EASIER SAID THAN DONE

Size: px
Start display at page:

Download "EASIER SAID THAN DONE"

Transcription

1 EASIER SAID THAN DONE A REVIEW OF RESULTS - BASED MANAGEMENT IN MULTILATERAL DEVELOPMENT INSTITUTIONS Michael Flint March 2003

2 This document is an output from a project funded by the UK Department for International Development (DFID). The author is grateful to all those in DFID, UNDP, UNICEF, UNIFEM, IDB, and the World Bank who assisted with this study. The views expressed in this report are those of the author alone, and are not necessarily those of DFID. Results-based approaches have continued to develop in the year since work started on this report. The information in this report does not therefore necessarily reflect the current situation in the institutions covered. Michael Flint & Partners Wernddu Pontrilas Herefordshire HR2 0ED United Kingdom [email protected] ii

3 CONTENTS Summary 1. Introduction 2. What is results-based management? 3. The history of results-based approaches 4. Strategic planning 5. Monitoring and reporting 6. Managing 7. Issues in results-based management 8. Conclusions Annexes A. Strategic planning country level B. Strategic planning corporate C. References iii

4 ABBREVIATIONS AND ACRONYMS ARDE AROE ARPE ARPP CAS CCF CN CIDA CPIA CPO CSP DAC DER DFID IDA IDB IMEP MDG MDI M&E MTSF MTP MTSP MYFF OECD OED OVE PCR PRSP QUAG RBM ROAR SBP SRF TAPOMA UNDP UNICEF UNIFEM Annual review of development effectiveness Annual report on operations evaluation Annual report on projects in execution Annual review of portfolio performance Country assistance strategy Country co-operation framework Country note Canadian International Development Agency Country policy and institutional assessment Country programme outline Country strategy paper Development Assistance Committee Development effectiveness report Department for International Development International Development Association Inter-American Development Bank Integrated monitoring and evaluation plan Millennium Development Goal Multilateral development institution Monitoring and evaluation Medium term strategic framework Medium term plan Medium term strategic plan Multi-year funding framework Organisation for Economic Co-operation and Development Operations Evaluation Department (World Bank) Office of Evaluation and Oversight (IDB) Project completion report Poverty reduction strategy paper Quality Assurance Group (World Bank) Results-based management Results orientated annual report Strategy and business plan Strategic results framework Task force on portfolio management United Nations Development Programme United Nations Children s Fund United Nations Development Fund for Women iv

5 SUMMARY 1. The purpose of this report is to present a comparative study of the practice of results-based management in a sample of five multilateral development institutions: the United Nations Development Programme (UNDP); United Nations Children s Fund (UNICEF); United Nations Development Fund for Women (UNIFEM); Inter-American Development Bank (IDB); and the World Bank. The report is based on a review of documents and a limited number of interviews with head office staff in mid As such, it does not claim to be definitive, nor necessarily fully up to date with developments since then. 2. The terms results and results-based management (RBM) are used in different ways in different institutions. Section 2 of the report provides some introductory definitions. Results are taken to include outputs, outcomes and impacts, but with an emphasis on outcomes and impacts. RBM is similar to, but not synonymous with, performance management. 3. All five institutions are, to a greater or lesser extent, engaging with resultsbased management. All have made a commitment to increase their resultsfocus. All have taken steps to, or are working on, improving the planning and reporting of results. As befits their different histories, mandates and cultures, there is enormous variety in their approaches and progress to the four main components of RBM: strategic planning, monitoring, reporting and managing (using). 4. The introduction and implementation of RBM within large institutions is never quick and easy, as is shown by experience in the public sector in OECD countries. The introduction of RBM to international development agencies is even more challenging. Four particular issues can be identified: v

6 developing country capacity attribution aggregation incentives 5. Results-based management is the latest in a very long line of efforts to improve the measurement, monitoring and reporting of effectiveness. This is not to diminish its potential significance. Thinking about development in terms of outcomes and impacts, rather than inputs, activities and outputs, is a powerful idea that has major implications for how multilateral development institutions operate. 6. Five conclusions emerge from this study: i. results-based management is easier said than done, particularly for development institutions, and particularly given the new emphasis on country and global results. Institutions should not underestimate the challenge. ii. Multilateral development institutions work through and with developing country governments to realise and measure results. This presents development agencies with a double challenge: introduce RBM internally and within partner country governments. One without the other is unlikely to succeed. Greater support for the introduction of RBM in developing countries, and associated public sector reform, is essential. iii. external accountability is driving much of the recent push for RBM. This needs to be accompanied by a greater emphasis on using results information for internal management. iv. RBM in development co-operation has to face up to the challenge of attribution. For all practical purposes, development agencies have little vi

7 option but to manage for outcomes in the medium- to long-term, but to manage by outputs, indicators and other measures of performance (eg. partnership, strategy and process) in the short-term. v. multilateral development institutions need to work to amend their internal incentive structures in favour of results. This implies working to correct the continued bias in favour of inputs and activities, as well as giving substance to results-based budgeting. Resources and recognition needs to flow to those individuals, units, sectors and countries with the best record of managing for, and delivering, results. 7. Finally, this study has implications for those supporting and monitoring the progress of results-based management within multilateral development institutions. Assessing the quality and extent of management change is not a straightforward task. Increasing support for the introduction of RBM will need to be accompanied by a more sophisticated approach to its monitoring. vii

8 1. Introduction 1.1 Recent interest in results-based management in multilateral development institutions is the product of two related developments. The first was the definition of, and agreement on, global development goals. This process started in the mid-1990s, and culminated in the endorsement of the Millennium Development Goals in September 2000 by all 189 United Nations states. The significance of this event is that, for the first time ever, all development agencies have a common set of results to which they are working, and against which their collective performance can be judged. This focus on results was confirmed at the United Nations Conference on Financing for Development in Monterrey in March 2002, and is matched by a broad consensus on development partnership and aid effectiveness. One key feature of this consensus is the emergence of the country as the primary unit of account. 1.2 The second development has been the drive to improve public sector performance in OECD member states. One response in many countries has been the adoption of results-based management (RBM) by public sector agencies, including those responsible for development co-operation. OECD countries are the major donors to the multilateral development institutions (MDIs). It was therefore only a matter of time before the MDIs themselves were influenced to embark upon a similar process of reform. This began to happen in the late 1990s. References to results and results-based approaches have become increasingly common among MDIs as a consequence. However, these references often mean different things in different institutions. 1

9 Study objectives 1.3 The purpose of this report is to present a comparative study of the practice of results-based management in a sample of UN development agencies and multilateral development banks. This was originally intended as background to a DFID-sponsored workshop on RBM. Outline conclusions on the value of RBM as currently practiced, and the reforms needed to realise its full potential, were expected. In the event, DFID decided not to hold a workshop, in part because of the similar World Bank sponsored workshop in June Eight institutions were originally selected for study. With the agreement of DIFD this was reduced to five: - The United Nations Development Programme (UNDP) - The United Nations Children s Fund (UNICEF) - The United Nations Development Fund for Women (UNIFEM) - The World Bank - The Inter-American Development Bank (IDB) 1.5 The consultant was ask to document and comment on the following aspects of RBM for each institution: the length of experience; changes made over time; organisation, effectiveness and timeliness; quality of information; commitment of operational staff; use made by management; and the quality of reports. This proved to be a hugely ambitious undertaking. RBM is a management approach, not a simple technical instrument. There is a huge difference between how it is meant to work on paper, how it is said to work, and how it actually works. Understanding RBM basically means understanding how these institutions are managed, both in head office and in the countries where they operate. This was clearly impossible in the time available (25 days in total). Each of these institutions would require this much 2

10 time to do them justice. Useful meetings were held with all the institutions involved, but these could not really do more than scratch the surface. The result is a report that is inevitably more superficial than was originally intended, and which concentrates more on generic issues than on institutional specifics. 1.6 The report begins with a discussion of the key terms: results and resultsbased management (section 2). Section 3 contains a brief history of RBM in each institution. Sections 4-6 cover the main elements of RBM: planning, monitoring, and managing. The report ends with a discussion of the main issues in implementing and monitoring RBM. 3

11 2. What is Results-Based Management? 2.1 Results-based management can mean many different things. The area is bedevilled by different definitions. What one institution calls an outcome is another s output, intermediate outcome, or impact. Without agreement about what exactly RBM is, it is very difficult to assess or monitor its implementation. Some discussion of what these words mean is therefore required at the outset. Results 2.2 The recent OECD DAC glossary of key terms defines a result as the output, outcome or impact of a development intervention (Box 1). While this is the definition used in this report, it should be noted that this is a broader definition than used by some of the leading exponents of results-based management. According to the Treasury Board of Canada, a result is the end or purpose for which a programme or activity is performed... and refers exclusively to outcomes. 1 Outcome in this usage covers both effects and impacts - but not outputs - and may be immediate, intermediate or final. 2.3 This is a potentially important distinction. A key feature of RBM is the requirement that managers look beyond inputs, activities and outputs, and instead focus on outcomes. Some would argue that to see outputs as results is therefore to weaken this fundamental shift in orientation towards outcomes. Others argue that outputs are results, and that the important feature of RBM is the link between these and changes at outcome level. 1 Results-Based Management Lexicon. Treasury Board of Canada Secretariat (2002). 4

12 Box 1 Results OECD DAC definitions 2 : Result : the output, outcome or impact of a development intervention. - Output : the products, capital goods and services which result from a development intervention. - Outcome : the likely or achieved short-term and medium-term effects of an intervention s outputs. - Impacts : positive and negative, primary and secondary long-term effects produced by a development intervention. - Effect : intended or unintended change due directly or indirectly to an intervention 2.4 The other key feature of a result is that it should represent attributable change resulting from a cause-and-effect relationship. In other words, there has to be a reasonable connection, or at least a credible linkage, between the specific outcome and the activities and outputs of the agency. If no attribution is possible, it is not a result. 2.5 The accepted way of linking inputs to outcomes, and of demonstrating attribution, is via a logical framework or results chain. An example of such a results chain is shown below. Inputs are immediately measurable and under the control of the MDI. Activities hopefully follow soon after the provision of inputs, but are dependent on the commitment and actions of the government and other development partners. The outputs, and even more so the outcomes, that result are generated after a lag of several years, are subject to many exogenous factors, and are only partly attributable to the inputs provided by the MDI. Impacts are even more time-lagged, subject to 5

13 multidimensional causation, and are extremely difficult to attribute to one MDI. 3 IMPACTS OUTCOMES OUTPUTS ACTIVITIES INPUTS Lower infant mortality Reduced infection Immunisation coverage Immunisation programmes Finance and skills 2.6 It follows that the requirement for describable or measurable attribution presents a real challenge for development agencies as they move from projects to programmes, and as their focus shifts to shared country and global outcomes, as exemplified by the Millennium Development Goals (MDGs). The issue of attribution, and its implications for RBM, will be returned to later (para.7.5). Results-based management 2.7 The OECD DAC defines results-based management as a management strategy focusing on performance and the achievement of outputs, outcomes and impacts. This is a wide definition. In addition to the reference to outputs, the definition also mentions performance. In doing so, OECD DAC is not implying that RBM is the same as performance management. Performance 2 Glossary of key terms in evaluation and results based management. OECD DAC (2002) 3 Measuring Outputs and Outcomes in IDA Countries. International Development Association. February

14 should include measures of process and efficiency, not just results. RBM is just one, albeit significant, approach to performance management. 2.8 Another definition of RBM is provided by the Treasury Board of Canada. This rightly defines RBM as a comprehensive management approach which emphasises outcomes throughout the programming cycle. As will be discussed later, RBM implies and requires fundamental changes in organisational culture and incentives. Box 2: Results-based management A comprehensive, life-cycle approach to management that integrates business strategy, people, processes and measurement to improve decision-making and drive change. The approach focuses on getting the right design early in the process, implementing performance measurement, learning and changing, and reporting performance. 2.9 The application of RBM varies from country to country, and from agency to agency. However, there are four core elements to most RBM approaches 4 : 1. Strategic planning: defining clear and measurable results and indicators, based on a logic model or framework. 2. Monitoring: measuring and describing progress towards results, and the resources consumed, using appropriate indicators. 3. Reporting, internally and externally, on progress towards results. 4. Managing: using results information (and evaluation) for lesson-learning and management decision making. 4 A much fuller discussion can be found in OECD DAC (2001) op cit 7

15 2.10 The experience and thinking of the five multilateral institutions with respect to these four elements is considered below, having first briefly outlined the history of results-based approaches in each. 8

16 3. The history of results-based approaches 3.1 This section documents the history of results-based approaches in the five institutions reviewed: UNDP, the World Bank Group, Inter-American Development Bank (IDB), UNICEF and UNIFEM. The practice of RBM needs to be considered at three main levels 5 : Project Country Corporate 3.2 In the context of development co-operation, RBM at the project level has the longest history and is most well documented 6. Work on introducing RBM at country and corporate level is much more recent. It is at these levels where the real challenge for RBM lies. This report will accordingly concentrate on RBM at country and corporate level. 3.3 This does not mean that RBM at project level should be ignored, for two reasons. First, despite the shift to a non-project development paradigm, projects still dominate the aid landscape 7. Second, RBM is most applicable, and least problematic, at the project level. Despite this, the application of RBM and logical frameworks to projects has not been particularly successful. The limited success of RBM in the much simpler environment of projects should, at the very least, give pause for thought. This issue is discussed further below (section 7). 5 RBM is also applicable at a fourth, cross-cutting, level : the sector. 6 OECD DAC (2001) op cit 7 Development Cooperation and performance evaluation : the Monterrey challenge. OED, World Bank Working Paper. June See also DFID DER. 9

17 3.4 It is important to emphasise that the degree to which RBM has been applied, or is claimed to be, is not necessarily correlated with effectiveness. The fact that most of the institutions have not yet adopted and implemented RBM in a formal sense does not mean that they are not implementing parts of the approach at some levels. It certainly does not mean that they are not producing development results. United Nations Development Programme (UNDP) 3.5 UNDP has made the strongest commitment to RBM. It is the only institution of the five to have begun to implement RBM as an organising principle at all levels, and is the most advanced of all the UN agencies. Further advances have been made since the information on which this section is based was collected UNDP s advanced status has two origins. The first was the pressure of declining core funds in the 1990s. UNDP knew that it had to change if it was to recover the confidence of the donor community. In 1997 UNDP initiated a set of change management processes, known as UNDP The UNDP change process emphasised, among other things, the need for the organisation to become more results-orientated In parallel, UNDP s Evaluation Office (EO) had been working on developing results-based monitoring and evaluation policies, methodologies and tools. In 1997 EO commissioned a joint study with SIDA on results management 10, and produced a handbook on results-orientated monitoring and evaluation for programme managers 11. In 1998 EO was given lead responsibility for developing a framework for the measurement and assessment of 8 In a response to a draft version of this report, UNDP stated that this report does not take account of the many, more recent advancements UNDP has made in internalising RBM. 9 Annual Report of the Administrator for UNDP (1998) 10 Measuring and Managing Results. Poate, D. (1997) 10

18 programme results. This step initiated the introduction of RBM in UNDP 12 and led to the Multi-Year Funding Framework (MYFF) in The MYFF was a four-year funding framework ( ) encompassing a Strategic Results Framework and a resource framework that integrated all financial allocations. 3.8 Since then, UNDP has been working to ensure that assessing and reporting on results is not a minority preoccupation but a way of doing business for the organisation as a whole. 13 Having been piloted in ten countries, RBM was introduced worldwide in only one year, with the first Results-Orientated Annual Report (ROAR) produced in Strategic choices were made to learn from others; to learn by doing; to tailor RBM to UNDP; to keep the system as simple as possible; not to over-invest in indicators; and to manage for (not by) results. The result is an approach that is still being adapted, but which has been mainstreamed throughout the organisation and its instruments. The next generation of RBM software is currently being introduced. Box 3: UNDP s Results-Based Management System Planning Instruments: Strategic Results Framework Integrated Results Framework Multi-Year Funding Framework Country Office Management Plan Reporting Instruments: Results-Orientated Annual Report Multi-Year Funding Framework Report Country Office Management Plan Report 11 Results-orientated Monitoring and Evaluation: a Handbook for Programme Managers. UNDP (1997) 12 Results Based Management Overview and General Principles. UNDP. 13 The Multi-Year Funding Framework. UNDP (1998) 11

19 United Nations Development Fund for Women (UNIFEM) 3.9 The history of results-based approaches within UNIFEM was not easy to discern on the basis of published documents and a single interview. In common with all the institutions in this study, the notion of results is not new to UNIFEM. In the Consultative Committee (CC) Report for 1997 UNIFEM reported on the introduction of RBM concepts into its programme. This work was initiated with support from the Canadian Government. UNIFEM s Strategy and Business Plan (SBP) for also clearly listed the results that were to be achieved, and the SBP for includes a results framework which lists expected outcomes and indicators Since 1998 the CC report has used a results orientated format for reporting against the SBP. By virtue of its close association with UNDP, UNIFEM was influenced by the UNDP 2001 change process and by the introduction of RBM in that organisation. UNIFEM uses the Results and Competency Assessment developed by UNDP, and has an interface with the UNDP ROAR. However, UNIFEM has also been exploring, and been influenced by, the RBM approaches of other multilateral and bilateral agencies According to the recent Report of the Executive Director, each of UNIFEM s three programming objectives is measured and driven by a results-based framework designed to create a learning and knowledge based institution. 14 However, it is acknowledged in the same report that new monitoring and evaluation mechanisms are needed, with greater focus on assessing progress towards results than completion of activities. Thus, while UNIFEM has certainly become more results-orientated since 1997, the introduction of results-based management tools and internal support has some way to go. 14 UNIFEM Report of the Executive Director. September

20 United Nations Children s Fund (UNICEF) 3.12 UNICEF is proof that a results-orientation is not necessarily new. While the use of the term RBM may be new, UNICEF has been practising large parts of the approach for at least twenty years. One of the best examples was the child survival campaign launched in By insisting on strategic action, measurable results, and clear accountability, the then Director of UNICEF (J.P.Grant) spearheaded extraordinary improvements in child survival and development over the following decade Over the last few years UNICEF has recognised the need to define more clearly the results it seeks to achieve. In 1996, a new Mission Statement was approved. This was followed by a Medium-Term Plan (MTP) for Although containing a statement of priorities, these were numerous and wide-ranging, and were not mainstreamed within UNICEF. The MTP also lacked clearly defined targets against which to measure achievement. Significant progress was nevertheless made over the MTP period in achieving a stronger results-focus in programming and reporting, and in moving towards a more strategic approach In 2000, UNICEF produced a Multi-Year Funding Framework. This was seen as an opportunity to strengthen results-based management within the organisation. Analytical reporting on results linked to objectives and budget was identified as a core element of the framework. The Executive Director s Annual Report in the same year was the first to use a results-based format Most recently, UNICEF has produced a Medium-Term Strategic Plan (MTSP) for , with results-based management as one of its guiding principles. This represents a clear shift towards results-based programming that goes beyond identifying broad goals and requires that specific results for children be identified, measured regularly, and systematically reported. 13

21 UNICEF also recognises that its evaluation function needed strengthening 15. As the MTSP put it: UNICEF must establish its organisational priorities, define objectives, define the criteria of success for its work, strive to achieve its objectives, systematically monitor progress (or lack of it) and evaluate its work so it may learn how to maintain relevance, effectiveness and efficiency: this is resultsbased management. 16 The World Bank 3.16 The World Bank has been working to increase its results orientation for the past ten years. In 1992, the World Bank was criticized by the Wapenhans Report for giving more attention to the quantity of its lending than to its quality: a product of the so-called approval culture. The World Bank responded with a concerted effort to improve its focus on quality and results. In 1993 the World Bank issued a new plan entitled Getting Results: the World Bank s Agenda for Development Effectiveness and initiated the Next Steps reform programme. In 1994 Learning from the Past, Embracing the Future was published, with a results orientation as one of its six guiding principles This was followed by the Renewal Process in A raft of general and sector-specific performance monitoring indicators, and the logical framework, were introduced. In the same year, the Quality Assurance Group (QUAG) was established to improve, and allow management to keep track of, project design (quality-at-entry) and supervision. This added a significant quality element to the traditional measures of lending approvals (number and amount), project performance (projects at risk), and ratings of closed projects (outcome, sustainability, and institutional development impact). 15 Report on the Evaluation Function in the Context of the Medium-Term Strategic Plan. UNICEF (2002) 16 Medium-Term Strategic Plan for the Period UNICEF (2001) 14

22 saw the launch of the Strategic Compact. The Compact aimed to make the World Bank more effective and efficient in achieving its main mission - reducing poverty and included a commitment to building a performance assessment system and to making management more performance based. This led to further improvements in performance measurement and management, and to some increase in results-orientation. For example, the 1998 Annual Report on Operations Evaluation (AROE) concluded that while RBM had not been formally adopted as had been recommended by the AROE in operations are moving in that direction A similar judgement was made in The Strategy Update Paper summarised the situation in the following way : We also are much more explicitly focusing on results, particularly on how we can better measure, monitor and manage to achieve them. We have come a long way in developing measures of operational inputs and their quality, and these have helped us to make a steady improvement in Bank performance over the last several years. We now need to ratchet up our results focus, doing more to measure and explain how our work makes a difference in terms of country outcomes Recent IDA-13 and Monterrey discussions have given renewed impetus to the search for better ways of monitoring country outputs and the contribution to country outcomes. Most of the improvements in the 1990s were aimed at improving the quality of the design, implementation and monitoring of projects. The World Bank accepts that more needs be done to increase its results orientation, particularly in areas other than projects. Improvements are planned in the planning and monitoring of country programmes, as well as for sector and thematic strategies. Further work on implementing the 17 Strategy Update Paper for FY03-05: Implementing the World Bank s Strategic Framework. Executive Summary p.i. March

23 results agenda with respect to corporate reporting, staff incentives and training, and risk management is also underway. 18 Inter-American Development Bank (IDB) 3.21 The IDB has not experienced the same level of external pressure for reform and results, and the associated permanent management revolution, which has characterised the World Bank over the last decade. However, concern about the results-focus of the IDB has followed a broadly similar history As with the World Bank, recent efforts to increase the results-focus of the IDB originated from a critical review of the Bank s portfolio. In 1993 the Task Force on Portfolio Management (TAPOMA) found that the focus on the initial approval of projects and the subsequent control of execution took the focus away from managing for development results. It concluded that a concern for results needed to be paramount The IDB Board and management endorsed this shift of focus and responded in the mid-1990s with a series of improvements to the way projects were designed and monitored. The overall aim was to promote a resultsorientated dialogue among Bank staff, executing agencies, and national counterparts and an increased results-focus in project design, monitoring and reporting. Improvements included the requirement for logical frameworks, impact indicators, and project completion reports based on data on the outcomes or impacts. The new US Administration s emphasis on results throughout 2001, and internal changes in Office of Evaluation and Oversight, gave fresh momentum to RBM within IDB. 18 Better Measuring, Monitoring and Managing for Development Results. Development Committee Paper. World Bank. September This section draws extensively on the Development Effectiveness Report. Office of Evaluation and Oversight. IDB. February

24 3.24 Despite the increasing commitment of management to results, IDB accepts that it has some way to go. A recent report by the Office of Evaluation and Oversight concluded that IDB projects are still not being designed and monitored so as to transparently demonstrate development results. Further improvements to project and country results frameworks are under consideration, as are changes to the incentive framework to help sharpen the IDB s focus on results and development effectiveness Development Effectiveness at the IDB. Paper for the Board of Executive Directors. January

25 4. Strategic planning 4.1 This section considers the extent to which strategic planning at the country and corporate level has a results-focus. For institutions that are implementing RBM, strategic planning should be about planning to achieve outcomes: management for results. Plans should contain clear, realistic and attributable results; defined indicators specifying exactly what will be achieved by when; a results chain or logic model linking inputs, activities, outputs and outcomes; and a strategy or strategies explaining how and why inputs will lead to outcomes, including a discussion of risk. Country-level planning 4.2 All the institutions are, to a greater or lesser extent, struggling with three challenges. First, to align their programmes more explicitly to the country s own plans, such as the Poverty Reduction Strategy Paper (PRSP). Second, to raise the sights of their programmes from the project level to country level. And third, to define better country-level results frameworks. 4.3 Annex A contains a summary assessment of country planning documents. While most of the institutions now specify country-level results of some sort, none of the institutions have developed logical frameworks for country programmes as a whole. UNICEF comes closest with its programme-level Integrated Monitoring and Evaluation Plan (para.4.12). Unlike the others, UNIFEM plans regionally and sub-regionally rather than at country level. The regional and sub-regional programmes are developed within the framework of the Regional SBP. Logical frameworks are a requirement at the programme level. 18

26 4.4 The 2002 Development Effectiveness Report (DER) provides a frank assessment of country-level planning in the IDB. It found that, with few exceptions, Bank programming does not establish ex-ante any specific results that it is seeking to obtain in working with an individual country. IDB country programmes described project-level outputs rather than country level outcomes. The one area of activity where the IDB had anticipated outcomes was structural reform. The experience in this area shows very clearly the importance of an outcome-focus. IDB projects have been very successful in producing the output of reform, but these reforms did not produce the outcome of growth in productivity. 4.5 The three Country Papers reviewed 21 support this conclusion. The Strategy Matrix is not a logical framework. Overall objectives are stated, but these are very general and are not accompanied by any indicators or targets. The Bank s strategy then consists of priority areas, activities or focuses under each objective, often referencing specific IDB programmes. The performance benchmarks for the strategy are a mix of selected program outputs and country outcomes. Examples from the Country Paper for Chile are contained in Box 4. In all the Country Papers reviewed, the link between strategy outputs and country outcomes is not specified. Box 4 : IDB Strategy Matrix examples Objective Poverty reduction, human capital formation and social inclusion Strategy Improvements in execution of preschool education programs (Early Childcare Program) Performance Recovery of net enrollment ratios in rural primary school to at benchmark least 87% by the end of Recent IDB guidance recognises the importance of including in Country Papers (and distinguishing between) indicators that can be used to monitor progress specific to the Bank s programme (ie. outputs), as well 21 Brazil (2000), Ecuador (2001), and Chile (2001). 19

27 as the Bank s contribution to country outcomes 22. This is very much work in progress, but one idea is to juxtapose IDB programme outputs with associated country outcome targets. 4.7 Better anchoring of the Country Assistance Strategy (CAS) in the country s specific priorities and objectives is central to the World Bank s increased focus on results at country level. According to the Annual Review of Development Effectiveness (ARDE) for 2001, results would be improved if CASs included a logical framework (and results chains) linking Bank instruments with country objectives. In 2002 the World Bank reported that results-based CASs are to be piloted in several countries. These will identify country outcomes (from the PRSP or similar) to which the World Bank will contribute, along with intermediate indicators linked to particular products and services that the Bank will provide Current World Bank CASs 24 are similar to the IDB Country Papers. Most include a Country Program Matrix detailing the main objectives or priorities, and the Country Strategy/Key Actions. Progress benchmarks or targets for each main strategy/action are given, but these refer country outcomes rather than Bank outcomes or outputs. As with the IDB, country strategies do not yet contain clear results frameworks or chains, nor clear, monitorable indicators for evaluating the development effectiveness of the Bank program 25. This is not to imply that this is easy to do. As recognised in an IDA-13 paper, part of the answer may lie in the identification of early indicators of output performance which have good eventual linkages to country outcome objectives Country Paper Guidelines. IDB. February World Bank (2002) op cit, p Pakistan (2002), Chile (2002), and Belarus (2002). 25 Ten Features of a Good CAS Measuring Outputs and Outcomes in IDA Countries. IDA. February

28 4.9 Recent UNDP Country Programme Outlines (CPOs) include a results and resources framework. 27 This lists intended outcomes and outputs (with indicators) within strategic areas of support. Examples from the Malaysia CPO are contained in Box 5. Note that the UNDP outcomes are lower level outcomes (less ambitious and more attributable) than those specified by UNICEF, IDB or the World Bank. Box 5 : UNDP results framework examples Strategic area of Sustainable human development support Intended outcome National policies more effectively address the social impact of economic liberalisation Indicator of Explicit analyses of the impact of global liberalisation on outcome human resources development integrated in key national plans and policies Output Increased capacity to assess and predict human development needs and to monitor in relation to competitiveness 4.10 This is an advance on earlier UNDP Country Cooperation Frameworks (CCFs). These had merely listed the areas of support and made no mention of results. 28 More recent CCFs had listed key results under each strategic area of support, but had not distinguished between outcomes and outputs, nor included indicators UNICEF Country Notes (CNs) describe overall objectives for the 5- year programme, plus specific objectives for each programme (eg. to reduce infant and child mortality by 25%). No overall results framework is presented for the country programme. However, a very detailed Integrated Monitoring and Evaluation Plan (IMEP) is then developed for each of the constituent programmes (eg. health, early education, etc.). 27 India CPO (2002); Malaysia CPO (2002). UNDP consider that the Malaysia CPO is not a good example from the RBM perspective. 28 Mongolia CCF (1997) 29 Malawi CCF (2001) 21

29 Examples from the Health Programme IMEP for Malawi ( ) are contained in Box 6. Box 6 : UNICEF Integrated Monitoring and Evaluation Plan examples Overall To create a conducive environment to realise rights to survival, objective development, protection and participation of children and women. Program To eliminate or decrease the major killers of children in UNICEF objective impact areas Specific To improve access to, and the quality of healthcare at health objective facilities Output Health workers at health facilities trained in IMCI case management and obstetrical care Baseline 10% Target 80% Critical Adequate number of qualified staff available assumption Corporate planning 4.12 There is a tension between corporate and country level objectives. Allowing priorities to be set at country level reduces the extent to which institutions can develop corporate-level results frameworks. In most cases this tension is resolved by restricting corporate planning to the definition of broad goals, priorities and principles. Few institutions have attempted to develop ex ante results frameworks at corporate level. A summary of the corporate plans for the five institutions is contained at Annex B UNDP is well aware of the tension between top-down and bottomup planning, but has gone further than any of the other institutions in determining a corporate results framework. The Strategic Results Framework (SRF) for lists 7 goals, 24 sub-goals, 142 outcomes (with indicators), and 84 strategic areas of support. Box 7 contains examples from the SRF. 22

30 Box 7 : UNDP Strategic Results Framework examples Goal To create an enabling environment for sustainable human development. Sub-Goal Strengthen capacity of key governance institutions for peoplecentred development and foster social cohesion Strategic Reform and strengthen the system of justice, including legal area of structures and procedures support Intended Independent and efficient system of justice, accessible to all outcome Indicator strata of the population in particular the poor. Number of countries in which there has been a decrease in time required for disposal of civil and criminal court cases 4.14 In practice, only the goals, sub-goals and strategic areas of support are used to guide country-level programming. Outcome and outputs are determined at country level. The utility of the corporate level outcomes within the SRF is therefore unclear UNIFEM s Strategy and Business Plan for followed a similar structure to that of the UNDP SRF, but without the sub-goals. 120 outcomes and indicators were listed. As with UNDP, no means of verification were given for the indicators. An example is given below. Box 8 : UNIFEM Strategy and Business Plan examples Objective Increase options and opportunities for women. Thematic Economic empowerment and rights area Strategic Strengthening women s economic capacity, rights and area of sustainable livelihoods as entrepreneurs, producers and homebased workers support Intended Reduction in the number of women in poverty through outcome participation in viable economic activities Indicator Number of small and medium scale enterprises owned by women 23

31 4.16 UNIFEM has subsequently revised and strengthened their results framework. In 2001 UNIFEM introduced a results indicators framework. In 2002, it consolidated the numerous outcomes of the SBP into a more logical and focused Outcome Framework with indicators and suggested means of verification. This reduced the number of outcomes to The UNICEF Medium Term Strategic Framework lays out 5 organisational priorities (plus targets and indicators) and 89 core intervention areas. Each of the organisational priorities is related to relevant long-term international goals, such as the MDGs. Examples from the MTSF are given below. Box 9 : UNCEF Medium Term Strategic Plan examples Organisational Fighting HIV/AIDS priority Long-term UN Special Session on HIV/AIDS Declaration of Commitment international goals MTSP target By 2005 ensure that national policies, strategies and action plans are under implementation to prevent parent-to-child transmission of HIV in all countries affected by HIV/AIDS Indicator Number of countries with national strategies and action plans under implementation 4.18 The IDB and World Bank have not yet attempted to develop corporate plans to this level of detail. The IDB Institutional Strategy merely sets out four priority areas 31. Two overarching objectives poverty reduction and social equity, and environmentally sustainable growth were added after a long debate. The Bank s contribution to these objectives is to be measured through its contribution to country level 30 How are we doing? Tracking UNIFEM progress in achieving results for management and learning. Briefing Note. UNIFEM (2002) 31 Renewing the Commitment to Development: Report of the Working Group on Institutional Strategy. IDB (1999) 24

32 outputs and outcomes. Sector strategies are in the process of being finalised The World Bank takes a similarly minimalist approach to corporate planning. The Strategic Framework Paper acknowledges that the MDG s frame the World Bank s strategy and provide a results-based framework for the international community. 32 However, no attempt is made to specify global outcomes or outputs for the Bank. Rather, the aim is to maximise the impact on poverty reduction through greater selectivity within countries, across countries and in global programmes. The main focus of planning and activity will remain at country level, but with strong corporate guidance on principles and practice. As the Strategic Framework observed, given the tension between bottom-up country driven needs and more top-down imperatives, this is inevitably a difficult and iterative process" This demonstrates the main difference between the UN agencies and the multilateral development banks (MDBs). All the UN agencies have, to a greater or lesser extent, defined global goals and outcomes. The challenge for all of them will be to show that these are monitorable and attributable. The MDBs have (so far) avoided global results frameworks, and have instead concentrated on strategy in broad support of the MDGs. This is now changing as all institutions feel the pressure to deliver and demonstrate results at the country and global level. 32 Strategic Framework. WBG, January Strategic Framework. World Bank Group. January 2001, p. 7 25

33 5. Monitoring and reporting 5.1 This section should be as much about monitoring as about reporting. Not everything that is monitored is reported, or needs to be. However, the limited duration of this study meant that little information could be collected on monitoring per se. Time constraints also meant that no country-level reports were examined. 5.2 The distinctions between monitoring and reporting, and between internal and external reporting, are important. Many institutions are under pressure to report externally on results. While this is important for accountability, internal reporting to management, and monitoring more generally, are arguably at least as important. RBM is intended to improve both management effectiveness and accountability. 5.3 It is also important to stress that accountability for results implies more than just reporting results. Many results (eg. outcomes) will not be attributable to a single institution. Because of this, reporting needs to demonstrate several things : i. that the agency is managing for outcomes, not just activities and outputs. ii. iii. iv. that improved outcomes are being achieved; that the agency has contributed to these outcomes; that the design and implementation of the results strategy is sound and effective; v. that the results over which the MDI has a significant degree of control, and is aiming for, are being achieved. 26

34 Annual reporting should concentrate on short-term results that show meaningful change over the reporting period; are attributable to the interventions being supported; and bear a significant relationship to longer-term objectives None of the reports reviewed yet approach this standard. Most concentrate on the second and last task reporting on outputs and outcomes but without either analysing the strength of the link between the two, nor the effectiveness of the management strategy. 5.5 The UNDP Results Orientated Annual Report (ROAR) represents the most ambitious and comprehensive corporate results report. The third ROAR (2001) presents key findings for each of the six SRF goals, together with indepth analysis of three selected sub-goals. Aggregated global figures for the percentage of annual outputs fully or partially achieved, and the percentage of outcomes where there was positive progress, are presented in the text, together with the number or percentage of country offices active in each area. Comparative figures are sometimes given for achievements in the previous year. One of the general observations made is that there is still a sizeable gap... between impressive results at the output levels achieved within each goal and their contribution to realising outcomes The ROAR process includes an independent assessment of the extent to which the self-reported results from the country offices are accurate and complete. 71% of progress statements were fully verified, and a further 9% were partially verified. The verification did not extend to the degree to which UNDP outputs contributed to progress at the outcome level. The ROAR does not make any claim that it is solely responsible for such progress, but simply reports changes in outcomes that are clearly linked to UNDP support. 34 Results-Based Management and Accountability for Enhanced Aid Effectiveness. A Reference Paper. CIDA Policy Branch. July Results-Orientated Annual Report, UNDP (2002), p.2. 27

35 5.7 While the ROAR is clearly a great advance on previous reporting, it lacks transparency in two respects. First, there is no single table showing coverage and achievements by goal and sub-goal for 1999, 2000, and It would be possible to largely create such a table by extracting the figures for 2000 and 2001 from the 67 pages of text, but the fact that the data is not presented in an accessible format is strange. The ROAR badly needs a straightforward summary. Second, although activities by goal and country are tabulated in an annex, there is no presentation of the achievement by outputs and outcome for each country office. This is a deliberate decision 36, and may reflect a judgement that country-specific results would be misleading given the wide variation in results, projects and countries. 5.8 For the last two years the Evaluation Office of UNDP has prepared a Development Effectiveness Report (DER). This is largely based on independent evaluation studies, and complements the ROAR by providing summary findings on the impact and sustainability of UNDP interventions at project and country level. The relative paucity of empirical data on the development impact of UNDP s assistance was noted in both of the last DERs. 5.9 UNICEF has used a results matrix to report on its Medium-Term Plan (MTP) since The results cited are a mix of global outcomes to which UNICEF made some contribution, or a description of what UNICEF has supported (ie. activities). There is no assessment of what UNICEF has directly achieved in terms of outputs, either against what was planned for the year in question or over the four years of the plan. A comparison of the results matrix for 1999 and 2001 does not allow any conclusion to be drawn as to whether UNICEF is more or less effective than it was, or whether its contribution is growing or 36 Results Based Management Concepts and Methodology. UNDP Technical Note (2000) p

36 shrinking. The better definition of intended results in the MTSP for is likely to lead to improved reporting UNIFEM s Strategy and Business Plan (SBP) for included a detailed list of activities under each objective. The new SBP for included a report on the previous plan that lists the specific and general results achieved. However, it is not possible to match the results with the activities originally listed in the SBP for The annual Report of the Executive Director mentions that implementation of each of [the SBP] objectives is measured and driven by a results-based framework, but does not report against the intended outcomes listed in the SBP for This is done in the Consultative Committee Report, which is an annual report of results against the objectives of the SBP, based on data from the 6-month and annual reports submitted from each Sub- Regional Office The IDB prepares an Annual Report on Projects in Execution (ARPE) for the Board of Executive Directors. This provides detailed information on the status and performance of the Bank s portfolio, including an assessment of the extent to which ongoing projects in each country are likely to achieve their development objectives. In addition, the ARPE provides an assessment of trends and challenges, the issues affecting portfolio performance and notes the Bank s response to these challenges. In the last two years the report has contained an analysis of the quality and compliance rate of Project Completion Reports (PCRs), has provided information on good practices noted, and highlighted lessons learned from both the Bank and Borrowers. 37 UNIFEM Report of the Executive Director. Executive Board of UNDP. September

37 5.13 The Bank is in the process of revamping the PCR and the Project Performance Monitoring Report (PPMR). The PPMR has been modified to include historical project ratings, as well as greater attention to financial and sustainability issues and lessons learned, and will be linked to other relevant reports and monitoring systems. The last PPMR will also serve as a key input for the preparation of the PCR, which will focus more on results and comply with OECD/DAC guidelines for MDBs. It will include an evaluation of both the Bank and Borrower performance, an assessment of the project s contribution to institutional development, and an outlook on expectations regarding the project s ability to deliver benefits in the medium and longterm Like UNDP, IDB s Office of Evaluation and Oversight (OVE) has also produced a Development Effectiveness Report. However, unlike in UNDP, OVE is independent of management. One of the findings reported in the IDB DER was that, for completed projects rated as highly likely to achieve their development objectives, the majority of PCRs only discuss project outputs. Although it is quite likely that all the projects made some contribution to outcomes and impacts, this was very rarely documented in the PCR According to Operations Evaluation Department (OED), the monitoring and evaluation (M&E) in World Bank operations has been chronically deficient. The Annual Report on Operations Evaluation (AROE) for went on to say that, despite indications of increasing operational quality and project performance, the Bank does not have a solid foundation to convincingly demonstrate results on the ground. 39 According to one source, the Bank is still years away from the systematic measurement of results. 38 Development Effectiveness Report. IDB (2002) pp Annual Report on Operations Evaluation OED, World Bank (2002) p

38 5.16 Part of the problem lies in the lack of monitorable outcomes in Country Assistance Strategies (CAS), Sector Strategy Papers, and Project Appraisal Documents. These and other problems have been the subject of a comprehensive M&E action plan since Further improvements in M&E such as a CAS completion report are underway. The methodological challenges associated with measuring and attributing results are also very real The Annual Review of Portfolio Performance (ARPP) produced by the Quality Assurance Group (QAG) is the Bank s primary operational monitoring tool. At present this focuses on design and supervision quality, rather than results. However, there are plans to broaden the ARPP into an Annual Report on Portfolio Performance and Results. Subject to a satisfactory solution to the problem of aggregation, there are also plans for units to report annually on outputs and outcomes related to real-time actions, but not program and country outcomes that will be realised only after long and variable lags The OED Annual Review of Development Effectiveness (ARDE) reports on the outcomes, sustainability and institutional development impact of completed projects, as well as providing a summary of country and sector evaluations. It should be noted that the term outcome in this context refers to the extent to which the project s relevant development objectives have been (or are expected to be) achieved. These will be a mix of outcomes (intermediate objectives such as skills and organisational capacity) and impacts (long-term goals such as human and social development) The ARDE provides a reliable measure of the extent to which completed Bank projects are producing relevant results. Because OED has used a 40 Better Measuring, Monitoring and Managing for Development Results. Development Committee Paper. World Bank. (September 2002) p.11 31

39 consistent methodology over the past few years, it also allows trends in project performance to be monitored. What it does not attempt to do is to quantify the specific results achieved or assess the contribution towards higher goals, such as the MDGs. In this sense it is more of an aggregation of results ratings rather than results. This is a practical solution to the problem of aggregating across diverse results The World Bank acknowledges that there is scope to improve its reporting on its results. The assessment of the Strategic Compact found that the corporate scorecard was still incomplete, in part because of a lack of an agreed methodology. Limited progress has been made on agreeing ways of measuring and monitoring the impact of World Bank actions at country and sector level. This missing second tier of the corporate scorecard is intended to link internal bank measures (such as product quantity and quality) with the International Development Goals (IDGs). The Strategic Framework produced in 2001 also highlighted the need to link country and sector work with the IDGs, but was not able to say how this would be done. 32

40 6. Managing...there is sufficient evidence that the key elements are well known to donors and carried out to some extent. But in so many instances they have failed owing to weaknesses in how the systems are used rather than what its components are. They reflect the missing link between the measurement procedures and the way in which the information is used the management process There are two primary uses, and motivations, for results information. The first is for accountability: to demonstrate effectiveness to others. This aspect was covered in the previous section. The second is to provide continuous feedback and learning for management. To what extent are these institutions really managing for outcomes? To what extent are they using information on outputs and outcomes, and from evaluation, in decision making? 6.2 These are difficult questions to answer, particularly in this type of study. The potential uses of results information extend throughout the institution, from planning and budgeting to staff appraisal. The observations below are drawn from a small number of interviews, and from the few reports that address this issue. Planning 6.3 Section 4 looked at the extent to which these institutions were planning to achieve outcomes: managing for results. In an ideal world strategic planning should also be about managing by results. Institutions should be amending their plans on the basis of results and experience. In practice this is something that few institutions are able or prepared to do. No development 41 Measuring and Managing Results. Poate, D. (1997) p.vi 33

41 institution has been implementing RBM long enough for the results of one strategic planning cycle to inform to inform the next More fundamentally, given the time lags between programmes and outcomes, let alone between programmes and data on outcomes, it is doubtful whether management by outcomes or impacts will ever be a practical proposition for development agencies. The best that can be hoped for is for periodic reviews to examine the alignment of the programme in respect of outcome trends. UNICEF have done this to some extent in their Medium Term Strategic Plan by concentrating, for example, on countries with particularly high child mortality rates. 6.5 Management by intermediate outcomes and outputs is more feasible on an annual basis. This is the approach being adopted by UNDP, and being investigated by the World Bank. The two drawbacks with this approach are, first, that even outputs are a poor measure of the agency s recent efforts because of the time lags involved. As observed in an IDA-13 paper, shortterm measures of outputs are likely to reflect the result of resources provided many years earlier 43. Second, early indicators of output or intermediate outcome performance need to have good linkages with ultimate outcome objectives. Unless they do, progress towards outputs and intermediate outcomes will not necessarily be the same as, nor any guarantee of, progress towards improved development outcomes. Institutions need to keep track of outcome and impact trends, and ensure through evaluation that performance in terms of outputs and intermediate outcomes is linked to these. This is the challenge for UNDP. 42 This is not to say that the experience of one planning cycle has not informed the next. For example, the UNIFEM SBP for certainly informed the formulation of SBP Measuring Outputs and Outcomes in IDA Countries. IDA (February 2002) p. 5 34

42 Resource allocation 6.6 As with planning, resource allocation can mean allocating for results or by results (or conceivably both). The World Bank is probably the strongest exponent of budgeting for results. There is good evidence that aid has a larger impact on growth and poverty reduction in the context of good policies and institutions. In line with this thinking, the World Bank has for some time used assessments of country policy and institutional (CPI) performance as a basis for allocating IDA funding Since the Strategic Framework, the Bank has sought still greater selectivity and focus in its work. 6.7 Budgeting by results is altogether more controversial, and difficult to apply. UNDP is particularly reluctant to contemplate results-based budgeting (RBB). There is concern over using results information to reward countries that do well, and penalise countries than do badly. As with the decision not to publish country-level data, this may reflect an internal political judgement. Getting staff to commit to results-orientated planning and reporting has been hard enough. Adding a budget implication would have made the process still more difficult. This implies, paradoxically, that RBM is more acceptable if it doesn t actually change anything. This is clearly contrary to the spirit of RBM. If RBM is to mean anything, it has to mean using office/unit performance as one criteria for allocating resources. As far as could be ascertained, none of these institutions yet do this. This may, in part, be due to the lack of a reliable results-based indicator of office/unit performance. 6.8 This is not to deny that there is real question about how best to balance need and results in resource allocation, particularly for country allocations. 44 Better Measuring, Monitoring and Managing for Development Results. Development Committee Paper. World Bank. (September 2002) p.7 45 It can be argued that CPI scores are themselves results of previous actions by governments and donors. The World Bank is in effect budgeting on the basis of past results in order to increase the likelihood of future results. 35

43 But this is not an either/or choice. Aid should be directed at countries in need with good policy and institutional environments, and therefore the best prospects for achieving results. It would appear that the World Bank does this rather better than do the UN agencies Finally, results-based budgeting should have implications for how resources are allocated. The 2001 ARDE included an analysis of which objectives World Bank projects have been the most effective at achieving. This showed, for example, much greater success with physical infrastructure than for public sector institutional change Other things being equal, results performance should inform sectoral allocations, both within countries and globally. As with country allocations, there is a question about whether poorly performing sectors should be penalised. For example, the DER showed that UNDP is performing relatively poorly in relation to gender and institution building. This should mean that UNDP should attempt to understand and address the causes of this underperformance, not immediately reduce its allocation to gender and institutional activities. In the longer run, however, continued poor performance should imply some reallocation of resources towards outcomes where the institution s contribution will be greatest As with office/unit performance, results-based sectoral allocations are dependent on reliable and acceptable indicators. This is a real challenge for all institutions, requiring as it does comparability in the definition and measurement of outputs and outcomes across sectors. 46 UNDP s allocations to good policy / bad policy countries (as measured by CPIA scores) became less favourable over the 1990 s. 47 Annual Review of Development Effectiveness OED World Bank (2002) p.20 36

44 Staff appraisal 6.12 It was not possible to ascertain the extent to which the assessment of staff performance now includes a results component. According to UNDP, ROAR results are now used in the assessment of Country Resident Representatives. The World Bank is also making some progress at evaluating managers on the basis of tangible results One obstacle to more results-based appraisal and to the application of RBM more generally - is the time-lag between inputs and outcomes. Annual appraisals can only hold staff accountable for very short-term results. Any higher outputs or outcomes will be the product of resources and actions provided years before. Equally, given the predominance of short postings, most staff will be long gone by the time the outputs and outcomes of their work become apparent. Making staff more accountable for planning for results, and for reporting on results, would be a step in the right direction. Managerial response 6.14 UNDP is aware that the real challenge for RBM is, and remains, to realise a management value beyond external reporting. As the ROAR itself points out, the unique benefits of the ROAR lie in the extent to which it can generate managerial responses at all levels. The key question is the extent to which a management response has been forthcoming. This is probably the most critical, but difficult, question to answer. To what extent is RBM really making a difference to the way the institution is managed? How much is rhetoric, and how much is reality? 6.15 According to UNDP staff, RBM is beginning to transform the way UNDP does business. Examples of this include : 37

45 Restructuring in some country offices in line with outcomes. More outcome-focussed discussions with partners, and at Board level. Improvements in country-level planning as a result of the SRF On the other hand, there has been some criticism of the limited response of management to some of the key ROAR findings, such as the relatively poor performance of UNDP in respect of gender. There is also reported to be more commitment to RBM at headquarters rather than in the country offices, and more at middle rather than senior management UNDP is well aware of the challenges involved in implementing RBM. According to UNDP these include defining results consistently and in a measurable way; building partnerships and assessing results together with partners; convincing donors and local partners of the virtues of RBM; and changing hearts, minds and capacities within UNDP None of the other institutions have attempted as rapid a transition to RBM as UNDP. Any managerial changes are therefore both more incremental and more difficult for an outsider to detect. The World Bank experience is a case in point. Ten years of management reform, intended in part to increase the results-focus of the organisation, have made some difference. The design, outcomes, sustainability and institutional development impact of World Bank projects have improved. However, as the Bank itself acknowledges, there is much more that needs to be done to increase its results-orientation, particularly at country, sector and corporate level. The Bank s own assessment of performance measurement under the Strategic Compact concluded as follows :... while the measurement of performance as well as several of its uses have improved during the Compact period, performance measurement has not yet been used systematically and consistently to make strategic 38

46 decisions on selectivity, mobilize resources, align staff motivation, and hold managers accountable for the performance of their units The lack of senior management support for a stronger focus on results measurement and management as evidenced by the failure to implement the OED recommendation on RBM in 1997, and the weak support for the corporate scorecard to date partly explains the slow progress. However, two other factors have contributed : the long period of time needed to implement fundamental change within an institution the difficulties associated with applying results-based management to a development institution The other three institutions UNICEF, UNIFEM and IDB will face the same challenges. It is noteworthy that IDB is in the process of recruiting a Chief Development Effectiveness Officer to spearhead the process of culture change within that institution. 48 Assessment of the Strategic Compact. Annex 9 Performance Measurement. World Bank (2001) p

47 7. Issues in results-based management 7.1 The introduction and implementation of RBM to large institutions is never quick and easy, as is shown by experience in the public sector in OECD countries. The introduction of RBM to international development agencies is even more challenging. 49 The aim of this section is to discuss these challenges, drawing on the findings of this survey and other literature. Four particular issues can be identified : developing country capacity attribution aggregation incentives Developing country capacity 7.2 The implementation of RBM in OECD countries was born out of the need to improve the performance of national bureaucracies and deliver better public services. RBM has been most effective when it has been designed as part of wider public sector management reform, and in an affirmative and stable policy and fiscal environment Aid agencies have come to recognise that development results depend on developing countries. As the World Bank said recently: that is where development outcomes are realised and measured and where the other goals will be met, or not 51. This presents development agencies with a 49 Assessing Development Effectiveness. Flint, M. and Jones, S. DER Working Paper 1. DFID Evaluation Department (2001) 50 Measuring and Managing Results. Poate, D. (1997) 51 Better Measuring, Monitoring and Managing for Development Results. Development Committee Paper. World Bank. (September 2002) p.4 40

48 double challenge: introduce RBM internally and within partner country governments. One without the other is unlikely to succeed 52. As the focus shifts from projects to sector programmes to countries, so development agencies become critically dependent on partner governments to better measure and manage results. 7.4 Experience in OECD countries suggests that RBM will not succeed without a supportive policy, fiscal and institutional environment. As Poate stated in 1997 even where aid agencies can tackle their own internal measurement procedures and use of performance information, advocating performance measurement to clients in isolation is unlikely to lead to improved results because too many components are missing. RBM requires and means full-scale public sector management reform in developing countries. This is an altogether more challenging prospect than attempting to implement RBM with development agencies. Strengthening country capacity in parallel is an all important priority, but a long-term task. Many countries not yet even have the systems to track inputs and outputs, let alone outcomes 53. Attribution 7.5 Attribution is the extent to which a result is caused by the activity, programme or agency: if there had been no agency activity, how would the outcome have been different? As development agencies lift their sights - from projects to programmes to countries to global so the problem of attribution increases. RBM is based on the principle that outcomes can be improved by increasing management focus on them. This can work well at the project level, and for so-called hard outcomes. It is much more difficult to apply at country and global level, and for soft 52 This would be akin to a car company introducing RBM in the major offices but not in its car plants. 53 Annual Report on Operations Evaluation World Bank (2002) p.34 41

49 outcomes. Table 1 draws on a discussion paper for CIDA to summarise the differences. Table 1: Characteristics of projects versus country and global programmes PROJECTS Largely self-contained, involving a relatively limited and identifiable range of actors, each of whom has relatively clearly defined, complementary roles and interests Produce tangible outputs Deal with discrete and well-defined development problems that have a defined physical location Progress from inputs to outputs to impacts in a way that is relatively easy to observe and quantify Progress from inputs to outcomes or impacts over a relatively confined period of time Have immediate cause and effect relationships that are relatively easy to observe and validate. There is a direct link with development outcomes and impacts. Have a design and direction over which the agency has a high degree of control or influence COUNTRY AND GLOBAL Are not self-contained, involving a wide network of actors who may have overlapping or conflicting roles and interests Produce intangible outputs (eg. influence) for which objective and relevant forms of measurement are not available Deal with systematic country-, region-wide or global development issues Do not always progress in linear fashion from outputs to outcomes to impacts. Progress may be iterative. Progress from inputs to outcomes or impacts over a relatively long period of time Involve cause and effect relationships that are difficult to observe and validate. Links may be indirect and multi-causal. Have a design and direction which the agency, on its own, has a low degree of control or influence 7.6 These are caricatures. For example, projects increasingly produce intangible outputs. The table nonetheless helps explain why RBM is becoming more difficult. Project-type interventions traditionally produce clear, measurable impacts (changes) that result from linear processes; the causes and impacts are easily attributable to a narrow range of inputs and actors. The more you move towards country-type interventions the 42

50 more you push notions of measurable change and identifiable causality to the limits of their validity Increasingly, donors (multilateral and bilateral) are seeking to work together in support of government designed and implemented policies and programmes. Multilateral development institutions (MDIs) pursue development outcomes indirectly, working with other partners and through country governments. But the assumption built into RBM is that the agency sets its objectives, pursues them and then reports on how well it has done more or less independently. Again, this makes most sense in the context of single donor projects and programmes. 7.8 Attributing development outcomes and impacts to individual MDIs is very difficult in these circumstances. In most cases, the multiplicity of influences, and MDIs relatively minor role, means that attempts to establish causality will be of dubious validity. This has major implications for RBM. There is a clear tension between the benefits of an outcomefocus, and the need for results to be results in the proper sense (ie. attributable change) if management is to benefit from focussing on them. The long time horizons for achieving outcomes and impacts (5-10 years plus), and the limited and lagged data availability, exacerbates the problem. 7.9 One response is to say that what matters is improved development outcomes, not whether they can be attributed to a particular MDI. This misses the point. Attribution is fundamental to RBM. Development outcomes like child mortality are useful if you want to measure and manage the collective efforts of governments and donors. They are much 54 Results-Based Management and Multilateral Programming at CIDA a discussion paper. Mark Schacter. Institute of Governance, Ottawa, Canada. (1999) p

51 less useful for measuring and managing the performance of a single donor But equally, just because attribution is difficult, it would be wrong to conclude either that identifying plausible association or credible linkages between outputs and outcomes is impossible, or that RBM is a non-starter for development agencies. Aiming for specific development outcomes and impacts remains a powerful and useful principle. Development agencies should manage for outcomes, and support developing countries in measuring these. They should not, however, either claim these as their results, nor be held individually accountable for progress or otherwise. Countries themselves are responsible and accountable for development outcomes. Development agencies should be responsible and accountable for providing efficient and effective support. This implies a short to medium-term management focus on outputs, leading indicators for outcomes, strategies and processes, informed by longer term evaluation to ensure that these are contributing to positive changes in outcomes. Aggregation 7.11 This is closely linked to the challenge of attribution. How do you add up diverse results in order to present a summary picture of performance, either at country or global level? Both UNDP and the World Bank are grappling with this problem Aggregating actual results (eg. number of parliaments strengthened) is not practical. Results are too numerous and diverse. Aggregating outcomes (eg. maternal mortality rates) runs straight in to the problems of attribution and data availability. Outcomes that are uncertainly, partially and variably attributable to the agency (such as girls enrolment rates) make little sense as corporate results. Logical 44

52 frameworks or similar may or may not help at country level, but are unlikely to do so at corporate level. Aggregating the number of programmes implemented in each results area as in the UNDP SRF merely measures activities, not results or performance The solution probably lies in aggregating results and performance ratings or scores. This is the approach already adopted by the World Bank in the ARDE, and UNDP in the ROAR. At country level the agency would measure its performance by aggregating intervention-level results and performance scores, plus additional country level performance measures (eg. partnership quality). At the corporate level the agency would aggregate intervention-level and country-level results and performance scores, allocated by priority area as appropriate. A key requirement for this approach is reliable and comparable ratings. Once again, this points to the need to strengthen country- and intervention-level monitoring and evaluation systems if management information systems and agency reports are to contain credible and useful information. Incentives 7.14 It is tempting to see the relatively slow transition of large institutions like the World Bank to more results-based approaches as simply proof of how long it takes to effect fundamental change. While this is undoubtably true, other factors are probably at work. RBM is just the latest in a very long line of efforts to make development agencies improve the measurement, monitoring and reporting of their effectiveness. Indicators, logical frameworks, and evaluation studies all wax and wane in popularity, but none quite makes the difference expected. Unless we can identify why the track record of performance measurement and management is so long and disappointing, RBM is unlikely to lead to a significant improvement. 45

53 7.15 Two of the possible reasons have already been mentioned. First, development agencies have been trying to implement improved monitoring and evaluation in difficult and unreformed environments. RBM needs to be part and parcel of public sector reform in developing countries. Second, results-based approaches are more difficult to apply to the work of international development agencies than to domestic OECD government agencies. They can be applied, but this will require adaptation and time The third possible reason has to do with incentives at both institutional and individual level: specifically, the greater incentive to spend money and implement activities than to deliver and account for results. Much has been written about the need to get away from a focus on inputs and activities, and to replace it with a focus on results. Actual incentives may still point the other way. The literature suggests that donors and recipients have a common interest in spending money, but a mismatch of objectives, and a weak interest in monitoring and demonstrating results Within donors, a persistent theme is that spending has continued to be driven by an approvals culture that reflects a set of incentives to donor-agency staff to maximise the volume of new spending without taking adequate account of implementation risks. Mention has already been made of the Wapenhans and TAPOMA reports in the early 1990s. In spite of waves of managerial changes since, anecdotal evidence from the World Bank and elsewhere suggests that not much has changed Killick (1997) and Mosley, Harrigan and Toye (1995) quoted in Shepherd, G. (op cit). 56 Delivering Project Aid in Old and New Ways: Institutions Matter. Geoffrey Shepherd. Workshop Paper (May 2002) p.21 46

54 7.18 Several factors contribute to this incentive to spend money and implement activities. For multilateral banks, lending plays an important role in covering the running costs. Lending is what banks do. For other development agencies, the amount spent is the easiest and most immediate measure of its contribution to the global development effort. It is much easier for an agency to say that it has spent more and will spend more, than it is to demonstrate that it has achieved more. Agencies and departments are criticised for under-spending their budgets. Furthermore, the growing complexity of projects and programmes militates against effective monitoring, while bureaucratic politics (ie. the bureaucratic interest in the agencies) may favour [a] model of credible financial commitment and non-credible implementation commitment Staff members face similar incentives. The amount spent and the number of policy-consistent activities started are easy to measure and report. More of both gets you noticed and promoted. Results on the other hand are difficult to measure and attribute, and take years to appear. Most staff will have moved to other posts by the time the result of their work become evident (para.6.13). An emphasis on quality at entry may, perversely, have further reduced staff interest in quality at exit. The fact that far more time and effort is expended on project appraisal documents than on project completion reports is indicative of the incentives that exist Recipient governments have a common interest in spending donor resources, but a much weaker interest in any implementation conditions. More importantly, one of the drivers of RBM in OECD countries a client focus and democratic accountability for the quality of services delivered may be weaker in many developing countries. Clientelistic politics, and a 57 Geoffrey Shepherd (op cit) p Project appraisal documents do, of course, hold out the potential of changing things for the better, whereas project completion reports can only report on what has or has not changed. 47

55 primary commitment to private and political ends rather than to poverty alleviation, will further undermine interest in results The existence of these incentives does not mean that an improved results-focus is not possible. It does, however, mean that it will not just happen. Institutions and staff cannot be made individually accountable for outcomes and impacts in developing countries. They can be made more accountable for reporting more effectively on their processes, strategies, and near-term results, and for evaluating their contribution. The experience of the World Bank Quality Assurance Group (QUAG) shows that it is possible to alter internal incentives. Similar mechanisms could be used to shift incentives towards results-based management The other key to increasing incentives is for management to use results information. There is little point, except for external image purposes, in reporting results but not acting on them. The reticence of some institutions to contemplate results-based budgeting needs to be challenged. In the medium- to long-run, resources need to be directed to individuals, departments, sectors and countries that can make the greatest contribution to outcomes and impacts. Avoiding this may make results-based approaches more acceptable in the short-term, but ultimately it is self-defeating. RBM without resource implications is not RBM. 59 Improving Aid to Africa. Van de Walle, N. and Johnson, T. Overseas Development Council, Washington (1996) quoted in Shepherd, G. (op cit) 48

56 8. Conclusions 8.1 Results-based management is the latest in a very long line of efforts to make development agencies more effective. It is also the latest in a very long line of efforts to improve the measurement, monitoring and reporting of effectiveness. This is not to diminish its potential significance. Thinking about development in terms of outcomes and impacts, rather than inputs, activities and outputs, is a powerful idea that has major implications for how multilateral development institutions operate. 8.2 All five institutions are, to a greater or lesser extent, engaging with resultsbased management. All have made a commitment to increase their resultsfocus, and all have taken steps to, or are working on, improving the planning and reporting of results. As befits their different histories, mandates and cultures, there is enormous variety in their approaches and progress. 8.3 Five conclusions emerge from this study. First, results-based management is easier said than done, particularly for development institutions, and particularly given the new focus on country and global results. The application of RBM to development institutions is an attempt to stretch the approach from one institutional context (government in developed countries) to a very different one. It is also an attempt to stretch the approach from one category of activity where is relatively easy to apply (projects) to one where it is not (country and corporate). Institutions should not underestimate the challenge. 8.4 Second, implementing RBM within multilateral development institutions is only half the task, and probably the easier half at that. MDIs work through and with developing country governments to realise and measure results. It follows that greater support for the introduction of RBM in developing countries, and associated public sector reform, is essential. Attempts to 49

57 implement RBM within MDIs alone, or within developing countries but without a supportive policy and fiscal environment, are unlikely to succeed. 8.5 Third, there are tensions and trade-offs between the two uses of results information: accountability and management. The reality is that external accountability is driving much of the recent push for improved RBM. Multilateral agencies are under pressure to demonstrate results. They are under less pressure to manage for and/or by results. Unless this is corrected, the result will be an over-emphasis on measuring and reporting results, and insufficient emphasis on using results information for internal management. The obvious risk is that so-called results-based approaches will lead more to an increase in the results claimed by institutions, than an increase in the results actually achieved. 8.6 Fourth, RBM in development co-operation has to face up to the challenge of attribution. Outcomes and impacts are too distant in time and causality to be the practical focus of management. For all practical purposes, development agencies have little option but to manage for outcomes in the medium- to long-term, and to manage by outputs, indicators and other measures of performance (eg. partnership, strategy and process) in the short-term. Technical challenges include developing simple, reliable and meaningful leading indicators, and workable approaches to both credible contribution and aggregation. 8.7 Fifth, multilateral development institutions need to work to amend their internal incentive structures in favour of results. This is also easier said than done. It implies working to correct the continued bias in favour of inputs and activities, as well as giving substance to results-based budgeting. Resources and recognition needs to flow to those individuals, units, sectors and countries with the best record of managing for, and delivering, results. 50

58 8.8 Finally, this study has implications for those supporting and monitoring the progress of results-based management within multilateral development institutions. The clear message of this report is that RBM is not something that has either been introduced or not. RBM implies far-reaching changes throughout the institution. All of these five institutions are trying, in different ways and with different degrees of success, to increase their results orientation. The understandable temptation is to claim a greater degree of change, and a greater impact, than may exist in reality. It follows that assessing the quality and extent of management change is not a straightforward task. Increasing support for the introduction of RBM will need to be accompanied by a more sophisticated approach to its monitoring. 51

59 STRATEGIC PLANNING COUNTRY LEVEL ANNEX A UNDP UNIFEM 60 UNICEF WB IDB Document Country Programme Country Note 61 Country Assistance Country Paper Outline Strategy 62 Logical framework 63 MDGs GOALS 64 Indicators Targets OUTCOMES Indicators Targets OUTPUTS Indicators Targets ACTIVITIES 65 INPUTS 60 UNIFEM has regional and sub-regional programmes. 61 Detailed Integrated Monitoring and Evaluation Plans (IMEPs) are prepared for each programme area. 62 CASs are very varied. This table is based on the CAS Program Matrix for Chile (January 2002). 63 Or results chain, logic model, etc.. 64 Overall objectives (UNICEF) 65 Bank strategy and interventions (IDB) 52

60 Document STRATEGIC PLANNING CORPORATE ANNEX B UNDP UNIFEM UNICEF WB IDB Strategic Results Strategy and Business Medium Term Strategic Strategic Framework Framework Plan Plan Paper 2001 Institutional Strategy I999 Logical framework 66 MDGs GOALS Indicators Targets SUB-GOALS 24 Indicators OUTCOMES Indicators Targets OUTPUTS ACTIVITY AREAS INPUTS 66 Or results chain, logic model, etc.. 67 Organizational Priorities (UNICEF); Strategic Objectives (UNIFEM); Main Objectives (IDB) 68 In 2002 the outcomes of the SBP were consolidated into a more focused Outcome Framework contained in the document Tracking Progress. This reduced the number of UNIFEM outcomes to Strategic Areas of Support (UNDP and UNICEF); Core Intervention Areas (UNICEF); Key Pillars (WBG); Priority Areas (IDB) 70 The relatively small number of activity areas for WB and IDB is misleading. The reality is a much larger number of areas of intervention. 53

61 REFERENCES ANNEX C CIDA Results-Based Management and Accountability for Enhanced Aid Effectiveness. A Reference Paper. Policy Branch. July Flint, M., and Jones, S. - Assessing Development Effectiveness. DER Working Paper 1. DFID Evaluation Department IDA Measuring Outputs and Outcomes in IDA Countries. February IDB Development Effectiveness Report. Office of Evaluation and Oversight. February IDB Development Effectiveness at the IDB. Paper for the Board of Executive Directors. January IDB Ecuador Country Paper IDB Brazil Country Paper IDB Chile Country Paper IDB Country Paper Guidelines. February IDB Renewing the Commitment to Development: Report of the Working Group on Institutional Strategy Killick, T. Principals, Agents and the Failings of Conditionality. Journal of International Development, Vol.9, No.4, Mosley, P., Harrigan, J., and Toye, J. Aid and Power: the World Bank and Policy Based Lending. Routledge, New York OECD Glossary of Key Terms in Evaluation and Results-Based Management. DAC OECD Results Based Management in the Development Co-operation Agencies: A review of experience. Annette Binnendijk. DAC Poate, D. Measuring and managing results. Report for UNDP Schacter, M. Results-Based Management and Multilateral Programming at CIDA a discussion paper. Institute of Governance, Ottawa, Canada

62 Shepherd, G. Delivering Project Aid in Old and New Ways: Institutions Matter. Workshop Paper. May Treasury Board of Canada Secretariat Results-Based Management Lexicon UNDP - Annual Report of the Administrator for UNDP Results-Orientated Monitoring and Evaluation: a Handbook for Programme Managers UNDP Results Based Management: Overview and Principles. UNDP Results Based Management Concepts and Methodology. Technical Note UNDP Multi-Year Funding Framework UNDP First Country Co-operation Framework for Mongolia ( ) UNDP Country Programme Outline for India ( ). June UNDP Country Programme Outline for Malaysia ( ). June UNDP Second Country Co-operation Framework for Malawi ( ) UNDP Second Regional Co-operation Framework for Africa ( ). February UNDP Results Orientated Annual Report, UNICEF Report on the Evaluation Function in the Context of the Medium-Term Strategic Plan UNICEF Medium-Term Strategic Plan for the Period UNIFEM Report of the Executive Director. September UNIFEM - How are we doing? Tracking UNIFEM progress in achieving results for management and learning. Briefing Note Van de Walle, N. and Johnston, T. Improving Aid to Africa. Overseas Development Council, Washington

63 World Bank Development Co-operation and the Monterrey Challenge. OED Working Paper. June World Bank - Strategic Framework World Bank Strategy Update Paper for FY03-05: Implementing the World Bank s Strategic Framework. March World Bank Country Assistance Strategy Progress Report for Brazil. May World Bank Country Assistance Strategy for Chile. January World Bank Country Assistance Strategy for Pakistan. June World Bank Country Assistance Strategy for Belarus. February World Bank Annual Report on Operations Evaluation OED World Bank - Better Measuring, Monitoring and Managing for Development Results. Development Committee Paper. September World Bank - Annual Review of Development Effectiveness OED World Bank Assessment of the Strategic Compact

Part 1. MfDR Concepts, Tools and Principles

Part 1. MfDR Concepts, Tools and Principles Part 1. Concepts, Tools and Principles 3 Overview Part 1. MfDR Concepts, Tools and Principles M anaging for Development Results (MfDR) is multidimensional, relating back to concepts about how to make international

More information

PROGRESS REPORT MANAGING FOR DEVELOPMENT RESULTS AT THE ASIAN DEVELOPMENT BANK

PROGRESS REPORT MANAGING FOR DEVELOPMENT RESULTS AT THE ASIAN DEVELOPMENT BANK Annex C PROGRESS REPORT ON MANAGING FOR DEVELOPMENT RESULTS AT THE ASIAN DEVELOPMENT BANK PREPARED FOR THE SECOND INTERNATIONAL ROUNDTABLE ON MANAGING FOR DEVELOPMENT RESULTS FEBRUARY 2004 Annex C CONTENTS

More information

Country Ownership of Policy Reforms and Aid Effectiveness: The Challenge of Enhancing the Policy Space for Developing Countries in Aid Relationships

Country Ownership of Policy Reforms and Aid Effectiveness: The Challenge of Enhancing the Policy Space for Developing Countries in Aid Relationships Country Ownership of Policy Reforms and Aid Effectiveness: The Challenge of Enhancing the Policy Space for Developing Countries in Aid Relationships Statement by Louis Kasekende, Chief Economist, African

More information

Lessons Learned from MDG Monitoring From A Statistical Perspective

Lessons Learned from MDG Monitoring From A Statistical Perspective Lessons Learned from MDG Monitoring From A Statistical Perspective Report of the Task Team on Lessons Learned from MDG Monitoring of the IAEG-MDG United Nations March 2013 The views expressed in this paper

More information

ASSESSMENT OF DEVELOPMENT RESULTS

ASSESSMENT OF DEVELOPMENT RESULTS ASSESSMENT OF DEVELOPMENT RESULTS UNDP Evaluation Office, January 2007 GUIDELINES FOR AN ASSESSMENT OF DEVELOPMENT RESULTS (ADR) CONTENTS A. WHAT IS THE ASSESSMENT OF DEVELOPMENT RESULTS (ADR)? An introduction

More information

OUTLINE OF PRINCIPLES OF IMPACT EVALUATION

OUTLINE OF PRINCIPLES OF IMPACT EVALUATION OUTLINE OF PRINCIPLES OF IMPACT EVALUATION PART I KEY CONCEPTS Definition Impact evaluation is an assessment of how the intervention being evaluated affects outcomes, whether these effects are intended

More information

UNDP Programming Manual December 2000. Chapter 7: MONITORING, REPORTING AND EVALUATION Page 1

UNDP Programming Manual December 2000. Chapter 7: MONITORING, REPORTING AND EVALUATION Page 1 Chapter 7: MONITORING, REPORTING AND EVALUATION Page 1 Contents Page 7.0 MONITORING, REPORTING AND EVALUATION See the New M & E Framework. 7.1 Policy framework 7.1.1 General policy statements 7.1.2 Coverage

More information

Session 6: Budget Support

Session 6: Budget Support Session 6: Budget Support Paper 6.1 - Introductory Paper on Budget Support [1] Introduction Budget support has become an increasingly important instrument of development assistance. It has not only received

More information

RESULTS-BASED MANAGEMENT IN UNDP

RESULTS-BASED MANAGEMENT IN UNDP Chapter 2 RESULTS-BASED MANAGEMENT IN UNDP 2.1 THE EVOLUTION OF RESULTS- BASED MANAGEMENT IN UNDP The history of results-based management in UNDP can be traced to the mid 1990s. Many people in the organization

More information

Framework for Managing Programme Performance Information

Framework for Managing Programme Performance Information Framework for Managing Programme Performance Information Published by the National Treasury Private Bag X115 Pretoria 0001 South Africa Tel: +27 12 315 5948 Fax: +27 12 315 5126 The Framework for Managing

More information

KEY PERFORMANCE INFORMATION CONCEPTS

KEY PERFORMANCE INFORMATION CONCEPTS Chapter 3 KEY PERFORMANCE INFORMATION CONCEPTS Performance information needs to be structured to demonstrate clearly how government uses available resources to deliver on its mandate. 3.1 Inputs, activities,

More information

Commonwealth Secretariat Response. to the DFID Multilateral Aid Review Update

Commonwealth Secretariat Response. to the DFID Multilateral Aid Review Update Commonwealth Secretariat Response to the DFID Multilateral Aid Review Update Summary The Commonwealth Secretariat recognises that the United Kingdom contribution to the Commonwealth Fund for Technical

More information

KPI UN Women Response Key Actions I. UN-Women s organisational effectiveness KPI 1: Providing direction for results

KPI UN Women Response Key Actions I. UN-Women s organisational effectiveness KPI 1: Providing direction for results KPI UN Women Response Key Actions I. UN-Women s organisational effectiveness KPI 1: Providing direction for results KPI 2: Corporate strategy and mandate KPI 3: Corporate focus on results KPI 4: Focus

More information

Guide for the Development of Results-based Management and Accountability Frameworks

Guide for the Development of Results-based Management and Accountability Frameworks Guide for the Development of Results-based Management and Accountability Frameworks August, 2001 Treasury Board Secretariat TABLE OF CONTENTS Section 1. Introduction to the Results-based Management and

More information

GOVERNANCE AND CIVIL SOCIETY

GOVERNANCE AND CIVIL SOCIETY PARTNERS FOR CHANGE GOVERNANCE AND CIVIL SOCIETY SUB-SAHARAN AFRICA PARTNERS FOR CHANGE GOVERNANCE AND CIVIL SOCIETY PARTNERS FOR CHANGE The British Council is committed to building engagement and trust

More information

A FRAMEWORK FOR NATIONAL HEALTH POLICIES, STRATEGIES AND PLANS

A FRAMEWORK FOR NATIONAL HEALTH POLICIES, STRATEGIES AND PLANS A FRAMEWORK FOR NATIONAL HEALTH POLICIES, STRATEGIES AND PLANS June 2010 A FRAMEWORK FOR NATIONAL HEALTH POLICIES, STRATEGIES AND PLANS June 2010 This paper reviews current practice in and the potential

More information

from danida s evaluation department - development cooperation, March 2008 EVALUATION STUDY 2008/3

from danida s evaluation department - development cooperation, March 2008 EVALUATION STUDY 2008/3 from danida s evaluation department - development cooperation, March 2008 Assessing Multilateral Organisation Effectiveness EVALUATION STUDY 2008/3 Assessing Multilateral Organisation Effectiveness March

More information

The Framework for Strategic Plans and Annual Performance Plans is also available on www.treasury.gov.za

The Framework for Strategic Plans and Annual Performance Plans is also available on www.treasury.gov.za Published by the National Treasury Private Bag X115 Pretoria 0001 South Africa Tel: +27 12 315 5948 Fax: +27 12 315 5126 The Framework for Strategic Plans and Annual Performance Plans is also available

More information

Capacity Development for Education for All (CapEFA) Programme

Capacity Development for Education for All (CapEFA) Programme Complementary Additional Programme 2014-2015 / Concept note Capacity Development for Education for All (CapEFA) Programme Empowering Ministries of Education and public agencies of countries furthest from

More information

UNICEF Global Evaluation Report Oversight System (GEROS) Review Template

UNICEF Global Evaluation Report Oversight System (GEROS) Review Template UNICEF Global Evaluation Report Oversight System (GEROS) Review Template Colour Coding CC Dark green Green Amber Red White Questions Outstanding Yes t Applicable Section & Overall Rating Very Confident

More information

Common Understanding - The role of the IMF in the Poorest Countries

Common Understanding - The role of the IMF in the Poorest Countries ECONOMIC AND FINANCIAL COMMITTEE Brussels, 2 September 2002 EFC/ECFIN/352/02 Common Understanding - The role of the IMF in the Poorest Countries The main objective of the IMF is to promote macro-economic

More information

STRATEGIC PLANNING BACKGROUND AND PRACTICE

STRATEGIC PLANNING BACKGROUND AND PRACTICE Module 2 STRATEGIC PLANNING BACKGROUND AND PRACTICE 1 John Glazebrook STRATEGIC PLANNING Introducing SWAp for Environment Belgrade, 24-25 July 2012 Today Look at Why do Strategic Planning? A mixture of

More information

Facilitating Remittances to Help Families and Small Businesses

Facilitating Remittances to Help Families and Small Businesses G8 ACTION PLAN: APPLYING THE POWER OF ENTREPRENEURSHIP TO THE ERADICATION OF POVERTY The UN Commission on the Private Sector and Development has stressed that poverty alleviation requires a strong private

More information

GLOSSARY OF EVALUATION TERMS

GLOSSARY OF EVALUATION TERMS Planning and Performance Management Unit Office of the Director of U.S. Foreign Assistance Final Version: March 25, 2009 INTRODUCTION This Glossary of Evaluation and Related Terms was jointly prepared

More information

A NEW DEAL for engagement in fragile states

A NEW DEAL for engagement in fragile states A NEW DEAL for engagement in fragile states THE FACTS 1.5 billion people live in conflict-affected and fragile states. About 70% of fragile states have seen conflict since 1989. Basic governance transformations

More information

How To Monitor A Project

How To Monitor A Project Module 4: Monitoring and Reporting 4-1 Module 4: Monitoring and Reporting 4-2 Module 4: Monitoring and Reporting TABLE OF CONTENTS 1. MONITORING... 3 1.1. WHY MONITOR?... 3 1.2. OPERATIONAL MONITORING...

More information

Governing Body 310th Session, Geneva, March 2011 TC FOR DECISION

Governing Body 310th Session, Geneva, March 2011 TC FOR DECISION INTERNATIONAL LABOUR OFFICE Governing Body 310th Session, Geneva, March 2011 Committee on Technical Cooperation GB.310/TC/1 TC FOR DECISION FIRST ITEM ON THE AGENDA Operational strategies for capacity

More information

STRATEGIC REVIEW OF HUMAN RESOURCE MANAGEMENT IN UNICEF. Terms of Reference July 20 2005

STRATEGIC REVIEW OF HUMAN RESOURCE MANAGEMENT IN UNICEF. Terms of Reference July 20 2005 1. Background STRATEGIC REVIEW OF HUMAN RESOURCE MANAGEMENT IN UNICEF Terms of Reference July 20 2005 UNICEF has decided to undertake a Strategic Review of its approach to and performance in Human Resource

More information

UNICEF Global Evaluation Report Oversight System (GEROS) Review Template

UNICEF Global Evaluation Report Oversight System (GEROS) Review Template EVALUATION ID 1430-2015/003 UNICEF Global Evaluation Report Oversight System (GEROS) Review Template Colour Coding CC Dark green Green Amber Red White s Outstanding Satisfactory No Not Applicable Section

More information

THE OECD/DAC HANDBOOK ON SSR: SUPPORTING SECURITY AND JUSTICE

THE OECD/DAC HANDBOOK ON SSR: SUPPORTING SECURITY AND JUSTICE THE OECD/DAC HANDBOOK ON SSR: SUPPORTING SECURITY AND JUSTICE Enhancing International Co-operation on Conflict, Peace and Security The OECD/DAC (Development Assistance Committee) Network on Conflict, Peace

More information

Health in the post-2015 Development Framework: How to meet the needs of the most marginalized and excluded

Health in the post-2015 Development Framework: How to meet the needs of the most marginalized and excluded Policy briefing Health in the post-2015 Development Framework: How to meet the needs of the most marginalized and excluded Introduction For the past two years, UN Member States, UN agencies, civil society

More information

Fund for Gender Equality MONITORING AND EVALUATION FRAMEWORK (2010-2013)

Fund for Gender Equality MONITORING AND EVALUATION FRAMEWORK (2010-2013) Fund for Gender Equality MONITORING AND EVALUATION FRAMEWORK (2010-2013) Prepared by Ana de Mendoza July 2010, revised March 2011 1 2 INDEX Page 0. Executive Summary 4 1. Introduction: Fund For Gender

More information

Monitoring and Evaluation Framework and Strategy. GAVI Alliance 2011-2015

Monitoring and Evaluation Framework and Strategy. GAVI Alliance 2011-2015 Monitoring and Evaluation Framework and Strategy GAVI Alliance 2011-2015 NOTE TO READERS The 2011-2015 Monitoring and Evaluation Framework and Strategy will continue to be used through the end of 2016.

More information

Evaluation policy and guidelines for evaluations

Evaluation policy and guidelines for evaluations Evaluation policy and guidelines for evaluations IOB October 2009 Policy and Operations Evaluation Department IOB October 2009 Policy and Operations Evaluation Department IOB October 2009 Policy and O

More information

INDICATIVE GUIDELINES ON EVALUATION METHODS: EVALUATION DURING THE PROGRAMMING PERIOD

INDICATIVE GUIDELINES ON EVALUATION METHODS: EVALUATION DURING THE PROGRAMMING PERIOD EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL POLICY Thematic development, impact, evaluation and innovative actions Evaluation and additionality The New Programming Period 2007-2013 INDICATIVE GUIDELINES

More information

4: Proposals for Best Practice Principles for GHP activities at country level

4: Proposals for Best Practice Principles for GHP activities at country level DOC 2.05-8.1 From: WORKING GROUP ON GLOBAL HEALTH PARTNERSHIPS: REPORT --- BEST PRACTICE PRINCIPLES FOR GLOBAL HEALTH PARTNERSHIP ACTIVITIES AT COUNTRY LEVEL (Oct. 2005) 4: Proposals for Best Practice

More information

WHAT WORKS IN INNOVATION AND EDUCATION IMPROVING TEACHING AND LEARNING FOR ADULTS WITH BASIC SKILL NEEDS THROUGH FORMATIVE ASSESSMENT STUDY OUTLINE

WHAT WORKS IN INNOVATION AND EDUCATION IMPROVING TEACHING AND LEARNING FOR ADULTS WITH BASIC SKILL NEEDS THROUGH FORMATIVE ASSESSMENT STUDY OUTLINE WHAT WORKS IN INNOVATION AND EDUCATION IMPROVING TEACHING AND LEARNING FOR ADULTS WITH BASIC SKILL NEEDS THROUGH FORMATIVE ASSESSMENT STUDY OUTLINE The OECD s Centre for Educational Research and Innovation

More information

1. Title: Support for International Development Research

1. Title: Support for International Development Research Ministry of Foreign Affairs TAS File no.: 104.C.110.b. Internal Grant Committee Meeting 2 April 2014 Agenda Item no.: 2 1. Title: Support for International Development Research 2. Partners: African Economic

More information

Guidance Note on Developing Terms of Reference (ToR) for Evaluations

Guidance Note on Developing Terms of Reference (ToR) for Evaluations Evaluation Guidance Note Series UNIFEM Evaluation Unit October 2009 Guidance Note on Developing Terms of Reference (ToR) for Evaluations Terms of Reference (ToR) What? Why? And How? These guidelines aim

More information

1. Background and Overview 1 1.1 Why the addendum? 1 1.2 How should this addendum be used? 1 1.3 Organization of the addendum 2

1. Background and Overview 1 1.1 Why the addendum? 1 1.2 How should this addendum be used? 1 1.3 Organization of the addendum 2 ADDENDUM june 2011 evaluation Updated guidance on EvalUAtion in the Handbook on Planning, Monitoring and EvalUAting for Development Results(2009) Table of Contents 1. Background and Overview 1 1.1 Why

More information

Strategic Plan 2012 16

Strategic Plan 2012 16 Strategic Plan 2012 16 ii Strategic Plan 2012 16 Contents 1. Introduction 4 2. Strategic Framework 10 3. Results-Based Management 12 4. Programmes 19 5. Management and Support 30 6. Budget 32 7. Project

More information

Revenue Administration: Performance Measurement in Tax Administration

Revenue Administration: Performance Measurement in Tax Administration T e c h n i c a l N o t e s a n d M a n u a l s Revenue Administration: Performance Measurement in Tax Administration William Crandall Fiscal Affairs Department I n t e r n a t i o n a l M o n e t a r

More information

Equal Rights and Treatment for Roma in Moldova and Ukraine. Manual

Equal Rights and Treatment for Roma in Moldova and Ukraine. Manual Equal Rights and Treatment for Roma in Moldova and Ukraine Project Management Methodology Manual WELCOME TO THE COUNCIL OF EUROPE PROJECT MANAGEMENT METHODOLOGY In July 2001, the Council of Europe launched

More information

evaluation outcome-level

evaluation outcome-level outcome-level evaluation a companion guide to the handbook on planning monitoring and evaluating for development results for programme units and evaluators december 2011 Table of Contents Acronyms and

More information

External Audit BV Performance Report: Delivering Change Management and Financial Sustainability

External Audit BV Performance Report: Delivering Change Management and Financial Sustainability CLACKMANNANSHIRE COUNCIL THIS PAPER RELATES TO ITEM 05 ON THE AGENDA Report to: Resources and Audit Committee Date of Meeting: 24 September 2015 Subject: External Audit BV Performance Report: Delivering

More information

Glossary Monitoring and Evaluation Terms

Glossary Monitoring and Evaluation Terms Glossary Monitoring and Evaluation Terms This glossary includes terms typically used in the area of monitoring and evaluation (M&E) and provides the basis for facilitating a common understanding of M&E.

More information

Road map to an integrated budget: cost classification and results-based budgeting. Joint report of UNDP, UNFPA and UNICEF

Road map to an integrated budget: cost classification and results-based budgeting. Joint report of UNDP, UNFPA and UNICEF Distr. Limited 19 July 2010 Original: English For action Executive Board of UNDP/UNFPA United Nations Children s Fund Second regular session 2010 Executive Board 30 August to 3 September 2010, New York

More information

Risk Management Strategy EEA & Norway Grants 2009-2014. Adopted by the Financial Mechanism Committee on 27 February 2013.

Risk Management Strategy EEA & Norway Grants 2009-2014. Adopted by the Financial Mechanism Committee on 27 February 2013. Risk Management Strategy EEA & Norway Grants 2009-2014 Adopted by the Financial Mechanism Committee on 27 February 2013. Contents 1 Purpose of the strategy... 3 2 Risk management as part of managing for

More information

PRINCIPLES FOR EVALUATION OF DEVELOPMENT ASSISTANCE

PRINCIPLES FOR EVALUATION OF DEVELOPMENT ASSISTANCE PRINCIPLES FOR EVALUATION OF DEVELOPMENT ASSISTANCE DEVELOPMENT ASSISTANCE COMMITTEE PARIS, 1991 DAC Principles for Evaluation of Development Assistance Development Assistance Committee Abstract: The following

More information

OPINION ON GENDER DIMENSION IN THE NEXT PROGRAMMING PERIOD OF THE STRUCTURAL FUNDS 2007-2013

OPINION ON GENDER DIMENSION IN THE NEXT PROGRAMMING PERIOD OF THE STRUCTURAL FUNDS 2007-2013 OPINION ON GENDER DIMENSION IN THE NEXT PROGRAMMING PERIOD OF THE STRUCTURAL FUNDS 2007-2013 Advisory Committee on Equal Opportunities Between Women and Men July 2006 1 Opinion 1 on GENDER DIMENSION IN

More information

Water, sanitation and hygiene in health care facilities in Asia and the Pacific

Water, sanitation and hygiene in health care facilities in Asia and the Pacific Water, sanitation and hygiene in health care facilities in Asia and the Pacific A necessary step to achieving universal health coverage and improving health outcomes This note sets out the crucial role

More information

Local and Community Development Programme

Local and Community Development Programme UPDATED TO REFLECT NEW FRAMEWORK MAY2011 Local and Community Development Programme A step by step guide to Strategic Planning for LCDP Step One - Reflection on the principles of the programme and the horizontal

More information

4 Project Implementation and Monitoring

4 Project Implementation and Monitoring 4 Project Implementation and Monitoring Version 3, 29 July 2014 Contents 4. Implementation and Monitoring... 2 4.1 Project Implementation... 3 4.1.1 Setting up project implementation... 3 4.1.2 Development

More information

A Three Year Investigation into the Triple Bottom Line Performance of Small and Micro Social and Environmental Enterprises in Developing Countries

A Three Year Investigation into the Triple Bottom Line Performance of Small and Micro Social and Environmental Enterprises in Developing Countries A Three Year Investigation into the Triple Bottom Line Performance of Small and Micro Social and Environmental Enterprises in Developing Countries Synopsis Prepared for the SEED Initiative by: Heather

More information

Note that the following document is copyright, details of which are provided on the next page.

Note that the following document is copyright, details of which are provided on the next page. Please note that the following document was created by the former Australian Council for Safety and Quality in Health Care. The former Council ceased its activities on 31 December 2005 and the Australian

More information

Evaluation Policy. Evaluation Office. United Nations Environment Programme. September 2009. Evaluation Office. United Nations Environment Programme

Evaluation Policy. Evaluation Office. United Nations Environment Programme. September 2009. Evaluation Office. United Nations Environment Programme United Nations Environment Programme Evaluation Policy Evaluation Office September 2009 Evaluation Office United Nations Environment Programme P.O. Box 30552-00100 Nairobi, Kenya Tel: +(254-20)-7623387

More information

FROM BILLIONS TO TRILLIONS:

FROM BILLIONS TO TRILLIONS: FROM BILLIONS TO TRILLIONS: MDB Contributions to Financing for Development In 2015, the international community is due to agree on a new set of comprehensive and universal sustainable development goals

More information

ADVERTISEMENT. Markets for Change / M4C Communications and Monitoring & Evaluation Officer (SC SB-4)

ADVERTISEMENT. Markets for Change / M4C Communications and Monitoring & Evaluation Officer (SC SB-4) ADVERTISEMENT Vacancy Announcement No. 2016/11 The UN Women Fiji Multi Country Office (MCO) seek to recruit a suitably qualified Solomon Islands national for the following position to be based in Honiara,

More information

Evaluation of the Special Educational Needs and Disability Pathfinder Programme

Evaluation of the Special Educational Needs and Disability Pathfinder Programme Evaluation of the Special Educational Needs and Disability Pathfinder Programme Thematic Report: Transition and the engagement of post-16 providers Research report August 2014 Graham Thom, Maya Agur &

More information

DG ENLARGEMENT SECTOR BUDGET SUPPORT GUIDELINES

DG ENLARGEMENT SECTOR BUDGET SUPPORT GUIDELINES Ref. Ares(2014)571140-04/03/2014 DG ENLARGEMENT SECTOR BUDGET SUPPORT GUIDELINES EXECUTIVE SUMMARY January 2014 TABLE OF CONTENTS Introduction 1. RATIONALE FOR BUDGET SUPPORT 1.1 What is Budget Support?

More information

The Gavi grant management change process

The Gavi grant management change process The Gavi grant management change process Overall change process Frequently asked questions June 2015 1. How was it decided that grant management changes were needed? Over recent years, through a series

More information

ETI PERSPECTIVE 2020: A FIVE YEAR STRATEGY

ETI PERSPECTIVE 2020: A FIVE YEAR STRATEGY ETI PERSPECTIVE 2020: A FIVE YEAR STRATEGY Introduction This document is the final and Board approved version of ETI s strategic directions based on the ETI Board meeting discussion of 12 th March 2015.

More information

UNICEF BRAZIL Vacancy Notice RH/2013/042

UNICEF BRAZIL Vacancy Notice RH/2013/042 UNICEF BRAZIL Vacancy Notice RH/2013/042 The United Nations Children s Fund (UNICEF), the world's leading organisation focusing on children and child rights, is inviting qualified professionals to apply

More information

Logical Framework: Making it Results-Oriented

Logical Framework: Making it Results-Oriented 1 of 11 2001-04-05 09:58 Logical Framework: Making it Results-Oriented Table of Contents 1. Introduction 2. Purpose of Guide 3. The LFA Process 4. The Logical Framework Structure 5. The Vertical Logic

More information

Canadian International Development Agency 200 Promenade du Portage Gatineau, Quebec K1A 0G4 Tel: (819) 997-5006 Toll free: 1-800-230-6349 Fax: (819)

Canadian International Development Agency 200 Promenade du Portage Gatineau, Quebec K1A 0G4 Tel: (819) 997-5006 Toll free: 1-800-230-6349 Fax: (819) Canadian International Development Agency 200 Promenade du Portage Gatineau, Quebec K1A 0G4 Tel: (819) 997-5006 Toll free: 1-800-230-6349 Fax: (819) 953-6088 (For the hearing and speech impaired only (TDD/TTY):

More information

TALENT MANAGEMENT AND SUCCESSION PLANNING

TALENT MANAGEMENT AND SUCCESSION PLANNING White Paper TALENT MANAGEMENT AND SUCCESSION PLANNING The CEO s and Chairman s role in talent management and succession planning is huge it should never be just a function of HR, because this is a top-down

More information

http://impact.zewo.ch/en/impact Stiftung Zewo Schweizerische Zertifizierungsstelle für gemeinnützige, Spenden sammelnde Organisationen

http://impact.zewo.ch/en/impact Stiftung Zewo Schweizerische Zertifizierungsstelle für gemeinnützige, Spenden sammelnde Organisationen These guidelines are designed to help project managers to assess the outcomes of their projects and programmes. They demonstrate how development agencies can implement an appropriate outcome and impact

More information

Guide to the Performance Management Framework

Guide to the Performance Management Framework Guide to the Performance Management Framework November 2012 Contents Contents... Guide to the Performance Management Framework...1 1. Introduction...4 1.1 Purpose of the guidelines...4 1.2 The performance

More information

HAVING REGARD to Article 5 b) of the Convention on the Organisation for Economic Cooperation and Development of 14 December 1960;

HAVING REGARD to Article 5 b) of the Convention on the Organisation for Economic Cooperation and Development of 14 December 1960; THE COUNCIL, HAVING REGARD to Article 5 b) of the Convention on the Organisation for Economic Cooperation and Development of 14 December 1960; HAVING REGARD to the 1976 Recommendation of the Council on

More information

192 EX/6. Executive Board Hundred and ninety-second session

192 EX/6. Executive Board Hundred and ninety-second session Executive Board Hundred and ninety-second session 192 EX/6 PARIS, 31 July 2013 Original: English Item 6 of the provisional agenda PROPOSAL FOR A GLOBAL ACTION PROGRAMME ON EDUCATION FOR SUSTAINABLE DEVELOPMENT

More information

New JICA Guidelines for Project Evaluation First Edition. Japan International Cooperation Agency (JICA) Evaluation Department

New JICA Guidelines for Project Evaluation First Edition. Japan International Cooperation Agency (JICA) Evaluation Department New JICA Guidelines for Project Evaluation First Edition Japan International Cooperation Agency (JICA) Evaluation Department June 2010 Contents 1 OVERVIEW OF AID EVALUATION AND JICA'S PROJECT EVALUATION...

More information

2008-2009 Unified Budget and Workplan. Performance Monitoring and Evaluation Framework

2008-2009 Unified Budget and Workplan. Performance Monitoring and Evaluation Framework 2008-2009 Unified Budget and Workplan Performance Monitoring and Evaluation Framework Secretariat UNAIDS UNHCR UNICEF WORLD BANK WFP UNDP WHO UNFPA UNESCO ILO UNODC 2 2008-2009 UBW Performance Monitoring

More information

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS EUROPEAN COMMISSION Strasbourg, 12.12.2012 COM(2012) 746 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF

More information

Capacity Building and Strengthening Framework

Capacity Building and Strengthening Framework FY 2012 The President s Emergency Plan for AIDS Relief (PEPFAR) Capacity Building and Strengthening Framework Version 2.0-1 - Table of Contents 1 Background... 3 2 Purpose... 4 2.1 How to Use the Capacity

More information

Internal Audit of the Georgia Country Office

Internal Audit of the Georgia Country Office Internal Audit of the Georgia Country Office Office of Internal Audit and Investigations (OIAI) Report 2013/48 Internal Audit of the Georgia Country Office (2013/48) 2 Summary The Office of Internal Audit

More information

The Logical Framework Approach An Introduction 1

The Logical Framework Approach An Introduction 1 The Logical Framework Approach An Introduction 1 1. What is the Logical Framework Approach? 1.1. The background The Logical Framework Approach (LFA) was developed in the late 1960 s to assist the US Agency

More information

REQUIREMENTS. for OMAN S SYSTEM OF QUALITY ASSURANCE IN HIGHER EDUCATION

REQUIREMENTS. for OMAN S SYSTEM OF QUALITY ASSURANCE IN HIGHER EDUCATION APPROVED VERSION Page 1 REQUIREMENTS for OMAN S SYSTEM OF QUALITY ASSURANCE IN HIGHER EDUCATION APPROVED VERSION Page 2 TABLE OF CONTENTS INTRODUCTION Part One: Standards I. Standards for Quality Assurance

More information

Performance Measurement

Performance Measurement Brief 21 August 2011 Public Procurement Performance Measurement C O N T E N T S What is the rationale for measuring performance in public procurement? What are the benefits of effective performance management?

More information

How To Build Trust In The Statistics Service

How To Build Trust In The Statistics Service Whose trust matters most? Paper for the session Meeting expectations from users within resources IAOS Conference Da Nang, Vietnam, 8-10 October 2014. Richard Laux and Richard Alldritt The importance of

More information

PACIFIC ISLANDS FORUM SECRETARIAT FEMM BIENNIAL STOCKTAKE 2012

PACIFIC ISLANDS FORUM SECRETARIAT FEMM BIENNIAL STOCKTAKE 2012 PACIFIC ISLANDS FORUM SECRETARIAT PIFS(12)FEMK.05 FORUM ECONOMIC MINISTERS MEETING Tarawa, Kiribati 2-4 July 2012 SESSION 2 FEMM BIENNIAL STOCKTAKE 2012 The attached paper, prepared by the Forum Secretariat,

More information

The Asset Management Landscape

The Asset Management Landscape The Asset Management Landscape ISBN 978-0-9871799-1-3 Issued November 2011 www.gfmam.org The Asset Management Landscape www.gfmam.org ISBN 978-0-9871799-1-3 Published November 2011 This version replaces

More information

International environmental governance. Bali Strategic Plan for Technology Support and Capacity-building

International environmental governance. Bali Strategic Plan for Technology Support and Capacity-building UNITED NATIONS UNEP/GC.23/6/Add.1 EP Governing Council of the United Nations Environment Programme Distr.: General 23 December 2004 Original: English Twenty-third session of the Governing Council/ Global

More information

Okinawa Charter on Global Information Society

Okinawa Charter on Global Information Society Okinawa Charter on Global Information Society 1. Information and Communications Technology (IT) is one of the most potent forces in shaping the twenty-first century. Its revolutionary impact affects the

More information

Building Disaster Risk Management capacity: key principles

Building Disaster Risk Management capacity: key principles briefing note Building Disaster Risk Management capacity: key principles How can programmes aiming to build disaster risk management (DRM) capacity improve their effectiveness? What works and why? What

More information

Sixth Meeting of Working Group III 29 April 2008 Human Resources Management Strategy and Policy

Sixth Meeting of Working Group III 29 April 2008 Human Resources Management Strategy and Policy Sixth Meeting of Working Group III 29 April 2008 Human Resources Management Strategy and Policy Background 1. In its report to the Conference, the Independent External Evaluation (IEE) team indicated that

More information

7. ASSESSING EXISTING INFORMATION SYSTEMS AND INFORMATION NEEDS: INFORMATION GAP ANALYSIS

7. ASSESSING EXISTING INFORMATION SYSTEMS AND INFORMATION NEEDS: INFORMATION GAP ANALYSIS 7. ASSESSING EXISTING INFORMATION 6. COMMUNITY SYSTEMS AND LEVEL INFORMATION MONITORING NEEDS: OF THE INFORMATION RIGHT TO ADEQUATE GAP ANALYSIS FOOD 7. ASSESSING EXISTING INFORMATION SYSTEMS AND INFORMATION

More information

UNITED NATIONS OFFICE FOR PROJECT SERVICES. ORGANIZATIONAL DIRECTIVE No. 33. UNOPS Strategic Risk Management Planning Framework

UNITED NATIONS OFFICE FOR PROJECT SERVICES. ORGANIZATIONAL DIRECTIVE No. 33. UNOPS Strategic Risk Management Planning Framework UNOPS UNITED NATIONS OFFICE FOR PROJECT SERVICES Headquarters, Copenhagen O.D. No. 33 16 April 2010 ORGANIZATIONAL DIRECTIVE No. 33 UNOPS Strategic Risk Management Planning Framework 1. Introduction 1.1.

More information

EIR Implementation Status Report: World Bank Group Commitments on Revenue and Contract Transparency

EIR Implementation Status Report: World Bank Group Commitments on Revenue and Contract Transparency EIR Implementation Status Report: World Bank Group Commitments on Revenue and Contract Transparency April 2006 I. Introduction In July 2001, the World Bank Group (WBG) commissioned the Extractive Industry

More information

national treasury National Treasury estimates of national expenditure Women, Children and People with Disabilities vote 8

national treasury National Treasury estimates of national expenditure Women, Children and People with Disabilities vote 8 vote 8 Women, Children and People with Disabilities National Treasury estimates of national expenditure national treasury Department: National Treasury REPUBLIC OF SOUTH AFRICA Estimates of National Expenditure

More information

AUDITOR-GENERAL S AUDITING STANDARD 4 (REVISED) THE AUDIT OF SERVICE PERFORMANCE REPORTS. Contents

AUDITOR-GENERAL S AUDITING STANDARD 4 (REVISED) THE AUDIT OF SERVICE PERFORMANCE REPORTS. Contents AUDITOR-GENERAL S AUDITING STANDARD 4 (REVISED) THE AUDIT OF SERVICE PERFORMANCE REPORTS Contents Page Introduction 3-8301 Scope of this Statement 3-8301 Application 3-8303 Objectives 3-8304 Definitions

More information

Trinidad and Tobago Strategic Actions for Children and GOTT-UNICEF Work Plan 2013-2014 1

Trinidad and Tobago Strategic Actions for Children and GOTT-UNICEF Work Plan 2013-2014 1 Trinidad and Tobago Strategic Actions for Children and GOTT-UNICEF Work Plan 2013-2014 1 The Trinidad and Tobago Strategic Actions for Children and the Government of Trinidad and Tobago-UNICEF Work Plan

More information

Financial Services Authority. FSA CP13/7: High-level proposals for an FCA regime for consumer credit. A Response by Credit Action

Financial Services Authority. FSA CP13/7: High-level proposals for an FCA regime for consumer credit. A Response by Credit Action Financial Services Authority FSA CP13/7: High-level proposals for an FCA regime for consumer credit A Response by Credit Action Background Credit Action is a national financial capability charity (registered

More information

GUIDELINES FOR ENGAGING FAITH BASED ORGANISATIONS (FBOS) AS AGENTS OF CHANGE

GUIDELINES FOR ENGAGING FAITH BASED ORGANISATIONS (FBOS) AS AGENTS OF CHANGE GUIDELINES FOR ENGAGING FAITH BASED ORGANISATIONS (FBOS) AS AGENTS OF CHANGE These Guidelines provide a critical framework for engagement with faith based organisations (FBOs). They are not a blue print.

More information

STANDARD OPERATIONAL FORMAT & GUIDANCE for REPORTING PROGRESS on the UNDAF. January 2010

STANDARD OPERATIONAL FORMAT & GUIDANCE for REPORTING PROGRESS on the UNDAF. January 2010 STANDARD OPERATIONAL FORMAT & GUIDANCE for REPORTING PROGRESS on the UNDAF January 2010 STANDARD OPERATIONAL FORMAT & GUIDANCE for REPORTING PROGRESS on the UNDAF January 2010 28 January 2010 UNDG Working

More information

REPORTING ACCOUNTANTS WORK ON FINANCIAL REPORTING PROCEDURES. Financing Change initiative

REPORTING ACCOUNTANTS WORK ON FINANCIAL REPORTING PROCEDURES. Financing Change initiative REPORTING ACCOUNTANTS WORK ON FINANCIAL REPORTING PROCEDURES consultation PAPER Financing Change initiative inspiring CONFIdENCE icaew.com/financingchange ICAEW operates under a Royal Charter, working

More information