELATED SERVICES ENGAGEMENTS (Effective as of December

More information

Service Quality Value Alignment through Internal Customer Orientation in Financial Services An Exploratory Study in Indian Banks

Service Quality Value Alignment through Internal Customer Orientation in Financial Services An Exploratory Study in Indian Banks Service Quality Value Alignment through Internal Customer Orientation in Financial Services An Exploratory Study in Indian Banks Prof. Tapan K.Panda* Introduction A high level of external customer satisfaction

More information

Introduction. Background Knowledge. The Task. The Support the Work Setting Should Provide

Introduction. Background Knowledge. The Task. The Support the Work Setting Should Provide Introduction Onboarding new employees is always a challenge. Everyone has a learning curve a gradual progression from initial level of understanding to mastery of a new role. Succeeding in a new workplace

More information

Learning about the influence of certain strategies and communication structures in the organizational effectiveness

Learning about the influence of certain strategies and communication structures in the organizational effectiveness Learning about the influence of certain strategies and communication structures in the organizational effectiveness Ricardo Barros 1, Catalina Ramírez 2, Katherine Stradaioli 3 1 Universidad de los Andes,

More information

Designing Student Affairs Organizational Structures: Perceptions of Senior Student Affairs Officers

Designing Student Affairs Organizational Structures: Perceptions of Senior Student Affairs Officers Designing Student Affairs Organizational Structures: Perceptions of Senior Student Affairs Officers Linda Kuk James H. Banning Student affairs organizations have become complex entities and serve as a

More information

Guidelines for Uniform Performance Standards and Evaluation Criteria for Principals

Guidelines for Uniform Performance Standards and Evaluation Criteria for Principals Virginia Department of Education P. O. Box 2120 Richmond, Virginia 23218-2120 Guidelines for Uniform Performance Standards and Evaluation Criteria for Principals Approved by the Virginia Board of Education

More information

CRISP-DM, which stands for Cross-Industry Standard Process for Data Mining, is an industry-proven way to guide your data mining efforts.

CRISP-DM, which stands for Cross-Industry Standard Process for Data Mining, is an industry-proven way to guide your data mining efforts. CRISP-DM, which stands for Cross-Industry Standard Process for Data Mining, is an industry-proven way to guide your data mining efforts. As a methodology, it includes descriptions of the typical phases

More information

The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision of resources to support service requirements.

The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision of resources to support service requirements. CAPACITY AND AVAILABILITY MANAGEMENT A Project Management Process Area at Maturity Level 3 Purpose The purpose of Capacity and Availability Management (CAM) is to plan and monitor the effective provision

More information

ANALYTICS. Acxiom Marketing Maturity Model CheckPoint. Are you where you want to be? Or do you need to advance your analytics capabilities?

ANALYTICS. Acxiom Marketing Maturity Model CheckPoint. Are you where you want to be? Or do you need to advance your analytics capabilities? ANALYTICS Analytics defined Analytics is the process of studying data to identify potential trends, evaluate decisions, or assess the performance of a tool, event, or scenario. The process should include

More information

Unit Title: Personnel Information Systems Unit Reference Number: F/601/7510 Guided Learning Hours: 160 Level: Level 5 Number of Credits: 18

Unit Title: Personnel Information Systems Unit Reference Number: F/601/7510 Guided Learning Hours: 160 Level: Level 5 Number of Credits: 18 Unit Title: Personnel Information Systems Unit Reference Number: F/601/7510 Guided Learning Hours: 160 Level: Level 5 Number of Credits: 18 Unit objective and aim(s): This unit aims to give learners a

More information

GAO PERFORMANCE MANAGEMENT SYSTEMS. IRS s Systems for Frontline Employees and Managers Align with Strategic Goals but Improvements Can Be Made

GAO PERFORMANCE MANAGEMENT SYSTEMS. IRS s Systems for Frontline Employees and Managers Align with Strategic Goals but Improvements Can Be Made GAO United States General Accounting Office Report to Congressional Requesters July 2002 PERFORMANCE MANAGEMENT SYSTEMS IRS s Systems for Frontline Employees and Managers Align with Strategic Goals but

More information

PSI Leadership Services

PSI Leadership Services PSI Leadership Services Strategic Solutions for Your Leadership Needs Select, Promote, & Develop the Leadership Talent Needed to Drive the Growth of Your Business SOLUTION BENEFIT/OBJECTIVE TYPICAL PROJECTS

More information

The Associate ERP Systems Analyst Series - A Career Builder

The Associate ERP Systems Analyst Series - A Career Builder Career Service Authority Page 1 of 6 Associate Enterprise Resource Planning Systems Analyst GENERAL STATEMENT OF CLASS DUTIES Performs intermediate level professional work analyzing, refining and documenting

More information

Offshore Development Team on Demand

Offshore Development Team on Demand Offshore Development Team on Demand We can save your time and money while providing invaluable expertise in building up your own custom software development team. Our extensive experience in numerous software

More information

Using Shared Leadership to Foster Knowledge Sharing in Information Systems Development Projects

Using Shared Leadership to Foster Knowledge Sharing in Information Systems Development Projects Using Shared Leadership to Foster Knowledge Sharing in Information Systems Development Projects Barbara Hewitt University of Texas at San Antonio bhewitt@utsa.edu Diane Walz University of Texas at San

More information

II. Organizations. Organizations

II. Organizations. Organizations II. Organizations Organizational Goals and Objectives Organizations as Systems Product Flow vs Information Flow Organization Charts Feedback and Control within Organizations Information Systems Departments

More information

7 Conclusions and suggestions for further research

7 Conclusions and suggestions for further research 7 Conclusions and suggestions for further research This research has devised an approach to analyzing system-level coordination from the point of view of product architecture. The analysis was conducted

More information

How To Understand The Relationship Between Organization And Performance

How To Understand The Relationship Between Organization And Performance Organizational Behavior and Development Michael Beer Harvard University Organizational studies is a fragmented field. Its foundations are the disciplines of Psychology, Sociology, and Economics and applied

More information

Sales Compensation Practices:

Sales Compensation Practices: Sales Compensation Practices: The 2012 2013 Special Survey Report Concord, MA Table of Contents Page I. Overview of the Survey and Participants Profile 3 II. How Sales Compensation Plans Are Structured

More information

A RESEARCH PAPER ON STUDY OF EMPLOYEE S PERFORMANCE MANAGEMENT SYSTEM. D. B. Bagul, Ph. D

A RESEARCH PAPER ON STUDY OF EMPLOYEE S PERFORMANCE MANAGEMENT SYSTEM. D. B. Bagul, Ph. D A RESEARCH PAPER ON STUDY OF EMPLOYEE S PERFORMANCE MANAGEMENT SYSTEM D. B. Bagul, Ph. D Director RJSPM, Institute of Computer and Management Research,Alandi Pune Abstract Managing human resources in today's

More information

Essential Elements for Any Successful Project

Essential Elements for Any Successful Project In this chapter Learn what comprises a successful project Understand the common characteristics of troubled projects Review the common characteristics of successful projects Learn which tools are indispensable

More information

Lean Healthcare Metrics Guide

Lean Healthcare Metrics Guide Lean Healthcare Metrics Guide Lean Metrics Guide Page 1 This Lean Metrics Guide is a resource to help organizations understand and select metrics to support their implementation of Lean and Six Sigma two

More information

Item 4. Compensation and Benefits Study

Item 4. Compensation and Benefits Study Item 4 Compensation and Benefits Study 258 First 5 LA Classification and Compensation Review APRIL 21, 2014 259 01 Introduction 260 2 Introduction First 5 LA asked Hay Group to review the organization

More information

Software Project Management Plan (SPMP)

Software Project Management Plan (SPMP) Software Project Management Plan (SPMP) The basic template to be used is derived from IEEE Std 1058-1998, IEEE Standard for Software Project Management Plans. The following is a template for the SPMP.

More information

School of Advanced Studies Doctor Of Management In Organizational Leadership. DM 004 Requirements

School of Advanced Studies Doctor Of Management In Organizational Leadership. DM 004 Requirements School of Advanced Studies Doctor Of Management In Organizational Leadership The mission of the Doctor of Management in Organizational Leadership degree program is to develop the critical and creative

More information

Core Leadership Competencies

Core Leadership Competencies Core Leadership Competencies The following guidance further clarifies the distinctions between levels of performance for the 8 core competencies outlined in Element 1 of all DHS SES performance plans.

More information

Sarajevo,2008.god.p.32 2 Ibid,p.34. 1 Zećir H.,Senad S.,Dženan K., Organisation, Faculty of Economics in

Sarajevo,2008.god.p.32 2 Ibid,p.34. 1 Zećir H.,Senad S.,Dženan K., Organisation, Faculty of Economics in INTERNAL FACTORS OF ORGANIZATIONAL STRUCTURE Mr.Elida Cirikovic c_elida@hotmail.com Abstract In order to realize the mission of business organization, which is the reason of its existence, it requires

More information

National Commission for Academic Accreditation & Assessment. Standards for Quality Assurance and Accreditation of Higher Education Institutions

National Commission for Academic Accreditation & Assessment. Standards for Quality Assurance and Accreditation of Higher Education Institutions National Commission for Academic Accreditation & Assessment Standards for Quality Assurance and Accreditation of Higher Education Institutions November 2009 Standards for Institutional Accreditation in

More information

Community College of Philadelphia Administrative Function and Support Service Audit Learning Lab Executive Summary

Community College of Philadelphia Administrative Function and Support Service Audit Learning Lab Executive Summary Community College of Philadelphia Administrative Function and Support Service Audit Learning Lab Executive Summary Introduction to Function /Service Description and History The Learning Lab was founded

More information

Centre for Learning and Development

Centre for Learning and Development The Leadership and Management Development Strategy was developed to endorse learning and development opportunities to strengthen the leadership and management capacity of the Newfoundland and Labrador

More information

Scholarly Project and Thesis Guidelines. for the. MSON Graduate Nursing Programs

Scholarly Project and Thesis Guidelines. for the. MSON Graduate Nursing Programs Scholarly Project and Thesis Guidelines for the MSON Graduate Nursing Programs Table of Contents Introduction 3 Course Descriptions 3 Project Options: Thesis.3-4 Project Options: Scholarly Project..4-7

More information

Employee s Name: Susan Jones. Title: Administrative Officer. Supervisor: Marcia Meadows. Date: April 2, 200x

Employee s Name: Susan Jones. Title: Administrative Officer. Supervisor: Marcia Meadows. Date: April 2, 200x Employee s Name: Susan Jones Title: Administrative Officer Descriptive Performance Review Form Job Definition Supervisor: Marcia Meadows Date: April 2, 200x 1. Attach a current position description; if

More information

CHAPTER 6 DISCUSSION AND IMPLICATOINS. This chapter is to discuss the findings of the research project on the Post ERP

CHAPTER 6 DISCUSSION AND IMPLICATOINS. This chapter is to discuss the findings of the research project on the Post ERP CHAPTER 6 DISCUSSION AND IMPLICATOINS 6.0 Introduction This chapter is to discuss the findings of the research project on the Post ERP Implementation effects in Malaysia. The four main parts in this chapter

More information

THE HIGHER DIPLOMA IN BUSINESS ADMINISTRATION (HDBA)

THE HIGHER DIPLOMA IN BUSINESS ADMINISTRATION (HDBA) THE HIGHER DIPLOMA IN BUSINESS ADMINISTRATION (HDBA) MKM - 3147 Entrepreneurial Studies and Leadership: NQF Level 7 Credits 20 Distinguish the various entrepreneurial opportunities and contributions to

More information

Northwestern Michigan College Supervisor: Employee: Department: Office of Research, Planning and Effectiveness

Northwestern Michigan College Supervisor: Employee: Department: Office of Research, Planning and Effectiveness General Information Company: Northwestern Michigan College Supervisor: Employee: Department: Office of Research, Planning and Effectiveness Employee No: Detail Job Title: Coordinator of Data Reporting

More information

STATE BOARD FOR TECHNICAL AND COMPREHENSIVE EDUCATION PROCEDURE

STATE BOARD FOR TECHNICAL AND COMPREHENSIVE EDUCATION PROCEDURE PAGE: 1 of 17 TITLE: EMPLOYEE PERFORMANCE MANAGEMENT SYSTEM (EPMS) (REVIEW DATE OPTION) POLICY REFERENCE NUMBER: 8-4-100 DIVISION OF RESPONSIBILITY: Human Resource Services DATE OF LAST REVISION: May 13,

More information

ORGANIZATIONAL CONTROL SYSTEMS AND SOFTWARE QUALITY: A CROSS-NATIONAL STUDY

ORGANIZATIONAL CONTROL SYSTEMS AND SOFTWARE QUALITY: A CROSS-NATIONAL STUDY ORGANIZATIONAL CONTROL SYSTEMS AND SOFTWARE QUALITY: A CROSS-NATIONAL STUDY Sanjay Gosain sgosain@rhsmith.umd.edu Anand Gopal agopal@rhsmith.umd.edu David P. Darcy ddarcy@rhsmith.umd.edu Yossi Lichtenstein

More information

Creating Real Value for Your Customers and Your Organization in the Call Center

Creating Real Value for Your Customers and Your Organization in the Call Center 2011 The Business Value in Balancing Call Center Efficiency with Customer Satisfaction Creating Real Value for Your Customers and Your Organization in the Call Center Sponsored by 1 Striking the Balance

More information

SC207 Software Engineering. Review Report: Producing More Reliable Software

SC207 Software Engineering. Review Report: Producing More Reliable Software SC207 Software Engineering Review Report: Producing More Reliable Software Guo Zaiyi (SA1) Lecturer: Dr. Edmond C. Prakash School of Computer Engineering Nanyang Technological University Abstract This

More information

ORGANIZATIONAL DESIGN AND ADAPTATION IN RESPONSE TO CRISES: THEORY AND PRACTICE

ORGANIZATIONAL DESIGN AND ADAPTATION IN RESPONSE TO CRISES: THEORY AND PRACTICE ORGANIZATIONAL DESIGN AND ADAPTATION IN RESPONSE TO CRISES: THEORY AND PRACTICE ZHIANG ("JOHN") LIN School of Management University of Texas at Dallas Richardson, TX 75083 KATHLEEN M. CARLEY Carnegie Mellon

More information

Florida Department of Education. Professional Development System Evaluation Protocol

Florida Department of Education. Professional Development System Evaluation Protocol Professional Development System Evaluation Protocol Reviewer s Guide Third Cycle 2010-14 Bureau of Educator Recruitment, Development and Retention April 2010 printing Florida Department of Education Reviewers

More information