1 Descriptions of Function

Size: px
Start display at page:

Download "1 Descriptions of Function"

Transcription

1 Utility Use Case #3 (residential and commercial) implements system and responds to signals from the utility (using ) 1 Descriptions of Function 1.1 Function Name Date , Version 1.11 implements system and responds to signals from the utility. 1.2 Function ID L Brief Description This use case will describe the process to allow a Utility s to implement a system and respond to the signals from the utility. Scenario 1 - Utility, responding to a variety of drivers (eg. CO2, feeder loading, etc.), sends dynamic pricing signals to influence a customer s response. (Peak Shaving). Scenario 2 - Utility, responding to a variety of drivers (eg. CO2, feeder loading, etc.), sends signals to request a customer s response or disconnect service. (Reliability Driven). 1.4 Narrative is becoming aware of the importance of understanding how much energy they are using and when it is being used. Many customers want to understand how their energy consumption habits affect their monthly energy bills and to find ways to reduce their monthly energy costs. By providing the better visibility to their energy usage and cost at their site, they can make more educated energy related decisions regarding participation in load reduction programs, be more inclined to install energy efficient systems and potentially change their energy consumption habits. will be able to view more detailed energy use information based on daily and potentially near real time meter read. UC-3 Version 1.11.doc 1 December 15, 2009

2 With a utility infrastructure, there are multiple avenues for the utility to provide information on energy use as well as alerts and updates as well as control signals. Technologies such as in home displays, the Internet, cell phones, , and text messaging can be used to alert the based on their desire for information and comfort level for taking action with that information. types of messages the utility could send include energy conservation alerts or tips, planned outage information, pricing information, and other energy related information. information can also be used by in home automation or commercial/industrial building automation to make decisions based on preference and take action based on control system programming. At the residential level, this may allow the to benefit by shifting or reducing energy usage autonomously, making for a more consistent and convenient savings. Within the commercial and industrial space, building controls interacting with modern control systems can be used to alter consumption, store energy. Utility s Rates & Tariffs determines dynamic retail price and sends updates to the. responds. system measures response providing data to the t. t sends the updated pricing information or the demand response requirements necessary based on the system event through the meter communications network to the Meter. Building Automation (commercial/industrial) or Home Area receives dynamic pricing or demand response system event signal from the Utility and performs optimizations on the best mix of actions to be taken based on the customer s criteria. Home Area or commercial Building Control acknowledges receipt of signal and verifies if action (demand response - load control) has taken place to the t. t passes the responses back to the Service/Billing, compiling them and feeding them back to Operations. Scenario 1 sending dynamic pricing signals Utility, responding to a variety of drivers (eg. CO2, feeder loading, etc.), sends dynamic pricing signals to influence a customer s response. Scenario 2 sending dynamic pricing signals reliability driven Utility, responding to a variety of drivers (eg. CO2, feeder loading, etc.), sends signals to request a customer s response or disconnect service. (Reliability Driven). UC-3 Version 1.11.doc 2 December 15, 2009

3 Utility s Rates & Tariffs determines dynamic retail price and sends updates to the. responds. system measures response providing data to the t. t sends the updated pricing information or the demand response requirements necessary based on the system event through the meter communications network to the Meter. Building Automation (commercial/industrial) or Home Area receives dynamic pricing or demand response system event signal from the Utility and performs optimizations on the best mix of actions to be taken based on the customer s criteria. Home Area or commercial Building Control acknowledges receipt of signal and verifies if action (demand response - load control) has taken place to the t. t passes the responses back to the Service/Billing, compiling them and feeding them back to Operations. 1.5 Actor (Stakeholder) Roles Describe all the people (their job), systems, databases, organizations, and devices involved in or affected by the Function (e.g. operators, system administrators, technicians, end users, service personnel, executives, SCADA system, real-time database, RTO, RTU, IED, power system). Typically, these actors are logically grouped by organization or functional boundaries or just for collaboration purpose of this use case. We need to identify these groupings and their relevant roles and understand the constituency. same actor could play different roles in different Functions, but only one role in one Function. If the same actor (e.g. the same person) does play multiple roles in one Function, list these different actor-roles as separate rows. Grouping (Community), Actors Functioning from s s. Group Description Actors that perform their specific functions from the customer s premises. Actor Name Home Area Actor Type (person, device, system etc.) Actor Description HAN. Any side (to include commercial and residential customers) automation that can make use of utility signals to affect energy usage within the premises will be considered as the Home Area for this project. Home Area can affect DER, lighting, security, etc. Utility will not own Home Area. UC-3 Version 1.11.doc 3 December 15, 2009

4 Grouping (Community), Actors Functioning from s s. Group Description Actors that perform their specific functions from the customer s premises. Actor Name Actor Type (person, device, system Actor Description etc.) t CEMS. owned premise system which interfaces with the Home Area and the to provide services for load management and distributed generation. Additionally, may provide the ability to control owned equipment independent of the. Person Residential or commercial energy user that has a contract with the utility to receive electrical service from the utility and have an meter installed. participates in programs provided by the utility including pricing events, load control or distributed generation. Receives pricing and event information from the. Pre-programs responses to events into their load controllers). Needs to reduce their load throughout the event to reduce energy costs or receive financial benefit. Renewable Credit Meter Control Equipment Device Device REC Meter. Renewable Credit Meter is a revenue grade meter used to measure the energy supplied by owned Generation. Renewable Credit Meter information is recorded and forwarded to the PV Program Manager. Advanced electric revenue meter capable of two-way communications with the utility. A device that serves as a gateway between the utility, site, and load controllers of the. meter measures, records, displays, and transmits data such as energy usage, generation, text messages, event logs, etc. to authorized systems (i.e., the t ) and provides other advanced utility functions. Switches loads on or off or reduces load in response to events communicated by the system (Meter). Needs to follow the preprogrammed rules. E.g. smart thermostat. UC-3 Version 1.11.doc 4 December 15, 2009

5 Grouping (Community), Actors Functioning from s s. Group Description Actors that perform their specific functions from the customer s premises. Actor Name Actor Type (person, device, system Actor Description etc.) (residential) Display Device Meter Device Device Display device that receives energy and event information from the and presents it to the. Meter is a bi-directional revenue grade meter used to measure energy supplied by the Generation or used by the. Advanced electric revenue meter capable of two-way communications with the utility. A device that serves as a gateway between the utility, site, and load controllers of the. meter measures, records, displays, and transmits data such as energy usage, generation, text messages, event logs, etc. to authorized systems (i.e., the t ) and provides other advanced utility functions. Meter Device Advanced electric revenue meter capable of two-way communications with the utility. A device that serves as a gateway between the utility, site, and load controllers. meter measures, records, displays, and transmits data such as energy usage, generation, text messages, event logs, etc. to authorized systems (i.e., the t ) and provides other advanced utility functions. is one of the communications radios that could be under glass of the Meter. (re are two radios built in to the Meter. One is for the and is a longer range radio. other is for the and it has a smaller range.) This is the communication resource to the Inverter and the Home Area (if available). UC-3 Version 1.11.doc 5 December 15, 2009

6 Grouping (Community), Actors Functioning from s s. Group Description Actors that perform their specific functions from the customer s premises. Actor Name Actor Type (person, device, system Actor Description etc.) Inverter Predefined Profile Device Equipment at the site belonging to the that can be used for control of DG real and reactive power output. completes a profile upon installation that will determine how the premise will function under different circumstances (pricing, etc.). This profile is programmed into the t. Replicate this table for each logic group. Grouping (Community), Utility Actors. Group Description Actors that perform their specific functions as a part of the Utility. Actor Name Actor Type (person, device, system etc.) Actor Description Utility Host utility. t MDMS. that gathers, validates, estimates and permits editing of meter data such as energy usage, generation, and meter logs. It stores this data for a limited amount of time before it goes to a data warehouse (Meter Data Archive), and makes this data available to authorized systems and authorized personnel. and Control DRAACS. and subsystems responsible for maintaining an estimate, with a known precision, of how much resource is available for dispatch. is also responsible for accepting requests for blocks of energy and/or capacity and implementing that request by issuing load control requests. UC-3 Version 1.11.doc 6 December 15, 2009

7 Grouping (Community), Utility Actors. Group Description Actors that perform their specific functions as a part of the Utility. Actor Name Actor Type (person, device, system Actor Description etc.) Grid Control Center Information Service Representative Person contains an optimization function that can determine the optimal set to request curtailment from based upon a variety of factors/parameters, including the size and location of the desired (DR) resource. and Control is expected to track the "as implemented" response to load control requests and issue additional load reduction requests to selected sets until authorized load reduction target is met. uses measured responses to load demand requests to refine its internal model. Note: Any in use today may be parts of other systems being used. No platform exists to bring it into an operational tool today. GCC. Grid Control Center controls grid operations through the t, SCADA and t in the control area. Grid Control Center will communicate to grid operators to ensure grid reliability and also sends signals. CIS. Maintains contact information, calculates and formats bills, receives, and applies payments for individual accounts. system is responsible for storing information such as site data, meter number, rates, and program participation. CSR. Staff employed by the utility who respond to complaints, to outage notifications, or to requests to activate, modify and/or terminate delivery of service. Service Representatives also enroll a in utility sponsored programs and answer questions related to the energy consumption and cost data of the. Many off-cycle reading, UC-3 Version 1.11.doc 7 December 15, 2009

8 Grouping (Community), Utility Actors. Group Description Actors that perform their specific functions as a part of the Utility. Actor Name Actor Type (person, device, system Actor Description etc.) t t billing, work orders and diagnostics requests are initiated by the Service Representative in response to contact. NMS. t is the utility back office system that is responsible for remote two-way communications with the Meters to retrieve data and execute commands. t has the responsibility to balance load on the communications network resulting from scheduled meter reads and to retry meters when communications fail. t is the component responsible for monitoring the health of the system, managing and implementing remote firmware updates, configuration changes, provisioning functions, control and diagnostics. DMS. A system that integrates the functions of SCADA, outage management, work management, distribution load management, reactive control, and asset management into a single console and set of applications. Advanced Metering Infrastructure. Advanced electric revenue metering system capable of two-way communications between the and the utility. A device that serves as a gateway ( ) between the utility, site, and load controllers of the. meter measures, records, displays, and transmits data such as energy usage, generation, text messages, event logs, etc. to authorized systems (i.e., the t ) and provides other advanced utility functions.. Wholesale Power Group Person WPG. Takes all resources available and determines optimum generation mix on economic basis UC-3 Version 1.11.doc 8 December 15, 2009

9 Grouping (Community), Utility Actors. Group Description Actors that perform their specific functions as a part of the Utility. Actor Name Actor Type (person, device, system Actor Description etc.) Power Operations Operations Price Origination Group t Person Person PO. Initiates dynamic pricing data or demand response events to mitigate transmission reliability requirements DO. Operating over the distribution system, using SCADA and t to make decisions concerning the distribution grid. Initiates dynamic pricing data or demand response events to mitigate distribution reliability and voltage profile requirements. Develop the rules that translate the resource costs and reliability inputs into dynamic pricing and demand response signals for the EMS. t controls grid operations in the control area. t will communicate to substation RTUs to ensure grid reliability. 1.6 Information exchanged Describe any information exchanged in this template. Information Object Name Wholesale Power Group loading and additional pricing information Information Object Description loading information and additional information that may affect the pricing signal. UC-3 Version 1.11.doc 9 December 15, 2009

10 Information Object Name t loading and additional pricing information Wholesale Power Group and t loading and additional pricing information Current Current and the Predefined Profile Meter Read Request Updated and Condition Data Based on Reliability Selected Listing for the Compares the Selected Listing for the Information Object Description loading information and additional information that may affect the pricing signal. A combination of the system loading information and additional information that may affect the pricing signal sent from the Wholesale Power Group and the t. calculated when the Price Origination Group enters the loading and additional pricing information into the. Calculated pricing signal from the that is compared to the Predefined Profile. This comparison is made automatically and will determine how the t and the affected premises (controlled premise devices) will respond. A request for an Meter Read. Meter data for a specific Meter. This data includes voltage, current, load and power quality parameters. Updated field equipment status, system or area load, voltage parameters, power quality and outages. called to maintain system reliability. Selected set of customers chosen to meet the requirements of the. s selected to meet the requirements of the will have the event parameters compared to their Predefined Profile. This comparison is made automatically UC-3 Version 1.11.doc 10 December 15, 2009

11 Information Object Name with the Predefined Profile Acknowledgement of Function Command Acknowledgement Equipment Status Information Object Description and will determine how the t and the affected premises (controlled premise devices) will respond. will be sent a notification of the on the Display. can acknowledge that event by pushing the Acknowledge Button on the Display. isn t required to acknowledge the event. When the chooses to a selected, they will be required to acknowledge the event on their Display by pushing the Acknowledge button and entering the correct Code onto the Display. When the Display receives the correct Code it will send a Function to the t, which will allow the controlled premise devices to act accordingly. After a chooses to a specific, the t receives a Function from the Display. t reads this Function and sends out a Command to the controlled devices in the premise. controlled devices will receive the Command and respond accordingly. Acknowledgement is developed when the t receives verification from the controlled devices in the premise that they have responded accordingly to the Command. t sends the Acknowledgement signal back to the and the t to allow the system to know which s decided to the and to allow for the system to verify if enough load was affected to meet the needs of the. During normal operation (not during ) the t will send and Equipment Status to the and the t to allow the system to know which s responded the and to allow for the system to verify if enough load was UC-3 Version 1.11.doc 11 December 15, 2009

12 Information Object Name Total Load Affected by the Information Object Description affected to meet the needs of the. calculated total load that was affected by the. This affected load is calculated by the t from the before and after metering data. 1.7 Activities/Services Describe or list the activities and services involved in this Function (in the context of this Function). An activity or service can be provided by a computer system, a set of applications, or manual procedures. se activities/services should be described at an appropriate level, with the understanding that sub-activities and services should be described if they are important for operational issues, automation needs, and implementation reasons. Other sub-activities/services could be left for later analysis. Activity/Service Name Activities/Services Provided 1.8 Contracts/Regulations Identify any overall (human-initiated) contracts, regulations, policies, financial considerations, engineering constraints, pollution constraints, and other environmental quality issues that affect the design and requirements of the Function. Contract/Regulation DG Service Contract Contract Impact of Contract/Regulation on Function No can operate on the Utility s system in a manner that is detrimental to the Utility or other. has signed a Contract to allow them to adjust their loads and/or DG source with pricing. has completed a Predefined Profile for the normal use of their DG installation. This profile has been programmed into the t. t will function automatically based on this profile. UC-3 Version 1.11.doc 12 December 15, 2009

13 Policy From Actor May Shall Not Shall Description (verb) To Actor Constraint Type Description Applies to 2 Step by Step Analysis of Function 2.1 Steps to implement function Scenario 1 sending dynamic pricing signals Scenario 1 sending dynamic pricing signals Preconditions and Assumptions Describe conditions that must exist prior to the initiation of the Function, such as prior state of the actors and activities Identify any assumptions, such as what systems already exist, what contractual relations exist, and what configurations of systems are probably in place Identify any initial states of information exchanged in the steps in the next section. For example, if a purchase order is exchanged in an activity, its precondition to the activity might be filled in but unapproved. Actor//Information/Contract Preconditions or Assumptions has enrolled in dynamic pricing tariff has enrolled in utility demand response program (alternate scenario) UC-3 Version 1.11.doc 13 December 15, 2009

14 Actor//Information/Contract Utility Utility Preconditions or Assumptions has selected a method for / event notification signals Wholesale Power Group gets system load feedback via the t system is installed has completed a Predefined Profile for the normal use of their DG installation. This profile has been programmed into the t. t will function automatically based on this profile Steps Describe the normal sequence of events, focusing on steps that identify new types of information or new information exchanges or new interface issues to address. Should the sequence require detailed steps that are also used by other functions, consider creating a new sub function, then referring to that subroutine in this function. Remember that the focus should be less on the algorithms of the applications and more on the interactions and information flows between entities, e.g. people, systems, applications, data bases, etc. re should be a direct link between the narrative and these steps. numbering of the sequence steps conveys the order and concurrency and iteration of the steps occur. Using a Dewey Decimal scheme, each level of nested procedure call is separated by a dot.. Within a level, the sequence number comprises an optional letter and an integer number. letter specifies a concurrent sequence within the next higher level; all letter sequences are concurrent with other letter sequences. number specifies the sequencing of messages in a given letter sequence. absence of a letter is treated as a default 'main sequence' in parallel with the lettered sequences. Sequence 1: Do step 1 1.2A.1 - In parallel to activity 2 B do step 1 1.2A.2 - In parallel to activity 2 B do step 2 1.2B.1 - In parallel to activity 2 A do step 1 1.2B.2 - In parallel to activity 2 A do step Do step nested step 3.1 UC-3 Version 1.11.doc 14 December 15, 2009

15 Sequence 2: nested step Do step Do step 2 # Primary Actor Name of Process/Activity Description of Process/Activity Information Producer Information Receiver Name of Info Exchanged Additional Notes IECSA Environments # Triggering event? Identify the name of the event What other actors are primarily responsible for the Process/Activity? Actors are defined in section1.5. Label that would appear in a process diagram. Use action verbs when naming activity. Describe the actions that take place in active and present tense. step should be a descriptive noun/verb phrase that portrays an outline summary of the step. If n Else scenarios can be captured as multiple Actions or as separate steps. What other actors are primarily responsible for Producing the information? Actors are defined in section 1.5. What other actors are primarily responsible for Receiving the information? Actors are defined in section1.5. (Note May leave blank if same as Primary Actor) Name of the information object. Information objects are defined in section 1.6 Elaborate architectural issues using attached spreadsheet. Use this column to elaborate details that aren t captured in the spreadsheet. Reference the applicable IECSA Environment containing this data exchange. Only one environment per step. 1.1 Utility, after viewing the current system metering data, decides to send out an economic signal to reduce utility peaking requirement s. Wholesale Power Group Wholesale Power Group sends pricing information to the Price Origination Group. Wholesale Power Group sends loading and additional pricing information to the Price Origination Group. Wholesale Power Group Price Origination Group Wholesale Power Group loading and additional pricing information UC-3 Version 1.11.doc 15 December 15, 2009

16 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments Utility, after viewing the current system metering data, decides to send out an economic signal to encourage the to react in a certain way. t t sends pricing information to the Price Origination Group t sends loading and additional pricing information to the Price Origination Group. t Price Origination Group t loading and additional pricing information Price Origination Group enters information into the Price Origination Group Price Origination Group enters information into the. Price Origination Group enters the loading and additional pricing information into the. Price Origination Group Wholesale Power Group and t loading and additional pricing information UC-3 Version 1.11.doc 16 December 15, 2009

17 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments 1.2 calculates the Current. calculates the Current. calculates the Current. Current A Current to the Price Origination Group. Current to the Price Origination Group. delivers the Current to the Price Origination Group. Price Origination Group Current UC-3 Version 1.11.doc 17 December 15, 2009

18 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments B Current to the t. Current to the t. delivers the Current to the Meter Data t t Current C Current to the Information. Current to the Information. delivers the Current to the Information. Information Current UC-3 Version 1.11.doc 18 December 15, 2009

19 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments D Current to the t. Current to the t. delivers the Current to the t. t Current D. 1 t Current to the. t t Current to the. t Current to the via the Infrastructure. t Current UC-3 Version 1.11.doc 19 December 15, 2009

20 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments D. 2 Current to the Display. Current to the Display. sends the Current to the Display. Display Device Current D. 3 Current to the t. Current to the t. sends the Current to the t. t Current UC-3 Version 1.11.doc 20 December 15, 2009

21 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments D. 4 t compares and acts accordingly. t t compares and acts accordingly. t compares the Current to the Predefined Profile and acts accordingly t Current and the Predefined Profile 1.3 Meter Data t sends an Meter Read Request to the t. t Meter Data t sends an Meter Read Request to the t. t sends an Meter Read Request to the t. t t Meter Read Request UC-3 Version 1.11.doc 21 December 15, 2009

22 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments t sends an Meter Read Request to the Meter. t t sends an Meter Read Request to the Meter. t sends an Meter Read Request to the Meter via the Infrastructure. t Meter Meter Read Request Meter delivers meter readings. Meter Meter delivers meter readings. Meter delivers meter readings to the t via the Infrastructure. Meter t UC-3 Version 1.11.doc 22 December 15, 2009

23 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments t delivers meter readings to the Meter Data t. t t delivers meter readings to the Meter Data t. t sends the Meter readings to the t. t t Post-conditions and Significant Results Describe conditions that must exist at the conclusion of the Function. Identify significant items similar to that in the preconditions section. Describe any significant results from the Function Actor/Activity Utility Post-conditions Description and Results has researched their Predefined Profile settings and has programmed them into their t to allow their DG act accordingly to benefit their costs/payback. Utility can call an event and have the respond accordingly. 2.2 Steps to implement function Scenario 2 sending dynamic pricing signals reliability driven Scenario 2 sending dynamic pricing signals reliability driven UC-3 Version 1.11.doc 23 December 15, 2009

24 2.2.1 Preconditions and Assumptions Describe conditions that must exist prior to the initiation of the Function, such as prior state of the actors and activities Identify any assumptions, such as what systems already exist, what contractual relations exist, and what configurations of systems are probably in place Identify any initial states of information exchanged in the steps in the next section. For example, if a purchase order is exchanged in an activity, its precondition to the activity might be filled in but unapproved. Actor//Information/Contract Utility Utility Utility Utility Utility Preconditions or Assumptions has enrolled in dynamic pricing tariff has enrolled in utility demand response program (alternate scenario) has selected a method for pricing/ event notification signals Wholesale Power Group gets system load feedback via the t system is installed has completed a Predefined Profile for the normal use of their DG installation. This profile has been programmed into the t. t will function automatically based on this profile. has the ability to a, but it may affect the rate at which they are billed Steps Describe the normal sequence of events, focusing on steps that identify new types of information or new information exchanges or new interface issues to address. Should the sequence require detailed steps that are also used by other functions, consider creating a new sub function, then referring to that subroutine in this function. Remember that the focus should be less on the algorithms of the applications and more on the UC-3 Version 1.11.doc 24 December 15, 2009

25 interactions and information flows between entities, e.g. people, systems, applications, data bases, etc. re should be a direct link between the narrative and these steps. numbering of the sequence steps conveys the order and concurrency and iteration of the steps occur. Using a Dewey Decimal scheme, each level of nested procedure call is separated by a dot.. Within a level, the sequence number comprises an optional letter and an integer number. letter specifies a concurrent sequence within the next higher level; all letter sequences are concurrent with other letter sequences. number specifies the sequencing of messages in a given letter sequence. absence of a letter is treated as a default 'main sequence' in parallel with the lettered sequences. Sequence 1: Do step 1 1.2A.1 - In parallel to activity 2 B do step 1 1.2A.2 - In parallel to activity 2 B do step 2 1.2B.1 - In parallel to activity 2 A do step 1 1.2B.2 - In parallel to activity 2 A do step Do step nested step nested step 3.2 Sequence 2: Do step Do step 2 # Primary Actor Name of Process/Activity Description of Process/Activity Information Producer Information Receiver Name of Info Exchanged Additional Notes IECSA Environments # Triggering event? Identify the name of the event What other actors are primarily responsible for the Process/Activity? Actors are defined in section1.5. Label that would appear in a process diagram. Use action verbs when naming activity. Describe the actions that take place in active and present tense. step should be a descriptive noun/verb phrase that portrays an outline summary of the step. If n Else scenarios can be captured as multiple Actions or as separate steps. What other actors are primarily responsible for Producing the information? Actors are defined in section 1.5. What other actors are primarily responsible for Receiving the information? Actors are defined in section1.5. (Note May leave blank if same as Primary Actor) Name of the information object. Information objects are defined in section 1.6 Elaborate architectural issues using attached spreadsheet. Use this column to elaborate details that aren t captured in the spreadsheet. Reference the applicable IECSA Environment containing this data exchange. Only one environment per step. UC-3 Version 1.11.doc 25 December 15, 2009

26 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments 2.1 Utility decides, because of reliability concerns, to issue a. t t sends system condition data to the Operations. t updates system data and sends the system condition data to the Operations. t Operations Updated and Condition Data Utility decides, because of reliability concerns, to issue a. Operations Operations review the system condition data. Operations review the system condition data and determine that a event is required for system reliability. t Operations Updated and Condition Data UC-3 Version 1.11.doc 26 December 15, 2009

27 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments Operations communicat e the possible need for a. Operations Operations communicat e the possible need for a. Operations communicate the possible need for a based on reliability to the Wholesale Power Group. Operations Wholesale Power Group Based on Reliability t sends data to the Wholesale Power Group. t t sends data to the Wholesale Power Group. t sends Updated and Condition Data to the Wholesale Power Group. t Wholesale Power Group Updated and Condition Data UC-3 Version 1.11.doc 27 December 15, 2009

28 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments 2.2 Wholesale Power Group determines that a is necessary based on reliability. Wholesale Power Group Wholesale Power Group determines that a is necessary based on reliability. Wholesale Power Group determines that a is necessary based on reliability or other economic requirements. Wholesale Power Group Wholesale Power Group Based on Reliability Wholesale Power Group sends the to the. Wholesale Power Group Wholesale Power Group sends the to the. Wholesale Power Group sends the to the and Control. will include current system load, affected area and reduction amount. Wholesale Power Group Based on Reliability will include current system load, affected area and reduction amount. UC-3 Version 1.11.doc 28 December 15, 2009

29 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments assembles the Selected Listing for the. assembles the Selected Listing for the. and Control assembles the Selected Listing to meet the needs of the. This notification will only be sent out to the selected customers. Selected Listing for the This notification will only be sent out to the selected customers A sends the to the Meter Data t. sends the to the Meter Data t. and Control sends the with the Selected to the t. t Selected Listing for the UC-3 Version 1.11.doc 29 December 15, 2009

30 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments B sends the to the Information. sends the to the Information. and Control provides the with the Selected to the Information. Information Selected Listing for the C sends the to the t. sends the to the t. and Control provides the with the Selected to the t. t Selected Listing for the UC-3 Version 1.11.doc 30 December 15, 2009

31 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments C. 1 t sends the to the. t t sends the to the. t sends with the Selected out to the via the Infrastructure. t Selected Listing for the C. 2A sends the to the t. sends the to the t. delivers the with the Selected to the selected customer s t. t Selected Listing for the UC-3 Version 1.11.doc 31 December 15, 2009

32 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments C. 2B sends the to the Display. sends the to the Display. delivers the with the Selected to the selected customer s Display. Display Device Selected Listing for the 2.4 t compares the to the Predefined Profile. t t compares the to the Predefined Profile. t compares the with the Selected to the Predefined Profile and acts accordingly. t Compares the Selected Listing for the with the Predefined Profile UC-3 Version 1.11.doc 32 December 15, 2009

33 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments A acknowledg es the. acknowledg es the. acknowledges the on the Display. Display Device Acknowledgem ent of A. 1 chooses to opt out of the. chooses to opt out of the. chooses to opt out of the by selecting the Function on the Display. Display Device Function A. 2 Command is delivered to the. Display Device Command is delivered to the. Command is delivered from the Display to the. Display Device Command UC-3 Version 1.11.doc 33 December 15, 2009

34 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments A. 3 Command. Command. delivers the Command to the t. t Command A. 4 t reacts accordingly to the Command. t t reacts accordingly to the Command. t reacts accordingly to the Command. Display Device t Command A. 5 t sends Acknowledg ement. t t sends Acknowledg ement. t sends Acknowledgement to the. t Acknowledgem ent UC-3 Version 1.11.doc 34 December 15, 2009

35 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments A. 6 sends Acknowledg ement. sends Acknowledg ement. Delivers the Acknowledgement to the t via the Infrastructure. t Acknowledgem ent A. 7 t sends Acknowledg ement. t t sends Acknowledg ement. t Acknowledgement to and Control. t Acknowledgem ent A. 8 t Acknowledg ement to the t. t t Acknowledg ement to the t. t Acknowledgement to the t. t t Acknowledgem ent UC-3 Version 1.11.doc 35 December 15, 2009

36 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments B t sends an Equipment Status. t t sends an Equipment Status. t sends an Equipment Status to the t Equipment Status B. 1 sends an Equipment Status. sends an Equipment Status. Delivers the Equipment Status to the t via the Infrastructure. t Equipment Status B. 1 t sends an Equipment Status. t t sends an Equipment Status. t Equipment Status to and Control. t Equipment Status UC-3 Version 1.11.doc 36 December 15, 2009

37 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments B. 2 t Equipment Status to the Meter Data t. t t Equipment Status to the Meter Data t. t Equipment Status to the t. t t Equipment Status 2.5 sends an Meter Read Request to the t. sends an Meter Read Request to the t.. and Control sends an Meter Read Request to the t. t Meter Read Request UC-3 Version 1.11.doc 37 December 15, 2009

38 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments t sends the Meter Read Request to the Meter via the Infrastructur e. t t sends the Meter Read Request to the Meter via the Infrastructur e. t sends the Meter Read Request to the Meter via the Infrastructure. t Meter Meter Read Request Meter delivers to the t. Meter Meter delivers to the t. Meter delivers Meter Data to the t via the Infrastructure. Meter t UC-3 Version 1.11.doc 38 December 15, 2009

39 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments t sends the to. t t sends the to. t sends the to and Control. t t to the Meter Data t. t t to the Meter Data t. t to the t. t t UC-3 Version 1.11.doc 39 December 15, 2009

40 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments 2.6 t performs a calculation for the total load affected by the. t t performs a calculation for the total load affected by the. t performs a calculation and verification to calculate the total load affected by the. t t t total load affected by the to the Wholesale Power Group. t t total load affected by the to the Wholesale Power Group. t total load affected by the to the Wholesale Power Group. t Wholesale Power Group Total Load Affected by the UC-3 Version 1.11.doc 40 December 15, 2009

41 Name of Description of Information Information Name of Info IECSA # Primary Actor Additional Notes Process/Activity Process/Activity Producer Receiver Exchanged Environments t total load affected by the to the t. t t total load affected by the to the t. t total load affected by the to the t. t t Total Load Affected by the t total load affected by the to the Operations. t t total load affected by the to the Operations. t displays the total load affected by the to the Operations. t Operations Total Load Affected by the Post-conditions and Significant Results Describe conditions that must exist at the conclusion of the Function. Identify significant items similar to that in the preconditions section. Describe any significant results from the Function UC-3 Version 1.11.doc 41 December 15, 2009

42 Actor/Activity Utility Utility Post-conditions Description and Results has researched their Predefined Profile settings and has programmed them into their t to allow their DG act accordingly to benefit their costs/payback. Utility can call an event and have the respond accordingly. Utility can call an event and measure the actual amount of load that was affected. 2.3 Architectural Issues in Interactions Elaborate on all architectural issues in each of the steps outlined in each of the sequences above. Reference the Step by number Diagram For clarification, draw (by hand, by Power Point, by UML diagram) the interactions, identifying the Steps where possible. UC-3 Version 1.11.doc 42 December 15, 2009

43 Use Case 3 Scenario 1 Sequence Diagram UC-3 Version 1.11.doc 43 December 15, 2009

44 3 Auxiliary Issues 3.1 References and contacts Documents and individuals or organizations used as background to the function described; other functions referenced by this function, or acting as sub functions; or other documentation that clarifies the requirements or activities described. All prior work (intellectual property of the company or individual) or proprietary (non-publicly available) work must be so noted. FUTURE USE ID Title or contact Reference or contact information [1] ANSI C Electrical Power s and Equipment Voltage Ratings (60HZ) ANSI A and ANSI B Voltage Requirements [2] 3.2 Action Item List As the function is developed, identify issues that still need clarification, resolution, or other notice taken of them. This can act as an Action Item list. FUTURE USE ID Description Status [1] [2] 3.3 Revision History For reference and tracking purposes, indicate who worked on describing this function, and what aspect they undertook. UC-3 Version 1.11.doc 44 December 15, 2009

45 FUTURE USE No Date Author Description Brian D. Green Draft for Review Brian D. Green Update Equipment s Brian D. Green Change to new template Brian D. Green Identify missing Information Objects, remove unnecessary steps and re-number Ronald J. Pasquarelli Ronald J. Pasquarelli Ronald J. Pasquarelli Updates for import into IKB. Remove old sequence diagrams Cleanup- add actor the Utility, remove policy Brian D. Green Cleanup Actors Brian D. Green Change actor name from Retail Rates and Tariffs Group to Price Origination Group Brian D. Green Make the document generic and ready for posting on EPRI s Smart Grid Use Case Repository. 3.4 Common Terms and Definitions As the function is developed, identify issues that still need clarification, resolution, or other notice taken of them. This can act as an Action Item list. UC-3 Version 1.11.doc 45 December 15, 2009

46 ID Term Definition [1] Feeder Penetration PV penetration is the rated capacity (KW) of the aggregated generation, including the proposed Generating Facility compared to the annual peak load (KW) as most recently measured at the substation or calculated for that portion of a public utility s electric system connected to a bounded by automatic sectionalizing devices or the end of the distribution line. Units are % of peak on the feeder or portion of a public utility s electric system In Manuel s discussions with the state, DG will be viewed by the rating of devices at point of common coupling. [2] Advanced Metering Infrastructure () [3] for the Utility for this project- refers to systems that measure, collect and analyze energy usage, and send information to the through advanced electricity meters, via various communication media on request or on a pre-defined schedule. This infrastructure includes advanced electrical meters, communications, and meter (MDM) software. communication between the end use energy consumer and the utility is two way communications. infrastructure and communications for the purposes of this project ends at the meter, which provides a to the Inverter or possibly the Home Area. is one of the communications radios under glass of the Meter. (re are two radios built in to the Meter. One is for the and is a longer range radio. other is for the and it has a smaller range.) This interfaces to the Inverter and the Home Area (if available). UC-3 Version 1.11.doc 46 December 15, 2009

47 [4] Home Area [5] Smart Grid [6] Real Time (RTP) Model [7] Generation (DG) and (DER) [8] Electrical Storage Any side automation that can make use of utility signals to affect energy usage within the premises will be considered as the Home Area for this project. Home Area can affect DER, lighting, security, etc. Utility will not own Home Area. Utility s perspective is that the "smart grid" is a grid that integrates the electrical grid with communications/ automation with a fully integrated IT infrastructure to enhance reliability, involve the consumer, and integrate distributed resources. It is the seamless integration of the electric network, a communications network, and all the necessary software and hardware to monitor, control and manage the creation, distribution, storage and consumption of energy by any type. smart grid of the future needs to be interactive, distributed, and extended to any consuming device. An electricity pricing methodology that enables automatic load response based on a pre-defined price matrix in response to a utility signal for hourly pricing. For this project Generation (DG) will be defined as utility or provided photovoltaic generation or storage connected at the distribution voltage level (12.47kV) or service voltage level. s (DER) on the other hand will include all DG and demand response capability through the Home Area. definition for storage for this project will be considered electrical storage (providing a way to add electrons to the grid). Alternate Scenario (and UC-3 ): definition for storage for this project will be electrical storage along with thermal storage (building envelop/thermal storage) and demand response techniques aligned with UC-3 Version 1.11.doc 47 December 15, 2009

48 commercial and residential cooling and refrigeration systems in addition to innovative approaches to demand response aligned with data center energy consumption. UC-3 Version 1.11.doc 48 December 15, 2009

1 Descriptions of Function

1 Descriptions of Function 1 Descriptions of Function Data Warehouse The Utility s e Version 3.0 April 26 th, 2010 This use case describes how the essential data elements are incorporated into The Utility s smart grid clearinghouse

More information

SmartConnect Use Case: C7 Utility Uses SmartConnect Data for Targeted Marketing Campaigns December 29, 2009

SmartConnect Use Case: C7 Utility Uses SmartConnect Data for Targeted Marketing Campaigns December 29, 2009 SmartConnect Use Case: C7 Utility Uses SmartConnect Data for Targeted Marketing Campaigns December 29, 2009 Author: Edison SmartConnect Page 1 of 34 Document History Revision History Edison SmartConnect

More information

APPENDIX E ARCHITECTURE COMPONENT/ACTOR DESCRIPTIONS

APPENDIX E ARCHITECTURE COMPONENT/ACTOR DESCRIPTIONS APPENDIX E ARCHITECTURE COMPONENT/ACTOR DESCRIPTIONS Architecture Component/Actor Descriptions Edge Data Center AMI Back office s Collection of s The AMI Edge Data Center encompasses systems that provide

More information

AMI Use Case: B3 - Utility detects tampering or theft at customer site 03/16/06

AMI Use Case: B3 - Utility detects tampering or theft at customer site 03/16/06 AMI Use Case: 03/16/06 Author: James McGrath Author: James Mcgrath Page 1 of 23 Document History Revision History Revision Number Revision Date Revision / Reviewed By Summary of Changes Changes marked

More information

Demand Response Management System Smart systems for Consumer engagement By Vikram Gandotra Siemens Smart Grid

Demand Response Management System Smart systems for Consumer engagement By Vikram Gandotra Siemens Smart Grid Demand Response Demand Response Management System Smart systems for Consumer engagement By Vikram Gandotra Siemens Smart Grid siemens.com/answers The Siemens Smart Grid Suite DRMS part of Grid Application

More information

Distributed Energy Resource Services and Pricing Caltech Resnick Ins;tute Grid 2020 Seminar

Distributed Energy Resource Services and Pricing Caltech Resnick Ins;tute Grid 2020 Seminar Distributed Energy Resource Services and Pricing Caltech Resnick Ins;tute Grid 2020 Seminar Ali Ipakchi VP, Smart Grid and Green Power February 21, 2013 Trade Secret This document and attachments contain

More information

Public Service Co. of New Mexico (PNM) - PV Plus Storage for Simultaneous Voltage Smoothing and Peak Shifting

Public Service Co. of New Mexico (PNM) - PV Plus Storage for Simultaneous Voltage Smoothing and Peak Shifting Public Service Co. of New Mexico (PNM) - PV Plus Storage for Simultaneous Voltage Smoothing and Peak Shifting Steve Willard, P.E. Brian Arellano DOE Peer Review October 20, 2011 Project Goals Develop an

More information

AMI and DA Convergence: Enabling Energy Savings through Voltage Conservation

AMI and DA Convergence: Enabling Energy Savings through Voltage Conservation AMI and DA Convergence: Enabling Energy Savings through Voltage Conservation September 2010 Prepared for: By Sierra Energy Group The Research & Analysis Division of Energy Central Table of Contents Executive

More information

Jim Sheppard, Director of Business Processes CenterPoint Energy, Texas, USA

Jim Sheppard, Director of Business Processes CenterPoint Energy, Texas, USA Jim Sheppard, Director of Business Processes CenterPoint Energy, Texas, USA About Us... Public company traded on the New York Stock Exchange (CNP) Headquartered in Houston, TX Operating 3 business segments

More information

ConnectivityWeek 2010

ConnectivityWeek 2010 SmartMeterTexas.com Access to the Smart Grid for all of Texas CenterPoint Energy Robert B. Frazier Director of Technology Houston Electric 1 WHO IS CENTERPOINT ENERGY? Public company traded on the New

More information

emeter- MDM General Overwiew April 19 th, CEER Workshop on Meter Data Management Alicia Carrasco, Regulatory Director

emeter- MDM General Overwiew April 19 th, CEER Workshop on Meter Data Management Alicia Carrasco, Regulatory Director emeter- MDM General Overwiew April 19 th, CEER Workshop on Meter Data Alicia Carrasco, Regulatory Director Copyright 2012 emeter, a Siemens Business. All rights reserved. Metering over the Years 1990 1995

More information

Itron White Paper. Itron Enterprise Edition. Meter Data Management. Connects AMI to the Enterprise: Bridging the Gap Between AMI and CIS

Itron White Paper. Itron Enterprise Edition. Meter Data Management. Connects AMI to the Enterprise: Bridging the Gap Between AMI and CIS Itron White Paper Meter Data Management Itron Enterprise Edition Meter Data Management Connects AMI to the Enterprise: Bridging the Gap Between AMI and CIS Wendy Lohkamp Director, Meter Data Management

More information

Development of a Conceptual Reference Model for Micro Energy Grid

Development of a Conceptual Reference Model for Micro Energy Grid Development of a Conceptual Reference Model for Micro Energy Grid 1 Taein Hwang, 2 Shinyuk Kang, 3 Ilwoo Lee 1, First Author, Corresponding author Electronics and Telecommunications Research Institute,

More information

Utilities the way we see it

Utilities the way we see it Utilities the way we see it Advanced Distribution Management Systems How to choose the right solution to improve your utility s safety, reliability, asset protection and quality of service Photo provided

More information

More MDM Choices: A Hosted MDMS

More MDM Choices: A Hosted MDMS More MDM Choices: A Hosted MDMS Jackie Lemmerhirt Director, Product Management Aclara Software February, 2008 Aclara Software (formerly Nexus Energy Software) Founded 1997, offices in MA, AZ, CA, VA over

More information

Smart Grid Overview How the smart grid will give customers the tools to create the new future for electricity use.

Smart Grid Overview How the smart grid will give customers the tools to create the new future for electricity use. Smart Grid Overview How the smart grid will give customers the tools to create the new future for electricity use. Presentation to California Municipal Utilities Association Paul Lau Assistant General

More information

WELCOME. Landis+Gyr Technical Training Catalog

WELCOME. Landis+Gyr Technical Training Catalog WELCOME Training is essential to ensure the customer s success in implementing the Smart Grid Solution. Our goal at Landis+Gyr is to provide a foundation of knowledge that will allow personnel to quickly

More information

How To Integrate Firstenergy'S Integrated Grid

How To Integrate Firstenergy'S Integrated Grid EPRI Smart Grid Demonstration Host Site Project FirstEnergy/JCP&L Host Site Overview/Update Integrated Distributed Energy Resources Management Joe Waligorski Technical Manager FE Technologies Eva Gardow

More information

Agenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman. sergio.fujii@areva-td.com. ethan.boardman@areva-td.com

Agenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman. sergio.fujii@areva-td.com. ethan.boardman@areva-td.com Agenda do Mini-Curso Sérgio Yoshio Fujii sergio.fujii@areva-td.com Ethan Boardman ethan.boardman@areva-td.com Agenda do Mini-Curso Sistemas de Distribuição (DMS) Characteristics of Distribution Network

More information

Outage Notification. "Acknowledgment: This material is based upon work supported by the Department of Energy under Award Number DE-OE0000193.

Outage Notification. Acknowledgment: This material is based upon work supported by the Department of Energy under Award Number DE-OE0000193. Outage Notification "Acknowledgment: This material is based upon work supported by the Department of Energy under Award Number DE-OE0000193." Disclaimer: "This report was prepared as an account of work

More information

Operating the power system while enabling more renewables : which solutions?

Operating the power system while enabling more renewables : which solutions? Operating the power system while enabling more renewables : which solutions? Sébastien GRENARD EDF R&D 22/06/2010 New environment for power systems design and operation European targets and attractive

More information

The Data Management Challenge: Making Extremely Large Amounts of Data Useful and Actionable

The Data Management Challenge: Making Extremely Large Amounts of Data Useful and Actionable The Data Management Challenge: Making Extremely Large Amounts of Data Useful and Actionable Todd Pistorese OSIsoft 777 Davis Street San Leandro, CA 94577 Summary The introduction of AMI has created a data

More information

I. TODAY S UTILITY INFRASTRUCTURE vs. FUTURE USE CASES...1 II. MARKET & PLATFORM REQUIREMENTS...2

I. TODAY S UTILITY INFRASTRUCTURE vs. FUTURE USE CASES...1 II. MARKET & PLATFORM REQUIREMENTS...2 www.vitria.com TABLE OF CONTENTS I. TODAY S UTILITY INFRASTRUCTURE vs. FUTURE USE CASES...1 II. MARKET & PLATFORM REQUIREMENTS...2 III. COMPLEMENTING UTILITY IT ARCHITECTURES WITH THE VITRIA PLATFORM FOR

More information

INTELLIGENT DISTRIBUTION NETWORK ANALYSIS AND INFORMATION ARCHITECTURE DESIGN

INTELLIGENT DISTRIBUTION NETWORK ANALYSIS AND INFORMATION ARCHITECTURE DESIGN INTELLIGENT DISTRIBUTION NETWORK ANALYSIS AND INFORMATION ARCHITECTURE DESIGN Yun CHEN SMEPC,State Grid China daddygirl@126.com ABSTRACT From the background of intelligent distribution network construction,

More information

Project Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management

Project Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management Project Management for Implementing the Smart Grid By Power System Engineering, Inc. Abstract PM Methodology Using a Repeatable Project Management Approach Project management solutions for the Smart Grid

More information

EC 350 Simplifies Billing Data Integration in PowerSpring Software

EC 350 Simplifies Billing Data Integration in PowerSpring Software White Paper EC 350 Simplifies Billing Data Integration in PowerSpring Software Executive Summary In the current energy environment, gas-metering data must be collected more frequently and in smaller increments

More information

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process Presented by: Marianne Mannschreck Date: Welcome A Look at the Net Energy Metering

More information

Digital Metering: a key enabling factor to foster RES development

Digital Metering: a key enabling factor to foster RES development RES4MED Days, Rabat September 16th, 2014 Digital Metering: a key enabling factor to foster RES development Simone Aibino Area Manager Europe, Mediterranean Countries & USA CESI SpA Consulting Division

More information

Con Edison Demonstration Project DE-OE0000197. Customer Sited Resource Management Tools

Con Edison Demonstration Project DE-OE0000197. Customer Sited Resource Management Tools Con Edison Demonstration Project DE-OE0000197 Sited Resource Tools Tom Magee General Manager Smart Grid Implementation Group, Con Edison ADS National Town Hall Meeting May 21, 2014 1 Demonstration Project

More information

Distribution Operations with High-penetration of Beyond the Meter Intermittent Renewables. Bob Yinger Southern California Edison April 15, 2014

Distribution Operations with High-penetration of Beyond the Meter Intermittent Renewables. Bob Yinger Southern California Edison April 15, 2014 1 Distribution Operations with High-penetration of Beyond the Meter Intermittent Renewables Bob Yinger Southern California Edison April 15, 2014 Southern California Edison SCE provides power to: Nearly

More information

METER DATA MANAGEMENT FOR THE SMARTER GRID AND FUTURE ELECTRONIC ENERGY MARKETPLACES

METER DATA MANAGEMENT FOR THE SMARTER GRID AND FUTURE ELECTRONIC ENERGY MARKETPLACES METER DATA MANAGEMENT FOR THE SMARTER GRID AND FUTURE ELECTRONIC ENERGY MARKETPLACES Sebnem RUSITSCHKA 1(1), Stephan MERK (1), Dr. Heinrich KIRCHAUER (2), Dr. Monika STURM (2) (1) Siemens AG Germany Corporate

More information

Architecture Concepts and Technical Issues for an Open, Interoperable Automated Demand Response Infrastructure

Architecture Concepts and Technical Issues for an Open, Interoperable Automated Demand Response Infrastructure LBNL-63664 Architecture Concepts and Technical Issues for an Open, Interoperable Automated Demand Response Infrastructure E. Koch, M.A. Piette Energy Environmental Technologies Division October 2007 Presented

More information

Real-Time Business Visibility Solutions For the Real World

Real-Time Business Visibility Solutions For the Real World Pre-Configured Solutions File Server Monitoring Real-Time Business Visibility Solutions For the Real World Updated: May 2009 Page 1 of 42 Doc. Version. 6.2.1 Table of Contents File Server Monitoring Solution

More information

Naperville Smart Grid Initiative

Naperville Smart Grid Initiative Naperville Smart Grid Initiative Business Case Fundamentals Updated on 9/7/2010 Summary The NGSI program delivers an excellent ROI by increasing network reliability, operational efficiencies, reducing

More information

Smart Grid Business Case Analysis. Rochester Public Utilities

Smart Grid Business Case Analysis. Rochester Public Utilities DRAFT REVISION Smart Grid Business Case Analysis Prepared For Rochester Public Utilities August 200 Project 55060 prepared for Rochester Public Utilities Rochester, Minnesota August 200 Project No. 55060

More information

Big Data in Smart Grid. Guangyi Liu China Electric Power Research Institute

Big Data in Smart Grid. Guangyi Liu China Electric Power Research Institute Big Data in Smart Grid Guangyi Liu China Electric Power Research Institute 1 Outline 一 二 Sources and Feature of Big Data in Smart Grid Use Scenarios of Big Data in Smart Grid 2 Sources of Big Data in Smart

More information

Applying Use Cases to Microcontroller Code Development. Chris Gilbert Cypress Semiconductor

Applying Use Cases to Microcontroller Code Development. Chris Gilbert Cypress Semiconductor Applying Use Cases to Microcontroller Code Development Chris Gilbert Cypress Semiconductor Agenda Why Use Cases Microcontroller Project Development Use Cases Defined Use Cases Composition General Example

More information

WHITEPAPER. Breathing New Life Into Legacy Demand Response. Gain the Benefits of Two-way Communications

WHITEPAPER. Breathing New Life Into Legacy Demand Response. Gain the Benefits of Two-way Communications WHITEPAPER Breathing New Life Into Legacy Demand Response Gain the Benefits of Two-way Communications Executive Summary Utilities are increasingly turning to smart grid-based demand response (DR) programs

More information

ESDER Implementation and TeMix Comments

ESDER Implementation and TeMix Comments Stakeholder Comments Template Submitted by Company Date Submitted Edward G. Cazalet TeMix Inc. August 10, 2015 ed@temix.com 408-621-2772 General Comments TeMix respectfully suggests that this CAISO Proposal

More information

Building Customer Programs Through AMI and Effective Data Management

Building Customer Programs Through AMI and Effective Data Management Building Customer Programs Through AMI and Effective Data Management Steve Bell, Vice President, Business Development ElectSolve Technology Solutions & Services Inc. sbell@electsolve.com (512) 656-0004

More information

Energy Systems Integration

Energy Systems Integration Energy Systems Integration Dr. Martha Symko-Davies Director of Partnerships, ESI March 2015 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy,

More information

PROCESS AUTOMATION FOR DISTRIBUTION OPERATIONS MANAGEMENT. Stipe Fustar. KEMA Consulting, USA

PROCESS AUTOMATION FOR DISTRIBUTION OPERATIONS MANAGEMENT. Stipe Fustar. KEMA Consulting, USA PROCESS AUTOMATION FOR DISTRIBUTION OPERATIONS MANAGEMENT Stipe Fustar KEMA Consulting, USA INTRODUCTION To prosper in a competitive market, distribution utilities are forced to better integrate their

More information

Monitoring & Control of Small-scale Renewable Energy Sources

Monitoring & Control of Small-scale Renewable Energy Sources Small Scale Renewable Energy Sources and Energy Saving: 6-17 th July 2009 Monitoring & Control of Small-scale Renewable Energy Sources Dr G A Taylor Brunel Institute of Power Systems Brunel University,

More information

Next Generation Distribution Management Systems (DMS) and Distributed Energy Resource Management Systems (DERMS)

Next Generation Distribution Management Systems (DMS) and Distributed Energy Resource Management Systems (DERMS) Next Generation Distribution Management Systems (DMS) and Distributed Energy Resource Management Systems (DERMS) S. S. (Mani) Venkata, Principal Scientist Glenn Brice, Director, DMS and DERMS Alstom Grid

More information

Sofware Requirements Engineeing

Sofware Requirements Engineeing Sofware Requirements Engineeing Three main tasks in RE: 1 Elicit find out what the customers really want. Identify stakeholders, their goals and viewpoints. 2 Document write it down (). Understandable

More information

GENe Software Suite. GENe-at-a-glance. GE Energy Digital Energy

GENe Software Suite. GENe-at-a-glance. GE Energy Digital Energy GE Energy Digital Energy GENe Software Suite Today s utilities have complex requirements that need sophisticated solutions. GE Energy s GENe provides these solutions. Using the latest advances in technology,

More information

PMCS. Integrated Energy Management Solution. Unlock the Full Potential of Power Networks Through Integration. Complete Solution. Informed Decisions

PMCS. Integrated Energy Management Solution. Unlock the Full Potential of Power Networks Through Integration. Complete Solution. Informed Decisions PMCS Integrated Energy Management Solution Unlock the Full Potential of Power Networks Through Integration Power Management Control System (PMCS) is a highly customizable, fully integrated end-to-end Energy

More information

An Oracle White Paper May 2009. Smart Grid Basics. Turning Information into Power

An Oracle White Paper May 2009. Smart Grid Basics. Turning Information into Power An Oracle White Paper May 2009 Smart Grid Basics Turning Information into Power Introduction The Smart Grid is a vision of a better electricity delivery infrastructure. Smart Grid implementations dramatically

More information

Smart Meter Capabilities and Implications for Net Metering. MADRI Smart Meters and Distributed Resource Data Issues

Smart Meter Capabilities and Implications for Net Metering. MADRI Smart Meters and Distributed Resource Data Issues Smart Meter Capabilities and Implications for Net Metering MADRI Smart Meters and Distributed Resource Data Issues Presented by: Robert Stewart, Manager of Advanced Technology and New Business February

More information

Grid IQ. Solutions as a Service. GE Energy Digital Energy. Why Solutions as a Service? Subscription based integrated Smart Grid solutions

Grid IQ. Solutions as a Service. GE Energy Digital Energy. Why Solutions as a Service? Subscription based integrated Smart Grid solutions GE Energy Digital Energy Grid IQ Solutions as a Service Subscription based integrated Smart Grid solutions With any Smart Grid implementation, utilities face extremely large up-front and on-going expenses

More information

APS Solar Partner Program

APS Solar Partner Program APS Solar Partner Program Sanket Adhikari, APS Integrating PV in Distribution Grids: Solutions and Technologies Workshop NREL, Golden, CO October 22 & 23, 2015 Agenda Overview SPP Use Cases, Feeders Inverters

More information

Smart Inverters Smart Grid Information Sharing Webcast

Smart Inverters Smart Grid Information Sharing Webcast Smart Inverters Smart Grid Information Sharing Webcast Brian K. Seal July 11 th, 2013 Inverter-Connected Solar is Coming US Future? 302 GW PV by 2030 Germany - Demand Late in May 2011 60 GW DOE SunShot

More information

Evolution of Control for the Smart Transmission Grid

Evolution of Control for the Smart Transmission Grid Evolution of Control for the Smart Transmission Grid Anjan Bose Washington State University Pullman, WA SCE Smart Grid Research Symposium California Institute Of Technology October, 2011 The Past (before

More information

Power & Environmental Monitoring

Power & Environmental Monitoring Data Centre Monitoring Made Easy Power & Environmental Monitoring Features & Benefits Packet Power provides the easiest, most cost effective way to capture detailed power and temperature information for

More information

Smart Metering for Automatic Demand Response

Smart Metering for Automatic Demand Response Smart Metering for Automatic Demand Response Sanjeev K Rana TATA Power Delhi Distribution Limited METERING BILLING/CRM BANGKOK 08-May-2012 Agenda Company Overview Challenges in Indian Power Sector Need

More information

Intellect Platform - The Workflow Engine Basic HelpDesk Troubleticket System - A102

Intellect Platform - The Workflow Engine Basic HelpDesk Troubleticket System - A102 Intellect Platform - The Workflow Engine Basic HelpDesk Troubleticket System - A102 Interneer, Inc. Updated on 2/22/2012 Created by Erika Keresztyen Fahey 2 Workflow - A102 - Basic HelpDesk Ticketing System

More information

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114. Generation Interconnection System Impact Study Report For PJM Generation Interconnection Request Queue Position X1-114 Sandyston January 2012 Preface The intent of the System Impact Study is to determine

More information

Advanced Metering Information Systems

Advanced Metering Information Systems e Executive Brief: Advanced ing Information s Introduction e s mission is to help utilities maximize the value of their advanced metering infrastructure ( AMI ) and fixed network 1 investments. Most utilities

More information

Venteea A Smart Grid demonstrator for the DRES integration on the MV distribution networks. www.venteea.fr/en/

Venteea A Smart Grid demonstrator for the DRES integration on the MV distribution networks. www.venteea.fr/en/ Venteea A Smart Grid demonstrator for the DRES integration on the MV distribution networks www.venteea.fr/en/ Lille, le 26 novembre 2015 Agenda Project overarching objectives The consortium The added value

More information

Draft for comment - OpenADR 2.0 Demand Response Program Guide

Draft for comment - OpenADR 2.0 Demand Response Program Guide Draft for comment - OpenADR 2.0 Demand Response Program Guide Revision Number: 0.75 Document Status: Working Text Document Number: 20140701 The information within this document is the property of the OpenADR

More information

Real Time Monitor. A Real-Time Windows Operator Interface. DDE Compliant. (for remote data display)

Real Time Monitor. A Real-Time Windows Operator Interface. DDE Compliant. (for remote data display) Real Time Monitor A Real-Time Windows Operator Interface DDE Compliant (for remote data display) TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 INSTALLATION...2 1.2 FIRST START UP - DDE CONFIGURE...2 1.3 AUTO-STARTUP...2

More information

Key Concepts Of Distributed Generation

Key Concepts Of Distributed Generation Key Concepts Of Distributed Generation National Grid - April 29, 2015 International Association of Electrical Inspectors Western Massachusetts Chapter - Springfield MA Bob Moran, Jim Kehrer, Patti Cox,

More information

Industry Data Model Solution for Smart Grid Data Management Challenges

Industry Data Model Solution for Smart Grid Data Management Challenges Industry Data Model Solution for Smart Grid Data Management Challenges Presented by: M. Joe Zhou & Tom Eyford UCAiug Summit 2012, New Orleans, LA October 23, 2012 UCAiug Summit 2012, New Orleans, LA 1

More information

ARRA Grant Case Studies SMUD s Smart Grid Program

ARRA Grant Case Studies SMUD s Smart Grid Program . ARRA Grant Case Studies SMUD s Smart Grid Program Jim Parks December 2012 Powering forward. Together. About SMUD 600,000 customers 1.4 million population $1.4 billion in revenues 900 mi 2, 2331 km 2

More information

Net Energy Metering and the Future of Distributed Generation

Net Energy Metering and the Future of Distributed Generation Net Energy Metering and the Future of Distributed Generation Vishal C. Patel, P.E. Manager - Distribution Resource Interconnections April 28, 2015 What is Net Energy Metering (NEM)? NEM is a tariffed program

More information

Value of Distributed Generation

Value of Distributed Generation Value of Distributed Generation Solar PV in Massachusetts April 2015 Overview Distributed energy resources (DERs) like solar photovoltaic (solar PV) systems provide unique value to the electric grid by

More information

Monitoring Underground Power Networks

Monitoring Underground Power Networks Monitoring Underground Power Networks By Mark Stiles Merve Cankaya ABSTRACT Underground electric distribution systems are common in large cities throughout the United States. Power usage for the entire

More information

RHODE ISLAND. Electronic Business Transactions (EBT) Standards. for Electronic Data Interchange (EDI) in a Restructured Electric Industry

RHODE ISLAND. Electronic Business Transactions (EBT) Standards. for Electronic Data Interchange (EDI) in a Restructured Electric Industry RHODE ISLAND Electronic Business Transactions (EBT) Standards for Electronic Data Interchange (EDI) in a Restructured Electric Industry PREPARED BY: THE NARRAGANSETT ELECTRIC COMPANY AUGUST 1999 TABLE

More information

Value of Distributed Generation

Value of Distributed Generation Value of Distributed Generation Solar PV in Rhode Island July 2015 Overview Distributed energy resources (DERs) like solar photovoltaic (solar PV) systems provide unique value to the electric grid by reducing

More information

The Future of Grid Control: Smart Grid and Beyond John D. McDonald, P.E. Director Technical Strategy & Policy Development

The Future of Grid Control: Smart Grid and Beyond John D. McDonald, P.E. Director Technical Strategy & Policy Development GE Digital Energy The Future of Grid Control: Smart Grid and Beyond John D. McDonald, P.E. Director Technical Strategy & Policy Development IEEE Fellow IEEE PES President (2006-2007) IEEE Division VII

More information

How does a multi-purpose. network compare to load. management alternatives?

How does a multi-purpose. network compare to load. management alternatives? White Paper Advanced Load Management: Challenges and Solutions How does a multi-purpose network compare to load management alternatives? Mikko Niemi Senior Product Manager Landis+Gyr Clark Pierce Vice

More information

Smart Metering Initiative ADWEA Program

Smart Metering Initiative ADWEA Program Smart Metering Initiative ADWEA Program Saeed Nassouri Technical Advisor Abu Dhabi Water & Electricity Authority (ADWEA) Dec 2010 Company Background SMART GRID Basics AMI Project Strategy Project Scope

More information

Table of Contents. (Extracts from an EPRI-sponsored project developed by Frances Cleveland, Xanthus Consulting International)

Table of Contents. (Extracts from an EPRI-sponsored project developed by Frances Cleveland, Xanthus Consulting International) Xanthus Consulting International White Paper for NIST CSWG: Cyber Requirements for Business Processes Involving Home Area Networks (HAN) (Extracts from an EPRI-sponsored project developed by Frances Cleveland,

More information

Strategic Microgrid Development for Maximum Value. Allen Freifeld SVP, Law & Public Policy Viridity Energy 443.878.7155

Strategic Microgrid Development for Maximum Value. Allen Freifeld SVP, Law & Public Policy Viridity Energy 443.878.7155 Strategic Microgrid Development for Maximum Value Allen Freifeld SVP, Law & Public Policy Viridity Energy 443.878.7155 1 MICROGRIDS Island Mode Buying and Selling Mode Retail Cost Structure to Maximize

More information

Harmonized Use Case for Electronic Health Records (Laboratory Result Reporting) March 19, 2006

Harmonized Use Case for Electronic Health Records (Laboratory Result Reporting) March 19, 2006 Harmonized Use Case for Electronic Health Records (Laboratory Result Reporting) March 19, 2006 Office of the National Coordinator for Health Information Technology (ONC) Table of Contents American Health

More information

3SL. Requirements Definition and Management Using Cradle

3SL. Requirements Definition and Management Using Cradle 3SL Requirements Definition and Management Using Cradle November 2014 1 1 Introduction This white paper describes Requirements Definition and Management activities for system/product development and modification

More information

Executive Summary... ii. 1. Introduction... 1 1.1 Purpose and Scope... 1 1.2 Organization of this Report... 3

Executive Summary... ii. 1. Introduction... 1 1.1 Purpose and Scope... 1 1.2 Organization of this Report... 3 Table of Contents Executive Summary... ii 1. Introduction... 1 1.1 Purpose and Scope... 1 1.2 Organization of this Report... 3 2. Overview of Demand Side Devices, Systems, Programs, and Expected Benefits...

More information

Security Fabric Tailored Trustworthy Space Part 2: End-to-End Management and Security

Security Fabric Tailored Trustworthy Space Part 2: End-to-End Management and Security Security Fabric Tailored Trustworthy Space Part 2: End-to-End Management and Security Charles Speicher McAfee 3965 Freedom Circle Santa Clara, CA 95054-1203 Abstract The Security Fabric framework is a

More information

Swirl. Multiplayer Gaming Simplified. CS4512 Systems Analysis and Design. Assignment 1 2010. Marque Browne 0814547. Manuel Honegger - 0837997

Swirl. Multiplayer Gaming Simplified. CS4512 Systems Analysis and Design. Assignment 1 2010. Marque Browne 0814547. Manuel Honegger - 0837997 1 Swirl Multiplayer Gaming Simplified CS4512 Systems Analysis and Design Assignment 1 2010 Marque Browne 0814547 Manuel Honegger - 0837997 Kieran O' Brien 0866946 2 BLANK MARKING SCHEME 3 TABLE OF CONTENTS

More information

Feature and Technical

Feature and Technical BlackBerry Mobile Voice System for SIP Gateways and the Avaya Aura Session Manager Version: 5.3 Feature and Technical Overview Published: 2013-06-19 SWD-20130619135120555 Contents 1 Overview...4 2 Features...5

More information

Dale Pennington, Managing Director, Utiliworks Consulting LLC, New York, USA

Dale Pennington, Managing Director, Utiliworks Consulting LLC, New York, USA Dale Pennington, Managing Director, Utiliworks Consulting LLC, New York, USA Meter Data from Cradle to Grave, do you know where your Data is? Getting Started Create your project team such that all critical

More information

A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES

A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES A MODERN DISTRIBUTION MANAGEMENT SYSTEM FOR REGIONAL ELECTRICITY COMPANIES A Roberts, T Berry, W D Wilson Schneider Electric Ltd, UK SYNOPSIS This paper describes the features of a modern Distribution

More information

NetVision. NetVision: Smart Energy Smart Grids and Smart Meters - Towards Smarter Energy Management. Solution Datasheet

NetVision. NetVision: Smart Energy Smart Grids and Smart Meters - Towards Smarter Energy Management. Solution Datasheet Version 2.0 - October 2014 NetVision Solution Datasheet NetVision: Smart Energy Smart Grids and Smart Meters - Towards Smarter Energy Management According to analyst firm Berg Insight, the installed base

More information

Oncor s Pioneering Transmission Dynamic Line Rating (DLR) Demonstration Lays Foundation for Follow-On Deployments

Oncor s Pioneering Transmission Dynamic Line Rating (DLR) Demonstration Lays Foundation for Follow-On Deployments Oncor s Pioneering Transmission Dynamic Line Rating (DLR) Demonstration Lays Foundation for Follow-On Deployments 1. Summary Oncor Electric Delivery Company (Oncor) successfully demonstrated a fully integrated

More information

Pennsylvania Summer Reliability

Pennsylvania Summer Reliability A. Reliability Enhancement Programs In 2015, Pennsylvania Power Company s ( Penn Power or Company ) reliability plan incorporates projects and programs to enhance overall reliability. The plan is structured

More information

Modeling of PV Based Distributed Generator Systems with Diverse Load Patterns

Modeling of PV Based Distributed Generator Systems with Diverse Load Patterns Modeling of PV Based Distributed Generator Systems with Diverse Load Patterns Mehmet H. Cintuglu, mcint015@fiu.edu, Armando Altamirano, araltami@fiu.edu Osama A. Mohammed, mohammed@fiu.edu Energy Systems

More information

Use Case 29: Data Acquisition from External DMS Network Monitoring Subsystem

Use Case 29: Data Acquisition from External DMS Network Monitoring Subsystem Use Case Description DMS (T. Berry, Data Acquisition)-03 Use Case 29: Data Acquisition from External DMS Network Monitoring Subsystem Summary: This use case describes how an Energy Management System (EMS)

More information

INTEGRATING SUBSTATION IT AND OT DEVICE ACCESS AND MANAGEMENT

INTEGRATING SUBSTATION IT AND OT DEVICE ACCESS AND MANAGEMENT Utilities WHITE PAPER May 2013 INTEGRATING SUBSTATION IT AND OT DEVICE ACCESS AND MANAGEMENT Table of Contents Introduction...3 Problem Statement...4 Solution Requirements...5 Components of an Integrated

More information

Advanced Data Management and Analytics for Automated Demand Response (ADR) based on NoSQL

Advanced Data Management and Analytics for Automated Demand Response (ADR) based on NoSQL Advanced Data Management and Analytics for Automated Demand Response (ADR) based on NoSQL Bert Taube btaube@versant.com Versant Corporation www.versant.com Rolf Bienert Rolf@openadr.org OpenADR Alliance

More information

The role of demand-responsive energy management systems for smart cities

The role of demand-responsive energy management systems for smart cities The role of demand-responsive energy management systems for smart cities Carlos Henggeler Antunes Dept. of Electrical Eng. and Computers, University of Coimbra and R&D Unit INESC Coimbra COST Exploratory

More information

Indiana Michigan Power Company

Indiana Michigan Power Company Indiana Michigan Power Company Supplier Handbook April 2012 Version 1.3 Master Table of Contents CHAPTER 1 INTRODUCTION...3 CHAPTER 2 OVERVIEW...5 CHAPTER 3 SERVICE PROVIDER REQUIREMENTS...8 CHAPTER 4

More information

ORACLE HYPERION PLANNING

ORACLE HYPERION PLANNING ORACLE HYPERION PLANNING ENTERPRISE WIDE PLANNING, BUDGETING, AND FORECASTING KEY FEATURES Hybrid data model facilitates planning, analysis and commentary Flexible workflow capabilities Reliability with

More information

Memory Systems. Static Random Access Memory (SRAM) Cell

Memory Systems. Static Random Access Memory (SRAM) Cell Memory Systems This chapter begins the discussion of memory systems from the implementation of a single bit. The architecture of memory chips is then constructed using arrays of bit implementations coupled

More information

Moving Towards the Smart Grid. Southern California Edison s Advanced Metering Infrastructure (AMI) Program

Moving Towards the Smart Grid. Southern California Edison s Advanced Metering Infrastructure (AMI) Program Moving Towards the Smart Grid Southern California Edison s Advanced Metering Infrastructure (AMI) Program 1 Copyright 2006, Southern California Edison www.sce.com/ami Select SCE Projects using Smart Grid

More information

Smart Meters are Disrupting the Retail Energy Landscape

Smart Meters are Disrupting the Retail Energy Landscape Smart Meters are Disrupting the Retail Energy Landscape Richard Ewers Principal (972) 689-6405 richard.ewers@parivedasolutions.com Pariveda Solutions, Inc. Dallas, TX Table of Contents Smart Meters Are

More information

RIG Acceptance Test (RAT) Procedures

RIG Acceptance Test (RAT) Procedures RIG Acceptance Test (RAT) Procedures RIG Acceptance Test (RAT) Procedure 0 Print Date 2 /20/2007 REVISION HISTORY REVISON NO. DATE DESCRIPTION 1.0 Initial Release 0 Update Logo and Links i RIG Acceptance

More information

Realization of control center HMIs by using IEC 61850 and CIM data bases for communication and data handling

Realization of control center HMIs by using IEC 61850 and CIM data bases for communication and data handling Realization of control center HMIs by using IEC 61850 and CIM data bases for communication and data handling A. Naumann, Otto-von-Guericke-University, Magdeburg V. Kostenko, Delphin-Informatika, Moscow

More information

Southern California Edison Implementing the Communications and Back Office Systems of a Large Scale Metering Project

Southern California Edison Implementing the Communications and Back Office Systems of a Large Scale Metering Project Mark Podorsky, Sr. Manager Business Design Edison SmartConnect Southern California Edison Implementing the Communications and Back Office Systems of a Large Scale Metering Project Southern California Edison

More information

Establishing the Scope for The Business Case Structure to Evaluate Advanced Metering

Establishing the Scope for The Business Case Structure to Evaluate Advanced Metering Establishing the Scope for The Business Case Structure to Evaluate Advanced Metering What factors should be considered when determining whether to invest in an advanced metering system? How can a business

More information

ATTACHMENT G. Network Operating Agreement

ATTACHMENT G. Network Operating Agreement ATTACHMENT G Network Operating Agreement 1. PURPOSE OF NETWORK OPERATING AGREEMENT The purpose of this Agreement is to identify contractual requirements related to Network Integration Transmission Service

More information