1 General Rules for the Certification of Management Systems Code: RG Drafted on: 1 April 2012 Effective from: 1 October 2012

2 TABLE OF CONTENTS CHAPTER TITLE PAGE CHAPTER 1 GENERAL 3 CHAPTER 2 REFERENCE STANDARD / CERTIFICATION REQUIREMENTS 4 CHAPTER 3 INITIAL CERTIFICATION 5 CHAPTER 4 MAINTAINING THE VALIDITY OF THE CERTIFICATE 7 CHAPTER 5 RECERTIFICATION 8 CHAPTER 6 PERFORMANCE OF THE AUDITS 10 CHAPTER 7 MANAGEMENT OF CERTIFICATES OF CONFORMITY 15 CHAPTER 8 AMENDMENT OF CERTIFICATION AND COMMUNICATION OF 16 MODIFICATIONS CHAPTER 9 SPECIAL REQUIREMENTS FOR MULTI-SITE ORGANIZATIONS 17 CHAPTER 10 TRANSFER OF ACCREDITED CERTIFICATES 19 CHAPTER 11 SUSPENSION, REINSTATEMENT AND WITHDRAWAL OF CERTIFICATION 19 CHAPTER 12 RENUNCIATION TO CERTIFICATION 21 CHAPTER 13 CONTRACTUAL CONDITIONS 21 2

3 CHAPTER 1 GENERAL 1.1 These Rules shall describe the procedures implemented by RINA SIMTEX Certification Body for the purpose of certifying the Management Systems and how Organizations can apply for, obtain, maintain and use this certification, as well as the possible suspension and revocation of such certification. For any issues not covered by this document, reference is made to the GENERAL CONTRACTUAL CONDITIONS GOVERNING MANAGEMENT SYSTEM, PRODUCT AND STAFF CERTIFICATION, which can be downloaded at RINA SIMTEX Certification Body shall issue the certificate in accordance with the requirements of SR EN ISO/CEI standard to Organizations whose Management System was acknowledged as complying with all the requirements of the reference standard and/or other regulatory document. For every standard relative to a Management System, RINA SIMTEX shall publish specific rules integrating the requirements of these rules. 1.3 Access to certification is open to all Organizations and is not conditional on their membership in a particular association or group. RINA SIMTEX shall apply its current certification fees and guarantee impartiality and uniformity of application. RINA SIMTEX shall be entitled not to accept requests for certification coming from Organizations that were subject to or whose production or activities were subject to restrictive, suspension or prohibition measures by a public authority. When RINA SIMTEX rejects a request, the reasons are communicated to the client. 1.4 The certificate issued by RINA SIMTEX shall pertain exclusively to a single Organization; Organization means a group, company, enterprise, body or institution, or parts and combinations thereof, whether associated or not, public or private, with its own functional and administrative structure. For Organizations with more than one operating unit, each operating unit can be defined as an Organization. 1.5 The requirements provided for in these rules shall also be applicable when the Management System certification is requested under the provisions of the General RINA SIMTEX Rules; in such case, any additional requirement for the management system must be complied with according to these rules. 1.6 The participation of observers shall be agreed in advance between RINA SIMTEX and the Organization. The Accreditation Bodies of RINA SIMTEX may require its observers to take part in the certification audits performed by RINA SIMTEX in order to ascertain whether the audit procedures adopted by RINA SIMTEX comply with the applicable standards for certification 3

4 bodies. If the Organization does not allow the observers of Accreditation Bodies to participate, the certificate issued by RINA SIMTEX Certification Body shall be suspended. 1.7 The terminology used in these Certification Rules complies with SR EN ISO/CEI standard. CHAPTER 2 REFERENCE STANDARD / CERTIFICATION REQUIREMENTS 2.1 Any Organizations wishing to obtain the RINA SIMTEX certification for their Management System must first and henceforth meet the requirements of the reference standard or the regulatory document and those indicated in the following paragraphs of this chapter, together with any additional elements provided by the accreditation bodies. During its accreditation activities, RINA SIMTEX must abide by certain reference documents issued by the Accreditation Bodies. Such documents can be obtained from RINA SIMTEX or directly from the Accreditation Bodies (by visiting their websites, for example). 2.2 In particular, in order to obtain the Management System certification, the Organization must: Have implemented a Management System and kept it active and fully operational, in total compliance with the requirements of the reference standard or regulatory document. The Management System shall be deemed as being fully operational when: it has been implemented for at least three months; the internal audit process was fully implemented and its effectiveness can be demonstrated; at least one management review of the system was carried out and documented, the objectives and processes required to obtain results, in agreement with customer requirements and organization policy, have been defined; the processes were identified, monitoring and measurements of the processes and products with respect to established policies, objectives and requirements were performed and registered; actions for continuous process improvement were implemented Have prepared a manual: defining the goal/scope of the Management System, describing the main system processes and elements and their interactions and containing or referring to the relative documented procedures; the description of the processes and their interactions must be extended to all those identified by the Organization (also to outsourced processes) required to manufacture/provide a product/service that are determining as regards the capacity of the product/service to meet the applicable requirements. This can be done in various ways: descriptions; flow charts or logograms; 4

5 tables and matrices; others; taking into consideration the requirements of the reference standard and providing a description, not necessarily detailed, of the resources and procedures used to ensure compliance with these requirements; containing a suitable description of the company Organization. All the information received from the client Organization shall be treated as confidential. 2.3 The conformity of the Management System with the reference standard shall be checked by means of an audit programme comprising: a two-stage initial certification audit. a surveillance audit in the first year. a surveillance audit in the second year. a certification renewal audit in the third year. The following shall be considered when establishing the audit programme: the size of the Organization, the scope and complexity of the Management System, the products and processes, the level of effectiveness of the Management system and the previous internal audit results, and any certificates already issued to the client or other audits already performed (e.g. second-party audits). CHAPTER 3 INITIAL CERTIFICATION 3.1 Organizations wishing to obtain certification for their Management System must provide RINA SIMTEX Certification Body with their main organisation data and site location by filling in all the sections of the Informative Questionnaire form for quotation, available at and by sending it to RINA SIMTEX, which will use it to prepare a quotation. In particular, the informative questionnaire requires information to be provided on: the scope of requested certification; the standard(s) according to which the Organization wishes to be certified and any admissible exclusions; the general characteristics of the Organization; the number of permanent and temporary sites subject to certification, including the name and addresses of the physical location(s) and the relative activities performed; the company processes and relative dedicated resources; any relationships with other larger companies (if applicable); all processes outsourced by the Organization which may have an effect on the compliance with requirements; any certificates already obtained; the use of any Management System-related consultancy services. Based on this information, RINA SIMTEX shall prepare a suitable quotation. 3.2 Prior to performing the audit, RINA SIMTEX shall make sure that: 5

6 a) there is enough information concerning the applicant Organization and its Management System to perform the audit; b) the certification requirements are clearly established and documented and are submitted to the applicant Organization; c) any difference of interpretation between RINA SIMTEX and the applicant Organization has been removed; d) RINA SIMTEX has the competence and capacity to perform certification activities; 3.3 If Organizations accept the offer, they must formalize their request by submitting to RINA SIMTEX the specific form attached to the offer, indicating the reference standard and, if relevant, any other reference regulatory document according to which certification is sought. Upon receipt of the request for certification and the relative annexes and after making sure they are complete, RINA SIMTEX shall send the Organization the written acceptance of its request. The Organization s request for certification of the Management System, which makes specific mention of these Rules and its acceptance by RINA SIMTEX, shall contractually formalise the relationship between RINA SIMTEX and the Organization, and the applicability of these Rules and the specific rules applicable to the system for which certification is sought. The agreement concluded between RINA SIMTEX and the Organization shall include: the initial certification audit comprising two stages and, if the outcome of the assessment is that of granting the certification, the issue of the certificate; subsequent surveillance and recertification audits; any additional services specified in the offer During the initial certification audit, the Organization must demonstrate that the Management System has been fully operational for at least three months and has been effectively implementing the documented system and procedures. 3.4 Simultaneously with or following the request for certification, the Organization must make the following documents available to RINA SIMTEX: the Organization s Management Manual (current version) referring to the policy, objectives and programmes for the Management System; the list of management system procedures; the copy of the Chamber of Commerce registration certificate attesting the existence of the Organization and the Confirmation issued by the Trade Register or an equivalent document specifying the authorized activity/activities; the organisational chart; the latest Management Review; the internal audit planning; the list of the main laws and/or rules applicable (to the product/service provided) or required for the correct implementation of the Management System; the list of current sites, with a description of the activities performed there, where applicable. 6

7 RINA SIMTEX may also request to review other documents, apart from those previously mentioned, that are deemed relevant for the assessment of the Management System. RINA SIMTEX shall examine the compliance of the above documents with the reference standard and these General Rules. The audit criteria, irrespective of stage, are: - the reference standard; - the Management System documentation (current version); - the legal, regulatory and contractual requirements; - the Regulation regarding the use of the RINA SIMTEX certification logo (except for the initial certification audit) 3.5 The initial certification audit comprises two stages: Audit stage 1, which can be performed: - partly in the RINA SIMTEX office and partly at the Organization s site or - entirely at the Organization s site Audit stage 2 at the Organization s site. During the initial certification audit, the Organization must demonstrate that the Management System has been fully operational for at least three months and has been effectively implementing the relative documented procedures. 3.6 After RINA SIMTEX completed the initial certification audit and if the conclusion hereof was to grant the certification, then a Certificate of Conformity with the reference standard, valid for three years, shall be issued for the Management System in question. The certificate contains the name and address of the company, the address of the operative site(s) included in the certification, the scope of certification, the date of initial issue, the current date of issue and the date of expiry. The validity period of the certificate shall be conditional on the performance of the subsequent annual surveillance and three-year recertification audits of the Management System and the results thereof. The frequency of the subsequent audits for maintaining the certification shall be established by RINA SIMTEX on a case-by-case basis by drawing up an audit plan for the three-year validity period of the certificate, which is to be submitted to the Organization. For details on the management and validity of the Certificates of Conformity issued by RINA SIMTEX, see chapter 7. CHAPTER 4 MAINTAINING THE VALIDITY OF THE CERTIFICATE 4.1 The Organization must ensure its Management System continues to meet the requirements of the Reference Standard or the regulatory document

8 The Organization must record any complaints and the relative corrective actions taken and must make these records available to RINA SIMTEX together with the corrective actions taken to address the nonconformities found during the annual audits (surveillance). 4.3 RINA SIMTEX shall conduct the annual audits of the Management System in order to assess whether it remains compliant with the requirements of the reference standard, according to the methods described in Chapter RINA SIMTEX shall also reserve the right to conduct within the Organization any additional audits to those established in the audit programme for the three-year validity period of the certificate, in the following circumstances: if it receives complaints or reports deemed as particularly relevant with respect to the failure of the Management System to meet the requirements of the reference standard and these General Rules; depending on the complexity of the modifications occurred within the Organization; the certification was suspended. If the Organization rejects, without a justified reason, the performance at the deadline set of the surveillance audits and the additional audits within the time limits set, RINA SIMTEX may decide to suspend/withdraw the certification. If RINA SIMTEX deems the complaints and reports are justified, the additional audit costs shall be incurred by the Organization. 4.5 The validity of the certificate shall be confirmed following the annual surveillance audit, by the decision to maintain the certification system. 4.6 In case of major non-conformities, the Organization shall be subject to an additional audit within the time limits set by RINA SIMTEX in relation to the importance of the nonconformities and, in any case, no more than three months after the end of the audit in order to check the effectiveness of proposed corrections and relative corrective actions. If the major nonconformities are not removed within the set term, RINA SIMTEX may suspend the certification until such major nonconformities are removed, as specified in Chapter 11. All costs relative to any additional audits arising from the shortcomings of the Management System shall be incurred by the Organization. CHAPTER 5 RECERTIFICATION 5.1 For the recertification audit of the Management System conducted every three years, the Organization must contact RINA SIMTEX Certification Body approximately three months before the expiry date of the Certificate of Conformity (as indicated in the audit plan for the validity period of the certificate) in its possession and send the Certification 8

9 Informative Questionnaire (available at in order to allow RINA SIMTEX to schedule the activity and agree on the date of the recertification audit. 5.2 The recertification audit sets out to confirm the maintenance of the conformity and effectiveness of the Management System as a whole and it is mainly based on an audit conducted on the client s site, having, in general, the same objectives as the initial certification audit stage The recertification procedure must be successfully completed before the expiry date indicated on the certificate. This date cannot be extended by RINA SIMTEX. Consequently, the recertification audit must be successfully completed at least one month before the expiry date indicated on the certificate, that is enough time to allow RINA SIMTEX Certification Body to take a decision on recertification and reissue the certificate on the date needed to ensure continuity. If the Organization fails to meet the above deadlines and obtain the certificate before the date of expiry, the certificate must be regarded as expired as of the following day after the expiry date indicated on the certificate. Organizations intending to obtain certification following the expiry of the certificate must submit a new request and, generally, repeat the entire initial certification procedure. 5.4 In case of major nonconformities, the Organization must effectively implement the relative corrections and corrective actions before the expiry date of the Certificate of Conformity. This means that RINA SIMTEX must perform the additional audit to check whether such major nonconformities were removed enough time before the subsequent issue of the certificate. The times set within which the additional audit must be performed shall be indicated in the recertification audit report. The audit team may decide to perform the additional audit on site. All costs relative to any additional audits arising from the shortcomings of the Management System shall be incurred by the Organization. 5.5 Following the completion of the recertification audit with the decision of recertification being taken, RINA SIMTEX shall reissue the Certificate of Conformity. The confirmation by RINA SIMTEX of recertification approval with subsequent issue of the certificate shall be submitted to the Organization in writing. For details on the management and validity of the Certificates of Conformity issued by RINA SIMTEX, see Chapter 7. The failure to perform the recertification audit for maintaining the validity of the certificate shall oblige the Contracting Parties to conduct the surveillance audit for year 3 S3, which is charged at the same value as the surveillance audit for year 2 S2. CHAPTER 6 PERFORMANCE OF THE AUDITS 6.1 GENERAL 9

10 6.1.1 An Audit Plan shall be drawn up for each audit according to the requirements of SR EN ISO/CEI 17021, which is submitted in due time to the client Organization. RINA SIMTEX also uses the Audit Plan to inform the Organization on the names of the auditors and technical experts appointed to perform the audit and the observers names, selected based on the competence required to perform the audit. The Organization may object to the appointment of these auditors provided it gives a justified reason. The audit has the following objectives: a) Determine the compliance of the management systems with the audit criteria for the scope of certification required by the client; b) Evaluate the ability of the management system to ensure the compliance of the client Organization with the applicable statutory, regulatory and contractual requirements; NOTE: A management system certification audit is not an audit of compliance with legal regulations. c) Evaluate the effectiveness of the management system; d) As the case may be, identify the areas for potential improvement of the management system. e) Check the compliance with the laws and regulations applicable to the scope of certification; f) Check that processes and procedures are documented, implemented and kept efficient so as to ensure confidence in the management system of the Organization; g) Check traceability between the Organization s policy, objectives, targets and the outcome achieved; any inconsistencies must be reported to the Organization to enable it to take appropriate measures. The Audit Plan indicates the tasks assigned to each auditor. The structure, policy, processes, records and documents related to the Management System must be reviewed and checked for each Organization To facilitate the performance of the audit, each auditor must be accompanied by a guide appointed by the Organization, who can have the following responsibilities: a) establish contacts and timing for interviews; b) arrange visits to specific parts of the site or the Organization; c) ensure the site safety rules and security procedures are known and observed by the audit team members; d) assist the audit on behalf of the Organization; e) provide the clarifications or information requested by an auditor A report shall be drawn up for each audit indicating any major nonconformities, minor nonconformities and improvement recommendations. A copy of the report shall be sent to the client Organization. RINA SIMTEX shall keep the original report. The Organization may indicate any comments concerning the findings made by RINA SIMTEX auditors in the relative space in the audit report. The contents of this report shall be subsequently confirmed by RINA SIMTEX in writing. If no written communication is received by RINA SIMTEX, the report shall be deemed as confirmed 12 days after the copy was submitted to the Organization. 10

11 6.1.4 After establishing the causes for the major nonconformities identified and documented in the audit report, the Organization must inform RINA SIMTEX on its proposals for correction and corrective action required and the deadlines provided for their implementation within no more than 12 days after the date of the audit. In this respect, the Organization shall fill in the respective fields of the Nonconformity Sheets (on paper or electronic format) drawn up by the audit team members and shall submit them to the RINA SIMTEX office. NOTES: Nonconformity. Failure to meet one or several requirements, a deviation from a standard. Major nonconformity (type A): Failure to meet one or several requirements of the reference standard applicable to the audited management system leading to a situation which raises serious doubts on the capacity of the client s management system to achieve the intended outputs. Minor nonconformity (type B): Failure to meet one or several requirements of the reference standard applicable to the audited management system, which has no effect on its capacity to generate the intended outputs If major nonconformities are found, the Organization shall be bound to establish and implement the appropriate corrections and corrective actions within the set period. The audit team members shall check by an additional audit conducted on the client s site within no later than 3 months after the initial audit the implementation effectiveness of the corrective/preventive actions which led to the removal of the major nonconformities. The certification decision shall only be taken by the Certification Body after all major nonconformities were removed. The implementing effectiveness of the corrections and corrective actions to remove the minor nonconformities found in the initial certification audit shall be checked by the team of the certification body in the first surveillance audit. In case of finding only minor nonconformities in the initial certification audit, the decision to grant the certification may be taken provided that the corrective/preventive actions for such nonconformities are appropriate. All costs relative to any additional audits arising from the shortcomings of the Management System shall be incurred by the Organization. 6.2 THE INITIAL CERTIFICATION AUDIT The initial certification audit shall be conducted in two stages Stage 1 The initial certification audit stage 1 sets out to: - review the Organization s Management System documents; - review the location and special conditions of the client s site and interview the client s staff in order to establish the level of preparedness for audit stage 2; - review the client s understanding of the standard, especially as regards the identification of key performances or significant aspects, processes, objectives and the operation of 11

12 the Management System; - obtain the necessary information concerning the scope of the Management System, the processes and the site(s) of the client, including the relative legal and regulatory aspects and the conformity with the same; - review the allocation of resources for audit stage 2 and agree on the performance details of audit stage 2 with the client; - plan the performance of audit stage 2, acquiring sufficient knowledge on the Management System and the activities performed at the client s office and on its secondary sites, as regards possible significant aspects; - review whether the internal audits and management review have been planned and performed and whether the level of implementation of the Management System proves the client s preparedness for the initial certification audit stage 2. The outcome of audit stage 1 shall be communicated to the Organization by way of submitting the audit stage 1 report which, inter alia, indicates all comments, including those that could be classified as nonconformities (major or minor) during audit stage 2 and therefore regarded as critical for obtaining the certification. The actions undertaken by the Organization to remove these findings shall be, in general, checked during the audit stage 2 referred to in paragraph Any comments classified as critical must be removed before proceeding to stage 2 on the Organization s site; if stage 1 and stage 2 are performed consecutively, stage 2 must be rescheduled and postponed. At least part of stage 1 shall be performed at the Organization s site(s) Stage 2 The initial certification audit stage 2 must be performed within 6 months as of the completion of stage 1; otherwise stage 1 must be repeated. In special cases, RINA SIMTEX may decide to extend this time limit to 12 months. The initial certification audit stage 2 shall be performed at the Organization s site for the purpose of checking the effective implementation of the Management System. Before conducting audit stage 2, RINA SIMTEX shall submit to the Organization s site(s) an audit plan giving a detailed description of the activities and requirements for conducting the audit. If the Organization carries out its activity on more than one operative site, the audit shall be conducted according to the criteria established by RINA SIMTEX and communicated to the Organization. Audit stage 2 shall be performed by qualified RINA SIMTEX auditors, based on the findings of audit stage 1 and the following updated documents drawn up by the Organization: Management System policy; Management System manual; Informative Questionnaire filled in by the Organization; List of internal procedures; Management procedures and other Management System documents; Other specific documents for the correct and effective implementation of the Management System. Audit stage 2 comprises the following main phases: 12

13 an initial meeting with the representatives of the Organization in order to explain and confirm the audit objectives and the audit methods indicated in the audit plan; review the effective implementation of the corrective actions related to the findings identified during audit stage 1; an inspection of the production site(s) of the Organization to check the compliance of the Management System with the reference documents and the applicable legal regulations; a closing meeting to present the conclusion of the evaluation. The objectives of the initial certification audit stage 2 are the following: - information and evidence regarding the compliance with all requirements of the standard applicable to the management system or other informative documents; - monitoring, measuring, reporting and analyzing performance against key objectives and targets (consistent with the expectations of the management system standard or other applicable regulatory documents); - client s performance and management system in terms of compliance with the legislation; - operational control of the client s processes; - internal auditing and management review; - management responsibility for the client s policies; - links between normative requirements, policies, objectives and performance-related targets (consistent with the expectations of the management system standard or other applicable normative documents), any applicable legal requirement, responsibilities, staff competence, operations, procedures, performance data and internal audit findings. If major nonconformities are found, an additional audit must be performed within three months for the purpose of checking the effective implementation of the corrective actions proposed. If the above period is exceeded, the Management System shall be completely reviewed within six months as of the completion date of the initial certification audit stage 2. If the six-month period has elapsed and the Organization still has not removed the major nonconformities, RINA SIMTEX shall reserve the right to definitively close the certification file and claim the expenses incurred up to that moment. In such a case, if the Organization wishes to proceed with the RINA SIMTEX certification, it must submit a new application and repeat the certification procedure. In special cases, the above time limits may be modified at the request of the Organization, if considered justified by RINA SIMTEX. If minor nonconformities are found in step 2, the Organization shall establish appropriate corrective actions. If upon assessing the corrective actions established by the Organization to remove minor nonconformities they are deemed appropriate, the Certification Body shall take the decision to grant the certification. The implementing effectiveness of the corrective actions for the minor nonconformities found shall be checked in the first surveillance audit. 6.3 SURVEILLANCE AUDITS

14 The dates of the surveillance audits shall be agreed with the Organization, provided they are conducted at an interval of no more than 12 months. RINA SIMTEX shall perform periodic audits on the Management System in order to evaluate whether it is maintained compliant with the requirements of the reference standard, at least once every 12 months as of the certification date. The interval within which the audits must be performed shall be indicated in the three-year audit plan which is in the possession of the Organization. This programme may be modified by RINA SIMTEX according to the results of the previous surveillance audits. If the time limits for the surveillance audits are exceeded for justified reasons, this situation must be agreed with RINA SIMTEX in advance and recovered during subsequent audits. In any case, the first surveillance audit following the initial certification must be performed within 12 months as of the last day of the initial certification audit stage 2, the second surveillance audit at 24 months and the recertification at 36 months as of the final date of the initial certification audit stage Surveillance audits shall be performed at the Organization s site(s), according to a three-year programme which enables each item contained in the reference standard according to which the Management System was certified to be audited at least once during the three-year validity of the Certificate, taking into consideration the documents provided in paragraph 3.4. The following targets (aspects) shall be considered during the surveillance audits: a) internal audits and management review; b) review of the action taken as a result of the nonconformities identified during the previous audit; c) handling of complaints; d) effectiveness of the Management System as regards achieving the objectives of the certified client; e) progress of activities planned for continuous improvement; f) continuity of operational control; g) review of any modifications; h) use of logos and/or any other certification reference. The details of the activities and the instructions for performing surveillance audits on site(s) shall be described in the surveillance audit plan which RINA SIMTEX submits to the Organization before performing the audit. 6.4 RECERTIFICATION AUDITS A recertification audit shall be planned and performed for the purpose of assessing whether all requirements of the management system standard or other relevant regulatory documents continue to be met. The recertification audit aims at confirming the continuous conformity and effectiveness of the management system as a whole, as well as its continuous relevance and applicability to the scope of certification. In particular, the recertification audit comprises an on-site audit aiming, inter alia, at the following aspects: - the performance of the Management System during the certification period; 14

15 - a review of the previous surveillance audit reports. If significant modifications were made to the Management System or to the context in which the Management System operates, it may be required to perform the audit stage 1. The recertification audit has the following objectives: a) the effectiveness of the Management System as a whole in the light of internal and external modifications and its continuous relevance and applicability to the scope of certification; b) the commitment proven as maintaining the effectiveness and improving the Management System for the purpose of increasing overall performance; c) the extent to which the activities of the Management System contribute to the achievement of the Organization s policy and objectives. The Certification Body must take the decision to renew the certification based on the results of the certification audit and the results of the system review during the certification period and the complaints received from certification users. CHAPTER 7 MANAGEMENT OF THE CERTIFICATES OF CONFORMITY 7.1 The Certificate of Conformity issued by RINA SIMTEX shall be valid for three years starting from the last day of the initial certification/recertification audit. 7.2 Since the day RINA SIMTEX issues the certificate, this certificate and the three-year audit plan shall be made available to the Organization. The effective date of the certificate must not precede the date of the certification decision The certificate of conformity must identify the following: a) name and geographical location of each client whose management system is certified (or the geographical location of the head office and any site within the scope of multi-site certification); b) granting, extension or renewal dates; c) expiration date or the expected date for recertification, according to the recertification cycle; d) a unique identification code; e) the standard and/or other regulatory document, including the issue and/or revision number, used for the certified client s audit; f) the scope for certification by product (or service), process, etc., as applicable to each location; g) the name, address and certification logo of the Certification Body; other logos can also be used (for example, the accreditation symbol), provided they are not misleading or ambiguous; h) any other information required by the standard and/or other regulatory document used for certification; i) when issuing revised certification documents, a means of distinguishing the revised documents from any previous obsolete documents. 15

16 The validity of the certificate, throughout the three years of validity, shall be maintained according to the results of the subsequent surveillance audits. The Certificate of Conformity shall be reissued following the audit whose conclusion is that of granting the certification/recertification. The validity of the certificate may be suspended, withdrawn or relinquished in accordance with the provisions of Chapters 11 and 12. RINA SIMTEX shall directly publish and update the following on its website a) the list of certified Organizations; b) the validity status of the certificates issued (indicating the valid, suspended or invalid status for each certificate); RINA SIMTEX shall provide information on the reasons for suspending/withdrawing the certificate. CHAPTER 8 AMENDMENT OF CERTIFICATION AND COMMUNICATION OF MODIFICATIONS 8.1 An Organization possessing a certification may request a modification or extension/limitation of the scope by submitting a new request for certification, accompanied by the duly updated documentation indicated in paragraph 3.4. RINA SIMTEX shall reserve the right to examine the requests on a case-by-case basis and to decide the evaluation methods for the purpose of issuing a new certificate according to the GENERAL CONTRACTUAL CONDITIONS GOVERNING MANAGEMENT SYSTEM, PRODUCT AND STAFF CERTIFICATION and the reference standard or a regulatory document for the Management System. 8.2 The Organization must promptly inform RINA SIMTEX of any modifications in factors that may affect the capacity of the Management System to continue to meet the requirements of the reference standard used for certification. This requirement shall refer, for example, to amendments to: a) the legal, commercial, organisational or ownership status; b) the organisation and management (e.g. key managers or technical staff involved in the decision-making process); c) the contact addresses and sites; d) the scope of the activities covered by the certified Management System; e) significant changes to the management system and processes. RINA SIMTEX shall reserve the right to perform additional audits on the Organization if the amendments communicated are deemed particularly significant as regards maintaining the compliance of the Management System with the requirements of the reference standard and these rules or to review the economic conditions for the potential amendment of the contract

17 RINA SIMTEX shall notify promptly the Organization of every amendment in the reference standards or certification rules as a result of updating the Accreditation Body rules. CHAPTER 9 SPECIAL REQUIREMENTS FOR MULTI-SITE ORGANIZATIONS 9.1 If an Organization operates on more than one permanent sites and a single certificate is required, the audit activities shall be performed by sampling the sites subject to audit, provided the following conditions are observed: the processes of all the sites are substantially of the same type and are performed using similar methods and procedures. If different processes are performed on different sites, they must be connected (e.g. the manufacturing of electronic components on one site, the assembly of these components performed by the same Organization on various other sites); the management system is managed and administrated on a central level and reviewed by the central management. The Organization must also prove that the central office has in place a management system compliant with the reference standard and that the entire Organization meets the requirements hereof. In particular, at least the following activities must be managed by the central function of the Organization: - assessment of regulatory requirements; - control and modification of documents; - management review; - handling of complaints; - assessment of the effectiveness of corrective and preventive actions; - planning and execution of internal audits and assessment of results; - existence of different legal requirements. Prior to the initial audit conducted by RINA SIMTEX, the Organization must have performed an internal audit for each site and must have checked the compliance of its management system with the reference standard. 9.2 If the Organization complies with the previous requirements, RINA SIMTEX shall always check the feasibility of sampling in all sites and may decide to limit this sampling depending on: - the requirements related to local variable factors; - the sectors or activities covered by the scope of certification; - the size of the sites suitable for a multi-site audit; - the changes in the local implementation of the management system, such as the need to frequently use in the sphere of the management system the plans concerning different activities or different contractual or regulatory systems; - the use of temporary sites (worksites). 17

18 For Organizations providing services, if not all the sites performing activities subject to certification are prepared to be submitted for certification at the same time, the Organization must notify promptly RINA SIMTEX on which sites it wishes to include in the certification and which sites must be excluded. 9.3 Based on the information provided by the Organization, RINA SIMTEX shall establish the applicable sampling plan. This activity is generally performed during the audit process and may also be performed after the audit is completed at the head office. In any case, RINA SIMTEX shall inform the client on which sites must be included in the sample. 9.4 RINA SIMTEX shall issue a single certificate with the name and address of the head office and the scope. A list of all the sites and the activities they perform to which the certificate refers shall be indicated in an annex or on the certificate. The Organization may be issued with an extract of the certificate for each site covered by certification, provided it indicates the same purpose or a sub-element and includes a clear reference to the main certificate. 9.5 For any nonconformities (major or minor) found on one site during audits, the Organization must assess whether these are due to shortcomings common to more than one site and, if so, it must take corrective/preventive actions both at head office and the other sites. If, instead, the nonconformities (major or minor) and/or comments are not of the same type, the Organization must provide suitable evidence and the reasons for limiting its followup corrective actions. If nonconformities are found even on a single site, the certification process shall be suspended for the entire network of listed sites until such nonconformities have been corrected and, in any case, in accordance with the provisions of paragraph The Organization may not exclude this (these) site(s) from the scope during the certification process to avoid the obstacle created by the existence of nonconformity. 9.6 The Organization must inform RINA SIMTEX of the closure of any site covered by certification. If this information is not communicated, RINA SIMTEX may decide whether or not to proceed according to the provisions of paragraph Additional sites can be included in an existing certificate following surveillance or recertification audits or following specific extension audits. CHAPTER 10 TRANSFER OF ACCREDITED CERTIFICATES 10.1 If an Organization with a valid certificate issued by another Management System Certification Body, a member of the IAF/MLA mutual recognition agreement, wishes to transfer its certification to RINA SIMTEX, it must submit to RINA SIMTEX the Informative 18

19 Questionnaire, according to paragraph 3.1, and a copy of the of Management System Certificate. RINA SIMTEX shall check that: the certificate is valid; the certificate is not suspended; the accreditation of the Certification Body that issued the certificate is not suspended; the client s certified activities fall within the accredited scope of RINA SIMTEX; and shall issue an offer for the transfer of certification, only after having found the Organization s certification was valid. If the Organization accepts the business offer, it must submit to RINA SIMTEX the Request for Certification together with the following documents: copy of the Management System Manual and the list of procedures; copy of the certification audit report or the last recertification audit report and the subsequent surveillance audit reports; evidence of the corrective actions taken in relation to the nonconformities found during the previous audit or evidence of the review, acceptance and verification of effectiveness by the previous Certification Body; the audit programme prepared by the previous Certification Body; the list of any complaints received and the relevant actions taken; the reasons for requesting the transfer of certification; any comments or reports by national or local authorities. The contract between RINA SIMTEX and the applicant shall be managed as indicated in paragraph 3.1, depending on the scope of the auditing activities. After the satisfactory completion of the above activities, a Certificate of Conformity of the management system, which generally maintains the deadline established by the body having issued the previous certificate, shall be issued. In general, the surveillance and recertification audits shall also be conducted according to the plan established by the Organization having issued the previous certificate. CHAPTER 11 SUSPENSION, REINSTATEMENT AND WITHDRAWAL OF CERTIFICATION 11.1 The certification may be suspended as indicated in GENERAL CONTRACTUAL CONDITIONS GOVERNING MANAGMENT SYSTEM, PRODUCT AND STAFF CERTIFICATION and in the following specific cases: if the Organization refuses to allow the scheduled audits to be performed at the frequencies and within the periods set by programme; if nonconformities are found in the management system, which were not removed within the time limits established by RINA SIMTEX; if the Organization fails to meet the deadlines established for the communication of the corrective actions to remove the nonconformities/comments indicated in the audit report; if the Organization made ample changes to its site(s) or moved to another site without informing RINA SIMTEX on such changes; 19

20 if the Organization made changes to its management system that were not accepted by RINA SIMTEX; if the Organization underwent an important restructuring and failed to report it to RINA SIMTEX; if it refuses or obstructs the participation in audits of the observers of an accreditation body; if there is evidence that the Management System does not guarantee the observance of the laws and regulations applicable to the supplied products/services, activity and/or site(s); if any justified and serious complaints received by RINA SIMTEX are confirmed. The Organization may also make a justified request to suspend certification, normally, for no more than six months and under any circumstances after the expiry date of the certificate. This suspension shall be notified in writing, stating the conditions for re-instating certification and the date by which the new conditions are to be complied with. The suspension of the certification shall be made public by RINA SIMTEX directly on the website as indicated in paragraph The reinstatement of certification shall be subject to checking whether the shortcomings having led to suspension were removed. This shall be achieved by means of an audit checking the compliance of the Management System with all the requirements of the reference standard. It shall be notified to the Organization in writing and made public by RINA SIMTEX on its website as established in paragraph The failure to meet the conditions of paragraph 11.2 above by the set date shall lead to the revocation of the Certificate of Conformity. The revocation of the Certificate of Conformity may be decided according to the indications in the GENERAL CONTRACTUAL CONDITIONS GOVERNING MANAGEMENT SYSTEM, PRODUCT AND STAFF CERTIFICATION and in the following specific cases: when there are reasons for suspension, such as those indicated in paragraph 11.1, which are deemed as particularly serious; if the Organization ceases the activities or services covered by the certified Management System for over six months as a rule; if the Organization does not accept the new business conditions established by RINA SIMTEX as a result of an amendment in the contract; for multi-site Organizations, if the head office or one of the sites fails to meet the criteria required to maintain certification; for any other major reason, at RINA SIMTEX discretion, such as the proven incapacity of the system to pursue its objectives regarding the applicable laws in force or the legal contractual or product safety requirements. The withdrawal of the Certificate of Conformity shall be notified in writing to the Organization and/or made public by RINA SIMTEX, as indicated in paragraph

21 Any Organization which, following revocation of its Certificate, wishes to be re-certified, must submit a new application and follow the entire procedure all over again. CHAPTER 12 RENUNCIATION TO CERTIFICATION A certified Organization may submit a formal communication of renunciation to certification to RINA SIMTEX before the expiry of the certificate, including if the Organization does not wish to or cannot comply with the new provisions established by RINA SIMTEX. Upon receipt of this communication, RINA SIMTEX shall initiate the procedure to invalidate the certificate. In general, within one month from the date of the communication, RINA SIMTEX shall update the validity status of the certificate. CHAPTER 13 CONTRACTUAL CONDITIONS As regards the contractual conditions, the provisions of the current edition of the document GENERAL CONTRACTUAL CONDITIONS GOVERNING THE MANAGEMENT SYSTEM, PRODUCT AND STAFF CERTIFICATION shall be applicable. 21

General Rules for the certification of Management Systems

General Rules for the certification of Management Systems General Rules for the certification of Management Systems Effective from 19/11/2015 RINA Via Corsica 12 16128 Genova - Italy tel. +39 010 53851 fax +39 010 5351000 website : www.rina.org Technical rules

More information

Rules for the certification of event sustainability management system

Rules for the certification of event sustainability management system Rules for the certification of event sustainability management system In force from 10/09/2014 RINA Services S.p.A. Via Corsica, 12 16128 Genova Tel. +39 010 53851 Fax +39 010 5351000 E-MAIL: info@rina.org,

More information

Rules for the certification of asset management systems

Rules for the certification of asset management systems Rules for the certification of asset management systems In force from 8/09/2014 RINA Services S.p.A. Via Corsica, 12 16128 Genova Tel. +39 010 53851 Fax +39 010 5351000 E-MAIL: info@rina.org, web: www.rina.org

More information

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems Date(s) of Evaluation: CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems Assessor(s) & Observer(s): Organization: Area/Field

More information

P-01 Certification Procedure for QMS, EMS, EnMS & OHSAS. Procedure. Application, Audit and Certification

P-01 Certification Procedure for QMS, EMS, EnMS & OHSAS. Procedure. Application, Audit and Certification Procedure Application, Audit and Certification Document No. P-01 Version 9.00 Date of Issue Nov 02, 2015 Reviewed & Approved by Name Designation Signature Date Kaushal Goyal Managing Director Nov 02, 2015

More information

Rules for the certification of Food Safety Management Systems

Rules for the certification of Food Safety Management Systems Rules for the certification of Food Safety Management Systems Effective from 19/11/2014 RINA Services S.p.A. Via Corsica, 12-16128 Genova - Italy Tel. +39 01053851 Fax: +39 0105351000 www.rina.org Technical

More information

Rules for the certification of Quality Management Systems

Rules for the certification of Quality Management Systems Rules for the certification of Quality Management Systems Effective from September 15 th, 2015 RINA Via Corsica, 12 16128 Genova - Italy Tel.: +39 01053851 Fax: +39 0105351000 Web site: www.rina.org Technical

More information

Regulations for certification of quality management systems

Regulations for certification of quality management systems Regulations for certification of quality management systems 00 24/04/2013 Annulla e sostituisce il documento Regulations for certification of quality management systems in rev. 14 SG DIR AD Rev. Data Descrizione

More information

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems Certification Services Division Newton Building, St George s Avenue Northampton, NN2 6JB United Kingdom Tel: +44(0)1604-893-811. Fax: +44(0)1604-893-868. E-mail: pcn@bindt.org CP14 ISSUE 5 DATED 1 st OCTOBER

More information

Certification Procedure of RSPO Supply Chain Audit

Certification Procedure of RSPO Supply Chain Audit : 1 of 19 Table of Contents 1. Purpose 2. Scope 3. Unit of Certification 3.1 Identity Preserved, Segregation, Mass Balance, 3.2. Book and Claim 4. Definitions 5. Responsibilities 5.1 Head of the Certification

More information

Rules for the certification of Environmental Management Systems

Rules for the certification of Environmental Management Systems Rules for the certification of Environmental Management Systems Effective from November 19 th, 2015 RINA Via Corsica, 12 16128 Genova - Italy Tel.: +39 01053851 Fax: +39 0105351000 Web site: www.rina.org

More information

Regulations for the certification of environmental management systems in conformity with UNI EN ISO 14001:2004

Regulations for the certification of environmental management systems in conformity with UNI EN ISO 14001:2004 Regulations for the certification of environmental management systems in conformity with UNI EN ISO 14001:2004 00 24/04/2013 Annulla e sostituisce il documento Regulations for the certification of environmental

More information

3 Terms and definitions 3.5 client organization whose management system is being audited for certification purposes

3 Terms and definitions 3.5 client organization whose management system is being audited for certification purposes 3 Terms and definitions 3.4 third-party certification audit audit carried out by an auditing organization independent of the client and the user, for the purpose of certifying the client's management system

More information

Rules for the certification of IT (Information Technology) Service Management Systems

Rules for the certification of IT (Information Technology) Service Management Systems Rules for the certification of IT (Information Technology) Service Management Systems Effective from 1 July 2010 RINA Via Corsica 12 16128 Genova - Italia tel +39 010 53851 fax +39 010 5351000 web site:

More information

TG 47-01. TRANSITIONAL GUIDELINES FOR ISO/IEC 17021-1:2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES

TG 47-01. TRANSITIONAL GUIDELINES FOR ISO/IEC 17021-1:2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES TRANSITIONAL GUIDELINES FOR ISO/IEC 17021-1:2015, ISO 9001:2015 and ISO 14001:2015 CERTIFICATION BODIES Approved By: Senior Manager: Mpho Phaloane Created By: Field Manager: John Ndalamo Date of Approval:

More information

Network Certification Body

Network Certification Body Network Certification Body Scheme rules for assessment of railway projects to requirements of the Railways Interoperability Regulations as a Notified and Designated Body 1 NCB_MS_56 Contents 1 Normative

More information

General Conditions for the Certification of Management System

General Conditions for the Certification of Management System General Conditions for the Certification of Management System The National Standards Authority of Ireland, inc. (hereinafter referred to as NSAI) located at 20 Trafalgar Square Nashua, NH 03063 provides

More information

Certification Regulations and Requirements. International Certification Management GmbH

Certification Regulations and Requirements. International Certification Management GmbH Certification Regulations and Requirements of (ICM) General These Certification Regulations and Requirements apply to the auditing, certification and maintenance of the certification of management systems.

More information

REGULATIONS FOR THE CERTIFICATION OF MANAGEMENT SYSTEMS

REGULATIONS FOR THE CERTIFICATION OF MANAGEMENT SYSTEMS CONTENTS 1. PURPOSE AND SCOPE 2. GENERAL PRINCIPLES AND GUARANTEES FOR THE CLIENT 3. STATUTORY AND REGULATORY REQUIREMENTS AND LEGALITY CONTROL LIMITS 4. ACCESS REQUIREMENTS FOR CERTIFICATION 5. CERTIFICATION

More information

Compliance Management Systems

Compliance Management Systems Certification Scheme Y03 Compliance Management Systems ISO 19600 ONR 192050 Issue V2.1:2015-01-08 Austrian Standards plus GmbH Dr. Peter Jonas Heinestraße 38 A-1020 Vienna, Austria E-Mail: p.jonas@austrian-standards.at

More information

Procedure PS-TNI-001 Information Security Management System Certification

Procedure PS-TNI-001 Information Security Management System Certification Table of Contents 1. Purpose 2. Scope 3. Definitions 4. Responsibilities 4.1 Head of the Certification Body 4.2 QM Manager / Management Representative 4.3 Auditors 4.4 Order Service 4.5 Certification Service

More information

CONTROL PROCESS NATURAL ORIGIN AND ORGANIC CANDLES AND HOME FRAGRANCES

CONTROL PROCESS NATURAL ORIGIN AND ORGANIC CANDLES AND HOME FRAGRANCES TS004(GPA)v03en v25/11/2015 CONTROL PROCESS NATURAL ORIGIN AND ORGANIC CANDLES AND HOME FRAGRANCES The aim of the present document is to describe the key steps of the control process. This document is

More information

AUDITOR GUIDELINES. Responsibilities Supporting Inputs. Receive AAA, Sign and return to IMS with audit report. Document Review required?

AUDITOR GUIDELINES. Responsibilities Supporting Inputs. Receive AAA, Sign and return to IMS with audit report. Document Review required? 1 Overview of Audit Process The flow chart below shows the overall process for auditors carrying out audits for IMS International. Stages within this process are detailed further in this document. Scheme

More information

Translation Service Provider according to ISO 17100

Translation Service Provider according to ISO 17100 www.lics-certification.org Certification Scheme S06 Translation Service Provider according to ISO 17100 Date of issue: V2.0, 2015-11-15 Austrian Standards plus GmbH Dr. Peter Jonas Heinestraße 38 1020

More information

Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification

Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification Copyright, Language, and Version Notice The official language of this [Certification Protocol] is English. The current version of the [Certification Protocol] is maintained on the Bonsucro website: www.bonsucro.com.

More information

Client information note Assessment process Management systems service outline

Client information note Assessment process Management systems service outline Client information note Assessment process Management systems service outline Overview The accreditation requirements define that there are four elements to the assessment process: assessment of the system

More information

EA-7/01. EA Guidelines. on the application. Of EN 45012. Publication Reference PURPOSE

EA-7/01. EA Guidelines. on the application. Of EN 45012. Publication Reference PURPOSE Publication Reference EA-7/01 EA Guidelines on the application Of EN 45012 PURPOSE The purpose of the document is to provide explanations with a view to harmonise the application of ISO/IEC Guide 62/EN

More information

DQS UL ASSESSMENT AND CERTIFICATION REGULATIONS

DQS UL ASSESSMENT AND CERTIFICATION REGULATIONS DQS UL ASSESSMENT AND CERTIFICATION REGULATIONS 1. Certification and Assessment Services 1.1 Scope and Applicability These DQS UL Certification and Assessment Regulations apply to all certification and

More information

SQ 901 Version D. Railway Application Quality Specification REQUIREMENTS FOR THE QUALITY MANAGEMENT SYSTEM AND QUALITY PLAN

SQ 901 Version D. Railway Application Quality Specification REQUIREMENTS FOR THE QUALITY MANAGEMENT SYSTEM AND QUALITY PLAN SQ 901 Version D Railway Application Quality Specification OBTAINING QUALITY OF PRODUCTS PURCHASED BY SNCF REQUIREMENTS FOR THE QUALITY MANAGEMENT SYSTEM AND QUALITY PLAN Issue date March 2004 This English

More information

Frequently Asked Questions. Unannounced audits for manufacturers of CE-marked medical devices. 720 DM 0701-53a Rev 1 2014/10/02

Frequently Asked Questions. Unannounced audits for manufacturers of CE-marked medical devices. 720 DM 0701-53a Rev 1 2014/10/02 Frequently Asked Questions Unannounced audits for manufacturers of CE-marked medical devices 720 DM 0701-53a Rev 1 2014/10/02 What is an unannounced audit?... 6 Are unannounced audits part of a new requirement?...

More information

Specific Conditions for the Assessment of Management Systems and Product Certifications

Specific Conditions for the Assessment of Management Systems and Product Certifications between DQS CFS GmbH, named DQS hereafter, with its contract partner, named the client" hereafter. 1 Assessment of Management Systems and DQS assesses the client s management system, or parts thereof,

More information

Management Systems Recognition Booklet

Management Systems Recognition Booklet Management Systems Recognition Booklet Page 1 of 15 Contents Revision History... 4 Related Documents... 4 1 Management Systems Recognition Booklet... 5 2 Accreditation Status... 5 3 The Recognition Process...

More information

EUROPEAN INSPECTION AND CERTIFICATION COMPANY S.A.

EUROPEAN INSPECTION AND CERTIFICATION COMPANY S.A. EUROPEAN INSPECTION AND CERTIFICATION COMPANY S.A. 89 CHLOIS & LIKOVRISEOS STR. - 144 52 METAMORFOSI TEL: +30 210 6253927, 210 6252495 INTERNET SITE: www.eurocert.gr E-mail: eurocert@otenet.gr FAX: +30

More information

IAF Mandatory Document. Witnessing Activities for the Accreditation of Management Systems Certification Bodies. Issue 1, Version 2 (IAF MD 17:2015)

IAF Mandatory Document. Witnessing Activities for the Accreditation of Management Systems Certification Bodies. Issue 1, Version 2 (IAF MD 17:2015) IAF Mandatory Document Witnessing Activities for the Accreditation of Management Systems Certification Bodies (IAF MD 17:2015) Witnessing Activities for the Accreditation Page 2 of 18 The (IAF) facilitates

More information

INSTITUTE FOR TESTING AND CERTIFICATION, Inc.

INSTITUTE FOR TESTING AND CERTIFICATION, Inc. Manual for ITC Clients Certification of management systems according to international standards ISO 9001:2008,, ISO 13485:2003, ISO 14001:2004 BS OHSAS 18001:2007, ISO 22000:2005, and HACCP according to

More information

Presentation by BSI on the main changes to the IATF ISO/TS 16949 certification scheme

Presentation by BSI on the main changes to the IATF ISO/TS 16949 certification scheme Presentation by BSI on the main changes to the IATF ISO/TS 16949 certification scheme ISO/TS 16949 IATF Scheme rules 4 th edition areas that impact BSI Clients Copyright 2014 BSI. All rights reserved.

More information

Description of the certification procedure MS - ISO 9001, MS - ISO 14001, MS - ISO/TS 29001 and MS OHSAS 18001 and MS ISO 50001

Description of the certification procedure MS - ISO 9001, MS - ISO 14001, MS - ISO/TS 29001 and MS OHSAS 18001 and MS ISO 50001 The certification of a management system based on standard ISO 9001 or ISO 14001 or ISO TS 29001, OHSAS 18001 and ISO 50001 respectively, consists of the offer and contract phase, the audit preparation,

More information

DLS QUALITY MANAGEMENT, INC

DLS QUALITY MANAGEMENT, INC OPERATING PROCEDURES DATE: 03/18/13 Page 1 of 29 CONTENTS Paragraph Page 0.0 Contents... 1-2 1.0 Purpose... 3 2.0 Scope... 3 3.0 References... 3 4.0 Definitions... 4-5 5.0 Discussion... 5 6.0 Procedure...

More information

KINGDOM OF SAUDI ARABIA. Capital Market Authority CREDIT RATING AGENCIES REGULATIONS

KINGDOM OF SAUDI ARABIA. Capital Market Authority CREDIT RATING AGENCIES REGULATIONS KINGDOM OF SAUDI ARABIA Capital Market Authority CREDIT RATING AGENCIES REGULATIONS English Translation of the Official Arabic Text Issued by the Board of the Capital Market Authority Pursuant to its Resolution

More information

Document Reference APMG 15/015

Document Reference APMG 15/015 Information technology service management Requirements for bodies providing audit and certification of IT service management systems under the APMG Certification Scheme Document Reference APMG 15/015 Introduction

More information

FAMI-QS Certification Rules for Operators. Rules for Operators

FAMI-QS Certification Rules for Operators. Rules for Operators Rules for Operators TABLE OF CONTENTS 1. Application for certification and FAMI QS associate membership...2 2. Assessment of operators...3 2.1. Audit planning...3 2.2. Frequency of audits and re certification...5

More information

PSC 05T REGULATION FOR THE CERTIFICATION OF THE ISO TS 16949 MANAGEMENT SYSTEM CONTENTS 1. PURPOSE AND SCOPE OF APPLICATION

PSC 05T REGULATION FOR THE CERTIFICATION OF THE ISO TS 16949 MANAGEMENT SYSTEM CONTENTS 1. PURPOSE AND SCOPE OF APPLICATION CONTENTS 1. PURPOSE AND SCOPE OF APPLICATION 2. GENERAL PRINCIPLES AND GUARANTEES FOR THE CUSTOMER 3. ASSESSMENT REQUIREMENTS 4. STATUTORY AND REGULATORY REQUIREMENTS AND CONTROL LIMITS OF LEGALITY 5.

More information

TERMS AND CONDITIONS FOR THE NATIONAL MANAGEMENT SYSTEMS CERTIFICATION SCHEME

TERMS AND CONDITIONS FOR THE NATIONAL MANAGEMENT SYSTEMS CERTIFICATION SCHEME TERMS AND CONDITIONS FOR THE NATIONAL MANAGEMENT SYSTEMS CERTIFICATION SCHEME CONTENTS Page 1 Introduction 2 2 Definitions 3 3 Certification Services 5 4 Certificates of Registration 5 5 Obligations of

More information

Canadian Grain Commission

Canadian Grain Commission Canadian Grain Commission Certification of an Identity Preserved and/or HACCP-Based Food Safety Program (CIPRS, CIPRS+HACCP, CGC HACCP) CGC QSP 1.1.0 Uncontrolled Copy Canadian Grain Commission Process

More information

REQUIREMENTS FOR CERTIFICATION BODIES TO DETERMINE COMPLIANCE OF APPLICANT ORGANIZATIONS TO THE MAGEN TZEDEK SERVICE MARK STANDARD

REQUIREMENTS FOR CERTIFICATION BODIES TO DETERMINE COMPLIANCE OF APPLICANT ORGANIZATIONS TO THE MAGEN TZEDEK SERVICE MARK STANDARD REQUIREMENTS FOR CERTIFICATION BODIES TO DETERMINE COMPLIANCE OF APPLICANT ORGANIZATIONS TO THE MAGEN TZEDEK SERVICE MARK STANDARD Foreword The Magen Tzedek Commission has established a standards and certification

More information

Conformity assessment Requirements for bodies providing audit and certification of management systems

Conformity assessment Requirements for bodies providing audit and certification of management systems BRITISH STANDARD Conformity assessment Requirements for bodies providing audit and certification of management systems The European Standard has the status of a British Standard ICS 03.120.20 BS EN ISO/IEC

More information

KINGDOM OF SAUDI ARABIA. Capital Market Authority CREDIT RATING AGENCIES REGULATIONS

KINGDOM OF SAUDI ARABIA. Capital Market Authority CREDIT RATING AGENCIES REGULATIONS KINGDOM OF SAUDI ARABIA Capital Market Authority CREDIT RATING AGENCIES REGULATIONS English Translation of the Official Arabic Text Issued by the Board of the Capital Market Authority Pursuant to its Resolution

More information

GENERAL OPERATIONS MANUAL FOR ASTM PRODUCT CERTIFICATION PROGRAM

GENERAL OPERATIONS MANUAL FOR ASTM PRODUCT CERTIFICATION PROGRAM GENERAL OPERATIONS MANUAL FOR ASTM PRODUCT CERTIFICATION PROGRAM INTERNATIONAL Standards Worldwide Issued September 25, 2012 Version 5.0 BY AMERICAN SOCIETY FOR TESTING AND MATERIALS INTERNATIONAL ASTM

More information

IAF Mandatory Document for the Transfer of Accredited Certification of Management Systems

IAF Mandatory Document for the Transfer of Accredited Certification of Management Systems IAF MD 2:2007. International Accreditation Forum, Inc. IAF Mandatory Document IAF Mandatory Document for the Transfer of Accredited Certification of Management Systems (IAF MD 2:2007) IAF MD2:2007 International

More information

UL s Medical Quality Management System Registration

UL s Medical Quality Management System Registration UL s Medical Quality Management System Registration Program Requirements 00-MB-C0032 10.0 7.0 Revised: 2011/6/09 At of the date of issuance of this document, UL LLC. is accredited by the following Accreditation

More information

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism 2009-2014

Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism 2009-2014 the European Economic Area (EEA) Financial Mechanism 2009-2014 adopted by the EEA Financial Mechanism Committee pursuant to Article 8.8 of Protocol 38b to the EEA Agreement on 13 January 2011 and confirmed

More information

Australian Transport Council. National Standard for the Administration of Marine Safety SECTION 5

Australian Transport Council. National Standard for the Administration of Marine Safety SECTION 5 Australian Transport Council National Standard for the Administration of Marine Safety SECTION 5 APPROVAL AND AUDITING OF REGISTERED TRAINING ORGANISATIONS August 2008 First Published: August 2008 Endorsed

More information

Certification Manual. Fair Trade USA V2.0 English Version. SCS Global Services Manual

Certification Manual. Fair Trade USA V2.0 English Version. SCS Global Services Manual SCS Global Services Manual Certification Manual Fair Trade USA V2.0 English Version 2000 Powell Street, Ste. 600, Emeryville, CA 94608 USA +1.510.452.8000 main +1.510.452.8001 fax www.scsglobalservices.com

More information

1 SUBJECT AND FIELD OF APPLICATION... 1 2 SPECIAL RULES CERTIFICATION ACCORDING TO THE STANDARDS EN 9100 EN 9110 EN 9120... 1

1 SUBJECT AND FIELD OF APPLICATION... 1 2 SPECIAL RULES CERTIFICATION ACCORDING TO THE STANDARDS EN 9100 EN 9110 EN 9120... 1 1 SUBJECT AND FIELD OF APPLICATION... 1 2 SPECIAL RULES CERTIFICATION ACCORDING TO THE STANDARDS EN 9100 EN 9110 EN 9120... 1 1 SUBJECT AND FIELD OF APPLICATION This document constitutes the special regulations

More information

ISO 14001 Registration Guidance Document

ISO 14001 Registration Guidance Document Introduction ISO 14001 Registration Guidance Document ISO 14001:2004 emphasizes the continuous improvement of an environmental management system (EMS). The standard specifies requirements for an environmental

More information

Voluntary Certification Scheme for Traditional Health Practitioner

Voluntary Certification Scheme for Traditional Health Practitioner ANNEX-3 Voluntary Certification Scheme for Traditional Health Practitioner 0. Introduction 0.1 This document defines the criteria to be followed by the bodies certifying persons against specific requirements,

More information

Raad voor Accreditatie (Dutch Accreditation Council RvA) Assessment of Conformity Assessment Schemes

Raad voor Accreditatie (Dutch Accreditation Council RvA) Assessment of Conformity Assessment Schemes Raad voor Accreditatie (Dutch Accreditation Council RvA) Assessment of Conformity Assessment Schemes Document code: RvA-T033-UK Version 3, 28 februari 2014 A Rv A-Explanatory note describes the policy

More information

DQS UL ASSESSMENT AND CERTIFICATION REGULATIONS

DQS UL ASSESSMENT AND CERTIFICATION REGULATIONS DQS UL ASSESSMENT AND CERTIFICATION REGULATIONS 1. Assessment and Certification Services 1.1 Scope and Applicability These DQS UL Assessment and Certification Regulations apply to all assessment and certification

More information

GUIDELINES FOR FOOD IMPORT CONTROL SYSTEMS

GUIDELINES FOR FOOD IMPORT CONTROL SYSTEMS GUIDELINES FOR FOOD IMPORT CONTROL SYSTEMS SECTION 1 SCOPE CAC/GL 47-2003 1. This document provides a framework for the development and operation of an import control system to protect consumers and facilitate

More information

SCS FSC Chain-of-Custody Guidance for Certification of Multiple Sites

SCS FSC Chain-of-Custody Guidance for Certification of Multiple Sites 2000 Powell Street, Ste. 600 Emeryville, CA 94608 USA +1.510.452.8000 main +1.510.452.8001 fax www.scsglobalservices.com SCS FSC Chain-of-Custody Guidance for Certification of Multiple Sites Table of Contents

More information

UL Qualified Firestop Contractor Program Requirements April 2012

UL Qualified Firestop Contractor Program Requirements April 2012 UL Qualified Firestop Contractor Program Requirements April 2012 For more information, please contact your local UL Field Representative INTRODUCTION: In order for a firestop systems installer/contractor

More information

Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014

Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014 Regulation on the implementation of the Norwegian Financial Mechanism 2009-2014 adopted by the Norwegian Ministry of Foreign Affairs pursuant to Article 8.8 of the Agreement between the Kingdom of Norway

More information

Manual for ITC Clients

Manual for ITC Clients Manual for ITC Clients Certification of management systems according to international standards ISO 9001:2008, ISO 13485:2003, EN ISO 13485:2012, ISO 14001:2004,BS OHSAS 18001:2007, ISO 22000:2005. Validity

More information

Certification Process Requirements

Certification Process Requirements SAAS Certification Process Requirements SAAS Procedure 200 and ISO/IEC 17021 Social Accountability Accreditation Services, June 2010 Accreditation Process and Policies SAAS Normative Requirements SAAS

More information

ISO/TS 16949:2002 Guidance Document

ISO/TS 16949:2002 Guidance Document ISO/TS 16949:2002 Guidance Document Introduction ISO/TS 16949:2009 emphasizes the development of a process oriented quality management system that provides for continual improvement, defect prevention,

More information

Trading Rules of the Georgian Stock Exchange

Trading Rules of the Georgian Stock Exchange A p p r o v e d : by the General Meeting of JSC Georgian Stock Exchange Minutes # 4, September 26, 1999 Changes and amendments are made: by the Supervisory Board of JSC Georgian Stock Exchange Minutes

More information

of 28 September 2007 (Status as of 1 April 2010)

of 28 September 2007 (Status as of 1 April 2010) English is not an official language of the Swiss Confederation. This translation is provided for information purposes only and has no legal force. Ordinance on Data Protection Certification (DPCO) 235.13

More information

HKCAS Supplementary Criteria No. 8

HKCAS Supplementary Criteria No. 8 Page 1 of 12 HKCAS Supplementary Criteria No. 8 Accreditation Programme for Information Security Management System (ISMS) Certification 1 INTRODUCTION 1.1 HKAS accreditation for information security management

More information

Monitoring requirements and global quality assurance

Monitoring requirements and global quality assurance Monitoring requirements and global quality assurance In applying for or renewing any ACCA certificate or licence, practitioners undertake to supply all information necessary to enable ACCA to carry out

More information

Specific Conditions for the Assessment of Management System and Product Certifications

Specific Conditions for the Assessment of Management System and Product Certifications between DQS CFS GmbH, named DQS hereafter, with its contract partner, named client" hereafter. 1 Assessment of Management Systems and DQS assesses the client s management system, or parts thereof, with

More information

QUALITY SYSTEM REQUIREMENTS FOR PHARMACEUTICAL INSPECTORATES

QUALITY SYSTEM REQUIREMENTS FOR PHARMACEUTICAL INSPECTORATES PHARMACEUTICAL INSPECTION CONVENTION PHARMACEUTICAL INSPECTION CO-OPERATION SCHEME PI 002-3 25 September 2007 RECOMMENDATION ON QUALITY SYSTEM REQUIREMENTS FOR PHARMACEUTICAL INSPECTORATES PIC/S September

More information

WESTERN AUSTRALIA HEAVY VEHICLE ACCREDITATION SCHEME (WAHVAS) BUSINESS RULES (DRAFT)

WESTERN AUSTRALIA HEAVY VEHICLE ACCREDITATION SCHEME (WAHVAS) BUSINESS RULES (DRAFT) WESTERN AUSTRALIA HEAVY VEHICLE ACCREDITATION SCHEME (WAHVAS) BUSINESS RULES (DRAFT) June 2015 DRAFT v1.3 Remove on final Contents 1. BUSINESS RULES OVERVIEW 3 1.1 Purpose 3 1.2 Legal Status of the Business

More information

Scheme Document. How could it be used to assess a multi-tenanted asset?

Scheme Document. How could it be used to assess a multi-tenanted asset? Page: 1 of 21 1 DOCUMENT DETAILS Scope To formalise BREEAM In-Use operating procedures between BRE Global Ltd, BREEAM In- Use Clients and BREEAM In-Use Auditors. This document is applicable to UK and International

More information

Disciplinary Policy and Procedure

Disciplinary Policy and Procedure Disciplinary Policy and Procedure Policy The success of the University is dependent on its most important resource, its staff. It is therefore vital that all employees are encouraged to work to the best

More information

Accredited Retail Certification Program (RCP ) Procedure for Certification

Accredited Retail Certification Program (RCP ) Procedure for Certification Accredited Retail Certification Program (RCP ) Procedure for Certification About UL UL is a premier global independent safety science company that has championed progress for 120 years. Its more than 10,000

More information

LIFEMARK VILLAGE SCHEME RULES A SIX-PILLAR QUALITY ASSURED RETIREMENT COMMUNITY

LIFEMARK VILLAGE SCHEME RULES A SIX-PILLAR QUALITY ASSURED RETIREMENT COMMUNITY LIFEMARK VILLAGE SCHEME RULES A SIX-PILLAR QUALITY ASSURED RETIREMENT COMMUNITY Version 8.0: July 2013 Contents 1. Definitions... 1 2. Introduction... 4 3. Purpose, objectives and scope of the Scheme...

More information

Spillemyndigheden s Certification Programme Change Management Programme

Spillemyndigheden s Certification Programme Change Management Programme SCP.06.00.EN.1.0 Table of contents Table of contents... 2 1 Objectives of the change management programme... 3 1.1 Scope of this document... 3 1.2 Version... 3 2 Certification... 4 2.1 Certification frequency...

More information

EA IAF/ILAC Guidance. on the Application of ISO/IEC 17020:1998

EA IAF/ILAC Guidance. on the Application of ISO/IEC 17020:1998 Publication Reference EA IAF/ILAC-A4: 2004 EA IAF/ILAC Guidance on the Application of ISO/IEC 17020:1998 PURPOSE This guidance document is for ISO/IEC 17020: General Criteria for the operation of various

More information

Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables

Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables (1987) Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables 1. General 1.1 Introduction 1.1.1 The present guidelines are to serve as a supplement to the IACS

More information

Terms and Conditions of Certification TUV Rheinland of North America

Terms and Conditions of Certification TUV Rheinland of North America Terms Conditions of Certification TUV Rheinl of North America I. General Terms Conditions of Certification 1. Scope 1.1 These Terms Conditions of Certification apply to the agreed certification services

More information

AGREEMENT ON TECHNICAL BARRIERS TO TRADE. Having regard to the Uruguay Round of Multilateral Trade Negotiations;

AGREEMENT ON TECHNICAL BARRIERS TO TRADE. Having regard to the Uruguay Round of Multilateral Trade Negotiations; Page 117 AGREEMENT ON TECHNICAL BARRIERS TO TRADE Members, Having regard to the Uruguay Round of Multilateral Trade Negotiations; Desiring to further the objectives of GATT 1994; Recognizing the important

More information

International Requirements for Organic Certification Bodies (IROCB)

International Requirements for Organic Certification Bodies (IROCB) International Requirements for Organic Certification Bodies (IROCB) ii International Requirements for Organic Certification Bodies (IROCB) An initiative of the United Nations Conference on Trade and Development

More information

SCOPE OF APPLICATION AND DEFINITIONS

SCOPE OF APPLICATION AND DEFINITIONS Unofficial translation No. 398/1995 Act on Foreign Insurance Companies Issued in Helsinki on 17 March 1995 PART I SCOPE OF APPLICATION AND DEFINITIONS Chapter 1. General Provisions Section 1. Scope of

More information

Electronic Documents Law

Electronic Documents Law Disclaimer: The English language text below is provided by the Translation and Terminology Centre for information only; it confers no rights and imposes no obligations separate from those conferred or

More information

RSPO Supply Chain Certification Systems

RSPO Supply Chain Certification Systems RSPO Supply Chain Certification Systems November 2009 Approved by RSPO Executive Board 5 November 2009 1 History of Document These RSPO Supply Chain Certification Systems are based on the outcome of the

More information

ETSI EN 319 403 V2.2.2 (2015-08)

ETSI EN 319 403 V2.2.2 (2015-08) EN 319 403 V2.2.2 (2015-08) EUROPEAN STANDARD Electronic Signatures and Infrastructures (ESI); Trust Service Provider Conformity Assessment - Requirements for conformity assessment bodies assessing Trust

More information

Asset Management Systems Scheme (AMS Scheme)

Asset Management Systems Scheme (AMS Scheme) Joint Accreditation System of Australia and New Zealand Scheme (AMS Scheme) Requirements for bodies providing audit and certification of 13 April 2015 Authority to Issue Dr James Galloway Chief Executive

More information

Guideline on good pharmacovigilance practices (GVP)

Guideline on good pharmacovigilance practices (GVP) 22 June 2012 EMA/541760/2011 Guideline on good pharmacovigilance practices (GVP) Module I Pharmacovigilance systems and their quality systems Draft finalised by the Agency in collaboration with Member

More information

EXAM PREPARATION GUIDE

EXAM PREPARATION GUIDE EXAM PREPARATION GUIDE PECB Certified ISO 9001 Lead Auditor The objective of the Certified ISO 9001 Lead Auditor examination is to ensure that the candidate possesses the needed expertise to audit a Quality

More information

Issue No. 02 BOBS May, 2008 Effective Date: 2008-06-01 UNCONTROLLED WHEN DOWNLOADED/PRINTED

Issue No. 02 BOBS May, 2008 Effective Date: 2008-06-01 UNCONTROLLED WHEN DOWNLOADED/PRINTED Page 1 of 7 Page 2 of 7 1. Purpose The purpose of this procedure is to ensure that enquiries on management system certification, the certification process and subsequent surveillance audits of companies

More information

COMMISSION REGULATION (EU)

COMMISSION REGULATION (EU) L 122/22 Official Journal of the European Union 11.5.2011 COMMISSION REGULATION (EU) No 445/2011 of 10 May 2011 on a system of certification of entities in charge of maintenance for freight wagons and

More information

FINAL DOCUMENT. Guidelines for Regulatory Auditing of Quality Management Systems of Medical Device Manufacturers Part 1: General Requirements

FINAL DOCUMENT. Guidelines for Regulatory Auditing of Quality Management Systems of Medical Device Manufacturers Part 1: General Requirements GHTF/SG4/N28R4:2008 FINAL DOCUMENT Title: Guidelines for Regulatory Auditing of Quality Management Systems of Medical Device Manufacturers Authoring Group: GHTF Study Group 4 Endorsed by: The Global Harmonization

More information

DIVISION OF CORPORATIONS, BUSINESS AND PROFESSIONAL LICENSING

DIVISION OF CORPORATIONS, BUSINESS AND PROFESSIONAL LICENSING Statutes and Regulations Public Accountancy October 2014 (Centralized Statutes and Regulations not included) DEPARTMENT OF COMMERCE, COMMUNITY, AND ECONOMIC DEVELOPMENT DIVISION OF CORPORATIONS, BUSINESS

More information

General Regulations. Part Ⅱ - Quality Management System Rules ENGLISH VERSION 5.0

General Regulations. Part Ⅱ - Quality Management System Rules ENGLISH VERSION 5.0 General Regulations Part Ⅱ - Quality Management System Rules ENGLISH VERSION 5.0 VALID FROM: 1 JULY 2015 OBLIGATORY FROM: 1 JULY 2016 TABLE OF CONTENTS 1. LEGALITY, ADMINISTRATION AND STRUCTURE... 3 1.1

More information

Aerospace Guidance Document

Aerospace Guidance Document Aerospace Guidance Document Introduction AS9100, AS9110 and AS9120 all include ISO 9001:2008 registration and specify additional requirements for a quality management system for the aerospace industry.

More information

23. The quality management system

23. The quality management system 23. The quality management system Version 2.0 On this page: Mandatory requirements: Extracts from the HFE Act Extracts from licence conditions HFEA guidance: Definition of the quality management system

More information

FSSC 22000. Certification scheme for food safety systems in compliance with ISO 22000: 2005 and technical specifications for sector PRPs PART I

FSSC 22000. Certification scheme for food safety systems in compliance with ISO 22000: 2005 and technical specifications for sector PRPs PART I FSSC 22000 Certification scheme for food safety systems in compliance with ISO 22000: 2005 and technical specifications for sector PRPs PART I REQUIREMENTS FOR ORGANIZATIONS THAT REQUIRE CERTIFICATION

More information

Application of ISO/IEC 17011 for the Accreditation of Food Safety Management Systems (FSMS) Certification Bodies

Application of ISO/IEC 17011 for the Accreditation of Food Safety Management Systems (FSMS) Certification Bodies IAF Mandatory Document Application of ISO/IEC 17011 for the Accreditation of Food Safety Management Systems (FSMS) Certification Bodies (IAF MD 16:2015) Version 2 Food Safety Management Systems (FSMS)

More information

1.1 The following words and expressions have the following meanings, unless they are inconsistent with the context:

1.1 The following words and expressions have the following meanings, unless they are inconsistent with the context: Terms and Conditions 1 Interpretation 1.1 The following words and expressions have the following meanings, unless they are inconsistent with the context: Applicant means a company or business registered

More information

The certification process

The certification process TS004(COS)v01 The certification process for COSMOS standard Standard in force available on www.cosmos-standard.org or sent on request. 1 Contents I. When to apply... 3 II. The different steps in the certification

More information